BSOL2023-0218BUILDING PERMIT
DESIGN & DEVELOPMENT
DEPARTMENT
78-495 CALLE TAMPICO
LA QUINTA, CALIFORNIA 92253
Permit Type:
Solar
Permit Number:
BSOL2023-0218
Property Address:
53821 ROSS AVE
APN:
767680044
Legal Description
Property Zoning:
Valuation:
$75,330.00
PHONE (760) 777-7125
WWW.LAQUINTACA.GOV
APPLIED DATE: 07/19/2023
ISSUED DATE: 08/28/2023
CALIFORNIA
Owner: RICHARD DOAN
PO BOX 8011, RANCHO SANTA FE, CA 92067
Applicant: CARMEN MESHACK
45350 SAN LUIS REY, PALM DESERT, CA 92260
Contractor: CARMEN MESHACK / 988895
45350 SAN LUIS REY, PALM DESERT, CA 92260
PRIOR TO THE ISSUANCE OF THIS PERMIT FOR CONSTRUCTION, ALTERATION, IMPROVEMENT, DEMOLITION, OR REPAIR THE OWNER, APPLICANT AND/OR
CONTRACTOR UNDER PENALTY OF PERJURY HAVE AFFIRMED WHEN APPLICABLE, THROUGH THE SUBMITTAL OF FORMS OR BY OTHER ELECTRONIC MEANS, THE
FOLLOWING:
LICENSED CONTRACTOR OR OWNER -BUILDER DECLARATION (1 or 2)
1) They are licensed under provisions of Chapter 9 (commencing with
Section 7000) of Division 3 of the Business and Professions Code, and the
referenced
License is in full force and effect, or;
2) That they are exempt from the Contractors' State License Law for the
reason(s) indicated by either (2)(a) and/or (2)(b), or (2)(c) where he or
she is exempt from licensure by a valid exemption. [Section 7031.5,
Business and Professions Code: Any city or county that requires a permit
to construct, alter, improve, demolish, or repair any structure, prior to its
issuance, also requires the applicant for the permit to file a signed
statement that he or she is licensed pursuant to the provisions of the
Contractors' State License Law (Chapter (commencing with Section 7000)
of Division 3 of the Business and Professions
Code] Any violation of Section 7031.5 by any applicant for a permit
subjects the
applicant to a civil penalty of not more than five hundred dollars ($500).)
a) As owner of the property, or my employees with wages as their sole
compensation, will do all of or portions of the work, and the structure is
not intended or offered for sale (Section 7044, Business and Professions
Code: The Contractors' State License Law does not apply to an owner of
property who, through employees' or personal effort, builds or improves
the property, provided that the improvements are not intended or offered
for sale. If, however, the building or improvement is sold within one year of
completion, the Owner -Builder will have the burden of proving that it was
not built or improved for the purpose of sale.).
b) As owner of the property, will be exclusively contracting with licensed
c) Are exempt from licensure under the Contractors' State License Law.
As an Owner -Builder, they acknowledge that, except for their personal
residence in which they must have resided in for at least one year prior to
completion of the improvements covered by this permit, they cannot legally
sell a structure built as an owner -builder if it has not been constructed in
its entirety by licensed contractors. It is understood that a copy of the
applicable law, Section 7044 of the Business and Professions Code, is
available upon request when this application was submitted at the
following Web site:
http://www.leginfo.ca.gov/calaw.html.
DECLARATION REGARDING CONSTRUCTION LENDING AGENCY (If
applicable)
A construction lender will be used for completion of the improvements
covered by this permit and the name and information of which is on file for
public inspection during the regular business hours of the public entity.
Failure of the applicant to indicate the construction lender on the
application does not relieve that person of the requirement to give the
construction lender preliminary notice from that duty.
WORKERS' COMPENSATION DECLARATION (1, 2 or 3)
WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS
UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND
CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION
TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION
3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES.
1) Has and will maintain a certificate of consent to self -insure for workers'
compensation, issued by the Director of Industrial Relations as provided for
by Section 3700 of the Labor Code, for the performance of the work for
which this permit is issued.
2) Has and will maintain workers' compensation insurance, as required by
Section 3700 of the Labor Code, for the performance of the work for which
this permit is issued.
3) Certifies that, in the performance of the work for which this permit is
issued, shall not employ any person in any manner so as to become subject
to the workers' compensation laws of California, and agree that, if should
become subject to the workers' compensation provisions of Section 3700 of
the Labor Code, shall forthwith comply with those provisions.
NOTICE TO APPLICANT (1, 2 and 3)
1) Each person upon whose behalf this application was made, each person
at whose request and for whose benefit work is being performed under or
pursuant to any permit issued as a result of this application, the owner, and
the applicant, each agrees to, and shall defend, indemnify and hold harmless
the City of La Quinta, its officers, agents, and employees for any act or
omission related to the work being performed under or following issuance of
this permit.
2) Any permit issued as a result of this application becomes null and void if
work is not commenced within 360 days from date of issuance of such
permit, or if cessation of work for 180 days will subject permit to
cancellation. On or after January 1, 2019, every permit issued shall become
invalid unless the work on the site authorized by such permit is commenced
within 12 months after its issuance, or if the work authorized on the site by
such permit is suspended or abandoned for a period of 12 months after the
time the work is commenced.
3) Certified that they read the application and state that the information
provided is correct. Agree to comply with all city and county ordinances and
state laws relating to building construction, and hereby authorize
representatives of this city to enter upon the above -mentioned property for
inspection purposes.
IMPORTANT: An Application for Permit was made to the Building Official,
subject to the conditions and restrictions set forth at the time of application,
which is now hereby an Issued Permit. If any part of the information being
supplied on this permit is inaccurate or untrue, please contact the City of La
Quinta at (760) 777-7125 immediately for correction.
Printed: 4/23/25 1:45 pm Page 1 of 3
Permit Type: Solar
BUILDING PERMIT
Permit Number:
Property Address
BSOL2023-0218
53821 ROSS AVE
LOT 39, ORIENTATION 180 DEGREES - 20.25kWDC SOLAR ARRAY - (50) 405W SEG 405-BMD-HV, (50) ENPHASE IQ7-60-2-US
MICROINVERTERS, WITH 125A ENPHASE COMBINER PANEL (1005SF). 2019 CALIFORNIA ELECTRICAL CODE.
PV System Type Residential System Size (kW DC) 20.25 PV Strings (EA) 4
PV Miscellaneous 1
Equipment EA
Type
Group
Sq Ft
Value
Invoice No.
Fee
Fee Amount
Amount Paid
INV-00000040
PV SYSTEM GREATER THAN 10KW PC
$43.77
$43.77
PERMIT ISSUANCE
$110.88
$110.88
PV SYSTEM GREATER THAN 10KW
$43.77
$43.77
BSAS SB1473 FEE
$2.00
$2.00
TECHNOLOGY ENHANCEMENT FEE
$8.00
$8.00
RECORDS MANAGEMENT FEE
$11.00
$11.00
Total for Invoice lNV-00000040
$219.42
$219.42
INV-00004592
Partial Inspection Fee
$87.53
$87.53
Total for Invoice lNV-00004592
$87.53
$87.53
INV-00004603
Credit Card Convenience Fee
$2.19
$2.19
Total for Invoice INV-00004603
$2.19
$2.19
Grand Total for Permit
$309.14
$309.14
Workflow Step / Action Name Action Type Start Date End Date
Application Completeness Check v.1 08/22/2023 10:28 08/22/2023 13:56
----------------------------------------------------------------------------------------------------------------------------------------
Submittal Document Verification v.1 Generic Action 08/22/2023 13:56
Plan Check v.1
08/22/2023
0:00
08/22/2023 14:47
----------------------------------------------------------------------------------------------------------------------------------------
Building Review (1 Day) v.1
Receive Submittal
08/22/2023
0:00
08/22/2023 15:03
Permit Issuance v.1
08/22/2023
14:28
09/18/2023 9:56
----------------------------------------------------------------------------------------------------------------------------------------
Verify Contractor info & Conditions have been met v.1
Generic Action
08/22/2023 14:30
----------------------------------------------------------------------------------------------------------------------------------------
Verify & Invoice Fees v.1
Generic Action
08/22/2023 14:30
----------------------------------------------------------------------------------------------------------------------------------------
Verify Fee Payment & Issue Permit v.1
Generic Action
08/22/2023 15:03
----------------------------------------------------------------------------------------------------------------------------------------
Print, Attach, and Email Building Permit v.1
Create Report
09/18/2023
9:56
09/18/2023 9:56
Solar Inspections v.1
10/20/2023
0:00
----------------------------------------------------------------------------------------------------------------------------------------
Rough Electrical v.1
Inspection
10/20/2023
0:00
10/24/2023 10:50
----------------------------------------------------------------------------------------------------------------------------------------
Rough Electrical v.2
Inspection
11/03/2023
0:00
11/06/2023 14:52
----------------------------------------------------------------------------------------------------------------------------------------
Rough Electrical v.3
Inspection
11/06/2023
0:00
----------------------------------------------------------------------------------------------------------------------------------------
Rough Plumbing v.1
Inspection
10/20/2023
0:00
10/24/2023 10:50
----------------------------------------------------------------------------------------------------------------------------------------
Rough Plumbing v.2
Inspection
11/03/2023
0:00
11/06/2023 14:49
Printed: 4/23/25 1:45 pm Page 2 of 3
BUILDING PERMIT
Permit Type: Solar
Permit Number: BSOL2023-0218
Property Address: 53821 ROSS AVE
Rough Plumbing v.3 Inspection 11/06/2023 0:00
-----------------------------------
-----------------------------------------------------------------------------------------------------
Temp Use of Permanent Power v.1 Inspection
Inspections - Final v.1
02/20/2024 16:28 02/22/2024 14:31
-
Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work
shall remain visible and able to be accessed for inspection purposes until approved. Approval as a result of an inspection shall not be
construed to be an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Inspections
presuming to give authority to violate or cancel the provisions of the applicable code and other ordinances of the jurisdiction shall not be
valid. It shall be the duty of the owner or the owner's authorized agent to cause the work to remain visible and able to be accessed for
inspection purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of
any material required to allow inspection.
It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for
inspection. It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this
code.
