Specifications Project 2019-14 - Addendum 1ta Qwkra - CAI Il ORNIA - ADDENDUM NUMBER 1 TO: All Prospective Bidders and Plan Holders FROM: Leonard R. St. Sauver, Construction Manager DATE: September 10, 2019 SUBJECT: Project No. 2019-14, CALLE TAMPICO AT PARK AVENUE GUARD RAIL IMPROVEMENTS The following shall be considered as incorporated into the project plans and specifications for the above referenced project. Portions of plans and specifications not specifically mentioned in this Addendum remain in force. - PROJECT BID DOCUMENTS Section 4000 Sheet 4000-2, Section 5.0 "Construct Guard Rail", add the following paragraph after paragraph 1: The terminal system shall be the latest model terminal system available from an approved Caltrans manufacturer. At the time of this addendum model MSKT-SP- MGS8 is the latest model from Road Systems, Inc. - PROJECT CLARIFICATIONS Q. Section 1500 7.4 Utility relocation& and Rearrangement. Second paragraph. Delete all but "Protect" Is this acceptable? a. The full paragraph says the following: "The Contractor assumes responsibility for the removal, relocation, or protection of existing facilities wherein said facilities are identified by the Plans, field located by a utility company, or as provided for in the General Requirements. The Contractor shall coordinate with the owner of utility facilities for the rearrangement of said facilities. The Contractor assumes responsibility for the removal, relocation, or protection of existing facilities wherein said facilities are identified by the Plans, field located by a ta Q�W C Al-IFORNIA- utility company, or as provided for in the General Requirements. The Contractor shall coordinate with the owner of utility facilities for the rearrangement of said facilities." The plans say to locate and protect in place a water line. The language in the paragraph is general and points to the project plans or other specification locations. The paragraph does not hold the Contractor responsible for anything other than what is specifically being asked for so it can remain as it is. Q. Section 1500 7.4 Utility relocation& and Rearrangement. Second paragraph. Delete all but "Protect" Is this acceptable? a. The full paragraph says the following: "Professional Liability or Errors and Omissions Insurance as appropriate shall be written on a policy form coverage specifically designed to protect against acts, errors or omissions of the Contracting Party and "Covered Professional Services" as designated in the policy must specifically include work performed under this agreement. The policy limit shall be no less than $1,000,000 per claim and in the aggregate. The policy must "pay on behalf of" the insured and must include a provision establishing the insurer's duty to defend. The policy retroactive date shall be on or before the effective date of this agreement. Professional Liability or Errors and Omissions Insurance as appropriate shall be written on a policy form coverage specifically designed to protect against acts, errors or omissions of the Contracting Party and "'Covered Professional Services" as designated in the policy must specifically include work performed under this agreement. The policy limit shall be no less than $1,000,000 per claim and in the aggregate. The policy must ''pay on behalf of" the insured and must include a provision establishing the insurer's duty to defend. The policy retroactive date shall be on or before the effective date of this agreement. Since the statement says as appropriate then the paragraph does not need to be omitted. Q. Section 3000 4.0 Work Details, 4.1 Traffic Control. Can you omit PE & TE Signature required? 4.2 Dust Control, an acceptable dust control plan will be submitted by Contractor. The designated -on site person to implement and prepare this plan (PM-10) this plan is the designated Safety person also. (The Contractor) Contractor requests that the "Certified by the SCAQMD" be omitted? a. These statements will remain as written. The Contractor is hereby notified; Addendum No. 1 must be acknowledged as stipulated under the instructions to Bidders and submitted as part of the Bid. Failure to do so shall result in the City designating said bid as 'Won -Responsive. APPROVED: Leona d R. St. Sauver Construction Manager END OF ADDENDUM NUMBER 1