Loading...
BSOL2023-0218BUILDING PERMIT DESIGN & DEVELOPMENT DEPARTMENT 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 Permit Type: Solar Permit Number: BSOL2023-0218 Property Address: 53821 ROSS AVE APN: 767680044 Legal Description Property Zoning: Valuation: $75,330.00 PHONE (760) 777-7125 WWW.LAQUINTACA.GOV APPLIED DATE: 07/19/2023 ISSUED DATE: 08/28/2023 CALIFORNIA Owner: RICHARD DOAN PO BOX 8011, RANCHO SANTA FE, CA 92067 Applicant: CARMEN MESHACK 45350 SAN LUIS REY, PALM DESERT, CA 92260 Contractor: CARMEN MESHACK / 988895 45350 SAN LUIS REY, PALM DESERT, CA 92260 PRIOR TO THE ISSUANCE OF THIS PERMIT FOR CONSTRUCTION, ALTERATION, IMPROVEMENT, DEMOLITION, OR REPAIR THE OWNER, APPLICANT AND/OR CONTRACTOR UNDER PENALTY OF PERJURY HAVE AFFIRMED WHEN APPLICABLE, THROUGH THE SUBMITTAL OF FORMS OR BY OTHER ELECTRONIC MEANS, THE FOLLOWING: LICENSED CONTRACTOR OR OWNER -BUILDER DECLARATION (1 or 2) 1) They are licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and the referenced License is in full force and effect, or; 2) That they are exempt from the Contractors' State License Law for the reason(s) indicated by either (2)(a) and/or (2)(b), or (2)(c) where he or she is exempt from licensure by a valid exemption. [Section 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractors' State License Law (Chapter (commencing with Section 7000) of Division 3 of the Business and Professions Code] Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).) a) As owner of the property, or my employees with wages as their sole compensation, will do all of or portions of the work, and the structure is not intended or offered for sale (Section 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who, through employees' or personal effort, builds or improves the property, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the Owner -Builder will have the burden of proving that it was not built or improved for the purpose of sale.). b) As owner of the property, will be exclusively contracting with licensed c) Are exempt from licensure under the Contractors' State License Law. As an Owner -Builder, they acknowledge that, except for their personal residence in which they must have resided in for at least one year prior to completion of the improvements covered by this permit, they cannot legally sell a structure built as an owner -builder if it has not been constructed in its entirety by licensed contractors. It is understood that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application was submitted at the following Web site: http://www.leginfo.ca.gov/calaw.html. DECLARATION REGARDING CONSTRUCTION LENDING AGENCY (If applicable) A construction lender will be used for completion of the improvements covered by this permit and the name and information of which is on file for public inspection during the regular business hours of the public entity. Failure of the applicant to indicate the construction lender on the application does not relieve that person of the requirement to give the construction lender preliminary notice from that duty. WORKERS' COMPENSATION DECLARATION (1, 2 or 3) WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. 1) Has and will maintain a certificate of consent to self -insure for workers' compensation, issued by the Director of Industrial Relations as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 2) Has and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 3) Certifies that, in the performance of the work for which this permit is issued, shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, shall forthwith comply with those provisions. NOTICE TO APPLICANT (1, 2 and 3) 1) Each person upon whose behalf this application was made, each person at whose request and for whose benefit work is being performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents, and employees for any act or omission related to the work being performed under or following issuance of this permit. 2) Any permit issued as a result of this application becomes null and void if work is not commenced within 360 days from date of issuance of such permit, or if cessation of work for 180 days will subject permit to cancellation. On or after January 1, 2019, every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 12 months after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 12 months after the time the work is commenced. 3) Certified that they read the application and state that the information provided is correct. Agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above -mentioned property for inspection purposes. IMPORTANT: An Application for Permit was made to the Building Official, subject to the conditions and restrictions set forth at the time of application, which is now hereby an Issued Permit. If any part of the information being supplied on this permit is inaccurate or untrue, please contact the City of La Quinta at (760) 777-7125 immediately for correction. Printed: 4/23/25 1:45 pm Page 1 of 3 Permit Type: Solar BUILDING PERMIT Permit Number: Property Address BSOL2023-0218 53821 ROSS AVE LOT 39, ORIENTATION 180 DEGREES - 20.25kWDC SOLAR ARRAY - (50) 405W SEG 405-BMD-HV, (50) ENPHASE IQ7-60-2-US MICROINVERTERS, WITH 125A ENPHASE COMBINER PANEL (1005SF). 2019 CALIFORNIA ELECTRICAL CODE. PV System Type Residential System Size (kW DC) 20.25 PV Strings (EA) 4 PV Miscellaneous 1 Equipment EA Type Group Sq Ft Value Invoice No. Fee Fee Amount Amount Paid INV-00000040 PV SYSTEM GREATER THAN 10KW PC $43.77 $43.77 PERMIT ISSUANCE $110.88 $110.88 PV SYSTEM GREATER THAN 10KW $43.77 $43.77 BSAS SB1473 FEE $2.00 $2.00 TECHNOLOGY ENHANCEMENT FEE $8.00 $8.00 RECORDS MANAGEMENT FEE $11.00 $11.00 Total for Invoice lNV-00000040 $219.42 $219.42 INV-00004592 Partial Inspection Fee $87.53 $87.53 Total for Invoice lNV-00004592 $87.53 $87.53 INV-00004603 Credit Card Convenience Fee $2.19 $2.19 Total for Invoice INV-00004603 $2.19 $2.19 Grand Total for Permit $309.14 $309.14 Workflow Step / Action Name Action Type Start Date End Date Application Completeness Check v.1 08/22/2023 10:28 08/22/2023 13:56 ---------------------------------------------------------------------------------------------------------------------------------------- Submittal Document Verification v.1 Generic Action 08/22/2023 13:56 Plan Check v.1 08/22/2023 0:00 08/22/2023 14:47 ---------------------------------------------------------------------------------------------------------------------------------------- Building Review (1 Day) v.1 Receive Submittal 08/22/2023 0:00 08/22/2023 15:03 Permit Issuance v.1 08/22/2023 14:28 09/18/2023 9:56 ---------------------------------------------------------------------------------------------------------------------------------------- Verify Contractor info & Conditions have been met v.1 Generic Action 08/22/2023 14:30 ---------------------------------------------------------------------------------------------------------------------------------------- Verify & Invoice Fees v.1 Generic Action 08/22/2023 14:30 ---------------------------------------------------------------------------------------------------------------------------------------- Verify Fee Payment & Issue Permit v.1 Generic Action 08/22/2023 15:03 ---------------------------------------------------------------------------------------------------------------------------------------- Print, Attach, and Email Building Permit v.1 Create Report 09/18/2023 9:56 09/18/2023 9:56 Solar Inspections v.1 10/20/2023 0:00 ---------------------------------------------------------------------------------------------------------------------------------------- Rough Electrical v.1 Inspection 10/20/2023 0:00 10/24/2023 10:50 ---------------------------------------------------------------------------------------------------------------------------------------- Rough Electrical v.2 Inspection 11/03/2023 0:00 11/06/2023 14:52 ---------------------------------------------------------------------------------------------------------------------------------------- Rough Electrical v.3 Inspection 11/06/2023 0:00 ---------------------------------------------------------------------------------------------------------------------------------------- Rough Plumbing v.1 Inspection 10/20/2023 0:00 10/24/2023 10:50 ---------------------------------------------------------------------------------------------------------------------------------------- Rough Plumbing v.2 Inspection 11/03/2023 0:00 11/06/2023 14:49 Printed: 4/23/25 1:45 pm Page 2 of 3 BUILDING PERMIT Permit Type: Solar Permit Number: BSOL2023-0218 Property Address: 53821 ROSS AVE Rough Plumbing v.3 Inspection 11/06/2023 0:00 ----------------------------------- ----------------------------------------------------------------------------------------------------- Temp Use of Permanent Power v.1 Inspection Inspections - Final v.1 02/20/2024 16:28 02/22/2024 14:31 - Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work shall remain visible and able to be accessed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of the applicable code and other ordinances of the jurisdiction shall not be valid. It shall be the duty of the owner or the owner's authorized agent to cause the work to remain visible and able to be accessed for inspection purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this code. A building or structure shall not be used or occupied in whole or in part, and a change of occupancy of a building or structure or portion thereof shall not be made, until the building official has issued a certificate of occupancy therefor as provided herein. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the iurisdiction shall not be valid. A person shall not make connections from a utility, a source of energy, fuel, or power, or a water system or sewer system to any building or system that is regulated by the applicable code and other ordinances of the jurisdiction for which a permit is required, until approved by the building official. Printed: 4/23/25 1:45 pm Page 3 of 3 ID SEG S O L A R SIV SERIES SEG Solar INC. (SEG) redefined the high -efficiency module series by Integrating 192min silicon wafers with multi-busbar and half -cut cell technologies SEG panel combined creative technology effectively and extremely improved the module efficiency and power output. - KEY FEATURES OLess mismatch to get more power Less power loss by minimizing the shading Impact Competitive love light performance ® 3 times EL test to ensure best quality QIdeal choice for utility and commercial scale projects by reduced BoS and Improved ROI Outstanding reliability proven by PVEL for stringent environment condition. Sand, acid. salt and hailstones Anti-PID SEG SOLAR INC. (SEG) www.segsolar.com PRODUCT CERTIFICATION IEC612152016: IEC 617302016: UL1703: UL61730/C,SAICEC IEC62804 PID IEC61701 Salt Mist IEC6271 o Ammonia Resmtance IEC60068 Dust and Sand IEC61215 Hallstui�il(25nan) Fire Type(UL8173(1):1R9 (Types-HV Type29-BG) IS0140012015 1S0900t2015; ISO45001:2018 VCYCYCLE tE ^ INSURANCE PM • WARRANTY q8•, Add.troual Value Irom Lrnear Warranty 93 OS". 9D% 87 56% a1 4% BOwr TO 25 years 25 G ara uNa a prooutd 25 bnoa _p ,sar XV material and %orkmanilllp output wallanty SEG SOLAR INC. (SEG) SEG Headowner CaNtorma ofte. 6200 Sloneodge Mall Rd.Ste 300 Pleaesmon. CA W5119 SEG San Antonio Texas orfce 973 Isom Road San Anlonlo. Tx 78216 Tel 425-4684198 Web vo w. 5egsola,-, 7 SEG S O L A R Electrical Characteristics adule Type I SEG40"MD-H SEG410-BMD-HV SEG-415 EPAD-Hv SF.Gd2U-8MU-HV STC NOCT STC NOCT STC NOCT STC NOCT Maximum Power at STC (Pmp) 405 304 410 308 415 311 420 315 Open Circuit Voltage (Voc) 37.22 34.73 37.32 34.81 37.42 34.90 37.52 34.99 Short Circuit Current (Isc) 13.70 11.07 13.80 11.15 13-90 11.23 14.00 11.32 Maximum Power Voltage (Vmp) 30.93 28.91 31.05 29.05 31.16 29,19 31.28 29.33 Maximum Power Current (Imp) 13.10 10.51 13.21 10.59 13.32 10.66 13.43 10.74 Module Efficiency at STC(gm) 20.74 21.00 21.25 21.51 Power Tolerance (0. +3%) Maximum System Voltage 1500V DC Maximum Series Fuse Rating 25 A STC trradiance 1000 WJmI module temperature 25°C AM- 1.5 NOCT. Irradiance 800W/m' ambient temperature 20"C module temperature 45'C wind Speed., Inds Power measurement tolerance- +/ 3% Temperature Characteristics Pmax Temperature Coefficient -0.35 %1°C Voc Temperature Coefficient -0.27 %I*C Isc Temperature Coefficient +0.05 %rc Operating Temperature 40 -+85 °C Nominal Operating Cell Temperature (NOCT) 45±2 'C Mechanical Specifications External Dimensions 1722 x 1134 x 35 mm Weight 21.5 kg Solar Cells PERC Mono (108 pcs) Front Glass 3.21 mm AR coating tempered glass t low iron Frame Black anodized aluminium alloy Junction Box IP6813 diodes Connector Type MC4 Cable Type t Length 12 AWG PV Wire (UUIEC) it 1200 mm Mechanical Load (Front) 5400 Pa 1 113 psf` Mechanical Load (Rear) 3600 Pa ! 75 psf' 'Refer to SEG installation Manual for details Packing Configuration Container 20-GP 40'HO Pieces per Pallet 31 31 Pallets per Container 6 26 Pieces per Container 196 606 For details, please consult SEG. SEG SOLAR INC. (SEG) www-segsolar.com 35+tmm l l ss en cw.,l I� N -� GE1. 13 to I %l to64.00r e -Ni ee0>A.a�nl - 1134a2-- --te4.96a0J8en1 o 11 S9 ,4n A -A sechon B 8 6.11 2:1 101 101 'Refer to SEG installation Manual for details IN Curve Soovlicatio+s are sbbloct W rnanga wttl-"t tuM*r natincaUB SEGDB{q-2022910 i>Copyngnt 2022 SEG SEG SOLAR INC. (SEG) SEG Headquarter California ofte, 6200 Slorwroge Mal Rd.. Ste 300 Pleasanton CA 94S88 SEG San AM-., Twee off- 973 Isom Road San W-a. Tx 78216 Tat 925-468.4198 'Nab'. anew segaatar rpm Data ;hest Enphase Microinverters Raclion US Enphase IQ 7 and IQ 7+ Microinverters a vaelka To learn more about Enphase offerings visit enphase.com The high-powered smart grid -ready Enphase IQ 7 Micro`" and Enphase IQ 7+ Micro" dramatically simplify the Installation process while achieving the highest system efficiency. Part of the Enphase IQ System, the IQ 7 and IQ 7+ Microinverters integrate seamlessly with the Enphase IQ Envoy'", Enphase Q Aggregator"', Enphase IQ Battery", and the Enphase Enlighten" monitoring and analysis software. IQ Series Microinverters extend the reliability standards set forth by previous generations and undergo over a million hours of power -on testing, enabling Enphase to provide an industry -leading warranty of up to 25 years. Easy to Install Lightweight and simple Faster installation with improved, lighter two -wire cabling Built-in rapid shutdown compliant (NEC 2014 & 2017) Productive and Reliable Optimized for high powered 60-cell and 72-cell* modules More than a million hours of testing Class II double -insulated enclosure • UL listed Smart Grid Ready Complies with advanced grid support, voltage and frequency ride -through requirements Remotely updates to respond to changing grid requirements Configurable for varying grid profiles Meets CA RUle 21 (UL 1741-SA) " The IQ 7* Micro is required to support 72-cell modules �ENPHASE Enphase IQ 7 and IQ 7+ Microinverters INPUT DATA (DC) IQ7-60-2-US IQ7PLUS-72-2-US Commonly used module pairings' 235 W - 350 W + 235 W - 440 W + Module compatibility 60-cell PV modules only 60-cell and 72-cell PV modules Maximum input DC voltage 48 V 60 V Peak power tracking voltage 27 V - 37 V 27 V - 45 V Operating range 16 V - 48 V 16 V - 60 V Min/Max start voltage 22 V / 48 V 22 V 160 V Max DC short circuit current (module Isc) 15 A 15 A Overvoltage class DC port II II DC port backfeed current 0 A 0 A PV array configuration 1 x 1 ungrounded array; No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA (AC) IQ 7 Microinverter IQ 7+ Microinverter Peak output power 250 VA 295 VA Maximum continuous output power 240 VA 290 VA Nominal (L-L) voltage/range2 240 V / 208 V / 240 V / 208 V / 211-264 V 183-229 V 211-264 V 183-229 V Maximum continuous output current 1.0 A 1 15 A 1.21 A 1.39 A Nominal frequency 60 Hz 60 Hz Extended frequency range 47 - 68 Hz 47 - 68 Hz AC short circuit fault current over 3 cycles 5.8 Arms 5.8 Arms Maximum units per 20 A (L-L) branch circuit' 16 (240 VAC) 13 (240 VAC) 13 (208 VAC) 11 (208 VAC) Overvoltage class AC port III III AC port backfeed current 0 A 0 A Power factor setting 1.0 1.0 Paver factor (adjustable) 0.7 leading .. 0 7 lagging 0.7 leading .. 0.7 lagging EFFICIENCY @240 V @208 V @240 V @208 V Peak CEC efficiency 97.6 % 97.6 % 97.5 % 97.3 % CEC weighted efficiency 97.0 % 97.0 % 97.0 a 97.0 MECHANICAL DATA IQ 7 Microinverter Ambient temperature range 40°C to +65°C J __ Relative humidity range 4% to 1000,0 (condensing) Connector type MC4 (or Amphenol H4 UTX with additional Q-DCC-5 adapter) Dimensions (WxHxD) 212 mm x 175 mm x 30.2 mm (without bracket) Weight 1.08 kg (2.38 Ibs) Cooling Natural convection - No fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double -insulated, corrosion resistant polymeric enclosure Environmental category / UV exposure rating NEMA Type 6 / outdoor FEATURES Communication Power Line Communication (PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options. Both options require installation of an Enphase IQ Envoy. Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load -break disconnect required by NEC 690. Compliance CA Rule 21 (UL 1741-SA) UL 62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO. 107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC-2014 and NEC-2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according manufacturer's instructions. 1. No enforced DC/AC ratio. See the compatibility calculator at httns://enghase.com/en-us/suooULj[mgs)y-Ig�ompatjbi . 2 Nominal voltage range can be extended beyond nominal if required by the utility. 