Loading...
BCOM2021-0029 - Enegergy Report - Revision 2BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: Report Prepared by: Job Number: Date: The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2019 Building Energy Efficiency Standards. This program developed by EnergySoft Software – www.energysoft.com. 73330 HWY 111 STUDIOS 2007 PALM DESERT, CA 92260 78065 MAIN STREET STE 100 Be So Coffee T.I. LA QUINTA, CA 92253 title24ofthedesert@gmail.com TITLE 24 OF THE DESERT SERVICES INC. 760 278.1840, 21 - YAS - 006 - 1R 1/31/2022 REVISION 2 - ARCHITECTURAL AS-BUILT, INCLUDING LAYOUT AND LIGHTING CHANGES, AND REVISION TO LIGHTING COMPLIANCE, ADD INSTALLATION OF PATIO DINING ENCLOSURE. 02/07/2022 BCOM2021-0029 TABLE OF CONTENTS Cover Page Table of Contents Form NRCC-LTI-E Indoor Lighting 1 2 3 Registration Number:Registration Date/Time:Registration Provider: Energysoft CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003 Schema Version: rev 20200601 Report Generated: 2022-01-31 10:38:06 STATE OF CALIFORNIA Indoor Lighting NRCC-LTI-E CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-E This document is used to demonstrate compliance with requirements in §110.9,§110.12(c),§130.0,§130.1,§140.6  and §141.0(b)2  for indoor lighting scopes using the prescriptive path. Project Name: Be So Coffee T.I.Report Page: (Page 1 of 8) Project Address: 78065 MAIN STREET STE 100 Date Prepared: 1/31/2022 A. GENERAL INFORMATION 01 Project Location (city)LA QUINTA 04 Total Conditioned Floor Area (ft2)1,228 02 Climate Zone 15 05 Total Unconditioned Floor Area (ft2)0 03 Occupancy Types Within Project (select all that apply):06 # of Stories (Habitable Above Grade)1 Office Retail Warehouse Hotel/Motel School Support Areas Parking Garage High-Rise Residential Relocatable Healthcare Other (Write in)Restaurant B. PROJECT SCOPE This table includes any lighting systems that are within the scope of the permit application and are demonstrating compliance using the prescriptive path outlined in §140.6  or §141.0(b)2  for alterations. Scope of Work Conditioned Spaces Unconditioned Spaces 01 02 03 04 05 My Project Consists of (check all that apply):Calculation Method Area (ft2)Calculation Method Area (ft2) New Lighting System New Lighting System - Parking Garage Altered Lighting System Complete Building Method 1228 Complete Building Method 0 Total Area of Work (ft2)1228 0 STATE OF CALIFORNIA Indoor Lighting NRCC-LTI-E CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-E Project Name: Be So Coffee T.I.Report Page: (Page 2 of 8) Project Address: 78065 MAIN STREET STE 100 Date Prepared: 1/31/2022 Registration Number:Registration Date/Time:Registration Provider: Energysoft CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003 Schema Version: rev 20200601 Report Generated: 2022-01-31 10:38:06 C. COMPLIANCE RESULTS If any cell on this table says "DOES NOT COMPLY" or "COMPLIES with Exceptional Conditions" refer to Table D. for guidance. Lighting in conditioned and unconditioned spaces must not be combined for compliance per §140.6(b)1  Allowed Lighting Power per §140.6(b)  (Watts) ≥ Adjusted Lighting Power per §140.6(a)  (Watts)Compliance Results 01 02 03 04 = 05 06 07 = 08 09 Complete Building §140.6(c)1  Area Category §140.6(c)2  Area Category Additional §140.6(c)2G  ( +) Tailored §140.6(c)3  ( +) Total Allowed (Watts) Total Designed (Watts) Adjustments Total Adjusted (Watts) *Includes Adjustments 05 must be >= 08 §140.6  PAF Lighting Control Credits §140.6(a)2  (-) (See Table I)(See Table I)(See Table J)(See Table K)(See Table F)(See Table P) Conditioned 860 =860 ≥877 20 =857 COMPLIES Unconditioned =≥= Controls Compliance (See Table H for Details)COMPLIES Rated Power Reduction Compliance (See Table Q for Details) D. EXCEPTIONAL CONDITIONS This