BELC2021-0101Description: 600AMP TEMP POWER POLE, (36) 100 AMP SUB POLES, 400AMP SUB/
Type: ELECTRICAL (WEB)
Subtype: Status: EXPIRED
Applied: 7/12/2021 ECON
Approved:
Parcel No: 777490014 Site Address: 79179 AHMANSON LN LA QUINTA,CA 92253
Subdivision: PM 33367
Block: Lot: 22
Issued:
Lot Sq Ft: 0
Building Sq Ft: 0 Zoning:
Finaled:
Valuation: $50,000.00
Occupancy Type: Construction Type:
Expired: 1/12/2022 AOR
No. Buildings: 0
No. Stories: 0 No. Unites: 0
Details: DISTRO PANEL, (2) 150 KVA TRANSFORMERS
ADDITIONAL
CHRONOLOGY
CHRONOLOGY TYPE
STAFF NAME
ACTION DATE
COMPLETION DATE
NOTES
E-MAIL
JAKE FUSON
7/22/2021
7/22/2021
NOTIFIED APPLICANT OF 1ST REVIEW COMMENTS VIA EMAIL.
E-MAIL
JAKE FUSON
8/25/2021
8/25/2021
NOTIFIED NICOLE LEWIS OF 2ND REVIEW COMMENTS.
E-MAIL
JAKE FUSON
1/24/2022
1/24/2022
NOTIFIED APPLICANT OF 3RD REVIEW COMMENTS.
RESUBMITTAL
JAKE FUSON
12/21/2021
12/21/2021
CONDITIONS
CONTACTS
NAME TYPE
NAME
ADDRESSI
CITY
STATE
ZIP PHONE FAX EMAIL
APPLICANT
IE INC - NICOLE LEWIS
31225 LA BAYA
WESTLAKE
ca
91362 (661)802-1954 niewis@ipermitca.com
VILLAGE
CONTRACTOR
TEMP POWER SYSTEMS
8929 IRVINE CENTER
Irvine
Ca
92618 (661)802-1954 niewis@ipermitca.com
DR #200
Printed: Tuesday, July 19, 2022 9:51:11 AM 1 of 5 C#—?—wsrSTEMs
FINANCIAL INFORMATION
CLTD
DESCRIPTION ACCOUNT QTY AMOUNT PAID
PAID DATE RECEIPT # CHECK # METHOD PAID BY
BY
BSAS SB1473 FEE 101-0000-20306 0 $2.00 $0.00
Total Paid for BUILDING STANDARDS ADMINISTRATION $2.00 $0.00
BSA:
OTHER ELECTRICAL
101-0000-42403
0
$53.66
$0.00
EQUIPMENT
OTHER ELECTRICAL
101-0000-42600
0
$53.66
$0.00
EQUIPMENT PC
POLE LIGHTS, EA
101-0000-42403
0
$69.68
$0.00
ADDITIONAL
POLE LIGHTS, EA
101-0000-42600
0
$17.42
$0.00
ADDITIONAL PC
POLE LIGHTS, FIRST 10
101-0000-42403
0
$26.83
$0.00
POLE LIGHTS, FIRST 10
101-0000-42600
0
$26.83
$0.00
PC
TEMP POWER SERVICE
101-0000-42403
0
$26.83
$0.00
TEMP POWER SERVICE
101-0000-42600
0
$18.78
$0.00
PC
Total Paid for ELECTRICAL 2019: $293.69 $0.00
PERMIT ISSUANCE
101-0000-42404
1 0
$101.97
$0.00
Total Paid for PERMIT ISSUANCE: $101.97 $0.00
RECORDS
101-0000-42416
0
$10.00
$0.00
MANAGEMENT FEE
Total Paid for RECORDS MANAGEMENT FEE: $10.00 $0.00
Printed: Tuesday, July 19, 2022 9:51:11 AM 2 of 5 C#?wsrSrEMS
DESCRIPTION ACCOUNT I QTY I AMOUNT I PAID I PAID DATE I RECEIPT # I CHECK # I METHOD I PAID BY I I CBY
TECHNOLOGY 502-0000-43611 I 0 $5.00 I $0.00
ENHANCEMENT FEE
Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $0.00
•
REVIEWS
REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED STATUS REMARKS NOTES
DATE
PROVIDE SINGLE LINE DRAWINGS FOR EACH
ELECTRICAL SYSTEM STARTING WITH THE METER
AND INCLUDING ALL DISTRIBUTION EQUIPMENT,
TRANSFORMERS, OVERCURRENT PROTECTION,
DISCONNECTING MEANS, EQUIPMENT,
1ST BLDG NS - GROUNDING METHODS, AND CONDUCTOR SIZES,
ETRAKIT (1 DAY) SAKE FUSON 7/12/2021 7/13/2021 7/22/2021 PENDING DOCUMENTS ETC. ALSO PLEASE SHOW MORE DETAIL ON THE
ELECTRICAL SITE DRAWINGS AS SOME OF THE
HANDWRITTEN ITEMS ARE NOT LEGIBLE AND IT IS
UNCLEAR WHAT EXACTLY IS BEING PROPOSED AT
SOME AREAS. A COMPLETE REVIEW WILL BE
COMPLETED WHEN THE APPROPRIATE DESIGNS
ARE PROVIDED.
