BRES2020-0217 - Geotechnical ReportGEOTECHNICAL INVESTIGATION
PROPOSED MADISON CLUB
GOLF CLUB AND RESfDEN'l"JAL DEVELOPMENT
NBC AVENUE 54 AND MA.DISON STREET
LA QUINTA, CALIFORNIA
-Prepared By-
Sladden Engineering
39-725 Garand Lane, Suite G
Palm Desert, California 92211
(760) 772-3893
(W
Sladden
Engineering
6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3896
January 28, 2005
East of Madison, LLC
81-100 Avenue 53
La Quinta, California 92253
Attention: Mr, John Gamlin
Project: Madison Club
Tentative Tract Map 33076
NEC Avenue 54 and Madison Street
La Quinta, California
Subject: Geotechnical Investigation
Project No. 544-4810
05-01-101
Presented herewith is the report of our Geotechnical Investigation conducted for the construction of the
proposed golf club and residential development to be located on the northeast corner of Avenue 54 and
Madison Street in the City of La Quinta, California, The investigation was performed in order to provide
recommendations for site preparation and to assist in foundation design for the proposed residential
structures and the related site improvements.
This report presents the results of our field investigation and laboratory testing along with conclusions
and recommendations for foundation design and site preparation. This report completes our original
scope of services as outlined within our proposal dated December 13, 2004.
We appreciate the opportunity to provide service to you on this project. if you have any questions
regarding this report, please contact the undersigned
Respectfully submitted,
SLADDE ENGINEERING
Brett L. Anderson
Principal Engineer
SER/pc
Copies: 6/East of Madison, LLC
k'�8
t S p+bpi^
U o
� NO' C 4538y x �
-'XP.9/30IOB
M
GEOTECHNICAL INVESTIGATION
PROPOSED MADISON CLUB
NEC AVENUE 54 & MADISON STREET
LA QUINTA, CALIFORNIA
January 28, 2005
TABLE OF CONTENTS
INTRODUCTION................................................................I,.,.,...................................................... 7.
SCOPEOF WORK............................................................................................................................. 1
PROJECT DESCRIPTION..........................................................................:....................................... 1
GEOLOGY AND SEISMICITY.................................................................................4............................ 2
SUBSURFACECONDITIONS......................................................................................................... 3
LIQUEFACTION.................................................................................................... 4.......................... 3
CONCLUSIONS AND RECOMMENDATIONS ............................................................................ 3
FoundationDesign....................................................................................................................... 4
Settlements.................................................................................................................................... 5
LateralDesign............................................................................................................................... 5
RetainingWalls........................................................................................................................... 5
ExpansiveSoil................................................................ . ........................................................ 5
ConcreteSlabs-on-Grade............................................................................................................. 5
SolubleSulfates........................................................................................................................... 6
Tentative Pavement Design........................................................................................................ 6
Shrinkageand Subsidence ................................................. .................................................... 6
GeneralSite Grading................................................................................................................... 6
1. Site Clearing........................................................................................................................ 6
2. Preparation of Building and Foundation Areas................................................................ 7
3. Placement of Compacted Fill........................................................................................... 7
4. Preparation of Slab and Pavement Areas........................................................................... 7
5. Testing and Inspection.......................................................................................................... 7
GENERAL.............................................................................................................................................. 8
REFERENCES........................................................................................................................................ 9
APPENDIX A - Site Plan and Boring Logs
Field Exploration
APPENDIX B - Laboratory Testing
Laboratory Test Results
APPENDIX C - 2001 California Building Code with 1997 UBC Seismic Design Criteria
January 28, 2005 -1- Project No. 544-4810
05-01-101
INTRODUCTION
This report presents the results of our Geotechnical Investigation performed in order to provide
recommendations for site preparation and to assist in the design and construction of the foundations for
the single-family residences proposed for the Madison Club golf course and residential development.
The project site is located on the northeast corner of Avenue 54 and Madison Street in the City of La
Quinta, California. The preliminary plans indicate that the proposed project will include an 18-hole golf
course, clubhouse, and approximately 200 single-family residences along with various associated site
improvements. The associated site improvements are expected to include paved roadways, concrete
driveways and patios, underground utilities, and landscape areas.
SCOPE OF WORK
The purpose of our investigation was to determine certain engineering characteristics of the near surface
soil on the site in order to develop recommendations for foundation design and site preparation. Our
investigation included field exploration, laboratory testing, literature review, engineering analysis and
the preparation of this report. Evaluation of hazardous materials or other environmental concerns was
not within the scope of services provided. Our investigation was performed in accordance with
contemporary geotechnical engineering principles and practice. We do not make other warranty, either
express or implied.
PROJECT DESCRIPTION
The project site is located on the northeast corner of Avenue 54 and Madison Street in the City of La
Quinta, California. It is our understanding that the project will consist of an 1.8-hole golf course,
clubhouse, and approximately 200 single-family residences along with various associated site
improvements. Tt is our understanding that the proposed residences and clubhouse will be of relatively
lightweight wood -frame construction and will be supported by conventional shallow spread footings and
concrete slabs on grade. The associated improvements will include paved roadways, concrete walkways,
patios, driveways, landscape areas and various underground utilities.
The majority of the subject site is presently vacant. The site includes several agricultural parcels as well
as undeveloped desert land. Large tamarisk trees exist along the majority of the property lines within the
southeastern portion of the site. The majority of the eastern portions of the property have been
previously used for agricultural purposes. The property is level throughout and is near the elevation of
the adjacent properties and roadways. A horse ranch occupies the southeast corner of the site. The ranch
contains several residential structures and various outbuildings. Fenced pastures occupy most of the
ranch. Several other residences and structures exist at locations throughout the site. Avenue 54 forms the
southern site boundary, Monroe Street forms the eastern site boundary, and Madison Street forms the
western site boundary. The Hideaway development is located just west of the site.
Sladden Engineering
January 28, 2005 -2- Project No. 544-4810
05-01-101
Based upon our previous experience with lightweight residential structures, we expect that isolated
column loads will be less than 30 kips and wall loading will be less than to 2.0 kips per linear foot.
Grading is expected to include minor cuts and fills to match the nearby elevations and to construct
slightly elevated building pads to accommodate site drainage. Extensive cuts are proposed for several of
the golf holes with the preliminary plans indicating cuts in excess of 40 feet within some of the golf holes.
This does not include removal and recompaction of the bearing soil within the building areas. If the
anticipated foundation loading or site grading varies substantially from that assumed the
recommendations included in this report should be reevaluated.
GEOLOGY AND SEISMICITY
The project site is located within the central Coachella Valley that is part of the broader Salton Trough
geomorphic province. The Salton Trough is a northwest trending depression that extends from the Gulf
of California to the Banning Pass. Structurally the Salton Trough is dominated by several northwest
trending faults, most notable of that is the San Andreas system.
A relatively thick sequence of sedimentary rocks have been deposited in the Coachella Valley portion of
the Salton Trough from Miocene to present times. These sediments are predominately terrestrial in
nature with some lacustrian and minor marine deposits. The mountains surrounding the Coachella
Valley are composed primarily of Precambrian metamorphic and Mesozoic granitic rock.
