BCOM2024-0017 Title 24INDOOR LIGHTING
CALIFORNIA ENERGY COMMISSION
�D
CERTIFICATE OF INSTALLATION
CEC-NRCI-LTI-E
This Certificate of Installation documents the installation of indoor lighting features, materials, components, and manufactured devices required to
demonstrate compliance with Title 24, Part 6 per §10-103(a)3 for nonresidential, hotel/motel and high-rise residential occupancies.
Project Name: PGA TOUR SUPERSTORE
Enforcement Agency:
CITY OF LA QUINTA
Permit Numbe GO� �-
Dwelling Address:
79110 HWY 111
City and Zip Code:
LA QUINTA 92253
Permit Application Date:
(0 %2
A. GENERAL INFORMATION
01
Project Location (city):
LA QUINTA
05
Authority Having Jurisdiction:
CITY OF LA QUINTA
02
Zip Code:
92253
06
Building Permit k;
C—O P1 Z,49 Z _ I
03
Date of Permit Set used for
r I I _ /,
l _�—`—�
07
Date of As -built Set:
�J l
construction:
`
[04
Name of Permit Set used for
�8Na a of As -built Set:
/
`�—
construction:
ti( e_ 21 c.e/3.Q 144-,tAJUAq
57r
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance
January 2022
INDOOR LIGHTING
CALIFORNIA ENERGY COMMISSION CEC-NRCI-L1 I-E
B. INSTALLER SCOPE
This table indicates construction systems and materials documented on this Certificate of Installation
01 02 03
Luminaires Space Types Controls'
X7 I General Lighting I X-� I Conditioned
Decorative/
Accent
Unconditioned
Timc
Occupancy
X^
switch
X
Sensors
X
Dimmers
Interlocked
X -'
Daylighting X
Systems
X
Shut-off
Area
Demand
Controls
Response
°
Videoconferencing Studio Controls
Institutional
Multi -level
Tuninit
C. COMPLIANCE RESULTS
This table indicates whether the as -built conditions documented in this form are equal or better than what was documented on the permitted
Certificate of Compliance. If the installation is not equal or better, Section 10-103(o)2B requires the Certificate of Compliance to be revised
accordingly to demonstrate compliance.
INSTALLED FEATURES EXACTLY MATCH DESIGN ON PERMITTED CERTIFICATE OF COMPLIANCE
Documented as -built conditions should be verified by inspector from Authority Having Jurisdiction to comply.
The Certificate of Compliance should be revised to confirm as -built conditions comply and this Certificate of Installation updated accordingly.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
INDOOR LIGHTING
CALIFORNIA ENERGY COMMISSION CEC-NRCI-LTI-E
D. EXCEPTIONAL CONDITIONS
This table is auto -filled with uneditable comments because of field conditions noted by the installer that may impact mechanical controls
requirements documented on the Certificate of Compliance.
E. INSTALLER NOTES
This table includes remarks made by the installer to the Authority Having Jurisdiction.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance
January 2022
INDOOR LIGHTING
CALIFORNIA ENERGY COMMISSION
F. INSTALLATION DETAILS
CEC-NRCI-LTI-E
The following tables indicate performance requirements as documented on the permitted Certificate of Compliance for all systems and components
included in Table B. Installer Scope. Also indicated are the os-built conditions documented by the installer/ documentation author_
Indoor Lighting Fixture Schedule for Spaces Other Than Dwelling Units/ Hotel Rooms/ Motel Rooms
01
02
03
0114
OS
C16
07
OS
09
10
11
12
13
Fixtur
Used in
Total
e
VA of
Voltag
Maximum
Rated
Luminair
Conditioned
Fixtur
Linear
Sum of
Number
Fixture
Withi
Curren
a of
Rated
Wattage
Name or Item Tag
a
or
e
FT2 of
Ampere
of
Complian
n
Descripti
Uncond
Type
Track
t
Branch
Rating
Input
perition
Luminaire
ce
Scope
Limiter
Circuit
Wattage
Luminaire
�
on
ed Space?
s
Per C of C
N0
LED
CONDITIONED
L
D
120127
16.3
NONE
22.6
1$
' L'
As -built Conditions
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
INDOOR LIGHTING
CALIFORNIA ENERGY COMMISSION CEC-NRCI-LTI-E
Residential Dwelling Unit or Hotel/ Motel Room Luminaire Efficacy Requirements
Residential dwelling unit and hotellmotel room lighting fixtures must be installed according the the following requirements.
The following light sources are considered high efficacy light sources and are not required to comply with Title 24, Part 6 Joint
Appendix 8 requirements:
A. Pin -based linear fluorescent or compact fluorescent light sources using electronic ballasts.
B. Pulse -start metal halide light sources.
C. High pressure sodium light sources.
D.
Have sunrise and sunset prediction accuracy within +/- 15 minutes and timekeeping accuracy within 5 min per year
(astronomical only);
E. Luminaires with hardwired high frequency generator and induction lamp.
F. LED light sources installed outdoors.
Inseparable solid state LED (SSL) luminaires containing colored light sources that are installed to provide decorative
G. lighting.
All other light sources shall be marked with "JA8-2019" or "JA8-2019-E" to qualify as high efficacy light sources. Light sources
not marked with "JA8-2019" or "JA8-2019-E" do not meet the efficacy requirements.
Ceiling recessed downlight luminaires shall not have screw bases regardless of lamp type.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
INDOOR LIGHTING
CALIFORNIA ENERGY COMMISSION CFC-NRCI-I.TI-F
Indoor Lighting Controls
01
02
03
04
0S
06
07
08
09
10
Area
Primary
Demand
Manual
Manual
Multi-
Shut
Primary/Skylit
Secondary
Interlocked
Description
Function
Response
Level
Off
Daylighting
Daylighting
Systems
Controls Compliance
Area
Controls
Controls
Controls
Per C of C
RETAIL
YES
YES
YES
YES
NO
NO
JC,
YES
As -built
Conditions
Controls for Additional Wattage Credit (Power Adjustment Factor)
Controls in spaces listed in this table were designed to allow additional wattage as part of the strategy to comply with the Energy Code.
01
02
03
04
1 05
06
Luminaires Controlled
Area Description
Control(s) for Wattage
Luminaire
Watts per
Number of
Lighting
Credit
Name or
Controlled
Luminaire
luminaires
Item Tag
(Watts)
Per C of C
As -built
Conditions
07
Controls for Credit Compliance
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
INDOOR LIGHTING
CALIFORNIA ENERGY COMMISSION
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Installation documentation is accurate and complete.
CEC-NRCI-LTI-E
Documentation Author Name: THOMAS DAVID
Documentation Author Signat t
Documentation Author Company Name: APEC
Date Signed:12/13/2024
Address: 24410 ROICK DR.
CEA/HERS Certification Identification (If applicable):
City/State/Zip:TEMECULA CA 92590
Phone:(951) 296 5835
RESPONSIBLE PERSON'S DECLARATION STATEMENT
2. 1 certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Installation is true and correct.
2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on
this Certificate of Installation and attest to the declarations in this statement (responsible builder/installer), otherwise I am an
authorized representative of the responsible builder/installer.
3. The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of
Installation conforms to all applicable codes and regulations, and the installation conforms to the requirements given on the plans and
Specifications approved by the enforcement agency.
4. 1 reviewed a copy of the Certificate of Compliance approved by the enforcement agency that identifies the specific requirements for
the scope of construction or installation identified on this Certificate of Installation, and I have ensured that the requirements that
apply to the construction or installation have been met.
5. 1 understand that a completed signed copy of this Certificate of Installation shall be posted, or made available with the building
permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to accomplish this requirement.
6. 1 understand that a completed signed copy of this Certificate of Installation is required to be included with the documentation the
builder provides to the building owner at occupancy, and I will take the necessary steps to accomplish this requirement.
Responsible Builder/Installer Name:
Respcnsible Builder/Installer Signajuae
SUPERINTENDANT
Position With Company (Title):
Company Name: (Installing Subcontractor or General Contractor or Builder/Owner)
FULCRUM CONSTRUCTION
SAME
Address:
CSt.B License:
City/State/Zip-
Phone:
Date Signed:
LOS ANGELLES
NA
12/13/2024
For assistance or questions regarding the Energy Standards, contact the Energy Hotline at: 1-800-772-3300
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS NRCI-LTI-E
Indoor Lighting (Page 1 of 3)
A. General Information
1. Enter the City the project is located in.
2. Enter the zip code.
3. Enter the Date of Permit Set used for construction.
4. Enter the Name of Permit Set used for construction.
5. Enter the Authority Having Jurisdiction.
6. Enter the Building Permit #.
7. Enter the Date of As -Built Set.
8. Enter the Name of As -Built Set.
B. Project Scope
1. Select applicable luminaires.
2. Select applicable space type.
3. Select applicable controls.
C. Compliance Results
1. This table is automatically filled with uneditable comments based on data entered in Section F.
D. Exceptional Conditions
1. This table is auto filled with uneditable comments because of selections made or data entered in tables throughout the form.
E. Installer Notes
1. This table is automatically filled with uneditable comments by the installer.
F. INSTALLATION DETAILS
Indoor Lighting Fixture Schedule for Spaces Other Than Dwelling Units/ Hotel Rooms/ Motel Rooms
1. This field is filled out automatically.
2. Fixture Within Scope: Select from dropdown.
3. Enter luminaire description.
4. This field is filled out automatically.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS NRCI-LTI-E
Indoor Lighting (Page 2 of 3)
5. Fixture type: Select from dropdown.
6. Enter linear FT2 of track.
7. Enter VA of current limiter.
8. Enter voltage of branch circuit.
9. Enter sum of Ampere rating.
10. Enter maximum rated input.
11. Enter rated wattage per luminaire.
12. Enter total number of luminaires.
13. This field is filled out automatically.
Residential Dwelling Unit or Hotel/Motel Room Luminaire Efficacy Requirements
1. This table covers the dwelling unit efficacy requirements for multifamily & hotel/motel projects.
Indoor Lighting Controls
1. This field is filled out automatically.
2. This field is filled out automatically.
3. Demand Response: Select from Dropdown.
4. Manual Area Controls: Select from Dropdown.
5. Multi Area Controls: Select from Dropdown.
6. Shut off Controls: Select from Dropdown.
7. Primary/skylit Daylighting: Select from Dropdown.
8. Secondary daylighting: Select from Dropdown.
9. Interlocked systems: Select from Dropdown.
10. This field is filled out automatically.
Controls for Additional Wattage Credit
1. This field is filled out automatically.
2. This field is filled out automatically.
3. Luminaire Item or Item Tag: Select from Dropdown.
4. This field is filled out automatically.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS
NRCI-LTI-E
Indoor Lighting
(Page 3 of 3)
5. Enter number of luminaires.
6. This field is filled out automatically.
7. This field is filled out automatically.
Documentation Declaration Statements
1. The person who prepared the NRCI will sign and complete the fields for their name, company (if applicable), address, phone number,
certification information (if applicable), date and signature.
