PGA West - Signature TR 36537 BCPR2021-0014ADDITIONAL SITES
CHRONOLOGY
CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES
Description: SIGNATURE AT PGA WEST / MASTER SOLAR PLANS -
TOPAZ & CITRINE
Status: APPROVED
Type: BUILDING CONSTRUCTION PLAN REVIEW (WEB)Status Date:
Subtype: SOLAR Applied: 5/20/2021
Address: 56140 PGA BLVD Approved: 7/20/2021
City, State, Zip: LA QUINTA,CA92253 Closed:
Project Manager: Expired:
Details: LA QUINTA BY WOODBRIDGE / SOLAR PHOTOVOLTAIC MASTER PLANS FOR TOPAZ
& CITRINE PLANS 1-8 FOR THE 2019 CODE CYCLE. 2019 CALIFORNIA BUILDING
CODES.
PLAN 1: 5.25kW SOLAR ARRAY - (15) 350W LONGI SOLAR LR4-60HPB-350M
MODULES W/ (15) ENPHASE IQ7PLUS-72-2-US MICROINVERTERS + 125A IQ
COMBINER BOX [300SF]. REFERENCE BCPR2021-0014 FOR APPROVED MASTER
PLANS. SOLAR ARRAY TO BE ORIENTED BETWEEN 105°-300° AZIMUTH.
PLAN 2, 3, 4 OR 5: 5.6kW SOLAR ARRAY - (16) 350W LONGI SOLAR LR4-60HPB-350M
MODULES W/ (16) ENPHASE IQ7PLUS-72-2-US MICROINVERTERS + 125A IQ
COMBINER BOX [320SF]. REFERENCE BCPR2021-0014 FOR APPROVED MASTER
PLANS. SOLAR ARRAY TO BE ORIENTED BETWEEN 105°-300° AZIMUTH.
PLAN 6, 7 OR 8: 5.95kW SOLAR ARRAY - (17) 350W LONGI SOLAR LR4-60HPB-350M
MODULES W/ (17) ENPHASE IQ7PLUS-72-2-US MICROINVERTERS + 125A IQ
COMBINER BOX [340SF]. REFERENCE BCPR2021-0014 FOR APPROVED MASTER
PLANS. SOLAR ARRAY TO BE ORIENTED BETWEEN 105°-300° AZIMUTH.
REVISION 2 - AC DISCONNECTS ADDED AND ELECTRICAL EQUIPMENT LOCATIONS
PROVIDED ON ROOF PLANS. (SEE REVISION 1 REVIEW NOTES).
REVISION 3 - REVISED ROOF LAYOUTS FOR PLAN 8 ELEV. A.
Printed: Wednesday, December 20, 2023 11:25:44 AM 1 of 6
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2021-0014
CONTACTS
NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL
APPLICANT SUNRUN INSTALLATION SERVICES
INC DBA SUN
775 FIERO LANE SUITE
200
SAN LUIS
OBISPO
CA 93401 (415)580-6900 DAVID.VITELA@SUNRU
N.COM
OWNER RREF II CWC LAQ LLC 5927 PRIESTLY DR STE
110
CARLSBAD CA 92008 (415)580-6900
PRIMARY
CONTACT
Vanessa Oros 1111 E Citrus St, Unit 1 Riverside CA 92507 (415)580-6900 Vanessa.garcia@sunru
n.com
EMAIL AARON HICKSON 5/20/2021 5/20/2021 EMAIL SENT WITH BL RENEWAL APPLICATION TO APPLICANT.
CHANGED ADDRESS PER PLANS EXAMINER
EMAIL JAKE FUSON 5/26/2021 5/26/2021 NOTIFIED APPLICANT OF 1ST REVIEW COMMENTS, SENT
CORRECTION LIST VIA EMAIL.
2ND PC SUBMITTAL
RECEIVED JAKE FUSON 6/10/2021 6/10/2021
EMAIL JAKE FUSON 6/23/2021 6/23/2021 NOTIFIED APPLICANT OF 2ND REVIEW COMMENTS, SENT
CORRECTIONS VIA EMAIL.
