Specifications Project 2022-25 - Addendum No. 1 1 of 3 ADDENDUM NUMBER 1 TO: All Prospective Bidders and Plan Holders FROM: Ubaldo Ayón, Assistant Construction Manager DATE: March 18, 2025 SUBJECT: Project No. 2022-25, Highway 111 Resurfacing Project The following shall be considered as incorporated into the project plans and specifications for the above referenced project. Portions of plans and specifications not specifically mentioned in this Addendum remain in force.  PROJECT SPECIFICATIONS Section 1210: Section 1210 is replaced; the following is a summary of the changes: • Base Bid Schedule has the following changes: o Item 3 description changed from “Dust Control” to “Dust Control/SWPPP” Section 4000: Sheet 4000-2, Section 4: Dust Control, Replace section with the following: As Reads: 4.0 DUST CONTROL (BID ITEM No. 3) Dust Control shall comply with Section 3000-4.2. In addition to general sweeping and maintenance of the site, the Contractor shall sweep sidewalk and other surfaces on a daily basis and as needed after roadway pulverization begins and prior to the base paving. DUST CONTROL shall be paid for at the Contract Lump Sum Price as shown on the bid schedule. Monthly payments will be made on a pro-rata basis. 4.1 Water Quality Management Plan (No Bid Item) 4.1.1 Water Quality Management Plan Contractors shall comply with the 2014 Whitewater Region Water Quality Management Plan (WQMP) 2 of 3 Contractor shall be responsible for installing post-construction BMPs as specified per the approved site specific WQMP. 4.1.2 Payment Payment for compliance with the WATER QUALITY MANAGEMENT PLAN shall be considered as included in other items of work and no additional compensation will be allowed therefore. Is Amended to Read: 4.0 DUST CONTROL/SWPPP (BID ITEM No. 3) Dust Control shall comply with Section 3000-4.2. In addition to general sweeping and maintenance of the site, the Contractor shall sweep sidewalk and other surfaces on a daily basis and as needed after roadway pulverization begins and prior to the base paving. DUST CONTROL shall be paid for at the Contract Lump Sum Price as shown on the bid schedule. Monthly payments will be made on a pro-rata basis. 4.1 Storm Water Pollution Prevention Plan (SWPPP) (No Bid Item) 4.11 Storm Water Pollution Prevention Plan Storm Water Pollution Prevention Plan (SWPPP) shall conform to the provisions in Section 3- 12.6, “Water Pollution Control” and Section 3-12.6.3 “Storm Water Pollution Prevention Plan (SWPPP)” of the Standard Specifications, California Regional Water Quality Control Board Colorado River Basin Region Discharge Requirements (Order No. R7-2008-0001, MPDES No. CAS617002) and the City of La Quinta Standards, and these Special Provisions. Contractor shall be responsible for implementing and maintaining Best Management Practices (BMPs) during the life of the project, including holidays and weekends. SWPPP includes expenditures for the preparation of the SWPPP documents, implementation of project specific Best Management Practices (BMPs), performing necessary inspections, and annual reports as required per the State of California General Permit for Storm Water Discharges (Order No. 2009-0009-DWQ, NPDES No. CAS000002) and the City of La Quinta MS4 discharge permit. See City of La Quinta web-page for more information on local standards: https://www.laquintaca.gov/business/design-and-development/development-services/wqmp- npdes-storm-drains-flood-zone The use of water (if needed) shall conform to 3-12.6 of the Standard Specifications. 