Loading...
PGA West - Signature TR 36537 BCPR2021-0014ADDITIONAL SITES CHRONOLOGY CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES Description: SIGNATURE AT PGA WEST / MASTER SOLAR PLANS - TOPAZ & CITRINE Status: APPROVED Type: BUILDING CONSTRUCTION PLAN REVIEW (WEB)Status Date: Subtype: SOLAR Applied: 5/20/2021 Address: 56140 PGA BLVD Approved: 7/20/2021 City, State, Zip: LA QUINTA,CA92253 Closed: Project Manager: Expired: Details: LA QUINTA BY WOODBRIDGE / SOLAR PHOTOVOLTAIC MASTER PLANS FOR TOPAZ & CITRINE PLANS 1-8 FOR THE 2019 CODE CYCLE. 2019 CALIFORNIA BUILDING CODES. PLAN 1: 5.25kW SOLAR ARRAY - (15) 350W LONGI SOLAR LR4-60HPB-350M MODULES W/ (15) ENPHASE IQ7PLUS-72-2-US MICROINVERTERS + 125A IQ COMBINER BOX [300SF]. REFERENCE BCPR2021-0014 FOR APPROVED MASTER PLANS. SOLAR ARRAY TO BE ORIENTED BETWEEN 105°-300° AZIMUTH. PLAN 2, 3, 4 OR 5: 5.6kW SOLAR ARRAY - (16) 350W LONGI SOLAR LR4-60HPB-350M MODULES W/ (16) ENPHASE IQ7PLUS-72-2-US MICROINVERTERS + 125A IQ COMBINER BOX [320SF]. REFERENCE BCPR2021-0014 FOR APPROVED MASTER PLANS. SOLAR ARRAY TO BE ORIENTED BETWEEN 105°-300° AZIMUTH. PLAN 6, 7 OR 8: 5.95kW SOLAR ARRAY - (17) 350W LONGI SOLAR LR4-60HPB-350M MODULES W/ (17) ENPHASE IQ7PLUS-72-2-US MICROINVERTERS + 125A IQ COMBINER BOX [340SF]. REFERENCE BCPR2021-0014 FOR APPROVED MASTER PLANS. SOLAR ARRAY TO BE ORIENTED BETWEEN 105°-300° AZIMUTH. REVISION 2 - AC DISCONNECTS ADDED AND ELECTRICAL EQUIPMENT LOCATIONS PROVIDED ON ROOF PLANS. (SEE REVISION 1 REVIEW NOTES). REVISION 3 - REVISED ROOF LAYOUTS FOR PLAN 8 ELEV. A. Printed: Wednesday, December 20, 2023 11:25:44 AM 1 of 6 Project Details City of La Quinta PROJECT NUMBER BCPR2021-0014 CONTACTS NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL APPLICANT SUNRUN INSTALLATION SERVICES INC DBA SUN 775 FIERO LANE SUITE 200 SAN LUIS OBISPO CA 93401 (415)580-6900 DAVID.VITELA@SUNRU N.COM OWNER RREF II CWC LAQ LLC 5927 PRIESTLY DR STE 110 CARLSBAD CA 92008 (415)580-6900 PRIMARY CONTACT Vanessa Oros 1111 E Citrus St, Unit 1 Riverside CA 92507 (415)580-6900 Vanessa.garcia@sunru n.com EMAIL AARON HICKSON 5/20/2021 5/20/2021 EMAIL SENT WITH BL RENEWAL APPLICATION TO APPLICANT. CHANGED ADDRESS PER PLANS EXAMINER EMAIL JAKE FUSON 5/26/2021 5/26/2021 NOTIFIED APPLICANT OF 1ST REVIEW COMMENTS, SENT CORRECTION LIST VIA EMAIL. 