Rancho Santana TR 31202 BCPR2020-0010 Plans 1, 3, 7 & 7X Master Solar 2019 Code Cycle Revision 2ADDITIONAL SITES
CHRONOLOGY
CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES
Description: RANCHO SANTANA / SOLAR MASTER PLANS - 2019
CODE CYCLE
Status: ARCHIVED
Type: BUILDING CONSTRUCTION PLAN REVIEW (WEB)Status Date:
Subtype: TRACT RESIDENTIAL Applied: 8/17/2020
Address: 81769 AVENUE 52 Approved: 9/24/2020
City, State, Zip: LA QUINTA,CA92253 Closed:
Project Manager: JAKE FUSON Expired:
Details: RANCHO SANTANA / SOLAR PHOTOVOLTAIC MASTER PLANS FOR PLANS 2 & 3 FOR
THE 2019 CODE CYCLE. PLAN 2: 5.76kW SOLAR ARRAY - (18) 320W MODULES
(OPTION OF HANWHA Q.PEAK DUO BLK-G5 OR JINKO SOLAR JKM320M-60HBL) +
SOLAREDGE P340 OPTIMIZERS W/ (1) SOLAREDGE SE3800H-US INVERTER [324SF].
PLAN 3: 6.40kW SOLAR ARRAY - (20) 320W MODULES (OPTION OF HANWHA
Q.PEAK DUO BLK-G5 OR JINKO SOLAR JKM320M-60HBL) + SOLAREDGE P340
OPTIMIZERS W/ (1) SOLAREDGE SE7600H-US INVERTER [360SF] 2019 CALIFORNIA
BUILDING CODES.
REVISION 1 - REVISED PANEL MANUFACTURER & MODELS + REVISED RACKING AND
ATTACHMENT SYSTEM.
NEW SYSTEM ATTRIBUTES:
PLAN 2: 5.76kW/5.85kW SOLAR ARRAY - (18) 320W OR 325W MODULES (OPTION
OF JA SOLAR JAM60S17-320/MR OR JAM60S17-325/MR MODULES) + SOLAREDGE
P370 OPTIMIZERS W/ (1) SOLAREDGE SE3800H-US INVERTER [360SF].
PLAN 3: 6.40kW/6.50kW SOLAR ARRAY - (20) 320W OR 325W MODULES (OPTION
OF JA SOLAR JAM60S17-320/MR OR JAM60S17-325/MR MODULES) + SOLAREDGE
P340 OPTIMIZERS W/ (1) SOLAREDGE SE7600H-US INVERTER [400SF]
REVISION 2 - ADD EXTERIOR AC DISCONNECT FOR ALL PLAN TYPES (2, 3, 7 & 7X).
Printed: Monday, March 20, 2023 2:26:32 PM 1 of 6
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2020-0010
CONTACTS
NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL
APPLICANT VIVINT SOLAR DEVELOPER LLC DBA
VIVINT SO
1800 W ASHTON BLVD LEHI UT 84043-
2019
(415)227-2250 riversidepermits@vivin
tsolar.com
CONTRACTOR VIVINT SOLAR DEVELOPER LLC DBA
VIVINT SO
1800 W ASHTON BLVD LEHI UT 84043-
2019
(415)227-2250 riversidepermits@vivin
tsolar.com
EMAIL JAKE FUSON 9/3/2020 9/3/2020
NOTIFIED APPLICANT OF 1ST PLAN REVIEW COMMENTS, AND
LET HER KNOW THAT THE RECORD NUMBER HAD BEEN
CHANGED TO BCPR2020-0010 TO GET THE PROJECT TYPE
CORRECT. LINKED APPLICANT'S CONTRACTOR ACCOUNT TO
THIS PROJECT TO ALLOW FOR RESUBMITTAL, MONITORING
AND OTHER ACTIVITY THROUGH THIS PROJECT.
2ND PC SUBMITTAL
RECEIVED JAKE FUSON 9/9/2020 9/9/2020 2ND SUBMITTAL RECEIVED VIA eTRAKiT ON 9/9/2020.
