Loading...
BCOM2015-0037BUILDING PERMIT DESIGN & DEVELOPMENT DEPARTMENT 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 Permit Type: Building Commercial Permit Number: BCOM2015-0037 Property Address: 78560 HIGHWAY 111 APN: 604050037 Legal Description Property Zoning: Valuation: $122,000.00 PHONE (760) 777-7125 WWW.LAQUINTACA.GOV APPLIED DATE: 06/23/2015 ISSUED DATE: 09/08/2015 CALIFORNIA Owner: WASHINGTON ADAM PARTNERSHIP 42620 CAROLINE CT 102, PALM DESERT, CA 92253 Applicant: MPA ARCHITECTS INC. 3578 TH STREET, SAN DIEGO, CA 92104 Contractor: DONALD L WESSELS 38982 DESERT GREENS DR EAST, PALM DESERT, CA 92260 PRIOR TO THE ISSUANCE OF THIS PERMIT FOR CONSTRUCTION, ALTERATION, IMPROVEMENT, DEMOLITION, OR REPAIR THE OWNER, APPLICANT AND/OR CONTRACTOR UNDER PENALTY OF PERJURY HAVE AFFIRMED WHEN APPLICABLE, THROUGH THE SUBMITTAL OF FORMS OR BY OTHER ELECTRONIC MEANS, THE FOLLOWING: LICENSED CONTRACTOR OR OWNER -BUILDER DECLARATION (1 or 2) 1) They are licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and the referenced License is in full force and effect, or; 2) That they are exempt from the Contractors' State License Law for the reason(s) indicated by either (2)(a) and/or (2)(b), or (2)(c) where he or she is exempt from licensure by a valid exemption. [Section 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractors' State License Law (Chapter (commencing with Section 7000) of Division 3 of the Business and Professions Code] Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).) a) As owner of the property, or my employees with wages as their sole compensation, will do all of or portions of the work, and the structure is not intended or offered for sale (Section 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who, through employees' or personal effort, builds or improves the property, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the Owner -Builder will have the burden of proving that it was not built or improved for the purpose of sale.). b) As owner of the property, will be exclusively contracting with licensed c) Are exempt from licensure under the Contractors' State License Law. As an Owner -Builder, they acknowledge that, except for their personal residence in which they must have resided in for at least one year prior to completion of the improvements covered by this permit, they cannot legally sell a structure built as an owner -builder if it has not been constructed in its entirety by licensed contractors. It is understood that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application was submitted at the following Web site: http://www.Ieginfo.ca.gov/calaw.htm1. DECLARATION REGARDING CONSTRUCTION LENDING AGENCY (If applicable) A construction lender will be used for completion of the improvements covered by this permit and the name and information of which is on file for public inspection during the regular business hours of the public entity. Failure of the applicant to indicate the construction lender on the WORKERS' COMPENSATION DECLARATION (1, 2 or 3) WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. 1) Has and will maintain a certificate of consent to self -insure for workers' compensation, issued by the Director of Industrial Relations as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 2) Has and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 3) Certifies that, in the performance of the work for which this permit is issued, shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, shall forthwith comply with those provisions. NOTICE TO APPLICANT (1, 2 and 3) 1) Each person upon whose behalf this application was made, each person at whose request and for whose benefit work is being performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents, and employees for any act or omission related to the work being performed under or following issuance of this permit. 2) Any permit issued as a result of this application becomes null and void if work is not commenced within 360 days from date of issuance of such permit, or if cessation of work for 180 days will subject permit to cancellation. On or after January 1, 2019, every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 12 months after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 12 months after the time the work is commenced. 3) Certified that they read the application and state that the information provided is correct. Agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above -mentioned property for inspection purposes. IMPORTANT: An Application for Permit was made to the Building Official, subject to the conditions and restrictions set forth at the time of application, which is now hereby an Issued Permit. If any part of the information being supplied on this permit is inaccurate or untrue, please contact the City of La Quinta at (760) 777-7125 immediately for correction. Printed: 5/15/25 3:08 pm Page 1 of 4 BUILDING PERMIT Permit Type: Building Commercial Permit Number: BCOM2015-0037 Property Address: 78560 HIGHWAY 111 application does not relieve that person of the requirement to give the construction lender preliminary notice from that duty. Printed: 5/15/25 3:08 pm Page 2 of 4 Permit Type Building Commercial BUILDING PERMIT Permit Number: Property Address BCOM2015-0037 78560 HIGHWAY 111 MILAUSKAS / 2,717SF TI TO EXPAND INTO ADJACENT SUITE *** 2,717SF OFFICE/EXAM TI TO EXPAND BUSINESS INTO ADJACENT SUITE [MILAUSKAS EYE INSTITUTE] THIS PERMIT DOES NOT INCLUDE ALTERATIONS TO THE EXISTING SPACE, THE SHELL BUILDING OR ADDITIONAL/CHANGEOUT OF PACKAGED HVAC SYSTEMS. 