3, Limits may vary. Refer to local requirements to define the number of microinverters per branch in you. area To learn more about Enphase offerings, visit enphase.com v E N P H A S E 2018 Enphase Energy All rights reserved, All tradernarks or txands used are the property of Enphase Energy, Inc 2018-02-08 SolarWedge 011 Revolutionary Commercial Mounting System! SolarWedge by Professional Solar Products, Inc, is an innovative low profile commercial/residential PV mounting system. The system provides an easy to install and economical solution for 5, 1.0 or 15 degree structural attachment. SolarWedge integrates with Professional Solar's patented "top -down" commercial RoofTrac' and FoamJack stanchion products. The system dramatically lowers installation and shipping costs while optimizing installed wattage on the roof. Advantages of the SolarWedge= * Easy handling and Installation: Each box supports up to 30' (front & rear) of RoofTrac` support rails * Integrated Leveling System: Compensates up to 2-1/2" of roof variation using an included 1/2" x 4" stainless steel stud * Fully Engineered: Load tested to 30 lbs. per sq. ft (approx. 110 mph wind load) at up to 6' centers * Finished Aluminum Parts: Clear anodized angled support brackets match support rail. FoamJack stanchion parts are machine tumbled and cleaned to provide excellent bonding of foam, flash or SolarWedge Precision extruded angles of anodized aluminum compress the support rail at a fixed angle while dramatically Increasing the strength Leveling Feature Stud rolls Into the post up to 2-1/2" to eliminate the need for cutting studs' on the job Foamlack Each kit includes the Foam -lack' with a 3" aluminum seal plate. Size included depends on the angle purchased LouJTrtlyd 110inph Wind Lad 301bs. s9. ft 'it &' o„ Center Rail Insert - , Compression Nut 1/2" x 4" Leveling Stud \ L Rail Low Support Roof Surface Modules arc mounted in the illustrated direction to optimize performance in the Foamed bases summer months as illustrated Assembly of the SolarWedge Components of the SolarWedge(�) system easily integrate with the new XD support rail. 1 Jam Nut/ 1 /2"Washer nmpressrr.r I Nut I \3"NDRmJ— Lower Suppc Jom Nut/ t — !/2" Washc / Jam Nut, Fully Assembled Attachment Parts List (Per Box) Not to scale Shipped in a shoe box sized package, the SolarWedge XD attachment components offer easy handling and storage along with reduced shipping costs. 12 ea. � 24 ea. 40 Aluminum 1/2"SS Flat Washers 6 ea. Compression I' Dia. Aluminum Nuts Rear Posts Q 12 ea. 12 ea. 3/8SS Flat Washers to ea. Aluminum Lower Pall ® 36 ea. I"Dia.Aluminum Supports Front Posts 12 eaI i 2' SS Jam Nuts . 112' 114" SS 12 ea. Leveling O 12 ea. 1.5" Dia. Studs 3" x 3" Aluminum Aluminum Seal Plates Bases Attachment Box Dimensions Specifications are Each box contains enough 6„ subject to change attachments to ��� without notice. install up to 12" 3.3 kW� Standard SolarWedge4Teehnieal Information n10 lmit Degree Box ensions Load Tested and engineered to 30 lbs. per W (approx.110mph wind load Hlustratea 5" equivalent) � L > Utilizes FoamJack'l Laboratory tested to 2.8701bs.vertical and 2,615 Ibs.side lateral pull out using a 3/8" x 6" lag bolt (secured at approx.6-1/2"). > Structurally attached to the roof - extremely important in areas with _ - `% potential horizontal and vertical seismic movement such as California. - - _ > Available in 5, 10' or 15' angles. Optimized to help reduce typical peak summer demand charges. ` Front Extension Height - - - - - - - - - - - F All Angles --- _------- --------------- — 4' O.C. Rear View 2.5" Support Rail profeSS!onal (805)486-4700 SOLAR 1551) S. Rose Ave. pIOCiUCtS�s�l� Oxnard, CA 93033 www.prosolar.com SW200BU321 6' O.C. 'using 2111 wr,,. moautes Rear Extension Height- 15 Degree I -/. 3I4" 10 Degree 14-1 /2" +1- 3!4" 5 Degree 11` y- 3/4' 'Height from mof surface to bottom of support 1,111 6' Span between attachments for commercial construction only Drill Guide (Sold Separately) r ee Sizes 1� Available • Degree Kit) 1 • 1 Degree Kit) • 0 5 Degree The FoamJack, drill guide ensures that pilot holes are drilled 90 degrees to the Patent e6.360.491 and 0547262 rafter/beam optimizing the strength and appearance of the connection. Roof Trac #6,360,491 The Original "Top -Down" PV Mounting System E T. I us Intertek 4007217 UL2703 UL1703 Class A Fire Rated Illustrated above is how the FastJack® attachment seamlessly integrates with the RoofTrac® mounting system. protesslonal SOLAR products,: �- Juna 20t5 Integrated with FastJack° attachments The patented RogJT?ncO rail/clamp syslern installed With. the FaslA 1, attachment method provides an ideal solution far installations inhere a flashing is desired. The FaslJack® is also the solar industries preferred method of attachment for new construction roofs. All attachment hardware is concealed within the support rail leaving an aestically pleasing solar array FastJack® Installation (TileTracO on back) Splice Self -Bonding Connection The splice kit provides a solution to rigidly lock multiple tail sees together and bond the rails to one another. For more it formation jvu can visil us on the iveb at www.ProSolar.com FastJack° Connection The FastJack'o attachment provides a quick and strong installation solution. Patented design places the boll directly under the stanchion post inhere the most support is offered. This feature allows standard roofJlashings to lay flal an the roof deck, Removable post allows l*I standard,Jlashings to be slipped over the base without damaging delicate surrounding composition shingles. Flashing 1 5/6x3.5" ..ft. Lag Bolt Threshold Fast.lack't' Base 1 i & ASSOCIATES Structural F.ngineers 3CLIENT: Professional Solar Products, Inc. 1551 S. Rose Ave., Oxnard, CA 93033 Tel: 805-486-4700 Subject: Static load test results for the ProSolar,,--R) sloped roof mount: Wind Roof ASCE 7-16 Wind Mounting System Min Rail Height Max rail span Test Load exposure (ASCE 7-16) zone"* Speed rating' RoofTracc, 2" 72" 30 Ib/ft2 A, B, C I All roof 120 mph zones TEST SETUP (as shown in attached drawing detail): Modules* were bolted to 2" tall Professional Solar Products (PSP) UL2703 RoofTra0l support rails using an assembly of 5/16" Stainless Steel (SS) bolts, SS lock washers and proprietary PSP aluminum clamps and RoofTracg channel nuts. The RoofTrac"'support rail was attached to the PSP RoofTracID structural attachment device with 3/8" SS hardware at four attachment points. The setup was attached to 2"x6" wooden rafters using 5/16" x 3- 1/2" lag bolts. The attachment spans consisted of 48" front to rear with structural attachments spaced 72" on center. TEST PROCEDURE (as shown in attached drawing detail): The test set up was top loaded to above specified load per UL2703 loading guidelines (Intertek report reference: 104601549LAX). The setup remained under load for an approximate period of 30 minutes per UL2703. Any signs of permanent deformation were recorded. The test setup was then inverted and loaded to simulate the wind uplift condition. The test set up was re -loaded to above specified load. The setup remained under load for an approximate period of 30 minutes. Any signs of permanent deformation were noted. TEST RESULTS: The maximum top load resulted in no permanent deformation. The maximum uplift load resulted in no permanent deformation. This document certifies the RoofTracc mounting system withstands the stated static pressure load, equivalent to the stated wind speeds**. The mounting system performed as expected. Sincerely, James R. Vinci, S.E. This engineering report verifies that Vinci & Associates accepts and verifies the findings outlined in the Testing Report 100779407LAX-003, dated May 19, 2021. The results of this load test reflect actual deflection values and are generally accepted as the industry standard for testing module mounting systems. Vinci & Associates does not field check installations or verify that the mounting system is installed as described in this engineering report. Structural attachment: Lag bolt attachment should be installed using the proper pilot hole for optimum strength. A 5/16" lag bolt requires a 3/16" pilot hole. It is the responsibility of the installer to ensure a proper attachment is made to the structural member of the roof. Failure to securely attach to the roof structure may result in damage to equipment. personal injury or property damage. The purposed racking system may be installed on any roof up to a maximum of 24 foot above grade without further analysis. Racking shall be installed into a roof member or blocking with a 5/16" diameter screw at each Fast -jack location. Screws shall have minimum of 21/2 penetration into framing member for zone 1&2(n/e/r), and a minimum of 3" penetration into framing member for zone 3(e/r). (Zone 3 is defined as the approximately 4'-0" square at each corner of the roof) This office/report does not express an opinion as to the load bearing characteristics of the structure 9?