Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
BCOM2024-0008
BUILDING PERMIT DESIGN & DEVELOPMENT DEPARTMENT 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 Permit Type: Building Commercial Permit Number: BCOM2024-0008 Property Address: 78730 HIGHWAY 111 APN: 643220024 Legal Description Parcel 4 PM 202/98 PM 30147 Property Zoning: CR, 4 Valuation: $175,000.00 PHONE (760) 777-7125 WWW.LAQUINTACA.GOV APPLIED DATE: 02/02/2024 ISSUED DATE: 04/29/2024 CALIFORNIA Owner: Applicant: Alesia Davis 1111 Sartori Ave, Torrance, CA 90501 Contractor: Kelly Stevens / 775947 421 E CERRITOS AVENUE, ANAHEIM, CA 92805 PRIOR TO THE ISSUANCE OF THIS PERMIT FOR CONSTRUCTION, ALTERATION, IMPROVEMENT, DEMOLITION, OR REPAIR THE OWNER, APPLICANT AND/OR CONTRACTOR UNDER PENALTY OF PERJURY HAVE AFFIRMED WHEN APPLICABLE, THROUGH THE SUBMITTAL OF FORMS OR BY OTHER ELECTRONIC MEANS, THE FOLLOWING: LICENSED CONTRACTOR OR OWNER -BUILDER DECLARATION (1 or 2) 1) They are licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and the referenced License is in full force and effect, or; 2) That they are exempt from the Contractors' State License Law for the reason(s) indicated by either (2)(a) and/or (2)(b), or (2)(c) where he or she is exempt from licensure by a valid exemption. [Section 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractors' State License Law (Chapter (commencing with Section 7000) of Division 3 of the Business and Professions Code] Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).) a) As owner of the property, or my employees with wages as their sole compensation, will do all of or portions of the work, and the structure is not intended or offered for sale (Section 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who, through employees' or personal effort, builds or improves the property, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the Owner -Builder will have the burden of proving that it was not built or improved for the purpose of sale.). b) As owner of the property, will be exclusively contracting with licensed c) Are exempt from licensure under the Contractors' State License Law. As an Owner -Builder, they acknowledge that, except for their personal residence in which they must have resided in for at least one year prior to completion of the improvements covered by this permit, they cannot legally sell a structure built as an owner -builder if it has not been constructed in its entirety by licensed contractors. It is understood that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application was submitted at the following Web site: http://www.leginfo.ca.gov/calaw.html. DECLARATION REGARDING CONSTRUCTION LENDING AGENCY (If applicable) A construction lender will be used for completion of the improvements covered by this permit and the name and information of which is on file for public inspection during the regular business hours of the public entity. Failure of the applicant to indicate the construction lender on the application does not relieve that person of the requirement to give the construction lender preliminary notice from that duty. WORKERS' COMPENSATION DECLARATION (1, 2 or 3) WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. 1) Has and will maintain a certificate of consent to self -insure for workers' compensation, issued by the Director of Industrial Relations as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 2) Has and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 3) Certifies that, in the performance of the work for which this permit is issued, shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, shall forthwith comply with those provisions. NOTICE TO APPLICANT (1, 2 and 3) 1) Each person upon whose behalf this application was made, each person at whose request and for whose benefit work is being performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents, and employees for any act or omission related to the work being performed under or following issuance of this permit. 2) Any permit issued as a result of this application becomes null and void if work is not commenced within 360 days from date of issuance of such permit, or if cessation of work for 180 days will subject permit to cancellation. On or after January 1, 2019, every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 12 months after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 12 months after the time the work is commenced. 3) Certified that they read the application and state that the information provided is correct. Agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above -mentioned property for inspection purposes. IMPORTANT: An Application for Permit was made to the Building Official, subject to the conditions and restrictions set forth at the time of application, which is now hereby an Issued Permit. If any part of the information being supplied on this permit is inaccurate or untrue, please contact the City of La Quinta at (760) 777-7125 immediately for correction. Printed: 5/16/25 10:43 am Page 1 of 5 Permit Type Building Commercial BUILDING PERMIT Permit Number: Property Address BCOM2024-0008 78730 HIGHWAY 111 FIVE BELOW / 10,153SF MERCANTILE RETAIL TENANT IMPROVEMENT [VB/M-OCC/103-OL/SPRINKLERED]. NO TUMF ASSESSMENT PER 2023 HANDOOK. THIS PERMIT DOES NOT INCLUDE BUILDING ENVELOPE MODIFICATIONS INCLUDING AWNINGS, OPENING INFILL & DOOR/WINDOW/STOREFRONT ALTERATIONS NOR BUILDING SIGNAGE. SEE BCOM2024-0011 FOR SHELL IMPROVEMENTS TO BE CONSTRUCTED CONCURRENTLY. 2022 CALIFORNIA BUILDING CODES. ,inntructinn Dpt;:. Commercial Work Type Remodel Building/Unit M: Stores, Markets, Gas Gross Square Footage 10153 Occupancy Station Classification(s) Conditioned Square 10153 Covered Square 10153 Fire Sprinkler Square 0 Footage Footage Footage Number of Floors 1 Occupant Load 150 Construction Type V-B Code Edition 2022 Original Valuation 175000.00 Remodel Area Square 10153 New Electrical Square 10153 Footage Number of Forced Air 5 Furnace(s) Number of Plumbing 8 Fixtures/Traps Water System Install Yes or Alteration? Grease Interceptor or No Sand/Oil Separator? Art in Public Places No Fund Exempt City Limits Within La Quinta Limits Lot Size 9266.36 Electrical Service? No Number of 5 Condenser(s) Number of Roof Drains 0 Back Flow Prevention No Device? Transportation Uniform No Mitigation Fee Applicable Zoning CR Footage Temporary Power No Service? Number of Ventilation 2 Fan(s) Number of Water 1 Heater(s) Sewer Connection? No City Development No Impact Fee Applicable General Plan CG Subdivision Name PM 30147 Lot Number 4 Legal Description Parcel 4 PM 202/98 PM 30147 Type Group Sq Ft Value Printed: 5/16/25 10:43 am Page 2 of 5 Permit Type Building Commercial BUILDING PERMIT Permit Number: Property Address BCOM2024-0008 78730 HIGHWAY 111 Invoice No. Fee Fee Amount Amount Paid INV-00006221 Water Heater/Vent $15.26 $15.26 Condenser/Compressor PC $152.55 $152.55 Building Standards Administration $7.00 $7.00 Condenser/Compressor $228.85 $228.85 Water System Inst/AIURep $15.26 $15.26 Water System Inst/AIURep PC $15.26 $15.26 Furnace unit, including attached ducts $228.85 $228.85 Credit Card Convenience Fee $100.00 $100.00 Art in Public Places - Commercial Remodel $875.00 $875.00 Zoning Clearance - Alt/Add - Non -Residential $183.00 $183.00 Fixture/Trap $122.08 $122.08 Remodel PC >100 $461.37 $461.37 SMI - Commercial $49.00 $49.00 Ventilation Fan PC $12.20 $12.20 Fixture/Trap PC $122.08 $122.08 Ventilation Fan $30.52 $30.52 Technology Enhancement Fee $8.00 $8.00 Non -Residential Electrical $323.88 $323.88 Water Heater/Vent PC $9.15 $9.15 Furnace, including attached ducts PC $152.55 $152.55 Remodel < 100 $62.24 $62.24 Digital Archiving and Records Management Fee $23.00 $23.00 Non -Residential Electrical PC $155.91 $155.91 Remodel >100 $576.66 $576.66 Remodel PC (< 100) $170.25 $170.25 Total for Invoice INV-00006221 $4,099.92 $4,099.92 Grand Total for Permit $4,099.92 $4,099.92 Workflow Step / Action Name Action Type Start Date End Date Application Completeness Check v.1 02/02/2024 11:34 02/02/2024 11:34 ---------------------------------------------------------------------------------------------------------------------------------------- Submittal Document Verification v.1 Generic Action 02/02/2024 11:34 Plan Check v.1 02/02/2024 0:00 04/17/2024 13:55 ---------------------------------------------------------------------------------------------------------------------------------------- Building Major Review v.1 Receive Submittal 02/02/2024 0:00 02/16/2024 11:34 ---------------------------------------------------------------------------------------------------------------------------------------- Building Major Review v.2 Receive Submittal 03/04/2024 0:00 03/19/2024 16:36 ---------------------------------------------------------------------------------------------------------------------------------------- Building Major Review v.3 Receive Submittal 03/28/2024 0:00 04/17/2024 13:55 Permit Issuance v.1 04/29/2024 8:23 04/29/2024 8:28 ---------------------------------------------------------------------------------------------------------------------------------------- Contractor / Owner -Builder Information v.1 Generic Action 04/29/2024 8:23 ---------------------------------------------------------------------------------------------------------------------------------------- Verify & Invoice Fees v.1 Generic Action 04/29/2024 8:23 ---------------------------------------------------------------------------------------------------------------------------------------- Ready to Issue v.1 Generic Action 04/29/2024 8:23 ---------------------------------------------------------------------------------------------------------------------------------------- Verify Fee Payment & Issue Permit v.1 Generic Action 04/29/2024 8:28 ---------------------------------------------------------- Print, Attach, and Email Building Permit v.1 ------- Create Report 04/29/2024 8:28 04/29/2024 8:28 Inspections - Do Not Pour Concrete Until Approved v.1 05/30/2024 0:00 ----------------------- ------------------------------------------------------------------ Footing v.1 Inspection ..- 06/12/2024 0:00 06/13/2024 8:12 Printed: 5/16/25 10:43 am Page 3 of 5 BUILDING PERMIT Permit Type: Building Commercial Permit Number: BCOM2024-0008 Property Address: 78730 HIGHWAY 111 F v.2 Inspection 06/13/2024 0:00 --------------------------------------------------------------------------- Setbacks v.1 Inspection ------------- --------------------------------------------------------------------------------------------------------------------------------------- Slab v.1 Inspection 06/03/2024 15:04 06/03/2024 15:06 ------ -- -- -- -- -- -- -- -- -- ------------------------------------- Underground Plumbing v.1 -- -- -- -- -- -- -- Inspection -- -- -- -- -- -- 05/30/2024 -- -- 0:00 -- -- -- -- ----- 05/31/2024 13:45 ---------------------------------------------------------------------------------------------------------------------------------------- Water Line v.1 Inspection Inspections - Cover No Work Until Approved v.1 06/10/2024 0:00 ---------------------------------------------------------------------------------------------------------------------------------------- Roof Nail v.1 Inspection ------------------------------------------------------------------------------------ Okay to Wrap v.1 --------- Inspection ------------------------------------------- ---------------------------------------------------------------------------------------------------------------------------------------- Framing v.1 Inspection 06/10/2024 0:00 06/11/2024 11:50 ---------------------------------------------------------------------------------------------------------------------------------------- Framing v.2 Inspection 06/12/2024 0:00 06/13/2024 12:04 ---------------------------------------------------------------------------------------------------------------------------------------- Framing v.3 Inspection 06/19/2024 0:00 06/20/2024 15:09 --------------------------------------------------------------------------------------------------------- Framing v.4 Inspection ------------- 07/09/2024 0:00 -- ----------- 07/10/2024 17:11 ------------------------------------------------------------------------------------------------------------------------ Rough Electrical v.1 Inspection 07/09/2024 0:00 -------------- 07/10/2024 17:13 --------------------------------------------------------------------------------------------------------------------------------------- Rough Electrical v.2 Inspection 08/13/2024 0:00 08/14/2024 13:50 --------------------------------------------------------------------------------------------------------------------------------------- Rough Mechanical v.1 Inspection 07/09/2024 0:00 07/10/2024 17:12 --------------------------------------------------------------------------------------------------------------------------------------- Rough Mechanical v.2 Inspection 08/13/2024 0:00 08/14/2024 13:51 --------------------------------------------------------------------------------------------------------------------------------------- Rough Plumbing v.1 Inspection 06/19/2024 0:00 06/20/2024 14:58 --------------------------------------------------------------------------------------------------------------------------------------- Rough Plumbing v.2 Inspection 07/09/2024 0:00 07/10/2024 17:12 --------------------------------------------------------------------------------------------------------------------------------------- Rough Fire Clearance Bldg v.1 Inspection 07/10/2024 8:55 07/12/2024 16:20 --------------------------------------------------------------------------------------------------------------------------------------- Shower Pan v.1 Inspection --------------------------------------------------------------------------------------------------------------------------------------- Insulation v.1 Inspection --------------------------------------------------------------------------------------------------------------------------------------- Drywall Nail v.1 Inspection 07/25/2024 0:00 07/26/2024 14:20 --------------------------------------------------------------------------------------------------------------------------------------- Drywall Nail v.2 Inspection 07/31/2024 0:00 08/01/2024 14:18 --------------------------------------------------------------------------------------------------------------------------------------- T-Bar/Overhead v.1 Inspection -------------------------------------------------------------------------------- Exterior Lath v.1 Inspection 07/18/2024 0:00 07/19/2024 13:24 --------------------------------------------------------------------------------------------------------------------------------------- Gas Test v.1 Inspection --------------------------------------------------------------------------------------------------------------------------------------- Sewer Connection v.1 Inspection Inspections - Masonry v.1 06/13/2024 8:04 06/13/2024 8:10 --------------------------------------------------------------------------------------- Bond Beam v.1 ------ Inspection ------------------ 06/13/2024 ------ 8:04 ----------------- - 06/13/2024 8:10 Inspections - Electrical for Meter Release v.1 ---------------------------------------------------------------------------------------------------------------------------------------- Temporary Power v.1 Inspection ---------------------------------------------------------------------------------------------------------------------------------------- Temp Use of Permanent Power v.1 Inspection Inspections - Final v.1 08/12/2024 8:08 09/20/2024 15:14 ---------------------------------------------------------------------------------------------------------------------------------------- Final Fire v.1 Inspection 08/12/2024 8:08 08/13/2024 17:09 ---------------------------------------------------------------------------------------------------------------------------------------- Final Planning/Zoning v.1 Inspection 09/12/2024 16:26 09/12/2024 16:28 ------------------------------------------------------------------------------ Final Building v.1 ----------------------------------------- Inspection 08/16/2024 0:00 -------------- 08/19/2024 14:09 --------------------------------------------------------------------------------------------------------------------------------------- Final Building v.2 Inspection 08/21/2024 0:00 08/22/2024 13:19 --------------------------------------------------------------------------------------------------------------------------------------- Final Building v.3 Inspection 09/12/2024 0:00 09/13/2024 11:09 --------------------------------------------------------------------------------------------------------------------------------------- Final Building v.4 Inspection 09/19/2024 0:00 09/20/2024 15:14 Certificate of Occupancy v.1 09/20/2024 15:15 09/20/2024 15:15 --------------------------------------------------------------------------------------------------------------------------------------- Issue Certificate of Occupancy v.1 Create Report 09/20/2024 15:15 09/20/2024 15:15 Printed: 5/16/25 10:43 am Page 4 of 5 BUILDING PERMIT Permit Type: Building Commercial Permit Number: BCOM2024-0008 Property Address: 78730 HIGHWAY 111 Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work shall remain visible and able to be accessed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of the applicable code and other ordinances of the jurisdiction shall not be valid. It shall be the duty of the owner or the owner's authorized agent to cause the work to remain visible and able to be accessed for inspection purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this code. A building or structure shall not be used or occupied in whole or in part, and a change of occupancy of a building or structure or portion thereof shall not be made, until the building official has issued a certificate of occupancy therefor as provided herein. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the jurisdiction shall not be valid. A person shall not make connections from a utility, a source of energy, fuel, or power, or a water system or sewer system to any building or system that is regulated by the applicable code and other ordinances of the jurisdiction for which a permit is required, until approved by the buildinq official. Printed: 5/16/25 10:43 am Page 5 of 5 CAL FIRE — RIVERSIDE UNIT RIVERSIDE COUNTY FIRE DEPARTMENT �Cci BILL WEISER -- FIRE CHIEF OFFICE OF THE FIRE MARSHAL — LA QUINTA-CALIFORNIA - 78495 Calle Tampico, La Quinta, CA 92253 • Phone (760) 777-7074 • www.rvcfire.org February 16, 2024 Alesia Davis, Applicant Re: Five Below - Tenant Improvement BCOM2024-0008 / 78730 Highway I I I The building plan you submitted was reviewed and approved by the Fire Department with the following conditions. DEFERRED SUBMITTALS REQUIRED 1) FIRE SPRINKLER and Fire Alarm SYSTEM — Any modifications required for the existing systems will require a separate submittal to the Fire Department for review and approval prior to beginning work. PRIOR TO FINAL 1) Approved building address shall be placed in such a position as to be plainly visible and legible from the street and rear access if applicable. Building address numbers shall be a minimum of 12". Minimum 6" tall suite addressing shall be provided to both the front and rear entrances. All addressing must be legible and of a contrasting color with the background to be visible from the street at all hours. 2) Provide keys to the tenant space (all tenants), utility rooms and elevator services for inclusion in the main building Knox Box. Key(s) shall have durable and legible tags affixed for identification of the correlating tenant space. 3) Install portable fire extinguishers per Title 19, but not less than 2AIOBC in rating. Contact a certified extinguisher company for proper placement and spacing of equipment. 4) Applicable room door(s) shall be posted "ELECTRICAL", "FACP", "FIRE RISER" and "ROOF ACCESS" on the outside of the door so it is visible and in a contrasting color. 5) Illuminated Exit Signage and Egress Illumination placement and functional test will be witnessed by OFM Fire Inspector at time of final inspection. The Fire Department approved plans and conditions letter must be at the job site. Applicant/installer shall be responsible to contact the Fire Department to schedule inspections. All questions regarding the meaning of these conditions should be referred to the Office of the Fire Marshal staff at (760)777-7078. Chris Cox - Fire Safety Supervisor PATH OF TRAVEL UPGRADE DETERMINATION DATE: 03/01 /24 STATUS: PLAN CHECKED BY: B.V. / Jake Fuson TELEPHONE NUMBER: (760) 777-7081 ADDRESS: 78730 Highway 111 DESCRIPTION: 5 below Tenant Improvement APPLICANT: Alesia Davis PLAN CHECK #: BCOMM2024-0008 In accordance with the 2022 California Building Code (CBC) Section 1113-202.4, exception 8, the cost of compliance with Section 1113-202.4 is allowed to be limited to 20% of the adjusted construction cost of the alterations, structural repairs or additions when the adjusted construction cost does not exceed the current valuation threshold. Construction cost for proposed project (not including costs of improvements to the path of travel to the area of alteration): $ 175,000 (A) Cost of alterations to areas on this path of travel undertaken during the preceding three-year period which did not provide an accessible path of travel to the area of alteration (as applicable): $ 0, SITE FULLY (B) Adjusted construction cost (C) = (A) + (B) $ 175,000 (C) COMPLIES PATH OF TRAVEL CONSTRUCTION COSTS: Elements serving the area of alteration Is element in If not, will element be Proposed cost of based on priority compliance with upgraded to current compliance with current Chapter Chapter 1113? (Y/N) current 1113? (Y/N) Chapter 11B 1. An accessible entrance Y $ 2. An accessible route (interior and $ exterior) to the Y altered area 3. At least one accessible restroom for 2 NEW ADA $ 20,000 each gender or a single accessible unisex, Y COMPLIANT single user or family restroom RESTROOMS 4. Accessible public telephones N/A $ 5. Accessible drinking fountains Y $ 6. When possible, additional accessible elements such as: a. Parking Y $ b. Storage N/A $ c. Signs Y $ d. Alarms Y $ e. Other $ Total cost of providing compliant path of $ 20,000 (D) travel elements: COST OF PATH OF TRAVEL UPGRADES AS PERCENTAGE OF ADJUSTED CONSTRUCTION COST: 20,000 Compliance of path of travel upgrades as % of adjusted construction cost: (E)% = 11 % (E) (D) / (C) Note: This may not be less than 20% Non -Residential Plan Check Correction List Page 4 of 4 City of La Quinta February 13, 2024 Project Description: Project Address: Application/ Permit #: TI: Five Below 78720 HWY 111. La Quinta, CA 92253 BCOM-2024-0008 Occupancy: M Type of Construction: II-B Sprinklers: Yes Stories: 1 Floor Area (s.£): - Fire Hazard Severity Zone/ WUL• No Fire Alarm: Yes BCOM-2024-0008 21309904 Bureau Veritas has completed the first plan review of the below listed documents on behalf of the City of La Quinta Building & Safety Department: GENERAL INSTRUCTIONS 1. This plan review has been made to verify conformance to minimum requirements of codes and ordinances adopted by the City of La Quinta. Codes in effect for this project include the 2022 editions of the California Building Code (CBC), California Residential Code (CRC), California Green Building Code (CGBC), California Plumbing Code (CPC), California Mechanical Code (CMC), California Electrical Code (CEC), and California Energy Code (CEnC). The CBC is based on the 2021 editions of the International Building Code, which was published by the International Code Council. The CPC and CMC are based on the 2021 edition of the Uniform Plumbing and Mechanical Codes, respectively, which were published by IAPMO. The CEC is based on the 2020 edition of the National Electrical Code published by the National Fire Protection Association (NFPA). Applicable code sections are referenced after each item in this list. 2. These plans and documents have been reviewed for compliance with the applicable code requirements and instructions of the jurisdiction. The stamping of these plans shall not be held to permit or be an approval of a violation of any applicable codes and/or standards nor relieve the owner, design professional of record or contractor of compliance with any applicable codes and/or standards. Plan review of documents does not authorize construction to proceed in violation of any federal, state, nor local regulation. 3. The review does not necessarily include errors and omissions. Complete compliance is the responsibility of the designer. 4. All comments shall be resolved on the plans prior to the recommendation to the governing body for approval. 5. The comments identified in other sections of this review require clarifications/corrections before this plan check can be completed. 6. For reference for explanations in the examiner's comment sections, italic text refers to the initial submittals, bold text on second submittals, and underlined text on third submittals. 7. Please annotate your response in the areas on each comment, please see the comment section, 8. Submit a list showinE any changes to the plan or previously submitted documents that are not the result of the plan check comments. Please "cloud" and/or "delta" all revisions made on plans due to this comment list as well as any other design changes. Page 1 of 7 City of La Quinta BCOM-2024-0008 February 13, 2024 m N 21309904 raze IN ORDER TO PROCESS THIS PLAN REVIEW PLEASE PROVIDE THE NAME AND PHONE NUMBER OF THE INDIVIDUAL WHO PREPARED THESE PLAN REVIEW RESPONSES NAME: PHONE: Please provide ONE full COMPLETE electronic submittal, with supporting documentation, and answers to ALL comments listed in the comment section and submit to: City of La Quinta, 78495 Calle Tampico, La Quinta, CA 92253 Respectfully Submitted, Martin Pasamba Plans Examiner 600 N. Rosemead Blvd., STE 233 Pasadena, CA 91107 martin.pasamba@bureauveritas.com Office: 626.325.9800 Morteza Beheshti, P.E. [MEP] Plan Review Engineer 9988 Hibert Street, Suite 100 San Diego, CA 92131 morteza.beheshti@bureauveritas.com Cell: 858.208.6802 Please write the sheet number, detail number, and/or location indicating where the comment is located. Please be specific as to where comment items have been addressed so that recheck may be expedited. To aid in the plan review process please indicate in the space adjacent to each comment or on a separate sheet, the sheet and the exact location on the sheet where corrections have been made (e.g., Detail S of Sheet 3). Please "cloud" and/or "delta " all revisions made on plans due to this comment list as well as any other design changes. JURISDICTIONAL COMMENTS J1. Please update the statement on the title sheet of the plans that this project shall comply with Title 24 and California Mechanical Code (CMC) and California Green Building Standards Code (CGBSC). [§ 107.2 CBC] RESPONSE: J2. Please clarify if the tenant space is unprotected or fully sprinklered. Revise Design Criteria: Occupancy portion on title sheet of plans. RESPONSE: J3. Provide a Building Code Data Legend on the Title Sheet. [§ 107.2 CBC] Include the following code information for each building proposed: a. APN # RESPONSE: ARCHITECTURAL COMMENTS Al. Please update the site plan to include property lines, easements and public ways on the site. Clearly dimension building setbacks from property lines, street centerlines, and from all adjacent buildings and structures on the site plan. [§ 107.2.5 CBC] RESPONSE: Page 2 of 7 �,U VF City of La Quinta BCOM-2024-0008 February 13, 2024 m N 21309904 T626 A2. Please clarify if East wall on sheet A1.0 will remain as existing or will be similarly patched, repaired and additionally altered to have another layer of gyp. board as the West wall referencing wall A per legend. RESPONSE: A3. Please clarify if the new storefront system is tempered glazed. [§2406.4 CBC] RESPONSE: A4. Please coordinate all doors and openings shown on Floor Plan, sheet A1.0 on door schedule, sheet A5.0. Doors/ openings 9, 10 and 11 are not coordinated. Additional comments may apply. RESPONSE: A5. Visual exit signs are required whenever two exits are required. Every 100 feet. Show all required exit sign locations. [§ 1013.1 CBC] Note on Egress Plan, sheet T1.1 states "Exit Sign See A2.0 For Details, TYP. " However, exit sign details are not shown on sheet A2.0. Please provide and show exit signs on Egress Plan where required. Additional comments may follow. RESPONSE: ACCESIBILITY COMMENTS ACCL [§ 11B-202.1 CBC] Additions and alterations to an existing building or facilities shall comply with the following: a. The area alteration or addition must fully comply. b. A primary entrance to the building or facility and the primary path of travel from accessible parking and from the public way to the specific area of alteration or addition must fully comply. RESPONSE: ACC2. At least one accessible route shall connect accessible buildings, accessible facilities, accessible elements, and accessible spaces that are on the same site. [§11B-206.2.2 CBC] Please provide an accessible route to accessible parking, trash enclosure, public way, etc. Additional comments may apply. RESPONSE: ACC3. Please provide a site plan, enlarged plan, details, notes, etc., to show existing accessible parking is in compliance per latest applicable Sections of I IB-208.2, I IB-502 CBC. Additional comments may apply. RESPONSE: ACC4. Please provide a site plan, enlarged plan, details, notes, etc., to showing circulation contiguous to vehicular traffic is physically separated from vehicular traffic per I IB-250.1, 11B-247, I IB-705, I IB-406 CBC. Additional comments may follow. RESPONSE: ACCS. Per AB No. 1732, all single -user bathrooms in any business, public place, or government agency shall be identified as all -gender restrooms. Please update accessibility signage detail