Palo Verde TR 32279 BCPR2022-0019Project Details PROJECT NUMBER
Cit of La Quinta BCPR2022-0019
Description: PALO VERDE / TRACT CONSTRUCTION PLANS (PLAN 3) - Status: APPROVED
2019 CODES
Type: BUILDING CONSTRUCTION PLAN REVIEW (WEB) Status Date: 2/24/2023
Subtype: TRACT RESIDENTIAL Applied: 8/11/2022
Address: 80550 AVENUE 58 Approved: 3/8/2023
City, State, Zip: LA QUINTA,CA92253 Closed:
Project Manager: JAKE FUSON Expired: 6/30/2023
Details: PALO VERDE / TRACT CONSTRUCTION MASTER PLANS FOR PLAN 3 FOR THE 2019
CODE CYCLE (TOTAL: SFDx3) -- SEE BCPR2022-0008 FOR PLANS 1 & 2. 2019
CALIFORNIA BUILDING CODES.
PLAN 3: 3,579SF
REVISION 1- POST TENSIONED SLAB CHANGES.
REVISION 2 - ALTERNATE EXTERIOR MECHANICAL EQUIPMENT LOCATION ADDED.
DAYS
REVIEWS
ACTIONS
INSPECTIONS
CONDITIONS
CASE OPEN
OPEN
COMPLETED
CHRONOLOGY TYPE
STAFF NAME
ACTION DATE
COMPLETION DATE
NOTES
PHONED APPLICANT (661.877.6783) TO DETERMINE PROJECT
DESCRIPTION SO THAT APPLICATION MAYBE BE PROCESSED.
PHONE CALL
AJ ORTEGA
8/11/2022
8/11/2022
VERIFIED THAT APPLICATION BCPR2022-0008 WAS ONLY FOR
TWO PLAN TYPES, COMPLETED PROCESSING FOR REVIEW,
ATTACHMENTS VERIFIED AND REVIEWS CREATED.
NOTIFIED APPLICANT OF 1ST REVIEW COMMENTS, SENT
EMAIL
JAKE FUSON
11/7/2022
11/7/2022
CORRECTION LIST VIA EMAIL.
2ND PC COMPLETE/READY
JAKE FUSON
2/23/2023
2/23/2023
NOTIFIED APPLICANT OF 2ND REVIEW RESULT, SENT
FOR PICK UP
INTERWEST COMMENTS VIA EMAIL.
3RD PC SUBMITTAL
JAKE FUSON
2/24/2023
2/24/2023
RECEIVED
Printed: Wednesday, December 20, 2023 12:39:25 PM 1 of 9 CENTRALSQUARE
Project Details PROJECT NUMBER
City of La Quinta BCPR2022-0019
NOTIFIED APPLICANT THAT PLANS ARE APPROVED AND FEE IS
EMAIL
JAKE FUSON
3/8/2023
3/8/2023
READY FOR PAYMENT.
NOTIFIED APPLICANT THAT REVISION 1 IS APPROVED AND
EMAIL
JAKE FUSON
4/11/2023
4/11/2023
READY FOR FEE PAYMENT.
NOTIFIED APPLICANT THAT REVISION 2 IS APPROVED AND
EMAIL
JAKE FUSON
5/18/2023
5/18/2023
READY FOR FEE PAYMENT.
