Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Andalusia TR 37790 BCPR2023-0006 (Plan 201 & 202) 2022 Code Update
i3 PLAN • -•- • • cMrnn<<� Plan Type: Building Construction Plan Review Plan No.: BCPR2023-0006 Work Class: Building Construction Plan Review District: City of La Quinta Status: Expired Square Feet: 0.00 Valuation: $0.00 Assigned To: Description: ANDALUSIA CLUB VILLAS ACC PLANS 201 and 202 CODE UPDATE 2022 Parcel: 764620041 Main I Address: Andalusia - Plan 201 & 202 Contractor Applicant Nolan Sparks Nolan Sparks 81570 Carboneras La Quinta, 81570 Carboneras La Quinta, CA 92253 CA 92253 Plan Custom Fields Tract / Subdivision Name Code Edition City Limits Lot Number Lot Size App Date: 05/09/2023 Exp Date: 05/08/2024 Completed: NOT COMPLETED Approval Expire Date: NOT AVAILABLE Main I Zone: ANDALUSIA CLUB Tract Number 37790 Number of Plan Types SFDX2 VILLAS 2022 Is this a revision? No General Plan ROW Within La Quinta City Acreage 3.83 Subdivision Name TR 31681-2 Limits S Legal Description Lot S MB 397/34 TR Centerlines 92341, 96267, 96417, 31681-2 96877,92339,96866, 96415, 113092, 96268, 96124, 96878, 96418, 96125, 96126, 96416, 96269, 96879, 92340 22528.3 Attachment File Name Added On Added By Attachment Group Notes BCPR2023-0006 Tract 31681 COA 09/29/2023 13:26 Cox, Chris Available Online Fire 9.29.23.pdf BCPR2023-0006 - 2ND REVIEW - 09/29/2023 15:39 Clayton, Duane Available Online 2ND REVIEW CORRECTION LIST COMPLETE CORRECTION LIST.pdf BCPR2020-0009 - APPROVED ENERG' 10/19/2023 13:26 Clayton, Duane Available Online APPROVED ENERGY 201 REPORT (PLAN 201) CF.pdf BCPR2020-0009 - APPROVED ENERG' 10/19/2023 13:26 Clayton, Duane Available Online APPROVED ENERGY 202 REPORT (PLAN 202) CF.pdf BCPR2020-0009 - APPROVED PLAN 10/19/2023 13:26 Clayton, Duane Available Online APPROVED PLAN SET SET (PLANS 201 - 202) CF.pdf Construction Plan 10/19/2023 13:27 Clayton, Duane Available Online Construction Plan Set Set-2023-09-19-D 1 _v1. pdf BCPR2023-0006 -APPROVED 10/20/2023 4:58 Clayton, Duane Available Online APPROVED STRUCTURAL CALCULATIONS STRUCTURAL CALCULATIONS (PLAN 201 & 202) S.pdf BCPR2023-0006 - APPROVED TRUSS 10/20/2023 4:58 Clayton, Duane Available Online APPROVED TRUSS PACKAGE PACKAGE (PLAN 201 & 202) S.pdf FOUNDATION REVIEW LETTER 10/20/2023 8:03 Mendez, Deisy Available Online Other Misc Documents PC3_v1.pdf GEOTECHNICAL LETTER PC3_v1.pdf 10/20/2023 8:03 Mendez, Deisy Available Online Geotechnical Report Invoice No. Fee Fee Amount Amount Paid INV-00001788 Hourly Charge - City Building Staff $175.00 $175.00 Hourly Charge - City Building Staff $175.00 $175.00 Hourly Charge - Interwest Plan Check Engineer 2023 $125.00 $125.00 Hourly Charge - City Building Staff $175.00 $175.00 Credit Card Convenience Fee $16.25 $16.25 April 25, 2025 78-495 Calle Tampico Page 1 of 2 Total for Invoice INV-00001788 $666.25 $666.25 Grand Total for Plan $666.25 $666.25 Submittal Name Status Received Date Due Date Building Major Review v.1 Requires Re -submit 05/09/2023 05/31/2023 Submittal Name Status Received Date Due Date Building Major Review v.2 Requires Re -submit 08/11/2023 08/25/2023 Item Review Name Department Assigned User Status Building Building Clayton, Duane Revisions Required Item Review Name Department Assigned User Status Fire Department - Building Cases Office of the Fire Marshal Cox, Chris Approved Comments: CREATED IN TRAKIT, ONLY UPDATED IN TYLER AS OF 9/19/2023 BY AOR Item Review Name Department Complete Outside Agency Submittal Name Status Building Major Review v.3 Approved Item Review Name Department Building Building Comments: PC3 IN-HOUSE PER DC Workflow Step / Action Name Plan Check v.1 Building Major Review v.1 Building Major Review v.2 Building Major Review v.3 Linked Records v.1 Linked Permits v.1 Assigned User Status Clayton, Duane Revisions Required Received Date Due Date 10/ 