BCOM2021-0029 - Enegergy Report - Revision 2BUILDING ENERGY ANALYSIS REPORT
PROJECT:
Project Designer:
Report Prepared by:
Job Number:
Date:
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2019 Building Energy Efficiency Standards.
This program developed by EnergySoft Software – www.energysoft.com.
73330 HWY 111
STUDIOS 2007
PALM DESERT, CA 92260
78065 MAIN STREET STE 100
Be So Coffee T.I.
LA QUINTA, CA 92253
title24ofthedesert@gmail.com
TITLE 24 OF THE DESERT SERVICES INC.
760 278.1840,
21 - YAS - 006 - 1R
1/31/2022
REVISION 2 -
ARCHITECTURAL AS-BUILT,
INCLUDING LAYOUT AND
LIGHTING CHANGES, AND
REVISION TO LIGHTING
COMPLIANCE, ADD
INSTALLATION OF PATIO
DINING ENCLOSURE.
02/07/2022
BCOM2021-0029
TABLE OF CONTENTS
Cover Page
Table of Contents
Form NRCC-LTI-E Indoor Lighting
1
2
3
Registration Number:Registration Date/Time:Registration Provider: Energysoft
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003
Schema Version: rev 20200601
Report Generated: 2022-01-31 10:38:06
STATE OF CALIFORNIA
Indoor Lighting
NRCC-LTI-E CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-E
This document is used to demonstrate compliance with requirements in §110.9,§110.12(c),§130.0,§130.1,§140.6 and §141.0(b)2 for indoor lighting scopes using the prescriptive
path.
Project Name: Be So Coffee T.I.Report Page: (Page 1 of 8)
Project Address: 78065 MAIN STREET STE 100 Date Prepared: 1/31/2022
A. GENERAL INFORMATION
01 Project Location (city)LA QUINTA 04 Total Conditioned Floor Area (ft2)1,228
02 Climate Zone 15 05 Total Unconditioned Floor Area (ft2)0
03 Occupancy Types Within Project (select all that apply):06 # of Stories (Habitable Above Grade)1
Office Retail Warehouse Hotel/Motel School Support Areas
Parking Garage High-Rise Residential Relocatable Healthcare Other (Write in)Restaurant
B. PROJECT SCOPE
This table includes any lighting systems that are within the scope of the permit application and are demonstrating compliance using the prescriptive path outlined in §140.6 or
§141.0(b)2 for alterations.
Scope of Work Conditioned Spaces Unconditioned Spaces
01 02 03 04 05
My Project Consists of (check all that apply):Calculation Method Area (ft2)Calculation Method Area (ft2)
New Lighting System
New Lighting System - Parking Garage
Altered Lighting System Complete Building Method 1228 Complete Building Method 0
Total Area of Work (ft2)1228 0
STATE OF CALIFORNIA
Indoor Lighting
NRCC-LTI-E CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-E
Project Name: Be So Coffee T.I.Report Page: (Page 2 of 8)
Project Address: 78065 MAIN STREET STE 100 Date Prepared: 1/31/2022
Registration Number:Registration Date/Time:Registration Provider: Energysoft
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003
Schema Version: rev 20200601
Report Generated: 2022-01-31 10:38:06
C. COMPLIANCE RESULTS
If any cell on this table says "DOES NOT COMPLY" or "COMPLIES with Exceptional Conditions" refer to Table D. for guidance.
Lighting in
conditioned and
unconditioned
spaces must not be
combined for
compliance per
§140.6(b)1
Allowed Lighting Power per §140.6(b) (Watts)
≥
Adjusted Lighting Power per §140.6(a) (Watts)Compliance Results
01 02 03 04
=
05 06 07
=
08 09
Complete
Building
§140.6(c)1
Area
Category
§140.6(c)2
Area
Category
Additional
§140.6(c)2G
( +)
Tailored
§140.6(c)3
( +)
Total
Allowed
(Watts)
Total
Designed
(Watts)
Adjustments
Total Adjusted
(Watts)
*Includes
Adjustments
05 must be >= 08
§140.6
PAF Lighting
Control Credits
§140.6(a)2
(-)
(See Table I)(See Table I)(See Table J)(See Table K)(See Table F)(See Table P)
Conditioned 860 =860 ≥877 20 =857 COMPLIES
Unconditioned =≥=
Controls Compliance (See Table H for Details)COMPLIES
Rated Power Reduction Compliance (See Table Q for Details)
D. EXCEPTIONAL CONDITIONS
This table is auto-filled with uneditable comments because of selections made or data entered in tables throughout the form.
