Loading...
Estates at Point Happy TR 31348 BCPR2023-0012 (Plan 1 & 2) SFD x 2•r Project Details PROJECT NUMBER Cit of la �uinta BCPR2023-0012 C Description: POINT HAPPY / 2022 CODE UPDATE / SFD X 2 / TR 31348 Status: REVISIONS REQUESTED Type: BUILDING CONSTRUCTION PLAN REVIEW (WEB) Status Date: Subtype: CODE UPDATE Applied: 6/16/2023 Address: 46201 WASHINGTON ST Approved: City, State, Zip: LA QUINTA,CA92253 Closed: Project Manager: Expired: Details: POINT HAPPY / TRACT CONSTRUCTION MASTER PLANS FOR DWELLINGS (SFDx2) -- PLANS 1 AND 2 FOR THE 2022 CODE CYCLE. PLAN 1 : 2,752 SF PLAN 2 : 3,215 SF DAYS REVIEWS ACTIONS SECTIONS VDITIONS A 1 0 • w4maellnel me, CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES NOTE AJ ORTEGA 6/20/2023 6/20/2023 TRANSFERRED FROM 78360 HERITAGE WAY TO 46201 WASHINGTON ST WHICH IS THE TRACTS UNDERLYING ADDRESS. NAME TYPE NAME ADDRESSI CITY STATE ZIP PHONE FAX EMAIL APPLICANT WILLIAMS HOMES INC 24911 AVENUE STANFORD SANTA CLARITA CA 91355 (661)222-9207 ZNORDBY@WILLIAMS HOMES.COM CONTRACTOR WILLIAMS HOMES INC 24911 AVENUE STANFORD SANTA CLARITA I CA 91355 I (661)222-9207 I I ZNORDBY@WILLIAMS I HOMES.COM OWNER WILLIAMS HOMES INC 24911 AVENUE STANFORD SANTA CLARITA CA 91355 (661)222-9207 ZNORDBY@WILLIAMS HOMES.COM Printed: Wednesday, March 19, 2025 2:13:45 PM 1 of 4 CENTRALSQUARE -' Project Details PROJECT NUMBER BCPR2023-0012 City of la Quinta CLTD DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT # CHECK # METHOD PAID BY BY RECORDS MANAGEMENT FEE - 101-0000-42416 0 $22.00 $0.00 MAJOR Total Paid for RECORDS MANAGEMENT FEE - MAJOR: $22.00 $0.00 TECHNOLOGY 502-0000-43611 0 $8.00 $0.00 ENHANCEMENT FEE Total Paid for TECHNOLOGY ENHANCEMENT FEE: $8.00 $0.00 NEW CONSTRUCTION - 101-0000-42400 0 $700.00 $0.00 5+ RESIDENTIAL UNITS Total Paid for ZONING CLEARANCE - PLANNING PLAN $700.00 $0.00 CHECK: • ii INSPECTION TYPE INSPECTOR SCHEDULED DATE COMPLETED RESULT J DATE REMARKS NOTES RETURNED REVIEW TYPE REVIEWER SENT DATE DUE DATE STATUS REMARKS NOTES DATE 1ST BLDG INTERWEST 6/20/2023 7/5/2023 7/5/2023 REVISIONS REQUIRED COMPLETE (2WK) 1ST BLDG NS (3WK) DUANE 6/16/2023 7/10/2023 8/15/2023 REVISIONS REQUIRED - SEE 1ST REVIEW CORRECTION LIST IN CLAYTO N ATTACHMENTS. 1ST FIRE (2WK) KOHL 6/16/2023 6/30/2023 7/27/2023 READY FOR APPROVAL HETRICK 1ST PERMIT PERMIT TECH 6/16/2023 6/19/2023 6/20/2023 COMPLETE ATTACHMENTS VERIFIED, REVIEWS CREATED. TECHNICIAN (1DAY) BUCKET Printed: Wednesday, March 19, 2025 2:13:45 PM 2 of 4 CENTRALSQUARE Project Details PROJECT NUMBER BCPR2023-0012 City of la Quinta 1ST PLANNING SIJIFREDO 6/16/2023 7/5/2023 7/5/2023 READY FOR APPROVAL (2WK) FERNANDEZ 1ST PUBLIC WORKS AMY YU 6/16/2023 6/30/2023 6/22/2023 APPROVED- IF FOOTPRINT IS CHANGED, PLEASE ALSO UPDATE (2WK) CONDITIONS PRECISE GRADING PLAN. :• •• Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED BCPR2023-0012 - 1ST DOC 6/20/2023 AJ ORTEGA 1ST SUBMITTAL PLAN SUBMITTAL PLAN 1 SET SET.pdf DOC 8/15/2023 DUANE CLAYTON PLAN 2 TAKE OFF SHEET BCPR2023-0012 - PLAN 0 2 TAKE OFF SHEET.pdf DOC 8/15/2023 DUANE CLAYTON PLAN 1 TAKE OFF SHEET BCPR2023-0012 - PLAN 0 1 TAKE OFF SHEET.pdf BCPR2023-0012 - 1ST DOC 8/15/2023 DUANE CLAYTON 1ST REVIEW COMPLETE REVIEW COMPLETE 1 CORRECTION LIST CORRECTION LIST.pdf BCPR2023-0012 - 1ST 1ST SUBMITTAL DOC 6/16/2023 Etrakit Contractor STRUCTURAL SUBMITTAL 1 STRUCTURAL CALCULATIONS CALCULATIONS.pdf BCPR2023-0012 - 1ST DOC 6/16/2023 Etrakit Contractor 1ST SUBMITTAL TRUSS SUBMITTAL TRUSS 1 CALCULATIONS CALCULATIONS.pdf BCPR2023-0012 - 1ST DOC 6/16/2023 Etrakit Contractor 1ST SUBMITTAL SUBMITTAL 1 FOUNDATION LETTER FOUNDATION LETTER.pdf BCPR2023-0012 - 1ST 1ST SUBMITTAL POST- DOC 6/16/2023 Etrakit Contractor TENSION SUBMITTAL POST- 1 TENSION CALCULATIONS CALCULATIONS.pdf Printed: Wednesday, March 19, 2025 2:13:45 PM 3 of 4 CENTRALSQUARE L Project Details PROJECT NUMBER City of la Quinta BCPR2023-0012 Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED La Quinta-BCR2023- La Quinta-BCR2023- DOC 7/5/2023 INTERWEST 0012-PC1-SFD X 3 Code 0012-PC1-SFD X 3 Code 0 Update.docx Update.docx La Quinta - LAQ23-0074 - La Quinta - LAQ23-0074 - DOC 7/5/2023 INTERWEST BCPR2023-0012 - BCPR2023-0012 - 0 Invoice 88921 Invoice 88921 $906.25.pdf $906.25.pdf Printed: Wednesday, March 19, 2025 2:13:45 PM 4 of 4 CENTRALSQUARE September 25, 2023 CITY OF LA QUINTA - SECOND REVIEW Permit No: BCPR2023-0012 Interwest No.: LAQ23-0074 Non -Structural: 5.75-hours Structural:.5-hours City of La Quinta Building Department 78-495 Calle Tampico La Quinta, CA 92253 Plan Review: SFD X 3 / TR 31348 Code Update Address: 46201 Washington Street 0 r"T INTERWEST A SAFEbuilt COMPANY Interwest Consulting Group has completed a second code compliance review of the following