13/2023 10/20/2 023 Assigned User Status Clayton, Duane Approved Complete Date Resubmit Completed 09/19/2023 Yes Yes Complete Date Resubmit Completed 09/29/2023 Yes Yes Assigned Due Completed Date Date Date 09/19/2023 08/25/2023 09/20/2023 Assigned Due Completed Date Date Date 09/19/2023 08/25/2023 09/29/2023 Assigned Due Completed Date Date Date 09/19/2023 08/25/2023 09/20/2023 Complete Date Resubmit Completed 10/19/2023 No Yes Assigned Due Completed Date Date Date 10/ 13/2 02 3 10/20/2023 10/19/2023 Action Type Start Date End Date Receive Submittal 09/19/2023 0:00 09/19/2023 8:53 Receive Submittal 09/19/2023 0:00 09/29/2023 11:53 Receive Submittal 10/13/2023 0:00 10/19/2023 13:27 Create Sub Permit April 25, 2025 78-495 Calle Tampico Page 2 of 2 CAL FIRE — RIVERSIDE UNIT RIVERSIDE COUNTY FIRE DEPARTMENT �Cci BILL WEISER -- FIRE CHIEF OFFICE OF THE FIRE MARSHAL — LA QUINTA-CALIFORNIA - 78495 Calle Tampico, La Quinta, CA 92253 • Phone (760) 777-7074 • www.rvcfire.org September 29, 2023 ATTN: National Mortgage & Land Company Re: Residential Fire Access & Water / ESS Plan Review — ANDALUSIA CLUB VILLAS ACC PLANS 201 and 202 CODE UPDATE 2022) BCPR2023-0006 / TRACT 31681 The plans you submitted for the above referenced project have been reviewed by Riverside County Fire Department - Office of the Fire Marshal personnel and are approved with the following conditions. 1) Property/Unit Addressing shall be provided. Minimum 4-inch tall numbers of contrasting color to their background shall be displayed on the structure and viewable from the roadway or posted at the driveway entrance and maintained visible. 2) Vehicle Gates/barricades restricting fire access to the structure are required/recommended to be provided with KNOX emergency access. (CFC 503.6) 3) Public/Private fire hydrants located in front of the property shall be provided with a minimum 3-feet radius around the hydrant of clearance of any obstructions, including vegetation. 4) Dwelling Units shall maintain a minimum 3-feet clear width Egress Court from emergency escape windows and doors of sleeping rooms and shall deposit to the front of the property or public way. These courts shall be traversable pathways, free of obstructions and landscaping intrusions. (Ref. CBC 1028.4 / CRC R311.1) 5) Energy Storage Systems shall comply with CFC 1206.11. a. Fire Detection - Areas shall be protected by smoke alarms. A listed heat detector shall be installed in locations within dwelling units and attached garages where smoke alarms cannot be installed based on their listing. b. Protection from Impact — ESS installed in a location subject to vehicle damage shall be protected by approved barriers. c. Operating Temperatures — ESS system manuals shall be consulted. Compliance with the maximum operating ambient temperatures shall be complied with. Provision of HVAC climate control may be necessary. 6) A Residential Fire Sprinkler system shall be installed in compliance with CRC R313. CA Licensed Contractor (C-16) shall submit plans and details for review and approval prior to system installation and Rough Inspections. The Fire Department approved plans and conditions letter must be at the job site. Applicant shall be responsible to contact the Fire Department to schedule inspections. Requests for inspections are to be made at least 48 hours in advance and may be arranged by calling (760)777-7131. All questions regarding the meaning of these conditions should be referred to the Office of the Fire Marshal staff at (760)777-7078. Chris Cox — Fire Safety Supervisor DESIGN & DEVELOPMENT DEPARTMENT 78-495 CALLS TAMPICO LA QUINTA, CALIFORNIA 92253 (760) 777-7125 FAX (760) 777-7011 RESIDENTIAL PLAN CHECK CORRECTION LIST DATE: 9/20/2023 STATUS: SECOND REVIEW PLANS 201 & 202 PLAN CHECKED BY: DUANE CLAYTON TELEPHONE NUMBER: 760-777-7084 ADDRESS: 81570 CARBONERAS DESCRIPTION: NEW SFD APPLICANT: NAT'L MORTGAGE & LAND PLAN CHECK #: BCPR2023-0007 This submittal has been checked for compliance with the 2022 California Residential, Green Building and Energy Codes, and the City of La Quinta Municipal Code. APPLICANT: The following items are being returned to you for correction: 1— 2ND SUBMITTAL PLAN SET THIS CORRECTION LIST BUILDING DEPARTMENT STAFF: DO NOT accept any resubmittal unless ALL of the following items are included: 1— REVISED PLAN THIS CORRECTION LIST W/RESPONSES INSTRUCTIONS TO APPLICANT: 1) Provide a written response to each comment on the following pages, noting specifically where the correction can be found. Responses such as, "Sheet A-3," or, "Handrails shall be per CBC Section 1003," are not acceptable. Show or note specifically how compliance with a code requirement is achieved. Responses such as, "Added note 16 on sheet A-3" are appropriate and will help expedite your back check. 2) Corrections may not be made by handwriting on existing drawings. Revise originals and reprint Plans and/or Calculations as necessary. 3) Return all red -marked Plans and/or Calculations with your resubmittal. 4) Each sheet of resubmitted Plans and/or Calculations shall include the preparer's name and telephone number and shall be wet -signed by the preparer. If the preparer is a licensed architect or engineer, all documents prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code Section 5536. Resubmittals will not be accepted with signatures missing. 5) Return this list, your written responses, and all documents listed above with your resubmittal. Residential Plan Check Correction List Page 1 of 3 SECTION A - GENERAL 1) Provide written evidence from Burrtec Waste, approving a waste management plan that diverts not less than 65% of the construction materials from landfill for the project. Contact the District Environmental Coordinator directly at (760) 674-1026 for free assistance with the preparation of this plan. SECTION B — PRECISE / SITE PLAN / ZONING 1) No comments remain. SECTION C - ARCHITECTURAL 1) No comments remain. SECTION D - MECHANICAL 1) No comments remain. SECTION E — ELECTRICAL 1) No comments remain. SECTION F - PLUMBING 1) No comments. SECTION G — ENERGY EFFICIENCY 1) PC-1: Provide complete energy calculations showing compliance with the 2022 California Energy Code for this project. Due to lack of information in this submittal, a comprehensive review will be performed at the next submittal. PC-2: Comment continues. Energy documents have been incorporated into the plan set, thank you. The azimuth orientation of the proposed pv array is called out at 180 degrees (South). I encourage the use of the California Flexible Installation (CFI) range, which is 150-270 degrees. This is typically the go -to option for tract construction where it is not possible to achieve one orientation of installation for all homes. 2) PC-1: Energy storage systems (ESS) ready. All single-family residences that include one or two dwelling units shall meet the following. All electrical components shall be installed in accordance with the California Electrical Code: 1. At least one of the following shall be provided: A. ESS ready interconnection equipment with a minimum backed -up capacity of 60 amps and a minimum of four ESS-supplied branch circuits, or B. A dedicated raceway from the main service to a panelboard (subpanel) that supplies the branch circuits in Section 150.0(s)(2). All branch circuits are permitted to be supplied by the main service panel prior to the installation of an ESS. The trade size of the raceway shall be not less than 1 inch. The panelboard that supplies the branch circuits (subpanel) must be labeled "Subpanel shall include all backed -up load circuits." 