Griffin Ranch TR 32879 BTCP2017-0006 SFD x9 2016 Code UpdateProject Details PROJECT NUMBER
owsw lit"of La Qu i nta
BTCP2017-0006
O F Tt�"
Description: GRIFFIN RANCH / 2016 CODE UPDATE SFD X 9 Status: ARCHIVED
Type: TRACT RESIDENTIAL CONSTRUCTION PLAN Status Date:
Subtype: STANDARD Applied: 6/9/2017
Address: 81181 MERV GRIFFIN WY Approved: 8/28/2017
City, State, Zip: LA QUINTA,CA92253 Closed:
Project Manager: JAKE FUSON Expired:
Details: GRIFFIN RANCH / 2016 CODE UPDATE. SFD x 9 - PLANS 1, 1X, 2, 3, 4, 5, 6, 7 & 8.
[VB/RES-3/CLASS A-FR/13D] 2016 CALIFORNIA BUILDING CODES.
PLAN 1 - 2,967 SF
PLAN 1X - 3,271 SF
PLAN 2 - 3,314 SF
PLAN 3 - 3,475 SF
PLAN 4 - 3,818 SF
PLAN 5 - 4, 154 SF
PLAN 6 - 4, 172 SF
PLAN 7 - 4,700 SF
PLAN 8 - 4,820 SF
10
DAYS
REVIEWS
ACTIONS
INSPECTIONS
CONDITIONS
1
CASE OPEN
OPEN
COMPLETED
CHRONOLOGYTYPE
STAFF NAME
ACTION DATE
COMPLETION DATE
NOTES
THE BELMONT AND PIMLICO SERIES BTCP2017-0001 AND
BTCP2017-0002 ARE NO LONGER BEING USED UNDER THOSE
NAMES. LENNAR BROUGHT IN NEW PLANS, GRIFFIN RANCH
1ST PC SUBMITTAL
MARY FASANO
6/9/2017
6/12/2017
2017. 1 SENT THE BELMONT AND PIMLICO PLANS TO YOUNG
RECEIVED
FOR REFERENCE SINCE THEY WERE ALREADY PLAN CHECKED
AND NOW BEING INCORPORATED INTO THE NEW 2017
PLANS.
Printed: Monday, March 20, 2023 9:47:14 AM 1 of 9 CENTRALSQUARE
Project Details PROJECT NUMBER
-ows� City of La Quinta BTCP2017-0006
NO PLANNING REVIEW SCHEDULED AT TIME OF SUBMITTAL.
A REVIEW WAS SCHEDULED FOR PLANNING STAFF ON
6/30/2017. NON-STURCTURAL AND STRUCTURAL BUILDING
REVIEWS ARE COMPLETED AND READY FOR CORRECTIONS.
BECAUSE THE PLANNING DIVISION REVIEW IS NOT
COMPLETE, THE APPLICANT MUST SUBMIT A SET OF PLANS
NOTE
JAKE FUSON
7/3/2017
7/3/2017
FOR THE PLANNING DIVISION TO REVIEW AT THE TIME THE
1ST REVIEW STRUC & N/S PLANS ARE PICKED UP BY
APPLICANT. APPLICANT ELECTS TO MOVE FORWARD AT
THEIR OWN RISK.
ADDITIONALLY, AN APPLICATION FORM MUST BE
COMPLETED AND SUBMITTED WITH THE 2ND SUBMITTAL AS
NO APPLICATION WAS PREVIOUSLY SUBMITTED.
SPOKE WITH SCOTT MCFARREN REGARDING PLAN REVIEW.
NO PLANNING REVIEW SCHEDULED AT TIME OF SUBMITTAL.
A REVIEW WAS SCHEDULED FOR PLANNING STAFF ON
6/30/2017 DUES 7/14/17. NON-STURCTURAL AND
STRUCTURAL BUILDING REVIEWS ARE COMPLETED AND
PHONE CALL
JAKE FUSON
7/3/2017
7/3/2017
READY FOR CORRECTIONS. BECAUSE THE PLANNING
DIVISION REVIEW IS NOT COMPLETE, NOTIFIED SCOTT THAT
HE MUST SUBMIT A SET OF PLANS FOR THE PLANNING
DIVISION TO REVIEW AT THE TIME THE 1ST REVIEW STRUC &
N/S PLANS ARE PICKED UP BY APPLICANT. HE AGREED TO
MOVE FORWARD AT HIS OWN RISK.
1ST PC PICKED UP
STEPHANIE SWANSTROM
7/5/2017
7/5/2017
PICKED UP BY SCOTT MCFERRIN
2ND PC SUBMITTAL
MARY FASANO
7/24/2017
7/24/2017
RECEIVED
NOTIFIED SCOTT MCFERRAN THAT PLAN REVIEW WAS
COMPLETE AND BOTH BUILDING AND PLANNING DIVISIONS
PHONE CALL
JAKE FUSON
8/8/2017
8/8/2017
HAD CORRECTIONS. NOTIFIED HIM THAT PLANS ARE READY
FOR PICKUP AND LEFT MY CONTACT INFO TO FIELD ANY
QUESTIONS.
NOTE
MARY FASANO
8/14/2017
8/14/2017
CONTRACTOR CAME IN AND SLIP SHEETED THE PLANS. SET
UP A ONE WEEK REVIEW FOR N/S AND PLANNING
Printed: Monday, March 20, 2023 9:47:14 AM 2 of 9 CENTRALSQUARE
Project Details PROJECT NUMBER
-ows� City of La Quinta BTCP2017-0006
FIL
NOTIFIED SCOTT MCFERRAN THAT PLANS WERE APPROVABLE
BY THE BUILDING DIVISION BUT PLANNING DIVISION WILL
NOT BE GRATED UNTIL THE APPEAL PROCESS (OF 15 DAYS)
HAS BEEN CONCLUDED. AFTER A DISCUSSION WITH B.