A building or structure shall not be used or occupied in whole or in part, and a change of occupancy of a building or structure or portion
thereof shall not be made, until the building official has issued a certificate of occupancy therefor as provided herein. Issuance of a
certificate of occupancy shall not be construed as an approval of a violation of the provisions of the applicable code and other ordinances
of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the
iurisdiction shall not be valid.
A person shall not make connections from a utility, a source of energy, fuel, or power, or a water system or sewer system to any building
or system that is regulated by the applicable code and other ordinances of the jurisdiction for which a permit is required, until approved by
the building official.
Printed: 4/23/25 1:45 pm Page 3 of 3
ID SEG
S O L A R
SIV SERIES
SEG Solar INC. (SEG) redefined the high -efficiency module series by
Integrating 192min silicon wafers with multi-busbar and half -cut cell
technologies SEG panel combined creative technology effectively
and extremely improved the module efficiency and power output.
- KEY FEATURES
OLess mismatch to get more power
Less power loss by minimizing the shading Impact
Competitive love light performance
® 3 times EL test to ensure best quality
QIdeal choice for utility and commercial scale projects
by reduced BoS and Improved ROI
Outstanding reliability proven by PVEL for
stringent environment condition.
Sand, acid. salt and hailstones
Anti-PID
SEG SOLAR INC. (SEG)
www.segsolar.com
PRODUCT CERTIFICATION
IEC612152016: IEC 617302016: UL1703: UL61730/C,SAICEC
IEC62804 PID
IEC61701 Salt Mist
IEC6271 o Ammonia Resmtance
IEC60068 Dust and Sand
IEC61215 Hallstui�il(25nan)
Fire Type(UL8173(1):1R9 (Types-HV Type29-BG)
IS0140012015 1S0900t2015; ISO45001:2018
VCYCYCLE
tE
^
INSURANCE
PM
• WARRANTY
q8•, Add.troual Value Irom
Lrnear Warranty
93 OS".
9D%
87 56%
a1 4%
BOwr
TO 25
years
25 G ara uNa a prooutd
25 bnoa _p ,sar
XV material and %orkmanilllp
output wallanty
SEG SOLAR INC. (SEG)
SEG Headowner CaNtorma ofte. 6200 Sloneodge Mall Rd.Ste 300 Pleaesmon. CA W5119
SEG San Antonio Texas orfce 973 Isom Road San Anlonlo. Tx 78216
Tel 425-4684198 Web vo w. 5egsola,-,
7 SEG
S O L A R
Electrical Characteristics
adule Type I SEG40"MD-H SEG410-BMD-HV SEG-415 EPAD-Hv SF.Gd2U-8MU-HV
STC NOCT
STC NOCT STC NOCT
STC NOCT
Maximum Power at STC (Pmp) 405 304
410 308 415 311
420 315
Open Circuit Voltage (Voc) 37.22 34.73
37.32 34.81 37.42 34.90
37.52 34.99
Short Circuit Current (Isc) 13.70 11.07
13.80 11.15 13-90 11.23
14.00 11.32
Maximum Power Voltage (Vmp) 30.93 28.91
31.05 29.05 31.16 29,19
31.28 29.33
Maximum Power Current (Imp) 13.10 10.51
13.21 10.59 13.32 10.66
13.43 10.74
Module Efficiency at STC(gm) 20.74
21.00 21.25
21.51
Power Tolerance
(0. +3%)
Maximum System Voltage
1500V DC
Maximum Series Fuse Rating
25 A
STC trradiance 1000 WJmI module temperature 25°C AM- 1.5
NOCT. Irradiance 800W/m' ambient temperature 20"C module
temperature 45'C wind Speed.,
Inds
Power measurement tolerance- +/ 3%
Temperature Characteristics
Pmax Temperature Coefficient
-0.35 %1°C
Voc Temperature Coefficient
-0.27 %I*C
Isc Temperature Coefficient
+0.05 %rc
Operating Temperature
40 -+85 °C
Nominal Operating Cell Temperature (NOCT)
45±2 'C
Mechanical Specifications
External Dimensions
1722 x 1134 x 35 mm
Weight
21.5 kg
Solar Cells
PERC Mono (108 pcs)
Front Glass
3.21 mm AR coating tempered glass t low iron
Frame
Black anodized aluminium alloy
Junction Box
IP6813 diodes
Connector Type
MC4
Cable Type t Length
12 AWG PV Wire (UUIEC) it 1200 mm
Mechanical Load (Front)
5400 Pa 1 113 psf`
Mechanical Load (Rear)
3600 Pa ! 75 psf'
'Refer to SEG installation Manual for details
Packing Configuration
Container 20-GP 40'HO
Pieces per Pallet 31 31
Pallets per Container 6 26
Pieces per Container 196 606
For details, please consult SEG.
SEG SOLAR INC. (SEG)
www-segsolar.com
35+tmm
l l ss en cw.,l
I�
N
-� GE1.
13
to
I
%l
to64.00r e
-Ni ee0>A.a�nl -
1134a2--
--te4.96a0J8en1
o
11 S9 ,4n A -A sechon B 8
6.11 2:1 101 101
'Refer to SEG installation Manual for details
IN Curve
Soovlicatio+s are sbbloct W rnanga wttl-"t tuM*r natincaUB SEGDB{q-2022910 i>Copyngnt 2022 SEG
SEG SOLAR INC. (SEG)
SEG Headquarter California ofte, 6200 Slorwroge Mal Rd.. Ste 300 Pleasanton CA 94S88
SEG San AM-., Twee off- 973 Isom Road San W-a. Tx 78216
Tat 925-468.4198 'Nab'. anew segaatar rpm
Data ;hest
Enphase Microinverters
Raclion US
Enphase
IQ 7 and IQ 7+
Microinverters
a
vaelka
To learn more about Enphase offerings visit enphase.com
The high-powered smart grid -ready
Enphase IQ 7 Micro`" and Enphase IQ 7+ Micro"
dramatically simplify the Installation process while
achieving the highest system efficiency.
Part of the Enphase IQ System, the IQ 7 and
IQ 7+ Microinverters integrate seamlessly with
the Enphase IQ Envoy'", Enphase Q Aggregator"',
Enphase IQ Battery", and the Enphase Enlighten"
monitoring and analysis software.
IQ Series Microinverters extend the reliability
standards set forth by previous generations and
undergo over a million hours of power -on testing,
enabling Enphase to provide an industry -leading
warranty of up to 25 years.
Easy to Install
Lightweight and simple
Faster installation with improved, lighter two -wire cabling
Built-in rapid shutdown compliant (NEC 2014 & 2017)
Productive and Reliable
Optimized for high powered 60-cell and 72-cell* modules
More than a million hours of testing
Class II double -insulated enclosure
• UL listed
Smart Grid Ready
Complies with advanced grid support, voltage and
frequency ride -through requirements
Remotely updates to respond to changing
grid requirements
Configurable for varying grid profiles
Meets CA RUle 21 (UL 1741-SA)
" The IQ 7* Micro is required to support 72-cell modules
�ENPHASE
Enphase IQ 7 and IQ 7+ Microinverters
INPUT DATA (DC)
IQ7-60-2-US
IQ7PLUS-72-2-US
Commonly used module pairings'
235 W - 350 W +
235 W - 440 W +
Module compatibility
60-cell PV modules only
60-cell and 72-cell PV modules
Maximum input DC voltage
48 V
60 V
Peak power tracking voltage
27 V - 37 V
27 V - 45 V
Operating range
16 V - 48 V
16 V - 60 V
Min/Max start voltage
22 V / 48 V
22 V 160 V
Max DC short circuit current (module Isc)
15 A
15 A
Overvoltage class DC port
II
II
DC port backfeed current
0 A
0 A
PV array configuration
1 x 1 ungrounded array; No additional
DC side protection required;
AC side protection requires max
20A per branch circuit
OUTPUT DATA (AC)
IQ 7 Microinverter
IQ 7+ Microinverter
Peak output power
250 VA
295 VA
Maximum continuous output power
240 VA
290 VA
Nominal (L-L) voltage/range2
240 V / 208 V /
240 V / 208 V /
211-264 V 183-229 V
211-264 V 183-229 V
Maximum continuous output current
1.0 A 1 15 A
1.21 A 1.39 A
Nominal frequency
60 Hz
60 Hz
Extended frequency range
47 - 68 Hz 47 - 68 Hz
AC short circuit fault current over 3 cycles
5.8 Arms 5.8 Arms
Maximum units per 20 A (L-L) branch circuit'
16 (240 VAC) 13 (240 VAC)
13 (208 VAC) 11 (208 VAC)
Overvoltage class AC port
III III
AC port backfeed current
0 A 0 A
Power factor setting
1.0 1.0
Paver factor (adjustable)
0.7 leading .. 0 7 lagging 0.7 leading .. 0.7 lagging
EFFICIENCY
@240 V @208 V @240 V @208 V
Peak CEC efficiency
97.6 % 97.6 % 97.5 % 97.3 %
CEC weighted efficiency
97.0 % 97.0 % 97.0 a 97.0
MECHANICAL DATA
IQ 7 Microinverter
Ambient temperature range
40°C to +65°C J __
Relative humidity range
4% to 1000,0 (condensing)
Connector type
MC4 (or Amphenol H4 UTX with additional Q-DCC-5 adapter)
Dimensions (WxHxD)
212 mm x 175 mm x 30.2 mm (without bracket)
Weight
1.08 kg (2.38 Ibs)
Cooling
Natural convection - No fans
Approved for wet locations
Yes
Pollution degree
PD3
Enclosure
Class II double -insulated, corrosion resistant polymeric enclosure
Environmental category / UV exposure rating
NEMA Type 6 / outdoor
FEATURES
Communication
Power Line Communication (PLC)
Monitoring
Enlighten Manager and MyEnlighten monitoring options.
Both options require installation of an Enphase IQ Envoy.
Disconnecting means
The AC and DC connectors have been evaluated and approved by UL for use as the load -break
disconnect required by NEC 690.
Compliance
CA Rule 21 (UL 1741-SA)
UL 62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES-0003 Class B,
CAN/CSA-C22.2 NO. 107.1-01
This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC-2014 and
NEC-2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC
and DC conductors, when installed according manufacturer's instructions.