2. The person who is assuming responsibility for the project being built to comply with Title 24, Part 6, will complete the fields for their name,
company (if applicable), address, phone number, license number (if applicable), date and signature.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
CERTIFICATE OF INSTALLATION
This Certificate of Installation documents the installation of mechanical features, materials, components, and manufactured devices required to
demonstrate compliance with Title 24, Part 6 per §10-103(a)3 for nonresidential, hotel/motel and high-rise residential occupancies.
Project Name: PGA super store
Enforcement Agency:
Dwelling Address:
79-110 California 111
Permit Number:
n/a
City and Zip Code:
Permit Application Date:
La Quint 92253
n/x
A. GENERAL INFORMATION
01
Project Location (city):
La qulnta
02
Zip Code:
92253
03
Date of Permit Set
used for construction:
5/9/2024
04
Name of Permit Set used for construction:
plan review
p
05
Authority Having
Jurisdiction:
La Quinta
06
Building Permit #:
n/a
07
Date of As -built Set:
n/a
08
Name of As -built Set:
n/a
B. INSTALLER SCOPE
This table indicates construction systems and materials documented on this Certificate of Installation
01
x ❑
Dry System (Airside) Equipment
❑
Ventilation
❑
System Controls
x ❑
Ductwork
❑
Boiler
❑
Pumps
❑
Terminal Box Controls
❑
Piping
❑
Chiller
❑
Fans and Air Economizers
❑
Heat Rejection Equipment (cooling towers,
condensers, waterside economizers)
❑
Electric Resistance Heating
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
IleCALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
C. COMPLIANCE RESULTS
This table indicates whether the as -built conditions documented in this form are equal or better than what was documented on the permitted
Certificate of Compliance. If the installation is not equal or better, Section 10-103(o)2B requires the Certificate of Compliance to be revised
accordingly to demonstrate compliance.
1 1 INSTALLED FEATURES EXACTLY MATCH DESIGN ON PERMITTED CERTIFICATE OF COMPLIANCE
Documented as -built conditions should be verified by inspector from Authority Having Jurisdiction to comply.
The Certificate of Compliance should be revised to confirm as -built conditions comply and this Certificate of Installation updated accordingly.
D. EXCEPTIONAL CONDITIONS
This table is auto filled with uneditable comments because of field conditions noted by the installer that may impact requirements documented on
the Certificate of Compliance.
n/a
E. INSTALLER NOTES
This table includes remarks made by the installer to the Authority Having Jurisdiction.
n/a
F. INSTALLATION DETAILS
The following tables indicate performance requirements as documented on the permitted Certificate of Compliance for all systems and components
included in Table B. Installer Scope. Also indicated are the as -built conditions documented by the installer/ documentation author.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
Dry System Equipment Schedule
01
02
03
04
05
06
07
08
09
10
11
12
13
Heating Mode
Cooling Mode
Equip
Rated
Supplemental
Rated
Name or Item
Model
Equipment
ment
Tag
#
Type
Output
Heating Output
Efficiency
Efficiency
Output
Efficiency
Efficiency
Efficiency
Efficiency
Compli
(kBtu/h)
(kBtu/h)
Unit
(kBtu/h)
Unit
Unit
ance
2'
Per C of C
5,
rn-013
gas
293
234
82
156.4
10.8
As -built
Conditions
Heat Pump Equipment Schedule
01
02
03
04
05
06
07
08
09
10
11
12
13
Heating Mode
Cooling Mode
Name or Item
Model
Size
Size
Equipment
Tag
#
System
Category
Efficiency
Efficiency
System
Category
Efficiency
Efficiency
Efficiency
Efficiency
Compliance
Category
(Btu/h)
Unit
Category
(Btu/h)
Unit
Unit
Per CofC
As -built
Conditions
DX DOAS Schedule
01
02
03
04
05
06
07
08
09
10
Name or Item
Model #
Equipment Type
Energy Recovery
Rating
Efficiency
Efficiency
Efficiency
Efficiency
Equipment
Tag
Condition
Unit
Unit
Compliance
Per CofC
ISMRE
ISCOP
As -built
Conditions
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
Boiler Efficiency and Controls
01
02
03
04
05
06
07
08
09
10
Controls
Tag/Plan Detail ID
Model #
Equipment Type
Quantity
Rated Input
(Btu/h)
Rated
Efficiency
Efficiency
Unit
Equipment
Compliance
Isolation
Temperature
Valve
Reset
PerCofC
As -built
Conditions
Chiller Efficiency and Controls
01
02
03
04
05
06
07
08
09
10
11
12
Rated
Rated
Controls
Tag/Plan Detail ID
Model#
Equipment Type
Quantity
Size
Efficiency
Efficiency
Efficiency
Efficiency
Equipment
Isolation
(tons)
#1
Unit #1
#2
Unit #2
Valve
Temperature Reset
Compliance
Per CofC
As -built
Conditions
Heat Rejection Equipment (Cooling Towers, Condensers, Waterside Economizers) Efficiency and Controls
01
02
03
04
05
06
07
08
09
10
11
12
Controls
Tag/Plan Detail ID
Model
Equipment
Quantity
Rated
Performance
Equipment
Fan
Tower
Fan Control in
Economizer
Condenser
#
Type
Yp
performance
Unit
Speed
Flow
Multiple Cell
Water
Compliance
Control
Control
Turndown
Equipment
Temp. Reset
Per CofC
As -built
Conditions
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
Electric Resistance Heating
01
02
03
04
05
Name or Tag ID
Model #
Equipment Description
Output Capacity
Equipment
(kW)
Compliance
Per CofC
As -built
Conditions
Pumps
01
02
03
04
05
06
07
08
09
Controls
Name or Tag ID
Type
Quantity
Horsepower
BHP)
Equipment Compliance
Variable Flow
Hydronic Heat
VSD on
Differential
Controls
Pump Isolation
Pumps > 5HP
Pressure Sensor
Per CofC
As -built
Conditions
Fans and Air Economizers
01
02
03
04
05
06
Fan Electrical Input Power
Name or Tag ID
Quantity
Fan Function
Economizer
System Compliance
Per CofC
As -built
Conditions
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
Dedicated Outdoor Air System (DOAS)
01
02
03
04
05
06
07
System Name
Quantity
Delivered Directly
DOAS Fan Control
Multi -Zone DOAS with
Multifamily DOAS
System Compliance
To The Space
Cooling
Per CofC
As -built
Conditions
H. Fan Energy Index (FEI)
01
02
03
04
Fan System Name or Item Tag
Name or Item Tag
FEI Exception
FEI
Per CofC
As -built Conditions
Exhaust Air Heat Recovery
01
02
03
04
05
06
07
Fan System Name
y
Required?
q
Type of Heat Recover Rating
yp y g
Required
Installed
EnergyRecover Bypass
y yp
System Compliance
y p
Recovery Ratio
Recovery Ratio
Per C of C
NA
As -built
Conditions
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
Dwelling Unit Fan Efficacy & Energy/Heat Recovery
01
02
03
04
05
06
07
Fan System Name
System Airflow
Input Power
Watts/CFM
Energy/Heat Recovery Ventilation
Sensible Recovery/Effectiveness
System Compliance
or Item Tag
(cfm)
(kW)
Per CofC
As -built
Conditions
System Controls
01
02
03
04
05
06
07
08
09
Shut -Off
Isolation Zone
Demand
Supply Air
Direct Digital Control
System Name
Thermostats
Window Interlocks
System Compliance
Controls
Controls
Response
Temp. Reset
(DDC)
Per CofC
As -built
Conditions
Nonresidential, Hotel/Motel and Multifamily Common Use Ventilation Systems
01
02
03
04
System Name
System Design CA CFM
Airflow
System Design Transfer Air
CFM
Air Filtration
05
06
07
08
09
Space Name
Exhaust Ventilation
Occupant Sensor Controls
Demand Control Ventilation
System Compliance
Per CofC
As -built
Conditions
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
Multifamily Dwelling Unit Ventilation Systems
01
02
03
04
05
06
07
Outside Air
Supply Air
Exhaust
Space Name
Local Exhaust
Air Filtration
Space Compliance
CFM
CFM
CFM
Per CofC
As -built
Conditions
Terminal Box Controls
01
02
03
04
05
06
07
08
09
Design
Reheated, Recooled, Mixed Air Compliance
Zone/System/VAV
Box Name Item
Zonal Control
Zone/ Box/ System
peak Primary
Primary Air in
Reheated Retooled
1st Stage Modulates
2nd Stage
or
Strategy
Airflow
Deadband
Mixed Airflow
Outside Air
<95°F and
Modulates from DB
Compliance
P
Tag
CFM
Flow to Heating
CFM
CFM
CFM
Maintains DB Rate?
Max Flow?
Per CofC
As -built
Conditions
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
*, CALIFORNIA ENERGY COMMISSION CEC-NRCI-MCH-E
1I
Ducts
The following duct systems require duct leakage testing by a certified Mechanical Acceptance Test Technician or a HERS Rater.
Learn more about the Acceptance Testing Program on the Energy Commission website here: https://www.energy.ca.gov/programs-and-
topics/programs/acceptance-test-technician-certification-provider-program
Learn more about the HERS Program on the Energy Commission website here: https://www.energy.ca.gov/programs-and-topics/programs/home-
energy-rating-system-hers-program
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-NRCI-MCH-E
Pipe Insulation
Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. Insulation exposed to
weather shall be installed with a cover suitable for outdoor service. Insulation covering chilled water piping and refrigerant suction piping located
outside the conditioned space shall have a Class I or Class II vapor retarder. All penetrations and joints of which shall be sealed.
Insulation thickness (in) or R-value shall be per the following Title 24, Part 6 Table 120.3-A/ 160.3-D.
Fluid Operating
Temperature
Range
(,F)
Insulation Conductivity
Nominal Pipe Diameter (in inches)
Conductivity
(in Btu•in/h•ft2•
•F)
Mean Rating
Temperature
VF)
< 1
1 to <1.S
1.S to < 4
4 to < 8
8 and
larger
Space heating and Service Water Heating Systems (Steam,
Steam Condensate, Refrigerant, Space Heating, Service Hot
Water)
Minimum Pipe Insulation Required (Thickness in inches or R-value)
Above 350
0.32-0.34
250
Inches
4.5
5.0
5.0
5.0
5.0
R-value
R 37
R 41
R 37
R 27
R 23
251-350
0.29-0.32
2nn
Inches
3.0
4.0
4.5
4.5
4.5
R-value
R 24
R 34
R 35
R 26
R 22
201-250
0.27-0.30
150
Inches
2.5
2.5
2.5
3.0
3.0
R-value
R 21
R 20
R 17.5
R 17
R 14.5
141-200
0.25-0.29
125
Inches
1.5
1.5
2.0
2.0
2.0
R-value
R11.5
R11
R14
R11
R10
105-140
0.22-0.28
100
Inches
1.0
1.5
1.5
1.5
1.5
R-value
R7.7
R12.5
1111
R9
R8
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-NRCI-MCH-E
Fluid operating
Insulation Conductivity
Nominal Pipe Diameter (in inches)
Temperature
Conductivity
Mean Rating
< 1
1 to <1.S
1.S to < 4
4 to < 8
8 and
Range
(°F)
(in Btu-in/h•ft2-
'F)
Temperature
('F)
larger
Space cooling systems (chilled water, refrigerant and brine)
Minimum Pipe Insulation Required (Thickness in inches or R-value)'
40-60
0.21-0.27
75
Inches
Nonres
Res
Nonres
Res
1.0
1.0
1.0
0.5
0.75
0.5
0.75
R-value
Nonres
Res
Nonres
Res
R 7
R o
R 5
R3
R6
R3
RS
Below 40
0.20-0.26
50
I r C h
1.0
1. 5
1.5
R-v-;l.ie
R 8.5
R 1.4
R 12
R 10
y
G. ACCEPTANCE TESTS & FIELD VERIFICATION
The following Acceptance Tests and HERS Verifications related to the systems or materials documented on this Certificate of Installation have been
indicated on the permitted Certificate of Compliance as being required to comply with Title 24, Part 6.
