Loading...
Floresta TR 36762 BCPR2018-0011 SFD x4 Revision 1 Delta 6ADDITIONAL SITES CHRONOLOGY CONTACTS NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL APPLICANT BEAZER HOMES HOLDINGS LLC- LONNIE ELLISOR 310 COMMERCE STE 150 IRVINE CA 92602 (714)672-7017 LONNIE.ELLISOR@BEAZ ER.COM ARCHITECT Bassenian Lagoni 2031 Orchard Drive Suite 100 Newport Beach CA 92660075 3 (714)672-7017 rrosecrans@bassenianl agoni.com CONTRACTOR BEAZER HOMES HOLDINGS LLC 310 COMMERCE STE 150 IRVINE CA 92602 (714)672-7017 LONNIE.ELLISOR@BEAZ ER.COM CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES EMAIL AJ ORTEGA 1/23/2019 1/23/2019 EMAILED APPLICANT (LONNIE.ELLISOR@BEAZER.COM) THAT STAMPS ARE ABOUT TO EXPIRE, UPLOAD NEW PLANS WITH EXPIRATION DATE PAST THE 1/31/2019 DATE CURRENTLY SHOWN FOR ARCHITECT. CONDITIONS Description: FLORESTA / SFD X 4 / REVISION 1 Status: ARCHIVED Type: BUILDING CONSTRUCTION PLAN REVIEW (WEB)Status Date: 12/17/2018 Subtype: REVISION Applied: 12/17/2018 Address: 79860 AVENUE 52 Approved: 2/12/2019 City, State, Zip: LA QUINTA,CA92253 Closed: Project Manager: AJ ORTEGA Expired: Details: FLORESTA / BEAZER HOMES / TM 36762 / SFD X 4 / REVISION 1 - DELTA 6 / VALID UNDER THE 2016 CALIFORNIA BUILDING CODES UNTIL JANUARY 31, 2021 BASED ON ARCHITECT KENNETH CHESTER NIEMERSKI RENEWAL/EXPIRATION DATE. Printed: Monday, March 20, 2023 12:32:14 PM 1 of 4 Project Details City of La Quinta PROJECT NUMBER BCPR2018-0011 CONTACTS NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL DEVELOPER (714)672-7017 ENGINEER (714)672-7017 OWNER BEAZER HOMES HOLDINGS CORP 1800 E IMPERIAL HWY S-140 BREA CA 92871 (714)672-7017 LONNIE.ELLISOR@BEAZ ER.COM PRIMARY CONTACT (714)672-7017 FINANCIAL INFORMATION DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD BY BUILDING REVISION 101-0000-42600 1 $250.00 $250.00 12/17/18 R42415 CTAAEC789 TRUST ACCOUNT BEAZER HOMES HOLDINGS LLC-LONN AOR Total Paid for BUILDING REVISION: $250.00 $250.00 101-0000-42600 ($250.00)($250.00)2/12/19 OFFSET OFFSET AOR HOURLY CHARGE - CITY BUILDING STAFF 101-0000-42600 3 $250.00 $250.00 2/12/19 DEPOSIT DEPOSIT AOR HOURLY CHARGE - CITY BUILDING STAFF 101-0000-42600 0 $230.00 $0.00 HOURLY CHARGE - CITY BUILDING STAFF 101-0000-42600 1 $160.00 $0.00 Total Paid for BUILDING STAFF - PER HOUR: $390.00 $0.00 RECORDS MANAGEMENT FEE - MAJOR 101-0000-42416 0 $21.00 $21.00 12/17/18 WEB3195 CTAAEC789 TRUST ACCT BEAZER HOMES HOLDINGS LLC-LONN ECON Total Paid for RECORDS MANAGEMENT FEE - MAJOR: $21.00 $21.00 TECHNOLOGY ENHANCEMENT FEE 502-0000-43611 0 $5.00 $5.00 12/17/18 WEB3195 CTAAEC789 TRUST ACCT BEAZER HOMES HOLDINGS LLC-LONN ECON Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00 Printed: Monday, March 20, 2023 12:32:14 PM 2 of 4 Project Details City of La Quinta PROJECT NUMBER BCPR2018-0011 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 12/17/2018 AJ ORTEGA REVISION 1 - 1ST SUBMITTAL PLAN SET BCPR2018-0002 - REVISION 1 - 1ST SUBMITTAL PLAN SET.pdf 1 DOC 12/17/2018 AJ ORTEGA REVISION 1 - 1ST SUBMITTAL REVISION LIST BCPR2018-0002 - REVISION 1 - 1ST SUBMITTAL REVISION LIST.pdf 1 BOND INFORMATION INSPECTIONS INSPECTION TYPE INSPECTOR SCHEDULED DATE COMPLETED DATE RESULT REMARKS NOTES REVIEWS TOTALS:$666.00 $276.00 REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED DATE STATUS REMARKS NOTES 1ST BLDG (1WK)AJ ORTEGA 12/17/2018 1/2/2019 1/23/2019 APPROVED- CONDITIONS ARCHITECT STAMPS ABOUT TO EXPIRE, SEE CHRONOLOGY. 1ST PERMIT TECHNICIAN (1DAY)AJ ORTEGA 12/17/2018 12/18/2018 12/17/2018 COMPLETE REVISION ORIGINALLY SUBMITTED ON BCRP2018- 0002 - DOWNLOADED AND FLATTENED ATTACHMENTS AND MOVED TO NEW 'REVISION' SUB-TYPE PLAN REVIEW. SEE CHRONOLOGY FOR ADDTIONAL INFORMATION. 2ND BLDG (1WK)AJ ORTEGA 2/12/2019 2/17/2019 2/12/2019 APPROVED UPDATED STAMPED PLANS APPROVED AND ATTACHED. Printed: Monday, March 20, 2023 12:32:14 PM 3 of 4 Project Details City of La Quinta PROJECT NUMBER BCPR2018-0011 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 12/17/2018 AJ ORTEGA REVISION 1 - 1ST SUBMITTAL STRUCTURAL CALCULATIONS BCPR2018-0002 - REVISION 1 - 1ST SUBMITTAL STRUCTURAL CALCULATIONS.pdf 1 DOC 12/17/2018 AJ ORTEGA REVISION 1 - 1ST SUBMITTAL TRUSS CALCULATIONS BCPR2018-0002 - REVISION 1 - 1ST SUBMITTAL TRUSS CALCULATIONS.pdf 1 DOC 2/12/2019 AJ ORTEGA REVISION 1 - PLAN SET (APPROVED) BCPR2018-0011 - REVISION 1 - PLAN SET (APPROVED).pdf 1 DOC 2/12/2019 AJ ORTEGA REVISION 1 - STRUCTURAL CALCULATIONS (APPROVED) BCPR2018-0011 - REVISION 1 - STRUCTURAL CALCULATIONS (APPROVED).pdf 1 DOC 2/12/2019 AJ ORTEGA REVISION 1 - TRUSS CALCULATIONS (APPROVED) BCPR2018-0011 - REVISION 1 - TRUSS CALCULATIONS (APPROVED).pdf 1 DOC 1/24/2019 EtrakitContractor REVISION 1 - 2ND SUBMITTAL PLAN SET (WITH UPDATED STAMPS) BCPR2018-0008 - REVISION 1 - 2ND SUBMITTAL PLAN SET (WITH UPDATED STAMPS).pdf 1 Printed: Monday, March 20, 2023 12:32:14 PM 4 of 4 Project Details City of La Quinta PROJECT NUMBER BCPR2018-0011