documents on behalf of the City of La Quinta: 1. Drawings: Digital Copy of following: a. A0.00, A0.20, A0.21, A0.22, A0.23, A0.24, A0.30 dated 0811612023 by Williams Homes. b. A1.1.1, A1.2.1, A1.3.1, A1.4.1, A1.4.2, A1.5.1, A1.6.1, A1.6.2, A1X.5.1, A1X.6.1, A1X.6.2, A1.7.1 dated 0811612023 by Williams Homes. C. A2.1.1, A2.2.1, A2.3.1, A2.4.1, A2.4.2, A2.5.1, A2.6.1, A2.6.2, A2.7.1 dated 0811612023 by Williams Homes. d. D1.1, D2.1, D2.2, D3.1, D4.1, D5.1 dated 0811612023 by Williams Homes. e. T-24.1 dated 0811712023 by Rick Maurer Title 24, Inc. f. T-24.2 through T-24.3 dated 06/05/2023 by Rick Maurer Title 24, Inc. g. SN-1 dated 0811012023 by mor Engineers. h. SN-3 dated 06/12/2023 by mor Engineers. i. S1-1.0, S1-1.1, S1-2.0, S1-2.1, S1X-1.0, S1X-2.0 dated 0811612023 by mor Engineers. j. S2-1.0, S2-1.1, S2-2.0, S2-2.1 dated 0811612023 by mor Engineers. k. SD-1 through SD-3 dated 0811612023 by mor Engineers. I. WSWH-1, WSWH-1.1, WSWH-2 dated 0811612023 by mor Engineers. M. PTD, PTD.1, PTD1, PTD1A, PT2 dated 06/07/2023 by Suncoast. n. M0.1 through M2.10811812023 by mor Engineers. o. E0.1 06/13/2023 by mor Engineers. P. P0.1 through P2.10811812023 by mor Engineers 2. Structural Calculations: Digital C py dated 06/07/2023 by er Engineers. None. 3. Energy Compliance Documentation: Attached to set. 4. Geotechnical Investigation: Digital copy: a Geet(,nhnical fe undati n plan r ., dated 06/08/2023 by i GC Valle., 4nc. None. b. Geotechnical pad certification dated 0911912023 by LGC Valley, Inc. C. Pad certification dated 0911912023 by Anderson Consulting Engineering, Inc. 1500 S. Haven Ave I Suite 220 Ontario, CA 91761 909.295-3142 LNTFRNFiTGRP.CON SFD X 3 / TR 31348 Code Update City of La Quints - Second Review 46201 Washington Street Interwest Project No. LAQ23-0074 9125123 Permit App: BCPR2023-0012 Page 2 of 7 5. Miscellaneous Documents: Digital Copy of the following: a. Post -Terri., C.,u n lotion dated Nerve by S unGeast. None. b. Truss calculations and layouts dated 0610612023 by mor Engineers. The applicable provisions of the 2022 California Building Standards Code were used as the basis of this review. Plan review comments follow on the attached list. Please submit an itemized response letter and complete and revised documents with directly to city of La Quinta Building and Safety Department. Sincerely, INTERWEST CONSULTING GROUP Karla Luther, CPE Plans Examiner INTERWEST SFD X 3 / TR 31348 Code Update 46201 Washington Street 9125123 PROJECT DATA: City of La Quin to - Second Review Interwest Project No. LAQ23-0074 Permit App: BCPR2023-0012 Page 3 of 7 Occupancy Group: Area (sq. ft.): R3 2752 (Plans 1A, 1B, 1XB); 3215 (Plans 2A, 2B) U 537 (Plans 1A, 1B, 1XB); 653; 653 (Garage Plans 2A, 2113; Tandem) 64 / 334 (Covered Entry/ Outdoor Room Plans 1A, 1B, 1XB); 38 U / 448 (Plans 2A, 2B) Total Area: Varies Building Height: Varies Building Stories: 1 Type of Construction: VB Occupant Load: <10 Sprinklered: Y Valuation: Unknown Risk Category: II Site Class (seismic): D-default Seismic Design Category: D Special Wind Region: Y Snow Loads: Y GENERAL COMMENTS: G1. The following plan review documents are based on the City of La Quinta Building Regulations. The following comments reference the 2022 California Building Standards Code as amended by the authority having jurisdiction unless otherwise noted. G2. Please respond in writing to each plan review comment by marking this comment list or creating a response letter. Indicate which detail, specification, or calculation shows the requested information. At minimum, the following should be included with each plan review response: • Page / sheet number(s), detail / specification number(s), etc., and include all applicable code section(s). Briefly explain in writing how the design is intended to comply with the applicable code sections. Please provide a narrative of revisions made outside the plan review comments. Complete and clear responses will expedite the re -check of this project. INTERWEST SFD X 3 / TR 31348 Code Update City of La Quints - Second Review 46201 Washington Street Interwest Project No. LAQ23-0074 9125123 Permit App: BCPR2023-0012 Page 4 of 7 G3. Please be sure to include on the re -submittal the architect's and /or engineer's stamp, signature, date of signature, and registration number on all sheets of plans depicting structural designed elements and cover sheets of calculations. CBPC 5536.1 and 6735. INTERWEST SFD X 3 /TR 31348 Code Update 46201 Washington Street 9125123 City of La Quints - Second Review Interwest Project No. LAQ23-0074 Permit App: BCPR2023-0012 Page 5 of 7 PLAN REVIEW COMMENTS: The revised permit documents have been reviewed. The following comments are numbered per the