BCOM2022-0011BUILDING PERMIT
DESIGN & DEVELOPMENT
DEPARTMENT
78-495 CALLE TAMPICO
LA QUINTA, CALIFORNIA 92253
PHONE (760) 777-7125
WWW.LAQUINTACA.GOV
APPLIED DATE: 02/16/2022
ISSUED DATE: 07/29/2022
Permit Type:
Permit Number:
Property Address:
APN:
Legal Description
Property Zoning:
Valuation:
Building Commercial
78010 MAIN ST
BCOM2022-0011
770121008
$45,000.00
Owner:OLD TOWN LA QUINTA LLC
78100 MAIN ST STE 206, LA QUINTA, CA 92253
Applicant:Kimberly Coronel
1100 Town & Country Rd, Orange, CA 92868
Contractor:DRIL ELECTRIC / 957312
54095 AVENUE VELASCO, LA QUINTA, CA 92253
Declaration / Acknowledgement
PRIOR TO THE ISSUANCE OF THIS PERMIT FOR CONSTRUCTION, ALTERATION, IMPROVEMENT, DEMOLITION, OR REPAIR THE OWNER, APPLICANT AND/OR
CONTRACTOR UNDER PENALTY OF PERJURY HAVE AFFIRMED WHEN APPLICABLE, THROUGH THE SUBMITTAL OF FORMS OR BY OTHER ELECTRONIC MEANS, THE
FOLLOWING:
LICENSED CONTRACTOR OR OWNER-BUILDER DECLARATION (1 or 2)
1) They are licensed under provisions of Chapter 9 (commencing with
Section 7000) of Division 3 of the Business and Professions Code, and the
referenced
License is in full force and effect, or;
2) That they are exempt from the Contractors’ State License Law for the
reason(s) indicated by either (2)(a) and/or (2)(b), or (2)(c) where he or
she is exempt from licensure by a valid exemption. [Section 7031.5,
Business and Professions Code: Any city or county that requires a permit
to construct, alter, improve, demolish, or repair any structure, prior to its
issuance, also requires the applicant for the permit to file a signed
statement that he or she is licensed pursuant to the provisions of the
Contractors’ State License Law (Chapter (commencing with Section 7000)
of Division 3 of the Business and Professions
Code] Any violation of Section 7031.5 by any applicant for a permit
subjects the
applicant to a civil penalty of not more than five hundred dollars ($500).)
a) As owner of the property, or my employees with wages as their sole
compensation, will do all of or portions of the work, and the structure is
not intended or offered for sale (Section 7044, Business and Professions
Code: The Contractors’ State License Law does not apply to an owner of
property who, through employees’ or personal effort, builds or improves
the property, provided that the improvements are not intended or offered
for sale. If, however, the building or improvement is sold within one year of
completion, the Owner-Builder will have the burden of proving that it was
not built or improved for the purpose of sale.).
b) As owner of the property, will be exclusively contracting with licensed
c) Are exempt from licensure under the Contractors’ State License Law.
As an Owner-Builder, they acknowledge that, except for their personal
residence in which they must have resided in for at least one year prior to
completion of the improvements covered by this permit, they cannot legally
sell a structure built as an owner-builder if it has not been constructed in
its entirety by licensed contractors. It is understood that a copy of the
applicable law, Section 7044 of the Business and Professions Code, is
available upon request when this application was submitted at the
following Web site:
http://www.leginfo.ca.gov/calaw.html.
DECLARATION REGARDING CONSTRUCTION LENDING AGENCY (If
applicable)
A construction lender will be used for completion of the improvements
covered by this permit and the name and information of which is on file for
public inspection during the regular business hours of the public entity.
Failure of the applicant to indicate the construction lender on the
application does not relieve that person of the requirement to give the
construction lender preliminary notice from that duty.
WORKERS’ COMPENSATION DECLARATION (1, 2 or 3)
WARNING: FAILURE TO SECURE WORKERS’ COMPENSATION COVERAGE IS
UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND
CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION
TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION
3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY’S FEES.
1) Has and will maintain a certificate of consent to self-insure for workers’
compensation, issued by the Director of Industrial Relations as provided for
by Section 3700 of the Labor Code, for the performance of the work for
which this permit is issued.
2) Has and will maintain workers’ compensation insurance, as required by
Section 3700 of the Labor Code, for the performance of the work for which
this permit is issued.
