BCOM2024-0017 Energy DocumentsOUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 1 of 4 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name:Enforcement Agency:
Address: Permit Number:
City, Zip: Permit Application Date:
Building: Floor:Room: Control/tag:
Intent: Verify measured outside airflow sensor reading is within 10% of the total required
outside airflow. Required for all newly installed HVAC units or additions and
alterations to existing HVAC systems including ducts. Reference NRCC-MCH-E for
nonresidential (including nonresidential spaces in high-rise multifamily) building
permits or LMCC-MCH-E for nonresidential spaces in low-rise multifamily building
permits. Submit one Certificate of Acceptance for each system that must
demonstrate compliance. NRCA-MCH-02-A can be performed in conjunction with
NRCA-MCH-07-A Supply Fan VFD Acceptance (if applicable) since testing activities
overlap. Reference §120.1(e), §120.1(d)2, §120.5(a)1, §160.2(c)6, §160.2(c)5B,
and §160.3(d)1A.
Table A: Construction Inspection for Air Volume Systems
Prior to functional testing, verify and document all of the following
Step Entry Item Code
Reference
1.0 Pass
Fail
Access to required document NRCC-MCH-E as
approved by the authority having jurisdiction or
LMCC-MCH-E registered by a CEC approved data
registry.
§10-103(a)2A
2.0 No Entry
For VAV systems, complete ALL of 2, 3, and 4 and
respond N/A for ALL of 5, 6, and 7.
For CAV systems, respond N/A for ALL of 2, 3, and
4, and complete ALL of 5, 6, and 7.
N/A
2.1 or P, F, N/A
VAV Only: Outside airflow is factory calibrated;
attach factory calibration spec-sheet.
(Pass, Fail, N/A-if CAV)
NA7.5.1.1.1(a)
NA7.5.1.1.1(b)
2.2 P, F, N/A
VAV Only: Outside airflow is field calibrated, attach
calibration results report.
(Pass, Fail, N/A-if CAV)
NA7.5.1.1.1(a)
NA7.5.1.1.1(b)
3.0 P, F, N/A
VAV Only: Dynamic damper control is being used to
control outside air.
(Pass, Fail, N/A-if CAV)
NA7.5.1.1.1(c)
4.0 No Entry VAV Only: Identify the dynamic control being
utilized to control outside air. (Description or N/A) NA7.5.1.1.1(d)
4.1 Response: Describe Control or N/A NA7.5.1.1.1(d)
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
PGA Superstore
79-110 California 111
La Quinta, 92253
n/a n/a Clubs,
Practice Bay
RTU 1
12/11/24
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 2 of 4 January 1, 2023
Step Entry Item
Code
Reference
5.0 P, F, N/A
CAV Only: System is designed to provide a fixed
minimum outside air when the unit is on.
(Pass, Fail, N/A-if VAV)
NA7.5.1.2.1(a)
6.0 P, F, N/A CAV Only: Minimum position is marked on the
outside air damper. (Pass, Fail, N/A-if VAV) NA7.5.1.2.1(d)
7.0 P, F, N/A
CAV Only: The system has means of maintaining
the minimum outdoor air damper position.
(Pass, Fail, N/A-if VAV)
NA7.5.1.2.1(e)
8.0 No Entry Method of delivering outside air to the heating or
cooling unit. Either 8.1 or 8.2 must pass. N/A
8.1 or P, F, N/A
Return Plenum Ducted.
If outside air is ducted at or to the return plenum,
confirm that the ducted is within 5ft of the heating
or cooling unit, or 15 ft. with direction and velocity
requirement as specified by NRCC-MCH-E or LMCC-
MCH-E. (Pass, Fail, N/A)
NA7.5.1.1.1(e)
NA7.5.1.2.1(b)
§120.1(e)
§160.2(c)6
8.2 P, F, N/A
Direct Unit Ducted.
If the outside air is ducted directly to the unit,
verify that return air plenum is NOT used to
distribute outside air to the heating or cooling unit.
(i.e. outside air is ducted directly to the unit,
outside air is provided independent of the unit, or
economizer). (Pass, Fail, N/A)
NA7.5.1.1.1(e)
NA7.5.1.2.1(b)
§120.1(e)
§160.2(c)6
9.0 Pass
Fail
Pre-occupancy Purge: Verify that the pre-
occupancy purge has been programmed for the 1-
hour period immediately before the building is
normally occupied to provide ventilation as
indicated on NRCC-MCH-E or LMCC-MCH-E.
NA7.5.1.1.1(f)
NA7.5.1.2.1(c)
§120.1(d)2
§160.2(c)5B
10.0 Pass
Fail
Check “Pass” if construction inspection complies
with all requirements.
Check “Fail” if construction inspection does not
comply with all requirements.
N/A
Table B-1: Functional Testing for Constant Air Ventilation (CAV) System
This table is to be completed for CAV systems only, skip this table testing a VAV system.
Step Entry Functional Test
Code
Reference
1.0 P, F, N/A Disable demand control ventilation.
(if applicable) (Pass, Fail, N/A) N/A
2.0 P, F, N/A Verify unit is not in economizer mode during test.
(economizer disabled) (Pass, Fail, N/A)
NA7.5.1.2.2
Step 1
3.0 Testing at full supply airflow, measured outdoor
airflow reading. (CFM)
NA7.5.1.2.2
Step 1a 1229
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 3 of 4 January 1, 2023
Step Entry Functional Test
Code
Reference
4.0 Record required outdoor airflow from NRCC-MCH-E
or LMCC-MCH-E. (CFM)
NA7.5.1.2.2
Step 1a
5.0 Pass
Fail Return to initial conditions. N/A
6.0 Calculate 100 x (Step3/Step4) (Percent) NA7.5.1.2.2
Step 1a
7.0 Pass
Fail Check pass if value in Step 6 ≥ 90% and ≤ 110%. NA7.5.1.2.2
Step 1a
Table B-2: Functional Testing for Variable Air Ventilation (VAV) System
This table is to be completed for VAV systems only, skip this table testing a CAV system.
Step Entry Functional Test
Code
Reference
1.0 P, F, N/A Disable demand control ventilation.
(if applicable) (Pass, Fail, N/A) N/A
2.0 P, F, N/A Verify unit is not in economizer mode during test.
(economizer disabled) (Pass, Fail, N/A)
NA7.5.1.1.2
Step 1
3.0 Pass
Fail
Testing at full supply airflow, adjust supply air to
achieve design airflow or maximum airflow at full
cooling.
NA7.5.1.1.2
Step 2
4.0 Testing at full supply airflow, measured outdoor
airflow reading. (CFM)
NA7.5.1.1.2
Step 2a
5.0 Record required outdoor airflow from NRCC-MCH-E.
(CFM)
NA7.5.1.1.2
Step 2a
6.0 Time for outside air damper to stabilize after full
supply airflow is achieved. (Minutes)
NA7.5.1.1.2
Step 2b
7.0 Pass
Fail
Adjust supply airflow to either the sum of the
minimum zone airflows, full heating, or 30% of the
total design airflow.
NA7.5.1.1.2
Step 3
8.0 Measured outdoor airflow reading. (CFM) NA7.5.1.1.2
Step 3a
9.0 Time for outside air damper to stabilize after
reduced supply airflow is achieved. (Minutes)
NA7.5.1.1.2
Step 3b
10.0 Pass
Fail Return to initial conditions. NA7.5.1.1.2
Step 4
11.0 Calculate 100 x (Step4/Step5) (Percent) NA7.5.1.2.2
Step 1a
12.0 Calculate 100 x (Step8/Step5) (Percent) NA7.5.1.1.2
Step 3a
13.0 Pass
Fail
Check pass if both Steps 6 and 9 are both 5
minutes or less AND if both Steps 11 and 12 are ≥
90% and ≤ 110%.
N/A
1250
98.32
1229
1250
3
1229
3
98
98
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 4 of 4 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Field Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David FolgerBradley
Mechanical12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 1 of 4 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name:Enforcement Agency:
Address: Permit Number:
City, Zip: Permit Application Date:
Building: Floor:Room: Control/tag:
Intent: Verify measured outside airflow sensor reading is within 10% of the total required
outside airflow. Required for all newly installed HVAC units or additions and
alterations to existing HVAC systems including ducts. Reference NRCC-MCH-E for
nonresidential (including nonresidential spaces in high-rise multifamily) building
permits or LMCC-MCH-E for nonresidential spaces in low-rise multifamily building
permits. Submit one Certificate of Acceptance for each system that must
demonstrate compliance. NRCA-MCH-02-A can be performed in conjunction with
NRCA-MCH-07-A Supply Fan VFD Acceptance (if applicable) since testing activities
overlap. Reference §120.1(e), §120.1(d)2, §120.5(a)1, §160.2(c)6, §160.2(c)5B,
and §160.3(d)1A.
Table A: Construction Inspection for Air Volume Systems
Prior to functional testing, verify and document all of the following
Step Entry Item Code
Reference
1.0 Pass
Fail
Access to required document NRCC-MCH-E as
approved by the authority having jurisdiction or
LMCC-MCH-E registered by a CEC approved data
registry.
§10-103(a)2A
2.0 No Entry
For VAV systems, complete ALL of 2, 3, and 4 and
respond N/A for ALL of 5, 6, and 7.
For CAV systems, respond N/A for ALL of 2, 3, and
4, and complete ALL of 5, 6, and 7.
N/A
2.1 or P, F, N/A
VAV Only: Outside airflow is factory calibrated;
attach factory calibration spec-sheet.
(Pass, Fail, N/A-if CAV)
NA7.5.1.1.1(a)
NA7.5.1.1.1(b)
2.2 P, F, N/A
VAV Only: Outside airflow is field calibrated, attach
calibration results report.
(Pass, Fail, N/A-if CAV)
NA7.5.1.1.1(a)
NA7.5.1.1.1(b)
3.0 P, F, N/A
VAV Only: Dynamic damper control is being used to
control outside air.
(Pass, Fail, N/A-if CAV)
NA7.5.1.1.1(c)
4.0 No Entry VAV Only: Identify the dynamic control being
utilized to control outside air. (Description or N/A) NA7.5.1.1.1(d)
4.1 Response: Describe Control or N/A NA7.5.1.1.1(d)
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
PGA Superstore
79-110 California 111
La Quinta, 92253
n/a n/a Green, Mens RTU 2
12/11/24
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 2 of 4 January 1, 2023
Step Entry Item
Code
Reference
5.0 P, F, N/A
CAV Only: System is designed to provide a fixed
minimum outside air when the unit is on.
(Pass, Fail, N/A-if VAV)
NA7.5.1.2.1(a)
6.0 P, F, N/A CAV Only: Minimum position is marked on the
outside air damper. (Pass, Fail, N/A-if VAV) NA7.5.1.2.1(d)
7.0 P, F, N/A
CAV Only: The system has means of maintaining
the minimum outdoor air damper position.
(Pass, Fail, N/A-if VAV)
NA7.5.1.2.1(e)
8.0 No Entry Method of delivering outside air to the heating or
cooling unit. Either 8.1 or 8.2 must pass. N/A
8.1 or P, F, N/A
Return Plenum Ducted.
If outside air is ducted at or to the return plenum,
confirm that the ducted is within 5ft of the heating
or cooling unit, or 15 ft. with direction and velocity
requirement as specified by NRCC-MCH-E or LMCC-
MCH-E. (Pass, Fail, N/A)
NA7.5.1.1.1(e)
NA7.5.1.2.1(b)
§120.1(e)
§160.2(c)6
8.2 P, F, N/A
Direct Unit Ducted.
If the outside air is ducted directly to the unit,
verify that return air plenum is NOT used to
distribute outside air to the heating or cooling unit.
(i.e. outside air is ducted directly to the unit,
outside air is provided independent of the unit, or
economizer). (Pass, Fail, N/A)
NA7.5.1.1.1(e)
NA7.5.1.2.1(b)
§120.1(e)
§160.2(c)6
9.0 Pass
Fail
Pre-occupancy Purge: Verify that the pre-
occupancy purge has been programmed for the 1-
hour period immediately before the building is
normally occupied to provide ventilation as
indicated on NRCC-MCH-E or LMCC-MCH-E.
NA7.5.1.1.1(f)
NA7.5.1.2.1(c)
§120.1(d)2
§160.2(c)5B
10.0 Pass
Fail
Check “Pass” if construction inspection complies
with all requirements.
Check “Fail” if construction inspection does not
comply with all requirements.
N/A
Table B-1: Functional Testing for Constant Air Ventilation (CAV) System
This table is to be completed for CAV systems only, skip this table testing a VAV system.
Step Entry Functional Test
Code
Reference
1.0 P, F, N/A Disable demand control ventilation.
(if applicable) (Pass, Fail, N/A) N/A
2.0 P, F, N/A Verify unit is not in economizer mode during test.
(economizer disabled) (Pass, Fail, N/A)
NA7.5.1.2.2
Step 1
3.0 Testing at full supply airflow, measured outdoor
airflow reading. (CFM)
NA7.5.1.2.2
Step 1a 1260
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 3 of 4 January 1, 2023
Step Entry Functional Test
Code
Reference
4.0 Record required outdoor airflow from NRCC-MCH-E
or LMCC-MCH-E. (CFM)
NA7.5.1.2.2
Step 1a
5.0 Pass
Fail Return to initial conditions. N/A
6.0 Calculate 100 x (Step3/Step4) (Percent) NA7.5.1.2.2
Step 1a
7.0 Pass
Fail Check pass if value in Step 6 ≥ 90% and ≤ 110%. NA7.5.1.2.2
Step 1a
Table B-2: Functional Testing for Variable Air Ventilation (VAV) System
This table is to be completed for VAV systems only, skip this table testing a CAV system.
Step Entry Functional Test
Code
Reference
1.0 P, F, N/A Disable demand control ventilation.
(if applicable) (Pass, Fail, N/A) N/A
2.0 P, F, N/A Verify unit is not in economizer mode during test.
(economizer disabled) (Pass, Fail, N/A)
NA7.5.1.1.2
Step 1
3.0 Pass
Fail
Testing at full supply airflow, adjust supply air to
achieve design airflow or maximum airflow at full
cooling.
NA7.5.1.1.2
Step 2
4.0 Testing at full supply airflow, measured outdoor
airflow reading. (CFM)
NA7.5.1.1.2
Step 2a
5.0 Record required outdoor airflow from NRCC-MCH-E.
(CFM)
NA7.5.1.1.2
Step 2a
6.0 Time for outside air damper to stabilize after full
supply airflow is achieved. (Minutes)
NA7.5.1.1.2
Step 2b
7.0 Pass
Fail
Adjust supply airflow to either the sum of the
minimum zone airflows, full heating, or 30% of the
total design airflow.
NA7.5.1.1.2
Step 3
8.0 Measured outdoor airflow reading. (CFM) NA7.5.1.1.2
Step 3a
9.0 Time for outside air damper to stabilize after
reduced supply airflow is achieved. (Minutes)
NA7.5.1.1.2
Step 3b
10.0 Pass
Fail Return to initial conditions. NA7.5.1.1.2
Step 4
11.0 Calculate 100 x (Step4/Step5) (Percent) NA7.5.1.2.2
Step 1a
12.0 Calculate 100 x (Step8/Step5) (Percent) NA7.5.1.1.2
Step 3a
13.0 Pass
Fail
Check pass if both Steps 6 and 9 are both 5
minutes or less AND if both Steps 11 and 12 are ≥
90% and ≤ 110%.
N/A
1250
100
1260
1250
3
1260
3
100
100
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 4 of 4 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Field Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David FolgerBradley
Mechanical12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 1 of 4 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name:Enforcement Agency:
Address: Permit Number:
City, Zip: Permit Application Date:
Building: Floor:Room: Control/tag:
Intent: Verify measured outside airflow sensor reading is within 10% of the total required
outside airflow. Required for all newly installed HVAC units or additions and
alterations to existing HVAC systems including ducts. Reference NRCC-MCH-E for
nonresidential (including nonresidential spaces in high-rise multifamily) building
permits or LMCC-MCH-E for nonresidential spaces in low-rise multifamily building
permits. Submit one Certificate of Acceptance for each system that must
demonstrate compliance. NRCA-MCH-02-A can be performed in conjunction with
NRCA-MCH-07-A Supply Fan VFD Acceptance (if applicable) since testing activities
overlap. Reference §120.1(e), §120.1(d)2, §120.5(a)1, §160.2(c)6, §160.2(c)5B,
and §160.3(d)1A.
Table A: Construction Inspection for Air Volume Systems
Prior to functional testing, verify and document all of the following
Step Entry Item Code
Reference
1.0 Pass
Fail
Access to required document NRCC-MCH-E as
approved by the authority having jurisdiction or
LMCC-MCH-E registered by a CEC approved data
registry.
§10-103(a)2A
2.0 No Entry
For VAV systems, complete ALL of 2, 3, and 4 and
respond N/A for ALL of 5, 6, and 7.
For CAV systems, respond N/A for ALL of 2, 3, and
4, and complete ALL of 5, 6, and 7.
N/A
2.1 or P, F, N/A
VAV Only: Outside airflow is factory calibrated;
attach factory calibration spec-sheet.
(Pass, Fail, N/A-if CAV)
NA7.5.1.1.1(a)
NA7.5.1.1.1(b)
2.2 P, F, N/A
VAV Only: Outside airflow is field calibrated, attach
calibration results report.
(Pass, Fail, N/A-if CAV)
NA7.5.1.1.1(a)
NA7.5.1.1.1(b)
3.0 P, F, N/A
VAV Only: Dynamic damper control is being used to
control outside air.
(Pass, Fail, N/A-if CAV)
NA7.5.1.1.1(c)
4.0 No Entry VAV Only: Identify the dynamic control being
utilized to control outside air. (Description or N/A) NA7.5.1.1.1(d)
4.1 Response: Describe Control or N/A NA7.5.1.1.1(d)
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
PGA Superstore
79-110 California 111
La Quinta, 92253
n/a n/a Accessories RTU 3
12/11/24
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 2 of 4 January 1, 2023
Step Entry Item
Code
Reference
5.0 P, F, N/A
CAV Only: System is designed to provide a fixed
minimum outside air when the unit is on.
(Pass, Fail, N/A-if VAV)
NA7.5.1.2.1(a)
6.0 P, F, N/A CAV Only: Minimum position is marked on the
outside air damper. (Pass, Fail, N/A-if VAV) NA7.5.1.2.1(d)
7.0 P, F, N/A
CAV Only: The system has means of maintaining
the minimum outdoor air damper position.
(Pass, Fail, N/A-if VAV)
NA7.5.1.2.1(e)
8.0 No Entry Method of delivering outside air to the heating or
cooling unit. Either 8.1 or 8.2 must pass. N/A
8.1 or P, F, N/A
Return Plenum Ducted.
If outside air is ducted at or to the return plenum,
confirm that the ducted is within 5ft of the heating
or cooling unit, or 15 ft. with direction and velocity
requirement as specified by NRCC-MCH-E or LMCC-
MCH-E. (Pass, Fail, N/A)
NA7.5.1.1.1(e)
NA7.5.1.2.1(b)
§120.1(e)
§160.2(c)6
8.2 P, F, N/A
Direct Unit Ducted.
If the outside air is ducted directly to the unit,
verify that return air plenum is NOT used to
distribute outside air to the heating or cooling unit.
(i.e. outside air is ducted directly to the unit,
outside air is provided independent of the unit, or
economizer). (Pass, Fail, N/A)
NA7.5.1.1.1(e)
NA7.5.1.2.1(b)
§120.1(e)
§160.2(c)6
9.0 Pass
Fail
Pre-occupancy Purge: Verify that the pre-
occupancy purge has been programmed for the 1-
hour period immediately before the building is
normally occupied to provide ventilation as
indicated on NRCC-MCH-E or LMCC-MCH-E.
NA7.5.1.1.1(f)
NA7.5.1.2.1(c)
§120.1(d)2
§160.2(c)5B
10.0 Pass
Fail
Check “Pass” if construction inspection complies
with all requirements.
Check “Fail” if construction inspection does not
comply with all requirements.
N/A
Table B-1: Functional Testing for Constant Air Ventilation (CAV) System
This table is to be completed for CAV systems only, skip this table testing a VAV system.
Step Entry Functional Test
Code
Reference
1.0 P, F, N/A Disable demand control ventilation.
(if applicable) (Pass, Fail, N/A) N/A
2.0 P, F, N/A Verify unit is not in economizer mode during test.
(economizer disabled) (Pass, Fail, N/A)
NA7.5.1.2.2
Step 1
3.0 Testing at full supply airflow, measured outdoor
airflow reading. (CFM)
NA7.5.1.2.2
Step 1a 1200
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 3 of 4 January 1, 2023
Step Entry Functional Test
Code
Reference
4.0 Record required outdoor airflow from NRCC-MCH-E
or LMCC-MCH-E. (CFM)
NA7.5.1.2.2
Step 1a
5.0 Pass
Fail Return to initial conditions. N/A
6.0 Calculate 100 x (Step3/Step4) (Percent) NA7.5.1.2.2
Step 1a
7.0 Pass
Fail Check pass if value in Step 6 ≥ 90% and ≤ 110%. NA7.5.1.2.2
Step 1a
Table B-2: Functional Testing for Variable Air Ventilation (VAV) System
This table is to be completed for VAV systems only, skip this table testing a CAV system.
Step Entry Functional Test
Code
Reference
1.0 P, F, N/A Disable demand control ventilation.
(if applicable) (Pass, Fail, N/A) N/A
2.0 P, F, N/A Verify unit is not in economizer mode during test.
(economizer disabled) (Pass, Fail, N/A)
NA7.5.1.1.2
Step 1
3.0 Pass
Fail
Testing at full supply airflow, adjust supply air to
achieve design airflow or maximum airflow at full
cooling.
NA7.5.1.1.2
Step 2
4.0 Testing at full supply airflow, measured outdoor
airflow reading. (CFM)
NA7.5.1.1.2
Step 2a
5.0 Record required outdoor airflow from NRCC-MCH-E.
(CFM)
NA7.5.1.1.2
Step 2a
6.0 Time for outside air damper to stabilize after full
supply airflow is achieved. (Minutes)
NA7.5.1.1.2
Step 2b
7.0 Pass
Fail
Adjust supply airflow to either the sum of the
minimum zone airflows, full heating, or 30% of the
total design airflow.
NA7.5.1.1.2
Step 3
8.0 Measured outdoor airflow reading. (CFM) NA7.5.1.1.2
Step 3a
9.0 Time for outside air damper to stabilize after
reduced supply airflow is achieved. (Minutes)
NA7.5.1.1.2
Step 3b
10.0 Pass
Fail Return to initial conditions. NA7.5.1.1.2
Step 4
11.0 Calculate 100 x (Step4/Step5) (Percent) NA7.5.1.2.2
Step 1a
12.0 Calculate 100 x (Step8/Step5) (Percent) NA7.5.1.1.2
Step 3a
13.0 Pass
Fail
Check pass if both Steps 6 and 9 are both 5
minutes or less AND if both Steps 11 and 12 are ≥
90% and ≤ 110%.
N/A
1250
96
1200
1250
3
1200
3
96
96
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 4 of 4 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Field Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David FolgerBradley
Mechanical12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 1 of 4 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name:Enforcement Agency:
Address: Permit Number:
City, Zip: Permit Application Date:
Building: Floor:Room: Control/tag:
Intent: Verify measured outside airflow sensor reading is within 10% of the total required
outside airflow. Required for all newly installed HVAC units or additions and
alterations to existing HVAC systems including ducts. Reference NRCC-MCH-E for
nonresidential (including nonresidential spaces in high-rise multifamily) building
permits or LMCC-MCH-E for nonresidential spaces in low-rise multifamily building
permits. Submit one Certificate of Acceptance for each system that must
demonstrate compliance. NRCA-MCH-02-A can be performed in conjunction with
NRCA-MCH-07-A Supply Fan VFD Acceptance (if applicable) since testing activities
overlap. Reference §120.1(e), §120.1(d)2, §120.5(a)1, §160.2(c)6, §160.2(c)5B,
and §160.3(d)1A.
Table A: Construction Inspection for Air Volume Systems
Prior to functional testing, verify and document all of the following
Step Entry Item Code
Reference
1.0 Pass
Fail
Access to required document NRCC-MCH-E as
approved by the authority having jurisdiction or
LMCC-MCH-E registered by a CEC approved data
registry.
§10-103(a)2A
2.0 No Entry
For VAV systems, complete ALL of 2, 3, and 4 and
respond N/A for ALL of 5, 6, and 7.
For CAV systems, respond N/A for ALL of 2, 3, and
4, and complete ALL of 5, 6, and 7.
N/A
2.1 or P, F, N/A
VAV Only: Outside airflow is factory calibrated;
attach factory calibration spec-sheet.
(Pass, Fail, N/A-if CAV)
NA7.5.1.1.1(a)
NA7.5.1.1.1(b)
2.2 P, F, N/A
VAV Only: Outside airflow is field calibrated, attach
calibration results report.
(Pass, Fail, N/A-if CAV)
NA7.5.1.1.1(a)
NA7.5.1.1.1(b)
3.0 P, F, N/A
VAV Only: Dynamic damper control is being used to
control outside air.
(Pass, Fail, N/A-if CAV)
NA7.5.1.1.1(c)
4.0 No Entry VAV Only: Identify the dynamic control being
utilized to control outside air. (Description or N/A) NA7.5.1.1.1(d)
4.1 Response: Describe Control or N/A NA7.5.1.1.1(d)
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
PGA Superstore
79-110 California 111
La Quinta, 92253
n/a n/a Receiving RTU 7
12/11/24
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 2 of 4 January 1, 2023
Step Entry Item
Code
Reference
5.0 P, F, N/A
CAV Only: System is designed to provide a fixed
minimum outside air when the unit is on.
(Pass, Fail, N/A-if VAV)
NA7.5.1.2.1(a)
6.0 P, F, N/A CAV Only: Minimum position is marked on the
outside air damper. (Pass, Fail, N/A-if VAV) NA7.5.1.2.1(d)
7.0 P, F, N/A
CAV Only: The system has means of maintaining
the minimum outdoor air damper position.
(Pass, Fail, N/A-if VAV)
NA7.5.1.2.1(e)
8.0 No Entry Method of delivering outside air to the heating or
cooling unit. Either 8.1 or 8.2 must pass. N/A
8.1 or P, F, N/A
Return Plenum Ducted.
If outside air is ducted at or to the return plenum,
confirm that the ducted is within 5ft of the heating
or cooling unit, or 15 ft. with direction and velocity
requirement as specified by NRCC-MCH-E or LMCC-
MCH-E. (Pass, Fail, N/A)
NA7.5.1.1.1(e)
NA7.5.1.2.1(b)
§120.1(e)
§160.2(c)6
8.2 P, F, N/A
Direct Unit Ducted.
If the outside air is ducted directly to the unit,
verify that return air plenum is NOT used to
distribute outside air to the heating or cooling unit.
(i.e. outside air is ducted directly to the unit,
outside air is provided independent of the unit, or
economizer). (Pass, Fail, N/A)
NA7.5.1.1.1(e)
NA7.5.1.2.1(b)
§120.1(e)
§160.2(c)6
9.0 Pass
Fail
Pre-occupancy Purge: Verify that the pre-
occupancy purge has been programmed for the 1-
hour period immediately before the building is
normally occupied to provide ventilation as
indicated on NRCC-MCH-E or LMCC-MCH-E.
NA7.5.1.1.1(f)
NA7.5.1.2.1(c)
§120.1(d)2
§160.2(c)5B
10.0 Pass
Fail
Check “Pass” if construction inspection complies
with all requirements.
Check “Fail” if construction inspection does not
comply with all requirements.
N/A
Table B-1: Functional Testing for Constant Air Ventilation (CAV) System
This table is to be completed for CAV systems only, skip this table testing a VAV system.
Step Entry Functional Test
Code
Reference
1.0 P, F, N/A Disable demand control ventilation.
(if applicable) (Pass, Fail, N/A) N/A
2.0 P, F, N/A Verify unit is not in economizer mode during test.
(economizer disabled) (Pass, Fail, N/A)
NA7.5.1.2.2
Step 1
3.0 Testing at full supply airflow, measured outdoor
airflow reading. (CFM)
NA7.5.1.2.2
Step 1a 198
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 3 of 4 January 1, 2023
Step Entry Functional Test
Code
Reference
4.0 Record required outdoor airflow from NRCC-MCH-E
or LMCC-MCH-E. (CFM)
NA7.5.1.2.2
Step 1a
5.0 Pass
Fail Return to initial conditions. N/A
6.0 Calculate 100 x (Step3/Step4) (Percent) NA7.5.1.2.2
Step 1a
7.0 Pass
Fail Check pass if value in Step 6 ≥ 90% and ≤ 110%. NA7.5.1.2.2
Step 1a
Table B-2: Functional Testing for Variable Air Ventilation (VAV) System
This table is to be completed for VAV systems only, skip this table testing a CAV system.
Step Entry Functional Test
Code
Reference
1.0 P, F, N/A Disable demand control ventilation.
(if applicable) (Pass, Fail, N/A) N/A
2.0 P, F, N/A Verify unit is not in economizer mode during test.
(economizer disabled) (Pass, Fail, N/A)
NA7.5.1.1.2
Step 1
3.0 Pass
Fail
Testing at full supply airflow, adjust supply air to
achieve design airflow or maximum airflow at full
cooling.
NA7.5.1.1.2
Step 2
4.0 Testing at full supply airflow, measured outdoor
airflow reading. (CFM)
NA7.5.1.1.2
Step 2a
5.0 Record required outdoor airflow from NRCC-MCH-E.
(CFM)
NA7.5.1.1.2
Step 2a
6.0 Time for outside air damper to stabilize after full
supply airflow is achieved. (Minutes)
NA7.5.1.1.2
Step 2b
7.0 Pass
Fail
Adjust supply airflow to either the sum of the
minimum zone airflows, full heating, or 30% of the
total design airflow.
NA7.5.1.1.2
Step 3
8.0 Measured outdoor airflow reading. (CFM) NA7.5.1.1.2
Step 3a
9.0 Time for outside air damper to stabilize after
reduced supply airflow is achieved. (Minutes)
NA7.5.1.1.2
Step 3b
10.0 Pass
Fail Return to initial conditions. NA7.5.1.1.2
Step 4
11.0 Calculate 100 x (Step4/Step5) (Percent) NA7.5.1.2.2
Step 1a
12.0 Calculate 100 x (Step8/Step5) (Percent) NA7.5.1.1.2
Step 3a
13.0 Pass
Fail
Check pass if both Steps 6 and 9 are both 5
minutes or less AND if both Steps 11 and 12 are ≥
90% and ≤ 110%.
