Loading...
2025 07 01 CouncilCITY COUNCIL AGENDA Page 1 of 7 JULY 1, 2025 CITY COUNCIL AGENDA CITY HALL COUNCIL CHAMBER 78495 Calle Tampico, La Quinta REGULAR MEETING ON TUESDAY, JULY 1, 2025 3:00 P.M. CLOSED SESSION | 4:00 P.M. OPEN SESSION Members of the public may listen to this meeting by tuning-in live via www.laquintaca.gov/livemeetings. CALL TO ORDER ROLL CALL: Councilmembers: Fitzpatrick, McGarrey, Peña, Sanchez, and Mayor Evans PUBLIC COMMENT ON MATTERS NOT ON THE AGENDA At this time, members of the public may address the City Council on any matter not listed on the agenda pursuant to the “Public Comments – Instructions” listed at the end of the agenda. The City Council values your comments; however, in accordance with State law, no action shall be taken on any item not appearing on the agenda unless it is an emergency item authorized by the Brown Act [Government Code § 54954.2(b)]. CONFIRMATION OF AGENDA CLOSED SESSION 1. CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION; PURSUANT TO PARAGRAPH (1) OF SUBDIVISION (d) OF GOVERNMENT CODE SECTION 54956.9; CASES NAMES AND NUMBERS – MULTIPLE (listed below, all in U.S. Bankruptcy Court, District of Delaware) CASE NAME: CASE NUMBER SilverRock Development Company, LLC 24-11647 SilverRock Lifestyle Residences, LLC 24-11648 SilverRock Lodging, LLC 24-11650 SilverRock Luxury Residences, LLC 24-11652 SilverRock Phase I, LLC 24-11654 RGC PA 789, LLC 24-11657 City Council agendas and staff reports are available on the City’s web page: www.LaQuintaCA.gov CITY COUNCIL AGENDA Page 2 of 7 JULY 1, 2025 2. CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION; PURSUANT TO PARAGRAPH (1) OF SUBDIVISION (d) OF GOVERNMENT CODE SECTION 54956.9; NAME OF CASE: CITY OF LA QUINTA V. SILVERROCK DEVELOPMENT COMPANY, ET AL. (RIVERSIDE COUNTY SUP. CT. CASE NO. CVPS2404750) 3. CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION PURSUANT TO PARAGRAPH (1) OF SUBDIVISION (d) of GOVERNMENT CODE SECTION 54956.9; NAME OF CASE: Langdon v. City of La Quinta (Small Claims Court, Riverside County Superior Court, Case No. SCPS2500496) RECESS TO CLOSED SESSION RECONVENE AT 4:00 P.M. REPORT ON ACTION(S) TAKEN IN CLOSED SESSION PLEDGE OF ALLEGIANCE PUBLIC COMMENT ON MATTERS NOT ON THE AGENDA At this time, members of the public may address the City Council on any matter not listed on the agenda pursuant to the “Public Comments – Instructions” listed at the end of the agenda. The City Council values your comments; however, in accordance with State law, no action shall be taken on any item not appearing on the agenda unless it is an emergency item authorized by the Brown Act [Government Code § 54954.2(b)]. ANNOUNCEMENTS, PRESENTATIONS, AND WRITTEN COMMUNICATIONS 1. SILVERROCK (FORMERLY TALUS) DEVELOPMENT PROJECT – STATUS UPDATE CONSENT CALENDAR NOTE: Consent Calendar items are routine in nature and can be approved by one motion. PAGE 1. APPROVE MINUTES OF CITY COUNCIL REGULAR MEETING HELD JOINTLY WITH HOUSING AUTHORITY SPECIAL MEETING DATED JUNE 17, 2025 9 2. AUTHORIZE OVERNIGHT TRAVEL FOR TWO DESIGN AND DEVELOPMENT DEPARTMENT EMPLOYEES TO ATTEND THE AMERICAN PLANNING ASSOCIATION CALIFORNIA CHAPTER’S ANNUAL CONFERENCE IN MONTEREY, CALIFORNIA, SEPTEMBER 28 THROUGH OCTOBER 1, 2025 25 3. AUTHORIZE OVERNIGHT TRAVEL FOR THREE COUNCILMEMBERS, CITY CLERK, AND DEPUTY CITY CLERK TO ATTEND THE CALIFORNIA JOINT POWERS INSURANCE AUTHORITY 2025 RISK MANAGEMENT EDUCATIONAL FORUM IN CARLSBAD, CALIFORNIA, OCTOBER 1-3, 2025 27 CITY COUNCIL AGENDA Page 3 of 7 JULY 1, 2025 4. APPROVE AGREEMENTS FOR CONTRACT SERVICES FOR ON-CALL STREET SWEEPING SERVICES WITH (1) LIPPA LLC DBA ROAD SERVICES AND (2) BANCROFT CONSTRUCTION SERVICES LLC 29 5. APPROVE AGREEMENT FOR CONTRACT SERVICES WITH ST. FRANCIS ELECTRIC FOR THE SIGNAL AND CROSSWALK IMPROVEMENTS PROJECT NO. 2024-18 89 6. APPROVE DEMAND REGISTERS DATED JUNE 6 AND 13, 2025 121 BUSINESS SESSION PAGE 1. APPROVE CANCELLING THE REGULAR CITY COUNCIL MEETINGS OF AUGUST 19 AND SEPTEMBER 2, 2025 139 2. APPROVE CITY HALL MURAL DESIGN 141 3. APPROVE AMENDMENT NO. 1 TO AGREEMENT FOR CONTRACT SERVICES WITH VISUAL EDGE IT FOR (1) MANAGED INFORMATION TECHNOLOGY SERVICES, AND (2) ADDITIONAL EQUIPMENT AND PROFESSIONAL SERVICES 147 STUDY SESSION – None PUBLIC HEARINGS – 5:00 p.m. or thereafter For all Public Hearings on the agenda, a completed “Request to Speak” form must be filed with the City Clerk prior to consideration of that item; comments are limited to three (3) minutes (approximately 350 words). Any person may submit written comments to the City Council prior to the public hearing and/or may appear and be heard in support of or opposition to the project(s) at the time of the public hearing. If you challenge a project(s) in court, you may be limited to raising only those issues you or someone else raised at the public hearing or in written correspondence delivered to the City at or prior to the public hearing. PAGE 1. ADOPT RESOLUTION TO APPROVE SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT NO. 3), CONDITIONAL USE PERMIT 2024-0007 AND SITE DEVELOPMENT PERMIT 2024-0014 FOR AN APPROXIMATE 3,690 SQUARE FOOT DRIVE-THROUGH BUILDING FOR THE HIGHWAY 111/ADAMS STREET DRIVE-THROUGH PROJECT; CEQA: THIS PROJECT IS EXEMPT FROM ENVIRONMENTAL REVIEW PURSUANT TO SECTION 15332 (CLASS 32) INFILL DEVELOPMENT; PROJECT LOCATION: SOUTHWEST CORNER OF ADAMS STREET AND CORPORATE CENTRE DRIVE [RESOLUTION NO. 2025-020] 185 CITY COUNCIL AGENDA Page 4 of 7 JULY 1, 2025 DEPARTMENTAL REPORTS 1. CITY MANAGER 2. CITY ATTORNEY 3. CITY CLERK 4. COMMUNITY SERVICES 5. DESIGN AND DEVELOPMENT 6. FINANCE 7. PUBLIC SAFETY 8. PUBLIC WORKS MAYOR’S AND COUNCIL MEMBERS’ ITEMS REPORTS AND INFORMATIONAL ITEMS 1. CVAG CONSERVATION COMMISSION (Evans) 2. CVAG ENERGY AND SUSTAINABILITY COMMITTEE (Evans) 3. CVAG EXECUTIVE COMMITTEE (Evans) 4. VISIT GREATER PALM SPRINGS CONVENTION AND VISITORS BUREAU (Evans) 5. LEAGUE OF CALIFORNIA CITIES DELEGATE (Evans) 6. COACHELLA VALLEY WATER DISTRICT JOINT POLICY COMMITTEE (Evans) 7. COACHELLA VALLEY POWER AGENCY JOINT POWERS AGREEMENT (Evans) 8. ECONOMIC DEVELOPMENT SUBCOMMITTEE (Evans & Fitzpatrick) 9. DESERT SANDS UNIFIED SCHOOL DISTRICT COMMITTEE (Evans & Sanchez) 10. DESERT RECREATION DISTRICT COMMITTEE (Fitzpatrick & McGarrey) 11. COACHELLA VALLEY UNIFIED SCHOOL DISTRICT COMMITTEE (Fitzpatrick & Peña) 12. RIVERSIDE COUNTY TRANSPORTATION COMMISSION (Fitzpatrick) 13. CVAG TRANSPORTATION COMMITTEE (Fitzpatrick) 14. COMMUNITY SERVICE GRANT REVIEW COMMITTEE (Evans & Sanchez) 15. COACHELLA VALLEY MOUNTAINS CONSERVANCY (McGarrey) 16. GREATER CV CHAMBER OF COMMERCE INFORMATION EXCHANGE COMMITTEE (Sanchez) 17. LEAGUE OF CALIFORNIA CITIES – ENVIRONMENTAL QUALITY POLICY COMMITTEE (McGarrey) 18. LEAGUE OF CALIFORNIA CITIES – EXECUTIVE COMMITTEE RIVERSIDE COUNTY DIVISION (McGarrey) 19. CANNABIS AD HOC COMMITTEE (Peña & Sanchez) 20. CVAG PUBLIC SAFETY COMMITTEE (Peña) 21. CVAG HOMELESSNESS COMMITTEE (Peña) 22. COACHELLA VALLEY MOSQUITO AND VECTOR CONTROL DISTRICT (Peña) 23. SUNLINE TRANSIT AGENCY (Peña) 24. ART PURCHASE COMMITTEE (Sanchez & McGarrey) 25. CALIFORNIA JOINT POWERS INSURANCE AUTHORITY (Sanchez) 26. CALIFORNIA ASSOCIATION OF LOCAL AGENCY FORMATION COMMISSION (Sanchez) 27. COACHELLA VALLEY ANIMAL CAMPUS COMMISSION (Sanchez) 28. LEAGUE OF CALIFORNIA CITIES – PUBLIC SAFETY COMMITTEE (Sanchez) CITY COUNCIL AGENDA Page 5 of 7 JULY 1, 2025 29. RIVERSIDE COUNTY AIRPORT LAND USE COMMISSION (Sanchez) 30. RIVERSIDE LOCAL AGENCY FORMATION COMMISSION (Sanchez) 31. SOUTHERN CALIFORNIA ASSOCIATION OF GOVERNMENTS (Sanchez) 32. SOUTHERN CALIFORNIA ASSOCIATION OF GOVERNMENTS REGIONAL COUNCIL (Sanchez) 33. FINANCING AUTHORITY SPECIAL MEETING MINUTES DATED JUNE 17, 2025 405 ADJOURNMENT ********************************* The next regular meeting of the City Council will be held on July 15, 2025, at 4:00 p.m. at the City Hall Council Chamber, 78495 Calle Tampico, La Quinta, CA 92253. DECLARATION OF POSTING I, Monika Radeva, City Clerk of the City of La Quinta, do hereby declare that the foregoing Agenda for the La Quinta City Council meeting was posted on the City’s website, near the entrance to the Council Chamber at 78495 Calle Tampico, and the bulletin board at the La Quinta Cove Post Office at 51321 Avenida Bermudas, on June 27, 2025. DATED: June 27, 2025 MONIKA RADEVA, City Clerk City of La Quinta, California Public Notices  Agenda packet materials are available for public inspection: 1) at the Clerk’s Office at La Quinta City Hall, located at 78495 Calle Tampico, La Quinta, California 92253; and 2) on the City’s website at www.laquintaca.gov/councilagendas, in accordance with the Brown Act [Government Code § 54957.5; AB 2647 (Stats. 2022, Ch. 971)].  The La Quinta City Council Chamber is handicapped accessible. If special equipment is needed for the hearing impaired, please call the City Clerk’s office at (760) 777-7123, 24- hours in advance of the meeting and accommodations will be made.  If background material is to be presented to the City Council during a City Council meeting, please be advised that 15 copies of all documents, exhibits, etc., must be supplied to the City Clerk for distribution. It is requested that this takes place prior to the beginning of the meeting. PUBLIC COMMENTS - INSTRUCTIONS CITY COUNCIL AGENDA Page 6 of 7 JULY 1, 2025 Members of the public may address the City Council on any matter listed or not listed on the agenda as follows: WRITTEN PUBLIC COMMENTS can be provided either in-person during the meeting by submitting 15 copies to the City Clerk, it is requested that this takes place prior to the beginning of the meeting; or can be emailed in advance to CityClerkMail@LaQuintaCA.gov, no later than 12:00 p.m., on the day of the meeting. Written public comments will be distributed to Council, made public, and will be incorporated into the public record of the meeting, but will not be read during the meeting unless, upon the request of the Mayor, a brief summary of public comments is asked to be reported. If written public comments are emailed, the email subject line must clearly state “Written Comments” and should include: 1) full name, 2) city of residence, and 3) subject matter. VERBAL PUBLIC COMMENTS can be provided in-person during the meeting by completing a “Request to Speak” form and submitting it to the City Clerk; it is requested that this takes place prior to the beginning of the meeting. Please limit your comments to three (3) minutes (or approximately 350 words). Members of the public shall be called upon to speak by the Mayor. In accordance with City Council Resolution No. 2022-027, a one-time additional speaker time donation of three (3) minutes per individual is permitted; please note that the member of the public donating time must: 1) submit this in writing to the City Clerk by completing a “Request to Speak” form noting the name of the person to whom time is being donated to, and 2) be present at the time the speaker provides verbal comments. Verbal public comments are defined as comments provided in the speakers’ own voice and may not include video or sound recordings of the speaker or of other individuals or entities, unless permitted by the Mayor. Public speakers may elect to use printed presentation materials to aid their comments; 15 copies of such printed materials shall be provided to the City Clerk to be disseminated to the City Council, made public, and incorporated into the public record of the meeting; it is requested that the printed materials are provided prior to the beginning of the meeting. There shall be no use of Chamber resources and technology to display visual or audible presentations during public comments, unless permitted by the Mayor. All writings or documents, including but not limited to emails and attachments to emails, submitted to the City regarding any item(s) listed or not listed on this agenda are public records. All information in such writings and documents is subject to disclosure as being in the public domain and subject to search and review by electronic means, including but not limited to the City’s Internet Web site and any other Internet Web-based platform or other Web-based form of communication. All information in such writings and documents similarly is subject to disclosure pursuant to the California Public Records Act [Government Code § 7920.000 et seq.]. CITY COUNCIL AGENDA Page 7 of 7 JULY 1, 2025 TELECONFERENCE ACCESSIBILITY – INSTRUCTIONS Teleconference accessibility may be triggered in accordance with AB 2449 (Stats. 2022, Ch. 285), codified in the Brown Act [Government Code § 54953], if a member of the City Council requests to attend and participate in this meeting remotely due to “just cause” or “emergency circumstances,” as defined, and only if the request is approved. In such instances, remote public accessibility and participation will be facilitated via Zoom Webinar as detailed at the end of this Agenda. *** TELECONFERENCE PROCEDURES*** APPLICABLE ONLY WHEN TELECONFERENCE ACCESSIBILITY IS IN EFFECT Pursuant to Government Code § 54953(f) [AB 2449, Stats. 2022, Ch. 285, Rubio]. Verbal public comments via Teleconference – members of the public may attend and participate in this meeting by teleconference via Zoom and use the “raise your hand” feature when public comments are prompted by the Mayor; the City will facilitate the ability for a member of the public to be audible to the City Council and general public and allow him/her/them to speak on the item(s) requested. Please note – members of the public must unmute themselves when prompted upon being recognized by the Mayor, in order to become audible to the City Council and the public. Only one person at a time may speak by teleconference and only after being recognized by the Mayor. ZOOM LINK: https://us06web.zoom.us/j/86171130130 Meeting ID: 861 7113 0130 Or join by phone: (253) 215 – 8782 Written public comments – can be provided in person during the meeting or emailed to the City Clerk’s Office at CityClerkMail@LaQuintaCA.gov any time prior to the adjournment of the meeting, and will be distributed to the City Council, made public, incorporated into the public record of the meeting, and will not be read during the meeting unless, upon the request of the Mayor, a brief summary of any public comment is asked to be read, to the extent the City Clerk’s Office can accommodate such request. 8 MINUTES Page 1 of 16 JUNE 17, 2025 CITY COUNCIL REGULAR MEETING HELD JOINTLY WITH HOUSING AUTHORITY SPECIAL MEETING CITY COUNCIL REGULAR MEETING HELD JOINTLY WITH HOUSING AUTHORITY SPECIAL MEETING MINUTES TUESDAY, JUNE 17, 2025 CALL TO ORDER A regular meeting of the La Quinta City Council was called to order at 3:00 p.m. by Mayor Evans. PRESENT: Councilmembers Fitzpatrick, McGarrey, Peña, Sanchez, and Mayor Evans ABSENT: None PUBLIC COMMENT ON MATTERS NOT ON THE AGENDA – None CONFIRMATION OF AGENDA Councilmember Fitzpatrick said she will comment on Consent Calendar Item No. 8. Mayor Evans said City Attorney Ihrke will provide a verbal announcement on Consent Calendar Item Nos. 8 and 9 regarding the salaries and fringe benefits of the City’s executive employees pursuant to Government Code § 54953(c)(3) [Brown Act]. Mayor Evans said she will comment on Consent Calendar Item No. 2. City Clerk Radeva said a HAND-OUT was distributed noting typographical corrections on pages 211 and 216 of the agenda packet, under Consent Calendar Item No. 8, related to the adoption of the proposed fiscal year 2025/26 Salary Plan/Schedule. Council concurred. CLOSED SESSION 1. CONFERENCE WITH LABOR NEGOTIATORS PURSUANT TO GOVERNMENT CODE SECTION 54957.6; CITY DESIGNATED REPRESENTATIVE: CARLA TRIPLETT, HUMAN RESOURCES DEPUTY DIRECTOR; AND EMPLOYEE ORGANIZATION: LA QUINTA CITY EMPLOYEES’ ASSOCIATION, AND UNREPRESENTED EMPLOYEES 2. CONFERENCE WITH LABOR NEGOTIATOR PURSUANT TO GOVERNMENT CODE SECTION 54957.6, CITY DESIGNATED REPRESENTATIVE: BILL IHRKE, CITY ATTORNEY; AND UNREPRESENTED EMPLOYEE – CITY MANAGER CONSENT CALENDAR ITEM NO. 1 9 MINUTES Page 2 of 16 JUNE 17, 2025 CITY COUNCIL REGULAR MEETING HELD JOINTLY WITH HOUSING AUTHORITY SPECIAL MEETING 3. CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION; PURSUANT TO PARAGRAPH (1) OF SUBDIVISION (d) OF GOVERNMENT CODE SECTION 54956.9; CASES NAMES AND NUMBERS – MULTIPLE (listed below, all in U.S. Bankruptcy Court, District of Delaware) CASE NAME: CASE NUMBER SilverRock Development Company, LLC 24-11647 SilverRock Lifestyle Residences, LLC 24-11648 SilverRock Lodging, LLC 24-11650 SilverRock Luxury Residences, LLC 24-11652 SilverRock Phase I, LLC 24-11654 RGC PA 789, LLC 24-11657 4. CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION; PURSUANT TO PARAGRAPH (1) OF SUBDIVISION (d) OF GOVERNMENT CODE SECTION 54956.9; NAME OF CASE: CITY OF LA QUINTA V. SILVERROCK DEVELOPMENT COMPANY, ET AL. (RIVERSIDE COUNTY SUP. CT. CASE NO. CVPS2404750) 5. CONFERENCE WITH REAL PROPERTY NEGOTIATORS PURSUANT TO GOVERNMENT CODE SECTION 54956.8 FOR PROPERTY LOCATED ON HIGHWAY 111 EAST OF DUNE PALMS (APN 600-020-057) CITY NEGOTIATOR: JON MCMILLEN, CITY MANAGER PROPERTY OWNER: CITY OF LA QUINTA NEGOTIATING PARTIES: SUNRIDGE PROPERTIES; THE PACIFIC COMPANY UNDER NEGOTIATION: PRICE AND TERMS OF PAYMENT 6. CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION PURSUANT TO PARAGRAPH (1) OF SUBDIVISION (d) of GOVERNMENT CODE SECTION 54956.9; NAME OF CASE: People ex rel. The City of La Quinta v. Langdon (Coordinated Courts, Desert Judicial Dist., Riverside County, Case No. MIIN2502554-1) COUNCIL RECESSED THE OPEN SESSION PORTION OF THE MEETING AND MOVED INTO CLOSED SESSION AT 3:05 P.M. MAYOR EVANS RECONVENED THE OPEN SESSION PORTION OF THE CITY COUNCIL MEETING AT 4:04 P.M. WITH ALL MEMBERS PRESENT REPORT ON ACTION(S) TAKEN IN CLOSED SESSION: City Attorney Ihrke reported the following pursuant to Government Code section 54957.1 (Brown Act):  CLOSED SESSION ITEM NO. 1 – labor negotiations have concluded; the item considered under Government Code Section 54957.6 included the Classification Plan 10 MINUTES Page 3 of 16 JUNE 17, 2025 CITY COUNCIL REGULAR MEETING HELD JOINTLY WITH HOUSING AUTHORITY SPECIAL MEETING and Salary Schedule/Plan for represented and unrepresented employees; and Council will consider these matters during the Open Session portion of the meeting under Consent Calendar Item No. 8 on tonight’s agenda;  CLOSED SESSION ITEM NO. 2 – labor negotiations have concluded; the item considered under Government Code Section 54957.6 included Amendment No. 2 to employment agreement for the City Manager unrepresented employee ; and Council will consider this matter during the Open Session portion of the meeting under Consent Calendar Item No. 9 on tonight’s agenda ;  CLOSED SESSION ITEM NO. 3 – no reportable action; Council’s authorization remains in place for the City Attorney, in coordination with the City Attorney’s Office and Special Counsel, to defend and protect the interests of the City in the multiple bankruptcy cases filed by SilverRock Development Company and its responsive affiliates as reported out for Closed Session Item No. 2 from the August 6, 2024, Council meeting. Mr. Ihrke noted that a brief summary of the bankruptcy proceedings status for SilverRock Development Company and its affiliates will be provided under the Announcements, Presentations, and Written Communications section of the agenda, as Presentation Item No. 1.  CLOSED SESSION ITEM NO. 4 – no reportable action;  CLOSED SESSION ITEM NO. 5 – no reportable action; and  CLOSED SESSION ITEM NO. 6 – no reportable action. PLEDGE OF ALLEGIANCE – CITY COUNCIL AND HOUSING AUTHORITY Councilmember/Authority Member Fitzpatrick led the audience in the Pledge of Allegiance. CALL TO ORDER – HOUSING AUTHORITY SPECIAL MEETING A special meeting of the La Quinta Housing Authority was called to order at 4:06 p.m. by Chairperson McGarrey. CHAIRPERSON McGARREY ASKED MAYOR EVANS TO ACT AS PRESIDING OFFICER FOR THE HOUSING AUTHORITY FOR THE REMAINDER OF THE SPECIAL MEETING; MAYOR EVANS CONCURRED AND ASSUMED PRESIDING OFFICER RESPONSIBILITIES ROLL CALL: Authority Members Evans, Fitzpatrick, Peña, Sanchez, and Chairperson McGarrey VERBAL ANNOUNCEMENT – AB 23 [AUTHORITY SECRETARY] 11 MINUTES Page 4 of 16 JUNE 17, 2025 CITY COUNCIL REGULAR MEETING HELD JOINTLY WITH HOUSING AUTHORITY SPECIAL MEETING CONFIRMATION OF AGENDA – HOUSING AUTHORITY – Confirmed PUBLIC COMMENT ON MATTERS NOT ON THE AGENDA – CITY COUNCIL AND HOUSING AUTHORITY PUBLIC SPEAKER: Mary Mann, La Quinta – opposed the location of the bighorn sheep fence being installed at the Club at Coral Mountain development (located south of Avenue 58, north of Avenue 60, and east and west of Madison Street), pursuant to Amendment No. 5 to Specific Plan 2003-067; believes the fence cuts off public access to the open land; and said Council can help by working with the developer and adjacent landholders to arrange for outdoor recreation in this unique landscape feature. PUBLIC SPEAKER: Jeff Fishbein, Chair of the La Quinta Chamber of Commerce, Coldwell Banker Realtor, and La Quinta resident – thanked the City for its collaboration and renewal of the agreement with the Greater Coachella Valley Chamber of Commerce (GCVCC) for professional promotional services; noted the La Quinta State of the City is scheduled for September 2025; provided an update on recent events, including the 2025 GCVCC Annual Installation and Business Awards Dinner, ribbon cutting at Rosati’s Pizza; and the upcoming 1st Annual Membership Appreciation Mixer scheduled for July 2, 2025, at the Acrisure Arena in Palm Desert. ANNOUNCEMENTS, PRESENTATIONS AND WRITTEN COMMUNICATIONS – CITY COUNCIL 1. SILVERROCK (FORMERLY TALUS) DEVELOPMENT PROJECT – STATUS UPDATE City Attorney Ihrke said on August 5, 2024, SilverRock Development Company LLC and its affiliates (debtors), collectively referred to as “SDC,” voluntarily petitioned for Chapter 11 bankruptcy in U.S. Bankruptcy Court in Delaware; and per Council’s directi on and approval, the City retained Special Counsel who has continuously been working with the City Manager and City Attorney throughout these proceedings. Prior Announcements regarding the bankruptcy case are available on the City’s website at www.laquintaca.gov/taluslq. As previously announced, pursuant to the U.S. Bankruptcy Court-approved Bid Procedures (March 2025), the Chief Restructuring Officer (CRO) retained Jones, Land, LaSalle (JLL) to provide professional marketing services for the project to secure a future developer; multiple meetings have been held pursuant to the Bid Procedures between the debtors, CRO, City, and their respective representatives in connection with prospective developers and financing teams for what is knows as a “stalking horse,” which in the bankruptcy context generally means a party that is incentivized to submit a bid to buy the debtors’ estate. On June 5, 2025, the debtors filed a Motion to Approve the Debtors’ Selection of a Stalking Horse and related relief and “Proposed Order,” identifying TBE RE Acquisition Co II LLC (an affiliate of Turnbridge Equities) as the potential stalking horse. This morning, June 17, 2025, the Bankruptcy Court held a hearing and granted the motion. 12 MINUTES Page 5 of 16 JUNE 17, 2025 CITY COUNCIL REGULAR MEETING HELD JOINTLY WITH HOUSING AUTHORITY SPECIAL MEETING In summary, the stalking horse proposal includes:  Purchase price of debtors’ assets at $60 million;  Acquisition of the approximately 130+ acres held by the debtors ;  Break-up fee of $2 million, payable if Turnbridge is not selected as successful bidder or as otherwise set forth in the Proposed Order;  Target closing date set for November 12, 2025. At the June 17, 2025, hearing, testimony was provided by representatives of the debtors that, among other facts relating to the selection of a stalking horse, is summarized as follows: (1) experts in recruiting hotel resorts and related luxury homes and facilities were retained and consulted to market this project opportunity, (2) the best way to maximize value from the sale of the debtors’ assets meant to sell the entirety of the debtors-held properties together as one project, (3) having the City’s support of a selected stalking horse was critical because the City has project approval authority and owns the surrounding property, and (4) there were five stalking horse offers, and the one selected was, in the debtor’s business judgment, the highest and best bid, and would be a good “road map” for any other bidders to potentially work with the debtors and City to submit any overbids by the deadline scheduled for the end of July 2025. There were objections filed by a couple of the creditors who hold secured interests over some portions of debtors’ property, generally voicing concern over the offered purchase price of the debtors’ assets. The debtors responded by noting a proposed sale price is, for purposes of the stalking horse motion, a starting point for potentially higher bids and offers as part of the “overbid” process. The Bankruptcy Court noted a recent U.S. Supreme Court case that decided the purchase price offer for assets in bankruptcy is a correct indication of valuation of the debtors’ assets. In its ruling, the Bankruptcy Court noted that, while other bidders may have participated, the Court accepted testimony from the debtors, that it had sufficiently exercised its business judgment, that this offer is the highest and best bid at this time, and that it is important to have the City’s support of the selected stalking horse, so that the process may move forward. In conclusion, Mr. Ihrke noted that: (1) being selected as a stalking horse is not a guaranty that this party will ultimately be the successful bidder or developer, as the Court-approved process allows for other potential buyers and developers, called “overbidders,” to submit bids according to the Court-approved Bid Procedures’ deadlines; and (2) the approval of a stalking horse is not an approval of the sale of the debtors’ assets, as that decision will be considered by the Bankruptcy Court at a later time, per the Bid Procedures. 2. CERTIFICATE OF APPRECIATION FOR OUTGOING FINANCIAL ADVISORY COMMISSIONER GEORGE BATAVICK Mayor Evans commended Mr. Batavick for his dedicated public service and contributions; noted he began his services in 2015 on the former Investment Advisory Board; provided a historic overview of the community participation, research, and efforts that lead to the 2016 voter-approved Measure G, a 1% sales and use tax, to which Mr. Batavick’s contribution 13 MINUTES Page 6 of 16 JUNE 17, 2025 CITY COUNCIL REGULAR MEETING HELD JOINTLY WITH HOUSING AUTHORITY SPECIAL MEETING was imperative; his service to Find Food Bank and One Future Coachella Valley; his forward- thinking recommendation regarding City reserves; and his focus on meeting the City’s pension obligations. Councilmembers thanked Mr. Batavick for his commitment, dedication, excellent advice, and exemplary service of him, and his wife Ellen to the community. Commissioner Batavick expressed his gratitude to his wife Ellen; for the opportunity to serve under two City Managers and three Finance Directors; for his talented fellow Commissioners; and said it was a privilege and an honor to serve. Council presented a Certificate of Appreciation to outgoing Commissioner Batavick in appreciation and gratitude of his services and contributions to the community. 3. INTRODUCE NEW AND PROMOTED CITY STAFF MEMBERS City Manager McMillen introduced the following new City employees: Employee Name Title Department Harold Contreras Borgetti Maintenance & Operations Worker Public Works/Streets Edgar Lopez-Contez Maintenance & Operations Worker Public Works/Streets Elmer Vasquez Gamez Maintenance & Operations Worker Public Works/Parks Jerry Mejia Maintenance & Operations Worker Public Works/Streets Luis Urias Maintenance & Operations Worker Public Works/Streets Council welcomed the new employees into the La Quinta family and expressed their gratitude for their service. BUSINESS SESSION – CITY COUNCIL AND HOUSING AUTHORITY 1. INTERVIEW AND APPOINT RESIDENTS TO SERVE ON VARIOUS CITY COMMISSIONS Council and Authority waived presentation of the staff report, which is on file in the Clerk’s Office. Mayor Evans thanked all applicants for their willingness to serve the City and explained the process for conducting interviews and appointing members. A. FINANCIAL ADVISORY COMMISSION The following applicants gave a brief presentation of their experience and qualifications:  Bryan Davis  Philip Niblo 14 MINUTES Page 7 of 16 JUNE 17, 2025 CITY COUNCIL REGULAR MEETING HELD JOINTLY WITH HOUSING AUTHORITY SPECIAL MEETING Results of the ballot vote: Councilmember Fitzpatrick: Bryan Davis Councilmember McGarrey: Phillip Niblo Councilmember Peña: Phillip Niblo Councilmember Sanchez: Phillip Niblo Mayor Evans: Bryan Davis MOTION – A motion was made and seconded by Councilmembers Fitzpatrick/Sanchez to appoint Phillip Niblo to serve on the Financial Advisory Commission for a full three-year term from July 1, 2025, to June 30, 2028. Motion passed unanimously. B. HOUSING COMMISSION The following applicants gave a brief presentation of their experience and qualifications:  Brian Hanrahan – application withdrawn June 17, 2025  Yesenia Hernandez  James Lewis (Tenant + 62 years of age)  Emmanuel Sanchez  Jai Singh Results of the ballot vote: Authority Member Evans: James Lewis Authority Member Fitzpatrick: James Lewis Authority Member Peña: Yesenia Hernandez Authority Member Sanchez: James Lewis Chairperson McGarrey: James Lewis MOTION – A motion was made and seconded by Authority Members Fitzpatrick/McGarrey to appoint James Lewis to serve on the Housing Commission for a one-year term from July 1, 2025, to June 30, 2026. Motion passed unanimously. MAYOR EVANS CALLED FOR A BRIEF RECESS AT 5:20 P.M. MAYOR EVANS RECONVENED THE REGULAR COUNCIL MEETING HELD JOINTLY WITH HOUSING AUTHORITY SPECIAL MEETING AT 5:26 P.M. WITH ALL MEMBERS PRESENT C. PLANNING COMMISSION The following applicants gave a brief presentation of their experience and qualifications:  Linda Bohlinger  Jason Dafforn – application withdrawn June 17, 2025  Veronica Flores  Robert Millar  Emmanuel Sanchez  Andrew Sincosky 15 MINUTES Page 8 of 16 JUNE 17, 2025 CITY COUNCIL REGULAR MEETING HELD JOINTLY WITH HOUSING AUTHORITY SPECIAL MEETING  Jai Singh  John Thekkathala – application withdrawn June 17, 2025  Austin Wasserman – was not present for interviews Results of the ballot vote: Councilmember Fitzpatrick: Linda Bohlinger Councilmember McGarrey: Linda Bohlinger Councilmember Peña: Linda Bohlinger Councilmember Sanchez: Robert Millar Mayor Evans: Robert Millar PUBLIC SPEAKER: Mary Mann, La Quinta – thanked all applicants for their willingness to serve, and noted the complexity and importance of their work, and taking residents’ comments into account; and said open space and recreational land uses need to be prioritized. MOTION – A motion was made and seconded by Councilmembers Fitzpatrick/McGarrey to appoint Linda Bohlinger to serve on the Planning Commission effective June 17, 2025, to fill an unexpired term ending June 30, 2027. Motion passed unanimously. 2. ADOPT RESOLUTION TO APPROVE FISCAL YEAR 2025/26 LA QUINTA HOUSING AUTHORITY BUDGET [RESOLUTION NO. HA 2025-003] Authority Treasurer Martinez introduced Finance Manager Ortega who presented the staff report, which is on file in the Clerk’s Office. The Authority discussed the need for additional affordable housing, the use of Authority funds to aid the City’s commitment in addressing affordable housing needs by making significant investments in its housing projects, identifying future affordable housing projects, and increasing funding to homelessness programs. MOTION – A motion was made and seconded by Chair McGarrey/Authority Member Peña to adopt Resolution No. HA 2025-003 approving Fiscal Year 2025/26 Housing Authority Budget as presented: A RESOLUTION OF THE HOUSING AUTHORITY OF THE CITY OF LA QUINTA, CALIFORNIA, APPROVING FISCAL YEAR 2023/24 BUDGET Motion passed unanimously. ADJOURNMENT – HOUSING AUTHORITY There being no further business, a motion was made and seconded by Authority Members Fitzpatrick/McGarrey to adjourn the Housing Authority special meeting at 6:31 p.m. Motion passed unanimously. 16 MINUTES Page 9 of 16 JUNE 17, 2025 CITY COUNCIL REGULAR MEETING HELD JOINTLY WITH HOUSING AUTHORITY SPECIAL MEETING >>> Taken out of agenda order PUBLIC HEARINGS 1. ADOPT RESOLUTION TO CONFIRM THE ASSESSMENT AND DISTRICT DIAGRAM FOR THE 2025/26 LANDSCAPE AND LIGHTING ASSESSMENT DISTRICT 89-1 (L&L AD 89-1) [RESOLUTION NO. 2025-018] Maintenance and Operations Superintendent Hansen presented the staff report, which is on file in the Clerk’s Office. MAYOR EVANS DECLARED THE PUBLIC HEARING OPEN AT 6:34 P.M. Council discussed the City subsidizes the maintenance cost shortfall of the L&L AD 89-1 because the $35.60 per parcel collected since 1997 does not generate sufficient funds to cover maintenance costs; the $35.60 assessment stays the same year after year a nd does not adjust for inflation or rising costs; and raising the assessment would require a ballot measure approval by two-thirds of La Quinta voters, and if the measure were to fail, the assessment would be reduced to zero with 100% of the cost drawn from the City’s general fund. PUBLIC SPEAKER: None MAYOR EVANS DECLARED THE PUBLIC HEARING CLOSED AT 6:35 P.M. MOTION – A motion was made and seconded by Councilmembers Sanchez/Fitzpatrick to adopt Resolution No. 2025-018 confirming the assessment and district diagram for the Landscape and Lighting Assessment District 89-1 for fiscal year 2025/26, pursuant to the Engineer’s report: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA QUINTA, CALIFORNIA, CONFIRMING THE DIAGRAM AND ASSESSMENTS FOR FISCAL YEAR 2025/2026 LANDSCAPE AND LIGHTING ASSESSMENT DISTRICT 89-1 (PURSUANT TO THE LANDSCAPE AND LIGHTING ACT OF 1972) Motion passed unanimously. 2. ADOPT RESOLUTION TO APPROVE FISCAL YEAR 2025/26 THROUGH 2029/30 CAPITAL IMPROVEMENT PROGRAM (CIP) [RESOLUTION NO. 2025-019] Administrative Technician Escarrega and Public Works Director / City Engineer McKinney presented the staff report, which is on file in the Clerk’s Office. Council discussed the Bear Creek Trailhead Restroom Project No. 2024-09, formerly tracking the Welcome Center improvements project for which funding was allocated in fiscal year 2024/25; the City of Indio delaying the schedule for the Avenue 50 Widening Improvements Project No. 2022-05 (from Jefferson St. to Madison St.), currently in design of the right-of-way portion of the project, which is expected to begin construction in 20 26; the Highway 111 pavement rehabilitation project timeline, expected to begin July 14, 2025 17 MINUTES Page 10 of 16 JUNE 17, 2025 CITY COUNCIL REGULAR MEETING HELD JOINTLY WITH HOUSING AUTHORITY SPECIAL MEETING starting on the west side of the street, and related signage regarding this upcoming project; and the City’s 5-year CIP and related funding. MAYOR EVANS DECLARED THE PUBLIC HEARING OPEN AT 6:45 P.M. PUBLIC SPEAKER: None MAYOR EVANS DECLARED THE PUBLIC HEARING CLOSED AT 6:45 P.M. MOTION – A motion was made and seconded by Councilmembers Sanchez/Fitzpatrick to adopt Resolution No. 2025-019 approving the 2025/26 through 2029/30 Capital Improvement Program as recommended: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA QUINTA, CALIFORNIA, APPROVING THE FISCAL YEAR 2025/2026 THROUGH 2029/2030 CAPITAL IMPROVEMENT PROGRAM Motion passed unanimously. CONSENT CALENDAR – CITY COUNCIL 1. APPROVE COUNCIL MEETING MINUTES DATED JUNE 3, 2025 2. EXCUSE ABSENCES OF (1) COMMISSIONER BROWER FROM THE JUNE 9, 2025, ARTS AND COMMUNITY SERVICES COMMISSION QUARTERLY METING, AND (2) COMMISSIONER HERNANDEZ FROM THE JUNE 10, 2025, PLANNING COMMISSION MEETING 3. AUTHORIZE OVERNIGHT TRAVEL FOR MAYOR, FOUR COUNCILMEMBERS, CITY MANAGER, DIRECTOR OF BUSINESS UNIT AND HOUSING DEVELOPMENT, AND FINANCE DIRECTOR FOR ATTEND THE LEAGUE OF CALIFORNIA CITIES ANNUAL CONFERENCE IN LONG BEACH, CALIFORNIA, OCTOBER 8-10, 2025 4. AUTHORIZE OVERNIGHT TRAVEL FOR ONE SENIOR MAINTENANCE AND OPERATIONS WORKER TO ATTEND YEAR ONE OF CALIFORNIA PARKS AND RECREATION SOCIETY MAINTENANCE MANAGEMENT SCHOOL IN LAKE ARROWHEAD, CALIFORNIA, NOVEMBER 3-7, 2025 5. AUTHORIZE OVERNIGHT TRAVEL FOR TWO CITY CLERK DEPARTMENT EMPLOYEES TO ATTEND THE ARMA INTERNATIONAL 2025 ANNUAL CONFERENCE OF INFORMATION AND RECORDS MANAGEMENT IN IRVINE, CALIFORNIA, JULY 24-25, 2025 6. ADOPT ORDINANCE NO. 624 ON SECOND READING UPDATING THE FIRE HAZARD SEVERITY ZONEZ PURSUANT TO GOVERNMENT CODE SECTION 51178 AND THE CALIFORNIA FIRE CODE 18 MINUTES Page 11 of 16 JUNE 17, 2025 CITY COUNCIL REGULAR MEETING HELD JOINTLY WITH HOUSING AUTHORITY SPECIAL MEETING 7. ADOPT RESOLUTION TO APPROVE FISCAL YEAR 2025/26 INVESTMENT POLICY [RESOLUTION NO. 2025-014] 8. ADOPT RESOLUTIONS TO: (A) APPROVE FISCAL YEAR 2025/26 CLASSIFICATION AND SALARY PLAN/SCHEDULE, AND (B) APPROVE AMENDMENT NO. 3 TO THE MEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF LA QUINTA AND THE LA QUINTA CITY EMPLOYEES’ ASSOCIATION [RESOLUTION NOS. 2025-015 AND 2025-016] 9. APPROVE SECOND AMENDMENT TO EMPLOYMENT AGREEMENT FOR THE CITY MANAGER 10. APPROVE AGREEMENT FOR CONTRACT SERVICES WITH ST. FRANCIS ELECTRIC FOR ON-CALL TRAFFIC SIGNAL REPAIR SERVICES 11. APPROVE DEMAND REGISTERS DATED MAY 23 AND 30, 2025 VERBAL ANNOUNCEMENT – by City Attorney Ihrke regarding City Manager and executive employees compensation: (1) Pursuant to Government Code Section 54953, subdivision (c)(3) [Brown Act], prior to the consideration or taking final action by the City Council, there must be a verbal summary of a recommendation for a final action on the salaries, salary schedules or compensation paid in the form of fringe benefits of any local agency executive, as defined by Government Code Section 3511.1, subdivision (d), during the open meeting in which the final action is to be taken; (2) Pursuant to Government Code Section 54957.1, subdivision (a)(6), and as noted during the Report on Actions(s) Taken in Closed Session section of this meeting, approval of an agreement concluding labor negotiations with represented employees pursuant to Government Code Section 54957.6, considered under Closed Session Item No. 1 on tonight’s agenda, shall be reported after the agreement is final and has been accepted – labor negotiations have concluded between the City and the La Quinta City Employee Association; and (3) Closed Session Item No. 2 – labor negotiations have concluded between the City and City Manager. ITEM NO. 8 – in summary, the recommendations include adopting resolutions to approve: (a) Fiscal year 2025/26 Classification Plan and Salary Plan/Schedule, which reflects salary adjustment of 3%, effective July 1, 2025, for both represented and unrepresented employees; and (b) Amendment No. 3 to the Memorandum of Understanding (MOU) between the City of La Quinta and the La Quinta Employees’ Association. 19 MINUTES Page 12 of 16 JUNE 17, 2025 CITY COUNCIL REGULAR MEETING HELD JOINTLY WITH HOUSING AUTHORITY SPECIAL MEETING The fringe benefits previously approved under the MOU for represented employees, as well as unrepresented employees include:  Citywide health benefits cap of $2,462 per month, per employee;  A $200 annual Wellness Dollar benefit per fiscal year, per employee; and  Deferred Compensation Program $50 match per pay period, per employee. The salaries for the eight management employee positions, or “local agency executives,” as defined, effective July 1, 2025, are as follows: Position Proposed Salary Fiscal Year 2025/2026 City Clerk $189,575.26 Community Services Deputy Director $171,176.59 Director of Business Unit and Housing Development $189,575.26 Finance Director $189,575.26 Human Resources Deputy Director $143,591.69 Public Safety Deputy Director $171,176.59 Public Works Director / City Engineer $214,495.56 ITEM NO. 9 – in summary, the recommendation is to approve Second Amendment to Employment Agreement for the City Manager, Jon McMillen, extending the term effective July 1, 2025, through June 30, 2028, which includes:  Base salary of $310,000 commencing July 1, 2025, with an increase tied to any future Council-approved cost of living/cost of labor increases for management-level full-time City employees; and  Continuing the previously approved deferred compensation in the amount of $30,000 annually; and  Commencing July 1, 2025, a potential employer match to any compensation deferrals made by the City Manager to the City’s supplemental deferred compensation plan, subject to limits under the U.S. Internal Revenue Code; and  Like all other City employees, the City Manager is eligible for the current citywide health benefits cap of $2,462 per month; a $200 annual Wellness Dollar benefit per fiscal year; and Deferred Compensation Program $50 match per pay period. This concludes the required verbal announcement, and the Council may proceed with comments and vote on the consent calendar items. CONSENT CALENDAR COMMENTS ITEM NO. 8 – Councilmember Fitzpatrick inquired about the purpose for adding the various apprentice positions to the proposed Classification Plan/Schedule. Mr. McMillen explained these positions were added to provide the opportunity for on-the-job training and experience to existing employees, when applicable, who have the skills but may lack the required qualifications to fill vacant positions. 