2. A minimum of four branch circuits shall be identified and have their source of supply collocated at a single panelboard suitable to be supplied by the ESS. At least one circuit shall supply the refrigerator, one lighting circuit shall be located near the primary egress and at least one circuit shall supply a sleeping room receptacle outlet. 3. The main panelboard shall have a minimum busbar rating of 225 amps. 4. Sufficient space shall be reserved to allow future installation of a system isolation equipment/transfer switch within 3 feet of the main panelboard. Raceways shall be installed between the panelboard and the system isolation equipment/transfer switch location to allow the connection of backup power source. PC-2: Comment partially addressed. Note on plans verified, thank you. Please indicate on the single line diagram a backup capacity of 60 amps minimum for the solar panel, and indicate the four required back up circuits and the panel they are to be located in. Refer to code reference above. For reference, 400 amp split main services that have both Residential Plan Check Correction List Page 2 of 3 ceitY Ot4a" main overcurrent devices in the same compartment are no longer permitted in the electrical code (230.71(B)). The single line only shows one throw for the panel, but I believe the services used in the past, on that tract, have been the split main type. Clarify which type of main service is being used. Please reach out with any questions regarding this new requirement. SECTION H - CALGREEN 1) No comments. SECTION I - STRUCTURAL 1) PC-1: S1. Drawing SN1: B. Please provide a code update letter from the soils engineer. C. Please provide soils engineer stamp/signature on foundation plans and details or an updated review letter from soils engineer. D. Please coordinate sheets with originally approved set of drawings. Simpson SSW detail sheets are missing. PC-2: Comment partially addressed. Item D remains from previous review. SECTION J — SOIL / FOUNDATION 1) See comment above. SECTION K - MISCELLANEOUS COMMENTS 1) Red marks on Plans, even if not specifically mentioned in this list, indicate items needing correction. Revise Plans as necessary and provide written response, noting where correction can be found. END CORRECTION LIST As further information is provided and reviewed, additional corrections may be required. Residential Plan Check Correction List Page 3 of 3 August 24, 2023 CITY OF LA QUINTA - SECOND REVIEW Permit No: BCPR2023-0007 Interwest No.: LAQ23-0041 Non -Structural: 0.5-hours Structural: 0.5-hours City of La Quinta Building Department 78-495 Calle Tampico La Quinta, CA 92253 Plan Review: ACC 301, 302, 303 2022 Code Updates Address: 81570 Carboneras 0 r"T INTERWEST A SAFEbuilt COMPANY Interwest Consulting Group has completed a second code compliance review of the following documents on behalf of the City of La Quinta: 1. Drawings: Electronic copies of following: a. CS through D-6 dated 811412023 by PEKAREK. b. SN1 through SD3 dated 711912023 by Gouvis. C. E-1.0 through T24.1 dated 81812023 by GLS. 2. Structural Calculations: Electronic copies dated 5/8/2023 by Gouvis. 3. Energy Compliance Documentation: Electronic copies dated 81812023 by GLS. 4. Geotechnical Investigation: Not provided. The applicable provisions of the 2022 California Building Standards Code were used as the basis of this review. Plan review comments follow on the attached list. Please submit an itemized response letter and complete and revised documents with directly to city of La Quinta Building and Safety Department. Sincerely, INTERWEST CONSULTING GROUP Martha Diaz, P.E. Plans Examiner mdiaz(@interwestgrp.com 909.719.0249 1500 S. Haven Ave I Suite 220 Ontario, CA 91761 909.295-3142 INTERd'ESTGRP.COH ACC Plans (301, 30Zand 303) Code Updates 59000 Madison St. 8124123 PROJECT DATA: City of La Quints - Second Review Interwest Project No.: LAQ23-0041 Permit App: BCPR2023-0007 Page 2 of 4 Occupancy