PGA West Signature - Jewel TR 36537 BCPR2021-0019ADDITIONAL SITES
CHRONOLOGY
CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES
EMAIL JAKE FUSON 7/21/2021 7/21/2021
NOTIFIED APPLICANT THAT NO CORRECTIONS EXIST AT THIS
TIME HOWEVER A COMPLETE REVIEW COULD NOT BE
COMPLETED AS THE DWELLING PERMITS HAVE NOT BEEN
REVIEWED OR APPROVED AND THE APPROVAL OF THE SOLAR
DESIGNS WILL BE DEPENDENT ON THE ENERGY REPORT AND
ROOF DESIGNS OF THE DWELLINGS. FURTHER REVIEW WILL
BE REQUIRED WHEN THE DWELLINGS ARE APPROVED.
Description: SIGNATURE AT PGA WEST / MASTER SOLAR PLANS -
JEWEL SERIES
Status: APPROVED
Type: BUILDING CONSTRUCTION PLAN REVIEW (WEB)Status Date:
Subtype: SOLAR Applied: 6/30/2021
Address: 56140 PGA BLVD Approved:
City, State, Zip: LA QUINTA,CA92253 Closed:
Project Manager: Expired:
Details: LA QUINTA BY WOODBRIDGE/SIGNATURE -- SOLAR PHOTOVOLTAIC MASTER PLANS
FOR THE JEWEL SERIES. PLANS 1, 2, 2 DUPLEX, & 3 DUPLEX FOR THE 2019 CODE
CYCLE. 2019 CALIFORNIA BUILDING CODES.
PLAN 1, 2 & 2 DUPLEX: 4.97kW SOLAR ARRAY - (14) 355W LONGI SOLAR LR4-
60HPB-355M MODULES + ENPHASE IQ7PLUS-72-2-US MICROINVERTERS + 125A
ENPHASE IQ COMBINER PANEL [280SF].
PLAN 3 DUPLEX: 3.905kW SOLAR ARRAY - (11) 355W LONGI SOLAR LR4-
60HPB-355M MODULES + ENPHASE IQ7PLUS-72-2-US MICROINVERTERS + 125A
ENPHASE IQ COMBINER PANEL [220SF].
REVISION 1 - ADDED ROOF LAYOUTS FOR PLANS 1 & 2.
REVISION 2 - EXTERIOR AC DISCONNECTS ADDED FOR ALL PLAN TYPES.
Printed: Wednesday, December 20, 2023 11:36:13 AM 1 of 8
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2021-0019
CONTACTS
NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL
APPLICANT Vanessa Oros 1111 E Citrus St, Unit 1 Riverside CA 92507 (323)470-6043 Vanessa.garcia@sunru
n.com
DEVELOPER WOODBRIDGE PACIFIC (323)470-6043
OWNER WOODBRIDGE PACIFIC 27271 LAS RAMBLAS MISSION VIEJO CA 92507 (323)470-6043 Vanessa.garcia@sunru
n.com
EMAIL JAKE FUSON 11/2/2021 11/2/2021 NOTIFIED APPLICANT OF 1ST REVIEW COMMENTS, SENT
CORRECTION LIST VIA EMAIL.
2ND PC SUBMITTAL
RECEIVED JAKE FUSON 12/8/2021 12/8/2021
EMAIL JAKE FUSON 1/11/2022 1/11/2022 NOTIFIED APPLICANT OF 2ND REVIEW COMMENTS, SENT
CORRECTION LIST VIA EMAIL.
3RD PC SUBMITTAL
RECEIVED JAKE FUSON 1/27/2022 1/27/2022
EMAIL JAKE FUSON 3/8/2022 3/8/2022 NOTIFIED APPLICANT OF 3RD REVIEW RESULT.
EMAIL JAKE FUSON 4/14/2022 4/14/2022
NOTIFIED APPLICANT THAT THE REVISED ENERGY REPORT
WAS APPROVED UNDER THE SFD TRACT CONSTRUCTION
REVIEW PROJECT SO THIS PROJECT IS NOW APPROVED AND
READY FOR FEE PAYMENT.