20 MINUTES Page 13 of 16 JUNE 17, 2025 CITY COUNCIL REGULAR MEETING HELD JOINTLY WITH HOUSING AUTHORITY SPECIAL MEETING City Clerk said a HAND-OUT was distributed, as announced under Confirmation of Agenda section of this meeting, above, noting typographical corrections on pages 211 and 216 of the agenda packet, under Consent Calendar Item No. 8, related to the adoption of the proposed fiscal year 2025/26 Salary Plan/Schedule. ITEM NO. 2 – Mayor Evans said per the La Quinta Municipal Code, there are two consecutive or three unexcused absences allowed per fiscal year, after which appointment removal is triggered; Council accommodates Commissioners by excusing absences since illness, vacations, emergencies etc. occur on occasion; called attention to Planning Commissioner Hernandez for whom this will be the forth excused absence in this fiscal year, not including cancelled meetings; noted limited contribution during meetings Commis sioner Hernandez does attend; stated this will be the last excused absence by Commissioner Hernandez she will support; and noted there is a vast number of qualified applicants for the Planning Commission. Mayor Pro Tem McGarrey and Councilmember Fitzpatrick explained the importance of attendance, participation, and the reliance on each Board and Commission member. Councilmember Peña suggested that the Commission Chair or Department Director speak with Commissioner Hernandez regarding his ability to attend future meetings. Mayor Evans explained the consequences if the Council does not excuse absences. MOTION – A motion was made and seconded by Councilmembers Peña/Sanchez to approve the Consent Calendar as presented, with Item No. 6 adopting Ordinance No. 624 on second reading; Item No. 7 adopting Resolution No. 2025-014; and Item No. 8 adopting Resolutions Nos. 2025-015 and 2025-016 as amended per the stated typographical corrections. Motion passed unanimously. BUSINESS SESSION – CITY COUNCIL – Continued 3. APPROVE SILVERROCK RESORT 2025/26 ANNUAL PLAN Finance Director Martinez presented the staff report, which is on file in the Clerk’s Office. PUBLIC SPEAKER: Randy Duncan, SilverRock Golf Course Director with Landmark Golf Management – answered Council’s questions regarding rounds played by residents; the potential decrease in rounds played in the proposed fiscal year 2025/26 annual plan due to the temporary closure of the front 9-holes of the course in July through August 2025, and upcoming temporary closure of the back 9-holes of the course in May through June 2026, for the turf replacement; capital reserve budget and the anticipated large projects; and provided an update on current turf replacement of the front 9-holes of the course. MOTION – A motion was made and seconded by Councilmembers Sanchez/McGarrey to approve the SilverRock Resort 2025/26 Annual Plan as presented. Motion passed unanimously. 21 MINUTES Page 14 of 16 JUNE 17, 2025 CITY COUNCIL REGULAR MEETING HELD JOINTLY WITH HOUSING AUTHORITY SPECIAL MEETING 4. APPROVE AGREEMENT FOR CONTRACT SERVICES WITH AK JOHNSTON LLC. FOR SPECIAL EVENT AUDIO AND VISUAL SERVICES Senior Management Analyst Calderon presented the staff report, which is on file in the Clerk’s Office. PRESENTER: Austin Johnston, CEO with AK Johnston, LLC. – said he appreciates the Council’s energy and collaboration with the community; explained his company’s philosophy and operating procedures not only to provide audio/visual services but rather as an experiential marketing agency with a strategic approach ; the company’s strong desire to service La Quinta; social media approach; event locations; solar versus generator power; site safety; staff qualifications; and offered ideas such as celebrating and thanking the community prior to large disrupting events. Council discussed events staffing, media budget; events parking coordination services; incorporating drone footage in the marketing plan for promoting events; use of clip-on microphones/speakers to help mitigate potential technical issued during performances and speeches; importance of completing events set-up timely; event videos; City ownership of all content created; knowledge and consideration of the desert’s wind and dust weather events; permitting; potential residents appreciation events; and integration with City’s marketing team and guidelines. MOTION – A motion was made and seconded by Councilmembers Sanchez/Peña to approve agreement for contract services with AK Johnston, LLC. for special event audio and visual services as presented. Motion passed unanimously. MAYOR EVANS CALLED FOR A BRIEF RECESS AT 7:35 P.M. MAYOR EVANS RECONVENED THE COUNCIL MEETING AT 7:51 P.M. WITH ALL MEMBERS PRESENT 5. RECEIVE AND FILE ANNUAL COMPREHENSIVE FINANCIAL REPORT (ACFR) FOR YEAR ENDED JUNE 30, 2024 Finance Director Martinez presented the staff report, which is on file in the Clerk’s Office. PRESENTER VIA TELECONFERENCE: Calvin Kunkel, CPA, Manager, Assurance and Advisory with Lance, Soll & Lunghard, LLP (LSL) – provided auditor comments regarding the procedures and testing performed, the reports issued, and the final results of the unmodified, or clean, finding of the ACFR. Council discussed delays due to change in audit firms. MOTION – A motion was made and seconded by Councilmembers Peña/Fitzpatrick to receive and file the Annual Comprehensive Financial Report for the year ended June 30, 2024, as presented. Motion passed unanimously. 22 MINUTES Page 15 of 16 JUNE 17, 2025 CITY COUNCIL REGULAR MEETING HELD JOINTLY WITH HOUSING AUTHORITY SPECIAL MEETING 6. RECEIVE AND FILE FISCAL YEAR 2024/25 BUDGET UPDATE REPORT AND APPROVE THE RECOMMENDED BUDGET ADJUSTMENTS Finance Director Martinez presented the staff report, which is on file in the Clerk’s Office. MOTION – A motion was made and seconded by Councilmembers McGarrey/Fitzpatrick to receive and file fiscal year 2024/25 Budget Update Report and approve the recommended budget adjustments, as presented. Motion passed unanimously. 7. ADOPT RESOLUTION TO APPROVE FISCAL YEAR 2025/26 BUDGET AND ESTABLISH THE CITY’S APPROPRIATIONS LIMIT [RESOLUTION NO. 2025-017] Finance Director Martinez presented the staff report, which is on file in the Clerk’s Office. Council discussed having a balanced budget; budget review process; the City’s sound financial position; total full-time positions; City’s continued conservative budget approach; and capital improvement project carryovers. MOTION – A motion was made and seconded by Councilmembers Fitzpatrick/Peña to adopt Resolution No. 2025-017 approving fiscal year 2025/26 Budget and establish the City’s appropriations limit, as presented. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA QUINTA, CALIFORNIA, ESTABLISHING THE CITY’S APPROPRIATIONS LIMIT FOR FISCAL YEAR 2025/26 AND APPROVING A BUDGET FOR FISCAL YEAR 2025/26 Motion passed unanimously. STUDY SESSION – None DEPARTMENTAL REPORTS – All reports are on file in the City Clerk’s Office. MAYOR’S AND COUNCIL MEMBERS’ ITEMS Mayor and Councilmembers reported on their attendance at local graduations; Carreon Scholarship Awards Banquet; Family YMCA Desert Preschool Graduation; ribbon cutting at Rosati’s Pizza, the annual Installation and Business Awards Dinner event ; Hansen House at Discovery Museum; and Western River Council of Governments 34 th Annual General Assembly and Leadership Address. Mayor Evans reported that College of the Desert has requested 2x2 meetings with two Councilmembers and two of their Board Members. Councilmembers McGarrey and Fitzpatrick volunteered for this assignment. 23 MINUTES Page 16 of 16 JUNE 17, 2025 CITY COUNCIL REGULAR MEETING HELD JOINTLY WITH HOUSING AUTHORITY SPECIAL MEETING REPORTS AND INFORMATIONAL ITEMS La Quinta’s representative for 2025, Mayor Evans reported on her participation in the following organizations’ meetings: CVAG COACHELLA VALLEY CONSERVATION COMMISSION COACHELLA VALLEY POWER AGENCY JOINT POWERS AGREEMENT La Quinta’s representative for 2025, Councilmember Fitzpatrick reported on her participation in the following organizations’ meetings: RIVERSIDE COUNTY ANIMAL CAMPUS COMMISSION – attended on behalf of Councilmember Sanchez RIVERSIDE COUNTY TRANSPORTATION COMMISSION (RCTC) La Quinta’s representative for 2025, Mayor Pro Tem McGarrey reported on her participation in the following organizations’ meetings: LEAGUE OF CALIFORNIA CITIES – ENVIRONMENTAL QUALITY POLICY COMMITTEE LEAGUE OF CALIFORNIA CITIES – EXECUTIVE COMMITTEE, RIVERSIDE COUNTY DIVISION La Quinta’s representative for 2025, Councilmember Peña reported on his participation in the following organization’s meeting: COACHELLA VALLEY MOSQUITO AND VECTOR CONTROL DISTRICT BOARD OF TRUSTEES La Quinta’s representative for 2025, Councilmember Sanchez reported on his participation in the following organization’s meeting: SO. CALIFORNIA ASSOCIATION OF GOVERNMENTS REGIONAL COUNCIL ADJOURNMENT There being no further business, a motion was made and seconded by Councilmembers Sanchez/McGarrey to adjourn at 8:55 p.m. Motion passed unanimously. Respectfully submitted, MONIKA RADEVA, City Clerk City of La Quinta, California 24 City of La Quinta CITY COUNCIL MEETING: July 1, 2025 STAFF REPORT AGENDA TITLE: AUTHORIZE OVERNIGHT TRAVEL FOR TWO DESIGN AND DEVELOPMENT DEPARTMENT EMPLOYEES TO ATTEND THE AMERICAN PLANNING ASSOCIATION CALIFORNIA CHAPTER’S ANNUAL CONFERENCE IN MONTEREY, CALIFORNIA, SEPTEMBER 28 THROUGH OCTOBER 1, 2025 RECOMMENDATION Authorize overnight travel for two Design and Development Department employees to attend the American Planning Association California Chapter’s Annual Conference in Monterey, California, September 28 through October 1, 2025. EXECUTIVE SUMMARY The American Planning Association California Chapter (APA) is a network of planners, citizens, and elected officials committed to urban, suburban, regional, and rural planning in the State of California. The APA 2025 Annual Conference is a 4-day event offering educational sessions, discussion forums, and networking opportunities. FISCAL IMPACT Estimated expenses are $4,100 per attendee, which includes registration, travel, lodging, and meals. Funds are budgeted in fiscal year 2025/26 Planning Travel and Training budget (Account No. 101-6002-60320). BACKGROUND/ANALYSIS The APA Conference provides networking and educational opportunities for planning professionals throughout California and the United States. The conference includes keynote speakers, workshops, concurrent tracks of programs/seminars, and practical “nuts and bolts” planning sessions dealing with various topics, including recent trends and best practices regarding land use policies, housing, community engagement, and environmental legislation. ALTERNATIVES Council may elect to decrease the number of attendees or not authorize this request. Prepared by: Cheri Flores, Planning Manager Approved by: Danny Castro, Design and Development Director CONSENT CALENDAR ITEM NO. 2 25 26 AGENDA TITLE: AUTHORIZE OVERNIGHT TRAVEL FOR THREE COUNCILMEMBERS, CITY CLERK, AND DEPUTY CITY CLERK TO ATTEND THE CALIFORNIA JOINT POWERS INSURANCE AUTHORITY 2025 RISK MANAGEMENT EDUCATIONAL FORUM IN CARLSBAD, CALIFORNIA, OCTOBER 1-3, 2025 RECOMMENDATION Authorize overnight travel for three Councilmembers, the City Clerk, and Deputy City Clerk to attend the California Joint Powers Insurance Authority 2025 Risk Management Educational Forum in Carlsbad, California, October 1-3, 2025. EXECUTIVE SUMMARY •Annually, the California Joint Powers Insurance Authority (CJPIA) holds the Risk Management Education Forum (Forum) which provides training seminars focusing on the essential building blocks to develop, establish, and embed a proactive risk management process within the City. •The annual Forum provides attendees the opportunity to participate in education sessions, discussion forums, and networking. FISCAL IMPACT Estimated expenses are $1,300 per attendee, which includes travel, lodging, and meals; there are no Forum registration costs for CJPIA member agencies. Funds are included in the respective fiscal year 2025/26 City Council and City Clerk travel and training budgets (Account Nos. 101-1002-60320 and 101-1005-60320). BACKGROUND/ANALYSIS CJPIA works to develop long-term strategies to mitigate the growing and ever-changing risks public agencies may encounter. An Executive Committee, elected by members and guided by the CJPIA’s mission to provide innovative risk management solutions, provides strategic oversight while professional staff of experienced risk mitigation experts facilitate day-to-day management and execute on key priorities and programs. This annual event is a three-day academy that allows participants to discuss and learn about topics such as legal liability, workers’ compensation, employment law, public safety, investigating incidents/accidents and preserving evidence, organizational thinking, CONSENT CALENDAR ITEM NO. 3 27 City of La Quinta CITY COUNCIL MEETING: July 1, 2025 STAFF REPORT governance, cyber liability and incident response, and legislation among other topics. The seminar also provides many opportunities to network with other industry professionals. ALTERNATIVES Council may elect to deny this travel request or reduce the number of attendees. However, the topics covered at this Forum provide the opportunity for elected officials and staff to stay abreast of trends and issues that impact City liability insurance and insurance premiums. Prepared by: Olivia Rodriguez, Deputy City Clerk Approved by: Monika Radeva, City Clerk 28 City of La Quinta CITY COUNCIL MEETING: July 1, 2025 STAFF REPORT AGENDA TITLE: APPROVE AGREEMENTS FOR CONTRACT SERVICES FOR ON-CALL STREET SWEEPING SERVICES WITH (1) LIPPA LLC DBA ROAD SERVICES AND (2) BANCROFT CONSTRUCTION SERVICES LLC RECOMMENDATION Approve agreements for contract services for on-call street sweeping services with (1) Lippa LLC. dba Road Services and (2) Bancroft Construction Services; and authorize the City Manager to execute the agreements. EXECUTIVE SUMMARY Public Works Maintenance and Operations (M&O) requires a dedicated on-call street sweeping contractor to assist with street sweeping following wind events, special events, and general bike path maintenance. In April 2025, the City published a Request for Proposal (RFP) for on-call street sweeping services; and received 3 proposals. Lippa LLC DBA Road Services (Road Services) and Bancroft Construction Services (Bancroft) were selected as the most qualified firms. Staff seeks Council approval for a three-year agreement, with the option to extend for 3 additional years. FISCAL IMPACT Proposed are two agreements for a combined total of up to $75,000 per fiscal year (FY), effective July 2, 2025, through June 30, 2028, and an optional 3-year extended term for a combined grand total not to exceed $450,000. Funds are available in fiscal year (FY) 2025/26 budget in the General Fund Streets Professional Services Account (Account No. 101-7003-60691). The following is the proposed annual budget for both, the initial and extended terms, for the on-call street sweeping services: Initial Term: Budget FY 2025/26 $75,000 FY 2026/27 $75,000 FY 2027/28 $75,000 INITIAL TERM TOTAL: $225,000 Possible Extended Term: FY 2028/29 $75,000 FY 2029/30 $75,000 FY 2030/2031 $75,000 TOTAL: $450,000 CONSENT CALENDAR ITEM NO. 4 29 BACKGROUND/ANALYSIS The City currently contracts with Burrtec Waste Industries, Inc. for bi-weekly residential street sweeping and Coachella Valley Association of Governments (CVAG) for bi-monthly arterial street sweeping. The frequency of service adequately serves the City under normal conditions. However, during intense wind events, heavy rain, or before and after major special events, the City requires additional street sweeping. The proposed agreements will enable M&O to maintain a high standard of cleanliness and safety on City streets and bike paths. In April 2025, staff published an RFP for on-call street sweeping services and received 3 proposals from Road Services, Bancroft, and Sweeping Corp of America. The selection committee reviewed the proposals and determined Road Services and Bancroft as the most qualified firms based on their experience and qualifications. Proposed are two agreements with Road Services (Attachment 1) and Bancroft (Attachment 2), effective July 2, 2025, through June 30, 2028, for a total not to exceed combined compensation of $75,000 per FY, with an option to extend for an additional 3-year term. ALTERNATIVES Council may elect not to approve these agreements. Prepared by: David Eastlick, Maintenance and Operations Streets Superintendent Approved by: Tony Ulloa, Maintenance and Operations Deputy Director Attachments: 1. Agreement with Lippa, LLC DBA Road Services 2. Agreement with Bancroft Construction Services, LLC 30 AGREEMENT FOR CONTRACT SERVICES THIS AGREEMENT FOR CONTRACT SERVICES (the “Agreement”) is made and entered into by and between the CITY OF LA QUINTA, (“City”), a California municipal corporation, and Lippa’s LLC, dba Road Services (“Contracting Party”). The parties hereto agree as follows: 1. SERVICES OF CONTRACTING PARTY. 1.1 Scope of Services. In compliance with all terms and conditions of this Agreement, Contracting Party shall provide those services related to On-call Street Sweeping Services, as specified in the “Scope of Services” attached hereto as “Exhibit A” and incorporated herein by this reference (the “Services”). Contracting Party represents and warrants that Contracting Party is a provider of first-class work and/or services and Contracting Party is experienced in performing the Services contemplated herein and, in light of such status and experience, Contracting Party covenants that it shall follow industry standards in performing the Services required hereunder, and that all materials, if any, will be of good quality, fit for the purpose intended. For purposes of this Agreement, the phrase “industry standards” shall mean those standards of practice recognized by one or more first-class firms performing similar services under similar circumstances. 1.2 Compliance with Law. All Services rendered hereunder shall be provided in accordance with all ordinances, resolutions, statutes, rules, regulations, and laws of the City and any Federal, State, or local governmental agency of competent jurisdiction. 1.3 Wage and Hour Compliance, Contracting Party shall comply with applicable Federal, State, and local wage and hour laws. 1.4 Licenses, Permits, Fees and Assessments. Except as otherwise specified herein, Contracting Party shall obtain at its sole cost and expense such licenses, permits, and approvals as may be required by law for the performance of the Services required by this Agreement, including a City of La Quinta business license. Contracting Party and its employees, agents, and subcontractors shall, at their sole cost and expense, keep in effect at all times during the term of this Agreement any licenses, permits, and approvals that are legally required for the performance of the Services required by this Agreement. Contracting Party shall have the sole obligation to pay for any fees, assessments, and taxes, plus applicable penalties and interest, which may be imposed by law and arise from or are necessary for the performance of the Services required by this Agreement, and shall indemnify, defend (with counsel selected by City), and hold City, its elected officials, officers, employees, and agents, free and harmless against any such fees, assessments, taxes, penalties, or interest levied, assessed, or imposed against City hereunder. Contracting Party shall be responsible for all subcontractors’ compliance with this Section. 1.5 Familiarity with Work. By executing this Agreement, Contracting Party warrants that (a) it has thoroughly investigated and considered the Services to be ATTACHMENT 1 31 -2- performed, (b) it has investigated the site where the Services are to be performed, if any, and fully acquainted itself with the conditions there existing, (c) it has carefully considered how the Services should be performed, and (d) it fully understands the facilities, difficulties, and restrictions attending performance of the Services under this Agreement. Should Contracting Party discover any latent or unknown conditions materially differing from those inherent in the Services or as represented by City, Contracting Party shall immediately inform City of such fact and shall not proceed except at Contracting Party’s risk until written instructions are received from the Contract Officer , or assigned designee (as defined in Section 4.2 hereof). 1.6 Standard of Care. Contracting Party acknowledges and understands that the Services contracted for under this Agreement require specialized skills and abilities and that, consistent with this understanding, Contracting Party’s work will be held to an industry standard of quality and workmanship. Consistent with Section 1.5 hereinabove, Contracting Party represents to City that it holds the necessary skills and abilities to satisfy the industry standard of quality as set forth in this Agreement. Contracting Party shall adopt reasonable methods during the life of this Agreement to furnish continuous protection to the Services performed by Contracting Party, and the equipment, materials, papers, and other components thereof to prevent losses or damages, and shall be responsible for all such damages, to persons or property, until acceptance of the Services by City, except such losses or damages as may be caused by City’s own negligence. The performance of Services by Contracting Party shall not relieve Contracting Party from any obligation to correct any incomplete, inaccurate, or defective work at no further cost to City, when such inaccuracies are due to the negligence of Contracting Party. 1.7 Additional Services. In accordance with the terms and conditions of this Agreement, Contracting Party shall perform services in addition to those specified in the Scope of Services (“Additional Services”) only when directed to do so by the Contract Officer, or assigned designee, provided that Contracting Party shall not be required to perform any Additional Services without compensation. Contracting Party shall not perform any Additional Services until receiving prior written authorization (in the form of a written change order if Contracting Party is a contractor performing the Services) from the Contract Officer, or assigned designee, incorporating therein any adjustment in (i) the Contract Sum, and/or (ii) the time to perform this Agreement, which said adjustments are subject to the written approval of Contracting Party. It is expressly understood by Contracting Party that the provisions of this Section shall not apply to the Services specifically set forth in the Scope of Services or reasonably contemplated therein. It is specifically understood and agreed that oral requests and/or approvals of Additional Services shall be barred and are unenforceable. Failure of Contracting Party to secure the Contract Officer’s, or assigned designee’s written authorization for Additional Services shall constitute a waiver of any and all right to adjustment of the Contract Sum or time to perform this Agreement, whether by way of compensation, restitution, quantum meruit, or the like, for Additional Services provided without the appropriate authorization from the Contract Officer, or assigned designee. Compensation for properly authorized Additional Services shall be made in accordance with Section 2.3 of this Agreement. 32 -3- 1.8 Special Requirements. Additional terms and conditions of this Agreement, if any, which are made a part hereof are set forth in “Exhibit D” (the “Special Requirements”), which is incorporated herein by this reference and expressly made a part hereof. In the event of a conflict between the provisions of the Special Requirements and any other provisions of this Agreement, the provisions of the Special Requirements shall govern. 2. COMPENSATION. 2.1 Contract Sum. For the Services rendered pursuant to this Agreement, Contracting Party shall be compensated in accordance with “Exhibit B” (the “Schedule of Compensation”) in a total amount not to exceed Seventy Five Thousand Dollars ($75,000.00), per fiscal year, for the life of the Agreement, encompassing the Initial and any Extended Terms (the “Contract Sum”), except as provided in Section 1.7. Contracting Party expressly acknowledges and agrees that the Contract Sum in this Agreement is the aggregate total amount covering this Agreement and that certain Agreement for Contract Services by and between the City and Bancroft Construction Services, LLC, of or about even date as this Agreement, such that the Contract Sum as defined herein is the maximum amount available for services provided under all agreements. The method of compensation set forth in the Schedule of Compensation may include a lump sum payment upon completion, payment in accordance with the percentage of completion of the Services, payment for time and materials based upon Contracting Party’s rate schedule, but not exceeding the Contract Sum, or such other reasonable methods as may be specified in the Schedule of Compensation. The Contract Sum shall include the attendance of Contracting Party at all project meetings reasonably deemed necessary by City; Contracting Party shall not be entitled to any additional compensation for attending said meetings. Compensation may include reimbursement for actual and necessary expenditures for reproduction costs, transportation expense, telephone expense, and similar costs and expenses when and if specified in the Schedule of Compensation. Regardless of the method of compensation set forth in the Schedule of Compensation, Contracting Party’s overall compensation shall not exceed the Contract Sum, except as provided in Section 1.7 of this Agreement. 2.2 Method of Billing & Payment. Any month in which Contracting Party wishes to receive payment, Contracting Party shall submit to City no later than the tenth (10th) working day of such month, in the form approved by City’s Finance Director, an invoice for Services rendered prior to the date of the invoice. Such invoice shall (1) describe in detail the Services provided, including time and materials, and (2) specify each staff member who has provided Services and the number of hours assigned to each such staff member. Such invoice shall contain a certification by a principal member of Contracting Party specifying that the payment requested is for Services performed in accordance with the terms of this Agreement. Upon approval in writing by the Contract Officer, or assigned designee, and subject to retention pursuant to Section 8.3, City will pay Contracting Party for all items stated thereon which are approved by City pursuant to this Agreement no later than thirty (30) days after invoices are received by the City’s Finance Department. 33 -4- 2.3 Compensation for Additional Services. Additional Services approved in advance by the Contract Officer, or assigned designee, pursuant to Section 1.7 of this Agreement shall be paid for in an amount agreed to in writing by both City and Contracting Party in advance of the Additional Services being rendered by Contracting Party. Any compensation for Additional Services amounting to five percent (5%) or less of the Contract Sum may be approved by the Contract Officer, or assigned designee. Any greater amount of compensation for Additional Services must be approved by the La Quinta City Council, the City Manager, or Department Director, depending upon City laws, regulations, rules and procedures concerning public contracting. Under no circumstances shall Contracting Party receive compensation for any Additional Services unless prior written approval for the Additional Services is obtained from the Contract Officer, or assigned designee, pursuant to Section 1.7 of this Agreement. 3. PERFORMANCE SCHEDULE. 3.1 Time of Essence. Time is of the essence in the performance of this Agreement. If the Services not completed in accordance with the Schedule of Performance, as set forth in Section 3.2 and “Exhibit C”, it is understood that the City will suffer damage. 3.2 Schedule of Performance. All Services rendered pursuant to this Agreement shall be performed diligently and within the time period established in “Exhibit C” (the “Schedule of Performance”). Extensions to the time period specified in the Schedule of Performance may be approved in writing by the Contract Officer, or assigned designee. 3.3 Force Majeure. The time period specified in the Schedule of Performance for performance of the Services rendered pursuant to this Agreement shall be extended because of any delays due to unforeseeable causes beyond the control and without the fault or negligence of Contracting Party, including, but not restricted to, acts of God or of the public enemy, fires, earthquakes, floods, epidemic, quarantine restrictions, riots, strikes, freight embargoes, acts of any governmental agency other than City, and unusually severe weather, if Contracting Party shall within ten (10) days of the commencement of such delay notify the Contract Officer, or assigned designee, in writing of the causes of the delay. The Contract Officer, or assigned designee, shall ascertain the facts and the extent of delay, and extend the time for performing the Services for the period of the forced delay when and if in the Contract Officer’s judgment such delay is justified, and the Contract Officer’s determination, or assigned designee, shall be final and conclusive upon the parties to this Agreement. Extensions to time period in the Schedule of Performance which are determined by the Contract Officer, or assigned designee, to be justified pursuant to this Section shall not entitle the Contracting Party to additional compensation in excess of the Contract Sum. 3.4 Term. Unless earlier terminated in accordance with the provisions in Article 8.0 of this Agreement, the term of this agreement shall commence on July 2, 2025, and terminate on June 30, 2028 (“Initial Term”). This Agreement may be extended for 34 -5- three (3) additional year(s) upon mutual agreement by both parties (“Extended Term”), and executed in writing. 4. COORDINATION OF WORK. 4.1 Representative of Contracting Party. The following principals of Contracting Party (“Principals”) are hereby designated as being the principals and representatives of Contracting Party authorized to act in its behalf with respect to the Services specified herein and make all decisions in connection therewith: (a) Adam Lippa 951-550-2762 / 951-851-9749 adam@roadservices.net It is expressly understood that the experience, knowledge, capability, and reputation of the foregoing Principals were a substantial inducement for City to enter into this Agreement. Therefore, the foregoing Principals shall be responsible during the term of this Agreement for directing all activities of Contracting Party and devoting sufficient time to personally supervise the Services hereunder. For purposes of this Agreement, the foregoing Principals may not be changed by Contracting Party and no other personnel may be assigned to perform the Services required hereunder without the express written approval of City. 4.2 Contract Officer. The “Contract Officer”, otherwise known as David Easlick, Public Works Superintendent, or assigned designee may be designated in writing by the City Manager of the City. It shall be Contracting Party’s responsibility to assure that the Contract Officer, or assigned designee, is kept informed of the progress of the performance of the Services, and Contracting Party shall refer any decisions, that must be made by City to the Contract Officer, or assigned designee. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the Contract Officer, or assigned designee. The Contract Officer, or assigned designee, shall have authority to sign all documents on behalf of City required hereunder to carry out the terms of this Agreement. 4.3 Prohibition Against Subcontracting or Assignment. The experience, knowledge, capability, and reputation of Contracting Party, its principals, and its employees were a substantial inducement for City to enter into this Agreement. Except as set forth in this Agreement, Contracting Party shall not contract or subcontract with any other entity to perform in whole or in part the Services required hereunder without the express written approval of City. In addition, neither this Agreement nor any interest herein may be transferred, assigned, conveyed, hypothecated, or encumbered, voluntarily or by operation of law, without the prior written approval of City. Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty five percent (25%) of the present ownership and/or control of Contracting Party, taking all transfers into account on a cumulative basis. Any attempted or purported assignment or contracting or subcontracting by Contracting Party without City’s express written approval shall be null, void, and of no effect. No approved 35 -6- transfer shall release Contracting Party of any liability hereunder without the express consent of City. 4.4 Independent Contractor. Neither City nor any of its employees shall have any control over the manner, mode, or means by which Contracting Party, its agents, or its employees, perform the Services required herein, except as otherwise set forth herein. City shall have no voice in the selection, discharge, supervision, or control of Contracting Party’s employees, servants, representatives, or agents, or in fixing their number or hours of service. Contracting Party shall perform all Services required herein as an independent contractor of City and shall remain at all times as to City a wholly independent contractor with only such obligations as are consistent with that role. Contracting Party shall not at any time or in any manner represent that it or any of its agents or employees are agents or employees of City. City shall not in any way or for any purpose become or be deemed to be a partner of Contracting Party in its business or otherwise or a joint venture or a member of any joint enterprise with Contracting Party. Contracting Party shall have no power to incur any debt, obligation, or liability on behalf of City. Contracting Party shall not at any time or in any manner represent that it or any of its agents or employees are agents or employees of City. Except for the Contract Sum paid to Contracting Party as provided in this Agreement, City shall not pay salaries, wages, or other compensation to Contracting Party for performing the Services hereunder for City. City shall not be liable for compensation or indemnification to Contracting Party for injury or sickness arising out of performing the Services hereunder. Notwithstanding any other City, state, or federal policy, rule, regulation, law, or ordinance to the contrary, Contracting Party and any of its employees, agents, and subcontractors providing services under this Agreement shall not qualify for or become entitled to any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in the California Public Employees Retirement System (“PERS”) as an employee of City and entitlement to any contribution to be paid by City for employer contributions and/or employee contributions for PERS benefits. Contracting Party agrees to pay all required taxes on amounts paid to Contracting Party under this Agreement, and to indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Contracting Party shall fully comply with the workers’ compensation laws regarding Contracting Party and Contracting Party’s employees. Contracting Party further agrees to indemnify and hold City harmless from any failure of Contracting Party to comply with applicable workers’ compensation laws. City shall have the right to offset against the amount of any payment due to Contracting Party under this Agreement any amount due to City from Contracting Party as a result of Contracting Party’s failure to promptly pay to City any reimbursement or indemnification arising under this Section. 4.5 Identity of Persons Performing Work. Contracting Party represents that it employs or will employ at its own expense all personnel required for the satisfactory performance of any and all of the Services set forth herein. Contracting Party represents that the Services required herein will be performed by Contracting Party or under its direct supervision, and that all personnel engaged in such work shall be fully qualified and shall be authorized and permitted under applicable State and local law to perform such tasks and services. 36 -7- 4.6 City Cooperation. City shall provide Contracting Party with any plans, publications, reports, statistics, records, or other data or information pertinent to the Services to be performed hereunder which are reasonably available to Contracting Party only from or through action by City. 5. INSURANCE. 5.1 Insurance. Prior to the beginning of any Services under this Agreement and throughout the duration of the term of this Agreement, Contracting Party shall procure and maintain, at its sole cost and expense, and submit concurrently with its execution of this Agreement, policies of insurance as set forth in “Exhibit E” (the “Insurance Requirements”) which is incorporated herein by this reference and expressly made a part hereof. 5.2 Proof of Insurance. Contracting Party shall provide Certificate of Insurance to Agency along with all required endorsements. Certificate of Insurance and endorsements must be approved by Agency’s Risk Manager prior to commencement of performance. 6. INDEMNIFICATION. 6.1 Indemnification. To the fullest extent permitted by law, Contracting Party shall indemnify, protect, defend (with counsel selected by City), and hold harmless City and any and all of its officers, employees, agents, and volunteers as set forth in “Exhibit F” (“Indemnification”) which is incorporated herein by this reference and expressly made a part hereof. 7. RECORDS AND REPORTS. 7.1 Reports. Contracting Party shall periodically prepare and submit to the Contract Officer, or assigned designee, such reports concerning Contracting Party’s performance of the Services required by this Agreement as the Contract Officer, or assigned designee, shall require. Contracting Party hereby acknowledges that City is greatly concerned about the cost of the Services to be performed pursuant to this Agreement. For this reason, Contracting Party agrees that if Contracting Party becomes aware of any facts, circumstances, techniques, or events that may or will materially increase or decrease the cost of the Services contemplated herein or, if Contracting Party is providing design services, the cost of the project being designed, Contracting Party shall promptly notify the Contract Officer, or assigned designee, of said fact, circumstance, technique, or event and the estimated increased or decreased cost related thereto and, if Contracting Party is providing design services, the estimated increased or decreased cost estimate for the project being designed. 7.2 Records. Contracting Party shall keep, and require any subcontractors to keep, such ledgers, books of accounts, invoices, vouchers, canceled checks, reports (including but not limited to payroll reports), studies, or other documents relating to the disbursements charged to City and the Services performed hereunder (the “Books and Records”), as shall be necessary to perform the Services required by this Agreement and 37 -8- enable the Contract Officer, or assigned designee, to evaluate the performance of such Services. Any and all such Books and Records shall be maintained in accordance with generally accepted accounting principles and shall be complete and detailed. The Contract Officer, or assigned designee, shall have full and free access to such Books and Records at all times during normal business hours of City, including the right to inspect, copy, audit, and make records and transcripts from such Books and Records. Such Books and Records shall be maintained for a period of three (3) years following completion of the Services hereunder, and City shall have access to such Books and Records in the event any audit is required. In the event of dissolution of Contracting Party’s business, custody of the Books and Records may be given to City, and access shall be provided by Contracting Party’s successor in interest. Under California Government Code Section 8546.7, if the amount of public funds expended under this Agreement exceeds Ten Thousand Dollars ($10,000.00), this Agreement shall be subject to the examination and audit of the State Auditor, at the request of City or as part of any audit of City, for a period of three (3) years after final payment under this Agreement. 