NOTE ARMANDO MAGALLON 9/24/2020 11/5/2020
PAYMENT WAS VOIDED ON THE DATE THAT THIS PERMIT
WAS APPLIED FOR. THE DEPOSIT FEE WAS GOING TO BE WAY
OVER THE AMOUNT THAT THIS PERMIT WAS GOING COST. I
FORGOT TO UNPAY THE PAYMENT ON TRAKIT AND HAVE
NOW UNPAID IT AND WILL CORRECT CRW SHEET
CRW WAS CORRECTED AND SENT TO FIANCE
EMAIL JAKE FUSON 9/24/2020 9/24/2020
NOTIFIED APPLICANT THAT PLANS ARE APPROVED AND FEES
ARE READY FOR PAYMENT. NOTIFIED THEM OF THE PROCESS
TO SUBMIT SEQUENCE SHEETS FOR INDIVIDUAL PERMITS AT
EACH ADDRESS.
EMAIL JAKE FUSON 12/9/2021 12/9/2021 NOTIFIED APPLICANT THAT REVISION 1 PLANS ARE
APPROVED AND READY FOR PAYMENT.
PHONE CALL JAKE FUSON 8/31/2022 8/31/2022
RECEIVED PHONE CALL FROM APPLICANT'S REPRESENTATIVE
(LAUREN AT 6260602-4814) REQUESTING THE REVIEW
STATUS OF REVISION 2, LET HER KNOW THAT REVISION 2 IS
APPROVED AND READY FOR FEE PAYMENT.
CONDITIONS
Printed: Monday, March 20, 2023 2:26:32 PM 2 of 6
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2020-0010
CONTACTS
NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL
OWNER MONROE 52 BUILDERS, LLC 940 EMMET AVE #200 BELMONT CA 94002 (415)227-2250 MARK@VILLAGEPROP.
COM
INSPECTIONS
INSPECTION TYPE INSPECTOR SCHEDULED
DATE
COMPLETED
DATE
RESULT REMARKS NOTES
REVIEWS
FINANCIAL INFORMATION
DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD
BY
HOURLY CHARGE - CITY
BUILDING STAFF 101-0000-42600 2 $322.00 $322.00 9/24/20 WEB6339 024937 CREDIT
VIVINT SOLAR
DEVELOPER LLC DBA
VIVINT SO
ECON
HOURLY CHARGE - CITY
BUILDING STAFF 101-0000-42600 1 $161.00 $161.00 7/27/22 WEB12601 674817019 CREDIT 973756 ECON
HOURLY CHARGE - CITY
BUILDING STAFF 101-0000-42600 0.5 $80.50 $80.50 8/31/22 WEB12941 716758792 CREDIT 973756 ECON
Total Paid for BUILDING STAFF - PER HOUR: $563.50 $563.50
RECORDS
MANAGEMENT FEE -
MAJOR
101-0000-42416 0 $21.00 $21.00 9/24/20 WEB6339 024937 CREDIT
VIVINT SOLAR
DEVELOPER LLC DBA
VIVINT SO
ECON
Total Paid for RECORDS MANAGEMENT FEE - MAJOR: $21.00 $21.00
TECHNOLOGY
ENHANCEMENT FEE 502-0000-43611 0 $5.00 $5.00 9/24/20 WEB6339 024937 CREDIT
VIVINT SOLAR
DEVELOPER LLC DBA
VIVINT SO
ECON
Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00
TOTALS:$589.50 $589.50
Printed: Monday, March 20, 2023 2:26:32 PM 3 of 6
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2020-0010
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 9/9/2020 EtrakitContractor 2ND SUBMITTAL PLAN
SET - PLAN 2
Rancho Santana Plan 2
Master Permit 9.8.20 EE
Stamp.pdf
1
DOC 9/9/2020 EtrakitContractor 2ND SUBMITTAL PLAN
SET - PLAN 3
Rancho Santana Plan 3
Master Permit 9.8.20 EE
Stamp.pdf
1
DOC 9/9/2020 EtrakitContractor
2ND SUBMITTAL
CORRECTION
RESPONSES
Rancho Santana
Response Letter 1st
Review 9.8.20.pdf
1
BOND INFORMATION
REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED
DATE STATUS REMARKS NOTES
1ST BLDG (1WK)JAKE FUSON 8/17/2020 8/24/2020 9/3/2020 REVISIONS REQUIRED SEE 1ST REVIEW CORRECTION LIST.
1ST BLDG (1WK)JAKE FUSON 11/9/2021 11/16/2021 12/9/2021 APPROVED REVISION 1
REVISION 1 - REVISED PANEL MANUFACTURER &
MODELS + REVISED RACKING AND ATTACHMENT
SYSTEM.