3 of 3 4.1.2 Payment Payment for the STORM WATER POLLUTION PREVENTION PLAN (SWPPP) shall be considered as included in other items of work and no additional compensation will be allowed therefore. Sheet 4000-11, Section 15: Asphalt Concrete, Add the following paragraph after paragraph 1: 1a. You may substitute RAP for part of the virgin aggregate in a quantity up to 25 percent of the aggregate blend. If RAP is used, the asphalt plant must automatically adjust the virgin asphalt binder to account for RAP percentage and RAP binder. During production, you may adjust hot- or cold-feed proportion controls for virgin aggregate and RAP. RAP must be within ±3 of RAP percentage described in your Contractor Job Mix Formula Proposal form without exceeding 25 percent. The Contractor is responsible to prepare a mix design with resultant final of PG70-10. RAP shall comply with Caltrans Standard Specification Section 39.2.02B(5) “Reclaimed Asphalt Pavement.”  PROJECT PLANS Sheets 2, and 4-8 are replaced with the attached. The addendum includes AC thickness description revised in Legend. The Contractor is hereby notified; Addendum No. 1 must be acknowledged and initialed as stipulated under the instructions to Bidders and submitted as part of the Bid. Failure to do so shall result in the City designating said bid as "Non-Responsive." APPROVED: Ubaldo Ayón, Assistant Construction Manager Attachments: 1. Bid Schedule Dated 3/18/2025 2. Revised Plan Sheet 2, and 4-8 END OF ADDENDUM NUMBER 1 Ubaldo Ayon (Mar 21, 2025 10:03 PDT) ADDENDUM 01 – 3/18/2025 Bid Schedule 1210-1 SECTION 1210 BID SCHEDULE City Project No. 2022-25 Federal Project No. HIPL-5433(021) HIGHWAY 111 RESURFACING PROJECT City of La Quinta 78-495 Calle Tampico La Quinta, CA 92253 To Whom It May Concern: Pursuant to the Invitation to Bid, and in accordance with the provisions therein stated, the undersigned hereby proposes and agrees that on award by the City under this Bid, to execute a Contract, with necessary bonds, to furnish and install any and all labor, materials, transportation and services for City Project No. 2022-25, Federal Project No. HIPL- 5433(021), Highway 111 Resurfacing Project in accordance with the plans and specifications therefore adopted and on file with the City within the time hereinafter set forth and at the prices named in this Bid. It is understood that the basis of award shall be the lowest total price of the Base Bid Areas. Unit prices in each and every case represent the true unit price used in preparing the bid schedule totals (Bid Form). Unit prices listed herein include material, installation and appurtenant work as is necessary to have the item complete and in place meeting the full intent of the plans and specifications. Furthermore, this project has broken down the Base Bid areas according to project funding requirements, therefore several of the same bid items have been split between the Base Bid Area. BASE BID AREA – HIGHWAY 111 RESURFACING PROJECT: BASE BID #1; FEDERAL PARTICIPATING Item No. Item Description Est. Qty. Unit Unit Price (in figures) Dollars Item Total (in figures) Dollars 1 Mobilization 1 LS $ $ 2 Traffic Control 1 LS $ $ 3 Dust Control/SWPPP 1 LS $ $ 4 Earthwork 1 LS $ $ ADDENDUM 01 – 3/18/2025 Bid Schedule 1210-2 BASE BID #1; FEDERAL PARTICIPATING Item No. Item Description Est. Qty. Unit Unit Price (in figures) Dollars Item Total (in figures) Dollars 5 Sawcut, Remove, and Dispose of Existing Concrete Curb; and Curb & Gutter 920 LF $ $ 6 Sawcut, Remove, and Dispose of Existing Concrete Pavement, Sidewalk, Cross-Gutter, Ramp, and Bus Turnout 18,900 SF $ $ 7 Construct Curb and Gutter per City of La Quinta Std. No. 202, 3” Dowel into Adjacent Existing Concrete Curb and Gutter 30 LF $ $ 8 Construct Cross-Gutter per City of La Quinta Std. No. 230 Mod. and 231 Mod. 4,935 SF $ $ 9 Construct Sidewalk per City of La Quinta Std. No. 240 Mod. 980 SF $ $ 10 Construct Concrete Curb Ramp per City of La Quinta Std. No. 250 Mod., Case A or F (Including Curb or Curb and Gutter along Ramp) 16 EA $ $ 11 Construct Concrete Curb Ramp per City of La Quinta Std. No. 250 Mod., Case C (Including Curb or Curb and Gutter along Ramp) 4 EA $ $ 12 Sawcut, Remove, and Dispose of Existing Concrete Ramp; Furnish and Install