2013 CALIFORNIA BUILDING CODES. nnntructinn Deta Commercial Work Type Remodel Building/Unit B: Office, Professional Conditioned Square 0 Occupancy Footage Classification(s) Fire Sprinkler Square 2717 Number of Floors 1 Occupant Load 57 Footage Construction Type V-B New Electrical Square 2717 Footage Water System Install Yes or Alteration? City Development No Impact Fee Applicable Code Edition 2013 Miscellaneous 1 Mechanical Transportation Uniform No Mitigation Fee Applicable Art in Public Places No Fund Exempt Remodel Area Square 2717 Footage Number of Plumbing 4 Fixtures/Traps Number of Dispensing 1 Units - Gas (TUMF) Type Group Sq Ft Value Invoice No. Fee PERMIT-BCOM2015-00; NON-RESIDENTIAL, EA ADDITION 2,000SF 7 WATER SYSTEM INST/ALT/REP PC REMODEL, EA ADDITIONAL 500 SF BSAS SB1473 FEE REMODEL, EA ADDITIONAL 500 SF PC NON-RESIDENTIAL, FIRST 2,000SF, PC FIXTURE/TRAP SMI - COMMERCIAL WATER SYSTEM INST/ALT/REP OTHER MECHANICAL EQUIPMENT NON-RESIDENTIAL, FIRST 2,000SF REMODEL, FIRST 500 SF PC REMODEL, FIRST 100 SF ART IN PUBLIC PLACES - COMMERCIAL REMOD FIXTURE/TRAP PC NON-RESIDENTIAL, EA ADDITION 2,000SF, PC OTHER MECHANICAL EQUIPMENT PC Fee Amount $36.26 $12.09 $130.50 $5.00 $104.40 $84.12 $48.36 $34.16 $12.09 $36.26 $108.77 $134.88 $49.31 $110.00 $48.36 $9.67 $36.26 Total for Invoice PERMIT-BCOM2015-0037 $1,000.49 Grand Total for Permit $1,000.49 Amount Paid $36.26 $12.09 $130.50 $5.00 $104.40 $84.12 $48.36 $34.16 $12.09 $36.26 $108.77 $134.88 $49.31 $110.00 $48.36 $9.67 $36.26 ;0i,uuu.4a $1,000.49 Printed: 5/15/25 3:08 pm Page 3 of 4 BUILDING PERMIT Permit Type: Building Commercial Permit Number: BCOM2015-0037 Property Address: 78560 HIGHWAY 111 Inspections v.1 06/23/2015 0:00 ---------------------------------------------------------------------------------------------------------------------------------------- FINAL** v.1 Inspection ---------------------------------------------------------------------------------------------------------------------------------------- T-BAR/OVERHEAD v.2 Inspection --------------------------------------------------- ROUGH MECH v.3 ------------------------------------------------------------------------------------- Inspection ---------------------------------------------------------------------------------------------------------------------------------------- T-BAR/OVERHEAD v.1 Inspection ---------------------------------------------------------------------------------------------------------------------------------------- DRYWALL NAIL v.1 Inspection ---------------------------------------------------------------------------------------------------------------------------------------- ROUGH ELEC v.3 Inspection ---------------------------------------------------------------------------------------------------------------------------------------- ROUGH ELEC v.2 Inspection ---------------------------------------------------------------------------------------------------------------------------------------- ROUGH MECH v.2 Inspection ---------------------------------------------------------------------------------------------------------------------------------------- ROUGH PLBG v.2 Inspection ---------------------------------------------------------------------------------------------------------------------------------------- FRAMING v.1 Inspection ---------------------------------------------------------------------------------------------------------------------------------------- ROUGH MECH v.1 Inspection ----------------------------------------- ROUGH ELEC v.1 ----------------------------------- Inspection --------------------------------------------------------------------------- ROUGH PLBG v.1 ------------------------------------------------------------- Inspection --------------------------------------- UNDERGROUND PLBG v.1 ------- ------- Inspection Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work shall remain visible and able to be accessed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of the applicable code and other ordinances of the jurisdiction shall not be valid. It shall be the duty of the owner or the owner's authorized agent to cause the work to remain visible and able to be accessed for inspection purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this code. A building or structure shall not be used or occupied in whole or in part, and a change of occupancy of a building or structure or portion thereof shall not be made, until the building official has issued a certificate of occupancy therefor as provided herein. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the iurisdiction shall not be valid. A person shall not make connections from a utility, a source of energy, fuel, or power, or a water system or sewer system to any building or system that is regulated by the applicable code and other ordinances of the jurisdiction for which a permit is required, until approved by the buildino official. Printed: 5/15/25 3:08 pm Page 4 of 4 Gz.O�n�Aj�pX COMMUNITY DEVELOPMENT DEPARTMENT 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 (760) 777-7125 FAX (760) 777-7011 NON-RESIDENTIAL PLAN CHECK CORRECTION LIST (.$) ADDRESS: 78-560 HIGHWAY 111 DESCRIPTION: OFFICE EXPANSION TI APPLICANT: MILAUSKAS EYE INSTITUTE PLAN CHECK #: BCOM2015-0037 This submittal has been checked for compliance with the 2013 California Building, Mechanical, Electrical, Plumbing, Energy, and Green Building Codes, and the City of La Quinta Municipal Code. APPLICANT: The following items are being returned to you for correction: 3- UNMARKED PLAN SETS 2- UNMARKED ENERGY CALCULATIONS 1- CORRECTION LIST BUILDING DEPARTMENT STAFF: DO NOT accept any resubmittal unless ALL of the following items are included: 2- REVISED PLAN SETS 2- REVISED ENERGY DOCUMENTS 1- ASSESSORS SITE/FLOOR PLAN 1- FIRE DEPARTMENT APPROVAL 1- CORRECTION LIST w/responses 1- FIRST REVIEW PLAN n 12015 f pF 4uopMENT INSTRUCTIONS TO APPLICANT: 1) Provide a written response to each comment on the following pages, noting specifically where the correction can be found. Responses such as, "Sheet A-3," or, "Handrails shall be per CBC Section 1003," are not acceptable. Show or note specifically how compliance with a code requirement is achieved. Responses such as, "Added note 16 on sheet A-3" are appropriate and will help expedite your back check. 