Certificates of Acceptance
Mechanical Acceptance Tests must be completed by a certified Acceptance Testing Technician and Certificate of Acceptance forms completed
through an approved Acceptance Test Technician Certification Provider database. The Certificate of Acceptance forms indicated below will be
required by the Authority Having Jurisdiction to demonstrate compliance.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
Form/Title
Systems to be Field Verified
NRCA-MCH-02-A Outdoor Air must be submitted for all newly installed HVAC units.
Note: MCH-02-A can be performed in conjunction with MCH-07-A Supply Fan VFD Acceptance (if applicable) since testing activities
overlap.
NRCA-MCH-03-A - Must be submitted for Constant Volume Single Zone HVAC.
NRCA-MCH-04b-A - Must be submitted for Air Distribution Duct Leakage.
NRCA-MCH-05-A - Must be submitted for Air Economizer Controls.
NRCA-MCH-06-A - Must be submitted for Demand Control Ventilation.
NRCA-MCH-07-A - Must be submitted for Supply Fan Variable Flow Controls.
NRCA-MCH-08-A - Must be submitted for Valve Leakage Test.
NRCA-MCH-09-A - Must be submitted for Supply Water Temperature Reset Controls.
NRCA-MCH-10-A - Must be submitted for Hydronic System Variable Flow Controls.
NRCA-MCH-11-A - Must be submitted for Automatic Demand Shed Controls.
NRCA-MCH-12-A-FDD-F - Must be submitted for Packaged Direct Expansion Units.
NRCA-MCH-13-A-FDD - Must be submitted for Air Handling Units and Zone Terminal Units.
NRCA-MCH-14-A - Must be submitted for Distributed Energy Storage DX -AC Systems.
NRCA-MCH-15-A - Must be submitted for Thermal Energy Storage.
NRCA-MCH-16-A - Must be submitted for Supply Air Temperature Reset Controls.
NRCA-MCH-17-A - Must be submitted for Condenser Water.
NRCA-MCH-18-A - Must be submitted for Energy Management Control Systems.
NRCA-MCH-19-A - Must be submitted for Occupancy Sensor Controls.
NRCA-MCH-20-H - Must be submitted for Multifamily Ventilation.
NRCA-MCH-21-H - Must be submitted for Multifamily Envelope.
NRCA-MCH-22-A - Must be submitted for Multifamily Duct Leakage.
NRCA-MCH-23-A - Must be submitted for Multifamily HRV/ERV Verification.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
i
Certificates of Verification
HERS verifications must be completed by a HERS Rater and NRCV forms completed through an approved HERS Provider database. The Certificate of
Verification forms indicated below will be required by the Authority Having Jurisdiction to demonstrate compliance.
NRCA-MCH-04a-H - Must be completed by installer and submitted for Air Distribution Duct Leakage.
NRCV-MCH-04-H Duct Leakage Test
NRCV-MCH-24 Enclosure Air Leakage Worksheet
NRCV-MCH-27 High-rise Residential
NRCV-MCH-32 Local Mechanical Exhaust
There are no Acceptance Tests or HERS verifications indicated on the permitted Certificate of Compliance related to the systems or materials
documented on this Certificate of Installation.
A copy of this Certificate of Installation should be distributed to the certified Acceptance Test Technician(s) who will perform the acceptance
test(s). Title 24, Part 6 Section 10-103(a)3F also requires this Certificate of Installation be posted or made available to the Authority Having
Jurisdiction for all applicable inspections.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name: David Folger
Documentation Author Signature:
Documentation Author Company Name: Bradley mechanical inc
Date Signed:
Address:10625 lawson river
CEA/HERS Certification Identification (If applicable):
City/State/Zip: Fountain Valley, Ca, 92708
Phone: 7149644600
RESPONSIBLE PERSON'S DECLARATION STATEMENT
2. 1 certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Installation is true and correct.
2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on
this Certificate of Installation and attest to the declarations in this statement (responsible builder/installer), otherwise I am an
authorized representative of the responsible builder/installer.
3. The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of
Installation conforms to all applicable codes and regulations, and the installation conforms to the requirements given on the plans and
specifications approved by the enforcement agency.
4. 1 reviewed a copy of the Certificate of Compliance approved by the enforcement agency that identifies the specific requirements for
the scope of construction or installation identified on this Certificate of Installation, and I have ensured that the requirements that
apply to the construction or installation have been met.
5. 1 understand that a completed signed copy of this Certificate of Installation shall be posted, or made available with the building
permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to accomplish this requirement.
6. 1 understand that a completed signed copy of this Certificate of Installation is required to be included with the documentation the
builder provides to the building owner at occupancy, and I will take the necessary steps to accomplish this requirement.
Responsible Builder/Installer Name:
Responsible Builder/Installer Signature:
David
Company Name: (Installing Subcontractor or General Contractor or Builder/Owner)
Position With Company (Title):
Bradley Mechanical inc
project manager
Address:
CSLB License:
10625 lawson river
748290
City/State/Zip:
Phone:
Date Signed:
fountain valley, ca, 92708
7149644600
12/11/2024
For assistance or questions regarding the Energy Standards, contact the Energy Hotline at: 1-800-772-3300
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS
NRCI-MCH-E
Mechanical Systems
(Page 1 of 7)
A. General Information
1. This field is filled out automatically.
2. Enter the zip code of the construction project.
3. Enter the Date of Permit Set used for construction.
4. Enter the Name of Permit Set used for construction.
5. Enter the Authority Having Jurisdiction.
6. Enter the Building Permit #.
7. Enter the Date of As -Built Set.
8. Enter the Name of As -Built Set.
B. Project Scope
1. Select all applicable equipment, systems and materials documented.
C. Compliance Results
Results in this table are automatically calculated from data input and calculations in Tables F.
D. Exceptional Conditions
1. This table is auto filled with uneditable comments because of selections made or data entered in tables throughout the form.
E. Installer Notes
1. Enter any notes or comments for the AHJ.
Dry System Equipment Schedule
1. This field is filled out automatically.
2. Enter the model # of the equipment being installed.
3. Select: True or False.
4. Enter the heating mode Rated Output of the equipment in kBtu/h.
5. Enter the Supplemental Heating Output of the equipment in kBtu/h.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS
NRCI-MCH-E
Mechanical Systems
(Page 2 of 7)
6. Enter the efficiency of the equipment while in heating mode.
7. This field is filled out automatically.
8. Enter the cooling mode Rated Output of the equipment in kBtu/h.
9. Enter the efficiency of the equipment while in cooling mode.
10. This field is filled out automatically.
11. If a second efficiency is required, enter the efficiency of the equipment while in cooling mode.
12. This field is filled out automatically.
13. This field is calculated automatically.
Heat Pump Equipment Schedule
1. This field is filled out automatically.
2. Enter the model # of the equipment being installed.
3. Select: True or False.
4. Select: True or False.
5. Enter the efficiency of the heat pump while in heating mode.
6. This field is filled out automatically.
7. Select: True or False.
8. Select: True or False.
9. Enter the efficiency of the heat pump while in cooling mode.
10. This field is filled out automatically.
11. If a second efficiency is required, enter the efficiency of the heat pump while in cooling mode.
12. This field is filled out automatically.
13. This field is calculated automatically.
DX DOAS Schedule
1. This field is filled out automatically.
2. Enter the model # of the equipment being installed.
3. Select: True or False.
4. Select: True or False.
5. Select: True or False.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS
NRCI-MCH-E
Mechanical Systems
(Page 3 of 7)
6. Enter the ISM RE efficiency of the DOAS equipment.
7. This field is static text showing the efficiency unit is ISMRE.
8. Enter the ISCOP efficiency of the DOAS equipment.
9. This field is static text showing the efficiency unit is ISCOP.
10. This field is calculated automatically.
Boiler
1. This field is filled out automatically.
2. Enter the model # of the equipment being installed.
3. Select: True or False.
4. Enter the quantity of identical equipment being installed.
5. Enter the Rated Input of the boiler in Btu/h.
6. Enter the Rated Efficiency of the equipment.
7. This field is automatically filled out.
8. Isolation Valve: Select from Dropdown.
9. Temperature Reset Controls: Select from Dropdown.
10. This field is calculated automatically.
Chiller
1. This field is filled out automatically.
2. Enter the model # of the equipment being installed.
3. Select: True or False.
4. Enter the quantity of identical equipment being installed.
5. Select: True or False.
6. Enter the efficiency while in cooling mode.
7. This field is filled out automatically.
8. If a second efficiency is required, enter the efficiency while in cooling mode.
9. This field is filled out automatically.
10. Isolation Valve: Select from Dropdown.
11. Temperature Reset Controls: Select from Dropdown.
12. This field is calculated automatically.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS
NRCI-MCH-E
Mechanical Systems
(Page 4 of 7)
Heat Rejection Equipment (Cooling Towers, Condensers, Waterside Economizers) Efficiency and Controls