-UT LJJf the mounting system/modules are being installed on. �O 5 IA, ICC accredited laboratory tested structural attachments manufactured by Professional Solar Products �� n (including, but not limited to FasUacks' , TileTrac,", and FoamJack") can be interchanged with this system. Any rail splice used shall be manufactured by PSP. As tested, 2.0 splice located anywhere along rail except No 41 I-T cantilever. Limit spliced rail run to approx. 45 ft. for expansion/contraction d- / 3 Check with local building department or Al-IJ for site specific requirements. S ' *Modules tested to UL1703, or equivalent, up to 23 ft2 are included in this engineering. l T CTU?, **Wind loading values relative to defined load values usingwind load exposure and gust factor F OF CA\ 1 coefficient "exposure C" as defined in the 2018(IBC) /2019(CBC)/ ASCE 7-16. Est snow load rating of 15 Ib/ft- based on 2.0 safety factor. 175 E. Wilbur Rd, Suite 103 Thousand Oaks, CA 91360 RT 2.0 Page 1 of 2 ar, 48' —I Approx2T r cantilever Total module (45 lbs ea.) and rail (12 Ibs ea.) weight: 159 Ibs Number of attachments: 4 ea Weight / attachment point: 40 Ibs Area: (3 modules) 69 ft2 Distributed weight: 2.3 lb/ ft2 5116" Stainless Steel Hex bolt 5116" Stainless Steel Lock Washer I Aluminum Roofrrac® Mid -Clamp I Aluminum RoofTraCL IS I channel nut I I 2" Aluminum RooFTrac0 Support Rail 318" Stainless Steel Hex Bolt Aluminum (' ! FastJack® / TileTrac@ Roof t Attachment* 5116" Lag Bolt i Professional Solar Products RoofTrac° Photovoltaic mounting system DOWNLOAD UPLIFT L' L RoofTrac , Solar Modules Static load test illustration RT 2.0 Page 2 of 2 No. of DC; and AG DC and modules. DC and AC rating Inverter watts of AC kW of inverters of module efficiency STC calculation system system SEG SOLAR- #SEG405-BMD-HV 405 196425 watts 20,250 watts -DC 20 3 kW -DC HIN-S365XG (BK) 376.5 r C 12,000 watts -AC 12.0 kW -AC Inverter nameplate Inverter efficiency Enphase Energy 50 240 97 0% 240vac IQ7-60-2-US Note: total watts -AC of system cannot exceed the total nameplate watt rating of the inverters TOTAL DC WATTS TOTAL AC WATTS 7/19/2023 22-028_Elway_Lot 71-B_System Watt Ratings_03-09-23 As 19642.5 watts 20,250 watts -DC 20.3 kW -DC 12,000 watts -AC 12.0 kW -AC WEIGHT LOADING ANALYSIS Solar Electric Installation RICHARD DOAN CONSTRUCTION/ #23-007_53821 Ross Avenue, La Quinta, CA 92253 Contractor: Southern California Energy Alternatives July 19, 2023 Analysis of dead load weight added by installation of solar array SEG SOLAR-#SEG-405-BMD-HV-BLK-solar module weight No. of solar modules Total weight of modules Weight of each Professional Solar Products "Roof Trac" rack set No. of rack sets Total weight of rack sets Total weight of solar array Height of each module Width of each module Area of one module Area of entire solar array Weight of solar array per unit 47.4 pounds 50 2,370 pounds 40 pounds 125 496 pounds 2.866 pounds 5.� feet 3.7 feet 21.0 square feet 1050 9 square feet nds/square foot No. of stanchions connected to rafters with lag screws 1 59 Weight loading per vertical pipe 48.9 poundsiconnection See attached sheets for engineering information on the Professioal Solar Products "Roof-Trac" racks. 7/19/2023 22-028_Elway_Weight Load Analysis_03-09-23.xls = Revisions -(/-7/23 General Project Description. 1. System is 20.250 W - STC 2. Modules 50 @ SEG-405-BMD-HV, 405 Watt Panels 3. Inverters: 50 @ Enphase IQ7-60-2-US microinverters 4. No Batteries or UPS 5. This is a tilt mounted system adding 2.8 Ib/sq 6. Spray -on foam roofing material on flat roof 7. 1 - story house 8. 2 x 4 rafters @ 16" OC with 5/8" OSB sheathing 9. ProSolar Solar Wedge 5° Kit 64" OC with 3l8" x 6" Lag Bolts 10. Standard components include ProSolar racking and mounting components, wiring, conduit, over -current protection, roofing sealant, flashings, as needed 11. All electrical equipment will be labeled with warning labels (see page 5) 12. All outdoor wiring will be weather rated 13. All module frames, equipment and conductor enclosures will be grounded 14. The system is grounded using the Prosolar Grounding System 15.This system has been calculated to meet the basic wind speed of 110 MPH and wind exposure C 16.All construction shall comply with the 2022 California Building, Residential. Mechanical, Electrical, Plumbing, Energy and Green Building Codes and the La Quinta Municipal Code 17.The installation of equipment and all associated wiring and interconnections shall be performed only by qualified persons (CEC §690.4(C)) 18.Automatic Rapid Shutdown (upon AC Grid Disconnect) integrated in Enphase inverters 19.PV source circuits and PV output circuits shall not be contained in the same raceway. cable tray. cable outlet box, junction box, or similar fittings as conductors, feeders, branch circuits of other non-PV systems. or inverter output circuits unless the conductor of the different systems are separated by a partition. PV system circuit conductors shall be identified and grouped as required by 690.31(B)(1) through (4). The means of identification shall be permitted by separate color coding. marking tape, tagging. or other approved means (CEC §690.31(8)) APN# 779-490-014 DISCLAIMER- It any Eno, Drscropancies or omm;%io n- appear in In— ma" V,specfications or other contract documants; Ttw Owner or General Con—tof mall robry the Dei to wn ring. of such error or ornisli.n. In it. event that the Owner of General Conlraclor falls to gin such nptKC- trel0re ConshUCSlon andiar IWr¢ason of IKe work. ihr• Owner or CM rat ConlracIw mI be heb reepunsihle to the roswt of any enors. discrepanoes or cmissicn and the coal of r­ifyirV them Approved by: Brandon Slater (760) 895-9474 Project Description 45-350 San Luis Rey Southern California Palm Desert, CA 92260 Contractor: Energy Alternatives 760-904-4917 CSLB # 988895 Richard Doan 53821 Ross Avenue Customer: Construction La Quinta, CA. 92253 MIC Lot 39-A REV 9 1 Scale: I Sheet 1 of 6 ARiy nil 5- APN# 779-490-014 DISCLAIMER If any Errors. Dlscrepencies or Omiss,ons appear In these dravnngs spedfkauars or other contract documents. The Or,er or General Contmaor srnll notay Ine Desq w. in writ-ng of such Brno• or ornrswon. In the event that the Owner of General Contractor falls to give such notice, before consbVcbort arsd'or I.,"catlon of Ine work. the Orrner a General Contractor pill h., nod iesWnwde to the —At al any -- discretxnaes or ortvsarnns amd the cost of rectifr g ulerr. ll A Legend: (E) Existing (N) New PL Property Line ❑ Skylight Vent ® Chimney I Mount (N) IMGHV Panda vnth 8 n�aranrerters FJectrimi Oosat: Man Senni a Panel tEj AC Dined IN) Enphow AC Combiner (Nj S ater (760) 895-9474 I Site Plan 45-350 San Luis Rey Southern California Palm Desert, CA 92260 Contrac'cr Energy Alternatives 760-904-4917 CSLB N 988895 53821 Ross Avenue Customer: Richard Doan La Qutnta, CA. 92253 Construction MIC Lot 39-A awmy N;mtw REV # Scale: 1r16" = 1' 1 Sheet 2 of 6 (N I Solar Array (E) 2 x 4 Ratters @ t G' OC with 5/g- OSB Sheathing 50 @ SEG-405-BMD-HV panels and Spray -on Foam Roofing Material 67.8" x 40.0" x 1.7' Roof Pltch: V Roof Section Scale 3/8" = 1' Legend: Approvals Date (E) Existing (� N New APN# 779-490-014 �_ pISCLAIMLN It any Errata. UlscreoW,>es or or iSstons Up— In nlese orawngs, spec —Wren or other callracl d.—nls; the Owner a Gonerai Coneactor mall notify the Destgner, in Wdlin, d Such Utter or arrtiS.tilon. In the event that the Owner or General Contraclor falls to give s� n notice. before consli Cbon alolar fawicatirin of the work, the Owner or General Contraclar will be held responsitlfe w the result of any errors. daaepancies or a*ussions and the cost d rectifying them Attachment Detail Scale 1" = 1' Approved by: Brandon 51ater (760) 895-9474 Attachment Detail 45-350 San Luis Rey Southern California Palm Desert, CA 92260 Contractor: Energy Alternatives 760-9044917 CSLB # 988895 53821 Ross Avenue Customer Richard Doan La Quinta, CA, 92253 Construction MIC Lot 39-A rawing Number, Rev x Scale: Sheet 3 of 6 PV Array (N) Junction Boxes (N) Enphase IQ Combiner N AC Disconnect (N) Main Service Panel (E) Branch Circuits of 2 x 13 and 2 x 14 Modules in Parallel an Roof Weather proof Bell box Located on Roof 2P 100A - Non -Fused 800 Amp Main Service (50) SEC-405�MD-HV Panels X40-AMl-240-B 240 V (50) Enphase 107.60-2-US Microinveners under panels 240 V NEMA 3R 4xa Output. 