A/ A4.1. RESPONSE: Page 3 of 7 City of La Quinta February 13, 2024 BCOM-2024-0008 21309904 ACC6. Grab Bars [§I IB-609 CBC]: a. Grab bars with a circular cross-section shall be a minimum of 1-1/4" and 2" maximum. RESPONSE: ACC7. Please verify lockers and coat hooks provided in employee break room complies with 11B-222, 11B-803 CBC: a. Turning space, 11B-803.2, I IB-304 CBC b. Door swing, 11B-803.3, 11B-304.3 CBC c. Coat Hooks and Shelves, 11B-803.5, 11B-308 CBC RESPONSE: ACC8. Please revise detail 14/ T1.2. Revise clear floor space at water closets. RESPONSE: ACC9. The centerline of the water closet shall be 17" minimum to 18" maximum from the side wall or partition, except that the water closet shall be 17" minimum to 19" maximum from the side wall or partition in ambulatory accessible toilet compartments. Water closets shall be arranged for a left - or right-handed approach. [§ 11B-604.2 CBC] Please revise detail 2C/A4.1. RESPONSE: GREEN BUILDING COMMENTS GBI. Please mark Yes or Not Applicable and Responsible Party for California Green Building Nonresidential Mandatory Measures. RESPONSE: GB2. Please verify short term and long-term bicycle parking is provided for alteration of structure per 5.106.4.1.1 and 5.106.4.1.3 CGBC. Provide on site plan along with applicable details, notes, etc. Additional comments may apply. RESPONSE: GB3. Please verify EV and EVCS parking provided per 5.106.5.3 CGBC. Please provide plans, details, notes, etc., as required. Additional comments may apply. RESPONSE: GB4. Please provide Good Housekeeping BMP plan per 5.106.1.2.2 CGBC. RESPONSE: ENERGY COMMENTS EnGl. Energy comments in each respective MEP comment. RESPONSE: ELECTRICAL COMMENTS El. Please provide a response letter and address all comments indicating location on plans where corrections are made for an expeditious review. Page 4 of 7 �,U VF City of La Quinta BCOM-2024-0008 February 13, 2024 m N 21309904 T626 RESPONSE: E2. Please provide a GFI CKT for the Electric water fountain. RESPONSE: E3. Please change all code references to 2022 California Electrical Code cycle date. See single line notes for instance. RESPONSE: E4. Provide a single line diagram for the new service. Include the following information: a. Please provide feeder overcurrent device size(s) at the existing service switchboard. b. Please verify and indicate location of all equipment shown on single line. c. For fault current mitigation, describe the electrical distribution equipment design as "engineered", "fully rated" or "series rated". Include the AIC specification rating of overcurrent devices throughout the system. RESPONSE: E5. Indicate WP or NEMA 3R enclosure for outdoor equipment such as J-Box outside for the sign. RESPONSE: E6. Please provide GFI/WP receptacle outlets within 25' of all HVAC equipment. CEC 210.63 RESPONSE: ET Please indicate a WP disconnect for the sign(s) per CEC 600.6. RESPONSE: E8. Emergency illumination is required to be installed in electrical equipment rooms. Please provide. CBC 1008.3.3 CEC 700.16 RESPONSE: E9. For buildings that require two or more exits, emergency illumination is required to be installed at exterior exit door landings and/or vestibules. Please provide. CBC 1008.3.2 RESPONSE: MECHANICAL COMMENTS M1. Please provide a response letter and address all comments indicating location on plans where corrections are made for an expeditious review. RESPONSE: M2. Please change all code references to 2022 California Mechanical Code cycle date. RESPONSE: M3. Provide the refrigerant volume concentration per CMC 1104.0 for the mechanical conditioning systems. Include a room schedule for alarms when required by CMC 1104.4. RESPONSE: Page 5 of 7 City of La Quinta February 13, 2024 BCOM-2024-0008 21309904 M4. Electrical outlets are required to be installed within 25' of mechanical equipment. Please include outlet locations, the receptacle specifications (GFCI & weather -resistant), and the extra duty cover specification. CMC 303.8.5 & CEC 210.63 RESPONSE: M5. Buildings of more than 15' in height shall have an inside means of access that meets the design requirements of CMC 304.3.1.1. Please provide City approval for use of an outside ladder is required. RESPONSE: M6. Roof access ladders require landings at no greater a separation of 18', measured from floor level. CMC 304.3.1.2 RESPONSE: M7. Please show the required 42 inches tall "Guards" (guard rails) or building parapets height where appliances, mechanical equipment, fans, roof hatch openings or other components that require service are located within 10 feet of a roof edge or open side of a walking surface. CBC 1015.6 & 1015.7 RESPONSE: M8. The ventilation air supply shall be sufficient to provide make-up air for exhaust systems. Provide an air balance schedule and specify all exhaust and make-up air systems that are required to be electrically interlocked. CMC 505.3 RESPONSE: M9. Specify compliance with CMC 603.4.1 for length limitations for factory made flexible air ducts (5') and use (not to be used for rigid elbows or fittings). RESPONSE: M10. Add note on plans: "Exhaust ducts shall be equipped with back -draft dampers per Sec. 504.1.1 CMC." RESPONSE: M11. Provide size and routing of condensate line for each HVAC unit. Show condensate receptor(s) for HVAC units. RESPONSE: PLUMBING COMMENTS P1. Please provide plumbing fixture count calculations on plans per Table 422.1 CPC to justify and coordinate the required amount of water closets, lavatories, drinking fountains and other items required. RESPONSE: Page 6 of 7 �,U VF City of La Quinta BCOM-2024-0008 February 13, 2024 m N 21309904 T626 P2. Please change all code references to 2022 California Plumbing Code cycle date. See P0.1 notes for instance. RESPONSE: P3. For backwater valve review, please show the upstream sewer manhole rim and finished floor elevations. CPC 710.0. RESPONSE: P4. Detail how the floor drain trap seal is to be maintained. CPC 1007.0. RESPONSE: P5. Floors shall slope to the floor drain(s) location(s). Please indicate sheet number on the Architectural set this is detailed. CPC 418.5. RESPONSE: P6. Show the required self -closing or self -closing metering faucets for the lavatories intended to serve the transient public. CPC, Section 407.4. RESPONSE: STRUCTURAL COMMENTS S 1. The plans and calculations need the signature of the licensed architect or engineer who prepared them. [§5536.1, 6735 California Business and Profession Code] RESPONSE: S2. Please verify existing framing is adequate support for proposed f VAC loads proposed at roof. Provide structural plans, calculations, etc., to verify. Additional comments may apply. RESPONSE: S3. Please provide structural calculations for proposed architectural, mechanical and electrical components, supports and attachments per Table 13.2-1 ASCE 7-16. Additional comments may apply. RESPONSE: S4. Please provide a typical non -bearing wall detail showing attachment to floor/ roof. Provide approved listing number of fasteners, if applicable. Additional comments may apply. RESPONSE: S5. Please clarify anchorage of hood per manufacturer on detail 5/ A2.0. RESPONSE: END OF COMMENTS Page 7 of 7 City of La Quinta March 11, 2024 Project Description: Project Address: Application/ Permit #: TI: Five Below 78720 HWY 111. La Quinta, CA 92253 BCOM-2024-0008 Occupancy: M Type of Construction: II-B Sprinklers: Yes Stories: 1 Floor Area (s.£): - Fire Hazard Severity Zone/ WUL• No Fire Alarm: Yes BCOM-2024-0008 21309904 Bureau Veritas has completed the second plan review of the below listed documents on behalf of the City of La Quinta Building & Safety Department: GENERAL INSTRUCTIONS 1. This plan review has been made to verify conformance to minimum requirements of codes and ordinances adopted by the City of La Quinta. Codes in effect for this project include the 2022 editions of the California Building Code (CBC), California Residential Code (CRC), California Green Building Code (CGBC), California Plumbing Code (CPC), California Mechanical Code (CMC), California Electrical Code (CEC), and California Energy Code (CEnC). The CBC is based on the 2021 editions of the International Building Code, which was published by the International Code Council. The CPC and CMC are based on the 2021 edition of the Uniform Plumbing and Mechanical Codes, respectively, which were published by IAPMO. The CEC is based on the 2020 edition of the National Electrical Code published by the National Fire Protection Association (NFPA). Applicable code sections are referenced after each item in this list. 2. These plans and documents have been reviewed for compliance with the applicable code requirements and instructions of the jurisdiction. The stamping of these plans shall not be held to permit or be an approval of a violation of any applicable codes and/or standards nor relieve the owner, design professional of record or contractor of compliance with any applicable codes and/or standards. Plan review of documents does not authorize construction to proceed in violation of any federal, state, nor local regulation. 3. The review does not necessarily include errors and omissions. Complete compliance is the responsibility of the designer. 4. All comments shall be resolved on the plans prior to the recommendation to the governing body for approval. 5. The comments identified in other sections of this review require clarifications/corrections before this plan check can be completed. 6. For reference for explanations in the examiner's comment sections, italic text refers to the initial submittals, bold text on second submittals, and underlined text on third submittals. 7. Please annotate your response in the areas on each comment, please see the comment section, 8. Submit a list showinE any changes to the plan or previously submitted documents that are not the result of the plan check comments. Please "cloud" and/or "delta" all revisions made on plans due to this comment list as well as any other design changes. Page 1 of 7 City of La Quinta BCOM-2024-0008 March 11, 2024 m N 21309904 raze IN ORDER TO PROCESS THIS PLAN REVIEW PLEASE PROVIDE THE NAME AND PHONE NUMBER OF THE INDIVIDUAL WHO PREPARED THESE PLAN REVIEW RESPONSES NAME: PHONE: Please provide ONE full COMPLETE electronic submittal, with supporting documentation, and answers to ALL comments listed in the comment section and submit to: City of La Quinta, 78495 Calle Tampico, La Quinta, CA 92253 Respectfully Submitted, Martin Pasamba Plans Examiner 600 N. Rosemead Blvd., STE 233 Pasadena, CA 91107 martin.pasamba@bureauveritas.com Office: 626.325.9800 Morteza Beheshti, P.E. [MEP] Plan Review Engineer 9988 Hibert Street, Suite 100 San Diego, CA 92131 morteza.beheshti@bureauveritas.com Cell: 858.208.6802 Please write the sheet number, detail number, and/or location indicating where the comment is located. Please be specific as to where comment items have been addressed so that recheck may be expedited. To aid in the plan review process please indicate in the space adjacent to each comment or on a separate sheet, the sheet and the exact location on the sheet where corrections have been made (e.g., Detail S of Sheet 3). Please "cloud" and/or "delta " all revisions made on plans due to this comment list as well as any other design changes. JURISDICTIONAL COMMENTS ARCHITECTURAL COMMENTS A2. Please elafif� if East wall E)a sheet A1.0 will r-emain as &dstifig er-will be similafly patehed, r-epaired and additionally altefed to have another- layef of g". board as the West wall r-efefeneing wall A per - Page 2 of 7 City of La Quinta March 11, 2024 BCOM-2024-0008 21309904 A3. Please clarify if the new storefront system is tempered glazed. [§2406.4 CBC] 2"d Submittal: Notes on sheet A1.0 reflect new storefront system. Please include under note that storefront modifications will be under a separate permit. Include note under comments on sheet T1.0 to coordinate storefront modifications will be under separate permit set by landlord per response as similarly provided for all signage under a separate permit. See S1. RESPONSE: EMAEU.- :. I !- 1 111MewsGIs!Um rMIr.�e�as!rs �■�er.� . � � .�e!tts���FEr�re!ts ACCESIBILITY COMMENTS rIR "I _ Sao rr��ra�rsrss!sn�str:rs�sirs!��!�.sses�:r.�:e!�ee��rszx :�rs!tiss _ . . . . _ • tMX!X2EME 2 OHMUR KeRig Page 3 of 7 �,U VF City of La Quinta BCOM-2024-0008 March 11, 2024 m N 21309904 T626 • • GREEN BUILDING COMMENTS T WUr�e!*szir�Te�e��e+r�� rsrrse�estr.rss �rszs� ENERGY COMMENTS ELECTRICAL COMMENTS " flilly "sefies » of ���tssr.��i�rec�_z�s�sr_�e�ssr�srrisxs�eee�r��r _. • _ Page 4 of 7 City of La Quinta March 11, 2024 • MECHANICAL COMMENTS a. • BCOM-2024-0008 21309904 Amu eersrrefa�e!fatirste!*ss700!*senr. W.V9s7ZEr.T=stste!*r�w Page 5 of 7 City of La Quinta March 11, 2024 PLUMBING COMMENTS BCOM-2024-0008 21309904 rrr:rsseee:!�!eeer.� rss��stre!r�:e!ese�!� _ Yrzs!f s • _ �errsserssr_�:sere�:�r�ir.�se�_ �r�i . _ �se�rssrs�.ess:rs .ram: .� . STRUCTURAL COMMENTS S 1. The plans and calculations need the signature of the licensed architect or engineer who prepared them. [§5536.1, 6735 California Business and Profession Code] 2"d Submittal: Please clarify on title sheet the permit number structural plans and calculations are under, provide justification from the City of La Quinta, in the form of an email or letter, that states all structural items are allowed to be under a separate permit and is allowed to be furnished by the landlord at a separate date. The proposed interior tenant remodel proposes alterations that may affect the structural safety of the building. If a separate permit is not provided for structural plans and calculations, please provide structural plans and calculations. Additional comments may apply. RESPONSE: S2. Please verify existing framing is adequate support for proposed HVAC loads proposed at roof. Provide structural plans, calculations, etc., to verify. Additional comments may apply. 2nd Submittal: New HVAC units proposed under permit BCOM2024-0008. Please provide structural calculations to verify HVAC unit support. Additional comments may apply. See S1. RESPONSE: S3. Please provide structural calculations for proposed architectural, mechanical, and electrical components, supports and attachments per Table 13.2-1 ASCE 7-16. Additional comments may apply. 2nd Submittal: Please clarify item that will be under a separate permit per response. Permit is for interior tenant improvement for ceiling T-bar as needed, new lighting, etc., where structural calculations are required to verify adequacy of architectural, mechanical, and electrical Page 6 of 7 �,U VF City of La Quinta BCOM-2024-0008 March 11, 2024 m N 21309904 T626 NZIMBUM components supports and attachments. Please provide structural calculations. Additional comments may apply. See SI. RESPONSE: . . s S5. Please clarify anchorage of hood per manufacturer on detail 5/ A2.0. 