7.3 Ownership of Documents. All drawings, specifications, maps, designs, photographs, studies, surveys, data, notes, computer files, reports, records, documents, and other materials plans, drawings, estimates, test data, survey results, models, renderings, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings, digital renderings, or data stored digitally, magnetically, or in any other medium prepared or caused to be prepared by Contracting Party, its employees, subcontractors, and agents in the performance of this Agreement (the “Documents and Materials”) shall be the property of City and shall be delivered to City upon request of the Contract Officer, or assigned designee, or upon the expiration or termination of this Agreement, and Contracting Party shall have no claim for further employment or additional compensation as a result of the exercise by City of its full rights of ownership use, reuse, or assignment of the Documents and Materials hereunder. Any use, reuse or assignment of such completed Documents and Materials for other projects and/or use of uncompleted documents without specific written authorization by Contracting Party will be at City’s sole risk and without liability to Contracting Party, and Contracting Party’s guarantee and warranties shall not extend to such use, revise, or assignment. Contracting Party may retain copies of such Documents and Materials for its own use. Contracting Party shall have an unrestricted right to use the concepts embodied therein. All subcontractors shall provide for assignment to City of any Documents and Materials prepared by them, and in the event Contracting Party fails to secure such assignment, Contracting Party shall indemnify City for all damages resulting therefrom. 7.4 In the event City or any person, firm, or corporation authorized by City reuses said Documents and Materials without written verification or adaptation by Contracting Party for the specific purpose intended and causes to be made or makes any changes or alterations in said Documents and Materials, City hereby releases, discharges, and exonerates Contracting Party from liability resulting from said change. The provisions of this clause shall survive the termination or expiration of this Agreement and shall thereafter remain in full force and effect. 38 -9- 7.5 Licensing of Intellectual Property. This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, rights of reproduction, and other intellectual property embodied in the Documents and Materials. Contracting Party shall require all subcontractors, if any, to agree in writing that City is granted a non-exclusive and perpetual license for the Documents and Materials the subcontractor prepares under this Agreement. Contracting Party represents and warrants that Contracting Party has the legal right to license any and all of the Documents and Materials. Contracting Party makes no such representation and warranty in regard to the Documents and Materials which were prepared by design professionals other than Contracting Party or provided to Contracting Party by City. City shall not be limited in any way in its use of the Documents and Materials at any time, provided that any such use not within the purposes intended by this Agreement shall be at City’s sole risk. 7.6 Release of Documents. The Documents and Materials shall not be released publicly without the prior written approval of the Contract Officer, or assigned designee, or as required by law. Contracting Party shall not disclose to any other entity or person any information regarding the activities of City, except as required by law or as authorized by City. 7.7 Confidential or Personal Identifying Information. Contracting Party covenants that all City data, data lists, trade secrets, documents with personal identifying information, documents that are not public records, draft documents, discussion notes, or other information, if any, developed or received by Contracting Party or provided for performance of this Agreement are deemed confidential and shall not be disclosed by Contracting Party to any person or entity without prior written authorization by City or unless required by law. City shall grant authorization for disclosure if required by any lawful administrative or legal proceeding, court order, or similar directive with the force of law. All City data, data lists, trade secrets, documents with personal identifying information, documents that are not public records, draft documents, discussions, or other information shall be returned to City upon the termination or expiration of this Agreement. Contracting Party’s covenant under this section shall survive the termination or expiration of this Agreement. 8. ENFORCEMENT OF AGREEMENT. 8.1 California Law. This Agreement shall be interpreted, construed, and governed both as to validity and to performance of the parties in accordance with the laws of the State of California. Legal actions concerning any dispute, claim, or matter arising out of or in relation to this Agreement shall be instituted in the Superior Court of the County of Riverside, State of California, or any other appropriate court in such county, and Contracting Party covenants and agrees to submit to the personal jurisdiction of such court in the event of such action. 8.2 Disputes. In the event of any dispute arising under this Agreement, the injured party shall notify the injuring party in writing of its contentions by submitting a claim therefore. The injured party shall continue performing its obligations hereunder so long 39 -10- as the injuring party commences to cure such default within ten (10) days of service of such notice and completes the cure of such default within forty-five (45) days after service of the notice, or such longer period as may be permitted by the Contract Officer, or assigned designee; provided that if the default is an immediate danger to the health, safety, or general welfare, City may take such immediate action as City deems warranted. Compliance with the provisions of this Section shall be a condition precedent to termination of this Agreement for cause and to any legal action, and such compliance shall not be a waiver of any party’s right to take legal action in the event that the dispute is not cured, provided that nothing herein shall limit City’s right to terminate this Agreement without cause pursuant to this Article 8.0. During the period of time that Contracting Party is in default, City shall hold all invoices and shall, when the default is cured, proceed with payment on the invoices. In the alternative, City may, in its sole discretion, elect to pay some or all of the outstanding invoices during any period of default. 8.3 Retention of Funds. City may withhold from any monies payable to Contracting Party sufficient funds to compensate City for any losses, costs, liabilities, or damages it reasonably believes were suffered by City due to the default of Contracting Party in the performance of the Services required by this Agreement. 8.4 Waiver. No delay or omission in the exercise of any right or remedy of a non-defaulting party on any default shall impair such right or remedy or be construed as a waiver. City’s consent or approval of any act by Contracting Party requiring City’s consent or approval shall not be deemed to waive or render unnecessary City’s consent to or approval of any subsequent act of Contracting Party. Any waiver by either party of any default must be in writing and shall not be a waiver of any other default concerning the same or any other provision of this Agreement. 8.5 Rights and Remedies are Cumulative. Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the parties are cumulative and the exercise by either party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default or any other default by the other party. 8.6 Legal Action. In addition to any other rights or remedies, either party may take legal action, at law or at equity, to cure, correct, or remedy any default, to recover damages for any default, to compel specific performance of this Agreement, to obtain declaratory or injunctive relief, or to obtain any other remedy consistent with the purposes of this Agreement. 8.7 Termination Prior To Expiration of Term. This Section shall govern any termination of this Agreement, except as specifically provided in the following Section for termination for cause. City reserves the right to terminate this Agreement at any time, with or without cause, upon thirty (30) days’ written notice to Contracting Party. Upon receipt of any notice of termination, Contracting Party shall immediately cease all Services hereunder except such as may be specifically approved by the Contract Officer, or assigned designee. Contracting Party shall be entitled to compensation for all Services rendered prior to receipt of the notice of termination and for any Services 40 -11- authorized by the Contract Officer, or assigned designee, thereafter in accordance with the Schedule of Compensation or such as may be approved by the Contract Officer, or assigned designee, except amounts held as a retention pursuant to this Agreement. 8.8 Termination for Default of Contracting Party. If termination is due to the failure of Contracting Party to fulfill its obligations under this Agreement, Contracting Party shall vacate any City-owned property which Contracting Party is permitted to occupy hereunder and City may, after compliance with the provisions of Section 8.2, take over the Services and prosecute the same to completion by contract or otherwise, and Contracting Party shall be liable to the extent that the total cost for completion of the Services required hereunder exceeds the compensation herein stipulated (provided that City shall use reasonable efforts to mitigate such damages), and City may withhold any payments to Contracting Party for the purpose of setoff or partial payment of the amounts owed City. 8.9 Attorneys’ Fees. If either party to this Agreement is required to initiate or defend or made a party to any action or proceeding in any way connected with this Agreement, the prevailing party in such action or proceeding, in addition to any other relief which may be granted, whether legal or equitable, shall be entitled to reasonable attorneys’ fees; provided, however, that the attorneys’ fees awarded pursuant to this Section shall not exceed the hourly rate paid by City for legal services multiplied by the reasonable number of hours spent by the prevailing party in the conduct of the litigation. Attorneys’ fees shall include attorneys’ fees on any appeal, and in addition a party entitled to attorneys’ fees shall be entitled to all other reasonable costs for investigating such action, taking depositions and discovery, and all other necessary costs the court allows which are incurred in such litigation. All such fees shall be deemed to have accrued on commencement of such action and shall be enforceable whether or not such action is prosecuted to judgment. The court may set such fees in the same action or in a separate action brought for that purpose. 9. CITY OFFICERS AND EMPLOYEES; NONDISCRIMINATION. 9.1 Non-liability of City Officers and Employees. No officer, official, employee, agent, representative, or volunteer of City shall be personally liable to Contracting Party, or any successor in interest, in the event or any default or breach by City or for any amount which may become due to Contracting Party or to its successor, or for breach of any obligation of the terms of this Agreement. 9.2 Conflict of Interest. Contracting Party covenants that neither it, nor any officer or principal of it, has or shall acquire any interest, directly or indirectly, which would conflict in any manner with the interests of City or which would in any way hinder Contracting Party’s performance of the Services under this Agreement. Contracting Party further covenants that in the performance of this Agreement, no person having any such interest shall be employed by it as an officer, employee, agent, or subcontractor without the express written consent of the Contract Officer, or assigned designee. Contracting Party agrees to at all times avoid conflicts of interest or the appearance of any conflicts of interest with the interests of City in the performance of this Agreement. 41 -12- No officer or employee of City shall have any financial interest, direct or indirect, in this Agreement nor shall any such officer or employee participate in any decision relating to this Agreement which effects his financial interest or the financial interest of any corporation, partnership or association in which he is, directly or indirectly, interested, in violation of any State statute or regulation. Contracting Party warrants that it has not paid or given and will not pay or give any third party any money or other consideration for obtaining this Agreement. 9.3 Covenant against Discrimination. Contracting Party covenants that, by and for itself, its heirs, executors, assigns, and all persons claiming under or through them, that there shall be no discrimination against or segregation of, any person or group of persons on account of any impermissible classification including, but not limited to, race, color, creed, religion, sex, marital status, sexual orientation, national origin, or ancestry in the performance of this Agreement. Contracting Party shall take affirmative action to ensure that applicants are employed and that employees are treated during employment without regard to their race, color, creed, religion, sex, marital status, sexual orientation, national origin, or ancestry. 10. MISCELLANEOUS PROVISIONS. 10.1 Notice. Any notice, demand, request, consent, approval, or communication either party desires or is required to give the other party or any other person shall be in writing and either served personally or sent by prepaid, first-class mail to the address set forth below. Either party may change its address by notifying the other party of the change of address in writing. Notice shall be deemed communicated forty-eight (48) hours from the time of mailing if mailed as provided in this Section. To City: CITY OF LA QUINTA Attention: David Eastlick 78495 Calle Tampico La Quinta, California 92253 To Contracting Party: Lippa’s LLC, dba Road Services Attention: Adam Lippa 240 Maple Ave, Ste B Beaumont, CA 92223 10.2 Interpretation. The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of this Agreement or any other rule of construction which might otherwise apply. 10.3 Section Headings and Subheadings. The section headings and subheadings contained in this Agreement are included for convenience only and shall not limit or otherwise affect the terms of this Agreement. 10.4 Counterparts. This Agreement may be executed in counterparts, each of which shall be deemed to be an original, and such counterparts shall constitute one and the same instrument. 42 -13- 10.5 Integrated Agreement. This Agreement including the exhibits hereto is the entire, complete, and exclusive expression of the understanding of the parties. It is understood that there are no oral agreements between the parties hereto affecting this Agreement and this Agreement supersedes and cancels any and all previous negotiations, arrangements, agreements, and understandings, if any, between the parties, and none shall be used to interpret this Agreement. 10.6 Amendment. No amendment to or modification of this Agreement shall be valid unless made in writing and approved by Contracting Party and by the City Council of City. The parties agree that this requirement for written modifications cannot be waived and that any attempted waiver shall be void. 10.7 Severability. In the event that any one or more of the articles, phrases, sentences, clauses, paragraphs, or sections contained in this Agreement shall be declared invalid or unenforceable, such invalidity or unenforceability shall not affect any of the remaining articles, phrases, sentences, clauses, paragraphs, or sections of this Agreement which are hereby declared as severable and shall be interpreted to carry out the intent of the parties hereunder unless the invalid provision is so material that its invalidity deprives either party of the basic benefit of their bargain or renders this Agreement meaningless. 10.8 Unfair Business Practices Claims. In entering into this Agreement, Contracting Party offers and agrees to assign to City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. § 15) or under the Cartwright Act (Chapter 2, (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials related to this Agreement. This assignment shall be made and become effective at the time City renders final payment to Contracting Party without further acknowledgment of the parties. 10.9 No Third-Party Beneficiaries. With the exception of the specific provisions set forth in this Agreement, there are no intended third-party beneficiaries under this Agreement and no such other third parties shall have any rights or obligations hereunder. 10.10 Authority. The persons executing this Agreement on behalf of each of the parties hereto represent and warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Agreement on behalf of said party, (iii) by so executing this Agreement, such party is formally bound to the provisions of this Agreement, and (iv) that entering into this Agreement does not violate any provision of any other Agreement to which said party is bound. This Agreement shall be binding upon the heirs, executors, administrators, successors, and assigns of the parties. [SIGNATURES ON FOLLOWING PAGE] 43 -14- IN WITNESS WHEREOF, the parties have executed this Agreement as of the dates stated below. CITY OF LA QUINTA, a California Municipal Corporation JON McMILLEN, City Manager City of La Quinta, California Dated: Lippa’s LLC, dba Road Services: By: Name: Adam Lippa Title: Owner/Operator ATTEST: MONIKA RADEVA, City Clerk City of La Quinta, California By: Name: Title: APPROVED AS TO FORM: WILLIAM H. IHRKE, City Attorney City of La Quinta, California 44 Exhibit A Page 1 of 4 Last revised summer 2017 Exhibit A Scope of Services 1. Services to be Provided: On-call street sweeping services, locations will be provided by city staff. The city will provide a disposal site. 2. Performance Standards: City staff will inspect work as completed and process invoice for payment. Must meet and exceed all South Coast Air Quality District (AQMD) rules and regulations regarding PM-10 and sweeper efficiency, such as Rule 1186. 45 Exhibit A Page 2 of 4 ADDENDUM TO AGREEMENT Re: Scope of Services If the Scope of Services include construction, alteration, demolition, installation, repair, or maintenance affecting real property or structures or improvements of any kind appurtenant to real property, the following apply: 1. Prevailing Wage Compliance. If Contracting Party is a contractor performing public works and maintenance projects, as described in this Section 1.3, Contracting Party shall comply with applicable Federal, State, and local laws. Contracting Party is aware of the requirements of California Labor Code Sections 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Sections 16000, et seq., (collectively, the “Prevailing Wage Laws”), and La Quinta Municipal Code Section 3.12.040, which require the payment of prevailing wage rates and the performance of other requirements on “Public works” and “Maintenance” projects. If the Services are being performed as part of an applicable “Public works” or “Maintenance” project, as defined by the Prevailing Wage Laws, and if construction work over twenty- five thousand dollars ($25,000.00) and/or alterations, demolition, repair or maintenance work over fifteen thousand dollars ($15,000.00) is entered into or extended on or after January 1, 2015 by this Agreement, Contracting Party agrees to fully comply with such Prevailing Wage Laws including, but not limited to, requirements related to the maintenance of payroll records and the employment of apprentices. Pursuant to California Labor Code Section 1725.5, no contractor or subcontractor may be awarded a contract for public work on a “Public works” project unless registered with the California Department of Industrial Relations (“DIR”) at the time the contract is awarded. If the Services are being performed as part of an applicable “Public works” or “Maintenance” project, as defined by the Prevailing Wage Laws, this project is subject to compliance monitoring and enforcement by the DIR. Contracting Party will maintain and will require all subcontractors to maintain valid and current DIR Public Works contractor registration during the term of this Agreement. Contracting Party shall notify City in writing immediately, and in no case more than twenty-four (24) hours, after receiving any information that Contracting Party’s or any of its subcontractor’s DIR registration status has been suspended, revoked, expired, or otherwise changed. It is understood that it is the responsibility of Contracting Party to determine the correct salary scale. Contracting Party shall make copies of the prevailing rates of per diem wages for each craft, classification, or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at Contracting Party’s principal place of business and at the project site, if any. The statutory penalties for failure to pay prevailing wage or to comply with State wage and hour laws will be enforced. Contracting Party must forfeit to City TWENTY-FIVE DOLLARS ($25.00) per day for each worker who works in excess of the minimum working hours when Contracting Party does not pay overtime. In accordance with the provisions of Labor Code Sections 1810 et seq., eight (8) hours is the legal working day. Contracting Party also shall comply with State law requirements to maintain payroll records and shall provide for certified records and inspection of records as required by California Labor Code Section 1770 et seq., including Section 1776. In addition to the other indemnities provided under this Agreement, Contracting Party shall defend (with counsel selected by City), indemnify, and hold City, 46 Exhibit A Page 3 of 4 its elected officials, officers, employees, and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. It is agreed by the parties that, in connection with performance of the Services, including, without limitation, any and all “Public works” (as defined by the Prevailing Wage Laws), Contracting Party shall bear all risks of payment or non-payment of prevailing wages under California law and/or the implementation of Labor Code Section 1781, as the same may be amended from time to time, and/or any other similar law. Contracting Party acknowledges and agrees that it shall be independently responsible for reviewing the applicable laws and regulations and effectuating compliance with such laws. Contracting Party shall require the same of all subcontractors. 2. Retention. Payments shall be made in accordance with the provisions of Article 2.0 of the Agreement. In accordance with said Sections, City shall pay Contracting Party a sum based upon ninety-five percent (95%) of the Contract Sum apportionment of the labor and materials incorporated into the Services under this Agreement during the month covered by said invoice. The remaining five percent (5%) thereof shall be retained as performance security to be paid to Contracting Party within sixty (60) days after final acceptance of the Services by the City Council of City, after Contracting Party has furnished City with a full release of all undisputed payments under this Agreement, if required by City. In the event there are any claims specifically excluded by Contracting Party from the operation of the release, City may retain proceeds (per Public Contract Code § 7107) of up to one hundred fifty percent (150%) of the amount in dispute. City’s failure to deduct or withhold shall not affect Contracting Party’s obligations under the Agreement. 3. Utility Relocation. City is responsible for removal, relocation, or protection of existing main or trunk-line utilities to the extent such utilities were not identified in the invitation for bids or specifications. City shall reimburse Contracting Party for any costs incurred in locating, repairing damage not caused by Contracting Party, and removing or relocating such unidentified utility facilities. Contracting Party shall not be assessed liquidated damages for delay arising from the removal or relocation of such unidentified utility facilities. 4. Trenches or Excavations. Pursuant to California Public Contract Code Section 7104, in the event the work included in this Agreement requires excavations more than four (4) feet in depth, the following shall apply: (a) Contracting Party shall promptly, and before the following conditions are disturbed, notify City, in writing, of any: (1) material that Contracting Party believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law; (2) subsurface or latent physical conditions at the site different from those indicated by information about the site made available to bidders prior to the deadline for submitting bids; or (3) unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Agreement. 47 Exhibit A Page 4 of 4 (b) City shall promptly investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in Contracting Party’s cost of, or the time required for, performance of any part of the work shall issue a change order per Section 1.8 of the Agreement. (c) in the event that a dispute arises between City and Contracting Party whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in Contracting Party’s cost of, or time required for, performance of any part of the work, Contracting Party shall not be excused from any scheduled completion date provided for by this Agreement, but shall proceed with all work to be performed under this Agreement. Contracting Party shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the contracting Parties. 5. Safety. Contracting Party shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out the Services, Contracting Party shall at all times be in compliance with all applicable local, state, and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed. Safety precautions as applicable shall include, but shall not be limited to: (A) adequate life protection and lifesaving equipment and procedures; (B) instructions in accident prevention for all employees and subcontractors, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures. 6. Liquidated Damages. Since the determination of actual damages for any delay in performance of the Agreement would be extremely difficult or impractical to determine in the event of a breach of this Agreement, Contracting Party shall be liable for and shall pay to City the sum of One Thousand dollars ($1,000.00) as liquidated damages for each working day of delay in the performance of any of the Services required hereunder, as specified in the Schedule of Performance. In addition, liquidated damages may be assessed for failure to comply with the emergency call out requirements, if any, described in the Scope of Services. City may withhold from any moneys payable on account of the Services performed by Contracting Party any accrued liquidated damages. 48 Exhibit B Page 1 of 1 Exhibit B Schedule of Compensation With the exception of compensation for Additional Services, provided for in Section 2.3 of this Agreement, the maximum total compensation to be paid to Contracting Party under this Agreement is not to exceed Seventy Five Thousand Dollars ($75,000.00) per fiscal year, for the life of the Agreement, encompassing the Initial and any Extended Terms (“Contract Sum”). Contracting Party expressly acknowledges and agrees that the Contract Sum in this Agreement is the aggregate total amount covering this Agreement and that certain Agreement for Contract Services by and between the City and Bancroft Construction Services, LLC, of or about even date as this Agreement, such that the Contract Sum as defined herein is the maximum amount available for services provided under all agreements. The Contracting Party is to submit invoices as work is completed. Invoices shall be paid to Contracting Party in the amount identified on submitted invoices, approved by the Project Manager for the work tasks performed and properly invoiced by Contracting Party in conformance with Section 2.2 of this Agreement. Complete Pricing List: 49 Exhibit C Page 1 of 1 Exhibit C Schedule of Performance Contracting Party shall complete all services identified in the Scope of Services, Exhibit A of this Agreement. 50 Exhibit D Page 1 of 1 Exhibit D Special Requirements None 51 Exhibit E Page 1 of 6 Exhibit E Insurance Requirements E.1 Insurance. Prior to the beginning of and throughout the duration of this Agreement, the following policies shall be maintained and kept in full force and effect providing insurance with minimum limits as indicated below and issued by insurers with A.M. Best ratings of no less than A-VI: Commercial General Liability (at least as broad as ISO CG 0001) $1,000,000 (per occurrence) $2,000,000 (general aggregate) Must include the following endorsements: General Liability Additional Insured General Liability Primary and Non-contributory Commercial Auto Liability (at least as broad as ISO CA 0001) $5,000,000 (per accident) Auto Liability Additional Insured Personal Auto Declaration Page if applicable Errors and Omissions Liability $1,000,000 (per claim and aggregate) Workers’ Compensation (per statutory requirements) Must include the following endorsements: Workers Compensation with Waiver of Subrogation Workers Compensation Declaration of Sole Proprietor if applicable Contracting Party shall procure and maintain, at its cost, and submit concurrently with its execution of this Agreement, Commercial General Liability insurance against all claims for injuries against persons or damages to property resulting from Contracting Party’s acts or omissions rising out of or related to Contracting Party’s performance under this Agreement. The insurance policy shall contain a severability of interest clause providing that the coverage shall be primary for losses arising out of Contracting Party’s performance hereunder and neither City nor its insurers shall be required to contribute to any such loss. An endorsement evidencing the foregoing and naming the City and its officers and employees as additional insured (on the Commercial General Liability policy only) must be submitted concurrently with the execution of this Agreement and approved by City prior to commencement of the services hereunder. Contracting Party shall carry automobile liability insurance of $1,000,000 per accident against all claims for injuries against persons or damages to property arising out of the use of any automobile by Contracting Party, its officers, any person directly or indirectly employed by Contracting Party, any subcontractor or agent, or anyone for 52 Exhibit E Page 2 of 6 whose acts any of them may be liable, arising directly or indirectly out of or related to Contracting Party’s performance under this Agreement. If Contracting Party or Contracting Party’s employees will use personal autos in any way on this project, Contracting Party shall provide evidence of personal auto liability coverage for each such person. The term “automobile” includes, but is not limited to, a land motor vehicle, trailer or semi-trailer designed for travel on public roads. The automobile insurance policy shall contain a severability of interest clause providing that coverage shall be primary for losses arising out of Contracting Party’s performance hereunder and neither City nor its insurers shall be required to contribute to such loss. Professional Liability or Errors and Omissions Insurance as appropriate shall be written on a policy form coverage specifically designed to protect against acts, errors or omissions of the Contracting Party and “Covered Professional Services” as designated in the policy must specifically include work performed under this agreement. The policy limit shall be no less than $1,000,000 per claim and in the aggregate. The policy must “pay on behalf of” the insured and must include a provision establishing the insurer’s duty to defend. The policy retroactive date shall be on or before the effective date of this agreement. Contracting Party shall carry Workers’ Compensation Insurance in accordance with State Worker’s Compensation laws with employer’s liability limits no less than $1,000,000 per accident or disease. Contracting Party shall procure and maintain Cyber Liability insurance with limits of $1,000,000 per occurrence/loss which shall include the following coverage: a. Liability arising from the theft, dissemination and/or use of confidential or personally identifiable information; including credit monitoring and regulatory fines arising from such theft, dissemination or use of the confidential information. b. Network security liability arising from the unauthorized use of, access to, or tampering with computer systems. c. Liability arising from the failure of technology products (software) required under the contract for Consultant to properly perform the services intended. d. Electronic Media Liability arising from personal injury, plagiarism or misappropriation of ideas, domain name infringement or improper deep- linking or framing, and infringement or violation of intellectual property rights. e. Liability arising from the failure to render professional services. If coverage is maintained on a claims-made basis, Contracting Party shall maintain such coverage for an additional period of three (3) years following termination of the contract. 53 Exhibit E Page 3 of 6 Contracting Party shall provide written notice to City within ten (10) working days if: (1) any of the required insurance policies is terminated; (2) the limits of any of the required polices are reduced; or (3) the deductible or self-insured retention is increased. In the event any of said policies of insurance are cancelled, Contracting Party shall, prior to the cancellation date, submit new evidence of insurance in conformance with this Exhibit to the Contract Officer. The procuring of such insurance or the delivery of policies or certificates evidencing the same shall not be construed as a limitation of Contracting Party’s obligation to indemnify City, its officers, employees, contractors, subcontractors, or agents. E.2 Remedies. In addition to any other remedies City may have if Contracting Party fails to provide or maintain any insurance policies or policy endorsements to the extent and within the time herein required, City may, at its sole option: a. Obtain such insurance and deduct and retain the amount of the premiums for such insurance from any sums due under this Agreement. b. Order Contracting Party to stop work under this Agreement and/or withhold any payment(s) which become due to Contracting Party hereunder until Contracting Party demonstrates compliance with the requirements hereof. c. Terminate this Agreement. Exercise any of the above remedies, however, is an alternative to any other remedies City may have. The above remedies are not the exclusive remedies for Contracting Party’s failure to maintain or secure appropriate policies or endorsements. Nothing herein contained shall be construed as limiting in any way the extent to which Contracting Party may be held responsible for payments of damages to persons or property resulting from Contracting Party’s or its subcontractors’ performance of work under this Agreement. E.3 General Conditions Pertaining to Provisions of Insurance Coverage by Contracting Party. Contracting Party and City agree to the following with respect to insurance provided by Contracting Party: 1. Contracting Party agrees to have its insurer endorse the third party general liability coverage required herein to include as additional insureds City, its officials, employees, and agents, using standard ISO endorsement No. CG 2010 with an edition prior to 1992. Contracting Party also agrees to require all contractors, and subcontractors to do likewise. 2. No liability insurance coverage provided to comply with this Agreement shall prohibit Contracting Party, or Contracting Party’s employees, or agents, from waiving the right of subrogation prior to a loss. Contracting Party agrees to waive subrogation rights against City regardless of the applicability of any insurance proceeds, and to require all contractors and subcontractors to do likewise. 54 Exhibit E Page 4 of 6 3. All insurance coverage and limits provided by Contracting Party and available or applicable to this Agreement are intended to apply to the full extent of the policies. Nothing contained in this Agreement or any other agreement relating to City or its operations limits the application of such insurance coverage. 4. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to City and approved of in writing. 5. No liability policy shall contain any provision or definition that would serve to eliminate so-called “third party action over” claims, including any exclusion for bodily injury to an employee of the insured or of any contractor or subcontractor. 6. All coverage types and limits required are subject to approval, modification and additional requirements by the City, as the need arises. Contracting Party shall not make any reductions in scope of coverage (e.g. elimination of contractual liability or reduction of discovery period) that may affect City’s protection without City’s prior written consent. 7. Proof of compliance with these insurance requirements, consisting of certificates of insurance evidencing all the coverages required and an additional insured endorsement to Contracting Party’s general liability policy, shall be delivered to City at or prior to the execution of this Agreement. In the event such proof of any insurance is not delivered as required, or in the event such insurance is canceled at any time and no replacement coverage is provided, City has the right, but not the duty, to obtain any insurance it deems necessary to protect its interests under this or any other agreement and to pay the premium. Any premium so paid by City shall be charged to and promptly paid by Contracting Party or deducted from sums due Contracting Party, at City option. 8. It is acknowledged by the parties of this agreement that all insurance coverage required to be provided by Contracting Party or any subcontractor, is intended to apply first and on a primary, non-contributing basis in relation to any other insurance or self-insurance available to City. 9. Contracting Party agrees to ensure that subcontractors, and any other party involved with the project that is brought onto or involved in the project by Contracting Party, provide the same minimum insurance coverage required of Contracting Party. Contracting Party agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contracting Party agrees that upon request, all agreements with subcontractors and others engaged in the project will be submitted to City for review. 10. Contracting Party agrees not to self-insure or to use any self-insured retentions or deductibles on any portion of the insurance required herein (with the exception of professional liability coverage, if required) and further agrees that it will not allow any contractor, subcontractor, Architect, Engineer or other entity or person in any way involved in the performance of work on the project contemplated by this agreement 55 Exhibit E Page 5 of 6 to self-insure its obligations to City. If Contracting Party’s existing coverage includes a deductible or self-insured retention, the deductible or self-insured retention must be declared to the City. At that time the City shall review options with the Contracting Party, which may include reduction or elimination of the deductible or self-insured retention, substitution of other coverage, or other solutions. 11. The City reserves the right at any time during the term of this Agreement to change the amounts and types of insurance required by giving the Contracting Party ninety (90) days advance written notice of such change. If such change results in substantial additional cost to the Contracting Party, the City will negotiate additional compensation proportional to the increased benefit to City. 12. For purposes of applying insurance coverage only, this Agreement will be deemed to have been executed immediately upon any party hereto taking any steps that can be deemed to be in furtherance of or towards performance of this Agreement. 13. Contracting Party acknowledges and agrees that any actual or alleged failure on the part of City to inform Contracting Party of non-compliance with any insurance requirement in no way imposes any additional obligations on City nor does it waive any rights hereunder in this or any other regard. 14. Contracting Party will renew the required coverage annually as long as City, or its employees or agents face an exposure from operations of any type pursuant to this agreement. This obligation applies whether the agreement is canceled or terminated for any reason. Termination of this obligation is not effective until City executes a written statement to that effect. 15. Contracting Party shall provide proof that policies of insurance required herein expiring during the term of this Agreement have been renewed or replaced with other policies providing at least the same coverage. Proof that such coverage has been ordered shall be submitted prior to expiration. A coverage binder or letter from Contracting Party’s insurance agent to this effect is acceptable. A certificate of insurance and an additional insured endorsement is required in these specifications applicable to the renewing or new coverage must be provided to City within five (5) days of the expiration of coverages. 