original list and require further response and/or revision. The format includes the original comment followed by a new or clarified recheck comment in bold italic typeface, prefaced by PC2. BUILDING AND LIFE SAFETY: [PC2:Karla Luther; kluther@interwestgrp.com; 909.313.2867] Al 1. Review was based on code changes only, please include with the next submittal a copy of the originally approved plans and documents to verify no other changes have occurred, as this set shall supersede the prior set of documents. Additional comments may apply. PC2. Comment remains. A2. Sheet A0.20 1. Please include the soils report number in the 'Summary of Work' Section of this sheet. PC2. Partial comment remains. The document project number of the LGC report is 203034-01. Please review and revise. The 213034-01 project number is associated with the pad certifications. A3. Sheet A1.2.1, A2.2.1 No further comment. 09/25/2023 KL A4. Sheet A1.4.1, A2.4.1 (Typical on all plan types.) 1. Please dimension in the plan the roof overhang at the right and left required per the Energy compliance. PC2. Comment remains. Please see the 'overhangs and fins'section of the Compliance document. As a required feature of the compliance modeling please dimension the overhangs/fins in the plan. (There may not have been enough information in the comment for a proper response, My apologies.) ENERGY COMPLIANCE: Electrical Compliance: EE1. Sheet A1.1.1, A2.1.1 (Typical on all plan types.) No further comment. 09/25/2023 KL EE2. Sheet A1.2.1, A2.2.1 (Typical on all plan types.) 1. Lighting in habitable spaces, including but not limited to living rooms, dining rooms, kitchens and bedrooms, shall have readily accessible wall -mounted dimming controls that allow the lighting to be INTERWEST SFD X 3 /TR 31348 Code Update 46201 Washington Street 9125123 City of La Quints - Second Review Interwest Project No. LAQ23-0074 Permit App: BCPR2023-0012 Page 6 of 7 manually adjusted up and down. Forward phase cut dimmers controlling LED light sources in these spaces shall comply with NEMA SSL 7A. Please demonstrate in the plan. (150.0(k)2F CEnC) PC2. Partial comment. Walk-in Closets shall utilize vacancy sensors. Please review and revise. (See bedroom #2 closet of Plan 2A.) 2. No further comment. 09/25/2023 KL Mechanical Compliance: EM1. Sheet A1.1.1, A2.2.1(Typical on all plan types.) No further comment. 09/25/2023 KL EM2. Sheet M1.1, M2.1(Typical on all plan types.) No further comment. 09/25/2023 KL Envelope Compliance: EC1. Energy Compliance Documents (Typical on all plan types.) No further comment. 09/25/2023 KL EC2. Sheet A1.2.1, A2.2.1 (Typical on all plan types.) No further comment. 09/25/2023 KL EC3. Sheet A1.3.1, A2.3.1 No further comment. 09/25/2023 KL CaIGREEN: No comment. 07/3/2023 KL STRUCTURAL: S1. Sheet SD-2 No further comment. 09/25/2023 KL S2. Structural Plans 1. Please include in the structural plan the geotechnical report date and project number. INTERWEST SFD X 3 /TR 31348 Code Update 46201 Washington Street 9125123 PC2. Comment remains. 2. No further comment. 09/25/2023 KL City of La Quints - Second Review Interwest Project No. LAQ23-0074 Permit App: BCPR2023-0012 Page 7 of 7 Please contact the listed reviewers between 9:00 A.M. and 4:00 P.M., M-F, with any questions. [END] INTERWEST October 5, 2023 CITY OF LA QUINTA - THIRD REVIEW Permit No: BCPR2023-0012 Interwest No.: LAQ23-0074 Non -Structural: 3.0-hours Structural: 1.25-hours City of La Quinta Building Department 78-495 Calle Tampico La Quinta, CA 92253 Plan Review: SFD X 3 / TR 31348 Code Update Address: 46201 Washington Street 0 r"T INTERWEST A SAFEbuilt COMPANY Interwest Consulting Group has completed a third code compliance review of the following documents on behalf of the City of La Quinta: 1. Drawings: Digital Copy of following: a. A0.00, A0.20, A0.21, A0.22, A0.23, A0.24, A0.30 dated 0811612023 by Williams Homes. b. A1.1.1, A1.2.1, A1.3.1, A1.4.1, A1.4.2, A1.5.1, A1.6.1, A1.6.2, A1X.5.1, A1X.6.1, A1X.6.2, A1.7.1 dated 0811612023 by Williams Homes. C. A2.1.1, A2.2.1, A2.3.1, A2.4.1, A2.4.2, A2.5.1, A2.6.1, A2.6.2, A2.7.1 dated 0811612023 by Williams Homes. d. D1.1, D2.1, D2.2, D3.1, D4.1, D5.1 dated 0811612023 by Williams Homes. e. T-24.1 dated 0811712023 by Rick Maurer Title 24, Inc. f. T-24.2 through T-24.3 dated 06/07/2023 by Rick Maurer Title 24, Inc. g. SN-1, SN-2 dated 0811012023 by mor Engineers. h. SN-3 dated None by mor Engineers. i. S1-1.0, S1-1.1, S1-2.0, S1-2.1, S1X-1.0, S1X-2.0 dated None by mor Engineers. j. S2-1.0, S2-1.1, S2-2.0, S2-2.1 dated None by mor Engineers. k. SD-1 through SD-3 dated None by mor Engineers. I. WSWH-1, WSWH-1.1, WSWH-2 dated None by mor Engineers. M. PTD, PTD.1, PT1, PT1A, PT2 dated 06/07/2023 by Suncoast. n. M0.1 through M2.1 0811812023 by mor Engineers. o. E0.1 dated None by mor Engineers. P. P0.1 through P2.1 0811812023 by mor Engineers 2. Structural Calculations: Digital C py dated 06/07/2023 by er Engineers. None, provide. 