The Coachella Valley is situated in one of the more seismically active areas of California. The San
Andreas fault zone is considered capable of generating a maximum credible earthquake of magnitude 8.0
and because of its proximity to the project site the distance of approximately 9.2 kilometers should be
considered in design fault for the project,
Seismic activity along the nearby faults continues to affect the area and the Coachella Valley is considered
one of the more seismically active regions in California. A computer program and pertinent geologic
literature were utilized to compile data related to earthquake fault zones in the region and previous
seismic activity that may have affected the site. E.Q. Fault Version 3.00 (Blake) provides a compilation of
data related to earthquake faults in the region. The program searches available databases and provides
both distances to causitive faults and the corresponding accelerations that may be experienced on the site
because of earthquake activity along these faults. The attenuation relationship utilized for this project
was based upon Joyner & Boore (2001.) attenuation curves. The information generated was utilized in our
liquefaction evaluation
The site is not located in any Earthquake Fault zones as designated by the State but is mapped in the
County's Liquefaction and Ground Shaking .H.azard Zone V. Several significant seismic events have
occurred within the Coachella Valley during the past 50 years. The events include Desert Hot Springs -
1948 (6.5 Magnitude), Palm Springs - 1986 (5.9 Magnitude), Desert Hot Springs - 1992 (6.1 Magnitude),
Landers -1992 (7.5 Magnitude) and Big Bear -1992 (6.6 Magnitude).
Sladden Engineering
January 28, 2005 -3- Project No. 544-4810
05-01-101
SUBSURFACE CONDITIONS
The soil underlying the site consists primarily of fine-grained silty sands with scattered prominent sandy
clay and sandy silt layers. As is typical for the area, the silty sand and sandy silt layers are inconsistently
interbedded and vary in thickness. Silty sands were the most prominent soil within our exploratory
borings but several prominent sandy silt and clayey silt layers were also encountered.
The silty sands encountered near the existing ground surface appeared somewhat loose but the deeper
silty sand and sandy silt layers appeared relatively firm. Relatively undisturbed samples indicated dry
density varying from 84 to 121 pcf. Sampler penetration resistance (as measured by field blowcounts)
indicates that density generally increases with depth. t"he site soil was dry on the surface and moist
below a depth of approximately 5 feet but some silty layers were typically wet. Laboratory testing
indicated moisture content varying from 1 to 33 percent.
Laboratory testing indicates that the surface soil within the upper 5 feet consist primarily of silty sands.
Expansion testing indicates that the surface silty sands are generally non -expansive and are classified as
,'very low" expansion category soil in accordance with Table 18-I-8 of the 1997 Uniform building Code.
Groundwater was encountered within our borings at depths of approximately 51 to 79 feet below the
existing ground surface. Groundwater should be considered in design and construction.
LIQUEFACTION
Liquefaction occurs with sudden loss of soil strength because of rapid increases in pore pressures within
cohesionless soil as a result of repeated cyclic loading during seismic events. Several conditions must be
present for liquefaction to occur including; the presence of relatively shallow groundwater, generally
loose soil conditions, the susceptibility of soil to liquefaction based upon grain -size characteristics and the
generation of significant and repeated seismically induced ground accelerations. Liquefaction affects
primarily loose, uniform grained cohesionless sands with low relative densities.
In the case of this project site, several of the factors required for liquefaction to occur are not present. As
previously indicated, groundwater was encountered within our borings at depths of approximately 51 to
79 feet below the existing ground surface on the site. Because of the depth to groundwater, the potential
for liquefaction affecting the site is considered negligible.
CONCLUSIONS AND RECOMMENDATIONS
Based upon our field investigation and laboratory testing, it is our opinion that the proposed golf course,
clubhouse, and residential development is feasible from a soil mechanic's standpoint provided that the
recommendations included in this report are considered in building foundation design and site
preparation. Because of the somewhat loose condition of the near surface soil, remedial grading is
recommended for the building areas. We recommend that remedial grading within the proposed
building areas include the overexcavation and recompaction of the primary foundation bearing soil.
Specific recommendations for site preparation are presented in the Site Grading section of this report.
Sladden ,Engineering
January 28, 2005 -4- Project No. 544-481.0
05-01-101
Based upon the depth to groundwater and the generally firm condition of the deeper sand layers, it is our
opinion that the potential for liquefaction affecting the site is negligible. The remedial grading
recommended for building areas will result in the construction of a uniform compacted soil mat beneath
all footings. In our opinion, liquefaction related mitigation measures in addition to the site grading and
foundation design recommendations included in this report should not be necessary.
The site is located in one of the more seismically active areas in California. Design professionals should
be aware of the site setting and the potential for earthquake activity during the anticipated life of the
structure should be acknowledged. The accelerations that may be experienced on the site (as previously
discussed) should be considered in design. The seismic provisions included in the Uniform Building
Code for Seismic Zone 4. should be considered the minimum design criteria. Pertinent 1997 UBC Seismic
Design Criteria is summarized in Appendix C,
Caving did occur within our borings and the potential for caving should be expected within deeper
excavations. All excavations should be constructed in accordance with the normal CalOSHA excavation
criteria. On the basis of our observations of the materials encountered, we anticipate that the near surface
silty sands will be classified by CalOSHA as Type C. Soil conditions should be verified in the field by a
"Competent person" employed by the Contractor.
The near surface soil encountered during our investigation was found to be non -expansive. Laboratory
testing indicated an Expansion Index of 0 for the surface silty sands that corresponds with the "very low"
expansion category in accordance with UBC Table 18-1-B.
The following recommendations present more detailed design criteria which have been developed on the
basis of our field and laboratory investigation. The recommendations are based upon non -expansive soil
criteria.
Foundation Design: The results of our investigation indicate that either conventional shallow
continuous footings or isolated pad footings that are supported upon properly compacted soil,
may be expected to provide adequate support for the proposed structure foundations. Building
pad grading should be performed as described in the Site Grading Section of this report to
provide for uniform and firm bearing conditions for the structure foundations.
Footings should extend at least 12 inches beneath lowest adjacent grade, Isolated square or
rectangular footings should be at least two feet square and continuous footings should be at least
12 inches wide. Continuous footings may be designed using an allowable bearing value of 1500
pounds per square foot (psf) and isolated pad footings may be designed using an allowable
bearing pressure of 1800 psf. Allowable increases of 250 psf for each additional 1 foot of width
and 250 psf for each additional 6 inches of depth may be utilized if desired. The maximum
allowable bearing pressure should be 2500 psf. The allowable bearing pressures are applicable to
dead and frequently applied live loads. The allowable bearing pressures may be increased by 1/3
to resist wind and seismic loading. Care should be taken to see that bearing or subgrade soil is
not allowed to become saturated from the ponding of rainwater or irrigation. Drainage from the
building area should be rapid and complete.
Sladden Engineering
January 28, 2005 -5- Project No. 544-4810
05-01-101
The recommendations provided in the preceding paragraph are based on the assumption that all
footings will be supported upon properly compacted engineered fill soil. All grading should be
performed under the testing and inspection of the Soil Engineer or his representative_ Prior to
the placement of concrete, we recommend that the footing excavations be inspected in order to
verify that they extend into compacted soil and are free of loose and disturbed materials.
Settlements: Settlements resulting from the anticipated foundation loads should be minimal
provided that the recommendations included in this report are considered in foundation design
and construction. The estimated ultimate settlements are calculated to be approximately one inch
when using the recommended bearing values. As a practical matter, differential settlements
between footings can be assumed as one-half of the total settlement.
Lateral Design: Resistance to lateral loads can be provided by a combination of friction acting at
the base of the slabs or foundations and passive earth pressure along the sides of the foundations.
A coefficient of friction of 0.40 between soil and concrete may be used with consideration to dead
load forces only. A passive earth pressure of. 250 pounds per square foot, per foot of depth, may
be used for the sides of footings that are poured against properly compacted native or approved
non -expansive import soil. Passive earth pressure should be ignored within the upper 1 foot
except where confined (such as beneath a floor slab).
Retaining Walls: Retaining walls may be necessary to accomplish the proposed construction.
Lateral pressures for use in retaining wall design can be estimated using an equivalent fluid
weight of 35 pcf for level free -draining native backfill conditions. For walls that are to be
restrained at the top, the equivalent fluid weight should be increased to 55 pef for level free -
draining native backfill conditions. Backdrains should be provided for the full height of the
walls.