EMAIL JAKE FUSON 5/26/2022 5/26/2022 NOTIFIED APPLICANT THAT REVISION 1 IS APPROVED AND
FEE IS READY FOR PAYMENT.
EMAIL JAKE FUSON 9/8/2022 9/8/2022 NOTIFIED APPLICANT THAT REVISION #2 IS APPROVED AND
READY FOR FEE PAYMENT.
CONDITIONS
FINANCIAL INFORMATION
Printed: Wednesday, December 20, 2023 11:36:13 AM 2 of 8
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2021-0019
INSPECTIONS
INSPECTION TYPE INSPECTOR SCHEDULED
DATE
COMPLETED
DATE
RESULT REMARKS NOTES
REVIEWS
DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD
BY
HOURLY CHARGE - CITY
BUILDING STAFF 101-0000-42600 3.5 $563.50 $563.50 4/14/22 WEB11412 636611825
99 CREDIT
SUNRUN
INSTALLATION
SERVICES INC
ECON
HOURLY CHARGE - CITY
BUILDING STAFF 101-0000-42600 0.5 $80.50 $80.50 5/26/22 WEB11918 637351487
62 CREDIT
SUNRUN
INSTALLATION
SERVICES INC
ECON
HOURLY CHARGE - CITY
BUILDING STAFF 101-0000-42600 0.5 $80.50 $80.50 9/9/22 WEB13003 721703408 CREDIT
SUNRUN
INSTALLATION
SERVICES INC
ECON
Total Paid for BUILDING STAFF - PER HOUR: $724.50 $724.50
RECORDS
MANAGEMENT FEE -
MAJOR
101-0000-42416 0 $21.00 $21.00 4/14/22 WEB11412 636611825
99 CREDIT
SUNRUN
INSTALLATION
SERVICES INC
ECON
Total Paid for RECORDS MANAGEMENT FEE - MAJOR: $21.00 $21.00
TECHNOLOGY
ENHANCEMENT FEE 502-0000-43611 0 $5.00 $5.00 4/14/22 WEB11412 636611825
99 CREDIT
SUNRUN
INSTALLATION
SERVICES INC
ECON
Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00
TOTALS:$750.50 $750.50
REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED
DATE STATUS REMARKS NOTES
1ST BLDG (1WK)JAKE FUSON 6/30/2021 7/8/2021 7/21/2021 TABLED
DWELLING PERMITS MUST BE REVIEWED AND
APPROVED PRIOR TO COMPLETE REVIEW OF
THESE SOLAR MASTER PLANS.
1ST BLDG (1WK)JAKE FUSON 10/12/2021 10/19/2021 11/2/2021 REVISIONS REQUIRED SEE 1ST REVIEW CORRECTION LIST.
Printed: Wednesday, December 20, 2023 11:36:13 AM 3 of 8
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2021-0019
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 6/30/2021 EtrakitContractor 1ST SUBMITTAL
MASTER PLAN 1
Jewel Plan 1 Master
Solar Plan (6.28.21).pdf 1
DOC 6/30/2021 EtrakitContractor 1ST SUBMITTAL MASTER
PLAN 2 DUPLEX
Jewel Plan 2 DUPLEX
Master Solar Plan
(6.28.21).pdf
1
DOC 6/30/2021 EtrakitContractor 1ST SUBMITTAL
MASTER PLAN 2
Jewel Plan 2 Master
Solar Plan (6.28.21).pdf 1
DOC 6/30/2021 EtrakitContractor 1ST SUBMITTAL MASTER
PLAN 3 DUPLEX
Jewel Plan 3 DUPLEX
Master Solar Plan
(6.28.21).pdf
1
DOC 12/7/2021 Etrakit Contractor 2ND SUBMITTAL -
MASTER PLAN 1
Jewel Master Solar Plan
1 (12.6.21) EE signed.pdf 1
BOND INFORMATION
1ST BLDG (1WK)JAKE FUSON 4/28/2022 5/5/2022 5/26/2022 APPROVED REVISION 1 REVISION 1 - ADDED ROOF LAYOUTS FOR PLANS 1
& 2.