3. Energy Compliance Documentation: Attached to set. 4. Geotechnical Investigation: Digital copy: a. Geotechnical foundation plan review dated 06/08/2023 by LGC Valley, Inc. b G,,,,+n, a,,;,-,.i Gd ,-eF4f4eGtien dated na/ 97QO23 by L GG � n,,,, ip,-. (Older version provided with PC3.) C. PG61 e,-4f4c-Gtiep dated 09,14 742022 by nn,d rr n G n,;„itiPg -Pgi, e -ipg 1p . None, provide. 1500 S. Haven Ave I Suite 220 Ontario, CA 91761 909.295-3142 LNTFRNFiTGRP.CON SFD X 3 /TR 31348 Code Update City of La Quinta - Third Review 46201 Washington Street Interwest Project No. LAQ23-0074 1015123 Permit App: BCPR2023-0012 Page 2 of 7 d. Geotechnical building code update dated 0610712023 by LGC Valley, Inc. Miscellaneous Documents: Digital Copy of the following: a Post Tension Feund-,t;,,n Calculate ,n.- dated N n by Sunc ass. None, provide. b TFUSS ,G.1-r- ..1-a+iens epd le.,, uts dated QOM60;23 by mer E=Pgip eFS None, provide. The applicable provisions of the 2022 California Building Standards Code were used as the basis of this review. Plan review comments follow on the attached list. Please submit an itemized response letter and complete and revised documents with directly to city of La Quinta Building and Safety Department. Sincerely, INTERWEST CONSULTING GROUP Karla Luther, CPE Plans Examiner INTERWEST SFD X 3 / TR 31348 Code Update 46201 Washington Street 1015123 PROJECT DATA: City of La Quinta - Third Review Interwest Project No. LAQ23-0074 Permit App: BCPR2023-0012 Page 3 of 7 Occupancy Group: Area (sq. ft.): R3 2752 (Plans 1A, 16, 1XB); 3215 (Plans 2A, 2B) U 537 (Plans 1A,113, 1XB); 653; 653 (Garage Plans 2A, 213; Tandem) 64 / 334 (Covered Entry/ Outdoor Room Plans 1A, 113, 1XB); 38 U / 448 (Plans 2A, 26) Total Area: Varies Building Height: Varies Building Stories: 1 Type of Construction: VB Occupant Load: <10 Sprinklered: Y Valuation: Unknown Risk Category: II Site Class (seismic): D-default Seismic Design Category: D Special Wind Region: Y Snow Loads: Y GENERAL COMMENTS: G1. The following plan review documents are based on the City of La Quinta Building Regulations. The following comments reference the 2022 California Building Standards Code as amended by the authority having jurisdiction unless otherwise noted. G2. Please respond in writing to each plan review comment by marking this comment list or creating a response letter. Indicate which detail, specification, or calculation shows the requested information. At minimum, the following should be included with each plan review response: • Page / sheet number(s), detail / specification number(s), etc., and include all applicable code section(s). Briefly explain in writing how the design is intended to comply with the applicable code sections. Please provide a narrative of revisions made outside the plan review comments. Complete and clear responses will expedite the re -check of this project. INTERWEST SFD X 3 / TR 31348 Code Update City of La Quinta - Third Review 46201 Washington Street Interwest Project No. LAQ23-0074 1015123 Permit App: BCPR2023-0012 Page 4 of 7 G3. Please be sure to include on the re -submittal the architect's and /or engineer's stamp, signature, date of signature, and registration number on all sheets of plans depicting structural designed elements and cover sheets of calculations. CBPC 5536.1 and 6735. INTERWEST SFD X 3 / TR 31348 Code Update 46201 Washington Street 1015123 City of La Quinta - Third Review Interwest Project No. LAQ23-0074 Permit App: BCPR2023-0012 Page 5 of 7 PLAN REVIEW COMMENTS: The revised permit documents have been reviewed. The following comments are numbered per the original list and require further response and/or revision. The format includes the original comment followed by a new or clarified recheck comment in bold italic typeface, prefaced by PC3. ***Please provide all plans and documents for approval of a complete package. *** BUILDING AND LIFE SAFETY: [PC3: Karla Luther; kluther@interwestgrp.com; 909.313.2867] Al 1. Review was based on code changes only, please include with the next submittal a copy of the originally approved plans and documents to verify no other changes have occurred, as this set shall supersede the prior set of documents. Additional comments may apply. PC2. Comment remains. PC3. Partial comments remain. Plan 1 - (A) The 'exercise room -option for the flex room of plan 1A has not been included in the revised plan. Please clarify. (B) The attic ventilation calculation for plan 1A has not been included in the revised plan. Please provide. (C) The attic ventilation calculation for plans 1B and 1XB has not been included in the revised plan. Please provide. Plan 2 - The attic ventilation calculation for plans 2A has not been included in the revised plan. Please provide. A2. Sheet A0.20 1. No further comment. 