Loading...
Rancho Santana TR 31202 BCPR2020-0013 Plan 7 & 7x with CasitaADDITIONAL SITES CHRONOLOGY CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES NOTE DUANE CLAYTON EMAIL DUANE CLAYTON 11/25/2020 12/25/2020 - INFORMED APPLICANT THAT REVIEW IS COMPLETE AND REQUIRES REVISIONS ON THE STRUCTURAL SIDE. 2ND PC SUBMITTAL RECEIVED JAKE FUSON 12/28/2020 12/28/2020 2ND SUBMITTAL STRUCTURAL CORRECTION RESPONSES RECEIVED 12/28/2020. PER APPLICANT, NO REVISED PLANS OR CALCS ARE REQUIRED IN ORDER TO RESOLVE 1ST REVIEW CORRECTION. REVIEWS CREATED. EMAIL DUANE CLAYTON 1/14/2021 1/14/2021 - INFORMED APPLICANT THAT STRUCTURAL REVISIONS ARE REQUIRED. CONDITIONS Description: RANCHO SANTANA / PLAN 7 & 7X AND CASITA Status: ARCHIVED Type: BUILDING CONSTRUCTION PLAN REVIEW (WEB)Status Date: Subtype: TRACT RESIDENTIAL Applied: 11/1/2020 Address: 81769 AVENUE 52 Approved: City, State, Zip: LA QUINTA,CA92253 Closed: Project Manager: Expired: Details: 3,805SF DWELLING - PLAN 7 and 7X (ADDITIONAL 568 SF WITH CASITA OPTION) [VB/RES-3/CLASS A-FR/13D]. THIS PERMIT DOES NOT INCLUDE POOL, SPA, BLOCK WALLS OR DRIVEWAY APPROACH. 2019 CALIFORNIA BUILDING CODES. Printed: Monday, March 20, 2023 2:30:08 PM 1 of 6 Project Details City of La Quinta PROJECT NUMBER BCPR2020-0013 CONTACTS NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL APPLICANT DESERT ESTATES DEVELOPMENT INC 78401 HWY 111 STE X LAQUINTA CA 92283 (760)777-9921 john@desertestatesbui lders.com CONTRACTOR DESERT ESTATES DEVELOPMENT INC 78401 HWY 111 STE X LAQUINTA CA 92283 (760)777-9921 john@desertestatesbui lders.com OWNER MONROE 52 BUILDERS, LLC 78401 HWY 111 STE X LA QUINTA CA 92253 (760)777-9921 JOHN@DESERTESTATE SBUILDERS.COM INSPECTIONS FINANCIAL INFORMATION DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD BY HOURLY CHARGE - CITY BUILDING STAFF 101-0000-42600 2 $322.00 $322.00 1/28/21 R63895 WEB7268 CREDIT JOHN PESALINO AHI HOURLY CHARGE - ESGIL CIVIL ENGINEER 101-0000-42600 3 $315.00 $315.00 1/28/21 R63895 WEB7268 CREDIT JOHN PESALINO AHI Total Paid for BUILDING STAFF - PER HOUR: $637.00 $637.00 RECORDS MANAGEMENT FEE - MAJOR 101-0000-42416 0 $21.00 $21.00 1/28/21 R63895 WEB7268 CREDIT JOHN PESALINO AHI Total Paid for RECORDS MANAGEMENT FEE - MAJOR: $21.00 $21.00 TECHNOLOGY ENHANCEMENT FEE 502-0000-43611 0 $5.00 $5.00 1/28/21 R63895 WEB7268 CREDIT JOHN PESALINO AHI Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00 NEW CONSTRUTION - SINGLE FAMILY RESIDENTIAL 101-0000-42400 0 $161.00 $161.00 1/28/21 R63895 WEB7268 CREDIT JOHN PESALINO AHI Total Paid for ZONING CLEARANCE - PLANNING PLAN CHECK: $161.00 $161.00 TOTALS:$824.00 $824.00 Printed: Monday, March 20, 2023 2:30:08 PM 2 of 6 Project Details City of La Quinta PROJECT NUMBER BCPR2020-0013 INSPECTION TYPE INSPECTOR SCHEDULED DATE COMPLETED DATE RESULT REMARKS NOTES REVIEWS REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED DATE STATUS REMARKS NOTES 1ST BLDG NS (3WK)DUANE CLAYTON 11/1/2020 11/23/2020 11/23/2020 APPROVED - PENDING 2ND SUBMITTAL RESPONSES TO STRUCTURAL COMMENTS. 