Loading...
Griffin Ranch - Pimlico TR 32879 BTCP2017-0002 - 2016 Code UpdateADDITIONAL SITES CHRONOLOGY CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES 1ST PC ROUTED TO OUTSIDE PC STEPHANIE SWANSTROM 1/23/2017 1/24/2017 1ST PC SUBMITTAL RECEIVED STEPHANIE SWANSTROM 1/23/2017 1/24/2017 1ST PC SUBMITTAL RECEIVED JIM JOHNSON 2/8/2017 2/8/2017 1ST PC COMPLETE/READY FOR PICK UP JIM JOHNSON 2/9/2017 2/9/2017 8.5 HR YOUNG AND 5 HR CITY STAFF 1ST PC PICKED UP MARY FASANO 2/28/2017 2/28/2017 2ND PC ROUTED TO OUTSIDE PC MARY FASANO 6/9/2017 6/9/2017 THIS PLAN REVIEW HAS BEEN INCORPORATED INTO BTCP2017-0006 PER AJ WITHDRAWN BY APPLICANT JAKE FUSON 2/27/2018 2/27/2018 PLAN CHECK WITHDRAWN BY APPLICANT LENNAR HOMES. SEE ATTACHED LETTER OF WITHDRAWAL FOR REFERENCE. Description: GRIFFIN RANCH / PIMLICO CODE UPDATE Status: ARCHIVED Type: TRACT RESIDENTIAL CONSTRUCTION PLAN Status Date: 6/9/2017 Subtype: STANDARD Applied: 1/23/2017 Address: 81181 MERV GRIFFIN WY Approved: City, State, Zip: LA QUINTA,CA92253 Closed: Project Manager: Expired: Details: PIMLICO - CODE UPDATE (2) NEW PLAN TYPES AND (2)CODE UPDATES TO 2016 PLAN CHECK WITHDRAWN BY APPLICANT LENNAR HOMES. SEE ATTACHED LETTER OF WITHDRAWAL FOR REFERENCE. Printed: Monday, March 20, 2023 9:08:51 AM 1 of 4 Project Details City of La Quinta PROJECT NUMBER BTCP2017-0002 CONTACTS NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL APPLICANT LENNAR HOMES - SHELLY JORDAN 980 MONTECITO DR STE 300 CORONA CA 92879 (949)349-8269 shelly.jordan@lennar.c om LOCAL CONTACT LENNAR HOMES OF CALIFORNIA INC 25 ENTERPRISE ALISO VIEJO CA 92656 (949)349-8269 lennar@lennar.com OWNER LENNAR HOMES OF CALIFORNIA 980 MONTECITO DR #300 CORONA CA 92879 (949)349-8269 CONDITIONS FINANCIAL INFORMATION DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD BY 101-0000-42600 ($304.00)($304.00)2/3/17 OFFSET OFFSET JJO 101-0000-42600 ($10.00)($10.00)2/8/17 OFFSET OFFSET JJO 101-0000-42600 ($807.50)($807.50)2/8/17 OFFSET OFFSET JJO 101-0000-42600 ($378.50)($378.50)2/9/17 OFFSET OFFSET JJO HOURLY CHARGE - CITY BUILDING STAFF 101-0000-42600 2 $304.00 $304.00 2/3/17 DEPOSIT DEPOSIT JJO HOURLY CHARGE - CITY BUILDING STAFF 101-0000-42600 3 $378.50 $378.50 2/9/17 DEPOSIT DEPOSIT JJO HOURLY CHARGE - CITY BUILDING STAFF 101-0000-42600 0 $77.50 $77.50 4/2/18 WEB2418 CREDIT LENNAR HOMES - SHELLY JORDAN ECON HOURLY CHARGE - YES ADMINISTRATIVE STAFF 101-0000-42600 0.25 $10.00 $10.00 2/8/17 DEPOSIT DEPOSIT JJO HOURLY CHARGE - YES STRUCTURAL PLAN REVIEW ENGINEER 101-0000-42600 8.5 $807.50 $807.50 2/8/17 DEPOSIT DEPOSIT JJO Total Paid for BUILDING STAFF - PER HOUR: $77.50 $77.50 Printed: Monday, March 20, 2023 9:08:51 AM 2 of 4 Project Details City of La Quinta PROJECT NUMBER BTCP2017-0002 BOND INFORMATION INSPECTIONS INSPECTION TYPE INSPECTOR SCHEDULED DATE COMPLETED DATE RESULT REMARKS NOTES REVIEWS DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD BY BUILDING TRACT RESIDENTIAL CONSTRUCTION PLAN DEPOSIT 101-0000-42600 1 $1,500.00 $1,500.00 1/23/17 R21601 000001 CREDIT CARD ANTHONY ANDERSON/LENNAR CORP SKH Total Paid for BUILDING TRACT RESIDENTIAL CONSTRUCTION PLAN DEPOSIT: $1,500.00 $1,500.00 Credit Card Fee 101-0000-43505 0 $1.49 $1.49 4/2/18 WEB2418 CREDIT LENNAR HOMES - SHELLY JORDAN ECON Credit Card Fee 101-0000-43505 0 $27.00 $27.00 1/23/17 R21601 000001 CREDIT CARD ANTHONY ANDERSON/LENNAR CORP SKH Total Paid for Credit Card Fee: $28.49 $28.49 TECHNOLOGY ENHANCEMENT FEE 502-0000-43611 0 $5.00 $5.00 4/2/18 WEB2418 CREDIT LENNAR HOMES - SHELLY JORDAN ECON Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00 TOTALS:$1,610.99 $1,610.99 REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED DATE STATUS REMARKS NOTES 1ST BLDG NS (3WK)JIM JOHNSON 1/23/2017 2/13/2017 