NAME TYPE
NAME
ADDRESSI
CITY
STATE
ZIP
PHONE
FAX
EMAIL
APPLICANT
WILLIAMS HOMES INC
24911 AVENUE
SANTA CLARITA
CA
91355
(661)877-6783
znordby@williamshom
STANFORD
es.com
CONTRACTOR
WILLIAMS HOMES INC
24911 AVENUE
SANTA CLARITA
CA
91355
(661)877-6783
znordby@williamshom
STANFORD
es.com
OWNER
WILLIAMS HOMES INC
24911 AVENUE
SANTA CLARITA
CA
91355
(661)877-6783
znordby@williamshom
STANFORD
es.com
•'i
grah
CLTD
DESCRIPTION
ACCOUNT
CITY
AMOUNT
PAID
PAID DATE
RECEIPT #
CHECK #
METHOD
PAID BY
BY
HOURLY CHARGE - CITY
101-0000-42600
3
$483.00
$483.00
3/8/23
WEB14568
828837963
CREDIT
734097
ECON
BUILDING STAFF
HOURLY CHARGE - CITY
101-0000-42600
0.5
$80.50
$80.50
4/12/23
WEB14865
849788614
CREDIT
734097
ECON
BUILDING STAFF
HOURLY CHARGE - CITY
101-0000-42600
0.25
$40.25
$0.00
BUILDING STAFF
HOURLY CHARGE -
INTERWEST
101-0000-42600
3.5
$437.50
$437.50
3/8/23
WEB14568
828837963
CREDIT
734097
ECON
STRUCTURAL PLAN
REVIEW
Printed: Wednesday, December 20, 2023 12:39:25 PM 2 of 9 CENTRALSQUARE
!� ylProject Details PROJECT NUMBER
City of La Quinta BCPR2022-0019
Low
CLTD
DESCRIPTION
ACCOUNT
CITY
AMOUNT
PAID
PAID DATE
RECEIPT #
CHECK #
METHOD
PAID BY
BY
HOURLY CHARGE -
INTERWEST
101-0000-42600
1
$125.00
$125.00
3/8/23
WEB14568
828837963
CREDIT
734097
ECON
STRUCTURAL PLAN
REVIEW
HOURLY CHARGE -
INTERWEST
101-0000-42600
1
$125.00
$125.00
3/8/23
WEB14568
828837963
CREDIT
734097
ECON
STRUCTURAL PLAN
REVIEW
HOURLY CHARGE -
INTERWEST
101-0000-42600
3
$375.00
$375.00
4/12/23
WEB14865
849788614
CREDIT
734097
ECON
STRUCTURAL PLAN
REVIEW
Total Paid for BUILDING STAFF - PER HOUR: $1,666.25 $1,626.00
FIRE NEW RESIDENTIAL
101-0000-42420
0
$242.00
$242.00
3/8/23
WEB14568
828837963
CREDIT
734097
ECON
PC
Total Paid for FIRE FEES: $242.00 $242.00
RECORDS
MANAGEMENT FEE -
101-0000-42416
0
$21.00
$21.00
3/8/23
WEB14568
828837963
CREDIT
734097
ECON
MAJOR
Total Paid for RECORDS MANAGEMENT FEE - MAJOR: $21.00 $21.00
TECHNOLOGY
502-0000-43611
0
$5.00
$5.00
3/8/23
WEB14568
828837963
CREDIT
734097
ECON
ENHANCEMENT FEE
Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00
NEW CONSTRUCTION -
101-0000-42400
0
$667.00
$667.00
3/8/23
WEB14568
828837963
CREDIT
734097
ECON
5+ RESIDENTIAL UNITS
Total Paid for ZONING CLEARANCE - PLANNING PLAN
$667.00 $667.00
CHECK:
INSPECTION TYPE I INSPECTOR I SCHEDULED I COMPLETED I RESULT
REMARKS
NOTES
Printed: Wednesday, December 20, 2023 12:39:25 PM 3 of 9 CENTRALSQUARE
!� ylProject Details PROJECT NUMBER
City of La Quinta BCPR2022-0019
DATE I DATE
RETURNED
REVIEW TYPE
REVIEWER
SENT DATE
DUE DATE
STATUS
REMARKS
NOTES
DATE
1ST BLDG (1WK)
JAKE FUSON
3/13/2023
3/20/2023
4/11/2023
APPROVED
REVISION 1 - PT
REVISION 1 - POST TENSIONED SLAB CHANGES.
FOUNDATION
1ST BLDG (1WK)
JAKE FUSON
4/12/2023
4/19/2023
5/18/2023
APPROVED
REVISION 2
REVISION 2 - ALTERNATE EXTERIOR MECHANICAL
EQUIPMENT LOCATION ADDED.
1ST BLDG NS (3WK)
JAKE FUSON
8/11/2022
9/1/2022
11/7/2022
REVISIONS REQUIRED
SEE ATTACHED 1ST REVIEW CORRECTION LIST.
1ST BLDG STR (2WK)
INTERWEST
8/11/2022
8/25/2022
8/25/2022
REVISIONS REQUIRED
1ST BLDG STR (2WK)
INTERWEST
3/13/2023
3/20/2023
3/20/2023
APPROVED
REVISION 1 - PT
FOUNDATION
1ST FIRE (2WK)
8/11/2022
8/25/2022
9/19/2022
APPROVED
HEOHL
ATTACHMENTS
TS
PENDING CONFIRMATION OF WHAT THIS
1ST PERMIT
AJ ORTEGA
8/11/2022
8/12/2022
8/11/2022
PENDING DOCUMENTS
SUBMITTAL IS, NO DESCRIPTION OF THE SCOPE
TECHNICIAN (1DAY)
OF WORK PROVIDED.