1. No enforced DC/AC ratio. See the compatibility calculator at httns://enghase.com/en-us/suooULj[mgs)y-Ig�ompatjbi .
2 Nominal voltage range can be extended beyond nominal if required by the utility.
3, Limits may vary. Refer to local requirements to define the number of microinverters per branch in you. area
To learn more about Enphase offerings, visit enphase.com v E N P H A S E
2018 Enphase Energy All rights reserved, All tradernarks or txands used are the property of Enphase Energy, Inc
2018-02-08
SolarWedge 011
Revolutionary Commercial Mounting System!
SolarWedge by Professional Solar Products, Inc, is an innovative low
profile commercial/residential PV mounting system. The system provides
an easy to install and economical solution for 5, 1.0 or 15 degree
structural attachment. SolarWedge integrates with Professional Solar's
patented "top -down" commercial RoofTrac' and FoamJack stanchion
products. The system dramatically lowers installation and shipping costs
while optimizing installed wattage on the roof.
Advantages of the SolarWedge=
* Easy handling and Installation: Each box supports up to 30' (front
& rear) of RoofTrac` support rails
* Integrated Leveling System: Compensates up to 2-1/2" of roof
variation using an included 1/2" x 4" stainless steel stud
* Fully Engineered: Load tested to 30 lbs. per sq. ft (approx. 110
mph wind load) at up to 6' centers
* Finished Aluminum Parts: Clear anodized angled support
brackets match support rail. FoamJack stanchion parts are
machine tumbled and cleaned to provide excellent bonding of
foam, flash or
SolarWedge
Precision extruded angles of anodized
aluminum compress the support rail at
a fixed angle while dramatically
Increasing the strength
Leveling Feature
Stud rolls Into the post up to 2-1/2"
to eliminate the need for cutting studs'
on the job
Foamlack
Each kit includes the Foam -lack'
with a 3" aluminum seal plate.
Size included depends on the
angle purchased
LouJTrtlyd
110inph
Wind Lad
301bs. s9. ft
'it &' o„ Center
Rail Insert - ,
Compression Nut
1/2" x 4"
Leveling Stud \
L Rail Low
Support
Roof Surface
Modules arc mounted in
the illustrated direction to
optimize performance in the Foamed bases
summer months as illustrated
Assembly of the SolarWedge
Components of the SolarWedge(�)
system easily integrate with the
new XD support rail.
1 Jam Nut/
1 /2"Washer
nmpressrr.r
I Nut
I \3"NDRmJ—
Lower Suppc
Jom Nut/
t — !/2" Washc
/ Jam Nut,
Fully Assembled
Attachment Parts List (Per Box) Not to scale
Shipped in a shoe box sized package, the SolarWedge XD attachment
components offer easy handling and storage along with reduced shipping
costs. 12 ea. � 24 ea.
40 Aluminum 1/2"SS Flat Washers
6 ea. Compression
I' Dia. Aluminum Nuts
Rear Posts Q 12 ea.
12 ea. 3/8SS Flat Washers
to ea. Aluminum
Lower Pall ® 36 ea.
I"Dia.Aluminum Supports
Front Posts 12 eaI i 2' SS Jam Nuts
.
112' 114" SS
12 ea. Leveling O 12 ea.
1.5" Dia. Studs 3" x 3" Aluminum
Aluminum
Seal Plates
Bases
Attachment Box Dimensions
Specifications are Each box contains enough 6„
subject to change attachments to ���
without notice. install up to 12"
3.3 kW�
Standard SolarWedge4Teehnieal Information n10 lmit Degree Box
ensions
Load Tested and engineered to 30 lbs. per W (approx.110mph wind load Hlustratea 5"
equivalent) � L
> Utilizes FoamJack'l Laboratory tested to 2.8701bs.vertical and 2,615 Ibs.side
lateral pull out using a 3/8" x 6" lag bolt (secured at approx.6-1/2").
> Structurally attached to the roof - extremely important in areas with _ - `%
potential horizontal and vertical seismic movement such as California. - - _
> Available in 5, 10' or 15' angles. Optimized to help reduce typical
peak summer demand charges. `
Front Extension Height - - - - - - - - - - -
F
All Angles --- _-------
---------------
— 4' O.C.
Rear View
2.5" Support Rail
profeSS!onal (805)486-4700
SOLAR
1551) S. Rose Ave.
pIOCiUCtS�s�l�
Oxnard, CA 93033
www.prosolar.com
SW200BU321
6' O.C.
'using 2111 wr,,.
moautes
Rear Extension Height-
15 Degree
I -/. 3I4"
10 Degree
14-1 /2" +1- 3!4"
5 Degree
11` y- 3/4'
'Height from mof surface to
bottom of support 1,111
6' Span between
attachments for commercial
construction only
Drill Guide (Sold Separately)
r
ee Sizes
1�
Available
• Degree Kit)
1 • 1 Degree Kit)
• 0 5 Degree The FoamJack, drill guide ensures that
pilot holes are drilled 90 degrees to the
Patent e6.360.491 and 0547262 rafter/beam optimizing the strength
and appearance of the connection.
Roof Trac
#6,360,491
The Original "Top -Down" PV Mounting System
E T.
I us
Intertek
4007217
UL2703
UL1703
Class A
Fire Rated
Illustrated above is how the
FastJack® attachment seamlessly
integrates with the RoofTrac®
mounting system.
protesslonal
SOLAR
products,: �-
Juna 20t5
Integrated with FastJack° attachments
The patented RogJT?ncO rail/clamp syslern installed With. the FaslA 1,
attachment method provides an ideal solution far installations
inhere a flashing is desired. The FaslJack® is also the solar industries
preferred method of attachment for new construction roofs.
All attachment hardware is
concealed within the support rail leaving
an aestically pleasing solar array
FastJack® Installation
(TileTracO on back)
Splice Self -Bonding Connection
The splice kit provides a solution to rigidly
lock multiple tail sees together and bond the
rails to one another.
For more it formation jvu can visil us on the iveb at
www.ProSolar.com
FastJack° Connection
The FastJack'o attachment provides a
quick and strong installation solution.
Patented design places the boll directly
under the stanchion post inhere the
most support is offered. This feature
allows standard roofJlashings to
lay flal an the roof deck,
Removable post allows l*I
standard,Jlashings to be
slipped over the base
without damaging
delicate surrounding
composition
shingles.
Flashing
1
5/6x3.5" ..ft.
Lag Bolt
Threshold
Fast.lack't' Base
1 i & ASSOCIATES
Structural F.ngineers
3CLIENT:
Professional Solar Products, Inc.
1551 S. Rose Ave., Oxnard, CA 93033
Tel: 805-486-4700
Subject: Static load test results for the ProSolar,,--R) sloped roof mount:
Wind Roof ASCE 7-16 Wind
Mounting System Min Rail Height Max rail span Test Load exposure
(ASCE 7-16) zone"* Speed rating'
RoofTracc, 2" 72" 30 Ib/ft2 A, B, C I All roof 120 mph
zones
TEST SETUP (as shown in attached drawing detail): Modules* were bolted to 2" tall Professional Solar Products (PSP) UL2703
RoofTra0l support rails using an assembly of 5/16" Stainless Steel (SS) bolts, SS lock washers and proprietary PSP aluminum
clamps and RoofTracg channel nuts. The RoofTrac"'support rail was attached to the PSP RoofTracID structural attachment
device with 3/8" SS hardware at four attachment points. The setup was attached to 2"x6" wooden rafters using 5/16" x 3-
1/2" lag bolts. The attachment spans consisted of 48" front to rear with structural attachments spaced 72" on center.
TEST PROCEDURE (as shown in attached drawing detail): The test set up was top loaded to above specified load per UL2703
loading guidelines (Intertek report reference: 104601549LAX). The setup remained under load for an approximate period of
30 minutes per UL2703. Any signs of permanent deformation were recorded. The test setup was then inverted and loaded to
simulate the wind uplift condition. The test set up was re -loaded to above specified load. The setup remained under load for
an approximate period of 30 minutes. Any signs of permanent deformation were noted.
TEST RESULTS:
The maximum top load resulted in no permanent deformation.
The maximum uplift load resulted in no permanent deformation.
This document certifies the RoofTracc mounting system withstands the stated static pressure load, equivalent to the stated
wind speeds**. The mounting system performed as expected.
Sincerely,
James R. Vinci, S.E.
This engineering report verifies that Vinci & Associates accepts and verifies the findings outlined in the Testing Report 100779407LAX-003, dated May 19,
2021. The results of this load test reflect actual deflection values and are generally accepted as the industry standard for testing module mounting systems.
Vinci & Associates does not field check installations or verify that the mounting system is installed as described in this engineering report.
Structural attachment: Lag bolt attachment should be installed using the proper pilot hole for optimum strength. A 5/16" lag bolt requires a 3/16" pilot hole.
It is the responsibility of the installer to ensure a proper attachment is made to the structural member of the roof. Failure to securely attach to the roof
structure may result in damage to equipment. personal injury or property damage. The purposed racking system may be installed on any roof up to a
maximum of 24 foot above grade without further analysis. Racking shall be installed into a roof member or blocking with a 5/16" diameter screw at each
Fast -jack location. Screws shall have minimum of 21/2 penetration into framing member for zone 1&2(n/e/r), and a minimum of 3" penetration into framing
member for zone 3(e/r). (Zone 3 is defined as the approximately 4'-0" square at each corner of the roof)
This office/report does not express an opinion as to the load bearing characteristics of the structure 9?-UT LJJf
the mounting system/modules are being installed on. �O 5 IA,
ICC accredited laboratory tested structural attachments manufactured by Professional Solar Products �� n
(including, but not limited to FasUacks' , TileTrac,", and FoamJack") can be interchanged with this system.
Any rail splice used shall be manufactured by PSP. As tested, 2.0 splice located anywhere along rail except No 41 I-T
cantilever. Limit spliced rail run to approx. 45 ft. for expansion/contraction d- / 3
Check with local building department or Al-IJ for site specific requirements. S '
*Modules tested to UL1703, or equivalent, up to 23 ft2 are included in this engineering. l T CTU?,
**Wind loading values relative to defined load values usingwind load exposure and gust factor F OF CA\ 1
coefficient "exposure C" as defined in the 2018(IBC) /2019(CBC)/ ASCE 7-16.
Est snow load rating of 15 Ib/ft- based on 2.0 safety factor.