table is auto-filled with uneditable comments because of selections made or data entered in tables throughout the form. E. ADDITIONAL REMARKS This table includes remarks made by the permit applicant to the Authority Having Jurisdiction. F. INDOOR LIGHTING FIXTURE SCHEDULE This table includes all permanent designed lighting and all portable lighting in offices. Designed Wattage: Conditioned Spaces 01 02 03 04 05 06 07 08 09 10 Name or Item Tag Complete Luminaire Description Modular (Track) Fixture Small Aperture & Color Change1 Watts per luminaire2 How is Wattage determined Total Number of Luminaires Excluded per §140.6(a)3 Design Watts Field Inspector Pass Fail PL-1 PL - 33 No No 33 Mfr. Spec 11 No 363 PL-2 PL - 45 No No 45 Mfr. Spec 9 No 405 STATE OF CALIFORNIA Indoor Lighting NRCC-LTI-E CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-E Project Name: Be So Coffee T.I.Report Page: (Page 3 of 8) Project Address: 78065 MAIN STREET STE 100 Date Prepared: 1/31/2022 Registration Number:Registration Date/Time:Registration Provider: Energysoft CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003 Schema Version: rev 20200601 Report Generated: 2022-01-31 10:38:06 F. INDOOR LIGHTING FIXTURE SCHEDULE PL-3 RCL - 16 No No 16 CEC Default 5 No 80 PL-4 TRF - 29W No No 29 CEC Default 1 No 29 Total Designed Watts: CONDITIONED SPACES 877 1FOOTNOTE: Design Watts for small aperture and color changing luminaires which qualify per §140.6(a)4B  is adjusted to be 75% of their rated wattage. Table F automatically makes this adjustment, the permit applicant should enter full rated wattage in column 05. 2Authority Having Jurisdiction may ask for Luminaire cut sheets to confirm wattage used for compliance per §130.0(c)  Wattage used must be the maximum rated for the luminaire, not the lamp. G. MODULAR LIGHTING SYSTEMS This section does not apply to this project. H. INDOOR LIGHTING CONTROLS (Not including PAFs) This table includes lighting controls for conditioned and unconditioned spaces. When a control having a * is shown, the notes section of this table provides more detail on how compliance is achieved. The lighting controls section of the Compliance Summary Table on the first page will show "DOES NOT COMPLY" if the notes are left blank. Building Level Controls 01 02 03 Mandatory Demand Response §110.12(c) Shut-off controls §130.1(c) Field Inspector Pass Fail Not Required <= 10,000 SF Whole Building Auto Time Switch STATE OF CALIFORNIA Indoor Lighting NRCC-LTI-E CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-E Project Name: Be So Coffee T.I.Report Page: (Page 4 of 8) Project Address: 78065 MAIN STREET STE 100 Date Prepared: 1/31/2022 Registration Number:Registration Date/Time:Registration Provider: Energysoft CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003 Schema Version: rev 20200601 Report Generated: 2022-01-31 10:38:06 H. INDOOR LIGHTING CONTROLS (Not including PAFs) Area Level Controls 04 05 06 07 08 09 10 11 12 Area Description Complete Building or Area Category Primary Function Area Area Controls §130.1(a)  Multi-Level Controls §130.1(b)  Shut-Off Controls §130.1(c)  Primary/Sky lit Daylighting §130.1(d)  Secondary Daylighting §140.6(d)  Interlocked Systems §140.6(a)1  Field Inspector Pass Fail BATHROOM Restaurant Building Manual ON/OFF Dimmer Vacancy N/A N/A No OFFICE Restaurant Building Manual ON/OFF Dimmer Occupancy Sensor N/A N/A No SERVICE Restaurant Building Manual ON/OFF Dimmer Automatic Timer Switch Included Included No FOOD STORAGE Restaurant Building Manual ON/OFF Other*Occupancy Sensor N/A N/A No *NOTES: Controls with a * require a note in the space below explaining how compliance is achieved. EX: Conference 1: Primary/Skylight Daylighting: Exempt because less than 120 watts of general lighting; EXCEPTION 