1. This field is filled out automatically.
2. Enter the model # of the equipment being installed.
3. Select: True or False
4. Enter the quantity of identical equipment being installed.
5. Enter the Rated Performance of the equipment being installed.
6. This field is filled out automatically.
7. Fan Speed Control: Select from Dropdown.
8. Tower Flow Turndown: Select from Dropdown.
9. Fan Control in Multiple Cell Equipment: Select from Dropdown.
10. Economizer Control: Select from Dropdown.
11. Condenser Water Temperature Reset: Select from Dropdown.
12. This field is calculated automatically.
Electric Resistance Heating
1. This field is filled out automatically.
2. Enter the model # of the equipment being installed.
3. This field is filled out automatically.
4. Enter the Output Capacity in kW.
5. This field is calculated automatically.
Pumps
1. This field is filled out automatically.
2. This field is filled out automatically.
3. Enter the quantity of identical equipment being installed.
4. Enter the Horsepower of the pump.
5. Variable Flow Controls: Select from Dropdown.
6. Hydronic Heat Pump Isolation Control: Select from Dropdown.
7. Variable Speed Drive on pumps greater than 5 horsepower: Select from Dropdown.
8. Differential Pressure Sensor Control: Select from Dropdown.
9. This field is calculated automatically.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS
NRCI-MCH-E
Mechanical Systems
(Page 5 of 7)
Fans and Air Economizers
1. This field is filled out automatically.
2. Enter the quantity of identical equipment being installed.
3. Fan Function: Select from Dropdown.
4. Economizer: Select from Dropdown.
5. Enter the Electrical Input Power of the fan in Watts.
6. This field is calculated automatically.
Dedicated Outdoor Air Systems (DOAS)
1. This field is filled out automatically.
2. Enter the quantity of identical equipment being installed.
3. Delivered Directly to the Space: Select from Dropdown.
4. Enter the fan system power in kilowatts.
5. Enter the fan system airflow in cubic feet per minute.
6. This field is calculated automatically.
7. This field is static text that says less than or equal to 3 speeds.
8. Multizone DOAS with cooling: Select from Dropdown.
9. Select: Yes or No.
10. Multifamily DOAS: Select from Dropdown.
11. This field is calculated automatically.
System Controls
1. This field is filled out automatically.
2. Thermostat Controls: Select from Dropdown.
3. Shut-off Controls: Select from Dropdown.
4. Isolation Zone Controls: Select from Dropdown.
5. Demand Response Controls: Select from Dropdown.
6. Supply Air Temperature Reset Controls: Select from Dropdown.
7. Window Interlock Controls: Select from Dropdown.
8. Direct Digital Controls: Select from Dropdown.
9. This field is calculated automatically.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS
NRCI-MCH-E
Mechanical Systems
(Page 6 of 7)
Nonresidential, Hotel/Motel and Multifamily Common User Ventilation Systems
1. This field is filled out automatically.
2. Enter System Designed Outside Air Airflow in cubic feet per minute.
3. Enter System Designed Transfer Air Airflow in cubic feet per minute.
4. Air Filtration: Select from Dropdown.
5. This field is filled out automatically.
6. Enter Exhaust Ventilation for the space.
7. Occupant Sensor Controls: Select from Dropdown.
8. Demand Control Ventilation: Select from Dropdown.
9. This field is calculated automatically.
Multifamily Dwelling Unit Ventilation Systems
1. This field is filled out automatically.
2. Enter System Designed Outside Air Airflow in cubic feet per minute.
3. Enter System Designed Supply Air Airflow in cubic feet per minute.
4. Enter Exhaust Air Airflow in cubic feet per minute.
5. Local Exhaust: Select from Dropdown.
6. Air Filtration: Select from Dropdown.
7. This field is calculated automatically.
Terminal Box Controls
1. This field is filled out automatically.
2. Zonal Control Strategy: Select from Dropdown.
3. Enter the Peak Primary Airflow for the zone or system in cubic feet per minute.
4. Enter the Primary Air in Deadband Airflow for the zone or system in cubic feet per minute.
5. Enter the Reheated, Recooled or Mixed Airflow for the zone or system in cubic feet per minute.
6. Enter the Outside Air Airflow for the zone or system in cubic feet per minute.
7. Confirm the first stage modulates and maintains the drybulb rate.
8. Confirm the second stage modulates from drybulb flow to heating max flow.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS
NRCI-MCH-E
Mechanical Systems
(Page 7 of 7)
9. This field is calculated automatically.
Ducts
1. This field is filled out automatically.
Pipe Insulation
1. This table includes required pipe insulation values from Part 6 and does not require user entry.
G. Acceptance Tests and Field Verification
1. This field is filled out automatically.
Documentation Declaration Statements
1. The person who prepared the NRCI will sign and complete the fields for their name, company (if applicable), address, phone number,
certification information (if applicable), date and signature.
2. The person who is assuming responsibility for the project being built to comply with Title 24, Part 6, will complete the fields for their name,
company (if applicable), address, phone number, license number (if applicable), date and signature.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
CERTIFICATE OF INSTALLATION
This Certificate of Installation documents the installation of mechanical features, materials, components, and manufactured devices required to
demonstrate compliance with Title 24, Part 6 per §10-103(a)3 for nonresidential, hotel/motel and high-rise residential occupancies.
Project Name: PGA super store
Enforcement Agency:
Dwelling Address:
79-110 California 111
Permit Number:
n/a
City and Zip Code:
Permit Application Date:
La Quint 92253
n/x
A. GENERAL INFORMATION
01
Project Location (city):
La qulnta
02
Zip Code:
92253
03
Date of Permit Set
used for construction:
5/9/2024
04
Name of Permit Set used for construction:
plan review
p
05
Authority Having
Jurisdiction:
La Quinta
06
Building Permit #:
n/a
07
Date of As -built Set:
n/a
08
Name of As -built Set:
n/a
B. INSTALLER SCOPE
This table indicates construction systems and materials documented on this Certificate of Installation
01
x ❑
Dry System (Airside) Equipment
❑
Ventilation
❑
System Controls
x ❑
Ductwork
❑
Boiler
❑
Pumps
❑
Terminal Box Controls
❑
Piping
❑
Chiller
❑
Fans and Air Economizers
❑
Heat Rejection Equipment (cooling towers,
condensers, waterside economizers)
❑
Electric Resistance Heating
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
IleCALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
C. COMPLIANCE RESULTS
This table indicates whether the as -built conditions documented in this form are equal or better than what was documented on the permitted
Certificate of Compliance. If the installation is not equal or better, Section 10-103(o)2B requires the Certificate of Compliance to be revised
accordingly to demonstrate compliance.
1 1 INSTALLED FEATURES EXACTLY MATCH DESIGN ON PERMITTED CERTIFICATE OF COMPLIANCE
Documented as -built conditions should be verified by inspector from Authority Having Jurisdiction to comply.
The Certificate of Compliance should be revised to confirm as -built conditions comply and this Certificate of Installation updated accordingly.
D. EXCEPTIONAL CONDITIONS
This table is auto filled with uneditable comments because of field conditions noted by the installer that may impact requirements documented on
the Certificate of Compliance.
n/a
E. INSTALLER NOTES
This table includes remarks made by the installer to the Authority Having Jurisdiction.
n/a
F. INSTALLATION DETAILS
The following tables indicate performance requirements as documented on the permitted Certificate of Compliance for all systems and components
included in Table B. Installer Scope. Also indicated are the as -built conditions documented by the installer/ documentation author.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
Dry System Equipment Schedule
01
02
03
04
05
06
07
08
09
10
11
12
13
Heating Mode
Cooling Mode
Equip
Rated
Supplemental
Rated
Name or Item
Model
Equipment
ment
Tag
#
Type
Output
Heating Output
Efficiency
Efficiency
Output
Efficiency
Efficiency
Efficiency
Efficiency
Compli
(kBtu/h)
(kBtu/h)
Unit
(kBtu/h)
Unit
Unit
ance
2'
Per C of C
5,
rn-013
gas
293
234
82
156.4
10.8
As -built
Conditions
Heat Pump Equipment Schedule
01
02
03
04
05
06
07
08
09
10
11
12
13
Heating Mode
Cooling Mode
Name or Item
Model
Size
Size
Equipment
Tag
#
System
Category
Efficiency
Efficiency
System
Category
Efficiency
Efficiency
Efficiency
Efficiency
Compliance
Category
(Btu/h)
Unit
Category
(Btu/h)
Unit
Unit
Per CofC
As -built
Conditions
DX DOAS Schedule
01
02
03
04
05
06
07
08
09
10
Name or Item
Model #
Equipment Type
Energy Recovery
Rating
Efficiency
Efficiency
Efficiency
Efficiency
Equipment
Tag
Condition
Unit
Unit
Compliance
Per CofC
ISMRE
ISCOP
As -built
Conditions
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
Boiler Efficiency and Controls
01
02
03
04
05
06
07
08
09
10
Controls
Tag/Plan Detail ID
Model #
Equipment Type
Quantity
Rated Input
(Btu/h)
Rated
Efficiency
Efficiency
Unit
Equipment
Compliance
Isolation
Temperature
Valve
Reset
PerCofC
As -built
Conditions
Chiller Efficiency and Controls
01
02
03
04
05
06
07
08
09
10
11
12
Rated
Rated
Controls
Tag/Plan Detail ID
Model#
Equipment Type
Quantity
Size
Efficiency
Efficiency
Efficiency
Efficiency
Equipment
Isolation
(tons)
#1
Unit #1
#2
Unit #2
Valve
Temperature Reset
Compliance
Per CofC
As -built
Conditions
Heat Rejection Equipment (Cooling Towers, Condensers, Waterside Economizers) Efficiency and Controls
01
02
03
04
05
06
07
08
09
10
11
12
Controls
Tag/Plan Detail ID
Model
Equipment
Quantity
Rated
Performance
Equipment
Fan
Tower
Fan Control in
Economizer
Condenser
#
Type
Yp
performance
Unit
Speed
Flow
Multiple Cell
Water
Compliance
Control
Control
Turndown
Equipment
Temp. Reset
Per CofC
As -built
Conditions
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
Electric Resistance Heating
01
02
03
04
05
Name or Tag ID
Model #
Equipment Description
Output Capacity
Equipment
(kW)
Compliance
Per CofC
As -built
Conditions
Pumps
01
02
03
04
05
06
07
08
09
Controls
Name or Tag ID
Type
Quantity
Horsepower
BHP)
Equipment Compliance
Variable Flow
Hydronic Heat
VSD on
Differential
Controls
Pump Isolation
Pumps > 5HP
Pressure Sensor
Per CofC
As -built
Conditions
Fans and Air Economizers
01
02
03
04
05
06
Fan Electrical Input Power
Name or Tag ID
Quantity
Fan Function
Economizer
System Compliance
Per CofC
As -built
Conditions
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
Dedicated Outdoor Air System (DOAS)
01
02
03
04
05
06
07
System Name
Quantity
Delivered Directly
DOAS Fan Control
Multi -Zone DOAS with
Multifamily DOAS
System Compliance
To The Space
Cooling
Per CofC
As -built
Conditions
H. Fan Energy Index (FEI)
01
02
03
04
Fan System Name or Item Tag
Name or Item Tag
FEI Exception
FEI
Per CofC
As -built Conditions
Exhaust Air Heat Recovery
01
02
03
04
05
06
07
Fan System Name
y
Required?
q
Type of Heat Recover Rating
yp y g
Required
Installed
EnergyRecover Bypass
y yp
System Compliance
y p
Recovery Ratio
Recovery Ratio
Per C of C
NA
As -built
Conditions
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
Dwelling Unit Fan Efficacy & Energy/Heat Recovery
01
02
03
04
05
06
07
Fan System Name
System Airflow
Input Power
Watts/CFM
Energy/Heat Recovery Ventilation
Sensible Recovery/Effectiveness
System Compliance
or Item Tag
(cfm)
(kW)
Per CofC
As -built
Conditions
System Controls
01
02
03
04
05
06
07
08
09
Shut -Off
Isolation Zone
Demand
Supply Air
Direct Digital Control
System Name
Thermostats
Window Interlocks
System Compliance
Controls
Controls
Response
Temp. Reset
(DDC)
Per CofC
As -built
Conditions
Nonresidential, Hotel/Motel and Multifamily Common Use Ventilation Systems
01
02
03
04
System Name
System Design CA CFM
Airflow
System Design Transfer Air
CFM
Air Filtration
05
06
07
08
09
Space Name
Exhaust Ventilation
Occupant Sensor Controls
Demand Control Ventilation
System Compliance
Per CofC
As -built
Conditions
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
Multifamily Dwelling Unit Ventilation Systems
01
02
03
04
05
06
07
Outside Air
Supply Air
Exhaust
Space Name
Local Exhaust
Air Filtration
Space Compliance
CFM
CFM
CFM
Per CofC
As -built
Conditions
Terminal Box Controls
01
02
03
04
05
06
07
08
09
Design
Reheated, Recooled, Mixed Air Compliance
Zone/System/VAV
Box Name Item
Zonal Control
Zone/ Box/ System
peak Primary
Primary Air in
Reheated Retooled
1st Stage Modulates
2nd Stage
or
Strategy
Airflow
Deadband
Mixed Airflow
Outside Air
<95°F and
Modulates from DB
Compliance
P
Tag
CFM
Flow to Heating
CFM
CFM
CFM
Maintains DB Rate?