175 E. Wilbur Rd, Suite 103 Thousand Oaks, CA 91360
RT 2.0 Page 1 of 2
ar, 48'
—I Approx2T r
cantilever
Total module (45 lbs ea.)
and rail (12 Ibs ea.) weight: 159
Ibs
Number of attachments: 4
ea
Weight / attachment point: 40
Ibs
Area: (3 modules) 69
ft2
Distributed weight: 2.3
lb/ ft2
5116" Stainless
Steel Hex bolt
5116" Stainless Steel
Lock Washer
I
Aluminum Roofrrac®
Mid -Clamp
I Aluminum RoofTraCL
IS I channel nut
I
I
2" Aluminum RooFTrac0
Support Rail
318" Stainless Steel
Hex Bolt
Aluminum
(' ! FastJack® / TileTrac@ Roof
t Attachment*
5116" Lag Bolt
i
Professional Solar Products RoofTrac°
Photovoltaic mounting system
DOWNLOAD
UPLIFT
L' L
RoofTrac ,
Solar Modules
Static load test illustration
RT 2.0 Page 2 of 2
No. of DC; and AG DC and
modules. DC and AC rating Inverter watts of AC kW of
inverters of module efficiency STC calculation system system
SEG SOLAR- #SEG405-BMD-HV 405 196425 watts 20,250 watts -DC 20 3 kW -DC
HIN-S365XG (BK) 376.5 r C 12,000 watts -AC 12.0 kW -AC
Inverter nameplate Inverter efficiency
Enphase Energy 50 240 97 0% 240vac
IQ7-60-2-US
Note: total watts -AC of system cannot exceed the total nameplate watt rating of the inverters
TOTAL DC WATTS
TOTAL AC WATTS
7/19/2023 22-028_Elway_Lot 71-B_System Watt Ratings_03-09-23 As
19642.5 watts 20,250 watts -DC 20.3 kW -DC
12,000 watts -AC 12.0 kW -AC
WEIGHT LOADING ANALYSIS
Solar Electric Installation
RICHARD DOAN CONSTRUCTION/ #23-007_53821 Ross Avenue, La Quinta, CA 92253
Contractor: Southern California Energy Alternatives July 19, 2023
Analysis of dead load weight added by installation of solar array
SEG SOLAR-#SEG-405-BMD-HV-BLK-solar module weight
No. of solar modules
Total weight of modules
Weight of each Professional Solar Products "Roof Trac" rack set
No. of rack sets
Total weight of rack sets
Total weight of solar array
Height of each module
Width of each module
Area of one module
Area of entire solar array
Weight of solar array per unit
47.4 pounds
50
2,370 pounds
40 pounds
125
496 pounds
2.866 pounds
5.� feet
3.7 feet
21.0 square feet
1050 9 square feet
nds/square foot
No. of stanchions connected to rafters with lag screws 1 59
Weight loading per vertical pipe 48.9 poundsiconnection
See attached sheets for engineering information on the Professioal Solar Products "Roof-Trac" racks.
7/19/2023 22-028_Elway_Weight Load Analysis_03-09-23.xls
= Revisions -(/-7/23
General Project Description.
1. System is 20.250 W - STC
2. Modules 50 @ SEG-405-BMD-HV, 405 Watt Panels
3. Inverters: 50 @ Enphase IQ7-60-2-US microinverters
4. No Batteries or UPS
5. This is a tilt mounted system adding 2.8 Ib/sq
6. Spray -on foam roofing material on flat roof
7. 1 - story house
8. 2 x 4 rafters @ 16" OC with 5/8" OSB sheathing
9. ProSolar Solar Wedge 5° Kit 64" OC with 3l8" x 6" Lag Bolts
10. Standard components include ProSolar racking and mounting components, wiring, conduit, over -current
protection, roofing sealant, flashings, as needed
11. All electrical equipment will be labeled with warning labels (see page 5)
12. All outdoor wiring will be weather rated
13. All module frames, equipment and conductor enclosures will be grounded
14. The system is grounded using the Prosolar Grounding System
15.This system has been calculated to meet the basic wind speed of 110 MPH and wind exposure C
16.All construction shall comply with the 2022 California Building, Residential. Mechanical, Electrical, Plumbing,
Energy and Green Building Codes and the La Quinta Municipal Code
17.The installation of equipment and all associated wiring and interconnections shall be performed only by
qualified persons (CEC §690.4(C))
18.Automatic Rapid Shutdown (upon AC Grid Disconnect) integrated in Enphase inverters
19.PV source circuits and PV output circuits shall not be contained in the same raceway. cable tray. cable outlet
box, junction box, or similar fittings as conductors, feeders, branch circuits of other non-PV systems. or
inverter output circuits unless the conductor of the different systems are separated by a partition. PV system
circuit conductors shall be identified and grouped as required by 690.31(B)(1) through (4). The means of
identification shall be permitted by separate color coding. marking tape, tagging. or other approved means
(CEC §690.31(8))
APN# 779-490-014
DISCLAIMER- It any Eno, Drscropancies or omm;%io n- appear in In— ma" V,specfications or other contract documants; Ttw Owner or General Con—tof mall robry the Dei to wn ring.
of such error or ornisli.n. In it. event that the Owner of General Conlraclor falls to gin such nptKC- trel0re ConshUCSlon andiar IWr¢ason of IKe work. ihr• Owner or CM rat ConlracIw mI be
heb reepunsihle to the roswt of any enors. discrepanoes or cmissicn and the coal of rifyirV them
Approved by:
Brandon Slater (760) 895-9474
Project Description
45-350 San Luis Rey
Southern California Palm Desert, CA 92260
Contractor: Energy Alternatives 760-904-4917
CSLB # 988895
Richard Doan 53821 Ross Avenue
Customer: Construction La Quinta, CA. 92253
MIC Lot 39-A
REV 9 1 Scale: I Sheet 1 of 6
ARiy nil 5-
APN# 779-490-014
DISCLAIMER If any Errors. Dlscrepencies or Omiss,ons appear In these dravnngs spedfkauars or other contract documents. The Or,er or General Contmaor srnll notay Ine Desq w. in writ-ng
of such Brno• or ornrswon. In the event that the Owner of General Contractor falls to give such notice, before consbVcbort arsd'or I.,"catlon of Ine work. the Orrner a General Contractor pill h.,
nod iesWnwde to the —At al any -- discretxnaes or ortvsarnns amd the cost of rectifr g ulerr.
ll
A
Legend:
(E) Existing
(N) New
PL Property Line
❑ Skylight
Vent
® Chimney
I Mount (N)
IMGHV Panda vnth
8 n�aranrerters
FJectrimi Oosat:
Man Senni a Panel tEj
AC Dined IN)
Enphow AC Combiner (Nj
S ater (760) 895-9474 I
Site Plan
45-350 San Luis Rey
Southern California
Palm Desert, CA 92260
Contrac'cr
Energy Alternatives
760-904-4917
CSLB N 988895
53821 Ross Avenue
Customer:
Richard Doan
La Qutnta, CA. 92253
Construction
MIC Lot 39-A
awmy N;mtw
REV #
Scale: 1r16" = 1'
1 Sheet 2 of 6
(N I Solar Array (E) 2 x 4 Ratters @ t G' OC with 5/g- OSB Sheathing
50 @ SEG-405-BMD-HV panels and Spray -on Foam Roofing Material
67.8" x 40.0" x 1.7' Roof Pltch: V
Roof Section Scale 3/8" = 1'
Legend: Approvals Date
(E) Existing
(� N New
APN# 779-490-014 �_
pISCLAIMLN It any Errata. UlscreoW,>es or or iSstons Up— In nlese orawngs, spec —Wren or other callracl d.—nls; the Owner a Gonerai Coneactor mall notify the Destgner, in Wdlin,
d Such Utter or arrtiS.tilon. In the event that the Owner or General Contraclor falls to give s� n notice. before consli Cbon alolar fawicatirin of the work, the Owner or General Contraclar will be
held responsitlfe w the result of any errors. daaepancies or a*ussions and the cost d rectifying them
Attachment Detail Scale 1" = 1'
Approved by:
Brandon 51ater (760) 895-9474
Attachment Detail
45-350 San Luis Rey
Southern California
Palm Desert, CA 92260
Contractor:
Energy Alternatives
760-9044917
CSLB # 988895
53821 Ross Avenue
Customer
Richard Doan
La Quinta, CA, 92253
Construction
MIC Lot 39-A
rawing Number,
Rev x
Scale:
Sheet 3 of 6
PV Array (N) Junction Boxes (N) Enphase IQ Combiner N AC Disconnect (N) Main Service Panel (E)
Branch Circuits of 2 x 13 and 2 x 14 Modules in Parallel an Roof Weather proof Bell box Located on Roof 2P 100A - Non -Fused 800 Amp Main Service
(50) SEC-405�MD-HV Panels X40-AMl-240-B 240 V
(50) Enphase 107.60-2-US Microinveners under panels 240 V NEMA 3R
4xa
Output. 20.250 Watts STC
hla,n Eiec next to
Panel
J-BOX
J-BOX
i
I..a:rmro @ 125% = 16.25 A (1 A x 13 x 125%)
tnN . & . BiwMvr.
&20—p
(2) # 12 THWN-2 - in Enphase G Cable
SUM OF INVERTER OUTPUT:
Equipment Grounding Conductor:
4 1118 THWN 2
( )
(1) 1118 THWN-2 (AC-EGC)
1 Amp x 50 x 125% = 62.5 Amp
(1) # 6 solid copper
314" EMT Conduit on Roof
Wire run under panels through inverters
Wire Sizing:
1,1—w%@125%= 14.88 A(1 A x 12 x 125%)
#8THWN-2-55A
55A x 80% (conduit lit) x 0.58
(2) # 12 THWN-2 - rn Enphase 0 Cable
Equipment Grounding Conductor
(1) # 6 solid copper
Legend:
Wire run under panels through inverters
(E) Existing
(N) New
Single Line Notes:
1. The DC circuit meets the requirements of ungrounded PV arrays in NEC 690.35-No additional GEC is I
required. Ground Fault Protection is integrated into the inverter
2. All wire sizes are as indicated or larger.
3. Wire sizes meet the criteria of 125% continuous use factor.
4- All equipment is bonded by mechanical means or by a grounding conductor.
5- All modules are grounded mechanically using Prosolar Grounding System.