N/A
200
99
198
200
3
1255
3
99
99
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 4 of 4 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Field Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David FolgerBradley
Mechanical12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 1 of 4 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name:Enforcement Agency:
Address: Permit Number:
City, Zip: Permit Application Date:
Building: Floor:Room: Control/tag:
Intent: Verify measured outside airflow sensor reading is within 10% of the total required
outside airflow. Required for all newly installed HVAC units or additions and
alterations to existing HVAC systems including ducts. Reference NRCC-MCH-E for
nonresidential (including nonresidential spaces in high-rise multifamily) building
permits or LMCC-MCH-E for nonresidential spaces in low-rise multifamily building
permits. Submit one Certificate of Acceptance for each system that must
demonstrate compliance. NRCA-MCH-02-A can be performed in conjunction with
NRCA-MCH-07-A Supply Fan VFD Acceptance (if applicable) since testing activities
overlap. Reference §120.1(e), §120.1(d)2, §120.5(a)1, §160.2(c)6, §160.2(c)5B,
and §160.3(d)1A.
Table A: Construction Inspection for Air Volume Systems
Prior to functional testing, verify and document all of the following
Step Entry Item Code
Reference
1.0 Pass
Fail
Access to required document NRCC-MCH-E as
approved by the authority having jurisdiction or
LMCC-MCH-E registered by a CEC approved data
registry.
§10-103(a)2A
2.0 No Entry
For VAV systems, complete ALL of 2, 3, and 4 and
respond N/A for ALL of 5, 6, and 7.
For CAV systems, respond N/A for ALL of 2, 3, and
4, and complete ALL of 5, 6, and 7.
N/A
2.1 or P, F, N/A
VAV Only: Outside airflow is factory calibrated;
attach factory calibration spec-sheet.
(Pass, Fail, N/A-if CAV)
NA7.5.1.1.1(a)
NA7.5.1.1.1(b)
2.2 P, F, N/A
VAV Only: Outside airflow is field calibrated, attach
calibration results report.
(Pass, Fail, N/A-if CAV)
NA7.5.1.1.1(a)
NA7.5.1.1.1(b)
3.0 P, F, N/A
VAV Only: Dynamic damper control is being used to
control outside air.
(Pass, Fail, N/A-if CAV)
NA7.5.1.1.1(c)
4.0 No Entry VAV Only: Identify the dynamic control being
utilized to control outside air. (Description or N/A) NA7.5.1.1.1(d)
4.1 Response: Describe Control or N/A NA7.5.1.1.1(d)
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
PGA Superstore
79-110 California 111
La Quinta, 92253
n/a n/a Shoes, Juniors RTU 4
12/11/24
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 2 of 4 January 1, 2023
Step Entry Item
Code
Reference
5.0 P, F, N/A
CAV Only: System is designed to provide a fixed
minimum outside air when the unit is on.
(Pass, Fail, N/A-if VAV)
NA7.5.1.2.1(a)
6.0 P, F, N/A CAV Only: Minimum position is marked on the
outside air damper. (Pass, Fail, N/A-if VAV) NA7.5.1.2.1(d)
7.0 P, F, N/A
CAV Only: The system has means of maintaining
the minimum outdoor air damper position.
(Pass, Fail, N/A-if VAV)
NA7.5.1.2.1(e)
8.0 No Entry Method of delivering outside air to the heating or
cooling unit. Either 8.1 or 8.2 must pass. N/A
8.1 or P, F, N/A
Return Plenum Ducted.
If outside air is ducted at or to the return plenum,
confirm that the ducted is within 5ft of the heating
or cooling unit, or 15 ft. with direction and velocity
requirement as specified by NRCC-MCH-E or LMCC-
MCH-E. (Pass, Fail, N/A)
NA7.5.1.1.1(e)
NA7.5.1.2.1(b)
§120.1(e)
§160.2(c)6
8.2 P, F, N/A
Direct Unit Ducted.
If the outside air is ducted directly to the unit,
verify that return air plenum is NOT used to
distribute outside air to the heating or cooling unit.
(i.e. outside air is ducted directly to the unit,
outside air is provided independent of the unit, or
economizer). (Pass, Fail, N/A)
NA7.5.1.1.1(e)
NA7.5.1.2.1(b)
§120.1(e)
§160.2(c)6
9.0 Pass
Fail
Pre-occupancy Purge: Verify that the pre-
occupancy purge has been programmed for the 1-
hour period immediately before the building is
normally occupied to provide ventilation as
indicated on NRCC-MCH-E or LMCC-MCH-E.
NA7.5.1.1.1(f)
NA7.5.1.2.1(c)
§120.1(d)2
§160.2(c)5B
10.0 Pass
Fail
Check “Pass” if construction inspection complies
with all requirements.
Check “Fail” if construction inspection does not
comply with all requirements.
N/A
Table B-1: Functional Testing for Constant Air Ventilation (CAV) System
This table is to be completed for CAV systems only, skip this table testing a VAV system.
Step Entry Functional Test
Code
Reference
1.0 P, F, N/A Disable demand control ventilation.
(if applicable) (Pass, Fail, N/A) N/A
2.0 P, F, N/A Verify unit is not in economizer mode during test.
(economizer disabled) (Pass, Fail, N/A)
NA7.5.1.2.2
Step 1
3.0 Testing at full supply airflow, measured outdoor
airflow reading. (CFM)
NA7.5.1.2.2
Step 1a 1243
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 3 of 4 January 1, 2023
Step Entry Functional Test
Code
Reference
4.0 Record required outdoor airflow from NRCC-MCH-E
or LMCC-MCH-E. (CFM)
NA7.5.1.2.2
Step 1a
5.0 Pass
Fail Return to initial conditions. N/A
6.0 Calculate 100 x (Step3/Step4) (Percent) NA7.5.1.2.2
Step 1a
7.0 Pass
Fail Check pass if value in Step 6 ≥ 90% and ≤ 110%. NA7.5.1.2.2
Step 1a
Table B-2: Functional Testing for Variable Air Ventilation (VAV) System
This table is to be completed for VAV systems only, skip this table testing a CAV system.
Step Entry Functional Test
Code
Reference
1.0 P, F, N/A Disable demand control ventilation.
(if applicable) (Pass, Fail, N/A) N/A
2.0 P, F, N/A Verify unit is not in economizer mode during test.
(economizer disabled) (Pass, Fail, N/A)
NA7.5.1.1.2
Step 1
3.0 Pass
Fail
Testing at full supply airflow, adjust supply air to
achieve design airflow or maximum airflow at full
cooling.
NA7.5.1.1.2
Step 2
4.0 Testing at full supply airflow, measured outdoor
airflow reading. (CFM)
NA7.5.1.1.2
Step 2a
5.0 Record required outdoor airflow from NRCC-MCH-E.
(CFM)
NA7.5.1.1.2
Step 2a
6.0 Time for outside air damper to stabilize after full
supply airflow is achieved. (Minutes)
NA7.5.1.1.2
Step 2b
7.0 Pass
Fail
Adjust supply airflow to either the sum of the
minimum zone airflows, full heating, or 30% of the
total design airflow.
NA7.5.1.1.2
Step 3
8.0 Measured outdoor airflow reading. (CFM) NA7.5.1.1.2
Step 3a
9.0 Time for outside air damper to stabilize after
reduced supply airflow is achieved. (Minutes)
NA7.5.1.1.2
Step 3b
10.0 Pass
Fail Return to initial conditions. NA7.5.1.1.2
Step 4
11.0 Calculate 100 x (Step4/Step5) (Percent) NA7.5.1.2.2
Step 1a
12.0 Calculate 100 x (Step8/Step5) (Percent) NA7.5.1.1.2
Step 3a
13.0 Pass
Fail
Check pass if both Steps 6 and 9 are both 5
minutes or less AND if both Steps 11 and 12 are ≥
90% and ≤ 110%.
N/A
1250
100
1243
1250
3
1243
3
100
100
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 4 of 4 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Field Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David FolgerBradley
Mechanical12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 1 of 4 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name:Enforcement Agency:
Address: Permit Number:
City, Zip: Permit Application Date:
Building: Floor:Room: Control/tag:
Intent: Verify measured outside airflow sensor reading is within 10% of the total required
outside airflow. Required for all newly installed HVAC units or additions and
alterations to existing HVAC systems including ducts. Reference NRCC-MCH-E for
nonresidential (including nonresidential spaces in high-rise multifamily) building
permits or LMCC-MCH-E for nonresidential spaces in low-rise multifamily building
permits. Submit one Certificate of Acceptance for each system that must
demonstrate compliance. NRCA-MCH-02-A can be performed in conjunction with
NRCA-MCH-07-A Supply Fan VFD Acceptance (if applicable) since testing activities
overlap. Reference §120.1(e), §120.1(d)2, §120.5(a)1, §160.2(c)6, §160.2(c)5B,
and §160.3(d)1A.
Table A: Construction Inspection for Air Volume Systems
Prior to functional testing, verify and document all of the following
Step Entry Item Code
Reference
1.0 Pass
Fail
Access to required document NRCC-MCH-E as
approved by the authority having jurisdiction or
LMCC-MCH-E registered by a CEC approved data
registry.
§10-103(a)2A
2.0 No Entry
For VAV systems, complete ALL of 2, 3, and 4 and
respond N/A for ALL of 5, 6, and 7.
For CAV systems, respond N/A for ALL of 2, 3, and
4, and complete ALL of 5, 6, and 7.
N/A
2.1 or P, F, N/A
VAV Only: Outside airflow is factory calibrated;
attach factory calibration spec-sheet.
(Pass, Fail, N/A-if CAV)
NA7.5.1.1.1(a)
NA7.5.1.1.1(b)
2.2 P, F, N/A
VAV Only: Outside airflow is field calibrated, attach
calibration results report.
(Pass, Fail, N/A-if CAV)
NA7.5.1.1.1(a)
NA7.5.1.1.1(b)
3.0 P, F, N/A
VAV Only: Dynamic damper control is being used to
control outside air.
(Pass, Fail, N/A-if CAV)
NA7.5.1.1.1(c)
4.0 No Entry VAV Only: Identify the dynamic control being
utilized to control outside air. (Description or N/A) NA7.5.1.1.1(d)
4.1 Response: Describe Control or N/A NA7.5.1.1.1(d)
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
PGA Superstore
79-110 California 111
La Quinta, 92253
n/a n/a Bags, Studios RTU 5
12/11/24
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 2 of 4 January 1, 2023
Step Entry Item
Code
Reference
5.0 P, F, N/A
CAV Only: System is designed to provide a fixed
minimum outside air when the unit is on.
(Pass, Fail, N/A-if VAV)
NA7.5.1.2.1(a)
6.0 P, F, N/A CAV Only: Minimum position is marked on the
outside air damper. (Pass, Fail, N/A-if VAV) NA7.5.1.2.1(d)
7.0 P, F, N/A
CAV Only: The system has means of maintaining
the minimum outdoor air damper position.
(Pass, Fail, N/A-if VAV)
NA7.5.1.2.1(e)
8.0 No Entry Method of delivering outside air to the heating or
cooling unit. Either 8.1 or 8.2 must pass. N/A
8.1 or P, F, N/A
Return Plenum Ducted.
If outside air is ducted at or to the return plenum,
confirm that the ducted is within 5ft of the heating
or cooling unit, or 15 ft. with direction and velocity
requirement as specified by NRCC-MCH-E or LMCC-
MCH-E. (Pass, Fail, N/A)
NA7.5.1.1.1(e)
NA7.5.1.2.1(b)
§120.1(e)
§160.2(c)6
8.2 P, F, N/A
Direct Unit Ducted.
If the outside air is ducted directly to the unit,
verify that return air plenum is NOT used to
distribute outside air to the heating or cooling unit.
(i.e. outside air is ducted directly to the unit,
outside air is provided independent of the unit, or
economizer). (Pass, Fail, N/A)
NA7.5.1.1.1(e)
NA7.5.1.2.1(b)
§120.1(e)
§160.2(c)6
9.0 Pass
Fail
Pre-occupancy Purge: Verify that the pre-
occupancy purge has been programmed for the 1-
hour period immediately before the building is
normally occupied to provide ventilation as
indicated on NRCC-MCH-E or LMCC-MCH-E.
NA7.5.1.1.1(f)
NA7.5.1.2.1(c)
§120.1(d)2
§160.2(c)5B
10.0 Pass
Fail
Check “Pass” if construction inspection complies
with all requirements.
Check “Fail” if construction inspection does not
comply with all requirements.
N/A
Table B-1: Functional Testing for Constant Air Ventilation (CAV) System
This table is to be completed for CAV systems only, skip this table testing a VAV system.
Step Entry Functional Test
Code
Reference
1.0 P, F, N/A Disable demand control ventilation.
(if applicable) (Pass, Fail, N/A) N/A
2.0 P, F, N/A Verify unit is not in economizer mode during test.
(economizer disabled) (Pass, Fail, N/A)
NA7.5.1.2.2
Step 1
3.0 Testing at full supply airflow, measured outdoor
airflow reading. (CFM)
NA7.5.1.2.2
Step 1a 1180
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 3 of 4 January 1, 2023
Step Entry Functional Test
Code
Reference
4.0 Record required outdoor airflow from NRCC-MCH-E
or LMCC-MCH-E. (CFM)
NA7.5.1.2.2
Step 1a
5.0 Pass
Fail Return to initial conditions. N/A
6.0 Calculate 100 x (Step3/Step4) (Percent) NA7.5.1.2.2
Step 1a
7.0 Pass
Fail Check pass if value in Step 6 ≥ 90% and ≤ 110%. NA7.5.1.2.2
Step 1a
Table B-2: Functional Testing for Variable Air Ventilation (VAV) System
This table is to be completed for VAV systems only, skip this table testing a CAV system.
Step Entry Functional Test
Code
Reference
1.0 P, F, N/A Disable demand control ventilation.
(if applicable) (Pass, Fail, N/A) N/A
2.0 P, F, N/A Verify unit is not in economizer mode during test.
(economizer disabled) (Pass, Fail, N/A)
NA7.5.1.1.2
Step 1
3.0 Pass
Fail
Testing at full supply airflow, adjust supply air to
achieve design airflow or maximum airflow at full
cooling.
NA7.5.1.1.2
Step 2
4.0 Testing at full supply airflow, measured outdoor
airflow reading. (CFM)
NA7.5.1.1.2
Step 2a
5.0 Record required outdoor airflow from NRCC-MCH-E.
(CFM)
NA7.5.1.1.2
Step 2a
6.0 Time for outside air damper to stabilize after full
supply airflow is achieved. (Minutes)
NA7.5.1.1.2
Step 2b
7.0 Pass
Fail
Adjust supply airflow to either the sum of the
minimum zone airflows, full heating, or 30% of the
total design airflow.
NA7.5.1.1.2
Step 3
8.0 Measured outdoor airflow reading. (CFM) NA7.5.1.1.2
Step 3a
9.0 Time for outside air damper to stabilize after
reduced supply airflow is achieved. (Minutes)
NA7.5.1.1.2
Step 3b
10.0 Pass
Fail Return to initial conditions. NA7.5.1.1.2
Step 4
11.0 Calculate 100 x (Step4/Step5) (Percent) NA7.5.1.2.2
Step 1a
12.0 Calculate 100 x (Step8/Step5) (Percent) NA7.5.1.1.2
Step 3a
13.0 Pass
Fail
Check pass if both Steps 6 and 9 are both 5
minutes or less AND if both Steps 11 and 12 are ≥
90% and ≤ 110%.
N/A
1250
94
1180
1250
3
1180
3
94
94
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 4 of 4 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Field Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David FolgerBradley
Mechanical12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 1 of 4 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name:Enforcement Agency:
Address: Permit Number:
City, Zip: Permit Application Date:
Building: Floor:Room: Control/tag:
Intent: Verify measured outside airflow sensor reading is within 10% of the total required
outside airflow. Required for all newly installed HVAC units or additions and
alterations to existing HVAC systems including ducts. Reference NRCC-MCH-E for
nonresidential (including nonresidential spaces in high-rise multifamily) building
permits or LMCC-MCH-E for nonresidential spaces in low-rise multifamily building
permits. Submit one Certificate of Acceptance for each system that must
demonstrate compliance. NRCA-MCH-02-A can be performed in conjunction with
NRCA-MCH-07-A Supply Fan VFD Acceptance (if applicable) since testing activities
overlap. Reference §120.1(e), §120.1(d)2, §120.5(a)1, §160.2(c)6, §160.2(c)5B,
and §160.3(d)1A.
Table A: Construction Inspection for Air Volume Systems
Prior to functional testing, verify and document all of the following
Step Entry Item Code
Reference
1.0 Pass
Fail
Access to required document NRCC-MCH-E as
approved by the authority having jurisdiction or
LMCC-MCH-E registered by a CEC approved data
registry.
§10-103(a)2A
2.0 No Entry
For VAV systems, complete ALL of 2, 3, and 4 and
respond N/A for ALL of 5, 6, and 7.
For CAV systems, respond N/A for ALL of 2, 3, and
4, and complete ALL of 5, 6, and 7.
N/A
2.1 or P, F, N/A
VAV Only: Outside airflow is factory calibrated;
attach factory calibration spec-sheet.
(Pass, Fail, N/A-if CAV)
NA7.5.1.1.1(a)
NA7.5.1.1.1(b)
2.2 P, F, N/A
VAV Only: Outside airflow is field calibrated, attach
calibration results report.
(Pass, Fail, N/A-if CAV)
NA7.5.1.1.1(a)
NA7.5.1.1.1(b)
3.0 P, F, N/A
VAV Only: Dynamic damper control is being used to
control outside air.
(Pass, Fail, N/A-if CAV)
NA7.5.1.1.1(c)
4.0 No Entry VAV Only: Identify the dynamic control being
utilized to control outside air. (Description or N/A) NA7.5.1.1.1(d)
4.1 Response: Describe Control or N/A NA7.5.1.1.1(d)
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
PGA Superstore
79-110 California 111
La Quinta, 92253
n/a n/a Tennis,
Womens
RTU 6
12/11/24
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 2 of 4 January 1, 2023
Step Entry Item
Code
Reference
5.0 P, F, N/A
CAV Only: System is designed to provide a fixed
minimum outside air when the unit is on.
(Pass, Fail, N/A-if VAV)
NA7.5.1.2.1(a)
6.0 P, F, N/A CAV Only: Minimum position is marked on the
outside air damper. (Pass, Fail, N/A-if VAV) NA7.5.1.2.1(d)
7.0 P, F, N/A
CAV Only: The system has means of maintaining
the minimum outdoor air damper position.
(Pass, Fail, N/A-if VAV)
NA7.5.1.2.1(e)
8.0 No Entry Method of delivering outside air to the heating or
cooling unit. Either 8.1 or 8.2 must pass. N/A
8.1 or P, F, N/A
Return Plenum Ducted.
If outside air is ducted at or to the return plenum,
confirm that the ducted is within 5ft of the heating
or cooling unit, or 15 ft. with direction and velocity
requirement as specified by NRCC-MCH-E or LMCC-
MCH-E. (Pass, Fail, N/A)
NA7.5.1.1.1(e)
NA7.5.1.2.1(b)
§120.1(e)
§160.2(c)6
8.2 P, F, N/A
Direct Unit Ducted.
If the outside air is ducted directly to the unit,
verify that return air plenum is NOT used to
distribute outside air to the heating or cooling unit.
(i.e. outside air is ducted directly to the unit,
outside air is provided independent of the unit, or
economizer). (Pass, Fail, N/A)
NA7.5.1.1.1(e)
NA7.5.1.2.1(b)
§120.1(e)
§160.2(c)6
9.0 Pass
Fail
Pre-occupancy Purge: Verify that the pre-
occupancy purge has been programmed for the 1-
hour period immediately before the building is
normally occupied to provide ventilation as
indicated on NRCC-MCH-E or LMCC-MCH-E.
NA7.5.1.1.1(f)
NA7.5.1.2.1(c)
§120.1(d)2
§160.2(c)5B
10.0 Pass
Fail
Check “Pass” if construction inspection complies
with all requirements.
Check “Fail” if construction inspection does not
comply with all requirements.
N/A
Table B-1: Functional Testing for Constant Air Ventilation (CAV) System
This table is to be completed for CAV systems only, skip this table testing a VAV system.
Step Entry Functional Test
Code
Reference
1.0 P, F, N/A Disable demand control ventilation.
(if applicable) (Pass, Fail, N/A) N/A
2.0 P, F, N/A Verify unit is not in economizer mode during test.
(economizer disabled) (Pass, Fail, N/A)
NA7.5.1.2.2
Step 1
3.0 Testing at full supply airflow, measured outdoor
airflow reading. (CFM)
NA7.5.1.2.2
Step 1a 1255
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 3 of 4 January 1, 2023
Step Entry Functional Test
Code
Reference
4.0 Record required outdoor airflow from NRCC-MCH-E
or LMCC-MCH-E. (CFM)
NA7.5.1.2.2
Step 1a
5.0 Pass
Fail Return to initial conditions. N/A
6.0 Calculate 100 x (Step3/Step4) (Percent) NA7.5.1.2.2
Step 1a
7.0 Pass
Fail Check pass if value in Step 6 ≥ 90% and ≤ 110%. NA7.5.1.2.2
Step 1a
Table B-2: Functional Testing for Variable Air Ventilation (VAV) System
This table is to be completed for VAV systems only, skip this table testing a CAV system.
Step Entry Functional Test
Code
Reference
1.0 P, F, N/A Disable demand control ventilation.
(if applicable) (Pass, Fail, N/A) N/A
2.0 P, F, N/A Verify unit is not in economizer mode during test.
(economizer disabled) (Pass, Fail, N/A)
NA7.5.1.1.2
Step 1
3.0 Pass
Fail
Testing at full supply airflow, adjust supply air to
achieve design airflow or maximum airflow at full
cooling.
NA7.5.1.1.2
Step 2
4.0 Testing at full supply airflow, measured outdoor
airflow reading. (CFM)
NA7.5.1.1.2
Step 2a
5.0 Record required outdoor airflow from NRCC-MCH-E.
(CFM)
NA7.5.1.1.2
Step 2a
6.0 Time for outside air damper to stabilize after full
supply airflow is achieved. (Minutes)
NA7.5.1.1.2
Step 2b
7.0 Pass
Fail
Adjust supply airflow to either the sum of the
minimum zone airflows, full heating, or 30% of the
total design airflow.
NA7.5.1.1.2
Step 3
8.0 Measured outdoor airflow reading. (CFM) NA7.5.1.1.2
Step 3a
9.0 Time for outside air damper to stabilize after
reduced supply airflow is achieved. (Minutes)
NA7.5.1.1.2
Step 3b
10.0 Pass
Fail Return to initial conditions. NA7.5.1.1.2
Step 4
11.0 Calculate 100 x (Step4/Step5) (Percent) NA7.5.1.2.2
Step 1a
12.0 Calculate 100 x (Step8/Step5) (Percent) NA7.5.1.1.2
Step 3a
13.0 Pass
Fail
Check pass if both Steps 6 and 9 are both 5
minutes or less AND if both Steps 11 and 12 are ≥
90% and ≤ 110%.
N/A
1250
100
1255
1250
3
1255
3
100
100
OUTDOOR AIR ACCEPTANCE 2022-CEC-NRCA-MCH-02-A
California Energy Commission Page 4 of 4 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Field Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David FolgerBradley
Mechanical12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 1 of 6 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name: Enforcement Agency:
Address:Permit Number:
City, Zip:Permit Application Date:
Building: Floor: Room: Control/tag:
Intent: This Certificate of Acceptance is intended to verify Energy Code compliance for
nonresidential and hotel/motel (see NRCA-MCH-23-A for multi-family) buildings with
newly installed economizers, dedicated outdoor air system (DOAS), Heat Recovery
Ventilation (HRV) systems, and energy recovery ventilation (ERV) system.
Economizers must be certified to the California Energy Commission in compliance with
JA6.3. Submit one Certificate of Acceptance for each economizer, DOAS, HRV, or ERV
system that must demonstrate compliance with the Energy Code. For direct Energy
Code reference see JA6.3, NA7.5.4, §140.4(e), §120.5(a)4, §160.3(d)1D, and
§170.2(c)4C.
Reference Table R-1 (Table 140.4-G)
Climate Zones Fixed Dry Bulb
Differential Dry Bulb
Fixed Enthalpy with
Fixed Dry bulb
1, 3, 5, 11-16 TOA > 75 oF TOA > TRA oF N/A
2, 4, and 10 TOA > 73 oF TOA > TRA – 2 oF N/A
6, 8, 9 TOA > 71 oF TOA > TRA – 4 oF N/A
7 TOA > 69 oF TOA > TRA – 6 oF N/A
All Climate Zones N/A N/A HOA > 28 Btu/LBS. or
TOA > 75 oF
Where: TOA = Outside Air Temperature
TRA = Return Air Temperature
HOA = Outdoor Air Enthalpy
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1.1 Pass
Fail
All documentation shipped with the economizer,
DOAS, HRV, or ERV system including manuals and
sensor performance curves are available for
review.
NA7.5.4.1(d)
1.2 Pass
Fail
Verify that the sensor output value measured
during sensor calibration is plotted on the
performance curve.
NA7.5.4.1(e)
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
N/a first RTU 1Clubs,
Practice Bay
PGA Super store
79-110 California 111
La Quinta, 92253
12/11/24
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 2 of 6 January 1, 2023
Step Entry Item
Code
Reference
2.1 and P, F, or N/A
Verify that the bypass high limit shutoff control for
the economizer, DOAS, HRV, or ERV system
complies with Reference Table R-1
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
2.2 P, F, or N/A
Verify that at altitudes substantially different than
sea level, the Fixed Enthalpy limit value is set to
the enthalpy value at 75°F and 50% relative
humidity. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
3 P, F, or N/A
Alternative to Step 2
If using Dew Point, Fixed Enthalpy, Electronic
Enthalpy, or Differential Enthalpy Controls
Energy Commission Executive Director
approval for use in California must be
attached. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
4 P, F, or N/A
Verify that devices with selectable (rather than
adjustable) setpoints are capable of being set to
within 2°F and 2 Btu/LBS of the setpoint listed.
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
5 P, F, or N/A
Verify that if the high-limit control is fixed dry-bulb
or fixed enthalpy with fixed dry-bulb, it has an
adjustable setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(b)
6 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass lockout control sensor is located to
prevent false readings.
NA7.5.4.1(c)
7.1, or P, F, or N/A
Verify if using damper for bypass control that the
economizer, DOAS, HRV, or ERV system bypass
damper moves freely without binding.
(Pass, Fail, or N/A)
NA7.5.4.1(f)
7.2 P, F, or N/A
Indicate if bypass control is achieved through
heat/energy recovery wheel rotation speed
modulation as means other than air dampers.
(Pass, Fail, or N/A)
NA7.5.4.1(f)1
8 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass has control systems, including two-
stage or electronic thermostats, that cycle
compressors off when the bypass can provide
partial cooling.
NA7.5.4.1(g)
9.0 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Using the documentation provided in Step 1.1,
verify that the air economizer and all air dampers
have ALL of the following features (9.1-9.8).
(Pass, Fail, or N/A-for non-economizers)
NA7.5.4.1(h)
§140.4(e)2D
§170.2(c)4Ciii
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 3 of 6 January 1, 2023
Step Entry Item
Code
Reference
9.1 Pass
Fail
Warranty. 5-year Manufacturer warranty of
economizer assembly.
NA7.5.4.1(h)
§140.4(e)2Di
§170.2(c)4Ciiia
9.2 Pass
Fail
Damper reliability testing. Certification from
suppliers of economizers that the economizer
assembly, including but not limited to outdoor air
damper, return air damper, drive linkage, and
actuator, have been tested and are able to open
and close against the rated airflow and pressure of
the system for 60,000 damper opening and closing
cycles.
NA7.5.4.1(h)
§140.4(e)2Dii
§170.2(c)4Ciiib
9.3 Pass
Fail
Damper leakage. Economizer outdoor air and
return air dampers have a maximum leakage rate
of 10 cfm/sf at 250 Pascals (1.0 in. of water) when
tested in accordance with AMCA Standard 500-D.
NA7.5.4.1(h)
§140.4(e)2Diii
§170.2(c)4Ciiic
9.4 P, F, or N/A
Adjustable setpoint. If the high-limit control is
fixed dry-bulb or fixed enthalpy with fixed dry-bulb
then verify that the control has an adjustable
setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(h)
§140.4(e)2Div
§170.2(c)4Ciiid
9.5 Pass
Fail
Sensor accuracy. Outdoor air, return air, mixed
air, and supply air sensors are calibrated within
the following accuracies.
1. Dry bulb and wet bulb temperatures accurate to
±2°F over the range of 40°F to 80°F.
2. Enthalpy accurate to ±3 Btu/LBS. over the
range of 20 Btu/LBS. to 36 Btu/LBS.
3. Relative humidity (RH) accurate to ±5 percent
over the range of 20 percent to 80 percent RH.
NA7.5.4.1(h)
§140.4(e)2Dv
§170.2(c)4Ciiie
9.6 Pass
Fail
Sensor calibration data. Data used for control of
the economizer is plotted on a sensor performance
curve.
NA7.5.4.1(h)
§140.4(e)2Dvi
§170.2(c)4Ciiif
9.7 Pass
Fail
Sensor high limit control. Sensors used for the
high limit control are located to prevent false
readings, including but not limited to being
properly shielded from direct sunlight.
NA7.5.4.1(h)
§140.4(e)2Dvii
§170.2(c)4Ciiig
9.8 Pass
Fail
Relief air system. Relief air systems is capable of
providing 100 percent outside air without over-
pressurizing the building.
NA7.5.4.1(h)
§140.4(e)2Dviii
§170.2(c)4Ciiih
10 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Verify that the economizer inlet damper is
designed to modulate up to 100 percent open, and
return air damper to 100 percent closed, without
over-pressurizing the building.
(Pass, Fail, or N/A)
NA7.5.4.1(i)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 4 of 6 January 1, 2023
Step Entry Item
Code
Reference
11.1, or P, F, or N/A
For systems with DDC controls verify that lockout
sensor(s) are either factory calibrated or field
calibrated. (Pass, Fail, or N/A)
NA7.5.4.1(j)
11.2 P, F, or N/A
For systems with non-DDC controls, verify that
manufacturer’s startup and testing procedures
have been applied. (Pass, Fail, or N/A)
NA7.5.4.1(k)
12 P, F, or N/A
For economizers only - DOAS, HRV, or ERV
systems enter N/A.
Verify that the economizer has been certified to
the Energy Commission by consulting the CEC Air
Economizer Certified List
(https://www.energy.ca.gov/media/3259).
(Pass, Fail, or N/A)
§140.4(e)2Diii
§170.2(c)4Ciiic
13 Pass
Fail
Check “Pass” if construction inspection complies
with all requirements.