PHONE CALL
JAKE FUSON
8/22/2017
8/22/2017
HANADA, A CONDITIONAL APPROVAL WILL BE GRANTED TO
PULL PERMITS FOR THE MODEL HOMES, WHICH DO NOT
INCLUDE THE PLAN TYPE IN QUESTIONS (PLAN TYPE 3). WHEN
PLANNING DIVISION HAS GRANTED THEIR APPROVAL,
SEQUENCE SHEETS MAY BE SUBMITTED AND PERMITS
OBTAINED UNDER THIS PROJECT.
NOTE
CARLOS FLORES
9/2/2017
9/2/2017
APPEAL PERIOD FOR PLAN 3 MBA IS OVER AND NO APPEAL
RECEIVED.
NOTE
ARMANDO MAGALLON
9/15/2017
9/15/2017
FIRE PERMITS LINKED TO THIS PERMIT FSS2017-0037 TO 0045
APPLICANT BROUGHT INCOMPLETE SUBMITTAL 9/15/2017
(MISSING STRUCTURAL CALCS). APPLICANT SAID THEY COULD
MAIL IN STRUCTURAL CALCS, I TOLD THEM I WOULD HOLD
THE PLAN AND PROCESS ONCE I RECEIVED CALCS. CALCS
NOTE
ARMANDO MAGALLON
9/19/2017
10/13/2017
WERE RECEIVED 9/18/2017 IN THE AFTERNOON I WILL BEGIN
PROCESSING 9/19/2017 AND SEND OUT.
NEW BTCP NUMBER WILL BE CREATED FOR CODE UPDATE
REV 1.
CONDITION
DATE
DATE
DATE
CONTACT
STATUS
REMARKS
NOTES
TYPE
ADDED
REQUIRED
SATISFIED
DO NOT ISSUE PERMITS FOR PLAN TYPE 3
GEN - A
NULL
8/22/2017
PENDING
DWELLINGS UNTIL FINAL PLANNING DIVISION
APPROVAL IS GRANTED.
NAME TYPE
NAME
ADDRESSI CITY
STATE
ZIP
PHONE
FAX
EMAIL
APPLICANT
LENNAR HOMES - SHELLY JORDAN
980 MONTECITO CORONA
CA
92879
(951)817-3526
shelly.jordan@lennar.c
om
Printed: Monday, March 20, 2023 9:47:14 AM 3 of 9 CENTRALSQUARE
Project Details PROJECT NUMBER
-ows� City of La Quinta BTCP2017-0006
NAME TYPE
NAME
ADDRESSI
CITY
STATE
ZIP
PHONE
FAX
EMAIL
ARCHITECT
THE MCKINLEY ASSOCIATES INC.
1818 FIRST AVE STE.
SAN DIEGO
CA
92101
(951)817-3526
200
CONTRACTOR
LENNAR HOMES OF CALIFORNIA INC
25 ENTERPRISE
ALISO VIEJO
CA
92656
(951)817-3526
lennar@lennar.com
DEVELOPER
LENNAR HOMES OF CALIFORNIA INC
OUTSIDE CITY LIMITS
(951)817-3526
ENGINEER
GOUVIS ENGR CONSULT GROUP INC
OUTSIDE CITY LIMITS
(951)817-3526
OWNER
IOTA GRIFFIN
4675 MACARTHUR CT
NEWPORT
CA
0
(951)817-3526
NO 1550
BEACH
PRIMARY
LENNAR HOMES -SHELLY JORDAN
980 MONTECITO
CORONA
CA
92879
(951)817-3526
shelly.jordan@lennar.c
CONTACTI
I
I
I I
I
Iom
PROJECT
LENNAR HOMES - SHELLY JORDAN
980 MONTECITO
CORONA
CA
92879
(951)817-3526
shelly.jordan@lennar.c
MANAGER
om
s•
a,
CLTD
DESCRIPTION
ACCOUNT
CITY
AMOUNT
PAID
PAID DATE
RECEIPT #
CHECK #
METHOD
PAID BY
BY
101-0000-42600
($10.00)
($10.00)
7/18/17
OFFSET
OFFSET
AOR
101-0000-42600
($950.00)
($950.00)
7/18/17
OFFSET
OFFSET
AOR
101-0000-42600
($540.00)
($540.00)
8/17/17
OFFSET
OFFSET
JFU
HOURLY CHARGE - CITY
101-0000-42600
5
$540.00
$540.00
8/17/17
DEPOSIT
DEPOSIT
JFU
BUILDING STAFF
HOURLY CHARGE - CITY
101-0000-42600
0
$220.00
$220.00
8/28/17
MR470
BTCP2017-
CREDIT
LENNAR HOMES OF
MFA
BUILDING STAFF
0006
CARD
CALIFORNIA INC
HOURLY CHARGE - CITY
101-0000-42600
1.5
$228.00
$228.00
8/28/17
MR470
BTCP2017-
CREDIT
LENNAR HOMES OF
MFA
BUILDING STAFF
10006
CARD
CALIFORNIA INC
HOURLY CHARGE - CITY
101-0000-42600
1
$152.00
$152.00
8/28/17
MR470
BTCP2017-
CREDIT
LENNAR HOMES OF
MFA
BUILDING STAFF
I 10006
CARD
CALIFORNIA INC
HOURLY CHARGE - YES
101-0000-42600
0.25
$10.00
$10.00
7/18/17
DEPOSIT
DEPOSIT
AOR
ADMINISTRATIVE STAFF