1ST PLANNING
SUIFREDO
8/11/2022
8/25/2022
8/16/2022
READY FOR APPROVAL
(2WK)
FERNANDEZ
PRIOR TO ISSUING BUILDING PERMIT, PLEASE
1ST PUBLIC WORKS
AMY YU
8/11/2022
8/25/2022
9/1/2022
APPROVED-
SUBMIT PAD CERTS AND COMPACTION REPORT
(2WK)
CONDITIONS
TO PUBLIC WORKS FOR REVIEW APPROVAL.
WQMP WILL ALSO NEED TO BE APPROVED.
2ND BLDG NS (2WK)
JAKE FUSON
12/27/2022
1/11/2023
2/23/2023
APPROVED-
INTERWEST STRUCTURAL APPROVAL REQUIRED.
CONDITIONS
2ND BLDG STR
INTERWEST
12/27/2022
1/4/2023
1/2/2023
REVISIONS REQUIRED
(1WK)
2ND PERMIT
PERMIT TECH
2ND SUBMITTAL PROCESSING
12/26/2022
12/27/2022
12/27/2022
COMPLETE
ADDED REVIEWS
TECHNICIAN (1DAY)
BUCKET
Printed: Wednesday, December 20, 2023 12:39:25 PM 4 of 9 CENTRALSQUARE
Project Details PROJECT NUMBER
City of La Quinta BCPR2022-0019
SAME COMMENT FROM 1ST REVIEW.
2ND PUBLIC WORKS
AMY YU
12/27/2022
1/4/2023
12/27/2022
APPROVED-
PRIOR TO ISSUING BUILDING PERMIT, PLEASE
(1WK)
CONDITIONS
SUBMIT PAD CERTS AND COMPACTION REPORT
TO PUBLIC WORKS FOR REVIEW APPROVAL.
3RD BLDG (1WK)
JAKE FUSON
2/24/2023
3/3/2023
3/8/2023
APPROVED
3RD BLDG STR
INTERWEST
2/24/2023
3/3/2023
2/28/2023
APPROVED
(2WK)
Attachment Type
CREATED
OWNER
DESCRIPTION
PATHNAME
SUBDIR
ETRAKIT ENABLED
BCPR2022-0019 - 1ST
DOC
8/11/2022
Etrakit Contractor
1ST SUBMITTAL PLAN
SUBMITTAL PLAN SET
1
SET (PLAN 3)
(PLAN 3).pdf
BCPR2022-0019 - 1ST
DOC
8/11/2022
Etrakit Contractor
1ST SUBMITTAL POST
SUBMITTAL POST
1
TENSION (PLAN 3)
TENSION (PLAN 3).pdf
BCPR2022-0019-1ST
1ST SUBMITTAL
SUBMITTAL
DOC
8/11/2022
Etrakit Contractor
STRUCTURAL
STRUCTURAL
1
CALCULATIONS (PLAN 3)
CALCULATIONS (PLAN
3).pdf
BCPR2022-0019-1ST
DOC
8/11/2022
Etrakit Contractor
1ST SUBMITTAL TRUSS
SUBMITTAL TRUSS
1
CALCULATIONS (PLAN 3)
CALCULATIONS (PLAN
3).pdf
1ST SUBMITTAL -
Geotechnical
DOC
8/17/2022
Etrakit Contractor
FOUNDATION PLAN
Letter —Plan 3 Slab
1
REVIEW LETTER
Review.pdf
00_Palo Verde —Plan
DOC
12/23/2022
Etrakit Contractor
2ND SUBMITTAL PLANS
3—Complete Set_2nd
1
BDS.pdf
Printed: Wednesday, December 20, 2023 12:39:25 PM 5 of 9 CENTRALSQUARE
!� ylProject Details PROJECT NUMBER
City of La Quinta BCPR2022-0019
Attachment Type
CREATED
OWNER
DESCRIPTION
PATHNAME
SUBDIR
ETRAKIT ENABLED
DOC
12/23/2022
Etrakit Contractor
2ND SUBMITTAL
01_Palo Verde —Plan
1
STRUCTURAL REVISIONS
3 Structural Calcs.pdf
02_Palo Verde
DOC
12/23/2022
Etrakit Contractor
2ND SUBMITTAL POST
—Plan
3—PT Placement
1
TENSION
Calcs.pdf
DOC
12/23/2022
Etrakit Contractor
2ND SUBMITTAL SOIL
03_Palo Verde _Soils
1
REPORT
Report S220718Z.pdf
DOC
12/23/2022
Etrakit Contractor
2ND SUBMITTAL
04_Palo Verde —Plan 3_
1
GEOTECHNICAL
Soils Review Letter.pdf
DOC
12/23/2022
Etrakit Contractor
2ND SUBMITTAL TRUSS
05 Palo Verde Plan
— —
1
CALCS
3 Truss.pdf
06_Palo Verde
DOC
12/23/2022
Etrakit Contractor
2ND SUBMITTAL
—Plan
3—Response Letters
1
RESPONSES 2
_La
Qunita_Delta 1.pdf
07_Palo Verde —Plan
DOC
12/23/2022
Etrakit Contractor
2ND SUBMITTAL
3_Response
1
RESPONSES 1
Letters_Interwest_Delta
1.pdf
Palo Verde
DOC
2/24/2023
Etrakit Contractor
3RD SUBMITTAL -
