BELC2022-0117ADDITIONAL SITES
CHRONOLOGY
CONTACTS
NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL
APPLICANT R D OLSON 400 SPECTRUM CENTER
DR. STE 1200
IRVINE CA 92618 (949)610-9284 KFREEMAN@RDOLSON
.COM
CONTRACTOR R D OLSON 400 SPECTRUM CENTER
DR. STE 1200
IRVINE CA 92618 (949)610-9284 JRAMIREZ@RDOLSON.
COM
OWNER SILVER ROCK LODGING, LLC 343 FOURTH AVE SAN DIEGO CA 92101 (949)610-9284 rick@therobertgreenco
mpany.com
CONDITIONS
Description: MONTAGE SHARED SERVICES CENTER EMERGENCY STANDBY GENERATOR
Type: ELECTRICAL (WEB)Subtype: Status: UNDER REVIEW Applied: 7/6/2022 ECON
Parcel No: 777490011 Site Address: 52049 SILVERROCK WY LA QUINTA,CA 92253 Approved:
Subdivision: Block: Lot: Issued:
Lot Sq Ft: 0 Building Sq Ft: 0 Zoning: Finaled:
Valuation: $30,000.00 Occupancy Type: Construction Type: Expired: 1/6/2023 AOR
No. Buildings: 0 No. Stories: 0 No. Unites: 0
Details: FUEL FIRED GENERATR
FINANCIAL INFORMATION
Printed: Tuesday, July 19, 2022 8:57:23 AM 1 of 3
Permit Details
City of La Quinta
PERMIT NUMBER
BELC2022-0117
INSPECTIONS
REVIEWS
REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED
DATE
STATUS REMARKS NOTES
1ST PERMIT TECH –
ETRAKIT (1 DAY)
BUILDING
BUCKET
7/6/2022 7/7/2022 7/7/2022 COMPLETE ATTACHMENTS VERIFIED, REVIEWS CREATED.
1ST BLDG NS –
ETRAKIT (2 WK)
BUILDING
BUCKET
7/6/2022 7/20/2022
1ST FIRE - ETRAKIT
(2 WK)
FIRE BUCKET 7/6/2022 7/20/2022
1ST PLANNING –
ETRAKIT (2 WK)
SIJIFREDO
FERNANDEZ
7/6/2022 7/20/2022
1ST BLDG
COMPLETE (2 WK)
INTERWEST 7/7/2022 7/21/2022
PARENT PROJECTS
DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD
BY
BSAS SB1473 FEE 101-0000-20306 0 $2.00 $0.00
Total Paid for BUILDING STANDARDS ADMINISTRATION
BSA: $2.00 $0.00
PERMIT ISSUANCE 101-0000-42404 0 $105.60 $0.00
Total Paid for PERMIT ISSUANCE: $105.60 $0.00
RECORDS
MANAGEMENT FEE 101-0000-42416 0 $11.00 $0.00
Total Paid for RECORDS MANAGEMENT FEE: $11.00 $0.00
TECHNOLOGY
ENHANCEMENT FEE 502-0000-43611 0 $5.00 $0.00
Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $0.00
TOTALS:$123.60 $0.00
Printed: Tuesday, July 19, 2022 8:57:23 AM 2 of 3
Permit Details
City of La Quinta
PERMIT NUMBER
BELC2022-0117
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 7/7/2022 AJ ORTEGA PLAN SET - VOLUME 1
(ARCH)
BCPR2019-0004 - 5TH
SUBMITTAL PLAN SET -
VOLUME 1 (ARCH).pdf
0
DOC 7/7/2022 AJ ORTEGA PLAN SET - VOLUME 1
(MEP)
BCPR2019-0004 - 5TH
SUBMITTAL PLAN SET -
VOLUME 1 (MEP).pdf
0
DOC 7/7/2022 AJ ORTEGA PLAN SET - VOLUME 1
(STR)
BCPR2019-0004 - 5TH
SUBMITTAL PLAN SET -
VOLUME 1 (STR).pdf
0
DOC 7/6/2022 Etrakit Contractor 1ST SUBMITTAL PLAN
SET
BELC2022-0117 - 1ST
SUBMITTAL PLAN
SET.pdf
1
BOND INFORMATION
Printed: Tuesday, July 19, 2022 8:57:23 AM 3 of 3
Permit Details
City of La Quinta
PERMIT NUMBER
BELC2022-0117
OFFICE OF THE FIRE MARSHAL – LA QUINTA
78495 Calle Tampico, La Quinta, CA 92253 • Phone (760) 777-7074
• www.rvcfire.org
August 11, 2022
R D Olson
400 Spectrum Center Dr. #1200
Irvine, CA 92618
Re: New Emergency & Standby Power System Plan Review – MONTAGE SHARED SERVICES
BELC2022-0117 / 52049 SILVERROCK WAY, LA QUINTA, CA 92253
The plans you submitted for the above referenced project have been reviewed by Riverside County Fire
Department - Office of the Fire Marshal personnel and are approved with the following conditions.
STATIONARY GENERATORS
Shall be listed in accordance with UL 2200 and bear the UL label identifying it’s certification
LOAD TRANSFER
Emergency Power Systems shall automatically provide secondary power within 10 seconds after primary
power is lost.
LOAD DURATION
Emergency Power Systems shall be designed to provide the required power for a minimum duration of 2-
hours without being refueled or recharged.
MAINTENANCE
Emergency Power Systems shall be maintained in accordance with NFPA 110 and NFPA 111. Routine
maintenance, inspection and operational testing shall be overseen by a properly instructed individual.