10/05/2023 KL A3. Sheet A1.2.1, A2.2.1 No further comment. 09/25/2023 KL A4. Sheet A1.4.1, A2.4.1 (Typical on all plan types.) No further comment. 10/05/2023 KL ENERGY COMPLIANCE: Electrical Compliance: EE1. Sheet A1.1.1, A2.1.1 (Typical on all plan types.) No further comment. 09/25/2023 KL EE2. Sheet A1.2.1, A2.2.1 (Typical on all plan types.) INTERWEST SFD X 3 / TR 31348 Code Update 46201 Washington Street 1015123 No further comment. 10/05/2023 KL Mechanical Compliance: EM1. Sheet A1.1.1, A2.2.1 (Typical on all plan types.) No further comment. 09/25/2023 KL EM2. Sheet M1.1, M2.1 (Typical on all plan types.) No further comment. 09/25/2023 KL Envelope Compliance: EC1. Energy Compliance Documents (Typical on all plan types.) No further comment. 09/25/2023 KL EC2. Sheet A1.2.1, A2.2.1 (Typical on all plan types.) No further comment. 09/25/2023 KL EC3. Sheet A1.3.1, A2.3.1 No further comment. 09/25/2023 KL CaIGREEN: No comment. 07/3/2023 KL STRUCTURAL: S1. Sheet SD-2 No further comment. 09/25/2023 KL S2. Structural Plans 1. No further comment. 10/05/2023 KL 2. No further comment. 09/25/2023 KL City of La Quinta - Third Review Interwest Project No. LAQ23-0074 Permit App: BCPR2023-0012 Page 6 of 7 3. Comment based upon comparison of the originally approved plan provided with the PC3 submittal. (A) There is a shear panel missing at the front corner of the flex room of Plan 2A. (B) Note on detail sheet SD-1 that detail 10/SD-1 is for reference only. (C) Please revise the foot note below the plan label for Plan 1BX of INTERWEST SFD X 3 / TR 31348 Code Update 46201 Washington Street 1015123 City of La Quinta - Third Review Interwest Project No. LAQ23-0074 Permit App: BCPR2023-0012 Page 7 of 7 sheet PT1A to reflect: 'See Plan 1B for Info...'. (D) The post tension plans shall bear the 'Shop Drawing Review' of mor Engineering. 4. There have been structural changes to the PT2, Plan 2A foundation. Please provide structural calculations. 5. Please provide the originally approved structural calculations, in addition to any revisions that may have occurred. Please contact the listed reviewers between 9:00 A.M. and 4:00 P.M., M-F, with any questions. [END] INTERWEST October 30, 2023 CITY OF LA QUINTA - FINAL REVIEW Permit No: BCPR2023-0012 Interwest No.: LAQ23-0074 Non -Structural: 3.5-hours Structural: 1.0-hours City of La Quinta Building Department 78-495 Calle Tampico La Quinta, CA 92253 Plan Review: SFD X 3 / TR 31348 Code Update Address: 46201 Washington Street 0 r"T INTERWEST A SAFEbuilt COMPANY Interwest Consulting Group has completed a FINAL code compliance review of the following documents on behalf of the City of La Quinta: 1. Drawings: Two copies of following: Drawings: Digital Copy of following: a. A0.00, A0.20, A0.21, A0.22, A0.23, A0.24, A0.30 dated 0811612023 by Williams Homes. b. A1.1.1, A1.2.1, A1.3.1, A1.4.1, A1.4.2, A1.5.1, A1.6.1, A1.6.2, A1X.5.1, A1X.6.1, A1X.6.2, A1.7.1 dated 0811612023 by Williams Homes. C. A2.1.1, A2.2.1, A2.3.1, A2.4.1, A2.4.2, A2.5.1, A2.6.1, A2.6.2, A2.7.1 dated 0811612023 by Williams Homes. d. D1.1, D2.1, D2.2, D3.1, D4.1, D5.1 dated 0811612023 by Williams Homes. e. T-24.1 dated 0811712023 by Rick Maurer Title 24, Inc. f. T-24.2 through T-24.3 dated 06/07/2023 by Rick Maurer Title 24, Inc. g. SN-1, SN-2 dated 0811012023 by mor Engineers. h. SN-3 dated None by mor Engineers. i. S1-1.0, S1-1.1, S1-2.0, S1-2.1, S1X-1.0, S1X-2.0 dated None by mor Engineers. j. S2-1.0, S2-1.1, S2-2.0, S2-2.1 dated None by mor Engineers. k. SD-1 through SD-3 dated None by mor Engineers. I. WSWH-1, WSWH-1.1, WSWH-2 dated None by mor Engineers. M. PTD, PTD.1, PT1, PT1A, PT2, PT2A dated 1011612023 by Suncoast. n. M0.1 through M2.10811812023 by mor Engineers. o. E0.1 dated None by mor Engineers. P. P0.1 through P2.10811812023 by mor Engineers 2. Structural Calculations: Digital Copy dated 06/07/2023 by mor Engineers. 