2°d Submittal: Per response, hood per detail 5/ A2.0 will be under a separate permit. Please list hood under a separate permit as similarly provided for signage on sheet T1.0. Include a note on detail 5/ A2.0, detail is for reference only. See S1. RESPONSE: END OF COMMENTS Page 7 of 7 T-11dY 4 4 a" DESIGN & DEVELOPMENT DEPARTMENT 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 (760) 777-7125 FAX (760) 777-7011 NON-RESIDENTIAL PLAN CHECK CORRECTION LIST (ccR) DATE: 2/14/2024 STATUS: FIRST REVIEW PLAN CHECKED BY: B.V. / JAKE FUSON TELEPHONE NUMBER: (760) 777-7081 ADDRESS: 78730 HIGHWAY 111 DESCRIPTION: 5 BELOW TENANT IMPROVEMENT APPLICANT: ALESIA DAVIS PLAN CHECK #: BCOM2024-0008 This submittal has been checked for compliance with the 2022 California Building, Electrical, Mechanical, Green Building and Energy Codes, and the City of La Quinta Municipal Code. APPLICANT: The following items are being returned to you for correction: THIS CORRECTION LIST BUILDING DEPARTMENT STAFF: DO NOT accept any resubmittal unless ALL of the following items are included: WRITTEN RESPONSES TO THIS CORRECTION LIST REVISED PLAN SET INSTRUCTIONS TO APPLICANT: 1) Provide a written response to each comment on the following pages, noting specifically where the correction can be found. Responses such as, "Sheet A-3," or, "Handrails shall be per CBC Section 1003," are not acceptable. Show or note specifically how compliance with a code requirement is achieved. Responses such as, "Added note 16 on sheet A-3" are appropriate and will help expedite your back check. 2) Corrections may not be made by handwriting on existing drawings. Revise originals and reprint Plans and/or Calculations as necessary. 3) Return all red -marked Plans and/or Calculations with your resubmittal. 4) Each sheet of resubmitted Plans and/or Calculations shall include the preparer's name and telephone number and shall be wet -signed by the preparer. If the preparer is a licensed architect or engineer, all documents prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code Section 5536. Resubmittals will not be accepted with signatures missing. 5) Return this list, your written responses, and all documents listed above with your resubmittaI. Non -Residential Plan Check Correction List Page 1 of 4 SECTION A— GENERAL 1) The City of La Quinta has elected to use Bureau Veritas for plan review of your project. In addition to the comments provided by the City of La Quinta within this correction list please see the attached outside consultant review comments. For resubmittal please include a separate response sheet for each set of review comments 2) The address on the permit application does not match the address on the plans, please reconcile inconsistencies. 3) Provide the Assessor's Parcel Number (APN) and complete legal description of project on the first sheet of plans. 4) Provide Riverside County Office of the Fire Marshal approval of this project. Contact your Fire reviewer directly with questions regarding the comments listed in the online portal. 5) Please update the construction type on the cover sheet to match original permit records for this building (Type VB). 6) Note on Plans: "All construction shall comply with the 2022 California Residential, Mechanical, Electrical, Plumbing, Green Building and Energy Codes and the La Quinta Municipal Code." Remove notes referencing other codes. 7) Note on plans that a separate permit is required for the building signage and remove this from the "Deferred Submittals" list on the cover sheet. SECTION B — SITE PLAN / ACCESSIBILITY / ARCHITECTURAL 1) When alterations or additions are made to existing buildings or facilities, an accessible path of travel to the specific area of alteration or addition shall be provided. The primary accessible path of travel shall include a primary entrance to the building or facility, toilet and bathing facilities serving the area, drinking fountains serving the area, public telephones serving the area, signs and when possible, parking. Please complete the path of travel upgrade determination form at the end of this document and include any required upgrades on the plan set. If no upgrades are required, complete the form accordingly and provide a statement of full compliance on the plans. (CBC 11B-202.4) 2) All single -user toilet facilities in any business establishment or place of public accommodation shall be identified as all -gender toilet facilities by signage and designated for use by no more than one occupant at a time or for family or assisted use. (HSC §118600) Please revised restroom signage accordingly. 3) Where towel or sanitary napkin dispensers, waste receptacles, or other accessories (including soap dispensers) are provided, all operable parts shall be 40 inches maximum above the finish floor. (CBC §11B-603.5) Please revise the soap dispenser height on detail 2/A4.1. 4) Lavatories, when located adjacent to a side wall or partition, shall be a minimum of 18 inches to the centerline of the fixture. Please updated detail 2/A4.1. (CBC §11B-606.6). 5) The front end of the grab bar on the side wall of the water closets shall be positioned 24 inches minimum in front of the water closet. Please update grab bar detailing to demonstrate compliance. (CBC §11B-604.5.1) 6) The exterior doors at the rear of the building are left blank on the demolition plan, please clarify whether the doors are being demolished/removed. Provide designs for infill construction and ensure the required U-factor of this wall is provided. 7) At lavatories required to be accessible, the knee clearance shall be 27 inches high minimum above the finish floor or ground at a depth of 8 inches minimum increasing to 29 inches high minimum above the finish floor or ground at the front edge of a counter with a built-in lavatory or at the front edge of a wall -mounted lavatory fixture. Please revise detail 14/T1.2 & 2D/A4.1. SECTION C — ENERGY EFFICIENCY 1) Provide non-residential Building Envelope energy compliance forms for the new glazing, exterior doors, and infilled exterior walls. Non -Residential Plan Check Correction List Page 2 of 4 END CITY REVIEW CORRECTION LIST CORRECTION LIST CONTINUED BY BUREAU VERITAS ATTACHED As further information is provided and reviewed, additional corrections may be required. Non -Residential Plan Check Correction List Page 3 of 4 PATH OF TRAVEL UPGRADE DETERMINATION DATE: ADDRESS: STATUS: DESCRIPTION: PLAN CHECKED BY: APPLICANT: TELEPHONE NUMBER: PLAN CHECK #: In accordance with the 2022 California Building Code (CBC) Section 1113-202.4, exception 8, the cost of compliance with Section 1113-202.4 is allowed to be limited to 20% of the adjusted construction cost of the alterations, structural repairs or additions when the adjusted construction cost does not exceed the current valuation threshold. Construction cost for proposed project (not including costs of improvements to the path of travel to the area of alteration): $ (A) Cost of alterations to areas on this path of travel undertaken during the preceding three-year period which did not provide an accessible path of travel to the area of alteration (as applicable): $ (B) Adjusted construction cost (C) = (A) + (B) $ (C) PATH OF TRAVEL CONSTRUCTION COSTS: Elements serving the area of alteration Is element in If not, will element be Proposed cost of based on priority compliance with upgraded to current compliance with current Chapter Chapter 11B? (Y/N) current 11B? (Y/N) Chapter 11B 1. An accessible entrance $ 2. An accessible route (interior and $ exterior) to the altered area 3. At least one accessible restroom for $ each gender or a single accessible unisex, single user or family restroom 4. Accessible public telephones $ 5. Accessible drinking fountains $ 6. When possible, additional accessible elements such as: a. Parking $ b. Storage $ c. Signs $ d. Alarms $ e. Other $ Total cost of providing compliant path of $ (D) travel elements: COST OF PATH OF TRAVEL UPGRADES AS PERCENTAGE OF ADJUSTED CONSTRUCTION COST: Compliance of path of travel upgrades as % of adjusted construction cost: (E)% _ % (E) (D) / (C) Note: This may not be less than 20% Non -Residential Plan Check Correction List Page 4 of 4 City of La Quinta February 13, 2024 Project Description: Project Address: Application/ Permit #: TI: Five Below 78720 HWY 111. La Quinta, CA 92253 BCOM-2024-0008 Occupancy: M Type of Construction: II-B Sprinklers: Yes Stories: 1 Floor Area (s.£): - Fire Hazard Severity Zone/ WUL• No Fire Alarm: Yes BCOM-2024-0008 21309904 Bureau Veritas has completed the first plan review of the below listed documents on behalf of the City of La Quinta Building & Safety Department: GENERAL INSTRUCTIONS 1. This plan review has been made to verify conformance to minimum requirements of codes and ordinances adopted by the City of La Quinta. Codes in effect for this project include the 2022 editions of the California Building Code (CBC), California Residential Code (CRC), California Green Building Code (CGBC), California Plumbing Code (CPC), California Mechanical Code (CMC), California Electrical Code (CEC), and California Energy Code (CEnC). The CBC is based on the 2021 editions of the International Building Code, which was published by the International Code Council. The CPC and CMC are based on the 2021 edition of the Uniform Plumbing and Mechanical Codes, respectively, which were published by IAPMO. The CEC is based on the 2020 edition of the National Electrical Code published by the National Fire Protection Association (NFPA). Applicable code sections are referenced after each item in this list. 2. These plans and documents have been reviewed for compliance with the applicable code requirements and instructions of the jurisdiction. The stamping of these plans shall not be held to permit or be an approval of a violation of any applicable codes and/or standards nor relieve the owner, design professional of record or contractor of compliance with any applicable codes and/or standards. Plan review of documents does not authorize construction to proceed in violation of any federal, state, nor local regulation. 3. The review does not necessarily include errors and omissions. Complete compliance is the responsibility of the designer. 4. All comments shall be resolved on the plans prior to the recommendation to the governing body for approval. 5. The comments identified in other sections of this review require clarifications/corrections before this plan check can be completed. 6. For reference for explanations in the examiner's comment sections, italic text refers to the initial submittals, bold text on second submittals, and underlined text on third submittals. 7. Please annotate your response in the areas on each comment, please see the comment section, 8. Submit a list showinE any changes to the plan or previously submitted documents that are not the result of the plan check comments. Please "cloud" and/or "delta" all revisions made on plans due to this comment list as well as any other design changes. Page 1 of 7 U VF City of La Quinta BCOM-2024-0008 February 13, 2024 m N 21309904 �Bze IN ORDER TO PROCESS THIS PLAN REVIEW PLEASE PROVIDE THE NAME AND PHONE NUMBER OF THE INDIVIDUAL WHO PREPARED THESE PLAN REVIEW RESPONSES NAME: PHONE: Please provide ONE full COMPLETE electronic submittal, with supporting documentation, and answers to ALL comments listed in the comment section and submit to: City of La Quinta, 78495 Calle Tampico, La Quinta, CA 92253 Respectfully Submitted, Martin Pasamba Plans Examiner 600 N. Rosemead Blvd., STE 233 Pasadena, CA 91107 martin.pasamba@bureauveritas.com Office: 626.325.9800 Morteza Beheshti, P.E. [MEP] Plan Review Engineer 9988 Hibert Street, Suite 100 San Diego, CA 92131 morteza.beheshti@bureauveritas.com Cell: 858.208.6802 Please write the sheet number, detail number, and/or location indicating where the comment is located. Please be specific as to where comment items have been addressed so that recheck may be expedited To aid in the plan review process please indicate in the space adjacent to each comment or on a separate sheet, the sheet and the exact location on the sheet where corrections have been made (e.g., Detail S of Sheet 3). Please "cloud" and/or "delta " all revisions made on plans due to this comment list as well as any other design changes. JURISDICTIONAL COMMENTS J1. Please update the statement on the title sheet of the plans that this project shall comply with Title 24 and California Mechanical Code (CMC) and California Green Building Standards Code (CGBSC). [§ 107.2 CBC] RESPONSE: J2. Please clarify if the tenant space is unprotected or fully sprinklered. Revise Design Criteria: Occupancy portion on title sheet of plans. RESPONSE: J3. Provide a Building Code Data Legend on the Title Sheet. [§ 107.2 CBC] Include the following code information for each building proposed: a. APN # RESPONSE: ARCHITECTURAL COMMENTS Al. Please update the site plan to include property lines, easements and public ways on the site. Clearly dimension building setbacks from property lines, street centerlines, and from all adjacent buildings and structures on the site plan. [§ 107.2.5 CBC] RESPONSE: Page 2 of 7 U VF City of La Quinta BCOM-2024-0008 February 13, 2024 m N 21309904 26y6 A2. Please clarify if East wall on sheet A1.0 will remain as existing or will be similarly patched, repaired and additionally altered to have another layer of gyp. board as the West wall referencing wall A per legend. RESPONSE: A3. Please clarify if the new storefront system is tempered glazed. [§2406.4 CBC] RESPONSE: A4. Please coordinate all doors and openings shown on Floor Plan, sheet A1.0 on door schedule, sheet A5.0. Doors/ openings 9, 10 and 11 are not coordinated. Additional comments may apply. RESPONSE: A5. Visual exit signs are required whenever two exits are required. Every 100 feet. Show all required exit sign locations. [§ 1013.1 CBC] Note on Egress Plan, sheet T1.1 states "Exit Sign See A2.0 For Details, TYP. " However, exit sign details are not shown on sheet A2.0. Please provide and show exit signs on Egress Plan where required. Additional comments may follow. RESPONSE: ACCESIBILITY COMMENTS ACCL [§ I IB-202.1 CBC] Additions and alterations to an existing building or facilities shall comply with the following: a. The area alteration or addition must fully comply. b. A primary entrance to the building or facility and the primary path of travel from accessible parking and from the public way to the specific area of alteration or addition must fully comply. RESPONSE: ACC2. At least one accessible route shall connect accessible buildings, accessible facilities, accessible elements, and accessible spaces that are on the same site. [§11B-206.2.2 CBC] Please provide an accessible route to accessible parking, trash enclosure, public way, etc. Additional comments may apply. RESPONSE: ACC3. Please provide a site plan, enlarged plan, details, notes, etc., to show existing accessible parking is in compliance per latest applicable Sections of I IB-208.2, I IB-502 CBC. Additional comments may apply. RESPONSE: ACC4. Please provide a site plan, enlarged plan, details, notes, etc., to