—Petra
Geotechnical
1
GEOTECHNICAL REPORT
Report_121721.pdf
Palo Verde -Post Tension
DOC
3/13/2023
Etrakit Contractor
REVISION 1 - 1ST
Plan Change
1
SUBMITTAL NARRATIVE
Summary_Specialty
Steel.pdf
REVISION 1 - 1ST
SUBMITTAL POST
DOC
3/13/2023
Etrakit Contractor
TENSION FOUNDATION
PALO VERDE PT CALCS
1
(3) 02-27-23.pdf
STRUCTURAL
CALCULATIONS
Printed: Wednesday, December 20, 2023 12:39:25 PM 6 of 9 CENTRALSQUARE
!� ylProject Details PROJECT NUMBER
City of La Quinta BCPR2022-0019
Attachment Type
CREATED
OWNER
DESCRIPTION
PATHNAME
SUBDIR
ETRAKIT ENABLED
REVISION 1 - 1ST
DOC
3/13/2023
Etrakit Contractor
SUBMITTAL
21-468 150 Plan 1-2, _ 3
1
FOUNDATION PLAN
Slab Review.pdf
REVIEW LETTER
REVISION 1 - 1ST
DOC
3/13/2023
Etrakit Contractor
SUBMITTAL POST
PALO VERDE PT (PLAN
1
TENSION FOUNDATION
3) 02-27-23ss.pdf
PLANS
REVISION 2 - 1ST
Palo Verde Delta 2 Plan
DOC
4/12/2023
Etrakit Contractor
SUBMITTAL
3 Mechanical
1
MECHANICAL PLANS
20230130.pdf
DOC
8/25/2022
INTERWEST
1ST REVIEW -
8550 Avenue 58 -
0
INTERWEST INVOICE
Invoice 80986.pdf
La Quinta-BCPR2022-
DOC
8/25/2022
INTERWEST
1ST REVIEW -
0019-PC1-80550-
0
INTERWEST COMMENTS
Avenue-58.docx
La Quinta - BCPR2022-
DOC
1/2/2023
INTERWEST
2ND REVIEW -
0019 - LAQ22-0078 -
0
INTERWEST INVOICE
Invoice 84343
$125.00.pdf
La Quinta-BCPR2022-
DOC
1/2/2023
INTERWEST
2ND REVIEW -
0019-PC2-80550-
0
INTERWEST COMMENTS
Avenue-58.docx
La Quinta - LAQ22-0078
DOC
2/28/2023
INTERWEST
3RD REVIEW -
- BCPR2022-0019 -
0
INTERWEST INVOICE
Invoice 85798
$93.75.pdf
3RD REVIEW -
La Quinta-BCPR2022-
DOC
2/28/2023
INTERWEST
INTERWEST
0019-PCF-80550-
0
TRANSMITTAL
Avenue-58.docx
Printed: Wednesday, December 20, 2023 12:39:25 PM 7 of 9 CENTRALSQUARE
!� ylProject Details PROJECT NUMBER
City of La Quinta BCPR2022-0019
Attachment Type
CREATED
OWNER
DESCRIPTION
PATHNAME
SUBDIR
ETRAKIT ENABLED
La Quinta - LAQ23-0020
REVISION 1 - 1ST
DOC
3/20/2023
INTERWEST
REVIEW INTERWEST
- BCPR2022-0019 -
0
Invoice 86285
INVOICE
$375.00.pdf
REVISION 1 - 1ST
La Quinta-BCPR2022-
DOC
3/20/2023
INTERWEST
REVIEW INTERWEST
0019-PCF-80550 Avenue
0
TRANSMITTAL
58-Revision.docx
BCPR2022-0019 - 1ST
DOC
11/7/2022
JAKE FUSON
1ST REVIEW COMPLETE
REVIEW COMPLETE
1
CORRECTION LIST
CORRECTION LIST.pdf
BCPR2022-0019 -
FOUNDATION PLAN
DOC
3/8/2023
JAKE FUSON
REVIEW LETTER
FOUNDATION PLAN
1
(APPROVED)
REVIEW LETTER
(APPROVED).pdf
BCPR2022-0019 -
DOC
3/8/2023
JAKE FUSON
GEOTECHNICAL REPORT
GEOTECHNICAL REPORT
1
(APPROVED)
(APPROVED).pdf
POST TENSION
BCPR2022-0019 - POST
DOC
3/8/2023
JAKE FUSON
FOUNDATION
TENSION FOUNDATION
1
CALCULATIONS
CALCULATIONS
(APPROVED)
(APPROVED).pdf
BCPR2022-0019 - SOIL
SOIL CORROSIVITY
DOC
3/8/2023
JAKE FUSON
EVALUATION REPORT
CORROSIVITY
1
EVALUATION REPORT
(APPROVED)
(APPROVED).pdf
BCPR2022-0019 -
STRUCTURAL
DOC
3/8/2023
JAKE FUSON
CALCULATIONS
STRUCTURAL
1
(APPROVED)
CALCULATIONS
(APPROVED).pdf
BCPR2022-0019 - TRUSS
DOC
3/8/2023
JAKE FUSON
TRUSS CALCULATIONS
CALCULATIONS
1
(APPROVED)
(APPROVED)1.pdf
Printed: Wednesday, December 20, 2023 12:39:25 PM 8 of 9 CENTRALSQUARE