Check “Fail” if construction inspection does not
comply with all requirements.
NA
Table B: Functional Testing for Air Economizer Controls
Step Entry Functional Test
Code
Reference
0 Exception
N/A
For economizers only - DOAS, HRV, or ERV enter
N/A.
If the economizer is installed by the HVAC
system manufacturer technician (not the
economizer technician), then the economizer is
excepted from this functional test (NA7.5.4.2).
Enter Step 0 as “Exception, by-pass all functional
testing and mark Step 7 as passing; otherwise
enter Step 0 as N/A.
§120.5(a)4
Exception
§160.3(d)1D
Exception
1 P, F, or N/A Disable demand control ventilation systems
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 1
2.0 Pass
Fail
Enable the economizer, DOAS, HRV, or ERV
system and simulate a cooling demand large
enough to drive the bypass to fully open position.
Maintain this status for all of Step 2.
NA7.5.4.2
Step 2
2.1 Pass
Fail
Verify either of the following:
1. Using dampers – bypass is 100 percent open,
and return is 100 percent closed; or
2. Using HRV/ERV wheel – wheel is fully stopped.
NA7.5.4.2
Step 2(a)
Step 2(a)1
2.2 Pass
Fail
Verify that all applicable fans and dampers/wheels
operate as intended to maintain building pressure.
NA7.5.4.2
Step 2(b)
2.3 P, F, or N/A Verify that the economizer heating is disabled
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 2(c)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 5 of 6 January 1, 2023
Step Entry Functional Test
Code
Reference
3.0 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 4.
Disable the economizer and simulate a cooling
demand. Maintain this status for all of Step 3.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 3
Step 3(g)
3.1 Pass
Fail
Verify that the economizer damper closes to its
minimum position.
NA7.5.4.2
Step 3(d)
3.2 Pass
Fail
Verify that all applicable fans and dampers
operate as intended to maintain building pressure.
NA7.5.4.2
Step 3(e)
3.3 P, F, or N/A Verify that the unit heating is disabled (if unit has
heating capability). (Pass, Fail, or N/A)
NA7.5.4.2
Step 3(f)
4.0 Pass
Fail
If unit has heating capability, simulate a heating
demand and set economizer, DOAS, HRV, or ERV
systems so that it is capable of operating (i.e.,
actual outdoor air conditions are below lockout
setpoint). Maintain this status for all of Step 4.
NA7.5.4.2
Step 4
4.1 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the economizer damper is at minimum
position. (Pass, Fail, or N/A)
NA7.5.4.2
Step 4(h)
4.2 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the return air damper opens.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(i)
4.3 P, F, or N/A
For DOAS, HRV, or ERV systems only -
economizers enter as N/A and proceed to Step 5.
Verify that the DOAS, HRV, or ERV systems
bypass control modulates bypass damper/wheel
speed to control temperature setpoint.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(j)
5 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 6.
Turn off the unit and verify that the economizer
damper closes completely.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 5
Step 5(k)
6 Pass
Fail
Restore demand control ventilation systems (if
applicable) and remove all system overrides
initiated.
NA7.5.4.2
Step 6
7 Pass
Fail
Check “Pass” if functional test complies with all
requirements.
Check “Fail” if functional test does not comply
with all requirements.
N/A
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 6 of 6 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 1 of 6 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name: Enforcement Agency:
Address:Permit Number:
City, Zip:Permit Application Date:
Building: Floor: Room: Control/tag:
Intent: This Certificate of Acceptance is intended to verify Energy Code compliance for
nonresidential and hotel/motel (see NRCA-MCH-23-A for multi-family) buildings with
newly installed economizers, dedicated outdoor air system (DOAS), Heat Recovery
Ventilation (HRV) systems, and energy recovery ventilation (ERV) system.
Economizers must be certified to the California Energy Commission in compliance with
JA6.3. Submit one Certificate of Acceptance for each economizer, DOAS, HRV, or ERV
system that must demonstrate compliance with the Energy Code. For direct Energy
Code reference see JA6.3, NA7.5.4, §140.4(e), §120.5(a)4, §160.3(d)1D, and
§170.2(c)4C.
Reference Table R-1 (Table 140.4-G)
Climate Zones Fixed Dry Bulb
Differential Dry Bulb
Fixed Enthalpy with
Fixed Dry bulb
1, 3, 5, 11-16 TOA > 75 oF TOA > TRA oF N/A
2, 4, and 10 TOA > 73 oF TOA > TRA – 2 oF N/A
6, 8, 9 TOA > 71 oF TOA > TRA – 4 oF N/A
7 TOA > 69 oF TOA > TRA – 6 oF N/A
All Climate Zones N/A N/A HOA > 28 Btu/LBS. or
TOA > 75 oF
Where: TOA = Outside Air Temperature
TRA = Return Air Temperature
HOA = Outdoor Air Enthalpy
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1.1 Pass
Fail
All documentation shipped with the economizer,
DOAS, HRV, or ERV system including manuals and
sensor performance curves are available for
review.
NA7.5.4.1(d)
1.2 Pass
Fail
Verify that the sensor output value measured
during sensor calibration is plotted on the
performance curve.
NA7.5.4.1(e)
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
N/a first RTU 4Shoes, Juniors
PGA Super store
79-110 California 111
La Quinta, 92253
12/11/24
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 2 of 6 January 1, 2023
Step Entry Item
Code
Reference
2.1 and P, F, or N/A
Verify that the bypass high limit shutoff control for
the economizer, DOAS, HRV, or ERV system
complies with Reference Table R-1
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
2.2 P, F, or N/A
Verify that at altitudes substantially different than
sea level, the Fixed Enthalpy limit value is set to
the enthalpy value at 75°F and 50% relative
humidity. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
3 P, F, or N/A
Alternative to Step 2
If using Dew Point, Fixed Enthalpy, Electronic
Enthalpy, or Differential Enthalpy Controls
Energy Commission Executive Director
approval for use in California must be
attached. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
4 P, F, or N/A
Verify that devices with selectable (rather than
adjustable) setpoints are capable of being set to
within 2°F and 2 Btu/LBS of the setpoint listed.
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
5 P, F, or N/A
Verify that if the high-limit control is fixed dry-bulb
or fixed enthalpy with fixed dry-bulb, it has an
adjustable setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(b)
6 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass lockout control sensor is located to
prevent false readings.
NA7.5.4.1(c)
7.1, or P, F, or N/A
Verify if using damper for bypass control that the
economizer, DOAS, HRV, or ERV system bypass
damper moves freely without binding.
(Pass, Fail, or N/A)
NA7.5.4.1(f)
7.2 P, F, or N/A
Indicate if bypass control is achieved through
heat/energy recovery wheel rotation speed
modulation as means other than air dampers.
(Pass, Fail, or N/A)
NA7.5.4.1(f)1
8 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass has control systems, including two-
stage or electronic thermostats, that cycle
compressors off when the bypass can provide
partial cooling.
NA7.5.4.1(g)
9.0 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Using the documentation provided in Step 1.1,
verify that the air economizer and all air dampers
have ALL of the following features (9.1-9.8).
(Pass, Fail, or N/A-for non-economizers)
NA7.5.4.1(h)
§140.4(e)2D
§170.2(c)4Ciii
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 3 of 6 January 1, 2023
Step Entry Item
Code
Reference
9.1 Pass
Fail
Warranty. 5-year Manufacturer warranty of
economizer assembly.
NA7.5.4.1(h)
§140.4(e)2Di
§170.2(c)4Ciiia
9.2 Pass
Fail
Damper reliability testing. Certification from
suppliers of economizers that the economizer
assembly, including but not limited to outdoor air
damper, return air damper, drive linkage, and
actuator, have been tested and are able to open
and close against the rated airflow and pressure of
the system for 60,000 damper opening and closing
cycles.
NA7.5.4.1(h)
§140.4(e)2Dii
§170.2(c)4Ciiib
9.3 Pass
Fail
Damper leakage. Economizer outdoor air and
return air dampers have a maximum leakage rate
of 10 cfm/sf at 250 Pascals (1.0 in. of water) when
tested in accordance with AMCA Standard 500-D.
NA7.5.4.1(h)
§140.4(e)2Diii
§170.2(c)4Ciiic
9.4 P, F, or N/A
Adjustable setpoint. If the high-limit control is
fixed dry-bulb or fixed enthalpy with fixed dry-bulb
then verify that the control has an adjustable
setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(h)
§140.4(e)2Div
§170.2(c)4Ciiid
9.5 Pass
Fail
Sensor accuracy. Outdoor air, return air, mixed
air, and supply air sensors are calibrated within
the following accuracies.
1. Dry bulb and wet bulb temperatures accurate to
±2°F over the range of 40°F to 80°F.
2. Enthalpy accurate to ±3 Btu/LBS. over the
range of 20 Btu/LBS. to 36 Btu/LBS.
3. Relative humidity (RH) accurate to ±5 percent
over the range of 20 percent to 80 percent RH.
NA7.5.4.1(h)
§140.4(e)2Dv
§170.2(c)4Ciiie
9.6 Pass
Fail
Sensor calibration data. Data used for control of
the economizer is plotted on a sensor performance
curve.
NA7.5.4.1(h)
§140.4(e)2Dvi
§170.2(c)4Ciiif
9.7 Pass
Fail
Sensor high limit control. Sensors used for the
high limit control are located to prevent false
readings, including but not limited to being
properly shielded from direct sunlight.
NA7.5.4.1(h)
§140.4(e)2Dvii
§170.2(c)4Ciiig
9.8 Pass
Fail
Relief air system. Relief air systems is capable of
providing 100 percent outside air without over-
pressurizing the building.
NA7.5.4.1(h)
§140.4(e)2Dviii
§170.2(c)4Ciiih
10 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Verify that the economizer inlet damper is
designed to modulate up to 100 percent open, and
return air damper to 100 percent closed, without
over-pressurizing the building.
(Pass, Fail, or N/A)
NA7.5.4.1(i)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 4 of 6 January 1, 2023
Step Entry Item
Code
Reference
11.1, or P, F, or N/A
For systems with DDC controls verify that lockout
sensor(s) are either factory calibrated or field
calibrated. (Pass, Fail, or N/A)
NA7.5.4.1(j)
11.2 P, F, or N/A
For systems with non-DDC controls, verify that
manufacturer’s startup and testing procedures
have been applied. (Pass, Fail, or N/A)
NA7.5.4.1(k)
12 P, F, or N/A
For economizers only - DOAS, HRV, or ERV
systems enter N/A.
Verify that the economizer has been certified to
the Energy Commission by consulting the CEC Air
Economizer Certified List
(https://www.energy.ca.gov/media/3259).
(Pass, Fail, or N/A)
§140.4(e)2Diii
§170.2(c)4Ciiic
13 Pass
Fail
Check “Pass” if construction inspection complies
with all requirements.
Check “Fail” if construction inspection does not
comply with all requirements.
NA
Table B: Functional Testing for Air Economizer Controls
Step Entry Functional Test
Code
Reference
0 Exception
N/A
For economizers only - DOAS, HRV, or ERV enter
N/A.
If the economizer is installed by the HVAC
system manufacturer technician (not the
economizer technician), then the economizer is
excepted from this functional test (NA7.5.4.2).
Enter Step 0 as “Exception, by-pass all functional
testing and mark Step 7 as passing; otherwise
enter Step 0 as N/A.
§120.5(a)4
Exception
§160.3(d)1D
Exception
1 P, F, or N/A Disable demand control ventilation systems
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 1
2.0 Pass
Fail
Enable the economizer, DOAS, HRV, or ERV
system and simulate a cooling demand large
enough to drive the bypass to fully open position.
Maintain this status for all of Step 2.
NA7.5.4.2
Step 2
2.1 Pass
Fail
Verify either of the following:
1. Using dampers – bypass is 100 percent open,
and return is 100 percent closed; or
2. Using HRV/ERV wheel – wheel is fully stopped.
NA7.5.4.2
Step 2(a)
Step 2(a)1
2.2 Pass
Fail
Verify that all applicable fans and dampers/wheels
operate as intended to maintain building pressure.
NA7.5.4.2
Step 2(b)
2.3 P, F, or N/A Verify that the economizer heating is disabled
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 2(c)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 5 of 6 January 1, 2023
Step Entry Functional Test
Code
Reference
3.0 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 4.
Disable the economizer and simulate a cooling
demand. Maintain this status for all of Step 3.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 3
Step 3(g)
3.1 Pass
Fail
Verify that the economizer damper closes to its
minimum position.
NA7.5.4.2
Step 3(d)
3.2 Pass
Fail
Verify that all applicable fans and dampers
operate as intended to maintain building pressure.
NA7.5.4.2
Step 3(e)
3.3 P, F, or N/A Verify that the unit heating is disabled (if unit has
heating capability). (Pass, Fail, or N/A)
NA7.5.4.2
Step 3(f)
4.0 Pass
Fail
If unit has heating capability, simulate a heating
demand and set economizer, DOAS, HRV, or ERV
systems so that it is capable of operating (i.e.,
actual outdoor air conditions are below lockout
setpoint). Maintain this status for all of Step 4.
NA7.5.4.2
Step 4
4.1 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the economizer damper is at minimum
position. (Pass, Fail, or N/A)
NA7.5.4.2
Step 4(h)
4.2 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the return air damper opens.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(i)
4.3 P, F, or N/A
For DOAS, HRV, or ERV systems only -
economizers enter as N/A and proceed to Step 5.
Verify that the DOAS, HRV, or ERV systems
bypass control modulates bypass damper/wheel
speed to control temperature setpoint.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(j)
5 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 6.
Turn off the unit and verify that the economizer
damper closes completely.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 5
Step 5(k)
6 Pass
Fail
Restore demand control ventilation systems (if
applicable) and remove all system overrides
initiated.
NA7.5.4.2
Step 6
7 Pass
Fail
Check “Pass” if functional test complies with all
requirements.
Check “Fail” if functional test does not comply
with all requirements.
N/A
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 6 of 6 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 1 of 6 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name: Enforcement Agency:
Address:Permit Number:
City, Zip:Permit Application Date:
Building: Floor: Room: Control/tag:
Intent: This Certificate of Acceptance is intended to verify Energy Code compliance for
nonresidential and hotel/motel (see NRCA-MCH-23-A for multi-family) buildings with
newly installed economizers, dedicated outdoor air system (DOAS), Heat Recovery
Ventilation (HRV) systems, and energy recovery ventilation (ERV) system.
Economizers must be certified to the California Energy Commission in compliance with
JA6.3. Submit one Certificate of Acceptance for each economizer, DOAS, HRV, or ERV
system that must demonstrate compliance with the Energy Code. For direct Energy
Code reference see JA6.3, NA7.5.4, §140.4(e), §120.5(a)4, §160.3(d)1D, and
§170.2(c)4C.
Reference Table R-1 (Table 140.4-G)
Climate Zones Fixed Dry Bulb
Differential Dry Bulb
Fixed Enthalpy with
Fixed Dry bulb
1, 3, 5, 11-16 TOA > 75 oF TOA > TRA oF N/A
2, 4, and 10 TOA > 73 oF TOA > TRA – 2 oF N/A
6, 8, 9 TOA > 71 oF TOA > TRA – 4 oF N/A
7 TOA > 69 oF TOA > TRA – 6 oF N/A
All Climate Zones N/A N/A HOA > 28 Btu/LBS. or
TOA > 75 oF
Where: TOA = Outside Air Temperature
TRA = Return Air Temperature
HOA = Outdoor Air Enthalpy
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1.1 Pass
Fail
All documentation shipped with the economizer,
DOAS, HRV, or ERV system including manuals and
sensor performance curves are available for
review.
NA7.5.4.1(d)
1.2 Pass
Fail
Verify that the sensor output value measured
during sensor calibration is plotted on the
performance curve.
NA7.5.4.1(e)
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
N/a first RTU 2Green, Mens
PGA Super store
79-110 California 111
La Quinta, 92253
12/11/24
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 2 of 6 January 1, 2023
Step Entry Item
Code
Reference
2.1 and P, F, or N/A
Verify that the bypass high limit shutoff control for
the economizer, DOAS, HRV, or ERV system
complies with Reference Table R-1
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
2.2 P, F, or N/A
Verify that at altitudes substantially different than
sea level, the Fixed Enthalpy limit value is set to
the enthalpy value at 75°F and 50% relative
humidity. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
3 P, F, or N/A
Alternative to Step 2
If using Dew Point, Fixed Enthalpy, Electronic
Enthalpy, or Differential Enthalpy Controls
Energy Commission Executive Director
approval for use in California must be
attached. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
4 P, F, or N/A
Verify that devices with selectable (rather than
adjustable) setpoints are capable of being set to
within 2°F and 2 Btu/LBS of the setpoint listed.
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
5 P, F, or N/A
Verify that if the high-limit control is fixed dry-bulb
or fixed enthalpy with fixed dry-bulb, it has an
adjustable setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(b)
6 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass lockout control sensor is located to
prevent false readings.
NA7.5.4.1(c)
7.1, or P, F, or N/A
Verify if using damper for bypass control that the
economizer, DOAS, HRV, or ERV system bypass
damper moves freely without binding.
(Pass, Fail, or N/A)
NA7.5.4.1(f)
7.2 P, F, or N/A
Indicate if bypass control is achieved through
heat/energy recovery wheel rotation speed
modulation as means other than air dampers.
(Pass, Fail, or N/A)
NA7.5.4.1(f)1
8 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass has control systems, including two-
stage or electronic thermostats, that cycle
compressors off when the bypass can provide
partial cooling.
NA7.5.4.1(g)
9.0 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Using the documentation provided in Step 1.1,
verify that the air economizer and all air dampers
have ALL of the following features (9.1-9.8).
(Pass, Fail, or N/A-for non-economizers)
NA7.5.4.1(h)
§140.4(e)2D
§170.2(c)4Ciii
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 3 of 6 January 1, 2023
Step Entry Item
Code
Reference
9.1 Pass
Fail
Warranty. 5-year Manufacturer warranty of
economizer assembly.
NA7.5.4.1(h)
§140.4(e)2Di
§170.2(c)4Ciiia
9.2 Pass
Fail
Damper reliability testing. Certification from
suppliers of economizers that the economizer
assembly, including but not limited to outdoor air
damper, return air damper, drive linkage, and
actuator, have been tested and are able to open
and close against the rated airflow and pressure of
the system for 60,000 damper opening and closing
cycles.
NA7.5.4.1(h)
§140.4(e)2Dii
§170.2(c)4Ciiib
9.3 Pass
Fail
Damper leakage. Economizer outdoor air and
return air dampers have a maximum leakage rate
of 10 cfm/sf at 250 Pascals (1.0 in. of water) when
tested in accordance with AMCA Standard 500-D.
NA7.5.4.1(h)
§140.4(e)2Diii
§170.2(c)4Ciiic
9.4 P, F, or N/A
Adjustable setpoint. If the high-limit control is
fixed dry-bulb or fixed enthalpy with fixed dry-bulb
then verify that the control has an adjustable
setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(h)
§140.4(e)2Div
§170.2(c)4Ciiid
9.5 Pass
Fail
Sensor accuracy. Outdoor air, return air, mixed
air, and supply air sensors are calibrated within
the following accuracies.
1. Dry bulb and wet bulb temperatures accurate to
±2°F over the range of 40°F to 80°F.
2. Enthalpy accurate to ±3 Btu/LBS. over the
range of 20 Btu/LBS. to 36 Btu/LBS.
3. Relative humidity (RH) accurate to ±5 percent
over the range of 20 percent to 80 percent RH.
NA7.5.4.1(h)
§140.4(e)2Dv
§170.2(c)4Ciiie
9.6 Pass
Fail
Sensor calibration data. Data used for control of
the economizer is plotted on a sensor performance
curve.
NA7.5.4.1(h)
§140.4(e)2Dvi
§170.2(c)4Ciiif
9.7 Pass
Fail
Sensor high limit control. Sensors used for the
high limit control are located to prevent false
readings, including but not limited to being
properly shielded from direct sunlight.
NA7.5.4.1(h)
§140.4(e)2Dvii
§170.2(c)4Ciiig
9.8 Pass
Fail
Relief air system. Relief air systems is capable of
providing 100 percent outside air without over-
pressurizing the building.
NA7.5.4.1(h)
§140.4(e)2Dviii
§170.2(c)4Ciiih
10 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Verify that the economizer inlet damper is
designed to modulate up to 100 percent open, and
return air damper to 100 percent closed, without
over-pressurizing the building.
(Pass, Fail, or N/A)
NA7.5.4.1(i)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 4 of 6 January 1, 2023
Step Entry Item
Code
Reference
11.1, or P, F, or N/A
For systems with DDC controls verify that lockout
sensor(s) are either factory calibrated or field
calibrated. (Pass, Fail, or N/A)
NA7.5.4.1(j)
11.2 P, F, or N/A
For systems with non-DDC controls, verify that
manufacturer’s startup and testing procedures
have been applied. (Pass, Fail, or N/A)
NA7.5.4.1(k)
12 P, F, or N/A
For economizers only - DOAS, HRV, or ERV
systems enter N/A.
Verify that the economizer has been certified to
the Energy Commission by consulting the CEC Air
Economizer Certified List
(https://www.energy.ca.gov/media/3259).
(Pass, Fail, or N/A)
§140.4(e)2Diii
§170.2(c)4Ciiic
13 Pass
Fail
Check “Pass” if construction inspection complies
with all requirements.
Check “Fail” if construction inspection does not
comply with all requirements.
NA
Table B: Functional Testing for Air Economizer Controls
Step Entry Functional Test
Code
Reference
0 Exception
N/A
For economizers only - DOAS, HRV, or ERV enter
N/A.
If the economizer is installed by the HVAC
system manufacturer technician (not the
economizer technician), then the economizer is
excepted from this functional test (NA7.5.4.2).
Enter Step 0 as “Exception, by-pass all functional
testing and mark Step 7 as passing; otherwise
enter Step 0 as N/A.
§120.5(a)4
Exception
§160.3(d)1D
Exception
1 P, F, or N/A Disable demand control ventilation systems
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 1
2.0 Pass
Fail
Enable the economizer, DOAS, HRV, or ERV
system and simulate a cooling demand large
enough to drive the bypass to fully open position.
Maintain this status for all of Step 2.
NA7.5.4.2
Step 2
2.1 Pass
Fail
Verify either of the following:
1. Using dampers – bypass is 100 percent open,
and return is 100 percent closed; or
2. Using HRV/ERV wheel – wheel is fully stopped.
NA7.5.4.2
Step 2(a)
Step 2(a)1
2.2 Pass
Fail
Verify that all applicable fans and dampers/wheels
operate as intended to maintain building pressure.
NA7.5.4.2
Step 2(b)
2.3 P, F, or N/A Verify that the economizer heating is disabled
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 2(c)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 5 of 6 January 1, 2023
Step Entry Functional Test
Code
Reference
3.0 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 4.
Disable the economizer and simulate a cooling
demand. Maintain this status for all of Step 3.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 3
Step 3(g)
3.1 Pass
Fail
Verify that the economizer damper closes to its
minimum position.
NA7.5.4.2
Step 3(d)
3.2 Pass
Fail
Verify that all applicable fans and dampers
operate as intended to maintain building pressure.
NA7.5.4.2
Step 3(e)
3.3 P, F, or N/A Verify that the unit heating is disabled (if unit has
heating capability). (Pass, Fail, or N/A)
NA7.5.4.2
Step 3(f)
4.0 Pass
Fail
If unit has heating capability, simulate a heating
demand and set economizer, DOAS, HRV, or ERV
systems so that it is capable of operating (i.e.,
actual outdoor air conditions are below lockout
setpoint). Maintain this status for all of Step 4.
NA7.5.4.2
Step 4
4.1 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the economizer damper is at minimum
position. (Pass, Fail, or N/A)
NA7.5.4.2
Step 4(h)
4.2 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the return air damper opens.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(i)
4.3 P, F, or N/A
For DOAS, HRV, or ERV systems only -
economizers enter as N/A and proceed to Step 5.
Verify that the DOAS, HRV, or ERV systems
bypass control modulates bypass damper/wheel
speed to control temperature setpoint.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(j)
5 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 6.
Turn off the unit and verify that the economizer
damper closes completely.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 5
Step 5(k)
6 Pass
Fail
Restore demand control ventilation systems (if
applicable) and remove all system overrides
initiated.
NA7.5.4.2
Step 6
7 Pass
Fail
Check “Pass” if functional test complies with all
requirements.
Check “Fail” if functional test does not comply
with all requirements.
N/A
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 6 of 6 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 1 of 6 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name: Enforcement Agency:
Address:Permit Number:
City, Zip:Permit Application Date:
Building: Floor: Room: Control/tag:
Intent: This Certificate of Acceptance is intended to verify Energy Code compliance for
nonresidential and hotel/motel (see NRCA-MCH-23-A for multi-family) buildings with
newly installed economizers, dedicated outdoor air system (DOAS), Heat Recovery
Ventilation (HRV) systems, and energy recovery ventilation (ERV) system.
Economizers must be certified to the California Energy Commission in compliance with
JA6.3. Submit one Certificate of Acceptance for each economizer, DOAS, HRV, or ERV
system that must demonstrate compliance with the Energy Code. For direct Energy
Code reference see JA6.3, NA7.5.4, §140.4(e), §120.5(a)4, §160.3(d)1D, and
§170.2(c)4C.
Reference Table R-1 (Table 140.4-G)
Climate Zones Fixed Dry Bulb
Differential Dry Bulb
Fixed Enthalpy with
Fixed Dry bulb
1, 3, 5, 11-16 TOA > 75 oF TOA > TRA oF N/A
2, 4, and 10 TOA > 73 oF TOA > TRA – 2 oF N/A
6, 8, 9 TOA > 71 oF TOA > TRA – 4 oF N/A
7 TOA > 69 oF TOA > TRA – 6 oF N/A
All Climate Zones N/A N/A HOA > 28 Btu/LBS. or
TOA > 75 oF
Where: TOA = Outside Air Temperature
TRA = Return Air Temperature
HOA = Outdoor Air Enthalpy
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1.1 Pass
Fail
All documentation shipped with the economizer,
DOAS, HRV, or ERV system including manuals and
sensor performance curves are available for
review.
NA7.5.4.1(d)
1.2 Pass
Fail
Verify that the sensor output value measured
during sensor calibration is plotted on the
performance curve.
NA7.5.4.1(e)
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
N/a first RTU 5Bags, Studios
PGA Super store
79-110 California 111
La Quinta, 92253
12/11/24
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 2 of 6 January 1, 2023
Step Entry Item
Code
Reference
2.1 and P, F, or N/A
Verify that the bypass high limit shutoff control for
the economizer, DOAS, HRV, or ERV system
complies with Reference Table R-1
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
2.2 P, F, or N/A
Verify that at altitudes substantially different than
sea level, the Fixed Enthalpy limit value is set to
the enthalpy value at 75°F and 50% relative
humidity. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
3 P, F, or N/A
Alternative to Step 2
If using Dew Point, Fixed Enthalpy, Electronic
Enthalpy, or Differential Enthalpy Controls
Energy Commission Executive Director
approval for use in California must be
attached. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
4 P, F, or N/A
Verify that devices with selectable (rather than
adjustable) setpoints are capable of being set to
within 2°F and 2 Btu/LBS of the setpoint listed.
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
5 P, F, or N/A
Verify that if the high-limit control is fixed dry-bulb
or fixed enthalpy with fixed dry-bulb, it has an
adjustable setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(b)
6 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass lockout control sensor is located to
prevent false readings.
NA7.5.4.1(c)
7.1, or P, F, or N/A
Verify if using damper for bypass control that the
economizer, DOAS, HRV, or ERV system bypass
damper moves freely without binding.
(Pass, Fail, or N/A)
NA7.5.4.1(f)
7.2 P, F, or N/A
Indicate if bypass control is achieved through
heat/energy recovery wheel rotation speed
modulation as means other than air dampers.
(Pass, Fail, or N/A)
NA7.5.4.1(f)1
8 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass has control systems, including two-
stage or electronic thermostats, that cycle
compressors off when the bypass can provide
partial cooling.
NA7.5.4.1(g)
9.0 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Using the documentation provided in Step 1.1,
verify that the air economizer and all air dampers
have ALL of the following features (9.1-9.8).
(Pass, Fail, or N/A-for non-economizers)
NA7.5.4.1(h)
§140.4(e)2D
§170.2(c)4Ciii
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 3 of 6 January 1, 2023
Step Entry Item
Code
Reference
9.1 Pass
Fail
Warranty. 5-year Manufacturer warranty of
economizer assembly.
NA7.5.4.1(h)
§140.4(e)2Di
§170.2(c)4Ciiia
9.2 Pass
Fail
Damper reliability testing. Certification from
suppliers of economizers that the economizer
assembly, including but not limited to outdoor air
damper, return air damper, drive linkage, and
actuator, have been tested and are able to open
and close against the rated airflow and pressure of
the system for 60,000 damper opening and closing
cycles.
NA7.5.4.1(h)
§140.4(e)2Dii
§170.2(c)4Ciiib
9.3 Pass
Fail
Damper leakage. Economizer outdoor air and
return air dampers have a maximum leakage rate
of 10 cfm/sf at 250 Pascals (1.0 in. of water) when
tested in accordance with AMCA Standard 500-D.
NA7.5.4.1(h)
§140.4(e)2Diii
§170.2(c)4Ciiic
9.4 P, F, or N/A
Adjustable setpoint. If the high-limit control is
fixed dry-bulb or fixed enthalpy with fixed dry-bulb
then verify that the control has an adjustable
setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(h)
§140.4(e)2Div
§170.2(c)4Ciiid
9.5 Pass
Fail
Sensor accuracy. Outdoor air, return air, mixed
air, and supply air sensors are calibrated within
the following accuracies.
1. Dry bulb and wet bulb temperatures accurate to
±2°F over the range of 40°F to 80°F.
2. Enthalpy accurate to ±3 Btu/LBS. over the
range of 20 Btu/LBS. to 36 Btu/LBS.
3. Relative humidity (RH) accurate to ±5 percent
over the range of 20 percent to 80 percent RH.
NA7.5.4.1(h)
§140.4(e)2Dv
§170.2(c)4Ciiie
9.6 Pass
Fail
Sensor calibration data. Data used for control of
the economizer is plotted on a sensor performance
curve.
NA7.5.4.1(h)
§140.4(e)2Dvi
§170.2(c)4Ciiif
9.7 Pass
Fail
Sensor high limit control. Sensors used for the
high limit control are located to prevent false
readings, including but not limited to being
properly shielded from direct sunlight.
NA7.5.4.1(h)
§140.4(e)2Dvii
§170.2(c)4Ciiig
9.8 Pass
Fail
Relief air system. Relief air systems is capable of
providing 100 percent outside air without over-
pressurizing the building.
NA7.5.4.1(h)
§140.4(e)2Dviii
§170.2(c)4Ciiih
10 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Verify that the economizer inlet damper is
designed to modulate up to 100 percent open, and
return air damper to 100 percent closed, without
over-pressurizing the building.
(Pass, Fail, or N/A)
NA7.5.4.1(i)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 4 of 6 January 1, 2023
Step Entry Item
Code
Reference
11.1, or P, F, or N/A
For systems with DDC controls verify that lockout
sensor(s) are either factory calibrated or field
calibrated. (Pass, Fail, or N/A)
NA7.5.4.1(j)
11.2 P, F, or N/A
For systems with non-DDC controls, verify that
manufacturer’s startup and testing procedures
have been applied. (Pass, Fail, or N/A)
NA7.5.4.1(k)
12 P, F, or N/A
For economizers only - DOAS, HRV, or ERV
systems enter N/A.
Verify that the economizer has been certified to
the Energy Commission by consulting the CEC Air
Economizer Certified List
(https://www.energy.ca.gov/media/3259).
(Pass, Fail, or N/A)
§140.4(e)2Diii
§170.2(c)4Ciiic
13 Pass
Fail
Check “Pass” if construction inspection complies
with all requirements.
Check “Fail” if construction inspection does not
comply with all requirements.
NA
Table B: Functional Testing for Air Economizer Controls
Step Entry Functional Test
Code
Reference
0 Exception
N/A
For economizers only - DOAS, HRV, or ERV enter
N/A.
If the economizer is installed by the HVAC
system manufacturer technician (not the
economizer technician), then the economizer is
excepted from this functional test (NA7.5.4.2).
Enter Step 0 as “Exception, by-pass all functional
testing and mark Step 7 as passing; otherwise
enter Step 0 as N/A.
§120.5(a)4
Exception
§160.3(d)1D
Exception
1 P, F, or N/A Disable demand control ventilation systems
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 1
2.0 Pass
Fail
Enable the economizer, DOAS, HRV, or ERV
system and simulate a cooling demand large
enough to drive the bypass to fully open position.
Maintain this status for all of Step 2.
NA7.5.4.2
Step 2
2.1 Pass
Fail
Verify either of the following:
1. Using dampers – bypass is 100 percent open,
and return is 100 percent closed; or
2. Using HRV/ERV wheel – wheel is fully stopped.
NA7.5.4.2
Step 2(a)
Step 2(a)1
2.2 Pass
Fail
Verify that all applicable fans and dampers/wheels
operate as intended to maintain building pressure.
NA7.5.4.2
Step 2(b)
2.3 P, F, or N/A Verify that the economizer heating is disabled
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 2(c)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 5 of 6 January 1, 2023
Step Entry Functional Test
Code
Reference
3.0 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 4.
Disable the economizer and simulate a cooling
demand. Maintain this status for all of Step 3.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 3
Step 3(g)
3.1 Pass
Fail
Verify that the economizer damper closes to its
minimum position.
NA7.5.4.2
Step 3(d)
3.2 Pass
Fail
Verify that all applicable fans and dampers
operate as intended to maintain building pressure.
NA7.5.4.2
Step 3(e)
3.3 P, F, or N/A Verify that the unit heating is disabled (if unit has
heating capability). (Pass, Fail, or N/A)
NA7.5.4.2
Step 3(f)
4.0 Pass
Fail
If unit has heating capability, simulate a heating
demand and set economizer, DOAS, HRV, or ERV
systems so that it is capable of operating (i.e.,
actual outdoor air conditions are below lockout
setpoint). Maintain this status for all of Step 4.
NA7.5.4.2
Step 4
4.1 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the economizer damper is at minimum
position. (Pass, Fail, or N/A)
NA7.5.4.2
Step 4(h)
4.2 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the return air damper opens.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(i)
4.3 P, F, or N/A
For DOAS, HRV, or ERV systems only -
economizers enter as N/A and proceed to Step 5.
Verify that the DOAS, HRV, or ERV systems
bypass control modulates bypass damper/wheel
speed to control temperature setpoint.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(j)
5 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 6.
Turn off the unit and verify that the economizer
damper closes completely.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 5
Step 5(k)
6 Pass
Fail
Restore demand control ventilation systems (if
applicable) and remove all system overrides
initiated.
NA7.5.4.2
Step 6
7 Pass
Fail
Check “Pass” if functional test complies with all
requirements.
Check “Fail” if functional test does not comply
with all requirements.
N/A
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 6 of 6 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 1 of 6 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name: Enforcement Agency:
Address:Permit Number:
City, Zip:Permit Application Date:
Building: Floor: Room: Control/tag:
Intent: This Certificate of Acceptance is intended to verify Energy Code compliance for
nonresidential and hotel/motel (see NRCA-MCH-23-A for multi-family) buildings with
newly installed economizers, dedicated outdoor air system (DOAS), Heat Recovery
Ventilation (HRV) systems, and energy recovery ventilation (ERV) system.
Economizers must be certified to the California Energy Commission in compliance with
JA6.3. Submit one Certificate of Acceptance for each economizer, DOAS, HRV, or ERV
system that must demonstrate compliance with the Energy Code. For direct Energy
Code reference see JA6.3, NA7.5.4, §140.4(e), §120.5(a)4, §160.3(d)1D, and
§170.2(c)4C.
Reference Table R-1 (Table 140.4-G)
Climate Zones Fixed Dry Bulb
Differential Dry Bulb
Fixed Enthalpy with
Fixed Dry bulb
1, 3, 5, 11-16 TOA > 75 oF TOA > TRA oF N/A
2, 4, and 10 TOA > 73 oF TOA > TRA – 2 oF N/A
6, 8, 9 TOA > 71 oF TOA > TRA – 4 oF N/A
7 TOA > 69 oF TOA > TRA – 6 oF N/A
All Climate Zones N/A N/A HOA > 28 Btu/LBS. or
TOA > 75 oF
Where: TOA = Outside Air Temperature
TRA = Return Air Temperature
HOA = Outdoor Air Enthalpy
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1.1 Pass
Fail
All documentation shipped with the economizer,
DOAS, HRV, or ERV system including manuals and
sensor performance curves are available for
review.
NA7.5.4.1(d)
1.2 Pass
Fail
Verify that the sensor output value measured
during sensor calibration is plotted on the
performance curve.
NA7.5.4.1(e)
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
N/a first RTU 3Accessories
PGA Super store
79-110 California 111
La Quinta, 92253
12/11/24
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 2 of 6 January 1, 2023
Step Entry Item
Code
Reference
2.1 and P, F, or N/A
Verify that the bypass high limit shutoff control for
the economizer, DOAS, HRV, or ERV system
complies with Reference Table R-1
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
2.2 P, F, or N/A
Verify that at altitudes substantially different than
sea level, the Fixed Enthalpy limit value is set to
the enthalpy value at 75°F and 50% relative
humidity. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
3 P, F, or N/A
Alternative to Step 2
If using Dew Point, Fixed Enthalpy, Electronic
Enthalpy, or Differential Enthalpy Controls
Energy Commission Executive Director
approval for use in California must be
attached. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
4 P, F, or N/A
Verify that devices with selectable (rather than
adjustable) setpoints are capable of being set to
within 2°F and 2 Btu/LBS of the setpoint listed.
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
5 P, F, or N/A
Verify that if the high-limit control is fixed dry-bulb
or fixed enthalpy with fixed dry-bulb, it has an
adjustable setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(b)
6 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass lockout control sensor is located to
prevent false readings.
NA7.5.4.1(c)
7.1, or P, F, or N/A
Verify if using damper for bypass control that the
economizer, DOAS, HRV, or ERV system bypass
damper moves freely without binding.
(Pass, Fail, or N/A)
NA7.5.4.1(f)
7.2 P, F, or N/A
Indicate if bypass control is achieved through
heat/energy recovery wheel rotation speed
modulation as means other than air dampers.
(Pass, Fail, or N/A)
NA7.5.4.1(f)1
8 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass has control systems, including two-
stage or electronic thermostats, that cycle
compressors off when the bypass can provide
partial cooling.
NA7.5.4.1(g)
9.0 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Using the documentation provided in Step 1.1,
verify that the air economizer and all air dampers
have ALL of the following features (9.1-9.8).
(Pass, Fail, or N/A-for non-economizers)
NA7.5.4.1(h)
§140.4(e)2D
§170.2(c)4Ciii
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 3 of 6 January 1, 2023
Step Entry Item
Code
Reference
9.1 Pass
Fail
Warranty. 5-year Manufacturer warranty of
economizer assembly.
NA7.5.4.1(h)
§140.4(e)2Di
§170.2(c)4Ciiia
9.2 Pass
Fail
Damper reliability testing. Certification from
suppliers of economizers that the economizer
assembly, including but not limited to outdoor air
damper, return air damper, drive linkage, and
actuator, have been tested and are able to open
and close against the rated airflow and pressure of
the system for 60,000 damper opening and closing
cycles.
NA7.5.4.1(h)
§140.4(e)2Dii
§170.2(c)4Ciiib
9.3 Pass
Fail
Damper leakage. Economizer outdoor air and
return air dampers have a maximum leakage rate
of 10 cfm/sf at 250 Pascals (1.0 in. of water) when
tested in accordance with AMCA Standard 500-D.
NA7.5.4.1(h)
§140.4(e)2Diii
§170.2(c)4Ciiic
9.4 P, F, or N/A
Adjustable setpoint. If the high-limit control is
fixed dry-bulb or fixed enthalpy with fixed dry-bulb
then verify that the control has an adjustable
setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(h)
§140.4(e)2Div
§170.2(c)4Ciiid
9.5 Pass
Fail
Sensor accuracy. Outdoor air, return air, mixed
air, and supply air sensors are calibrated within
the following accuracies.
1. Dry bulb and wet bulb temperatures accurate to
±2°F over the range of 40°F to 80°F.
2. Enthalpy accurate to ±3 Btu/LBS. over the
range of 20 Btu/LBS. to 36 Btu/LBS.
3. Relative humidity (RH) accurate to ±5 percent
over the range of 20 percent to 80 percent RH.
NA7.5.4.1(h)
§140.4(e)2Dv
§170.2(c)4Ciiie
9.6 Pass
Fail
Sensor calibration data. Data used for control of
the economizer is plotted on a sensor performance
curve.
NA7.5.4.1(h)
§140.4(e)2Dvi
§170.2(c)4Ciiif
9.7 Pass
Fail
Sensor high limit control. Sensors used for the
high limit control are located to prevent false
readings, including but not limited to being
properly shielded from direct sunlight.
NA7.5.4.1(h)
§140.4(e)2Dvii
§170.2(c)4Ciiig
9.8 Pass
Fail
Relief air system. Relief air systems is capable of
providing 100 percent outside air without over-
pressurizing the building.
NA7.5.4.1(h)
§140.4(e)2Dviii
§170.2(c)4Ciiih
10 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Verify that the economizer inlet damper is
designed to modulate up to 100 percent open, and
return air damper to 100 percent closed, without
over-pressurizing the building.
(Pass, Fail, or N/A)
NA7.5.4.1(i)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 4 of 6 January 1, 2023
Step Entry Item
Code
Reference
11.1, or P, F, or N/A
For systems with DDC controls verify that lockout
sensor(s) are either factory calibrated or field
calibrated. (Pass, Fail, or N/A)
NA7.5.4.1(j)
11.2 P, F, or N/A
For systems with non-DDC controls, verify that
manufacturer’s startup and testing procedures
have been applied. (Pass, Fail, or N/A)
NA7.5.4.1(k)
12 P, F, or N/A
For economizers only - DOAS, HRV, or ERV
systems enter N/A.
Verify that the economizer has been certified to
the Energy Commission by consulting the CEC Air
Economizer Certified List
(https://www.energy.ca.gov/media/3259).
(Pass, Fail, or N/A)
§140.4(e)2Diii
§170.2(c)4Ciiic
13 Pass
Fail
Check “Pass” if construction inspection complies
with all requirements.
Check “Fail” if construction inspection does not
comply with all requirements.
NA
Table B: Functional Testing for Air Economizer Controls
Step Entry Functional Test
Code
Reference
0 Exception
N/A
For economizers only - DOAS, HRV, or ERV enter
N/A.
If the economizer is installed by the HVAC
system manufacturer technician (not the
economizer technician), then the economizer is
excepted from this functional test (NA7.5.4.2).
Enter Step 0 as “Exception, by-pass all functional
testing and mark Step 7 as passing; otherwise
enter Step 0 as N/A.
§120.5(a)4
Exception
§160.3(d)1D
Exception
1 P, F, or N/A Disable demand control ventilation systems
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 1
2.0 Pass
Fail
Enable the economizer, DOAS, HRV, or ERV
system and simulate a cooling demand large
enough to drive the bypass to fully open position.
Maintain this status for all of Step 2.
NA7.5.4.2
Step 2
2.1 Pass
Fail
Verify either of the following:
1. Using dampers – bypass is 100 percent open,
and return is 100 percent closed; or
2. Using HRV/ERV wheel – wheel is fully stopped.
NA7.5.4.2
Step 2(a)
Step 2(a)1
2.2 Pass
Fail
Verify that all applicable fans and dampers/wheels
operate as intended to maintain building pressure.
NA7.5.4.2
Step 2(b)
2.3 P, F, or N/A Verify that the economizer heating is disabled
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 2(c)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 5 of 6 January 1, 2023
Step Entry Functional Test
Code
Reference
3.0 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 4.
Disable the economizer and simulate a cooling
demand. Maintain this status for all of Step 3.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 3
Step 3(g)
3.1 Pass
Fail
Verify that the economizer damper closes to its
minimum position.
NA7.5.4.2
Step 3(d)
3.2 Pass
Fail
Verify that all applicable fans and dampers
operate as intended to maintain building pressure.
NA7.5.4.2
Step 3(e)
3.3 P, F, or N/A Verify that the unit heating is disabled (if unit has
heating capability). (Pass, Fail, or N/A)
NA7.5.4.2
Step 3(f)
4.0 Pass
Fail
If unit has heating capability, simulate a heating
demand and set economizer, DOAS, HRV, or ERV
systems so that it is capable of operating (i.e.,
actual outdoor air conditions are below lockout
setpoint). Maintain this status for all of Step 4.
NA7.5.4.2
Step 4
4.1 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the economizer damper is at minimum
position. (Pass, Fail, or N/A)
NA7.5.4.2
Step 4(h)
4.2 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the return air damper opens.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(i)
4.3 P, F, or N/A
For DOAS, HRV, or ERV systems only -
economizers enter as N/A and proceed to Step 5.
Verify that the DOAS, HRV, or ERV systems
bypass control modulates bypass damper/wheel
speed to control temperature setpoint.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(j)
5 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 6.
Turn off the unit and verify that the economizer
damper closes completely.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 5
Step 5(k)
6 Pass
Fail
Restore demand control ventilation systems (if
applicable) and remove all system overrides
initiated.
NA7.5.4.2
Step 6
7 Pass
Fail
Check “Pass” if functional test complies with all
requirements.
Check “Fail” if functional test does not comply
with all requirements.
N/A
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 6 of 6 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 1 of 6 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name: Enforcement Agency:
Address:Permit Number:
City, Zip:Permit Application Date:
Building: Floor: Room: Control/tag:
Intent: This Certificate of Acceptance is intended to verify Energy Code compliance for
nonresidential and hotel/motel (see NRCA-MCH-23-A for multi-family) buildings with
newly installed economizers, dedicated outdoor air system (DOAS), Heat Recovery
Ventilation (HRV) systems, and energy recovery ventilation (ERV) system.
Economizers must be certified to the California Energy Commission in compliance with
JA6.3. Submit one Certificate of Acceptance for each economizer, DOAS, HRV, or ERV
system that must demonstrate compliance with the Energy Code. For direct Energy
Code reference see JA6.3, NA7.5.4, §140.4(e), §120.5(a)4, §160.3(d)1D, and
§170.2(c)4C.
Reference Table R-1 (Table 140.4-G)
Climate Zones Fixed Dry Bulb
Differential Dry Bulb
Fixed Enthalpy with
Fixed Dry bulb
1, 3, 5, 11-16 TOA > 75 oF TOA > TRA oF N/A
2, 4, and 10 TOA > 73 oF TOA > TRA – 2 oF N/A
6, 8, 9 TOA > 71 oF TOA > TRA – 4 oF N/A
7 TOA > 69 oF TOA > TRA – 6 oF N/A
All Climate Zones N/A N/A HOA > 28 Btu/LBS. or
TOA > 75 oF
Where: TOA = Outside Air Temperature
TRA = Return Air Temperature
HOA = Outdoor Air Enthalpy
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1.1 Pass
Fail
All documentation shipped with the economizer,
DOAS, HRV, or ERV system including manuals and
sensor performance curves are available for
review.
NA7.5.4.1(d)
1.2 Pass
Fail
Verify that the sensor output value measured
during sensor calibration is plotted on the
performance curve.
NA7.5.4.1(e)
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
N/a first RTU 6Tennis,
womens
PGA Super store
79-110 California 111
La Quinta, 92253
12/11/24
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 2 of 6 January 1, 2023
Step Entry Item
Code
Reference
2.1 and P, F, or N/A
Verify that the bypass high limit shutoff control for
the economizer, DOAS, HRV, or ERV system
complies with Reference Table R-1
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
2.2 P, F, or N/A
Verify that at altitudes substantially different than
sea level, the Fixed Enthalpy limit value is set to
the enthalpy value at 75°F and 50% relative
humidity. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
3 P, F, or N/A
Alternative to Step 2
If using Dew Point, Fixed Enthalpy, Electronic
Enthalpy, or Differential Enthalpy Controls
Energy Commission Executive Director
approval for use in California must be
attached. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
4 P, F, or N/A
Verify that devices with selectable (rather than
adjustable) setpoints are capable of being set to
within 2°F and 2 Btu/LBS of the setpoint listed.
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
5 P, F, or N/A
Verify that if the high-limit control is fixed dry-bulb
or fixed enthalpy with fixed dry-bulb, it has an
adjustable setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(b)
6 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass lockout control sensor is located to
prevent false readings.
NA7.5.4.1(c)
7.1, or P, F, or N/A
Verify if using damper for bypass control that the
economizer, DOAS, HRV, or ERV system bypass
damper moves freely without binding.
(Pass, Fail, or N/A)
NA7.5.4.1(f)
7.2 P, F, or N/A
Indicate if bypass control is achieved through
heat/energy recovery wheel rotation speed
modulation as means other than air dampers.
(Pass, Fail, or N/A)
NA7.5.4.1(f)1
8 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass has control systems, including two-
stage or electronic thermostats, that cycle
compressors off when the bypass can provide
partial cooling.
NA7.5.4.1(g)
9.0 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Using the documentation provided in Step 1.1,
verify that the air economizer and all air dampers
have ALL of the following features (9.1-9.8).
(Pass, Fail, or N/A-for non-economizers)
NA7.5.4.1(h)
§140.4(e)2D
§170.2(c)4Ciii
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 3 of 6 January 1, 2023
Step Entry Item
Code
Reference
9.1 Pass
Fail
Warranty. 5-year Manufacturer warranty of
economizer assembly.
NA7.5.4.1(h)
§140.4(e)2Di
§170.2(c)4Ciiia
9.2 Pass
Fail
Damper reliability testing. Certification from
suppliers of economizers that the economizer
assembly, including but not limited to outdoor air
damper, return air damper, drive linkage, and
actuator, have been tested and are able to open
and close against the rated airflow and pressure of
the system for 60,000 damper opening and closing
cycles.
NA7.5.4.1(h)
§140.4(e)2Dii
§170.2(c)4Ciiib
9.3 Pass
Fail
Damper leakage. Economizer outdoor air and
return air dampers have a maximum leakage rate
of 10 cfm/sf at 250 Pascals (1.0 in. of water) when
tested in accordance with AMCA Standard 500-D.
NA7.5.4.1(h)
§140.4(e)2Diii
§170.2(c)4Ciiic
9.4 P, F, or N/A
Adjustable setpoint. If the high-limit control is
fixed dry-bulb or fixed enthalpy with fixed dry-bulb
then verify that the control has an adjustable
setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(h)
§140.4(e)2Div
§170.2(c)4Ciiid
9.5 Pass
Fail
Sensor accuracy. Outdoor air, return air, mixed
air, and supply air sensors are calibrated within
the following accuracies.
1. Dry bulb and wet bulb temperatures accurate to
±2°F over the range of 40°F to 80°F.
2. Enthalpy accurate to ±3 Btu/LBS. over the
range of 20 Btu/LBS. to 36 Btu/LBS.
3. Relative humidity (RH) accurate to ±5 percent
over the range of 20 percent to 80 percent RH.
NA7.5.4.1(h)
§140.4(e)2Dv
§170.2(c)4Ciiie
9.6 Pass
Fail
Sensor calibration data. Data used for control of
the economizer is plotted on a sensor performance
curve.
NA7.5.4.1(h)
§140.4(e)2Dvi
§170.2(c)4Ciiif
9.7 Pass
Fail
Sensor high limit control. Sensors used for the
high limit control are located to prevent false
readings, including but not limited to being
properly shielded from direct sunlight.
NA7.5.4.1(h)
§140.4(e)2Dvii
§170.2(c)4Ciiig
9.8 Pass
Fail
Relief air system. Relief air systems is capable of
providing 100 percent outside air without over-
pressurizing the building.
NA7.5.4.1(h)
§140.4(e)2Dviii
§170.2(c)4Ciiih
10 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Verify that the economizer inlet damper is
designed to modulate up to 100 percent open, and
return air damper to 100 percent closed, without
over-pressurizing the building.
(Pass, Fail, or N/A)
NA7.5.4.1(i)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 4 of 6 January 1, 2023
Step Entry Item
Code
Reference
11.1, or P, F, or N/A
For systems with DDC controls verify that lockout
sensor(s) are either factory calibrated or field
calibrated. (Pass, Fail, or N/A)
NA7.5.4.1(j)
11.2 P, F, or N/A
For systems with non-DDC controls, verify that
manufacturer’s startup and testing procedures
have been applied. (Pass, Fail, or N/A)
NA7.5.4.1(k)
12 P, F, or N/A
For economizers only - DOAS, HRV, or ERV
systems enter N/A.
Verify that the economizer has been certified to
the Energy Commission by consulting the CEC Air
Economizer Certified List
(https://www.energy.ca.gov/media/3259).
(Pass, Fail, or N/A)
§140.4(e)2Diii
§170.2(c)4Ciiic
13 Pass
Fail
Check “Pass” if construction inspection complies
with all requirements.
Check “Fail” if construction inspection does not
comply with all requirements.
NA
Table B: Functional Testing for Air Economizer Controls
Step Entry Functional Test
Code
Reference
0 Exception
N/A
For economizers only - DOAS, HRV, or ERV enter
N/A.
If the economizer is installed by the HVAC
system manufacturer technician (not the
economizer technician), then the economizer is
excepted from this functional test (NA7.5.4.2).
Enter Step 0 as “Exception, by-pass all functional
testing and mark Step 7 as passing; otherwise
enter Step 0 as N/A.
§120.5(a)4
Exception
§160.3(d)1D
Exception
1 P, F, or N/A Disable demand control ventilation systems
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 1
2.0 Pass
Fail
Enable the economizer, DOAS, HRV, or ERV
system and simulate a cooling demand large
enough to drive the bypass to fully open position.
Maintain this status for all of Step 2.
NA7.5.4.2
Step 2
2.1 Pass
Fail
Verify either of the following:
1. Using dampers – bypass is 100 percent open,
and return is 100 percent closed; or
2. Using HRV/ERV wheel – wheel is fully stopped.
NA7.5.4.2
Step 2(a)
Step 2(a)1
2.2 Pass
Fail
Verify that all applicable fans and dampers/wheels
operate as intended to maintain building pressure.
NA7.5.4.2
Step 2(b)
2.3 P, F, or N/A Verify that the economizer heating is disabled
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 2(c)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 5 of 6 January 1, 2023
Step Entry Functional Test
Code
Reference
3.0 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 4.
Disable the economizer and simulate a cooling
demand. Maintain this status for all of Step 3.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 3
Step 3(g)
3.1 Pass
Fail
Verify that the economizer damper closes to its
minimum position.
NA7.5.4.2
Step 3(d)
3.2 Pass
Fail
Verify that all applicable fans and dampers
operate as intended to maintain building pressure.
NA7.5.4.2
Step 3(e)
3.3 P, F, or N/A Verify that the unit heating is disabled (if unit has
heating capability). (Pass, Fail, or N/A)
NA7.5.4.2
Step 3(f)
4.0 Pass
Fail
If unit has heating capability, simulate a heating
demand and set economizer, DOAS, HRV, or ERV
systems so that it is capable of operating (i.e.,
actual outdoor air conditions are below lockout
setpoint). Maintain this status for all of Step 4.
NA7.5.4.2
Step 4
4.1 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the economizer damper is at minimum
position. (Pass, Fail, or N/A)
NA7.5.4.2
Step 4(h)
4.2 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the return air damper opens.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(i)
4.3 P, F, or N/A
For DOAS, HRV, or ERV systems only -
economizers enter as N/A and proceed to Step 5.
Verify that the DOAS, HRV, or ERV systems
bypass control modulates bypass damper/wheel
speed to control temperature setpoint.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(j)
5 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 6.
Turn off the unit and verify that the economizer
damper closes completely.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 5
Step 5(k)
6 Pass
Fail
Restore demand control ventilation systems (if
applicable) and remove all system overrides
initiated.
NA7.5.4.2
Step 6
7 Pass
Fail
Check “Pass” if functional test complies with all
requirements.
Check “Fail” if functional test does not comply
with all requirements.
N/A
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 6 of 6 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
FDD – PACKAGED UNITS 2022-CEC-NRCA-MCH-12-A
California Energy Commission Page 1 of 3 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name: Enforcement Agency:
Address: Permit Number:
City, Zip: Permit Application Date:
Building: Floor: Room: Control/tag:
Intent: Submit one Certificate of Acceptance for each Fault Detection and Diagnostics
(FDD) system that must demonstrate compliance. Reference NRCC-MCH-E for
nonresidential (including nonresidential spaces in high-rise multifamily) building
permits or LMCC-MCH-E for nonresidential spaces in low-rise multifamily building
permits. This acceptance test is recommended to be performed in conjunction with
NRCA-MCH-02-A (Outside Air) and NRCA-MCH-05-A (Air Economizer Controls).
References: §120.2(i), §120.5(a)11, §160.3(a)2H, §160.3(d)1K, and NA7.5.11.
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1.0 Pass
Fail
Verify access to the following documents: NRCC-MCH-
E or LMCC-MCH-E, designs, specification sheets, and
schedules as approved by the authority having
jurisdiction.
§10-103(a)2A
1.1 Pass
Fail
Verify access to the following documents: NRCA-MCH-
02-A (Outside Air) and NRCA-MCH-05-A (Air
Economizer Controls); recommended to be completed
simultaneously.
N/A
2 Pass
Fail Verify that the FDD hardware is installed on the unit. NA7.5.11.1(a)
3 Pass
Fail
Verify the FDD system matches the make and model
reported on the design drawings. NA7.5.11.1(b)
4 Pass
Fail
Verify the following air temperature sensors are
permanently installed: Outside air, Supply air, and
Return air.
NA7.5.11.1(c)
5 Pass
Fail
Verify the controller has the capability of displaying
the value of the following parameters: Air
temperatures for outside air, supply air, and return air.
NA7.5.11.1(d)
6 Pass
Fail
Verify the controller provides system status by
indicating the following conditions: Free cooling
available, Economizer enabled, Compressor enabled,
Heating enabled, and Mixed air low limit cycle active.
NA7.5.11.1(e)
7 Pass
Fail
Indicate that the Construction Inspection complies
with ALL requirements. N/A
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
N/A First
PGA Superstore
79-110 California 111
La Quinta, 92253
RTU 1Clubs,
Practice bay
12/11/24
FDD – PACKAGED UNITS 2022-CEC-NRCA-MCH-12-A
California Energy Commission Page 2 of 3 January 1, 2023
Table B: Functional Testing
Step Entry Functional Test Code
Reference
1.0 Pass
Fail
Air Temperature Sensor failure/fault.
Verify the FDD system indicates normal operation.
NA7.5.11.2.1
Step 1
1.1 Pass
Fail
Disconnect outside air temperature sensor from unit
controller and verify that the FDD system reports a
fault.
NA7.5.11.2.1
Step 2
1.2 Pass
Fail
Connect outside air temperature sensor to unit
controller and verify that the FDD system indicates
normal operation.
NA7.5.11.2.1
Step 3
2 Pass
Fail
Excess Outside Air Sensor failure/fault. Coordinate
this test with NRCA-MCH-02-A (Outdoor Air) and
verify that the FDD system indicates normal
operation.
NA7.5.11.2.2
3.0 Pass
Fail
Economizer Operation. Interfere with normal unit
operation so NA7.5.4 “Air Economizer Controls” test
fails by immobilizing the outdoor air economizer
damper according to manufacturer’s instructions and
verify FDD system reports a fault.
NA7.5.11.2.3
Step 1
3.1 Pass
Fail
Successfully complete and pass NA7.5.4 Air
Economizer Controls and verify that the FDD system
reports normal operation.
NA7.5.11.2.3
Step 2
4 Pass
Fail
Indicate that the Functional Test complies with ALL
requirements. N/A
FDD – PACKAGED UNITS 2022-CEC-NRCA-MCH-12-A
California Energy Commission Page 3 of 3 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
FDD – PACKAGED UNITS 2022-CEC-NRCA-MCH-12-A
California Energy Commission Page 1 of 3 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name: Enforcement Agency:
Address: Permit Number:
City, Zip: Permit Application Date:
Building: Floor: Room: Control/tag:
Intent: Submit one Certificate of Acceptance for each Fault Detection and Diagnostics
(FDD) system that must demonstrate compliance. Reference NRCC-MCH-E for
nonresidential (including nonresidential spaces in high-rise multifamily) building
permits or LMCC-MCH-E for nonresidential spaces in low-rise multifamily building
permits. This acceptance test is recommended to be performed in conjunction with
NRCA-MCH-02-A (Outside Air) and NRCA-MCH-05-A (Air Economizer Controls).
References: §120.2(i), §120.5(a)11, §160.3(a)2H, §160.3(d)1K, and NA7.5.11.
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1.0 Pass
Fail
Verify access to the following documents: NRCC-MCH-
E or LMCC-MCH-E, designs, specification sheets, and
schedules as approved by the authority having
jurisdiction.