Truncated Dome Concrete Tile per City of La Quinta Std. 250 Mod. 50 SF $ $ 13 Construct Concrete Passageway per CALTRANS Std. A88B Mod.; Type B 1 EA $ $ ADDENDUM 01 – 3/18/2025 Bid Schedule 1210-3 BASE BID #1; FEDERAL PARTICIPATING Item No. Item Description Est. Qty. Unit Unit Price (in figures) Dollars Item Total (in figures) Dollars 14 Construct PCC Bus Pad per City of La Quinta Std. 650 Mod. 3,695 SF $ $ 15 Remove and Reconstruct Ex. Portion of Catch Basin and Local Depression per City of La Quinta Std. 300, 330, and per Plan 1 LS $ $ 16 2” Grind and Asphalt Concrete Overlay 16,740 SF $ $ 17* Pulverize 13” of Road Section – Three Step Process 1,084,980 SF $ $ 18 Construct 5.5” Asphalt Concrete Over Pulverized Base 1,085,300 SF $ $ 19 Grade Parkway, Remove, Modify, and Replace Landscape and Irrigation in Kind to Furthest Extent Possible to Join Proposed Curb Ramp 1 LS $ $ 20 Remove and Relocate Existing PPB and PPB Post per CALTRANS Std. ES-7A 6 EA $ $ 21 Salvage to City Existing Pull Box and Furnish and Install New No. 6(T) Traffic Pull Box per CALTRANS Std. Plan ES-8B 34 EA $ $ 22 Lower and Raise Storm Drain Manhole 14 EA $ $ 23 Signing and Striping, Including All Incidentals 1 LS $ $ Total Amount of Bid Items 1 – 23 $ * - Bid Item considered Specialty Work ADDENDUM 01 – 3/18/2025 Bid Schedule 1210-4 GRAND TOTAL BASE BID (Figures): $ GRAND TOTAL BASE BID (Words): Bid Amount of each of the above Bid Items must be filled in and completed. It is understood that the quantities shown hereon are but estimates and the bidder is responsible to verify quantities prior to submitting a bid. Final payment will be based upon actual work performed, subject to such adjustments and alterations as elsewhere provided herein. ___________________________________________________________ Signature of Bidder (Ink) ___________________________________________________________ Name of Bidder (Printed or Typed) ___________________________________________________________ Bidder Telephone Number ___________________________________________________________ Bidder Email Address PROTECT IN PLACE AND REFRESH EXISTING STRIPING/PAVEMENT MARKING2 PAINT PAVEMENT MARKING, TYPE PER PLAN9 PLACE BACK ORIGINAL STRIPING AND TYPE IN SAME LOCATION1 REMOVE STRIPING/PAVEMENT MARKING AND DO NOT PLACE BACK3 STRIPE 6 INCH WIDE WHITE BIKE LANE, PER CAMUTCD FIGURE 3A-112 (CA), DETAIL 394 STRIPE 6 INCH WIDE WHITE DASHED BIKE LANE, PER CAMUTCD FIGURE 3A-112 (CA), DETAIL 39A5 STRIPE 6 INCH WIDE WHITE LANE LINE AND INSTALL RAISED PAVEMENT MARKERS, PER CAMUTCD FIGURE 3A-102 (CA), DETAIL 12 6 PAINT 12 INCH WIDE WHITE DIAGONAL, 50' O.C. (U.N.O.)8 PAINT WHITE "BIKE" AND "LANE" LETTERING, "HELMETED BIKE RIDER" SYMBOL, AND SMALL BIKE LANE ARROW, PER CALTRANS STANDARD PLANS A24A, A24C, AND A24D, AND AS POSITIONED PER CAMUTCD FIGURE 9C-3 DETAIL C. PAINT CENTERED ON GREEN RECTANGULAR BACKGROUND, 3.5'X37' 7 INSTALL NEW SIGN WITH NEW POST AND FOOTING (TYPE AS SHOWN) PER CALTRANS STANDARD RS511 STRIPE 6 INCH WIDE WHITE LINE, 50' LONG10 NOT USED13 STRIPE 8 INCH WIDE WHITE CHANNELIZING LINE, PER CAMUTCD FIGURE 3A-112 (CA), DETAIL 3814 STRIPE 6 INCH WIDE WHITE EDGE LINE PER CAMUTCD FIGURE 3A-106, DETAIL 27B, PLACED AS SHOWN ON PLAN PAINT WHITE GOLF CART LANE SYMBOL, PER CITY OF LA QUINTA STANDARD PLAN 50216 INSTALL GREEN PAINT WITHIN THE BIKE LANE DASHED AREA17 STRIPE 6 INCH WIDE WHITE INTERSECTION EXTENSION LINE, PER CAMUTCD FIGURE 3A-112 (CA), DETAIL 4018 15 NOT USED12 PROTECT IN PLACE1 18 PLACE 5.5" ASPHALT CONCRETE OVER PULVERIZED BASE PULVERIZE 13" OF ROAD SECTION FROM EXISTING (THREE STEP PROCESS), REMOVE EXCESS, GRADE, AND COMPACT TO 7.5" DEPTH 20 UTILITY ASSEMBLY TO BE PROTECTED IN PLACE 16 2" GRIND AND ASPHALT CONCRETE OVERLAY; FILL ALL CRACKS 1/4" AND LARGER PRIOR TO OVERLAY 2 SAWCUT, REMOVE, AND DISPOSE OF EXISTING CONCRETE PAVEMENT/SIDEWALK/RAMP TO NEAREST JOINT 4 SAWCUT, REMOVE, AND DISPOSE OF