3) Certifies that, in the performance of the work for which this permit is
issued, shall not employ any person in any manner so as to become subject
to the workers’ compensation laws of California, and agree that, if should
become subject to the workers’ compensation provisions of Section 3700 of
the Labor Code, shall forthwith comply with those provisions.
NOTICE TO APPLICANT (1, 2 and 3)
1) Each person upon whose behalf this application was made, each person
at whose request and for whose benefit work is being performed under or
pursuant to any permit issued as a result of this application, the owner, and
the applicant, each agrees to, and shall defend, indemnify and hold harmless
the City of La Quinta, its officers, agents, and employees for any act or
omission related to the work being performed under or following issuance of
this permit.
2) Any permit issued as a result of this application becomes null and void if
work is not commenced within 360 days from date of issuance of such
permit, or if cessation of work for 180 days will subject permit to
cancellation. On or after January 1, 2019, every permit issued shall become
invalid unless the work on the site authorized by such permit is commenced
within 12 months after its issuance, or if the work authorized on the site by
such permit is suspended or abandoned for a period of 12 months after the
time the work is commenced.
3) Certified that they read the application and state that the information
provided is correct. Agree to comply with all city and county ordinances and
state laws relating to building construction, and hereby authorize
representatives of this city to enter upon the above-mentioned property for
inspection purposes.
IMPORTANT: An Application for Permit was made to the Building Official,
subject to the conditions and restrictions set forth at the time of application,
which is now hereby an Issued Permit. If any part of the information being
supplied on this permit is inaccurate or untrue, please contact the City of La
Quinta at (760) 777-7125 immediately for correction.
Printed: 5/14/25 1:08 pm Page 1 of 3
Permit Type:
Permit Number:
Property Address:
Building Commercial
BCOM2022-0011
78010 MAIN ST
BUILDING PERMIT
OLD TOWN LQ / NEW FREESTANDING WALK-UP ATM MACHINE *** NEW FREESTANDING WALK-UP ATM MACHINE IN EXISTING
SHOPPING CENTER. NO TUMF ASSESSMENT PER 2018 HANDBOOK. COMPLIANT PATH OF TRAVEL TO BE FIELD VERIFIED. 2019
CALIFORNIA BUILDING CODES. #|||# OLD TOWN LQ / NEW FREESTANDING WALK-UP ATM MACHINE *** REVISION 1 - ADD CURB
AND HANDRAIL AT ATM AREA + ADD PATH OF TRAVEL IMPROVEMENTS TO SCOPE OF WORK. NEW PARKING SIGNAGE + ADD (2) SETS
OF DETECTABLE WARNING TRUNCATED DOMES ON ACCESSIBLE ROUTES TO ATM.
Use of Permit
Construction Details
Other Non-ResidentialCommercial Work Type 20Gross Square Footage 0Conditioned Square
Footage
V-BConstruction Type 2019Code Edition 20Addition Area Square
Footage
0New Electrical Square
Footage
2Number of
Receptacle/Switch/Lig
ht(s)
NoTransportation Uniform
Mitigation Fee
Applicable
NoCity Development
Impact Fee Applicable
NoArt in Public Places
Fund Exempt
Valuation Details
Type Group Sq Ft Value
Financial Information
Fee AmountFee Amount PaidInvoice No.
