Loading...
BELC2022-0117ADDITIONAL SITES CHRONOLOGY CONTACTS NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL APPLICANT R D OLSON 400 SPECTRUM CENTER DR. STE 1200 IRVINE CA 92618 (949)610-9284 KFREEMAN@RDOLSON .COM CONTRACTOR R D OLSON 400 SPECTRUM CENTER DR. STE 1200 IRVINE CA 92618 (949)610-9284 JRAMIREZ@RDOLSON. COM OWNER SILVER ROCK LODGING, LLC 343 FOURTH AVE SAN DIEGO CA 92101 (949)610-9284 rick@therobertgreenco mpany.com CONDITIONS Description: MONTAGE SHARED SERVICES CENTER EMERGENCY STANDBY GENERATOR Type: ELECTRICAL (WEB)Subtype: Status: UNDER REVIEW Applied: 7/6/2022 ECON Parcel No: 777490011 Site Address: 52049 SILVERROCK WY LA QUINTA,CA 92253 Approved: Subdivision: Block: Lot: Issued: Lot Sq Ft: 0 Building Sq Ft: 0 Zoning: Finaled: Valuation: $30,000.00 Occupancy Type: Construction Type: Expired: 1/6/2023 AOR No. Buildings: 0 No. Stories: 0 No. Unites: 0 Details: FUEL FIRED GENERATR FINANCIAL INFORMATION Printed: Tuesday, July 19, 2022 8:57:23 AM 1 of 3 Permit Details City of La Quinta PERMIT NUMBER BELC2022-0117 INSPECTIONS REVIEWS REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED DATE STATUS REMARKS NOTES 1ST PERMIT TECH – ETRAKIT (1 DAY) BUILDING BUCKET 7/6/2022 7/7/2022 7/7/2022 COMPLETE ATTACHMENTS VERIFIED, REVIEWS CREATED. 1ST BLDG NS – ETRAKIT (2 WK) BUILDING BUCKET 7/6/2022 7/20/2022 1ST FIRE - ETRAKIT (2 WK) FIRE BUCKET 7/6/2022 7/20/2022 1ST PLANNING – ETRAKIT (2 WK) SIJIFREDO FERNANDEZ 7/6/2022 7/20/2022 1ST BLDG COMPLETE (2 WK) INTERWEST 7/7/2022 7/21/2022 PARENT PROJECTS DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD BY BSAS SB1473 FEE 101-0000-20306 0 $2.00 $0.00 Total Paid for BUILDING STANDARDS ADMINISTRATION BSA: $2.00 $0.00 PERMIT ISSUANCE 101-0000-42404 0 $105.60 $0.00 Total Paid for PERMIT ISSUANCE: $105.60 $0.00 RECORDS MANAGEMENT FEE 101-0000-42416 0 $11.00 $0.00 Total Paid for RECORDS MANAGEMENT FEE: $11.00 $0.00 TECHNOLOGY ENHANCEMENT FEE 502-0000-43611 0 $5.00 $0.00 Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $0.00 TOTALS:$123.60 $0.00 Printed: Tuesday, July 19, 2022 8:57:23 AM 2 of 3 Permit Details City of La Quinta PERMIT NUMBER BELC2022-0117 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 7/7/2022 AJ ORTEGA PLAN SET - VOLUME 1 (ARCH) BCPR2019-0004 - 5TH SUBMITTAL PLAN SET - VOLUME 1 (ARCH).pdf 0 DOC 7/7/2022 AJ ORTEGA PLAN SET - VOLUME 1 (MEP) BCPR2019-0004 - 5TH SUBMITTAL PLAN SET - VOLUME 1 (MEP).pdf 0 DOC 7/7/2022 AJ ORTEGA PLAN SET - VOLUME 1 (STR) BCPR2019-0004 - 5TH SUBMITTAL PLAN SET - VOLUME 1 (STR).pdf 0 DOC 7/6/2022 Etrakit Contractor 1ST SUBMITTAL PLAN SET BELC2022-0117 - 1ST SUBMITTAL PLAN SET.pdf 1 BOND INFORMATION Printed: Tuesday, July 19, 2022 8:57:23 AM 3 of 3 Permit Details City of La Quinta PERMIT NUMBER BELC2022-0117 OFFICE OF THE FIRE MARSHAL – LA QUINTA 78495 Calle Tampico, La Quinta, CA 92253 • Phone (760) 777-7074 • www.rvcfire.org August 11, 2022 R D Olson 400 Spectrum Center Dr. #1200 Irvine, CA 92618 Re: New Emergency & Standby Power System Plan Review – MONTAGE SHARED SERVICES BELC2022-0117 / 52049 SILVERROCK WAY, LA QUINTA, CA 92253 The plans you submitted for the above referenced project have been reviewed by Riverside County Fire Department - Office of the Fire Marshal personnel and are approved with the following conditions. STATIONARY GENERATORS Shall be listed in accordance with UL 2200 and bear the UL label identifying it’s certification LOAD TRANSFER Emergency Power Systems shall automatically provide secondary power within 10 seconds after primary power is lost. LOAD DURATION Emergency Power Systems shall be designed to provide the required power for a minimum duration of 2- hours without being refueled or recharged. MAINTENANCE Emergency Power Systems shall be maintained in accordance with NFPA 110 and NFPA 111. Routine maintenance, inspection and operational testing shall be overseen by a properly instructed individual. TRANSFER SWITCH The test of the transfer switch shall consist of electrically operating the transfer switch from the normal position to the alternate position and then return to the normal position. NOTATION OF AREA/EQUIPMENT SERVED A permanent sign shall be installed at the Emergency Power System and Automatic Transfer Switch that identifies the Area, Building, Equipment and Services served. FINAL INSPECTION Prior to operation, a Fire Department inspection is required to verify all conditions stated at plan check are met. *Fire Storage Tank (FST2022-0001) pending final review and approval. Applicant/installer shall be responsible to contact the