2) Corrections may not be made by handwriting on existing drawings. Revise originals and reprint Plans alid/or Calculations as necessary. 3) Return all red -marked Plans and/or Calculations with your resubmittal. 4) Each sheet of resubmitted Plans and/or Calculations shall include the preparer's name and telephone number and shall be wet -signed by the preparer. If the preparer is a licensed architect or engineer, all documents prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code Section 5536. Resubmittals will not be accepted with signatures missing. 5) Return this list, your written responses, and all documents listed above with your resubmittal. Non Residential Plan Check Correction List (os) Page 1 of 3 SECTION A - GENERAL 1) Specify within scope of work that project is proposed to combine suite addresses 78-570 and 78-560 into one suite. 2) Provide on each sheet of resubmitted Plans and cover sheet of bound Calculations the preparer's name and telephone number and wet -signature. If the preparer is a licensed architect or engineer, all documents prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code ' 5536. Resubmittals will not be accepted with signatures missing. 3) Provide written evidence of Riverside County Fire Department approval of this Project. Contact the Fire Department directly at (760) 863-8886. SECTION B - ARCHITECTURAL 1) Professional offices of health care providers shall comply with Section 1113-805. (11B-223.4) Provide the following throughout the proposed expansion. a) Where seating is provided in waiting rooms, at least 5 percent of the seating shall be wheelchair spaces complying with Section I IB-802.1. (11B-805.3) b) A 36 inch (914 min) minimum wide clear space shall be provided along the full length of each side of beds, exam tables, procedure tables, gurneys and lounge chairs. (I IB-805.4.1) c) Turning space complying with Section I IB-304 shall be provided within the rooms. (I IB-805.4.3) d) All hand washing fixtures, lavatories and sinks shall comply with Section I IB-606. (I IB-805.6) e) Built-in cabinets, counters and work surfaces shall be accessible, including: patient wardrobes, nurse's stations, administrative centers, reception desks, medicine preparation areas, laboratory work stations, equipment consoles, clean and soiled utility cabinets, and storage areas; and shall comply with Sections I I B-225 and 11 B-902. (I 1 B-805.7) 2) Handles, pulls, latches, locks, and other operable parts on doors and gates shall be operable with one hand and shall not require tight grasping, pinching, or twisting of the wrist. The force required to activate operable parts shall be 5 pounds maximum. Operable parts of such hardware shall be 34 inches minimum and 44 inches maximum above the finish floor or ground. Where sliding doors are in the fully open position, operating hardware shall be exposed and usable from both sides. (CBC § 11 B-309.4 and 11 b-404.2.7) Revise plans to demonstrate compliance at sliding doors and their proposed hardware. 3) Locks and latches shall be permitted to prevent operation of doors in Group A having an occupancy load of 300 or less, Groups B, F, M and S, and in places of religious worship at the main exit door or doors only provided the locking device is readily distinguishable as locked and the door is posted with a readily visible sign on the egress side stating: "THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED" in letters 1 inch in height on contrasting background. (CBC § 1008.1.9.3) Verify that the existing hardware at the rear egress doors is single action type. SECTION C — ELECTRICAL 1) All branch circuits serving patient care areas shall be provided with an effective ground -fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, or metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118. (CEC §517.13(A)) Verify the proposed conductors comply. Non Residential Plan Check Correction List (os) Page 2 of 3 City of La Quinta SECTION D - PLUMBING 1) In business and mercantile occupancies with a total occupant load of 50 or less including customers and employees, one toilet facility, designed for use by no more than one person at a time, shall be permitted for use by both sexes." — Interpretation: You may use single user toilet facilities to satisfy the requirements for fixtures of both sexes when under the occupant load threshold. Show that the proper number of plumbing fixtures is provided for this occupancy meeting the requirements of Chapter 4 of the 2013 California Plumbing Code (CPC), Revise fixture calculation and demonstrate compliance on plans. SECTION E — ENERGY EFFICIENCY 1) The performance approach may be used for whole building permit applications; or for permit applications that involve combination of either building envelope and indoor lighting or the mechanical system or for lighting and mechanical together. The performance method may be used to demonstrate compliance with the envelope alone or the mechanical system alone, but cannot be used to show lighting compliance alone. (2013 California Non -Residential Compliance Manual, Section 11.4 — Application Scenarios) Provide LTG forms showing compliance with lighting fixtures specified on plans using the Complete Building Method, Area Category Method, or Tailored Method. Due to lack of information in this submittal, a comprehensive review will be performed at next submittal. 