Max Flow?
Per CofC
As -built
Conditions
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
*, CALIFORNIA ENERGY COMMISSION CEC-NRCI-MCH-E
1I
Ducts
The following duct systems require duct leakage testing by a certified Mechanical Acceptance Test Technician or a HERS Rater.
Learn more about the Acceptance Testing Program on the Energy Commission website here: https://www.energy.ca.gov/programs-and-
topics/programs/acceptance-test-technician-certification-provider-program
Learn more about the HERS Program on the Energy Commission website here: https://www.energy.ca.gov/programs-and-topics/programs/home-
energy-rating-system-hers-program
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-NRCI-MCH-E
Pipe Insulation
Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. Insulation exposed to
weather shall be installed with a cover suitable for outdoor service. Insulation covering chilled water piping and refrigerant suction piping located
outside the conditioned space shall have a Class I or Class II vapor retarder. All penetrations and joints of which shall be sealed.
Insulation thickness (in) or R-value shall be per the following Title 24, Part 6 Table 120.3-A/ 160.3-D.
Fluid Operating
Temperature
Range
(,F)
Insulation Conductivity
Nominal Pipe Diameter (in inches)
Conductivity
(in Btu•in/h•ft2•
•F)
Mean Rating
Temperature
VF)
< 1
1 to <1.S
1.S to < 4
4 to < 8
8 and
larger
Space heating and Service Water Heating Systems (Steam,
Steam Condensate, Refrigerant, Space Heating, Service Hot
Water)
Minimum Pipe Insulation Required (Thickness in inches or R-value)
Above 350
0.32-0.34
250
Inches
4.5
5.0
5.0
5.0
5.0
R-value
R 37
R 41
R 37
R 27
R 23
251-350
0.29-0.32
2nn
Inches
3.0
4.0
4.5
4.5
4.5
R-value
R 24
R 34
R 35
R 26
R 22
201-250
0.27-0.30
150
Inches
2.5
2.5
2.5
3.0
3.0
R-value
R 21
R 20
R 17.5
R 17
R 14.5
141-200
0.25-0.29
125
Inches
1.5
1.5
2.0
2.0
2.0
R-value
R11.5
R11
R14
R11
R10
105-140
0.22-0.28
100
Inches
1.0
1.5
1.5
1.5
1.5
R-value
R7.7
R12.5
1111
R9
R8
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-NRCI-MCH-E
Fluid operating
Insulation Conductivity
Nominal Pipe Diameter (in inches)
Temperature
Conductivity
Mean Rating
< 1
1 to <1.S
1.S to < 4
4 to < 8
8 and
Range
(°F)
(in Btu-in/h•ft2-
'F)
Temperature
('F)
larger
Space cooling systems (chilled water, refrigerant and brine)
Minimum Pipe Insulation Required (Thickness in inches or R-value)'
40-60
0.21-0.27
75
Inches
Nonres
Res
Nonres
Res
1.0
1.0
1.0
0.5
0.75
0.5
0.75
R-value
Nonres
Res
Nonres
Res
R 7
R o
R 5
R3
R6
R3
RS
Below 40
0.20-0.26
50
I r C h
1.0
1. 5
1.5
R-v-;l.ie
R 8.5
R 1.4
R 12
R 10
y
G. ACCEPTANCE TESTS & FIELD VERIFICATION
The following Acceptance Tests and HERS Verifications related to the systems or materials documented on this Certificate of Installation have been
indicated on the permitted Certificate of Compliance as being required to comply with Title 24, Part 6.
Certificates of Acceptance
Mechanical Acceptance Tests must be completed by a certified Acceptance Testing Technician and Certificate of Acceptance forms completed
through an approved Acceptance Test Technician Certification Provider database. The Certificate of Acceptance forms indicated below will be
required by the Authority Having Jurisdiction to demonstrate compliance.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
Form/Title
Systems to be Field Verified
NRCA-MCH-02-A Outdoor Air must be submitted for all newly installed HVAC units.
Note: MCH-02-A can be performed in conjunction with MCH-07-A Supply Fan VFD Acceptance (if applicable) since testing activities
overlap.
NRCA-MCH-03-A - Must be submitted for Constant Volume Single Zone HVAC.
NRCA-MCH-04b-A - Must be submitted for Air Distribution Duct Leakage.
NRCA-MCH-05-A - Must be submitted for Air Economizer Controls.
NRCA-MCH-06-A - Must be submitted for Demand Control Ventilation.
NRCA-MCH-07-A - Must be submitted for Supply Fan Variable Flow Controls.
NRCA-MCH-08-A - Must be submitted for Valve Leakage Test.
NRCA-MCH-09-A - Must be submitted for Supply Water Temperature Reset Controls.
NRCA-MCH-10-A - Must be submitted for Hydronic System Variable Flow Controls.
NRCA-MCH-11-A - Must be submitted for Automatic Demand Shed Controls.
NRCA-MCH-12-A-FDD-F - Must be submitted for Packaged Direct Expansion Units.
NRCA-MCH-13-A-FDD - Must be submitted for Air Handling Units and Zone Terminal Units.
NRCA-MCH-14-A - Must be submitted for Distributed Energy Storage DX -AC Systems.
NRCA-MCH-15-A - Must be submitted for Thermal Energy Storage.
NRCA-MCH-16-A - Must be submitted for Supply Air Temperature Reset Controls.
NRCA-MCH-17-A - Must be submitted for Condenser Water.
NRCA-MCH-18-A - Must be submitted for Energy Management Control Systems.
NRCA-MCH-19-A - Must be submitted for Occupancy Sensor Controls.
NRCA-MCH-20-H - Must be submitted for Multifamily Ventilation.
NRCA-MCH-21-H - Must be submitted for Multifamily Envelope.
NRCA-MCH-22-A - Must be submitted for Multifamily Duct Leakage.
NRCA-MCH-23-A - Must be submitted for Multifamily HRV/ERV Verification.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
i
Certificates of Verification
HERS verifications must be completed by a HERS Rater and NRCV forms completed through an approved HERS Provider database. The Certificate of
Verification forms indicated below will be required by the Authority Having Jurisdiction to demonstrate compliance.
NRCA-MCH-04a-H - Must be completed by installer and submitted for Air Distribution Duct Leakage.
NRCV-MCH-04-H Duct Leakage Test
NRCV-MCH-24 Enclosure Air Leakage Worksheet
NRCV-MCH-27 High-rise Residential
NRCV-MCH-32 Local Mechanical Exhaust
There are no Acceptance Tests or HERS verifications indicated on the permitted Certificate of Compliance related to the systems or materials
documented on this Certificate of Installation.
A copy of this Certificate of Installation should be distributed to the certified Acceptance Test Technician(s) who will perform the acceptance
test(s). Title 24, Part 6 Section 10-103(a)3F also requires this Certificate of Installation be posted or made available to the Authority Having
Jurisdiction for all applicable inspections.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name: David Folger
Documentation Author Signature:
Documentation Author Company Name: Bradley mechanical inc
Date Signed:
Address:10625 lawson river
CEA/HERS Certification Identification (If applicable):
City/State/Zip: Fountain Valley, Ca, 92708
Phone: 7149644600
RESPONSIBLE PERSON'S DECLARATION STATEMENT
2. 1 certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Installation is true and correct.
2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on
this Certificate of Installation and attest to the declarations in this statement (responsible builder/installer), otherwise I am an
authorized representative of the responsible builder/installer.
3. The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of
Installation conforms to all applicable codes and regulations, and the installation conforms to the requirements given on the plans and
specifications approved by the enforcement agency.
4. 1 reviewed a copy of the Certificate of Compliance approved by the enforcement agency that identifies the specific requirements for
the scope of construction or installation identified on this Certificate of Installation, and I have ensured that the requirements that
apply to the construction or installation have been met.
5. 1 understand that a completed signed copy of this Certificate of Installation shall be posted, or made available with the building
permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to accomplish this requirement.
6. 1 understand that a completed signed copy of this Certificate of Installation is required to be included with the documentation the
builder provides to the building owner at occupancy, and I will take the necessary steps to accomplish this requirement.
Responsible Builder/Installer Name:
Responsible Builder/Installer Signature:
David
Company Name: (Installing Subcontractor or General Contractor or Builder/Owner)
Position With Company (Title):
Bradley Mechanical inc
project manager
Address:
CSLB License:
10625 lawson river
748290
City/State/Zip:
Phone:
Date Signed:
fountain valley, ca, 92708
7149644600
12/11/2024
For assistance or questions regarding the Energy Standards, contact the Energy Hotline at: 1-800-772-3300
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS
NRCI-MCH-E
Mechanical Systems
(Page 1 of 7)
A. General Information
1. This field is filled out automatically.
2. Enter the zip code of the construction project.
3. Enter the Date of Permit Set used for construction.
4. Enter the Name of Permit Set used for construction.
5. Enter the Authority Having Jurisdiction.
6. Enter the Building Permit #.
7. Enter the Date of As -Built Set.
8. Enter the Name of As -Built Set.
B. Project Scope
1. Select all applicable equipment, systems and materials documented.
C. Compliance Results
Results in this table are automatically calculated from data input and calculations in Tables F.
D. Exceptional Conditions
1. This table is auto filled with uneditable comments because of selections made or data entered in tables throughout the form.