Printed: Monday, March 20, 2023 9:47:14 AM 4 of 9 CENTRALSQUARE
Project Details PROJECT NUMBER
-ows� City of La Quinta BTCP2017-0006
O F Tt�"
CLTD
DESCRIPTION
ACCOUNT
CITY
AMOUNT
PAID
PAID DATE
RECEIPT #
CHECK #
METHOD
PAID BY
BY
HOURLY CHARGE - YES
101-0000-42600
0.25
$10.00
$10.00
8/28/17
MR470
BTCP2017-
CREDIT
LENNAR HOMES OF
MFA
ADMINISTRATIVE STAFF
0006
CARD
CALIFORNIA INC
HOURLY CHARGE - YES
STRUCTURAL PLAN
101-0000-42600
10
$950.00
$950.00
7/18/17
DEPOSIT
DEPOSIT
AOR
REVIEW ENGINEER
HOURLY CHARGE - YES
STRUCTURAL PLAN
101-0000-42600
2
$190.00
$190.00
8/28/17
MR470
BTCP2017-
CREDIT
LENNAR HOMES OF
MFA
0006
CARD
CALIFORNIA INC
REVIEW ENGINEER
Total Paid for BUILDING STAFF - PER HOUR: $800.00 $800.00
BUILDING TRACT
RESIDENTIAL
101-0000-42600
1
$1,500.00
$1,500.00
6/9/17
R25623
1
CREDIT
LENNAR HOMES OF
TSA
CONSTRUCTION PLAN
CARD
CALIFORNIA INC
DEPOSIT
Total Paid for BUILDING TRACT RESIDENTIAL
$1,500.00 $1,500.00
CONSTRUCTION PLAN DEPOSIT:
Credit Card Fee
101-0000-43505
0
$14.40
$14.40
8/28/17
MR470
BTCP2017-
CREDIT
LENNAR HOMES OF
MFA
0006
CARD
CALIFORNIA INC
Credit Card Fee
101-0000-43505
0
$46.10
$46.10
6/9/17
R25623
1
CREDIT
LENNAR HOMES OF
TSA
CARD
CALIFORNIA INC
Total Paid for Credit Card Fee: $60.50 $60.50
FIRE NEW RESIDENTIAL
101-0000-22811
0
$1,056.00
$1,056.00
6/9/17
R25623
1
CREDIT
LENNAR HOMES OF
TSA
-TRACT
CARD
CALIFORNIA INC
Total Paid for FIRE NEW RESIDENTIAL - TRACT: $1,056.00 $1,056.00
TECHNOLOGY
502-0000-43611
0
$5.00
$5.00
6/9/17
R25623
1
CREDIT
LENNAR HOMES OF
TSA
ENHANCEMENT FEE
CARD
CALIFORNIA INC
Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00
INSPECTION TYPE I INSPECTOR I SCHEDULED I COMPLETED I RESULT
REMARKS
NOTES
Printed: Monday, March 20, 2023 9:47:14 AM 5 of 9 CENTRALSQUARE
Project Details PROJECT NUMBER
-ows� City of La Quinta BTCP2017-0006
DATE I DATE
RETURNED
REVIEW TYPE
REVIEWER
SENT DATE
DUE DATE
STATUS
REMARKS
NOTES
DATE
1ST BLDG NS (3WK)
JAKE FUSON
6/9/2017
6/30/2017
6/30/2017
REVISIONS REQUIRED
SEE 1ST REVIEW - NON-STRUCTURAL
CORRECTION LIST.
1ST BLDG STR (2WK)
YOUNG
6/9/2017
6/23/2017
6/30/2017
REVISIONS REQUIRED
ENGINEERING
1ST FIRE (1WK)
RONALD
6/9/2017
6/16/2017
6/15/2017
NOT REQUIRED
GRIESINGER
1ST FIRE (2WK)
RONALD
6/9/2017
6/23/2017
6/15/2017
NOT REQUIRED
GRIESINGER
1ST PLANNING
CARLOS
6/30/2017
7/14/2017
7/12/2017
REVISIONS REQUIRED
PENDING APPROVAL OF SDP2017-0010
(4WK)
FLORES
2ND BLDG NS (2WK)
JAKE FUSON
7/24/2017
8/7/2017
8/7/2017
REVISIONS REQUIRED
SEE 2ND REVIEW - NON-STRUCTURAL
CORRECTION LIST.
2ND BLDG STR
YOUNG
7/24/2017
8/7/2017
8/7/2017
READY FOR APPROVAL
(2WK)
ENGINEERING
2ND PLANNING
CARLOS
7/24/2017
8/7/2017
8/4/2017
REVISIONS REQUIRED
ELEVATIONS FOR PLAN 3 DO NOT MATCH
(2WK)
FLORES
APPROVED ELEVATIONS VIA SDP2017-0010.
3RD BLDG (1WK)
JAKE FUSON
8/14/2017
8/21/2017
8/21/2017
APPROVED
BUILDING REVIEW APPROVED --PENDING
APPROVAL BY PLANNING DIVISION STAFF.
APPEAL PERIOD FOR MBA2017-0007 MUST END
3RD PLANNING
CARLOS
8/14/2017
8/21/2017
8/21/2017
TABLED
BEFORE PLANNING APPROVAL. APPEAL PERIOD
(1WK)
FLORES
ENDS 9/2/2017. IF NO APPEAL OCCURS,
PLANNING WILL APPROVE.