16. The provisions of any workers’ compensation or similar act will not limit the obligations of Contracting Party under this agreement. Contracting Party expressly agrees not to use any statutory immunity defenses under such laws with respect to City, its employees, officials, and agents. 17. Requirements of specific coverage features, or limits contained in this section are not intended as limitations on coverage, limits or other requirements nor as a waiver of any coverage normally provided by any given policy. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be limiting or all-inclusive. 56 Exhibit E Page 6 of 6 18. These insurance requirements are intended to be separate and distinct from any other provision in this Agreement and are intended by the parties here to be interpreted as such. 19. The requirements in this Exhibit supersede all other sections and provisions of this Agreement to the extent that any other section or provision conflicts with or impairs the provisions of this Exhibit. 20. Contracting Party agrees to be responsible for ensuring that no contract used by any party involved in any way with the project reserves the right to charge City or Contracting Party for the cost of additional insurance coverage required by this agreement. Any such provisions are to be deleted with reference to City. It is not the intent of City to reimburse any third party for the cost of complying with these requirements. There shall be no recourse against City for payment of premiums or other amounts with respect thereto. 21. Contracting Party agrees to provide immediate notice to City of any claim or loss against Contracting Party arising out of the work performed under this agreement. City assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve City. 57 Exhibit F Page 1 of 2 Exhibit F Indemnification F.1 Indemnity for the Benefit of City. a. Indemnification for Professional Liability. When the law establishes a professional standard of care for Contracting Party’s Services, to the fullest extent permitted by law, Contracting Party shall indemnify, protect, defend (with counsel selected by City), and hold harmless City and any and all of its officials, employees, and agents (“Indemnified Parties”) from and against any and all claims, losses, liabilities of every kind, nature, and description, damages, injury (including, without limitation, injury to or death of an employee of Contracting Party or of any subcontractor), costs and expenses of any kind, whether actual, alleged or threatened, including, without limitation, incidental and consequential damages, court costs, attorneys’ fees, litigation expenses, and fees of expert consultants or expert witnesses incurred in connection therewith and costs of investigation, to the extent same are caused in whole or in part by any negligent or wrongful act, error or omission of Contracting Party, its officers, agents, employees or subcontractors (or any entity or individual that Contracting Party shall bear the legal liability thereof) in the performance of professional services under this agreement. With respect to the design of public improvements, the Contracting Party shall not be liable for any injuries or property damage resulting from the reuse of the design at a location other than that specified in Exhibit A without the written consent of the Contracting Party. b. Indemnification for Other Than Professional Liability. Other than in the performance of professional services and to the full extent permitted by law, Contracting Party shall indemnify, defend (with counsel selected by City), and hold harmless the Indemnified Parties from and against any liability (including liability for claims, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses or costs of any kind, whether actual, alleged or threatened, including, without limitation, incidental and consequential damages, court costs, attorneys’ fees, litigation expenses, and fees of expert consultants or expert witnesses) incurred in connection therewith and costs of investigation, where the same arise out of, are a consequence of, or are in any way attributable to, in whole or in part, the performance of this Agreement by Contracting Party or by any individual or entity for which Contracting Party is legally liable, including but not limited to officers, agents, employees, or subcontractors of Contracting Party. c. Indemnity Provisions for Contracts Related to Construction (Limitation on Indemnity). Without affecting the rights of City under any provision of this agreement, Contracting Party shall not be required to indemnify and hold harmless City for liability attributable to the active negligence of City, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where City is shown to have been actively negligent and where City’s active negligence accounts for only a percentage of the liability involved, the obligation of Contracting Party will be for that entire portion or percentage of liability not attributable to the active negligence of City. 58 Exhibit F Page 2 of 2 d. Indemnification Provision for Design Professionals. 1. Applicability of this Section F.1(d). Notwithstanding Section F.1(a) hereinabove, the following indemnification provision shall apply to a Contracting Party who constitutes a “design professional” as the term is defined in paragraph 3 below. 2. Scope of Indemnification. When the law establishes a professional standard of care for Contracting Party’s Services, to the fullest extent permitted by law, Contracting Party shall indemnify and hold harmless City and any and all of its officials, employees, and agents (“Indemnified Parties”) from and against any and all losses, liabilities of every kind, nature, and description, damages, injury (including, without limitation, injury to or death of an employee of Contracting Party or of any subcontractor), costs and expenses, including, without limitation, incidental and consequential damages, court costs, reimbursement of attorneys’ fees, litigation expenses, and fees of expert consultants or expert witnesses incurred in connection therewith and costs of investigation, to the extent same are caused by any negligent or wrongful act, error or omission of Contracting Party, its officers, agents, employees or subcontractors (or any entity or individual that Contracting Party shall bear the legal liability thereof) in the performance of professional services under this agreement. With respect to the design of public improvements, the Contracting Party shall not be liable for any injuries or property damage resulting from the reuse of the design at a location other than that specified in Exhibit A without the written consent of the Contracting Party. 3. Design Professional Defined. As used in this Section F.1(d), the term “design professional” shall be limited to licensed architects, registered professional engineers, licensed professional land surveyors and landscape architects, all as defined under current law, and as may be amended from time to time by Civil Code § 2782.8. F.2 Obligation to Secure Indemnification Provisions. Contracting Party agrees to obtain executed indemnity agreements with provisions identical to those set forth herein this Exhibit F, as applicable to the Contracting Party, from each and every subcontractor or any other person or entity involved by, for, with or on behalf of Contracting Party in the performance of this Agreement. In the event Contracting Party fails to obtain such indemnity obligations from others as required herein, Contracting Party agrees to be fully responsible according to the terms of this Exhibit. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend City as set forth in this Agreement are binding on the successors, assigns or heirs of Contracting Party and shall survive the termination of this Agreement. 59 AGREEMENT FOR CONTRACT SERVICES THIS AGREEMENT FOR CONTRACT SERVICES (the “Agreement”) is made and entered into by and between the CITY OF LA QUINTA, (“City”), a California municipal corporation, and Bancroft Construction Services, LLC (“Contracting Party”). The parties hereto agree as follows: 1. SERVICES OF CONTRACTING PARTY. 1.1 Scope of Services. In compliance with all terms and conditions of this Agreement, Contracting Party shall provide those services related to On-call Street Sweeping Services, as specified in the “Scope of Services” attached hereto as “Exhibit A” and incorporated herein by this reference (the “Services”). Contracting Party represents and warrants that Contracting Party is a provider of first-class work and/or services and Contracting Party is experienced in performing the Services contemplated herein and, in light of such status and experience, Contracting Party covenants that it shall follow industry standards in performing the Services required hereunder, and that all materials, if any, will be of good quality, fit for the purpose intended. For purposes of this Agreement, the phrase “industry standards” shall mean those standards of practice recognized by one or more first-class firms performing similar services under similar circumstances. 1.2 Compliance with Law. All Services rendered hereunder shall be provided in accordance with all ordinances, resolutions, statutes, rules, regulations, and laws of the City and any Federal, State, or local governmental agency of competent jurisdiction. 1.3 Wage and Hour Compliance, Contracting Party shall comply with applicable Federal, State, and local wage and hour laws. 1.4 Licenses, Permits, Fees and Assessments. Except as otherwise specified herein, Contracting Party shall obtain at its sole cost and expense such licenses, permits, and approvals as may be required by law for the performance of the Services required by this Agreement, including a City of La Quinta business license. Contracting Party and its employees, agents, and subcontractors shall, at their sole cost and expense, keep in effect at all times during the term of this Agreement any licenses, permits, and approvals that are legally required for the performance of the Services required by this Agreement. Contracting Party shall have the sole obligation to pay for any fees, assessments, and taxes, plus applicable penalties and interest, which may be imposed by law and arise from or are necessary for the performance of the Services required by this Agreement, and shall indemnify, defend (with counsel selected by City), and hold City, its elected officials, officers, employees, and agents, free and harmless against any such fees, assessments, taxes, penalties, or interest levied, assessed, or imposed against City hereunder. Contracting Party shall be responsible for all subcontractors’ compliance with this Section. 1.5 Familiarity with Work. By executing this Agreement, Contracting Party warrants that (a) it has thoroughly investigated and considered the Services to be ATTACHMENT 2 60 -2- performed, (b) it has investigated the site where the Services are to be performed, if any, and fully acquainted itself with the conditions there existing, (c) it has carefully considered how the Services should be performed, and (d) it fully understands the facilities, difficulties, and restrictions attending performance of the Services under this Agreement. Should Contracting Party discover any latent or unknown conditions materially differing from those inherent in the Services or as represented by City, Contracting Party shall immediately inform City of such fact and shall not proceed except at Contracting Party’s risk until written instructions are received from the Contract Officer , or assigned designee (as defined in Section 4.2 hereof). 1.6 Standard of Care. Contracting Party acknowledges and understands that the Services contracted for under this Agreement require specialized skills and abilities and that, consistent with this understanding, Contracting Party’s work will be held to an industry standard of quality and workmanship. Consistent with Section 1.5 hereinabove, Contracting Party represents to City that it holds the necessary skills and abilities to satisfy the industry standard of quality as set forth in this Agreement. Contracting Party shall adopt reasonable methods during the life of this Agreement to furnish continuous protection to the Services performed by Contracting Party, and the equipment, materials, papers, and other components thereof to prevent losses or damages, and shall be responsible for all such damages, to persons or property, until acceptance of the Services by City, except such losses or damages as may be caused by City’s own negligence. The performance of Services by Contracting Party shall not relieve Contracting Party from any obligation to correct any incomplete, inaccurate, or defective work at no further cost to City, when such inaccuracies are due to the negligence of Contracting Party. 1.7 Additional Services. In accordance with the terms and conditions of this Agreement, Contracting Party shall perform services in addition to those specified in the Scope of Services (“Additional Services”) only when directed to do so by the Contract Officer, or assigned designee, provided that Contracting Party shall not be required to perform any Additional Services without compensation. Contracting Party shall not perform any Additional Services until receiving prior written authorization (in the form of a written change order if Contracting Party is a contractor performing the Services) from the Contract Officer, or assigned designee, incorporating therein any adjustment in (i) the Contract Sum, and/or (ii) the time to perform this Agreement, which said adjustments are subject to the written approval of Contracting Party. It is expressly understood by Contracting Party that the provisions of this Section shall not apply to the Services specifically set forth in the Scope of Services or reasonably contemplated therein. It is specifically understood and agreed that oral requests and/or approvals of Additional Services shall be barred and are unenforceable. Failure of Contracting Party to secure the Contract Officer’s, or assigned designee’s written authorization for Additional Services shall constitute a waiver of any and all right to adjustment of the Contract Sum or time to perform this Agreement, whether by way of compensation, restitution, quantum meruit, or the like, for Additional Services provided without the appropriate authorization from the Contract Officer, or assigned designee. Compensation for properly authorized Additional Services shall be made in accordance with Section 2.3 of this Agreement. 61 -3- 1.8 Special Requirements. Additional terms and conditions of this Agreement, if any, which are made a part hereof are set forth in “Exhibit D” (the “Special Requirements”), which is incorporated herein by this reference and expressly made a part hereof. In the event of a conflict between the provisions of the Special Requirements and any other provisions of this Agreement, the provisions of the Special Requirements shall govern. 2. COMPENSATION. 2.1 Contract Sum. For the Services rendered pursuant to this Agreement, Contracting Party shall be compensated in accordance with “Exhibit B” (the “Schedule of Compensation”) in a total amount not to exceed Seventy Five Thousand Dollars ($75,000.00), per fiscal year, for the life of the Agreement, encompassing the Initial and any Extended Terms (the “Contract Sum”), except as provided in Section 1.7. Contracting Party expressly acknowledges and agrees that the Contract Sum in this Agreement is the aggregate total amount covering this Agreement and that certain Agreement for Contract Services by and between the City and Lippa’s LLC, dba Road Services, of or about even date as this Agreement, such that the Contract Sum as defined herein is the maximum amount available for services provided under all agreements. The method of compensation set forth in the Schedule of Compensation may include a lump sum payment upon completion, payment in accordance with the percentage of completion of the Services, payment for time and materials based upon Contracting Party’s rate schedule, but not exceeding the Contract Sum, or such other reasonable methods as may be specified in the Schedule of Compensation. The Contract Sum shall include the attendance of Contracting Party at all project meetings reasonably deemed necessary by City; Contracting Party shall not be entitled to any additional compensation for attending said meetings. Compensation may include reimbursement for actual and necessary expenditures for reproduction costs, transportation expense, telephone expense, and similar costs and expenses when and if specified in the Schedule of Compensation. Regardless of the method of compensation set forth in the Schedule of Compensation, Contracting Party’s overall compensation shall not exceed the Contract Sum, except as provided in Section 1.7 of this Agreement. 2.2 Method of Billing & Payment. Any month in which Contracting Party wishes to receive payment, Contracting Party shall submit to City no later than the tenth (10th) working day of such month, in the form approved by City’s Finance Director, an invoice for Services rendered prior to the date of the invoice. Such invoice shall (1) describe in detail the Services provided, including time and materials, and (2) specify each staff member who has provided Services and the number of hours assigned to each such staff member. Such invoice shall contain a certification by a principal member of Contracting Party specifying that the payment requested is for Services performed in accordance with the terms of this Agreement. Upon approval in writing by the Contract Officer, or assigned designee, and subject to retention pursuant to Section 8.3, City will pay Contracting Party for all items stated thereon which are approved by City pursuant to this Agreement no later than thirty (30) days after invoices are received by the City’s Finance Department. 62 -4- 2.3 Compensation for Additional Services. Additional Services approved in advance by the Contract Officer, or assigned designee, pursuant to Section 1.7 of this Agreement shall be paid for in an amount agreed to in writing by both City and Contracting Party in advance of the Additional Services being rendered by Contracting Party. Any compensation for Additional Services amounting to five percent (5%) or less of the Contract Sum may be approved by the Contract Officer, or assigned designee. Any greater amount of compensation for Additional Services must be approved by the La Quinta City Council, the City Manager, or Department Director, depending upon City laws, regulations, rules and procedures concerning public contracting. Under no circumstances shall Contracting Party receive compensation for any Additional Services unless prior written approval for the Additional Services is obtained from the Contract Officer, or assigned designee, pursuant to Section 1.7 of this Agreement. 3. PERFORMANCE SCHEDULE. 3.1 Time of Essence. Time is of the essence in the performance of this Agreement. If the Services not completed in accordance with the Schedule of Performance, as set forth in Section 3.2 and “Exhibit C”, it is understood that the City will suffer damage. 3.2 Schedule of Performance. All Services rendered pursuant to this Agreement shall be performed diligently and within the time period established in “Exhibit C” (the “Schedule of Performance”). Extensions to the time period specified in the Schedule of Performance may be approved in writing by the Contract Officer, or assigned designee. 3.3 Force Majeure. The time period specified in the Schedule of Performance for performance of the Services rendered pursuant to this Agreement shall be extended because of any delays due to unforeseeable causes beyond the control and without the fault or negligence of Contracting Party, including, but not restricted to, acts of God or of the public enemy, fires, earthquakes, floods, epidemic, quarantine restrictions, riots, strikes, freight embargoes, acts of any governmental agency other than City, and unusually severe weather, if Contracting Party shall within ten (10) days of the commencement of such delay notify the Contract Officer, or assigned designee, in writing of the causes of the delay. The Contract Officer, or assigned designee, shall ascertain the facts and the extent of delay, and extend the time for performing the Services for the period of the forced delay when and if in the Contract Officer’s judgment such delay is justified, and the Contract Officer’s determination, or assigned designee, shall be final and conclusive upon the parties to this Agreement. Extensions to time period in the Schedule of Performance which are determined by the Contract Officer, or assigned designee, to be justified pursuant to this Section shall not entitle the Contracting Party to additional compensation in excess of the Contract Sum. 3.4 Term. Unless earlier terminated in accordance with the provisions in Article 8.0 of this Agreement, the term of this agreement shall commence on July 2, 2025, and terminate on June 30, 2028 (“Initial Term”). This Agreement may be extended for 63 -5- three (3) additional year(s) upon mutual agreement by both parties (“Extended Term”), and executed in writing. 4. COORDINATION OF WORK. 4.1 Representative of Contracting Party. The following principals of Contracting Party (“Principals”) are hereby designated as being the principals and representatives of Contracting Party authorized to act in its behalf with respect to the Services specified herein and make all decisions in connection therewith: (a) Ashley Driscoll, Owner (443) 254-4531 ashley@bancroftcs.com It is expressly understood that the experience, knowledge, capability, and reputation of the foregoing Principals were a substantial inducement for City to enter into this Agreement. Therefore, the foregoing Principals shall be responsible during the term of this Agreement for directing all activities of Contracting Party and devoting sufficient time to personally supervise the Services hereunder. For purposes of this Agreement, the foregoing Principals may not be changed by Contracting Party and no other personnel may be assigned to perform the Services required hereunder without the express written approval of City. 4.2 Contract Officer. The “Contract Officer”, otherwise known as David Easlick, Public Works Superintendent, or assigned designee may be designated in writing by the City Manager of the City. It shall be Contracting Party’s responsibility to assure that the Contract Officer, or assigned designee, is kept informed of the progress of the performance of the Services, and Contracting Party shall refer any decisions, that must be made by City to the Contract Officer, or assigned designee. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the Contract Officer, or assigned designee. The Contract Officer, or assigned designee, shall have authority to sign all documents on behalf of City required hereunder to carry out the terms of this Agreement. 4.3 Prohibition Against Subcontracting or Assignment. The experience, knowledge, capability, and reputation of Contracting Party, its principals, and its employees were a substantial inducement for City to enter into this Agreement. Except as set forth in this Agreement, Contracting Party shall not contract or subcontract with any other entity to perform in whole or in part the Services required hereunder without the express written approval of City. In addition, neither this Agreement nor any interest herein may be transferred, assigned, conveyed, hypothecated, or encumbered, voluntarily or by operation of law, without the prior written approval of City. Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty five percent (25%) of the present ownership and/or control of Contracting Party, taking all transfers into account on a cumulative basis. Any attempted or purported assignment or contracting or subcontracting by Contracting Party without City’s express written approval shall be null, void, and of no effect. No approved 64 -6- transfer shall release Contracting Party of any liability hereunder without the express consent of City. 4.4 Independent Contractor. Neither City nor any of its employees shall have any control over the manner, mode, or means by which Contracting Party, its agents, or its employees, perform the Services required herein, except as otherwise set forth herein. City shall have no voice in the selection, discharge, supervision, or control of Contracting Party’s employees, servants, representatives, or agents, or in fixing their number or hours of service. Contracting Party shall perform all Services required herein as an independent contractor of City and shall remain at all times as to City a wholly independent contractor with only such obligations as are consistent with that role. Contracting Party shall not at any time or in any manner represent that it or any of its agents or employees are agents or employees of City. City shall not in any way or for any purpose become or be deemed to be a partner of Contracting Party in its business or otherwise or a joint venture or a member of any joint enterprise with Contracting Party. Contracting Party shall have no power to incur any debt, obligation, or liability on behalf of City. Contracting Party shall not at any time or in any manner represent that it or any of its agents or employees are agents or employees of City. Except for the Contract Sum paid to Contracting Party as provided in this Agreement, City shall not pay salaries, wages, or other compensation to Contracting Party for performing the Services hereunder for City. City shall not be liable for compensation or indemnification to Contracting Party for injury or sickness arising out of performing the Services hereunder. Notwithstanding any other City, state, or federal policy, rule, regulation, law, or ordinance to the contrary, Contracting Party and any of its employees, agents, and subcontractors providing services under this Agreement shall not qualify for or become entitled to any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in the California Public Employees Retirement System (“PERS”) as an employee of City and entitlement to any contribution to be paid by City for employer contributions and/or employee contributions for PERS benefits. Contracting Party agrees to pay all required taxes on amounts paid to Contracting Party under this Agreement, and to indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Contracting Party shall fully comply with the workers’ compensation laws regarding Contracting Party and Contracting Party’s employees. Contracting Party further agrees to indemnify and hold City harmless from any failure of Contracting Party to comply with applicable workers’ compensation laws. City shall have the right to offset against the amount of any payment due to Contracting Party under this Agreement any amount due to City from Contracting Party as a result of Contracting Party’s failure to promptly pay to City any reimbursement or indemnification arising under this Section. 4.5 Identity of Persons Performing Work. Contracting Party represents that it employs or will employ at its own expense all personnel required for the satisfactory performance of any and all of the Services set forth herein. Contracting Party represents that the Services required herein will be performed by Contracting Party or under its direct supervision, and that all personnel engaged in such work shall be fully qualified and shall be authorized and permitted under applicable State and local law to perform such tasks and services. 65 -7- 4.6 City Cooperation. City shall provide Contracting Party with any plans, publications, reports, statistics, records, or other data or information pertinent to the Services to be performed hereunder which are reasonably available to Contracting Party only from or through action by City. 5. INSURANCE. 5.1 Insurance. Prior to the beginning of any Services under this Agreement and throughout the duration of the term of this Agreement, Contracting Party shall procure and maintain, at its sole cost and expense, and submit concurrently with its execution of this Agreement, policies of insurance as set forth in “Exhibit E” (the “Insurance Requirements”) which is incorporated herein by this reference and expressly made a part hereof. 5.2 Proof of Insurance. Contracting Party shall provide Certificate of Insurance to Agency along with all required endorsements. Certificate of Insurance and endorsements must be approved by Agency’s Risk Manager prior to commencement of performance. 6. INDEMNIFICATION. 6.1 Indemnification. To the fullest extent permitted by law, Contracting Party shall indemnify, protect, defend (with counsel selected by City), and hold harmless City and any and all of its officers, employees, agents, and volunteers as set forth in “Exhibit F” (“Indemnification”) which is incorporated herein by this reference and expressly made a part hereof. 7. RECORDS AND REPORTS. 7.1 Reports. Contracting Party shall periodically prepare and submit to the Contract Officer, or assigned designee, such reports concerning Contracting Party’s performance of the Services required by this Agreement as the Contract Officer, or assigned designee, shall require. Contracting Party hereby acknowledges that City is greatly concerned about the cost of the Services to be performed pursuant to this Agreement. For this reason, Contracting Party agrees that if Contracting Party becomes aware of any facts, circumstances, techniques, or events that may or will materially increase or decrease the cost of the Services contemplated herein or, if Contracting Party is providing design services, the cost of the project being designed, Contracting Party shall promptly notify the Contract Officer, or assigned designee, of said fact, circumstance, technique, or event and the estimated increased or decreased cost related thereto and, if Contracting Party is providing design services, the estimated increased or decreased cost estimate for the project being designed. 7.2 Records. Contracting Party shall keep, and require any subcontractors to keep, such ledgers, books of accounts, invoices, vouchers, canceled checks, reports (including but not limited to payroll reports), studies, or other documents relating to the disbursements charged to City and the Services performed hereunder (the “Books and Records”), as shall be necessary to perform the Services required by this Agreement and 66 -8- enable the Contract Officer, or assigned designee, to evaluate the performance of such Services. Any and all such Books and Records shall be maintained in accordance with generally accepted accounting principles and shall be complete and detailed. The Contract Officer, or assigned designee, shall have full and free access to such Books and Records at all times during normal business hours of City, including the right to inspect, copy, audit, and make records and transcripts from such Books and Records. Such Books and Records shall be maintained for a period of three (3) years following completion of the Services hereunder, and City shall have access to such Books and Records in the event any audit is required. In the event of dissolution of Contracting Party’s business, custody of the Books and Records may be given to City, and access shall be provided by Contracting Party’s successor in interest. Under California Government Code Section 8546.7, if the amount of public funds expended under this Agreement exceeds Ten Thousand Dollars ($10,000.00), this Agreement shall be subject to the examination and audit of the State Auditor, at the request of City or as part of any audit of City, for a period of three (3) years after final payment under this Agreement. 7.3 Ownership of Documents. All drawings, specifications, maps, designs, photographs, studies, surveys, data, notes, computer files, reports, records, documents, and other materials plans, drawings, estimates, test data, survey results, models, renderings, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings, digital renderings, or data stored digitally, magnetically, or in any other medium prepared or caused to be prepared by Contracting Party, its employees, subcontractors, and agents in the performance of this Agreement (the “Documents and Materials”) shall be the property of City and shall be delivered to City upon request of the Contract Officer, or assigned designee, or upon the expiration or termination of this Agreement, and Contracting Party shall have no claim for further employment or additional compensation as a result of the exercise by City of its full rights of ownership use, reuse, or assignment of the Documents and Materials hereunder. Any use, reuse or assignment of such completed Documents and Materials for other projects and/or use of uncompleted documents without specific written authorization by Contracting Party will be at City’s sole risk and without liability to Contracting Party, and Contracting Party’s guarantee and warranties shall not extend to such use, revise, or assignment. Contracting Party may retain copies of such Documents and Materials for its own use. Contracting Party shall have an unrestricted right to use the concepts embodied therein. All subcontractors shall provide for assignment to City of any Documents and Materials prepared by them, and in the event Contracting Party fails to secure such assignment, Contracting Party shall indemnify City for all damages resulting therefrom. 7.4 In the event City or any person, firm, or corporation authorized by City reuses said Documents and Materials without written verification or adaptation by Contracting Party for the specific purpose intended and causes to be made or makes any changes or alterations in said Documents and Materials, City hereby releases, discharges, and exonerates Contracting Party from liability resulting from said change. The provisions of this clause shall survive the termination or expiration of this Agreement and shall thereafter remain in full force and effect. 67 -9- 7.5 Licensing of Intellectual Property. This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, rights of reproduction, and other intellectual property embodied in the Documents and Materials. Contracting Party shall require all subcontractors, if any, to agree in writing that City is granted a non-exclusive and perpetual license for the Documents and Materials the subcontractor prepares under this Agreement. Contracting Party represents and warrants that Contracting Party has the legal right to license any and all of the Documents and Materials. Contracting Party makes no such representation and warranty in regard to the Documents and Materials which were prepared by design professionals other than Contracting Party or provided to Contracting Party by City. City shall not be limited in any way in its use of the Documents and Materials at any time, provided that any such use not within the purposes intended by this Agreement shall be at City’s sole risk. 7.6 Release of Documents. The Documents and Materials shall not be released publicly without the prior written approval of the Contract Officer, or assigned designee, or as required by law. Contracting Party shall not disclose to any other entity or person any information regarding the activities of City, except as required by law or as authorized by City. 7.7 Confidential or Personal Identifying Information. Contracting Party covenants that all City data, data lists, trade secrets, documents with personal identifying information, documents that are not public records, draft documents, discussion notes, or other information, if any, developed or received by Contracting Party or provided for performance of this Agreement are deemed confidential and shall not be disclosed by Contracting Party to any person or entity without prior written authorization by City or unless required by law. City shall grant authorization for disclosure if required by any lawful administrative or legal proceeding, court order, or similar directive with the force of law. All City data, data lists, trade secrets, documents with personal identifying information, documents that are not public records, draft documents, discussions, or other information shall be returned to City upon the termination or expiration of this Agreement. Contracting Party’s covenant under this section shall survive the termination or expiration of this Agreement. 8. ENFORCEMENT OF AGREEMENT. 8.1 California Law. This Agreement shall be interpreted, construed, and governed both as to validity and to performance of the parties in accordance with the laws of the State of California. Legal actions concerning any dispute, claim, or matter arising out of or in relation to this Agreement shall be instituted in the Superior Court of the County of Riverside, State of California, or any other appropriate court in such county, and Contracting Party covenants and agrees to submit to the personal jurisdiction of such court in the event of such action. 8.2 Disputes. In the event of any dispute arising under this Agreement, the injured party shall notify the injuring party in writing of its contentions by submitting a claim therefore. The injured party shall continue performing its obligations hereunder so long 68 -10- as the injuring party commences to cure such default within ten (10) days of service of such notice and completes the cure of such default within forty-five (45) days after service of the notice, or such longer period as may be permitted by the Contract Officer, or assigned designee; provided that if the default is an immediate danger to the health, safety, or general welfare, City may take such immediate action as City deems warranted. Compliance with the provisions of this Section shall be a condition precedent to termination of this Agreement for cause and to any legal action, and such compliance shall not be a waiver of any party’s right to take legal action in the event that the dispute is not cured, provided that nothing herein shall limit City’s right to terminate this Agreement without cause pursuant to this Article 8.0. During the period of time that Contracting Party is in default, City shall hold all invoices and shall, when the default is cured, proceed with payment on the invoices. In the alternative, City may, in its sole discretion, elect to pay some or all of the outstanding invoices during any period of default. 8.3 Retention of Funds. City may withhold from any monies payable to Contracting Party sufficient funds to compensate City for any losses, costs, liabilities, or damages it reasonably believes were suffered by City due to the default of Contracting Party in the performance of the Services required by this Agreement. 8.4 Waiver. No delay or omission in the exercise of any right or remedy of a non-defaulting party on any default shall impair such right or remedy or be construed as a waiver. City’s consent or approval of any act by Contracting Party requiring City’s consent or approval shall not be deemed to waive or render unnecessary City’s consent to or approval of any subsequent act of Contracting Party. Any waiver by either party of any default must be in writing and shall not be a waiver of any other default concerning the same or any other provision of this Agreement. 8.5 Rights and Remedies are Cumulative. Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the parties are cumulative and the exercise by either party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default or any other default by the other party. 8.6 Legal Action. In addition to any other rights or remedies, either party may take legal action, at law or at equity, to cure, correct, or remedy any default, to recover damages for any default, to compel specific performance of this Agreement, to obtain declaratory or injunctive relief, or to obtain any other remedy consistent with the purposes of this Agreement. 8.7 Termination Prior To Expiration of Term. This Section shall govern any termination of this Agreement, except as specifically provided in the following Section for termination for cause. City reserves the right to terminate this Agreement at any time, with or without cause, upon thirty (30) days’ written notice to Contracting Party. Upon receipt of any notice of termination, Contracting Party shall immediately cease all Services hereunder except such as may be specifically approved by the Contract Officer, or assigned designee. Contracting Party shall be entitled to compensation for all Services rendered prior to receipt of the notice of termination and for any Services 69 -11- authorized by the Contract Officer, or assigned designee, thereafter in accordance with the Schedule of Compensation or such as may be approved by the Contract Officer, or assigned designee, except amounts held as a retention pursuant to this Agreement. 