E. Installer Notes
1. Enter any notes or comments for the AHJ.
Dry System Equipment Schedule
1. This field is filled out automatically.
2. Enter the model # of the equipment being installed.
3. Select: True or False.
4. Enter the heating mode Rated Output of the equipment in kBtu/h.
5. Enter the Supplemental Heating Output of the equipment in kBtu/h.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS
NRCI-MCH-E
Mechanical Systems
(Page 2 of 7)
6. Enter the efficiency of the equipment while in heating mode.
7. This field is filled out automatically.
8. Enter the cooling mode Rated Output of the equipment in kBtu/h.
9. Enter the efficiency of the equipment while in cooling mode.
10. This field is filled out automatically.
11. If a second efficiency is required, enter the efficiency of the equipment while in cooling mode.
12. This field is filled out automatically.
13. This field is calculated automatically.
Heat Pump Equipment Schedule
1. This field is filled out automatically.
2. Enter the model # of the equipment being installed.
3. Select: True or False.
4. Select: True or False.
5. Enter the efficiency of the heat pump while in heating mode.
6. This field is filled out automatically.
7. Select: True or False.
8. Select: True or False.
9. Enter the efficiency of the heat pump while in cooling mode.
10. This field is filled out automatically.
11. If a second efficiency is required, enter the efficiency of the heat pump while in cooling mode.
12. This field is filled out automatically.
13. This field is calculated automatically.
DX DOAS Schedule
1. This field is filled out automatically.
2. Enter the model # of the equipment being installed.
3. Select: True or False.
4. Select: True or False.
5. Select: True or False.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS
NRCI-MCH-E
Mechanical Systems
(Page 3 of 7)
6. Enter the ISM RE efficiency of the DOAS equipment.
7. This field is static text showing the efficiency unit is ISMRE.
8. Enter the ISCOP efficiency of the DOAS equipment.
9. This field is static text showing the efficiency unit is ISCOP.
10. This field is calculated automatically.
Boiler
1. This field is filled out automatically.
2. Enter the model # of the equipment being installed.
3. Select: True or False.
4. Enter the quantity of identical equipment being installed.
5. Enter the Rated Input of the boiler in Btu/h.
6. Enter the Rated Efficiency of the equipment.
7. This field is automatically filled out.
8. Isolation Valve: Select from Dropdown.
9. Temperature Reset Controls: Select from Dropdown.
10. This field is calculated automatically.
Chiller
1. This field is filled out automatically.
2. Enter the model # of the equipment being installed.
3. Select: True or False.
4. Enter the quantity of identical equipment being installed.
5. Select: True or False.
6. Enter the efficiency while in cooling mode.
7. This field is filled out automatically.
8. If a second efficiency is required, enter the efficiency while in cooling mode.
9. This field is filled out automatically.
10. Isolation Valve: Select from Dropdown.
11. Temperature Reset Controls: Select from Dropdown.
12. This field is calculated automatically.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS
NRCI-MCH-E
Mechanical Systems
(Page 4 of 7)
Heat Rejection Equipment (Cooling Towers, Condensers, Waterside Economizers) Efficiency and Controls
1. This field is filled out automatically.
2. Enter the model # of the equipment being installed.
3. Select: True or False
4. Enter the quantity of identical equipment being installed.
5. Enter the Rated Performance of the equipment being installed.
6. This field is filled out automatically.
7. Fan Speed Control: Select from Dropdown.
8. Tower Flow Turndown: Select from Dropdown.
9. Fan Control in Multiple Cell Equipment: Select from Dropdown.
10. Economizer Control: Select from Dropdown.
11. Condenser Water Temperature Reset: Select from Dropdown.
12. This field is calculated automatically.
Electric Resistance Heating
1. This field is filled out automatically.
2. Enter the model # of the equipment being installed.
3. This field is filled out automatically.
4. Enter the Output Capacity in kW.
5. This field is calculated automatically.
Pumps
1. This field is filled out automatically.
2. This field is filled out automatically.
3. Enter the quantity of identical equipment being installed.
4. Enter the Horsepower of the pump.
5. Variable Flow Controls: Select from Dropdown.
6. Hydronic Heat Pump Isolation Control: Select from Dropdown.
7. Variable Speed Drive on pumps greater than 5 horsepower: Select from Dropdown.
8. Differential Pressure Sensor Control: Select from Dropdown.
9. This field is calculated automatically.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS
NRCI-MCH-E
Mechanical Systems
(Page 5 of 7)
Fans and Air Economizers
1. This field is filled out automatically.
2. Enter the quantity of identical equipment being installed.
3. Fan Function: Select from Dropdown.
4. Economizer: Select from Dropdown.
5. Enter the Electrical Input Power of the fan in Watts.
6. This field is calculated automatically.
Dedicated Outdoor Air Systems (DOAS)
1. This field is filled out automatically.
2. Enter the quantity of identical equipment being installed.
3. Delivered Directly to the Space: Select from Dropdown.
4. Enter the fan system power in kilowatts.
5. Enter the fan system airflow in cubic feet per minute.
6. This field is calculated automatically.
7. This field is static text that says less than or equal to 3 speeds.
8. Multizone DOAS with cooling: Select from Dropdown.
9. Select: Yes or No.
10. Multifamily DOAS: Select from Dropdown.
11. This field is calculated automatically.
System Controls
1. This field is filled out automatically.
2. Thermostat Controls: Select from Dropdown.
3. Shut-off Controls: Select from Dropdown.
4. Isolation Zone Controls: Select from Dropdown.
5. Demand Response Controls: Select from Dropdown.
6. Supply Air Temperature Reset Controls: Select from Dropdown.
7. Window Interlock Controls: Select from Dropdown.
8. Direct Digital Controls: Select from Dropdown.
9. This field is calculated automatically.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS
NRCI-MCH-E
Mechanical Systems
(Page 6 of 7)
Nonresidential, Hotel/Motel and Multifamily Common User Ventilation Systems
1. This field is filled out automatically.
2. Enter System Designed Outside Air Airflow in cubic feet per minute.
3. Enter System Designed Transfer Air Airflow in cubic feet per minute.
4. Air Filtration: Select from Dropdown.
5. This field is filled out automatically.
6. Enter Exhaust Ventilation for the space.
7. Occupant Sensor Controls: Select from Dropdown.
8. Demand Control Ventilation: Select from Dropdown.
9. This field is calculated automatically.
Multifamily Dwelling Unit Ventilation Systems
1. This field is filled out automatically.
2. Enter System Designed Outside Air Airflow in cubic feet per minute.
3. Enter System Designed Supply Air Airflow in cubic feet per minute.
4. Enter Exhaust Air Airflow in cubic feet per minute.
5. Local Exhaust: Select from Dropdown.
6. Air Filtration: Select from Dropdown.
7. This field is calculated automatically.
Terminal Box Controls
1. This field is filled out automatically.
2. Zonal Control Strategy: Select from Dropdown.
3. Enter the Peak Primary Airflow for the zone or system in cubic feet per minute.
4. Enter the Primary Air in Deadband Airflow for the zone or system in cubic feet per minute.
5. Enter the Reheated, Recooled or Mixed Airflow for the zone or system in cubic feet per minute.
6. Enter the Outside Air Airflow for the zone or system in cubic feet per minute.
7. Confirm the first stage modulates and maintains the drybulb rate.
8. Confirm the second stage modulates from drybulb flow to heating max flow.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS
NRCI-MCH-E
Mechanical Systems
(Page 7 of 7)
9. This field is calculated automatically.
Ducts
1. This field is filled out automatically.
Pipe Insulation
1. This table includes required pipe insulation values from Part 6 and does not require user entry.
G. Acceptance Tests and Field Verification
1. This field is filled out automatically.
Documentation Declaration Statements
1. The person who prepared the NRCI will sign and complete the fields for their name, company (if applicable), address, phone number,
certification information (if applicable), date and signature.
2. The person who is assuming responsibility for the project being built to comply with Title 24, Part 6, will complete the fields for their name,
company (if applicable), address, phone number, license number (if applicable), date and signature.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
CERTIFICATE OF INSTALLATION
This Certificate of Installation documents the installation of mechanical features, materials, components, and manufactured devices required to
demonstrate compliance with Title 24, Part 6 per §10-103(a)3 for nonresidential, hotel/motel and high-rise residential occupancies.
Project Name: PGA super store
Enforcement Agency:
Dwelling Address:
79-110 California 111
Permit Number:
n/a
City and Zip Code:
Permit Application Date:
La Quint 92253
n/x
A. GENERAL INFORMATION
01
Project Location (city):
La qulnta
02
Zip Code:
92253
03
Date of Permit Set
used for construction:
5/9/2024
04
Name of Permit Set used for construction:
plan review
p
05
Authority Having
Jurisdiction:
La Quinta
06
Building Permit #:
n/a
07
Date of As -built Set:
n/a
08
Name of As -built Set:
n/a
B. INSTALLER SCOPE
This table indicates construction systems and materials documented on this Certificate of Installation
01
x ❑
Dry System (Airside) Equipment
❑
Ventilation
❑
System Controls
x ❑
Ductwork
❑
Boiler
❑
Pumps
❑
Terminal Box Controls
❑
Piping
❑
Chiller
❑
Fans and Air Economizers
❑
Heat Rejection Equipment (cooling towers,
condensers, waterside economizers)
❑
Electric Resistance Heating
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
IleCALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
C. COMPLIANCE RESULTS
This table indicates whether the as -built conditions documented in this form are equal or better than what was documented on the permitted
Certificate of Compliance. If the installation is not equal or better, Section 10-103(o)2B requires the Certificate of Compliance to be revised
accordingly to demonstrate compliance.
1 1 INSTALLED FEATURES EXACTLY MATCH DESIGN ON PERMITTED CERTIFICATE OF COMPLIANCE
Documented as -built conditions should be verified by inspector from Authority Having Jurisdiction to comply.
The Certificate of Compliance should be revised to confirm as -built conditions comply and this Certificate of Installation updated accordingly.
D. EXCEPTIONAL CONDITIONS
This table is auto filled with uneditable comments because of field conditions noted by the installer that may impact requirements documented on
the Certificate of Compliance.
n/a
E. INSTALLER NOTES
This table includes remarks made by the installer to the Authority Having Jurisdiction.