Printed: Tuesday, July 19, 2022 9:51:11 AM 3 of 5 CN—r—wsrSrEMS
2ND BLDG NS —
ETRAKIT (1 DAY)
JAKE FUSON
8/19/2021 1
8/20/2021 1
8/25/2021 1
REVISIONS REQUIRED
THERE ARE SOME INCONSISTENCIES IN THE SITE
PLAN RD OLSON PROVIDED AND THE ELECTRICAL
SHEET PROVIDED BY THE ELECTRICAL ENGINEER.
PLEASE WORK WITH THE ELECTRICAL ENGINEER
TO COORDINATE THE SINGLE LINE DIAGRAM AND
THE ELECTRICAL SITE PLAN TO ENSURE THEY
MATCH AND ARE CONSISTENT WITH EACH
OTHER. PLEASE HAVE THEM REVISE THE
FOLLOWING:
• THE DESIGNS SHOULD BE A COMPLETE
PACKAGE OF BOTH SITE PLAN, SINGLE LINE
DIAGRAM, PANEL SCHEDULES, ETC. THE SITE
PLAN APPEARS TO BE PUT TOGETHER BY A
DIFFERENT DESIGNER AND THIS MAY BE THE
REASON FOR THE INCONSISTENCIES. PLEASE
HAVE THE ELECTRICAL ENGINEER REVIEW AND
STAMP THE SITE PLAN TO ENSURE IT IS A PART OF
THE COMPLETE DESIGN AND MATCHES THE
ELECTRICAL DIAGRAMS AND PANEL SCHEDULES
• THE 100A POWER POLES THROUGHOUT THE
SITE ARE NOT REFLECTED IN THE SINGLE LINE
DIAGRAM AND THE ASSOCIATED LOADS ARE NOT
REFLECTED IN THE PANEL SCHEDULES PROVIDED
• THE DISCONNECT RATING SHOWN AT THE STEP-
UP TRANSFORMER ON THE SITE PLAN (200A)
DOES NOT MATCH THE SINGLE LINE DIAGRAM
(600A)
• THE PANEL SCHEDULES FOR PANELBOARDS
"TRP3" AND "TRAILER PNL" ARE NOT PROVIDED
Printed: Tuesday, July 19, 2022 9:51:11 AM 4 of 5 CN-r-wsrsrEMs
3RD BLDG NS (1
DAY)
JAKE FUSON
12/21/20211
12/22/2021 1
1/24/2022
REVISIONS REQUIRED
THE ELECTRICAL DESIGNS DO NOT MATCH THE
PRIVATE ELECTRICAL SYSTEM AT THIS SITE. THE
PROPOSED DESIGNS SHOW A NEW SERVICE AND
METER SUPPLIED BY A UTILITY TRANSFORMER,
WHICH IS NOT ACCURATE TO WHAT IS ON THIS
SITE. THE DESIGNS MUST BE REVISED TO SHOW
THE PRIVATE TRANSFORMER OR POWER SOURCE
SUPPLYING THIS TEMP POWER SYSTEM, SHOW
THE CONNECTION METHODS, A LOAD
CALCULATION FOR THE POWER SOURCE TO
ENSURE ADEQUATE SIZING, ETC. NOTIFIED
APPLICANT VIA EMAIL AND LET THEM KNOW I'M
WILLING TO EXPLAIN VIA TELEPHONE SINCE THIS
IS SOMETHING THAT IS NOT TYPICAL FOR MOST
SITES IN LA QUINTA.