3. Energy Compliance Documentation: Attached to set. 4. Geotechnical Investigation: Digital copy: a. Geotechnical foundation plan review dated 06/08/2023 by LGC Valley, Inc. b. Building Code Update Report for Remaining Lots dated 06/07/2023 by LGC Valley, Inc. 1500 S. Haven Ave I Suite 220 Ontario, CA 91761 909.295-3142 1NTiRV,c>T6RP rqN [Project Name] [Address] Due Date City of La Quinto - Final Review Interwest Project No. [Number] PermitApp: [Number] Page 2 of2 C. Geotechnical pad certification dated 0911912023 by LGC Valley, Inc. d. Pad certification dated 0911912023 by Anderson Consulting Engineering, Inc. e. Geotechnical building code update dated 0610712023 by LGC Valley, Inc. 5. Miscellaneous Documents: Digital Copy of the following: a. Post -Tension Foundation Calculations dated None by Suncoast. b. Truss calculations and layouts dated 0610612023 by mor Engineers. The applicable provisions of the 2022 California Building Standards Code were used as the basis of this review. Plan review comments follow on the attached list. Enclosed, please find the above noted documents bearing Interwest Consulting Group's plan review stamps indicating the documents have been reviewed for code compliance. Please do not hesitate to contact us directly with any questions. Sincerely, INTERWEST CONSULTING GROUP Karla Luther, CPE Plans Examiner INTERWEST INTERWEST w mot.," carw*xv Bill to: City of La Quinta Attn Castro, Danny Design and Development Director 78-495 Calle Tampico La Quinta, CA 92253 Remit to: Interwest Consulting Group P.O. Box 301069 Los Angeles, CA 90030-1069 Invoice #141827 October 9, 2023 Direct questions to Erica Cuevas ecuevas@interwestgrp.com Professional services for the period October 1, 2023 through October 31, 2023 Residential - Code Update - LAQ23-0074 - BCPR2023-0012 Invoice Total (Please pay this amount) $573.75 Ref No. Project $ Amount LAQ23-0074 Residential - Code Update - LAQ23-0074 - BCPR2023-0012 $573.75 Employee Title Karla Lu Hours Rate Total th er Plan Check Engineer 4.25 $135.00 $573.75 Labor 4.25 $573.75 Karla Luther LAQ23-0074 Residential - Code Update - LAQ23-0074 - BCPR2023-0012 Day Description 10/5/2023 LAQ23-0074 Hours 4.25 Total 4.25 1 of 1 Karla Luther LAQ23-0074 Residential - Code Update - LAQ23-0074 - BCPR2023-0012 Day Description 10/5/2023 LAQ23-0074 Hours 4.25 Total 4.25 1 of 1 rw INTERWEST A 6AFEbukf COMPANY Bill to: City of La Quinta Attn Castro, Danny Design and Development Director 78-495 Calle Tampico La Quinta, CA 92253 Remit to: Interwest Consulting Group P.O. Box 301069 Los Angeles, CA 90030-1069 Invoice #149390 October 31, 2023 Direct questions to Erica Cuevas ecuevas@interwestgrp.com Professional services for the period October 10, 2023 through October 30, 2023 Residential - Code Update - LAQ23-0074 - BCPR2023-0012 Invoice Total (Please pay this amount) $517.50 Ref No. Project $ Amount LAQ23-0074 Residential - Code Update - LAQ23-0074 - BCPR2023-0012 $517.50 Employee Title Karla Lu Hours Rate Total th er ICC Certified Plans Examiner 4.50 $115.00 $517.50 Labor 4.50 $517.50 Karla Luther LAQ23-0074 Residential - Code Update - LAQ23-0074 - BCPR2023-0012 Day Description Hours 10/16/2023 LAQ23-0074 / Email 0.25 10/30/2023 LAQ23-0074 4.00 10/18/2023 LAQ23-0074 / Email 0.25 Total 4.50 1ofI Karla Luther LAQ23-0074 Residential - Code Update - LAQ23-0074 - BCPR2023-0012 Day Description Hours 10/16/2023 LAQ23-0074 / Email 0.25 10/30/2023 LAQ23-0074 4.00 10/18/2023 LAQ23-0074 / Email 0.25 Total 4.50 1ofI 9/26/23, 1:22 PM Invoice 11V I N T E R W E S T A SAFEbuilt COMPANY INVOICE #91260 September 26, 2023 Jurisdiction No. BCPR2023-0012 Interwest Job No. LAQ23-0074 Bill to: City of La Quinta Remit to: Interwest Consulting Group Direct questions to: Attention Danny Castro P.O. Box 301069 Erica Cuevas Design & Development Director Los Angeles, CA 90030-1069 (970) 568-5034 78495 Calle Tampico ecuevas@interwestgrp.com La Quinta, CA 92253 Professional services for the period September 1 through September 26, 2023 RESIDENTIAL - CODE UPDATE- LAQ23-0074 - BCPR2023-0012 46201 Washington Street Invoice Total $843.75 Employee Title Day Hours Rate Total Karla Luther Plan Check Engineer 1 9/261 6.25 $135.001 $843.75 https://interwest.lucidbilling.com/invoices/print 1 /1 LGC Valley, Inc. Geotechnical Consultinq June 7, 2023 Mr. Zachary Nordby Williams Homes 24911 Avenue Stanford Santa Clarita, CA 91355 Project No. 213034-01 Subject. Building Code Update Report for the Remaining Lots at The Estates Development at Point Happy Ranch, Tract 31348, La Quinta, California. Introduction In accordance with your request, LGC Valley, Inc., (LGC) has prepared this letter to provide a building code update for the remaining lots at the Estates Development at Point Happy Ranch, Tract 31348, La Quinta, California. The purpose of this letter is to update the referenced report (LGC, 2021) to be in accordance with the adopted building code (i.e. 2022 California Building Code). Conclusion and Recommendations Based on our current review, the seismic, foundation, and retaining wall design parameters previously provided in the referenced report (LGC, 2021) are still considered applicable for the subject development. The site design for the subject project should be performed