8.8 Termination for Default of Contracting Party. If termination is due to the failure of Contracting Party to fulfill its obligations under this Agreement, Contracting Party shall vacate any City-owned property which Contracting Party is permitted to occupy hereunder and City may, after compliance with the provisions of Section 8.2, take over the Services and prosecute the same to completion by contract or otherwise, and Contracting Party shall be liable to the extent that the total cost for completion of the Services required hereunder exceeds the compensation herein stipulated (provided that City shall use reasonable efforts to mitigate such damages), and City may withhold any payments to Contracting Party for the purpose of setoff or partial payment of the amounts owed City. 8.9 Attorneys’ Fees. If either party to this Agreement is required to initiate or defend or made a party to any action or proceeding in any way connected with this Agreement, the prevailing party in such action or proceeding, in addition to any other relief which may be granted, whether legal or equitable, shall be entitled to reasonable attorneys’ fees; provided, however, that the attorneys’ fees awarded pursuant to this Section shall not exceed the hourly rate paid by City for legal services multiplied by the reasonable number of hours spent by the prevailing party in the conduct of the litigation. Attorneys’ fees shall include attorneys’ fees on any appeal, and in addition a party entitled to attorneys’ fees shall be entitled to all other reasonable costs for investigating such action, taking depositions and discovery, and all other necessary costs the court allows which are incurred in such litigation. All such fees shall be deemed to have accrued on commencement of such action and shall be enforceable whether or not such action is prosecuted to judgment. The court may set such fees in the same action or in a separate action brought for that purpose. 9. CITY OFFICERS AND EMPLOYEES; NONDISCRIMINATION. 9.1 Non-liability of City Officers and Employees. No officer, official, employee, agent, representative, or volunteer of City shall be personally liable to Contracting Party, or any successor in interest, in the event or any default or breach by City or for any amount which may become due to Contracting Party or to its successor, or for breach of any obligation of the terms of this Agreement. 9.2 Conflict of Interest. Contracting Party covenants that neither it, nor any officer or principal of it, has or shall acquire any interest, directly or indirectly, which would conflict in any manner with the interests of City or which would in any way hinder Contracting Party’s performance of the Services under this Agreement. Contracting Party further covenants that in the performance of this Agreement, no person having any such interest shall be employed by it as an officer, employee, agent, or subcontractor without the express written consent of the Contract Officer, or assigned designee. Contracting Party agrees to at all times avoid conflicts of interest or the appearance of any conflicts of interest with the interests of City in the performance of this Agreement. 70 -12- No officer or employee of City shall have any financial interest, direct or indirect, in this Agreement nor shall any such officer or employee participate in any decision relating to this Agreement which effects his financial interest or the financial interest of any corporation, partnership or association in which he is, directly or indirectly, interested, in violation of any State statute or regulation. Contracting Party warrants that it has not paid or given and will not pay or give any third party any money or other consideration for obtaining this Agreement. 9.3 Covenant against Discrimination. Contracting Party covenants that, by and for itself, its heirs, executors, assigns, and all persons claiming under or through them, that there shall be no discrimination against or segregation of, any person or group of persons on account of any impermissible classification including, but not limited to, race, color, creed, religion, sex, marital status, sexual orientation, national origin, or ancestry in the performance of this Agreement. Contracting Party shall take affirmative action to ensure that applicants are employed and that employees are treated during employment without regard to their race, color, creed, religion, sex, marital status, sexual orientation, national origin, or ancestry. 10. MISCELLANEOUS PROVISIONS. 10.1 Notice. Any notice, demand, request, consent, approval, or communication either party desires or is required to give the other party or any other person shall be in writing and either served personally or sent by prepaid, first-class mail to the address set forth below. Either party may change its address by notifying the other party of the change of address in writing. Notice shall be deemed communicated forty-eight (48) hours from the time of mailing if mailed as provided in this Section. To City: CITY OF LA QUINTA Attention: David Eastlick 78495 Calle Tampico La Quinta, California 92253 To Contracting Party: Bancroft Construction Services LLC Ashley Driscoll, Owner 7486 La Jolla Blvd, Suite 176 La Jolla, CA 92037 10.2 Interpretation. The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of this Agreement or any other rule of construction which might otherwise apply. 10.3 Section Headings and Subheadings. The section headings and subheadings contained in this Agreement are included for convenience only and shall not limit or otherwise affect the terms of this Agreement. 10.4 Counterparts. This Agreement may be executed in counterparts, each of which shall be deemed to be an original, and such counterparts shall constitute one and the same instrument. 71 -13- 10.5 Integrated Agreement. This Agreement including the exhibits hereto is the entire, complete, and exclusive expression of the understanding of the parties. It is understood that there are no oral agreements between the parties hereto affecting this Agreement and this Agreement supersedes and cancels any and all previous negotiations, arrangements, agreements, and understandings, if any, between the parties, and none shall be used to interpret this Agreement. 10.6 Amendment. No amendment to or modification of this Agreement shall be valid unless made in writing and approved by Contracting Party and by the City Council of City. The parties agree that this requirement for written modifications cannot be waived and that any attempted waiver shall be void. 10.7 Severability. In the event that any one or more of the articles, phrases, sentences, clauses, paragraphs, or sections contained in this Agreement shall be declared invalid or unenforceable, such invalidity or unenforceability shall not affect any of the remaining articles, phrases, sentences, clauses, paragraphs, or sections of this Agreement which are hereby declared as severable and shall be interpreted to carry out the intent of the parties hereunder unless the invalid provision is so material that its invalidity deprives either party of the basic benefit of their bargain or renders this Agreement meaningless. 10.8 Unfair Business Practices Claims. In entering into this Agreement, Contracting Party offers and agrees to assign to City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. § 15) or under the Cartwright Act (Chapter 2, (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials related to this Agreement. This assignment shall be made and become effective at the time City renders final payment to Contracting Party without further acknowledgment of the parties. 10.9 No Third-Party Beneficiaries. With the exception of the specific provisions set forth in this Agreement, there are no intended third-party beneficiaries under this Agreement and no such other third parties shall have any rights or obligations hereunder. 10.10 Authority. The persons executing this Agreement on behalf of each of the parties hereto represent and warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Agreement on behalf of said party, (iii) by so executing this Agreement, such party is formally bound to the provisions of this Agreement, and (iv) that entering into this Agreement does not violate any provision of any other Agreement to which said party is bound. This Agreement shall be binding upon the heirs, executors, administrators, successors, and assigns of the parties. [SIGNATURES ON FOLLOWING PAGE] 72 -14- IN WITNESS WHEREOF, the parties have executed this Agreement as of the dates stated below. CITY OF LA QUINTA, a California Municipal Corporation JON McMILLEN, City Manager City of La Quinta, California Dated: Bancroft Construction Services LLC: By: Name: Ashley Driscoll Title: Owner ATTEST: MONIKA RADEVA, City Clerk City of La Quinta, California By: Name: Title: APPROVED AS TO FORM: WILLIAM H. IHRKE, City Attorney City of La Quinta, California 73 Exhibit A Page 1 of 4 Last revised summer 2017 Exhibit A Scope of Services 1. Services to be Provided: On-call street sweeping services, locations will be provided by city staff. The city will provide a disposal site. 2. Performance Standards: City staff will inspect work as completed and process invoice for payment. Must meet and exceed all South Coast Air Quality District (AQMD) rules and regulations regarding PM-10 and sweeper efficiency, such as Rule 1186. 74 Exhibit A Page 2 of 4 ADDENDUM TO AGREEMENT Re: Scope of Services If the Scope of Services include construction, alteration, demolition, installation, repair, or maintenance affecting real property or structures or improvements of any kind appurtenant to real property, the following apply: 1. Prevailing Wage Compliance. If Contracting Party is a contractor performing public works and maintenance projects, as described in this Section 1.3, Contracting Party shall comply with applicable Federal, State, and local laws. Contracting Party is aware of the requirements of California Labor Code Sections 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Sections 16000, et seq., (collectively, the “Prevailing Wage Laws”), and La Quinta Municipal Code Section 3.12.040, which require the payment of prevailing wage rates and the performance of other requirements on “Public works” and “Maintenance” projects. If the Services are being performed as part of an applicable “Public works” or “Maintenance” project, as defined by the Prevailing Wage Laws, and if construction work over twenty- five thousand dollars ($25,000.00) and/or alterations, demolition, repair or maintenance work over fifteen thousand dollars ($15,000.00) is entered into or extended on or after January 1, 2015 by this Agreement, Contracting Party agrees to fully comply with such Prevailing Wage Laws including, but not limited to, requirements related to the maintenance of payroll records and the employment of apprentices. Pursuant to California Labor Code Section 1725.5, no contractor or subcontractor may be awarded a contract for public work on a “Public works” project unless registered with the California Department of Industrial Relations (“DIR”) at the time the contract is awarded. If the Services are being performed as part of an applicable “Public works” or “Maintenance” project, as defined by the Prevailing Wage Laws, this project is subject to compliance monitoring and enforcement by the DIR. Contracting Party will maintain and will require all subcontractors to maintain valid and current DIR Public Works contractor registration during the term of this Agreement. Contracting Party shall notify City in writing immediately, and in no case more than twenty-four (24) hours, after receiving any information that Contracting Party’s or any of its subcontractor’s DIR registration status has been suspended, revoked, expired, or otherwise changed. It is understood that it is the responsibility of Contracting Party to determine the correct salary scale. Contracting Party shall make copies of the prevailing rates of per diem wages for each craft, classification, or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at Contracting Party’s principal place of business and at the project site, if any. The statutory penalties for failure to pay prevailing wage or to comply with State wage and hour laws will be enforced. Contracting Party must forfeit to City TWENTY-FIVE DOLLARS ($25.00) per day for each worker who works in excess of the minimum working hours when Contracting Party does not pay overtime. In accordance with the provisions of Labor Code Sections 1810 et seq., eight (8) hours is the legal working day. Contracting Party also shall comply with State law requirements to maintain payroll records and shall provide for certified records and inspection of records as required by California Labor Code Section 1770 et seq., including Section 1776. In addition to the other indemnities provided under this Agreement, Contracting Party shall defend (with counsel selected by City), indemnify, and hold City, 75 Exhibit A Page 3 of 4 its elected officials, officers, employees, and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. It is agreed by the parties that, in connection with performance of the Services, including, without limitation, any and all “Public works” (as defined by the Prevailing Wage Laws), Contracting Party shall bear all risks of payment or non-payment of prevailing wages under California law and/or the implementation of Labor Code Section 1781, as the same may be amended from time to time, and/or any other similar law. Contracting Party acknowledges and agrees that it shall be independently responsible for reviewing the applicable laws and regulations and effectuating compliance with such laws. Contracting Party shall require the same of all subcontractors. 2. Retention. Payments shall be made in accordance with the provisions of Article 2.0 of the Agreement. In accordance with said Sections, City shall pay Contracting Party a sum based upon ninety-five percent (95%) of the Contract Sum apportionment of the labor and materials incorporated into the Services under this Agreement during the month covered by said invoice. The remaining five percent (5%) thereof shall be retained as performance security to be paid to Contracting Party within sixty (60) days after final acceptance of the Services by the City Council of City, after Contracting Party has furnished City with a full release of all undisputed payments under this Agreement, if required by City. In the event there are any claims specifically excluded by Contracting Party from the operation of the release, City may retain proceeds (per Public Contract Code § 7107) of up to one hundred fifty percent (150%) of the amount in dispute. City’s failure to deduct or withhold shall not affect Contracting Party’s obligations under the Agreement. 3. Utility Relocation. City is responsible for removal, relocation, or protection of existing main or trunk-line utilities to the extent such utilities were not identified in the invitation for bids or specifications. City shall reimburse Contracting Party for any costs incurred in locating, repairing damage not caused by Contracting Party, and removing or relocating such unidentified utility facilities. Contracting Party shall not be assessed liquidated damages for delay arising from the removal or relocation of such unidentified utility facilities. 4. Trenches or Excavations. Pursuant to California Public Contract Code Section 7104, in the event the work included in this Agreement requires excavations more than four (4) feet in depth, the following shall apply: (a) Contracting Party shall promptly, and before the following conditions are disturbed, notify City, in writing, of any: (1) material that Contracting Party believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law; (2) subsurface or latent physical conditions at the site different from those indicated by information about the site made available to bidders prior to the deadline for submitting bids; or (3) unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Agreement. 76 Exhibit A Page 4 of 4 (b) City shall promptly investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in Contracting Party’s cost of, or the time required for, performance of any part of the work shall issue a change order per Section 1.8 of the Agreement. (c) in the event that a dispute arises between City and Contracting Party whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in Contracting Party’s cost of, or time required for, performance of any part of the work, Contracting Party shall not be excused from any scheduled completion date provided for by this Agreement, but shall proceed with all work to be performed under this Agreement. Contracting Party shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the contracting Parties. 5. Safety. Contracting Party shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out the Services, Contracting Party shall at all times be in compliance with all applicable local, state, and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed. Safety precautions as applicable shall include, but shall not be limited to: (A) adequate life protection and lifesaving equipment and procedures; (B) instructions in accident prevention for all employees and subcontractors, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures. 6. Liquidated Damages. Since the determination of actual damages for any delay in performance of the Agreement would be extremely difficult or impractical to determine in the event of a breach of this Agreement, Contracting Party shall be liable for and shall pay to City the sum of One Thousand dollars ($1,000.00) as liquidated damages for each working day of delay in the performance of any of the Services required hereunder, as specified in the Schedule of Performance. In addition, liquidated damages may be assessed for failure to comply with the emergency call out requirements, if any, described in the Scope of Services. City may withhold from any moneys payable on account of the Services performed by Contracting Party any accrued liquidated damages. 77 Exhibit B Page 1 of 1 Exhibit B Schedule of Compensation With the exception of compensation for Additional Services, provided for in Section 2.3 of this Agreement, the maximum total compensation to be paid to Contracting Party under this Agreement is not to exceed Seventy Five Thousand Dollars ($75,000.00) (the “Contract Sum”) per fiscal year, for the life of the agreement, encompassing the Initial and any Extended Terms (“Contract Sum”). Contracting Party expressly acknowledges and agrees that the Contract Sum in this Agreement is the aggregate total amount covering this Agreement, and that certain Agreement for Contract Services by and between the City and Lippa’s LLC, dba Road Services, of or about even dates of this Agreement, such that the Contract Sum as defined herein is the maximum amount available for services provided under all agreements. Contracting Party is to submit invoices as work is completed. Invoices shall be paid to Contracting Party in the amount identified on submitted invoices, approved by the Project Manager for the work tasks performed and properly invoiced by Contracting Party in conformance with Section 2.2 of this Agreement. Complete Pricing List: 78 Exhibit C Page 1 of 1 Exhibit C Schedule of Performance Contracting Party shall complete all services identified in the Scope of Services, Exhibit A of this Agreement. 79 Exhibit D Page 1 of 1 Exhibit D Special Requirements None 80 Exhibit E Page 1 of 6 Exhibit E Insurance Requirements E.1 Insurance. Prior to the beginning of and throughout the duration of this Agreement, the following policies shall be maintained and kept in full force and effect providing insurance with minimum limits as indicated below and issued by insurers with A.M. Best ratings of no less than A-VI: Commercial General Liability (at least as broad as ISO CG 0001) $1,000,000 (per occurrence) $2,000,000 (general aggregate) Must include the following endorsements: General Liability Additional Insured General Liability Primary and Non-contributory Commercial Auto Liability (at least as broad as ISO CA 0001) $5,000,000 (per accident) Auto Liability Additional Insured Personal Auto Declaration Page if applicable Errors and Omissions Liability $1,000,000 (per claim and aggregate) Workers’ Compensation (per statutory requirements) Must include the following endorsements: Workers Compensation with Waiver of Subrogation Workers Compensation Declaration of Sole Proprietor if applicable Contracting Party shall procure and maintain, at its cost, and submit concurrently with its execution of this Agreement, Commercial General Liability insurance against all claims for injuries against persons or damages to property resulting from Contracting Party’s acts or omissions rising out of or related to Contracting Party’s performance under this Agreement. The insurance policy shall contain a severability of interest clause providing that the coverage shall be primary for losses arising out of Contracting Party’s performance hereunder and neither City nor its insurers shall be required to contribute to any such loss. An endorsement evidencing the foregoing and naming the City and its officers and employees as additional insured (on the Commercial General Liability policy only) must be submitted concurrently with the execution of this Agreement and approved by City prior to commencement of the services hereunder. Contracting Party shall carry automobile liability insurance of $1,000,000 per accident against all claims for injuries against persons or damages to property arising out of the use of any automobile by Contracting Party, its officers, any person directly or indirectly employed by Contracting Party, any subcontractor or agent, or anyone for 81 Exhibit E Page 2 of 6 whose acts any of them may be liable, arising directly or indirectly out of or related to Contracting Party’s performance under this Agreement. If Contracting Party or Contracting Party’s employees will use personal autos in any way on this project, Contracting Party shall provide evidence of personal auto liability coverage for each such person. The term “automobile” includes, but is not limited to, a land motor vehicle, trailer or semi-trailer designed for travel on public roads. The automobile insurance policy shall contain a severability of interest clause providing that coverage shall be primary for losses arising out of Contracting Party’s performance hereunder and neither City nor its insurers shall be required to contribute to such loss. Professional Liability or Errors and Omissions Insurance as appropriate shall be written on a policy form coverage specifically designed to protect against acts, errors or omissions of the Contracting Party and “Covered Professional Services” as designated in the policy must specifically include work performed under this agreement. The policy limit shall be no less than $1,000,000 per claim and in the aggregate. The policy must “pay on behalf of” the insured and must include a provision establishing the insurer’s duty to defend. The policy retroactive date shall be on or before the effective date of this agreement. Contracting Party shall carry Workers’ Compensation Insurance in accordance with State Worker’s Compensation laws with employer’s liability limits no less than $1,000,000 per accident or disease. Contracting Party shall procure and maintain Cyber Liability insurance with limits of $1,000,000 per occurrence/loss which shall include the following coverage: a. Liability arising from the theft, dissemination and/or use of confidential or personally identifiable information; including credit monitoring and regulatory fines arising from such theft, dissemination or use of the confidential information. b. Network security liability arising from the unauthorized use of, access to, or tampering with computer systems. c. Liability arising from the failure of technology products (software) required under the contract for Consultant to properly perform the services intended. d. Electronic Media Liability arising from personal injury, plagiarism or misappropriation of ideas, domain name infringement or improper deep- linking or framing, and infringement or violation of intellectual property rights. e. Liability arising from the failure to render professional services. If coverage is maintained on a claims-made basis, Contracting Party shall maintain such coverage for an additional period of three (3) years following termination of the contract. 82 Exhibit E Page 3 of 6 Contracting Party shall provide written notice to City within ten (10) working days if: (1) any of the required insurance policies is terminated; (2) the limits of any of the required polices are reduced; or (3) the deductible or self-insured retention is increased. In the event any of said policies of insurance are cancelled, Contracting Party shall, prior to the cancellation date, submit new evidence of insurance in conformance with this Exhibit to the Contract Officer. The procuring of such insurance or the delivery of policies or certificates evidencing the same shall not be construed as a limitation of Contracting Party’s obligation to indemnify City, its officers, employees, contractors, subcontractors, or agents. E.2 Remedies. In addition to any other remedies City may have if Contracting Party fails to provide or maintain any insurance policies or policy endorsements to the extent and within the time herein required, City may, at its sole option: a. Obtain such insurance and deduct and retain the amount of the premiums for such insurance from any sums due under this Agreement. b. Order Contracting Party to stop work under this Agreement and/or withhold any payment(s) which become due to Contracting Party hereunder until Contracting Party demonstrates compliance with the requirements hereof. c. Terminate this Agreement. Exercise any of the above remedies, however, is an alternative to any other remedies City may have. The above remedies are not the exclusive remedies for Contracting Party’s failure to maintain or secure appropriate policies or endorsements. Nothing herein contained shall be construed as limiting in any way the extent to which Contracting Party may be held responsible for payments of damages to persons or property resulting from Contracting Party’s or its subcontractors’ performance of work under this Agreement. E.3 General Conditions Pertaining to Provisions of Insurance Coverage by Contracting Party. Contracting Party and City agree to the following with respect to insurance provided by Contracting Party: 1. Contracting Party agrees to have its insurer endorse the third party general liability coverage required herein to include as additional insureds City, its officials, employees, and agents, using standard ISO endorsement No. CG 2010 with an edition prior to 1992. Contracting Party also agrees to require all contractors, and subcontractors to do likewise. 2. No liability insurance coverage provided to comply with this Agreement shall prohibit Contracting Party, or Contracting Party’s employees, or agents, from waiving the right of subrogation prior to a loss. Contracting Party agrees to waive subrogation rights against City regardless of the applicability of any insurance proceeds, and to require all contractors and subcontractors to do likewise. 83 Exhibit E Page 4 of 6 3. All insurance coverage and limits provided by Contracting Party and available or applicable to this Agreement are intended to apply to the full extent of the policies. Nothing contained in this Agreement or any other agreement relating to City or its operations limits the application of such insurance coverage. 4. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to City and approved of in writing. 5. No liability policy shall contain any provision or definition that would serve to eliminate so-called “third party action over” claims, including any exclusion for bodily injury to an employee of the insured or of any contractor or subcontractor. 6. All coverage types and limits required are subject to approval, modification and additional requirements by the City, as the need arises. Contracting Party shall not make any reductions in scope of coverage (e.g. elimination of contractual liability or reduction of discovery period) that may affect City’s protection without City’s prior written consent. 7. Proof of compliance with these insurance requirements, consisting of certificates of insurance evidencing all the coverages required and an additional insured endorsement to Contracting Party’s general liability policy, shall be delivered to City at or prior to the execution of this Agreement. In the event such proof of any insurance is not delivered as required, or in the event such insurance is canceled at any time and no replacement coverage is provided, City has the right, but not the duty, to obtain any insurance it deems necessary to protect its interests under this or any other agreement and to pay the premium. Any premium so paid by City shall be charged to and promptly paid by Contracting Party or deducted from sums due Contracting Party, at City option. 8. It is acknowledged by the parties of this agreement that all insurance coverage required to be provided by Contracting Party or any subcontractor, is intended to apply first and on a primary, non-contributing basis in relation to any other insurance or self-insurance available to City. 9. Contracting Party agrees to ensure that subcontractors, and any other party involved with the project that is brought onto or involved in the project by Contracting Party, provide the same minimum insurance coverage required of Contracting Party. Contracting Party agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contracting Party agrees that upon request, all agreements with subcontractors and others engaged in the project will be submitted to City for review. 10. Contracting Party agrees not to self-insure or to use any self-insured retentions or deductibles on any portion of the insurance required herein (with the exception of professional liability coverage, if required) and further agrees that it will not allow any contractor, subcontractor, Architect, Engineer or other entity or person in any way involved in the performance of work on the project contemplated by this agreement 84 Exhibit E Page 5 of 6 to self-insure its obligations to City. If Contracting Party’s existing coverage includes a deductible or self-insured retention, the deductible or self-insured retention must be declared to the City. At that time the City shall review options with the Contracting Party, which may include reduction or elimination of the deductible or self-insured retention, substitution of other coverage, or other solutions. 11. The City reserves the right at any time during the term of this Agreement to change the amounts and types of insurance required by giving the Contracting Party ninety (90) days advance written notice of such change. If such change results in substantial additional cost to the Contracting Party, the City will negotiate additional compensation proportional to the increased benefit to City. 12. For purposes of applying insurance coverage only, this Agreement will be deemed to have been executed immediately upon any party hereto taking any steps that can be deemed to be in furtherance of or towards performance of this Agreement. 13. Contracting Party acknowledges and agrees that any actual or alleged failure on the part of City to inform Contracting Party of non-compliance with any insurance requirement in no way imposes any additional obligations on City nor does it waive any rights hereunder in this or any other regard. 14. Contracting Party will renew the required coverage annually as long as City, or its employees or agents face an exposure from operations of any type pursuant to this agreement. This obligation applies whether the agreement is canceled or terminated for any reason. Termination of this obligation is not effective until City executes a written statement to that effect. 15. Contracting Party shall provide proof that policies of insurance required herein expiring during the term of this Agreement have been renewed or replaced with other policies providing at least the same coverage. Proof that such coverage has been ordered shall be submitted prior to expiration. A coverage binder or letter from Contracting Party’s insurance agent to this effect is acceptable. A certificate of insurance and an additional insured endorsement is required in these specifications applicable to the renewing or new coverage must be provided to City within five (5) days of the expiration of coverages. 16. The provisions of any workers’ compensation or similar act will not limit the obligations of Contracting Party under this agreement. Contracting Party expressly agrees not to use any statutory immunity defenses under such laws with respect to City, its employees, officials, and agents. 17. Requirements of specific coverage features, or limits contained in this section are not intended as limitations on coverage, limits or other requirements nor as a waiver of any coverage normally provided by any given policy. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be limiting or all-inclusive. 85 Exhibit E Page 6 of 6 18. These insurance requirements are intended to be separate and distinct from any other provision in this Agreement and are intended by the parties here to be interpreted as such. 19. The requirements in this Exhibit supersede all other sections and provisions of this Agreement to the extent that any other section or provision conflicts with or impairs the provisions of this Exhibit. 20. Contracting Party agrees to be responsible for ensuring that no contract used by any party involved in any way with the project reserves the right to charge City or Contracting Party for the cost of additional insurance coverage required by this agreement. Any such provisions are to be deleted with reference to City. It is not the intent of City to reimburse any third party for the cost of complying with these requirements. There shall be no recourse against City for payment of premiums or other amounts with respect thereto. 21. Contracting Party agrees to provide immediate notice to City of any claim or loss against Contracting Party arising out of the work performed under this agreement. City assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve City. 86 Exhibit F Page 1 of 2 Exhibit F Indemnification F.1 Indemnity for the Benefit of City. a. Indemnification for Professional Liability. When the law establishes a professional standard of care for Contracting Party’s Services, to the fullest extent permitted by law, Contracting Party shall indemnify, protect, defend (with counsel selected by City), and hold harmless City and any and all of its officials, employees, and agents (“Indemnified Parties”) from and against any and all claims, losses, liabilities of every kind, nature, and description, damages, injury (including, without limitation, injury to or death of an employee of Contracting Party or of any subcontractor), costs and expenses of any kind, whether actual, alleged or threatened, including, without limitation, incidental and consequential damages, court costs, attorneys’ fees, litigation expenses, and fees of expert consultants or expert witnesses incurred in connection therewith and costs of investigation, to the extent same are caused in whole or in part by any negligent or wrongful act, error or omission of Contracting Party, its officers, agents, employees or subcontractors (or any entity or individual that Contracting Party shall bear the legal liability thereof) in the performance of professional services under this agreement. With respect to the design of public improvements, the Contracting Party shall not be liable for any injuries or property damage resulting from the reuse of the design at a location other than that specified in Exhibit A without the written consent of the Contracting Party. b. Indemnification for Other Than Professional Liability. Other than in the performance of professional services and to the full extent permitted by law, Contracting Party shall indemnify, defend (with counsel selected by City), and hold harmless the Indemnified Parties from and against any liability (including liability for claims, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses or costs of any kind, whether actual, alleged or threatened, including, without limitation, incidental and consequential damages, court costs, attorneys’ fees, litigation expenses, and fees of expert consultants or expert witnesses) incurred in connection therewith and costs of investigation, where the same arise out of, are a consequence of, or are in any way attributable to, in whole or in part, the performance of this Agreement by Contracting Party or by any individual or entity for which Contracting Party is legally liable, including but not limited to officers, agents, employees, or subcontractors of Contracting Party. c. Indemnity Provisions for Contracts Related to Construction (Limitation on Indemnity). Without affecting the rights of City under any provision of this agreement, Contracting Party shall not be required to indemnify and hold harmless City for liability attributable to the active negligence of City, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where City is shown to have been actively negligent and where City’s active negligence accounts for only a percentage of the liability involved, the obligation of Contracting Party will be for that entire portion or percentage of liability not attributable to the active negligence of City. 87 Exhibit F Page 2 of 2 d. Indemnification Provision for Design Professionals. 1. Applicability of this Section F.1(d). Notwithstanding Section F.1(a) hereinabove, the following indemnification provision shall apply to a Contracting Party who constitutes a “design professional” as the term is defined in paragraph 3 below. 2. Scope of Indemnification. When the law establishes a professional standard of care for Contracting Party’s Services, to the fullest extent permitted by law, Contracting Party shall indemnify and hold harmless City and any and all of its officials, employees, and agents (“Indemnified Parties”) from and against any and all losses, liabilities of every kind, nature, and description, damages, injury (including, without limitation, injury to or death of an employee of Contracting Party or of any subcontractor), costs and expenses, including, without limitation, incidental and consequential damages, court costs, reimbursement of attorneys’ fees, litigation expenses, and fees of expert consultants or expert witnesses incurred in connection therewith and costs of investigation, to the extent same are caused by any negligent or wrongful act, error or omission of Contracting Party, its officers, agents, employees or subcontractors (or any entity or individual that Contracting Party shall bear the legal liability thereof) in the performance of professional services under this agreement. With respect to the design of public improvements, the Contracting Party shall not be liable for any injuries or property damage resulting from the reuse of the design at a location other than that specified in Exhibit A without the written consent of the Contracting Party. 3. Design Professional Defined. As used in this Section F.1(d), the term “design professional” shall be limited to licensed architects, registered professional engineers, licensed professional land surveyors and landscape architects, all as defined under current law, and as may be amended from time to time by Civil Code § 2782.8. F.2 Obligation to Secure Indemnification Provisions. Contracting Party agrees to obtain executed indemnity agreements with provisions identical to those set forth herein this Exhibit F, as applicable to the Contracting Party, from each and every subcontractor or any other person or entity involved by, for, with or on behalf of Contracting Party in the performance of this Agreement. In the event Contracting Party fails to obtain such indemnity obligations from others as required herein, Contracting Party agrees to be fully responsible according to the terms of this Exhibit. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend City as set forth in this Agreement are binding on the successors, assigns or heirs of Contracting Party and shall survive the termination of this Agreement. 