1 to §130.1(d)2  13 Plan Sheet Showing Daylit Zones: FOOD STORAGE * REFRIGERATED AREA E101.0 I. LIGHTING POWER ALLOWANCE: COMPLETE BUILDING OR AREA CATEGORY METHODS Each area complying using the Complete Building or Area Category Methods per §140.6(b)  are included in this table. Column 06 indicates if additional lighting power allowances per §140.6(c)  or adjustments per §140.6(a)  are being used . Conditioned Spaces 01 02 03 04 05 06 Area Description Complete Building or Area Category Primary Function Area Allowed Density (W/ft2)Area (ft2)Allowed Wattage (Watts) Additional Allowance / Adjustment Area Category PAF Whole Building Restaurant Building 0.7 1,228 859.6 No Yes TOTALS:1,228 859.6 See Tables J, or P for detail STATE OF CALIFORNIA Indoor Lighting NRCC-LTI-E CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-E Project Name: Be So Coffee T.I.Report Page: (Page 5 of 8) Project Address: 78065 MAIN STREET STE 100 Date Prepared: 1/31/2022 Registration Number:Registration Date/Time:Registration Provider: Energysoft CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003 Schema Version: rev 20200601 Report Generated: 2022-01-31 10:38:06 J. ADDITIONAL ALLOWANCE: AREA CATEGORY METHOD QUALIFYING LIGHTING SYSTEM This section does not apply to this project. K. TAILORED METHOD GENERAL LIGHTING POWER ALLOWANCE This section does not apply to this project. L. ADDITIONAL LIGHTING ALLOWANCE: TAILORED WALL DISPLAY This section does not apply to this project. M. ADDITIONAL LIGHTING ALLOWANCE: TAILORED FLOOR AND TASK LIGHTING This section does not apply to this project. N. ADDITIONAL LIGHTING ALLOWANCE: TAILORED ORNAMENTAL/SPECIAL EFFECTS This section does not apply to this project. O. ADDITIONAL LIGHTING ALLOWANCE: TAILORED VERY VALUABLE MERCHANDISE This section does not apply to this project. STATE OF CALIFORNIA Indoor Lighting NRCC-LTI-E CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-E Project Name: Be So Coffee T.I.Report Page: (Page 6 of 8) Project Address: 78065 MAIN STREET STE 100 Date Prepared: 1/31/2022 Registration Number:Registration Date/Time:Registration Provider: Energysoft CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003 Schema Version: rev 20200601 Report Generated: 2022-01-31 10:38:06 P. POWER ADJUSTMENT: LIGHTING CONTROL CREDIT (POWER ADJUSTMENT FACTOR (PAF)) This table includes all areas indicated in Table I or Table K as using a PAF credit described in §140.6(a)2. Conditioned Spaces 01 02 03 04 05 06 07 Area Description PAF per §140.6(a)2 1 Luminaires Controlled for PAF Credit Control Credit Power Adjustments (Watts) 1 2A 2B 2C 3A 3B 4 5 6 7 Luminaire Name or Item Tag Luminaire Design Watts Number of Luminaires Lighting Controlled (Watts)Pick up to one Pick up to one Pick up to one Z-2 PL-1 33 5 165 16.5 Z-2 PL-3 16 2 32 3.2 08 09 All spaces applying PAF 5, 6 or 7 include a daylight design meeting requirements in §140.3(d). See Table S.Total Power Adjustment (Watts) CONDITIONED SPACES:19.7 1 FOOTNOTES: PAFs outlined in Table 140.6-A include 1) Daylight dimming plus OFF; 2A) Occupant sensors in offices [dlte/] 125 ft2; 2B) Occupant sensors in offices 126 - 250 ft2; 2C) Occupant sensors in offices 251 - 500 ft2; 3A) Institutional tuning, non-daylit areas and 3B) Institutional tuning, daylit areas; 4) Demand response; 5) Clerestory fenestration; 6) Horizontal slats; 7) Light shelves. Q. RATED POWER REDUCTION COMPLIANCE FOR ALTERATIONS This section does not apply to this project. R. 80% LIGHTING POWER FOR ALL ALTERATIONS - CONTROLS EXCEPTIONS This section does not apply to this project. STATE OF CALIFORNIA Indoor Lighting NRCC-LTI-E CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-E Project Name: Be So Coffee T.I.Report Page: (Page 7 of 8) Project Address: 78065 MAIN STREET STE 100 