Group: Area (sq. ft.): (301/302/303) R3 U R3 (patios) 3,333/3,694/4,038 743/650/733 532/693/765 Total Area: 4,608/5,037/5,536 Building Height: Varies Building Stories: 1/1/1 Type of Construction: VB Occupant Load: <10 Sprinklered: Y Valuation: TBD Risk Category: II Site Class (seismic): D-default Seismic Design Category: D GENERAL COMMENTS: G1. The following plan review documents are based on the City of La Quinta Building Regulations. The following comments reference the 2022 California Building Standards Code as amended by the authority having jurisdiction unless otherwise noted. G2. Please respond in writing to each plan review comment by marking this comment list or creating a response letter. Indicate which detail, specification, or calculation shows the requested information. At minimum, the following should be included with each plan review response: • Page / sheet number(s), detail / specification number(s), etc., and include all applicable code section(s). Briefly explain in writing how the design is intended to comply with the applicable code sections. Please provide a narrative of revisions made outside the plan review comments. Complete and clear responses will expedite the re -check of this project. G3. Please be sure to include on the re -submittal the architect's and /or engineer's stamp, signature, date of signature, and registration number on all sheets of plans depicting structural designed elements and cover sheets of calculations. CBPC 5536.1 and 6735. INTERWEST ACC Plans (301, 30Zand 303) Code Updates 59000 Madison St. 8124123 City of La Quints - Second Review Interwest Project No.: LAQ23-0041 Permit App: BCPR2023-0007 Page 3 of 4 PLAN REVIEW COMMENTS: The revised permit documents have been reviewed. The following comments are numbered per the original list and require further response and/or revision. The format includes the original comment followed by a new or clarified recheck comment in bold italic typeface, prefaced by PC2. BUILDING AND LIFE SAFETY: Al. Drawing 301-3/302-3/303-3: No further comments 812412023 MD ENERGY COMPLIANCE: Electrical Compliance: EEL Drawings 301-3/302-3/303-3: No further comments 812412023 MD EE2. Drawings 301-6/302-6/303-6: No further comments 812412023 MD Mechanical Compliance: No comments 5/30/2023 MD Envelope Compliance: No comments 5/30/2023 MD CaIGREEN: No comments 5/30/2023 MD STRUCTURAL: S1. Drawing SN1: B. Please provide a code update letter from the soils engineer. PC2. Comment remains. INTERWEST ACC Plans (301, 30Zand 303) Code Updates 59000 Madison St. 8124123 City of La Quints - Second Review Interwest Project No.: LAQ23-0041 Permit App: BCPR2023-0007 Page 4 of 4 C. Please provide soils engineer stamp/signature on foundation plans and details or an updated review letter from soils engineer. PC2. Comment remains. D. Please coordinate sheets with originally approved set of drawings. Simpson SSW detail sheets are missing. PC2. Comment remains. S2. Drawing S-1.2/S-2.2/S-3.2: No further comments 812412023 MD Please contact the listed reviewers between 8:00 A.M. and 12:00 P.M., M-F, with any questions. [END] INTERWEST Sladden Engineering 45090 Golf Center Parkway, Suite F, Indio, CA 92201 (760) 863-0713 Fax (760) 8634)847 6782 Stanton Avenue, Suite C, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369 450 Egan Avenue, Beaumont, CA 92223 (951) 845-7743 Fax (951) 845-8863 www.Sladdenengincering.com July 17, 2023 Project No. 544-18139 23-07 366 National Mortgage and Land Company 81570 Carboneras La Quinta, California 92253 Project: Remaining Lots Tract No. 38188, Tract No. 37790 & Tract No. 31681-3 Andalusia at Coral Mountain La Quinta, California Subject: Foundation Plan Review Ref: Geotechnical Update prepared by Sladden Engineering dated July 17, 2023; Project No. 544-18139, Report No. 23-07-365 In accordance with your request, we