showing circulation contiguous to vehicular traffic is physically separated from vehicular traffic per I IB-250.1, 11B-247, I IB-705, I IB-406 CBC. Additional comments may follow. RESPONSE: ACCS. Per AB No. 1732, all single -user bathrooms in any business, public place, or government agency shall be identified as all -gender restrooms. Please update accessibility signage detail A/ A4.1. RESPONSE: Page 3 of 7 City of La Quinta February 13, 2024 BCOM-2024-0008 21309904 ACC6. Grab Bars [§I IB-609 CBC]: a. Grab bars with a circular cross-section shall be a minimum of 1-1/4" and 2" maximum. RESPONSE: ACC7. Please verify lockers and coat hooks provided in employee break room complies with 11B-222, 11B-803 CBC: a. Turning space, 11B-803.2, I IB-304 CBC b. Door swing, 11B-803.3, 11B-304.3 CBC c. Coat Hooks and Shelves, 11B-803.5, 11B-308 CBC RESPONSE: ACC8. Please revise detail 14/ T1.2. Revise clear floor space at water closets. RESPONSE: ACC9. The centerline of the water closet shall be 17" minimum to 18" maximum from the side wall or partition, except that the water closet shall be 17" minimum to 19" maximum from the side wall or partition in ambulatory accessible toilet compartments. Water closets shall be arranged for a left - or right-handed approach. [§ 11B-604.2 CBC] Please revise detail 2C/A4.1. RESPONSE: GREEN BUILDING COMMENTS GBI. Please mark Yes or Not Applicable and Responsible Party for California Green Building Nonresidential Mandatory Measures. RESPONSE: GB2. Please verify short term and long-term bicycle parking is provided for alteration of structure per 5.106.4.1.1 and 5.106.4.1.3 CGBC. Provide on site plan along with applicable details, notes, etc. Additional comments may apply. RESPONSE: GB3. Please verify EV and EVCS parking provided per 5.106.5.3 CGBC. Please provide plans, details, notes, etc., as required. Additional comments may apply. RESPONSE: GB4. Please provide Good Housekeeping BMP plan per 5.106.1.2.2 CGBC. RESPONSE: ENERGY COMMENTS EnGl. Energy comments in each respective MEP comment. RESPONSE: ELECTRICAL COMMENTS El. Please provide a response letter and address all comments indicating location on plans where corrections are made for an expeditious review. Page 4 of 7 U VF City of La Quinta BCOM-2024-0008 February 13, 2024 m N 21309904 26y6 RESPONSE: E2. Please provide a GFI CKT for the Electric water fountain. RESPONSE: E3. Please change all code references to 2022 California Electrical Code cycle date. See single line notes for instance. RESPONSE: E4. Provide a single line diagram for the new service. Include the following information: a. Please provide feeder overcurrent device size(s) at the existing service switchboard. b. Please verify and indicate location of all equipment shown on single line. c. For fault current mitigation, describe the electrical distribution equipment design as "engineered", "fully rated" or "series rated". Include the AIC specification rating of overcurrent devices throughout the system. RESPONSE: E5. Indicate WP or NEMA 3R enclosure for outdoor equipment such as J-Box outside for the sign. RESPONSE: E6. Please provide GFI/WP receptacle outlets within 25' of all HVAC equipment. CEC 210.63 RESPONSE: ET Please indicate a WP disconnect for the sign(s) per CEC 600.6. RESPONSE: E8. Emergency illumination is required to be installed in electrical equipment rooms. Please provide. CBC 1008.3.3 CEC 700.16 RESPONSE: E9. For buildings that require two or more exits, emergency illumination is required to be installed at exterior exit door landings and/or vestibules. Please provide. CBC 1008.3.2 RESPONSE: MECHANICAL COMMENTS M1. Please provide a response letter and address all comments indicating location on plans where corrections are made for an expeditious review. RESPONSE: M2. Please change all code references to 2022 California Mechanical Code cycle date. RESPONSE: M3. Provide the refrigerant volume concentration per CMC 1104.0 for the mechanical conditioning systems. Include a room schedule for alarms when required by CMC 1104.4. RESPONSE: Page 5 of 7 City of La Quinta February 13, 2024 BCOM-2024-0008 21309904 M4. Electrical outlets are required to be installed within 25' of mechanical equipment. Please include outlet locations, the receptacle specifications (GFCI & weather -resistant), and the extra duty cover specification. CMC 303.8.5 & CEC 210.63 RESPONSE: M5. Buildings of more than 15' in height shall have an inside means of access that meets the design requirements of CMC 304.3.1.1. Please provide City approval for use of an outside ladder is required. RESPONSE: M6. Roof access ladders require landings at no greater a separation of 18', measured from floor level. CMC 304.3.1.2 RESPONSE: M7. Please show the required 42 inches tall "Guards" (guard rails) or building parapets height where appliances, mechanical equipment, fans, roof hatch openings or other components that require service are located within 10 feet of a roof edge or open side of a walking surface. CBC 1015.6 & 1015.7 RESPONSE: M8. The ventilation air supply shall be sufficient to provide make-up air for exhaust systems. Provide an air balance schedule and specify all exhaust and make-up air systems that are required to be electrically interlocked. CMC 505.3 RESPONSE: M9. Specify compliance with CMC 603.4.1 for length limitations for factory made flexible air ducts (5') and use (not to be used for rigid elbows or fittings). RESPONSE: M10. Add note on plans: "Exhaust ducts shall be equipped with back -draft dampers per Sec. 504.1.1 CMC." RESPONSE: M 11. Provide size and routing of condensate line for each HVAC unit. Show condensate receptor(s) for HVAC units. RESPONSE: PLUMBING COMMENTS P1. Please provide plumbing fixture count calculations on plans per Table 422.1 CPC to justify and coordinate the required amount of water closets, lavatories, drinking fountains and other items required. RESPONSE: Page 6 of 7 U VF City of La Quinta BCOM-2024-0008 February 13, 2024 m N 21309904 26y6 P2. Please change all code references to 2022 California Plumbing Code cycle date. See P0.1 notes for instance. RESPONSE: P3. For backwater valve review, please show the upstream sewer manhole rim and finished floor elevations. CPC 710.0. RESPONSE: P4. Detail how the floor drain trap seal is to be maintained. CPC 1007.0. RESPONSE: P5. Floors shall slope to the floor drain(s) location(s). Please indicate sheet number on the Architectural set this is detailed. CPC 418.5. RESPONSE: P6. Show the required self -closing or self -closing metering faucets for the lavatories intended to serve the transient public. CPC, Section 407.4. RESPONSE: STRUCTURAL COMMENTS S 1. The plans and calculations need the signature of the licensed architect or engineer who prepared them. [§5536.1, 6735 California Business and Profession Code] RESPONSE: S2. Please verify existing framing is adequate support for proposed f VAC loads proposed at roof. Provide structural plans, calculations, etc., to verify. Additional comments may apply. RESPONSE: S3. Please provide structural calculations for proposed architectural, mechanical and electrical components, supports and attachments per Table 13.2-1 ASCE 7-16. Additional comments may apply. RESPONSE: S4. Please provide a typical non -bearing wall detail showing attachment to floor/ roof. Provide approved listing number of fasteners, if applicable. Additional comments may apply. RESPONSE: S5. Please clarify anchorage of hood per manufacturer on detail 5/ A2.0. RESPONSE: END OF COMMENTS Page 7 of 7 STATE OF CALIFORNIA AIR ECONOMIZER CONTROLS ACCEPTANCE CEC-NRCA-MCH-05-A (Revised 01/16) CALIFORNIA ENERGY COMMISSION 4S CERTIFICATE OF ACCEPTANCE NRCA-MCH-05-A Air Economizer Controls Acceptance (Page 1 of 3) Project Name: La Quinta Center TI Enforcement Agency: City Permit Number: BCOM2024-0008 Project Address: 78-730 Highway 111 City: La Quinta Zip Code: 92253 System Name or Identification/Tag: RTU System Location or Area Served: Retail Note: Submit one Certificate of Acceptance for each system that must Enforcement Agency Use: Checked by/Date demonstrate compliance. A. Construction Inspection 1. Supporting documentation needed to perform test includes: a. 2016 Building Energy Efficiency Standards Nonresidential Compliance Manual (NA7.5.4 Air Economizer Controls Acceptance At -A - Glance). b. 2016 Building Energy Efficiency Standards. 2. Instrumentation to perform test includes: a. Hand-held temperature probe Calibration Date: 1/4/24 (must be within last year) b. Device capable of calculating enthalpy (i.e. psychrometer) Calibration Date: (must be within last year) c. 1.2 k Ohm Resistor ( when specified by the manufacturer) 3. Installation: (all of the following boxes should be checked) ❑✓ Economizer high limit shutoff control complies with Table 140.4-B found in the 2016 Building Energy Efficiency Standards Section 140.4(e)3. ❑✓ Economizer reliability features are present per 2016 Building Energy Efficiency Standards Section 140.4(e)4: a. 5-year manufacturer warranty of economizer assembly b. Provide a product specification sheet proving capability of at least 60,000 actuations c. Provide a product specification sheet proving compliance with AMCA Standard 500-D damper leakage at 10 cfm/ftz at 250 Pascals (1.0 in w.g). A product specification sheet showing the manufacturer's results after following the testing procedures of AMCA Standard 500-D. A product specification sheet showing the economizer outside air and return air damper leakage rates have been certified to the Energy Commission in accordance with Section 110. d. If the high limit setpoint is fixed dry-bulb or fixed enthalpy + fixed dry-bulb then the control shall have an adjustable setpoint. e. Outdoor air, return air, mixed air, and supply air sensors shall be calibrated as follows: i. Dry-bulb and wet -bulb temperatures accurate to ±2°F over the range of 40oF to 80oF ii. Enthalpy accurate to ±3 Btu/Ib over the range of 20 Btu/Ib to 36 Btu/Ib iii. Relative humidity (RH) accurate to ±5% over the range of 20% to 80% RH f. Check that the sensor performance curve(s) is provided by the factory and sensor output values measured during sensor calibration are plotted on the performance curve(s). g. Sensors used for high limit control shall be located to prevent false readings, including but not limited to being properly shielded from direct sunlight. �✓ Unitary systems with an economizer have control systems, including two -stage or electronic thermostats, that cycle compressors off when economizers can provide partial cooling. ❑✓ System has return fan speed control, relief dampers, or dedicated relief fans to prevent building over pressurization in full economizer mode. ❑✓ For systems with DDC controls, sensor used for economizer lockout has been factory or field calibrated. ❑✓ For systems with non-DDC controls, manufacturer's startup and testing procedures have been applied. CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA AIR ECONOMIZER CONTROLS ACCEPTANCE CEC-NRCA-MCH-05-A (Revised 01/16) CALIFORNIA ENERGY COMMISSION 4S CERTIFICATE OF ACCEPTANCE NRCA-MCH-05-A Air Economizer Controls Acceptance (Page 2 of 3) Project Name: La Quinta Center TI Enforcement Agency: City Permit Number: BCOM2024-0008 Project Address: 78-730 Highway 111 City: La Quinta Zip Code: 92253 System Name or Identification/Tag: RTU System Location or Area Served: Retail B. Functional Testing 61 Results Is the economizer listed in the CEC equipment certification directory? (if yes, proceed to Section D.) Yes (F) No Step 1: Disable demand control ventilation systems (if applicable) Step 2: Enable the economizer and simulate a cooling demand large enough to drive the economizer fully open. Verify the following: a. Economizer damper modulates 100% open. Yes (F) No b. Return air damper modulates 100% closed. Yes O No C. For systems that meet the criteria of 2016 Building Energy Efficiency Standards Section 140.4(e)1, verify that the economizer remains 100% open with the use of mechanical cooling. This occurs when the cooling demand can no longer be met by the economizer alone. Yes No d• All applicable fans and dampers operate as intended to maintain building pressure. Yes Q No e• The unit heating is disabled (if applicable). Yes ® No ® NA Step 3: Disable the economizer and simulate a cooling demand. Verify the following: a. Economizer damper closes to its minimum position. Yes Q No Q b. All applicable fans and dampers operate as intended to maintain building pressure. Yes Q No C. The unit heating is disabled (if applicable). Yes ® No O NA Step 4: If the unit is equipped with heating, simulate a heating demand and enable the economizer. Verify the following: a. Economizer damper closes to its minimum position. Yes () No() NA(F) b. Return air damper opens. Yes Q No O NA Q Step 5: Turn off the unit and verify the following: a. Economizer damper closes completely. Yes Q No Q Step 6: System returned to initial operating conditions Yes Q No C. Testing Results PASS / FAIL Step 2: Simulate cooling load and enable the economizer (all answers are Y and/or NA). Step 3: Simulate cooling load and disable the economizer (all answers are Y and/or NA). O Step 4: Simulate heating demand and enable the economizer (all answers are Y and/or NA). Step 5: Turn off the unit (all answers are Y). 0 D. Evaluation ❑✓ PASS: All Construction Inspection responses are complete and all Testing Results responses are "Pass" or the economizer is listed in the CEC equipment cerification directory. Notes: CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA AIR ECONOMIZER CONTROLS ACCEPTANCE CEC-NRCA-MCH-05-A (Revised 01/16) CALIFORNIA ENERGY COMMISSION 4S CERTIFICATE OF ACCEPTANCE NRCA-MCH-05-A Air Economizer Controls Acceptance (Page 3 of 3) Project Name: La Quinta Center TI Enforcement Agency: City Permit Number: BCOM2024-0008 Project Address: 78-730 Highway 111 City: La Quinta Zip Code: 92253 System Name or Identification/Tag: RTU System Location or Area Served: Retail DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Name: David Korneff Documentation Author Signature: Documentation Author Company Name: Advanced Compliance Date Signed: 9/18/24 Address: PO BOX 5755 ATT Certification Identification (If applicable): city/state/Zip:Whlttler, CA. 90607 Phone:5622545520 FIELD TECHNICIAN'S DECLARATION STATEMENT !J 1 certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Acceptance is true and correct. 2. 1 am the person who performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). 3. The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with the building permit(s) issued for the building. Field Technician Name: Field Technician Signature: Field Technician Company Name: Position with Company (Title): Address: ATT Certification Identification (if applicable): City/State/Zip: Phone: Date Signed: RESPONSIBLE PERSON'S DECLARATION STATEMENT U 1 certify the following under penalty of perjury, under the laws of the State of California: 1. 