6. The system is grounded at the neutral buss in the main electrical panel.
7. The system is grid - inter le only, has no batteries or UPS. FEE"
8. Individual panels inverted from DC to AC with microinverners located under panels.
9. The Enphase Q Cable System (double insulated DIG cable) does not have neutral wire
APN# 779-490-014
1�n ���, uolry rlerar
i4 eetlaMwp
l�
WWII 0,0
12a 20flV
S,xa, ecuso, 1
(2) # 4 THHNM-fWN-2
(1)111 4THHNnHWN-2-Neutral
(1)# 6THHNrTHWN-2AC-EGC
1" EMT Conduit
correction) = 25.52 A Wire Sizing:
# 4 THWN-2.95A
95A x 100% (conduit rill) x 0.82 (temp. correction) = 77.9 A
AUTOMATIC RAPID SHUTDOWN UPON AC GRID
DISCONNECT INTEGRATED IN ENPHASE INVERTERS
TO MEET NEC 2020
Approved by:
Brandon later (760) 895-9474
1 - Line
45-350 San Luis Rey
Southern California Palm Desert, CA 92260
Contractor: Energy Alternatives 760-904-4917
CSLB N 988895
Customer:
DISCLAIMER: If any Ena . Discrepancies or Onpec�ea ,isuons appear in these drawings. stions or other contract d—tints; The firmer or General Contractor shall notify lne Designer. in wnlinp.
of such error or omission. In the event that the Owner or General Contractor falls to gave such notice. before consinjoion andlor fabrication of the work, the Owner or General Contractor wd) be
held responsible to the result of any errors. disaeoamles or ornresions and the cost of rectifying then,. raw�ng Numbi
Richard Doan 53821 Ross Avenue
Construction La Quinta, CA, 92253
MIC Lot 39-A
REV # Scale: I Sheet 4 of 6
NEC 690.64(B)(7) NEC 690.54 NEC 690.56(B)
PLACE THIS LABEL AT P.O.C. TO SERVICE DISTRIBUTION PLACE THIS LABEL AT "INTERACTIVE POINT OF BUILDINGS OR STRUCTURES WITH BOTH UTILITY SERVICE
EQUIPMENT (I.E. MAIN PANEL (AND SUBPANEL IF APPLICABLE)) INTERCONNECTION' (AT MAIN SERVICE PANEL AND AND PHOTOVOLTAIC SYSTEM SHALL HAVE A PERMANENT
THIS LABEL IS ONLY NECESSARY WHEN BREAKERS FEEDING SUBPANEL IF APPLICABLE) PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE
PANEL EXCEEDS 100% OF BUSS RATING SERVICE DISCONNECTING MEANS AND THE PV SYSTEM
DISCONNECTING MEANS IF NOT LOCATED AT THE SAME
LOCATION.
MAIN SERVICE PANEL
SOLAR PV SYSTEM EQUIPPED WITH
RAPID SHUTDOWN
TURN RAPID SHUTDOWN
SWITCH TO THE "OFF'
POSITION TO SHUT
DOWN PV SYSTEM AND
REDUCE SHOCK HAZARD
IN THE ARRAY
EXTERIOR / INTERIOR CONDUIT
CAUTION: SOLAR CIRCUIT
APN# 779-490-014
SOLAR ONLY SUBPANEL 13 PANEL CIRCUITS:
INTERACTIVE PHOTOVOLTAIC POWER SUUHGE
RATED AC OUTPUT CURRENT: 13 A _
NOMINAL OPERATING AC VOLTAGE: 240 V
SOLARONLY SUBPANEL 12 PANEL CIRCUITS:
AC DISCONNECT - READILY ACCESSIBLE:
MAIN SERVICE PANEL: Approved by: i
• • •LTAIC POWER SOURCE Brandon later (760) 895-9474
PUT CURRENT: 50Aj Labels
VOLTAGE:6ATING AC 45-350 San Luis Rey
Southern California Palm Desert, CA 92260
Contractor Energy Alternatives 760-904-4917
CSLB # 988895
DISCLAIMER: If any Errors. Discrepancies or Orr.Sion appear in these drawingsspeciiicarions or other conhad doa,ments The Owner or General Contractor shall notify ale Designee, in wniing
of such error or omission. In No event that the Owner or General C-itractur falls to give such notice, before construction andlor tabncatwn of the wurk. the Owner or General Conuaaur will he;
held roc�owsiole to:he result of any efrom discrepances or umieswns and the cost o' rectifying them.
I I Richard Doan I 53821 Ross Avenue I
Customer. Construction La Quinta. CA, 92253
MIC Lot 39-A
REV 4 1 Scale: I Sheet 5 of 6
PLACARD FOR MAIN SERVICE PANEL:
CAUTION
POWER TO THIS BUILDING IS ALSO SUPPLIED
FROM THE FOLLOWING SOURCES WITH
DISCONNECTS LOCATED AS SHOWN:
APN# 779-490-014
,DISCIlUMER: If any Errors. Discrepancies or Omissions appear In these dramngs. spectlications or other contract documents. The Owner or General Contractor shall nobly the Desigher, in w
of such error or omrssion. In the event that the Owner or General Contractor falls to give such notice. Defore construction and/or fabrication of the work, me Owner or General Contractor will be
held responsible to the result of any errors, discrcoanaes or omissions and the cost of reetdying them.
Approved by:
Brandon Siater (760) 895-9474
PLACARD
45-350 San Luis Rey
Southern California Palm Desert, CA 92260
Contractor: I Energy Alternatives 760-904-4917
CSLB # 988895
Richard Doan 53821 Ross Avenue
Customer: Construction La Quinta, CA, 92253
MIC Lot 39-A
REV 0 1 Scale: I Sheet 6 of 6
= Revisions -(/-7/23
General Project Description.
1. System is 20.250 W - STC
2. Modules 50 @ SEG-405-BMD-HV, 405 Watt Panels
3. Inverters: 50 @ Enphase IQ7-60-2-US microinverters
4. No Batteries or UPS
5. This is a tilt mounted system adding 2.8 Ib/sq
6. Spray -on foam roofing material on flat roof
7. 1 - story house
8. 2 x 4 rafters @ 16" OC with 5/8" OSB sheathing
9. ProSolar Solar Wedge 5° Kit 64" OC with 3l8" x 6" Lag Bolts
10. Standard components include ProSolar racking and mounting components, wiring, conduit, over -current
protection, roofing sealant, flashings, as needed
11. All electrical equipment will be labeled with warning labels (see page 5)
12. All outdoor wiring will be weather rated
13. All module frames, equipment and conductor enclosures will be grounded
14. The system is grounded using the Prosolar Grounding System
15.This system has been calculated to meet the basic wind speed of 110 MPH and wind exposure C
16.All construction shall comply with the 2022 California Building, Residential. Mechanical, Electrical, Plumbing,
Energy and Green Building Codes and the La Quinta Municipal Code
17.The installation of equipment and all associated wiring and interconnections shall be performed only by
qualified persons (CEC §690.4(C))
18.Automatic Rapid Shutdown (upon AC Grid Disconnect) integrated in Enphase inverters
19.PV source circuits and PV output circuits shall not be contained in the same raceway. cable tray. cable outlet
box, junction box, or similar fittings as conductors, feeders, branch circuits of other non-PV systems. or
inverter output circuits unless the conductor of the different systems are separated by a partition. PV system
circuit conductors shall be identified and grouped as required by 690.31(B)(1) through (4). The means of
identification shall be permitted by separate color coding. marking tape, tagging. or other approved means
(CEC §690.31(8))
APN# 779-490-014
DISCLAIMER- It any Eno, Drscropancies or omm;%io n- appear in In— ma" V,specfications or other contract documants; Ttw Owner or General Con—tof mall robry the Dei to wn ring.
of such error or ornisli.n. In it. event that the Owner of General Conlraclor falls to gin such nptKC- trel0re ConshUCSlon andiar IWr¢ason of IKe work. ihr• Owner or CM rat ConlracIw mI be
heb reepunsihle to the roswt of any enors. discrepanoes or cmissicn and the coal of rifyirV them
Approved by:
Brandon Slater (760) 895-9474
Project Description
45-350 San Luis Rey
Southern California Palm Desert, CA 92260
Contractor: Energy Alternatives 760-904-4917
CSLB # 988895
Richard Doan 53821 Ross Avenue
Customer: Construction La Quinta, CA. 92253
MIC Lot 39-A
REV 9 1 Scale: I Sheet 1 of 6
ARiy nil 5-
APN# 779-490-014
DISCLAIMER If any Errors. Dlscrepencies or Omiss,ons appear In these dravnngs spedfkauars or other contract documents. The Or,er or General Contmaor srnll notay Ine Desq w. in writ-ng
of such Brno• or ornrswon. In the event that the Owner of General Contractor falls to give such notice, before consbVcbort arsd'or I.,"catlon of Ine work. the Orrner a General Contractor pill h.,
nod iesWnwde to the —At al any -- discretxnaes or ortvsarnns amd the cost of rectifr g ulerr.
ll
A
Legend:
(E) Existing
(N) New
PL Property Line
❑ Skylight
Vent
® Chimney
I Mount (N)
IMGHV Panda vnth
8 n�aranrerters
FJectrimi Oosat:
Man Senni a Panel tEj
AC Dined IN)
Enphow AC Combiner (Nj
S ater (760) 895-9474 I
Site Plan
45-350 San Luis Rey
Southern California
Palm Desert, CA 92260
Contrac'cr
Energy Alternatives
760-904-4917
CSLB N 988895
53821 Ross Avenue
Customer:
Richard Doan
La Qutnta, CA. 92253
Construction
MIC Lot 39-A
awmy N;mtw
REV #
Scale: 1r16" = 1'
1 Sheet 2 of 6
(N I Solar Array (E) 2 x 4 Ratters @ t G' OC with 5/g- OSB Sheathing
50 @ SEG-405-BMD-HV panels and Spray -on Foam Roofing Material
67.8" x 40.0" x 1.7' Roof Pltch: V
Roof Section Scale 3/8" = 1'
Legend: Approvals Date
(E) Existing
(� N New
APN# 779-490-014 �_
pISCLAIMLN It any Errata. UlscreoW,>es or or iSstons Up— In nlese orawngs, spec —Wren or other callracl d.—nls; the Owner a Gonerai Coneactor mall notify the Destgner, in Wdlin,
d Such Utter or arrtiS.tilon. In the event that the Owner or General Contraclor falls to give s� n notice. before consli Cbon alolar fawicatirin of the work, the Owner or General Contraclar will be
held responsitlfe w the result of any errors. daaepancies or a*ussions and the cost d rectifying them
Attachment Detail Scale 1" = 1'
Approved by:
Brandon 51ater (760) 895-9474
Attachment Detail
45-350 San Luis Rey
Southern California
Palm Desert, CA 92260
Contractor:
Energy Alternatives
760-9044917
CSLB # 988895
53821 Ross Avenue
Customer
Richard Doan
La Quinta, CA, 92253
Construction
MIC Lot 39-A
rawing Number,
Rev x
Scale:
Sheet 3 of 6
PV Array (N) Junction Boxes (N) Enphase IQ Combiner N AC Disconnect (N) Main Service Panel (E)
Branch Circuits of 2 x 13 and 2 x 14 Modules in Parallel an Roof Weather proof Bell box Located on Roof 2P 100A - Non -Fused 800 Amp Main Service
(50) SEC-405�MD-HV Panels X40-AMl-240-B 240 V
(50) Enphase 107.60-2-US Microinveners under panels 240 V NEMA 3R
4xa
Output. 20.250 Watts STC
hla,n Eiec next to
Panel
J-BOX
J-BOX
i
I..a:rmro @ 125% = 16.25 A (1 A x 13 x 125%)
tnN . & . BiwMvr.