2ND PC SUBMITTAL RECEIVED JAKE FUSON 6/10/2021 6/10/2021 EMAIL JAKE FUSON 6/23/2021 6/23/2021 NOTIFIED APPLICANT OF 2ND REVIEW COMMENTS, SENT CORRECTIONS VIA EMAIL. EMAIL JAKE FUSON 7/20/2021 7/20/2021 NOTIFIED APPLICANT THAT PLANS ARE APPROVED AND FEES ARE READY FOR PAYMENT. EMAIL JAKE FUSON 8/11/2022 8/11/2022 NOTIFIED APPLICANT THAT REVISIONS 1 & 2 ARE APPROVED AND READY FOR FEE PAYMENT. EMAIL JAKE FUSON 4/17/2023 4/17/2023 NOTIFIED APPLICANT THAT REVISION 3 IS APPROVED AND READY FOR FEE PAYMENT. CONDITIONS FINANCIAL INFORMATION DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD BY HOURLY CHARGE - CITY BUILDING STAFF 101-0000-42600 2.5 $402.50 $402.50 7/20/21 R66114 INVOICE 798 CREDIT ASHLE MARTINEZ AMA Printed: Wednesday, December 20, 2023 11:25:44 AM 2 of 6 Project Details City of La Quinta PROJECT NUMBER BCPR2021-0014 INSPECTIONS INSPECTION TYPE INSPECTOR SCHEDULED DATE COMPLETED DATE RESULT REMARKS NOTES REVIEWS DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD BY HOURLY CHARGE - CITY BUILDING STAFF 101-0000-42600 0.75 $120.75 $120.75 8/11/22 WEB12755 705874798 CREDIT SUNRUN INSTALLATION SERVICES INC ECON HOURLY CHARGE - CITY BUILDING STAFF 101-0000-42600 0.5 $80.50 $80.50 4/20/23 WEB14940 854740259 CREDIT SUNRUN INSTALLATION SERVICES INC ECON Total Paid for BUILDING STAFF - PER HOUR: $603.75 $603.75 RECORDS MANAGEMENT FEE - MAJOR 101-0000-42416 0 $21.00 $21.00 7/20/21 R66114 INVOICE 798 CREDIT ASHLE MARTINEZ AMA Total Paid for RECORDS MANAGEMENT FEE - MAJOR: $21.00 $21.00 TECHNOLOGY ENHANCEMENT FEE 502-0000-43611 0 $5.00 $5.00 7/20/21 R66114 INVOICE 798 CREDIT ASHLE MARTINEZ AMA Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00 TOTALS:$629.75 $629.75 REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED DATE STATUS REMARKS NOTES 1ST BLDG (1WK)JAKE FUSON 5/20/2021 5/27/2021 5/26/2021 REVISIONS REQUIRED SEE 1ST REVIEW CORRECTION LIST. Printed: Wednesday, December 20, 2023 11:25:44 AM 3 of 6 Project Details City of La Quinta PROJECT NUMBER BCPR2021-0014 1ST BLDG (1WK)JAKE FUSON 5/31/2022 6/7/2022 8/11/2022 APPROVED REVISION 1 APPROVED THORUGH REVISION 2, WHICH WAS SUBMITTED PRIOR TO REVIEW OF REVISION 1 BEING COMPLETED. CHANGES REFLECTED IN THE REVISION 1 PLANS WERE ALSO INCLUDED IN THE REVISION 2 PLAN SET SO NO REVISION 1 PLAN SET WAS STAMPED--THE REVISION 2 PLAN SET INCLUDES BOTH REVISION 1 & REVISION 2 CHANGES. 1ST BLDG (1WK)JAKE FUSON 3/13/2023 3/20/2023 4/17/2023 APPROVED REVISION 3 REVISION 3 - REVISED ROOF LAYOUTS FOR PLAN 8 ELEV. A. 1ST PERMIT TECHNICIAN (1DAY) PERMIT TECH BUCKET 5/20/2021 5/21/2021 5/20/2021 COMPLETE 1ST PLANNING (2WK) CARLOS FLORES 5/20/2021 6/4/2021 5/20/2021 NOT REQUIRED 2ND BLDG (1WK)JAKE FUSON 8/5/2022 8/12/2022 8/11/2022 APPROVED REVISION 2 REVISION 2 - AC DISCONNECTS ADDED AND ELECTRICAL EQUIPMENT LOCATIONS PROVIDED ON ROOF PLANS. (SEE REVISION 1 REVIEW NOTES) 2ND BLDG NS (2WK)JAKE FUSON 6/10/2021 6/17/2021 6/23/2021 REVISIONS REQUIRED 1. THE CONDUCTORS SHOWN IN CONDUIT SCHEDULE #2 ON THE ROOFTOP ARE SPECIFIED AS NM-B CONDUCTORS WHICH ARE NOT APPROVED FOR USE IN WET LOCATIONS SUCH AS THE ROOFTOP, PLEASE REVISE 2. PLEASE PROVIDE SPECIFIC PROOF THAT THE PROPOSED MODULES ARE COMPATIBLE WITH THE MICROINVERTERS SPECIFIED ON THE PLANS. PER THE MICROINVERTER CUTSHEET ONLY 60- AND 72-CELL MODULES ARE COMPATIBLE, AND THE RESPONSE PROVIDED DOES NOT RESOLVE THE ORIGINAL COMMENT. THIS PROOF OF COMPATIBILITY WOULD COME FROM TECHNICAL DATA PUBLISHED BY THE MANUFACTURER SPECIFICALLY DEMONSTRATING COMPLIANCE WITH THE COMPATIBILITY OF THE EQUIPMENT 3RD BLDG (1WK)JAKE FUSON 7/20/2021 7/21/2021 7/20/2021 APPROVED Printed: Wednesday, December 20, 2023 11:25:44 AM 4 of 6 Project Details City of La Quinta PROJECT NUMBER BCPR2021-0014 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 5/20/2021 EtrakitContractor 1ST SUBMITTAL PLANS Master Plan_La Quinta Woodbridge Pacific_Rev B.pdf 1 DOC 6/9/2021 EtrakitContractor 2ND SUBMITTAL PLANS Master Plan_La Quinta Woodbridge Pacific_Rev C.pdf 1 DOC 6/9/2021 EtrakitContractor 2ND SUBMITTAL RESPONSES Sunrun response letter - La Quinta (Woodbridge Pacific).pdf 1 DOC 7/20/2021 EtrakitContractor 3RD SUBMITTAL SOLAR PLAN Master Plan_La Quinta Woodbridge Pacific_Rev C (1).pdf 1 DOC 7/20/2021 EtrakitContractor 3RD SUBMITTAL RESPONSES Sunrun response letter - La Quinta (7.15.2021).pdf 1 DOC 5/27/2022 Etrakit Contractor REVISION 1 - 1ST SUBMITTAL SOLAR PLANS Signature Series Revision E Plans.pdf 1 DOC 5/27/2022 Etrakit Contractor REVISION 1 - NARRATIVE OF CHANGES Signature Series Revision E Letter.pdf 1 DOC 8/5/2022 Etrakit Contractor (REVISION 2) - NARRATIVE OF CHANGES La Quinta Advisory of Changes Notice (7.6.2022).docx 1 DOC 8/5/2022 Etrakit Contractor (REVISION 2) 1ST SUBMITTAL MASTER SOLAR PLAN Master Plan_La Quinta Woodbridge Pacific_Rev F (7.6.22).pdf 1 DOC 3/13/2023 Etrakit Contractor REVISION 3 - 1ST SUBMITTAL PLAN SHEETS Master Plan_La Quinta Woodbridge Pacific_Rev G (3.8.23).pdf 1 BOND INFORMATION Printed: Wednesday, December 20, 2023 11:25:44 AM 5 of 6 Project Details City of La Quinta PROJECT NUMBER BCPR2021-0014 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 3/13/2023 Etrakit Contractor REVISION 3 - 1ST SUBMITTAL NARRATIVE Signature at PGA West Sunrun Advisory of Changes Notice (3.8.23).docx 1 DOC 5/26/2021 JAKE FUSON 1ST REVIEW CORRECTION LIST BCPR2021-0014 - 1ST REVIEW CORRECTION LIST.pdf 1 DOC 7/20/2021 JAKE FUSON SOLAR MASTER PLANS (APPROVED) BCPR2021-0014 - APPROVED SOLAR MASTER PLANS.pdf 