BOND INFORMATION
Attachment Type
CREATED
OWNER
ATTACHMENTS
DESCRIPTION PATHNAME
SUBDIR
ETRAKIT ENABLED
e3617c0ed2aebc91d38b
DOC
7/12/2021
EtrakitContractor
f230592feeOf873679f5
1
(1).pdf
39a0f9446bd1276c0f95c
DOC
7/12/2021
EtrakitContractor
834c67b55e61ad48561
1
(1).pdf
93410b568efc44ec01bf2
DOC
8/18/2021
EtrakitContractor
2ND SUBMITTAL SINGLE
8bd7f8ab884d3da984a
1
LINE DIAGRAM
(1).pdf
002d93d0b97aa14b762f
DOC
8/18/2021
EtrakitContractor
2ND SUBMITTAL
e626f9e6a78a1757d2ad
1
ELECTRICAL SITE PLAN
(2).pdf
eebbadfa4ee06c8edbfl
DOC
12/21/2021
Etrakit Contractor
3RD SUBMITTAL PLAN
49887df28efb7e9982d2.
1
pdf
Printed: Tuesday, July 19, 2022 9:51:11 AM 5 of 5 C-7- WYSrEMS
6C,r,AMP IkjuyV''0 �
Mt~CILt•� sw11c1E 3A-'?
1�i���49vJ�
xuv� 4,N,av 14 Div-
2oc g 49or 'S¢♦t��S• 2
f r09fw 1'1�.1 $pCv 17+ P4SY C.
CMS' IlojZogv -14—
tvo KNockovr
(80o n 1201 LAv 3's
DIS-t. 66Af.o 45r)
�. rap uun.n.ra.
A000T—,I.o..«.b+d+.. t
. Las�mr eil.c�Prp ryD�pMs
OOR�IO.bon
RCs 0% &L\JC POLLS 3rMALL gC
55,W) 11.lyz11L►c0 sr I&YGiLOVrvy
J wEATACIL pu4c.% (ZC.LEPTA (.LL 5
�►� CALA FCF, dtAGAt LA,vtEliA4
C(2\-" pMe)r. 6 Ljecavop0 cif L�
1QGA ` ov by; t115c w17-"A
kV z )LTtm e,
4 ^ onn P k1A1.1cv v �p L,o,5 ttfwL
(,) 'LO n Ri su-
SITE STAGING PLAN
RDOC reserves tw fight tD maoay.
m retoc ar'd adjust une locations of
all crams OentA0C in Vo key as
otautructonOrepmudm m.
ILIA 4'k-V W UI%Cy n�n(�'YT (74t)
Iv Kvt ycFsmiq- "F
?t 2aa14ev -#
po KQDC.1WVT
41-)1►314o-jp
,c'UAMe-is-41l4sod y
&T Mg-EV- 1 AOM
U:,oA✓1P 23:41410'14
w Ao 6rrgTef- jrA Pt L
tiaoAMP 4st"..14 ej iZ4
orq ward iS D,Sc �Nroar 5
tY kv4 xr•LM t
?-VJA PAO GL,Vrr. t2011a''� •�
[1) twA paSYtS
>�G^•AMP stj (,VTrrl—
�4){O�n 4uvv i4 a1;LONIVI-C 5
(yl roan 4,•QV 14 0.,,5sL5
NT V-4f4a•v V
NJ ►WDCw-OvT
(1010A 1a-44'60V V
1>1L:. BOALID Alf
1? ANc t-
RD Olson Construction Trailer
Project Cooling Center
AED
Montage Site Logistical Plan
Legend
Power Distribution Pole
Black Diamond Power
Distribution Pole
600 AMP 120/208V 30
Metered Switchboard
150 KVA Step-up Transformer
120/208 - 480V
200A 480V - 3x Disc.
200A 480V 3x Riser
(3) 100A 120/208V 10 Riser
Power Distribution Pole
W/Ox-Blue Camera
Power Distribution Pole
W/Power Outlet
Shade/Water Area
Designated Cooling Center
Construction Fencing
Sanitary Stations
Roll-off Dumpsters
Electrical High Lines
All "High-lines
providing power will
be flagged.
All "High-lines
providing power will
be flagged.
All "High-lines
providing power will
be flagged.
All "High-lines
providing power will
be flagged.
Construction Entry
Gate #1
Construction Entry
Gate #2
All "High-lines
providing power will
be flagged.
This plan is diagrammatic. Elements will be shifted
to not interfere with permanent structures.