&20—p
(2) # 12 THWN-2 - in Enphase G Cable
SUM OF INVERTER OUTPUT:
Equipment Grounding Conductor:
4 1118 THWN 2
( )
(1) 1118 THWN-2 (AC-EGC)
1 Amp x 50 x 125% = 62.5 Amp
(1) # 6 solid copper
314" EMT Conduit on Roof
Wire run under panels through inverters
Wire Sizing:
1,1—w%@125%= 14.88 A(1 A x 12 x 125%)
#8THWN-2-55A
55A x 80% (conduit lit) x 0.58
(2) # 12 THWN-2 - rn Enphase 0 Cable
Equipment Grounding Conductor
(1) # 6 solid copper
Legend:
Wire run under panels through inverters
(E) Existing
(N) New
Single Line Notes:
1. The DC circuit meets the requirements of ungrounded PV arrays in NEC 690.35-No additional GEC is I
required. Ground Fault Protection is integrated into the inverter
2. All wire sizes are as indicated or larger.
3. Wire sizes meet the criteria of 125% continuous use factor.
4- All equipment is bonded by mechanical means or by a grounding conductor.
5- All modules are grounded mechanically using Prosolar Grounding System.
6. The system is grounded at the neutral buss in the main electrical panel.
7. The system is grid - inter le only, has no batteries or UPS. FEE"
8. Individual panels inverted from DC to AC with microinverners located under panels.
9. The Enphase Q Cable System (double insulated DIG cable) does not have neutral wire
APN# 779-490-014
1�n ���, uolry rlerar
i4 eetlaMwp
l�
WWII 0,0
12a 20flV
S,xa, ecuso, 1
(2) # 4 THHNM-fWN-2
(1)111 4THHNnHWN-2-Neutral
(1)# 6THHNrTHWN-2AC-EGC
1" EMT Conduit
correction) = 25.52 A Wire Sizing:
# 4 THWN-2.95A
95A x 100% (conduit rill) x 0.82 (temp. correction) = 77.9 A
AUTOMATIC RAPID SHUTDOWN UPON AC GRID
DISCONNECT INTEGRATED IN ENPHASE INVERTERS
TO MEET NEC 2020
Approved by:
Brandon later (760) 895-9474
1 - Line
45-350 San Luis Rey
Southern California Palm Desert, CA 92260
Contractor: Energy Alternatives 760-904-4917
CSLB N 988895
Customer:
DISCLAIMER: If any Ena . Discrepancies or Onpec�ea ,isuons appear in these drawings. stions or other contract d—tints; The firmer or General Contractor shall notify lne Designer. in wnlinp.
of such error or omission. In the event that the Owner or General Contractor falls to gave such notice. before consinjoion andlor fabrication of the work, the Owner or General Contractor wd) be
held responsible to the result of any errors. disaeoamles or ornresions and the cost of rectifying then,. raw�ng Numbi
Richard Doan 53821 Ross Avenue
Construction La Quinta, CA, 92253
MIC Lot 39-A
REV # Scale: I Sheet 4 of 6
NEC 690.64(B)(7) NEC 690.54 NEC 690.56(B)
PLACE THIS LABEL AT P.O.C. TO SERVICE DISTRIBUTION PLACE THIS LABEL AT "INTERACTIVE POINT OF BUILDINGS OR STRUCTURES WITH BOTH UTILITY SERVICE
EQUIPMENT (I.E. MAIN PANEL (AND SUBPANEL IF APPLICABLE)) INTERCONNECTION' (AT MAIN SERVICE PANEL AND AND PHOTOVOLTAIC SYSTEM SHALL HAVE A PERMANENT
THIS LABEL IS ONLY NECESSARY WHEN BREAKERS FEEDING SUBPANEL IF APPLICABLE) PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE
PANEL EXCEEDS 100% OF BUSS RATING SERVICE DISCONNECTING MEANS AND THE PV SYSTEM
DISCONNECTING MEANS IF NOT LOCATED AT THE SAME
LOCATION.
MAIN SERVICE PANEL
SOLAR PV SYSTEM EQUIPPED WITH
RAPID SHUTDOWN
TURN RAPID SHUTDOWN
SWITCH TO THE "OFF'
POSITION TO SHUT
DOWN PV SYSTEM AND
REDUCE SHOCK HAZARD
IN THE ARRAY
EXTERIOR / INTERIOR CONDUIT
CAUTION: SOLAR CIRCUIT
APN# 779-490-014
SOLAR ONLY SUBPANEL 13 PANEL CIRCUITS:
INTERACTIVE PHOTOVOLTAIC POWER SUUHGE
RATED AC OUTPUT CURRENT: 13 A _
NOMINAL OPERATING AC VOLTAGE: 240 V
SOLARONLY SUBPANEL 12 PANEL CIRCUITS:
AC DISCONNECT - READILY ACCESSIBLE:
MAIN SERVICE PANEL: Approved by: i
• • •LTAIC POWER SOURCE Brandon later (760) 895-9474
PUT CURRENT: 50Aj Labels
VOLTAGE:6ATING AC 45-350 San Luis Rey
Southern California Palm Desert, CA 92260
Contractor Energy Alternatives 760-904-4917
CSLB # 988895
DISCLAIMER: If any Errors. Discrepancies or Orr.Sion appear in these drawingsspeciiicarions or other conhad doa,ments The Owner or General Contractor shall notify ale Designee, in wniing
of such error or omission. In No event that the Owner or General C-itractur falls to give such notice, before construction andlor tabncatwn of the wurk. the Owner or General Conuaaur will he;
held roc�owsiole to:he result of any efrom discrepances or umieswns and the cost o' rectifying them.
I I Richard Doan I 53821 Ross Avenue I
Customer. Construction La Quinta. CA, 92253
MIC Lot 39-A
REV 4 1 Scale: I Sheet 5 of 6
PLACARD FOR MAIN SERVICE PANEL:
CAUTION
POWER TO THIS BUILDING IS ALSO SUPPLIED
FROM THE FOLLOWING SOURCES WITH
DISCONNECTS LOCATED AS SHOWN:
APN# 779-490-014
,DISCIlUMER: If any Errors. Discrepancies or Omissions appear In these dramngs. spectlications or other contract documents. The Owner or General Contractor shall nobly the Desigher, in w
of such error or omrssion. In the event that the Owner or General Contractor falls to give such notice. Defore construction and/or fabrication of the work, me Owner or General Contractor will be
held responsible to the result of any errors, discrcoanaes or omissions and the cost of reetdying them.
Approved by:
Brandon Siater (760) 895-9474
PLACARD
45-350 San Luis Rey
Southern California Palm Desert, CA 92260
Contractor: I Energy Alternatives 760-904-4917
CSLB # 988895
Richard Doan 53821 Ross Avenue
Customer: Construction La Quinta, CA, 92253
MIC Lot 39-A
REV 0 1 Scale: I Sheet 6 of 6
No. of DC; and AG DC and
modules. DC and AC rating Inverter watts of AC kW of
inverters of module efficiency STC calculation system system
SEG SOLAR- #SEG405-BMD-HV 405 196425 watts 20,250 watts -DC 20 3 kW -DC
HIN-S365XG (BK) 376.5 r C 12,000 watts -AC 12.0 kW -AC
Inverter nameplate Inverter efficiency
Enphase Energy 50 240 97 0% 240vac
IQ7-60-2-US
Note: total watts -AC of system cannot exceed the total nameplate watt rating of the inverters
TOTAL DC WATTS
TOTAL AC WATTS
7/19/2023 22-028_Elway_Lot 71-B_System Watt Ratings_03-09-23 As
19642.5 watts 20,250 watts -DC 20.3 kW -DC
12,000 watts -AC 12.0 kW -AC
WEIGHT LOADING ANALYSIS
Solar Electric Installation
RICHARD DOAN CONSTRUCTION/ #23-007_53821 Ross Avenue, La Quinta, CA 92253
Contractor: Southern California Energy Alternatives July 19, 2023
Analysis of dead load weight added by installation of solar array
SEG SOLAR-#SEG-405-BMD-HV-BLK-solar module weight
No. of solar modules
Total weight of modules
Weight of each Professional Solar Products "Roof Trac" rack set
No. of rack sets
Total weight of rack sets
Total weight of solar array
Height of each module
Width of each module
Area of one module
Area of entire solar array
Weight of solar array per unit
47.4 pounds
50
2,370 pounds
40 pounds
125
496 pounds
2866 pounds
5.� feet
3.7 feet
21.0 square feet
1050 9 square feet
nds/square foot
No. of stanchions connected to rafters with lag screws 1 59
Weight loading per vertical pipe 48.9 poundsiconnection
See attached sheets for engineering information on the Professioal Solar Products "Roof-Trac" racks.
7/19/2023 22-028_Elway_Weight Load Analysis_03-09-23.xls
7 SEG
S O L A R
SIV SERIES
SEG Solar INC. (SEG) redefined the high -efficiency module series by
Integrating 192min silicon wafers with multi-busbar and half -cut cell
technologies SEG panel combined creative technology effectively
and extremely improved the module efficiency and power output.