2) Luminaires providing general lighting that are in or are partially in the Skylit Daylit Zones or the Primary Sidelit Daylit Zones shall be controlled independently by fully functional automatic daylighting controls that meet the applicable requirements of Section 110.9, and the applicable requirements of Section 130.l(d)2, Items A — D. SECTION F - MISCELLANEOUS COMMENTS 1) Red marks on Plans, even if not specifically mentioned in this list, indicate items needing correction. Revise Plans as necessary and provide written response, noting where correction can be found. 2) Provide one copy each of the Site Plan and Floor Plan for the County Assessor's office. While not required for resubmittal, this administrative item must be addressed prior to issuance of building permit. 3) Provide contractor information to complete building permit application form. 4) Provide proof of current City business license. 5) Inadequate information has been provided at this submittal to calculate fees for this project. Fee calculation will be performed when Plans are complete. END CORRECTION LIST As further information is provided and reviewed, additional corrections may be required. Non Residential Plan Check Correction List Page 3 of 3 RESPONSE TO PLAN CHECK COMMENTS MPAARCHITECTS INC. Agency: Checked by: Project Address: Plan Check #: City of La Quinta Community Development Department 78-495 Calls Tampico La Quinta, CA 92253 AJ Ortega 78-560 Highway 111 BCOM2015-0037 Comment # Response SECTION A — GENERAL 1 Combining suites added to scope of work on sheet Al 2 Plan preparers name, phone number and signature added to each sheet of plans 3 Fire Dept. approved SECTION B — ARCHITECTURAL a) Wheelchair spaces added to waiting areas on floor plan, sheet A3 b) 36" clear added to side of procedure chairs on floor plan, sheet A3 c) Turning space added to Exam roams, floor plan, sheet A3 d) Clearances at sinks added to floor plan, sheet A3 e) Counter top height requirements added to floor plan key notes, sheet A3 2 Sliding door requirements added to door schedule notes, sheet A3 3 Single action hardware added to revised door schedule, sheet A3 SECTION C — ELECTRICAL Conductor / Grounding requirements in patient rooms added to sheet E1 SECTION D — PLUMBING 1 Minimum plumbing fixture table revised on sheet A3 SECTION E — ENERGY EFFICIENCY 1 T-24 forms added to sheet T-24(2) 2 Daylight controls added to lighting plan, sheet E2 SECTION F — MISCELLANEOUS COMMENTS 1 Red marked plans not received 2 One additional Site plan attached 3 Contractor pulling permit will provide info 4 Contractor pulling permit will provide city business license 5 Understood 3578 30t" Street • San Diego, California 92101 • (619) 236-0595 • Fax (619) 236-0557 www.mpa-architects.com MEMORANDUM WA ARCHITECTS JLJIE To: City of La Quints Community Development Department 78-495 Calle Tampico La Quinta, CA 92253 Date: 09-28-15 Regarding: Milauskas Eye Institute 78-560 Highway 111 Permit # BCOM2015-0037 To Whom It May Concern, MPA ARCHITECTS, INC. 3578 301h Street San Diego, CA 92104 619.236.0595 1 fax 619.236.0557 www.mpa-architects.com Flexible mechanical ducting may be used as an alternative to the rigid ducting shown in the approved set of plans. Sincereiy, � - c ANC John Rumsey Project Architect j i * No. C26819 (0 EXP.3-31-2017 ���0 CAL�F�/ STATE OF CALIFORNIA INDOOR LIGHTING CEC•NRCC-LT I.01-E iRemsed 08115) CERTIFICATE OF COMPLIANCE Indoor Lighting Project Name MILAUSKAS EYE INSTITUTE A. General Information Climate Zone: Conditioned Floor Area : 2,717 Unconditioned Floor Area Building Type: M Nonresidential ❑ Schools ❑ Relocatable Public Schools Phase of Construction: ❑ New Construction Method of Compliance: ❑ Complete Building Project Address: 78-560 HIGHWAY 111 CALIFORNIA ENERGY COMMISSION a NRCC-LTI-01-E (Page 1 of 6) Date Prepared. 9/28/2015 ❑ High -Rise Residential ❑ Hotel/Motel ❑ Conditioned Spaces ❑ Unconditioned Spaces ❑ Addition M Alteration ® Area Category ❑ Tailored B. lighting Compliance Documents (select yes for each document included) For detailed instructions on the use of this and oil Energy Efficiency Standards compliance documents, refer to the Nonresidential Manual published by the California Energy Commission, YES NO FORM TITLE x NRCC-LTI.01-E Certificate of Compliance. All Pages required on plans for all submittals. x NRCC-LTI-02-E Lighting Controls, Certificate of Compliance, and PAF Calculation, All Pages required on plans for all submittals. x NRCC-LTI-03-E Indoor Lighting Power Allowance NRCC LTI-04-E Tailored Method Worksheets NRCC-LTI-05 E Line Voltage Track Lighting Worksheets CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance August 2015 STATE OF CALIFORNIA INDOOR LIGHTING CEC-NRCC-LTI-01-E {Revised 081151 CERTIFICATE OF COMPLIANCE _ Indoor Lighting Project Name: MILAUSKAS EYE INSTITUTE C. Summary of Allowed Lighting Power Conditioned and Unconditioned space Lighting must not be combined for compliance Indoor Lighting Power for Conditioned Spaces Watts AISSION .0 N RCC-LTI-01-E (Page 2 of 6) Date Prepared. 9/28/2015 Indoor Lighting Power for Unconditioned Spaces Watts Installed Lighting Installed Lighting 1. NRCC-LTI-01-E, page 4 + 1,732 NRCC-LTI-01-E, page 4 1 + PORTABLE ONLY FOR OFFICES 2 + NRCC-LTI-01-E, page 3 Minus Lighting Control Credits Minus Lighting Control Credits 3. NRCC-LTI-02-E, pa e 2 NRCC LTI 02 E, page 2 Adjusted Installed Lighting Power 1,732 Adjusted Installed Lighting Power 4. (row 1 plus row 2 minus row 3) (row 1 minus row 3) 5 Complies ONLY if Installed 5 Allowed Allowed Lighting Power I 2,361 I Allowed Lighting Power 6' Conditioned NRCC-LTI-03-E, page 1 Unconditioned NRCC-LTI-03-E, page 1 Complies ONLY if Installed 5 Allowed D. Declaration of Required Installation Certificates Declare by selecting yes for all Installation Certificates that will be submitted. (Retain copies and verify forms are completed and signed.) YES NO Form/Title X NRCI-LTI-01-E - Must be submitted for all buildings ❑ Field Inspector NRCI-LTI-02-E - Must