EXISTING CONCRETE CURB; AND CURB & GUTTER CONSTRUCT SIDEWALK PER CITY OF LA QUINTA STD. 240; MAX 1.5% CROSS-SLOPE AND 4.5% LONGITUDINAL SLOPE7 CONSTRUCT CURB RAMP PER CITY OF LA QUINTA STD. 250 MOD.; CASE PER PLAN (INCLUDING CURB OR CURB AND GUTTER ALONG RAMP AS SHOWN) 17 14 REMOVE AND REPLACE PULL BOX WITH No. 6(T) TRAFFIC PULL BOX PER CALTRANS STD PLAN ES-8B GRADE PARKWAY MAX 1:3 SLOPE TO JOIN CURB RAMP, MODIFY/ADJUST IRRIGATION AND REPLACE LANDSCAPE TO SATISFACTION OF CITY 15 21 ADJUST DRAINAGE MANHOLE FRAME AND COVER TO FINAL GRADE PER CVWD STANDARD PLAN S-1B 3 SAWCUT, REMOVE, AND DISPOSE OF EXISTING CONCRETE CROSS-GUTTER TO NEAREST JOINT CONSTRUCT PORTION OF CROSS-GUTTER PER CITY OF LA QUINTA STD. 230 & 231 MODIFIED TO MATCH EXISTING WIDTH, MAINTAIN EXISTING FLOW PATTERN 8 10 CONSTRUCT 8" CURB & GUTTER PER CITY OF LA QUINTA STD. 202, 3" DOWEL INTO ADJACENT EXISTING CONCRETE CURB 5 REMOVE EXISTING PCC BUS TURNOUT PAVEMENT 12 CONSTRUCT PCC BUS PAD PER CITY OF LA QUINTA STD. 650 MOD. REMOVE & RELOCATE EXISTING PPB AND PPB POST PER CALTRANS STD. ES-7A13 6 SAWCUT, REMOVE, AND DISPOSE OF EXISTING CONCRETE RAMP; FURNISH AND INSTALL TRUNCATED DOMES PER CITY OF LA QUINTA STD. 250 MOD. 11 CONSTRUCT PASSAGEWAY PER CALTRANS STD. A88B MOD.; TYPE B9 19 UTILITY FRAME AND COVER TO BE ADJUSTED TO FINAL GRADE BY CVWD. CONTRACTOR TO COORDINATE WITH CVWD RECONSTRUCT EX. CURB INLET CATCH BASIN AND GUTTER DEPRESSION PER CITY OF LA QUINTA STD. 300, 330, AND PER DETAIL "N" ON SHEET 3 22 PULVERIZE OF ROAD SECTION FROM EXISTING 5.5" ASPHALT CONCRETE OVER PULVERIZED BASE GRIND AND ASPHALT CONCRETE OVERLAY REMOVE EXISTING SIDEWALK/RAMP/X-GUTTER CONSTRUCT CONCRETE IMPROVEMENTS RIGHT-OF-WAY (EXISTING) CENTERLINE SAWCUT LIMITS W S G T TS EXISTING TRAFFIC SIGNAL INTERCONNECT (CITY) EXISTING TELEPHONE/COM LINE (FRONTIER) EXISTING GAS MAIN (SOCALGAS) EXISTING STORM DRAIN (CITY) EXISTING SEWER MAIN (CVWD) EXISTING WATER MAIN (CVWD) CATV EXISTING TELEPHONE/COM CABLE (CHARTER) EXISTING OVERHEAD TELEPHONE/COM CABLE (CHARTER) E EXISTING ELECTRIC CABLE (IID) EXISTING OVERHEAD ELECTRIC CABLE (IID) LEGEND: (VARIES 46'-56')(43') (VARIES 69'-105')(55') N'LY R/W S'LY R/W CURB CURB & GUTTER1 1 1 (3%±)(2%±) (VARIES 2% -3%) (33') STRAIGHT GRADE VARIES 1.5% - 2% 4' MEDIAN CURB & GUTTER 18 17 (2%±) STRAIGHT GRADE VARIES 2% - 4%18 17 (VARIES 36'-56')(VARIES 36'-60') (VARIES 55'-105')(VARIES 55'-78') N'LY R/W S'LY R/W MEDIAN CURBCURB & GUTTER CURB & GUTTER1 17 1 17 1 (VARIES 1% - 3%)(VARIES 3% - 6%) STRAIGHT GRADE VARIES 2% - 4% (VARIES 1% - 3%)(VARIES 3% - 6%) STRAIGHT GRADE VARIES 2% - 4% (VARIES 13'-28') 1818 ---- Consulting NAI ITEM DESCRIPTION UNIT QUANTITY* HIGHWAY 111 PAVEMENT REHABILITATION CONSTRUCTION NOTES AND ESTIMATE OF QUANTITIES ITEM DESCRIPTION UNIT QUANTITY* HIGHWAY 111 PAVEMENT REHABILITATION SIGNING AND STRIPING NOTES AND ESTIMATE OF QUANTITIES ---- ---- ---- 19,165LF 19,935LF 31,295LF ---- 117EA 3,050LF 27EA 47EA 920LF 4,935SF 10,270SF 3,695SF 30LF 980SF 4,935SF 3,695SF 6EA 1,085,300SF 51EA 12EA 14EA 1EA 20EA 50SF ---- 34EA 16,740SF 1,084,980SF HWY 111 TYPICAL SECTION STA 12+00 TO STA 18+00 & STA 35+00 TO STA 117+00 NOT TO SCALE ---- ---- 13,720LF 355LF 47EA ---- 2,985LF HWY 111 TYPICAL SECTION STA 19+00 TO STA 35+00 NOT TO SCALE 1EA 1 3/18/25 LG AC THICKNESS REVISED IN LEGEND 1 DENSE TREES DENSE TREES DENSE TREES HWY 111 LA Q U I N T A PL A Z A 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 C I T Y O F L A Q U I N T A C I T Y O F I N D I A N W E L L S CIT Y O F L A Q U I N T A CIT Y O F I N D I A N W E L L S DEEP CANYON STORMWATER CHANNEL STA 12+01 BEGIN PVMT REHAB 1 WATER VALVE 3 EA STA 12+79 END PVMT REHAB STA 16+14 BEGIN PVMT REHAB 19 20 GAS VALVE SOCAL GAS 2 EA 193 EA 19 2020GAS VALVE SOCAL GAS GAS VALVE SOCAL GAS CAUTION! EX. 6" HIGH PRESSURE GAS MAIN 17 18 17 18 1 CURB, TYP. 1CURB & GUTTER, TYP. 1 CONC. PAVEMENT 17 18 1 X-GUTTER, TYP. END PVMT REHAB