4TH PLANNING
CARLOS
9/19/2017
9/26/2017
9/19/2017
READY FOR APPROVAL
(1WK)
FLORES
BOND INFORMATION
Printed: Monday, March 20, 2023 9:47:14 AM 6 of 9 CENTRALSQUARE
Project Details PROJECT NUMBER
-ows� City of La Quinta BTCP2017-0006
Attachment Type
CREATED
OWNER
DESCRIPTION
PATHNAME
SUBDIR
ETRAKIT ENABLED
GRIFFIN RANCH FORM
DOC
8/2/2018
AARON HICKSON
CERTIFICATION LOTS
GRIFFIN RANCH FORM
0
CERT.pdf
123-126
1ST CHECK -
1ST CHECK -
DOC
6/30/2017
BRONZ YOUNG
STRUCTURAL
STRUCTURAL
0
TRANSMITTAL.pdf
TRANSMITTAL.pdf
1ST CHECK -
1ST CHECK -
DOC
6/30/2017
BRONZ YOUNG
STRUCTURAL
STRUCTURAL
0
COMMENTS.doc
COMMENTS.doc
2ND CHECK -
2ND CHECK -
DOC
8/7/2017
BRONZ YOUNG
STRUCTURAL
STRUCTURAL
0
TRANSMITTAL.pdf
TRANSMITTAL.pdf
BTCP2017-0006 - 1ST
1ST REVIEW - NOW
DOC
7/3/2017
JAKE FUSON
STRUCTURAL
REVIEW - NON-
1
STRUCTURAL
CORRECTION LIST
CORRECTION LIST.pdf
BTCP2017-0006 - 2ND
2ND REVIEW NOW
DOC
8/8/2017
JAKE FUSON
STRUCTURAL
REVIEW NOW
1
STRUCTURAL
CORRECTION LIST
CORRECTION LIST.pdf
BTCP2017-0006 - RFI -
RFI - ALTERNATE
DOC
12/19/2017
JAKE FUSON
FOUNDATION
ALTERNATE
1
FOUNDATION
HARDWARE - STHD
HARDWARE - STHD.pdf
BTCP2017-0006 - RFI -
DOC
12/19/2017
JAKE FUSON
RFI - ALTERED TRUSSES
ALTERED TRUSSES AT
1
AT PLAN 2
PLAN 2.pdf
BTCP2017-0006 - RFI -
RFI - ALTERNATE
DOC
12/19/2017
JAKE FUSON
FOUNDATION
ALTERNATE
1
FOUNDATION
HARDWARE - STB
HARDWARE - STB.pdf
Printed: Monday, March 20, 2023 9:47:14 AM 7 of 9 CENTRALSQUARE
Project Details PROJECT NUMBER
-ows� City of La Quinta BTCP2017-0006
Attachment Type
CREATED
OWNER
DESCRIPTION
PATHNAME
SUBDIR
ETRAKIT ENABLED
BTCP2017-0006 - RFI -
RFI - CLARIFICATION OF
DOC
12/19/2017
JAKE FUSON
WOOD STRONG WALL
CLARIFICATION OF
1
WOOD STRONG WALL
DETAILING
DETAILING.pdf
GRIFFIN RANCH -
STRUCTURAL
DOC
5/10/2018
JAKE FUSON
OBSERVATION REPORT -
STRUCTURAL
1
OBSERVATION REPORT -
LOT 173
LOT 173.pdf
GRIFFIN RANCH -
STRUCTURAL
DOC
5/10/2018
JAKE FUSON
OBSERVATION REPORT -
STRUCTURAL
1
OBSERVATION REPORT -
LOT 174
LOT 174.pdf
GRIFFIN RANCH -
STRUCTURAL
DOC
5/10/2018
JAKE FUSON
OBSERVATION REPORT -
STRUCTURAL
1
OBSERVATION REPORT -
LOT 184
LOT 184.pdf
GRIFFIN RANCH -
STRUCTURAL
DOC
5/10/2018
JAKE FUSON
OBSERVATION REPORT -
STRUCTURAL
1
LOT 230
OBSERVATION REPORT -
LOT 230.pdf
GRIFFIN RANCH -
STRUCTURAL
DOC
5/10/2018
JAKE FUSON
OBSERVATION REPORT -
STRUCTURAL
1
OBSERVATION REPORT -
LOT 231
LOT 231.pdf
RFI - CALRIFICATION OF
BTCP2017-0006 - RFI -
DOC
7/19/2018
JAKE FUSON
GARAGE SLAB
CALRIFICATION OF
1
REINFORCEMENT (ALL
GARAGE SLAB
PLAN TYPES)
REINFORCEMENT.pdf
STRUCTURAL
STRUCTURAL
DOC
7/25/2018
JAKE FUSON
OBSERVATION - LOTS
OBSERVATION - LOTS
1
121 - 122 and 127-
121 - 122 and 127-128
128.pdf
Printed: Monday, March 20, 2023 9:47:14 AM 8 of 9 CENTRALSQUARE
° n P Project Details PROJECT NUMBER
maws��� City of La Quinta BTCP2017-0006
EL
Attachment Type
CREATED
OWNER
DESCRIPTION
PATHNAME
SUBDIR
ETRAKIT ENABLED
DOC
10/22/2018
JAKE FUSON
STRUCTURAL
OBSERVATION - LOTS
123, 125-126
STRUCTURAL
OBSERVATION - LOTS
123, 125-126.pdf
1
Printed: Monday, March 20, 2023 9:47:14 AM 9 of 9 CENTRALSQUARE
SINCE
1960
A TRUSTED PARTNER IN
INNOVATION, QUALITY & SERVICE
December 18, 2017
Scott Teresi
Lennar
980 Montecito Drive, Suite 302
Corona, CA 92879-
Re: Griffin Ranch
USP vs. Simpson Bolts
GECG job No. 64306-200
Dear Mr. Teresi,
Pursuant to your request regarding the above captioned project, we submit the following:
It is structurally acceptable to use STB bolts (USP Products) vs. Simpson SSTB bolts per below:
STB24 for HTT5.
STB28 for PHD8/ UPHD8.