EMAIL JAKE FUSON 7/20/2021 7/20/2021 NOTIFIED APPLICANT THAT PLANS ARE APPROVED AND FEES
ARE READY FOR PAYMENT.
EMAIL JAKE FUSON 8/11/2022 8/11/2022 NOTIFIED APPLICANT THAT REVISIONS 1 & 2 ARE APPROVED
AND READY FOR FEE PAYMENT.
EMAIL JAKE FUSON 4/17/2023 4/17/2023
NOTIFIED APPLICANT THAT REVISION 3 IS APPROVED AND
READY FOR FEE PAYMENT.
CONDITIONS
FINANCIAL INFORMATION
DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD
BY
HOURLY CHARGE - CITY
BUILDING STAFF 101-0000-42600 2.5 $402.50 $402.50 7/20/21 R66114 INVOICE
798 CREDIT ASHLE MARTINEZ AMA
Printed: Wednesday, December 20, 2023 11:25:44 AM 2 of 6
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2021-0014
INSPECTIONS
INSPECTION TYPE INSPECTOR SCHEDULED
DATE
COMPLETED
DATE
RESULT REMARKS NOTES
REVIEWS
DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD
BY
HOURLY CHARGE - CITY
BUILDING STAFF 101-0000-42600 0.75 $120.75 $120.75 8/11/22 WEB12755 705874798 CREDIT
SUNRUN
INSTALLATION
SERVICES INC
ECON
HOURLY CHARGE - CITY
BUILDING STAFF 101-0000-42600 0.5 $80.50 $80.50 4/20/23 WEB14940 854740259 CREDIT
SUNRUN
INSTALLATION
SERVICES INC
ECON
Total Paid for BUILDING STAFF - PER HOUR: $603.75 $603.75
RECORDS
MANAGEMENT FEE -
MAJOR
101-0000-42416 0 $21.00 $21.00 7/20/21 R66114 INVOICE
798 CREDIT ASHLE MARTINEZ AMA
Total Paid for RECORDS MANAGEMENT FEE - MAJOR: $21.00 $21.00
TECHNOLOGY
ENHANCEMENT FEE 502-0000-43611 0 $5.00 $5.00 7/20/21 R66114 INVOICE
798 CREDIT ASHLE MARTINEZ AMA
Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00
TOTALS:$629.75 $629.75
REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED
DATE STATUS REMARKS NOTES
1ST BLDG (1WK)JAKE FUSON 5/20/2021 5/27/2021 5/26/2021 REVISIONS REQUIRED SEE 1ST REVIEW CORRECTION LIST.
Printed: Wednesday, December 20, 2023 11:25:44 AM 3 of 6
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2021-0014
1ST BLDG (1WK)JAKE FUSON 5/31/2022 6/7/2022 8/11/2022 APPROVED REVISION 1
APPROVED THORUGH REVISION 2, WHICH WAS
SUBMITTED PRIOR TO REVIEW OF REVISION 1
BEING COMPLETED. CHANGES REFLECTED IN THE
REVISION 1 PLANS WERE ALSO INCLUDED IN THE
REVISION 2 PLAN SET SO NO REVISION 1 PLAN SET
WAS STAMPED--THE REVISION 2 PLAN SET
INCLUDES BOTH REVISION 1 & REVISION 2
CHANGES.
1ST BLDG (1WK)JAKE FUSON 3/13/2023 3/20/2023 4/17/2023 APPROVED REVISION 3 REVISION 3 - REVISED ROOF LAYOUTS FOR PLAN 8
ELEV. A.