2/9/2017 REVISIONS REQUIRED 1ST BLDG STR (2WK)YOUNG ENGINEERING 1/23/2017 2/6/2017 2/7/2017 REVISIONS REQUIRED Printed: Monday, March 20, 2023 9:08:51 AM 3 of 4 Project Details City of La Quinta PROJECT NUMBER BTCP2017-0002 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 2/7/2017 BRONZ YOUNG 1ST CHECK - STRUCTURAL TRANSMITTAL.pdf 1ST CHECK - STRUCTURAL TRANSMITTAL.pdf 0 DOC 2/7/2017 BRONZ YOUNG 1ST CHECK - STRUCTURAL COMMENTS.doc 1ST CHECK - STRUCTURAL COMMENTS.doc 0 DOC 3/29/2017 JIM JOHNSON 81181 MERV GRIFFIN BTCP2017-0001 and 2.docx 81181 MERV GRIFFIN BTCP2017-0001 and 2.docx 0 Printed: Monday, March 20, 2023 9:08:51 AM 4 of 4 Project Details City of La Quinta PROJECT NUMBER BTCP2017-0002 1 Jacob Fuson From:Shelly Jordan <Shelly.Jordan@lennar.com> Sent:Monday, February 26, 2018 6:19 PM To:Jacob Fuson; Samantha Mazella Cc:Kay Hensel Subject:RE: Original 2016 Code Updates - Pimlico & Belmont (BTCP2017-0001 & BTCP2017-0002) Hello Jacob, Lennar does not wish to proceed with the Pimlico and Belmont plan types. You can move forward with disposing of the plans and associated documents. Samantha, will you please pay the below fees? The outstanding fees are as follows: BTCP2017-0001 (Belmont code update) - $220.00 BTCP2017-0002 (Pimlico code update) - $82.50 Shelly Jordan Project Manager Lennar Homes - Inland Empire shelly.jordan@lennar.com www.lennar.com Office: 951-817-3526 Mobile: 951-258-8688 980 Montecito Drive, Ste. 300 Corona, CA 92879 Lennar New Homes For Sale - Building Houses and Communities www.lennar.com Everything’s Included by Lennar, the leading homebuilder of new homes for sale in the nation’s most desirable real estate markets. 2 From: Jacob Fuson [mailto:Jfuson@la-quinta.org] Sent: Monday, February 26, 2018 8:46 AM To: Shelly Jordan <Shelly.Jordan@lennar.com> Cc: Kay Hensel <Khensel@la-quinta.org> Subject: Original 2016 Code Updates - Pimlico & Belmont (BTCP2017-0001 & BTCP2017-0002) ** External email from: Jfuson@la-quinta.org. If suspicious, forward to: NotifySecurity@lennar.com ** Good morning Shelly, I hope you had a good weekend. The reason I’m reaching out to you is that we have some large plan sets here at City Hall that look like the original 2016 code updates for both the Pimlico and Belmont homes at Griffin Ranch. I’m not sure if you were involved on this submittal—it may have been Scott McFerran but I don’t quite remember. Anyways, there were plan checks conducted on these plans (BTCP2017-0001 & BTCP2017-0002), but when it came time to resubmit there was a change in plan types, and all the new plan types (some previous Pimlico, some previous Belmont, and some entirely new plans) were submitted together as a separate plan set titled “Griffin Ranch 2017.” This plan check (BTCP2017-0012) then went on to be approved, and these are what they are using for construction in the field. I wanted to reach out and get confirmation that the original plans (the Pimlico and Belmont code updates) will not be used in the future and that you don’t wish to pursue the plan checks, so we can move forward with disposing of the plans and associated documents. Like I mentioned, they are large plan sets and we can use all the room we can get. However, there are plan check fees due for the original plan reviews conducted on these plan sets. The outstanding fees are as follows: BTCP2017-0001 (Belmont code update) - $220.00 BTCP2017-0002 (Pimlico code update) - $82.50 Please let me know if we can get these fees paid so we can move forward with the disposal of the plans. Any help is greatly appreciated! Thanks Shelly, Jake Fuson | Building Inspector City of La Quinta 78495 Calle Tampico ◦ La Quinta, CA 92253 Ph. 760.777.7081 jfuson@la-quinta.org website: www.La-Quinta.org