EXACT LOCATION T.B.D. IN FIELD BY CITY 1MEDIAN CURB & GUTTER, TYP. 19 2' 16 END PVMT REHAB EXACT LOCATION T.B.D. IN FIELD BY CITY 16 EX. R/W EX. R/W 2' 9 55' 79'± 56'± 43'± 38'± 64'± 76'± 36' 36' 47' 70' 36' 47' 38'± PEDESTRIAN EASEMENT DENSE TREES DENSE TREES W A S H I N G T O N S T R E E T HWY 111 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 19 19 20 GAS VALVE SOCAL GAS 20 GAS VALVE SOCAL GAS 19 20 GAS VALVE SOCAL GAS 21 3 EA 21 2 EA CAUTION! EX. 6" HIGH PRESSURE GAS MAIN CAUTION! EX. 6" HIGH PRESSURE GAS MAIN STA 28+03.95 HIGHWAY 111= WASHINGTON STREET 16 16 21 END PVMT REHAB EXACT LOCATION T.B.D. IN FIELD BY CITY 17 18 1CURB & GUTTER, TYP. 1 1 X-GUTTER, TYP. 1 CONC. BUS PAD 1MEDIAN CURB & GUTTER, TYP. CURB, TYP. 17 18 1 CURB & GUTTER, TYP. 1CONC. BUS PAD MEDIAN CURB & GUTTER, TYP.1 EX. R/W EX. R/W SEE DETAIL "A", SHEET 9 21 19 7 EA 2' 2' 11 11 2 EA 21 11 95' 55' 53' 70.5' 40' 55' 105' 76' 46' 56'± PEDESTRIAN EASEMENT LANDSCAPE & SIDEWALK EASEMENT NOTES TO CONTRACTOR: 1.REMOVE ALL VEHICLE DETECTION LOOPS (UNLESS OTHERWISE SPECIFIED BY THE CITY). 2.PROTECT IN PLACE ALL SURVEY MONUMENTS OR RE-ESTABLISH PER GENERAL NOTES. 3.PROTECT IN PLACE ALL EXISTING SIGNS, UNLESS OTHERWISE SPECIFIED BY THE PLANS. 4.REFRESH EXISTING STRIPING, PAVEMENT MARKINGS, AND CROSS-WALKS ON ALL LEGS AND CROSS STREETS 25' BEYOND THE LIMIT LINE AND CROSS-WALKS. 5.STATIONING AND CENTERLINE IS SHOWN FOR REFERENCE ONLY AND HAS NOT BEEN TIED DOWN BY SURVEYOR. 6.CONTRACTOR IS RESPONSIBLE TO POTHOLE ALL EXISTING FACILITIES IN PULVERIZED AREAS TO DETERMINE THE DEPTH AND DIRECTION OF UNDERGROUND FACILITIES. PROTECT IN PLACE1 LEGEND: PULVERIZE OF ROAD SECTION FROM EXISTING 5.5" ASPHALT CONCRETE OVER PULVERIZED BASE GRIND AND ASPHALT CONCRETE OVERLAY RIGHT-OF-WAY (EXISTING) CENTERLINE SAWCUT LIMITS GRIND AND ASPHALT CONCRETE OVERLAY LIMITS PULVERIZE 13" OF ROAD SECTION FROM EXISTING (THREE STEP PROCESS), REMOVE EXCESS, GRADE, AND COMPACT TO 7.5" DEPTH 16 2" GRIND AND ASPHALT CONCRETE OVERLAY; FILL ALL CRACKS 1/4" AND LARGER PRIOR TO OVERLAY 17 CONSTRUCT PASSAGEWAY PER CALTRANS STD. A88B MOD.; TYPE B9 SAWCUT, REMOVE, AND DISPOSE OF EXISTING CONCRETE RAMP; FURNISH AND INSTALL TRUNCATED DOMES PER CITY OF LA QUINTA STD. 250 MOD. 11 CONSTRUCTION NOTES: 18 PLACE 5.5" ASPHALT CONCRETE OVER PULVERIZED BASE 20 UTILITY ASSEMBLY TO BE PROTECTED IN PLACE 21 ADJUST DRAINAGE MANHOLE FRAME AND COVER TO FINAL GRADE PER CVWD STANDARD PLAN S-1B 19 UTILITY FRAME AND COVER TO BE ADJUSTED TO FINAL GRADE BY CVWD. CONTRACTOR TO COORDINATE WITH CVWD Consulting NAI 04020 40 80 120 SCALE: 1"=40' S C A L E : 1 " = 4 0 ' MA T C H L I N E S T A 2 2 + 0 0 SE E B O T T O M L E F T M A T C H L I N E S T A 2 2 + 0 0 S E E T O P R I G H T MA T C H L I N E S T A 3 4 + 0 0 SE E S H E E T 5 04020 40 80 120 SCALE: 1"=40' S C A L E : 1 " = 4 0 ' WASHINGTON STREET SEE SHEET 8 1 3/18/25 LG AC THICKNESS REVISED IN LEGEND 1 18 PLACE 5.5" ASPHALT CONCRETE OVER PULVERIZED BASE PULVERIZE 13" OF ROAD SECTION FROM EXISTING (THREE STEP PROCESS), REMOVE EXCESS, GRADE, AND COMPACT TO 7.5" DEPTH 16 2" GRIND AND ASPHALT CONCRETE OVERLAY; FILL ALL CRACKS 1/4" AND LARGER PRIOR TO OVERLAY 17 NOTES TO CONTRACTOR: 1.REMOVE ALL VEHICLE DETECTION LOOPS (UNLESS OTHERWISE SPECIFIED BY THE CITY). 2.PROTECT IN PLACE ALL SURVEY MONUMENTS OR RE-ESTABLISH PER GENERAL NOTES. 3.PROTECT IN PLACE ALL EXISTING SIGNS, UNLESS OTHERWISE SPECIFIED BY THE PLANS. 4.REFRESH EXISTING STRIPING, PAVEMENT MARKINGS, AND CROSS-WALKS ON ALL LEGS AND CROSS STREETS 25' BEYOND THE LIMIT LINE AND CROSS-WALKS. 5.STATIONING AND CENTERLINE IS SHOWN FOR REFERENCE ONLY AND HAS NOT BEEN TIED DOWN BY SURVEYOR. 