be submitted for a lighting control system, or for an Energy Management Control System (EMCS), ❑ Field Inspector x to be recognized for compliance. NRCI-LTI-03-E - Must be submitted for a line -voltage track lighting integral current limiter, or for a supplementary ❑ Field Inspector overcurrent protection panel used to energize only line -voltage track lighting, to be recognized for compliance. NRCI-LTI-04-E - Must be submitted for two interlocked systems serving an auditorium, a convention center, a ❑ Field Inspector r conference room, a multipurpose room, or a theater to be recognized for compliance. _ NRCI-LTI-05-E - Must be submitted for a Power Adjustment Factor (PAF) to be recognized for compliance. ❑ Field Inspector NRCI-LTI-06-E - Must be submitted for additional wattage installed in a video conferencing studio to be recognized for ❑ Field Inspector compliance. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance August 2015 STATE OF CALIFORNIA INDOOR LIGHTING CEC-NRCC-LTI-01-E (Rewsed 00115) CERTIFICATE OF COMPLIANCE Indoor Lighting Project Name MILAUSKAS EYE INSTITUTE Date Prepared 9/28/2015 dISSION 0 NRCC-LTI-01-E (Page 3 of 6) E. Declaration of Required Certificates of Acceptance Declare by checking all of the Certificates of Acceptance that will be submitted. (Retain copies and verify forms are completed and signed.) YES NO Form/Title x NRCA-LTI-02-A - Must be submitted for occupancy sensors and automatic time switch controls. ❑ Field Inspector X NRCA-LTI-03-A - Must be submitted for automatic daylight controls. ❑ Field Inspector _ NRCA-LTI-04-A - Must be submitted for demand responsive lighting controls. ❑Field Inspector A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for: ® CONDITIONED SPACE O UNCONDITIONED SPACE F. Indoor Lighting Schedule and Field Inspection Energy Checklist ❑ The actual indoor lighting power listed on this page and on the next page includes all installed permanent and planned portable lighting systems. ❑ When Complete Building Method is used for compliance, list each different type of luminaire on separate lines. ill When Area Category Method or Tailored Method is used for compliance, list each different type of luminaire by each different function area on separate lines fl Akin inrli,rlp track liehtina in schedule, and submit the track lighting compliance form (NRCC-LTI-05-E) when line -voltage track lighting is installed. August 2015 CA Building Energy Efficiency Standards 2013 Nonresidential Compliance STATE OF CALIFORNIA r��n/'1f1� 1 If�IJTI War_ r1' 11nL %JVr% vr r 1 nw CALIFORNIA ENERGY COMMISSION CEC-NRCC-LT[-Ot-E Remised 08I15 NRCC-LTI-01-E CERTIFICATE OF COMPLIANCE (Page 4 of 6) Indoor Lighting Project Name: MILAUSKAS EYE INSTI"I'UTF. Date Prepared 9/28/2015 G. Installed Portable Luminaires in Offices — Exception to Section 140.6(a) ❑ This section shall be filled out ONLY for portable luminaires in offices (As defined in §100.1). All other planned portable luminaires shall be documented on next page of this compliance form. ❑ This section is used to determine if greater than 0.3 watts of portable lighting is planned for any office ❑ Fill out a separate line for each different office. Small offices that are typical (having the same general and portable lighting) may be grouped together. This allowance shall not be traded between offices having different lighting systems. Office Portable Luminaire Schedule Office Installed Portable Luminaire Watts Per Square Foot Office Location Field Inspector 1 2 3 4 5 6 7 8 9 10 installed If F S 0.3, portable Watts enter o v luminaire a per zero; Identify Office area in c watts in o square COS x G07 which these portable Pass Fail Complete luminaire Description Z E this office 'Q foot if G06 > luminaires are installed (i.e., LED, under cabinet, furniture mounted Watts per (G02 x 0(G04 / 0.3, direct/indirect) Luminaire G03) G05) (G06-0.3) ❑ ❑ ❑ ❑ ❑fNRCC-LTI-] ❑ Enter sum total of all pages into Total installed portable luminaire watts that are greater than 0.3 watts per square foot per office: 01-E; Page 1 I — CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance August 2015 STATE OF CALIFORNIA INDOOR LIGHTING CEC-NRCC-LTI-01-E (Re%msed 08115) CERTIFICATE OF COMPLIANCE Indoor Lighting Project Name: MILAUSKAS EYE INSTITUTE Date Prepared. 9/28/2015 ENERGY i separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for: G CONDITIONED SPACE ❑ UNCONDITIONED SPACE is AISSION NRCC-LTI-01-E (Page 5 of 6) H. INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Luminaire Schedule Installed Watts Location Field Inspector A g C D E F G H o ad Complete Luminae Description m v F c E E (Le, 3 lamp fluorescent troffer,m E z p= 3 F32T8, one dimmable electronic ballast) A/B ' L 35 (; 4" Recessed LED 11 G 14" Round Surface Fluorescent 32 How wattage was determined ra FU v � N N _ if O v H ✓ O w m c_ c c 2 x, g i E o E E o Prima Function area in which n u° $ a o z 3 o �0- 3= these luminaires are installed ❑ 36 1,260 Waiting, Office, Hall, Stara ❑ M 40 440 Exam, Office ❑ ❑ ❑ RJ 1 32 Restroom ❑ ❑ ❑ ❑ INSTALLED WATTS PAGE TOTAL: 1,732 Enter sum total of all pages into NRCC-LTI-01-E; Page 2 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance August 2015 STATE OF CALIFORNIA INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised OW151 CERTIFICATE OF COMPLIANCE Indoor Lighting Project Name: MILAUSKAS EYE INSTITUTE Date Prepared. 9/28/2015 AISSION 0. NRCC-LTI-01-E (Page 6 of 6) DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of COMPlia-Due documentation i accurate and complete. Docurnentation Author Name. Dotumenty _ 7<6 Company: r � (p 1 L' Signature Date. Address. •� CEA Certification (dent (if applicable): C City/state/Lp: Phone RESPONSIBLE PERSOWS DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance 2. 