20.250 Watts STC hla,n Eiec next to Panel J-BOX J-BOX i I..a:rmro @ 125% = 16.25 A (1 A x 13 x 125%) tnN . & . BiwMvr. &20—p (2) # 12 THWN-2 - in Enphase G Cable SUM OF INVERTER OUTPUT: Equipment Grounding Conductor: 4 1118 THWN 2 ( ) (1) 1118 THWN-2 (AC-EGC) 1 Amp x 50 x 125% = 62.5 Amp (1) # 6 solid copper 314" EMT Conduit on Roof Wire run under panels through inverters Wire Sizing: 1,1—w%@125%= 14.88 A(1 A x 12 x 125%) #8THWN-2-55A 55A x 80% (conduit lit) x 0.58 (2) # 12 THWN-2 - rn Enphase 0 Cable Equipment Grounding Conductor (1) # 6 solid copper Legend: Wire run under panels through inverters (E) Existing (N) New Single Line Notes: 1. The DC circuit meets the requirements of ungrounded PV arrays in NEC 690.35-No additional GEC is I required. Ground Fault Protection is integrated into the inverter 2. All wire sizes are as indicated or larger. 3. Wire sizes meet the criteria of 125% continuous use factor. 4- All equipment is bonded by mechanical means or by a grounding conductor. 5- All modules are grounded mechanically using Prosolar Grounding System. 6. The system is grounded at the neutral buss in the main electrical panel. 7. The system is grid - inter le only, has no batteries or UPS. FEE" 8. Individual panels inverted from DC to AC with microinverners located under panels. 9. The Enphase Q Cable System (double insulated DIG cable) does not have neutral wire APN# 779-490-014 1�n ���, uolry rlerar i4 eetlaMwp l� WWII 0,0 12a 20flV S,xa, ecuso, 1 (2) # 4 THHNM-fWN-2 (1)111 4THHNnHWN-2-Neutral (1)# 6THHNrTHWN-2AC-EGC 1" EMT Conduit correction) = 25.52 A Wire Sizing: # 4 THWN-2.95A 95A x 100% (conduit rill) x 0.82 (temp. correction) = 77.9 A AUTOMATIC RAPID SHUTDOWN UPON AC GRID DISCONNECT INTEGRATED IN ENPHASE INVERTERS TO MEET NEC 2020 Approved by: Brandon later (760) 895-9474 1 - Line 45-350 San Luis Rey Southern California Palm Desert, CA 92260 Contractor: Energy Alternatives 760-904-4917 CSLB N 988895 Customer: DISCLAIMER: If any Ena . Discrepancies or Onpec�ea ,isuons appear in these drawings. stions or other contract d—tints; The firmer or General Contractor shall notify lne Designer. in wnlinp. of such error or omission. In the event that the Owner or General Contractor falls to gave such notice. before consinjoion andlor fabrication of the work, the Owner or General Contractor wd) be held responsible to the result of any errors. disaeoamles or ornresions and the cost of rectifying then,. raw�ng Numbi Richard Doan 53821 Ross Avenue Construction La Quinta, CA, 92253 MIC Lot 39-A REV # Scale: I Sheet 4 of 6 NEC 690.64(B)(7) NEC 690.54 NEC 690.56(B) PLACE THIS LABEL AT P.O.C. TO SERVICE DISTRIBUTION PLACE THIS LABEL AT "INTERACTIVE POINT OF BUILDINGS OR STRUCTURES WITH BOTH UTILITY SERVICE EQUIPMENT (I.E. MAIN PANEL (AND SUBPANEL IF APPLICABLE)) INTERCONNECTION' (AT MAIN SERVICE PANEL AND AND PHOTOVOLTAIC SYSTEM SHALL HAVE A PERMANENT THIS LABEL IS ONLY NECESSARY WHEN BREAKERS FEEDING SUBPANEL IF APPLICABLE) PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE PANEL EXCEEDS 100% OF BUSS RATING SERVICE DISCONNECTING MEANS AND THE PV SYSTEM DISCONNECTING MEANS IF NOT LOCATED AT THE SAME LOCATION. MAIN SERVICE PANEL SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF' POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY EXTERIOR / INTERIOR CONDUIT CAUTION: SOLAR CIRCUIT APN# 779-490-014 SOLAR ONLY SUBPANEL 13 PANEL CIRCUITS: INTERACTIVE PHOTOVOLTAIC POWER SUUHGE RATED AC OUTPUT CURRENT: 13 A _ NOMINAL OPERATING AC VOLTAGE: 240 V SOLARONLY SUBPANEL 12 PANEL CIRCUITS: AC DISCONNECT - READILY ACCESSIBLE: MAIN SERVICE PANEL: Approved by: i • • •LTAIC POWER SOURCE Brandon later (760) 895-9474 PUT CURRENT: 50Aj Labels VOLTAGE:6ATING AC 45-350 San Luis Rey Southern California Palm Desert, CA 92260 Contractor Energy Alternatives 760-904-4917 CSLB # 988895 DISCLAIMER: If any Errors. Discrepancies or Orr.Sion appear in these drawingsspeciiicarions or other conhad doa,ments The Owner or General Contractor shall notify ale Designee, in wniing of such error or omission. In No event that the Owner or General C-itractur falls to give such notice, before construction andlor tabncatwn of the wurk. the Owner or General Conuaaur will he; held roc�owsiole to:he result of any efrom discrepances or umieswns and the cost o' rectifying them. I I Richard Doan I 53821 Ross Avenue I Customer. Construction La Quinta. CA, 92253 MIC Lot 39-A REV 4 1 Scale: I Sheet 5 of 6 PLACARD FOR MAIN SERVICE PANEL: CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: APN# 779-490-014 ,DISCIlUMER: If any Errors. Discrepancies or Omissions appear In these dramngs. spectlications or other contract documents. The Owner or General Contractor shall nobly the Desigher, in w of such error or omrssion. In the event that the Owner or General Contractor falls to give such notice. Defore construction and/or fabrication of the work, me Owner or General Contractor will be held responsible to the result of any errors, discrcoanaes or omissions and the cost of reetdying them. Approved by: Brandon Siater (760) 895-9474 PLACARD 45-350 San Luis Rey Southern California Palm Desert, CA 92260 Contractor: I Energy Alternatives 760-904-4917 CSLB # 988895 Richard Doan 53821 Ross Avenue Customer: Construction La Quinta, CA, 92253 MIC Lot 39-A REV 0 1 Scale: I Sheet 6 of 6 = Revisions -(/-7/23 General Project Description. 1. System is 20.250 W - STC 2. Modules 50 @ SEG-405-BMD-HV, 405 Watt Panels 3. Inverters: 50 @ Enphase IQ7-60-2-US microinverters 4. No Batteries or UPS 5. This is a tilt mounted system adding 2.8 Ib/sq 6. Spray -on foam roofing material on flat roof 7. 1 - story house 8. 2 x 4 rafters @ 16" OC with 5/8" OSB sheathing 9. ProSolar Solar Wedge 5° Kit 64" OC with 3l8" x 6" Lag Bolts 10. Standard components include ProSolar racking and mounting components, wiring, conduit, over -current protection, roofing sealant, flashings, as needed 11. All electrical equipment will be labeled with warning labels (see page 5) 12. All outdoor wiring will be weather rated 13. All module frames, equipment and conductor enclosures will be grounded 14. The system is grounded using the Prosolar Grounding System 15.This system has been calculated to meet the basic wind speed of 110 MPH and wind exposure C 16.All construction shall comply with the 2022 California Building, Residential. Mechanical, Electrical, Plumbing, Energy and Green Building Codes and the La Quinta Municipal Code 17.The installation of equipment and all associated wiring and interconnections shall be performed only by qualified persons (CEC §690.4(C)) 18.Automatic Rapid Shutdown (upon AC Grid Disconnect) integrated in Enphase inverters 19.PV source circuits and PV output circuits shall not be contained in the same raceway. cable tray. cable outlet box, junction box, or similar fittings as conductors, feeders, branch circuits of other non-PV systems. or inverter output circuits unless the conductor of the different systems are separated by a partition. PV system circuit conductors shall be identified and grouped as required by 690.31(B)(1) through (4). The means of identification shall be permitted by separate color coding. marking tape, tagging. or other approved means (CEC §690.31(8)) APN# 779-490-014 DISCLAIMER- It any Eno, Drscropancies or omm;%io n- appear in In— ma" V,specfications or other contract documants; Ttw Owner or General Con—tof mall robry the Dei to wn ring. of such error or ornisli.n. In it. event that the Owner of General Conlraclor falls to gin such nptKC- trel0re ConshUCSlon andiar IWr¢ason of IKe work. ihr• Owner or CM rat ConlracIw mI be heb reepunsihle to the roswt of any enors. discrepanoes or cmissicn and the coal of r­ifyirV them Approved by: Brandon Slater (760) 895-9474 Project Description 45-350 San Luis Rey Southern California Palm Desert, CA 92260 Contractor: Energy Alternatives 760-904-4917 CSLB # 988895 Richard Doan 53821 Ross Avenue Customer: Construction La Quinta, CA. 92253 MIC Lot 39-A REV 9 1 Scale: I Sheet 1 of 6 ARiy nil 5- APN# 779-490-014 DISCLAIMER If any Errors. Dlscrepencies or Omiss,ons appear In these dravnngs spedfkauars or other contract documents. The Or,er or General Contmaor srnll notay Ine Desq w. in writ-ng of such Brno• or ornrswon. In the event that the Owner of General Contractor falls to give such notice, before consbVcbort arsd'or I.,"catlon of Ine work. the Orrner a General Contractor pill h., nod iesWnwde to the —At al any -- discretxnaes or ortvsarnns amd the cost of rectifr g ulerr. ll A Legend: (E) Existing (N) New PL Property Line ❑ Skylight Vent ® Chimney I Mount (N) IMGHV Panda vnth 8 n�aranrerters FJectrimi Oosat: Man Senni a Panel tEj AC Dined IN) Enphow AC Combiner (Nj S ater (760) 895-9474 I Site Plan 45-350 San Luis Rey Southern California Palm Desert, CA 92260 Contrac'cr Energy Alternatives 760-904-4917 CSLB N 988895 53821 Ross Avenue Customer: Richard Doan La Qutnta, CA. 92253 Construction MIC Lot 39-A awmy N;mtw REV # Scale: 1r16" = 1' 1 Sheet 2 of 6 (N I Solar Array (E) 2 x 4 Ratters @ t G' OC with 5/g- OSB Sheathing 50 @ SEG-405-BMD-HV panels and Spray -on Foam Roofing Material 67.8" x 40.0" x 1.7' Roof Pltch: V Roof Section Scale 3/8" = 1' Legend: Approvals Date (E) Existing (� N New APN# 779-490-014 �_ pISCLAIMLN It any Errata. UlscreoW,>es or or iSstons Up— In nlese orawngs, spec —Wren or other callracl d.