1 am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement (responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s) issued for the building. 5. 1 will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person Name: Kelly Responsible Acceptance Person Signature: Responsible Acceptance Person Company Name: Gray Const. Position with Company (Title): Project Manager Address: 2070 N. Tustin Ave CSLB License:775947 city/state/Zip:Santa Ana, CA. 92705 Phone7144911317 Date Signed: CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA MECHANICAL CEC-NRCI-MCH-01-E (Revised 01/20) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF INSTALLATION NRCI-MCH-01-E Mechanical (Page 1 of 2) Project Name: La Quinta Center Enforcement Agency: City Permit Number: BCOM2024-0008 Project Address: City: La Quinta Zip Code: A. GENERAL INFORMATION DATE OF BUILDING PERMIT: 4/22/24 BUILDING TYPE ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel PHASE OF ❑ ❑ New Construction Addition ® Alteration CONSTRUCTION If more than one person has responsibility for building construction, each person shall prepare and sign an Installation Certificate document applicable to the portion of construction for which they are responsible, alternatively, the person with chief responsibility for construction shall prepare and sign the Installation Certificate document(s) for the entire construction. B. SCOPE OF RESPONSIBILITY Date of approval by the enforcement agency of the Certificate of Compliance that provides the Date: 4/22/24 specifications for this Installation Certificate. In the table below identify all applicable construction documents that specify the features, materials, components, manufactured devices, or system performance diagnostic results required for the scope of responsibility for this Installation Certificate. Document Title or Description Applicable Sheets or Pages, Tables, Schedules, etc. Date Approved By the Enforcement Agency Mechanical Details M-Sheets 4/22/24 CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA MECHANICAL CEC-NRCI-MCH-01-E (Revised 01/20) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF INSTALLATION NRCI-MCH-01-E Mechanical (Page 2 of 2) Project Name: La Quinta Center Enforcement Agency: Cit Permit Number: BCOM2024-0008 ProjectA dre s: 7 Highway 111 City: La Quinta Zip Code: 92253 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: David KOrneff Documentation Author Signature: oc—� Documentation Author Company Name: Date Signed: Advanced Com liance 9 18 24 Address: CEA/ HERS Certification Identification (If applicable): PO Box 5755 City/State/Zip: Phone: Whittier, CA, 90607 5622545250 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Installation is true and correct. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement (responsible builder/installer), otherwise I am an authorized representative of the responsible builder/installer. 3. The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations, and the installation conforms to the requirements given on the plans and specifications approved by the enforcement agency. 4. 1 reviewed a copy of the Certificate of Compliance approved by the enforcement agency that identifies the specific requirements for the scope of construction or installation identified on this Certificate of Installation, and I have ensured that the requirements that apply to the construction or installation have been met. 5. 1 will ensure that a completed signed copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Position With Company (Title): Address: CSLB License: City/State/Zip: Phone: Date Signed: CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 CERTIFICATE OF INSTALLATION —USER INSTRUCTIONS NRCI-MCH-01-E Mechanical (Page 1 of 1) NRCI-MCH-01 User Instructions Section A. General Information 01. Enter the date on the building permit. 02. Indicate the appropriate building type. 03. Indicate the appropriate phase of construction. Section B. Scope of Responsibility 01. Enter the date the enforcement agency approved the Certificate of Compliance (NRCC-MCH-XX) that is used as the basis of the specifications used to demonstrate compliance. 02. Enter the construction document that specifies the installed feature, material, component, manufactured device or system performance diagnostic results required for compliance as specified on the certificate of compliance. 03. As needed, this row shall be filled according to the instructions for row B.02 04. As needed, this row shall be filled according to the instructions for row 6.02 05. As needed, this row shall be filled according to the instructions for row 6.02 CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA ENERGY MANAGEMENT CONTROL SYSTEM ACCEPTANCE CEC-NRCA-MCH-18-A Revised 01/20 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-18-A Energy Management Control System Acceptance (Page 1 of 2) Project Name: La Qulnta Center TI Enforcement Agency: City Permit Number: BCOM2024-0008 Project Address: 78-730 Highway 111 City: La Quinta Zip Code: 92253 System Name or Identification/Tag: H P- FC System Location or Area Served: Retail Compliance Results: Enforcement Agency Use: Checked by/Date: G Complies 0 Does NOT Comply The purpose of this acceptance test is to ensure that when an energy management control system (EMCS) is installed for the purpose of compliance with the Building Energy Efficiency Standards (Standards), it is properly installed, operational, and is in compliance with Intent: each relevant requirement in the Standards. Submit one Certificate of Acceptance for each system that must demonstrate compliance. A. Construction Inspection Building: 1 Floor: 1 Room/Area/Zone: Retail Control/System: H P-FC 1 Required Documentation (check all of the following): ❑✓ a. Designs, plans, schematics, and schedules as approved by the authority having jurisdiction. b Building documents including: manufacturer specifications, calibration certificates, or tear sheets for the installed system as available. ❑ C. NRCA-MCH-11-A (Automatic Demand Shed Control) must be completed. (§110.12(b)) 2 Verify and document the following (check all of the following): Check NA ❑✓ REQ a. Relying on documentation from the manufacturer, verify that the EMCS has completed the initial startup and can achieve normal operation. 0 b' Verify that all unitary heating or cooling systems under thermostatic control of the EMCS are identified on NRCC- MCH-E, Section I. (§110.2(c), §10-103(a)2A) 0 0 C. IF Construction Inspection 2b is selected on NRCA-MCH-03-A, THEN verify that NRCA-MCH-03-A is completed. 0 d. IF the EMCS is installed to function as a lighting control that is required by the Standards, THEN verify that NRCI-LTI- 02-E (EMCS for Lighting Control Systems) has been completed and approved by the authority having jurisdiction. (§130.0(e)2, §130.4(b)2, §110.9, §130.0 through §130.5, §140.6 through §150.0, §150.2, and NA7.7.2 ) 0 e' For all lighting controls systems for which an EMCS is identified as providing compliance (NRCC-LTI-E, NRCC-LTO-E), verify that the following acceptance tests have been completed: §130.0 e ) 0 0 i. NRCA-LTI-02-A (Shut -Off Lighting Controls) 0 0 ii. NRCA-LTI-03-A (Automatic Daylighting Controls) 0 0 iii. NRCA-LTI-04-A (Demand Responsive Controls) 0 0 iv. NRCA-LTI-05-A (Institutional Tuning Power Adjustment Factor) 0 0 v. NRCA-LTO-02-A (Outdoor Lighting Controls) 0 0 f' IF the EMCS is used as a fault management application for an anemometer failure detection on an exhaust fan system serving a laboratory or factory greater than 10,000 CFM, THEN verify that NRCA-PRC-14-F is completed. 0 0 g IF the EMCS is used as a fault management application for a contaminant sensor failure detection on an exhaust fan system serving a laboratory or factory greater than 10,000 CFM, THEN verify that NRCA-PRC-14-F is completed. Construction Inspection Compliance Results: Complies ® Does NOT Comply CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA ENERGY MANAGEMENT CONTROL SYSTEM ACCEPTANCE CEC-NRCA-MCH-18-A (Revised 01/20) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-18-A Energy Management Control System Acceptance (Page 2 of 2) Project Name. La Quinta Center TI Enforcement Agency: City Permit Number: BCOM2024-0008 Project Address. 78-730 Highway 111 City. La Quinta Zip code. 92253 System Name or Identification/Tag: HP-FC System Location or Area Served: Retail DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Name: David Korneff Documentation Author SignatureFl 00 JJ Documentation Author Company Name:Advanced Compliance Date Signed:8/22/24 Address:PO Box 5755 ATT Certification Identification (If applicable): City/State/Zip:Whittier, CA. 90607 Phone:562-254-5250 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Acceptance is true and correct. 2. 1 am the person who performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). 3. The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with the building permit(s) issued for the building. Field Technician Name: Field Technician Signature: Field Technician Company Name: Position with Company (Title): Address: ATT Certification Identification (if applicable): City/State/Zip: Phone: Date Signed: RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. 1 am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement (responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s) issued for the building. 5. 1 will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person Name :Shelly Responsible Acceptance Person Signature: Responsible Acceptance Person Company Name: Gray Position with Company (Title): Project Manager Address:2070 N. Tustin Ave CSLB License:775947 city/state/Zip:Santa Ana, CA. 92705 Phone:7144911317 Date Signed: CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 GUNDERSON INSPECTIONS 16550 Artesian Hills Court San Diego, CA 92127 Field Daily Report Phone: 949.636.5013 Email: conorgunderson@gmail.com Report Date: 9-5-2024 Job Name: 5 BELOW Job Address: 78-730 CA 111, BLDG 9A - 9C Client: Atlas Inspector: Conor Gunderson License #: 8360518 Exp Date: 06-2025 Contractor: Atlas Site: 5 BELOW License Required for Inspection: CONCRETE Permit: City/County License: # Jurisdiction: Type of Work: ❑X Reinforced Concrete Prestressed Concrete Wood Description of Work: ❑ Masonry ❑ Steel/Welding Fireproofing soil I INSPECTED THE 3 - 1/2" HILTI ANCHOR BOLTS FOR THE RACKS. ALL HOLES HAVE BEEN DRILLED TO THE PROPER DEPTH, AND BLOWN OUT. APPROXIMATELY 145 BOLTS HAVE BEEN INSTALLED. ALL BOLTS ARE SECURE, AND ARE FLUSH WITH THE CONCRETE. ALL BOLTS HAVE BEEN TESTED WITH ICC-ESR 3027. NO DEFICIENCIES, ALL WORK IS GOOD. ALL WORK OBSERVED, FIELD QUALITY CONTROL AND TESTING WAS CONDUCTED ACCORDING TO CONTRACT DOCUMENTS, APPROVED PLANS, MANUFACTURERS SPECIFICATIONS, PROVIDED RFI'S/CDC'S AND APPLICABLE CODES, EXCEPT WHERE NOTED. ALL ISSUES CONCERNING CORRECTIONS AND NON -CONFORMING ITEMS/ DISCREPANCIES HAVE BEEN BROUGHT TO THE ATTENTION OF ALL CONCERNED PROJECT PERSONELL, CONTRACTOR, SUB -CONTRACTOR, CONSTRUCTION MANAGEMENT TEAM AND WHEN POSSIBLE THE INSTALLER/ PLACEMENT SUB -CONTRACTOR. . The Work ❑X WAS 16 J � WAS NOT Inspected in Accordance with the Requirements of the Approved Plans and Specifications DATE TASK # REGULAR O.T. TIME IN TIME OUT 9-5-2024 4 0900 1100 Inspector Name: Conor Gunderson Signature 6na 4d*v� Approved by: John Moreno Signature: STATE OF CALIFORNIA 100141 SUPPLY AIR TEMPERATURE RESET CONTROLS ACCEPTANCE CEC-NRCA-MCH-16-A Revised 01/20 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-16-A Supply Air Temperature Reset Controls Acceptance (Page 1 of 3) Project Name: La Qulnta Center TI Enforcement Agency: City Permit Number: BCOM2024-0008 Project Address: 78-730 Highway 111 city: La Quinta Zip Code: 92253 System Name or Identification/Tag: ` ,A` , System Location or Area Served: Retail Compliance Results: Enforcement Agency Use: Checked by/Date Complies () Does NOT Comply Verify that the supply air temperature modulates to meet system temperature setpoint(s). Intent: Submit one Certificate of Acceptance for each system that must demonstrate compliance. (NA7.5.15, J14D.4 f ) A. Construction Inspection Building: 1 Floor: 1 Room/Area/Zone: Retail Control/System: VAV 1 Required Documentation (check all of the following): (NA7.5.15.1) ❑✓ a. Designs, plans, schematics, and schedules as approved by the authority having jurisdiction. ❑✓ b. NRCC-MCH-E as approved by the authority having jurisdiction. (10-103(a)2A) ❑✓ c. Manufacturer specifications, calibration certificates, or tear sheets for the installed system as available. 2 Prior to functional testing, verify and document the following: a. Supply air temperature reset controls are installed as specified by the requirements §140.4(f). Verifythat NRCC-MCH-E has been completed and approved b the authority having jurisdiction. NA7.5.15.1(a), 140.4 f p pp Y Y gJ ( § ( )) b All system air temperature sensors are factory or field calibrated within 2% of a calibrated reference temperature sensor. (NA7.5.15.1(b)) c. Document current supply air temperature (OF): (NA7.5.15.1(c)) Construction Inspection Compliance t)Complies ® Does NOT Comply CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA SUPPLY AIR TEMPERATURE RESET CONTROLS ACCEPTANCE CEC-NRCA-MCH-16-A Revised 01/20 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-16-A Supply Air Temperature Reset Controls Acceptance (Page 2 of 3) Project Name: La Qulnta Center TI Enforcement Agency: City Permit Number: BCOM2024-0008 Project Address: 78-730 Highway 111 city: La Quinta Zip Code: 92253 System Name or Identification/Tag: ` ,A` , System Location or Area Served: Retail B. Functional Testing Building: 1 Floor: 1 Room/Area/Zone: Retail Control/System: VAV Check to make sure that chilled/hot water coils, if used, are not already fully open and calling for maximum cooling/heating. If this is the case, reverse Steps 1 and 2 and/or change the set point range as necessary to conduct this test. (NA7.5.15.2(a)) Identify the control parameter: (NA7.5.15.2(b)) ❑ Outside air temperature ❑ Zone or return air temperature ❑ Zones calling for heating or cooling ❑✓ Other Steps: Results 1 During occupied mode, adjust the reset control parameter to decrease the supply air temperature (to the lower supply temperature limit). Verify and document the following: (NA7.5.15.2 Step 1) a. Supply air temperature controls modulate as intended. (NA7.5.15.2 Step 1(a)) • P/F b. Actual supply air temperature decreases to meet the new setpoint within ±22F. (NA7.5.15.2 Step 1(b)) Q P/F Q Supply air temperature set point (OF). Actual supply air temperature (°F): c. I Supply air temperature stabilizes within 15 minutes. (NA7.5.15.2 Step 1(c)) • P/F 2 During occupied mode, adjust the reset control parameter to increase the supply air temperature (to the upper supply temperature limit). Verify and document the following: (NA7.5.15.2 Step 2) a. Supply air temperature controls modulate as intended. (NA7.5.15.2 Step 2(a)) P/F o b. Actual supply air temperature increases to meet the new setpoint within ±22F. (NA7.5.15.2 Step 2(b)) P/F Supply air temperature s(°F): et point Actual supply air temperature (OF): c. I Supply air temperature stabilizes within 15 minutes. (NA7.5.15.2 Step 2(c)) Q• P/F Q 3 Restore reset control parameter to automatic control. Verify and document the following: (NA7.5.15.2 Step 3) a. Supply air temperature controls modulate as intended. (NA7.5.15.2 Step 3(a)) Q P/F Q b. Actual supply air temperature changes to meet the new setpoint within ±22F. (NA7.5.15.2 Step 3(b)) 0 P/F Q Supply air temperature set point (OF): Actual supply air temperature (°F): c. Supply air temperature stabilizes within 15 minutes. (NA7.5.15.2 Step 3(c)) 0 P/F Q Functional Testing Compliance Results: Complies o Does NOT Comply CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA SUPPLY AIR TEMPERATURE RESET CONTROLS ACCEPTANCE CEC-NRCA-MCH-16-A Revised 01/20 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-16-A Supply Air Temperature Reset Controls Acceptance (Page 3 of 3) Project Name: La Qulnta Center TI Enforcement Agency: City Permit Number: BCOM2024-0008 Project Address: 78-730 Highway 111 city: La Quinta Zip Code: 92253 System Name or Identification/Tag: ` A , System Location or Area Served: Retail DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Name:David Korneff Documentation Author Signature: Documentation Author Company Name:Advanced Compliance Date Signed:9/18/24 Address:PO Box 5755 ATT Certification Identification (If applicable): City/State/Zip:Whittier Phone:5622545250 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Acceptance is true and correct. 