Note: Please verify the above with the building department prior to construction.
If you have any questions please do not hesitate to contact this office.
Sincerely, �IF 0
GOUVIS ENGINEERING CONSULTING GROUP, INC. �OQ NG N,
�'�• J*N Acc YE
• 64238
Huan Nguyen, P.E. * EXp. 9
Executive Vice President, Partner �s
F OF CAt-`4i
949.752.1612
15 Studebaker
Irvine, CA
92618
www.gouvisgroup.com
Palm Springs, CA Pleasanton, CA Ho Chi Minh City, Vietnam
c
SINCE
1960
A TRUSTED PARTNER IN
INNOVATION, QUALITY & SERVICE
December 19, 2017
Shelly Jordan
Lennar
980 Montecito Drive, Suite 302
Corona, CA 92879-
Re: Griffin Ranch (Series 1)
USP Hardware Clarification
GECG Job No. 64305-N/A
Dear Ms. Jordan,
Pursuant to the request of Scott Teresi at Lennar Homes regarding the above captioned project, we
submit the following:
It is acceptable to substitute Simpson STHD 10 holdown with USP STAD 10 holdown.
It is acceptable to substitute Simpson STHD 14 holdown with USP STAD 14 holdown.
If you have any questions please do not hesitate to contact this office.
Sincerely,
GOUVIS ENGINEERING CONSULTING GROUP, INC.
0
Daniel T Tanuw3jala, M-.
Director of Residential
949.752.1612 O0
15 Studebaker
Irvine, CA
92618
www.gouvisgroup.com Palm Springs, CA Pleasanton, CA Ho Chi Minh City, Vietnam p
SINCE
1960
A TRUSTED PARTNER IN
INNOVATION, QUALITY & SERVICE
July 19, 2018
Shelly Jordan
Lennar
980 Montecito Drive, Suite 302
Corona, CA 92879-
Re: Griffin Ranch (Series 1)
Garage Slab
GECG Job No. 64305-N/A
Dear Ms. Jordan,
Pursuant to the request of Scott Teresi at Lennar Homes regarding the above captioned project, we
submit the following:
At all garage foundation plans, the slab thickness is 4" with #3 bars @ 18" o.c. e/w per detail I /SDI .
Sincerely,
GOUVIS ENGINEERING CONSULTING GROUP, INC.
Andrew Tran
Project Manager
949.752.1612
15 Studebaker
Irvine, CA
92618
www.gouvisgroup.com
Palm Springs, CA Pleasanton, CA Ho Chi Minh City, Vietnam
GOUVIsenggineerin
consulting group, inc.
May 1, 2018
Shelly Jordan
Lennar
980 Montecito Drive, Suite 302
Corona, CA 92879
Re: Griffin Ranch (Series 1)
GECG Job # 64305
Phase 2, Lot 173, Address: 81-595 Thunder Gulch Way, Permit #: BRES 2017-0286
Structural Observation Report/Interior & Exterior Framing
Dear Ms. Jordan,
This letter advises that we have observed the structural requirements that are visible during construction at
the time of our site visit.
Gouvis Engineering believes that the as -built construction at the time of our visit is in general conformance
with our structural plans and relevant correspondence issued by our office relating to the above referenced
dwelling.
We observed the building in its framed condition prior to installation of drywall and stucco. We observed
the visual and accessible structural requirements. (Exclusions are items such as: size of footings, reinforced
steel in the foundations and roof sheathing.)
This report is understood to be an expression of professional opinion by this engineer, which is based on
his best knowledge, information and beliefs. As such, it consists of a report for only structural elements (as
above outlined) and is neither a guarantee nor a warranty, expressed or implied for other trades or
requirements of subject dwelling.
If you have any questions please do not hesitate to contact this office.
Respectfully Submitted:
GOUVIS ENGINEERING CONSULTING GROUP, INC.
Basil A Ammari, P.E. Ronnie Ammari
Vice President, Field Operations Project Manager - Field
949.752.1612
15 Studebaker
Irvine, CA
92618
www.gouvisgroup.com
Palm Springs, CA Pleasanton, CA Ho Chi Minh City, Vietnam
GOUVIsenggineerin
consulting group, inc.
May 1, 2018
Shelly Jordan
Lennar
980 Montecito Drive, Suite 302
Corona, CA 92879
Re: Griffin Ranch (Series 1)
GECG Job # 64305
Phase 2, Lot 174, Address: 81-575 Thunder Gulch Way, Permit #: BRES 2017-0287
Structural Observation Report/Interior & Exterior Framing
Dear Ms. Jordan,
This letter advises that we have observed the structural requirements that are visible during construction at
the time of our site visit.
Gouvis Engineering believes that the as -built construction at the time of our visit is in general conformance
with our structural plans and relevant correspondence issued by our office relating to the above referenced
dwelling.
We observed the building in its framed condition prior to installation of drywall and stucco. We observed
the visual and accessible structural requirements. (Exclusions are items such as: size of footings, reinforced
steel in the foundations and roof sheathing.)
This report is understood to be an expression of professional opinion by this engineer, which is based on
his best knowledge, information and beliefs. As such, it consists of a report for only structural elements (as
above outlined) and is neither a guarantee nor a warranty, expressed or implied for other trades or
requirements of subject dwelling.
If you have any questions please do not hesitate to contact this office.
Respectfully Submitted:
GOUVIS ENGINEERING CONSULTING GROUP, INC.
Basil A Ammari, P.E. Ronnie Ammari
Vice President, Field Operations Project Manager - Field
949.752.1612
15 Studebaker
Irvine, CA
92618
www.gouvisgroup.com
Palm Springs, CA Pleasanton, CA Ho Chi Minh City, Vietnam
GOUVIsenggineerin
consulting group, inc.