—nls; the Owner a Gonerai Coneactor mall notify the Destgner, in Wdlin, d Such Utter or arrtiS.tilon. In the event that the Owner or General Contraclor falls to give s� n notice. before consli Cbon alolar fawicatirin of the work, the Owner or General Contraclar will be held responsitlfe w the result of any errors. daaepancies or a*ussions and the cost d rectifying them Attachment Detail Scale 1" = 1' Approved by: Brandon 51ater (760) 895-9474 Attachment Detail 45-350 San Luis Rey Southern California Palm Desert, CA 92260 Contractor: Energy Alternatives 760-9044917 CSLB # 988895 53821 Ross Avenue Customer Richard Doan La Quinta, CA, 92253 Construction MIC Lot 39-A rawing Number, Rev x Scale: Sheet 3 of 6 PV Array (N) Junction Boxes (N) Enphase IQ Combiner N AC Disconnect (N) Main Service Panel (E) Branch Circuits of 2 x 13 and 2 x 14 Modules in Parallel an Roof Weather proof Bell box Located on Roof 2P 100A - Non -Fused 800 Amp Main Service (50) SEC-405�MD-HV Panels X40-AMl-240-B 240 V (50) Enphase 107.60-2-US Microinveners under panels 240 V NEMA 3R 4xa Output. 20.250 Watts STC hla,n Eiec next to Panel J-BOX J-BOX i I..a:rmro @ 125% = 16.25 A (1 A x 13 x 125%) tnN . & . BiwMvr. &20—p (2) # 12 THWN-2 - in Enphase G Cable SUM OF INVERTER OUTPUT: Equipment Grounding Conductor: 4 1118 THWN 2 ( ) (1) 1118 THWN-2 (AC-EGC) 1 Amp x 50 x 125% = 62.5 Amp (1) # 6 solid copper 314" EMT Conduit on Roof Wire run under panels through inverters Wire Sizing: 1,1—w%@125%= 14.88 A(1 A x 12 x 125%) #8THWN-2-55A 55A x 80% (conduit lit) x 0.58 (2) # 12 THWN-2 - rn Enphase 0 Cable Equipment Grounding Conductor (1) # 6 solid copper Legend: Wire run under panels through inverters (E) Existing (N) New Single Line Notes: 1. The DC circuit meets the requirements of ungrounded PV arrays in NEC 690.35-No additional GEC is I required. Ground Fault Protection is integrated into the inverter 2. All wire sizes are as indicated or larger. 3. Wire sizes meet the criteria of 125% continuous use factor. 4- All equipment is bonded by mechanical means or by a grounding conductor. 5- All modules are grounded mechanically using Prosolar Grounding System. 6. The system is grounded at the neutral buss in the main electrical panel. 7. The system is grid - inter le only, has no batteries or UPS. FEE" 8. Individual panels inverted from DC to AC with microinverners located under panels. 9. The Enphase Q Cable System (double insulated DIG cable) does not have neutral wire APN# 779-490-014 1�n ���, uolry rlerar i4 eetlaMwp l� WWII 0,0 12a 20flV S,xa, ecuso, 1 (2) # 4 THHNM-fWN-2 (1)111 4THHNnHWN-2-Neutral (1)# 6THHNrTHWN-2AC-EGC 1" EMT Conduit correction) = 25.52 A Wire Sizing: # 4 THWN-2.95A 95A x 100% (conduit rill) x 0.82 (temp. correction) = 77.9 A AUTOMATIC RAPID SHUTDOWN UPON AC GRID DISCONNECT INTEGRATED IN ENPHASE INVERTERS TO MEET NEC 2020 Approved by: Brandon later (760) 895-9474 1 - Line 45-350 San Luis Rey Southern California Palm Desert, CA 92260 Contractor: Energy Alternatives 760-904-4917 CSLB N 988895 Customer: DISCLAIMER: If any Ena . Discrepancies or Onpec�ea ,isuons appear in these drawings. stions or other contract d—tints; The firmer or General Contractor shall notify lne Designer. in wnlinp. of such error or omission. In the event that the Owner or General Contractor falls to gave such notice. before consinjoion andlor fabrication of the work, the Owner or General Contractor wd) be held responsible to the result of any errors. disaeoamles or ornresions and the cost of rectifying then,. raw�ng Numbi Richard Doan 53821 Ross Avenue Construction La Quinta, CA, 92253 MIC Lot 39-A REV # Scale: I Sheet 4 of 6 NEC 690.64(B)(7) NEC 690.54 NEC 690.56(B) PLACE THIS LABEL AT P.O.C. TO SERVICE DISTRIBUTION PLACE THIS LABEL AT "INTERACTIVE POINT OF BUILDINGS OR STRUCTURES WITH BOTH UTILITY SERVICE EQUIPMENT (I.E. MAIN PANEL (AND SUBPANEL IF APPLICABLE)) INTERCONNECTION' (AT MAIN SERVICE PANEL AND AND PHOTOVOLTAIC SYSTEM SHALL HAVE A PERMANENT THIS LABEL IS ONLY NECESSARY WHEN BREAKERS FEEDING SUBPANEL IF APPLICABLE) PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE PANEL EXCEEDS 100% OF BUSS RATING SERVICE DISCONNECTING MEANS AND THE PV SYSTEM DISCONNECTING MEANS IF NOT LOCATED AT THE SAME LOCATION. MAIN SERVICE PANEL SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF' POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY EXTERIOR / INTERIOR CONDUIT CAUTION: SOLAR CIRCUIT APN# 779-490-014 SOLAR ONLY SUBPANEL 13 PANEL CIRCUITS: INTERACTIVE PHOTOVOLTAIC POWER SUUHGE RATED AC OUTPUT CURRENT: 13 A _ NOMINAL OPERATING AC VOLTAGE: 240 V SOLARONLY SUBPANEL 12 PANEL CIRCUITS: AC DISCONNECT - READILY ACCESSIBLE: MAIN SERVICE PANEL: Approved by: i • • •LTAIC POWER SOURCE Brandon later (760) 895-9474 PUT CURRENT: 50Aj Labels VOLTAGE:6ATING AC 45-350 San Luis Rey Southern California Palm Desert, CA 92260 Contractor Energy Alternatives 760-904-4917 CSLB # 988895 DISCLAIMER: If any Errors. Discrepancies or Orr.Sion appear in these drawingsspeciiicarions or other conhad doa,ments The Owner or General Contractor shall notify ale Designee, in wniing of such error or omission. In No event that the Owner or General C-itractur falls to give such notice, before construction andlor tabncatwn of the wurk. the Owner or General Conuaaur will he; held roc�owsiole to:he result of any efrom discrepances or umieswns and the cost o' rectifying them. I I Richard Doan I 53821 Ross Avenue I Customer. Construction La Quinta. CA, 92253 MIC Lot 39-A REV 4 1 Scale: I Sheet 5 of 6 PLACARD FOR MAIN SERVICE PANEL: CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: APN# 779-490-014 ,DISCIlUMER: If any Errors. Discrepancies or Omissions appear In these dramngs. spectlications or other contract documents. The Owner or General Contractor shall nobly the Desigher, in w of such error or omrssion. In the event that the Owner or General Contractor falls to give such notice. Defore construction and/or fabrication of the work, me Owner or General Contractor will be held responsible to the result of any errors, discrcoanaes or omissions and the cost of reetdying them. Approved by: Brandon Siater (760) 895-9474 PLACARD 45-350 San Luis Rey Southern California Palm Desert, CA 92260 Contractor: I Energy Alternatives 760-904-4917 CSLB # 988895 Richard Doan 53821 Ross Avenue Customer: Construction La Quinta, CA, 92253 MIC Lot 39-A REV 0 1 Scale: I Sheet 6 of 6 No. of DC; and AG DC and modules. DC and AC rating Inverter watts of AC kW of inverters of module efficiency STC calculation system system SEG SOLAR- #SEG405-BMD-HV 405 196425 watts 20,250 watts -DC 20 3 kW -DC HIN-S365XG (BK) 376.5 r C 12,000 watts -AC 12.0 kW -AC Inverter nameplate Inverter efficiency Enphase Energy 50 240 97 0% 240vac IQ7-60-2-US Note: total watts -AC of system cannot exceed the total nameplate watt rating of the inverters TOTAL DC WATTS TOTAL AC WATTS 7/19/2023 22-028_Elway_Lot 71-B_System Watt Ratings_03-09-23 As 19642.5 watts 20,250 watts -DC 20.3 kW -DC 12,000 watts -AC 12.0 kW -AC WEIGHT LOADING ANALYSIS Solar Electric Installation RICHARD DOAN CONSTRUCTION/ #23-007_53821 Ross Avenue, La Quinta, CA 92253 Contractor: Southern California Energy Alternatives July 19, 2023 Analysis of dead load weight added by installation of solar array SEG SOLAR-#SEG-405-BMD-HV-BLK-solar module weight No. of solar modules Total weight of modules Weight of each Professional Solar Products "Roof Trac" rack set No. of rack sets Total weight of rack sets Total weight of solar array Height of each module Width of each module Area of one module Area of entire solar array Weight of solar array per unit 47.4 pounds 50 2,370 pounds 40 pounds 125 496 pounds 2866 pounds 5.� feet 3.7 feet 21.0 square feet 1050 9 square feet nds/square foot No. of stanchions connected to rafters with lag screws 1 59 Weight loading per vertical pipe 48.9 poundsiconnection See attached sheets for engineering information on the Professioal Solar Products "Roof-Trac" racks. 