1 am eligible under Division 3 of the Business and (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to th building owner at occupancy. Responsible Designer Name. �. Responsible Designer signature: , () \ Comparry : Date Signed. Address: License: 6 l crty/state/Zip: / )F / ` r Phone. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance August 2015 STATE OF CALIFORNIA INDOOR LIGHTING — LIGHTING CONTROLS CEC-NRCC-LTI-02-E Revised 05115 CERTIFICATE OF COMPLIANCE Indoor Lighting - Lighting Controls "N.— MILAUSKAS EYE INSTITUTE RNW ENERGY COMMISSION -e NRCC-LTI-02-E 9/28/2015 T1, Alorr 1 YI_rY7_C l,hau do ,mo(1 to rinr11rY1Pnt all mandatory and prescriptive lighting controls that are applicable to the project. 1of3 I IIC Iv 1\l1%__1L i-vim-l_ —lull — v.�.,,... ... .. .......... �...- _.. ..--- ._ --- - .- A. Mandatory Lighting Control Declaration Statements (Indicate if the measure applies by checking yes or no below.) YES NO Control Requirements Lighting shall be controlled by self-contained lighting control devices which are certified to the Energy Commission according to the Title 20 Appliance X Efficiency Regulations in accordance with Section 110.9. Lighting shall be controlled by a lighting control a system or energy management control system in accordance with §110.9. An Installation Certificate X shall be submitted in accordance with Section 130.4(b). One or more Track Lighting Integral Current Limiters shall be installed which have been certified to the Energy Commission in accordance with §110.9 and _ §130.0. Additionally, an Installation Certificate shall be submitted in accordance with Section 130.4(b). A Track Lighting Supplementary Overcurrent Protection Panel shall be installed in accordance with Section 110.9 and Section 130.0. Additionally, an — Installation Certificate shall be installed in accordance with Section 130.4(b). All lighting controls and equipment shall comply with the applicable requirements in §110.9 and shall be installed in accordance with the manufacturer's X instructions in accordance with Section 130.1. X All luminaires shall be functionally controlled with manually switched ON and OFF lighting controls in accordance with Section 130.1(a). General lighting shall be separately controlled from all other lighting systems in an area. Floor and wall display, window display, case display, ornamental, and special effects lighting shall each be separately controlled on circuits that are 20 amps or less. When track lighting is used, general, display, X ornamental, and special effects lighting shall each be separately controlled; in accordance with Section 130.1(a)4. The general lighting of any enclosed area 100 square feet or larger, with a connected lighting load that exceeds 0.5 watts per square foot shall meet the X multi -level lighting control requirements in accordance with Section 130.1(b). X All installed indoor lighting shall be equipped with controls that meet the applicable Shut -OFF control requirements in Section 130.1(c). X Lighting in all Daylit Zones shall be controlled in accordance with the requirements in Section 130.1(d) and daylit zones are shown on the plans. Lighting power in buildings larger than 10,000 square feet shall be capable of being automatically reduced in response to a Demand Responsive Signal in accordance with Section 130.1(e). Before an occupancy permit is granted for a newly constructed building or area, or a new lighting system serving a building, area, or site is operated for normal use, indoor lighting controls serving the building, area, or site shall be certified as meeting the Acceptance Requirements for Code Compliance in X accordance with Section 130.4.(a). The controls required to meet the Acceptance Requirements include automatic daylight controls, automaticshut-OFF controls, and demand responsive controls. May 2015 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance STATE OF CALIFORNIA INDOOR LIGHTING — LIGHTING CONTROLS CEC-NRCC-LTI-02-E {Revised 05!151 CERTIFICATE OF COMPLIANCE Indoor Lighting - Lighting Controls ° w° N— MILAUSKAS EYE INSTITUTE Dare Prepared 9/28/2015 ENERGY A separate document must be filled out for Conditioned and Unconditioned Spaces. This page is used only for the following: ® CONDITIONED SPACES ❑ UNCONDITIONED SPACES NRCC-LTI-02-E (Page 2 of 3) B. Mandatory and Prescriptive Indoor Lighting Control Schedule, PAF Calculation, and Field Inspection Checklist PAF Credit Calculation t „ D a n o < r 7 O � n V, m Standards Complying With 1 ° � _U X m �' : o Lighting Control Schedule (✓ all that apply, or enter 'E' if Exempted) 070 d, T r n 0 — d n A B C D E F G H I 1 K L M N O Type/ Description of Lighting Control (i.e.: occupancy sensor, # iO w w w , 10, 0, A v T Location in Building automatic time switch, of o r+ 0 O 0 r 0 r 0 r-+ 0 rn 0 �, a dimmer, automatic daylight, Units ^ a '� !' a etc...) Switch/Occupancy Only) 10 E I E E X X Not lic ble ❑ ❑ ❑ ❑ ❑ ❑ Exam/Office/Storage (Rooms: 107-110, 119-12 Multi -Level Switch/Occu anc S F, E X X (Not li hle) ❑ ❑ Admin/Story e/Hall ❑ ❑ (Rooms: 105, 106, 111-11 , 117 Only) Switch/Occupancy1 F. E E�X�X �(Nothc ble) ❑ ❑ Restroom Control Credit PAGE TOTAL (Sum of Column M): IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column M): Enter Control Credit total into NRCC-LTI-01-E; Page 1. 1. §130.1(a) = Manual area controls; §130.0(b) = Multi Level; §130.1(c) = Auto Shut -Off,' §130.1(d) = Mandatory Daylight; §130.1(e) = Demand Responsive; §140.6(d) = Additional lighting controls installed to earn a PAF; §140.6(d) = Prescriptive Secondary Sidelit Daylight Controls. As condition to earn a PAF, an Installation Certificate is 2. Check Table 140.6-A for correct Factor. PAFs shall not be traded between conditioned and unconditioned spaces. a L� _J U15u rCUUrruu LU c 1,rrc a• vary, ryr , ••.. +•...••.•••....• CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA INDOOR LIGHTING — LIGHTING CONTROLS rrr-NRrGI Tt.02-E IRmaeed 05l151 _ CERTIFICATE OF COMPLIANCE Indoor Lighting - Lighting Controls P""eL" MIL AUSKAS EYE INSTITUTE � DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Autlror Name: Documentation Author 5 S &7 _ Signature Date Company , Address- �' CEA Certification Identification (If apPllcabh Uty/Srate/Ap _ `�/ l Phone. v i v RESPONSIBLE PERSON'S DECLARATION STATEMENT CALIFORNIA ENERGY COMMISSION 0 NRCC-LTI-02-E (Page 3 of 3) (late Prepared 9/28/2015 I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance Is true and correct. 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part I and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable Inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to thelbuilding own at occupancy. Responsible Designer Name: n �) ���� / Responsible Designer Signature;_- - --- _-_ Company: .t ^ I ' DateSigned �I Address: .l ,.(„ ticense: U �) Phone MR CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance 4' E :";F (;,t IFOR%1,` INDOOR LIGHTING POWER ALLOWANCE CEC-NRCC-LTI-03-E (Revised 05, 151 CERTIFICATE OF COMPLIANCE Certificate of Compliance - Indoor Lighting Power Allowance °' j" 11d. " MILAUSKAS EYE INSTITUTE CALIFORNIA ENERGY COMMISSION 0 N RCC-LTI-03-E (Page 1 of 4) 9/28/2015 A separate page must be filled out for Conditioned and Unconditioned Spaces. This page is only for: I K CONDITIONED spaces O UNCONDITIONED spaces B. COMPLETE BUILDING METHOD LIGHTING POWER ALLOWANCE 1 TYPE OF BUILDING (From §140.6 Table 140.6-B) 2 3 4 WATTS X COMPLETE _ ALLOWED PER (ft2) BLDG. AREA WATTS Total Area: Total Watts. Enter Total Watts into section A, row 1 (Above on this page) -1 AREA CATEGORY METHOD TOTAL LIGHTING POWER ALLOWANCES (D plus E) Total from section C-2 Total from section C-3 Total Watts. Enter Total Watts into section A, row 2 (Above on this page) Watts 2,361 2,361 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA INDOOR LIGHTING POWER ALLOWANCE GEC-NRCC-L i 1-03-E {Revised 051151 CERTIFICATE OF COMPLIANCE Certificate of Compliance - Indoor Lighting Power Allowance MILAUSKAS EYE INSTITUTE A separate page must be filled out for Conditioned and Unconditioned Spaces. This page is only for: ® CONDITIONED spaces 0 UNCONDITIONED spaces Eate Pr,wr.d 9/28/2015 C -2 AREA CATEGORY METHOD GENERAL LIGHTING POWER ALLOWANCE ® Do not include portable lighting for offices. Portable lighting for offices shall be documented only in section B of NRCC-LTI-01-E. ENERGY COMMISSION 0 N RCC-LTI-03-E (Page 2 of 4) aupw a y - u5 a 5 ,— r. ....... , .-..�-... _. __ -- --_ _. _ __ - A B X C = D AREA CATEGORY (From §140.6 Table 140.6-C) WATTS PER (ft 2) AREA (W) ALLOWED WATTS Location in Building Primary Function Area per Table 140.6-C Admin/Pre-Test (Rooms: 107-114) Office 1.0 812 832 Storage (Rooms: H 5, 117, 119, 120) Commercial Storage Area 0.6 �08 305 Hall (Room: 106) Corridor 0.6 515 309 Exam (Rooms: 121-124) I.aboratory Area 1.4 '108 371 Waiting (Room: 105) Waiting Area 1.1 276 `111 Restroom (Room: 1 16) Restmom 0.6 67 40 TOTALS 1 2,606 Enter sum total Area Category allowed watts into section C-1 of NRCC-LTI-03-E (this compliance form) 2,361 WA CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA INDOOR LIGHTING POWER ALLOWANCE CEC-NRCC-LTI-03-E Revised 051151 CERTIFICATE OF COMPLIANCE Certificate of Compliance - Indoor Lighting Power Allowance P' J_rlk&" MILAUSKAS EYE INSTITUTE A separate page must be filled out for Conditioned and Unconditioned Spaces. This page is only for: 0 CONDITIONED spaces 0 UNCONDITIONED spaces _ CALIFORNIA ENERGY COMMISSION is NRCC-LTI-031 (Page 3 of 4) 9/28/2015 AREA CATEGORY METHOD ADDITIONAL LIGHTING WATTAGE ALLOWANCE (from Table 140.E-C Footnotes) A II B II C' II D Additional Wattage Primary Sq Ft or Watts Allowance Function linear ft' Allowed (B z C) E Description(s) and Quantity of Special Total Design Luminaire Types in each Primary Function Area I I Watts 3 G ALLOWED WATTS Smaller of Dorf TOTALS —Enter into TOTAL AREA CATEGORY METHOD ADDITIONAL ALLOWANCES —Section C-1 1. Use linear feet only for additional allowance for white board or chalk board. All other additional Area Category allowances shall use watts per square foot. 2 . Additional watts are available only when allowed according to the footnotes on bottom of Table 146-C, which include: Specialized task work; Ornamental lighting; Precision commercial and industrial work; Per linear foot of white board or chalk board; Accent, display and feature lighting; and Videoconferencing Studio lighting.. 3. Luminaire classification and wattage shall be determined in accordance with §130.0(c) of the Standards. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA INDOOR LIGHTING POWER ALLOWANCE CEC-NRCC-LTI-03-E Revised 051151 CERTIFICATE OF COMPLIANCE Certificate of Compliance - Indoor Lighting Power Allowance P.J-tu.me MILAUSKAS EYE INSTITUTE CALIFORNIA ENERGY COMMISSION NRCC-LTI-03-E (Page 4 of 4) 9/28/2015 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: Company: Signature Date Address CEA Certification Identification (if applicable). City/State/Zip: Phone. RESPONSIBLE PERSON"S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: Responsible Designer Signature Company Date Signed: Address: License city/State/bp. Phone. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance '.gay —, 93, (,1%lCTl#Jwd94*kL_� y� �u� � r J M �/1 � � J 1� ►L K.r�,�jV l/�,-'gib .ti►� 1S/ (J� Y �^ ""� e0 1fl 9D C/ry M/ n V! Tom - ALL- .7�c�•:�'`� �A/ Wl��1��- — — — I I N1��17iL7f� ON MMENEMN Nmm� Yi��IN N=me��N�����i���r�l�� N � � N �N ppgg��..ww mN=mMNNmmmii. Nr Nam/ c�ta�i� ffm���..�..■iiN:��I�uti CNN r �•nat o-trat y retAlMi MiO( �s rKAlt� R!? }trot i.