E. ADDITIONAL REMARKS
This table includes remarks made by the permit applicant to the Authority Having Jurisdiction.
F. INDOOR LIGHTING FIXTURE SCHEDULE
This table includes all permanent designed lighting and all portable lighting in offices.
Designed Wattage: Conditioned Spaces
01 02 03 04 05 06 07 08 09 10
Name or Item
Tag
Complete Luminaire
Description
Modular
(Track) Fixture
Small
Aperture &
Color Change1
Watts per
luminaire2
How is Wattage
determined
Total Number
of Luminaires
Excluded per
§140.6(a)3 Design Watts
Field Inspector
Pass Fail
PL-1 PL - 33 No No 33 Mfr. Spec 11 No 363
PL-2 PL - 45 No No 45 Mfr. Spec 9 No 405
STATE OF CALIFORNIA
Indoor Lighting
NRCC-LTI-E CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-E
Project Name: Be So Coffee T.I.Report Page: (Page 3 of 8)
Project Address: 78065 MAIN STREET STE 100 Date Prepared: 1/31/2022
Registration Number:Registration Date/Time:Registration Provider: Energysoft
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003
Schema Version: rev 20200601
Report Generated: 2022-01-31 10:38:06
F. INDOOR LIGHTING FIXTURE SCHEDULE
PL-3 RCL - 16 No No 16 CEC Default 5 No 80
PL-4 TRF - 29W No No 29 CEC Default 1 No 29
Total Designed Watts: CONDITIONED SPACES 877
1FOOTNOTE: Design Watts for small aperture and color changing luminaires which qualify per §140.6(a)4B is adjusted to be 75% of their rated wattage. Table F automatically makes
this adjustment, the permit applicant should enter full rated wattage in column 05.
2Authority Having Jurisdiction may ask for Luminaire cut sheets to confirm wattage used for compliance per §130.0(c) Wattage used must be the maximum rated for the luminaire, not
the lamp.
G. MODULAR LIGHTING SYSTEMS
This section does not apply to this project.
H. INDOOR LIGHTING CONTROLS (Not including PAFs)
This table includes lighting controls for conditioned and unconditioned spaces. When a control having a * is shown, the notes section of this table provides more detail on how
compliance is achieved. The lighting controls section of the Compliance Summary Table on the first page will show "DOES NOT COMPLY" if the notes are left blank.
Building Level Controls
01 02 03
Mandatory Demand Response §110.12(c) Shut-off controls §130.1(c) Field Inspector
Pass Fail
Not Required <= 10,000 SF Whole Building Auto Time Switch
STATE OF CALIFORNIA
Indoor Lighting
NRCC-LTI-E CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-E
Project Name: Be So Coffee T.I.Report Page: (Page 4 of 8)
Project Address: 78065 MAIN STREET STE 100 Date Prepared: 1/31/2022
Registration Number:Registration Date/Time:Registration Provider: Energysoft
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003
Schema Version: rev 20200601
Report Generated: 2022-01-31 10:38:06
H. INDOOR LIGHTING CONTROLS (Not including PAFs)
Area Level Controls
04 05 06 07 08 09 10 11 12
Area Description
Complete Building or Area
Category Primary Function
Area
Area Controls
§130.1(a)
Multi-Level
Controls
§130.1(b)
Shut-Off Controls
§130.1(c)
Primary/Sky
lit
Daylighting
§130.1(d)
Secondary
Daylighting
§140.6(d)
Interlocked
Systems
§140.6(a)1
Field Inspector
Pass Fail
BATHROOM Restaurant Building Manual
ON/OFF Dimmer Vacancy N/A N/A No
OFFICE Restaurant Building Manual
ON/OFF Dimmer Occupancy Sensor N/A N/A No
SERVICE Restaurant Building Manual
ON/OFF Dimmer Automatic Timer
Switch Included Included No
FOOD STORAGE Restaurant Building Manual
ON/OFF Other*Occupancy Sensor N/A N/A No
*NOTES: Controls with a * require a note in the space below explaining how compliance is achieved.