88 City of La Quinta CITY COUNCIL MEETING: July 1, 2025 STAFF REPORT AGENDA TITLE: APPROVE AGREEMENT FOR CONTRACT SERVICES WITH ST. FRANCIS ELECTRIC FOR THE SIGNAL AND CROSSWALK IMPROVEMENTS PROJECT NO. 2024-18 RECOMMENDATION Approve agreement for contract services with St. Francis Electric for the Signal and Crosswalk Improvements Project No. 2024-18; and authorize City Manager to execute the agreement. EXECUTIVE SUMMARY On June 3, 2025, Council approved appropriation of General Fund budget of $700,000 for the Signal and Crosswalk Improvements Project No. 2024-18 (project). Staff recommends utilizing the City’s on-call traffic maintenance contractor, St. Francis Electric (St. Francis) in an amount not to exceed $610,000 (Attachment 1), for the pole procurement and installation at Dune Palms Road at the X-Park, Avenue 52 roundabout near Fritz Burns Park, and at Dune Palms Road and Highway 111. St. Francis is recommended for procurement and installation of the crosswalks and signal modifications to avoid delays in construction of Highway 111 Pavement Rehabilitation, Fritz Burns Park Improvements, and the start of school at La Quinta High School. FISCAL IMPACT Council approved the following project budget on June 3, 2025. Total Budget Design/Professional: $ 75,000 Inspection/Testing/Survey: $ 15,000 Construction: $ 550,000 Contingency: $ 60,000 Total Budget: $ 700,000 CONSENT CALENDAR ITEM NO. 5 89 BACKGROUND/ANALYSIS The City has contracted with St. Francis Electric (St. Francis) for on-call traffic signal repair services since 2019. Under this agreement, St. Francis is also able to subcontract for related services, such as the installation of traffic signal poles and associated concrete work. Time is critical to install a temporary traffic signal pole at the northeast corner of Dune Palms Road and Highway 111. This installation will enable the City’s pavement rehabilitation contractor to complete the widening of that corner during ongoing Highway 111 construction, avoiding additional traffic closures and costs. Additionally, with the Fritz Burns Park improvement project nearing construction, City staff anticipates increased use of the northern parking lot near Fritz Burns Park. To improve pedestrian safety and expedite installation, staff recommends constructing the associated crosswalk improvements as a stand-alone project rather than incorporating them into the ongoing park improvements. This approach will help avoid schedule delays. Finally, during the Dune Palms Bridge construction, staff received community requests for a lighted crosswalk at the X-Park. In anticipation of this future improvement, the bridge contractor installed a median cut-through with Americans with Disabilities Act (ADA)- compliant ramps and pole foundations. However, due to extended procurement lead times, the poles were not ordered or installed during the bridge project. City staff now recommends completing this work prior to the start of the school year to enhance pedestrian safety. Staff seeks Council approval of the proposed agreement and recommends utilizing the City’s on-call traffic maintenance contractor, St. Francis, in an amount not to exceed $610,000, for the pole procurement and installation at Dune Palms Road at the X-Park, Avenue 52 roundabout near Fritz Burns Park, and at Dune Palms Road and Highway 111, and all related future task orders for the project. ALTERNATIVES Staff does not recommend an alternative. Prepared by: Carley Escarrega, Administrative Technician Approved by: Bryan McKinney, PE, City Engineer/Public Works Director Attachment: 1. Agreement for Contract Services with St. Francis Electric 90 AGREEMENT FOR CONTRACT SERVICES THIS AGREEMENT FOR CONTRACT SERVICES (the “Agreement”) is made and entered into by and between the CITY OF LA QUINTA, (“City”), a California municipal corporation, and St. Francis Electric (“Contracting Party”). The parties hereto agree as follows: 1. SERVICES OF CONTRACTING PARTY. 1.1 Scope of Services. In compliance with all terms and conditions of this Agreement, Contracting Party shall provide those services related to construction services for the Signal and Crosswalks Improvements project no. 2024-18, as specified in the “Scope of Services” attached hereto as “Exhibit A” and incorporated herein by this reference (the “Services”). Contracting Party represents and warrants that Contracting Party is a provider of first-class work and/or services and Contracting Party is experienced in performing the Services contemplated herein and, in light of such status and experience, Contracting Party covenants that it shall follow industry standards in performing the Services required hereunder, and that all materials, if any, will be of good quality, fit for the purpose intended. For purposes of this Agreement, the phrase “industry standards” shall mean those standards of practice recognized by one or more first-class firms performing similar services under similar circumstances. 1.2 Compliance with Law. All Services rendered hereunder shall be provided in accordance with all ordinances, resolutions, statutes, rules, regulations, and laws of the City and any Federal, State, or local governmental agency of competent jurisdiction. 1.3 Wage and Hour Compliance, Contracting Party shall comply with applicable Federal, State, and local wage and hour laws. 1.4 Licenses, Permits, Fees and Assessments. Except as otherwise specified herein, Contracting Party shall obtain at its sole cost and expense such licenses, permits, and approvals as may be required by law for the performance of the Services required by this Agreement, including a City of La Quinta business license. Contracting Party and its employees, agents, and subcontractors shall, at their sole cost and expense, keep in effect at all times during the term of this Agreement any licenses, permits, and approvals that are legally required for the performance of the Services required by this Agreement. Contracting Party shall have the sole obligation to pay for any fees, assessments, and taxes, plus applicable penalties and interest, which may be imposed by law and arise from or are necessary for the performance of the Services required by this Agreement, and shall indemnify, defend (with counsel selected by City), and hold City, its elected officials, officers, employees, and agents, free and harmless against any such fees, assessments, taxes, penalties, or interest levied, assessed, or imposed against City hereunder. Contracting Party shall be responsible for all subcontractors’ compliance with this Section. 1.5 Familiarity with Work. By executing this Agreement, Contracting Party warrants that (a) it has thoroughly investigated and considered the Services to be ATTACHMENT 1 91 -2- performed, (b) it has investigated the site where the Services are to be performed, if any, and fully acquainted itself with the conditions there existing, (c) it has carefully considered how the Services should be performed, and (d) it fully understands the facilities, difficulties, and restrictions attending performance of the Services under this Agreement. Should Contracting Party discover any latent or unknown conditions materially differing from those inherent in the Services or as represented by City, Contracting Party shall immediately inform City of such fact and shall not proceed except at Contracting Party’s risk until written instructions are received from the Contract Officer , or assigned designee (as defined in Section 4.2 hereof). 1.6 Standard of Care. Contracting Party acknowledges and understands that the Services contracted for under this Agreement require specialized skills and abilities and that, consistent with this understanding, Contracting Party’s work will be held to an industry standard of quality and workmanship. Consistent with Section 1.5 hereinabove, Contracting Party represents to City that it holds the necessary skills and abilities to satisfy the industry standard of quality as set forth in this Agreement. Contracting Party shall adopt reasonable methods during the life of this Agreement to furnish continuous protection to the Services performed by Contracting Party, and the equipment, materials, papers, and other components thereof to prevent losses or damages, and shall be responsible for all such damages, to persons or property, until acceptance of the Services by City, except such losses or damages as may be caused by City’s own negligence. The performance of Services by Contracting Party shall not relieve Contracting Party from any obligation to correct any incomplete, inaccurate, or defective work at no further cost to City, when such inaccuracies are due to the negligence of Contracting Party. 1.7 Additional Services. In accordance with the terms and conditions of this Agreement, Contracting Party shall perform services in addition to those specified in the Scope of Services (“Additional Services”) only when directed to do so by the Contract Officer, or assigned designee, provided that Contracting Party shall not be required to perform any Additional Services without compensation. Contracting Party shall not perform any Additional Services until receiving prior written authorization (in the form of a written change order if Contracting Party is a contractor performing the Services) from the Contract Officer, or assigned designee, incorporating therein any adjustment in (i) the Contract Sum, and/or (ii) the time to perform this Agreement, which said adjustments are subject to the written approval of Contracting Party. It is expressly understood by Contracting Party that the provisions of this Section shall not apply to the Services specifically set forth in the Scope of Services or reasonably contemplated therein. It is specifically understood and agreed that oral requests and/or approvals of Additional Services shall be barred and are unenforceable. Failure of Contracting Party to secure the Contract Officer’s, or assigned designee’s written authorization for Additional Services shall constitute a waiver of any and all right to adjustment of the Contract Sum or time to perform this Agreement, whether by way of compensation, restitution, quantum meruit, or the like, for Additional Services provided without the appropriate authorization from the Contract Officer, or assigned designee. Compensation for properly authorized Additional Services shall be made in accordance with Section 2.3 of this Agreement. 92 -3- 1.8 Special Requirements. Additional terms and conditions of this Agreement, if any, which are made a part hereof are set forth in “Exhibit D” (the “Special Requirements”), which is incorporated herein by this reference and expressly made a part hereof. In the event of a conflict between the provisions of the Special Requirements and any other provisions of this Agreement, the provisions of the Special Requirements shall govern. 2. COMPENSATION. 2.1 Contract Sum. For the Services rendered pursuant to this Agreement, Contracting Party shall be compensated in accordance with “Exhibit B” (the “Schedule of Compensation”) in a total amount not to exceed Six Hundred Ten Thousand Dollars ($610,000), for the life of the Agreement, encompassing the Initial and any Extended Terms (the “Contract Sum”), except as provided in Section 1.7. The method of compensation set forth in the Schedule of Compensation may include a lump sum payment upon completion, payment in accordance with the percentage of completion of the Services, payment for time and materials based upon Contracting Party’s rate schedule, but not exceeding the Contract Sum, or such other reasonable methods as may be specified in the Schedule of Compensation. The Contract Sum shall include the attendance of Contracting Party at all project meetings reasonably deemed necessary by City; Contracting Party shall not be entitled to any additional compensation for attending said meetings. Compensation may include reimbursement for actual and necessary expenditures for reproduction costs, transportation expense, telephone expense, and similar costs and expenses when and if specified in the Schedule of Compensation. Regardless of the method of compensation set forth in the Schedule of Compensation, Contracting Party’s overall compensation shall not exceed the Contract Sum, except as provided in Section 1.7 of this Agreement. 2.2 Method of Billing & Payment. Any month in which Contracting Party wishes to receive payment, Contracting Party shall submit to City no later than the tenth (10th) working day of such month, in the form approved by City’s Finance Director, an invoice for Services rendered prior to the date of the invoice. Such invoice shall (1) describe in detail the Services provided, including time and materials, and (2) specify each staff member who has provided Services and the number of hours assigned to each such staff member. Such invoice shall contain a certification by a principal member of Contracting Party specifying that the payment requested is for Services performed in accordance with the terms of this Agreement. Upon approval in writing by the Contract Officer, or assigned designee, and subject to retention pursuant to Section 8.3, City will pay Contracting Party for all items stated thereon which are approved by City pursuant to this Agreement no later than thirty (30) days after invoices are received by the City’s Finance Department. 2.3 Compensation for Additional Services. Additional Services approved in advance by the Contract Officer, or assigned designee, pursuant to Section 1.7 of this Agreement shall be paid for in an amount agreed to in writing by both City and Contracting Party in advance of the Additional Services being rendered by Contracting Party. Any compensation for Additional Services amounting to five percent (5%) or less of the 93 -4- Contract Sum may be approved by the Contract Officer, or assigned designee. Any greater amount of compensation for Additional Services must be approved by the La Quinta City Council, the City Manager, or Department Director, depending upon City laws, regulations, rules and procedures concerning public contracting. Under no circumstances shall Contracting Party receive compensation for any Additional Services unless prior written approval for the Additional Services is obtained from the Contract Officer, or assigned designee, pursuant to Section 1.7 of this Agreement. 3. PERFORMANCE SCHEDULE. 3.1 Time of Essence. Time is of the essence in the performance of this Agreement. If the Services not completed in accordance with the Schedule of Performance, as set forth in Section 3.2 and “Exhibit C”, it is understood that the City will suffer damage. 3.2 Schedule of Performance. All Services rendered pursuant to this Agreement shall be performed diligently and within the time period established in “Exhibit C” (the “Schedule of Performance”). Extensions to the time period specified in the Schedule of Performance may be approved in writing by the Contract Officer, or assigned designee. 3.3 Force Majeure. The time period specified in the Schedule of Performance for performance of the Services rendered pursuant to this Agreement shall be extended because of any delays due to unforeseeable causes beyond the control and without the fault or negligence of Contracting Party, including, but not restricted to, acts of God or of the public enemy, fires, earthquakes, floods, epidemic, quarantine restrictions, riots, strikes, freight embargoes, acts of any governmental agency other than City, and unusually severe weather, if Contracting Party shall within ten (10) days of the commencement of such delay notify the Contract Officer, or assigned designee, in writing of the causes of the delay. The Contract Officer, or assigned designee, shall ascertain the facts and the extent of delay, and extend the time for performing the Services for the period of the forced delay when and if in the Contract Officer’s judgment such delay is justified, and the Contract Officer’s determination, or assigned designee, shall be final and conclusive upon the parties to this Agreement. Extensions to time period in the Schedule of Performance which are determined by the Contract Officer, or assigned designee, to be justified pursuant to this Section shall not entitle the Contracting Party to additional compensation in excess of the Contract Sum. 3.4 Term. Unless earlier terminated in accordance with the provisions in Article 8.0 of this Agreement, the term of this agreement shall commence on June 3, 2025, and terminate on December 31, 2026 (“Initial Term”). This Agreement may be extended upon mutual agreement by both parties (“Extended Term”), and executed in writing. 94 -5- 4. COORDINATION OF WORK. 4.1 Representative of Contracting Party. The following principals of Contracting Party (“Principals”) are hereby designated as being the principals and representatives of Contracting Party authorized to act in its behalf with respect to the Services specified herein and make all decisions in connection therewith: (a) Name: Jill Petrie, Southern CA Area Manager Telephone No.: (951) 304-4903 Email: jpetrie@SFE-INC.com It is expressly understood that the experience, knowledge, capability, and reputation of the foregoing Principals were a substantial inducement for City to enter into this Agreement. Therefore, the foregoing Principals shall be responsible during the term of this Agreement for directing all activities of Contracting Party and devoting sufficient time to personally supervise the Services hereunder. For purposes of this Agreement, the foregoing Principals may not be changed by Contracting Party and no other personnel may be assigned to perform the Services required hereunder without the express written approval of City. 4.2 Contract Officer. The “Contract Officer”, otherwise known as Bryan McKinney, PE, Public Works Director/City Engineer, or assigned designee may be designated in writing by the City Manager of the City. It shall be Contracting Party’s responsibility to assure that the Contract Officer, or assigned designee, is kept informed of the progress of the performance of the Services, and Contracting Party shall refer any decisions, that must be made by City to the Contract Officer, or assigned designee. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the Contract Officer, or assigned designee. The Contract Officer, or assigned designee, shall have authority to sign all documents on behalf of City required hereunder to carry out the terms of this Agreement. 4.3 Prohibition Against Subcontracting or Assignment. The experience, knowledge, capability, and reputation of Contracting Party, its principals, and its employees were a substantial inducement for City to enter into this Agreement. Except as set forth in this Agreement, Contracting Party shall not contract or subcontract with any other entity to perform in whole or in part the Services required hereunder without the express written approval of City. In addition, neither this Agreement nor any interest herein may be transferred, assigned, conveyed, hypothecated, or encumbered, voluntarily or by operation of law, without the prior written approval of City. Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty five percent (25%) of the present ownership and/or control of Contracting Party, taking all transfers into account on a cumulative basis. Any attempted or purported assignment or contracting or subcontracting by Contracting Party without City’s express written approval shall be null, void, and of no effect. No approved transfer shall release Contracting Party of any liability hereunder without the express consent of City. 95 -6- 4.4 Independent Contractor. Neither City nor any of its employees shall have any control over the manner, mode, or means by which Contracting Party, its agents, or its employees, perform the Services required herein, except as otherwise set forth herein. City shall have no voice in the selection, discharge, supervision, or control of Contracting Party’s employees, servants, representatives, or agents, or in fixing their number or hours of service. Contracting Party shall perform all Services required herein as an independent contractor of City and shall remain at all times as to City a wholly independent contractor with only such obligations as are consistent with that role. Contracting Party shall not at any time or in any manner represent that it or any of its agents or employees are agents or employees of City. City shall not in any way or for any purpose become or be deemed to be a partner of Contracting Party in its business or otherwise or a joint venture or a member of any joint enterprise with Contracting Party. Contracting Party shall have no power to incur any debt, obligation, or liability on behalf of City. Contracting Party shall not at any time or in any manner represent that it or any of its agents or employees are agents or employees of City. Except for the Contract Sum paid to Contracting Party as provided in this Agreement, City shall not pay salaries, wages, or other compensation to Contracting Party for performing the Services hereunder for City. City shall not be liable for compensation or indemnification to Contracting Party for injury or sickness arising out of performing the Services hereunder. Notwithstanding any other City, state, or federal policy, rule, regulation, law, or ordinance to the contrary, Contracting Party and any of its employees, agents, and subcontractors providing services under this Agreement shall not qualify for or become entitled to any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in the California Public Employees Retirement System (“PERS”) as an employee of City and entitlement to any contribution to be paid by City for employer contributions and/or employee contributions for PERS benefits. Contracting Party agrees to pay all required taxes on amounts paid to Contracting Party under this Agreement, and to indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Contracting Party shall fully comply with the workers’ compensation laws regarding Contracting Party and Contracting Party’s employees. Contracting Party further agrees to indemnify and hold City harmless from any failure of Contracting Party to comply with applicable workers’ compensation laws. City shall have the right to offset against the amount of any payment due to Contracting Party under this Agreement any amount due to City from Contracting Party as a result of Contracting Party’s failure to promptly pay to City any reimbursement or indemnification arising under this Section. 4.5 Identity of Persons Performing Work. Contracting Party represents that it employs or will employ at its own expense all personnel required for the satisfactory performance of any and all of the Services set forth herein. Contracting Party represents that the Services required herein will be performed by Contracting Party or under its direct supervision, and that all personnel engaged in such work shall be fully qualified and shall be authorized and permitted under applicable State and local law to perform such tasks and services. 4.6 City Cooperation. City shall provide Contracting Party with any plans, publications, reports, statistics, records, or other data or information pertinent to the 96 -7- Services to be performed hereunder which are reasonably available to Contracting Party only from or through action by City. 5. INSURANCE. 5.1 Insurance. Prior to the beginning of any Services under this Agreement and throughout the duration of the term of this Agreement, Contracting Party shall procure and maintain, at its sole cost and expense, and submit concurrently with its execution of this Agreement, policies of insurance as set forth in “Exhibit E” (the “Insurance Requirements”) which is incorporated herein by this reference and expressly made a part hereof. 5.2 Proof of Insurance. Contracting Party shall provide Certificate of Insurance to Agency along with all required endorsements. Certificate of Insurance and endorsements must be approved by Agency’s Risk Manager prior to commencement of performance. 6. INDEMNIFICATION. 6.1 Indemnification. To the fullest extent permitted by law, Contracting Party shall indemnify, protect, defend (with counsel selected by City), and hold harmless City and any and all of its officers, employees, agents, and volunteers as set forth in “Exhibit F” (“Indemnification”) which is incorporated herein by this reference and expressly made a part hereof. 7. RECORDS AND REPORTS. 7.1 Reports. Contracting Party shall periodically prepare and submit to the Contract Officer, or assigned designee, such reports concerning Contracting Party’s performance of the Services required by this Agreement as the Contract Officer, or assigned designee, shall require. Contracting Party hereby acknowledges that City is greatly concerned about the cost of the Services to be performed pursuant to this Agreement. For this reason, Contracting Party agrees that if Contracting Party becomes aware of any facts, circumstances, techniques, or events that may or will materially increase or decrease the cost of the Services contemplated herein or, if Contracting Party is providing design services, the cost of the project being designed, Contracting Party shall promptly notify the Contract Officer, or assigned designee, of said fact, circumstance, technique, or event and the estimated increased or decreased cost related thereto and, if Contracting Party is providing design services, the estimated increased or decreased cost estimate for the project being designed. 7.2 Records. Contracting Party shall keep, and require any subcontractors to keep, such ledgers, books of accounts, invoices, vouchers, canceled checks, reports (including but not limited to payroll reports), studies, or other documents relating to the disbursements charged to City and the Services performed hereunder (the “Books and Records”), as shall be necessary to perform the Services required by this Agreement and enable the Contract Officer, or assigned designee, to evaluate the performance of such Services. Any and all such Books and Records shall be maintained in accordance with 97 -8- generally accepted accounting principles and shall be complete and detailed. The Contract Officer, or assigned designee, shall have full and free access to such Books and Records at all times during normal business hours of City, including the right to inspect, copy, audit, and make records and transcripts from such Books and Records. Such Books and Records shall be maintained for a period of three (3) years following completion of the Services hereunder, and City shall have access to such Books and Records in the event any audit is required. In the event of dissolution of Contracting Party’s business, custody of the Books and Records may be given to City, and access shall be provided by Contracting Party’s successor in interest. Under California Government Code Section 8546.7, if the amount of public funds expended under this Agreement exceeds Ten Thousand Dollars ($10,000.00), this Agreement shall be subject to the examination and audit of the State Auditor, at the request of City or as part of any audit of City, for a period of three (3) years after final payment under this Agreement. 7.3 Ownership of Documents. All drawings, specifications, maps, designs, photographs, studies, surveys, data, notes, computer files, reports, records, documents, and other materials plans, drawings, estimates, test data, survey results, models, renderings, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings, digital renderings, or data stored digitally, magnetically, or in any other medium prepared or caused to be prepared by Contracting Party, its employees, subcontractors, and agents in the performance of this Agreement (the “Documents and Materials”) shall be the property of City and shall be delivered to City upon request of the Contract Officer, or assigned designee, or upon the expiration or termination of this Agreement, and Contracting Party shall have no claim for further employment or additional compensation as a result of the exercise by City of its full rights of ownership use, reuse, or assignment of the Documents and Materials hereunder. Any use, reuse or assignment of such completed Documents and Materials for other projects and/or use of uncompleted documents without specific written authorization by Contracting Party will be at City’s sole risk and without liability to Contracting Party, and Contracting Party’s guarantee and warranties shall not extend to such use, revise, or assignment. Contracting Party may retain copies of such Documents and Materials for its own use. Contracting Party shall have an unrestricted right to use the concepts embodied therein. All subcontractors shall provide for assignment to City of any Documents and Materials prepared by them, and in the event Contracting Party fails to secure such assignment, Contracting Party shall indemnify City for all damages resulting therefrom. 7.4 In the event City or any person, firm, or corporation authorized by City reuses said Documents and Materials without written verification or adaptation by Contracting Party for the specific purpose intended and causes to be made or makes any changes or alterations in said Documents and Materials, City hereby releases, discharges, and exonerates Contracting Party from liability resulting from said change. The provisions of this clause shall survive the termination or expiration of this Agreement and shall thereafter remain in full force and effect. 7.5 Licensing of Intellectual Property. This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all 98 -9- copyrights, designs, rights of reproduction, and other intellectual property embodied in the Documents and Materials. Contracting Party shall require all subcontractors, if any, to agree in writing that City is granted a non-exclusive and perpetual license for the Documents and Materials the subcontractor prepares under this Agreement. Contracting Party represents and warrants that Contracting Party has the legal right to license any and all of the Documents and Materials. Contracting Party makes no such representation and warranty in regard to the Documents and Materials which were prepared by design professionals other than Contracting Party or provided to Contracting Party by City. City shall not be limited in any way in its use of the Documents and Materials at any time, provided that any such use not within the purposes intended by this Agreement shall be at City’s sole risk. 7.6 Release of Documents. The Documents and Materials shall not be released publicly without the prior written approval of the Contract Officer, or assigned designee, or as required by law. Contracting Party shall not disclose to any other entity or person any information regarding the activities of City, except as required by law or as authorized by City. 7.7 Confidential or Personal Identifying Information. Contracting Party covenants that all City data, data lists, trade secrets, documents with personal identifying information, documents that are not public records, draft documents, discussion notes, or other information, if any, developed or received by Contracting Party or provided for performance of this Agreement are deemed confidential and shall not be disclosed by Contracting Party to any person or entity without prior written authorization by City or unless required by law. City shall grant authorization for disclosure if required by any lawful administrative or legal proceeding, court order, or similar directive with the force of law. All City data, data lists, trade secrets, documents with personal identifying information, documents that are not public records, draft documents, discussions, or other information shall be returned to City upon the termination or expiration of this Agreement. Contracting Party’s covenant under this section shall survive the termination or expiration of this Agreement. 8. ENFORCEMENT OF AGREEMENT. 8.1 California Law. This Agreement shall be interpreted, construed, and governed both as to validity and to performance of the parties in accordance with the laws of the State of California. Legal actions concerning any dispute, claim, or matter arising out of or in relation to this Agreement shall be instituted in the Superior Court of the County of Riverside, State of California, or any other appropriate court in such county, and Contracting Party covenants and agrees to submit to the personal jurisdiction of such court in the event of such action. 8.2 Disputes. In the event of any dispute arising under this Agreement, the injured party shall notify the injuring party in writing of its contentions by submitting a claim therefore. The injured party shall continue performing its obligations hereunder so long as the injuring party commences to cure such default within ten (10) days of service of such notice and completes the cure of such default within forty-five (45) days after service 99 -10- of the notice, or such longer period as may be permitted by the Contract Officer, or assigned designee; provided that if the default is an immediate danger to the health, safety, or general welfare, City may take such immediate action as City deems warranted. Compliance with the provisions of this Section shall be a condition precedent to termination of this Agreement for cause and to any legal action, and such compliance shall not be a waiver of any party’s right to take legal action in the event that the dispute is not cured, provided that nothing herein shall limit City’s right to terminate this Agreement without cause pursuant to this Article 8.0. During the period of time that Contracting Party is in default, City shall hold all invoices and shall, when the default is cured, proceed with payment on the invoices. In the alternative, City may, in its sole discretion, elect to pay some or all of the outstanding invoices during any period of default. 8.3 Retention of Funds. City may withhold from any monies payable to Contracting Party sufficient funds to compensate City for any losses, costs, liabilities, or damages it reasonably believes were suffered by City due to the default of Contracting Party in the performance of the Services required by this Agreement. 8.4 Waiver. No delay or omission in the exercise of any right or remedy of a non-defaulting party on any default shall impair such right or remedy or be construed as a waiver. City’s consent or approval of any act by Contracting Party requiring City’s consent or approval shall not be deemed to waive or render unnecessary City’s consent to or approval of any subsequent act of Contracting Party. Any waiver by either party of any default must be in writing and shall not be a waiver of any other default concerning the same or any other provision of this Agreement. 8.5 Rights and Remedies are Cumulative. Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the parties are cumulative and the exercise by either party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default or any other default by the other party. 8.6 Legal Action. In addition to any other rights or remedies, either party may take legal action, at law or at equity, to cure, correct, or remedy any default, to recover damages for any default, to compel specific performance of this Agreement, to obtain declaratory or injunctive relief, or to obtain any other remedy consistent with the purposes of this Agreement. 8.7 Termination Prior To Expiration of Term. This Section shall govern any termination of this Agreement, except as specifically provided in the following Section for termination for cause. City reserves the right to terminate this Agreement at any time, with or without cause, upon thirty (30) days’ written notice to Contracting Party. Upon receipt of any notice of termination, Contracting Party shall immediately cease all Services hereunder except such as may be specifically approved by the Contract Officer, or assigned designee. Contracting Party shall be entitled to compensation for all Services rendered prior to receipt of the notice of termination and for any Services authorized by the Contract Officer, or assigned designee, thereafter in accordance with 100 -11- the Schedule of Compensation or such as may be approved by the Contract Officer, or assigned designee, except amounts held as a retention pursuant to this Agreement. 8.8 Termination for Default of Contracting Party. If termination is due to the failure of Contracting Party to fulfill its obligations under this Agreement, Contracting Party shall vacate any City-owned property which Contracting Party is permitted to occupy hereunder and City may, after compliance with the provisions of Section 8.2, take over the Services and prosecute the same to completion by contract or otherwise, and Contracting Party shall be liable to the extent that the total cost for completion of the Services required hereunder exceeds the compensation herein stipulated (provided that City shall use reasonable efforts to mitigate such damages), and City may withhold any payments to Contracting Party for the purpose of setoff or partial payment of the amounts owed City. 8.9 Attorneys’ Fees. If either party to this Agreement is required to initiate or defend or made a party to any action or proceeding in any way connected with this Agreement, the prevailing party in such action or proceeding, in addition to any other relief which may be granted, whether legal or equitable, shall be entitled to reasonable attorneys’ fees; provided, however, that the attorneys’ fees awarded pursuant to this Section shall not exceed the hourly rate paid by City for legal services multiplied by the reasonable number of hours spent by the prevailing party in the conduct of the litigation. Attorneys’ fees shall include attorneys’ fees on any appeal, and in addition a party entitled to attorneys’ fees shall be entitled to all other reasonable costs for investigating such action, taking depositions and discovery, and all other necessary costs the court allows which are incurred in such litigation. All such fees shall be deemed to have accrued on commencement of such action and shall be enforceable whether or not such action is prosecuted to judgment. The court may set such fees in the same action or in a separate action brought for that purpose. 9. CITY OFFICERS AND EMPLOYEES; NONDISCRIMINATION. 9.1 Non-liability of City Officers and Employees. No officer, official, employee, agent, representative, or volunteer of City shall be personally liable to Contracting Party, or any successor in interest, in the event or any default or breach by City or for any amount which may become due to Contracting Party or to its successor, or for breach of any obligation of the terms of this Agreement. 9.2 Conflict of Interest. Contracting Party covenants that neither it, nor any officer or principal of it, has or shall acquire any interest, directly or indirectly, which would conflict in any manner with the interests of City or which would in any way hinder Contracting Party’s performance of the Services under this Agreement. Contracting Party further covenants that in the performance of this Agreement, no person having any such interest shall be employed by it as an officer, employee, agent, or subcontractor without the express written consent of the Contract Officer, or assigned designee. Contracting Party agrees to at all times avoid conflicts of interest or the appearance of any conflicts of interest with the interests of City in the performance of this Agreement. 101 -12- No officer or employee of City shall have any financial interest, direct or indirect, in this Agreement nor shall any such officer or employee participate in any decision relating to this Agreement which effects his financial interest or the financial interest of any corporation, partnership or association in which he is, directly or indirectly, interested, in violation of any State statute or regulation. Contracting Party warrants that it has not paid or given and will not pay or give any third party any money or other consideration for obtaining this Agreement. 9.3 Covenant against Discrimination. Contracting Party covenants that, by and for itself, its heirs, executors, assigns, and all persons claiming under or through them, that there shall be no discrimination against or segregation of, any person or group of persons on account of any impermissible classification including, but not limited to, race, color, creed, religion, sex, marital status, sexual orientation, national origin, or ancestry in the performance of this Agreement. Contracting Party shall take affirmative action to ensure that applicants are employed and that employees are treated during employment without regard to their race, color, creed, religion, sex, marital status, sexual orientation, national origin, or ancestry. 10. MISCELLANEOUS PROVISIONS. 10.1 Notice. Any notice, demand, request, consent, approval, or communication either party desires or is required to give the other party or any other person shall be in writing and either served personally or sent by prepaid, first-class mail to the address set forth below. Either party may change its address by notifying the other party of the change of address in writing. Notice shall be deemed communicated forty-eight (48) hours from the time of mailing if mailed as provided in this Section. To City: CITY OF LA QUINTA Attention: Bryan McKinney, PE 78495 Calle Tampico La Quinta, California 92253 To Contracting Party: ST. FRANCIS ELECTRIC Attn: Jill Petrie, Southern CA Area 1420 Citrus Street Riverside, CA 92507 10.2 Interpretation. The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of this Agreement or any other rule of construction which might otherwise apply. 10.3 Section Headings and Subheadings. The section headings and subheadings contained in this Agreement are included for convenience only and shall not limit or otherwise affect the terms of this Agreement. 10.4 Counterparts. This Agreement may be executed in counterparts, each of which shall be deemed to be an original, and such counterparts shall constitute one and the same instrument. 