TRANSFER SWITCH
The test of the transfer switch shall consist of electrically operating the transfer switch from the normal
position to the alternate position and then return to the normal position.
NOTATION OF AREA/EQUIPMENT SERVED
A permanent sign shall be installed at the Emergency Power System and Automatic Transfer Switch that
identifies the Area, Building, Equipment and Services served.
FINAL INSPECTION
Prior to operation, a Fire Department inspection is required to verify all conditions stated at plan check are
met. *Fire Storage Tank (FST2022-0001) pending final review and approval.
Applicant/installer shall be responsible to contact the Fire Department to schedule inspections. Requests for
inspections are to be made at least 48 hours in advance and may be arranged by calling (760)777-7131.
All questions regarding the meaning of these conditions should be referred to the Office of the Fire Marshal
staff at (760)777-7074.
Kohl Hetrick - Fire Safety Specialist
78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131
RIVERSIDE COUNTY FIRE PROTECTION PLANNING
RECORD OF INSPECTIONS / PERMIT CARD
THIS CARD IS TO REMAIN ON SITE AT ALL TIMES.
INSTALLING CONTRACTOR MUST BE PRESENT FOR ALL INSPECTIONS. SEE NOTES ON REVERSE SIDE.
JOB
ADDRESS: PERMIT#: DATE
ISSUED:
DESCRIPTION: CONTRACTOR:
HYDRANT SYSTEM DATE INITIALS SPECIAL SUPPRESSION DATE INITIALS
Thrust block pre-pour Door fan test
UG rough piping Abort test
UG hydro Mechanical shutdown
Flush Detector test
Final E F Deluge/pre-action
SPRINKLER U.G. Final E F
Thrust block pre-pour UST/AST TANK
UG rough piping Installation
UG hydro Removal
Flush Emergency shut off
Final E F Primary piping
FIRE SPRINKLER Secondary piping
Weld inspection Dispensers & shear valves
Overhead rough piping Final E F
Overhead hydro MISC. INSPECTIONS
UG flush / OK to connect Spray booths
Main drain/inspectors’ test Hood/duct extinguishing
High pile storage High pile rack storage
In-rack sprinklers H.P. vents/access/corridors
Hose racks Tract access/hydrant verification
Final E F Access & Address verification
HOOD EXTINGUISHING OTHER CONST. PERMIT
Detection system
Function test
Gas/electrical shut-off
Nozzle model/placement
Fire alarm connection
Final E F
SPRAY BOOTHS FIRE CODE PERMIT(S)
Installation
Air flow test
Mechanical interlock
Extinguishing system
Fire alarm connection
Final E F
FIRE ALARM KNOX SYSTEM
Rough-wire inspection Building Knox box
Function test Gate access Knox box/padlock
Duct detectors/velocity BUILDING INSPECTIONS
24 hr. battery test T/I final
Sprinkler monitoring Shell final
Final E F Final for occupancy
FINAL INSPECTION DATE: INSPECTORS SIGNATURE:
**WHEN CALLING FOR AN INSPECTION PLEASE HAVE PERMIT NUMBER READY. SEE NOTES ON REVERSE SIDE**
78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131
INSPECTION NOTES
1. Sway bracing and hangers will be inspected at the time of rough piping inspection.
2. All required hydrostatic pressure tests shall maintain 200 psi for a 2-hour duration. (EX: Residential Fire Sprinkler
Systems)
3. Fire sprinkler system remodels: if indicated on plans or this card, a hydrostatic pressure test shall be required.
4. All underground joints and thrusts blocks shall be exposed and readily visible during the hydrostatic test.
5. Contractor shall supply all testing equipment, access and operating instructions at time of test.
6. All systems shall be inspected, tested, and approved by a Fire Inspector before any work is started that may cause the
affected system to be covered or hidden.
POLICIES ON FIELD INSPECTIONS
A. INSPECTION REQUESTS: Inspections are made subject to availability. Please have the permit number available when
scheduling inspections. For City of La Quinta inspections call: (760) 777-7131.
B. APPROVED PLANS: Shall be kept on the job site at all times that work is in progress. Work shall NOT commence
without approved plans.
C. INSPECTION REQUESTS: As required by the California Fire Code, the appropriate installing contractor shall be required
to schedule the necessary inspections and be present on site for inspections.
D. RE-INSPECTIONS: Will be charged against a permit when an inspection has failed, is not ready, the responsible party not
on site or where previously noted corrections have not been completed.
E. COMMODITIES: Unless otherwise noted on approved plans or letter of conditions, no commodities shall be entered into
the structure until clearance has been granted by the Fire Dept and Building Official.
F. OCCUPANCY: Buildings shall NOT be occupied by persons other than construction workers until a Final Fire Clearance
has been granted by the Fire Dept and a Certificate for Occupancy has been issued by the Building Official.
INSPECTION NOTES:
THIS CARD IS REQURIED TO BE POSTED AT THE CONSTRUCTION SITE. THIS CARD AND APPROVED PLANS MUST BE
AVAILABLE AT THE CONSTRUCTION SITE FOR ALL INSPECTIONS.
THIS PERMIT SHALL EXPIRE AND BECOME NULL AND VOID IF THE WORK AUTHORIZED IS NOT COMMENCED WITHIN 180
DAYS OR IF THE WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS OR MORE.
THIS PERMIT IS FOR FIRE DEPARTMENT APPROVAL ONLY AND DOES NOT INTEND TO ABROGATE MORE RESTRICTIVE
REQUIREMENTS OF OTHER AGENCIES HAVING RESPONSIBILITY.