1ST BLDG STR (2WK)KURT CULVER 11/1/2020 11/16/2020 11/16/2020 REVISIONS REQUIRED STRUCTURAL ONLY REVIEW, SEE PLAN SUBMITTAL BCPR2020-0006 FOR PLAN TYPES 2 & 3 FROM SAME DEVELOPER. SEE ATTACHED 1ST REVIEW ESGIL CORRECTIONS. 1ST FIRE (2WK)KOHL HETRICK 11/1/2020 11/16/2020 11/17/2020 READY FOR APPROVAL 1ST PERMIT TECHNICIAN (1DAY)AJ ORTEGA 11/1/2020 11/2/2020 11/2/2020 PENDING DOCUMENTS REVIEWS CREATED BUT TRUSS CALCULATION ATTACHMENT IS NOT ACTUALLY THE TRUSS PACKAGE, EMAIL SENT TO APPLICANT. 1ST PLANNING (2WK) CARLOS FLORES 11/1/2020 11/16/2020 11/16/2020 READY FOR APPROVAL 1ST PUBLIC WORKS (2WK)AMY YU 11/1/2020 11/16/2020 11/17/2020 APPROVED- CONDITIONS PRECISE GRADING PLAN WILL NEED TO BE REVISED BEFORE ISSUANCE OF BUILDING PERMITS FOR PLAN TYPE 7 2ND BLDG (1WK)DUANE CLAYTON 12/28/2020 1/6/2021 1/14/2021 APPROVED DUE DATE UPDATED TO ACCOUNT FOR HOLIDAYS. - STRUCTURAL REVISIONS REQUIRED. SEE ATTACHMENTS. 2ND BLDG STR (2WK)KURT CULVER 12/28/2020 1/6/2021 1/14/2021 REVISIONS REQUIRED PLEASE NOTE THAT NO REVISED PLANS OR CALCULATIONS WERE PROVIDED WITH THE 2ND SUBMITTAL, ONLY PLAN CHECK RESPONSES WERE REQUIRED PER THE APPLICANT. SEE "2ND SUBMITTAL - STRUCTURAL CORRECTION RESPONSES" DOCUMENT IN ATTACHMENTS. DUE DATE UPDATED TO ACCOUNT FOR HOLIDAYS. Printed: Monday, March 20, 2023 2:30:08 PM 3 of 6 Project Details City of La Quinta PROJECT NUMBER BCPR2020-0013 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 2/1/2021 ARMANDO MAGALLON BCPR2020-0013 - PLAN SET (APPROVED) BCPR2020-0013 - PLAN SET (APPROVED).pdf 1 DOC 11/2/2020 AJ ORTEGA 1ST SUBMITTAL PLAN SET BCPR2020-0013 - 1ST SUBMITTAL PLAN SET.pdf 1 DOC 11/2/2020 AJ ORTEGA 1ST SUBMITTAL TRUSS CALCULATIONS BCPR2020-0013 - 1ST SUBMITTAL TRUSS CALCULATIONS.pdf 1 DOC 11/16/2020 AJ ORTEGA 1ST REVIEW ESGIL FEE SHEET BCPR2020-0013 - 1ST REVIEW ESGIL FEE SHEET.pdf 1 DOC 11/16/2020 AJ ORTEGA 1ST REVIEW ESGIL STRUCTURAL CORRECTIONS BCPR2020-0013 - 1ST REVIEW ESGIL STRUCTURAL CORRECTIONS.pdf 1 DOC 1/14/2021 AJ ORTEGA 2ND REVIEW STRUCTURAL CORRECTIONS BCPR2020-0013 - 2ND REVIEW STRUCTURAL CORRECTIONS.pdf 1 DOC 1/27/2021 DUANE CLAYTON STRUCTURAL CALCULATIONS 7-7X (APPROVED) 81-769 AVENUE 52 - STRUCTURAL CALCULATIONS 7-7X (APPROVED).pdf 1 BOND INFORMATION 3RD BLDG NS (2WK)DUANE CLAYTON 1/19/2021 2/2/2021 1/27/2021 APPROVED ONE WEEK E-TRAKIT REVIEW - 3RD NS 3RD BLDG STR (2WK)KURT CULVER 1/19/2021 1/26/2021 1/27/2021 APPROVED ONE WEEK - ETRAKIT REVIEW FOR 3RD STRUCTURAL REVIEW UPDATED BASED ON EMAILED TRANSMITTAL. Printed: Monday, March 20, 2023 2:30:08 PM 4 of 6 Project Details City of La Quinta PROJECT NUMBER BCPR2020-0013 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 1/27/2021 DUANE CLAYTON STRUCUTRAL CALCULATIONS 7-7X CASITA (APPROVED) 81-769 AVENUE 52 - STRUCUTRAL CALCULATIONS 7-7X CASITA (APPROVED).pdf 1 DOC 1/27/2021 DUANE CLAYTON ENERGY DOCUMENTS (APPROVED) 81-769 AVENUE 52 - ENERGY DOCUMENTS (APPROVED).pdf 1 DOC 12/10/2021 DUANE CLAYTON PLAN 7 - CASITA OPTION - TAKE OFF SHEET BCPR2020-0013 - PLAN 7 - CASITA OPTION (1).pdf 0 DOC 12/10/2021 DUANE CLAYTON PLAN 7X - TAKE OFF SHEET BCPR2020-0013 - PLAN 7X (1).pdf 0 DOC 12/10/2021 DUANE CLAYTON PLAN 7X - CASITA OPTION - TAKE OFF SHEET BCPR2020-0013 - PLAN 7X - CASITA OPTION.pdf 0 DOC 12/10/2021 DUANE CLAYTON PLAN 7 - TAKE OFF SHEET BCPR2020-0013 - PLAN 7.pdf 0 DOC 11/1/2020 EtrakitContractor 1ST SUBMITTAL STRUCTURAL CALCULATIONS BCPR2020-0013 - 1ST SUBMITTAL STRUCTURAL CALCULATIONS.pdf 1 DOC 11/1/2020 EtrakitContractor 1ST SUBMITTAL STRUCTURAL CALCULATIONS (CASITA) BCPR2020-0013 - 1ST SUBMITTAL STRUCTURAL CALCULATIONS (CASITA).pdf 1 DOC 11/1/2020 EtrakitContractor 1ST SUBMITTAL ENERGY DOCUMENTS BCPR2020-0013 - 1ST SUBMITTAL ENERGY DOCUMENTS.pdf 1 DOC 11/1/2020 EtrakitContractor Truss Calcs (INCORRECT UPLOAD) The Estates at Rancho Santana Truss Calcs CD Plan 7-7X-Casita.pdf 1 Printed: Monday, March 20, 2023 2:30:08 PM 5 of 6 Project Details City of La Quinta PROJECT NUMBER BCPR2020-0013 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 12/30/2020 EtrakitContractor The Estates at Rancho Santana CD Plan 7-7X- Casita Stamped.pdf 1 DOC 1/16/2021 EtrakitContractor 3RD SUBMITTAL - PLAN SET The Estates at Rancho Santana CD Plan 7-7X- Casita - SIGNED.pdf 1 DOC 1/16/2021 EtrakitContractor 3RD SUBMITTAL - GEOTECHNICAL LETTER (UPDATED) Rancho Santana Soils Update 032520.pdf 1 DOC 1/16/2021 EtrakitContractor 3RD SUBMITTAL - 2ND REVIEW APPLICANT RESPONSES TO ESGIL COMMENTS Estates at RanchoSantana Reply 2 1 14 2021.pdf 1 DOC 1/16/2021 EtrakitContractor 3RD SUBMITTAL - STRUCTURAL CALCULATIONS - CASITA L065_Compiled Casita Signed 1 16 2021.pdf 1 DOC 1/16/2021 EtrakitContractor 3RD SUBMITTAL - STRUCTURAL CALCULATIONS - PLANS 7 AND 7X Rancho Santana Plan 7 7X Struct Calcs signed 1 14 2021.pdf 1 DOC 12/28/2020 JAKE FUSON 2ND SUBMITTAL - STRUCTURAL CORRECTION RESPONSES BCPR2020-0013 - 2ND SUBMITTAL - STRUCTURAL CORRECTION RESPONSES.pdf 1 DOC 1/27/2021 JAKE FUSON 3RD REVIEW ESGIL APPROVAL TRANSMITTAL BCPR2020-0013 - 3RD REVIEW ESGIL APPROVAL TRANSMITTAL.pdf 0 Printed: Monday, March 20, 2023 2:30:08 PM 6 of 6 Project Details City of La Quinta PROJECT NUMBER BCPR2020-0013