§10-103(a)2A
1.1 Pass
Fail
Verify access to the following documents: NRCA-MCH-
02-A (Outside Air) and NRCA-MCH-05-A (Air
Economizer Controls); recommended to be completed
simultaneously.
N/A
2 Pass
Fail Verify that the FDD hardware is installed on the unit. NA7.5.11.1(a)
3 Pass
Fail
Verify the FDD system matches the make and model
reported on the design drawings. NA7.5.11.1(b)
4 Pass
Fail
Verify the following air temperature sensors are
permanently installed: Outside air, Supply air, and
Return air.
NA7.5.11.1(c)
5 Pass
Fail
Verify the controller has the capability of displaying
the value of the following parameters: Air
temperatures for outside air, supply air, and return air.
NA7.5.11.1(d)
6 Pass
Fail
Verify the controller provides system status by
indicating the following conditions: Free cooling
available, Economizer enabled, Compressor enabled,
Heating enabled, and Mixed air low limit cycle active.
NA7.5.11.1(e)
7 Pass
Fail
Indicate that the Construction Inspection complies
with ALL requirements. N/A
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
N/A First
PGA Superstore
79-110 California 111
La Quinta, 92253
RTU 2Green, Mens
12/11/24
FDD – PACKAGED UNITS 2022-CEC-NRCA-MCH-12-A
California Energy Commission Page 2 of 3 January 1, 2023
Table B: Functional Testing
Step Entry Functional Test Code
Reference
1.0 Pass
Fail
Air Temperature Sensor failure/fault.
Verify the FDD system indicates normal operation.
NA7.5.11.2.1
Step 1
1.1 Pass
Fail
Disconnect outside air temperature sensor from unit
controller and verify that the FDD system reports a
fault.
NA7.5.11.2.1
Step 2
1.2 Pass
Fail
Connect outside air temperature sensor to unit
controller and verify that the FDD system indicates
normal operation.
NA7.5.11.2.1
Step 3
2 Pass
Fail
Excess Outside Air Sensor failure/fault. Coordinate
this test with NRCA-MCH-02-A (Outdoor Air) and
verify that the FDD system indicates normal
operation.
NA7.5.11.2.2
3.0 Pass
Fail
Economizer Operation. Interfere with normal unit
operation so NA7.5.4 “Air Economizer Controls” test
fails by immobilizing the outdoor air economizer
damper according to manufacturer’s instructions and
verify FDD system reports a fault.
NA7.5.11.2.3
Step 1
3.1 Pass
Fail
Successfully complete and pass NA7.5.4 Air
Economizer Controls and verify that the FDD system
reports normal operation.
NA7.5.11.2.3
Step 2
4 Pass
Fail
Indicate that the Functional Test complies with ALL
requirements. N/A
FDD – PACKAGED UNITS 2022-CEC-NRCA-MCH-12-A
California Energy Commission Page 3 of 3 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
FDD – PACKAGED UNITS 2022-CEC-NRCA-MCH-12-A
California Energy Commission Page 1 of 3 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name: Enforcement Agency:
Address: Permit Number:
City, Zip: Permit Application Date:
Building: Floor: Room: Control/tag:
Intent: Submit one Certificate of Acceptance for each Fault Detection and Diagnostics
(FDD) system that must demonstrate compliance. Reference NRCC-MCH-E for
nonresidential (including nonresidential spaces in high-rise multifamily) building
permits or LMCC-MCH-E for nonresidential spaces in low-rise multifamily building
permits. This acceptance test is recommended to be performed in conjunction with
NRCA-MCH-02-A (Outside Air) and NRCA-MCH-05-A (Air Economizer Controls).
References: §120.2(i), §120.5(a)11, §160.3(a)2H, §160.3(d)1K, and NA7.5.11.
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1.0 Pass
Fail
Verify access to the following documents: NRCC-MCH-
E or LMCC-MCH-E, designs, specification sheets, and
schedules as approved by the authority having
jurisdiction.
§10-103(a)2A
1.1 Pass
Fail
Verify access to the following documents: NRCA-MCH-
02-A (Outside Air) and NRCA-MCH-05-A (Air
Economizer Controls); recommended to be completed
simultaneously.
N/A
2 Pass
Fail Verify that the FDD hardware is installed on the unit. NA7.5.11.1(a)
3 Pass
Fail
Verify the FDD system matches the make and model
reported on the design drawings. NA7.5.11.1(b)
4 Pass
Fail
Verify the following air temperature sensors are
permanently installed: Outside air, Supply air, and
Return air.
NA7.5.11.1(c)
5 Pass
Fail
Verify the controller has the capability of displaying
the value of the following parameters: Air
temperatures for outside air, supply air, and return air.
NA7.5.11.1(d)
6 Pass
Fail
Verify the controller provides system status by
indicating the following conditions: Free cooling
available, Economizer enabled, Compressor enabled,
Heating enabled, and Mixed air low limit cycle active.
NA7.5.11.1(e)
7 Pass
Fail
Indicate that the Construction Inspection complies
with ALL requirements. N/A
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
N/A First
PGA Superstore
79-110 California 111
La Quinta, 92253
RTU 6Tennis,
Womens
12/11/24
FDD – PACKAGED UNITS 2022-CEC-NRCA-MCH-12-A
California Energy Commission Page 2 of 3 January 1, 2023
Table B: Functional Testing
Step Entry Functional Test Code
Reference
1.0 Pass
Fail
Air Temperature Sensor failure/fault.
Verify the FDD system indicates normal operation.
NA7.5.11.2.1
Step 1
1.1 Pass
Fail
Disconnect outside air temperature sensor from unit
controller and verify that the FDD system reports a
fault.
NA7.5.11.2.1
Step 2
1.2 Pass
Fail
Connect outside air temperature sensor to unit
controller and verify that the FDD system indicates
normal operation.
NA7.5.11.2.1
Step 3
2 Pass
Fail
Excess Outside Air Sensor failure/fault. Coordinate
this test with NRCA-MCH-02-A (Outdoor Air) and
verify that the FDD system indicates normal
operation.
NA7.5.11.2.2
3.0 Pass
Fail
Economizer Operation. Interfere with normal unit
operation so NA7.5.4 “Air Economizer Controls” test
fails by immobilizing the outdoor air economizer
damper according to manufacturer’s instructions and
verify FDD system reports a fault.
NA7.5.11.2.3
Step 1
3.1 Pass
Fail
Successfully complete and pass NA7.5.4 Air
Economizer Controls and verify that the FDD system
reports normal operation.
NA7.5.11.2.3
Step 2
4 Pass
Fail
Indicate that the Functional Test complies with ALL
requirements. N/A
FDD – PACKAGED UNITS 2022-CEC-NRCA-MCH-12-A
California Energy Commission Page 3 of 3 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
FDD – PACKAGED UNITS 2022-CEC-NRCA-MCH-12-A
California Energy Commission Page 1 of 3 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name: Enforcement Agency:
Address: Permit Number:
City, Zip: Permit Application Date:
Building: Floor: Room: Control/tag:
Intent: Submit one Certificate of Acceptance for each Fault Detection and Diagnostics
(FDD) system that must demonstrate compliance. Reference NRCC-MCH-E for
nonresidential (including nonresidential spaces in high-rise multifamily) building
permits or LMCC-MCH-E for nonresidential spaces in low-rise multifamily building
permits. This acceptance test is recommended to be performed in conjunction with
NRCA-MCH-02-A (Outside Air) and NRCA-MCH-05-A (Air Economizer Controls).
References: §120.2(i), §120.5(a)11, §160.3(a)2H, §160.3(d)1K, and NA7.5.11.
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1.0 Pass
Fail
Verify access to the following documents: NRCC-MCH-
E or LMCC-MCH-E, designs, specification sheets, and
schedules as approved by the authority having
jurisdiction.
§10-103(a)2A
1.1 Pass
Fail
Verify access to the following documents: NRCA-MCH-
02-A (Outside Air) and NRCA-MCH-05-A (Air
Economizer Controls); recommended to be completed
simultaneously.
N/A
2 Pass
Fail Verify that the FDD hardware is installed on the unit. NA7.5.11.1(a)
3 Pass
Fail
Verify the FDD system matches the make and model
reported on the design drawings. NA7.5.11.1(b)
4 Pass
Fail
Verify the following air temperature sensors are
permanently installed: Outside air, Supply air, and
Return air.
NA7.5.11.1(c)
5 Pass
Fail
Verify the controller has the capability of displaying
the value of the following parameters: Air
temperatures for outside air, supply air, and return air.
NA7.5.11.1(d)
6 Pass
Fail
Verify the controller provides system status by
indicating the following conditions: Free cooling
available, Economizer enabled, Compressor enabled,
Heating enabled, and Mixed air low limit cycle active.
NA7.5.11.1(e)
7 Pass
Fail
Indicate that the Construction Inspection complies
with ALL requirements. N/A
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
N/A First
PGA Superstore
79-110 California 111
La Quinta, 92253
RTU 7Receiving
12/11/24
FDD – PACKAGED UNITS 2022-CEC-NRCA-MCH-12-A
California Energy Commission Page 2 of 3 January 1, 2023
Table B: Functional Testing
Step Entry Functional Test Code
Reference
1.0 Pass
Fail
Air Temperature Sensor failure/fault.
Verify the FDD system indicates normal operation.
NA7.5.11.2.1
Step 1
1.1 Pass
Fail
Disconnect outside air temperature sensor from unit
controller and verify that the FDD system reports a
fault.
NA7.5.11.2.1
Step 2
1.2 Pass
Fail
Connect outside air temperature sensor to unit
controller and verify that the FDD system indicates
normal operation.
NA7.5.11.2.1
Step 3
2 Pass
Fail
Excess Outside Air Sensor failure/fault. Coordinate
this test with NRCA-MCH-02-A (Outdoor Air) and
verify that the FDD system indicates normal
operation.
NA7.5.11.2.2
3.0 Pass
Fail
Economizer Operation. Interfere with normal unit
operation so NA7.5.4 “Air Economizer Controls” test
fails by immobilizing the outdoor air economizer
damper according to manufacturer’s instructions and
verify FDD system reports a fault.
NA7.5.11.2.3
Step 1
3.1 Pass
Fail
Successfully complete and pass NA7.5.4 Air
Economizer Controls and verify that the FDD system
reports normal operation.
NA7.5.11.2.3
Step 2
4 Pass
Fail
Indicate that the Functional Test complies with ALL
requirements. N/A
FDD – PACKAGED UNITS 2022-CEC-NRCA-MCH-12-A
California Energy Commission Page 3 of 3 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
FDD – PACKAGED UNITS 2022-CEC-NRCA-MCH-12-A
California Energy Commission Page 1 of 3 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name: Enforcement Agency:
Address: Permit Number:
City, Zip: Permit Application Date:
Building: Floor: Room: Control/tag:
Intent: Submit one Certificate of Acceptance for each Fault Detection and Diagnostics
(FDD) system that must demonstrate compliance. Reference NRCC-MCH-E for
nonresidential (including nonresidential spaces in high-rise multifamily) building
permits or LMCC-MCH-E for nonresidential spaces in low-rise multifamily building
permits. This acceptance test is recommended to be performed in conjunction with
NRCA-MCH-02-A (Outside Air) and NRCA-MCH-05-A (Air Economizer Controls).
References: §120.2(i), §120.5(a)11, §160.3(a)2H, §160.3(d)1K, and NA7.5.11.
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1.0 Pass
Fail
Verify access to the following documents: NRCC-MCH-
E or LMCC-MCH-E, designs, specification sheets, and
schedules as approved by the authority having
jurisdiction.
§10-103(a)2A
1.1 Pass
Fail
Verify access to the following documents: NRCA-MCH-
02-A (Outside Air) and NRCA-MCH-05-A (Air
Economizer Controls); recommended to be completed
simultaneously.
N/A
2 Pass
Fail Verify that the FDD hardware is installed on the unit. NA7.5.11.1(a)
3 Pass
Fail
Verify the FDD system matches the make and model
reported on the design drawings. NA7.5.11.1(b)
4 Pass
Fail
Verify the following air temperature sensors are
permanently installed: Outside air, Supply air, and
Return air.
NA7.5.11.1(c)
5 Pass
Fail
Verify the controller has the capability of displaying
the value of the following parameters: Air
temperatures for outside air, supply air, and return air.
NA7.5.11.1(d)
6 Pass
Fail
Verify the controller provides system status by
indicating the following conditions: Free cooling
available, Economizer enabled, Compressor enabled,
Heating enabled, and Mixed air low limit cycle active.
NA7.5.11.1(e)
7 Pass
Fail
Indicate that the Construction Inspection complies
with ALL requirements. N/A
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
N/A First
PGA Superstore
79-110 California 111
La Quinta, 92253
RTU 4Shoes, Juniors
12/11/24
FDD – PACKAGED UNITS 2022-CEC-NRCA-MCH-12-A
California Energy Commission Page 2 of 3 January 1, 2023
Table B: Functional Testing
Step Entry Functional Test Code
Reference
1.0 Pass
Fail
Air Temperature Sensor failure/fault.
Verify the FDD system indicates normal operation.
NA7.5.11.2.1
Step 1
1.1 Pass
Fail
Disconnect outside air temperature sensor from unit
controller and verify that the FDD system reports a
fault.
NA7.5.11.2.1
Step 2
1.2 Pass
Fail
Connect outside air temperature sensor to unit
controller and verify that the FDD system indicates
normal operation.
NA7.5.11.2.1
Step 3
2 Pass
Fail
Excess Outside Air Sensor failure/fault. Coordinate
this test with NRCA-MCH-02-A (Outdoor Air) and
verify that the FDD system indicates normal
operation.
NA7.5.11.2.2
3.0 Pass
Fail
Economizer Operation. Interfere with normal unit
operation so NA7.5.4 “Air Economizer Controls” test
fails by immobilizing the outdoor air economizer
damper according to manufacturer’s instructions and
verify FDD system reports a fault.
NA7.5.11.2.3
Step 1
3.1 Pass
Fail
Successfully complete and pass NA7.5.4 Air
Economizer Controls and verify that the FDD system
reports normal operation.
NA7.5.11.2.3
Step 2
4 Pass
Fail
Indicate that the Functional Test complies with ALL
requirements. N/A
FDD – PACKAGED UNITS 2022-CEC-NRCA-MCH-12-A
California Energy Commission Page 3 of 3 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
FDD – PACKAGED UNITS 2022-CEC-NRCA-MCH-12-A
California Energy Commission Page 1 of 3 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name: Enforcement Agency:
Address: Permit Number:
City, Zip: Permit Application Date:
Building: Floor: Room: Control/tag:
Intent: Submit one Certificate of Acceptance for each Fault Detection and Diagnostics
(FDD) system that must demonstrate compliance. Reference NRCC-MCH-E for
nonresidential (including nonresidential spaces in high-rise multifamily) building
permits or LMCC-MCH-E for nonresidential spaces in low-rise multifamily building
permits. This acceptance test is recommended to be performed in conjunction with
NRCA-MCH-02-A (Outside Air) and NRCA-MCH-05-A (Air Economizer Controls).
References: §120.2(i), §120.5(a)11, §160.3(a)2H, §160.3(d)1K, and NA7.5.11.
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1.0 Pass
Fail
Verify access to the following documents: NRCC-MCH-
E or LMCC-MCH-E, designs, specification sheets, and
schedules as approved by the authority having
jurisdiction.
§10-103(a)2A
1.1 Pass
Fail
Verify access to the following documents: NRCA-MCH-
02-A (Outside Air) and NRCA-MCH-05-A (Air
Economizer Controls); recommended to be completed
simultaneously.
N/A
2 Pass
Fail Verify that the FDD hardware is installed on the unit. NA7.5.11.1(a)
3 Pass
Fail
Verify the FDD system matches the make and model
reported on the design drawings. NA7.5.11.1(b)
4 Pass
Fail
Verify the following air temperature sensors are
permanently installed: Outside air, Supply air, and
Return air.
NA7.5.11.1(c)
5 Pass
Fail
Verify the controller has the capability of displaying
the value of the following parameters: Air
temperatures for outside air, supply air, and return air.
NA7.5.11.1(d)
6 Pass
Fail
Verify the controller provides system status by
indicating the following conditions: Free cooling
available, Economizer enabled, Compressor enabled,
Heating enabled, and Mixed air low limit cycle active.
NA7.5.11.1(e)
7 Pass
Fail
Indicate that the Construction Inspection complies
with ALL requirements. N/A
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
N/A First
PGA Superstore
79-110 California 111
La Quinta, 92253
RTU 5Bags, Studios
12/11/24
FDD – PACKAGED UNITS 2022-CEC-NRCA-MCH-12-A
California Energy Commission Page 2 of 3 January 1, 2023
Table B: Functional Testing
Step Entry Functional Test Code
Reference
1.0 Pass
Fail
Air Temperature Sensor failure/fault.
Verify the FDD system indicates normal operation.
NA7.5.11.2.1
Step 1
1.1 Pass
Fail
Disconnect outside air temperature sensor from unit
controller and verify that the FDD system reports a
fault.
NA7.5.11.2.1
Step 2
1.2 Pass
Fail
Connect outside air temperature sensor to unit
controller and verify that the FDD system indicates
normal operation.
NA7.5.11.2.1
Step 3
2 Pass
Fail
Excess Outside Air Sensor failure/fault. Coordinate
this test with NRCA-MCH-02-A (Outdoor Air) and
verify that the FDD system indicates normal
operation.
NA7.5.11.2.2
3.0 Pass
Fail
Economizer Operation. Interfere with normal unit
operation so NA7.5.4 “Air Economizer Controls” test
fails by immobilizing the outdoor air economizer
damper according to manufacturer’s instructions and
verify FDD system reports a fault.
NA7.5.11.2.3
Step 1
3.1 Pass
Fail
Successfully complete and pass NA7.5.4 Air
Economizer Controls and verify that the FDD system
reports normal operation.
NA7.5.11.2.3
Step 2
4 Pass
Fail
Indicate that the Functional Test complies with ALL
requirements. N/A
FDD – PACKAGED UNITS 2022-CEC-NRCA-MCH-12-A
California Energy Commission Page 3 of 3 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
FDD – PACKAGED UNITS 2022-CEC-NRCA-MCH-12-A
California Energy Commission Page 1 of 3 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name: Enforcement Agency:
Address: Permit Number:
City, Zip: Permit Application Date:
Building: Floor: Room: Control/tag:
Intent: Submit one Certificate of Acceptance for each Fault Detection and Diagnostics
(FDD) system that must demonstrate compliance. Reference NRCC-MCH-E for
nonresidential (including nonresidential spaces in high-rise multifamily) building
permits or LMCC-MCH-E for nonresidential spaces in low-rise multifamily building
permits. This acceptance test is recommended to be performed in conjunction with
NRCA-MCH-02-A (Outside Air) and NRCA-MCH-05-A (Air Economizer Controls).
References: §120.2(i), §120.5(a)11, §160.3(a)2H, §160.3(d)1K, and NA7.5.11.
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1.0 Pass
Fail
Verify access to the following documents: NRCC-MCH-
E or LMCC-MCH-E, designs, specification sheets, and
schedules as approved by the authority having
jurisdiction.
§10-103(a)2A
1.1 Pass
Fail
Verify access to the following documents: NRCA-MCH-
02-A (Outside Air) and NRCA-MCH-05-A (Air
Economizer Controls); recommended to be completed
simultaneously.
N/A
2 Pass
Fail Verify that the FDD hardware is installed on the unit. NA7.5.11.1(a)
3 Pass
Fail
Verify the FDD system matches the make and model
reported on the design drawings. NA7.5.11.1(b)
4 Pass
Fail
Verify the following air temperature sensors are
permanently installed: Outside air, Supply air, and
Return air.
NA7.5.11.1(c)
5 Pass
Fail
Verify the controller has the capability of displaying
the value of the following parameters: Air
temperatures for outside air, supply air, and return air.
NA7.5.11.1(d)
6 Pass
Fail
Verify the controller provides system status by
indicating the following conditions: Free cooling
available, Economizer enabled, Compressor enabled,
Heating enabled, and Mixed air low limit cycle active.
NA7.5.11.1(e)
7 Pass
Fail
Indicate that the Construction Inspection complies
with ALL requirements. N/A
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
N/A First
PGA Superstore
79-110 California 111
La Quinta, 92253
RTU 3Accessories
12/11/24
FDD – PACKAGED UNITS 2022-CEC-NRCA-MCH-12-A
California Energy Commission Page 2 of 3 January 1, 2023
Table B: Functional Testing
Step Entry Functional Test Code
Reference
1.0 Pass
Fail
Air Temperature Sensor failure/fault.
Verify the FDD system indicates normal operation.
NA7.5.11.2.1
Step 1
1.1 Pass
Fail
Disconnect outside air temperature sensor from unit
controller and verify that the FDD system reports a
fault.
NA7.5.11.2.1
Step 2
1.2 Pass
Fail
Connect outside air temperature sensor to unit
controller and verify that the FDD system indicates
normal operation.
NA7.5.11.2.1
Step 3
2 Pass
Fail
Excess Outside Air Sensor failure/fault. Coordinate
this test with NRCA-MCH-02-A (Outdoor Air) and
verify that the FDD system indicates normal
operation.
NA7.5.11.2.2
3.0 Pass
Fail
Economizer Operation. Interfere with normal unit
operation so NA7.5.4 “Air Economizer Controls” test
fails by immobilizing the outdoor air economizer
damper according to manufacturer’s instructions and
verify FDD system reports a fault.
NA7.5.11.2.3
Step 1
3.1 Pass
Fail
Successfully complete and pass NA7.5.4 Air
Economizer Controls and verify that the FDD system
reports normal operation.
NA7.5.11.2.3
Step 2
4 Pass
Fail
Indicate that the Functional Test complies with ALL
requirements. N/A
FDD – PACKAGED UNITS 2022-CEC-NRCA-MCH-12-A
California Energy Commission Page 3 of 3 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
S/A TEMP RESET CONTROLS 2022-CEC-NRCA-MCH-16-A
California Energy Commission Page 1 of 4 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name:Enforcement Agency:
Address:Permit Number:
City, Zip:Permit Acceptance Date:
Building:Floor: Room:Control/tag:
Intent: Verify that the supply air temperature modulates to meet system temperature
setpoint(s). Reference NRCC-MCH-E for nonresidential (including nonresidential
spaces in high-rise multifamily) building permits or LMCC-MCH-E for nonresidential
spaces in low-rise multifamily building permits. Submit one Certificate of
Acceptance for each system that must demonstrate compliance. References:
§120.5(a)15, §140.4(f), §160.3(d)1O, §170.2(c)4D, and NA7.5.15.
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1 No Entry Check the following Required Documentation: N/A
1.1 Pass
Fail
Designs, plans, schematics, and schedules as
approved by the authority having jurisdiction N/A
1.2 Pass
Fail
NRCC-MCH-E or LMCC-MCH-E as approved by the
authority having jurisdiction §10-103(a)2A
1.3 Pass
Fail
Manufacturer specifications, calibration certificates,
or tear sheets for the installed system as available N/A
2 No Entry Prior to functional testing, verify and document the
following: NA7.5.15.1
2.1 Pass
Fail
Supply air temperature reset controls are installed
as specified by the requirements
NA7.5.15.1(a)
§140.4(f)
§170.2(c)4D
2.2 Pass
Fail
All system air temperature sensors are factory or
field calibrated within 2% of a calibrated reference
temperature sensor
NA7.5.15.1(b)
2.3 Document current supply air temperature (°F) NA7.5.15.1(c)
3 Pass
Fail
Verify that the Construction Inspection complies
with ALL requirements. N/A
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
PGA Superstore
79-110 California 111
La Quinta, 92253
N/a First Clubs,
Practice bay
RTU 1
55
S/A TEMP RESET CONTROLS 2022-CEC-NRCA-MCH-16-A
California Energy Commission Page 2 of 4 January 1, 2023
Table B: Functional Testing
Procedure — Pressurized Duct Leakage Test
Step Entry Functional Test
Code
Reference
0
Pass
Fail
N/A
Check to make sure that chilled/hot water coils, if
used, are not already fully open and calling for
maximum cooling/heating. If so, reverse steps 2
and 3 and/or change the set point range as
necessary to conduct this test
(Pass, Fail, N/A)
NA7.5.15.2(a)
1 No Entry Identify the control parameter NA7.5.15.2(b)
1.1, or Check or
NA Outside air temperature N/A
1.2, or Check or
NA Zone or return air temperature N/A
1.3, or Check or
NA Zone calling for heating or cooling N/A
1.4 Check or
NA Other N/A
2 No Entry
During occupied mode, adjust the reset control
parameter to decrease the supply air temperature
(to the lower supply temperature limit). Verify and
document the following:
NA7.5.15.2
Step 1
2.1 Pass
Fail
Supply air temperature controls modulate as
intended
NA7.5.14.2
Step 1(a)
2.2 Pass
Fail
Actual supply air decreases to meet the new
setpoint within ±2°F
NA7.5.15.2
Step 1(b)
2.2.1 Supply air temperature set point N/A
2.2.2 Actual Supply air temperature N/A
2.3 Supply air temperature stabilizes within 15
minutes
NA7.5.15.2
Step 1(c)
3 No Entry
During occupied mode, adjust the reset control
parameter to increase the supply of air
temperature (to the upper supply temperature
limit). Verify the following:
NA7.5.15.2
Step 2
3.1 Pass
Fail
Supply air temperature controls modulate as
intended
NA7.5.15.2
Step 2(a)
3.2 Pass
Fail
Actual supply air temperature changes to meet
the new setpoint within ±2°F
NA7.5.15.2
Step 2(b)
57
59
Pass
Fail
S/A TEMP RESET CONTROLS 2022-CEC-NRCA-MCH-16-A
California Energy Commission Page 3 of 4 January 1, 2023
Step Entry Functional Test
Code
Reference
3.2.1 Supply air temperature set point N/A
3.2.2 Actual Supply air temperature N/A
3.3 Pass
Fail
Supply air temperature stabilizes within 15
minutes
NA7.5.15.2
Step 2(c)
4 No Entry Restore reset control parameter to automatic
control. Verify and document the following:
NA7.5.15.2
Step 3
4.1 Pass
Fail
Supply air temperature controls modulate as
intended
NA7.5.15.2
Step 3(a)
4.2 Pass
Fail
Actual supply air temperature changes to meet
the new setpoint within ±2°F
NA7.5.15.2
Step 3(b)
4.2.1 Supply air temperature set point N/A
4.2.2 Actual supply air temperature N/A
4.3 Pass
Fail
Supply air temperature stabilizes within 15
minutes
NA7.5.15.2
Step 3(c)
5 Pass
Fail
Verify that the Functional Test complies with ALL
requirements. N/A
65
67
55
57
S/A TEMP RESET CONTROLS
California Energy Commission Page 4 of 4 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
S/A TEMP RESET CONTROLS 2022-CEC-NRCA-MCH-16-A
California Energy Commission Page 1 of 4 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name:Enforcement Agency:
Address:Permit Number:
City, Zip:Permit Acceptance Date:
Building:Floor: Room:Control/tag:
Intent: Verify that the supply air temperature modulates to meet system temperature
setpoint(s). Reference NRCC-MCH-E for nonresidential (including nonresidential
spaces in high-rise multifamily) building permits or LMCC-MCH-E for nonresidential
spaces in low-rise multifamily building permits. Submit one Certificate of
Acceptance for each system that must demonstrate compliance. References:
§120.5(a)15, §140.4(f), §160.3(d)1O, §170.2(c)4D, and NA7.5.15.
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1 No Entry Check the following Required Documentation: N/A
1.1 Pass
Fail
Designs, plans, schematics, and schedules as
approved by the authority having jurisdiction N/A
1.2 Pass
Fail
NRCC-MCH-E or LMCC-MCH-E as approved by the
authority having jurisdiction §10-103(a)2A
1.3 Pass
Fail
Manufacturer specifications, calibration certificates,
or tear sheets for the installed system as available N/A
2 No Entry Prior to functional testing, verify and document the
following: NA7.5.15.1
2.1 Pass
Fail
Supply air temperature reset controls are installed
as specified by the requirements
NA7.5.15.1(a)
§140.4(f)
§170.2(c)4D
2.2 Pass
Fail
All system air temperature sensors are factory or
field calibrated within 2% of a calibrated reference
temperature sensor
NA7.5.15.1(b)
2.3 Document current supply air temperature (°F) NA7.5.15.1(c)
3 Pass
Fail
Verify that the Construction Inspection complies
with ALL requirements. N/A
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
PGA Superstore
79-110 California 111
La Quinta, 92253
N/a First Shoes, Juniors RTU 4
55
12/11/24
S/A TEMP RESET CONTROLS 2022-CEC-NRCA-MCH-16-A
California Energy Commission Page 2 of 4 January 1, 2023
Table B: Functional Testing
Procedure — Pressurized Duct Leakage Test
Step Entry Functional Test
Code
Reference
0
Pass
Fail
N/A
Check to make sure that chilled/hot water coils, if
used, are not already fully open and calling for
maximum cooling/heating. If so, reverse steps 2
and 3 and/or change the set point range as
necessary to conduct this test
(Pass, Fail, N/A)
NA7.5.15.2(a)
1 No Entry Identify the control parameter NA7.5.15.2(b)
1.1, or Check or
NA Outside air temperature N/A
1.2, or Check or
NA Zone or return air temperature N/A
1.3, or Check or
NA Zone calling for heating or cooling N/A
1.4 Check or
NA Other N/A
2 No Entry
During occupied mode, adjust the reset control
parameter to decrease the supply air temperature
(to the lower supply temperature limit). Verify and
document the following:
NA7.5.15.2
Step 1
2.1 Pass
Fail
Supply air temperature controls modulate as
intended
NA7.5.14.2
Step 1(a)
2.2 Pass
Fail
Actual supply air decreases to meet the new
setpoint within ±2°F
NA7.5.15.2
Step 1(b)
2.2.1 Supply air temperature set point N/A
2.2.2 Actual Supply air temperature N/A
2.3 Supply air temperature stabilizes within 15
minutes
NA7.5.15.2
Step 1(c)
3 No Entry
During occupied mode, adjust the reset control
parameter to increase the supply of air
temperature (to the upper supply temperature
limit). Verify the following:
NA7.5.15.2
Step 2
3.1 Pass
Fail
Supply air temperature controls modulate as
intended
NA7.5.15.2
Step 2(a)
3.2 Pass
Fail
Actual supply air temperature changes to meet
the new setpoint within ±2°F
NA7.5.15.2
Step 2(b)
57
59
Pass
Fail
S/A TEMP RESET CONTROLS 2022-CEC-NRCA-MCH-16-A
California Energy Commission Page 3 of 4 January 1, 2023
Step Entry Functional Test
Code
Reference
3.2.1 Supply air temperature set point N/A
3.2.2 Actual Supply air temperature N/A
3.3 Pass
Fail
Supply air temperature stabilizes within 15
minutes
NA7.5.15.2
Step 2(c)
4 No Entry Restore reset control parameter to automatic
control. Verify and document the following:
NA7.5.15.2
Step 3
4.1 Pass
Fail
Supply air temperature controls modulate as
intended
NA7.5.15.2
Step 3(a)
4.2 Pass
Fail
Actual supply air temperature changes to meet
the new setpoint within ±2°F
NA7.5.15.2
Step 3(b)
4.2.1 Supply air temperature set point N/A
4.2.2 Actual supply air temperature N/A
4.3 Pass
Fail
Supply air temperature stabilizes within 15
minutes
NA7.5.15.2
Step 3(c)
5 Pass
Fail
Verify that the Functional Test complies with ALL
requirements. N/A
65
67
55
57
S/A TEMP RESET CONTROLS
California Energy Commission Page 4 of 4 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
S/A TEMP RESET CONTROLS 2022-CEC-NRCA-MCH-16-A
California Energy Commission Page 1 of 4 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name:Enforcement Agency:
Address:Permit Number:
City, Zip:Permit Acceptance Date:
Building:Floor: Room:Control/tag:
Intent: Verify that the supply air temperature modulates to meet system temperature
setpoint(s). Reference NRCC-MCH-E for nonresidential (including nonresidential
spaces in high-rise multifamily) building permits or LMCC-MCH-E for nonresidential
spaces in low-rise multifamily building permits. Submit one Certificate of
Acceptance for each system that must demonstrate compliance. References:
§120.5(a)15, §140.4(f), §160.3(d)1O, §170.2(c)4D, and NA7.5.15.