Expansive Soil: Because of the prominence of "very low" expansion category soil near the
surface, the expansion potential of the foundation bearing soil should not be a controlling factor
in foundation or floor slab design. Expansion potential should be reevaluated subsequent to
grading.
Concrete Slabs -on -Grade: All surfaces to receive concrete slabs -on -grade should be underlain by
a minimum compacted non -expansive fill thickness of 24 inches, placed as described in the Site
Grading Section of this report. Where slabs are to receive moisture sensitive floor coverings or
where dampness of the floor slab is not desired, we recommend the use of an appropriate vapor
barrier or an adequate capillary break. Vapor barriers should be protected by sand in order to
reduce the possibility of puncture and to aid in obtaining uniform concrete curing.
Reinforcement of slabs -on -grade in order to resist expansive soil pressures should not be
necessary, However, reinforcement will have a beneficial effect in containing cracking because of
concrete shrinkage. Temperature and shrinkage related cracking should be anticipated in all
concrete slabs -on -grade. Slab reinforcement and the spacing of control joints should be
determined by the Structural Engineer.
Sladden Engineering
January 28, 2005 -6- Project No. 544-4810
05-01-1.01.
Soluble Sulfates: The soluble sulfate concentrations of the surface soil have not yet been
determined but native soil in the area has been known to be potentially corrosive with respect to
concrete. The use of Type V cement and specialized sulfate resistant concrete mix designs may be
necessary for concrete in contact with the native soil.
Tentative Pavement Design: All paving should be underlain by a minimum compacted fill
thickness of 1.2 inches (excluding aggregate base), This may be performed as described in the Site
Grading Section of this report. R-Value testing was not conducted during our investigation but
based upon the sandy nature of the surface soil, an R-Value of approximately 50 appears
appropriate for preliminary pavement design. The following preliminary onsite pavement
section is based upon a design R-Value of 50.
Onsite Pavement (Traffic Index = 5,0)
use 3.0 inches of asphalt on 4.5 inches of Class 2 base material
Aggregate base should conform to the requirements for Class 2 Aggregate base in Section 26 of
CalTrans Standard Specifications, January 1992. Asphaltic concrete should conform to Section 39
of the Cal".Gans Standard Specifications. The recommended sections should be provided with a
uniformly compacted subgrade and precise control of thickness and elevations during placement.
Pavement and slab designs are tentative and should be confirmed at the completion of site
grading when the subgrade soil is in -place. This will include sampling and testing of the actual
subgrade soil and an analysis based upon the specific traffic information
Shrinkage and Subsidence: Volumetric shrinkage of the material that is excavated and replaced
as controlled compacted fill should be anticipated. We estimate that this shrinkage could vary
from 20 to 25 percent. Subsidence of the surfaces that are scarified and compacted should be
between 1 and 3 tenths of a foot. This will vary depending upon the type of equipment used, the
moisture content of the soil at the time of grading and the actual degree of compaction attained.
These values for shrinkage and subsidence are exclusive of losses that will occur because of the
stripping of the organic material from the site and the removal of oversize material. The
shrinkage losses are suspected to be somewhat less within areas where deeper cuts (more than 20
feet in depth) are planned.
General Site Grading: All grading should be performed in accordance with the grading
ordinance of the City of La Quinta, California. The following recommendations have been
developed on the basis of our field and laboratory testing and are intended to provide a uniform
compacted mat of soil beneath the building slabs and foundations.
1. Site Clearing: Proper site clearing will be very important. Any existing vegetation,
slabs, foundations, abandoned underground utilities or irrigation lines should be
removed from the proposed building areas and the resulting excavations should be
properly backfilled. Soil that is disturbed during site clearing should be removed and
replaced as controlled compacted fill under the direction of the Soil Engineer.
Sladden Engineering
January 28, 2005 -7- Project No. 544-4810
05-01-101
2, Preparation of Building and Foundation Areas: In order to provide adequate and
uniform bearing conditions, we recommend overexcavation throughout the proposed
residential building areas. The building areas should be overexcavated to a depth of at
least 3 feet below existing grade or 3 feet below the bottom of the footings, whichever is
deeper. The exposed soil should then be scarified to a depth of 1-foot, moisture
conditioned and recompacted to at least 90 percent relative compaction: The excavated
material may then be replaced as engineered fill material as recommended below.
3. Placement of Compacted Fill: Within the building pad areas, fill materials should be
spread in thin lifts, and compacted at near optimum moisture content to a minimum of
90 percent relative compaction. Imported fill material shall have an Expansion Index not
exceeding 20.
The contractor shall notify the Soil )engineer at least 48 hours in advance of importing soil
in order to provide sufficient time for the evaluation of proposed import materials. The
contractor shall be responsible for delivering material to the site that complies with the
project specifications. Approval by the Soil Engineer will be based upon material
delivered to the site and not the preliminary evaluation of import sources.
Our observations of the materials encountered during our investigation indicate that
compaction within the native soil will be most readily obtained by means of heavy
rubber tired equipment and/or sheepsfoot compactors. The moisture content of the near
surface soils was somewhat inconsistent within our borings. In general, the sandy soils
are dry and well below optimum moisture content but some of the deeper silt layers
were wet. It is likely that wet silt/clay layers will be encountered during grading
particularly in irrigated areas where deep cuts are planned. A uniform and near
optimum moisture content should be maintained during fill placement and compaction.
4. Preparation of Slab and Paving .Areas: All surfaces to receive asphalt concrete paving or
exterior concrete slabs -on -grade, should be underlain by a minimum compacted fill
thickness of 12 inches. This may be accomplished by a combination of overexcavation,
scarification and recompaction of the surface, and replacement of the excavated material
as controlled compacted fill. Compaction of the slab and pavement areas should be to a
minimum of 90 percent relative compaction.
5. Testing and Inspection: During grading tests and observations should be performed by
the Soil Engineer or his representative in order to verify that the grading is being
performed in accordance with the project specifications. Field density testing shall be
performed in accordance with applicable ASTM test standards.
The minimum acceptable degree of compaction shall be 90 percent of the maximum dry
density as obtained by the ASTM D1557-91 test method. Where testing indicates
insufficient density, additional cornpactive effort shall be applied until retesting indicates
satisfactory compaction.
Sladden Engineering
January 28, 2005 -$- Project No. 544-4810
05-01-101
GENERAL
The findings and recommendations presented in this report are based upon an interpolation of the soil
conditions between boring locations and extrapolation of these conditions throughout the proposed
building area. Should conditions encountered during grading appear different than those indicated in
this report, this office should be notified.
This report is considered to be applicable for use by East of Madison, LLC, for the specific site and project
described herein. The use of this report by other parties or for other projects is not authorized. The
recommendations of this report are contingent upon monitoring of the grading operations by a
representative of Sladden Engineering. All recommendations are considered to be tentative pending our
review of the grading operations and additional testing, if indicated. If others are employed to perform
any soil testing, this office should be notified prior to such testing in order to coordinate any required site
visits by our representative and to assure indemnification of Sladden Engineering.
We recommend that a pre -jab conference be held on the site prior to the initiation of site grading. The
purpose of this meeting will be to assure a complete understanding of the recommendations presented in
this report as they apply to the actual grading performed.
Sladden Engineering
January 28, 2005 -9- Project No. 544-4810
05-01-101
REFERENCES
ASCE Journal of Geotechnical Engineering Division, April 1974.
Boore, Joyner and Fumal (1994) Estimation of Response Spectra and Peak Accelerations from North American
Earthquakes, U. S. Geological Survey, Open File Reports 94-127 and 93-509.
Finn, W. E. Liam, (1996) Evaluation of Liquefaction Potential for Different Earthquake Magnitudes and Site
Conditions, National Center for Earthquake Engineering Research Committee.