n/a
F. INSTALLATION DETAILS
The following tables indicate performance requirements as documented on the permitted Certificate of Compliance for all systems and components
included in Table B. Installer Scope. Also indicated are the as -built conditions documented by the installer/ documentation author.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
Dry System Equipment Schedule
01
02
03
04
05
06
07
08
09
10
11
12
13
Heating Mode
Cooling Mode
Equip
Rated
Supplemental
Rated
Name or Item
Model
Equipment
ment
Tag
#
Type
Output
Heating Output
Efficiency
Efficiency
Output
Efficiency
Efficiency
Efficiency
Efficiency
Compli
(kBtu/h)
(kBtu/h)
Unit
(kBtu/h)
Unit
Unit
ance
2'
Per C of C
5,
rn-013
gas
293
234
82
156.4
10.8
As -built
Conditions
Heat Pump Equipment Schedule
01
02
03
04
05
06
07
08
09
10
11
12
13
Heating Mode
Cooling Mode
Name or Item
Model
Size
Size
Equipment
Tag
#
System
Category
Efficiency
Efficiency
System
Category
Efficiency
Efficiency
Efficiency
Efficiency
Compliance
Category
(Btu/h)
Unit
Category
(Btu/h)
Unit
Unit
Per CofC
As -built
Conditions
DX DOAS Schedule
01
02
03
04
05
06
07
08
09
10
Name or Item
Model #
Equipment Type
Energy Recovery
Rating
Efficiency
Efficiency
Efficiency
Efficiency
Equipment
Tag
Condition
Unit
Unit
Compliance
Per CofC
ISMRE
ISCOP
As -built
Conditions
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
Boiler Efficiency and Controls
01
02
03
04
05
06
07
08
09
10
Controls
Tag/Plan Detail ID
Model #
Equipment Type
Quantity
Rated Input
(Btu/h)
Rated
Efficiency
Efficiency
Unit
Equipment
Compliance
Isolation
Temperature
Valve
Reset
PerCofC
As -built
Conditions
Chiller Efficiency and Controls
01
02
03
04
05
06
07
08
09
10
11
12
Rated
Rated
Controls
Tag/Plan Detail ID
Model#
Equipment Type
Quantity
Size
Efficiency
Efficiency
Efficiency
Efficiency
Equipment
Isolation
(tons)
#1
Unit #1
#2
Unit #2
Valve
Temperature Reset
Compliance
Per CofC
As -built
Conditions
Heat Rejection Equipment (Cooling Towers, Condensers, Waterside Economizers) Efficiency and Controls
01
02
03
04
05
06
07
08
09
10
11
12
Controls
Tag/Plan Detail ID
Model
Equipment
Quantity
Rated
Performance
Equipment
Fan
Tower
Fan Control in
Economizer
Condenser
#
Type
Yp
performance
Unit
Speed
Flow
Multiple Cell
Water
Compliance
Control
Control
Turndown
Equipment
Temp. Reset
Per CofC
As -built
Conditions
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
Electric Resistance Heating
01
02
03
04
05
Name or Tag ID
Model #
Equipment Description
Output Capacity
Equipment
(kW)
Compliance
Per CofC
As -built
Conditions
Pumps
01
02
03
04
05
06
07
08
09
Controls
Name or Tag ID
Type
Quantity
Horsepower
BHP)
Equipment Compliance
Variable Flow
Hydronic Heat
VSD on
Differential
Controls
Pump Isolation
Pumps > 5HP
Pressure Sensor
Per CofC
As -built
Conditions
Fans and Air Economizers
01
02
03
04
05
06
Fan Electrical Input Power
Name or Tag ID
Quantity
Fan Function
Economizer
System Compliance
Per CofC
As -built
Conditions
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
Dedicated Outdoor Air System (DOAS)
01
02
03
04
05
06
07
System Name
Quantity
Delivered Directly
DOAS Fan Control
Multi -Zone DOAS with
Multifamily DOAS
System Compliance
To The Space
Cooling
Per CofC
As -built
Conditions
H. Fan Energy Index (FEI)
01
02
03
04
Fan System Name or Item Tag
Name or Item Tag
FEI Exception
FEI
Per CofC
As -built Conditions
Exhaust Air Heat Recovery
01
02
03
04
05
06
07
Fan System Name
y
Required?
q
Type of Heat Recover Rating
yp y g
Required
Installed
EnergyRecover Bypass
y yp
System Compliance
y p
Recovery Ratio
Recovery Ratio
Per C of C
NA
As -built
Conditions
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
Dwelling Unit Fan Efficacy & Energy/Heat Recovery
01
02
03
04
05
06
07
Fan System Name
System Airflow
Input Power
Watts/CFM
Energy/Heat Recovery Ventilation
Sensible Recovery/Effectiveness
System Compliance
or Item Tag
(cfm)
(kW)
Per CofC
As -built
Conditions
System Controls
01
02
03
04
05
06
07
08
09
Shut -Off
Isolation Zone
Demand
Supply Air
Direct Digital Control
System Name
Thermostats
Window Interlocks
System Compliance
Controls
Controls
Response
Temp. Reset
(DDC)
Per CofC
As -built
Conditions
Nonresidential, Hotel/Motel and Multifamily Common Use Ventilation Systems
01
02
03
04
System Name
System Design CA CFM
Airflow
System Design Transfer Air
CFM
Air Filtration
05
06
07
08
09
Space Name
Exhaust Ventilation
Occupant Sensor Controls
Demand Control Ventilation
System Compliance
Per CofC
As -built
Conditions
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
Multifamily Dwelling Unit Ventilation Systems
01
02
03
04
05
06
07
Outside Air
Supply Air
Exhaust
Space Name
Local Exhaust
Air Filtration
Space Compliance
CFM
CFM
CFM
Per CofC
As -built
Conditions
Terminal Box Controls
01
02
03
04
05
06
07
08
09
Design
Reheated, Recooled, Mixed Air Compliance
Zone/System/VAV
Box Name Item
Zonal Control
Zone/ Box/ System
peak Primary
Primary Air in
Reheated Retooled
1st Stage Modulates
2nd Stage
or
Strategy
Airflow
Deadband
Mixed Airflow
Outside Air
<95°F and
Modulates from DB
Compliance
P
Tag
CFM
Flow to Heating
CFM
CFM
CFM
Maintains DB Rate?
Max Flow?
Per CofC
As -built
Conditions
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
*, CALIFORNIA ENERGY COMMISSION CEC-NRCI-MCH-E
1I
Ducts
The following duct systems require duct leakage testing by a certified Mechanical Acceptance Test Technician or a HERS Rater.
Learn more about the Acceptance Testing Program on the Energy Commission website here: https://www.energy.ca.gov/programs-and-
topics/programs/acceptance-test-technician-certification-provider-program
Learn more about the HERS Program on the Energy Commission website here: https://www.energy.ca.gov/programs-and-topics/programs/home-
energy-rating-system-hers-program
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-NRCI-MCH-E
Pipe Insulation
Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. Insulation exposed to
weather shall be installed with a cover suitable for outdoor service. Insulation covering chilled water piping and refrigerant suction piping located
outside the conditioned space shall have a Class I or Class II vapor retarder. All penetrations and joints of which shall be sealed.
Insulation thickness (in) or R-value shall be per the following Title 24, Part 6 Table 120.3-A/ 160.3-D.
Fluid Operating
Temperature
Range
(,F)
Insulation Conductivity
Nominal Pipe Diameter (in inches)
Conductivity
(in Btu•in/h•ft2•
•F)
Mean Rating
Temperature
VF)
< 1
1 to <1.S
1.S to < 4
4 to < 8
8 and
larger
Space heating and Service Water Heating Systems (Steam,
Steam Condensate, Refrigerant, Space Heating, Service Hot
Water)
Minimum Pipe Insulation Required (Thickness in inches or R-value)
Above 350
0.32-0.34
250
Inches
4.5
5.0
5.0
5.0
5.0
R-value
R 37
R 41
R 37
R 27
R 23
251-350
0.29-0.32
2nn
Inches
3.0
4.0
4.5
4.5
4.5
R-value
R 24
R 34
R 35
R 26
R 22
201-250
0.27-0.30
150
Inches
2.5
2.5
2.5
3.0
3.0
R-value
R 21
R 20
R 17.5
R 17
R 14.5
141-200
0.25-0.29
125
Inches
1.5
1.5
2.0
2.0
2.0
R-value
R11.5
R11
R14
R11
R10
105-140
0.22-0.28
100
Inches
1.0
1.5
1.5
1.5
1.5
R-value
R7.7
R12.5
1111
R9
R8
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-NRCI-MCH-E
Fluid operating
Insulation Conductivity
Nominal Pipe Diameter (in inches)
Temperature
Conductivity
Mean Rating
< 1
1 to <1.S
1.S to < 4
4 to < 8
8 and
Range
(°F)
(in Btu-in/h•ft2-
'F)
Temperature
('F)
larger
Space cooling systems (chilled water, refrigerant and brine)
Minimum Pipe Insulation Required (Thickness in inches or R-value)'
40-60
0.21-0.27
75
Inches
Nonres
Res
Nonres
Res
1.0
1.0
1.0
0.5
0.75
0.5
0.75
R-value
Nonres
Res
Nonres
Res
R 7
R o
R 5
R3
R6
R3
RS
Below 40
0.20-0.26
50
I r C h
1.0
1. 5
1.5
R-v-;l.ie
R 8.5
R 1.4
R 12
R 10
y
G. ACCEPTANCE TESTS & FIELD VERIFICATION
The following Acceptance Tests and HERS Verifications related to the systems or materials documented on this Certificate of Installation have been
indicated on the permitted Certificate of Compliance as being required to comply with Title 24, Part 6.
Certificates of Acceptance
Mechanical Acceptance Tests must be completed by a certified Acceptance Testing Technician and Certificate of Acceptance forms completed
through an approved Acceptance Test Technician Certification Provider database. The Certificate of Acceptance forms indicated below will be
required by the Authority Having Jurisdiction to demonstrate compliance.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
Form/Title
Systems to be Field Verified
NRCA-MCH-02-A Outdoor Air must be submitted for all newly installed HVAC units.
Note: MCH-02-A can be performed in conjunction with MCH-07-A Supply Fan VFD Acceptance (if applicable) since testing activities
overlap.
NRCA-MCH-03-A - Must be submitted for Constant Volume Single Zone HVAC.
NRCA-MCH-04b-A - Must be submitted for Air Distribution Duct Leakage.
NRCA-MCH-05-A - Must be submitted for Air Economizer Controls.
NRCA-MCH-06-A - Must be submitted for Demand Control Ventilation.
NRCA-MCH-07-A - Must be submitted for Supply Fan Variable Flow Controls.
NRCA-MCH-08-A - Must be submitted for Valve Leakage Test.
NRCA-MCH-09-A - Must be submitted for Supply Water Temperature Reset Controls.
NRCA-MCH-10-A - Must be submitted for Hydronic System Variable Flow Controls.
NRCA-MCH-11-A - Must be submitted for Automatic Demand Shed Controls.
NRCA-MCH-12-A-FDD-F - Must be submitted for Packaged Direct Expansion Units.
NRCA-MCH-13-A-FDD - Must be submitted for Air Handling Units and Zone Terminal Units.
NRCA-MCH-14-A - Must be submitted for Distributed Energy Storage DX -AC Systems.
NRCA-MCH-15-A - Must be submitted for Thermal Energy Storage.
NRCA-MCH-16-A - Must be submitted for Supply Air Temperature Reset Controls.
NRCA-MCH-17-A - Must be submitted for Condenser Water.
NRCA-MCH-18-A - Must be submitted for Energy Management Control Systems.
NRCA-MCH-19-A - Must be submitted for Occupancy Sensor Controls.
NRCA-MCH-20-H - Must be submitted for Multifamily Ventilation.
NRCA-MCH-21-H - Must be submitted for Multifamily Envelope.
NRCA-MCH-22-A - Must be submitted for Multifamily Duct Leakage.
NRCA-MCH-23-A - Must be submitted for Multifamily HRV/ERV Verification.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
i
Certificates of Verification
HERS verifications must be completed by a HERS Rater and NRCV forms completed through an approved HERS Provider database. The Certificate of
Verification forms indicated below will be required by the Authority Having Jurisdiction to demonstrate compliance.
NRCA-MCH-04a-H - Must be completed by installer and submitted for Air Distribution Duct Leakage.
NRCV-MCH-04-H Duct Leakage Test
NRCV-MCH-24 Enclosure Air Leakage Worksheet
NRCV-MCH-27 High-rise Residential
NRCV-MCH-32 Local Mechanical Exhaust
There are no Acceptance Tests or HERS verifications indicated on the permitted Certificate of Compliance related to the systems or materials
documented on this Certificate of Installation.