1ST PERMIT
TECHNICIAN (1DAY)
PERMIT TECH
BUCKET 5/20/2021 5/21/2021 5/20/2021 COMPLETE
1ST PLANNING
(2WK)
CARLOS
FLORES 5/20/2021 6/4/2021 5/20/2021 NOT REQUIRED
2ND BLDG (1WK)JAKE FUSON 8/5/2022 8/12/2022 8/11/2022 APPROVED REVISION 2
REVISION 2 - AC DISCONNECTS ADDED AND
ELECTRICAL EQUIPMENT LOCATIONS PROVIDED
ON ROOF PLANS. (SEE REVISION 1 REVIEW
NOTES)
2ND BLDG NS (2WK)JAKE FUSON 6/10/2021 6/17/2021 6/23/2021 REVISIONS REQUIRED
1. THE CONDUCTORS SHOWN IN CONDUIT
SCHEDULE #2 ON THE ROOFTOP ARE SPECIFIED AS
NM-B CONDUCTORS WHICH ARE NOT APPROVED
FOR USE IN WET LOCATIONS SUCH AS THE
ROOFTOP, PLEASE REVISE
2. PLEASE PROVIDE SPECIFIC PROOF THAT THE
PROPOSED MODULES ARE COMPATIBLE WITH
THE MICROINVERTERS SPECIFIED ON THE PLANS.
PER THE MICROINVERTER CUTSHEET ONLY 60-
AND 72-CELL MODULES ARE COMPATIBLE, AND
THE RESPONSE PROVIDED DOES NOT RESOLVE
THE ORIGINAL COMMENT. THIS PROOF OF
COMPATIBILITY WOULD COME FROM TECHNICAL
DATA PUBLISHED BY THE MANUFACTURER
SPECIFICALLY DEMONSTRATING COMPLIANCE
WITH THE COMPATIBILITY OF THE EQUIPMENT
3RD BLDG (1WK)JAKE FUSON 7/20/2021 7/21/2021 7/20/2021 APPROVED
Printed: Wednesday, December 20, 2023 11:25:44 AM 4 of 6
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2021-0014
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 5/20/2021 EtrakitContractor 1ST SUBMITTAL PLANS
Master Plan_La Quinta
Woodbridge Pacific_Rev
B.pdf
1
DOC 6/9/2021 EtrakitContractor 2ND SUBMITTAL PLANS
Master Plan_La Quinta
Woodbridge Pacific_Rev
C.pdf
1
DOC 6/9/2021 EtrakitContractor 2ND SUBMITTAL
RESPONSES
Sunrun response letter -
La Quinta (Woodbridge
Pacific).pdf
1
DOC 7/20/2021 EtrakitContractor 3RD SUBMITTAL SOLAR
PLAN
Master Plan_La Quinta
Woodbridge Pacific_Rev
C (1).pdf
1
DOC 7/20/2021 EtrakitContractor 3RD SUBMITTAL
RESPONSES
Sunrun response letter -
La Quinta
(7.15.2021).pdf
1
DOC 5/27/2022 Etrakit Contractor
REVISION 1 - 1ST
SUBMITTAL SOLAR
PLANS
Signature Series
Revision E Plans.pdf 1
DOC 5/27/2022 Etrakit Contractor
REVISION 1 -
NARRATIVE OF
CHANGES
Signature Series
Revision E Letter.pdf 1
DOC 8/5/2022 Etrakit Contractor
(REVISION 2) -
NARRATIVE OF
CHANGES
La Quinta Advisory of
Changes Notice
(7.6.2022).docx
1
DOC 8/5/2022 Etrakit Contractor
(REVISION 2) 1ST
SUBMITTAL MASTER
SOLAR PLAN
Master Plan_La Quinta
Woodbridge Pacific_Rev
F (7.6.22).pdf
1
DOC 3/13/2023 Etrakit Contractor
REVISION 3 - 1ST
SUBMITTAL PLAN
SHEETS
Master Plan_La Quinta
Woodbridge Pacific_Rev
G (3.8.23).pdf
1
BOND INFORMATION
Printed: Wednesday, December 20, 2023 11:25:44 AM 5 of 6
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2021-0014
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 3/13/2023 Etrakit Contractor REVISION 3 - 1ST
SUBMITTAL NARRATIVE
Signature at PGA West
Sunrun Advisory of
Changes Notice
(3.8.23).docx
1