May 1, 2018
Shelly Jordan
Lennar
980 Montecito Drive, Suite 302
Corona, CA 92879
Re: Griffin Ranch (Series 1)
GECG Job # 64305
Phase 2, Lot 184, Address: 81-555 Thunder Gulch Way, Permit #: BRES 2017-0285
Structural Observation Report/Interior & Exterior Framing
Dear Ms. Jordan,
This letter advises that we have observed the structural requirements that are visible during construction at
the time of our site visit.
Gouvis Engineering believes that the as -built construction at the time of our visit is in general conformance
with our structural plans and relevant correspondence issued by our office relating to the above referenced
dwelling.
We observed the building in its framed condition prior to installation of drywall and stucco. We observed
the visual and accessible structural requirements. (Exclusions are items such as: size of footings, reinforced
steel in the foundations and roof sheathing.)
This report is understood to be an expression of professional opinion by this engineer, which is based on
his best knowledge, information and beliefs. As such, it consists of a report for only structural elements (as
above outlined) and is neither a guarantee nor a warranty, expressed or implied for other trades or
requirements of subject dwelling.
If you have any questions please do not hesitate to contact this office.
Respectfully Submitted:
GOUVIS ENGINEERING CONSULTING GROUP, INC.
Basil A Ammari, P.E. Ronnie Ammari
Vice President, Field Operations Project Manager - Field
949.752.1612
15 Studebaker
Irvine, CA
92618
www.gouvisgroup.com
Palm Springs, CA Pleasanton, CA Ho Chi Minh City, Vietnam
GOUVIsenggineerin
consulting group, inc.
May 1, 2018
Shelly Jordan
Lennar
980 Montecito Drive, Suite 302
Corona, CA 92879
Re: Griffin Ranch (Series 1)
GECG Job # 64305
Phase 2, Lot 230, Address: 81-280 Thunder Gulch Way, Permit #: BRES 2017-0288
Structural Observation Report/Interior & Exterior Framing
Dear Ms. Jordan,
This letter advises that we have observed the structural requirements that are visible during construction at
the time of our site visit.
Gouvis Engineering believes that the as -built construction at the time of our visit is in general conformance
with our structural plans and relevant correspondence issued by our office relating to the above referenced
dwelling.
We observed the building in its framed condition prior to installation of drywall and stucco. We observed
the visual and accessible structural requirements. (Exclusions are items such as: size of footings, reinforced
steel in the foundations and roof sheathing.)
This report is understood to be an expression of professional opinion by this engineer, which is based on
his best knowledge, information and beliefs. As such, it consists of a report for only structural elements (as
above outlined) and is neither a guarantee nor a warranty, expressed or implied for other trades or
requirements of subject dwelling.
If you have any questions please do not hesitate to contact this office.
Respectfully Submitted:
GOUVIS ENGINEERING CONSULTING GROUP, INC.
Basil A Ammari, P.E. Ronnie Ammari
Vice President, Field Operations Project Manager - Field
949.752.1612
15 Studebaker
Irvine, CA
92618
www.gouvisgroup.com
Palm Springs, CA Pleasanton, CA Ho Chi Minh City, Vietnam
GOUVIsenggineerin
consulting group, inc.
May 1, 2018
Shelly Jordan
Lennar
980 Montecito Drive, Suite 302
Corona, CA 92879
Re: Griffin Ranch (Series 1)
GECG Job # 64305
Phase 2, Lot 23 I, Address: 81-255 Thunder Gulch Way, Permit #: BRES 2017-0289
Structural Observation Report/Interior & Exterior Framing
Dear Ms. Jordan,
This letter advises that we have observed the structural requirements that are visible during construction at
the time of our site visit.
Gouvis Engineering believes that the as -built construction at the time of our visit is in general conformance
with our structural plans and relevant correspondence issued by our office relating to the above referenced
dwelling.
We observed the building in its framed condition prior to installation of drywall and stucco. We observed
the visual and accessible structural requirements. (Exclusions are items such as: size of footings, reinforced
steel in the foundations and roof sheathing.)
This report is understood to be an expression of professional opinion by this engineer, which is based on
his best knowledge, information and beliefs. As such, it consists of a report for only structural elements (as
above outlined) and is neither a guarantee nor a warranty, expressed or implied for other trades or
requirements of subject dwelling.
If you have any questions please do not hesitate to contact this office.
Respectfully Submitted:
GOUVIS ENGINEERING CONSULTING GROUP, INC.
Basil A Ammari, P.E. Ronnie Ammari
Vice President, Field Operations Project Manager - Field
949.752.1612
15 Studebaker
Irvine, CA
92618
www.gouvisgroup.com
Palm Springs, CA Pleasanton, CA Ho Chi Minh City, Vietnam
•,kry Yti*�
July 23, 2018
Ms. Amy Yu
City of La Quinta
78-495 Calle Tampico
La Quinta, CA 92252
RE: Form Certification — Griffin Ranch, Tract Map No. 32879
JN 1721 — Lots 123-126 (Portion of Phase 3)
Dear Amy:
This letter is to verify that the locations and elevations of the building forms for Lots 123,
124, 125 and 126, Tract Map No. 32879, were field checked by MSA Consulting, Inc., and
found to be in substantial conformance with the Precise Grading Plans. The results are as
follows:
Lot
Address
Plan
Field
Difference
123
81-660 Man-O-War Court
473.17
473.18
+0.01'
124
81-640 Man-O-War Court
474.17
474.17
+0.00'
125
81-645 Man-O-War Court
474.17
474.18
+0.01'
126
81-665 Man-O-War Court
472.97
472.97
+0.00'
If you have any questions, please contact our office.