7/19/2023 22-028_Elway_Weight Load Analysis_03-09-23.xls 7 SEG S O L A R SIV SERIES SEG Solar INC. (SEG) redefined the high -efficiency module series by Integrating 192min silicon wafers with multi-busbar and half -cut cell technologies SEG panel combined creative technology effectively and extremely improved the module efficiency and power output. - KEY FEATURES OLess mismatch to get more power Less power loss by minimizing the shading Impact Competitive low light performance ® 3 times EL test to ensure best quality QIdeal choice for utility and commercial scale projects by reduced BoS and Improved ROI Outstanding reliability proven by PVEL for stringent environment condition. Sand, acid, salt and hailstones Anti-PID SEG SOLAR INC. (SEG) www.segsolar.com PRODUCT CERTIFICATION IEC612152016: IEC 617302016: UL1703: UL61730/CSAICEC IEC62804 PID IEC61701 Salt Mist IEC6271 o Ammnnla Resistance IEC60068 Dust anil Sand IEC61215 Hallstui�il(25nan) Fire Type(UL8173(1):1R9 (Types-HV Type29-BG) ISD140012015 IS09001-2015; ISO45001:2018 CYCLE C s• 'a.CE INSURANCE PM • WARRANTY q8•, Add.troual Value trom Un— Warranty 93 OS 9D% sn.3Y. a7 55k a1 4% al! 0 5 "5 :s 20 25 yeux 25 G aranlua 00 proouQ 25 bnaar_o,m XV matelial and 101kr1111"I p output wallanty SEG SOLAR INC. (SEG) SEG Headowner Cakforma ottrce. 6200 Sloneodge Mall Rd.Ste 300 Pla—mon. CA 945BB SEG San Antonio Texas office 973 Isom Roao San Anlonlo. Tx 78216 Tel 1125-4684198 Web vMw.Segeolar cu•r, 7 SEG S O L A R Electrical Characteristics adule Type GFG-40"MU.H SEG-'71-.11O-HV SEG-415 EPAO-Hv SF.Gd2U-8MU-HV STC NOCT STC NOCT STC NOCT STC NOCT Maximum Power at STC (Pmp) 405 304 410 308 415 311 420 315 Open Circuit Voltage (Voc) 3722 34.73 37.32 34.81 37.42 34.90 37.52 34.99 Short Circuit Current (Isc) 13.70 11.07 13.80 11.15 13-90 11.23 14.00 11.32 Maximum Power Voltage (Vmp) 30.93 28.91 31.05 29.05 31.16 29,19 31.28 29.33 Maximum Power Current (Imp) 13.10 10.51 13.21 10.59 13.32 10.66 13.43 10.74 Module Efficiency at STC(gm) 20.74 21.00 21.25 21.51 Power Tolerance (0. +3%) Maximum System Voltage 1500V DC Maximum Series Fuse Rating 25 A STCr trradiance 1000 WJmI module temperature 25'C AM- 1.5 NOCT. Irradiance 800W/m' ambient temperature 20'C module temperature 45'C wind speed: cods Power measurement tolerance- +/ 3% Temperature Characteristics Pmax Temperature Coefficient -0.35 %1°C Voc Temperature Coefficient -0.27 %f°C Isc Temperature Coefficient +0.05 %rc Operating Temperature 40 -+85 °C Nominal Operating Cell Temperature (NOCT) 45±2 'C Mechanical Specifications External Dimensions 1722 x 1134 x 35 mm Weight 21.5 kg Solar Cells PERC Mono (108 pcs) Front Glass 3.21 mm AR coating tempered glass t low iron Frame Black anodized aluminium alloy Junction Box IP6813 diodes Connector Type MC4 Cable Type t Length 12 AWG PV Wire (UUIEC) it 1200 mm Mechanical Load (Front) 5400 Pa 1 113 psf` Mechanical Load (Rear) 3600 Pa ! 75 psf' 'Refer to SEG installation Manual for details Packing Configuration Container 20 GP 40'HO Pieces per Pallet 31 31 Pallets per Container 6 26 Pieces per Container 196 606 For details, please consult SEG. SEG SOLAR INC. (SEG) 1www-segsolar.com _ Merw to I i e to64 e -142 ee0:o.ae.00 "i 1,a4a2nw� --lM.96i0Aewl tt S9 .4n A -A Section 8.8 6:1 2:1 101 101 'Refer to SEG installation Manual for details IN Curve 71. Soovlicatio+s are sbbloct W cnanga wtt,"t tuM*r notincaU/ SEG05{q-2022910 oCopyngnt 2022 SEG SEG SOLAR INC. (SEG) SEG Headquarter Calilarnia ofte, 6200 SEowK*e Mal Rd.. Ste 300 Pleasanton CA 94S88 SEG San AM-. Twee oxtce 973 1.- Road San W-a. Tx 78216 T.I 925-468.4198 'Nab'. anew mq%W r rpm Data ;hest Enphase Microinverters Raclion US Enphase IQ 7 and IQ 7+ Microinverters a To learn more about Enphase offerings, visit enphase.com The high-powered smart grid -ready Enphase IQ 7 Micro`" and Enphase IQ 7+ Micro" dramatically simplify the Installation process while achieving the highest system efficiency. Part of the Enphase IQ System, the IQ 7 and IQ 7+ Microinverters integrate seamlessly with the Enphase IQ Envoy'", Enphase Q Aggregator"', Enphase IQ Battery", and the Enphase Enlighten" monitoring and analysis software. IQ Series Microinverters extend the reliability standards set forth by previous generations and undergo over a million hours of power -on testing, enabling Enphase to provide an industry -leading warranty of up to 25 years. Easy to Install Lightweight and simple Faster installation with improved, lighter two -wire cabling Built-in rapid shutdown compliant (NEC 2014 & 2017) Productive and Reliable Optimized for high powered 60-cell and 72-cell* modules More than a million hours of testing Class II double -insulated enclosure • UL listed Smart Grid Ready Complies with advanced grid support, voltage and frequency ride -through requirements Remotely updates to respond to changing grid requirements Configurable for varying grid profiles Meets CA RUle 21 (UL 1741-SA) " The IQ 7* Micro is required to support 72-cell modules �ENPHASE Enphase IQ 7 and IQ 7+ Microinverters INPUT DATA (DC) IQ7-60-2-US IQ7PLUS-72-2-US Commonly used module pairings' 235 W - 350 W + 235 W - 440 W + Module compatibility 60-cell PV modules only 60-cell and 72-cell PV modules Maximum input DC voltage 48 V 60 V Peak power tracking voltage 27 V - 37 V 27 V - 45 V Operating range 16 V - 48 V 16 V - 60 V Min/Max start voltage 22 V / 48 V 22 V 160 V Max DC short circuit current (module Isc) 15 A 15 A Overvoltage class DC port II II DC port backfeed current 0 A 0 A PV array configuration 1 x 1 ungrounded array; No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA (AC) IQ 7 Microinverter IQ 7+ Microinverter Peak output power 250 VA 295 VA Maximum continuous output power 240 VA 290 VA Nominal (L-L) voltage/range2 240 V / 208 V / 240 V / 208 V / 211-264 V 183-229 V 211-264 V 183-229 V Maximum continuous output current 1.0 A 1 15 A 1.21 A 1.39 A Nominal frequency 60 Hz 60 Hz Extended frequency range 47 - 68 Hz 47 - 68 Hz AC short circuit fault current over 3 cycles 5.8 Arms 5.8 Arms Maximum units per 20 A (L-L) branch circuit' 16 (240 VAC) 13 (240 VAC) 13 (208 VAC) 11 (208 VAC) Overvoltage class AC port III III AC port backfeed current 0 A 0 A Power factor setting 1.0 1.0 Paver factor (adjustable) 0.7 leading .. 0 7 lagging 0.7 leading .. 0.7 lagging EFFICIENCY @240 V @208 V @240 V @208 V Peak CEC efficiency 97.6 % 97.6 % 97.5 % 97.3 % CEC weighted efficiency 97.0 % 97.0 % 97.0 a 97.0 MECHANICAL DATA IQ 7 Microinverter Ambient temperature range 40°C to +651C J __ Relative humidity range 4% to 1000,0 (condensing) Connector type MC4 (or Amphenol H4 UTX with additional Q-DCC-5 adapter) Dimensions (WxHxD) 212 mm x 175 mm x 30.2 mm (without bracket) Weight 1.08 kg (2.38 Ibs) Cooling Natural convection - No fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double -insulated, corrosion resistant polymeric enclosure Environmental category / UV exposure rating NEMA Type 6 / outdoor FEATURES Communication Power Line Communication (PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options. Both options require installation of an Enphase IQ Envoy. Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load -break disconnect required by NEC 690. Compliance CA Rule 21 (UL 1741-SA) UL 62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO. 107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC-2014 and NEC-2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according manufacturer's instructions. 1. No enforced DC/AC ratio. See the compatibility calculator at httns://enghase.com/en-us/suooIg�ompatjbi 't . 2 Nominal voltage range can be extended beyond nominal if required by the utility. 3, Limits may vary. Refer to local requirements to define the number of microinverters per branch in you. area To learn more about Enphase offerings, visit enphase.com v E N P H A S E 2018 Enphase Energy All rights reserved, All trademarks or txands used are the property of Enphase Energy, Inc 2018-02-08 SolarWedge Revolutionary Commercial Mounting System! SolarWedge by Professional Solar Products, Inc, is an innovative low profile commercial/residential PV mounting system. The system provides an easy to install and economical solution for 5, 1.0 or 15 degree structural attachment. SolarWedge integrates with Professional Solar's patented "top -down" commercial RoofTrac' and FoamJack, stanchion products. The system dramatically lowers installation and shipping costs while optimizing installed wattage on the roof. Advantages of the SolarWedge= * Easy handling and Installation: Each box supports up to 30' (front & rear) of RoofTrac` support rails * Integrated Leveling System: Compensates up to 2-1/2" of roof variation using an included 1/2" x 4" stainless steel stud * Fully Engineered: Load tested to 30 lbs. per sq. ft (approx. 110 mph wind load) at up to 6' centers * Finished Aluminum Parts: Clear anodized angled support brackets match support rail. FoamJack stanchion parts are machine tumbled and cleaned to provide excellent bonding of foam, flash or SolarWedge Precision extruded angles of anodized aluminum compress the support rail at a fixed angle while dramatically Increasing the strength Leveling Feature Stud rolls Into the post up to 2-1/2" to eliminate the need for cutting studs' on the job Foamlack Each kit includes the Foam -lack' with a 3" aluminum seal plate. Size included depends on the angle purchased LouJTrtlyd 110inph Wind Lad 301bs. s9. ft 'it &' o„ Center Rail Insert - Compression Nut 1/2" x 4 Leveling Stud L Rail Low Support Roof Surface Modules arc mounted in the illustrated direction to optimize performance in the Foamed bases summer months' as illustrated Assembly of the SolarWedge Components of the SolarWedge(�) system easily integrate with the new XD support rail. 1 Jam Nut/ 1 /2"Washer IrImpresslr.r I Nut I \�3"NDRmJ- Lower Suppc Jom Nut/ t - !