!� ylProject Details PROJECT NUMBER
City of La Quinta BCPR2022-0019
Attachment Type
CREATED
OWNER
DESCRIPTION
PATHNAME
SUBDIR
ETRAKIT ENABLED
DOC
3/8/2023
JAKE FUSON
PLAN 3 TAKEOFF SHEET
BCPR2022-0019 - PLAN
0
3 TAKEOFF SHEET.pdf
DOC
3/8/2023
JAKE FUSON
PLAN SET (APPROVED)
BCPR2022-0019 - PLAN
1
SET (APPROVED).pdf
BCPR2022-0019 -
REVISION 1 -
REVISION 1 -
DOC
4/11/2023
JAKE FUSON
FOUNDATION PLAN
FOUNDATION PLAN
1
REVIEW LETTER
(APPROVED)
REVIEW LETTER
(APPROVED).pdf
BCPR2022-0019 -
REVISION 1 - POST
DOC
4/11/2023
JAKE FUSON
TENSION STRUCTUAL
REVISION 1 - POST
1
PLANS (APPROVED)
TENSION STRUCTUAL
PLANS (APPROVED).pdf
BCPR2022-0019 -
REVISION 1 - PT
REVISION 1 - PT
FOUNDATION
DOC
4/11/2023
JAKE FUSON
STRUCTURAL
FOUNDATION
1
STRUCTURAL
CALCULATIONS
(APPROVED)
CALCULATIONS
(APPROVED).pdf
BCPR2022-0019 -
REVISION 2 -
DOC
5/18/2023
JAKE FUSON
MECHANICAL PLAN
REVISION 2 -
1
MECHANICAL PLAN
(APPROVED)
(APPROVED).pdf
BCPR2022-0019 - FIRE
DOC
9/19/2022
KOHL HETRICK
FIRE CONDITIONS OF
CONDITIONS OF
1
APPROVAL
AppROVAL.pdf
Printed: Wednesday, December 20, 2023 12:39:25 PM 9 of 9 CENTRALSQUARE
UNDERLYING ADDRESS
80-550 AVENUE 58
APPLICATION
BCPR2022-0019
PROJECT DESCRIPTION
VALID UNITL DATE
12/31/2023
PALO VERDE
- PLAN 3
Mechanical
Units
New Construction
FURNACE
2
HEATER
CONDITIONED/AC (SF)
3,579
APPLIANCE (ALT/ADD)
GARAGE/UNCOND (SF)
643
COMPRESSOR
2
PATIO/COVERED (SF)
448
AIR HANDLER
EVAP COOLER
VENT FAN
7
FIRE SPRINKLER (SF)
4,222
EXHAUST HOOD
1
MISC MECHANICAL
CODE EDITION
2019
CONSTRUCTION TYPE
VB
Electrical
Units
GOOD
YES- / NO
NUMBER OF FLOORS
1
NEW ELECTRICAL (SF;
4,222
NUMBER OF BEDROOMS
4
and/or
NUMBER OF UNITS
1
RECEP/SWITCH/LIGHT
OCCUPANT LOAD
plus
OCCUPANCY
R-3/1-1
APPLIANCE - RES
MSHCP (DU/ACRE)
2.7
APPLIANCE - NONRES
(DWELLING UNITS PER ACRE, EX: 43,560SF/7,000SF Lot = 6.22DU/ACRE)
POWER APPARATUS
SIGNS
Options
SERVICE
None
TEMPORARY SERVICE
MISC ELECTRICAL
LIGHT POLES
PV SYSTEM - ARRAY
PV SYSTEM - MISC EQ
Plumbing
Units
Grading
FIXTURE/TRAP
20
TRACT
1
SEWER
1
CUSTOM HOME <=7KSF
SEPTIC
CUSTOM HOME >7KSF
ROOF DRAIN
WATER HEATER
1
GREASE INTERCEPTOR
WATER PIPING
1
BACKFLOW
GAS OUTLETS
6
REVISED: 5/15/2019
CAL FIRE - RIVERSIDE UNIT
RIVERSIDE COUNTY FIRE DEPARTMENT uCv
CASEY HARTMAN -- (ACTING) FIRE CHIE
OFFICE OF THE FIRE MARSHAL — LA QUINTA
78495 Calle Tampico, La Quinta, CA 92253 • Phone (760) 777-7074
• www.rvcfire.org
September 19, 2022
William's Homes Inc
24911 Avuenue Stanford
Santa Clarita, CA 91355
Re: New Building - Fire Plan Review — PALO VERDE — TR 32279 — MASTER PLAN 3
BCPR2022-0019 / 80550 AVENUE 58, LA QUINTA, CA 92253
The building plans you submitted for the above referenced project have been reviewed by Riverside County
Fire Department - Office of the Fire Marshal personnel and are approved with the following conditions.
Fire Department approval is based upon the 2019 CBC/CRC requirements for R-3/U occupancies in a
planned/tract community.
TRACT ACCESS & WATER REQUIREMENTS:
ACCESS