DOC 5/26/2021 JAKE FUSON 1ST REVIEW
CORRECTION LIST
BCPR2021-0014 - 1ST
REVIEW CORRECTION
LIST.pdf
1
DOC 7/20/2021 JAKE FUSON SOLAR MASTER PLANS
(APPROVED)
BCPR2021-0014 -
APPROVED SOLAR
MASTER PLANS.pdf
1
DOC 8/18/2021 JAKE FUSON TAKEOFF SHEETS (DO
NOT USE)
BCPR2021-0014 -
TAKEOFF SHEETS.pdf 1
DOC 6/8/2022 JAKE FUSON TAKEOFF SHEETS
(UPDATED)
BCPR2021-0014 -
TAKEOFF SHEETS
(UPDATED).pdf
1
DOC 8/11/2022 JAKE FUSON REVISIONS 1 & 2 - PLAN
SHEETS (APPROVED)
BCPR2021-0014 -
REVISIONS 1 _ 2 - PLAN
SHEETS (APPROVED).pdf
1
DOC 4/17/2023 JAKE FUSON REVISION 3 - PLAN
SHEETS (APPROVED)
BCPR2021-0014 -
REVISION 3 - PLAN
SHEETS (APPROVED).pdf
1
Printed: Wednesday, December 20, 2023 11:25:44 AM 6 of 6
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2021-0014
BCPR2021-0014 – SIGNATURE MASTER SOLAR PLAN
TAKE-OFFS
PLAN 1
Permit Notes:
PLAN 1: 5.25kW SOLAR ARRAY - (15) 350W LONGI SOLAR LR4-60HPB-350M MODULES W/ (15) ENPHASE
IQ7PLUS-72-2-US MICROINVERTERS + 125A IQ COMBINER BOX [300SF]. REFERENCE BCPR2021-0014 FOR
APPROVED MASTER PLANS. SOLAR ARRAY TO BE ORIENTED BETWEEN 105°-300° AZIMUTH. 2019
CALIFORNIA BUILDING CODES.
Description:
SIGNATURE / 5.25kW PV SYSTEM - (15) PANELS W/MICROINV.
Fee Breakdown:
- Building Standards Administration (BSAS)
- Electrical 2019
o PV System less than 10kW PC
o PV System less than 10kW
o (1) PV Miscellaneous Equipment
o (1) PV Miscellaneous Equipment PC
- Permit issuance
- Records Management Fee
- Technology Enhancement Fee
PLAN 2, 3, 4 & 5
Permit Notes:
PLAN 2, 3, 4 OR 5: 5.6kW SOLAR ARRAY - (16) 350W LONGI SOLAR LR4-60HPB-350M MODULES W/ (16)
ENPHASE IQ7PLUS-72-2-US MICROINVERTERS + 125A IQ COMBINER BOX [320SF]. REFERENCE BCPR2021-
0014 FOR APPROVED MASTER PLANS. SOLAR ARRAY TO BE ORIENTED BETWEEN 105°-300° AZIMUTH.
2019 CALIFORNIA BUILDING CODES.
Description:
SIGNATURE / 5.6kW PV SYSTEM - (16) PANELS W/MICROINV.
Fee Breakdown:
- Building Standards Administration (BSAS)
- Electrical 2019
o PV System less than 10kW PC
o PV System less than 10kW
o (1) PV Miscellaneous Equipment
o (1) PV Miscellaneous Equipment PC
- Permit issuance
- Records Management Fee
- Technology Enhancement Fee
PLAN 6, 7 & 8
Description:
SIGNATURE / 5.95kW PV SYSTEM - (17) PANELS W/MICROINV.
Permit Notes:
PLAN 6, 7 OR 8: 5.95kW SOLAR ARRAY - (17) 350W LONGI SOLAR LR4-60HPB-350M MODULES W/ (17)
ENPHASE IQ7PLUS-72-2-US MICROINVERTERS + 125A IQ COMBINER BOX [340SF]. REFERENCE BCPR2021-
0014 FOR APPROVED MASTER PLANS. SOLAR ARRAY TO BE ORIENTED BETWEEN 105°-300° AZIMUTH.
2019 CALIFORNIA BUILDING CODES.
Fee Breakdown:
- Building Standards Administration (BSAS)
- Electrical 2019
o PV System less than 10kW PC
o PV System less than 10kW
o (1) PV Miscellaneous Equipment
o (1) PV Miscellaneous Equipment PC
- Permit issuance
- Records Management Fee
- Technology Enhancement Fee