Loading...
Staff Rpt 2025-03-18 HA - BP Dune Palms Rd Utilities Reimbursement ApprovalCONSENT CALENDAR ITEM NO. 2 City of La Quinta HOUSING AUTHORITY SPECIAL MEETING: March 18, 2025 STAFF REPORT AGENDA TITLE: APPROPRIATE FUNDS AND APPROVE REIMBURSEMENT FOR CONSTRUCTION COSTS OF UTILITY UPGRADES ASSOCIATED WITH CERTAIN REAL PROPERTY COMPRISED OF 5.2 ACRES LOCATED AT THE NORTHEAST CORNER OF HIGHWAY 111 AND DUNE PALMS ROAD (APN: 600-030-039) TO BP DUNE PALMS, LP, BY GENERAL PARTNER BLACKPOINT PROPERTIES, LLC RECOMMENDATION Appropriate funds and approve reimbursement in the amount of $207,003 for construction costs of utility upgrades associated with certain real property comprised of 5.2 acres located at the northeast corner of Highway 111 and Dune Palms Road (APN: 600-030- 039) to BP Dune Palms, LP, by General Partner Blackpoint Properties, LLC. EXECUTIVE SUMMARY • On January 17, 2023, the Housing Authority (Authority) approved an Agreement for Purchase and Sale and Escrow Instructions (PSA) with BP Dune Palms, LP, by General Partner Blackpoint Properties, LLC (Blackpoint) to purchase 5.2 acres of vacant real property located west of the Home Depot Center on Highway 111, on the northeast corner of Highway 111 and Dune Palms Road (Property), for an affordable housing development. • On July 16, 2024, the Authority and Blackpoint executed a Side Letter Agreement (Agreement) formalizing the Authority's reimbursement obligation for construction of utility undergrounding costs, with future costs from Imperial Irrigation District (IID) to be brought back upon final invoicing. • On November 5, 2024, and January 21, 2025, the Authority approved partial reimbursements in the amount of $366,542 and $179,958, respectively, for utility improvements related to the Property. • On February 27, 2025, IID provided allocation fees to complete the offsite conduit connections. The total cost for this is $381,051, of which the Authority's share is 54.324% of the total fees, equating to $207,003. An appropriation of $207,003 to Account No. 249-0000-80050 is necessary to cover the Authority's share of the IID fees. 9 Total utility improvements reimbursement costs for the Property to date are $753,503 as detailed below: 2024 (November 5) $366,542 2025 (January 21) $179,958 2025 (March) $207,003 BACKGROUND/ANALYSIS On January 17, 2023, the Authority approved a PSA with Blackpoint to purchase the Property located at the northeast corner of Highway 111 and Dune Palms Road for the purpose of developing affordable housing with a connecting thoroughfare to CV Link. The agreement stipulated the Authority's responsibility for relocating and undergrounding utility lines along Dune Palms Road, or reimbursing Blackpoint if they performed the work themselves. In October 2023, Blackpoint recorded Final Parcel Map No. 38668 (DOC # 2023-031546) with the Riverside County Recorder, subdividing the vacant lot into three parcels, and the Authority took ownership of the norther portion of the lot (parcel 1), which fronts Dune Palms Road, and Blackpoint retained the southern portion along Highway 111 comprised of two new parcels 2 and 3. Blackpoint