- KEY FEATURES
OLess mismatch to get more power
Less power loss by minimizing the shading Impact
Competitive low light performance
® 3 times EL test to ensure best quality
QIdeal choice for utility and commercial scale projects
by reduced BoS and Improved ROI
Outstanding reliability proven by PVEL for
stringent environment condition.
Sand, acid, salt and hailstones
Anti-PID
SEG SOLAR INC. (SEG)
www.segsolar.com
PRODUCT CERTIFICATION
IEC612152016: IEC 617302016: UL1703: UL61730/CSAICEC
IEC62804 PID
IEC61701 Salt Mist
IEC6271 o Ammnnla Resistance
IEC60068 Dust anil Sand
IEC61215 Hallstui�il(25nan)
Fire Type(UL8173(1):1R9 (Types-HV Type29-BG)
ISD140012015 IS09001-2015; ISO45001:2018
CYCLE
C s•
'a.CE
INSURANCE
PM
• WARRANTY
q8•, Add.troual Value trom Un—
Warranty
93 OS
9D%
sn.3Y.
a7 55k
a1 4%
al!
0 5 "5 :s
20 25
yeux
25 G aranlua 00 proouQ
25 bnaar_o,m
XV matelial and 101kr1111"I p
output wallanty
SEG SOLAR INC. (SEG)
SEG Headowner Cakforma ottrce. 6200 Sloneodge Mall Rd.Ste 300 Pla—mon. CA 945BB
SEG San Antonio Texas office 973 Isom Roao San Anlonlo. Tx 78216
Tel 1125-4684198 Web vMw.Segeolar cu•r,
7 SEG
S O L A R
Electrical Characteristics
adule Type GFG-40"MU.H SEG-'71-.11O-HV SEG-415 EPAO-Hv SF.Gd2U-8MU-HV
STC NOCT
STC NOCT STC NOCT
STC NOCT
Maximum Power at STC (Pmp) 405 304
410 308 415 311
420 315
Open Circuit Voltage (Voc) 3722 34.73
37.32 34.81 37.42 34.90
37.52 34.99
Short Circuit Current (Isc) 13.70 11.07
13.80 11.15 13-90 11.23
14.00 11.32
Maximum Power Voltage (Vmp) 30.93 28.91
31.05 29.05 31.16 29,19
31.28 29.33
Maximum Power Current (Imp) 13.10 10.51
13.21 10.59 13.32 10.66
13.43 10.74
Module Efficiency at STC(gm) 20.74
21.00 21.25
21.51
Power Tolerance
(0. +3%)
Maximum System Voltage
1500V DC
Maximum Series Fuse Rating
25 A
STCr trradiance 1000 WJmI module temperature 25'C AM- 1.5
NOCT. Irradiance 800W/m' ambient temperature 20'C module
temperature 45'C wind speed:
cods
Power measurement tolerance- +/ 3%
Temperature Characteristics
Pmax Temperature Coefficient
-0.35 %1°C
Voc Temperature Coefficient
-0.27 %f°C
Isc Temperature Coefficient
+0.05 %rc
Operating Temperature
40 -+85 °C
Nominal Operating Cell Temperature (NOCT)
45±2 'C
Mechanical Specifications
External Dimensions
1722 x 1134 x 35 mm
Weight
21.5 kg
Solar Cells
PERC Mono (108 pcs)
Front Glass
3.21 mm AR coating tempered glass t low iron
Frame
Black anodized aluminium alloy
Junction Box
IP6813 diodes
Connector Type
MC4
Cable Type t Length
12 AWG PV Wire (UUIEC) it 1200 mm
Mechanical Load (Front)
5400 Pa 1 113 psf`
Mechanical Load (Rear)
3600 Pa ! 75 psf'
'Refer to SEG installation Manual for details
Packing Configuration
Container 20 GP 40'HO
Pieces per Pallet 31 31
Pallets per Container 6 26
Pieces per Container 196 606
For details, please consult SEG.
SEG SOLAR INC. (SEG)
1www-segsolar.com
_
Merw
to
I
i
e
to64
e
-142 ee0:o.ae.00 "i
1,a4a2nw�
--lM.96i0Aewl
tt S9 .4n A -A Section 8.8
6:1 2:1 101 101
'Refer to SEG installation Manual for details
IN Curve
71.
Soovlicatio+s are sbbloct W cnanga wtt,"t tuM*r notincaU/ SEG05{q-2022910 oCopyngnt 2022 SEG
SEG SOLAR INC. (SEG)
SEG Headquarter Calilarnia ofte, 6200 SEowK*e Mal Rd.. Ste 300 Pleasanton CA 94S88
SEG San AM-. Twee oxtce 973 1.- Road San W-a. Tx 78216
T.I 925-468.4198 'Nab'. anew mq%W r rpm
Data ;hest
Enphase Microinverters
Raclion US
Enphase
IQ 7 and IQ 7+
Microinverters
a
To learn more about Enphase offerings, visit enphase.com
The high-powered smart grid -ready
Enphase IQ 7 Micro`" and Enphase IQ 7+ Micro"
dramatically simplify the Installation process while
achieving the highest system efficiency.
Part of the Enphase IQ System, the IQ 7 and
IQ 7+ Microinverters integrate seamlessly with
the Enphase IQ Envoy'", Enphase Q Aggregator"',
Enphase IQ Battery", and the Enphase Enlighten"
monitoring and analysis software.
IQ Series Microinverters extend the reliability
standards set forth by previous generations and
undergo over a million hours of power -on testing,
enabling Enphase to provide an industry -leading
warranty of up to 25 years.
Easy to Install
Lightweight and simple
Faster installation with improved, lighter two -wire cabling
Built-in rapid shutdown compliant (NEC 2014 & 2017)
Productive and Reliable
Optimized for high powered 60-cell and 72-cell* modules
More than a million hours of testing
Class II double -insulated enclosure
• UL listed
Smart Grid Ready
Complies with advanced grid support, voltage and
frequency ride -through requirements
Remotely updates to respond to changing
grid requirements
Configurable for varying grid profiles
Meets CA RUle 21 (UL 1741-SA)
" The IQ 7* Micro is required to support 72-cell modules
�ENPHASE
Enphase IQ 7 and IQ 7+ Microinverters
INPUT DATA (DC)
IQ7-60-2-US
IQ7PLUS-72-2-US
Commonly used module pairings'
235 W - 350 W +
235 W - 440 W +
Module compatibility
60-cell PV modules only
60-cell and 72-cell PV modules
Maximum input DC voltage
48 V
60 V
Peak power tracking voltage
27 V - 37 V
27 V - 45 V
Operating range
16 V - 48 V
16 V - 60 V
Min/Max start voltage
22 V / 48 V
22 V 160 V
Max DC short circuit current (module Isc)
15 A
15 A
Overvoltage class DC port
II
II
DC port backfeed current
0 A
0 A
PV array configuration
1 x 1 ungrounded array; No additional
DC side protection required;
AC side protection requires max
20A per branch circuit
OUTPUT DATA (AC)
IQ 7 Microinverter
IQ 7+ Microinverter
Peak output power
250 VA
295 VA
Maximum continuous output power
240 VA
290 VA
Nominal (L-L) voltage/range2
240 V / 208 V /
240 V / 208 V /
211-264 V 183-229 V
211-264 V 183-229 V
Maximum continuous output current
1.0 A 1 15 A
1.21 A 1.39 A
Nominal frequency
60 Hz
60 Hz
Extended frequency range
47 - 68 Hz 47 - 68 Hz
AC short circuit fault current over 3 cycles
5.8 Arms 5.8 Arms
Maximum units per 20 A (L-L) branch circuit'
16 (240 VAC) 13 (240 VAC)
13 (208 VAC) 11 (208 VAC)
Overvoltage class AC port
III III
AC port backfeed current
0 A 0 A
Power factor setting
1.0 1.0
Paver factor (adjustable)
0.7 leading .. 0 7 lagging 0.7 leading .. 0.7 lagging
EFFICIENCY
@240 V @208 V @240 V @208 V
Peak CEC efficiency
97.6 % 97.6 % 97.5 % 97.3 %
CEC weighted efficiency
97.0 % 97.0 % 97.0 a 97.0
MECHANICAL DATA
IQ 7 Microinverter
Ambient temperature range
40°C to +651C J __
Relative humidity range
4% to 1000,0 (condensing)
Connector type
MC4 (or Amphenol H4 UTX with additional Q-DCC-5 adapter)
Dimensions (WxHxD)
212 mm x 175 mm x 30.2 mm (without bracket)
Weight
1.08 kg (2.38 Ibs)
Cooling
Natural convection - No fans
Approved for wet locations
Yes
Pollution degree
PD3
Enclosure
Class II double -insulated, corrosion resistant polymeric enclosure
Environmental category / UV exposure rating
NEMA Type 6 / outdoor
FEATURES
Communication
Power Line Communication (PLC)
Monitoring
Enlighten Manager and MyEnlighten monitoring options.
Both options require installation of an Enphase IQ Envoy.
Disconnecting means
The AC and DC connectors have been evaluated and approved by UL for use as the load -break
disconnect required by NEC 690.
Compliance
CA Rule 21 (UL 1741-SA)
UL 62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES-0003 Class B,
CAN/CSA-C22.2 NO. 107.1-01
This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC-2014 and
NEC-2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC
and DC conductors, when installed according manufacturer's instructions.
1. No enforced DC/AC ratio. See the compatibility calculator at httns://enghase.com/en-us/suooIg�ompatjbi 't .
2 Nominal voltage range can be extended beyond nominal if required by the utility.
3, Limits may vary. Refer to local requirements to define the number of microinverters per branch in you. area
To learn more about Enphase offerings, visit enphase.com v E N P H A S E
2018 Enphase Energy All rights reserved, All trademarks or txands used are the property of Enphase Energy, Inc
2018-02-08
SolarWedge
Revolutionary Commercial Mounting System!
SolarWedge by Professional Solar Products, Inc, is an innovative low
profile commercial/residential PV mounting system. The system provides
an easy to install and economical solution for 5, 1.0 or 15 degree
structural attachment. SolarWedge integrates with Professional Solar's
patented "top -down" commercial RoofTrac' and FoamJack, stanchion
products. The system dramatically lowers installation and shipping costs
while optimizing installed wattage on the roof.