Fire Department emergency vehicle apparatus access road locations and design shall be in accordance with
the California Fire Code, La Quinta Municipal Code and Riverside County Fire Department Standards.
1) Certain designed areas will be required to be maintained as fire lanes and will require approved signs
and/or red painted curbs.
2) Vehicle access gates shall be provided with KNOX Box, Padlock or Key -switch access. Automatic gates
shall also have Opticom IR receivers.
3) Approved street signs shall be installed and visible.
4) No Traffic Calming Devices shall be installed. *Future/proposed traffic calming devices require
approval by the Office of the Fire Marshal.
WATER
1) Fire hydrants shall be installed within 600 feet hose -lay length of the proposed residential units.
2) An observable minimum fire flow shall be present upon testing.
3) Fire hydrant caps shall be in place and marked in accordance with local requirements.
4) Blue roadway reflector shall be installed in the completed roadway to identify the location of all fire
hydrants.
5) Hydrant roadway valve boxes shall have their coverplate or lid exposed and easily accessible.
PRIOR TO PERMIT RELEASE INSPECTION
1) Individual Tract Home (Production) permits will not be released until a Tract Access/Water inspection
has been completed for the affected phase or grouping of f lots. Applicant/Contractor shall be responsible
for contacting the Office of the Fire Marshal to schedule inspections. Request for inspections are to be
made at least 48 hours in advance and may be arranged by calling 760-777-7131.
DEFERRED SUBMITTALS REQUIRED
1) A Residential Fire Sprinkler system shall be installed in compliance with CRC R313. CA Licensed
Contractor (C-16) shall submit plans and details for review and approval prior to Rough Inspections.
a. Residential Fire Sprinkler permits may be applied for as Master Plan Types. A single Fire
Sprinkler Master Plan permit for each different plan type may be individually applied for.
Coordinate with the La Quinta Permit Technicians for appropriate application and fee
process.
GENERAL CONDITIONS
1) Property/Unit Addressing shall be provided. Minimum 4-inch tall numbers of contrasting color to their
background shall be posted on the structure when viewable from the roadway, or at the driveway
entrance and maintained visible from both directions of travel.
2) All HOA and Private landscaping shall maintain a minimum 3-feet radius clearance around the
circumference of fire protection equipment, that includes fire hydrants.
3) Dwelling Units shall maintain a minimum 3-feet clear width Egress Court from emergency escape
windows and doors of sleeping rooms, and shall deposit to the front of the property or public way. (Ref.
CBC 1028.4 / CRC R311.1)
The Fire Department approved plans and conditions letter must be at the job site.
Applicant/installer shall be responsible to contact the Fire Department to schedule inspections. Requests for
inspections are to be made at least 48 hours in advance and may be arranged by calling (760)777-7131.