102 -13- 10.5 Integrated Agreement. This Agreement including the exhibits hereto is the entire, complete, and exclusive expression of the understanding of the parties. It is understood that there are no oral agreements between the parties hereto affecting this Agreement and this Agreement supersedes and cancels any and all previous negotiations, arrangements, agreements, and understandings, if any, between the parties, and none shall be used to interpret this Agreement. 10.6 Amendment. No amendment to or modification of this Agreement shall be valid unless made in writing and approved by Contracting Party and by the City Council of City. The parties agree that this requirement for written modifications cannot be waived and that any attempted waiver shall be void. 10.7 Severability. In the event that any one or more of the articles, phrases, sentences, clauses, paragraphs, or sections contained in this Agreement shall be declared invalid or unenforceable, such invalidity or unenforceability shall not affect any of the remaining articles, phrases, sentences, clauses, paragraphs, or sections of this Agreement which are hereby declared as severable and shall be interpreted to carry out the intent of the parties hereunder unless the invalid provision is so material that its invalidity deprives either party of the basic benefit of their bargain or renders this Agreement meaningless. 10.8 Unfair Business Practices Claims. In entering into this Agreement, Contracting Party offers and agrees to assign to City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. § 15) or under the Cartwright Act (Chapter 2, (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials related to this Agreement. This assignment shall be made and become effective at the time City renders final payment to Contracting Party without further acknowledgment of the parties. 10.9 No Third-Party Beneficiaries. With the exception of the specific provisions set forth in this Agreement, there are no intended third-party beneficiaries under this Agreement and no such other third parties shall have any rights or obligations hereunder. 10.10 Authority. The persons executing this Agreement on behalf of each of the parties hereto represent and warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Agreement on behalf of said party, (iii) by so executing this Agreement, such party is formally bound to the provisions of this Agreement, and (iv) that entering into this Agreement does not violate any provision of any other Agreement to which said party is bound. This Agreement shall be binding upon the heirs, executors, administrators, successors, and assigns of the parties. [SIGNATURES ON FOLLOWING PAGE] 103 -14- IN WITNESS WHEREOF, the parties have executed this Agreement as of the dates stated below. CITY OF LA QUINTA, a California Municipal Corporation JON MCMILLEN, City Manager City of La Quinta, California Dated: ST. FRANCIS ELECTRIC: By: Name: Guy Smith Title: President ATTEST: MONIKA RADEVA, City Clerk City of La Quinta, California By: Name: Title: APPROVED AS TO FORM: WILLIAM H. IHRKE, City Attorney City of La Quinta, California 104 Exhibit A Page 1 of 4 Last revised summer 2017 Exhibit A Scope of Services 1. Services to be Provided:  Procurement of poles and equipment  Perform modification of traffic signals  Installation of signal and crosswalk components including concrete foundation and flatwork required  Potholing 105 Exhibit A Page 2 of 4 ADDENDUM TO AGREEMENT Re: Scope of Services If the Scope of Services include construction, alteration, demolition, installation, repair, or maintenance affecting real property or structures or improvements of any kind appurtenant to real property, the following apply: 1. Prevailing Wage Compliance. If Contracting Party is a contractor performing public works and maintenance projects, as described in this Section 1.3, Contracting Party shall comply with applicable Federal, State, and local laws. Contracting Party is aware of the requirements of California Labor Code Sections 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Sections 16000, et seq., (collectively, the “Prevailing Wage Laws”), and La Quinta Municipal Code Section 3.12.040, which require the payment of prevailing wage rates and the performance of other requirements on “Public works” and “Maintenance” projects. If the Services are being performed as part of an applicable “Public works” or “Maintenance” project, as defined by the Prevailing Wage Laws, and if construction work over twenty- five thousand dollars ($25,000.00) and/or alterations, demolition, repair or maintenance work over fifteen thousand dollars ($15,000.00) is entered into or extended on or after January 1, 2015 by this Agreement, Contracting Party agrees to fully comply with such Prevailing Wage Laws including, but not limited to, requirements related to the maintenance of payroll records and the employment of apprentices. Pursuant to California Labor Code Section 1725.5, no contractor or subcontractor may be awarded a contract for public work on a “Public works” project unless registered with the California Department of Industrial Relations (“DIR”) at the time the contract is awarded. If the Services are being performed as part of an applicable “Public works” or “Maintenance” project, as defined by the Prevailing Wage Laws, this project is subject to compliance monitoring and enforcement by the DIR. Contracting Party will maintain and will require all subcontractors to maintain valid and current DIR Public Works contractor registration during the term of this Agreement. Contracting Party shall notify City in writing immediately, and in no case more than twenty-four (24) hours, after receiving any information that Contracting Party’s or any of its subcontractor’s DIR registration status has been suspended, revoked, expired, or otherwise changed. It is understood that it is the responsibility of Contracting Party to determine the correct salary scale. Contracting Party shall make copies of the prevailing rates of per diem wages for each craft, classification, or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at Contracting Party’s principal place of business and at the project site, if any. The statutory penalties for failure to pay prevailing wage or to comply with State wage and hour laws will be enforced. Contracting Party must forfeit to City TWENTY-FIVE DOLLARS ($25.00) per day for each worker who works in excess of the minimum working hours when Contracting Party does not pay overtime. In accordance with the provisions of Labor Code Sections 1810 et seq., eight (8) hours is the legal working day. Contracting Party also shall comply with State law requirements to maintain payroll records and shall provide for certified records and inspection of records as required by California Labor Code Section 1770 et seq., including Section 1776. In addition to the other indemnities provided under this Agreement, Contracting Party shall defend (with counsel selected by City), indemnify, and hold City, 106 Exhibit A Page 3 of 4 its elected officials, officers, employees, and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. It is agreed by the parties that, in connection with performance of the Services, including, without limitation, any and all “Public works” (as defined by the Prevailing Wage Laws), Contracting Party shall bear all risks of payment or non-payment of prevailing wages under California law and/or the implementation of Labor Code Section 1781, as the same may be amended from time to time, and/or any other similar law. Contracting Party acknowledges and agrees that it shall be independently responsible for reviewing the applicable laws and regulations and effectuating compliance with such laws. Contracting Party shall require the same of all subcontractors. 2. Retention. Payments shall be made in accordance with the provisions of Article 2.0 of the Agreement. In accordance with said Sections, City shall pay Contracting Party a sum based upon ninety-five percent (95%) of the Contract Sum apportionment of the labor and materials incorporated into the Services under this Agreement during the month covered by said invoice. The remaining five percent (5%) thereof shall be retained as performance security to be paid to Contracting Party within sixty (60) days after final acceptance of the Services by the City Council of City, after Contracting Party has furnished City with a full release of all undisputed payments under this Agreement, if required by City. In the event there are any claims specifically excluded by Contracting Party from the operation of the release, City may retain proceeds (per Public Contract Code § 7107) of up to one hundred fifty percent (150%) of the amount in dispute. City’s failure to deduct or withhold shall not affect Contracting Party’s obligations under the Agreement. 3. Utility Relocation. City is responsible for removal, relocation, or protection of existing main or trunk-line utilities to the extent such utilities were not identified in the invitation for bids or specifications. City shall reimburse Contracting Party for any costs incurred in locating, repairing damage not caused by Contracting Party, and removing or relocating such unidentified utility facilities. Contracting Party shall not be assessed liquidated damages for delay arising from the removal or relocation of such unidentified utility facilities. 4. Trenches or Excavations. Pursuant to California Public Contract Code Section 7104, in the event the work included in this Agreement requires excavations more than four (4) feet in depth, the following shall apply: (a) Contracting Party shall promptly, and before the following conditions are disturbed, notify City, in writing, of any: (1) material that Contracting Party believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law; (2) subsurface or latent physical conditions at the site different from those indicated by information about the site made available to bidders prior to the deadline for submitting bids; or (3) unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Agreement. 107 Exhibit A Page 4 of 4 (b) City shall promptly investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in Contracting Party’s cost of, or the time required for, performance of any part of the work shall issue a change order per Section 1.8 of the Agreement. (c) in the event that a dispute arises between City and Contracting Party whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in Contracting Party’s cost of, or time required for, performance of any part of the work, Contracting Party shall not be excused from any scheduled completion date provided for by this Agreement, but shall proceed with all work to be performed under this Agreement. Contracting Party shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the contracting Parties. 5. Safety. Contracting Party shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out the Services, Contracting Party shall at all times be in compliance with all applicable local, state, and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed. Safety precautions as applicable shall include, but shall not be limited to: (A) adequate life protection and lifesaving equipment and procedures; (B) instructions in accident prevention for all employees and subcontractors, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures. 6. Liquidated Damages. Since the determination of actual damages for any delay in performance of the Agreement would be extremely difficult or impractical to determine in the event of a breach of this Agreement, Contracting Party shall be liable for and shall pay to City the sum of One Thousand dollars ($1,000.00) as liquidated damages for each working day of delay in the performance of any of the Services required hereunder, as specified in the Schedule of Performance. In addition, liquidated damages may be assessed for failure to comply with the emergency call out requirements, if any, described in the Scope of Services. City may withhold from any moneys payable on account of the Services performed by Contracting Party any accrued liquidated damages. 108 Exhibit B Page 1 of 1 Exhibit B Schedule of Compensation With the exception of compensation for Additional Services, provided for in Section 2.3 of this Agreement, the maximum total compensation to be paid to Contracting Party under this Agreement is not to exceed Six Hundred Ten Thousand Dollars ($610,000) (“Contract Sum”). The Contract Sum shall be paid to Contracting Party in installment payments made on a monthly basis and in an amount identified in Contracting Party’s schedule of compensation attached hereto for the work tasks performed and properly invoiced by Contracting Party in conformance with Section 2.2 of this Agreement. Payment will be made on time and materials basis per approved task orders executed by the Contract Officer. 109 Exhibit C Page 1 of 1 Exhibit C Schedule of Performance Contracting Party shall complete all services identified in the Scope of Services, Exhibit A of this Agreement. 110 Exhibit D Page 1 of 1 Exhibit D Special Requirements None 111 Exhibit E Page 1 of 6 Exhibit E Insurance Requirements E.1 Insurance. Prior to the beginning of and throughout the duration of this Agreement, the following policies shall be maintained and kept in full force and effect providing insurance with minimum limits as indicated below and issued by insurers with A.M. Best ratings of no less than A-VI: Commercial General Liability (at least as broad as ISO CG 0001) $1,000,000 (per occurrence) $2,000,000 (general aggregate) Must include the following endorsements: General Liability Additional Insured General Liability Primary and Non-contributory Commercial Auto Liability (at least as broad as ISO CA 0001) $1,000,000 (per accident) Auto Liability Additional Insured Personal Auto Declaration Page if applicable Errors and Omissions Liability $1,000,000 (per claim and aggregate) Workers’ Compensation (per statutory requirements) Must include the following endorsements: Workers Compensation with Waiver of Subrogation Workers Compensation Declaration of Sole Proprietor if applicable Contracting Party shall procure and maintain, at its cost, and submit concurrently with its execution of this Agreement, Commercial General Liability insurance against all claims for injuries against persons or damages to property resulting from Contracting Party’s acts or omissions rising out of or related to Contracting Party’s performance under this Agreement. The insurance policy shall contain a severability of interest clause providing that the coverage shall be primary for losses arising out of Contracting Party’s performance hereunder and neither City nor its insurers shall be required to contribute to any such loss. An endorsement evidencing the foregoing and naming the City and its officers and employees as additional insured (on the Commercial General Liability policy only) must be submitted concurrently with the execution of this Agreement and approved by City prior to commencement of the services hereunder. Contracting Party shall carry automobile liability insurance of $1,000,000 per accident against all claims for injuries against persons or damages to property arising out of the use of any automobile by Contracting Party, its officers, any person directly or indirectly employed by Contracting Party, any subcontractor or agent, or anyone for whose acts any of them may be liable, arising directly or indirectly out of or related to 112 Exhibit E Page 2 of 6 Contracting Party’s performance under this Agreement. If Contracting Party or Contracting Party’s employees will use personal autos in any way on this project, Contracting Party shall provide evidence of personal auto liability coverage for each such person. The term “automobile” includes, but is not limited to, a land motor vehicle, trailer or semi-trailer designed for travel on public roads. The automobile insurance policy shall contain a severability of interest clause providing that coverage shall be primary for losses arising out of Contracting Party’s performance hereunder and neither City nor its insurers shall be required to contribute to such loss. Professional Liability or Errors and Omissions Insurance as appropriate shall be written on a policy form coverage specifically designed to protect against acts, errors or omissions of the Contracting Party and “Covered Professional Services” as designated in the policy must specifically include work performed under this agreement. The policy limit shall be no less than $1,000,000 per claim and in the aggregate. The policy must “pay on behalf of” the insured and must include a provision establishing the insurer’s duty to defend. The policy retroactive date shall be on or before the effective date of this agreement. Contracting Party shall carry Workers’ Compensation Insurance in accordance with State Worker’s Compensation laws with employer’s liability limits no less than $1,000,000 per accident or disease. Contracting Party shall procure and maintain Cyber Liability insurance with limits of $1,000,000 per occurrence/loss which shall include the following coverage: a. Liability arising from the theft, dissemination and/or use of confidential or personally identifiable information; including credit monitoring and regulatory fines arising from such theft, dissemination or use of the confidential information. b. Network security liability arising from the unauthorized use of, access to, or tampering with computer systems. c. Liability arising from the failure of technology products (software) required under the contract for Consultant to properly perform the services intended. d. Electronic Media Liability arising from personal injury, plagiarism or misappropriation of ideas, domain name infringement or improper deep- linking or framing, and infringement or violation of intellectual property rights. e. Liability arising from the failure to render professional services. If coverage is maintained on a claims-made basis, Contracting Party shall maintain such coverage for an additional period of three (3) years following termination of the contract. 113 Exhibit E Page 3 of 6 Contracting Party shall provide written notice to City within ten (10) working days if: (1) any of the required insurance policies is terminated; (2) the limits of any of the required polices are reduced; or (3) the deductible or self-insured retention is increased. In the event any of said policies of insurance are cancelled, Contracting Party shall, prior to the cancellation date, submit new evidence of insurance in conformance with this Exhibit to the Contract Officer. The procuring of such insurance or the delivery of policies or certificates evidencing the same shall not be construed as a limitation of Contracting Party’s obligation to indemnify City, its officers, employees, contractors, subcontractors, or agents. E.2 Remedies. In addition to any other remedies City may have if Contracting Party fails to provide or maintain any insurance policies or policy endorsements to the extent and within the time herein required, City may, at its sole option: a. Obtain such insurance and deduct and retain the amount of the premiums for such insurance from any sums due under this Agreement. b. Order Contracting Party to stop work under this Agreement and/or withhold any payment(s) which become due to Contracting Party hereunder until Contracting Party demonstrates compliance with the requirements hereof. c. Terminate this Agreement. Exercise any of the above remedies, however, is an alternative to any other remedies City may have. The above remedies are not the exclusive remedies for Contracting Party’s failure to maintain or secure appropriate policies or endorsements. Nothing herein contained shall be construed as limiting in any way the extent to which Contracting Party may be held responsible for payments of damages to persons or property resulting from Contracting Party’s or its subcontractors’ performance of work under this Agreement. E.3 General Conditions Pertaining to Provisions of Insurance Coverage by Contracting Party. Contracting Party and City agree to the following with respect to insurance provided by Contracting Party: 1. Contracting Party agrees to have its insurer endorse the third party general liability coverage required herein to include as additional insureds City, its officials, employees, and agents, using standard ISO endorsement No. CG 2010 with an edition prior to 1992. Contracting Party also agrees to require all contractors, and subcontractors to do likewise. 2. No liability insurance coverage provided to comply with this Agreement shall prohibit Contracting Party, or Contracting Party’s employees, or agents, from waiving the right of subrogation prior to a loss. Contracting Party agrees to waive subrogation rights against City regardless of the applicability of any insurance proceeds, and to require all contractors and subcontractors to do likewise. 114 Exhibit E Page 4 of 6 3. All insurance coverage and limits provided by Contracting Party and available or applicable to this Agreement are intended to apply to the full extent of the policies. Nothing contained in this Agreement or any other agreement relating to City or its operations limits the application of such insurance coverage. 4. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to City and approved of in writing. 5. No liability policy shall contain any provision or definition that would serve to eliminate so-called “third party action over” claims, including any exclusion for bodily injury to an employee of the insured or of any contractor or subcontractor. 6. All coverage types and limits required are subject to approval, modification and additional requirements by the City, as the need arises. Contracting Party shall not make any reductions in scope of coverage (e.g. elimination of contractual liability or reduction of discovery period) that may affect City’s protection without City’s prior written consent. 7. Proof of compliance with these insurance requirements, consisting of certificates of insurance evidencing all the coverages required and an additional insured endorsement to Contracting Party’s general liability policy, shall be delivered to City at or prior to the execution of this Agreement. In the event such proof of any insurance is not delivered as required, or in the event such insurance is canceled at any time and no replacement coverage is provided, City has the right, but not the duty, to obtain any insurance it deems necessary to protect its interests under this or any other agreement and to pay the premium. Any premium so paid by City shall be charged to and promptly paid by Contracting Party or deducted from sums due Contracting Party, at City option. 8. It is acknowledged by the parties of this agreement that all insurance coverage required to be provided by Contracting Party or any subcontractor, is intended to apply first and on a primary, non-contributing basis in relation to any other insurance or self-insurance available to City. 9. Contracting Party agrees to ensure that subcontractors, and any other party involved with the project that is brought onto or involved in the project by Contracting Party, provide the same minimum insurance coverage required of Contracting Party. Contracting Party agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contracting Party agrees that upon request, all agreements with subcontractors and others engaged in the project will be submitted to City for review. 10. Contracting Party agrees not to self-insure or to use any self-insured retentions or deductibles on any portion of the insurance required herein (with the exception of professional liability coverage, if required) and further agrees that it will not allow any contractor, subcontractor, Architect, Engineer or other entity or person in any way involved in the performance of work on the project contemplated by this agreement 115 Exhibit E Page 5 of 6 to self-insure its obligations to City. If Contracting Party’s existing coverage includes a deductible or self-insured retention, the deductible or self-insured retention must be declared to the City. At that time the City shall review options with the Contracting Party, which may include reduction or elimination of the deductible or self-insured retention, substitution of other coverage, or other solutions. 11. The City reserves the right at any time during the term of this Agreement to change the amounts and types of insurance required by giving the Contracting Party ninety (90) days advance written notice of such change. If such change results in substantial additional cost to the Contracting Party, the City will negotiate additional compensation proportional to the increased benefit to City. 12. For purposes of applying insurance coverage only, this Agreement will be deemed to have been executed immediately upon any party hereto taking any steps that can be deemed to be in furtherance of or towards performance of this Agreement. 13. Contracting Party acknowledges and agrees that any actual or alleged failure on the part of City to inform Contracting Party of non-compliance with any insurance requirement in no way imposes any additional obligations on City nor does it waive any rights hereunder in this or any other regard. 14. Contracting Party will renew the required coverage annually as long as City, or its employees or agents face an exposure from operations of any type pursuant to this agreement. This obligation applies whether the agreement is canceled or terminated for any reason. Termination of this obligation is not effective until City executes a written statement to that effect. 15. Contracting Party shall provide proof that policies of insurance required herein expiring during the term of this Agreement have been renewed or replaced with other policies providing at least the same coverage. Proof that such coverage has been ordered shall be submitted prior to expiration. A coverage binder or letter from Contracting Party’s insurance agent to this effect is acceptable. A certificate of insurance and an additional insured endorsement is required in these specifications applicable to the renewing or new coverage must be provided to City within five (5) days of the expiration of coverages. 16. The provisions of any workers’ compensation or similar act will not limit the obligations of Contracting Party under this agreement. Contracting Party expressly agrees not to use any statutory immunity defenses under such laws with respect to City, its employees, officials, and agents. 17. Requirements of specific coverage features, or limits contained in this section are not intended as limitations on coverage, limits or other requirements nor as a waiver of any coverage normally provided by any given policy. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be limiting or all-inclusive. 116 Exhibit E Page 6 of 6 18. These insurance requirements are intended to be separate and distinct from any other provision in this Agreement and are intended by the parties here to be interpreted as such. 19. The requirements in this Exhibit supersede all other sections and provisions of this Agreement to the extent that any other section or provision conflicts with or impairs the provisions of this Exhibit. 20. Contracting Party agrees to be responsible for ensuring that no contract used by any party involved in any way with the project reserves the right to charge City or Contracting Party for the cost of additional insurance coverage required by this agreement. Any such provisions are to be deleted with reference to City. It is not the intent of City to reimburse any third party for the cost of complying with these requirements. There shall be no recourse against City for payment of premiums or other amounts with respect thereto. 21. Contracting Party agrees to provide immediate notice to City of any claim or loss against Contracting Party arising out of the work performed under this agreement. City assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve City. 117 Exhibit F Page 1 of 2 Exhibit F Indemnification F.1 Indemnity for the Benefit of City. a. Indemnification for Professional Liability. When the law establishes a professional standard of care for Contracting Party’s Services, to the fullest extent permitted by law, Contracting Party shall indemnify, protect, defend (with counsel selected by City), and hold harmless City and any and all of its officials, employees, and agents (“Indemnified Parties”) from and against any and all claims, losses, liabilities of every kind, nature, and description, damages, injury (including, without limitation, injury to or death of an employee of Contracting Party or of any subcontractor), costs and expenses of any kind, whether actual, alleged or threatened, including, without limitation, incidental and consequential damages, court costs, attorneys’ fees, litigation expenses, and fees of expert consultants or expert witnesses incurred in connection therewith and costs of investigation, to the extent same are caused in whole or in part by any negligent or wrongful act, error or omission of Contracting Party, its officers, agents, employees or subcontractors (or any entity or individual that Contracting Party shall bear the legal liability thereof) in the performance of professional services under this agreement. With respect to the design of public improvements, the Contracting Party shall not be liable for any injuries or property damage resulting from the reuse of the design at a location other than that specified in Exhibit A without the written consent of the Contracting Party. b. Indemnification for Other Than Professional Liability. Other than in the performance of professional services and to the full extent permitted by law, Contracting Party shall indemnify, defend (with counsel selected by City), and hold harmless the Indemnified Parties from and against any liability (including liability for claims, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses or costs of any kind, whether actual, alleged or threatened, including, without limitation, incidental and consequential damages, court costs, attorneys’ fees, litigation expenses, and fees of expert consultants or expert witnesses) incurred in connection therewith and costs of investigation, where the same arise out of, are a consequence of, or are in any way attributable to, in whole or in part, the performance of this Agreement by Contracting Party or by any individual or entity for which Contracting Party is legally liable, including but not limited to officers, agents, employees, or subcontractors of Contracting Party. c. Indemnity Provisions for Contracts Related to Construction (Limitation on Indemnity). Without affecting the rights of City under any provision of this agreement, Contracting Party shall not be required to indemnify and hold harmless City for liability attributable to the active negligence of City, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where City is shown to have been actively negligent and where City’s active negligence accounts for only a percentage of the liability involved, the obligation of Contracting Party will be for that entire portion or percentage of liability not attributable to the active negligence of City. 118 Exhibit F Page 2 of 2 d. Indemnification Provision for Design Professionals. 1. Applicability of this Section F.1(d). Notwithstanding Section F.1(a) hereinabove, the following indemnification provision shall apply to a Contracting Party who constitutes a “design professional” as the term is defined in paragraph 3 below. 2. Scope of Indemnification. When the law establishes a professional standard of care for Contracting Party’s Services, to the fullest extent permitted by law, Contracting Party shall indemnify and hold harmless City and any and all of its officials, employees, and agents (“Indemnified Parties”) from and against any and all losses, liabilities of every kind, nature, and description, damages, injury (including, without limitation, injury to or death of an employee of Contracting Party or of any subcontractor), costs and expenses, including, without limitation, incidental and consequential damages, court costs, reimbursement of attorneys’ fees, litigation expenses, and fees of expert consultants or expert witnesses incurred in connection therewith and costs of investigation, to the extent same are caused by any negligent or wrongful act, error or omission of Contracting Party, its officers, agents, employees or subcontractors (or any entity or individual that Contracting Party shall bear the legal liability thereof) in the performance of professional services under this agreement. With respect to the design of public improvements, the Contracting Party shall not be liable for any injuries or property damage resulting from the reuse of the design at a location other than that specified in Exhibit A without the written consent of the Contracting Party. 3. Design Professional Defined. As used in this Section F.1(d), the term “design professional” shall be limited to licensed architects, registered professional engineers, licensed professional land surveyors and landscape architects, all as defined under current law, and as may be amended from time to time by Civil Code § 2782.8. F.2 Obligation to Secure Indemnification Provisions. Contracting Party agrees to obtain executed indemnity agreements with provisions identical to those set forth herein this Exhibit F, as applicable to the Contracting Party, from each and every subcontractor or any other person or entity involved by, for, with or on behalf of Contracting Party in the performance of this Agreement. In the event Contracting Party fails to obtain such indemnity obligations from others as required herein, Contracting Party agrees to be fully responsible according to the terms of this Exhibit. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend City as set forth in this Agreement are binding on the successors, assigns or heirs of Contracting Party and shall survive the termination of this Agreement. 119 120 City of La Quinta CITY COUNCIL MEETING: July 1, 2025 STAFF REPORT AGENDA TITLE: APPROVE DEMAND REGISTERS DATED JUNE 6 AND 13, 2025 RECOMMENDATION Approve demand registers dated June 6 and 13, 2025. EXECUTIVE SUMMARY – None FISCAL IMPACT Demand of Cash: City 4,110,513.44$ Successor Agency of RDA -$ Housing Authority 31,091.91$ 4,141,605.35$ BACKGROUND/ANALYSIS Routine bills and payroll must be paid between Council meetings. Attachment 1 details the weekly demand registers for June 6 and 13, 2025. Warrants Issued: 217002-217052 321,092.51$ 217053-217114 420,824.82$ EFT 228-231 783.85$ Wire Transfers 3,059,971.91$ Payroll Tax Transfers 59,785.78$ Payroll Direct Deposit 279,146.48$ 4,141,605.35$ CONSENT CALENDAR ITEM NO. 6 121 Vendor Account Name Amount Purpose Paradise Chevrolet and Cadillac Vehicles Purchased $67,777.36 Purchase Chevy Silverado Truck Imperial Irrigation District(1)Various $60,749.69 Electricity Service JSL Architecture, Inc.Design $57,775.75 Maintenance & Operations Yard Design Desert Concepts Construction, Inc.