PERMIT-BCOM2022-001
1
$226.25 NONRES ADDITION, FIRST 100 SF PC $226.25
$2.00 BSAS SB1473 FEE $2.00
$5.00 TECHNOLOGY ENHANCEMENT FEE $5.00
$161.00 ALTERATIONS/ADDITIONS - NON-RESIDENTIAL $161.00
$161.06 NONRES ADDITION, FIRST 100 SF $161.06
$87.50 HOURLY CHARGE - CITY BUILDING STAFF $87.50
$21.00 RECORDS MANAGEMENT FEE - MAJOR $21.00
$210.00 HOURLY CHARGE - ESGIL CIVIL ENGINEER $210.00
$27.79 DEVICES, FIRST 20 $27.79
$27.79 DEVICES, FIRST 20 PC $27.79
$929.39 $929.39 Total for Invoice PERMIT-BCOM2022-0011
Grand Total for Permit $929.39 $929.39
Workflow / Inspections
Workflow Step / Action Name Action Type Start Date End Date
Inspections v.1 02/16/2022 0:00
PLANNING FINAL v.1 Inspection
FINAL** v.2 Inspection
FINAL** v.1 Inspection
UNDERGROUND ELEC v.3 Inspection
FOOTINGS v.4 Inspection
FOOTINGS v.3 Inspection
UNDERGROUND ELEC v.2 Inspection
Printed: 5/14/25 1:08 pm Page 2 of 3
Permit Type:
Permit Number:
Property Address:
Building Commercial
BCOM2022-0011
78010 MAIN ST
BUILDING PERMIT
FOOTINGS v.2 Inspection
FOOTINGS v.1 Inspection
UNDERGROUND ELEC v.1 Inspection
Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work
shall remain visible and able to be accessed for inspection purposes until approved. Approval as a result of an inspection shall not be
construed to be an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Inspections
presuming to give authority to violate or cancel the provisions of the applicable code and other ordinances of the jurisdiction shall not be
valid. It shall be the duty of the owner or the owner's authorized agent to cause the work to remain visible and able to be accessed for
inspection purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of
any material required to allow inspection.
It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for
inspection. It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this
code.
Inspections
A building or structure shall not be used or occupied in whole or in part, and a change of occupancy of a building or structure or portion
thereof shall not be made, until the building official has issued a certificate of occupancy therefor as provided herein. Issuance of a
certificate of occupancy shall not be construed as an approval of a violation of the provisions of the applicable code and other ordinances
of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the
jurisdiction shall not be valid.
Certificate of Occupancy
A person shall not make connections from a utility, a source of energy, fuel, or power, or a water system or sewer system to any building
or system that is regulated by the applicable code and other ordinances of the jurisdiction for which a permit is required, until approved by
the building official.
Service Utilities
Printed: 5/14/25 1:08 pm Page 3 of 3
78495 CALLE TAMPICO
LA QUINTA, CA 92253
760-777-7000
PERMIT #
PLAN LOCATION:
Project Address:Project Description: Pool, Remodel, Add’t, Elect, Plumb, Mech
APN #:
Applicant Name:
Address:
City, ST, Zip:
Telephone:
Email: Valuation of Project $______________________________
Contractor Name: New SFD Construction:
Address: Conditioned Space _________ SF
City, St, Zip Garage _________ SF
Telephone: Patio/Porch _________ SF
Email: Fire Sprinklers _________ SF
State Lic: City Bus Lic:
Arch/Eng Name: Construction Type: Occupancy:
Address: Grading:
City, St, Zip
Telephone: Bedrooms: Stories: # Units:
Email:
State Lic: City Bus Lic:
Property Owner’s Name: New Commercial / Tenant Improvements:
Address: Total Building __________ SF
City, ST, Zip Construction Type: Occupancy:
Telephone:
Email:
OFFICE USE ONLY
# Submittal Req’d Rec’d
Plan Sets
Structural Calcs
Truss Calcs
Title 24 Calcs
Soils Report
Grading Plan (PM10)
Landscape Plan
Subcontractor List
Grant Deed
HOA Approval
School Fees
Burrtec Debris Plan
Planning approval
Public Works approval
Fire approval
City Business License
DESIGN & DEVELOPMENT D EPARTMENT
78-495 C ALLE T AMPICO
L A Q UINTA , CALIFORNIA 92253
(760) 777 -7 125 FAX (760) 777 -7011
Page 1 of 2
PATH OF TRAVEL UPGRADE DETERMINATION
DATE: 08/24/2022
STATUS: Approved
PLAN CHECKED BY: Jacob Fuson
TELEPHONE NUMBER: 760.777.7081
ADDRESS: 78-010 Main Street___________
DESCRIPTION: Walk up ATM
APPLICANT: FLITE Banking Centers, LLC
PLAN CHECK #: BCOM2022-0011
In accordance with the 2019 California Building Code (CBC) Section 11B-202.4, exception 8, the cost of compliance with
Section 11B-202.4 is allowed to be limited to 20% of the adjusted construction cost of the alterations, structural repairs
or additions when the adjusted construction cost does not exceed the current valuation threshold.