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1 No Entry Check the following Required Documentation: N/A
1.1 Pass
Fail
Designs, plans, schematics, and schedules as
approved by the authority having jurisdiction N/A
1.2 Pass
Fail
NRCC-MCH-E or LMCC-MCH-E as approved by the
authority having jurisdiction §10-103(a)2A
1.3 Pass
Fail
Manufacturer specifications, calibration certificates,
or tear sheets for the installed system as available N/A
2 No Entry Prior to functional testing, verify and document the
following: NA7.5.15.1
2.1 Pass
Fail
Supply air temperature reset controls are installed
as specified by the requirements
NA7.5.15.1(a)
§140.4(f)
§170.2(c)4D
2.2 Pass
Fail
All system air temperature sensors are factory or
field calibrated within 2% of a calibrated reference
temperature sensor
NA7.5.15.1(b)
2.3 Document current supply air temperature (°F) NA7.5.15.1(c)
3 Pass
Fail
Verify that the Construction Inspection complies
with ALL requirements. N/A
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
PGA Superstore
79-110 California 111
La Quinta, 92253
N/a First Green, Mens RTU 2
55
12/11/24
S/A TEMP RESET CONTROLS 2022-CEC-NRCA-MCH-16-A
California Energy Commission Page 2 of 4 January 1, 2023
Table B: Functional Testing
Procedure — Pressurized Duct Leakage Test
Step Entry Functional Test
Code
Reference
0
Pass
Fail
N/A
Check to make sure that chilled/hot water coils, if
used, are not already fully open and calling for
maximum cooling/heating. If so, reverse steps 2
and 3 and/or change the set point range as
necessary to conduct this test
(Pass, Fail, N/A)
NA7.5.15.2(a)
1 No Entry Identify the control parameter NA7.5.15.2(b)
1.1, or Check or
NA Outside air temperature N/A
1.2, or Check or
NA Zone or return air temperature N/A
1.3, or Check or
NA Zone calling for heating or cooling N/A
1.4 Check or
NA Other N/A
2 No Entry
During occupied mode, adjust the reset control
parameter to decrease the supply air temperature
(to the lower supply temperature limit). Verify and
document the following:
NA7.5.15.2
Step 1
2.1 Pass
Fail
Supply air temperature controls modulate as
intended
NA7.5.14.2
Step 1(a)
2.2 Pass
Fail
Actual supply air decreases to meet the new
setpoint within ±2°F
NA7.5.15.2
Step 1(b)
2.2.1 Supply air temperature set point N/A
2.2.2 Actual Supply air temperature N/A
2.3 Supply air temperature stabilizes within 15
minutes
NA7.5.15.2
Step 1(c)
3 No Entry
During occupied mode, adjust the reset control
parameter to increase the supply of air
temperature (to the upper supply temperature
limit). Verify the following:
NA7.5.15.2
Step 2
3.1 Pass
Fail
Supply air temperature controls modulate as
intended
NA7.5.15.2
Step 2(a)
3.2 Pass
Fail
Actual supply air temperature changes to meet
the new setpoint within ±2°F
NA7.5.15.2
Step 2(b)
57
59
Pass
Fail
S/A TEMP RESET CONTROLS 2022-CEC-NRCA-MCH-16-A
California Energy Commission Page 3 of 4 January 1, 2023
Step Entry Functional Test
Code
Reference
3.2.1 Supply air temperature set point N/A
3.2.2 Actual Supply air temperature N/A
3.3 Pass
Fail
Supply air temperature stabilizes within 15
minutes
NA7.5.15.2
Step 2(c)
4 No Entry Restore reset control parameter to automatic
control. Verify and document the following:
NA7.5.15.2
Step 3
4.1 Pass
Fail
Supply air temperature controls modulate as
intended
NA7.5.15.2
Step 3(a)
4.2 Pass
Fail
Actual supply air temperature changes to meet
the new setpoint within ±2°F
NA7.5.15.2
Step 3(b)
4.2.1 Supply air temperature set point N/A
4.2.2 Actual supply air temperature N/A
4.3 Pass
Fail
Supply air temperature stabilizes within 15
minutes
NA7.5.15.2
Step 3(c)
5 Pass
Fail
Verify that the Functional Test complies with ALL
requirements. N/A
65
67
55
57
S/A TEMP RESET CONTROLS
California Energy Commission Page 4 of 4 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
S/A TEMP RESET CONTROLS 2022-CEC-NRCA-MCH-16-A
California Energy Commission Page 1 of 4 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name:Enforcement Agency:
Address:Permit Number:
City, Zip:Permit Acceptance Date:
Building:Floor: Room:Control/tag:
Intent: Verify that the supply air temperature modulates to meet system temperature
setpoint(s). Reference NRCC-MCH-E for nonresidential (including nonresidential
spaces in high-rise multifamily) building permits or LMCC-MCH-E for nonresidential
spaces in low-rise multifamily building permits. Submit one Certificate of
Acceptance for each system that must demonstrate compliance. References:
§120.5(a)15, §140.4(f), §160.3(d)1O, §170.2(c)4D, and NA7.5.15.
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1 No Entry Check the following Required Documentation: N/A
1.1 Pass
Fail
Designs, plans, schematics, and schedules as
approved by the authority having jurisdiction N/A
1.2 Pass
Fail
NRCC-MCH-E or LMCC-MCH-E as approved by the
authority having jurisdiction §10-103(a)2A
1.3 Pass
Fail
Manufacturer specifications, calibration certificates,
or tear sheets for the installed system as available N/A
2 No Entry Prior to functional testing, verify and document the
following: NA7.5.15.1
2.1 Pass
Fail
Supply air temperature reset controls are installed
as specified by the requirements
NA7.5.15.1(a)
§140.4(f)
§170.2(c)4D
2.2 Pass
Fail
All system air temperature sensors are factory or
field calibrated within 2% of a calibrated reference
temperature sensor
NA7.5.15.1(b)
2.3 Document current supply air temperature (°F) NA7.5.15.1(c)
3 Pass
Fail
Verify that the Construction Inspection complies
with ALL requirements. N/A
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
PGA Superstore
79-110 California 111
La Quinta, 92253
N/a First Tennis,
Womens
RTU 6
55
12/11/24
S/A TEMP RESET CONTROLS 2022-CEC-NRCA-MCH-16-A
California Energy Commission Page 2 of 4 January 1, 2023
Table B: Functional Testing
Procedure — Pressurized Duct Leakage Test
Step Entry Functional Test
Code
Reference
0
Pass
Fail
N/A
Check to make sure that chilled/hot water coils, if
used, are not already fully open and calling for
maximum cooling/heating. If so, reverse steps 2
and 3 and/or change the set point range as
necessary to conduct this test
(Pass, Fail, N/A)
NA7.5.15.2(a)
1 No Entry Identify the control parameter NA7.5.15.2(b)
1.1, or Check or
NA Outside air temperature N/A
1.2, or Check or
NA Zone or return air temperature N/A
1.3, or Check or
NA Zone calling for heating or cooling N/A
1.4 Check or
NA Other N/A
2 No Entry
During occupied mode, adjust the reset control
parameter to decrease the supply air temperature
(to the lower supply temperature limit). Verify and
document the following:
NA7.5.15.2
Step 1
2.1 Pass
Fail
Supply air temperature controls modulate as
intended
NA7.5.14.2
Step 1(a)
2.2 Pass
Fail
Actual supply air decreases to meet the new
setpoint within ±2°F
NA7.5.15.2
Step 1(b)
2.2.1 Supply air temperature set point N/A
2.2.2 Actual Supply air temperature N/A
2.3 Supply air temperature stabilizes within 15
minutes
NA7.5.15.2
Step 1(c)
3 No Entry
During occupied mode, adjust the reset control
parameter to increase the supply of air
temperature (to the upper supply temperature
limit). Verify the following:
NA7.5.15.2
Step 2
3.1 Pass
Fail
Supply air temperature controls modulate as
intended
NA7.5.15.2
Step 2(a)
3.2 Pass
Fail
Actual supply air temperature changes to meet
the new setpoint within ±2°F
NA7.5.15.2
Step 2(b)
57
59
Pass
Fail
S/A TEMP RESET CONTROLS 2022-CEC-NRCA-MCH-16-A
California Energy Commission Page 3 of 4 January 1, 2023
Step Entry Functional Test
Code
Reference
3.2.1 Supply air temperature set point N/A
3.2.2 Actual Supply air temperature N/A
3.3 Pass
Fail
Supply air temperature stabilizes within 15
minutes
NA7.5.15.2
Step 2(c)
4 No Entry Restore reset control parameter to automatic
control. Verify and document the following:
NA7.5.15.2
Step 3
4.1 Pass
Fail
Supply air temperature controls modulate as
intended
NA7.5.15.2
Step 3(a)
4.2 Pass
Fail
Actual supply air temperature changes to meet
the new setpoint within ±2°F
NA7.5.15.2
Step 3(b)
4.2.1 Supply air temperature set point N/A
4.2.2 Actual supply air temperature N/A
4.3 Pass
Fail
Supply air temperature stabilizes within 15
minutes
NA7.5.15.2
Step 3(c)
5 Pass
Fail
Verify that the Functional Test complies with ALL
requirements. N/A
65
67
55
57
S/A TEMP RESET CONTROLS
California Energy Commission Page 4 of 4 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
S/A TEMP RESET CONTROLS 2022-CEC-NRCA-MCH-16-A
California Energy Commission Page 1 of 4 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name:Enforcement Agency:
Address:Permit Number:
City, Zip:Permit Acceptance Date:
Building:Floor: Room:Control/tag:
Intent: Verify that the supply air temperature modulates to meet system temperature
setpoint(s). Reference NRCC-MCH-E for nonresidential (including nonresidential
spaces in high-rise multifamily) building permits or LMCC-MCH-E for nonresidential
spaces in low-rise multifamily building permits. Submit one Certificate of
Acceptance for each system that must demonstrate compliance. References:
§120.5(a)15, §140.4(f), §160.3(d)1O, §170.2(c)4D, and NA7.5.15.
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1 No Entry Check the following Required Documentation: N/A
1.1 Pass
Fail
Designs, plans, schematics, and schedules as
approved by the authority having jurisdiction N/A
1.2 Pass
Fail
NRCC-MCH-E or LMCC-MCH-E as approved by the
authority having jurisdiction §10-103(a)2A
1.3 Pass
Fail
Manufacturer specifications, calibration certificates,
or tear sheets for the installed system as available N/A
2 No Entry Prior to functional testing, verify and document the
following: NA7.5.15.1
2.1 Pass
Fail
Supply air temperature reset controls are installed
as specified by the requirements
NA7.5.15.1(a)
§140.4(f)
§170.2(c)4D
2.2 Pass
Fail
All system air temperature sensors are factory or
field calibrated within 2% of a calibrated reference
temperature sensor
NA7.5.15.1(b)
2.3 Document current supply air temperature (°F) NA7.5.15.1(c)
3 Pass
Fail
Verify that the Construction Inspection complies
with ALL requirements. N/A
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
PGA Superstore
79-110 California 111
La Quinta, 92253
N/a First Receiving RTU 7
55
12/11/24
S/A TEMP RESET CONTROLS 2022-CEC-NRCA-MCH-16-A
California Energy Commission Page 2 of 4 January 1, 2023
Table B: Functional Testing
Procedure — Pressurized Duct Leakage Test
Step Entry Functional Test
Code
Reference
0
Pass
Fail
N/A
Check to make sure that chilled/hot water coils, if
used, are not already fully open and calling for
maximum cooling/heating. If so, reverse steps 2
and 3 and/or change the set point range as
necessary to conduct this test
(Pass, Fail, N/A)
NA7.5.15.2(a)
1 No Entry Identify the control parameter NA7.5.15.2(b)
1.1, or Check or
NA Outside air temperature N/A
1.2, or Check or
NA Zone or return air temperature N/A
1.3, or Check or
NA Zone calling for heating or cooling N/A
1.4 Check or
NA Other N/A
2 No Entry
During occupied mode, adjust the reset control
parameter to decrease the supply air temperature
(to the lower supply temperature limit). Verify and
document the following:
NA7.5.15.2
Step 1
2.1 Pass
Fail
Supply air temperature controls modulate as
intended
NA7.5.14.2
Step 1(a)
2.2 Pass
Fail
Actual supply air decreases to meet the new
setpoint within ±2°F
NA7.5.15.2
Step 1(b)
2.2.1 Supply air temperature set point N/A
2.2.2 Actual Supply air temperature N/A
2.3 Supply air temperature stabilizes within 15
minutes
NA7.5.15.2
Step 1(c)
3 No Entry
During occupied mode, adjust the reset control
parameter to increase the supply of air
temperature (to the upper supply temperature
limit). Verify the following:
NA7.5.15.2
Step 2
3.1 Pass
Fail
Supply air temperature controls modulate as
intended
NA7.5.15.2
Step 2(a)
3.2 Pass
Fail
Actual supply air temperature changes to meet
the new setpoint within ±2°F
NA7.5.15.2
Step 2(b)
57
59
Pass
Fail
S/A TEMP RESET CONTROLS 2022-CEC-NRCA-MCH-16-A
California Energy Commission Page 3 of 4 January 1, 2023
Step Entry Functional Test
Code
Reference
3.2.1 Supply air temperature set point N/A
3.2.2 Actual Supply air temperature N/A
3.3 Pass
Fail
Supply air temperature stabilizes within 15
minutes
NA7.5.15.2
Step 2(c)
4 No Entry Restore reset control parameter to automatic
control. Verify and document the following:
NA7.5.15.2
Step 3
4.1 Pass
Fail
Supply air temperature controls modulate as
intended
NA7.5.15.2
Step 3(a)
4.2 Pass
Fail
Actual supply air temperature changes to meet
the new setpoint within ±2°F
NA7.5.15.2
Step 3(b)
4.2.1 Supply air temperature set point N/A
4.2.2 Actual supply air temperature N/A
4.3 Pass
Fail
Supply air temperature stabilizes within 15
minutes
NA7.5.15.2
Step 3(c)
5 Pass
Fail
Verify that the Functional Test complies with ALL
requirements. N/A
65
67
55
57
S/A TEMP RESET CONTROLS
California Energy Commission Page 4 of 4 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
S/A TEMP RESET CONTROLS 2022-CEC-NRCA-MCH-16-A
California Energy Commission Page 1 of 4 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name:Enforcement Agency:
Address:Permit Number:
City, Zip:Permit Acceptance Date:
Building:Floor: Room:Control/tag:
Intent: Verify that the supply air temperature modulates to meet system temperature
setpoint(s). Reference NRCC-MCH-E for nonresidential (including nonresidential
spaces in high-rise multifamily) building permits or LMCC-MCH-E for nonresidential
spaces in low-rise multifamily building permits. Submit one Certificate of
Acceptance for each system that must demonstrate compliance. References:
§120.5(a)15, §140.4(f), §160.3(d)1O, §170.2(c)4D, and NA7.5.15.
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1 No Entry Check the following Required Documentation: N/A
1.1 Pass
Fail
Designs, plans, schematics, and schedules as
approved by the authority having jurisdiction N/A
1.2 Pass
Fail
NRCC-MCH-E or LMCC-MCH-E as approved by the
authority having jurisdiction §10-103(a)2A
1.3 Pass
Fail
Manufacturer specifications, calibration certificates,
or tear sheets for the installed system as available N/A
2 No Entry Prior to functional testing, verify and document the
following: NA7.5.15.1
2.1 Pass
Fail
Supply air temperature reset controls are installed
as specified by the requirements
NA7.5.15.1(a)
§140.4(f)
§170.2(c)4D
2.2 Pass
Fail
All system air temperature sensors are factory or
field calibrated within 2% of a calibrated reference
temperature sensor
NA7.5.15.1(b)
2.3 Document current supply air temperature (°F) NA7.5.15.1(c)
3 Pass
Fail
Verify that the Construction Inspection complies
with ALL requirements. N/A
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
PGA Superstore
79-110 California 111
La Quinta, 92253
N/a First Accessories RTU 3
55
12/11/24
S/A TEMP RESET CONTROLS 2022-CEC-NRCA-MCH-16-A
California Energy Commission Page 2 of 4 January 1, 2023
Table B: Functional Testing
Procedure — Pressurized Duct Leakage Test
Step Entry Functional Test
Code
Reference
0
Pass
Fail
N/A
Check to make sure that chilled/hot water coils, if
used, are not already fully open and calling for
maximum cooling/heating. If so, reverse steps 2
and 3 and/or change the set point range as
necessary to conduct this test
(Pass, Fail, N/A)
NA7.5.15.2(a)
1 No Entry Identify the control parameter NA7.5.15.2(b)
1.1, or Check or
NA Outside air temperature N/A
1.2, or Check or
NA Zone or return air temperature N/A
1.3, or Check or
NA Zone calling for heating or cooling N/A
1.4 Check or
NA Other N/A
2 No Entry
During occupied mode, adjust the reset control
parameter to decrease the supply air temperature
(to the lower supply temperature limit). Verify and
document the following:
NA7.5.15.2
Step 1
2.1 Pass
Fail
Supply air temperature controls modulate as
intended
NA7.5.14.2
Step 1(a)
2.2 Pass
Fail
Actual supply air decreases to meet the new
setpoint within ±2°F
NA7.5.15.2
Step 1(b)
2.2.1 Supply air temperature set point N/A
2.2.2 Actual Supply air temperature N/A
2.3 Supply air temperature stabilizes within 15
minutes
NA7.5.15.2
Step 1(c)
3 No Entry
During occupied mode, adjust the reset control
parameter to increase the supply of air
temperature (to the upper supply temperature
limit). Verify the following:
NA7.5.15.2
Step 2
3.1 Pass
Fail
Supply air temperature controls modulate as
intended
NA7.5.15.2
Step 2(a)
3.2 Pass
Fail
Actual supply air temperature changes to meet
the new setpoint within ±2°F
NA7.5.15.2
Step 2(b)
57
59
Pass
Fail
S/A TEMP RESET CONTROLS 2022-CEC-NRCA-MCH-16-A
California Energy Commission Page 3 of 4 January 1, 2023
Step Entry Functional Test
Code
Reference
3.2.1 Supply air temperature set point N/A
3.2.2 Actual Supply air temperature N/A
3.3 Pass
Fail
Supply air temperature stabilizes within 15
minutes
NA7.5.15.2
Step 2(c)
4 No Entry Restore reset control parameter to automatic
control. Verify and document the following:
NA7.5.15.2
Step 3
4.1 Pass
Fail
Supply air temperature controls modulate as
intended
NA7.5.15.2
Step 3(a)
4.2 Pass
Fail
Actual supply air temperature changes to meet
the new setpoint within ±2°F
NA7.5.15.2
Step 3(b)
4.2.1 Supply air temperature set point N/A
4.2.2 Actual supply air temperature N/A
4.3 Pass
Fail
Supply air temperature stabilizes within 15
minutes
NA7.5.15.2
Step 3(c)
5 Pass
Fail
Verify that the Functional Test complies with ALL
requirements. N/A
65
67
55
57
S/A TEMP RESET CONTROLS
California Energy Commission Page 4 of 4 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
S/A TEMP RESET CONTROLS 2022-CEC-NRCA-MCH-16-A
California Energy Commission Page 1 of 4 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name:Enforcement Agency:
Address:Permit Number:
City, Zip:Permit Acceptance Date:
Building:Floor: Room:Control/tag:
Intent: Verify that the supply air temperature modulates to meet system temperature
setpoint(s). Reference NRCC-MCH-E for nonresidential (including nonresidential
spaces in high-rise multifamily) building permits or LMCC-MCH-E for nonresidential
spaces in low-rise multifamily building permits. Submit one Certificate of
Acceptance for each system that must demonstrate compliance. References:
§120.5(a)15, §140.4(f), §160.3(d)1O, §170.2(c)4D, and NA7.5.15.
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1 No Entry Check the following Required Documentation: N/A
1.1 Pass
Fail
Designs, plans, schematics, and schedules as
approved by the authority having jurisdiction N/A
1.2 Pass
Fail
NRCC-MCH-E or LMCC-MCH-E as approved by the
authority having jurisdiction §10-103(a)2A
1.3 Pass
Fail
Manufacturer specifications, calibration certificates,
or tear sheets for the installed system as available N/A
2 No Entry Prior to functional testing, verify and document the
following: NA7.5.15.1
2.1 Pass
Fail
Supply air temperature reset controls are installed
as specified by the requirements
NA7.5.15.1(a)
§140.4(f)
§170.2(c)4D
2.2 Pass
Fail
All system air temperature sensors are factory or
field calibrated within 2% of a calibrated reference
temperature sensor
NA7.5.15.1(b)
2.3 Document current supply air temperature (°F) NA7.5.15.1(c)
3 Pass
Fail
Verify that the Construction Inspection complies
with ALL requirements. N/A
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
PGA Superstore
79-110 California 111
La Quinta, 92253
N/a First Bags, Studios RTU 5
55
12/11/24
S/A TEMP RESET CONTROLS 2022-CEC-NRCA-MCH-16-A
California Energy Commission Page 2 of 4 January 1, 2023
Table B: Functional Testing
Procedure — Pressurized Duct Leakage Test
Step Entry Functional Test
Code
Reference
0
Pass
Fail
N/A
Check to make sure that chilled/hot water coils, if
used, are not already fully open and calling for
maximum cooling/heating. If so, reverse steps 2
and 3 and/or change the set point range as
necessary to conduct this test
(Pass, Fail, N/A)
NA7.5.15.2(a)
1 No Entry Identify the control parameter NA7.5.15.2(b)
1.1, or Check or
NA Outside air temperature N/A
1.2, or Check or
NA Zone or return air temperature N/A
1.3, or Check or
NA Zone calling for heating or cooling N/A
1.4 Check or
NA Other N/A
2 No Entry
During occupied mode, adjust the reset control
parameter to decrease the supply air temperature
(to the lower supply temperature limit). Verify and
document the following:
NA7.5.15.2
Step 1
2.1 Pass
Fail
Supply air temperature controls modulate as
intended
NA7.5.14.2
Step 1(a)
2.2 Pass
Fail
Actual supply air decreases to meet the new
setpoint within ±2°F
NA7.5.15.2
Step 1(b)
2.2.1 Supply air temperature set point N/A
2.2.2 Actual Supply air temperature N/A
2.3 Supply air temperature stabilizes within 15
minutes
NA7.5.15.2
Step 1(c)
3 No Entry
During occupied mode, adjust the reset control
parameter to increase the supply of air
temperature (to the upper supply temperature
limit). Verify the following:
NA7.5.15.2
Step 2
3.1 Pass
Fail
Supply air temperature controls modulate as
intended
NA7.5.15.2
Step 2(a)
3.2 Pass
Fail
Actual supply air temperature changes to meet
the new setpoint within ±2°F
NA7.5.15.2
Step 2(b)
57
59
Pass
Fail
S/A TEMP RESET CONTROLS 2022-CEC-NRCA-MCH-16-A
California Energy Commission Page 3 of 4 January 1, 2023
Step Entry Functional Test
Code
Reference
3.2.1 Supply air temperature set point N/A
3.2.2 Actual Supply air temperature N/A
3.3 Pass
Fail
Supply air temperature stabilizes within 15
minutes
NA7.5.15.2
Step 2(c)
4 No Entry Restore reset control parameter to automatic
control. Verify and document the following:
NA7.5.15.2
Step 3
4.1 Pass
Fail
Supply air temperature controls modulate as
intended
NA7.5.15.2
Step 3(a)
4.2 Pass
Fail
Actual supply air temperature changes to meet
the new setpoint within ±2°F
NA7.5.15.2
Step 3(b)
4.2.1 Supply air temperature set point N/A
4.2.2 Actual supply air temperature N/A
4.3 Pass
Fail
Supply air temperature stabilizes within 15
minutes
NA7.5.15.2
Step 3(c)
5 Pass
Fail
Verify that the Functional Test complies with ALL
requirements. N/A
65
67
55
57
S/A TEMP RESET CONTROLS
California Energy Commission Page 4 of 4 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 1 of 6 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name: Enforcement Agency:
Address:Permit Number:
City, Zip:Permit Application Date:
Building: Floor: Room: Control/tag:
Intent: This Certificate of Acceptance is intended to verify Energy Code compliance for
nonresidential and hotel/motel (see NRCA-MCH-23-A for multi-family) buildings with
newly installed economizers, dedicated outdoor air system (DOAS), Heat Recovery
Ventilation (HRV) systems, and energy recovery ventilation (ERV) system.
Economizers must be certified to the California Energy Commission in compliance with
JA6.3. Submit one Certificate of Acceptance for each economizer, DOAS, HRV, or ERV
system that must demonstrate compliance with the Energy Code. For direct Energy
Code reference see JA6.3, NA7.5.4, §140.4(e), §120.5(a)4, §160.3(d)1D, and
§170.2(c)4C.
Reference Table R-1 (Table 140.4-G)
Climate Zones Fixed Dry Bulb
Differential Dry Bulb
Fixed Enthalpy with
Fixed Dry bulb
1, 3, 5, 11-16 TOA > 75 oF TOA > TRA oF N/A
2, 4, and 10 TOA > 73 oF TOA > TRA – 2 oF N/A
6, 8, 9 TOA > 71 oF TOA > TRA – 4 oF N/A
7 TOA > 69 oF TOA > TRA – 6 oF N/A
All Climate Zones N/A N/A HOA > 28 Btu/LBS. or
TOA > 75 oF
Where: TOA = Outside Air Temperature
TRA = Return Air Temperature
HOA = Outdoor Air Enthalpy
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1.1 Pass
Fail
All documentation shipped with the economizer,
DOAS, HRV, or ERV system including manuals and
sensor performance curves are available for
review.
NA7.5.4.1(d)
1.2 Pass
Fail
Verify that the sensor output value measured
during sensor calibration is plotted on the
performance curve.
NA7.5.4.1(e)
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
N/a first RTU 1Clubs,
Practice Bay
PGA Super store
79-110 California 111
La Quinta, 92253
12/11/24
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 2 of 6 January 1, 2023
Step Entry Item
Code
Reference
2.1 and P, F, or N/A
Verify that the bypass high limit shutoff control for
the economizer, DOAS, HRV, or ERV system
complies with Reference Table R-1
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
2.2 P, F, or N/A
Verify that at altitudes substantially different than
sea level, the Fixed Enthalpy limit value is set to
the enthalpy value at 75°F and 50% relative
humidity. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
3 P, F, or N/A
Alternative to Step 2
If using Dew Point, Fixed Enthalpy, Electronic
Enthalpy, or Differential Enthalpy Controls
Energy Commission Executive Director
approval for use in California must be
attached. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
4 P, F, or N/A
Verify that devices with selectable (rather than
adjustable) setpoints are capable of being set to
within 2°F and 2 Btu/LBS of the setpoint listed.
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
5 P, F, or N/A
Verify that if the high-limit control is fixed dry-bulb
or fixed enthalpy with fixed dry-bulb, it has an
adjustable setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(b)
6 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass lockout control sensor is located to
prevent false readings.
NA7.5.4.1(c)
7.1, or P, F, or N/A
Verify if using damper for bypass control that the
economizer, DOAS, HRV, or ERV system bypass
damper moves freely without binding.
(Pass, Fail, or N/A)
NA7.5.4.1(f)
7.2 P, F, or N/A
Indicate if bypass control is achieved through
heat/energy recovery wheel rotation speed
modulation as means other than air dampers.
(Pass, Fail, or N/A)
NA7.5.4.1(f)1
8 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass has control systems, including two-
stage or electronic thermostats, that cycle
compressors off when the bypass can provide
partial cooling.
NA7.5.4.1(g)
9.0 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Using the documentation provided in Step 1.1,
verify that the air economizer and all air dampers
have ALL of the following features (9.1-9.8).
(Pass, Fail, or N/A-for non-economizers)
NA7.5.4.1(h)
§140.4(e)2D
§170.2(c)4Ciii
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 3 of 6 January 1, 2023
Step Entry Item
Code
Reference
9.1 Pass
Fail
Warranty. 5-year Manufacturer warranty of
economizer assembly.
NA7.5.4.1(h)
§140.4(e)2Di
§170.2(c)4Ciiia
9.2 Pass
Fail
Damper reliability testing. Certification from
suppliers of economizers that the economizer
assembly, including but not limited to outdoor air
damper, return air damper, drive linkage, and
actuator, have been tested and are able to open
and close against the rated airflow and pressure of
the system for 60,000 damper opening and closing
cycles.
NA7.5.4.1(h)
§140.4(e)2Dii
§170.2(c)4Ciiib
9.3 Pass
Fail
Damper leakage. Economizer outdoor air and
return air dampers have a maximum leakage rate
of 10 cfm/sf at 250 Pascals (1.0 in. of water) when
tested in accordance with AMCA Standard 500-D.
NA7.5.4.1(h)
§140.4(e)2Diii
§170.2(c)4Ciiic
9.4 P, F, or N/A
Adjustable setpoint. If the high-limit control is
fixed dry-bulb or fixed enthalpy with fixed dry-bulb
then verify that the control has an adjustable
setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(h)
§140.4(e)2Div
§170.2(c)4Ciiid
9.5 Pass
Fail
Sensor accuracy. Outdoor air, return air, mixed
air, and supply air sensors are calibrated within
the following accuracies.