/2" Washc / Join Nut, Fully Assembled Attachment Parts List (Per Box) Not to scale Shipped in a shoe box sized package, the SolarWedge XD attachment components offer easy handling and storage along with reduced shipping costs. 12 ea. � 24 ea. 40 Aluminum 1/2"SS Flat Washers 6 ea. Lompressl On I' Dia. Aluminum Nuts Rear Posts Q 12 ea. 12 ea. 3/8SS Flat Washers ® 6 ea. Aluminum Lower Pall ® 36 ea. I"Dia.Aluminum Supports Front Posts 12 eaI i 2' SS Jam Nuts . 112' x 4" SS ' 12 ea. Leveling O 12 ea. 1.5" Dia. Studs 3" x 3" Aluminum Aluminum Seal Plates Bases Attachment Box Dimensions Specifications are Each box contains enough 6„ subject to change attachments to ��� without notice. install up to 12" 3.3 kW� Standard SolarWedge4Teehnieal Information n10 lmit Degree Box ensions Load Tested and engineered to 30 lbs. per W (approx.110mph wind load Hlustratea 5" equivalent) � L > Utilizes FoamJack'� Laboratory tested to 2.8701bs.vertical and 2,615 Ibs.side lateral pull out using a 3/8" x 6" lag bolt (secured at approx.6-1/2"). > Structurally attached to the roof - extremely important in areas with _ - `% potential horizontal and vertical seismic movement such as California. - - _ > Available in 5, 10' or 15' angles. Optimized to help reduce typical peak summer demand charges. Front Extension Height - - - - - - - - - - - - F All Angles --- _------- --------------- — 4' O.C. Rear View 2.5" Support Rail profeSS!onal (805)486-4700 SOLAR 1551) S. Rose Ave. pIOCiUCtS�:r�l� Oxnard, CA 93033 www.prosolar.com SW200BU321 6' O.C. 'using 2111 wr,,. moautes Rear Extension Height- 15 Degree I V -/. 3/4" 10 Degree 14-1 /2" +1- 314" 5 Degree 11` y- 3/4- 'Height from mof surface to bottom of support 1,111 6' Span between attachments for commercial construction only Drill Guide (Sold Separately) Availableee Sizes • Degree Kit) 1 • 1 Degree Kit) • 0 5 Degree The FoamJack, drill guide ensures that pilot holes are drilled 90 degrees to the Patent •6.360.491and 0547262 rafter/beam optimizing the strength and appearance of the connection. Roof Trac #6,360,491 The Original "Top -Down" PV Mounting System FIRM- E1� us Intertek 4007217 UL2703 UL1703 Class A Fire Rated Illustrated above is how the FastJack® attachment seamlessly integrates with the RoofTrac® mounting system. protesslonal SOLAR products,: �- Juna 20t5 Integrated with FastJack° attachments The patented RogJT?ncO rail/clainp syslern installed With the FastA 1, attachment method provides an ideal solution far installations inhere a flashing is desired. The FastJack® is also the solar industries preferred method of attachment for new construction roofs. All attachment hardware is concealed within the support rail leaving an aestically pleasing solar array FastJack® Installation (TileTracO on back) Splice Self -Bonding Connection The splice kit provides a solution to ,r gidly lock multiple mil sees together and bond the rails to one another. For more itrformrttion jvu can visil us on the tveb at www.ProSolar.com FastJack° Connection The FastJack'o attachment provides a quick and strong installation solution. Patented design places the boll directly under the stanchion post inhere the most support is offered. This feature allows standard roofJlashings to lay flat an the roof deck, Removable post allows t*I standard,Jlashings to be slipped over the base without damaging delicate surrounding composition shingles. Flashing 5/6x3.5" .� Lag Bolt Threshold Fast.lack't' Base 1 i & ASSOCIATES Structural F.ngineers 3CLIENT: Professional Solar Products, Inc. 1551 S. Rose Ave., Oxnard, CA 93033 Tel: 805-486-4700 Subject: Static load test results for the ProSolar,,--R) sloped roof mount: Mounting System Min Rail Height Max rail span Test Load Wind exposure Roof ASCE 7-16 Wind (ASCE 7-16) zone"" Speed rating" RoofTracc, 2" 72" 30 Ib/ft2 A, B, C All roof 120 mph zones TEST SETUP (as shown in attached drawing detail): Modules* were bolted to 2" tall Professional Solar Products (PSP) UL2703 RoofTra0l support rails using an assembly of 5/16" Stainless Steel (SS) bolts, SS lock washers and proprietary PSP aluminum clamps and RoofTrac® channel nuts. The RoofTrac"'support rail was attached to the PSP RoofTracID structural attachment device with 3/8" SS hardware at four attachment points. The setup was attached to 2"x6" wooden rafters using 5/16" x 3- 1/2" lag bolts. The attachment spans consisted of 48" front to rear with structural attachments spaced 72" on center. TEST PROCEDURE (as shown in attached drawing detail): The test set up was top loaded to above specified load per UL2703 loading guidelines (Intertek report reference: 104601549LAX). The setup remained under load for an approximate period of 30 minutes per UL2703. Any signs of permanent deformation were recorded. The test setup was then inverted and loaded to simulate the wind uplift condition. The test set up was re -loaded to above specified load. The setup remained under load for an approximate period of 30 minutes. Any signs of permanent deformation were noted. TEST RESULTS: The maximum top load resulted in no permanent deformation. The maximum uplift load resulted in no permanent deformation. This document certifies the RoofTracc mounting system withstands the stated static pressure load, equivalent to the stated wind speeds**. The mounting system performed as expected. Sincerely, James R. Vinci, S.E. This engineering report verifies that Vinci & Associates accepts and verifies the findings outlined in the Testing Report 100779407LAX-003, dated May 19, 2021. The results of this load test reflect actual deflection values and are generally accepted as the industry standard for testing module mounting systems. Vinci & Associates does not field check installations or verify that the mounting system is installed as described in this engineering report. Structural attachment: Lag bolt attachment should be installed using the proper pilot hole for optimum strength. A 5/16" lag bolt requires a 3/16" pilot hole. It is the responsibility of the installer to ensure a proper attachment is made to the structural member of the roof. Failure to securely attach to the roof structure may result in damage to equipment. personal injury or property damage. The purposed racking system may be installed on any roof up to a maximum of 24 foot above grade without further analysis. Racking shall be installed into a roof member or blocking with a 5/16" diameter screw at each Fast -jack location. Screws shall have minimum of 21/2 penetration into framing member for zone 1&2(n/e/r), and a minimum of 3" penetration into framing member for zone 3(e/r). (Zone 3 is defined as the approximately 4'-0" square at each corner of the roof) This office/report does not express an opinion as to the load bearing characteristics of the structure the mounting system/modules are being installed on. ICC accredited laboratory tested structural attachments manufactured by Professional Solar Products (including, but not limited to FasUacks' , TileTrac,", and FoamJack") can be interchanged with this system. Any rail splice used shall be manufactured by PSP. As tested, 2.0 splice located anywhere along rail except cantilever. Limit spliced rail run to approx. 45 ft. for expansion/contraction Check with local building department or AFIJ for site specific requirements. *Modules tested to UL1703, or equivalent, up to 23 ft2 are included in this engineering. **Wind loading values relative to defined load values usingwind load exposure and gust factor coefficient "exposure C" as defined in the 2018(IBC)/2019(CBC)/ ASCE 7-16. Est snow load rating of 15 Ib/ft- based on 2.0 safety factor. / QO iA 7C No 41 JCTl1RP����P `OF CAS 175 E. Wilbur Rd, Suite 103 Thousand Oaks, CA 91360 RT 2.0 Page 1 of 2 —I 4mx27' r cantilever Total module (45 lbs ea.) and rail (12 Ibs ea.) weight: 159 Ibs Number of attachments: 4 ea Weight / attachment point: 40 Ibs Area: (3 modules) 69 ft2 Distributed weight: 2.3 lb/ ft2 5116" Stainless Steel Hex bolt 5116" Stainless Steel rTr Lock Washer I Aluminum Roofrrac® Mid -Clamp I Aluminum RoofTraCL IS I channel nut I I 2" Aluminum RooFTrac0 Support Rail 318" Stainless Steel Hex Bolt Aluminum (' ! FastJack® / TileTrac@ Roof t Attachment* 5116" Lag Bolt i Professional Solar Products RoofTrac° Photovoltaic mounting system DOWNLOAD UPLIFT F!4 yC � No A 1 r2T X ST CT&6P ZNQ' TF OF CAL�F��/ L' L RoofTrac , Solar Modules Static load test illustration RT 2.0 Page 2 of 2