Construction cost for proposed project (not including costs of improvements to the path of travel to the area of
alteration): $ __12030____________ (A)
Cost of alterations to areas on this path of travel undertaken during the preceding three-year period which did not
provide an accessible path of travel to the area of alteration (as applicable): $_0___ (B)
Adjusted construction cost (C) = (A) + (B) $ ___$12030___________ (C)
PATH OF TRAVEL CONSTRUCTION COSTS:
Elements serving the area of alteration
based on priority
Is element in
compliance with
current Chapter
11B? (Y/N)
If not, will element be
upgraded to current
Chapter 11B? (Y/N)
Proposed cost of
compliance with
current
Chapter 11B
1. An accessible entrance no Yes $8,017
2. An accessible route (interior and
exterior) to the
altered area
$
3. At least one accessible restroom for
each gender or a single accessible unisex,
single user or family restroom
$
4. Accessible public telephones $
5. Accessible drinking fountains $
6. When possible, additional accessible
elements such as:
a. Parking $
b. Storage $
c. Signs No Yes $125
d. Alarms $
e. Sign on Post No Yes $125
f. Domes No Yes $1350
Total cost of providing compliant path of
travel elements:
$ 9,617
(D)
COST OF PATH OF TRAVEL UPGRADES AS PERCENTAGE OF ADJUSTED CONSTRUCTION COST:
Compliance of path of travel upgrades as % of adjusted construction cost: (E)% =
(D) / (C)
Note: This may not be less than 20%
80% (E)
Residential Plan Check Correction List Page 2 of 2
MEMORANDUM
To: Erich A. Kuchar, P.E.
City of La Quinta – Structural Review
From: Kimberly Coronel
Kimley-Horn and Associates, Inc.
Date:
May 2, 2022
Subject:
FLITE La Quinta – Plan Review Comment Response (LQ-BCOM2022-0011.e)
RESPONSE TO COMMENTS:
Dear Erich,
I have reviewed the city comments provided and have made all revisions or an explanation as to why it
has not been provided. The items are summarized below:
1st Review Comments
GENERAL
1. Please make all corrections and submit two new complete sets of prints, to: The jurisdiction’s
building department.
Response: Noted
2. Plans may be submitted in electronic format, subject to the jurisdiction’s approval. If so, they must
have restrictions removed from the security settings. Electronic plans with restrictions to markups,
printing, or stamping will not be approved.
Electronic plans must be submitted back to the jurisdiction’s building department and will then be
routed to Interwest. ONLY submit FULL complete and combined sets of plans, uploading multiple
single sheets will not be allowed. Make sure all plans and calc packages, spec. reports, etc. are
labeled clearly and can be read what they are and WHAT SUBMITTAL they go with. DO NOT
SEND documents directly to Interwest as they will not be accepted.
Response: Noted
3. Provide item-by-item responses on an 8-1/2-inch by 11-inch sheet(s) clearly and specifically
indicating where and how each correction item has been addressed (vague responses, such as
“Done“ or “See plans,” are unacceptable).
Response: Noted, this comment response memo serves as this item.
STRUCTURAL
4. Update plans and calcs for city required 110 mph wind speed and not 103 mph as currently used.
Response: Plans and calcs have been revised for 110 mph wind speeds, see sheets G-5 on the
Structural Calculations and S-001.
5. Provide complete structural framing and details for the new ATM as shown in the calcs. Only the
foundation and columns were provided in the drawings.
Response: Structural framing plan and details have been added as part of the resubmittal
package.
ADDITIONAL
6. Please provide a response list indicating where each correction item has been addressed on the
plans. I.e., specify the plan sheet, note, or detail number, calculation page, etc., where the item
is corrected on the plans.
Response: Noted, this comment response memo serves as this item.
7. Please indicate here if any changes have been made to the plans that are not a result of
corrections form this list. If there are other changes, please briefly describe them and where they
are located in the plans. Have changes been made to the plans not resulting from this correction
list?
Please indicate: Yes No
Response: No changes outside what was revised as requested.
8. The jurisdiction has contracted with Interwest, located at 9320 Chesapeake Drive, Suite 208,
San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for
your project. If you have any questions regarding these plan review items, please contact Erich
A., Kuchar, P.E. at Interwest. Thank you.
Response: Noted
Please contact me at (714) 705-1384 or Kimberly.Coronel@kimley-horn.com should you have any
questions.
Sincerely,
KIMLEY-HORN AND ASSOCIATES, INC.
Kimberly Coronel
X