1. Dry bulb and wet bulb temperatures accurate to
±2°F over the range of 40°F to 80°F.
2. Enthalpy accurate to ±3 Btu/LBS. over the
range of 20 Btu/LBS. to 36 Btu/LBS.
3. Relative humidity (RH) accurate to ±5 percent
over the range of 20 percent to 80 percent RH.
NA7.5.4.1(h)
§140.4(e)2Dv
§170.2(c)4Ciiie
9.6 Pass
Fail
Sensor calibration data. Data used for control of
the economizer is plotted on a sensor performance
curve.
NA7.5.4.1(h)
§140.4(e)2Dvi
§170.2(c)4Ciiif
9.7 Pass
Fail
Sensor high limit control. Sensors used for the
high limit control are located to prevent false
readings, including but not limited to being
properly shielded from direct sunlight.
NA7.5.4.1(h)
§140.4(e)2Dvii
§170.2(c)4Ciiig
9.8 Pass
Fail
Relief air system. Relief air systems is capable of
providing 100 percent outside air without over-
pressurizing the building.
NA7.5.4.1(h)
§140.4(e)2Dviii
§170.2(c)4Ciiih
10 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Verify that the economizer inlet damper is
designed to modulate up to 100 percent open, and
return air damper to 100 percent closed, without
over-pressurizing the building.
(Pass, Fail, or N/A)
NA7.5.4.1(i)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 4 of 6 January 1, 2023
Step Entry Item
Code
Reference
11.1, or P, F, or N/A
For systems with DDC controls verify that lockout
sensor(s) are either factory calibrated or field
calibrated. (Pass, Fail, or N/A)
NA7.5.4.1(j)
11.2 P, F, or N/A
For systems with non-DDC controls, verify that
manufacturer’s startup and testing procedures
have been applied. (Pass, Fail, or N/A)
NA7.5.4.1(k)
12 P, F, or N/A
For economizers only - DOAS, HRV, or ERV
systems enter N/A.
Verify that the economizer has been certified to
the Energy Commission by consulting the CEC Air
Economizer Certified List
(https://www.energy.ca.gov/media/3259).
(Pass, Fail, or N/A)
§140.4(e)2Diii
§170.2(c)4Ciiic
13 Pass
Fail
Check “Pass” if construction inspection complies
with all requirements.
Check “Fail” if construction inspection does not
comply with all requirements.
NA
Table B: Functional Testing for Air Economizer Controls
Step Entry Functional Test
Code
Reference
0 Exception
N/A
For economizers only - DOAS, HRV, or ERV enter
N/A.
If the economizer is installed by the HVAC
system manufacturer technician (not the
economizer technician), then the economizer is
excepted from this functional test (NA7.5.4.2).
Enter Step 0 as “Exception, by-pass all functional
testing and mark Step 7 as passing; otherwise
enter Step 0 as N/A.
§120.5(a)4
Exception
§160.3(d)1D
Exception
1 P, F, or N/A Disable demand control ventilation systems
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 1
2.0 Pass
Fail
Enable the economizer, DOAS, HRV, or ERV
system and simulate a cooling demand large
enough to drive the bypass to fully open position.
Maintain this status for all of Step 2.
NA7.5.4.2
Step 2
2.1 Pass
Fail
Verify either of the following:
1. Using dampers – bypass is 100 percent open,
and return is 100 percent closed; or
2. Using HRV/ERV wheel – wheel is fully stopped.
NA7.5.4.2
Step 2(a)
Step 2(a)1
2.2 Pass
Fail
Verify that all applicable fans and dampers/wheels
operate as intended to maintain building pressure.
NA7.5.4.2
Step 2(b)
2.3 P, F, or N/A Verify that the economizer heating is disabled
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 2(c)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 5 of 6 January 1, 2023
Step Entry Functional Test
Code
Reference
3.0 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 4.
Disable the economizer and simulate a cooling
demand. Maintain this status for all of Step 3.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 3
Step 3(g)
3.1 Pass
Fail
Verify that the economizer damper closes to its
minimum position.
NA7.5.4.2
Step 3(d)
3.2 Pass
Fail
Verify that all applicable fans and dampers
operate as intended to maintain building pressure.
NA7.5.4.2
Step 3(e)
3.3 P, F, or N/A Verify that the unit heating is disabled (if unit has
heating capability). (Pass, Fail, or N/A)
NA7.5.4.2
Step 3(f)
4.0 Pass
Fail
If unit has heating capability, simulate a heating
demand and set economizer, DOAS, HRV, or ERV
systems so that it is capable of operating (i.e.,
actual outdoor air conditions are below lockout
setpoint). Maintain this status for all of Step 4.
NA7.5.4.2
Step 4
4.1 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the economizer damper is at minimum
position. (Pass, Fail, or N/A)
NA7.5.4.2
Step 4(h)
4.2 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the return air damper opens.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(i)
4.3 P, F, or N/A
For DOAS, HRV, or ERV systems only -
economizers enter as N/A and proceed to Step 5.
Verify that the DOAS, HRV, or ERV systems
bypass control modulates bypass damper/wheel
speed to control temperature setpoint.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(j)
5 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 6.
Turn off the unit and verify that the economizer
damper closes completely.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 5
Step 5(k)
6 Pass
Fail
Restore demand control ventilation systems (if
applicable) and remove all system overrides
initiated.
NA7.5.4.2
Step 6
7 Pass
Fail
Check “Pass” if functional test complies with all
requirements.
Check “Fail” if functional test does not comply
with all requirements.
N/A
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 6 of 6 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 1 of 6 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name: Enforcement Agency:
Address:Permit Number:
City, Zip:Permit Application Date:
Building: Floor: Room: Control/tag:
Intent: This Certificate of Acceptance is intended to verify Energy Code compliance for
nonresidential and hotel/motel (see NRCA-MCH-23-A for multi-family) buildings with
newly installed economizers, dedicated outdoor air system (DOAS), Heat Recovery
Ventilation (HRV) systems, and energy recovery ventilation (ERV) system.
Economizers must be certified to the California Energy Commission in compliance with
JA6.3. Submit one Certificate of Acceptance for each economizer, DOAS, HRV, or ERV
system that must demonstrate compliance with the Energy Code. For direct Energy
Code reference see JA6.3, NA7.5.4, §140.4(e), §120.5(a)4, §160.3(d)1D, and
§170.2(c)4C.
Reference Table R-1 (Table 140.4-G)
Climate Zones Fixed Dry Bulb
Differential Dry Bulb
Fixed Enthalpy with
Fixed Dry bulb
1, 3, 5, 11-16 TOA > 75 oF TOA > TRA oF N/A
2, 4, and 10 TOA > 73 oF TOA > TRA – 2 oF N/A
6, 8, 9 TOA > 71 oF TOA > TRA – 4 oF N/A
7 TOA > 69 oF TOA > TRA – 6 oF N/A
All Climate Zones N/A N/A HOA > 28 Btu/LBS. or
TOA > 75 oF
Where: TOA = Outside Air Temperature
TRA = Return Air Temperature
HOA = Outdoor Air Enthalpy
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1.1 Pass
Fail
All documentation shipped with the economizer,
DOAS, HRV, or ERV system including manuals and
sensor performance curves are available for
review.
NA7.5.4.1(d)
1.2 Pass
Fail
Verify that the sensor output value measured
during sensor calibration is plotted on the
performance curve.
NA7.5.4.1(e)
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
N/a first RTU 4Shoes, Juniors
PGA Super store
79-110 California 111
La Quinta, 92253
12/11/24
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 2 of 6 January 1, 2023
Step Entry Item
Code
Reference
2.1 and P, F, or N/A
Verify that the bypass high limit shutoff control for
the economizer, DOAS, HRV, or ERV system
complies with Reference Table R-1
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
2.2 P, F, or N/A
Verify that at altitudes substantially different than
sea level, the Fixed Enthalpy limit value is set to
the enthalpy value at 75°F and 50% relative
humidity. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
3 P, F, or N/A
Alternative to Step 2
If using Dew Point, Fixed Enthalpy, Electronic
Enthalpy, or Differential Enthalpy Controls
Energy Commission Executive Director
approval for use in California must be
attached. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
4 P, F, or N/A
Verify that devices with selectable (rather than
adjustable) setpoints are capable of being set to
within 2°F and 2 Btu/LBS of the setpoint listed.
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
5 P, F, or N/A
Verify that if the high-limit control is fixed dry-bulb
or fixed enthalpy with fixed dry-bulb, it has an
adjustable setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(b)
6 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass lockout control sensor is located to
prevent false readings.
NA7.5.4.1(c)
7.1, or P, F, or N/A
Verify if using damper for bypass control that the
economizer, DOAS, HRV, or ERV system bypass
damper moves freely without binding.
(Pass, Fail, or N/A)
NA7.5.4.1(f)
7.2 P, F, or N/A
Indicate if bypass control is achieved through
heat/energy recovery wheel rotation speed
modulation as means other than air dampers.
(Pass, Fail, or N/A)
NA7.5.4.1(f)1
8 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass has control systems, including two-
stage or electronic thermostats, that cycle
compressors off when the bypass can provide
partial cooling.
NA7.5.4.1(g)
9.0 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Using the documentation provided in Step 1.1,
verify that the air economizer and all air dampers
have ALL of the following features (9.1-9.8).
(Pass, Fail, or N/A-for non-economizers)
NA7.5.4.1(h)
§140.4(e)2D
§170.2(c)4Ciii
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 3 of 6 January 1, 2023
Step Entry Item
Code
Reference
9.1 Pass
Fail
Warranty. 5-year Manufacturer warranty of
economizer assembly.
NA7.5.4.1(h)
§140.4(e)2Di
§170.2(c)4Ciiia
9.2 Pass
Fail
Damper reliability testing. Certification from
suppliers of economizers that the economizer
assembly, including but not limited to outdoor air
damper, return air damper, drive linkage, and
actuator, have been tested and are able to open
and close against the rated airflow and pressure of
the system for 60,000 damper opening and closing
cycles.
NA7.5.4.1(h)
§140.4(e)2Dii
§170.2(c)4Ciiib
9.3 Pass
Fail
Damper leakage. Economizer outdoor air and
return air dampers have a maximum leakage rate
of 10 cfm/sf at 250 Pascals (1.0 in. of water) when
tested in accordance with AMCA Standard 500-D.
NA7.5.4.1(h)
§140.4(e)2Diii
§170.2(c)4Ciiic
9.4 P, F, or N/A
Adjustable setpoint. If the high-limit control is
fixed dry-bulb or fixed enthalpy with fixed dry-bulb
then verify that the control has an adjustable
setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(h)
§140.4(e)2Div
§170.2(c)4Ciiid
9.5 Pass
Fail
Sensor accuracy. Outdoor air, return air, mixed
air, and supply air sensors are calibrated within
the following accuracies.
1. Dry bulb and wet bulb temperatures accurate to
±2°F over the range of 40°F to 80°F.
2. Enthalpy accurate to ±3 Btu/LBS. over the
range of 20 Btu/LBS. to 36 Btu/LBS.
3. Relative humidity (RH) accurate to ±5 percent
over the range of 20 percent to 80 percent RH.
NA7.5.4.1(h)
§140.4(e)2Dv
§170.2(c)4Ciiie
9.6 Pass
Fail
Sensor calibration data. Data used for control of
the economizer is plotted on a sensor performance
curve.
NA7.5.4.1(h)
§140.4(e)2Dvi
§170.2(c)4Ciiif
9.7 Pass
Fail
Sensor high limit control. Sensors used for the
high limit control are located to prevent false
readings, including but not limited to being
properly shielded from direct sunlight.
NA7.5.4.1(h)
§140.4(e)2Dvii
§170.2(c)4Ciiig
9.8 Pass
Fail
Relief air system. Relief air systems is capable of
providing 100 percent outside air without over-
pressurizing the building.
NA7.5.4.1(h)
§140.4(e)2Dviii
§170.2(c)4Ciiih
10 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Verify that the economizer inlet damper is
designed to modulate up to 100 percent open, and
return air damper to 100 percent closed, without
over-pressurizing the building.
(Pass, Fail, or N/A)
NA7.5.4.1(i)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 4 of 6 January 1, 2023
Step Entry Item
Code
Reference
11.1, or P, F, or N/A
For systems with DDC controls verify that lockout
sensor(s) are either factory calibrated or field
calibrated. (Pass, Fail, or N/A)
NA7.5.4.1(j)
11.2 P, F, or N/A
For systems with non-DDC controls, verify that
manufacturer’s startup and testing procedures
have been applied. (Pass, Fail, or N/A)
NA7.5.4.1(k)
12 P, F, or N/A
For economizers only - DOAS, HRV, or ERV
systems enter N/A.
Verify that the economizer has been certified to
the Energy Commission by consulting the CEC Air
Economizer Certified List
(https://www.energy.ca.gov/media/3259).
(Pass, Fail, or N/A)
§140.4(e)2Diii
§170.2(c)4Ciiic
13 Pass
Fail
Check “Pass” if construction inspection complies
with all requirements.
Check “Fail” if construction inspection does not
comply with all requirements.
NA
Table B: Functional Testing for Air Economizer Controls
Step Entry Functional Test
Code
Reference
0 Exception
N/A
For economizers only - DOAS, HRV, or ERV enter
N/A.
If the economizer is installed by the HVAC
system manufacturer technician (not the
economizer technician), then the economizer is
excepted from this functional test (NA7.5.4.2).
Enter Step 0 as “Exception, by-pass all functional
testing and mark Step 7 as passing; otherwise
enter Step 0 as N/A.
§120.5(a)4
Exception
§160.3(d)1D
Exception
1 P, F, or N/A Disable demand control ventilation systems
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 1
2.0 Pass
Fail
Enable the economizer, DOAS, HRV, or ERV
system and simulate a cooling demand large
enough to drive the bypass to fully open position.
Maintain this status for all of Step 2.
NA7.5.4.2
Step 2
2.1 Pass
Fail
Verify either of the following:
1. Using dampers – bypass is 100 percent open,
and return is 100 percent closed; or
2. Using HRV/ERV wheel – wheel is fully stopped.
NA7.5.4.2
Step 2(a)
Step 2(a)1
2.2 Pass
Fail
Verify that all applicable fans and dampers/wheels
operate as intended to maintain building pressure.
NA7.5.4.2
Step 2(b)
2.3 P, F, or N/A Verify that the economizer heating is disabled
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 2(c)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 5 of 6 January 1, 2023
Step Entry Functional Test
Code
Reference
3.0 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 4.
Disable the economizer and simulate a cooling
demand. Maintain this status for all of Step 3.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 3
Step 3(g)
3.1 Pass
Fail
Verify that the economizer damper closes to its
minimum position.
NA7.5.4.2
Step 3(d)
3.2 Pass
Fail
Verify that all applicable fans and dampers
operate as intended to maintain building pressure.
NA7.5.4.2
Step 3(e)
3.3 P, F, or N/A Verify that the unit heating is disabled (if unit has
heating capability). (Pass, Fail, or N/A)
NA7.5.4.2
Step 3(f)
4.0 Pass
Fail
If unit has heating capability, simulate a heating
demand and set economizer, DOAS, HRV, or ERV
systems so that it is capable of operating (i.e.,
actual outdoor air conditions are below lockout
setpoint). Maintain this status for all of Step 4.
NA7.5.4.2
Step 4
4.1 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the economizer damper is at minimum
position. (Pass, Fail, or N/A)
NA7.5.4.2
Step 4(h)
4.2 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the return air damper opens.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(i)
4.3 P, F, or N/A
For DOAS, HRV, or ERV systems only -
economizers enter as N/A and proceed to Step 5.
Verify that the DOAS, HRV, or ERV systems
bypass control modulates bypass damper/wheel
speed to control temperature setpoint.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(j)
5 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 6.
Turn off the unit and verify that the economizer
damper closes completely.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 5
Step 5(k)
6 Pass
Fail
Restore demand control ventilation systems (if
applicable) and remove all system overrides
initiated.
NA7.5.4.2
Step 6
7 Pass
Fail
Check “Pass” if functional test complies with all
requirements.
Check “Fail” if functional test does not comply
with all requirements.
N/A
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 6 of 6 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 1 of 6 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name: Enforcement Agency:
Address:Permit Number:
City, Zip:Permit Application Date:
Building: Floor: Room: Control/tag:
Intent: This Certificate of Acceptance is intended to verify Energy Code compliance for
nonresidential and hotel/motel (see NRCA-MCH-23-A for multi-family) buildings with
newly installed economizers, dedicated outdoor air system (DOAS), Heat Recovery
Ventilation (HRV) systems, and energy recovery ventilation (ERV) system.
Economizers must be certified to the California Energy Commission in compliance with
JA6.3. Submit one Certificate of Acceptance for each economizer, DOAS, HRV, or ERV
system that must demonstrate compliance with the Energy Code. For direct Energy
Code reference see JA6.3, NA7.5.4, §140.4(e), §120.5(a)4, §160.3(d)1D, and
§170.2(c)4C.
Reference Table R-1 (Table 140.4-G)
Climate Zones Fixed Dry Bulb
Differential Dry Bulb
Fixed Enthalpy with
Fixed Dry bulb
1, 3, 5, 11-16 TOA > 75 oF TOA > TRA oF N/A
2, 4, and 10 TOA > 73 oF TOA > TRA – 2 oF N/A
6, 8, 9 TOA > 71 oF TOA > TRA – 4 oF N/A
7 TOA > 69 oF TOA > TRA – 6 oF N/A
All Climate Zones N/A N/A HOA > 28 Btu/LBS. or
TOA > 75 oF
Where: TOA = Outside Air Temperature
TRA = Return Air Temperature
HOA = Outdoor Air Enthalpy
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1.1 Pass
Fail
All documentation shipped with the economizer,
DOAS, HRV, or ERV system including manuals and
sensor performance curves are available for
review.
NA7.5.4.1(d)
1.2 Pass
Fail
Verify that the sensor output value measured
during sensor calibration is plotted on the
performance curve.
NA7.5.4.1(e)
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
N/a first RTU 2Green, Mens
PGA Super store
79-110 California 111
La Quinta, 92253
12/11/24
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 2 of 6 January 1, 2023
Step Entry Item
Code
Reference
2.1 and P, F, or N/A
Verify that the bypass high limit shutoff control for
the economizer, DOAS, HRV, or ERV system
complies with Reference Table R-1
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
2.2 P, F, or N/A
Verify that at altitudes substantially different than
sea level, the Fixed Enthalpy limit value is set to
the enthalpy value at 75°F and 50% relative
humidity. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
3 P, F, or N/A
Alternative to Step 2
If using Dew Point, Fixed Enthalpy, Electronic
Enthalpy, or Differential Enthalpy Controls
Energy Commission Executive Director
approval for use in California must be
attached. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
4 P, F, or N/A
Verify that devices with selectable (rather than
adjustable) setpoints are capable of being set to
within 2°F and 2 Btu/LBS of the setpoint listed.
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
5 P, F, or N/A
Verify that if the high-limit control is fixed dry-bulb
or fixed enthalpy with fixed dry-bulb, it has an
adjustable setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(b)
6 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass lockout control sensor is located to
prevent false readings.
NA7.5.4.1(c)
7.1, or P, F, or N/A
Verify if using damper for bypass control that the
economizer, DOAS, HRV, or ERV system bypass
damper moves freely without binding.
(Pass, Fail, or N/A)
NA7.5.4.1(f)
7.2 P, F, or N/A
Indicate if bypass control is achieved through
heat/energy recovery wheel rotation speed
modulation as means other than air dampers.
(Pass, Fail, or N/A)
NA7.5.4.1(f)1
8 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass has control systems, including two-
stage or electronic thermostats, that cycle
compressors off when the bypass can provide
partial cooling.
NA7.5.4.1(g)
9.0 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Using the documentation provided in Step 1.1,
verify that the air economizer and all air dampers
have ALL of the following features (9.1-9.8).
(Pass, Fail, or N/A-for non-economizers)
NA7.5.4.1(h)
§140.4(e)2D
§170.2(c)4Ciii
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 3 of 6 January 1, 2023
Step Entry Item
Code
Reference
9.1 Pass
Fail
Warranty. 5-year Manufacturer warranty of
economizer assembly.
NA7.5.4.1(h)
§140.4(e)2Di
§170.2(c)4Ciiia
9.2 Pass
Fail
Damper reliability testing. Certification from
suppliers of economizers that the economizer
assembly, including but not limited to outdoor air
damper, return air damper, drive linkage, and
actuator, have been tested and are able to open
and close against the rated airflow and pressure of
the system for 60,000 damper opening and closing
cycles.
NA7.5.4.1(h)
§140.4(e)2Dii
§170.2(c)4Ciiib
9.3 Pass
Fail
Damper leakage. Economizer outdoor air and
return air dampers have a maximum leakage rate
of 10 cfm/sf at 250 Pascals (1.0 in. of water) when
tested in accordance with AMCA Standard 500-D.
NA7.5.4.1(h)
§140.4(e)2Diii
§170.2(c)4Ciiic
9.4 P, F, or N/A
Adjustable setpoint. If the high-limit control is
fixed dry-bulb or fixed enthalpy with fixed dry-bulb
then verify that the control has an adjustable
setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(h)
§140.4(e)2Div
§170.2(c)4Ciiid
9.5 Pass
Fail
Sensor accuracy. Outdoor air, return air, mixed
air, and supply air sensors are calibrated within
the following accuracies.
1. Dry bulb and wet bulb temperatures accurate to
±2°F over the range of 40°F to 80°F.
2. Enthalpy accurate to ±3 Btu/LBS. over the
range of 20 Btu/LBS. to 36 Btu/LBS.
3. Relative humidity (RH) accurate to ±5 percent
over the range of 20 percent to 80 percent RH.
NA7.5.4.1(h)
§140.4(e)2Dv
§170.2(c)4Ciiie
9.6 Pass
Fail
Sensor calibration data. Data used for control of
the economizer is plotted on a sensor performance
curve.
NA7.5.4.1(h)
§140.4(e)2Dvi
§170.2(c)4Ciiif
9.7 Pass
Fail
Sensor high limit control. Sensors used for the
high limit control are located to prevent false
readings, including but not limited to being
properly shielded from direct sunlight.
NA7.5.4.1(h)
§140.4(e)2Dvii
§170.2(c)4Ciiig
9.8 Pass
Fail
Relief air system. Relief air systems is capable of
providing 100 percent outside air without over-
pressurizing the building.
NA7.5.4.1(h)
§140.4(e)2Dviii
§170.2(c)4Ciiih
10 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Verify that the economizer inlet damper is
designed to modulate up to 100 percent open, and
return air damper to 100 percent closed, without
over-pressurizing the building.
(Pass, Fail, or N/A)
NA7.5.4.1(i)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 4 of 6 January 1, 2023
Step Entry Item
Code
Reference
11.1, or P, F, or N/A
For systems with DDC controls verify that lockout
sensor(s) are either factory calibrated or field
calibrated. (Pass, Fail, or N/A)
NA7.5.4.1(j)
11.2 P, F, or N/A
For systems with non-DDC controls, verify that
manufacturer’s startup and testing procedures
have been applied. (Pass, Fail, or N/A)
NA7.5.4.1(k)
12 P, F, or N/A
For economizers only - DOAS, HRV, or ERV
systems enter N/A.
Verify that the economizer has been certified to
the Energy Commission by consulting the CEC Air
Economizer Certified List
(https://www.energy.ca.gov/media/3259).
(Pass, Fail, or N/A)
§140.4(e)2Diii
§170.2(c)4Ciiic
13 Pass
Fail
Check “Pass” if construction inspection complies
with all requirements.
Check “Fail” if construction inspection does not
comply with all requirements.
NA
Table B: Functional Testing for Air Economizer Controls
Step Entry Functional Test
Code
Reference
0 Exception
N/A
For economizers only - DOAS, HRV, or ERV enter
N/A.
If the economizer is installed by the HVAC
system manufacturer technician (not the
economizer technician), then the economizer is
excepted from this functional test (NA7.5.4.2).
Enter Step 0 as “Exception, by-pass all functional
testing and mark Step 7 as passing; otherwise
enter Step 0 as N/A.
§120.5(a)4
Exception
§160.3(d)1D
Exception
1 P, F, or N/A Disable demand control ventilation systems
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 1
2.0 Pass
Fail
Enable the economizer, DOAS, HRV, or ERV
system and simulate a cooling demand large
enough to drive the bypass to fully open position.
Maintain this status for all of Step 2.
NA7.5.4.2
Step 2
2.1 Pass
Fail
Verify either of the following:
1. Using dampers – bypass is 100 percent open,
and return is 100 percent closed; or
2. Using HRV/ERV wheel – wheel is fully stopped.
NA7.5.4.2
Step 2(a)
Step 2(a)1
2.2 Pass
Fail
Verify that all applicable fans and dampers/wheels
operate as intended to maintain building pressure.
NA7.5.4.2
Step 2(b)
2.3 P, F, or N/A Verify that the economizer heating is disabled
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 2(c)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 5 of 6 January 1, 2023
Step Entry Functional Test
Code
Reference
3.0 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 4.
Disable the economizer and simulate a cooling
demand. Maintain this status for all of Step 3.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 3
Step 3(g)
3.1 Pass
Fail
Verify that the economizer damper closes to its
minimum position.
NA7.5.4.2
Step 3(d)
3.2 Pass
Fail
Verify that all applicable fans and dampers
operate as intended to maintain building pressure.
NA7.5.4.2
Step 3(e)
3.3 P, F, or N/A Verify that the unit heating is disabled (if unit has
heating capability). (Pass, Fail, or N/A)
NA7.5.4.2
Step 3(f)
4.0 Pass
Fail
If unit has heating capability, simulate a heating
demand and set economizer, DOAS, HRV, or ERV
systems so that it is capable of operating (i.e.,
actual outdoor air conditions are below lockout
setpoint). Maintain this status for all of Step 4.
NA7.5.4.2
Step 4
4.1 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the economizer damper is at minimum
position. (Pass, Fail, or N/A)
NA7.5.4.2
Step 4(h)
4.2 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the return air damper opens.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(i)
4.3 P, F, or N/A
For DOAS, HRV, or ERV systems only -
economizers enter as N/A and proceed to Step 5.
Verify that the DOAS, HRV, or ERV systems
bypass control modulates bypass damper/wheel
speed to control temperature setpoint.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(j)
5 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 6.
Turn off the unit and verify that the economizer
damper closes completely.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 5
Step 5(k)
6 Pass
Fail
Restore demand control ventilation systems (if
applicable) and remove all system overrides
initiated.
NA7.5.4.2
Step 6
7 Pass
Fail
Check “Pass” if functional test complies with all
requirements.
Check “Fail” if functional test does not comply
with all requirements.
N/A
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 6 of 6 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 1 of 6 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name: Enforcement Agency:
Address:Permit Number:
City, Zip:Permit Application Date:
Building: Floor: Room: Control/tag:
Intent: This Certificate of Acceptance is intended to verify Energy Code compliance for
nonresidential and hotel/motel (see NRCA-MCH-23-A for multi-family) buildings with
newly installed economizers, dedicated outdoor air system (DOAS), Heat Recovery
Ventilation (HRV) systems, and energy recovery ventilation (ERV) system.
Economizers must be certified to the California Energy Commission in compliance with
JA6.3. Submit one Certificate of Acceptance for each economizer, DOAS, HRV, or ERV
system that must demonstrate compliance with the Energy Code. For direct Energy
Code reference see JA6.3, NA7.5.4, §140.4(e), §120.5(a)4, §160.3(d)1D, and
§170.2(c)4C.
Reference Table R-1 (Table 140.4-G)
Climate Zones Fixed Dry Bulb
Differential Dry Bulb
Fixed Enthalpy with
Fixed Dry bulb
1, 3, 5, 11-16 TOA > 75 oF TOA > TRA oF N/A
2, 4, and 10 TOA > 73 oF TOA > TRA – 2 oF N/A
6, 8, 9 TOA > 71 oF TOA > TRA – 4 oF N/A
7 TOA > 69 oF TOA > TRA – 6 oF N/A
All Climate Zones N/A N/A HOA > 28 Btu/LBS. or
TOA > 75 oF
Where: TOA = Outside Air Temperature
TRA = Return Air Temperature
HOA = Outdoor Air Enthalpy
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1.1 Pass
Fail
All documentation shipped with the economizer,
DOAS, HRV, or ERV system including manuals and
sensor performance curves are available for
review.
NA7.5.4.1(d)
1.2 Pass
Fail
Verify that the sensor output value measured
during sensor calibration is plotted on the
performance curve.
NA7.5.4.1(e)
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
N/a first RTU 5Bags, Studios
PGA Super store
79-110 California 111
La Quinta, 92253
12/11/24
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 2 of 6 January 1, 2023
Step Entry Item
Code
Reference
2.1 and P, F, or N/A
Verify that the bypass high limit shutoff control for
the economizer, DOAS, HRV, or ERV system
complies with Reference Table R-1
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
2.2 P, F, or N/A
Verify that at altitudes substantially different than
sea level, the Fixed Enthalpy limit value is set to
the enthalpy value at 75°F and 50% relative
humidity. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
3 P, F, or N/A
Alternative to Step 2
If using Dew Point, Fixed Enthalpy, Electronic
Enthalpy, or Differential Enthalpy Controls
Energy Commission Executive Director
approval for use in California must be
attached. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
4 P, F, or N/A
Verify that devices with selectable (rather than
adjustable) setpoints are capable of being set to
within 2°F and 2 Btu/LBS of the setpoint listed.
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
5 P, F, or N/A
Verify that if the high-limit control is fixed dry-bulb
or fixed enthalpy with fixed dry-bulb, it has an
adjustable setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(b)
6 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass lockout control sensor is located to
prevent false readings.
NA7.5.4.1(c)
7.1, or P, F, or N/A
Verify if using damper for bypass control that the
economizer, DOAS, HRV, or ERV system bypass
damper moves freely without binding.
(Pass, Fail, or N/A)
NA7.5.4.1(f)
7.2 P, F, or N/A
Indicate if bypass control is achieved through
heat/energy recovery wheel rotation speed
modulation as means other than air dampers.
(Pass, Fail, or N/A)
NA7.5.4.1(f)1
8 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass has control systems, including two-
stage or electronic thermostats, that cycle
compressors off when the bypass can provide
partial cooling.
NA7.5.4.1(g)
9.0 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Using the documentation provided in Step 1.1,
verify that the air economizer and all air dampers
have ALL of the following features (9.1-9.8).