have reviewed the Foundation Plans and Details prepared by Gouvis Engineering for the remaining residences to be constructed within the Andalusia at Coral Mountain development located in the City of La Quinta, California. Foundation plans were reviewed for the Club Villa Plans 201A, 201B, 201C, 201A Reverse, 202A, 202B and 202C, Andalusia 65' Series Plans 301A, 301B, 301C, 302A, 302A Reverse, 302B, 302C, 303A, 303A Reverse, 303B and 303C and Andalusia 75' Series Plans 401A, 401B, 401C and 401A Reverse, 402A, 402B, 402C and 402A Reverse. Based on our review of the previously indicated foundation plans including the post -tensioned elements, is our opinion that the recommendations provided in the above referenced Geotechnical Update as well as the previous geotechnical report have been properly incorporated into these plans. If you have questions regarding this memo or the referenced report, please contact the undersigned. Respectfully submitted, SLADDEN ENGINEERIN - BRETT L. `2 ANOERSON Z Brett L. Anderson y No. C45389 n Principal Engineer aG CML ENGINEERING -k Letter/ra Copies: pdf / National Mortgage Sladden Engineering t4,►vw. Slrrrldettertgiireering. com Sladden Engineering 45090 Golf Center Parkway, Suite F, Indio, CA 92201 (760) 863-0713 Fax (760) 863-0847 6782 Stanton Avenue, Suite C, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369 450 Egan Avenue, Beaumont, CA 92223 (951) 845-7743 Fax (951) 845-8863 www.sladdenengineering.com July 17, 2023 Project No. 544-18139 23-07-365 National Mortgage and Land Company 81570 Carboneras La Quinta, California 92253 Subject: Geotechnical Update — Remaining Lots Project: Andalusia at Coral Mountain Tract No's. 38188, 37790 & 31681-3 La Quinta, California Ref: Geotechnical Investigation report prepared by Sladden Engineering dated September 5, 2018; Project No. 544-18139, Report No. 18-09-441 In accordance with your request, we have reviewed the above referenced Geotechnical Investigation report as it relates to the design and construction of the residential structures proposed for the remaining lots within Tract No. 38188 (Lots 1-50), Tract No. 37790 (Lots 4-6, 26- 28, 40, 41 & 46) and Tract No. 31681-3 (Lots 115, 130, 132, 133, 136, 138, 143 & 145). The lots are located within the "Andalusia at Coral Mountain" development in the City of La Quinta, California. It is our understanding that the proposed residential structures will be of relatively lightweight wood -frame construction and will be supported by conventional shallow spread footings and post -tensioned slabs on grade. The referenced report includes recommendations pertaining to the design and construction of residential structure foundations. Based upon our review of the referenced report, our previous experience on the project site and our understanding of the proposed construction, it is our opinion that the structural values included in the referenced Geotechnical Investigation report remain applicable for the design and construction of the proposed residential structures, except as amended herein. Post -tensioned slabs are planned for the proposed residential structures to mitigate potential liquefaction related differential seismic settlements. We have evaluated the on -site soil for construction of post -tensioned foundation systems in general accordance with design specifications of the Post Tensioning Institute (PTI). Post -tensioned slabs should be designed to be rigid and capable of spanning areas of non -uniform support and meet the following criteria: 1. Bearing Capacity =1500 psf 2. Potential Liquefaction Induced Differential Settlement = 2.25 inches (over a horizontal distance of 100 feet) 3. Coefficient of Friction = 0.40 July 17, 2023 -2- Project No. 544-18139 23-07-365 Auxiliary structures may be supported upon conventional shallow spread footings. Conventional shallow