NEW SYSTEM ATTRIBUTES:
PLAN 2: 5.76kW/5.85kW SOLAR ARRAY - (18)
320W OR 325W MODULES (OPTION OF JA SOLAR
JAM60S17-320/MR OR JAM60S17-325/MR
MODULES) + SOLAREDGE P370 OPTIMIZERS W/
(1) SOLAREDGE SE3800H-US INVERTER [360SF].
PLAN 3: 6.40kW/6.50kW SOLAR ARRAY - (20)
320W OR 325W MODULES (OPTION OF JA SOLAR
JAM60S17-320/MR OR JAM60S17-325/MR
MODULES) + SOLAREDGE P340 OPTIMIZERS W/
(1) SOLAREDGE SE7600H-US INVERTER [400SF]
1ST BLDG (1WK)JAKE FUSON 7/21/2022 7/22/2022 8/31/2022 APPROVED REVISION 2 REVISION 2 - ADD EXTERIOR AC DISCONNECT FOR
ALL PLAN TYPES (2, 3, 7 & 7X).
2ND BLDG (1WK)JAKE FUSON 9/9/2020 9/16/2020 9/24/2020 APPROVED
Printed: Monday, March 20, 2023 2:26:32 PM 4 of 6
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2020-0010
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 11/9/2021 Etrakit Contractor REVISION 1 NARRATIVE
Rancho Santana
Advisory of Changes
Notice
(11.9.21).docx.pdf
1
DOC 11/9/2021 Etrakit Contractor
REVISION 1 - 1ST
SUBMITTAL PLAN (PLAN
2)
Rancho Santana_Plan
2_Master Solar Plan
(11.8.21).pdf
1
DOC 11/9/2021 Etrakit Contractor
REVISION 1 - 1ST
SUBMITTAL PLAN (PLAN
3)
Rancho Santana_Plan
3_Master Solar Plan
(11.8.21).pdf
1
DOC 7/21/2022 Etrakit Contractor
REVISION 2 - 1ST
SUBMITTAL PLANS AND
NARRATIVE
Rancho Santana Master
Revisions and letter-
BCPR2020-0010.pdf
1
DOC 9/3/2020 JAKE FUSON 1ST REVIEW
CORRECTION LIST
BCPR2020-0010 - 1ST
REVIEW CORRECTION
LIST.pdf
1
DOC 9/3/2020 JAKE FUSON 1ST SUBMITTAL PLAN
SET - PLAN 2
BCPR2020-0010 - 1ST
SUBMITTAL PLAN SET -
PLAN 2.pdf
1
DOC 9/3/2020 JAKE FUSON 1ST SUBMITTAL PLAN
SET - PLAN 3
BCPR2020-0010 - 1ST
SUBMITTAL PLAN SET -
PLAN 3.pdf
1
DOC 10/27/2020 JAKE FUSON TAKEOFF SHEETS BCPR2020-0010 -
TAKEOFF SHEETS.pdf 0
DOC 7/21/2021 JAKE FUSON PLAN 2 - APPROVED
SOLAR MASTER PLAN
BCRP2020-0010 - PLAN
2 - APPROVED SOLAR
MASTER PLAN.pdf
1
DOC 7/21/2021 JAKE FUSON PLAN 3 - APPROVED
MASTER SOLAR PLAN
BCRP2020-0010 - PLAN
3 - APPROVED MASTER
SOLAR PLAN.pdf
1
Printed: Monday, March 20, 2023 2:26:32 PM 5 of 6
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2020-0010
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 12/9/2021 JAKE FUSON
REVISION 1 - PLAN 2
MASTER SOLAR PLAN
(APPROVED)
BCPR2020-0010 -
REVISION 1 - PLAN 2
MASTER SOLAR PLAN
(APPROVED).pdf
1
DOC 12/9/2021 JAKE FUSON
REVISION 1 - PLAN 3
MASTER SOLAR PLAN
(APPROVED)
BCPR2020-0010 -
REVISION 1 - PLAN 3
MASTER SOLAR PLAN
(APPROVED).pdf
1
DOC 8/31/2022 JAKE FUSON
REVISION 2 - MASTER
SOLAR PLANS
(APPROVED)
BCPR2020-0010 -
REVISION 2 - MASTER
SOLAR PLANS
(APPROVED).pdf
1
Printed: Monday, March 20, 2023 2:26:32 PM 6 of 6
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2020-0010