All questions regarding the meaning of these conditions should be referred to the Office of the Fire Marshal
staff at (760)777-7074.
Kohl Hetrick - Fire Safety Specialist
riv,
INTERWES
-
INVOICE #80986
August 25, 2022
Jurisdiction No. BCPR2022-0019
Interwest Job No. LAQ22-0078
Bill to: City of La Quinta Remit to: Interwest Consulting Direct questions to:
Attention Danny Castro, Design & Development :Group :Kayla Degrote
Director 444 N. Cleveland Avenue :kdegrote@interwestgrp.com
78495 Calle Tampico :Loveland, CO 80537
La Quinta, CA 92253
Professional services for the period July 1, 2020 through August 25, 2022
RESIDENTIAL - BCPR2022-0019 - LAQ22-0078 - 80550 AVENUE 58
80550 AVENUE 58
Invoice Total 1 $437.50
Employee Title Week Hours Rate Total
Jenny Truong I Plan Check Engineer 1 8/25/20221 3.5 $125.001 $437.50
12/30/22, 2:54 PM Invoice
nV
INTERWEST
A SAFEbwtt COMPANY
INVOICE #84343
December 30, 2022
Jurisdiction No. BCPR2022-0019
Interwest Job No. LAQ22-0078
Bill to: City of La Quinta :Remit to: Interwest Consulting :Direct questions to:
Attention Danny Castro, Design & Development :Group :Erica Cuevas
Director 444 N. Cleveland Ave :(970) 568-5034
78495 Calle Tampico Loveland, CO 80537 :ecuevas@interwestgrp.com
La Quinta, CA 92253
Professional services for the period December 1-through December 30, 2022
RESIDENTIAL- BCPR2022-0019 - LAQ22-0078 - 80550 AVENUE 58
80550 AVENUE 58
Invoice Total 1 $125.00
Employee Title Day Hours Rate Total
Jenny Truong Plan Check Engineer 1 12/29 1 $125.001 $125.00
https://interwest.lucidbilling.com/invoices/print 1/1
2/28/23. 11:27 AM Invoice
1w
INTERWEST
A SAFEbwtt COMPANY
INVOICE #85798
February 28, 2023
Jurisdiction No. BCPR2022-0019
Interwest Job No. LAQ22-0078
Bill to: City of La Quinta Remit to: Interwest Consulting Group Direct questions to:
Attention Danny Castro 444 N. Cleveland Ave Erica Cuevas
Design & Development Director Loveland, CO 80537 (970) 568-5034
78495 Calle Tampico ecuevas@interwestgrp.com
La Quinta, CA 92253
Professional services for the period February I through February 28, 2023
RESIDENTIAL - BCPR2022-0019 - LAQ22-0078 - 80550 AVENUE 58
80550 AVENUE 58
Invoice Total 1$93.75
Employee Title Day Hours Rate Total
Jenny Truong Plan Check Engineer 1 2/271 0.75 $125.001 $93.75
https://interwest.lucidbilIing.com/invoices/print 1/1
3/20/23. 8:35 AM Invoice
nV
INTERWEST
A SAFEbwtt COMPANY
INVOICE #86285
March 20, 2023
Jurisdiction No. BCPR2022-0019
Interwest Job No. LAQ23-0020
Bill to: City of La Quinta Remit to: Interwest Consulting Group Direct questions to:
Attention Danny Castro 444 N. Cleveland Ave Erica Cuevas
Design & Development Director Loveland, CO 80537 (970) 568-5034
78495 Calle Tampico ecuevas@interwestgrp.com
La Quinta, CA 92253
Professional services for the period March I through March 20, 2023
REviSION #1 - SINGLE FAMILY - BCPR2022-0019 - LAQ23-0020
80550 Avenue58
Invoice Total 1 $375.00
Employee Title Day Hours Rate Total
Ho Jun Kong Plan Check Engineer 1 3/18 3 $125.001 $375.00
https://interwest.lucidbilling.com/invoices/print 1/1
ENGINEERS + GEOLOGISTS + ENVIRONMENTAL SCIENTISTS
February 28, 2023
J.N. 21-468
WILLIAMS HOMES
24911 Avenue Stanford
Santa Clarita, California 91355
Attention: Mr. Zachary Nordby
Subject: Review of Footing and Slab on Grade Plans, Palo Verde Project, Tract No. 33336,
Cherrywood Place and Rosewood Court, North of Avenue 58 and East of Paseo Del
Lago, City of La Quinta, Riverside County, California
Reference: Geotechnical Design and Construction Recommendations, Palo Verde Project,
Tracts 33336 (Lots 1 — 23) and 32279 (Lots 2, 9 — 12, 16 — 22, 29 and 30), Cherrywood
Place and Rosewood Court, North of Avenue 58 and East of Paseo Del Lago, City of La
Quinta, Riverside County, California; report prepared by Petra Geosciences, Inc. dated
December 17, 2021.