1ST BLDG (1WK)JAKE FUSON 8/18/2022 8/25/2022 9/8/2022 APPROVED REVISION 2 REVISION 2 - EXTERIOR AC DISCONNECTS ADDED
FOR ALL PLAN TYPES.
1ST BLDG (1WK)JAKE FUSON 3/13/2023 3/20/2023 4/17/2023 NOT REQUIRED REVISION 3
THESE PLANS ARE FOR TOPAZ & CITRINE MODELS,
NOT JEWEL PRODUCT. REVIEW CONDUCTED
UNDER BCPR2021-0014.
1ST PERMIT
TECHNICIAN (1DAY)
PERMIT TECH
BUCKET 6/30/2021 7/1/2021 6/30/2021 COMPLETE
2ND BLDG (1WK)JAKE FUSON 12/8/2021 12/15/2021 1/11/2022 REVISIONS REQUIRED SEE ATTACHED 2ND REVIEW CORRECTION LIST.
3RD BLDG (1WK)JAKE FUSON 1/27/2022 2/3/2022 3/8/2022 APPROVED
REVISED ENERGY REPORTS MUST BE SUBMITTED
FOR REVIEW AND APPROVAL THROUGH
BCPR2021-0020.
ENERGY REPORT APPROVED UNDER BCPR2021-
0020, REVIEW STATUS UPDATED TO
"APPROVED."
Printed: Wednesday, December 20, 2023 11:36:13 AM 4 of 8
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2021-0019
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 12/7/2021 Etrakit Contractor 2ND SUBMITTAL -
MASTER PLAN 2
Jewel Master Solar Plan
2 (12.6.21) EE signed.pdf 1
DOC 12/7/2021 Etrakit Contractor 2ND SUBMITTAL -
MASTER PLAN 2 DUPLEX
Jewel Master Solar Plan
2 Duplex (12.6.21) EE
signed.pdf
1
DOC 12/7/2021 Etrakit Contractor 2ND SUBMITTAL -
MASTER PLAN 3 DUPLEX
Jewel Master Solar Plan
3 Duplex (12.6.21) EE
signed.pdf
1
DOC 12/7/2021 Etrakit Contractor 2ND SUBMITTAL -
RESPONSES
Jewel Solar Comments
Response Letter
(12.6.21).pdf
1
DOC 1/27/2022 Etrakit Contractor 3RD SUBMITTAL - PLAN
1 SOLAR PLANS
Jewel PLAN 1 Master
Solar Permit 1.18.22.pdf 1
DOC 1/27/2022 Etrakit Contractor 3RD SUBMITTAL - PLAN
2 DUPLEX SOLAR PLANS
Jewel PLAN 2 DUPLEX
Master Solar Permit
1.18.22.pdf
1
DOC 1/27/2022 Etrakit Contractor 3RD SUBMITTAL - PLAN
2 SOLAR PLANS
Jewel PLAN 2 Master
Solar Permit 1.18.22.pdf 1
DOC 1/27/2022 Etrakit Contractor 3RD SUBMITTAL - PLAN
3 DUPLEX SOLAR PLANS
Jewel PLAN 3 DUPLEX
Master Solar Permit
1.18.22.pdf
1
DOC 1/27/2022 Etrakit Contractor 3RD SUBMITTAL -
RESPONSES
Jewel Solar Comments
Response Second
Review.docx.pdf
1
DOC 1/27/2022 Etrakit Contractor PLAN 1 ENERGY REPORT
(FOR REFERENCE ONLY)T-24.2.pdf 1
DOC 1/27/2022 Etrakit Contractor PLAN 2 ENERGY REPORT
(FOR REFERENCE ONLY)T-24.3.pdf 1
DOC 1/27/2022 Etrakit Contractor
PLAN 2 DUPLEX ENERGY
REPORT (FOR
REFERENCE ONLY)
T-24.4.pdf 1
Printed: Wednesday, December 20, 2023 11:36:13 AM 5 of 8