Advantages of the SolarWedge=
* Easy handling and Installation: Each box supports up to 30' (front
& rear) of RoofTrac` support rails
* Integrated Leveling System: Compensates up to 2-1/2" of roof
variation using an included 1/2" x 4" stainless steel stud
* Fully Engineered: Load tested to 30 lbs. per sq. ft (approx. 110
mph wind load) at up to 6' centers
* Finished Aluminum Parts: Clear anodized angled support
brackets match support rail. FoamJack stanchion parts are
machine tumbled and cleaned to provide excellent bonding of
foam, flash or
SolarWedge
Precision extruded angles of anodized
aluminum compress the support rail at
a fixed angle while dramatically
Increasing the strength
Leveling Feature
Stud rolls Into the post up to 2-1/2"
to eliminate the need for cutting studs'
on the job
Foamlack
Each kit includes the Foam -lack'
with a 3" aluminum seal plate.
Size included depends on the
angle purchased
LouJTrtlyd
110inph
Wind Lad
301bs. s9. ft
'it &' o„ Center
Rail Insert -
Compression Nut
1/2" x 4
Leveling Stud
L Rail Low
Support
Roof Surface
Modules arc mounted in
the illustrated direction to
optimize performance in the Foamed bases
summer months' as illustrated
Assembly of the SolarWedge
Components of the SolarWedge(�)
system easily integrate with the
new XD support rail.
1 Jam Nut/
1 /2"Washer
IrImpresslr.r
I Nut
I \�3"NDRmJ-
Lower Suppc
Jom Nut/
t - !/2" Washc
/ Join Nut,
Fully Assembled
Attachment Parts List (Per Box) Not to scale
Shipped in a shoe box sized package, the SolarWedge XD attachment
components offer easy handling and storage along with reduced shipping
costs. 12 ea. � 24 ea.
40 Aluminum 1/2"SS Flat Washers
6 ea. Lompressl On
I' Dia. Aluminum Nuts
Rear Posts Q 12 ea.
12 ea. 3/8SS Flat Washers
® 6 ea. Aluminum
Lower Pall ® 36 ea.
I"Dia.Aluminum Supports
Front Posts 12 eaI i 2' SS Jam Nuts
.
112' x 4" SS
' 12 ea. Leveling O 12 ea.
1.5" Dia. Studs 3" x 3" Aluminum
Aluminum
Seal Plates
Bases
Attachment Box Dimensions
Specifications are Each box contains enough 6„
subject to change attachments to ���
without notice. install up to 12"
3.3 kW�
Standard SolarWedge4Teehnieal Information n10 lmit Degree Box
ensions
Load Tested and engineered to 30 lbs. per W (approx.110mph wind load Hlustratea 5"
equivalent) � L
> Utilizes FoamJack'� Laboratory tested to 2.8701bs.vertical and 2,615 Ibs.side
lateral pull out using a 3/8" x 6" lag bolt (secured at approx.6-1/2").
> Structurally attached to the roof - extremely important in areas with _ - `%
potential horizontal and vertical seismic movement such as California. - - _
> Available in 5, 10' or 15' angles. Optimized to help reduce typical
peak summer demand charges.
Front Extension Height - - - - - - - - - - - -
F
All Angles --- _-------
---------------
— 4' O.C.
Rear View
2.5" Support Rail
profeSS!onal (805)486-4700
SOLAR
1551) S. Rose Ave.
pIOCiUCtS�:r�l�
Oxnard, CA 93033
www.prosolar.com
SW200BU321
6' O.C.
'using 2111 wr,,.
moautes
Rear Extension Height-
15 Degree
I V -/. 3/4"
10 Degree
14-1 /2" +1- 314"
5 Degree
11` y- 3/4-
'Height from mof surface to
bottom of support 1,111
6' Span between
attachments for commercial
construction only
Drill Guide (Sold Separately)
Availableee Sizes
• Degree Kit)
1 • 1 Degree Kit)
• 0 5 Degree The FoamJack, drill guide ensures that
pilot holes are drilled 90 degrees to the
Patent •6.360.491and 0547262 rafter/beam optimizing the strength
and appearance of the connection.
Roof Trac
#6,360,491
The Original "Top -Down" PV Mounting System
FIRM-
E1� us
Intertek
4007217
UL2703
UL1703
Class A
Fire Rated
Illustrated above is how the
FastJack® attachment seamlessly
integrates with the RoofTrac®
mounting system.
protesslonal
SOLAR
products,: �-
Juna 20t5
Integrated with FastJack° attachments
The patented RogJT?ncO rail/clainp syslern installed With the FastA 1,
attachment method provides an ideal solution far installations
inhere a flashing is desired. The FastJack® is also the solar industries
preferred method of attachment for new construction roofs.
All attachment hardware is
concealed within the support rail leaving
an aestically pleasing solar array
FastJack® Installation
(TileTracO on back)
Splice Self -Bonding Connection
The splice kit provides a solution to ,r gidly
lock multiple mil sees together and bond the
rails to one another.
For more itrformrttion jvu can visil us on the tveb at
www.ProSolar.com
FastJack° Connection
The FastJack'o attachment provides a
quick and strong installation solution.
Patented design places the boll directly
under the stanchion post inhere the
most support is offered. This feature
allows standard roofJlashings to
lay flat an the roof deck,
Removable post allows t*I
standard,Jlashings to be
slipped over the base
without damaging
delicate surrounding
composition
shingles.
Flashing
5/6x3.5" .�
Lag Bolt
Threshold
Fast.lack't' Base
1 i & ASSOCIATES
Structural F.ngineers
3CLIENT:
Professional Solar Products, Inc.
1551 S. Rose Ave., Oxnard, CA 93033
Tel: 805-486-4700
Subject: Static load test results for the ProSolar,,--R) sloped roof mount:
Mounting System
Min Rail Height
Max rail span
Test Load
Wind
exposure
Roof
ASCE 7-16 Wind
(ASCE 7-16)
zone""
Speed rating"
RoofTracc,
2"
72"
30 Ib/ft2
A, B, C
All roof
120 mph
zones
TEST SETUP (as shown in attached drawing detail): Modules* were bolted to 2" tall Professional Solar Products (PSP) UL2703
RoofTra0l support rails using an assembly of 5/16" Stainless Steel (SS) bolts, SS lock washers and proprietary PSP aluminum
clamps and RoofTrac® channel nuts. The RoofTrac"'support rail was attached to the PSP RoofTracID structural attachment
device with 3/8" SS hardware at four attachment points. The setup was attached to 2"x6" wooden rafters using 5/16" x 3-
1/2" lag bolts. The attachment spans consisted of 48" front to rear with structural attachments spaced 72" on center.
TEST PROCEDURE (as shown in attached drawing detail): The test set up was top loaded to above specified load per UL2703
loading guidelines (Intertek report reference: 104601549LAX). The setup remained under load for an approximate period of
30 minutes per UL2703. Any signs of permanent deformation were recorded. The test setup was then inverted and loaded to
simulate the wind uplift condition. The test set up was re -loaded to above specified load. The setup remained under load for
an approximate period of 30 minutes. Any signs of permanent deformation were noted.
TEST RESULTS:
The maximum top load resulted in no permanent deformation.
The maximum uplift load resulted in no permanent deformation.
This document certifies the RoofTracc mounting system withstands the stated static pressure load, equivalent to the stated
wind speeds**. The mounting system performed as expected.
Sincerely,
James R. Vinci, S.E.
This engineering report verifies that Vinci & Associates accepts and verifies the findings outlined in the Testing Report 100779407LAX-003, dated May 19,
2021. The results of this load test reflect actual deflection values and are generally accepted as the industry standard for testing module mounting systems.
Vinci & Associates does not field check installations or verify that the mounting system is installed as described in this engineering report.
Structural attachment: Lag bolt attachment should be installed using the proper pilot hole for optimum strength. A 5/16" lag bolt requires a 3/16" pilot hole.
It is the responsibility of the installer to ensure a proper attachment is made to the structural member of the roof. Failure to securely attach to the roof
structure may result in damage to equipment. personal injury or property damage. The purposed racking system may be installed on any roof up to a
maximum of 24 foot above grade without further analysis. Racking shall be installed into a roof member or blocking with a 5/16" diameter screw at each
Fast -jack location. Screws shall have minimum of 21/2 penetration into framing member for zone 1&2(n/e/r), and a minimum of 3" penetration into framing
member for zone 3(e/r). (Zone 3 is defined as the approximately 4'-0" square at each corner of the roof)
This office/report does not express an opinion as to the load bearing characteristics of the structure
the mounting system/modules are being installed on.
ICC accredited laboratory tested structural attachments manufactured by Professional Solar Products
(including, but not limited to FasUacks' , TileTrac,", and FoamJack") can be interchanged with this system.
Any rail splice used shall be manufactured by PSP. As tested, 2.0 splice located anywhere along rail except
cantilever. Limit spliced rail run to approx. 45 ft. for expansion/contraction
Check with local building department or AFIJ for site specific requirements.
*Modules tested to UL1703, or equivalent, up to 23 ft2 are included in this engineering.
**Wind loading values relative to defined load values usingwind load exposure and gust factor
coefficient "exposure C" as defined in the 2018(IBC)/2019(CBC)/ ASCE 7-16.
Est snow load rating of 15 Ib/ft- based on 2.0 safety factor.
/ QO iA 7C
No
41
JCTl1RP����P
`OF CAS
175 E. Wilbur Rd, Suite 103 Thousand Oaks, CA 91360
RT 2.0 Page 1 of 2
—I 4mx27' r
cantilever
Total module (45 lbs ea.)
and rail (12 Ibs ea.) weight: 159
Ibs
Number of attachments: 4
ea
Weight / attachment point: 40
Ibs
Area: (3 modules) 69
ft2
Distributed weight: 2.3
lb/ ft2
5116" Stainless
Steel Hex bolt
5116" Stainless Steel
rTr Lock Washer
I
Aluminum Roofrrac®
Mid -Clamp
I Aluminum RoofTraCL
IS I channel nut
I
I
2" Aluminum RooFTrac0
Support Rail
318" Stainless Steel
Hex Bolt
Aluminum
(' ! FastJack® / TileTrac@ Roof
t Attachment*
5116" Lag Bolt
i
Professional Solar Products RoofTrac°
Photovoltaic mounting system
DOWNLOAD
UPLIFT
F!4 yC �
No A 1 r2T
X
ST CT&6P ZNQ'
TF OF CAL�F��/
L' L
RoofTrac ,
Solar Modules
Static load test illustration
RT 2.0 Page 2 of 2