Dear Mr. Nordby:
Petra Geosciences, Inc. (Petra) is in receipt of 2 sets of post -tensioned slab and foundation plans,
Plans 1-2 and Plan 3, for Tract 33336 at the subject project. These plans were prepared by Specialty Steel,
both dated February 27, 2023. Plans 1-2 set includes Structural Sheets PTD, PTHD, PT-1, and PT-2.
Additionally, this set also include Sheets WSWH1.1 and WSWHlprepared by Simpson Strong -Tie, Co.
Inc., last updated on March 16, 2021. The Plan 3 set includes Structural Sheets PTD, PTHD, and PT-3. We
have reviewed these plans, especially Sheet PTD of each set, and find that they are prepared in general
conformance with the relevant contents of the referenced reports.
We appreciate this opportunity to be of service. Should you have any questions, please do not hesitate to
contact us.
Respectfully submitted,
PETRA GEOSCIENCES, INC.
2/28/23
Siamak Jafroudi, PhD
Senior Principal Engineer
GE 2024
9:3
SJ/lv
W:\2020-2025\2021\400\21468\Reports\21-468 150 Plan 1-2, & 3 Slab Review.docx
OF
Offices Strategically Positioned Throughout Southern California
ORANGE COUNTY OFFICE
3186 Airway Avenue, Suite K, Costa Mesa, California 92626
T:714.549.8921 F:714.751.0108
For more information visit us online at www.i)etra-inc.com
REVISION 1
BCPR2022-0019
CITY OF LA QUINTA
BUILDING DIVISION
REVIEWED FOR
CODE
COMPLIANCE
D1104/11 /2023 , j F
POST TENSIONED SLAB
CHANGES
ENGINEERS + GEOLOGISTS + ENVIRONMENTAL SCIENTISTS BCPR2022-0019
CITY OF LA QUINTA August 17, 2022
BUILDING DIVISION J.N. 21-468
WILLIAMS HOMES REVIEWED FOR
CODE
24911 Avenue Stanford COMPLIANCE
Santa Clarita, California 91355 0A,03/08/2023 JP
PALO VERDE / PLAN 3 TRACT
Attention: Mr. Zachary Nordby CONSTRUCTION PLANS
Subject: Review of Footing and Slab on Grade Plans — Plan 3, Palo Verde Project, Tract
Nos. 33336 and 32279, Cherrywood Place and Rosewood Court, North of Avenue 58
and East of Paseo Del Lago, City of La Quinta, Riverside County, California
Reference: Geotechnical Design and Construction Recommendations, Palo Verde Project,
Tracts 33336 (Lots 1 — 23) and 32279 (Lots 2, 9 — 12, 16 — 22, 29 and 30), Cherrywood
Place and Rosewood Court, North of Avenue 58 and East of Paseo Del Lago, City of La
Quinta, Riverside County, California; report prepared by Petra Geosciences, Inc.,
J.N. 21-468, dated December 17, 2021.
Dear Mr. Nordby:
Petra Geosciences, Inc. (Petra) is in receipt of post -tensioned slab and foundation plans for the subject
project. These plans were prepared by SunCoast Post -Tension, Ltd., dated 6/17/2022 (Delta 1), and include
Structural Sheets PTD and PT3. We have reviewed these plans, especially Sheet PTD, and find that they
are prepared in general conformance with the relevant contents of the referenced reports.
We appreciate this opportunity to be of service. Should you have any questions, please do not hesitate to
contact us.
Respectfully submitted,
PETRA GEOSCIENCES, INC.
8/1�j /22
Siamak Jafroudi, PhD
Senior Principal Engineer
GE 2024
SJ/lv
W:\2020-2025\2021\400\21-468\Reports\21-468 150 Plan 3 Slab Review.docx
Reviewed for Code Compliance
Feb. 27, 2023
Interwest Consulting Group
w No. GE002024
nc
\lECHN
FOFCALF
Offices Strategically Positioned Throughout Southern California
ORANGE COUNTY OFFICE
3186 Airway Avenue, Suite K, Costa Mesa, California 92626
T:714.549.8921 F:714.751.0108
For more information visit us online at www.i)etra-inc.com