(Pass, Fail, or N/A-for non-economizers)
NA7.5.4.1(h)
§140.4(e)2D
§170.2(c)4Ciii
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 3 of 6 January 1, 2023
Step Entry Item
Code
Reference
9.1 Pass
Fail
Warranty. 5-year Manufacturer warranty of
economizer assembly.
NA7.5.4.1(h)
§140.4(e)2Di
§170.2(c)4Ciiia
9.2 Pass
Fail
Damper reliability testing. Certification from
suppliers of economizers that the economizer
assembly, including but not limited to outdoor air
damper, return air damper, drive linkage, and
actuator, have been tested and are able to open
and close against the rated airflow and pressure of
the system for 60,000 damper opening and closing
cycles.
NA7.5.4.1(h)
§140.4(e)2Dii
§170.2(c)4Ciiib
9.3 Pass
Fail
Damper leakage. Economizer outdoor air and
return air dampers have a maximum leakage rate
of 10 cfm/sf at 250 Pascals (1.0 in. of water) when
tested in accordance with AMCA Standard 500-D.
NA7.5.4.1(h)
§140.4(e)2Diii
§170.2(c)4Ciiic
9.4 P, F, or N/A
Adjustable setpoint. If the high-limit control is
fixed dry-bulb or fixed enthalpy with fixed dry-bulb
then verify that the control has an adjustable
setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(h)
§140.4(e)2Div
§170.2(c)4Ciiid
9.5 Pass
Fail
Sensor accuracy. Outdoor air, return air, mixed
air, and supply air sensors are calibrated within
the following accuracies.
1. Dry bulb and wet bulb temperatures accurate to
±2°F over the range of 40°F to 80°F.
2. Enthalpy accurate to ±3 Btu/LBS. over the
range of 20 Btu/LBS. to 36 Btu/LBS.
3. Relative humidity (RH) accurate to ±5 percent
over the range of 20 percent to 80 percent RH.
NA7.5.4.1(h)
§140.4(e)2Dv
§170.2(c)4Ciiie
9.6 Pass
Fail
Sensor calibration data. Data used for control of
the economizer is plotted on a sensor performance
curve.
NA7.5.4.1(h)
§140.4(e)2Dvi
§170.2(c)4Ciiif
9.7 Pass
Fail
Sensor high limit control. Sensors used for the
high limit control are located to prevent false
readings, including but not limited to being
properly shielded from direct sunlight.
NA7.5.4.1(h)
§140.4(e)2Dvii
§170.2(c)4Ciiig
9.8 Pass
Fail
Relief air system. Relief air systems is capable of
providing 100 percent outside air without over-
pressurizing the building.
NA7.5.4.1(h)
§140.4(e)2Dviii
§170.2(c)4Ciiih
10 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Verify that the economizer inlet damper is
designed to modulate up to 100 percent open, and
return air damper to 100 percent closed, without
over-pressurizing the building.
(Pass, Fail, or N/A)
NA7.5.4.1(i)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 4 of 6 January 1, 2023
Step Entry Item
Code
Reference
11.1, or P, F, or N/A
For systems with DDC controls verify that lockout
sensor(s) are either factory calibrated or field
calibrated. (Pass, Fail, or N/A)
NA7.5.4.1(j)
11.2 P, F, or N/A
For systems with non-DDC controls, verify that
manufacturer’s startup and testing procedures
have been applied. (Pass, Fail, or N/A)
NA7.5.4.1(k)
12 P, F, or N/A
For economizers only - DOAS, HRV, or ERV
systems enter N/A.
Verify that the economizer has been certified to
the Energy Commission by consulting the CEC Air
Economizer Certified List
(https://www.energy.ca.gov/media/3259).
(Pass, Fail, or N/A)
§140.4(e)2Diii
§170.2(c)4Ciiic
13 Pass
Fail
Check “Pass” if construction inspection complies
with all requirements.
Check “Fail” if construction inspection does not
comply with all requirements.
NA
Table B: Functional Testing for Air Economizer Controls
Step Entry Functional Test
Code
Reference
0 Exception
N/A
For economizers only - DOAS, HRV, or ERV enter
N/A.
If the economizer is installed by the HVAC
system manufacturer technician (not the
economizer technician), then the economizer is
excepted from this functional test (NA7.5.4.2).
Enter Step 0 as “Exception, by-pass all functional
testing and mark Step 7 as passing; otherwise
enter Step 0 as N/A.
§120.5(a)4
Exception
§160.3(d)1D
Exception
1 P, F, or N/A Disable demand control ventilation systems
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 1
2.0 Pass
Fail
Enable the economizer, DOAS, HRV, or ERV
system and simulate a cooling demand large
enough to drive the bypass to fully open position.
Maintain this status for all of Step 2.
NA7.5.4.2
Step 2
2.1 Pass
Fail
Verify either of the following:
1. Using dampers – bypass is 100 percent open,
and return is 100 percent closed; or
2. Using HRV/ERV wheel – wheel is fully stopped.
NA7.5.4.2
Step 2(a)
Step 2(a)1
2.2 Pass
Fail
Verify that all applicable fans and dampers/wheels
operate as intended to maintain building pressure.
NA7.5.4.2
Step 2(b)
2.3 P, F, or N/A Verify that the economizer heating is disabled
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 2(c)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 5 of 6 January 1, 2023
Step Entry Functional Test
Code
Reference
3.0 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 4.
Disable the economizer and simulate a cooling
demand. Maintain this status for all of Step 3.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 3
Step 3(g)
3.1 Pass
Fail
Verify that the economizer damper closes to its
minimum position.
NA7.5.4.2
Step 3(d)
3.2 Pass
Fail
Verify that all applicable fans and dampers
operate as intended to maintain building pressure.
NA7.5.4.2
Step 3(e)
3.3 P, F, or N/A Verify that the unit heating is disabled (if unit has
heating capability). (Pass, Fail, or N/A)
NA7.5.4.2
Step 3(f)
4.0 Pass
Fail
If unit has heating capability, simulate a heating
demand and set economizer, DOAS, HRV, or ERV
systems so that it is capable of operating (i.e.,
actual outdoor air conditions are below lockout
setpoint). Maintain this status for all of Step 4.
NA7.5.4.2
Step 4
4.1 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the economizer damper is at minimum
position. (Pass, Fail, or N/A)
NA7.5.4.2
Step 4(h)
4.2 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the return air damper opens.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(i)
4.3 P, F, or N/A
For DOAS, HRV, or ERV systems only -
economizers enter as N/A and proceed to Step 5.
Verify that the DOAS, HRV, or ERV systems
bypass control modulates bypass damper/wheel
speed to control temperature setpoint.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(j)
5 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 6.
Turn off the unit and verify that the economizer
damper closes completely.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 5
Step 5(k)
6 Pass
Fail
Restore demand control ventilation systems (if
applicable) and remove all system overrides
initiated.
NA7.5.4.2
Step 6
7 Pass
Fail
Check “Pass” if functional test complies with all
requirements.
Check “Fail” if functional test does not comply
with all requirements.
N/A
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 6 of 6 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 1 of 6 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name: Enforcement Agency:
Address:Permit Number:
City, Zip:Permit Application Date:
Building: Floor: Room: Control/tag:
Intent: This Certificate of Acceptance is intended to verify Energy Code compliance for
nonresidential and hotel/motel (see NRCA-MCH-23-A for multi-family) buildings with
newly installed economizers, dedicated outdoor air system (DOAS), Heat Recovery
Ventilation (HRV) systems, and energy recovery ventilation (ERV) system.
Economizers must be certified to the California Energy Commission in compliance with
JA6.3. Submit one Certificate of Acceptance for each economizer, DOAS, HRV, or ERV
system that must demonstrate compliance with the Energy Code. For direct Energy
Code reference see JA6.3, NA7.5.4, §140.4(e), §120.5(a)4, §160.3(d)1D, and
§170.2(c)4C.
Reference Table R-1 (Table 140.4-G)
Climate Zones Fixed Dry Bulb
Differential Dry Bulb
Fixed Enthalpy with
Fixed Dry bulb
1, 3, 5, 11-16 TOA > 75 oF TOA > TRA oF N/A
2, 4, and 10 TOA > 73 oF TOA > TRA – 2 oF N/A
6, 8, 9 TOA > 71 oF TOA > TRA – 4 oF N/A
7 TOA > 69 oF TOA > TRA – 6 oF N/A
All Climate Zones N/A N/A HOA > 28 Btu/LBS. or
TOA > 75 oF
Where: TOA = Outside Air Temperature
TRA = Return Air Temperature
HOA = Outdoor Air Enthalpy
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1.1 Pass
Fail
All documentation shipped with the economizer,
DOAS, HRV, or ERV system including manuals and
sensor performance curves are available for
review.
NA7.5.4.1(d)
1.2 Pass
Fail
Verify that the sensor output value measured
during sensor calibration is plotted on the
performance curve.
NA7.5.4.1(e)
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
N/a first RTU 3Accessories
PGA Super store
79-110 California 111
La Quinta, 92253
12/11/24
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 2 of 6 January 1, 2023
Step Entry Item
Code
Reference
2.1 and P, F, or N/A
Verify that the bypass high limit shutoff control for
the economizer, DOAS, HRV, or ERV system
complies with Reference Table R-1
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
2.2 P, F, or N/A
Verify that at altitudes substantially different than
sea level, the Fixed Enthalpy limit value is set to
the enthalpy value at 75°F and 50% relative
humidity. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
3 P, F, or N/A
Alternative to Step 2
If using Dew Point, Fixed Enthalpy, Electronic
Enthalpy, or Differential Enthalpy Controls
Energy Commission Executive Director
approval for use in California must be
attached. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
4 P, F, or N/A
Verify that devices with selectable (rather than
adjustable) setpoints are capable of being set to
within 2°F and 2 Btu/LBS of the setpoint listed.
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
5 P, F, or N/A
Verify that if the high-limit control is fixed dry-bulb
or fixed enthalpy with fixed dry-bulb, it has an
adjustable setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(b)
6 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass lockout control sensor is located to
prevent false readings.
NA7.5.4.1(c)
7.1, or P, F, or N/A
Verify if using damper for bypass control that the
economizer, DOAS, HRV, or ERV system bypass
damper moves freely without binding.
(Pass, Fail, or N/A)
NA7.5.4.1(f)
7.2 P, F, or N/A
Indicate if bypass control is achieved through
heat/energy recovery wheel rotation speed
modulation as means other than air dampers.
(Pass, Fail, or N/A)
NA7.5.4.1(f)1
8 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass has control systems, including two-
stage or electronic thermostats, that cycle
compressors off when the bypass can provide
partial cooling.
NA7.5.4.1(g)
9.0 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Using the documentation provided in Step 1.1,
verify that the air economizer and all air dampers
have ALL of the following features (9.1-9.8).
(Pass, Fail, or N/A-for non-economizers)
NA7.5.4.1(h)
§140.4(e)2D
§170.2(c)4Ciii
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 3 of 6 January 1, 2023
Step Entry Item
Code
Reference
9.1 Pass
Fail
Warranty. 5-year Manufacturer warranty of
economizer assembly.
NA7.5.4.1(h)
§140.4(e)2Di
§170.2(c)4Ciiia
9.2 Pass
Fail
Damper reliability testing. Certification from
suppliers of economizers that the economizer
assembly, including but not limited to outdoor air
damper, return air damper, drive linkage, and
actuator, have been tested and are able to open
and close against the rated airflow and pressure of
the system for 60,000 damper opening and closing
cycles.
NA7.5.4.1(h)
§140.4(e)2Dii
§170.2(c)4Ciiib
9.3 Pass
Fail
Damper leakage. Economizer outdoor air and
return air dampers have a maximum leakage rate
of 10 cfm/sf at 250 Pascals (1.0 in. of water) when
tested in accordance with AMCA Standard 500-D.
NA7.5.4.1(h)
§140.4(e)2Diii
§170.2(c)4Ciiic
9.4 P, F, or N/A
Adjustable setpoint. If the high-limit control is
fixed dry-bulb or fixed enthalpy with fixed dry-bulb
then verify that the control has an adjustable
setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(h)
§140.4(e)2Div
§170.2(c)4Ciiid
9.5 Pass
Fail
Sensor accuracy. Outdoor air, return air, mixed
air, and supply air sensors are calibrated within
the following accuracies.
1. Dry bulb and wet bulb temperatures accurate to
±2°F over the range of 40°F to 80°F.
2. Enthalpy accurate to ±3 Btu/LBS. over the
range of 20 Btu/LBS. to 36 Btu/LBS.
3. Relative humidity (RH) accurate to ±5 percent
over the range of 20 percent to 80 percent RH.
NA7.5.4.1(h)
§140.4(e)2Dv
§170.2(c)4Ciiie
9.6 Pass
Fail
Sensor calibration data. Data used for control of
the economizer is plotted on a sensor performance
curve.
NA7.5.4.1(h)
§140.4(e)2Dvi
§170.2(c)4Ciiif
9.7 Pass
Fail
Sensor high limit control. Sensors used for the
high limit control are located to prevent false
readings, including but not limited to being
properly shielded from direct sunlight.
NA7.5.4.1(h)
§140.4(e)2Dvii
§170.2(c)4Ciiig
9.8 Pass
Fail
Relief air system. Relief air systems is capable of
providing 100 percent outside air without over-
pressurizing the building.
NA7.5.4.1(h)
§140.4(e)2Dviii
§170.2(c)4Ciiih
10 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Verify that the economizer inlet damper is
designed to modulate up to 100 percent open, and
return air damper to 100 percent closed, without
over-pressurizing the building.
(Pass, Fail, or N/A)
NA7.5.4.1(i)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 4 of 6 January 1, 2023
Step Entry Item
Code
Reference
11.1, or P, F, or N/A
For systems with DDC controls verify that lockout
sensor(s) are either factory calibrated or field
calibrated. (Pass, Fail, or N/A)
NA7.5.4.1(j)
11.2 P, F, or N/A
For systems with non-DDC controls, verify that
manufacturer’s startup and testing procedures
have been applied. (Pass, Fail, or N/A)
NA7.5.4.1(k)
12 P, F, or N/A
For economizers only - DOAS, HRV, or ERV
systems enter N/A.
Verify that the economizer has been certified to
the Energy Commission by consulting the CEC Air
Economizer Certified List
(https://www.energy.ca.gov/media/3259).
(Pass, Fail, or N/A)
§140.4(e)2Diii
§170.2(c)4Ciiic
13 Pass
Fail
Check “Pass” if construction inspection complies
with all requirements.
Check “Fail” if construction inspection does not
comply with all requirements.
NA
Table B: Functional Testing for Air Economizer Controls
Step Entry Functional Test
Code
Reference
0 Exception
N/A
For economizers only - DOAS, HRV, or ERV enter
N/A.
If the economizer is installed by the HVAC
system manufacturer technician (not the
economizer technician), then the economizer is
excepted from this functional test (NA7.5.4.2).
Enter Step 0 as “Exception, by-pass all functional
testing and mark Step 7 as passing; otherwise
enter Step 0 as N/A.
§120.5(a)4
Exception
§160.3(d)1D
Exception
1 P, F, or N/A Disable demand control ventilation systems
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 1
2.0 Pass
Fail
Enable the economizer, DOAS, HRV, or ERV
system and simulate a cooling demand large
enough to drive the bypass to fully open position.
Maintain this status for all of Step 2.
NA7.5.4.2
Step 2
2.1 Pass
Fail
Verify either of the following:
1. Using dampers – bypass is 100 percent open,
and return is 100 percent closed; or
2. Using HRV/ERV wheel – wheel is fully stopped.
NA7.5.4.2
Step 2(a)
Step 2(a)1
2.2 Pass
Fail
Verify that all applicable fans and dampers/wheels
operate as intended to maintain building pressure.
NA7.5.4.2
Step 2(b)
2.3 P, F, or N/A Verify that the economizer heating is disabled
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 2(c)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 5 of 6 January 1, 2023
Step Entry Functional Test
Code
Reference
3.0 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 4.
Disable the economizer and simulate a cooling
demand. Maintain this status for all of Step 3.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 3
Step 3(g)
3.1 Pass
Fail
Verify that the economizer damper closes to its
minimum position.
NA7.5.4.2
Step 3(d)
3.2 Pass
Fail
Verify that all applicable fans and dampers
operate as intended to maintain building pressure.
NA7.5.4.2
Step 3(e)
3.3 P, F, or N/A Verify that the unit heating is disabled (if unit has
heating capability). (Pass, Fail, or N/A)
NA7.5.4.2
Step 3(f)
4.0 Pass
Fail
If unit has heating capability, simulate a heating
demand and set economizer, DOAS, HRV, or ERV
systems so that it is capable of operating (i.e.,
actual outdoor air conditions are below lockout
setpoint). Maintain this status for all of Step 4.
NA7.5.4.2
Step 4
4.1 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the economizer damper is at minimum
position. (Pass, Fail, or N/A)
NA7.5.4.2
Step 4(h)
4.2 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the return air damper opens.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(i)
4.3 P, F, or N/A
For DOAS, HRV, or ERV systems only -
economizers enter as N/A and proceed to Step 5.
Verify that the DOAS, HRV, or ERV systems
bypass control modulates bypass damper/wheel
speed to control temperature setpoint.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(j)
5 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 6.
Turn off the unit and verify that the economizer
damper closes completely.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 5
Step 5(k)
6 Pass
Fail
Restore demand control ventilation systems (if
applicable) and remove all system overrides
initiated.
NA7.5.4.2
Step 6
7 Pass
Fail
Check “Pass” if functional test complies with all
requirements.
Check “Fail” if functional test does not comply
with all requirements.
N/A
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 6 of 6 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 1 of 6 January 1, 2023
Project Name and Address Authority Having Jurisdiction
Name: Enforcement Agency:
Address:Permit Number:
City, Zip:Permit Application Date:
Building: Floor: Room: Control/tag:
Intent: This Certificate of Acceptance is intended to verify Energy Code compliance for
nonresidential and hotel/motel (see NRCA-MCH-23-A for multi-family) buildings with
newly installed economizers, dedicated outdoor air system (DOAS), Heat Recovery
Ventilation (HRV) systems, and energy recovery ventilation (ERV) system.
Economizers must be certified to the California Energy Commission in compliance with
JA6.3. Submit one Certificate of Acceptance for each economizer, DOAS, HRV, or ERV
system that must demonstrate compliance with the Energy Code. For direct Energy
Code reference see JA6.3, NA7.5.4, §140.4(e), §120.5(a)4, §160.3(d)1D, and
§170.2(c)4C.
Reference Table R-1 (Table 140.4-G)
Climate Zones Fixed Dry Bulb
Differential Dry Bulb
Fixed Enthalpy with
Fixed Dry bulb
1, 3, 5, 11-16 TOA > 75 oF TOA > TRA oF N/A
2, 4, and 10 TOA > 73 oF TOA > TRA – 2 oF N/A
6, 8, 9 TOA > 71 oF TOA > TRA – 4 oF N/A
7 TOA > 69 oF TOA > TRA – 6 oF N/A
All Climate Zones N/A N/A HOA > 28 Btu/LBS. or
TOA > 75 oF
Where: TOA = Outside Air Temperature
TRA = Return Air Temperature
HOA = Outdoor Air Enthalpy
Table A: Construction Inspection
Prior to functional testing, verify and document all of the following
Step Entry Item
Code
Reference
1.1 Pass
Fail
All documentation shipped with the economizer,
DOAS, HRV, or ERV system including manuals and
sensor performance curves are available for
review.
NA7.5.4.1(d)
1.2 Pass
Fail
Verify that the sensor output value measured
during sensor calibration is plotted on the
performance curve.
NA7.5.4.1(e)
Construction inspection and functional testing comply
Does not comply Date Submitted to AHJ:
N/a first RTU 6Tennis,
womens
PGA Super store
79-110 California 111
La Quinta, 92253
12/11/24
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 2 of 6 January 1, 2023
Step Entry Item
Code
Reference
2.1 and P, F, or N/A
Verify that the bypass high limit shutoff control for
the economizer, DOAS, HRV, or ERV system
complies with Reference Table R-1
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
2.2 P, F, or N/A
Verify that at altitudes substantially different than
sea level, the Fixed Enthalpy limit value is set to
the enthalpy value at 75°F and 50% relative
humidity. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
3 P, F, or N/A
Alternative to Step 2
If using Dew Point, Fixed Enthalpy, Electronic
Enthalpy, or Differential Enthalpy Controls
Energy Commission Executive Director
approval for use in California must be
attached. (Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
4 P, F, or N/A
Verify that devices with selectable (rather than
adjustable) setpoints are capable of being set to
within 2°F and 2 Btu/LBS of the setpoint listed.
(Pass, Fail, or N/A)
NA7.5.4.1(a)
§140.4(e)2
Table 140.4-G
§170.2(c)4Cii
Table 170.2-G
5 P, F, or N/A
Verify that if the high-limit control is fixed dry-bulb
or fixed enthalpy with fixed dry-bulb, it has an
adjustable setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(b)
6 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass lockout control sensor is located to
prevent false readings.
NA7.5.4.1(c)
7.1, or P, F, or N/A
Verify if using damper for bypass control that the
economizer, DOAS, HRV, or ERV system bypass
damper moves freely without binding.
(Pass, Fail, or N/A)
NA7.5.4.1(f)
7.2 P, F, or N/A
Indicate if bypass control is achieved through
heat/energy recovery wheel rotation speed
modulation as means other than air dampers.
(Pass, Fail, or N/A)
NA7.5.4.1(f)1
8 Pass
Fail
Verify that the economizer, DOAS, HRV, or ERV
system bypass has control systems, including two-
stage or electronic thermostats, that cycle
compressors off when the bypass can provide
partial cooling.
NA7.5.4.1(g)
9.0 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Using the documentation provided in Step 1.1,
verify that the air economizer and all air dampers
have ALL of the following features (9.1-9.8).
(Pass, Fail, or N/A-for non-economizers)
NA7.5.4.1(h)
§140.4(e)2D
§170.2(c)4Ciii
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 3 of 6 January 1, 2023
Step Entry Item
Code
Reference
9.1 Pass
Fail
Warranty. 5-year Manufacturer warranty of
economizer assembly.
NA7.5.4.1(h)
§140.4(e)2Di
§170.2(c)4Ciiia
9.2 Pass
Fail
Damper reliability testing. Certification from
suppliers of economizers that the economizer
assembly, including but not limited to outdoor air
damper, return air damper, drive linkage, and
actuator, have been tested and are able to open
and close against the rated airflow and pressure of
the system for 60,000 damper opening and closing
cycles.
NA7.5.4.1(h)
§140.4(e)2Dii
§170.2(c)4Ciiib
9.3 Pass
Fail
Damper leakage. Economizer outdoor air and
return air dampers have a maximum leakage rate
of 10 cfm/sf at 250 Pascals (1.0 in. of water) when
tested in accordance with AMCA Standard 500-D.
NA7.5.4.1(h)
§140.4(e)2Diii
§170.2(c)4Ciiic
9.4 P, F, or N/A
Adjustable setpoint. If the high-limit control is
fixed dry-bulb or fixed enthalpy with fixed dry-bulb
then verify that the control has an adjustable
setpoint. (Pass, Fail, or N/A)
NA7.5.4.1(h)
§140.4(e)2Div
§170.2(c)4Ciiid
9.5 Pass
Fail
Sensor accuracy. Outdoor air, return air, mixed
air, and supply air sensors are calibrated within
the following accuracies.
1. Dry bulb and wet bulb temperatures accurate to
±2°F over the range of 40°F to 80°F.
2. Enthalpy accurate to ±3 Btu/LBS. over the
range of 20 Btu/LBS. to 36 Btu/LBS.
3. Relative humidity (RH) accurate to ±5 percent
over the range of 20 percent to 80 percent RH.
NA7.5.4.1(h)
§140.4(e)2Dv
§170.2(c)4Ciiie
9.6 Pass
Fail
Sensor calibration data. Data used for control of
the economizer is plotted on a sensor performance
curve.
NA7.5.4.1(h)
§140.4(e)2Dvi
§170.2(c)4Ciiif
9.7 Pass
Fail
Sensor high limit control. Sensors used for the
high limit control are located to prevent false
readings, including but not limited to being
properly shielded from direct sunlight.
NA7.5.4.1(h)
§140.4(e)2Dvii
§170.2(c)4Ciiig
9.8 Pass
Fail
Relief air system. Relief air systems is capable of
providing 100 percent outside air without over-
pressurizing the building.
NA7.5.4.1(h)
§140.4(e)2Dviii
§170.2(c)4Ciiih
10 P, F, or N/A
For economizers only - DOAS, HRV, or ERV system
indicate N/A and proceed to Step 11.1.
Verify that the economizer inlet damper is
designed to modulate up to 100 percent open, and
return air damper to 100 percent closed, without
over-pressurizing the building.
(Pass, Fail, or N/A)
NA7.5.4.1(i)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 4 of 6 January 1, 2023
Step Entry Item
Code
Reference
11.1, or P, F, or N/A
For systems with DDC controls verify that lockout
sensor(s) are either factory calibrated or field
calibrated. (Pass, Fail, or N/A)
NA7.5.4.1(j)
11.2 P, F, or N/A
For systems with non-DDC controls, verify that
manufacturer’s startup and testing procedures
have been applied. (Pass, Fail, or N/A)
NA7.5.4.1(k)
12 P, F, or N/A
For economizers only - DOAS, HRV, or ERV
systems enter N/A.
Verify that the economizer has been certified to
the Energy Commission by consulting the CEC Air
Economizer Certified List
(https://www.energy.ca.gov/media/3259).
(Pass, Fail, or N/A)
§140.4(e)2Diii
§170.2(c)4Ciiic
13 Pass
Fail
Check “Pass” if construction inspection complies
with all requirements.
Check “Fail” if construction inspection does not
comply with all requirements.
NA
Table B: Functional Testing for Air Economizer Controls
Step Entry Functional Test
Code
Reference
0 Exception
N/A
For economizers only - DOAS, HRV, or ERV enter
N/A.
If the economizer is installed by the HVAC
system manufacturer technician (not the
economizer technician), then the economizer is
excepted from this functional test (NA7.5.4.2).
Enter Step 0 as “Exception, by-pass all functional
testing and mark Step 7 as passing; otherwise
enter Step 0 as N/A.
§120.5(a)4
Exception
§160.3(d)1D
Exception
1 P, F, or N/A Disable demand control ventilation systems
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 1
2.0 Pass
Fail
Enable the economizer, DOAS, HRV, or ERV
system and simulate a cooling demand large
enough to drive the bypass to fully open position.
Maintain this status for all of Step 2.
NA7.5.4.2
Step 2
2.1 Pass
Fail
Verify either of the following:
1. Using dampers – bypass is 100 percent open,
and return is 100 percent closed; or
2. Using HRV/ERV wheel – wheel is fully stopped.
NA7.5.4.2
Step 2(a)
Step 2(a)1
2.2 Pass
Fail
Verify that all applicable fans and dampers/wheels
operate as intended to maintain building pressure.
NA7.5.4.2
Step 2(b)
2.3 P, F, or N/A Verify that the economizer heating is disabled
(if applicable). (Pass, Fail, or N/A)
NA7.5.4.2
Step 2(c)
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 5 of 6 January 1, 2023
Step Entry Functional Test
Code
Reference
3.0 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 4.
Disable the economizer and simulate a cooling
demand. Maintain this status for all of Step 3.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 3
Step 3(g)
3.1 Pass
Fail
Verify that the economizer damper closes to its
minimum position.
NA7.5.4.2
Step 3(d)
3.2 Pass
Fail
Verify that all applicable fans and dampers
operate as intended to maintain building pressure.
NA7.5.4.2
Step 3(e)
3.3 P, F, or N/A Verify that the unit heating is disabled (if unit has
heating capability). (Pass, Fail, or N/A)
NA7.5.4.2
Step 3(f)
4.0 Pass
Fail
If unit has heating capability, simulate a heating
demand and set economizer, DOAS, HRV, or ERV
systems so that it is capable of operating (i.e.,
actual outdoor air conditions are below lockout
setpoint). Maintain this status for all of Step 4.
NA7.5.4.2
Step 4
4.1 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the economizer damper is at minimum
position. (Pass, Fail, or N/A)
NA7.5.4.2
Step 4(h)
4.2 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter Steps 4.1 and 4.2 as N/A and
proceed to Step 4.3.
Verify that the return air damper opens.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(i)
4.3 P, F, or N/A
For DOAS, HRV, or ERV systems only -
economizers enter as N/A and proceed to Step 5.
Verify that the DOAS, HRV, or ERV systems
bypass control modulates bypass damper/wheel
speed to control temperature setpoint.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 4(j)
5 P, F, or N/A
For economizers only – DOAS, HRV, or ERV
systems enter as N/A and proceed to Step 6.
Turn off the unit and verify that the economizer
damper closes completely.
(Pass, Fail, or N/A)
NA7.5.4.2
Step 5
Step 5(k)
6 Pass
Fail
Restore demand control ventilation systems (if
applicable) and remove all system overrides
initiated.
NA7.5.4.2
Step 6
7 Pass
Fail
Check “Pass” if functional test complies with all
requirements.
Check “Fail” if functional test does not comply
with all requirements.
N/A
ECONOMIZER DOAS HRV ERV 2022-CEC-NRCA-MCH-05-A
California Energy Commission Page 6 of 6 January 1, 2023
Declaration Statement Signatory
Document Author
I assert that this Certificate of Acceptance documentation is accurate and complete.
Acceptance Test Technician
I certify the following under penalty of perjury, under the laws of the State of California:
The information provided on this Certificate of Acceptance is true and correct. I am the person who
performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The
construction or installation identified on this Certificate of Acceptance complies with the applicable
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or
installation identified on this Certificate of Acceptance has been completed and signed by the responsible
builder/installer and has been posted or made available with the building permit(s) issued for the building.
Responsible Person
I assert the following under penalty of perjury, under the laws of the State of California:
I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and
I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3
of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction or installation of features, materials, components, or manufactured devices for the
scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement
(responsible acceptance person). The information provided on this Certificate of Acceptance substantiates
that the construction or installation identified on this Certificate of Acceptance complies with the
acceptance requirements indicated in the plans and specifications approved by the enforcement agency
and conforms to the applicable acceptance requirements and procedures specified in Reference
Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction
or installation identified on this Certificate of Acceptance has been completed and is posted or made
available with the building permit(s) issued for the building. I understand that a completed, signed copy of
this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections, and I will take the
necessary steps to ensure this requirement is accomplished. I understand that a signed copy of this
Certificate of Acceptance is required to be included with the documentation the builder provides to the
building owner at occupancy, and I will take the necessary steps to ensure this requirement is
accomplished.
David Folger
Bradley Mechanical
748290
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
Project Manager
(714)964-4600
12/11/2024
David Folger
Bradley Mechanical
12/11/2024