2. 1 am the person who performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). 3. The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with the building permit(s) issued for the building. Field Technician Name: Field Technician Signature: Field Technician Company Name: Position with Company (Title): Address: ATT Certification Identification (if applicable): City/State/Zip: Phone: Date Signed: RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. 1 am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement (responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s) issued for the building. 5. 1 will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person Name:Shelly Responsible Acceptance Person Signature: Responsible Acceptance Person Company Name: Position with Company (Title):PrO ect Manager 1 9 Gray Address:2070 N. Tustin Ave CSLB License:775947 city/state/Zip:Santa Ana, CA. 92705 Phone:7144911317 Date Signed: CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA OUTDOOR AIR ACCEPTANCE CEC-NRCA-MCH-02-A (Revised 01/20) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-02-A Outdoor Air Acceptance (Page 1 of 3) Project Name: La QUlnta Center TI Enforcement Agency: City Permit Number: BCOM2024-008 Project Address: 78-730 Highway 111 City: La Quinta Zip Code: 92253 System Name or Identification/Tag: HP 1-2 System Location or Area Served: Retail Compliance Results: Enforcement Agency Use:Initial/Date Complies () Does NOT Comply Verify measured outside airflow sensor reading is within 10% of the total required outside airflow. Required for all newly installed HVAC units. Reference NRCC-MCH-E. Intent: Submit one Certificate of Acceptance for each system that must demonstrate compliance. NRCA-MCH-02-A can be performed in conjunction with NRCA-MCH-07-A Supply Fan VFD Acceptance (if applicable) since testing activities overlap. A. Construction Inspection Building: 1 Floor: 1 Room/Area/Zone: Retail L+ Control/System Air Sy stem Prior to Functional Testing, verify and document all of the following 1. Required Documentation (all must be checked). R1 a. I NRCC-MCH-E as approved by the authority having jurisdiction. (§10-103(a)2A) 2. System type —Select either Constant Air Volume (CAV) or Variable Air Volume (VAV) below: a. VAV only: i. I Outside airflow is either factory calibrated or field calibrated (check one of the following). E) A factory calibrated. (NA 7.5.1.1.1 (a)) ® B field calibrated. (NA 7.5.1.1.1(b)) ii. Damper Control (check all of the following): ❑ A Dynamic damper control is being used to control outside air. (NA 7.5.1.1.1 (c)) ❑ B Dynamic damper is NOT a fixed minimum damper. (NA 7.5.1.1.1, §120.1(f12) iii. Identify the dynamic control being utilized to control outside air. (NA 7.5.1.1.1 (d)) ❑ Describe control: Q b. CAV only (check all of the following): ❑ i. System is designed to provide a fixed minimum outside air when the unit is on. (NA 7.5.1.2.1 (a)) ❑ ii. Minimum position is marked on the outside air damper. (NA 7.5.1.2.1 (d)) ❑ iii. The system has means of maintaining the minimum outdoor air damper position. (NA 7.5.1.2.1 (e)) 3. Method of delivering outside air to the heating or cooling unit (select one of the following): (NA 7.5.1.1.1 (e), NA 7.5.1.2.1 (b)) a' Return Plenum Ducted: Confirm that outside air is ducted to within 5 or 15 ft. (with direction and velocity requirement) of the heating or cooling unit as specified by NRCC-MCH-E, Section H. (§120.1(e)1 &2) ® b' Direct Unit Ducted. Return air plenum is NOT used to distribute outside air to the heating or cooling unit. (i.e. outside air is ducted directly to the unit, outside air is provided independent of the unit, or economizer). 4. Pre -occupancy Purge El a' Verify that the pre -occupancy purge has been programmed for the 1-hour period immediately before the building is normally occupied to provide ventilation as indicated on NRCC-MCH-E. (VAV - NA 7.5.1.1.1 (f) , CAV - NA 7.5.1.2.1 (c), §120.1(c1 2) Construction Inspection Compliance Results: G Complies © Does NOT Comply CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA OUTDOOR AIR ACCEPTANCE CEC-NRCA-MCH-02-A (Revised 01/20) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-02-A Outdoor Air Acceptance (Page 2 of 3) Project Name: La QUlnta Center TI Enforcement Agency: City Permit Number: BCOM2024-008 Project Address: 78-730 Highway 111 City: La Quinta Zip Code: 92253 System Name or Identification/Tag: HP 1-2 System Location or Area Served: Retail B. Functional Testing Building: Floor: Room/Area/Zone: Control/System: 1 1 Community Center Mechanical Air System Steps: CAV VAV 1 Disable demand control ventilation (if applicable) ❑ Check if NA ❑ ❑✓ Verify unit is not in economizer mode during test 2 (economizer disabled) ❑ Check if NA ❑ ❑✓ (VAV - NA 7.5.1.1.2 Step 1, CAV — NA 7.5.1.2.2 Step 1) 3 CAV and VAV testing at full supply airflow a Adjust supply air to achieve design airflow or maximum airflow at full cooling. ❑✓ (NA 7.5.1.1.2 Step 21 Measured outdoor airflow reading (cfm) b (VAV - NA 7.5.1.1.2 Step 2a, CAV — NA 7.5.1.2.2 Step 2a) cfm cfm Required outdoor airflow (cfm) C. (refer to NRCC-MCH-E, Section J). cfm cfm Time for outside air damper to stabilize after full supply airflow is achieved (minutes): d (NA 7.5.1.1.2 Step 2b) min 4 VAV testing at reduced supply airflow a. Adjust supply airflow to either the sum of the minimum zone airflows, full heating, or 30% of the total design airflow. (NA 7.5.1.1.2 Step 3) b. Measured outdoor airflow reading (cfm). [NA 7.5.1.1.2 Step 3a] cfm Required outdoor airflow (cfm) C. (refer to NRCC-MCH-E, Section J). cfm Time for outside air damper to stabilize after reduced supply airflow is achieved d. (minutes): (NA 7.5.1.1.2 Step 3b) min 5 Return to initial conditions (NA 7.5.1.1.2 Step 4) ❑ ❑✓ 6 Calculations Determine Percent Outside Air at full supply airflow (%OAFA) for Step 3. (§120.1(f L11 %OAFA = Measured outdoor airflow reading /Required outdoor airflow. a' 100 x (Step3b/Step3c) ° ° �° b. %OAFA is within 10% of design Outside Air. (90% <_ %OAFA <_ 110%) Q P / F Q Q P / F Q C. Outside air damper position stabilizes within 5 minutes. (Step 3d < 5 minutes) O P / F O VAV only: Determine Percent Outside Air at reduced supply airflow (%OARA) for Step 4. (§120.1(fl21 %OARA = Measured outdoor airflow reading /Required outdoor airflow reading. a 100 x (Step4b/Step4c) % b. %OARA is within 10% of design Outside Air. (90% <_ %OARA <_ 110%) (D P / F C) C. Outside air damper position stabilizes within 5 minutes. (Step 4d < 5 minutes) P / F Functional Testing Compliance Results: Q Complies () Does NOT Comply CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 STATE OF CALIFORNIA OUTDOOR AIR ACCEPTANCE CEC-NRCA-MCH-02-A (Revised 01/20) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-02-A Outdoor Air Acceptance (Page 3 of 3) Project Name: La QUlnta Center TI Enforcement Agency: City Permit Number: BCOM2024-008 Project Address: 78-730 Highway 111 City: La Quinta Zip Code: 92253 System Name or Identification/Tag: HP 1-2 System Location or Area Served: Retail DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Name: David KOrneff Documentation Author Signature: JC--J Documentation Author Company Name. Compliance Date Date Signed: 9/18/24 Address: PO BOX 5755 ATT Certification Identification (If applicable): city/state/Zip:Whittier, CA. 90607 Phone:5622545250 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Acceptance is true and correct. 2. 1 am the person who performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). 3. The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NAT 4. 1 have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with the building permit(s) issued for the building. Field Technician Name: Field Technician Signature: Field Technician Company Name: Position with Company (Title): Address: ATT Certification Identification (if applicable): City/State/Zip: Phone: Date Signed: RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. 1 am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement (responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NAT 4. 1 have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s) issued for the building. 5. 1 will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person Name: Kelly Stevens Responsible Acceptance Person Signature: Responsible Acceptance Person Company Name: Gray West Position with Company (Title): Project Manager Address:2070 N Tustin Ave CSLB License:775947 city/state/Zip:Santa Ana, CA. 92705 Phone 7144911317 Date Signed: CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020 CERTIFICATE OF INSTALLATION CI-LTO 02-E Outdoor EMCS or Lighting Control System Project Name: 5 Below Enforcement Agency C= OF LA QUMA Permit Number: BCOM20240008 Project Address: 78730 highway 111 City La g ita IZip Code: 92253 ENERGY MANAGEMENT CONTROL SYSTEM OR LIGHTING CONTROL SYSTEM CERTIFICATE OF INSTALLATION General Information Building Type: r Nonresidential Outdoor Lighting -:phase of Construction: r New Construction r Addition F" Alteration Cope of Responsibility =nter the date of approval by enforcement agency of the Certificate of Compliance that provides the specifications for the energy efficiency measures for the scope of responsibility for this Installation Certificate. Date: 8/14/2024 12:00:00 AM Requirements in the Standards: §130.4(b) Before an Energy Management Control System (EMCS), or Lighting Control System can be recognized for compliance with the lighting control requirements in Part 6 of Title 24, the person who is eligible under Division 3 of the Business and Professions Code to accept responsibility for the construction or installation of features, materials, components, or manufactured devices shall sign and submit this Installation Certificate. If any of the requirements in this Installation Certificate fail the Energy Management Control System or Lighting Control System installation requirements, these options for controlling lighting shall not be recognized for compliance with the Building Energy Efficiency Standards. Check all that apply PART 1 What type of Lighting Control System has been installed? r A. Energy Management Control System (EMCS) - Is a computerized control system designed to regulate the energy consumption of a building by controlling the operation of energy consuming systems, such as the heating, ventilation and air conditioning (HVAC), lighting, and water heating systems, and is capable of monitoring environmental and system loads, and adjusting HVAC operations in order to optimize energy usage and respond to demand response signals. r The Energy Management Control System has been installed to function as a lighting control required by Part 6 and functionally meets all applicable requirements for each application for which it is installed, in accordance with Sections 110.9, 130.0 through 130.S, 140.6 through 1SC.0, and 1S0.2; and complies with Reference Nonresidential Appendix NA7.7.2. r The EMCS has been separately tested for each respective lighting control system for which it is installed to function as. B. Lighting Control System - Requires two or more components to be installed in the buildings to pro+. ids all of the functionality required to make up a fully functional and compliant lighting control. C,ALTP lalifornlaAdvaneedLighting Controls Training Program This is page 1 of 5 CERTIFICATE OF INSTALLATION CI-LTO 02-E Outdoor EMCS or Lighting Control System Project Name: 5 Below Enforcement Agency C= OF LA QUMA Permit Number: BCOM20240008 Project Address: 78730 Highway 111 1City La quits Zip Code: 92253 Ir The installed Lighting Control System complies with the requirements checked below; and all components of the system considered together as installed meet all applicable requirements for the application for which they are installed as required in Sections 130.0 through 130.S, Sections 140.6 through 140.8, Section 141.0, and Section 1S0.0(k). PART 2 Lighting Control Functional requirements: Check all that apply when verifying the installation of an EMCS or Lighting Control System. r A. All outdoor lighting controls and equipment have been installed in accordance with the manufacturer's instructions. r B. The manufacturer has provided instructions for calibration. r C. If indicator lights are integral to any components, such indicator lights consumes no more than 1 watt of power per indicator light. 171-01 D. Components that are regulated by the Title 20 Appliance Efficiency Regulations have been certified to the Energy Commission. 