subsequently commenced utility relocation and undergrounding work, which has now been substantially completed. On July 16, 2024, the Authority and Blackpoint executed a Side Letter Agreement pursuant to Sections 5.8.1 and 5.8.4 of the PSA, which formalized the Authority's reimbursement obligation for utility undergrounding costs as detailed under the Fiscal Impact section of this report, with permitting and construction costs each subject to final invoicing from IID. The current construction costs were provided by Blackpoint on March 5, 2025, detailing a total cost of $381,051, which includes offsite mitigation work required to deliver adequate power to the site, including installation of a new IID vault abutting the City property with an underground connection crossing the street to the vault on the west side, south of the bridge. The Authority's share, based on the proportional linear footage of conduit installed along Dune Palms Road (54.324%), calculates to $207,003 (Attachment 1). Blackpoint will pay the full IID fee immediately to prevent project delays, and, per the PSA, the Authority must reimburse its share within 30 days. Staff recommends approval of the appropriation and reimbursement to ensure the timely completion of the project. ALTERNATIVES As the Authority approved the PSA terms which stipulate reimbursement for utility improvements and undergrounding, staff does not recommend an alternative. Prepared by: Doug Kinley III, Senior Management Analyst, City Manager's Office Approved by: Jon McMillen, Executive Director Attachment: 1. Blackpoint — utilities relocation and undergrounding reimbursement invoices 10 D1 TRICT 11D PO BOX 937 IMPERIAL, CA 92251-0937 BUSINESS PARTNER # 3512150 BP DUNE PALMS LP JEFFERY HALBERT MANAGING MEMBER 1129 INDUSTRIAL AVE PETALUMA CA 94952 PROJECT DESCRIPTION: OFF SITE MITIGATION ATTACHMENT 1 DATE: February 27, 2025 SERVICE NOTIFICATION # 4038495 PROJECT LOCATION: 79520 HIGHWAY I I I LA QUINTA CA 92253 AMOUNT DUE: $381,050.70 DESCRIPTION COST Engineering $ 21,338.80 UG Construction $ 100,347.00 UG Transportation $ 18,959.20 UG Materials $ 173,914.28 G&A Overhead $ 60,541.42 Traffic Control $ 5,950.00 TOTAL AMOUNT DUE $ 381,050.70 THIS ESTIMATE IS SUBJECT TO REVIEW IF IID CONSTRUCTION IS NOT SCHEDULED TO PERFORM WORK WITHIN THE SIX MONTH TIME FRAME. IMPERIAL IRRIGATION DISTRICT 81600 AVENUE 58 LA QUINTA, CA 92253, PHONE: (760) 398-5841 11 BP Dune Palms Invoice c/o Texas Exchange Bank 301 Commerce Blvd, Ste 2901 Fort Worth, TX 76102 Bill To City of La Quinta 78495 Calle Tampico La Quinta, CA 92253 Attn: Douglas Kinley III Date Invoice No. 03/05/25 8 Terms Net 30 Project Hwy 111 & Dune Palms Item Description Amount Construction Fees IID Fees 207,003.00 Wire Instructions: Texas Exchange Bank ABA Number : 111903232 Beneficiary: BP Dune Palms, LP Acct Number: 8032708 Thank you for your prompt payment. Total $207,003.00 Please remit payment to above address or via wire instructions. 