1 DOC 8/18/2021 JAKE FUSON TAKEOFF SHEETS (DO NOT USE) BCPR2021-0014 - TAKEOFF SHEETS.pdf 1 DOC 6/8/2022 JAKE FUSON TAKEOFF SHEETS (UPDATED) BCPR2021-0014 - TAKEOFF SHEETS (UPDATED).pdf 1 DOC 8/11/2022 JAKE FUSON REVISIONS 1 & 2 - PLAN SHEETS (APPROVED) BCPR2021-0014 - REVISIONS 1 _ 2 - PLAN SHEETS (APPROVED).pdf 1 DOC 4/17/2023 JAKE FUSON REVISION 3 - PLAN SHEETS (APPROVED) BCPR2021-0014 - REVISION 3 - PLAN SHEETS (APPROVED).pdf 1 Printed: Wednesday, December 20, 2023 11:25:44 AM 6 of 6 Project Details City of La Quinta PROJECT NUMBER BCPR2021-0014 BCPR2021-0014 – SIGNATURE MASTER SOLAR PLAN TAKE-OFFS PLAN 1 Permit Notes: PLAN 1: 5.25kW SOLAR ARRAY - (15) 350W LONGI SOLAR LR4-60HPB-350M MODULES W/ (15) ENPHASE IQ7PLUS-72-2-US MICROINVERTERS + 125A IQ COMBINER BOX [300SF]. REFERENCE BCPR2021-0014 FOR APPROVED MASTER PLANS. SOLAR ARRAY TO BE ORIENTED BETWEEN 105°-300° AZIMUTH. 2019 CALIFORNIA BUILDING CODES. Description: SIGNATURE / 5.25kW PV SYSTEM - (15) PANELS W/MICROINV. Fee Breakdown: - Building Standards Administration (BSAS) - Electrical 2019 o PV System less than 10kW PC o PV System less than 10kW o (1) PV Miscellaneous Equipment o (1) PV Miscellaneous Equipment PC - Permit issuance - Records Management Fee - Technology Enhancement Fee PLAN 2, 3, 4 & 5 Permit Notes: PLAN 2, 3, 4 OR 5: 5.6kW SOLAR ARRAY - (16) 350W LONGI SOLAR LR4-60HPB-350M MODULES W/ (16) ENPHASE IQ7PLUS-72-2-US MICROINVERTERS + 125A IQ COMBINER BOX [320SF]. REFERENCE BCPR2021- 0014 FOR APPROVED MASTER PLANS. SOLAR ARRAY TO BE ORIENTED BETWEEN 105°-300° AZIMUTH. 2019 CALIFORNIA BUILDING CODES. Description: SIGNATURE / 5.6kW PV SYSTEM - (16) PANELS W/MICROINV. Fee Breakdown: - Building Standards Administration (BSAS) - Electrical 2019 o PV System less than 10kW PC o PV System less than 10kW o (1) PV Miscellaneous Equipment o (1) PV Miscellaneous Equipment PC - Permit issuance - Records Management Fee - Technology Enhancement Fee PLAN 6, 7 & 8 Description: SIGNATURE / 5.95kW PV SYSTEM - (17) PANELS W/MICROINV. Permit Notes: PLAN 6, 7 OR 8: 5.95kW SOLAR ARRAY - (17) 350W LONGI SOLAR LR4-60HPB-350M MODULES W/ (17) ENPHASE IQ7PLUS-72-2-US MICROINVERTERS + 125A IQ COMBINER BOX [340SF]. REFERENCE BCPR2021- 0014 FOR APPROVED MASTER PLANS. SOLAR ARRAY TO BE ORIENTED BETWEEN 105°-300° AZIMUTH. 2019 CALIFORNIA BUILDING CODES. Fee Breakdown: - Building Standards Administration (BSAS) - Electrical 2019 o PV System less than 10kW PC o PV System less than 10kW o (1) PV Miscellaneous Equipment o (1) PV Miscellaneous Equipment PC - Permit issuance - Records Management Fee - Technology Enhancement Fee