17170 E. The EMCS or Lighting Control System functions as one or more of the Time -Switch Lighting Controls checked below, and complies with all of the following requirements: pr 1. Automatic Time -Switch Controls meeting all requirements for Automatic Time Switch Control devices in the Title 20 Appliance Efficiency Regulations, including the requirements below: <br />a. Commercial automatic time -switch controls meet the following requirements: <br />i. Has program backup capabilities that prevent the loss of the device's schedule for at least 7 days, and the device's date and time for at least 72 hours if power is interrupted;<br />ii. Is capable of providing manual override to each connected load and shall resume normally scheduled operation after manual override is initiated within 2 hours for each connected load; and<br />iii. Incorporates an automatic holiday shutoff feature that turns off all connected loads for 1r least 24 hours and then resumes normally scheduled operation. Fr 2. Astronomical Time -Switch Controls meeting all requirements for Astronomical Time -Switch Control devices in the Title 20 Appliance Efficiency Regulations, including the requirements below: <br />a. Meets the requirements of an automatic time -switch control; <br />b. Has sunrise and sunset prediction accuracy within plus -or -minus 1S minutes and timekeeping accuracy within S minutes per year; <br />c. Is capable of displaying date, current time, sunrise time, sunset time, and switching times for each step during programming; <br />d. Has an automatic daylight savings time adjustment; and<br />e. Has the ability to independently offset the on and off for each channel by at least 99 minutes before and after sunrise or sunset. Fr 3. Multi -Level Astronomical Time -Switch Controls, in addition to meeting all of the requirements for Astronomical Time -Switch Controls, includes at least 2 separately programmable steps per zone. F F. The EMCS or Lighting Control System functions as one or more of the Daylighting Controls listed below: C,ALTP lalifornlaAdvaneedLighting Controls Training PTogram This is page 2 of 5 CERTIFICATE OF INSTALLATION CI-LTO 02-E Outdoor E\SCS or Lighting Control System Project Name: 5 Below Enforcement Agency C= OF LA QUMA Permit Number: BCOM20240008 Project Address: 78730 Highway 111 1City La quits Zip Code: 92253 r 1. Automatic Daylight Controls meet all requirements for Automatic Daylight Control devices in the Title 20 Appliance Efficiency Regulations, including the following: <br />a. Is capable of reducing the power consumption in response to measured daylight either directly or by sending and receiving signals; <br />b. If the system includes a dimmer, complies with the Dimmer Control device requirements in the Title 20 Appliance Efficiency Regulations. <br />c. Automatically return to its most recent time delay settings within 60 minute_ when put in calibration mode;<br />d. Has a set point control that easily distinguishes settings to within 10 percent of full scale adjustment;<br />e. Has a light sensor that has a linear response within 5 percent accuracy over the range of illuminance measured by the light sensor; <br /A Has a light sensor that is physically separated from where the calibration adjustments are made, or is capable of being calibrated in a manner that the person initiating the calibration is remote from the sensor during calibration to avoid influencing calibration accuracy; and<br />g. Complies with the Title 20 requirements for photo controls if the system contains a photo control component. r 2. Photo Controls meet all requirements for Photo Control devices in the Title 20 Appliance Efficiency Regulations, including the following that it does not have a mechanical device that permits disabling of the control. G. The EMCS or Lighting Control System functions as a Dimmer and meets all requirements for a Dimmer Control device in the Title 20 Appliance Efficiency Regulations, including the following: <br />1. Is capable of reducing power consumption by a minimum of 65 percent when the dimmer is at its lowest level; <br />2. Includes an off position which produces a zero lumen output; and<br />3. Does not consume more than 1 watt per lighting dimmer switch leg when in the off position.<br />4. Dimmer controls that can directly control lamps provide electrical outputs to lamps for reduced flicker operation through the dimming range so that the light output has an amplitude modulation of less than 30 percent for frequencies less than 200 Hz without causing premature lamp failure. <br />5. If designed for use in three way circuits is capable of turning lights off, and to the level set by the dimmer if the lights are off. F_ H. The EMCS or Lighting Control System meets the following requirements: <br />1. Is capable of automatically turning off controlled lights in the area no more than 30 minutes after the area has been vacated; <br />2. Allows all lights to be manually turned off regardless of the status of occupancy; and<br />3. Has a visible status signal that indicates that the device is operating properly, or that it has failed or malfunctioned. The visible status signal may have an override switch that turns off the signal. <br />4. All occupant sensing devices that utilize ultrasonic radiation for detection of occupants meet the Ultrasound Maximum Decibel Values in the Title 20 Appliance Efficiency Regulations<br />5. All occupant sensing devices that utilize microwave radiation for detection of occupants meet the radiation requirements in the Title 20 Appliance Efficiency Regulations<br />6. Occupant sensing devices incorporating dimming comply with the requirements for dimmer controls in the Title 20 Appliance Efficiency Regulations<br />7. The EMCS or Lighting Control System functions as one or more of the Occupant Sensing Controls Checked Below: 7 a. Motion Sensors meeting all applicable requirements for Motion Sensor Controls devices in the Title 20 Appliance Efficiency Regulations, including that motion sensors are rated for outdoor use. r b. Partial -ON Sensors meeting all applicable requirements for partial on sensing devices in the Title 20 Appliance Efficiency Regulations, including the following: <br />i. Has two poles each with automatic -off functionality; <br />ii. Has one pole that is manual -on and does not incorporate DIP switches, or other manual means, for conversion between manual and automatic functionality; and<br />iii. Has one pole that is automatic -on and is not be capable of conversion by the user to manual -on functionality. r c. Partial -OFF Sensors meet all applicable requirements for partial off sensing devices in the Title 20 Appliance Efficiency Regulations, including the following: <br />i. Has two poles; <br />ii. Has one pole that is manual -on and manual off; and<br />iii. Has one pole that is automatic -on and automatic -off and is not capable of conversion by the user to manual -on only functionality. C,ALTP lalifornlaAdvaneedLighting Controls Training Program This is page 3 of 5 CERTIFICATE OF INSTALLATION CI-LTO 02-E Outdoor EMCS or Lighdng Control System Project Name: 5 Below Enforcement Agency C= OF LA QUMA Petmit Number: BCOM20240008 Project Address: 78730 Highway ill I IZip Code: 92253 CART 3 Requirements for which the control is being installed to complied with: .a=ntify all requirements in the Standards for which the EMCS or Lighting Control System is installed to function as and complie- with: =heck all that are applicable I7 A. Section 130.2(c)1 Photocontrol i✓ B. Section 130.2(c)1 Outdoor astronomical time -switch control r C. Section 130.2 (c)3 Motion Sensor r D. Section 130.2 (c)4A Part -Night Outdoor Lighting Control r E. Section 130.2 (c)4B Motion Sensor r F. Section 130.2 (c)SA Part -Night Outdoor Lighting Control r G. Section 130.2 (c)SB Motion Sensor r H. Section 130.2 (c)SC Centralized time -based zone lighting control. C,ALTP GalitornlaAdvaneedLighting Controls Training Program This is page 4 of 5 CERTIFICATE OF INSTALLATION CI-LTO 02-E Outdoor EMCS or Lighting Control System Project Name: 5 Below Enforcement Agency C= OF LA QUMA Permit Number: BCOM2024-0008 Project Address: 78730 Highway ill City La quita IZip Code: 92253 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT I certify that this Certificate of Acceptance document is accurate and complete. ocumentation Author Alfredo Company Name ame -ddress 3458 Ranch St City -iP Code Phone 92571 -EA/ATT Certification Author Signature dentification (if pplicable) 0 ate of Signature: 08./21.I2024 So Cal Competitive Electric Perris (951)232-9959 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the follovnng under penalty, of perjury, under the lava of the State of California: 1. I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. I am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, :onstruction or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement (responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies vnth the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. I have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed is posted or made available vnth the building permit(s) issued for the building. 5. I vrill ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available vdth the building permits) issued for the 'wilding, and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included vnth the documentation the builder provides to the building ovmer at occupancy. __ponsible Acceptance Company Name -erson Name Alfredo So Cal Competitive Electric ddress: City 3458 Ranch St Perris -ip Code Phone 92571 (951)232-9959 -SLB License Position vAth Company (Title) Ovmer -esponsible Acceptance Person Signature 08./21112024 C,ALTP lalitornlaAdvaneedLighting Controls Training Program This is page 5 of 5 ba L-0 L2 LremeroUservLaesxom NBI #1031507 EPA #P5EF7967BE3A9C481 El (951) 313-2603 PROJECT Fi❑e Belo❑ Eb ❑ ❑inta❑78m30 Cal 11. Ila ❑ ❑inta[ Ca.92253 (,omfo1140 CONTRACTOR c� os C C rti - Blair Heating ❑ Air C 653 Oleander RdEPalm Springs Z c 1507 � Exp„es10-18-2024 Ca. 92264 NCl Contact❑ 7601537111120 ba uda%rnUwLa%I.. cowl, CalCerts #CC2005690 Cheers #CCN78632086 1.P B -A Cr Evewgy Sewicels- Date: 8/12/2024 ob Name/Address: Fi❑e BeloO SUMMARY ➢ Building Balanced within 5% of design ➢ Not required to list unit info on existing systems ➢ All balancing was performed with both a Shortridge Flowhood and Shortridge ADM870 Multimeter ➢ All meters and tools used to perform Balance are currently calibrated top of the line in quality Milding PressOre [lirbalance ScOedOle[ [ OSA x 5 0 2695 ❑ Ex0a0st Air 80 x 2 0 0160 02695 DEMO ❑ 02535 cfm OPositilb area pressOre[ Abbreviations Legend CC = CONCENTRIO OSA = OUTSIDE AIR CD = CEILING DIFFUSER RAE = RETURN AIR EXHAUST CR = CEILING RETURN RAG = RETURN AIR GRILL CV = CONSTANT VELOCITY SPS = SPIRAL SIDEWALL SUPPLY DD = DIRECT DRIVE SWD = SIDEWALL DIFFUSER EAG = EXHAUST AIR GRILL SWR = SIDEWALL REGISTER LCD = LINEAR CEILING DIFFUSER DELETED SWS = SIDE WALL SUPPLY LD = LINEAR DIFFUSER VAV = VARIABLE AIR VOLUME LDR = LINEAR DIFFUSER RETURN 2 B aa&-A Cr Energy Setvtzels/ 8/12/2024 EQUIPMENT DATA Job Name/Address: Fi❑e Belo❑ Equipment Data Equipment Data Equipment Data Unit Name HP 1 7.5 ton HP 2 10 ton HP 3 7.5 ton Location/Area Served Roof / Sales . Storage . Offices Roof / Sales Roof / Existing Man/Model Carrier / 50C❑ M08132M5A6 Carrier / 50FC❑ M12B2M5 Carrier / 50FC❑ M08132M5 Serial Number 1824P72286 2524P76624 874P72283 Motor Make Carrier Carrier Carrier Motor HP/RPM/Frame ❑A Med/Hi CIS ❑A Med/Hi ❑A Med/Hi Volts/Phase/Hertz 208 3 60 208 3 60 208 3 60 _ F.L. Amps/S.F. 44 1.15 49 1.50 44 1.15 Motor Sheave Diam/Bore DIRECT DR®E Design Actual Design % DIRECT DRME Design Actual Design % DIRECT DR®E Design Actual Design % Fan Sheave Diam/Bore Belt Size/# of Belts Sheave Closed % Sheaved Center to Center Test Data Total Fan Airflow 3000 2995 1 % 4000 3700 3000 2875 Total Outlet Airflow 3000 2995 4000 3700 3000 2875 Total Return 2350 2345 3135 2975 2350 2225 OSA 650 655 855 725 650 650 S.P. Supply/Return - - - - - - - - - External-------- S.P. -------- ------ - ------- - --------- -------- - Total S.P. - - - - - - - - - Fan Speed (RPM) Med/Hi Med Hi - Med/Hi Med/Hi - Med/Hi med/Hi - Voltage 208 213 - 208 213 - 208 213 - Amperage T1/T2/T3 1 44 29 1- 49 32 - 44 27 - Notes: B -'A Cr Energy Sarvicek 8/12/2024 AIR OUTLET TEST REPORT Job Name/Address: FiDe Belo❑ SYSTEM NAME TERMINAL EFFECT AREA DESIGN ACTUAL NOTE # AREA SERVED HP 1 # Type Size KFactor FPM CFM FPM CFM Office 1 CD 12x12 1.0 100 90 Restroom Restroom Wor❑Area 2 50 55 3 50 55 4 100 105 5 200 190 Front entrance 6 200 205 7 1400 1385 8 900 910 3100 2995 HP 1Ret❑rn R1 SWR 2430 1.0 3000 2345 OSA 855 650 HP 2 1 CC 8" x 121 1.0 4000 3650 HP 2Ret❑rn R1 CC 8Ec 12" 1.0 3135 2925 OSA 865 865 HP 3 1 CC 81312" 1.0 3000 2875 HP 3Ret❑rn R1 CC 8"x121 1.0 2350 2225 OSA 650 650 Notes: 1 2 3 Notes Correspond to the note # above B -fl Cr Energy SP,wicea- Job Name/Address: Unit Name Location/Area Served Existing Man/Model Serial Number Motor Make Motor HP/RPM/Frame Volts/Phase/Hertz F.L. Amps/S.F. Motor Sheave Diam/Bore Fan Sheave Diam/Bore Belt Size/# of Belts Sheave Closed % Sheaved Center to Center Test Data Total Fan Airflow Total Outlet Airflow S.P. Supply/1 External S.P. Total S.P. Fan Speed (R Voltaize T 1 /T2/T3 Notes: EQUIPMENT DATA Fi❑e Belo❑ Equipment Data HP 4 5 ton Roof / Sales.Storage. Offices EEP / RH0060HOF C242107223 48TC002234 OA Med/Hi [IIII 208 1 60 � 1 1.50 DORECT DRIDE Design I Actual IDes 2000 1950 1 3% 2000 1950 1650 1600 325 350 Med/Hi Med/Hi 208 213 31 26 Equipment Data HP55ton Roof / Sales .Storage. Offices EEP / RH0060HOF C24210722 48TC002234 IJA Med/Hi (]$ 208 1 60 31 1.50 DE)RECT DRIME Equipment Data EF 112 Ceiling / Restrooms yor❑ C1 In ❑A ❑A [� 0125 115 1 1 60- [� TP DORECT DR®ES gn %I Design I Actual IDesign %I Design I Actual 2000 1940 4% 75175 80180 2000 1940 1650 1625 325 315 - Med/Hi Med/Hi - - 208 213 - - 31 25 - Cr E nergy Sarvicek AIR OUTLET TEST REPORT 8/12/2024 Job Name/Address: FiDe Belo❑ SYSTEM NAME TERMINAL EFFECT AREA DESIGN ACTUAL NOTE # AREA SERVED # Type Size KFactor FPM CFM FPM CFM HP 4 CD 12x12 1.0 100 100 2 400 385 3 1500 1465 2000 1950 HP 4RetOrn R1 SWR 24x30 1.0 1675 1600 325 350 HP 5 1 CC 81R12" 1.0 100 105 2 400 370 3 1500 1465 2000 1940 HP 5 RetOrn 1 SWR 24x30 1.0 1675 1625 OSA 325 315 EF 1 1 EAR 10x10 1.0 75 80 EF 2 1 EAR 10x10 1.0 .75 80 Notes: 1 2 3 Notes Correspond to the note # above Batt&-Avr Energy se+-w-lc..e� INSTRUMENTATION LIST INSTRUMENT MANUFACTURER MODEL # SERIAL # CALIBRATION DATE Digital Anemometer Pacer DA 400 1014130 7/ 10/20 2 Air Data Multimeter* Shortridge ADM-860 M99021 8/22/2023 Tachometer Stricht 252 735540 10/25/2023 Volt/Amp Meter Fluke 335 88105713 6/23/2023 Digital Manometer Dwyer 477-1-FM S313301 9/18/2023 Anemometer Davis 21850 80222B 9/ 1 /202 3 Hydro Data Meter Shortridge HDN-300 W09008 7/22/2023 *Also used on flowhoods HERS Testifig -. Air Balc,w,�.,, s� 8 Page CERTIFICATE OF OCCUPANCY DESIGN AND DEVELOPMENT DEPARTMENT This Certificate is issued pursuant to the requirements of Chapter 1 Section 111 of the California Building Code, certifying that, at the time of issuance, this structure was in compliance with the provisions of the Building Code and the various ordinances of the City regulating building construction and/or use. BUILDING ADDRESS: 78730 HIGHWAY 111 Use Classification: RETAIL STORE Occupancy Group: M Code Edition: 2022 By: Jake Fuson Date: 9/20/2024 Building Official: AJ ORTEGA c4aQul�&a — GFM of the DESERT — Type of Construction: V-B Sprinkler Installed: YES Permit No.: BCOM2024-0008 Land Use Zone: CR Occupant Load: 150 Owner of Building: MILAN LQ ONE XI / MILAN LQ TUSCANY Address: 701 S. PARKER ST #5300 City, ST, ZIP: ORANGE, CA 92868 POST IN A CONSPICUOUS PLACE