Joyner and Boore, (1988) Measurements, Characterization and Prediction of Strong Ground Motion, ASCE
Journal of Geotechnical Engineering, Special Publication No. 20.
Lee & Albaisa (1974) "Earthquake Induced Settlements in Saturated Sands".
Seed and Idriss (1982) Ground Motions and Soil Liquefaction During Earthquakes, Earthquake Engineering
Research Institute Monograph.
Seed, Tokimatsa, Harder and Chung, (1985), Influence of SPT Procedures in Soil Liquefaction Resistance
Evaluations, ASCE Journal of Geotechnical Engineering, Volume 111, No.12, December.
Rogers, Thomas H., Geologic Map of California, Santa Ana Map Sheet.
Riverside County,1984, Seismic Safety Element of the Riverside County General Plan.
Sladden Engineering
APPENDIX A
Site Plan
Boring Logs
APPENDIX A
FIELD EXPLORATION
For our field investigation, 29 exploratory borings were excavated between December 13 and December
23, 2004 using a truck mounted hollow stem auger rig (Mobile B-61) in the approximate locations
indicated on the site plan included in this appendix. Continuous log of the materials encountered were
prepared on the site by a representative of $ladders Engineering. Boring logs are included in this
appendix.
Representative undisturbed samples were obtained within our boring by driving a thin -walled steel
penetration sampler (California split spoon sampler) or a Standard Penetration Test (SPT), sampler with a
140 pound hammer dropping approximately 30 inches (ASTM D1586), The number of blows required to
drive the samplers 18 inches was recorded (generally in 6 inch increments). Blowcounts are indicated on
the boring log.
The California samplers are 3.0 inches in diameter, carrying brass sample rings having inner diameters of
2.5 inches. The standard penetration samplers are 2.0 inches in diameter with an inner diameter of 1.5
inches. Undisturbed samples were removed from the sampler and placed in moisture scaled containers
in order to preserve the natural soil moisture content. Bulk samples were obtained from the excavation
spoils and samples were then transported to our laboratory for further observations and testing.
Madison Club -The Hideaway
NEC avenue 54 & Madison Street, La Quinta
Date: 12/13/2004 Boring No. 1 Jab Number: 5444810
Description
VI
4.4
ks
Q
S
10
15
20
25
=Native
6/4/6
Sand: Fine to Medium Graincd and Sandy Silt Layer— 2"
SP
11
---
Soil
Grey in color
30
5/6/7
Clayey Silt
ML
6
64
Grey in color
35
JL
9/13/10
Sand: Fine to Mcdium Grained Layer-9" and Sandy Silt 1
SP
2
10
Grcy in color
40
10/10/8
Silty Sand- Fine Grained
SM
2
14
Grey in color
45
8110/8
Silt and Clay: lntcrbc tided Thin Lenses
ML
6
---
Grey in color
50
1 I/I6/21
Sand: Fine to Medium Grained
SP
3
$
Grcy in color
Sladden Engineering
55
8/9/11
Sand: Fine to Medium Grained and Sandy Silt Layer -- 2"
SP
4
6
Brownish Grcy in color
60
3/314
Clayey Silt
ML
27
77
Grey in color
65
JL
10/7/8
Sand: Fine to Medium Grained Layer -=9" and Sandy Silt
SP
23
---
Grey in color
70
11/13/16
Silry Sand: Fine Grained
SM
26
22
Dark Grcy in color
75
-v
719/12
Silt and Clay: Interbedded Thin Lenses
ML
33
72
Dark Grcy in color
Groundwater (a 78 Feet
80
85
90
5/7/8
6/10/10
Clxyry Silt
ML
32
70
Brownish Grey in color
Sample Not Recovered
_
95
_
100
ote: The stratification lines
reptesent the approximate
boundaTics bctwccn the sail
es; the transition may be
gradual.
Total Dcpth = 90 Fcd
Groundwater encountered
edrock not encountered
Sladden 13ngineering
Madison Club -The Hldenwny
NEC ,Avenue 54 & Madison Street, La Quinta
Date: 12/18/2004 Boring No. 2 Job Number: 5444810
�
s
r� U
0
Description
Rcmarks
0
Native Soil
5
3/3/3
Silty Sand: Finc Graincd
$M
2
.--
Light Grcy in color
10
5/6/7
Silty Sand: Finc Graincd
SM
I
---
Light Brown in color
15
3/4/6
Silt
ML
9
97
Tan in color
20
4/5/7
Sandy Silt and Silt Layers
ML
11
81
Tan in color
25
5/6/7
Silty Sand: Fine Grained
SM
2
24
rcyish Brown in color
30
3/5/9
Sandy Silt and Silt Layers
ML
5
64
Light Brown in color
35
4/5/7
Sandy Silt
ML
6
56
Greyish Brown in color
40
6/8113
Silty Sand. Fine Grained
SM
2
---
Brownish Grcy in color
45
5/7/7
Sandy Silt
ML
10
51
Brownish Grey in color
50
jjj[_8/10/1
t
I Silty Sand: Finc Grained and Silt Layer -4
SM
3
18
jrrownish Grcy in Color
Sladden Engineering
t6055
4/6l$
Claycy Silt
ML
22
77
rown in color
4/7/8
Sandy Silt with Tram of Clay
ML
17
67
Brown in color
65
5/8/9
Sandy Silt
ML
22
77
Brown in color
70
7/8/18
Sand and Silt Lay=
SM
12
34
Brown in color
75
3/3/6
Claycy Silt
ML
31
83
Brown in color
-
Crnundwater Q --79 Feet
s0
4/6/7
Clayey Silt
ML
27
88
Brown in color
85
6/14/17
Claycy Silt
ML
26
63
Brown in color
9U
1/3/5
Silty Sand: Fine Grained
SM
28
10
Brown in color
Note: The stratification lines
represent the approximate
95
1 /7/16
Silty Sand: Fine Grained
SM
28
16
undarics between the soil
_
types; the transition may be
gradual.
_Total
Dcpth = 101.5 Fcct
100
5/6/12
Claycy Sand
SM
19
47
Groundwater encountered
_
edrock not encountered
Sladden Engineering
Madison Club -The Hideaway
NEC Avenue 54 & Madison Street, La Quinta
Date- 12/18/2004 Boring No. 3 Job Number: 544-4810
Q
0
d)
gal
V
pq
Description
Vj
�Z)
P,
Remarks
0
ative Soil
5
10
15
20
25
5/9/12
Silty Sand: Fine Grained and Silt Laycr-3"
SM
5
20
Greyish Brown in color
30
4/6/9
Silty Sand: Fine Grained and Silt Laycr--1"
SM
3
21
Greyish Brown in color
35
8111/16
Silty Sand: Finc Grains!
SM
2
14
Brownish Grey in color
40
6/9/14
Silty Sand: Fine Grained
SM
3
16
Brownish Grey in color
45 JL
5/5/7
Sandy Sill
ML
25
84
Brown in color
50
114/8
Silt
ML
22
56
Town in color
Sladden Engineering
55
9/10/17
Sand: Fine to Medium Grained
SP
2()
9
Brownish Grey in color
Groundwater 56 Feet
0
60
416/7
Silt
NIL
27
66
town in color
65
6/13110
Silty Sand: Fine Grained
Sm
24
14
Brownish Grey in color
70
JL
2/5/14
Sandy Silt
ML
24
52
Brown in color
75
5
so
5/12/22
6/21/34
Silty Sand- Fine Grained
Clayey Sand
Sm
Sm
27
16
30
26
Brown in color
Brown in color
85
go
AL
11/2o/26
10/16/31
Sand: FinctoMedium Grained
Sand: Coarse Grained and Sandy Silt
SP
SP
18
28
5
---
Brown in color
Brown in color
ote: The stratification lints
represent the approximate
boundarim between the soil
types; the transition may be
gradual.