Date Prepared: 1/31/2022 Registration Number:Registration Date/Time:Registration Provider: Energysoft CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003 Schema Version: rev 20200601 Report Generated: 2022-01-31 10:38:06 S. DAYLIGHT DESIGN POWER ADJUSTMENT FACTOR (PAF) This table documents clerestories, horizontal slats or light shelves meet the requirements in §140.3(d)  if a Power Adjustment Factor was claimed on Table P. These features must be documented on the architectural plans or where appropriate within the construction documents. This PAF also must be verified in the field with an acceptance test per Table U. 01 Compliance Strategy T. DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION Selections have been made based on information provided in this document. If any selection have been changed by permit applicant, an explanation should be included in Table E. Additional Remarks. These documents must be provided to the building inspector during construction and can be found online at https://www.energy.ca.gov/title24/2019standards/2019_compliance_documents/Nonresidential_Documents/NRCI/ Yes No Form/Title Field Inspector Pass Fail NRCI-LTI-01-E - Must be submitted for all buildings NRCI-LTI-02-E- Must be submitted for a lighting control system, or for an Energy Management Control System (EMCS), to be recognized for compliance. NRCI-LTI-04-E - Must be submitted for two interlocked systems serving an auditorium, a convention center, a conference room, a multipurpose room or a theater to be recognized for compliance. NRCI-LTI-05-E- Must be submitted for a Power Adjustment Factor (PAF) to be recognized for compliance. NRCI-LTI-06-E- Must be submitted for additional wattage installed in a video conferencing studio to be recognized for compliance. U. DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE Selections have been made based on information provided in this document. If any selection have been changed by the permit applicant, an explanation should be included in Table E. Additional Remarks. These documents must be provided to the building inspector during construction and any with "-A" in the form name must be completed through an Acceptance Test Technician Certification Provider (ATTCP). For more information visit: http://www.energy.ca.gov/title24/attcp/providers.html Yes No Form/Title Field Inspector Pass Fail NRCA-LTI-02-A - Must be submitted for occupancy sensors and automatic time switch controls. NRCA-LTI-03-A - Must be submitted for automatic daylight controls. NRCA-LTI-04-A - Must be submitted for demand responsive lighting controls. NRCA-LTI-05-A. - Must be submitted for institutional tuning power adjustment factor (PAF) STATE OF CALIFORNIA Indoor Lighting NRCC-LTI-E CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-E Project Name: Be So Coffee T.I.Report Page: (Page 8 of 8) Project Address: 78065 MAIN STREET STE 100 Date Prepared: 1/31/2022 Registration Number:Registration Date/Time:Registration Provider: Energysoft CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003 Schema Version: rev 20200601 Report Generated: 2022-01-31 10:38:06 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name:Documentation Author Signature: Company: TITLE 24 OF THE DESERT SERVICES INC. Signature Date: 2022-01-31 Address: title24ofthedesert@gmail.com CEA/ HERS Certification Identification (if applicable): City/State/Zip: 760 278.1840 Phone: RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Compliance is true and correct. 2.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer) 3.The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5.I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name:Responsible Designer Signature: Company:Date Signed: 2022-01-31 Address:License: City/State/Zip:Phone: