Floresta TR 36762 BCPR2018-0011 SFD x4 Revision 1 Delta 6ADDITIONAL SITES
CHRONOLOGY
CONTACTS
NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL
APPLICANT BEAZER HOMES HOLDINGS LLC-
LONNIE ELLISOR
310 COMMERCE STE
150
IRVINE CA 92602 (714)672-7017 LONNIE.ELLISOR@BEAZ
ER.COM
ARCHITECT Bassenian Lagoni 2031 Orchard Drive
Suite 100
Newport Beach CA 92660075
3
(714)672-7017 rrosecrans@bassenianl
agoni.com
CONTRACTOR BEAZER HOMES HOLDINGS LLC 310 COMMERCE STE
150
IRVINE CA 92602 (714)672-7017 LONNIE.ELLISOR@BEAZ
ER.COM
CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES
EMAIL AJ ORTEGA 1/23/2019 1/23/2019
EMAILED APPLICANT (LONNIE.ELLISOR@BEAZER.COM) THAT
STAMPS ARE ABOUT TO EXPIRE, UPLOAD NEW PLANS WITH
EXPIRATION DATE PAST THE 1/31/2019 DATE CURRENTLY
SHOWN FOR ARCHITECT.
CONDITIONS
Description: FLORESTA / SFD X 4 / REVISION 1 Status: ARCHIVED
Type: BUILDING CONSTRUCTION PLAN REVIEW (WEB)Status Date: 12/17/2018
Subtype: REVISION Applied: 12/17/2018
Address: 79860 AVENUE 52 Approved: 2/12/2019
City, State, Zip: LA QUINTA,CA92253 Closed:
Project Manager: AJ ORTEGA Expired:
Details: FLORESTA / BEAZER HOMES / TM 36762 / SFD X 4 / REVISION 1 - DELTA 6 / VALID
UNDER THE 2016 CALIFORNIA BUILDING CODES UNTIL JANUARY 31, 2021 BASED
ON ARCHITECT KENNETH CHESTER NIEMERSKI RENEWAL/EXPIRATION DATE.
Printed: Monday, March 20, 2023 12:32:14 PM 1 of 4
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2018-0011
CONTACTS
NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL
DEVELOPER (714)672-7017
ENGINEER (714)672-7017
OWNER BEAZER HOMES HOLDINGS CORP 1800 E IMPERIAL HWY
S-140
BREA CA 92871 (714)672-7017 LONNIE.ELLISOR@BEAZ
ER.COM
PRIMARY
CONTACT
(714)672-7017
FINANCIAL INFORMATION
DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD
BY
BUILDING REVISION 101-0000-42600 1 $250.00 $250.00 12/17/18 R42415 CTAAEC789 TRUST
ACCOUNT
BEAZER HOMES
HOLDINGS LLC-LONN AOR
Total Paid for BUILDING REVISION: $250.00 $250.00
101-0000-42600 ($250.00)($250.00)2/12/19 OFFSET OFFSET AOR
HOURLY CHARGE - CITY
BUILDING STAFF 101-0000-42600 3 $250.00 $250.00 2/12/19 DEPOSIT DEPOSIT AOR
HOURLY CHARGE - CITY
BUILDING STAFF 101-0000-42600 0 $230.00 $0.00
HOURLY CHARGE - CITY
BUILDING STAFF 101-0000-42600 1 $160.00 $0.00
Total Paid for BUILDING STAFF - PER HOUR: $390.00 $0.00
RECORDS
MANAGEMENT FEE -
MAJOR
101-0000-42416 0 $21.00 $21.00 12/17/18 WEB3195 CTAAEC789 TRUST
ACCT
BEAZER HOMES
HOLDINGS LLC-LONN ECON
Total Paid for RECORDS MANAGEMENT FEE - MAJOR: $21.00 $21.00
TECHNOLOGY
ENHANCEMENT FEE 502-0000-43611 0 $5.00 $5.00 12/17/18 WEB3195 CTAAEC789 TRUST
ACCT
BEAZER HOMES
HOLDINGS LLC-LONN ECON
Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00
Printed: Monday, March 20, 2023 12:32:14 PM 2 of 4
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2018-0011
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 12/17/2018 AJ ORTEGA REVISION 1 - 1ST
SUBMITTAL PLAN SET
BCPR2018-0002 -
REVISION 1 - 1ST
SUBMITTAL PLAN
SET.pdf
1
DOC 12/17/2018 AJ ORTEGA
REVISION 1 - 1ST
SUBMITTAL REVISION
LIST
BCPR2018-0002 -
REVISION 1 - 1ST
SUBMITTAL REVISION
LIST.pdf
1
BOND INFORMATION
INSPECTIONS
INSPECTION TYPE INSPECTOR SCHEDULED
DATE
COMPLETED
DATE
RESULT REMARKS NOTES
REVIEWS
TOTALS:$666.00 $276.00
REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED
DATE STATUS REMARKS NOTES
1ST BLDG (1WK)AJ ORTEGA 12/17/2018 1/2/2019 1/23/2019 APPROVED-
CONDITIONS
ARCHITECT STAMPS ABOUT TO EXPIRE, SEE
CHRONOLOGY.
1ST PERMIT
TECHNICIAN (1DAY)AJ ORTEGA 12/17/2018 12/18/2018 12/17/2018 COMPLETE
REVISION ORIGINALLY SUBMITTED ON BCRP2018-
0002 - DOWNLOADED AND FLATTENED
ATTACHMENTS AND MOVED TO NEW 'REVISION'
SUB-TYPE PLAN REVIEW. SEE CHRONOLOGY FOR
ADDTIONAL INFORMATION.
2ND BLDG (1WK)AJ ORTEGA 2/12/2019 2/17/2019 2/12/2019 APPROVED UPDATED STAMPED PLANS APPROVED AND
ATTACHED.
Printed: Monday, March 20, 2023 12:32:14 PM 3 of 4
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2018-0011
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 12/17/2018 AJ ORTEGA
REVISION 1 - 1ST
SUBMITTAL
STRUCTURAL
CALCULATIONS
BCPR2018-0002 -
REVISION 1 - 1ST
SUBMITTAL
STRUCTURAL
CALCULATIONS.pdf
1
DOC 12/17/2018 AJ ORTEGA
REVISION 1 - 1ST
SUBMITTAL TRUSS
CALCULATIONS
BCPR2018-0002 -
REVISION 1 - 1ST
SUBMITTAL TRUSS
CALCULATIONS.pdf
1
DOC 2/12/2019 AJ ORTEGA REVISION 1 - PLAN SET
(APPROVED)
BCPR2018-0011 -
REVISION 1 - PLAN SET
(APPROVED).pdf
1
DOC 2/12/2019 AJ ORTEGA
REVISION 1 -
STRUCTURAL
CALCULATIONS
(APPROVED)
BCPR2018-0011 -
REVISION 1 -
STRUCTURAL
CALCULATIONS
(APPROVED).pdf
1
DOC 2/12/2019 AJ ORTEGA
REVISION 1 - TRUSS
CALCULATIONS
(APPROVED)
BCPR2018-0011 -
REVISION 1 - TRUSS
CALCULATIONS
(APPROVED).pdf
1
DOC 1/24/2019 EtrakitContractor
REVISION 1 - 2ND
SUBMITTAL PLAN SET
(WITH UPDATED
STAMPS)
BCPR2018-0008 -
REVISION 1 - 2ND
SUBMITTAL PLAN SET
(WITH UPDATED
STAMPS).pdf
1
Printed: Monday, March 20, 2023 12:32:14 PM 4 of 4
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2018-0011