Total Depth = 101.5 Feet
Groundwater encountered
Bedrock not cncountered
J5
7Y15121
Silty Sand- Fine Grained
Sm
19
---
100[:::I
5/8/17 1
Sand; Coarse Grained
SP
17
-ILI
Sladden Engineering
Madison Club-Tbe.gadeaway
NEC Avenue 54 & Madison Street La QUinta
Data 12/20/2004 Boring No. 4 Job Number. $44-4810
C)
CD
C
pp
Description
CA
Remarks
0
Nativc Soil
Silty Sand- Fine to Medium Grained
5
to
15
20
25
2/4/6
Clayey Silt
ML
11
78
Grey in color
30
5/8/9
Silty Sand: Fine Grained and Clay Laycr —P
SM
6
...
Grcy in color
35
718/12
Sand: Fine Grained
Grey in color
40
5/8/13
Sand: Finc Grained
SP
2
9
Grey in color
45
2/3/6
Clayey Silt Laycr — 8" and Silty Clay Layer — 8"
ML
31
87
Grcy in color
50
5W11
!Silty Sand: FincGrainod
SM
22
19Groundwater
@ Feet
Sladden Engineering
55
9118/31
Sand: Fine Grained
SP
22
11
ark Grcy in color
60
JL
6/8/16
Sandy Silt
ML
24
61
Dark Grey in color
65
3/4/7
Clay
CL
23
91
Brownibih Grey in color
70
75
80
85
90
95
100
_p3edrock
-:
9/13/16
9/15/17
12/16/23
6/9113
6/10/15
17/26/29
8/17/29
Sand: Flnc to Goarw Grained
Sand: Fine to Coarse Grained
Sand: Fine to Coarse Grained and Gravel
Sand- Fine to Coarse Grained and Silty Clay Laycr — 4"
Sand: Fine to Coarse Grained
Sand: Fine to Coarse Grained
Sand: Fine to Coarsc Grained
SP
SP
SP
SP
SP
SP
Sl'
25
23
23
23
28
27
30
10
11
8
--Grey
11
7
8
Grcy in color
Grey in color
Grey in color
in color
rey in color
otc: The stratification lines
Ircprcmmt the approximatc
undaries between the soil
the transition may be
ual.
otal Dcpth = 101.5 F=1
roundwater encountered
not encountered
Sladden Engineering
Madison Club -The Hideaway
NEC Avenue 54 & Madison Street, La Quinta
Date: 12/20/2004 Boring No. 5 Job Number: 5"-4810
ti
CD
N
Descri tion
G
-[ernarks
V) V
pq
0
ativc Soil
5
5/7/10
Sandy Silt
ML
96
14
77
Greyish Brown in color
10
3/5/9
Silty Sand: Finc Graincd
SM
110
5
16
Grey in color
15
5/7/10
Clayey Silt and Sandy Silt
ML
108
3
74
Brownish Grey in color
20
4/8/13
Sand: Fine Grained
SP
114
1
11
rey in color
25
30
California Split -spoon Samplc
Total Depth —21'
!
edrock notcncountcrcd
-
Unrocovcrcd Samplc
roundwator not encountered
-
Standard Penetration Test Samplc
35
40
Now The stratification lines represent the approximate
-
boundaries between the soil types; the transition may be
gradual.
45
50
Sladden Engineering
Madison Club -The Hideaway
NEC Avenue 54 & Madison Street, La Quanta
Date: 12/20/2004 Bering No. 6 Job Number: 544-4810
o
cm
N
■
u
Cn
CJ
I)GRcrl tion
Cn
oRvrnarks
'
o
i
ativc Soil
5
5/9/11.
Sand: Fine Grained and Claycy Silt
SP
114
2
---
Grey in color
1 U
9/10/10
Sand: Finc Grained and Silty Sand: Fine Grained
SP
107
2
11
Grey in w1or
15
4/6/10
Sand: Fine Grained and Sandy Silt
SP
101
23
---
Grey in color
20
5/10/17
Sand: Fine Grained
SP
91
20
7
rcy in color
25
30
California Split -spoon Sample
Total Depth —2V
_
I
Bedrock not cnwuntcrod
-
Unr000vered Sample
roundwatcr not encountcmd
-
Standard Penetration Tcst Samplc
35
40
Notc: The stratification line: represent the approximate
boundaries between► die soil types; the transition may be
gradual.
45
50
Sladden Engineering
Madison Club -The Hideaway
NEC Avenue 54 & Madison Street, La QUinta
Date: 12/20/2004 Boring No. 7 Job Number* 544-4810
_Q
U
Description
V)
e
Rcmark,-
0
Native Soil
5
4/5/8
Silty Sand: Finn Grained
Sm
102
3
21
Brownish Grey in color
10
4/4/8
Clay and Silty Sand: Fine Grained
Sm
94
22
16
Brownish Grey in color
15
4/6/11
Sand: Fine to Coarse Grained and Sandy Silt
SP
103
5
10
Gmy in color
20'
5/9/13
Sandy Silt
ML
110
6
77
Grey in color
25
30
California Split -spoon Sample
Total Depth 2 P
Iedrock
not encountered
5Standard
UnTwovercd Sample
Groundwater not encountered
Penetration Test Sample
35
40
Note: The stratification lines represent the approximate
boundaries between the soil types; the transition may be
gradual,
45
50
Sladden Engineering
Madison Club -The Hideaway
NEC Avenue 54 & Madison Street, La Quints
Date: 12/20/2004
Boring No. 8 Job Number: 544-4810
rn
U
pq
Dese J tion
r°
a
4
�Z
Remarks
0
ative Soil
5
4/7/11
Sandy Silt and Silty Clay
lull,
104
2
67
rey in color
10
7/9/9
Silty Clay and Silty Sand: Finc Grained
ML
107
8
80
Grcy in color
15
10/16/24
$sad: Fine Grained
SP
118
6
9
rey in color
20
8/12/18
Silty Sand: Fine Grained and Sandy Silt
SM
1 1 1
7
15
Grey in color
25
30
California Split-slxK)n Sample
Total Dcpth —2 V
_
I
Bedrock not mwuntered
-
Unrecovered Samplc
Groundwater not encountered
-
Standard Penetration Test Sample
35
40
Now The stratification lines roprescnt the approximate
boundaries between the soil types; the transition may be
gradual.
45
50
Sladdcn Engineering
Madisou Club -The Hideaway
NEC Avenue 54 & Madison Street La Quinta
Date: 12/20/2004 Bering No. 9 Job Numbers 544-4810
w
w
AC)
Descri tion
f°
�
�
6
o
a
Rcnwks
0Native
Soil
5
4/5/9
Sand: Fine Grained
SP
101
3
7
Grey in color
10
5/9/15
Sandy Silt
ML
90
22
75
Grvy in w1or
15
4/9115
Silty Sand: Fine Gminrd
SM
102
14
15
Grey in color
20
8/16/20
Sand: Finc Graingci
5F
IF
98
18
11
rey in color
25
30
California Split -spoon Sample
Total Depth —21'
-
I
laedrmk not encountered
-
Unrecovered Sample
Groundwater not encountered
-
Standard Penetration Test Sample
35
40
Note: The stratification lines represent the approximate
_
boundaries between the soil types; tho transition may be
-
gradual.
45
50
Sladdcn Engineering
Madison Club -The Hideaway
NEC Avenue 54 & Madison Street, La Quinta
Date: 12/21/2004 Bering No.10 Job Number:-44-4810
�
�
o
a
�
U
pq
Description
Remarks
U
ativu Soil
5
12/15/23
Sand: Fine Grained and Sandy Silt
SP
100
2
9
GTqincolor
10
.'