using the parameters and recommendations in accordance with the referenced LGC report (LGC, 2021) for the seismic design parameters, foundation design, design settlement, bearing capacity, retaining wall design, and backfill considerations. Closure This letter is issued with the understanding that it is the responsibility of the owner, or of his/her representative, to ensure that the information and recommendations contained herein are brought to the attention of the structural/foundation engineer and the necessary steps are taken to see that the information is implemented in the structural/foundation design, as necessary. If you should have any questions, please do not hesitate to contact us. The undersigned can be reached at (661) 702-8474. Respectfully Submitted, LGC Valley, Inc. z--4No. 2734 Exp.6J30124 — `�,Cct`-TECNN�G Basil Hattar, GE 2734 CA1�EC Principal Engineer BIH/ Distribution: (1) Addressee (via email) Reviewed for Code Compliance October 30, 2023 Interwest Consulting Group 28532 Constellation Road 9 Valencia • CA 91355 • (661) 702-8474 • Fax (661) 702-8475 References American Society of Civil Engineers (ASCE), 2017, Minimum Design Loads for Buildings and Other Structures, ASCE/SEI 7-16, 2017. ASCE 7 Hazard Tool, htt2s://asce7hazardtool.online/ California Building Standards Commission, 2022, California Building Code, California Code of Regulations Title 24, Volumes 1 and 2, dated July 2022. County of Los Angeles Department of Public Works GMED, 2020, Administrative Manual 5004.0, Seismic Earth pressures on Retaining Walls, Dated January 6, 2020 LGC Valley, Inc., 2020, Geotechnical Update Report for Lots 1 through 7, 25, 33 through 38, 40 through 47, and 66 through 72, The Estates Development at Point Happy Ranch, Tract 31348, La Quinta, California. Project No. 203034-01, dated December 6, 2021. 2022, Compaction Report, Lots 1 through 7, 25, 36 through 38, 40 through 47, and 66 through 72, The Estates Development at Point Happy Ranch, Tract 31348, La Quinta, California. Project No. 203034-01, dated May 17, 2022. Suncoast Post -Tension, 2022, Post -Tension Plans and Details for Point Happy, La Quinta, California for Williams Homes. Job No. 21-8154, dated December 28, 2021/Delta 1 Dated May 16, 2022. United States Geological Survey (USGS), 2008a, "2008 National Seismic Hazard Maps - Fault Parameters" Retrieved December 17, 2013, from: http://geohazards.usgs.jzov/cfusion/hazfaults_search/hf search main.cfm , 2008b, "2008 Interactive Deaggregations (Beta)," Retrieved December 12, 2013, from: hM2s://geohazards.usgs.gov/deaggint/2008 , 2013, U.S. Seismic Design Maps, Retrieved December 12, 2013, from: http://aeohazards.usjzs.gov/desijzmngps/usibatch.php#cs Project No. 213034-01 Page 2 June 7, 2023 LGC Valley, Inc. Geotechnical Consulting June 8, 2023 Mr. Zachary Nordby Williams Homes 24911 Avenue Stanford Santa Clarita, CA 91355 Project No. 213034-01 Subject. Geotechnical Foundation Plan Review for the Proposed Estates Development at Point Happy Ranch, Tract 31348, La Quinta, California References: LGC Valley, Inc., 2021, Geotechnical Update Report for Lots 1 through 7, 25, 33 through 38, 40 through 47, and 66 through 72, The Estates Development at Point Happy Ranch, Tract 31348, La Quinta, California. Project No. 213034-01, dated December 6, 2021. LGC Valley, Inc., 2022, Compaction Report, Lots 1 through 7, 25, 36 through 38, 40 through 47, and 66 through 72, The Estates Development at Point Happy Ranch, Tract 31348, La Quinta, California. Project No. 213034-01, dated May 17, 2022. LGC Valley, Inc., 2023, Building Code Update Report for the Remaining Lots at The Estates Development at Point Happy Ranch, Tract 31348, La Quinta, California. Project No. 213034-01, dated June 7, 2023. Suncoast Post -Tension, 2023, Post -Tension Plans and Details for Point Happy, La Quinta, California for Williams Homes. Job No. 21-8154, dated Dated June 7, 2023. LGC Valley, Inc. (LGC) has reviewed the latest Post -Tension foundation plans for the proposed Estates Development at Point Happy Ranch of Tract 31348 located in the city of La Quinta, California. The latest Post -Tension Foundation Plans, Details, and Specifications prepared by Suncoast Post -Tension (dated June 7, 2023) was the subject of our geotechnical review. Based on our review, it is our opinion that the recommendations included in the referenced geotechnical reports (LGC, 2021 and 2023) have been properly incorporated in the project plans and specifications. Therefore, LGC finds the plans are acceptable from a geotechnical point of view provided the recommendations of the referenced reports are implemented during construction. Based on our review, the structural design minimum slab thickness of 4.5 inches for very low expansion potentials (finish grade expansion potentials between 0 to 5 and were found to be non -plastic soils) is acceptable from a geotechnical point of view for the subject development. If you should have any questions, please do not hesitate to contact us. The undersigned can be reached at (661) 702-8474. Sincerely, CFEsslo HMAI , Reviewed for Code LGC Valley, Inc. No.Compliance V.Q=24 October 30 2023 �- � lxp. Basil Hattar, GE 2734 slF�TECNN�G �P I nterwest Consulting Group Principal Engineer qlf CA1.