6.CONTRACTOR IS RESPONSIBLE TO POTHOLE ALL EXISTING FACILITIES IN PULVERIZED AREAS TO DETERMINE THE DEPTH AND DIRECTION OF UNDERGROUND FACILITIES. CONSTRUCTION NOTES:LEGEND: HWY 111 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 STA 41+22.78 HIGHWAY 111= SIMON DRIVE CAUTION! EX. 6" HIGH PRESSURE GAS MAIN 21 21 21 2' 16 EX. R/W EX. R/W 17 18 17 18 1 X-GUTTER, TYP. 1CURB & GUTTER, TYP. 1MEDIAN CURB & GUTTER, TYP. END PVMT REHAB EXACT LOCATION T.B.D. IN FIELD BY CITY SEE DETAIL "D", SHEET 10 SEE DETAIL "C", SHEET 10 38 46L=30' 70' 87'± 55'60'± 57'± 2121 1 CONC. BUS PAD 55' 92'± 60'± 46'± 53' 68' LANDSCAPE & SIDEWALK EASEMENT LANDSCAPE & PEDESTRIAN EASEMENT SI M O N D R I V E DEN S E TRE E S DEN S E TRE E S HWY 111 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 CAUTION! EX. 6" HIGH PRESSURE GAS MAIN 17 18 17 18 EX. R/W EX. R/W 5 1 CONC. BUS PAD 1 MEDIAN CURB & GUTTER, TYP. 1 CURB & GUTTER, TYP. 1 CURB, TYP. 1 END PVMT REHAB EXACT LOCATION T.B.D. IN FIELD BY CITY SEE DETAIL "E", SHEET 10 12 70' 80' 50' 58' 43' 55' 83'± 64'± 46'± 12'± 1CONC. BUS PAD X-GUTTER, TYP. LANDSCAPE & SIDEWALK EASEMENT LA Q U I N T A CE N T E R D R I V E PULVERIZE OF ROAD SECTION FROM EXISTING 5.5" ASPHALT CONCRETE OVER PULVERIZED BASE GRIND AND ASPHALT CONCRETE OVERLAY REMOVE EXISTING SIDEWALK/RAMP/X-GUTTER CONSTRUCT CONCRETE IMPROVEMENTS RIGHT-OF-WAY (EXISTING) CENTERLINE SAWCUT LIMITS GRIND AND ASPHALT CONCRETE OVERLAY LIMITS 21 ADJUST DRAINAGE MANHOLE FRAME AND COVER TO FINAL GRADE PER CVWD STANDARD PLAN S-1B 12 CONSTRUCT PCC BUS PAD PER CITY OF LA QUINTA STD. 650 MOD. 4 SAWCUT, REMOVE, AND DISPOSE OF EXISTING CONCRETE CURB; AND CURB & GUTTER 3 SAWCUT, REMOVE, AND DISPOSE OF EXISTING CONCRETE CROSS-GUTTER TO NEAREST JOINT CONSTRUCT 8" CURB & GUTTER PER CITY OF LA QUINTA STD. 202, 3" DOWEL INTO ADJACENT EXISTING CONCRETE CURB 5 REMOVE EXISTING PCC BUS TURNOUT PAVEMENT 6 CONSTRUCT PORTION OF CROSS-GUTTER PER CITY OF LA QUINTA STD. 230 & 231 MODIFIED TO MATCH EXISTING WIDTH, MAINTAIN EXISTING FLOW PATTERN 8 PROTECT IN PLACE1 Consulting NAI MA T C H L I N E S T A 4 7 + 0 0 SE E B O T T O M L E F T MA T C H L I N E S T A 4 7 + 0 0 SE E T O P R I G H T 04020 40 80 120 SCALE: 1"=40' S C A L E : 1 " = 4 0 ' MA T C H L I N E S T A 3 4 + 0 0 SE E S H E E T 4 M A T C H L I N E S T A 5 9 + 0 0 S E E S H E E T 6 1 1 3/18/25 LG AC THICKNESS REVISED IN LEGEND 18 PLACE 5.5" ASPHALT CONCRETE OVER PULVERIZED BASE PULVERIZE 13" OF ROAD SECTION FROM EXISTING (THREE STEP PROCESS), REMOVE EXCESS, GRADE, AND COMPACT TO 7.5" DEPTH 20 UTILITY ASSEMBLY TO BE PROTECTED IN PLACE 17 19 UTILITY FRAME AND COVER TO BE ADJUSTED TO FINAL GRADE BY CVWD. CONTRACTOR TO COORDINATE WITH CVWD NOTES TO CONTRACTOR: 1.REMOVE ALL VEHICLE DETECTION LOOPS (UNLESS OTHERWISE SPECIFIED BY THE CITY). 2.PROTECT IN PLACE ALL SURVEY MONUMENTS OR RE-ESTABLISH PER GENERAL NOTES. 3.PROTECT IN PLACE ALL EXISTING SIGNS, UNLESS OTHERWISE SPECIFIED BY THE PLANS. 4.REFRESH EXISTING STRIPING, PAVEMENT MARKINGS, AND CROSS-WALKS ON ALL LEGS AND CROSS STREETS 25' BEYOND THE LIMIT LINE AND CROSS-WALKS. 5.STATIONING AND CENTERLINE IS SHOWN FOR REFERENCE ONLY AND HAS NOT BEEN TIED DOWN BY SURVEYOR. 6.CONTRACTOR IS RESPONSIBLE TO POTHOLE ALL EXISTING FACILITIES IN PULVERIZED AREAS TO DETERMINE THE DEPTH AND DIRECTION OF UNDERGROUND FACILITIES. CONSTRUCTION NOTES:LEGEND: DENSE TREES T J J J J J J HWY 111 59+00 60+00 61+00 62+00 63+00 64+00 65+00 66+00 67+00 68+00 69+00 70+00 TEL. MH FRONTIER CAUTION! EX. 6" HIGH PRESSURE GAS MAIN 1 20 STA 64+63.49 HIGHWAY 111= ADAMS STREET CURB & GUTTER, TYP. EX. R/W EX. R/W5 CONC. BUS PAD 1 CURB, TYP.1 1X-GUTTER, TYP. 16 17 18 17 18 2' 16 END PVMT RECON EXACT LOCATION T.B.D. IN FIELD BY CITY END PVMT REHAB EXACT LOCATION T.B.D. IN FIELD BY CITY 1 MEDIAN CURB & GUTTER, TYP. SEE DETAIL "F", SHEET 11 SEE DETAIL "G", SHEET 11 2' 19 2' 5 EA 19 A D A M S S T R E E T 12 3 8 44' 68' 70' 70' 76' 73' 43' 70' 80' 66' 512 12' LANDSCAPE & SIDEWALK EASEMENT LANDSCAPE & PUBLIC UTILITY EASEMENT 16 19 DENSE TREES DENSE TREES T J J J J J J J J J J J J J HWY 111 AU T O C E N T E R WA Y N O R T H 70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00 