Griffin Ranch TR 32879 BCPR2018-0010 Delta 7 Master Bath RevisionADDITIONAL SITES
CHRONOLOGY
CONTACTS
NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL
APPLICANT LENNAR - BRYCE FLEMING 980 MONTICITO DRIVE CORONA (949)389-1756 BRYCE.FLEMING@LEN
NAR.COM
ARCHITECT (949)389-1756
CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES
EMAIL JAKE FUSON 1/8/2019 1/8/2019
NOTIFIED APPLICANT THAT PLAN REVIEW WAS COMPLETE
AND REQUIRED CORRECTIONS. SENT CORRECTIONS VIA
EMAIL (NO FORMAL CORRECTION LIST GENERATED DUE TO
MINOR NATURE OF CORRECTIONS).
EMAIL JAKE FUSON 2/7/2019 2/7/2019
NOTIFIED SHELLY JORDAN AND BRYCE FLEMING THAT PLANS
WERE APPROVED AND REVISION WAS READY TO BE ISSUED
WHEN FEES HAVE BEEN PAID.
CONDITIONS
Description: GRIFFIN RANCH / DELTA 7 MASTER BATH REVISIONS Status: ARCHIVED
Type: BUILDING CONSTRUCTION PLAN REVIEW (WEB)Status Date: 11/20/2018
Subtype: TRACT RESIDENTIAL Applied: 11/20/2018
Address: 81181 MERV GRIFFIN WY Approved: 2/7/2019
City, State, Zip: LA QUINTA,CA92253 Closed:
Project Manager: JAKE FUSON Expired:
Details: GRIFFIN RANCH / DELTA 7 MASTER BATH REVISIONS. 2016 CALIFORNIA BUILDING
CODES.
Printed: Monday, March 20, 2023 12:27:09 PM 1 of 4
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2018-0010
CONTACTS
NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL
CONTRACTOR LENNAR HOMES OF CALIFORNIA INC 25 ENTERPRISE ALISO VIEJO CA 92656 (949)389-1756 bryce.fleming@lennar.
com
DEVELOPER (949)389-1756
ENGINEER (949)389-1756
OWNER Lennar Homes of CA, Inc.980 Montecito Drive,
Suite 302
Corona CA 92879 (949)389-1756 Bryce.Fleming@Lennar
.com
PRIMARY
CONTACT
(949)389-1756
FINANCIAL INFORMATION
DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD
BY
101-0000-42600 ($240.00)($240.00)2/7/19 OFFSET OFFSET JFU
HOURLY CHARGE - CITY
BUILDING STAFF 101-0000-42600 1.5 $240.00 $240.00 2/7/19 DEPOSIT DEPOSIT JFU
Total Paid for BUILDING STAFF - PER HOUR: $0.00 $0.00
BUILDING TRACT
RESIDENTIAL
CONSTRUCTION PLAN
DEPOSIT
101-0000-42600 1 $1,500.00 $1,500.00 11/20/18 WEB3105 CREDIT LENNAR - BRYCE
FLEMING ECON
Total Paid for BUILDING TRACT RESIDENTIAL
CONSTRUCTION PLAN DEPOSIT: $1,500.00 $1,500.00
Credit Card Fee 101-0000-43505 0 $27.47 $27.47 11/20/18 WEB3105 CREDIT LENNAR - BRYCE
FLEMING ECON
Total Paid for Credit Card Fee: $27.47 $27.47
RECORDS
MANAGEMENT FEE -
MAJOR
101-0000-42416 0 $21.00 $21.00 11/20/18 WEB3105 CREDIT LENNAR - BRYCE
FLEMING ECON
Total Paid for RECORDS MANAGEMENT FEE - MAJOR: $21.00 $21.00
Printed: Monday, March 20, 2023 12:27:09 PM 2 of 4
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2018-0010
INSPECTIONS
INSPECTION TYPE INSPECTOR SCHEDULED
DATE
COMPLETED
DATE
RESULT REMARKS NOTES
REVIEWS
DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD
BY
TECHNOLOGY
ENHANCEMENT FEE 502-0000-43611 0 $5.00 $5.00 11/20/18 WEB3105 CREDIT LENNAR - BRYCE
FLEMING ECON
Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00
TOTALS:$1,553.47 $1,553.47
REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED
DATE STATUS REMARKS NOTES
1ST BLDG NS (3WK)JAKE FUSON 11/20/2018 12/12/2018 1/8/2019 REVISIONS REQUIRED
-PROVIDE STRUCTURAL CALCULATIONS FOR THE
STRUCTURAL CHANGES
-PROVIDE ARCHITECTURAL PLANS FOR THE NEW
PLAN 2X
**NO CORRECTION LIST GENERATED DUE TO THE
MINOR NATURE OF CORRECTIONS.
1ST BLDG STR (2WK)KURT CULVER 11/28/2018 12/12/2018 1/25/2019 READY FOR APPROVAL Please submit structural calculations for the
proposed changes.
1ST FIRE (2WK)EDGAR
GONZALEZ 11/20/2018 11/30/2018 11/28/2018 APPROVED-
CONDITIONS
IF ANY REFERENCED CHANGES AFFECT FIRE
SPRINKER SYSTEM COVERAGE, AN AS-BUILT
SUBMITTAL WILL BE REQUIRED.
1ST PERMIT
TECHNICIAN (1DAY)
ARMANDO
MAGALLON 11/20/2018 11/21/2018 11/29/2018 COMPLETE
1ST PLANNING
(2WK)
CARLOS
FLORES 11/20/2018 12/6/2018 12/6/2018 APPROVED-
CONDITIONS
ALL CHANGES WILL HAVE TO MEET ALL SETBACKS.
SPECIFICALLY, CHANGES TO MASTER BATH WILL
HAVE TO MEET REAR YARD SETBACKS
Printed: Monday, March 20, 2023 12:27:09 PM 3 of 4
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2018-0010
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 11/20/2018 EtrakitContractor 1ST SUBMITTAL - PLAN
SET
Combined Delta
revisions.pdf 1
DOC 11/20/2018 EtrakitContractor 1ST SUBMITTAL -
LETTER WITH CHANGES
Combined Revision
letters.pdf 1
DOC 1/23/2019 EtrakitContractor 2ND SUBMITTAL -
STRUCTURAL RESPONSE
Structural Delta 9
Narrative revised 01-21-
19.pdf
1
DOC 1/23/2019 EtrakitContractor 2ND SUBMITTAL -
TRUSS PACKAGE
stamped truss Plan
3B.pdf 1
DOC 2/7/2019 JAKE FUSON APPROVED TRUSS
PLANS
BCPR2018-0010 -
APPROVED TRUSS
PLANS.pdf
1
DOC 2/7/2019 JAKE FUSON APPROVED PLAN BCPR2018-0010 -
APPROVED PLAN.pdf 1
BOND INFORMATION
1ST PUBLIC WORKS
(2WK)AMY YU 11/20/2018 12/6/2018 12/4/2018 APPROVED-
CONDITIONS
DEVELOPER SHOULD VERIFY THE FIRE PLACE
ADDED TO THE MASTER BATHROOM FOR PLAN 3,
6, AND 8 MEETS THE SIDE YARD SETBACK ON
ALREADY APPROVED PRECISE GRADING PLANS
2ND BLDG (1WK)JAKE FUSON 1/23/2019 1/30/2019 2/7/2019 APPROVED
Printed: Monday, March 20, 2023 12:27:09 PM 4 of 4
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2018-0010