spread footings should be bottomed into properly compacted fill material a minimum of 12 inches below lowest adjacent grade. Continuous footings should be at least 12 inches wide and isolated pad footings should be at least 2 feet wide. Continuous footings and isolated pad footings may be designed utilizing allowable bearing pressures of 1800 psf and 2000 psf, respectively. Allowable increases of 250 psf for each additional 1 foot of width and 250 psf for each additional 6 inches of depth may be utilized, if desired. The maximum allowable bearing pressure should be 3000 psf. The recommended allowable bearing pressures may be increased by one-third for wind and seismic loading. Static settlement resulting from the anticipated foundation loads should be minimal provided that the recommendations included in this report are considered in foundation design and construction. The ultimate static settlement is estimated to be less than one inch when using the recommended foundation bearing pressures. As a practical matter, differential static settlement between footings can be assumed as one-half of the total static settlement. Lateral forces may be resisted by friction along the base of the foundations and passive resistance along the sides of the footings. A friction coefficient of 0.40 times the normal dead load forces is recommended for use in design. Passive resistance may be estimated using an equivalent fluid weight of 250 pcf. If used in combination with the passive resistance, the frictional resistance should be reduced by one third to 0.33 times the normal dead load forces. Retaining walls may be necessary to accomplish the proposed construction. Lateral pressures for use in retaining wall design can be estimated using an equivalent fluid weight of 35 pcf for level free -draining native backfill conditions. For walls that are to be restrained at the top, the equivalent fluid weight should be increased to 55 pcf for level free -draining native backfill conditions. Back drains should be provided for the full height of the walls. Seismic pressures should be incorporated into any retaining walls greater than 6 feet in height. Seismic deign pressures may be provided once specific wall heights and locations are known design pressures can be provided. The seismic design category for a structure may be determined in accordance with Section 1613 of the 2022 CBC or ASCE7-16. According to the 2022 CBC, Site Class D may be used to estimate design seismic loading for the proposed structures. The 2022 CBC Site Specific Seismic Hazard Analyses are attached. July 17, 2023 -3- Project No. 544-18139 23-07-365 We appreciate the opportunity to provide service to you on this project. If you have any questions regarding this letter or the referenced report, please contact the undersigned. �5Xpt4AL GFG Respectfully submitted, OC�N SLADDEN ENGINEERING a TAMES MINOR III 9 FE �� N No. 9735 \Q Nw �2 Brett L. Anderson �c�2 Jam . Minor, III F OF CAL�FO Principal Engineer . No. E 6Sao y, nior Geologist It ��E EE"MNG /� SER/ra Copies: pdf/ Addressee Sladden Engineering Z3 _ 07 - 34-57 Please verify that soils reports contain all of the above information. In addition, to assure continuity between the Investigation/reporting stage and the execution stage, please use the fol➢ovAng checklist to verify that the conclusions and recommendations in the report cover all the required elements. Only then can we be assured that the construction documents address all of the site soil conditions. La Quinta Geotechnica➢ Report Checklist Does the Conclusions and Recommendations" section of the report address each of the following criteria? "Address" means: (a) the criterion is considered significant and mitigation measure(s) noted, or; (b) the criterion is considered insignificant and explicitly so stated. Yes f ii�-!o h1 Criterion Foundation criteria based upon bearing capacity of natural or compacted soil. ® Foundafion criteria to mitigate the effects of expansive soils. ® Foundation criteria based upon bearing capacity of natural or compacted soil. F-1 Foundation criteria to mitigate.the effects of liquefaction. ® Foundation criteria to mitigate the effects of seismically Induced differential settlement. 