12 IID OFFSITE FEES ALLOCATION IID SCOPE IID LF PER NOTE % RESPONSIBLE # CONDUIT TOTAL CONDUIT LF Q,o TOTAL CONDUIT PROPORTIONAL FEE IID OFFSITE FEE $ 3819051 Note 46 (7-10) P 255 100ao 4 1020 Note 26 (R1-R2) P 35 100uo 2 70 Note 26 P Riser 10 100a) 2 20 Note 66 (1-6) P 185 100'a" b 6 1110 Note 66 (1-6) P 175 1009-b 6 1050 Note 66: 1-6) P 440 13% 6 348 DUNE PALMS TOTAL 3618 54.324% $ 2079003 Note 66: 1-6) P 440 87% 6 2292 Note66 (1-6) P 125 100% 6 750 HWY 111 TOTAL 3042 45.676% $ 1749047 CONDUIT NOTES: - . 1) TYPICAL, STUBOUTS ARE REQUIRED TO AVOID UNDERMINING TRANSFORMER PADS AND SEC. PULLBOXES IN THE FUTURE. INSTALL 2-5" CND SCH.40 PVC PER SHOWN LENGTH. 330 �„ . -_ 25 (REFER TO SHEETS 10-11,111-123 OF THE D.E.P.G. REV. 5.24 2020 P m. 75' 0 P, �•®M_M -4 UN1171064P i f D PICK-UP EA 2-5" (CSP 400400 i ) I: R3 UN1171063H I I zc U C <� o� � Y M � IN X N wti i UN1171062S I INSTALL 2-5 CND SCH.40 PVC PER SHOWN LENGTH. 25 (REFER TO SHEETS 10-11,111-123 OF THE D.E.P.G. REV. 5.24 2020) P STUB -OUT IN:6" X 90' SWEEP SCH. 80 PVC & 1-6" CND SCH.80 PVC(10') ABOVE 26 GROUND & 1-6 CND SCH.40 PVC STUB OUT AT BASE OF POLE. RISER (REFER TO SHEET 262 OF THE D.E.P.G. REV. 5.24 2020) P INSTALL 2-6" CND SCH.40 PVC PER SHOWN LENGTH. 26 (REFER TO SHEETS 10-11,111-123 OF THE D.E.P.G. REV. 5.24 2020) P INSTALL 4-6" CND SCH.40 PVC PER SHOWN LENGTH. 46 (REFER TO SHEETS 10-11,111-123 OF THE D.E.P.G. REV. 5.24 2020) P INSTALL 6-6" CND SCH.40 PVC PER SHOWN LENGTH. 66 (REFER TO SHEETS 10-11,111-123 OF THE D.E.P.G. REV. 5.24 2020) P INSTALL 6-6" CND SCH.40 PVC PER SHOWN LENGTH. 66 (REFER TO SHEETS 10-11, 111-123 OF THE D.E.P.G. REV. 5.24 2020) P STUB -OUT TRENCHING DETAILS: � _7 2-4 PRI. DUCT CONC. ENCASED D D REFER TO SHEETS 116 & 122-123 OF THE D.E.P.G. REV. 5.24 2020 5-9 PRI. DUCT CONC. ENCASED REFER TO SHEETS 116 & 122-123 OF THE D.E.P.G. REV. 5.24 2020 COMPACTION BACK FILL MULTI PRI. DUCT G REFER TO SHEETS 116 & 122-123 OF THE D.E.P.G. REV. 5.24 2020 CURVE DATA TABLE # RADIUS < LENGTH R1 12.5' 900 19.63' RD 12.5' 450 9.81' R3 25.0' 900 39.26' R4 25.0' 450 19.63' TRENCHING NOTES: TYPICAL: CONTRACTOR SHALL INSTALL 2 LINE GUARD TAPE (RED) "CAUTION: BURIED ELECTRIC LINE BELOW." (REFER TO SHEET 122 OF THE D.E.P.G. REV. 5.24 2020) TYPICAL: 7'-8" FROM FACE OF CURB TO CENTER OF TRENCH. CONDUITS SHALL BE INSTALLED WITHIN 10' P.U.E. UNLESS OTHERWISE NOTES. (REFER TO SHEET 113 OF THE D.E.P.G. REV. 5.24 2020) STRUCTURAL DETAILS_ m SUBSTRUCTURE MEDIUM VAULT EQUIPMENT ENCLOSURE REFER TO SHEETS 184-185, 210-212, & 235-240 OF THE D.E.P.G. REV. 5.24 2020 LARGE SWITCH PAD REFER TO SHEETS 192-193, 210-212, 219-221 OF THE D.E.P.G. REV. 5.24 2020 THREE PHASE SECTOR SLEEVE & IID CLEARANCES REFER TO SHEETS 192-198, 201-203, 207-209, 223-228 OF THE D.E.P.G. REV. 5.21 2020 PRIMARY RISER POLE REFER TO SHEET 120 & 262 OF THE D.E.P.G. REV. 5.24 2020 m STUB OUT MARKER DETAIL REFER TO SHEETS 124 & 125 OF THE D.E.P.G. REV. 5.24 2020 CAUTION: IID ENERGIZED STRUCTURES & CABLE VAULT DETAIL: VAULT DETAIL: VAl ll T• 11N1159212S VAULT DETAIL: OVTS�DE - - 5 6 A B 1 2 3 4 1 2 3 4 VAULT: U N 1247335S LOOKING: EAST F.: VAULT: U N 1247106S LOOKING: NORTH VAULT DETAIL: /A,_ VAULT`. UN1247336S LOOKING: NORTH co IID Lh LO �~ SCALE:1:50 T.5, R.7, SEC.29 z BP DUNE PALMS LP w J CONDUIT LAYOUT �- SUB: N. LA QUINTA KT: 4008 DATE:12/04/2024 1 SHEET 1 OF 1 13