Very truly yours, NA+-�,y�
of
Douglas . Redlin, P.L.S. 7964
Survey nager
r L S No 7964 / y
� [xp 3/311�
\� CF CAI�FV/
34200 BOB HOPE DRIVE ■ RANCHO MIRAGE ■ CALIFORNIA ■ 92270
760-320-9811 ■ 760-323-7893 FAX ■ www.MSACONSULTINGINC.COM
1I.
jouvIs"'o-12
Acrilm
�oup, Inc,
June 4, 2018
Shelly Jordan
Lennar
980 Montecito Drive, Suite 302
Corona, CA 92879
Re: Griffin Ranch (Series 1)
GECG Job # 64305
Lot 121, Address: 81700 Man O War Ct, Permit #: BRES2017-0299
Structural Observation Report/Interior & Exterior Framing
Dear Ms. Jordan,
This letter advises that we have observed the structural requirements that are visible during construction at
the time of our site visit.
Gouvis Engineering believes that the as -built construction at the time of our visit is in general conformance
with our structural plans and relevant correspondence issued by our office relating to the above referenced
dwelling.
We observed the building in its framed condition prior to installation of drywall and stucco. We observed
the visual and accessible structural requirements. (Exclusions are items such as: size of footings, reinforced
steel in the foundations and roof sheathing.)
This report is understood to be an expression of professional opinion by this engineer, which is based on
his best knowledge, information and beliefs. As such, it consists of a report for only structural elements (as
above outlined) and is neither a guarantee nor a warranty, expressed or implied for other trades or
requirements of subject dwelling.
If you have any questions please do not hesitate to contact this office.
Respectfully Submitted:
GOUVIS ENGINEERING CONSULTING GROUP, INC.
Basil A Ammari, P.E. Ronnie Ammari
Vice President, Field Operations Project Manager - Field
949.752.1612
15 Studebaker
Irvine, CA
92618
www.gouvisgroup.com
Palm Springs, CA Pleasanton, CA Ho Chi Minh City, Vietnam
GOUVISF
ing gro- p? 1 ,
June 4, 2018
Shelly Jordan
Lennar
980 Montecito Drive, Suite 302
Corona, CA 92879
Re: Griffin Ranch (Series 1)
GECG Job # 64305
Lot 122, Address: 81680 Man O War Ct, Permit #: BRES2017-0283
Structural Observation Report/interior & Exterior Framing
Dear Ms. Jordan,
This letter advises that we have observed the structural requirements that are visible during construction at
the time of our site visit.
Gouvis Engineering believes that the as -built construction at the time of our visit is in general conformance
with our structural plans and relevant correspondence issued by our office relating to the above referenced
dwelling.
We observed the building in its framed condition prior to installation of drywall and stucco. We observed
the visual and accessible structural requirements. (Exclusions are items such as: size of footings, reinforced
steel in the foundations and roof sheathing.)
This report is understood to be an expression of professional opinion by this engineer, which is based on
his best knowledge, information and beliefs. As such, it consists of a report for only structural elements (as
above outlined) and is neither a guarantee nor a warranty, expressed or implied for other trades or
requirements of subject dwelling.
If you have any questions please do not hesitate to contact this office.
Respectfully Submitted:
GOUVIS ENGINEERING CONSULTING GROUP, INC.
Basil A Ammari, P.E. Ronnie Ammari
Vice President, Field Operations Project Manager - Field
949.752.1612
15 Studebaker
Irvine, CA
92618
www.gouvisgroup.com
Palm Springs, CA Pleasanton, CA Ho Chi Minh City, Vietnam
GOUNIR 'effillim.1
June 4, 2018
Shelly Jordan
Lennar
980 Montecito Drive, Suite 302
Corona, CA 92879
Re: Griffin Ranch (Series 1)
GECG Job # 64305
Lot 127, Address: 81685 Man O War Ct, Permit #: BRES2017-0284
Structural Observation Report/interior & Exterior Framing
Dear Ms. Jordan,
This letter advises that we have observed the structural requirements that are visible during construction at
the time of our site visit.
Gouvis Engineering believes that the as -built construction at the time of our visit is in general conformance
with our structural plans and relevant correspondence issued by our office relating to the above referenced
dwelling.
We observed the building in its framed condition prior to installation of drywall and stucco. We observed
the visual and accessible structural requirements. (Exclusions are items such as: size of footings, reinforced
steel in the foundations and roof sheathing.)
This report is understood to be an expression of professional opinion by this engineer, which is based on
his best knowledge, information and beliefs. As such, it consists of a report for only structural elements (as
above outlined) and is neither a guarantee nor a warranty, expressed or implied for other trades or
requirements of subject dwelling.
If you have any questions please do not hesitate to contact this office.
Respectfully Submitted:
GOUVIS ENGINEERING CONSULTING GROUP, INC.
Basil A Ammari, P.E. Ronnie Ammari
Vice President, Field Operations Project Manager - Field
949.752.1612
15 Studebaker
Irvine, CA
92618
www.gouvisgroup.com
Palm Springs, CA Pleasanton, CA Ho Chi Minh City, Vietnam
GOUVIS 290"6011119
'ORS f$ inc.
June 4, 2018
Shelly Jordan
Lennar
980 Montecito Drive, Suite 302
Corona, CA 92879
Re: Griffin Ranch (Series 1)
GECG Job # 64305
Lot 128, Address: 81705 Man O War Ct, Permit #: BRES2017-0281
Structural Observation Report/lnterior & Exterior Framing
Dear Ms. Jordan,
This letter advises that we have observed the structural requirements that are visible during construction at
the time of our site visit.
Gouvis Engineering believes that the as -built construction at the time of our visit is in general conformance
with our structural plans and relevant correspondence issued by our office relating to the above referenced
dwelling.