0 Foundation criteria to mitigate the effects of long-term differential settlement_ f © Foundation criteria to mitigate the effects of varying soil strength. 0 Foundation criteria to mitigate expected total and differential settlement_ Any "No- answers to the above checklist should be noted as specific required corrections. W O O N N m V m -1 W ko O N '7 O n O O 00 .-1 .-1 O e 4 e f O O O O m l0 Vl V1 Ol OO V Ol 01 01 Ol 01 01 CIO 0 O O O V O O O O O O O Z Q 2 l� 0 0 0 0 0 0 a o o O O o Ln Coln � o a Z 00 m C C 3 L U O Q1 m y a � � Q c a 2 ( m E f0 vl^ ■ Ln O_ N O u4 N u 0 O W Q OL i 2 m Lq Q. m 2 m C m V m m .-1 W , N 75 'j OO C C C W N OO OO '-1 OI ,,,� O_ .� .m .0 O W N O! N O C N -N6 N O '.J O O f- o O O O C N m - vats v v � a 14 PI w Q w u w Q w al � N _ m 7 LL o co l0 1 m o > 2 tl O U m E l- O F u j Ol 7 J N 00 'JO O c d d d :2 m o m OD N w 0 to Z o 0 O uu li F- F ~ In V` 7 00 C ci C O 0 m 1 O N Q Z lD v p en Q In Z m VI u i N C C V V E S 3 V N N pL, 7 r VI it CO N 2 OA N V1 0 N 4 CL Z N m g 'C Cl. C{ c ui v ~ H a m f C LL W f7 iF N uj ym, C c n y u o cmC ar o O 4P O V u m O m 7 U! n L J uC_ C m w W LL m v rl m 0� OR 0 0 u V 2 O V Z6 m UIrn N �I C O V O K N O � O 0 O N � s -w .0 U 0 N c yo 0 W ,y m N N N N H N nl X � C� V L N m r 2 S U � - p O O 8 8 O O O O 8 N M O In n O O O O O O d O O O O O O N N K1 V Ln o O n n Z 0 1 1 1 V) Z 0 W V (LLA l P W -- �J Z {_ -- W O Co W 1 -- o 8 5t N ry '1 O �3) uoneia�a»b 0 z ro V� Ln o:!� [�f Z Z O Cc) rJ -4 LL y N - -� " ,o m ui a, h r m N D N O rn .+ ,n m r , m O r .{ O v1 m m r� O r Co 00 y ,D a, O Kl ul qp ,O •G ,D n O u• N iu C op ,O h h c �p pp�� pp ��pp oppp O ul ,� ,O � W 1O O n N R m w 0 U N N H C O O O1 a, a, a, a, a1 0 0 �-'� N m m d V V ul 1!1 O � � .-1 !4 N N N N N N N N N N N N •U ti N '+ '-I � N rl rl rl � rl '-I � rl N N N 'i rti .1 N Z � o m N O C C Q u` ul ul a0 O ,o N ,o ae a0 m aQ7 O N m m O N lm m m m ul rl"i l0 r: a? '+ m l0 It 'I E+ m o 0 0 0 0 0 0 .+ .i .+ w .� .+ �+ o C.0 0 0 c m o v a o 00 ca,n 000 0 0 OOOOOSZ O O O 0 a O O O O O jej uope�a eery z, E a CL r,4mmcom�o�888888888888N�gr, wm 17 ,M M d a V1 u1 l0 1D n n CO CO a0 00 CO o0 00 a0 w m CO o0 n lD lD N 611 m N .• r-- cu 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 V O 00 CL w a: io It � 2 pG ° m Lrl 00 O m O co mNm n O m vi h00 mo0000 0000 00m0r n v v i w f6 0 0 0 0 0 0 0 0 o o 0 ri < I ri - r+ c I . i c+ + .- c i 0 0 0 0 0 0 o 0 0 0 N � n c w w V l� Q 0 0 0 0 Vl O o 0 0 M 0 1D O p W o o o S S 8 0 8 8 8 8 0 0 0 1 0 0 0 0 0 0 o 0 c! c! �-! ! r! �-! r! rf N N m d ul co n o0 m m 0 0 0 O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ri ri N m d u 1 a.. 4 1`m LL G V L 'u uu O V u F- u �L c 10 O a ^ E ° Im 1-4 n v+ a n°i 't n O ] O + ^+ O O O O O e0 w �n 0. w v1 u w ^ - r,mr w N r,0w tz O Ln tD %0 mO Ln d N r 0 O O - v1 c "j Qh1 8 E U CO O IO O Un W .-+ 'D t9 O M t- M CO O L1 d N fV w 0 .-1 ri ri .-i rl O O 0 0 w 0 V N LlJ h Q !V � 00 h 01 01 -4 0% h Ql N rl, 00 m n !4 z 0 n v 00 Lr+ tl .1 4 O O G O d o 28o0S 88888 O a-1 N m u1 Lon r 0 0 0 0 0 w O O O O O O .-� N cn 4 ui m w m m m m m 3Oo•-1 •1h 0 N o N O CO U1 N In u > -4 O . + .--i 0 � y w yO wa 7 N o w w r a E wmmm rnLn0 t tJ 3 O 00 ul N L!1 0 VtLn .vi tLa v ° iJ1 0) �+ 0 0 2 g a,- m Ln u, a V m iv V w }, ba ( DUI O .- u) w w no a = u E v v1 w toy oC m nm 00 LA ut 0 Z V w 'o a L E W a E m '- E V 05 o W � k W � ko N a o w U w a C' v v W c g - V V o p o 10 V An C U n C m E a m w CJ O d N U a vA�i o} Q 1 o $ Ln N N rl ei O 0 v S 0 0 0 0 0 � 0 0