Fire Department to schedule inspections. Requests for inspections are to be made at least 48 hours in advance and may be arranged by calling (760)777-7131. All questions regarding the meaning of these conditions should be referred to the Office of the Fire Marshal staff at (760)777-7074. Kohl Hetrick - Fire Safety Specialist 78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131 RIVERSIDE COUNTY FIRE PROTECTION PLANNING RECORD OF INSPECTIONS / PERMIT CARD THIS CARD IS TO REMAIN ON SITE AT ALL TIMES. INSTALLING CONTRACTOR MUST BE PRESENT FOR ALL INSPECTIONS. SEE NOTES ON REVERSE SIDE. JOB ADDRESS: PERMIT#: DATE ISSUED: DESCRIPTION: CONTRACTOR: HYDRANT SYSTEM DATE INITIALS SPECIAL SUPPRESSION DATE INITIALS Thrust block pre-pour Door fan test UG rough piping Abort test UG hydro Mechanical shutdown Flush Detector test Final E F Deluge/pre-action SPRINKLER U.G. Final E F Thrust block pre-pour UST/AST TANK UG rough piping Installation UG hydro Removal Flush Emergency shut off Final E F Primary piping FIRE SPRINKLER Secondary piping Weld inspection Dispensers & shear valves Overhead rough piping Final E F Overhead hydro MISC. INSPECTIONS UG flush / OK to connect Spray booths Main drain/inspectors’ test Hood/duct extinguishing High pile storage High pile rack storage In-rack sprinklers H.P. vents/access/corridors Hose racks Tract access/hydrant verification Final E F Access & Address verification HOOD EXTINGUISHING OTHER CONST. PERMIT Detection system Function test Gas/electrical shut-off Nozzle model/placement Fire alarm connection Final E F SPRAY BOOTHS FIRE CODE PERMIT(S) Installation Air flow test Mechanical interlock Extinguishing system Fire alarm connection Final E F FIRE ALARM KNOX SYSTEM Rough-wire inspection Building Knox box Function test Gate access Knox box/padlock Duct detectors/velocity BUILDING INSPECTIONS 24 hr. battery test T/I final Sprinkler monitoring Shell final Final E F Final for occupancy FINAL INSPECTION DATE: INSPECTORS SIGNATURE: **WHEN CALLING FOR AN INSPECTION PLEASE HAVE PERMIT NUMBER READY. SEE NOTES ON REVERSE SIDE** 78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131 INSPECTION NOTES 1. Sway bracing and hangers will be inspected at the time of rough piping inspection. 2. All required hydrostatic pressure tests shall maintain 200 psi for a 2-hour duration. (EX: Residential Fire Sprinkler Systems) 3. Fire sprinkler system remodels: if indicated on plans or this card, a hydrostatic pressure test shall be required. 4. All underground joints and thrusts blocks shall be exposed and readily visible during the hydrostatic test. 5. Contractor shall supply all testing equipment, access and operating instructions at time of test. 6. All systems shall be inspected, tested, and approved by a Fire Inspector before any work is started that may cause the affected system to be covered or hidden. POLICIES ON FIELD INSPECTIONS A. INSPECTION REQUESTS: Inspections are made subject to availability. Please have the permit number available when scheduling inspections. For City of La Quinta inspections call: (760) 777-7131. B. APPROVED PLANS: Shall be kept on the job site at all times that work is in progress. Work shall NOT commence without approved plans. C. INSPECTION REQUESTS: As required by the California Fire Code, the appropriate installing contractor shall be required to schedule the necessary inspections and be present on site for inspections. D. RE-INSPECTIONS: Will be charged against a permit when an inspection has failed, is not ready, the responsible party not on site or where previously noted corrections have not been completed. E. COMMODITIES: Unless otherwise noted on approved plans or letter of conditions, no commodities shall be entered into the structure until clearance has been granted by the Fire Dept and Building Official. F. OCCUPANCY: Buildings shall NOT be occupied by persons other than construction workers until a Final Fire Clearance has been granted by the Fire Dept and a Certificate for Occupancy has been issued by the Building Official. INSPECTION NOTES: THIS CARD IS REQURIED TO BE POSTED AT THE CONSTRUCTION SITE. THIS CARD AND APPROVED PLANS MUST BE AVAILABLE AT THE CONSTRUCTION SITE FOR ALL INSPECTIONS. THIS PERMIT SHALL EXPIRE AND BECOME NULL AND VOID IF THE WORK AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF THE WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS OR MORE. THIS PERMIT IS FOR FIRE DEPARTMENT APPROVAL ONLY AND DOES NOT INTEND TO ABROGATE MORE RESTRICTIVE REQUIREMENTS OF OTHER AGENCIES HAVING RESPONSIBILITY.