(aG eiC QSVMLY l�t]I rnuatowa( a acc�.ec. eno+ s:ra( �Y• ayPG pt.tr.ntraes 0(} OCrt4 dYKi W a w�us., r u-roe s7714Gortal r�yh M•e1c�t7i tY•:" � 1 IM �Y })RL M•}tt11W EXISTING EXTERIOR LIGHT FIXTURE SCHEDULE SVWQL nrE oesuwnOn VAT 2 WU QMWf Log# CR11(: r NWIiCIYIW MFA JCNYO:GH 1►et tp�ytLv O IEi l rAMPME00tt& Mm I'YPM(OaetLlMrtcDr(Cv nA.lA[fM' Y )R�Oe.wi../Wt10rtI�.L W 4 i6). w.. ua✓4b 1tlOt ...inc.l...Ale. « GENEW NOTES H O O 0................................................... _ I:.................................................................. rr � T� rr �._. a I ...........................................................I............. i......... ...... O 1.1.1.1 H � II H '� I! � nl I� 1.1 O D.......................... ....................................................................................................................................................................................... : .................. .. �0 O �❑ N (5 1l8"=1'-0" NORTH O LIGHTING PLAN O O w 2 Z c4 } 2 Q HCD FW=9W of Uzw}Lu Jro'W J a CeQzo �p F- LLopw po'awU w J Lu< JUOtn 0 H w~ O z F- w W w Of Q W Q J of 2 cG Q O~ J� H aw0 a- ?oawx ............................ E O 0 0 0 0 LIGHTING FIXTURE SCHEDULE SYMBOL NOTATION DESCRIPTION LAMP MANUF. & CATALOG NO. (N) 24"x24" RECESSED W/ 9 AO CELL PARABOLIC TROFFER ELECTRONIC BALLAST CREE, MODEL - CR22 35W LED LED TROFFER NL B O SAME AS FIXTURE AO (OR EQUAL) EM w/ EMERGENCY BATERY PACK O (N) 4" DIA. RECESSED LIGHT 11W LED LITHONIA 4BEMW (E) WP D O (E) WALL MTD. WALL PACK, NO CHANGE, U.N.O. (E) NO CHANGE, U.N.O. (E) NO CHANGE, U.N.O. E EXIT O (E) EXIT LIGHT W/ EM. BATTERY PACK N LX TI F O (E) EXIT LIGHT W/ EM. BATTERY PACK GO SURFACE MTD. DRUM FLUORESCENT w/ OPAL 32W DABBCO #1390 CIRCLELINE OR EQUAL LENS 14" ROUND OCCUPANCY SENSOR qCS SWITCH RELAY CONTROL DEVICE PROVIDES DIMMING/ SWITCHING CONTROL AS WATTSTOPPER P1 REQ'D FOR THE NUMBER OF CIRCUITS AND SWITCH LEGS AS INDICATED LMRC-211 ON THE PLANS WATTSTOPPER OS DUAL TECHNOLOGY CEILING MOUNT OCCUPANCY SENSOR LMDC-100 S WATTSTOPPER DS DAYLIGHT SENSOR, SINGLE ZONE LMLS-400 L_ MANDATORY MEASURES ❑ BUILDING LIGHTING SHUT-OFF THE BUILDING LIGHTING SHUT-OFF SYSTEM CONSISTS OF AN AUTOMATIC TIME SWITCH, WITH A TIME ZONE FOR EACH FLOOR ® OVERRIDE FOR BUILDING LIGHTING SHUT-OFF THE AUTOMATIC BUILDING SHUT-OFF SYSTEM IS PROVIDED WITH A MANUAL, ACCESSIBLE OVERRIDE SWITCH IN SIGHT OF THE LIGHTS. THE AREA OF OVERRIDE IS NOT TO EXCEED 5,000 SQUARE FEET. ® AUTOMATIC CONTROL DEVICES CERTIFIED ALL AUTOMATIC CONTROL DEVICES SPECIFIED ARE CERTIFIED. ALL ALTERNATE EQUIPMENT SHALL BE CERTIFIED AND INSTALLED AS DIRECTED BY THE MANUFACTURER. ® FLUORESCENT BALLAST AND LUMINARIES CERTIFIED ALL FLUORESCENT FIXTURES SPECIFIED FOR THE PROJECT ARE CERTIFIED AND LISTED IN THE DIRECTORY. ALL INSTALLED FIXTURES SHALL BE CERTIFIED. ❑ TANDEM WIRING FOR TWO -LAMP BALLAST'S ALL ONE AND THREE LAMP FLUORESCENT FIXTURES ARE TANDEM WIRED WITH TWO LAMP BALLAST WHERE REQUIRED BY STANDARDS 132: OR ALL THREE LAMP FLUORESCENT FIXTURES ARE SPECIFIED WITH ELECTRONIC HIGH FREQUENCY BALLASTS AND ARE EXEMPT FROM TWO -LAMP TANDEM WIRING REQUIREMENTS. ® INDIVIDUAL ROOM/AREA CONTROLS EACH ROOM AND AREA IN THIS BUILDING IS EQUIPPED WITH A SEPARATE SWITCH OR OCCUPANCY SENSOR DEVICE FOR EACH AREA WITH FLOOR TO CEILING WALLS ® UNIFORM REDUCTION FOR INDIVIDUAL ROOMS ALL ROOMS AND AREAS GREATER THAN 100 SQUARE FEET AND MORE THAN 1.2 WATTS PER SQUARE FOOT FOOT OF LIGHTING LOAD SHALL BE CONTROLLED WITH BI LEVEL SWITCHING FOR UNIFORM REDUCTION OF LIGHTING WITHIN THE ROOM. ® DAYLIT AREA CONTROL ALL ROOMS WITH WINDOWS AND SKYLIGHTS, THAT ARE GREATER THAN 250 SQUARE FEET, AND THAT ALLOW FOR THE EFFECTIVE USE OF DAYLIGHT IN THE AREA SHALL HAVE 50% OF THE LAMPS IN EACH DAYLIT AREA CONTROLLED BY A SEPARATE SWITCH; OR THE EFFECTIVE USE OF DAYLIGHT THROUGH CANNOT BE ACCOMPLISHED BECAUSE THE WINDOWS ARE CONTINUOUSLY SHADED BY A BUILDING ON THE ADJACENT LOT. DIAGRAM OF SHADING DURING DIFFERENT TIMES OF YEAR IS INCLUDED ON PLANS. ® CONTROL OF EXTERIOR LIGHTS EXTERIOR MOUNTED FIXTURES SERVED FROM THE ELECTRICAL PANEL INSIDE THE BUILDING ARE CONTROLLED WITH A DIRECTIONAL PHOTO CELL CONTROL ON THE ROOF AND A CORRESPONDING RELAY IN THE ELECTRICAL PANEL. Hot Blk 120/23, LMLS-400 Photosensor @r::0 Occupancy Sensor O L1 Dimmingming Room Controller RJ45 Port (Typical) 00 00 Class 2 0-10 Volt Control Wiring Lighting V'a Load G9 0-10VDC Dimming II Ballast required. LMRJ Series Pre —Terminated Cables or CAT5e. Free Topology & Splitter Acceptable LMDM-101 Dimming Switch *NOTE: Corner mount Sensor shown with pigtail & supplied coupler. Ceiling mount RJ45 �� Sensor has two RJ45 ports. (Typical) DEVICES ARE PRESET FOR PLUG n' GO'" OPERATION, ADJUSTMENT IS OPTIONAL. Sequence of Operation: The LMLS-400 monitors the ambient light in the controlled space and works with the room controller(s) to maintain the design light level. WattStopper's exclusive control algorithm uses on/off or dimming setpoints and other control parameters to establish the correct light levels throughout the day regardless of changing daylight contribution. For full operational details, adjustments and more features of the product, see the DLM System Installation Guide at www.wattstopper.com �bli�II�i3 LMIS-400 Single Zone Closed Loop Digital Photosensor AUTOMATIC DAYLIGHTING CONTROLS NO SCALE U Z N 10000 H U W H 2 U Q Q d 3578 30th Street San Diego, CA 92104 V. 619.236.0595 F. 619.236.0557 www.mpa-architects.com MEMBER AMERICAN INSTITUTE OF ARCHITECTS CLIENT MILAUSKAS EYE INSTITUTE 78560 HIGHWAY 111 LA QUINTA, CA 92253 PROJECT Q W H UJI O J Z W LU O Of LO Z CN 0- CV W Q --- Q Q W w C� ~ = z Q U O < CD (� L W 0 Q �/� v) ti J O U Q o J CO O 0- C O G Q REVISIONS NO. DESCRIPTION DATE Q PLAN CHECK 07-21-15 D ARC,y/T R UMs�,A ,G Exp. 3-3 - 17 9�F OF C A�-�F0 SHEET TITLE LIGHTING PLAN & PANEL SCHEDULE DATE: 06-01-15 SCALE: AS NOTED DRAWN BY: BD DATABASE: 15127_ET2.DWG CHECKED BY: SHEET NUMBER: "/�/ C L PROJECT N0: 15127