A copy of this Certificate of Installation should be distributed to the certified Acceptance Test Technician(s) who will perform the acceptance
test(s). Title 24, Part 6 Section 10-103(a)3F also requires this Certificate of Installation be posted or made available to the Authority Having
Jurisdiction for all applicable inspections.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
MECHANICAL SYSTEMS
CALIFORNIA ENERGY COMMISSION CEC-N RCI-MCH-E
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name: David Folger
Documentation Author Signature:
Documentation Author Company Name: Bradley mechanical inc
Date Signed:
Address:10625 lawson river
CEA/HERS Certification Identification (If applicable):
City/State/Zip: Fountain Valley, Ca, 92708
Phone: 7149644600
RESPONSIBLE PERSON'S DECLARATION STATEMENT
2. 1 certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Installation is true and correct.
2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on
this Certificate of Installation and attest to the declarations in this statement (responsible builder/installer), otherwise I am an
authorized representative of the responsible builder/installer.
3. The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of
Installation conforms to all applicable codes and regulations, and the installation conforms to the requirements given on the plans and
specifications approved by the enforcement agency.
4. 1 reviewed a copy of the Certificate of Compliance approved by the enforcement agency that identifies the specific requirements for
the scope of construction or installation identified on this Certificate of Installation, and I have ensured that the requirements that
apply to the construction or installation have been met.
5. 1 understand that a completed signed copy of this Certificate of Installation shall be posted, or made available with the building
permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to accomplish this requirement.
6. 1 understand that a completed signed copy of this Certificate of Installation is required to be included with the documentation the
builder provides to the building owner at occupancy, and I will take the necessary steps to accomplish this requirement.
Responsible Builder/Installer Name:
Responsible Builder/Installer Signature:
David
Company Name: (Installing Subcontractor or General Contractor or Builder/Owner)
Position With Company (Title):
Bradley Mechanical inc
project manager
Address:
CSLB License:
10625 lawson river
748290
City/State/Zip:
Phone:
Date Signed:
fountain valley, ca, 92708
7149644600
12/11/2024
For assistance or questions regarding the Energy Standards, contact the Energy Hotline at: 1-800-772-3300
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS
NRCI-MCH-E
Mechanical Systems
(Page 1 of 7)
A. General Information
1. This field is filled out automatically.
2. Enter the zip code of the construction project.
3. Enter the Date of Permit Set used for construction.
4. Enter the Name of Permit Set used for construction.
5. Enter the Authority Having Jurisdiction.
6. Enter the Building Permit #.
7. Enter the Date of As -Built Set.
8. Enter the Name of As -Built Set.
B. Project Scope
1. Select all applicable equipment, systems and materials documented.
C. Compliance Results
Results in this table are automatically calculated from data input and calculations in Tables F.
D. Exceptional Conditions
1. This table is auto filled with uneditable comments because of selections made or data entered in tables throughout the form.
E. Installer Notes
1. Enter any notes or comments for the AHJ.
Dry System Equipment Schedule
1. This field is filled out automatically.
2. Enter the model # of the equipment being installed.
3. Select: True or False.
4. Enter the heating mode Rated Output of the equipment in kBtu/h.
5. Enter the Supplemental Heating Output of the equipment in kBtu/h.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS
NRCI-MCH-E
Mechanical Systems
(Page 2 of 7)
6. Enter the efficiency of the equipment while in heating mode.
7. This field is filled out automatically.
8. Enter the cooling mode Rated Output of the equipment in kBtu/h.
9. Enter the efficiency of the equipment while in cooling mode.
10. This field is filled out automatically.
11. If a second efficiency is required, enter the efficiency of the equipment while in cooling mode.
12. This field is filled out automatically.
13. This field is calculated automatically.
Heat Pump Equipment Schedule
1. This field is filled out automatically.
2. Enter the model # of the equipment being installed.
3. Select: True or False.
4. Select: True or False.
5. Enter the efficiency of the heat pump while in heating mode.
6. This field is filled out automatically.
7. Select: True or False.
8. Select: True or False.
9. Enter the efficiency of the heat pump while in cooling mode.
10. This field is filled out automatically.
11. If a second efficiency is required, enter the efficiency of the heat pump while in cooling mode.
12. This field is filled out automatically.
13. This field is calculated automatically.
DX DOAS Schedule
1. This field is filled out automatically.
2. Enter the model # of the equipment being installed.
3. Select: True or False.
4. Select: True or False.
5. Select: True or False.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS
NRCI-MCH-E
Mechanical Systems
(Page 3 of 7)
6. Enter the ISM RE efficiency of the DOAS equipment.
7. This field is static text showing the efficiency unit is ISMRE.
8. Enter the ISCOP efficiency of the DOAS equipment.
9. This field is static text showing the efficiency unit is ISCOP.
10. This field is calculated automatically.
Boiler
1. This field is filled out automatically.
2. Enter the model # of the equipment being installed.
3. Select: True or False.
4. Enter the quantity of identical equipment being installed.
5. Enter the Rated Input of the boiler in Btu/h.
6. Enter the Rated Efficiency of the equipment.
7. This field is automatically filled out.
8. Isolation Valve: Select from Dropdown.
9. Temperature Reset Controls: Select from Dropdown.
10. This field is calculated automatically.
Chiller
1. This field is filled out automatically.
2. Enter the model # of the equipment being installed.
3. Select: True or False.
4. Enter the quantity of identical equipment being installed.
5. Select: True or False.
6. Enter the efficiency while in cooling mode.
7. This field is filled out automatically.
8. If a second efficiency is required, enter the efficiency while in cooling mode.
9. This field is filled out automatically.
10. Isolation Valve: Select from Dropdown.
11. Temperature Reset Controls: Select from Dropdown.
12. This field is calculated automatically.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS
NRCI-MCH-E
Mechanical Systems
(Page 4 of 7)
Heat Rejection Equipment (Cooling Towers, Condensers, Waterside Economizers) Efficiency and Controls
1. This field is filled out automatically.
2. Enter the model # of the equipment being installed.
3. Select: True or False
4. Enter the quantity of identical equipment being installed.
5. Enter the Rated Performance of the equipment being installed.
6. This field is filled out automatically.
7. Fan Speed Control: Select from Dropdown.
8. Tower Flow Turndown: Select from Dropdown.
9. Fan Control in Multiple Cell Equipment: Select from Dropdown.
10. Economizer Control: Select from Dropdown.
11. Condenser Water Temperature Reset: Select from Dropdown.
12. This field is calculated automatically.
Electric Resistance Heating
1. This field is filled out automatically.
2. Enter the model # of the equipment being installed.
3. This field is filled out automatically.
4. Enter the Output Capacity in kW.
5. This field is calculated automatically.
Pumps
1. This field is filled out automatically.
2. This field is filled out automatically.
3. Enter the quantity of identical equipment being installed.
4. Enter the Horsepower of the pump.
5. Variable Flow Controls: Select from Dropdown.
6. Hydronic Heat Pump Isolation Control: Select from Dropdown.
7. Variable Speed Drive on pumps greater than 5 horsepower: Select from Dropdown.
8. Differential Pressure Sensor Control: Select from Dropdown.
9. This field is calculated automatically.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS
NRCI-MCH-E
Mechanical Systems
(Page 5 of 7)
Fans and Air Economizers
1. This field is filled out automatically.
2. Enter the quantity of identical equipment being installed.
3. Fan Function: Select from Dropdown.
4. Economizer: Select from Dropdown.
5. Enter the Electrical Input Power of the fan in Watts.
6. This field is calculated automatically.
Dedicated Outdoor Air Systems (DOAS)
1. This field is filled out automatically.
2. Enter the quantity of identical equipment being installed.
3. Delivered Directly to the Space: Select from Dropdown.
4. Enter the fan system power in kilowatts.
5. Enter the fan system airflow in cubic feet per minute.
6. This field is calculated automatically.
7. This field is static text that says less than or equal to 3 speeds.
8. Multizone DOAS with cooling: Select from Dropdown.
9. Select: Yes or No.
10. Multifamily DOAS: Select from Dropdown.
11. This field is calculated automatically.
System Controls
1. This field is filled out automatically.
2. Thermostat Controls: Select from Dropdown.
3. Shut-off Controls: Select from Dropdown.
4. Isolation Zone Controls: Select from Dropdown.
5. Demand Response Controls: Select from Dropdown.
6. Supply Air Temperature Reset Controls: Select from Dropdown.
7. Window Interlock Controls: Select from Dropdown.
8. Direct Digital Controls: Select from Dropdown.
9. This field is calculated automatically.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS
NRCI-MCH-E
Mechanical Systems
(Page 6 of 7)
Nonresidential, Hotel/Motel and Multifamily Common User Ventilation Systems
1. This field is filled out automatically.
2. Enter System Designed Outside Air Airflow in cubic feet per minute.
3. Enter System Designed Transfer Air Airflow in cubic feet per minute.
4. Air Filtration: Select from Dropdown.
5. This field is filled out automatically.
6. Enter Exhaust Ventilation for the space.
7. Occupant Sensor Controls: Select from Dropdown.
8. Demand Control Ventilation: Select from Dropdown.
9. This field is calculated automatically.
Multifamily Dwelling Unit Ventilation Systems
1. This field is filled out automatically.
2. Enter System Designed Outside Air Airflow in cubic feet per minute.
3. Enter System Designed Supply Air Airflow in cubic feet per minute.
4. Enter Exhaust Air Airflow in cubic feet per minute.
5. Local Exhaust: Select from Dropdown.
6. Air Filtration: Select from Dropdown.
7. This field is calculated automatically.
Terminal Box Controls
1. This field is filled out automatically.
2. Zonal Control Strategy: Select from Dropdown.
3. Enter the Peak Primary Airflow for the zone or system in cubic feet per minute.
4. Enter the Primary Air in Deadband Airflow for the zone or system in cubic feet per minute.
5. Enter the Reheated, Recooled or Mixed Airflow for the zone or system in cubic feet per minute.
6. Enter the Outside Air Airflow for the zone or system in cubic feet per minute.
7. Confirm the first stage modulates and maintains the drybulb rate.
8. Confirm the second stage modulates from drybulb flow to heating max flow.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022
CERTIFICATE OF INSTALLATION — USER INSTRUCTIONS
NRCI-MCH-E
Mechanical Systems
(Page 7 of 7)
9. This field is calculated automatically.
Ducts
1. This field is filled out automatically.
Pipe Insulation
1. This table includes required pipe insulation values from Part 6 and does not require user entry.
G. Acceptance Tests and Field Verification
1. This field is filled out automatically.
Documentation Declaration Statements
1. The person who prepared the NRCI will sign and complete the fields for their name, company (if applicable), address, phone number,
certification information (if applicable), date and signature.
2. The person who is assuming responsibility for the project being built to comply with Title 24, Part 6, will complete the fields for their name,
company (if applicable), address, phone number, license number (if applicable), date and signature.
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance January 2022