81+00 82+00 83+00 LA Q U I N T A DR I V E 1 20TEL. MH FRONTIER STA 78+33.87 HIGHWAY 111= LA QUINTA DRIVE CURB & GUTTER, TYP.EX. R/W EX. R/W CAUTION! EX. 6" HIGH PRESSURE GAS MAIN 17 18 17 18 1X-GUTTER, TYP. 1 MEDIAN CURB, TYP. SEE DETAIL "I", SHEET 11 SEE DETAIL "H", SHEET 11 19 63'± 50' 55' 70' 44' 68' 70' 70'44' 52' 45' FUTURE DEVELOPMENT IMPROVEMENTS PULVERIZE OF ROAD SECTION FROM EXISTING 5.5" ASPHALT CONCRETE OVER PULVERIZED BASE GRIND AND ASPHALT CONCRETE OVERLAY REMOVE EXISTING SIDEWALK/RAMP/X-GUTTER CONSTRUCT CONCRETE IMPROVEMENTS RIGHT-OF-WAY (EXISTING) CENTERLINE SAWCUT LIMITS GRIND AND ASPHALT CONCRETE OVERLAY LIMITS 3 SAWCUT, REMOVE, AND DISPOSE OF EXISTING CONCRETE CROSS-GUTTER TO NEAREST JOINT PROTECT IN PLACE1 16 2" GRIND AND ASPHALT CONCRETE OVERLAY; FILL ALL CRACKS 1/4" AND LARGER PRIOR TO OVERLAY 5 REMOVE EXISTING PCC BUS TURNOUT PAVEMENT CONSTRUCT PORTION OF CROSS-GUTTER PER CITY OF LA QUINTA STD. 230 & 231 MODIFIED TO MATCH EXISTING WIDTH, MAINTAIN EXISTING FLOW PATTERN 8 12 CONSTRUCT PCC BUS PAD PER CITY OF LA QUINTA STD. 650 MOD. Consulting NAI MA T C H L I N E S T A 7 0 + 0 0 SE E T O P R I G H T 04020 40 80 120 SCALE: 1"=40' S C A L E : 1 " = 4 0 ' MA T C H L I N E S T A 5 9 + 0 0 SE E S H E E T 5 M A T C H L I N E S T A 7 0 + 0 0 S E E B O T T O M L E F T MA T C H L I N E S T A 8 3 + 0 0 SE E S H E E T 7 04020 40 80 120 SCALE: 1"=40' S C A L E : 1 " = 4 0 ' 1 3/18/25 LG AC THICKNESS REVISED IN LEGEND 1 18 PLACE 5.5" ASPHALT CONCRETE OVER PULVERIZED BASE PULVERIZE 13" OF ROAD SECTION FROM EXISTING (THREE STEP PROCESS), REMOVE EXCESS, GRADE, AND COMPACT TO 7.5" DEPTH 20 UTILITY ASSEMBLY TO BE PROTECTED IN PLACE 16 2" GRIND AND ASPHALT CONCRETE OVERLAY; FILL ALL CRACKS 1/4" AND LARGER PRIOR TO OVERLAY 17 19 UTILITY FRAME AND COVER TO BE ADJUSTED TO FINAL GRADE BY CVWD. CONTRACTOR TO COORDINATE WITH CVWD NOTES TO CONTRACTOR: 1.REMOVE ALL VEHICLE DETECTION LOOPS (UNLESS OTHERWISE SPECIFIED BY THE CITY). 2.PROTECT IN PLACE ALL SURVEY MONUMENTS OR RE-ESTABLISH PER GENERAL NOTES. 3.PROTECT IN PLACE ALL EXISTING SIGNS, UNLESS OTHERWISE SPECIFIED BY THE PLANS. 4.REFRESH EXISTING STRIPING, PAVEMENT MARKINGS, AND CROSS-WALKS ON ALL LEGS AND CROSS STREETS 25' BEYOND THE LIMIT LINE AND CROSS-WALKS. 5.STATIONING AND CENTERLINE IS SHOWN FOR REFERENCE ONLY AND HAS NOT BEEN TIED DOWN BY SURVEYOR. 6.CONTRACTOR IS RESPONSIBLE TO POTHOLE ALL EXISTING FACILITIES IN PULVERIZED AREAS TO DETERMINE THE DEPTH AND DIRECTION OF UNDERGROUND FACILITIES. CONSTRUCTION NOTES: PROTECT IN PLACE1 2 SAWCUT, REMOVE, AND DISPOSE OF EXISTING CONCRETE PAVEMENT/SIDEWALK/RAMP TO NEAREST JOINT LEGEND: DENSETREES DENSETREES DENSETREES DENSETREES J J J JJJ J J J J J J J HWY 111 83+00 84+00 85+00 86+00 87+00 88+00 89+00 90+00 91+00 92+00 93+00 94+00 95+00 96+00 EX. R/W CAUTION! EX. 6" HIGH PRESSURE GAS MAIN 19 EX. R/W 16 1 CONC. BUS PAD 1 1 MEDIAN CURB & GUTTER, TYP. 1 X-GUTTER, TYP. 1 CURB & GUTTER, TYP. END PVMT REHAB EXACT LOCATION T.B.D. IN FIELD BY CITY STA 91+45.57 HIGHWAY 111= DUNE PALMS ROAD 17 18 17 18 SEE DETAIL "J", SHEET 12 SEE DETAIL "K", SHEET 12 CONC. BUS PAD 2' 19 4 EA 193 EA 2' 20TEL. MH FRONTIER 70' 78' 46' 74' 70' 78' 44' 76' 68'70' 86' 44' 48' 54' 38'±55'45' FUTURE DEVELOPMENT IMPROVEMENTS 16 2 DU N E P A L M S RO A D DENSETREES DENSE DENSETREES J T J J J J JJ J J J J J JJ HWY 111 96+00 97+00 98+00 99+00 100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00 109+00 20TEL. MH FRONTIER 193 EA CAUTION! EX. 6" HIGH PRESSURE GAS MAIN 19 EX. R/W EX. R/W DE P O T DR I V E 20 19 16 1 17 18 17 18 CURB & GUTTER, TYP.1 1 MEDIAN CURB, TYP. CO S T C O DR I V E SEE DETAIL "M", SHEET 12 19SEE DETAIL "L", SHEET 12 X-GUTTER, TYP. TEL. MH FRONTIER END PVMT REHAB EXACT LOCATION T.B.D. IN FIELD BY CITY 66' 86' 78' 74' 54'78' 74' 46' 46' 54' 70' 70' 50' SIDEWALK EASEMENT 2' PULVERIZE OF ROAD SECTION FROM EXISTING 5.5" ASPHALT CONCRETE OVER PULVERIZED BASE GRIND AND ASPHALT CONCRETE OVERLAY RIGHT-OF-WAY (EXISTING) CENTERLINE SAWCUT LIMITS GRIND AND ASPHALT CONCRETE OVERLAY LIMITS Consulting NAI MA T C H L I N E S T A 9 6 + 0 0 SE E T O P R I G H T MA T C H L I N E S T A 8 3 + 0 0 SE E S H E E T 6 MA T C H L I N E S T A 1 0 9 + 0 0 SE E S H E E T 8 04020 40 80 120 SCALE: 1"=40' SC A L E : 1 " = 4 0 ' MA T C H L I N E S T A 9 6 + 0 0 SE E B O T T O M L E F T 1 1 3/18/25 LG AC THICKNESS REVISED IN LEGEND 12 CONSTRUCT PCC BUS PAD PER CITY OF LA QUINTA STD. 650 MOD. NOTES TO CONTRACTOR: 1.REMOVE ALL VEHICLE DETECTION LOOPS (UNLESS OTHERWISE SPECIFIED BY THE CITY). 2.PROTECT IN PLACE ALL SURVEY MONUMENTS OR RE-ESTABLISH PER GENERAL NOTES. 3.PROTECT IN PLACE ALL EXISTING SIGNS, UNLESS OTHERWISE SPECIFIED BY THE PLANS. 4.REFRESH EXISTING STRIPING, PAVEMENT MARKINGS, AND CROSS-WALKS ON ALL LEGS AND CROSS STREETS 25' BEYOND THE LIMIT LINE AND CROSS-WALKS. 5.STATIONING AND CENTERLINE IS SHOWN FOR REFERENCE ONLY AND HAS NOT BEEN TIED DOWN BY SURVEYOR. 6.CONTRACTOR IS RESPONSIBLE TO POTHOLE ALL EXISTING FACILITIES IN PULVERIZED AREAS TO DETERMINE THE DEPTH AND DIRECTION OF UNDERGROUND FACILITIES. CONSTRUCTION NOTES: PROTECT IN PLACE1 DENSETREES TREES J T J J J J J J J J JJ J HWY 111 JE F F E R S O N ST R E E T 109+00 110+00 111+00 112+00 113+00 114+00 115+00 116+00 117+00 117+96 CAUTION! EX. 6" HIGH PRESSURE GAS MAIN 19 EX. R/W EX. R/W END PVMT REHAB EXACT LOCATION T.B.D. IN FIELD BY CITY 19 CI T Y O F LA Q U I N T A CI T Y O F I N D I O END PVMT REHAB EXACT LOCATION T.B.D. IN FIELD BY CITY2'16 16 2' 16 17 1 X-GUTTER, TYP. 5 17 18 18 1CURB & GUTTER, TYP. 1MEDIAN CURB, TYP. SEE DETAIL "B", SHEET 9 STA 117+96.19 HIGHWAY 111= JEFFERSON STREET 12 2' 46' 86' 70' 54' 46'78' 14' SIDEWALK EASEMENT LEGEND: PULVERIZE OF ROAD SECTION FROM EXISTING 5.5" ASPHALT CONCRETE OVER PULVERIZED BASE GRIND AND ASPHALT CONCRETE OVERLAY REMOVE EXISTING SIDEWALK/RAMP/X-GUTTER CONSTRUCT CONCRETE IMPROVEMENTS RIGHT-OF-WAY (EXISTING) CENTERLINE SAWCUT LIMITS GRIND AND ASPHALT CONCRETE OVERLAY LIMITS 5 REMOVE EXISTING PCC BUS TURNOUT PAVEMENT 18 PLACE 5.5" ASPHALT CONCRETE OVER PULVERIZED BASE PULVERIZE 13" OF ROAD SECTION FROM EXISTING (THREE STEP PROCESS), REMOVE EXCESS, GRADE, AND COMPACT TO 7.5" DEPTH 16 2" GRIND AND ASPHALT CONCRETE OVERLAY; FILL ALL CRACKS 1/4" AND LARGER PRIOR TO OVERLAY 17 19 UTILITY FRAME AND COVER TO BE ADJUSTED TO FINAL GRADE BY CVWD. CONTRACTOR TO COORDINATE WITH CVWD DE N S E TR E E S WASHINGTON STREET 28 + 0 0 29+ 0 0 30+ 0 0 HW Y 1 1 1 END PVMT REHAB EXACT LOCATION T.B.D. IN FIELD BY CITY 12'± EX. R/W 16 1MEDIAN ISLAND 37'44' 95'83' EX. R/W 1CURB & GUTTER, TYP. END PVMT REHAB EXACT LOCATION T.B.D. IN FIELD BY CITY 19 19 21 2 EA 3 EA 2 EA 1 CURB & GUTTER, TYP. 1 MEDIAN CURB, TYP. 16 193 EA 27' 1 X-GUTTER 19 3 EA REMOVE EXISTING RED BIRD-OF-PARADISE SHRUB 21 ADJUST DRAINAGE MANHOLE FRAME AND COVER TO FINAL GRADE PER CVWD STANDARD PLAN S-1B Consulting NAI 04020 40 80 120 SCALE: 1"=40' SC A L E : 1 " = 4 0 ' MA T C H L I N E S T A 1 0 9 + 0 0 SE E S H E E T 7 04020 40 80 120 SCALE: 1"=40' SCALE: 1"=40' HW Y 1 1 1 SE E S H E E T 4 1 3/18/25 LG AC THICKNESS REVISED IN LEGEND 1 2022-25 Hwy 111_Addendum 01 Final Audit Report 2025-03-21 Created:2025-03-21 By:Carley Escarrega (cescarrega@laquintaca.gov) Status:Signed Transaction ID:CBJCHBCAABAAsZ8TX0gHAspBazDmbVBmz5bg933FiSDp "2022-25 Hwy 111_Addendum 01" History Document created by Carley Escarrega (cescarrega@laquintaca.gov) 2025-03-21 - 3:50:24 PM GMT Document emailed to uayon@laquintaca.gov for signature 2025-03-21 - 3:50:50 PM GMT Email viewed by uayon@laquintaca.gov 2025-03-21 - 3:51:04 PM GMT Signer uayon@laquintaca.gov entered name at signing as Ubaldo Ayon 2025-03-21 - 5:03:53 PM GMT Document e-signed by Ubaldo Ayon (uayon@laquintaca.gov) Signature Date: 2025-03-21 - 5:03:55 PM GMT - Time Source: server Agreement completed. 2025-03-21 - 5:03:55 PM GMT