We observed the building in its framed condition prior to installation of drywall and stucco. We observed
the visual and accessible structural requirements. (Exclusions are items such as: size of footings, reinforced
steel in the foundations and roof sheathing.)
This report is understood to be an expression of professional opinion by this engineer, which is based on
his best knowledge, information and beliefs. As such, it consists of a report for only structural elements (as
above outlined) and is neither a guarantee nor a warranty, expressed or implied for other trades or
requirements of subject dwelling.
If you have any questions please do not hesitate to contact this office.
Respectfully Submitted:
GOUVIS ENGINEERING CONSULTING GROUP, INC.
Basil A Ammari, P.E. Ronnie Ammari
Vice President, Field Operations Project Manager - Field
949.752.1612
15 Studebaker
Irvine, CA
92618
www.gouvisgroup.com
Palm Springs, CA Pleasanton, CA Ho Chi Minh City, Vietnam
GOUVIsenggineerin
consulting group, inc.
October 11, 2018
Shelly Jordan
Lennar
980 Montecito Drive, Suite 302
Corona, CA 92879
Re: Griffin Ranch (Series 1)
GECG Job # 64305
Phase 3, Lot 123, Address
81-660 Man-O War Court, Permit: BRES 2017-0331
Structural Observation Report/Interior & Exterior Framing
Dear Ms. Jordan,
This letter advises that we have observed the structural requirements that are visible during construction at
the time of our site visit.
Gouvis Engineering believes that the as -built construction at the time of our visit (except items noted on
field notes) is in general conformance with our structural plans and relevant correspondence issued by our
office relating to the above referenced dwelling.
We observed the building in its framed condition prior to installation of drywall and stucco. We observed
the visual and accessible structural requirements. (Exclusions are items such as: size of footings, reinforced
steel in the foundations and roof sheathing.)
This report is understood to be an expression of professional opinion by this engineer, which is based on
his best knowledge, information and beliefs. As such, it consists of a report for only structural elements (as
above outlined) and is neither a guarantee nor a warranty, expressed or implied for other trades or
requirements of subject dwelling.
If you have any questions please do not hesitate to contact this office.
Respectfully Submitted:
GOUVIS ENGINEERING CONSULTING GROUP, INC.
y^^
Basil A Ammari, P.E. Luu Do
Vice President, Field Operations Project Manager - Field
949.752.1612
15 Studebaker
Irvine, CA
92618
www.gouvisgroup.com Palm Springs, CA Pleasanton, CA Ho Chi Minh City, Vietnam
GOUVIsenggineerin
consulting group, inc.
October 11, 2018
Shelly Jordan
Lennar
980 Montecito Drive, Suite 302
Corona, CA 92879
Re: Griffin Ranch (Series 1)
GECG Job # 64305
Phase 3, Lot 125, Address
81-645 Man-O War Court, Permit: BRES 2017-0333
Structural Observation Report/Interior & Exterior Framing
Dear Ms. Jordan,
This letter advises that we have observed the structural requirements that are visible during construction at
the time of our site visit.
Gouvis Engineering believes that the as -built construction at the time of our visit (except items noted on
field notes) is in general conformance with our structural plans and relevant correspondence issued by our
office relating to the above referenced dwelling.
We observed the building in its framed condition prior to installation of drywall and stucco. We observed
the visual and accessible structural requirements. (Exclusions are items such as: size of footings, reinforced
steel in the foundations and roof sheathing.)
This report is understood to be an expression of professional opinion by this engineer, which is based on
his best knowledge, information and beliefs. As such, it consists of a report for only structural elements (as
above outlined) and is neither a guarantee nor a warranty, expressed or implied for other trades or
requirements of subject dwelling.
If you have any questions please do not hesitate to contact this office.
Respectfully Submitted:
GOUVIS ENGINEERING CONSULTING GROUP, INC.
y^^
Basil A Ammari, P.E. Luu Do
Vice President, Field Operations Project Manager - Field
949.752.1612
15 Studebaker
Irvine, CA
92618
www.gouvisgroup.com Palm Springs, CA Pleasanton, CA Ho Chi Minh City, Vietnam
GOUVIsenggineerin
consulting group, inc.
October 11, 2018
Shelly Jordan
Lennar
980 Montecito Drive, Suite 302
Corona, CA 92879
Re: Griffin Ranch (Series 1)
GECG Job # 64305
Phase 3, Lot 126, Address
81-665 Man-O War Court, Permit: BRES 2017-0334
Structural Observation Report/Interior & Exterior Framing
Dear Ms. Jordan,
This letter advises that we have observed the structural requirements that are visible during construction at
the time of our site visit.
Gouvis Engineering believes that the as -built construction at the time of our visit (except items noted on
field notes) is in general conformance with our structural plans and relevant correspondence issued by our
office relating to the above referenced dwelling.
We observed the building in its framed condition prior to installation of drywall and stucco. We observed
the visual and accessible structural requirements. (Exclusions are items such as: size of footings, reinforced
steel in the foundations and roof sheathing.)
This report is understood to be an expression of professional opinion by this engineer, which is based on
his best knowledge, information and beliefs. As such, it consists of a report for only structural elements (as
above outlined) and is neither a guarantee nor a warranty, expressed or implied for other trades or
requirements of subject dwelling.
If you have any questions please do not hesitate to contact this office.
Respectfully Submitted:
GOUVIS ENGINEERING CONSULTING GROUP, INC.
y^^
Basil A Ammari, P.E. Luu Do
Vice President, Field Operations Project Manager - Field
949.752.1612
15 Studebaker
Irvine, CA
92618
www.gouvisgroup.com Palm Springs, CA Pleasanton, CA Ho Chi Minh City, Vietnam