EX: Conference 1: Primary/Skylight Daylighting: Exempt because less than 120 watts of general lighting; EXCEPTION 1
to §130.1(d)2
13
Plan Sheet Showing Daylit Zones:
FOOD STORAGE * REFRIGERATED AREA E101.0
I. LIGHTING POWER ALLOWANCE: COMPLETE BUILDING OR AREA CATEGORY METHODS
Each area complying using the Complete Building or Area Category Methods per §140.6(b) are included in this table. Column 06 indicates if additional lighting power allowances per
§140.6(c) or adjustments per §140.6(a) are being used .
Conditioned Spaces
01 02 03 04 05 06
Area Description Complete Building or Area Category Primary
Function Area
Allowed Density
(W/ft2)Area (ft2)Allowed Wattage
(Watts)
Additional Allowance / Adjustment
Area Category PAF
Whole Building Restaurant Building 0.7 1,228 859.6 No Yes
TOTALS:1,228 859.6 See Tables J, or P for detail
STATE OF CALIFORNIA
Indoor Lighting
NRCC-LTI-E CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-E
Project Name: Be So Coffee T.I.Report Page: (Page 5 of 8)
Project Address: 78065 MAIN STREET STE 100 Date Prepared: 1/31/2022
Registration Number:Registration Date/Time:Registration Provider: Energysoft
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003
Schema Version: rev 20200601
Report Generated: 2022-01-31 10:38:06
J. ADDITIONAL ALLOWANCE: AREA CATEGORY METHOD QUALIFYING LIGHTING SYSTEM
This section does not apply to this project.
K. TAILORED METHOD GENERAL LIGHTING POWER ALLOWANCE
This section does not apply to this project.
L. ADDITIONAL LIGHTING ALLOWANCE: TAILORED WALL DISPLAY
This section does not apply to this project.
M. ADDITIONAL LIGHTING ALLOWANCE: TAILORED FLOOR AND TASK LIGHTING
This section does not apply to this project.
N. ADDITIONAL LIGHTING ALLOWANCE: TAILORED ORNAMENTAL/SPECIAL EFFECTS
This section does not apply to this project.
O. ADDITIONAL LIGHTING ALLOWANCE: TAILORED VERY VALUABLE MERCHANDISE
This section does not apply to this project.
STATE OF CALIFORNIA
Indoor Lighting
NRCC-LTI-E CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-E
Project Name: Be So Coffee T.I.Report Page: (Page 6 of 8)
Project Address: 78065 MAIN STREET STE 100 Date Prepared: 1/31/2022
Registration Number:Registration Date/Time:Registration Provider: Energysoft
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003
Schema Version: rev 20200601
Report Generated: 2022-01-31 10:38:06
P. POWER ADJUSTMENT: LIGHTING CONTROL CREDIT (POWER ADJUSTMENT FACTOR (PAF))
This table includes all areas indicated in Table I or Table K as using a PAF credit described in §140.6(a)2.
Conditioned Spaces
01 02 03 04 05 06 07
Area Description
PAF per §140.6(a)2 1 Luminaires Controlled for PAF Credit Control
Credit Power
Adjustments
(Watts)
1 2A 2B 2C 3A 3B 4 5 6 7 Luminaire
Name or Item
Tag
Luminaire
Design Watts
Number of
Luminaires
Lighting
Controlled
(Watts)Pick up to one Pick up to one Pick up to one
Z-2 PL-1 33 5 165 16.5
Z-2 PL-3 16 2 32 3.2
08 09
All spaces applying PAF 5, 6 or 7 include a daylight design
meeting requirements in §140.3(d). See Table S.Total Power Adjustment (Watts) CONDITIONED SPACES:19.7
1 FOOTNOTES: PAFs outlined in Table 140.6-A include 1) Daylight dimming plus OFF; 2A) Occupant sensors in offices [dlte/] 125 ft2; 2B) Occupant sensors in offices 126 - 250 ft2; 2C)
Occupant sensors in offices 251 - 500 ft2; 3A) Institutional tuning, non-daylit areas and 3B) Institutional tuning, daylit areas; 4) Demand response; 5) Clerestory fenestration; 6)
Horizontal slats; 7) Light shelves.