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2021-0019
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 1/27/2022 Etrakit Contractor
PLAN 3 DUPLEX ENERGY
REPORT (FOR
REFERENCE ONLY)
T-24.5.pdf 1
DOC 4/27/2022 Etrakit Contractor REVISION 1- 1ST
SUBMITTAL NARRATIVE
Revision Letter
BCPR2021-0019.pdf 1
DOC 4/27/2022 Etrakit Contractor
REVISION 1- 1ST
SUBMITTAL PLAN (PLAN
1)
REVISIONS PLAN 1
BCPR2021-0019.pdf 1
DOC 4/27/2022 Etrakit Contractor
REVISION 1- 1ST
SUBMITTAL PLAN (PLAN
2)
REVISIONS PLAN 2
BCPR2021-0019.pdf 1
DOC 8/18/2022 Etrakit Contractor REVISION 2 - 1ST
SUBMITTAL NARRATIVE
Jewel Advisory of
Changes Notice
(8.18.22).pdf
1
DOC 8/18/2022 Etrakit Contractor
REVISION 2 - 1ST
SUBMITTAL SOLAR PLAN
(PLAN 1)
Jewel_Plan 1_Master
Solar Plan (8.18.22).pdf 1
DOC 8/18/2022 Etrakit Contractor
REVISION 2 - 1ST
SUBMITTAL SOLAR PLAN
(PLAN 2 DUPLEX)
Jewel_Plan 2
Duplex_Master Solar
Plan (8.18.22).pdf
1
DOC 8/18/2022 Etrakit Contractor
REVISION 2 - 1ST
SUBMITTAL SOLAR PLAN
(PLAN 2)
Jewel_Plan 2_Master
Solar Plan (8.18.22).pdf 1
DOC 8/18/2022 Etrakit Contractor
REVISION 2 - 1ST
SUBMITTAL SOLAR PLAN
(PLAN 3 DUPLEX)
Jewel_Plan 3
Duplex_Master Solar
Plan (8.18.22).pdf
1
DOC 3/13/2023 Etrakit Contractor
REVISION 3 - 1ST
SUBMITTAL PLAN
SHEETS
Master Plan_La Quinta
Woodbridge Pacific_Rev
G (3.8.23).pdf
1
Printed: Wednesday, December 20, 2023 11:36:13 AM 6 of 8
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2021-0019
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 3/13/2023 Etrakit Contractor REVISION 3 - 1ST
SUBMITTAL NARRATIVE
Signature at PGA West
Sunrun Advisory of
Changes Notice
(3.8.23).docx
1
DOC 11/2/2021 JAKE FUSON 1ST REVIEW
CORRECTION LIST
BCPR2021-0019 - 1ST
REVIEW CORRECTION
LIST.pdf
1
DOC 1/11/2022 JAKE FUSON 2ND REVIEW
CORRECTION LIST
BCPR2021-0019 - 2ND
REVIEW CORRECTION
LIST.pdf
1
DOC 3/8/2022 JAKE FUSON TAKEOFF SHEETS BCPR2021-0019 -
TAKEOFF SHEETS.pdf 0
DOC 4/14/2022 JAKE FUSON PLAN 1 SOLAR PLAN
(APPROVED)
BCPR2021-0019 - PLAN
1 SOLAR PLAN
(APPROVED).pdf
1
DOC 4/14/2022 JAKE FUSON PLAN 2 DUPLEX SOLAR
PLAN (APPROVED)
BCPR2021-0019 - PLAN
2 DUPLEX SOLAR PLAN
(APPROVED).pdf
1
DOC 4/14/2022 JAKE FUSON PLAN 2 SOLAR PLAN
(APPROVED)
BCPR2021-0019 - PLAN
2 SOLAR PLAN
(APPROVED).pdf
1
DOC 4/14/2022 JAKE FUSON PLAN 3 DUPLEX SOLAR
PLAN (APPROVED)
BCPR2021-0019 - PLAN
3 DUPLEX SOLAR PLAN
(APPROVED).pdf
1
DOC 5/26/2022 JAKE FUSON
REVISION 1 - PLAN 1 -
MASTER SOLAR PLAN
(APPROVED)
BCPR2021-0019 -
REVISION 1 - PLAN 1 -
MASTER SOLAR PLAN
(APPROVED).pdf
1
DOC 5/26/2022 JAKE FUSON
REVISION 1 - PLAN 2 -
MASTER SOLAR PLAN
(APPROVED)
BCPR2021-0019 -
REVISION 1 - PLAN 2 -
MASTER SOLAR PLAN
(APPROVED).pdf
1
Printed: Wednesday, December 20, 2023 11:36:13 AM 7 of 8
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2021-0019
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 9/8/2022 JAKE FUSON
REVISION 2 - PLAN 1 -
MASTER SOLAR PLAN
(APPROVED)
REVISION 2 - PLAN 1 -
MASTER SOLAR PLAN
(APPROVED).pdf
1
DOC 9/8/2022 JAKE FUSON
REVISION 2 - PLAN 2 -
MASTER SOLAR PLAN
(APPROVED)
REVISION 2 - PLAN 2 -
MASTER SOLAR PLAN
(APPROVED).pdf
1
DOC 9/8/2022 JAKE FUSON
REVISION 2 - PLAN 2
DUPLEX - MASTER
SOLAR PLAN
(APPROVED)
REVISION 2 - PLAN 2
DUPLEX - MASTER
SOLAR PLAN
(APPROVED).pdf
1
DOC 9/8/2022 JAKE FUSON
REVISION 2 - PLAN 3
DUPLEX - MASTER
SOLAR PLAN
(APPROVED)
REVISION 2 - PLAN 3
DUPLEX - MASTER
SOLAR PLAN
(APPROVED).pdf
1
Printed: Wednesday, December 20, 2023 11:36:13 AM 8 of 8
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2021-0019
BCPR2021-0014 – SIGNATURE MASTER SOLAR PLAN
TAKE-OFFS
PLAN 1, 2, & 2 DUPLEX
Permit Notes:
PLAN 1, 2, 2 DUPLEX: 4.97kW SOLAR ARRAY - (14) 355W LONGI SOLAR LR4-60HPB-355M
MODULES + ENPHASE IQ7PLUS-72-2-US MICROINVERTERS + 125A ENPHASE IQ COMBINER
PANEL [280SF]. REFERENCE BCPR2021-0019 FOR APPROVED MASTER PLANS. 2019
CALIFORNIA BUILDING CODES.
Fee Breakdown:
- Building Standards Administration (BSAS)
- Electrical 2019
o PV System less than 10kW PC
o PV System less than 10kW
o Miscellaneous Electrical Equipment PC x 1
o Miscellaneous Electrical Equipment x 1
- Permit issuance
- Records Management Fee
- Technology Enhancement Fee
PLAN 3 DUPLEX
Permit Notes:
PLAN 3 DUPLEX: 3.905kW SOLAR ARRAY - (11) 355W LONGI SOLAR LR4-60HPB-355M MODULES +
ENPHASE IQ7PLUS-72-2-US MICROINVERTERS + 125A ENPHASE IQ COMBINER PANEL [280SF].
REFERENCE BCPR2021-0019 FOR APPROVED MASTER PLANS. 2019 CALIFORNIA BUILDING
CODES.
Fee Breakdown:
- Building Standards Administration (BSAS)
- Electrical 2019
o PV System less than 10kW PC
o PV System less than 10kW
o Miscellaneous Electrical Equipment PC x 1
o Miscellaneous Electrical Equipment x 1
- Permit issuance
- Records Management Fee
- Technology Enhancement Fee