23/35/3 l
Sand: Finc Grained and Clayey Silt
SP
108
3
9
Brownish Grey in color
15
i €
16/21 /38
Sand: Fine Grained
SP
99
6
7
Brownish Grey in color
20
!
23/50-5
Sand: Fine Grained
SP
t O6
3
7
Greyish Brown in color
25
30
California Split -spoon Sample
Total Depth e--2 P
IlBadrock
not encountered
Unrecovered Sample
I
Groundwater not encountered
-
Standard Penetration Test Sample
35
40
Note; The stratification linen represent the approximate
-
boundaries between the soil types; the transition may bu
gradual.
45
i0
Sladden Engineering
Madison Club -The Hideaway
NEC Avenue 54 & Madison Street, La RuInta
Date: 12/21/2004 Boring No. 11 Job Number: 5444810
A
rn
C�P
o
Description
Q
�
Remarks
0
alive Soil
5
10/14/19
Sand- Fine Grained
SP
114
2
12
GTq in color
10
8111115
Sand: Finc Graincd
SP
115
3
11
Brownish Grey in color
15
9/13/16
Sandy Silt and Sand: Fine Grained
ML
121
2
72
Greyish Brown in color
20
8/11/15
Sand: Finc Grained
SP
113
2
El
Grey ui color
25
30
California Split -spoon Samplc
Total Dcpth —2V
-
I
Wrock not mcountercd
-
Wnrecovered Sample
I
Groundwater not encountered
-
Standard Penetration Test Sample
35
40
Note: The stratification ling mproxnt the appmximato
-
boundaries between the soil types; the transition may be
_
gradual.
45
50
Sladden Engineering
Madison Club -The Hideaway
NEC Avenue 54 & Madison Street, La Quinta
Date: 12/21/2004
Boring No.12 Job Number: 5444810
U
a
0
o
a
Q
cn
U
Description
rn
Z
emarks
0
ative, Soil
5
8/11/13
Sand: Fine Grained
SP
113
2
$
Brownish Grey in color
10
6/9/ 13
Sand: Fine; Grained
SP
109
1
9
Grcy in color
15
9/12/14
Silty Sand: Fine Grained
SM
114
2
17
Grey in color
20
9/12/22
Silty Sand: Fine Grained
SM
112
4
16
Grey in color
25
30
California Split -spoon Sample
Total Depth —21'
_
I
adrock not cnoountexnd
-
Unrccovercd Sample
I
Groundwater not encountered
_
Standard Penetration Test Sample
35
40
Note: The stratification lines represent the approximate
-
boundaries between the soil types; the transition may be
_
gradual.
45
�a
Sladden Engineering
Madison Club -The Hideaway
NEC Avenue 54 & Madison Street, La Quinta
Date: 12/21/2004 Boring No.13 Job Number: $44-4810
IM
n
U
e
O
Description
r°
U
1?.
CD
N
4k
Remarks
0
Native Soil
S
4/6/6
Sand: Fine Grained
SP
115
1
10
Greyincolor
10
6n1i i
Sand: Fine Grained
SP
103
1
$
Grcy in color
1 S
4/1411 S
Silty Sand: Fine Grained
SM
110
1
18
Grey in color
-
California Split -spoon Sample
Total Depth —16'
-
f
Bedrock not encountered
20
Unrecovered Sample
Groundwater not aneounteaed
-
Standard Pcnctration Test Sample
25
-
Note: The stratification lines represent the approximate
boundaries between the soil types; the transition may be
_
gradual.
30
35
40
45
30
Sladden Engineering
Madison Club -The Hideaway
NEC Avenue 54 & Madison Street, La Quints
Date; 12/21/2004 Boring No. 14 Job Number: 544-4810
Descrition
C°
�
8
ygyy
�
�
Remarks
p
Native Soil
5
7/10/14
Clayey Sill and Silty Sand: Pine Grained
ML
104
11
77
Grey in color
10
8/12/1t5
Sand: Fine Grained
SP
FF
6
8
Brownish Grey in color
15
6/10/1 l
Clayey Silt
ML
93
24
83
Drownisli Grey in color
20
5/8/11
Clayey Silt and Sandy Silt
ML
93
27
80
Grey in color
25
30
California Split -spoon Sample
Total Depth —2 V
IBedrock
notCncounturod
Unrecovered Sample
Groundwater not encountered
-
Standard Penetration Teat Sample
35
40
Note: The stratification lints rcprrscnt the approximate
boundaries between the soil types; the transition may be
grad"-
45
50
Sladden Engineering
Madison Club -The Hideaway
NEC Avenue 54 & Madison Street, La Quints
Date; 12/21/2004
Berhag No.15 Job Number. 544-4810
o
0
N
m
Cj
Description
o
F•
a
Remarks
0
Native Soil
5
3/2/2
Sand: Fine Grained
SP
3
10
rey in color
10
2/2/3
Silty Sand: Fine Grained
SM
8
13
Grey in color
15
3/5/7
Silty Sand: Fine Grained
SM
3
15
Brownincolor
20
6/7/7
Silty Sand: Fine Grained and Clay Layer • 3"
SM
6
16
Brown in color
25
3/3/4
Clay Layer -7" and Clayey Silt Layer-4"
Brown in color
30
Califomia Split -spawn Sample
Total Depth =-26'
IBedrock
not encountered
-
Unrecowred Sample
Groundwater not cncwunteral
Standard Penetration Test Sample
35
40
Note: The stratification lir►cs repraeent the approximate
_
boundaries between the soil types; the transition may be
-
gradual.
45
50
Sladden Engineering
Madison Club -The Hideaway
NEC Avenue 54 & Madison Street La Quints
Date: 12/21/2004 Boring No.16 Job Number: 544-4810
�
�
o
Q
�
,7
w
U
pq
Description
rn
Remarks
p
Native Soil
5
10/1 I/14
Silty Sand: Fine Grained and Clayey Silt
SM
103
6
16
Grey in color
10
6/9/13
Sand: Finc Gxair►cd
SP
110
2
7
Grcy in color
15
7111112
Sand: Fine Graincd
SP
109
2
G
Grey in color
20
7/13/20
Sandy Silt and Silty Sand: Fine Grained
ML
99
7
G0Grey
in color
25
30
California Split -spoon Sample
Total Dcpth —21'
edrock not encountcrcd
-
Unreawered Sample
roundwater not cnoountrrdd
Standard Penetration Test Sample
'35
40
Now The stratification linca represcnt the approximate
boundarics bctwecn the soil types; the transition may be
_
gradual.
45
50
Sladden Engineering
Madison Club -The. Hideaway
NEC Avenue 54 & Madison Street, La quinta
Date.- 12/21/2004
Boring No.17 Job Number; 544-4810
o
41�jw�r
Y
V
Description Cn Rcmarks
0
Native Soil
5
6/10/16
Claycy Silt
ML
109
1
76
Grey in color
10
12/14/22
Clayey Silt
ML
10s
8
71
Grey in color
15
6/9/12
Silty Sand: Fine Grained
SM
107
2
16 1.
Grey in color
-
California Split -spoon Sample
otal Depth —16'
_
1
Bedrock not encountered
20
Unrecovered Sample
Groundwater not encountered
I
Standard Penetration Test Sample
25
_
Note: The stratification lines represent the approximate
_
boundaries between the soil types; the transition may be
-
gradual,
30
35
40
45
SO
Sladden Engineering
Madison Club -The Hideaway
NEC Avenue 54 & Madison Street Ira Quinta
Date: 12/21/2004
Boring No. 18 Job Number: 544-4810
o
CD
�
U
Descri tion
U
o
[Cmarks
0
Nativc Soil
S
6/8/15
Silty Sand: Finn Grained
SM
103
1
17
Grey in color
10
12/14/19
Sand: Fine Grained
SP
112
0
7
Brownish Grcy in color
15
9/10/13
Sand: Fine Grained
SP
104
1
5
Brownish Grcy in color
-
California Split -spoon Samplc
otal Depth �-16'
cdrock not emeounterexl
20
Unrecovcrcd Samplc
I
Groundwatcr not cncountcrW
-
Standard Penetration Test Samplc
25
-
Note; The stratification lines represent the approximate
boundaric s between the soil types; the transition may be
gradual.
30
35
40
45
50
Sladden Engineering
Madison Ouh-The Hideaway
NEC Avenue 54 & Madison Street La Quinta
Date: 12/21/2004
Boring No. 19 Job Number: 544-4810
y e 4
U � [V
P.
o Dcscri tion u°]'Remarks
0
Native Soil
5
10/14/18
Silty Sand: Fine Grained
SM
103
1 14 Grey in color
i0
4/7/9
Sand: Fine Grained
SP
104
2 lU n5' in color
15
5/7/10
Silty Sand: Finc Grained
SM
111
4 18 Grey in color
20
:
7/11/20
Sand: Fine Graincd
SP
109
4 8 Gray in color
25
30
California Split -spoon Sample
Total Depth —21'
edrock not encountered
-
lJnrecovcrod Sample
Groundwater not encountered
Standard Penetration Test Sample
35
40
Notc: The stratification lines represent the approximate
_
boundaries between the soil types; the transition may be
-
gradual.
45
50
Sladden Engineering
Madison Club -The Hideaway
NEC Avenue 54 & Madison Street, La Quinta
Date: 12/21/2004 Boring No, 20 Job Number: 544-4810
_
d
U
¢
Description
u
mo
91
a
enuuics
0
ative Soil
5
8/9/12
Sand: Finc Grained
SP
113
1
$
Grey in color
10
':
9/13/14
Sand: FincGraincd
SP]09
5
---
Grey in Dolor
5
6/9/13
Sand: Fine Grained
SP
109
1
8
Grey in oolor
20
8/14/27
Sand: Fine Grained
SP
112
4
10
Grcy in color
25
30
California Split -spoon Sample
Total Depth —2 V
-
I
edrock not encountered
-
Unrccovcred Sample
Groundwater not encountered
-
Standard Penetration Test Sample
35
40
Note: The stratification lines represent the approximate
boundaries between the soil types; the transition may be
_
gradual,
45
50
Sladden Engineering
Madison Club -The Hideaway
NEC Avenue 54 & Madison Street, La Quinta
Date: 12/23/2004 Boring No. 21 Job Number: 5444810
tl
o
o
0
�
w
Av'i
U
Description
�
ti
a
�
o
ema *s
0
Native Soil
5
5110/21
Sand: Fine Graincd
SP
1
9
Grey in color
10
8/10/10
Sand: Finc Grained
SP
5
10
Grey in color
15
3/4/8
Silty Clay and Cluy buyer--Y
ML
11
75
Brownish Grey in color
20
3/611 l
Silt and Clay: Thin Interbedded Lenses
CL
10
95
Brownitih Grey in color
25
30
California Split -spoon Sample
Total Depth —2V
-
I
9edrack not encountered
-
Unrecovered Sample
Groundwater not encountered
Standard Penetration Test Sample
35
40
Note: The stratification lines represent the approximate
boundaries between the soil types; the transition may he
_
gradual-
45
50
Sladden Engineering
Madison Club -The Hideaway
NEC Avenue 54 & Madison Street Ea Quinta
Date: 12/23/2004 Boring No. 22 Jab Number: 5444810
o
p U Descri ties o Remarks
0
Native Soil
5
4/4/10
Clay and Sandy Silt Layer--6"
ML
7
57
Brownish Grey in color
10
5/8/11
Silty Clay and Silty Sand: Fine Grained Laycr-2"
CL
13
86
Grey in color
15
6/9/14
Silty Sand: Finc Grained and Silty Clay Layer —7"
SM
18
---
rey in color
20
ii:
5/8/11
Sand: Fine Grained
SP
1
14
rownish Grey in color
25
3/7/10
Clayey Silt
ML
3
81
113rownish Grey in color
30
California Split -spoon Sample
otal Dcpth —25.5'
_
I
odrock not CnOountered
-
Unreoovcrrd Sample
I
Groundwater not encountered
Standard Penetration Test Sample
35
40
Notc: The stratification lines represent the approximate
boundaries between the soil types; the transition may be
gradual,
45
50
Sladden Engineering
Madkon Club -The Hideaway
NEC Avenue 54 & Madison Stree La Quinta
Date: 12/23/2004 Boring No. 23 Job Number: 5444810
c*1
o �
o �
An Description o Remarks
0Grass
Posture
5
4/6/9
Sand: Pinc Grained
SIP
I 10
Grey in color
10
3/5/11
Sand_ Fine Grained
SP
7 10
Grvy in Color
15
3/6/8
Clayey Silt and Sandy Silt Layer -7
ML
8 68
Brownish Grcy in color
20
3/3/5
Clay and Sandy Silty Layer - 6"
NIL
20 71
Lrownishrcy in color
25
30
California Split -spoon Sample
Total Depth —20.5'
_
IBedrock
not moountered
Uttrecovered Sample
Groundwater not encountered
_
Standard Penetration Tcst Sample
35
40
Note- The stratification lines rcpresmt the approximate
boundaries bctwcen the soil types; the transition may be
_
gradual_
45
50
Sladden Engineering
Madison Club -The IIideaway
NEC Avenue 54 & Madison Street La Quinta
Date: 12/23/2004 Boring No. 24 Job Number: 5" 4810
o
V
3
O
CC1
Description
c
O
\
Rcmarks
0
Native Soil
5
5/20/20
Clayey Silt
ML
1
---
Ligbt Grcy
10
6/7/10
Sand: Fine Graincd
SP
2
9
Grey in color
15
5/6/10
Silty Sand: Finc Grained
SM
2
12
Grey in color
20
5/918
Silty Sand: fine Grained
SM
l
12
Grey in color
25
30
California Split -spoon Sample
Total Depth �-20.5'
-
I
odrock not mcountcrod
-
UnrmovcrO Sample
I
roundwatcr not cncvuntcrud
.
-
Standard Penetration Test Sample
35
40
Note: The stratification lines represent the approximate
boundaries between the soil types; the transition may be
gradual.
45
50
Sladden Engineering
Madison Club -The Hideaway
NEC Avenue 54 & Madison Street, La Quanta
Date: 12/23/2004
Boring No. 25 Job Number: 544-4810
v
Cj
pq
Description
:Z)Remarks
o
�
0
Native Soil
5
10/20/20
Sand: Fine Grained
SP
1
9
Qrey in color
10
'
6/9/18
Sand: Fine Grained
SP
1
I I
Grey in color
15
6/10/15
Clayey Silt
ML
3
77
Brown in color
20
8/10/14
Sandy Silt and Clayey Silt Layer --V
ML
3
72
Brown in color
25
30
California SplWspoon Sample
Total Depth —20.5'
I
odrook not encountered
UnrewvtTW Sample
Groundwater not encountered
Standard Penetration Test Sample
35
40
Note: The stratification lines rcprmrni the approximate
boundaries between the soil types; the transition may be
_
gradual.
45
50
Sladden Engineering
Madison Club -The Hideaway
NEC Avenue 54 & Madison Street, lLa uinta
Date:
12/23/2004
Boring No. 26
Job dumber:
CD
$" 4810
8
a
CL
Desch tion
rn
Remarks
0
ative, Soil
5
3/6/10
Silty Clay Layer —6" and Sand: Fine Grained
ML
18
81
rey in color
10
=
5/6/$
Sand: Fine Grained
SP
B
10
Orcy in color
I5
`•.
3/4/6
Sand: Fine Grained Layer --3" and Clayey Silt
SP
8
---
Grey in color
_
California Split -spoon Sample
oral Depth —15.5'
edrock not cncountercdd
20
Unrecovered Sample
ruundwater not enoountcre
-
Standard Penetration Test Samplc
25
-
Note: The stratification lines represent the approximate
boundaries between the soil types; the transition may be
gradual.
30
35
40
45
50
11
Sladden Engineering
Madison Club -The Hideaway
NEC Avenue 54 & Madison Street, La Quinta
Date:
12/23/2004
Borino No. 27
,fob Number:
5444810
8
o
�
o
Description
rQ
�
�
s
arks
0
ativc Soil
5
6/7/9
Sand: Fine Grained
SP
4
9
Grey in color
10
3/4/5
Clayey Silt
ML
2
84
rownish Grey in color
15
4/5/5
Sandy Silt and Clayey Silt--3"
ML
12
71
rownisb Grey in color
20
JIL 5/5/8 Sand: Nine to Medium Grained
SP
G
10
Town in color
25
30
California Split -spoon Sample
Total Depth —20.5'
_
,
edrock not encountered
-
Unreoovorod Sample
I
roundwater not encountered
-
-
Standard Penetration Test Sample
35
40
Notc: The stratification lilies rcprcRcnt the ¢Pproxiunate
_
boundaries between the soil types; the transition may be
gradual,
45
50
Sladden Engineering
Madison Club -The Hideaway
NEC Avenue 54 & Madison Street La Quinta
Date: 12/23/2004
Borig No. 28 Job Number: 5444810
q U
N
o �
pq Desct tion V) o emarks
0
ativc Soil
5
4/7/9
Sandy Silt
ML
3
61
Grey in color
10
3/3/6
Clay Laya —7" and Sandy Silt
ML
10
74
Grey in color
2/2/3
Clay
CL
12
90
cownish Grey in color
F
California Split -spoon Sample
otal Depth a--15,5'
-
I
edrock not enwuntcrcd
20
Unrccovered Sample
roundwater not encountered
I
Standard Pcnctration Tcst Sample
25
Note: The stratification lined represent the approximatc
_
boundaries between the soil typcs; the transition may be
_
gradual_
30
35
40
45
50
Sladden Engineering
Madison Chub -The Hideaway
NEC Avenue 54 & Madison Stree La Quinta
Date: 12/23/2004 During No. 29 Jab Number: 544-4810
c
�
O
42
a
c i
pq
Description
v,
Ar
Remarks
t)
Native Soil
5
6/9/14
Silty Sand: Finc Grained
SM
1
17
Cirey in color
10
6/7/8
Sand: i inc Grained
SP
2
11
Grey in color
15
3/4/7
Sand: Fine Grained
SP
4
10
Grey in txalor
-
California Split -spoon Sample
Total Dcpth =—I 5.5'
-
I
Bedrock not encountered
20
Unrccovcrml Saunplc
Groundwater not encountered
Standard Penetration Test Sample
25
Note: The stratification lines represent the approximate
boundaries between the soil types; the transition may be
_
gradual.
30
35
40
45
5U
Sladdcn Engineering
APPENDIX B
Laboratory Testing
Laboratory Test Results
APPENDIX B
LABORATORY TESTING
Representative bulk and relatively undisturbed soil samples were obtained in the field and returned to our
laboratory for additional observations and testing. Laboratory testing was generally performed in two phases. The
first phase consisted of testing in order to determine the compaction of the existing natural soil and the general
engineering classifications of the soil underlying the site. This testing was performed in order to estimate the
engineering characteristics of the soil and to serve as a basis for selecting samples for the second phase of testing. The
second phase consisted of soil mechanics testing. This testing including consolidation, shear strength and expansion
testing was performed in order to provide a means of developing specific design recommendations based on the
mechanical properties of the soil.
CLASSIFICATION AND COMPACTION TESTING
Unit Weight and Moisture Content Determinations: Each undisturbed sample was weighed and measured in order
to determine its unit weight. A small portion of each sample was then subjected to testing in order to determine its
moisture content_ This was used in order to determine the dry density of the soil in its natural condition. The results
of this testing are shown on the Boring Log.
Maximum Density -Optimum Moisture Determinations: Representative soil types were selected for maximum
density determinations. This testing was performed in accordance with the ASTM Standard D1557-91, Test Method
A. The results of this testing are presented graphically in this appendix. The maximum densities are compared to
the field densities of the sail in order to determine the existing relative compaction to the soil. This is shown on the
Boring Log, and is useful in estimating the strength and compressibility of the soil.
Classification Testing: Soil samples were selected for classification testing. This testing consists of mechanical grain
size analyses and Atterberg Limits determinations. These provide information for developing classifications for the
soil in accordance with the Unified Classification System. This classification system categorizes the soil into groups
having similar engineering characteristics. The results of this test are very useful for detecting variations in the soil
and in selecting samples for further testing.
SOIL MECHANIC'S TESTING
Direct Shear Testing: One bulk sample was selected for Direct Shear Testing. This testing measures the shear
strength of the soil under various normal pressures and is used in developing parameters for foundation design and
lateral design. Testing was performed using recompacted test specimens, which were saturated prior to testing.
Testing was performed using a strain controlled test apparatus with normal pressures ranging from 800 to 2300
pounds per square foot.
Expansion Testing: One bulk sample was selected for Expansion testing. Expansion testing was performed in
accordance with the UBC Standard 18-2. This testing consists of remolding, 4-inch diameter by 1-inch thick test
specimens to a moisture content and dry density corresponding to approximately 50 percent saturation. The samples
are subjected to a surcharge of 144 pounds per square foot and allowed to reach equilibrium. At that point the
specimens are inundated with distilled water. The linear expansion is then measured until complete.
Consolidation Testing: RIOrelatively undisturbed samples were selected for consolidation testing. For this testing
one -inch thick test specim s are subjected to vertical loads varying from 575 psf to 11520 psf applied progressively,
The consolidation at each oad increment was recorded prior to placement of each subsequent load_ The specimens
were saturated at the 575 sf or 720 psf load increment.
APPENDIX C
2001 California Building Code with 1,997 UBC Seismic Design Criteria
January 28, 2005 -15- Project No. 544-4810
05-01-101
2001 CALIFORNIA BUILDING CODE SEISMIC DESIGN INFORMATION
The California Code of Regulations, 'Title 24 (2001 California Building Code) and 1997 Uniform
Building Code, Chapter 16 of this code, contain substantial revisions and additions to earthquake
engineering design criteria. Concepts contained in the code that will be relevant to construction of
the proposed structures are summarized below.
Ground shaking is expected to be the primary hazard most likely to affect the site, based upon
proximity to significant faults capable of generating large earthquakes. Major fault zones considered
to be most likely to create strong ground shaking at the site are listed below.
Fault Zone
Approximate Distance
From Site
fault Type
(1997 UBC)
San Andreas
8.9 km
A
San Jacinto
30.9 km
A
Based on our field observations and understanding of local geologic conditions, the soil profile type
judged applicable to this site is So, generally described as stiff or dense soil. The site is located within
UBC Seismic Zone 4. The following table presents additional coefficients and factors relevant to seismic
mitigation for new construction upon adoption of the 1997 code.
Near -Source
Near -Source
Seismic
Seismic
Seismic
Acceleration
Velocity
Coefficient
Coefficient
Source
Factor, Na
Factor, NX
Ca
C�
San Andreas
1.04
L29
0.44Na
0.64NY
San Jacinto
1 1.0
1.0
0,44N.
0.64Nv
Madden Engineering