�E0� BIH/ Distribution: (1) Addressee 28532 Constellation Road • Valencia • CA 91355 • (661) 702-8474 • Fax (661) 702-8475 LGC Valley, Inc. Geotechnical Consulting September 19, 2023 City of La Quinta Attn: Amy Yu 78-495 Calle Tampico La Quinta, California 92252 Project No. 213034-01 Subject. Geotechnical Pad Certification for Lots I through 7, 25, 36 through 38, 40 through 47, and 66 through 72, The Estates Development at Point Happy Ranch, Tract 31348, La Quinta, California. Lot/Tract No.: Lots 1 through 7, 25, 36 through 38, 40 through 47, and 66 through 72, Tract 31348 References: LGC Valley, Inc., 2022, Compaction Report, Lots 1 through 7, 25, 36 through 38, 40 through 47, and 66 through 72, The Estates Development at Point Happy Ranch, Tract 31348, La Quinta, California. Project No. 213034-01, dated May 17, 2022. LGC Valley, Inc., 2021, Geotechnical Update Report for Lots 1 through 7, 25, 33 through 38, 40 through 47, and 66 through 72, The Estates Development at Point Happy Ranch, Tract 31348, La Quinta, California. Project No. 213034-01, Dated December 06, 2021. In accordance with your request, LGC Valley, Inc. (LGC) has performed observation and testing services during grading operations for Lots 1 through 7, 25, 36 through 38, 40 through 47, and 66 through 72 of The Estates Development at Point Happy Ranch, Tract 31348, La Quinta, California. The grading for the subject residential building pads was performed between March 22, 2022 and May 5, 2022, in general accordance with the referenced geotechnical report (LGC, 2021). The grading operations were performed under the observation and testing services of LGC. Our field technician was onsite on a full-time basis during the rough grading operations. Grading operations included: 1) the removal of all potentially compressible soils down to competent fill; and 2) placement of compacted fill soils to design finish grades. Following remedial removals, areas to receive fill were scarified a minimum of 6 inches, moisture -conditioned as needed to obtain a near -optimum moisture content and compacted to a minimum 90 percent relative compaction, as determined by ASTM Test Method D1557. The finish grade soils were found to have a very low expansion potential, have negligible soluble sulfate content, and were found to be corrosive to buried metals. The grading for the subject residential pads was performed in general accordance with the referenced geotechnical report (LGC, 2021), and the city of La Quinta Requirements. It is our professional opinion that the subject pad is suitable for its intended residential use provided the recommendations of our report (LGC, 2021) are incorporated into the design, and that proper landscaping, irrigation, and maintenance programs are implemented. If you should have any questions, please do not hesitate to contact us. Sincerely, LGC VALLEY, INC. 'P'4 A Basil Hattar, GE 2734 Principal Engineer BIH Distribution: (1) Addressee Reviewed for Code Compliance October 30, 2023 Interwest Consulting Group 28532 Constellation Road 9 Valencia • CA 91355 • (661) 702-8474 • Fax (661) 702-8475 ANDERSON CONSULTING ENGINEERS, INC City of La Quinta Attn: Amy Yu 78-495 Calle Tampico La Quinta, CA 92252 PAD CERTIFICATION Tract No. 31348 (Point Happy) Lot No's 1-4, 36-38 September 19, 2023 This letter is to verify that the locations and elevations of the building pads for Lots 1 through 4, and 36 through 38 of Tract Map No. 31348, were field checked by Vertex Surveying, under my direction, and found to be in substantial conformance with the approved Precise Grading Plan. The results are as follows: Lot Address Plan Elev Field Elev. Difference 1 78-365 Heritage Way 75.5 75.5 0.0 2 78-375 Heritage Way 75.0 75.0 0.0 3 78-385 Heritage Way 74.8 74.8 0.0 4 78-395 Heritage Way 74.6 74.6 0.0 36 78-390 Heritage Way 74.6 74.6 0.0 37 78-380 Heritage Way 74.8 74.8 0.0 38 78-370 Heritage Way 75.1 75.1 0.0 Regards, Jeff A. Anderson, PE Signature RCE C48750 Exp: 9/30/24 /O QRpf ESS/py.4 rx NO. C 48750 EXP. 09/ 50/24 st CN I qT£ OF CALF Reviewed for Code Compliance Page I 1 October 30, 2023 Interwest Consulting Group 12526 High Bluff Dr. #300 San Diego, CA 92130 (858) 524-6579