Q. RATED POWER REDUCTION COMPLIANCE FOR ALTERATIONS
This section does not apply to this project.
R. 80% LIGHTING POWER FOR ALL ALTERATIONS - CONTROLS EXCEPTIONS
This section does not apply to this project.
STATE OF CALIFORNIA
Indoor Lighting
NRCC-LTI-E CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-E
Project Name: Be So Coffee T.I.Report Page: (Page 7 of 8)
Project Address: 78065 MAIN STREET STE 100 Date Prepared: 1/31/2022
Registration Number:Registration Date/Time:Registration Provider: Energysoft
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003
Schema Version: rev 20200601
Report Generated: 2022-01-31 10:38:06
S. DAYLIGHT DESIGN POWER ADJUSTMENT FACTOR (PAF)
This table documents clerestories, horizontal slats or light shelves meet the requirements in §140.3(d) if a Power Adjustment Factor was claimed on Table P. These features must be
documented on the architectural plans or where appropriate within the construction documents. This PAF also must be verified in the field with an acceptance test per Table U.
01 Compliance Strategy
T. DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION
Selections have been made based on information provided in this document. If any selection have been changed by permit applicant, an explanation should be included in Table E.
Additional Remarks. These documents must be provided to the building inspector during construction and can be found online at
https://www.energy.ca.gov/title24/2019standards/2019_compliance_documents/Nonresidential_Documents/NRCI/
Yes No Form/Title Field Inspector
Pass Fail
NRCI-LTI-01-E - Must be submitted for all buildings
NRCI-LTI-02-E- Must be submitted for a lighting control system, or for an Energy Management Control System (EMCS), to be
recognized for compliance.
NRCI-LTI-04-E - Must be submitted for two interlocked systems serving an auditorium, a convention center, a conference room, a
multipurpose room or a theater to be recognized for compliance.
NRCI-LTI-05-E- Must be submitted for a Power Adjustment Factor (PAF) to be recognized for compliance.
NRCI-LTI-06-E- Must be submitted for additional wattage installed in a video conferencing studio to be recognized for compliance.
U. DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE
Selections have been made based on information provided in this document. If any selection have been changed by the permit applicant, an explanation should be included in Table E.
Additional Remarks. These documents must be provided to the building inspector during construction and any with "-A" in the form name must be completed through an Acceptance
Test Technician Certification Provider (ATTCP). For more information visit: http://www.energy.ca.gov/title24/attcp/providers.html
Yes No Form/Title Field Inspector
Pass Fail
NRCA-LTI-02-A - Must be submitted for occupancy sensors and automatic time switch controls.
NRCA-LTI-03-A - Must be submitted for automatic daylight controls.
NRCA-LTI-04-A - Must be submitted for demand responsive lighting controls.
NRCA-LTI-05-A. - Must be submitted for institutional tuning power adjustment factor (PAF)
STATE OF CALIFORNIA
Indoor Lighting
NRCC-LTI-E CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-E
Project Name: Be So Coffee T.I.Report Page: (Page 8 of 8)
Project Address: 78065 MAIN STREET STE 100 Date Prepared: 1/31/2022
Registration Number:Registration Date/Time:Registration Provider: Energysoft
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003
Schema Version: rev 20200601
Report Generated: 2022-01-31 10:38:06
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
I certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name:Documentation Author Signature:
Company:
TITLE 24 OF THE DESERT SERVICES INC.
Signature Date:
2022-01-31
Address:
title24ofthedesert@gmail.com
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
760 278.1840
Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Compliance is true and correct.
2.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer)
3.The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements
of Title 24, Part 1 and Part 6 of the California Code of Regulations.
4.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations,
plans and specifications submitted to the enforcement agency for approval with this building permit application.
5.I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable
inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Designer Name:Responsible Designer Signature:
Company:Date Signed:
2022-01-31
Address:License:
City/State/Zip:Phone: