Loading...
2022 Urban Habitat - Change Order 3 - X-Park Lands & Irrigation Project 2016-03Gta QaLtkv — (,EENM Fd,,-L)E:TK1- — TO: Jon McMillen, City Manager FROM: Bryan McKinney, P.E., Public Works Director/City Engineer Via: Carley Escarrega, Management Assistant DATE: September 27, 2022 RE: Contract Change Order No. 3 X-Park Landscaping and Irrigation Improvements Project No. 2016-03G Attached for your signatures is one (1) electronic Contract Change Order No. 3 between Urban Habitat and the City of La Quinta for the project referenced above. DESCRIPTION OF CHANGE This Contract Change Order allows for addition of drains at the basins Total $ 30,715.39 Please sign and return the original to the City Clerk for final distribution. REQUESTING DEPARTMENT TO CHECK THE ITEMS BELOW AS APPROPRIATE: X Contract payments will be charged to the construction account number: 401-0000-60188-2016-03G-CT Authority to execute this agreement is based upon: X City Manager's signature authority provided under Resolution No. 2019-021 for budgeted expenditures of $50,000 or less. City Council approval on The following Budget Summary is provided: Project Budget $ 614,820 Contract Amount ($ 529,820) Contract Change Orders No. 1 and 2 ($ 5,688) This Contract Change Order No. 3 ($ 30,715) Balance Remaining $ 48,S97 As indicated, adequate funding is available. 78-495 Calle Tampico La Quinta, CA 92253 760.777.7000 i�+Lrli�IW ( 11 IFORMA Sheet 1 of 3 CONTRACT: X-Park Landscaping and Irrigation Improvements PROJECT NO. 2016-03G CONTRACTOR: Urban Habitat PO Box 1177 La Quinta, CA 92247 CONTRACT CHANGE ORDER NO. 3 Pursuant to the terms of the original Contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated all work shall conform to the terms, general conditions, and special provisions of the original Contract. DESCRIPTION OF CHANGE This Contract Change Order allows addition of drains at the basins Total $30,715.39 Original Contract Amount Change Orders No. 1 - 2 $ 529,819.52 $ 5,688.21 Add This Change Order No. 3 $ 30,715.39 Revised Contract Total $ 566,223.12 By reason of this contract change order the time of completion is adjusted as follows: - 12 - days added to contract time. The contract completion date shall be: 10/13/2022 Digitally igmd by Lanaea Gruehl Va�a� Data: 2022 09 2713:12:06 -07'00' Submitted By: Approved Digitally agne by Bryan MCIOnmy DN:-=Bryan McKinney, o ou anon=b kinney®laWantacago, 9/27/22 c=U9 Dale: 2022 D927133957-07'00' r)gktA- ***yc�c��rycyk3k�k�k�k�c�k�c�k�k�k�k�k***�k�K*�K*�K*yk*�kyK�k�k�kyk�k�k*****�K*�k*�kyk�k*�k*�K�k*�K�K*�k�kyK* We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment furnish all materials, perform all labor, except as may be noted above, and perform all services necessary to complete the above specified work, and hereby accept as full payment the amount shown above, which includes all direct and indirect overhead expenses for any delays. Brett Brennan �ae:202209.2711:3o:ca T a' President Accepted By: Title: Urban Habitat 09/27/2022 Contractor: Date: Change Order Request "BVRBN 0 KI HABITAT LANDSCAPECONTRACTOR!$ PROJECT: X Park Project CHANGE ORDER NUMBER: 4 DATE: 9/27/2022 PROJECT NUMBER: 22-25 TO CONTRACTOR: City of La Quinta CONTRACT DATE: The Contract is changed as follows: See below cost to add drains at the Basins per site request. 1) See attached subcotractor cost. $ 30,715.39 Total $ 30,715.39 The original Contract Sum was $ 529,819.52 Net change by previously authorized Change orders $ 5,688.21 The Contract Sum prior to this Change order was $ 535,507.73 The Contract Sum will be amended by this Change Order in the amount of $ 30,715.39 The new Contract Sum including this Change Order will be $ 566,223.12 The Contract Time will be amended by 12 days The date of Substantial Completion as of the date of this Change Order therefore is Urban Habitat SUBCONTRACTOR PO Box 1177, La Quinta, CA 92247 Address BY DATE 9/27/22 OWNER Address BY DATE AIA Form G701 COR WORKSHEET DESCRIPTION OF CHANGE: Add Drains at Basins PROJECT: X- Park Type Qty I Units Description Cost Each Subtotal Mark -Up Sub Total Bonding Price Total J - I Demolition and Disposal Misc. 35 EA 24" x 18"x 4" Quickcrete/Concrete Drain Inlet (3sf/Each) $12.00 $420.00 $63.00 $483.00 $7.25 $ 490.25 Misc. 1 LS Forming Materials $500.00 $500.00 $75.00 $575.00 $8.63 $ 583.63 Misc. 87.5 HR Concrete Forming/Mix/Finishing Labor (2.5 Hours/Each) $85.00 $7,437.50 $1,115.63 $8,553.13 $128.30 $ 8,681.42 Misc. 2 DAY Concrete Mixer Rental/Fuel $150.00 $300.00 $45.00 $345.00 $5.18 $ 350.18 Misc. 35 LF 4" Flat Drain Inlet Tan $3.88 $135.80 $20.37 $156.17 $2.34 $ 158.51 Misc. 35 LF 4" Pop Up Drain Cap Tan $12.10 $423.50 $63.53 $487.03 $7.31 $ 494.33 Misc. 1225 LF 4" SDR 35 Drain Pipe $3.52 $4,312.00 $646.80 $4,958.80 $74.38 $ 5,033.18 Misc. 35 EA 4" PVC Drain Coupling $3.67 $128.45 $19.27 $147.72 $2.22 $ 149.93 Misc. 70 EA 22.5 Degree 4" PVC Drain Ell $5.20 $364.00 $54.60 $418.60 $6.28 $ 424.88 Misc. 35 EA 90 Degree 4" PVC Drain Ell $5.50 $192.50 $28.88 $221.38 $3.32 $ 224.70 Misc. 1 GAL PVC Glue $111.10 $111.10 $16.67 $127.77 $1.92 $ 129.68 Misc. 87.5 HR Excavation/ BackfiII/Pipe Fitter Labor (2.5 Hours/Each) $85.00 $7,437.50 $1,115.63 $8,553.13 $128.30 $ 8,681.42 Misc. 17.5 HR Remove Spoils From Basin $85.00 $1,487.50 $223.13 $1,710.63 $25.66 $ 1,736.28 Misc. 2450 SF Replace Contaminated DG Per Unit Cost $1.46 $3,577.00 $0.00 $3,577.00 $0.00 $ 3,577.00 Sub Total $ 30,715.39 22.5 Degree Ell _ Formed/Finished Concrete Inlet Flat Drain Inlet 4" SDR PVC 22.5 Degree Ell 3/ 1 611 = 1 1 Pop Up Drain Outlet 22.5 Degree Ell w/Holes Drilled In Bottom CONSENT CALENDAR ITEM NO. 11 City of La Quints CITY COUNCIL MEETING: July 19, 2022 STAFF REPORT AGENDA TITLE: AWARD CONTRACT TO URBAN HABITAT FOR CONSTRUCTION OF THE LA QUINTA LANDSCAPE IMPROVEMENTS PROJECT NO. 2016-03G, LOCATED AT THE LA QUINTA X-PARK, ON THE SOUTH SIDE OF WESTWARD HO DRIVE AND EAST SIDE OF DUNE PALMS ROAD RECOMMENDATION Award a contract to Urban Habitat to construct the La Quinta Landscape Improvements Project located at the La Quinta X-Park, on the south side of Westward Ho Drive and east side of Dune Palms Road; and authorize the City Manager to execute the contract. EXECUTIVE SUMMARY • This landscape improvement project will complete the Measure G-funded La Quinta Landscape Renovation Project. The limits of the project include the frontage of the X-Park on both Dune Palms Road and Westward Ho Drive and the interior of the X-Park (Attachment 1). • The project includes: o Placing approximately 49,000 square feet of decomposed granite on the interior of the X-Park adjacent to features; o Placing parkway and driveway landscaping on approximately 30,000 square feet using the Desert Oasis plant pallet; o Wall cleaning and painting • Urban Habitat of La Quinta, California, submitted the lowest responsible and responsive bid at $529,819.52 (Attachment 2). FISCAL IMPACT The 2020/21 Capital Improvement Program (CIP) allocates $9,963,148 to Landscape Renovation projects; $9,043,914 of Measure G Funds, $426,073 of General Funds, $479,661 of CVWD reimbursement, and $13,500 of Arts in Public Places Funds. The following is the project budget: 91 Total Budget (All Phases) Phase 6.1 — Topaz Phase 6.2&6.3 — Desert Pride, Marbella & Sierra Del Re X-Park* Professional: $ 547,258 $ 20,000 $ 35,000 $ 15,000 Design: $ 699,212 $ 86,692 $ 121,070 $ 30,000 Inspection/Tes tin /Surve : $ 677,242 $ 115,000 $ 40,000 $ 10,000 Construction: $ 6,970,407 $ 648,851 $ 1,595,208 $ 529,820 Contingency: $ 1,069,029 $ 119,457 $ 160,000 $ 30,000 Total Budget: $ 9,963,148 $ 990,000 $ 1,951,278 $ 614,820 *Note: Approximately $3,000,000 is expected to be available for the construction of Landscape Renovation Turf Conversion projects (Cactus Flower). BACKGROUND/ANALYSIS These improvements will entail completing the improvements at the X-Park with landscaping. The landscaping is designed using the Desert Oasis landscape palette, which uses hardscape textures with minimal planting to create an aesthetically pleasing environment with lower installation, long-term maintenance, and water costs. Both natural and artificial turf will be used at standing and resting areas. Wall cleaning/painting complete the renovation effort. There will also be a board yard' installed to allow participants to leave portions of skate boards no longer useable; this is a concept brought over from the skate park at the La Quinta Park. In order to keep dust and maintenance at a minimum, decomposed granite, turf, and artificial turf will be used on the interior of the X-Park. This will also allow for guests to freely move around the interior of the park without the need to avoid planting material. On June 7, 2022, staff solicited construction bids from qualified contractors. The City received 2 bids on July 6, 2022. Urban Habitat of La Quinta, California, submitted the lowest responsible and responsive bid at $529,819.52. Contingent upon award of the project on July 19, 2022, the following is the project schedule: Council Considers Project Award July 19, 2022 Execute Contract and Mobilize July 20 to August 12, 2022 Construction (30 Working Days) August to September 2022 Accept Improvements October 2022 92 ALTERNATIVES Staff does not recommend an alternative. Prepared by: Julie Mignogna, Management Analyst Approved by: Bryan McKinney, P.E., Public Works Director/ City Engineer Attachments: 1. Project Vicinity Map 2. Bid Comparison Summary 93