(1)Various $52,000.00 Citywide Medians/Parks Repair and Maintenance NAI Consulting, Inc.Professional Services $44,881.00 Professional Engineering Services (1) Payment were made 06/06/25 & 06/13/25. Wire Transfers: Thirteen transfers totaled $3,059,972. Of this amount, $2,000,000 was to U.S. Bank for investment purchases, and $629,772 was to SilverRock Phase 1 LLC for Debtor-in-Possession financing. (See Attachment 2 for a complete listing). Investment Transactions: Full details of investment transactions, as well as total holdings, are reported quarterly in the Treasurer’s Report. Prepared by: Jesse Batres, Finance Technician Approved by: Rosemary Hallick, Principal Management Analyst Attachments: 1. Demand Registers 2. Wire Transfers Transaction Issuer Type Par Value Settle Date Coupon Rate YTM Purchase Sound Credit Union CD 248,000$ 6/2/2025 4.150% 4.150% Purchase United States Treasury Treasury Note 1,000,000$ 6/2/2025 4.000% 4.060% Maturity Federal Farm Credit Banks Agency 500,000$ 6/9/2025 0.500% 0.506% Maturity Federal Farm Credit Banks Agency 500,000$ 6/10/2025 0.680% 0.680% Maturity Federal Home Loan Banks Agency 500,000$ 6/13/2025 0.500% 0.506% 122 6/23/2025 10:42:30 AM Page 1 of 6 Demand Register Packet: APPKT04186 - 06/06/2025 JB AmountVendor Name Payment Number Description (Item)Account Name Account Number Fund: 101 - GENERAL FUND 144.00Blood/Alcohol TestingBLOOD ALCOHOL ANALYSIS217003AMERICAN FORENSIC NURSE…101-2001-60174 340.00Mobile/Cell Phones/Satellites01/2025 - PUBLIC SAFETY RADIO RENTA…217004ANDERSON COMMUNICATI…101-2002-61304 374.00Mobile/Cell Phones/Satellites04/2025 - PUBLIC SAFETY RADIO RENTA…217004ANDERSON COMMUNICATI…101-2002-61304 80.00Mobile/Cell Phones/Satellites07/2/24 - EOC RADIO MAINTENANCE SE…217004ANDERSON COMMUNICATI…101-2002-61304 154.10Citywide Supplies04/13-05/12/25 - CITYWIDE DRINK WAT…217005BLUETRITON BRANDS INC 101-1007-60403 1,294.00Employee Recognition Events05/20/25 - DRINKS FOR PW APPRECIATI…217007BONITAS COFFEE 101-1004-60340 100.00Cable/Internet - Utilities05/29-06/28-25 - FS #32 INTERNET (350…217009CHARTER COMMUNICATIONS…101-2002-61400 100.00Cable/Internet - Utilities05/24-06/23/25 - FS #93 INTERNET217009CHARTER COMMUNICATIONS…101-2002-61400 39.94Contributions to Other Agenc…03/2025 - ARTS AND MUSIC LINE SHARE…217011COACHELLA VALLEY ASSOC O…101-7006-60480 3,950.00Professional Services06/2025 - RENTALSCAPE217013DECKARD TECHNOLOGIES, I…101-1005-60103 27,814.34Animal Shelter Contract Servi…04/2025 - ANIMAL SERVICES217014DEPARTMENT OF ANIMAL SE…101-6004-60197 175.00Blood/Alcohol Testing04/2025 - BLOOD ALCOHOL ANALYSIS217015DEPARTMENT OF JUSTICE 101-2001-60174 3,250.00Maintenance/ServicesFB PARK REPAIR WATER BACKFLOW217016DESERT CONCEPTS CONSTR…101-3005-60691 1,440.00Maintenance/Services05/20/25 - CH PLANT INSTALLATION217016DESERT CONCEPTS CONSTR…101-3005-60691 114.71Cable/Internet - Utilities05/22-06/21/25 - EOC CABLE217018DISH NETWORK 101-2002-61400 85.63Materials/SuppliesPAINT217019DUNN-EDWARDS CORPORAT…101-3008-60431 1,606.94Materials/SuppliesPAINT217019DUNN-EDWARDS CORPORAT…101-3008-60431 186.51Materials/SuppliesPAINT217019DUNN-EDWARDS CORPORAT…101-3008-60431 224.39Garnishments PayableGARNISHMENT217020FRANCHISE TAX BOARD 101-0000-20985 89.07Building PermitsPERMIT REFUND BSAP2024-0011217021FREEDOM FOREVER SOUTHE…101-0000-42400 581.61Operating SuppliesFILTER SOCK217022GRAINGER 101-7003-60420 24.71Maintenance/ServicesFS #93 CLEANING SUPPLIES217023HOME DEPOT CREDIT SERVIC…101-2002-60691 34.88Maintenance/ServicesSMALL TOOLS217023HOME DEPOT CREDIT SERVIC…101-2002-60691 19.47Maintenance/ServicesPLUMBING PARTS217023HOME DEPOT CREDIT SERVIC…101-2002-60691 51.01Materials/SuppliesPAINT SUPPLIES217023HOME DEPOT CREDIT SERVIC…101-3005-60431 181.76Materials/SuppliesSUPPLIES217023HOME DEPOT CREDIT SERVIC…101-3005-60431 111.98Materials/SuppliesPAINT SUPPLIES217023HOME DEPOT CREDIT SERVIC…101-3005-60431 29.16Materials/SuppliesCONCRETE REPAIR217023HOME DEPOT CREDIT SERVIC…101-3005-60431 82.62Tools/EquipmentGRINDING WHEEL217023HOME DEPOT CREDIT SERVIC…101-3005-60432 452.37Tools/EquipmentPOWER TOOL217023HOME DEPOT CREDIT SERVIC…101-3005-60432 179.59Tools/EquipmentSMALL TOOLS217023HOME DEPOT CREDIT SERVIC…101-3005-60432 108.11Tools/EquipmentSMALL TOOLS217023HOME DEPOT CREDIT SERVIC…101-3005-60432 13.00Tools/EquipmentSMALL TOOLS217023HOME DEPOT CREDIT SERVIC…101-3005-60432 54.10Materials/SuppliesCONSTRUCTION ADHESIVE217023HOME DEPOT CREDIT SERVIC…101-3008-60431 82.28Materials/SuppliesPAINT SUPPLIES217023HOME DEPOT CREDIT SERVIC…101-3008-60431 42.29Materials/SuppliesMATERIALS217023HOME DEPOT CREDIT SERVIC…101-3008-60431 473.76Materials/SuppliesWATER JUG HOLDER & WATER STAND D…217023HOME DEPOT CREDIT SERVIC…101-3008-60431 116.13Materials/SuppliesBATTERIES217023HOME DEPOT CREDIT SERVIC…101-3008-60431 1,717.16HVACMINI SPLIT HVAC FOR CH217023HOME DEPOT CREDIT SERVIC…101-3008-60667 70.38Supplies - FieldLOCKS FOR PARK SIGNS217023HOME DEPOT CREDIT SERVIC…101-6004-60425 22.99Operating SuppliesSUPPLIES217023HOME DEPOT CREDIT SERVIC…101-7003-60420 48.87Tools/EquipmentSTAPLE GUN & STAPLES217023HOME DEPOT CREDIT SERVIC…101-7003-60432 1,558.46Electricity - UtilitiesELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 101-2002-61101 3,819.03Electric - Civic Center Park - U…ELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 101-3005-61103 516.80Electric - Fritz Burns Park - Uti…ELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 101-3005-61105 1,156.10Electric - Community Park - U…ELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 101-3005-61109 20.84Electric - Velasco Park - Utiliti…ELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 101-3005-61111 19.24Electric - Desert Pride - Utiliti…ELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 101-3005-61114 19,783.55Electricity - UtilitiesELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 101-3008-61101 19.24Electric - Monticello Park - Uti…ELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 101-3005-61102 429.11Electric - Fritz Burns Park - Uti…ELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 101-3005-61105 3,165.09Electric - Sports Complex - Uti…ELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 101-3005-61106 5,214.27Electric - Community Park - U…ELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 101-3005-61109 ATTACHMENT 1 123 Demand Register Packet: APPKT04186 - 06/06/2025 JB 6/23/2025 10:42:30 AM Page 2 of 6 AmountVendor Name Payment Number Description (Item)Account Name Account Number 55.46Electric - Adams Park - Utiliti…ELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 101-3005-61110 24.75Electric - Eisenhower Park - U…ELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 101-3005-61113 3,392.83Electric - SilverRock Event Sit…ELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 101-3005-61115 842.62Electricity - Charging StationsELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 101-3008-61102 11,100.00Marketing & Tourism Promot…05/01-06/30/25 - MEDIA STRATEGIC PL…217027JNS MEDIA SPECIALISTS 101-3007-60461 550.00Administrative CitationsREFUND 50% OF CITATION LQ200734217028JOSE TAMIAS 101-0000-42700 3,500.00Contract Services - Administr…05/2025 - FEDERAL LOBBYIST SERVICES217029KILEY & ASSOCIATES 101-1002-60101 2,280.00AuditorsFY 23/24 FINANCIAL AUDITING SERVICES217031LANCE, SOLL, & LUNGHARD L…101-1006-60106 780.00AuditorsFY 23/24 SINGLE AUDIT217031LANCE, SOLL, & LUNGHARD L…101-1006-60106 65.00Community Experiences05/24/25 - CONCERT IN THE PARK REMA…217032LIVE FROM EARTH MUSIC 101-3003-60149 338.21Fire StationFS #70 PATIO CHAIRS217033LOWE'S HOME IMPROVEME…101-2002-60670 73.49Maintenance/ServicesPLUMBING PARTS217033LOWE'S HOME IMPROVEME…101-2002-60691 72.19Operating SuppliesTOWER FAN217033LOWE'S HOME IMPROVEME…101-3002-60420 30.93Community ExperiencesCITY BDAY EVENT SUPPLIES217033LOWE'S HOME IMPROVEME…101-3003-60149 77.40Materials/SuppliesMATERIALS217033LOWE'S HOME IMPROVEME…101-3005-60431 92.96Tools/EquipmentPRESSURE WASHER SPRAY GUN217033LOWE'S HOME IMPROVEME…101-3005-60432 40.25Tools/EquipmentSMALL TOOLS217033LOWE'S HOME IMPROVEME…101-3005-60432 125.65Materials/SuppliesPEST CONTROL SUPPLIES217033LOWE'S HOME IMPROVEME…101-3008-60431 68.64Materials/SuppliesMATERIALS217033LOWE'S HOME IMPROVEME…101-3008-60431 34.41Materials/SuppliesPLUMBING PARTS217033LOWE'S HOME IMPROVEME…101-3008-60431 24.10Materials/SuppliesPLUMBING PARTS217033LOWE'S HOME IMPROVEME…101-3008-60431 110.25Materials/SuppliesWATER FILTER & SINK FILTRATION SYST…217033LOWE'S HOME IMPROVEME…101-3008-60431 47.82Materials/SuppliesMATERIALS217033LOWE'S HOME IMPROVEME…101-3008-60431 71.74Materials/SuppliesSUPPLIES217033LOWE'S HOME IMPROVEME…101-3008-60431 12.35Materials/SuppliesPEST CONTROL SUPPLIES217033LOWE'S HOME IMPROVEME…101-3008-60431 184.93Materials/SuppliesSHELVES217033LOWE'S HOME IMPROVEME…101-3008-60431 57.02Tools/EquipmentMEASURING TOOL & DRILL BITS217033LOWE'S HOME IMPROVEME…101-3008-60432 51.63Tools/EquipmentLASER LEVEL217033LOWE'S HOME IMPROVEME…101-3008-60432 191.02Tools/EquipmentLASER LEVEL & TRIPOD217033LOWE'S HOME IMPROVEME…101-3008-60432 46.47Tools/EquipmentLASER LEVEL TRIPOD217033LOWE'S HOME IMPROVEME…101-3008-60432 82.63Operating SuppliesEXTENSION CORD217033LOWE'S HOME IMPROVEME…101-7003-60420 39.19Operating SuppliesSTORAGE CONTAINERS217033LOWE'S HOME IMPROVEME…101-7003-60420 133.03Operating SuppliesSANDER & WOOD217033LOWE'S HOME IMPROVEME…101-7003-60420 -20.36Operating SuppliesRETURN WOOD217033LOWE'S HOME IMPROVEME…101-7003-60420 135.80Operating SuppliesMULTIMETER & EXTENSION CORD217033LOWE'S HOME IMPROVEME…101-7003-60420 138.26Tools/EquipmentSMALL TOOLS217033LOWE'S HOME IMPROVEME…101-7003-60432 2,762.88Special Enforcement FundsRIVCO SHERIFF UNIFORM217035MOTOPORT USA 101-2001-60175 1,485.00Contingency for Operations03/2025 - ELECTRIC UTILITY FEASIBILITY …217036NBS 101-1002-60510 7,958.18Fritz Burns Pool MaintenanceFB POOL HEATER MAINTENANCE217037OCEAN SPRINGS TECH INC 101-3005-60184 225.00Fritz Burns Pool MaintenanceFB POOL MEMORIAL DAY SERVICE217037OCEAN SPRINGS TECH INC 101-3005-60184 14.34Operating SuppliesVINYL SHEET217038ODP BUSINESS SOLUTIONS, L…101-6006-60420 30.57Operating SuppliesOFFICE SUPPLIES217038ODP BUSINESS SOLUTIONS, L…101-6006-60420 10.86Operating SuppliesCUTTING MAT217038ODP BUSINESS SOLUTIONS, L…101-6006-60420 76.91Operating SuppliesOFFICE SUPPLIES217038ODP BUSINESS SOLUTIONS, L…101-6006-60420 88.32Operating SuppliesOFFICE SUPPLIES217038ODP BUSINESS SOLUTIONS, L…101-6006-60420 3,213.00HVAC04/16-04/17/25 - CH HVAC PREVENTATI…217039PACIFIC WEST AIR CONDITIO…101-3008-60667 1,284.75HVACCH HVAC PREVENTATIVE MAINTENANCE217039PACIFIC WEST AIR CONDITIO…101-3008-60667 567.00HVAC05/08/25 - CH HVAC REPAIR217039PACIFIC WEST AIR CONDITIO…101-3008-60667 150.00Maintenance/ServicesFS #70 THREE BUTTON STATION REPLAC…217041PATTON DOOR & GATE 101-2002-60691 1,706.80Temporary Agency Services05/23/25 - TEMP AGENCY SERVICES G.R…217042PROPER SOLUTIONS INC 101-1004-60125 1,429.45Temporary Agency Services05/30/25 - TEMP AGENCY SERVICES G.R…217042PROPER SOLUTIONS INC 101-1004-60125 198.50Miscellaneous PermitsREFUND PERMIT APPLICATION BRES202…217044ROOF TILE SPECIALTY INC 101-0000-42404 108.00United Way DeductionsCONTRIBUTION217049UNITED WAY OF THE DESERT 101-0000-20981 453.65Recruiting/Pre-Employment05/2025 - PRE-EMPLOYMENT BACKGRO…217051USA-FACT,INC.101-1004-60129 1,141.26Professional Services05/2025 - DATA BACK UP FOR LASERFIC…217052VERITAS TECHNOLOGIES LLC 101-1005-60103 Fund 101 - GENERAL FUND Total:129,517.73 Fund: 201 - GAS TAX FUND 888.41Electricity - UtilitiesELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 201-7003-61101 42.14Electricity - UtilitiesELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 201-7003-61101 124 Demand Register Packet: APPKT04186 - 06/06/2025 JB 6/23/2025 10:42:30 AM Page 3 of 6 AmountVendor Name Payment Number Description (Item)Account Name Account Number 309.89Materials/SuppliesCANOPY217033LOWE'S HOME IMPROVEME…201-7003-60431 Fund 201 - GAS TAX FUND Total:1,240.44 Fund: 202 - LIBRARY & MUSEUM FUND 98.81Maintenance/ServicesLIGHT BULBS217023HOME DEPOT CREDIT SERVIC…202-3004-60691 5,650.05Electricity - UtilitiesELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 202-3004-61101 1,360.69Electricity - UtilitiesELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 202-3006-61101 72.28Maintenance/ServicesDOOR KNOBS217033LOWE'S HOME IMPROVEME…202-3004-60691 341.68Maintenance/ServicesPAINT & PAINT SUPPLIES217033LOWE'S HOME IMPROVEME…202-3004-60691 1,606.50HVAC4/14,22,28/25 LIBRARY HVAC PREVENT…217039PACIFIC WEST AIR CONDITIO…202-3004-60667 661.50HVAC05/08/25 - LIBRARY HVAC SERVICE CALL217039PACIFIC WEST AIR CONDITIO…202-3004-60667 845.00Maintenance/ServicesLIBRARY TOILET REPLACEMENT217050USA DRAIN AND PLUMBING…202-3004-60691 Fund 202 - LIBRARY & MUSEUM FUND Total:10,636.51 Fund: 215 - LIGHTING & LANDSCAPING FUND 5,760.00Maintenance/Services05/19-05/23/25 - AVE 52 MEDIAN REST…217016DESERT CONCEPTS CONSTR…215-7004-60691 4,906.15Materials/SuppliesFLOOD LIGHTS217017DESERT ELECTRIC SUPPLY 215-7004-60431 4,906.15Materials/SuppliesFLOOD LIGHTS217017DESERT ELECTRIC SUPPLY 215-7004-60431 6,660.60Consultants04/2025 - L&L LIGHTING MAINTENANCE217024HORIZON LIGHTING 215-7004-60104 6,660.60Consultants05/2025 - L&L LIGHTING MAINTENANCE217024HORIZON LIGHTING 215-7004-60104 5,388.17Electric - UtilitiesELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 215-7004-61116 2,377.50Electric - Medians - UtilitiesELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 215-7004-61117 871.29Electric - UtilitiesELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 215-7004-61116 799.02Electric - Medians - UtilitiesELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 215-7004-61117 846.35Electric - UtilitiesELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 215-7004-61116 280.42Electric - UtilitiesELECTRICITY SERVICE217025IMPERIAL IRRIGATION DIST 215-7004-61116 4,500.00Travel & TrainingCLASS A DRIVERS TRAINING R.SEVILLA217045SILLERS INSTITUTE INC.215-7004-60320 Fund 215 - LIGHTING & LANDSCAPING FUND Total:43,956.25 Fund: 221 - AB 939 - CALRECYCLE FUND 1,500.00AB 939 Recycling Solutions05/2025 - RECYCLING DIGITAL ADS217002ALPHA MEDIA LLC 221-0000-60127 3,500.00AB 939 Recycling Solutions05/2025 - RECYCLING RADIO ADS MIX 1…217002ALPHA MEDIA LLC 221-0000-60127 320.00AB 939 Recycling SolutionsRECYCLING/SB 1383 EDUCATION FOR H…217046THE ECOHERO SHOW LLC 221-0000-60127 Fund 221 - AB 939 - CALRECYCLE FUND Total:5,320.00 Fund: 241 - HOUSING AUTHORITY 8,737.50Professional Services05/2025 - HOUSING CONSULTANT SERV…217008CAHA, BECKY 241-9101-60103 5,000.00AuditorsFY 23/24 HOUSING AUTHORITY AUDIT S…217031LANCE, SOLL, & LUNGHARD L…241-9101-60106 Fund 241 - HOUSING AUTHORITY Total:13,737.50 Fund: 250 - TRANSPORTATION DIF FUND 4,009.00Developer FeesREFUND PERMIT WITHDRAWAL BRES20…217048UBALDO HERNANDEZ 250-0000-43200 Fund 250 - TRANSPORTATION DIF FUND Total:4,009.00 Fund: 251 - PARKS & REC DIF FUND 2,106.00Developer FeesREFUND PERMIT WITHDRAWAL BRES20…217048UBALDO HERNANDEZ 251-0000-43200 Fund 251 - PARKS & REC DIF FUND Total:2,106.00 Fund: 252 - CIVIC CENTER DIF FUND 1,230.00Developer FeesREFUND PERMIT WITHDRAWAL BRES20…217048UBALDO HERNANDEZ 252-0000-43200 Fund 252 - CIVIC CENTER DIF FUND Total:1,230.00 Fund: 253 - LIBRARY DEVELOPMENT DIF 397.00Developer FeesREFUND PERMIT WITHDRAWAL BRES20…217048UBALDO HERNANDEZ 253-0000-43200 Fund 253 - LIBRARY DEVELOPMENT DIF Total:397.00 Fund: 254 - COMMUNITY & CULTURAL CENTERS DIF 956.00Developer FeesREFUND PERMIT WITHDRAWAL BRES20…217048UBALDO HERNANDEZ 254-0000-43200 Fund 254 - COMMUNITY & CULTURAL CENTERS DIF Total:956.00 Fund: 257 - FIRE PROTECTION DIF 369.00Developer FeesREFUND PERMIT WITHDRAWAL BRES20…217048UBALDO HERNANDEZ 257-0000-43200 Fund 257 - FIRE PROTECTION DIF Total:369.00 Fund: 259 - MAINTENANCE FACILITIES DIF FUND 313.00Developer FeesREFUND PERMIT WITHDRAWAL BRES20…217048UBALDO HERNANDEZ 259-0000-43200 Fund 259 - MAINTENANCE FACILITIES DIF FUND Total:313.00 125 Demand Register Packet: APPKT04186 - 06/06/2025 JB 6/23/2025 10:42:30 AM Page 4 of 6 AmountVendor Name Payment Number Description (Item)Account Name Account Number Fund: 401 - CAPITAL IMPROVEMENT PROGRAMS 284.62Contributions to Other Agenc…AVE 50 WIDENING IMPROVEMENTS RE…217010CITY OF INDIO 401-0000-60480 1,643.31Contributions to Other Agenc…AVE 50 WIDENING IMPROVEMENTS RE…217010CITY OF INDIO 401-0000-60480 281.63ConstructionPOWER TOOL217023HOME DEPOT CREDIT SERVIC…401-0000-60188 30,384.42ConstructionFB PARK RESTROOM BUILDING PURCHA…217043ROMTEC INC.401-0000-60188 2,658.63ConstructionRESTROOM AND POOL BUILDING PURC…217043ROMTEC INC.401-0000-60188 Fund 401 - CAPITAL IMPROVEMENT PROGRAMS Total:35,252.61 Fund: 501 - FACILITY & FLEET REPLACEMENT 2,274.38Motorcycle Repair & Mainte…MOTORCYCLE REPAIR A1155217006BMW MOTORCYCLES OF RIV…501-0000-60679 570.08Vehicle Repair & Maintenan…2017 CHEVY COLORADO VIN H1266558…217012DANIEL'S TIRE SERVICE, INC.501-0000-60676 30.42Parts, Accessories, and UpfitsBALL COUPLER FOR TRAILER217023HOME DEPOT CREDIT SERVIC…501-0000-60675 152.51Vehicle Repair & Maintenan…EQUIPMENT SERVICE217026INLAND POWER EQUIPMENT…501-0000-60676 236.95Motorcycle Repair & Mainte…MOTORCYCLE MAINTENANCE SERVICE …217030KUSTOM SIGNALS INC 501-0000-60679 67,777.36Vehicles, PurchasedPURCHASE 2025 CHEVY 2500 SILVERADO…217040PARADISE CHEVROLET AND …501-0000-71031 342.56Vehicle Repair & Maintenan…VEHICLE REMOTES & KEYS217047THE LOCK SHOP, INC 501-0000-60676 Fund 501 - FACILITY & FLEET REPLACEMENT Total:71,384.26 Fund: 502 - INFORMATION TECHNOLOGY 136.00Cell/Mobile Phones05/2025 - STREET RADIO RENTALS217004ANDERSON COMMUNICATI…502-0000-61301 Fund 502 - INFORMATION TECHNOLOGY Total:136.00 Fund: 601 - SILVERROCK RESORT 48.81Repair & MaintenanceUTILITY KNIFE & SCISSORS217023HOME DEPOT CREDIT SERVIC…601-0000-60660 82.63Repair & MaintenanceTUBE LIGHTS217033LOWE'S HOME IMPROVEME…601-0000-60660 62.00Repair & MaintenanceTUBE LIGHT BULBS217033LOWE'S HOME IMPROVEME…601-0000-60660 123.95Repair & MaintenanceRECESSED LIGHTS217033LOWE'S HOME IMPROVEME…601-0000-60660 28.91Repair & MaintenanceHEAT SHRINK TUBING217033LOWE'S HOME IMPROVEME…601-0000-60660 184.91Repair & MaintenanceTUBE LIGHT BULBS217033LOWE'S HOME IMPROVEME…601-0000-60660 Fund 601 - SILVERROCK RESORT Total:531.21 Grand Total:321,092.51 126 Demand Register Packet: APPKT04186 - 06/06/2025 JB 6/23/2025 10:42:30 AM Page 5 of 6 Fund Summary Fund Expense Amount 101 - GENERAL FUND 129,517.73 201 - GAS TAX FUND 1,240.44 202 - LIBRARY & MUSEUM FUND 10,636.51 215 - LIGHTING & LANDSCAPING FUND 43,956.25 221 - AB 939 - CALRECYCLE FUND 5,320.00 241 - HOUSING AUTHORITY 13,737.50 250 - TRANSPORTATION DIF FUND 4,009.00 251 - PARKS & REC DIF FUND 2,106.00 252 - CIVIC CENTER DIF FUND 1,230.00 253 - LIBRARY DEVELOPMENT DIF 397.00 254 - COMMUNITY & CULTURAL CENTERS DIF 956.00 257 - FIRE PROTECTION DIF 369.00 259 - MAINTENANCE FACILITIES DIF FUND 313.00 401 - CAPITAL IMPROVEMENT PROGRAMS 35,252.61 501 - FACILITY & FLEET REPLACEMENT 71,384.26 502 - INFORMATION TECHNOLOGY 136.00 601 - SILVERROCK RESORT 531.21 Grand Total:321,092.51 Account Summary Account Number Account Name Expense Amount 101-0000-20981 United Way Deductions 108.00 101-0000-20985 Garnishments Payable 224.39 101-0000-42400 Building Permits 89.07 101-0000-42404 Miscellaneous Permits 198.50 101-0000-42700 Administrative Citations 550.00 101-1002-60101 Contract Services - Admi…3,500.00 101-1002-60510 Contingency for Operati…1,485.00 101-1004-60125 Temporary Agency Servi…3,136.25 101-1004-60129 Recruiting/Pre-Employm…453.65 101-1004-60340 Employee Recognition E…1,294.00 101-1005-60103 Professional Services 5,091.26 101-1006-60106 Auditors 3,060.00 101-1007-60403 Citywide Supplies 154.10 101-2001-60174 Blood/Alcohol Testing 319.00 101-2001-60175 Special Enforcement Fu…2,762.88 101-2002-60670 Fire Station 338.21 101-2002-60691 Maintenance/Services 302.55 101-2002-61101 Electricity - Utilities 1,558.46 101-2002-61304 Mobile/Cell Phones/Sate…794.00 101-2002-61400 Cable/Internet - Utilities 314.71 101-3002-60420 Operating Supplies 72.19 101-3003-60149 Community Experiences 95.93 101-3005-60184 Fritz Burns Pool Mainten…8,183.18 101-3005-60431 Materials/Supplies 451.31 101-3005-60432 Tools/Equipment 968.90 101-3005-60691 Maintenance/Services 4,690.00 101-3005-61102 Electric - Monticello Park…19.24 101-3005-61103 Electric - Civic Center Pa…3,819.03 101-3005-61105 Electric - Fritz Burns Park…945.91 101-3005-61106 Electric - Sports Complex…3,165.09 101-3005-61109 Electric - Community Par…6,370.37 101-3005-61110 Electric - Adams Park - Ut…55.46 101-3005-61111 Electric - Velasco Park - …20.84 101-3005-61113 Electric - Eisenhower Par…24.75 101-3005-61114 Electric - Desert Pride - U…19.24 101-3005-61115 Electric - SilverRock Even…3,392.83 101-3007-60461 Marketing & Tourism Pr…11,100.00 101-3008-60431 Materials/Supplies 3,327.53 127 Demand Register Packet: APPKT04186 - 06/06/2025 JB 6/23/2025 10:42:30 AM Page 6 of 6 Account Summary Account Number Account Name Expense Amount 101-3008-60432 Tools/Equipment 346.14 101-3008-60667 HVAC 6,781.91 101-3008-61101 Electricity - Utilities 19,783.55 101-3008-61102 Electricity - Charging Stat…842.62 101-6004-60197 Animal Shelter Contract …27,814.34 101-6004-60425 Supplies - Field 70.38 101-6006-60420 Operating Supplies 221.00 101-7003-60420 Operating Supplies 974.89 101-7003-60432 Tools/Equipment 187.13 101-7006-60480 Contributions to Other A…39.94 201-7003-60431 Materials/Supplies 309.89 201-7003-61101 Electricity - Utilities 930.55 202-3004-60667 HVAC 2,268.00 202-3004-60691 Maintenance/Services 1,357.77 202-3004-61101 Electricity - Utilities 5,650.05 202-3006-61101 Electricity - Utilities 1,360.69 215-7004-60104 Consultants 13,321.20 215-7004-60320 Travel & Training 4,500.00 215-7004-60431 Materials/Supplies 9,812.30 215-7004-60691 Maintenance/Services 5,760.00 215-7004-61116 Electric - Utilities 7,386.23 215-7004-61117 Electric - Medians - Utilit…3,176.52 221-0000-60127 AB 939 Recycling Solutio…5,320.00 241-9101-60103 Professional Services 8,737.50 241-9101-60106 Auditors 5,000.00 250-0000-43200 Developer Fees 4,009.00 251-0000-43200 Developer Fees 2,106.00 252-0000-43200 Developer Fees 1,230.00 253-0000-43200 Developer Fees 397.00 254-0000-43200 Developer Fees 956.00 257-0000-43200 Developer Fees 369.00 259-0000-43200 Developer Fees 313.00 401-0000-60188 Construction 33,324.68 401-0000-60480 Contributions to Other A…1,927.93 501-0000-60675 Parts, Accessories, and …30.42 501-0000-60676 Vehicle Repair & Maint…1,065.15 501-0000-60679 Motorcycle Repair & Ma…2,511.33 501-0000-71031 Vehicles, Purchased 67,777.36 502-0000-61301 Cell/Mobile Phones 136.00 601-0000-60660 Repair & Maintenance 531.21 Grand Total:321,092.51 Project Account Summary Project Account Key Expense AmountProject Account Name Project Name **None**261,491.73**None****None** 201804E 4,906.15Landscape & Lighting Median Islan…Landscape & Lighting Median Island Improvements 202008CB 39.94Contribution Expense Avenue 48 Art and Music Line Project 202102CT 33,043.05Construction Expense Fritz Burns Park Improvements 202205CB 1,927.93Contribution Expense Avenue 50 Widening Improvements (Jeff to Madison) 202328E 5,760.00Citywide Landscape Maintenance …Citywide Landscape Maintenance Srvcs (L&L AD 89-1) 202329E 4,906.15Citywide Lighting Maintenance Srv…Citywide Lighting Maintenance Srvcs (L&L AD 89-1) 202330E 4,690.00Park Landscape Maintenance Servi…Park Landscape Maintenance Services 2425TMICT 281.63Construction Expense FY24/25 Traffic Maintenance Improvements BDAYE 30.93City Picnic & Birthday Celebration …City Picnic & Birthday Celebration CONCERTE 65.00Concert Expense Master Account for all SRR Concert Series STVRE 3,950.00Short Term Vacation Rental Expen…Short Term Vacation Rental Tracking Grand Total:321,092.51 *Project codes are generally used to track Capital Improvement Program (CIP) projects, other large public works projects, developer deposits, or city-wide events. Normal operational expenditures are not project coded and, therefore, will report as "none" in this section. 128 6/23/2025 10:38:56 AM Page 1 of 8 Demand Register Packet: APPKT04192 - 06/13/25 DR AmountVendor Name Payment Number Description (Item)Account Name Account Number Fund: 101 - GENERAL FUND 125.00Annual Wellness Dollar Reim…FY 24/25 WELLNESS DOLLARS REIMB D.…228BATUTA, DANIELE 101-1004-50252 200.00Annual Wellness Dollar Reim…FY 24/25 WELLNESS DOLLARS REIMB D.…229HUNTER, DOMINIQUE 101-1004-50252 197.90Annual Wellness Dollar Reim…FY 24/25 WELLNESS DOLLARS REIMB O.…230RODRIGUEZ, OLIVIA 101-1004-50252 698.76Citywide SuppliesCOFFEE SUPPLIES FOR LOBBY MACHINE217053ALL PRO BEVERAGE INC 101-1007-60403 58.00Consultants/Employee Servic…BILINGUAL TESTING #482217054ALTA LANGUAGE SERVICES I…101-1004-60104 232.33PM 10 - Dust Control06/2025 - PM 10 ANSWERING SERVICES217055ANSAFONE CONTACT CENTE…101-7006-60146 45.76Materials/SuppliesDRINKS FOR PW PRESENTATIONS217059BMO FINANCIAL GROUP 101-3008-60431 558.21Materials/SuppliesLQ PARK RR HEADRAIL217059BMO FINANCIAL GROUP 101-3008-60431 61.60Community Experiences05/07/25 - CONCERT IN THE PARK BEVE…217059BMO FINANCIAL GROUP 101-3003-60149 88.41Community Experiences05/22/25 - CONCERT IN THE PARK LUN…217059BMO FINANCIAL GROUP 101-3003-60149 87.96Community Experiences05/07/25 - CONCERT IN THE PARK LUN…217059BMO FINANCIAL GROUP 101-3003-60149 1,086.41Community ExperiencesGENERATORS FOR EVENTS217059BMO FINANCIAL GROUP 101-3003-60149 146.42Travel & Training05/6/25 COUNCIL MEETING STAFF DINN…217059BMO FINANCIAL GROUP 101-1004-60320 34.76Travel & Training05/6/25 COUNCIL MEETING STAFF DINN…217059BMO FINANCIAL GROUP 101-1004-60320 241.73Travel & Training5/22/25 DEPT ASSESSMENT UPDATE LU…217059BMO FINANCIAL GROUP 101-1006-60320 530.00Subscriptions & PublicationsFY 23/24 ACR CERTIFICATE REVIEW FEE217059BMO FINANCIAL GROUP 101-1006-60352 21.82Citywide SuppliesBREAKROOM COFFEE SUPPLIES217059BMO FINANCIAL GROUP 101-1007-60403 25.51Citywide SuppliesCOFFEE SUPPLIES217059BMO FINANCIAL GROUP 101-1007-60403 26.97Citywide SuppliesBREAKROOM SUPPLIES217059BMO FINANCIAL GROUP 101-1007-60403 134.85Citywide SuppliesFRONT LOBBY COFFEE SUPPLIES217059BMO FINANCIAL GROUP 101-1007-60403 255.15Miscellaneous SuppliesBANK DEPOSIT BAGS217059BMO FINANCIAL GROUP 101-1007-60405 348.00LQ Police VolunteersPOLICE FOOD - BRUCE LEE MEMORIAL217059BMO FINANCIAL GROUP 101-2001-60109 44.43LQ Police Volunteers5/22/25 NEIGHBORHOOD WATCH MEET…217059BMO FINANCIAL GROUP 101-2001-60109 211.98LQ Police Volunteers5/7/25 - FOOD FOR TEAM MEET & GREET217059BMO FINANCIAL GROUP 101-2001-60109 70.00LQ Police Volunteers5/7/25 - SNACKS FOR SET TEAM MEET &…217059BMO FINANCIAL GROUP 101-2001-60109 51.77Travel & TrainingSNACKS FOR EM MEETING217059BMO FINANCIAL GROUP 101-2002-60320 24.95Travel & TrainingEMERGENCY PREPAREDNESS DISASTER …217059BMO FINANCIAL GROUP 101-2002-60320 72.52Travel & TrainingSNACKS FOR CERT TRAINING 5/2 - 5/4/25217059BMO FINANCIAL GROUP 101-2002-60320 78.06Office SuppliesBUG REPELLENT SUPPLIES217059BMO FINANCIAL GROUP 101-2002-60400 108.74Fire StationFS#32 POWER SUPPLY217059BMO FINANCIAL GROUP 101-2002-60670 196.40Operating SuppliesWC SUPPLIES/CUPS217059BMO FINANCIAL GROUP 101-3002-60420 71.76Operating SuppliesWC GAME SUPPLIES217059BMO FINANCIAL GROUP 101-3002-60420 24.75Operating SuppliesWC SUPPLIES217059BMO FINANCIAL GROUP 101-3002-60420 82.24Operating SuppliesWC SUPPLIES217059BMO FINANCIAL GROUP 101-3002-60420 60.88Community ExperiencesCASE FOR EVENT SOUND SYSTEM217059BMO FINANCIAL GROUP 101-3003-60149 542.49Materials/SuppliesCHRISTMAS LIGHTS217059BMO FINANCIAL GROUP 101-3005-60431 240.00Membership Dues05/2025 MAILCHIMP217059BMO FINANCIAL GROUP 101-3007-60351 25.95Membership Dues06/2025 APPLE MUSIC/STORAGE217059BMO FINANCIAL GROUP 101-3007-60351 211.79Materials/SuppliesMOSQUITO ZAPPER LAMP217059BMO FINANCIAL GROUP 101-3008-60431 58.70Materials/SuppliesOPERATING SUPPLIES217059BMO FINANCIAL GROUP 101-3008-60431 15.09Materials/SuppliesSELF ADHESIVE FURNITURE - BUMPERS217059BMO FINANCIAL GROUP 101-3008-60431 413.22Materials/SuppliesOFFICE CHAIRS217059BMO FINANCIAL GROUP 101-3008-60431 324.67Materials/SuppliesOPERATING SUPPLIES217059BMO FINANCIAL GROUP 101-3008-60431 1,957.49Materials/SuppliesROLLING TABLES217059BMO FINANCIAL GROUP 101-3008-60431 547.08Materials/SuppliesHAND SOAP REFILL/DISPENSER217059BMO FINANCIAL GROUP 101-3008-60431 69.09Office SuppliesOFFICE SUPPLIES217059BMO FINANCIAL GROUP 101-6001-60400 256.89Office SuppliesOFFICE SUPPLIES217059BMO FINANCIAL GROUP 101-6001-60400 375.00Travel & TrainingCMRTA REGISTRATION J.CISNEROS217059BMO FINANCIAL GROUP 101-6004-60320 375.00Travel & TrainingCMRTA REGISTRATION N.HUNTER217059BMO FINANCIAL GROUP 101-6004-60320 200.00Travel & TrainingCAOHC OFFICER TRAINING S.TORRES217059BMO FINANCIAL GROUP 101-6004-60320 400.00Travel & TrainingCAOHC OFFICER TRAINING J.CISNEROS217059BMO FINANCIAL GROUP 101-6004-60320 17.56Office SuppliesOFFICE SUPPLIES217059BMO FINANCIAL GROUP 101-6004-60400 289.81Office SuppliesERGONOMIC CHAIR217059BMO FINANCIAL GROUP 101-6004-60400 129 Demand Register Packet: APPKT04192 - 06/13/25 DR 6/23/2025 10:38:56 AM Page 2 of 8 AmountVendor Name Payment Number Description (Item)Account Name Account Number 32.61Office SuppliesTABLECLOTHS FOR PUBLIC SAFETY EVEN…217059BMO FINANCIAL GROUP 101-6004-60400 113.19Supplies - FieldFIELD SUPPLIES FOR CODE OFFICERS217059BMO FINANCIAL GROUP 101-6004-60425 -16.17Supplies - FieldREFUND HEAVY DUTY BAGS217059BMO FINANCIAL GROUP 101-6004-60425 85.17Operating SuppliesOPERATING SUPPLIES217059BMO FINANCIAL GROUP 101-7003-60420 127.29Operating SuppliesOPERATING SUPPLIES217059BMO FINANCIAL GROUP 101-7003-60420 67.40Operating SuppliesOPERATING SUPPLIES217059BMO FINANCIAL GROUP 101-7003-60420 105.85Operating SuppliesOPERATING SUPPLIES217059BMO FINANCIAL GROUP 101-7003-60420 2.04Consultants/Employee Servic…A/B DRIVING RECORD REQUEST HISTORY…217059BMO FINANCIAL GROUP 101-1004-60104 97.94Recruiting/Pre-Employment5/12/25 INTVW PANEL LUNCH217059BMO FINANCIAL GROUP 101-1004-60129 18.72Travel & Training05/01/25 - AM TRAINING SNACK217059BMO FINANCIAL GROUP 101-1004-60320 105.99Travel & Training05/01/25 - FALL PROTECTION TRAINING…217059BMO FINANCIAL GROUP 101-1004-60320 260.00Travel & TrainingCALBO 2025 - TRAINING - A.ORTEGA217059BMO FINANCIAL GROUP 101-6006-60320 85.00Travel & TrainingWEBINAR TRAINING - E.MOLINA217059BMO FINANCIAL GROUP 101-6006-60320 172.50Travel & TrainingTRAFFIC CONTROL TRAINING - J.REYES217059BMO FINANCIAL GROUP 101-7003-60320 172.50Travel & TrainingINTR TO PW TRAINING - D.EASTLICK217059BMO FINANCIAL GROUP 101-7003-60320 390.00Travel & TrainingMSA TRAINING - D.EASTLICK217059BMO FINANCIAL GROUP 101-7003-60320 300.00Operating SuppliesPW SPECIALIST TC TRAINING - A.VIRAM…217059BMO FINANCIAL GROUP 101-7003-60420 159.87Operating SuppliesPAINT SWATCHES217059BMO FINANCIAL GROUP 101-7003-60420 87.42Operating SuppliesSAFETY GEAR217059BMO FINANCIAL GROUP 101-7003-60420 36.47Operating SuppliesWATER217059BMO FINANCIAL GROUP 101-7003-60420 28.14Operating SuppliesWATER217059BMO FINANCIAL GROUP 101-7003-60420 3,329.07Tools/EquipmentTRAILER217059BMO FINANCIAL GROUP 101-7003-60432 173.94Travel & Training05/20/25 COUNCIL MEETING DINNER217059BMO FINANCIAL GROUP 101-1001-60320 60.00Travel & TrainingRIVCO EDU STUDENT OF THE YEAR217059BMO FINANCIAL GROUP 101-1001-60320 60.00Travel & TrainingLEAGUE DINNER - J.PENA217059BMO FINANCIAL GROUP 101-1001-60320 65.00Travel & TrainingRM CHAMBER LUNCH - S.SANCHEZ217059BMO FINANCIAL GROUP 101-1001-60320 60.00Travel & TrainingCHAMBER JOINT MIXER217059BMO FINANCIAL GROUP 101-1001-60320 40.00Travel & Training05/28/25 - DESERT UNITED LUNCH S.SA…217059BMO FINANCIAL GROUP 101-1001-60320 293.33Travel & Training05/06/25 - COUNCIL MEETING DINNER217059BMO FINANCIAL GROUP 101-1001-60320 41.51Travel & TrainingWREATH FOR MEMORIAL DAY217059BMO FINANCIAL GROUP 101-1001-60320 60.00Travel & TrainingLEAGUE MEETING - D MCGARREY217059BMO FINANCIAL GROUP 101-1001-60320 60.00Travel & TrainingLEAGUE MEETING - K FITZPATRICK217059BMO FINANCIAL GROUP 101-1001-60320 35.00Travel & TrainingCHAMBER MIXER - S.SANCHEZ217059BMO FINANCIAL GROUP 101-1001-60320 60.00Travel & TrainingLEAGUE MEETING - J.MCMILLEN217059BMO FINANCIAL GROUP 101-1001-60320 60.00Travel & TrainingLEAGUE MEETING - L EVANS217059BMO FINANCIAL GROUP 101-1001-60320 695.45Operating SuppliesNOTARY TRAINING & SUPPLIES217059BMO FINANCIAL GROUP 101-1005-60420 1,740.00Employee Recognition EventsM&O OPEN HOUSE LUNCH217059BMO FINANCIAL GROUP 101-1004-60340 880.11Employee Recognition EventsM&O OPEN HOUSE BREAKFAST217059BMO FINANCIAL GROUP 101-1004-60340 73.91Travel & TrainingM&O SUPPLIES217059BMO FINANCIAL GROUP 101-7003-60320 796.90Travel & Training2025 MSA CONFRENCE - A.MONTENEG…217059BMO FINANCIAL GROUP 101-7003-60320 159.00Travel & TrainingDRONE PILOT LICENSE COURSE217059BMO FINANCIAL GROUP 101-7003-60320 44.00Travel & Training2025 OPEN GOV TRAINING PARKING217059BMO FINANCIAL GROUP 101-7003-60320 796.90Travel & Training2025 MSA CONFRENCE - T.ULLOA217059BMO FINANCIAL GROUP 101-7003-60320 44.55Operating SuppliesM&O SUPPLIES217059BMO FINANCIAL GROUP 101-7003-60420 126.05Operating SuppliesM&O SUPPLIES217059BMO FINANCIAL GROUP 101-7003-60420 99.74Travel & Training06/2025 - APWA LUNCHEON217059BMO FINANCIAL GROUP 101-7001-60320 105.07Travel & Training06/2025 - APWA LUNCHEON217059BMO FINANCIAL GROUP 101-7002-60320 92.70Travel & TrainingMSA MEMBERSHIP - D EASTLICK217059BMO FINANCIAL GROUP 101-7003-60320 99.74Travel & Training06/2025 - APWA LUNCHEON217059BMO FINANCIAL GROUP 101-7006-60320 800.00Membership DuesCALED MEMBERSHIP RENEWAL G.VILLA…217064CALIFORNIA ASSOCIATION F…101-1002-60351 190.27Annual Wellness Dollar Reim…FY 24/25 WELLNESS DOLLARS REIMB R.…217065CAMARENA, REYNA 101-1004-50252 648.00Professional Services06/2025 - STVR HOTLINE217066CENTRAL COMMUNICATIONS 101-6004-60103 120.02Cable/Internet - Utilities05/24-06/23/25 - FS #93 CABLE (4001)217067CHARTER COMMUNICATIONS…101-2002-61400 200.00Annual Wellness Dollar Reim…FY 24/25 WELLNESS DOLLARS REIMB L.…217068CHASTAIN, LISA N 101-1004-50252 3,023.62Contributions to Other Agenc…01/2025 - ARTS AND MUSIC LINE SHARE…217070COACHELLA VALLEY ASSOC O…101-7006-60480 436.77Contributions to Other Agenc…03/2025 - ARTS AND MUSIC LINE SHARE…217070COACHELLA VALLEY ASSOC O…101-7006-60480 868.93Water -Pioneer Park - UtilitiesWATER SERVICE217071COACHELLA VALLEY WATER D…101-3005-61207 143.53Water - UtilitiesWATER SERVICE217071COACHELLA VALLEY WATER D…101-2002-61200 187.01Water -Eisenhower Park - Util…WATER SERVICE217071COACHELLA VALLEY WATER D…101-3005-61203 127.13Water -Velasco Park - UtilitiesWATER SERVICE217071COACHELLA VALLEY WATER D…101-3005-61205 130 Demand Register Packet: APPKT04192 - 06/13/25 DR 6/23/2025 10:38:56 AM Page 3 of 8 AmountVendor Name Payment Number Description (Item)Account Name Account Number 2,642.78Water -Fritz Burns Park - Utili…WATER SERVICE217071COACHELLA VALLEY WATER D…101-3005-61204 810.98Water - UtilitiesWATER SERVICE217071COACHELLA VALLEY WATER D…101-3008-61200 5,450.00Supplies-Graffiti and Vandali…ADAMS PARK EQUIPMENT ROOM DOOR…217074DESERT CONCEPTS CONSTR…101-3005-60423 1,440.00Maintenance/Services05/30/25 - WC GROUND COVER INSTAL…217074DESERT CONCEPTS CONSTR…101-3005-60691 5,760.00Maintenance/Services05/27-05/30/25 CIVIC CENTER LANDSC…217074DESERT CONCEPTS CONSTR…101-3005-60691 1,072.88Annual Permits/InspectionsCITY BUILDINGS FIRE EXTINGUISHER MA…217075DESERT FIRE EXTINGUISHER …101-3008-60196 443.26Annual Permits/InspectionsPW YARD FIRE EXTINGUISHERS MAINTE…217075DESERT FIRE EXTINGUISHER …101-3008-60196 12,587.39School Officer01/09-02/05/25 - BP #8 SCHOOL RESOU…217076DESERT SANDS UNIFIED SCH…101-2001-60168 450.00Maintenance/ServicesFIREANT TREATMENT SPORT COMPLEX217077DESERT TREE SPRAYING 101-3005-60691 450.00Maintenance/ServicesFIREANT TREATMENT AT LQ PARK217077DESERT TREE SPRAYING 101-3005-60691 450.00Maintenance/ServicesFIREANT TREATMENT AT PAIGE FIELDS &…217077DESERT TREE SPRAYING 101-3005-60691 130.39Safety GearSUN HATS217079EWING IRRIGATION PRODUC…101-3005-60427 79.00HVACCH HVAC DIAGNOSTIC ANALYSIS217080FIRST CHOICE A/C & HEATING…101-3008-60667 2,750.00HVACIT SERVER ROOM HVAC MAINTENANCE217080FIRST CHOICE A/C & HEATING…101-3008-60667 9,408.00HVACCITY HALL HVAC REPAIRS CONDENSER …217080FIRST CHOICE A/C & HEATING…101-3008-60667 230.04Special Enforcement FundsNOTARY FEES REIMBURSEMENT R.FOST…217081FOSTER, ROCIO 101-2001-60175 224.39Garnishments PayableGARNISHMENT217082FRANCHISE TAX BOARD 101-0000-20985 535.68Cable/Internet - Utilities05/26-06/25/25 - POLICE INTERNET217083FRONTIER COMMUNICATIO…101-2001-61400 1,800.00Professional ServicesCONTINGENCY PROFESSIONAL SERVICE …217084GOVOS, INC.101-1005-60103 1,424.41Electricity - UtilitiesELECTRICITY SERVICE217085IMPERIAL IRRIGATION DIST 101-2002-61101 557.45Electric - Colonel Paige - Utilit…ELECTRICITY SERVICE217085IMPERIAL IRRIGATION DIST 101-3005-61108 50.00Travel & TrainingGARY POWERS EVENT S.SANCHEZ217087LA QUINTA ROTARY CLUB OF…101-1001-60320 4,000.00Professional Services05/2025 ONSITE DEPARTMENT ASSESS…217088LANCE, SOLL, & LUNGHARD L…101-1006-60103 59.81Materials/SuppliesPLAQUE FOR VOGTS & CELLI217091MCDOWELL AWARDS 101-3005-60431 57.09Office SuppliesNAMES PLATES FOR FIRE DEPT217091MCDOWELL AWARDS 101-2002-60400 209.35Office SuppliesNAMES PLATES FOR CODE DEPT217091MCDOWELL AWARDS 101-6004-60400 15,833.98Janitorial05/2025 - CITYWIDE JANITORIAL SERVIC…217092MERCHANTS BUILDING MAI…101-3008-60115 190.00Fritz Burns Pool MaintenanceBACKWASH VALVE PREVENTATIVE MAI…217094OCEAN SPRINGS TECH INC 101-3005-60184 199.72Fritz Burns Pool MaintenanceFB POOL HANDRAIL COVER REPLACEME…217094OCEAN SPRINGS TECH INC 101-3005-60184 105.67Office SuppliesSTAPLER & STAPLES217095ODP BUSINESS SOLUTIONS, L…101-1006-60400 -91.00Office SuppliesRETURN STAPLER217095ODP BUSINESS SOLUTIONS, L…101-1006-60400 945.00HVACCH HVAC REPAIRS217096PACIFIC WEST AIR CONDITIO…101-3008-60667 2,965.61Special Enforcement FundsHELMET COMMUNICATIONS KIT217097PVP COMMUNICATIONS INC 101-2001-60175 894.19Security & Alarm04/01-06/30/25 - ALARM MONITORING …217098PYE BARKER 101-3008-60123 465.63Fire Station04/01-06/30/25 - FIRE ALARM MONITOR…217098PYE BARKER 101-2002-60670 465.62Security & Alarm04/01-06/30/25 - FIRE ALARM MONITOR…217098PYE BARKER 101-3008-60123 650.00Map/Plan CheckingPMER 2025-0001 ONCALL MAP CHECKI…217100RASA/ERIC NELSON 101-7002-60183 700.00Map/Plan CheckingCOCO 2025-0002 ONCALL MAP CHECKI…217100RASA/ERIC NELSON 101-7002-60183 780.00Map/Plan CheckingLLA 2025-0001 ONCALL MAP CHECKING …217100RASA/ERIC NELSON 101-7002-60183 293.63Materials/SuppliesPARKING SIGNS217103SIGNATURE TINT 101-3005-60431 56.90Travel & TrainingSNACKS FOR DE-ESCALATION TRAINNG217104SMART & FINAL 101-1004-60320 735.20Materials/SuppliesPARKS HARDSCAPE MATERIAL217105SOUTHWEST BOULDER & ST…101-3005-60431 733.94Materials/SuppliesPARKS HARDSCAPE MATERIAL217105SOUTHWEST BOULDER & ST…101-3005-60431 924.20Lot Cleaning/Gravel ProgramCRUSHED ROCK FOR GRAVEL PROGRAM217105SOUTHWEST BOULDER & ST…101-6004-60120 602.56Materials/SuppliesPARKS HARDSCAPE MATERIAL217105SOUTHWEST BOULDER & ST…101-3005-60431 36.38Office SuppliesFRAMES FOR RECOGNITION CERTIFICAT…217106STAPLES ADVANTAGE 101-7001-60400 165.32Office SuppliesOFFICE SUPPLIES217106STAPLES ADVANTAGE 101-1006-60400 62.55Administrative Citation Servi…FY 24/25 FTB OFFSETS217107STATE CONTROLLER'S OFFICE 101-6004-60111 117.67Operating SuppliesPAINT217108THE SHERWIN-WILLIAMS CO.101-7003-60420 404.77Materials/SuppliesHARDSCAPE MATERIALS217109TRI-STATE MATERIALS INC 101-3005-60431 108.00United Way DeductionsCONTRIBUTION217111UNITED WAY OF THE DESERT 101-0000-20981 888.90Telephone - Utilities04/26-05/25/25 - LQPD CELLS (6852)217113VERIZON WIRELESS 101-2001-61300 7,915.87Maintenance/Services5/22-5/27/25 CIVIC PARK PERMA POST …217114VINTAGE E & S INC 101-3005-60691 5,124.08Maintenance/Services05/28/25 - CIVIC PARK PERMA POST OU…217114VINTAGE E & S INC 101-3005-60691 Fund 101 - GENERAL FUND Total:127,300.33 Fund: 201 - GAS TAX FUND 17.96Materials/SuppliesCOFFEE SUPPLIES217059BMO FINANCIAL GROUP 201-7003-60431 202.52Materials/SuppliesM&O SUPPLIES217059BMO FINANCIAL GROUP 201-7003-60431 56.25Materials/Supplies06/01/25 DIG ALERT SERVICES217110UNDERGROUND SERVICE AL…201-7003-60431 Fund 201 - GAS TAX FUND Total:276.73 131 Demand Register Packet: APPKT04192 - 06/13/25 DR 6/23/2025 10:38:56 AM Page 4 of 8 AmountVendor Name Payment Number Description (Item)Account Name Account Number Fund: 202 - LIBRARY & MUSEUM FUND 201.52Fire Extinguisher ServiceMUSEUM FIRE EXTINGUISHER MAINTE…217075DESERT FIRE EXTINGUISHER …202-3006-60664 187.83Fire Extinguisher ServiceLIBRARY FIRE EXTINGUISHER MAINTEN…217075DESERT FIRE EXTINGUISHER …202-3004-60664 3,264.32Janitorial05/2025 - CITYWIDE JANITORIAL SERVIC…217092MERCHANTS BUILDING MAI…202-3004-60115 989.54Janitorial05/2025 - CITYWIDE JANITORIAL SERVIC…217092MERCHANTS BUILDING MAI…202-3006-60115 149.04Security & Alarm04/01-06/30/25 - ALARM MONITORING …217098PYE BARKER 202-3004-60123 298.07Security & Alarm04/01-06/30/25 - ALARM MONITORING …217098PYE BARKER 202-3006-60123 232.82Security & Alarm04/01-06/30/25 - FIRE ALARM MONITOR…217098PYE BARKER 202-3004-60123 232.82Security & Alarm04/01-06/30/25 - FIRE ALARM MONITOR…217098PYE BARKER 202-3006-60123 Fund 202 - LIBRARY & MUSEUM FUND Total:5,555.96 Fund: 215 - LIGHTING & LANDSCAPING FUND 260.95Safety GearFY 24/25 SAFETY BOOTS B.TELLEZ231TELLEZ-SANCHEZ, BENJAMIN 215-7004-60427 3,900.00Tree Maintenance/Palm TreesPALM TREE ABORIST SERVICES217056ARBORPRO INC 215-7004-60673 13,980.00Tree Maintenance/Palm TreesPALM TREE ABORIST SERVICES217056ARBORPRO INC 215-7004-60673 1,000.00Tree Maintenance/Palm TreesPALM TREE ABORIST SERVICES217056ARBORPRO INC 215-7004-60673 1,100.00Tree Maintenance/Palm TreesPALM TREE ABORIST SERVICES217056ARBORPRO INC 215-7004-60673 58.04Supplies-Graffiti and Vandali…SAFETY GEAR217059BMO FINANCIAL GROUP 215-7004-60423 2,090.82Water - Medians - UtilitiesWATER SERVICE217071COACHELLA VALLEY WATER D…215-7004-61211 8,161.01Water - Medians - UtilitiesWATER SERVICE217071COACHELLA VALLEY WATER D…215-7004-61211 13,950.00Supplies-Graffiti and Vandali…JEFFERSON MONUMENT EMERGENCY E…217074DESERT CONCEPTS CONSTR…215-7004-60423 1,630.27Materials/SuppliesIRRIGATION PARTS217079EWING IRRIGATION PRODUC…215-7004-60431 85.80Electric - UtilitiesELECTRICITY SERVICE217085IMPERIAL IRRIGATION DIST 215-7004-61116 160.60Electric - UtilitiesELECTRICITY SERVICE217085IMPERIAL IRRIGATION DIST 215-7004-61116 150.00Travel & TrainingMSA NPDES TRAINING D.HANSEN217090MAINTENANCE SUPERINTEN…215-7004-60320 2,088.00Materials/SuppliesPLANTS217101RED TERRA NURSERY, LLC 215-7004-60431 9,564.50Materials/SuppliesHARDSCAPE MATERIALS217109TRI-STATE MATERIALS INC 215-7004-60431 1,203.47Materials/SuppliesHARDSCAPE MATERIALS217109TRI-STATE MATERIALS INC 215-7004-60431 2,586.27Materials/SuppliesHARDSCAPE MATERIALS217109TRI-STATE MATERIALS INC 215-7004-60431 3,942.08Materials/SuppliesHARDSCAPE MATERIALS217109TRI-STATE MATERIALS INC 215-7004-60431 1,210.47Materials/SuppliesHARDSCAPE MATERIALS217109TRI-STATE MATERIALS INC 215-7004-60431 2,586.27Materials/SuppliesHARDSCAPE MATERIALS217109TRI-STATE MATERIALS INC 215-7004-60431 2,613.59Maintenance/Services06/04-06/05/25 - AVE 52 MEDIAN LIGHT…217114VINTAGE E & S INC 215-7004-60691 Fund 215 - LIGHTING & LANDSCAPING FUND Total:72,322.14 Fund: 241 - HOUSING AUTHORITY 687.79Travel & TrainingNOTARY RENEWAL L.MCGINLEY217059BMO FINANCIAL GROUP 241-9101-60320 Fund 241 - HOUSING AUTHORITY Total:687.79 Fund: 247 - ECONOMIC DEVELOPMENT FUND 950.00Travel & TrainingCLASS ENROLLMENT - L.MCGINLEY217059BMO FINANCIAL GROUP 247-0000-60320 950.00Travel & TrainingCLASS ENROLLMENT - D.KINLEY217059BMO FINANCIAL GROUP 247-0000-60320 68.50Marketing & Tourism Promot…MARKETING VIDEOS217059BMO FINANCIAL GROUP 247-0000-60461 235.32Marketing & Tourism Promot…MARKETING VIDEOS - LUNCH217059BMO FINANCIAL GROUP 247-0000-60461 Fund 247 - ECONOMIC DEVELOPMENT FUND Total:2,203.82 Fund: 401 - CAPITAL IMPROVEMENT PROGRAMS 3,686.62Design04/2025 DUNE PALMS BRIDGE LOW WA…217058BENGAL ENGINEERING INC 401-0000-60185 57,775.75DesignM&O YARD DESIGN217086JSL ARCHITECTURE, INC.401-0000-60185 390.00Professional Services05/2025 CITYWIDE DOG PARK IMPROV…217093NAI CONSULTING INC 401-0000-60103 11,366.50Professional Services05/2025 AVE 58 PAVEMENT REHAB JEFF…217093NAI CONSULTING INC 401-0000-60103 1,987.50Professional Services05/2025 COVE AREA SLURRY SEAL IMP…217093NAI CONSULTING INC 401-0000-60103 585.00Professional Services05/2025 MISC RETENTION BASIN IMPR…217093NAI CONSULTING INC 401-0000-60103 290.00Professional Services05/2025 CITY HALL DRAINAGE IMPROV…217093NAI CONSULTING INC 401-0000-60103 1,887.50Professional Services05/2025 WASH STREET CONNECTOR AR…217093NAI CONSULTING INC 401-0000-60103 1,403.00Professional Services05/2025 VILLAGE ART/CULTURAL PLAZA217093NAI CONSULTING INC 401-0000-60103 875.00Professional Services05/2025 AVE 52 JEFFERSON ST ROUND…217093NAI CONSULTING INC 401-0000-60103 2,187.50Professional Services05/2025 CITYWIDE ADA MISC IMPROV…217093NAI CONSULTING INC 401-0000-60103 427.50Professional Services05/2025 HIGHWAY 111 CORRIDOR217093NAI CONSULTING INC 401-0000-60103 1,150.00Professional Services05/2025 WASHINGTON ST SIDEWALK I…217093NAI CONSULTING INC 401-0000-60103 2,621.00Professional Services05/2025 DUNE PALMS BRIDGE IMPROV…217093NAI CONSULTING INC 401-0000-60103 63.50Professional Services05/2025 BPMP BRIDGE PREVENTATIVE …217093NAI CONSULTING INC 401-0000-60103 2,325.00Professional Services05/2025 MAINTENANCE AND OPERATI…217093NAI CONSULTING INC 401-0000-60103 132 Demand Register Packet: APPKT04192 - 06/13/25 DR 6/23/2025 10:38:56 AM Page 5 of 8 AmountVendor Name Payment Number Description (Item)Account Name Account Number 5,977.00Professional Services05/2025 FRITZ BURNS PARK IMPROVEM…217093NAI CONSULTING INC 401-0000-60103 585.00Professional Services05/2025 AVENUE 48 ART AND MUSIC L…217093NAI CONSULTING INC 401-0000-60103 780.00Professional Services05/2025 CAMERAS PHASE II217093NAI CONSULTING INC 401-0000-60103 1,670.00Professional Services05/2025 AVE 50 BRIDGE217093NAI CONSULTING INC 401-0000-60103 1,331.00Professional Services05/2025 AVENUE 52 MONROE STREET (…217093NAI CONSULTING INC 401-0000-60103 47.50Professional Services05/2025 AVENUE 50 WIDENING IMPRO…217093NAI CONSULTING INC 401-0000-60103 6,931.50Professional Services05/2025 - HIGHWAY 111 REHAB217093NAI CONSULTING INC 401-0000-60103 Fund 401 - CAPITAL IMPROVEMENT PROGRAMS Total:106,343.37 Fund: 501 - FACILITY & FLEET REPLACEMENT 224.46Parts, Accessories, and UpfitsVEHICLE AIR FILTERS217057AUTOZONE 501-0000-60675 127.85Parts, Accessories, and UpfitsVEHICLE WIPER BLADES217057AUTOZONE 501-0000-60675 55.05Vehicle Repair & Maintenan…VEHICLE REG RENEWAL VIN #464032217059BMO FINANCIAL GROUP 501-0000-60676 2,868.13Vehicle Repair & Maintenan…22 CHEVY SILVERADO VIN F182277 REPA…217069CHEVROLET CADILLAC 501-0000-60676 106.29Vehicle Repair & Maintenan…22 CHEVY SILVERADO VIN F265472 MAI…217069CHEVROLET CADILLAC 501-0000-60676 482.47Vehicle Repair & Maintenan…22 CHEVY EQUINOX VIN L181411 MAIN…217069CHEVROLET CADILLAC 501-0000-60676 106.29Vehicle Repair & Maintenan…22 CHEVY SILVERADO VIN F182137 MAI…217069CHEVROLET CADILLAC 501-0000-60676 288.52Vehicle Repair & Maintenan…22 NISSAN FRONTIER MAINTENANCE217072DANIEL'S TIRE SERVICE, INC.501-0000-60676 951.14Vehicle Repair & Maintenan…CITY VEHICLES FIRE EXTINGUISHER MAI…217075DESERT FIRE EXTINGUISHER …501-0000-60676 165.00Vehicle Repair & Maintenan…CHEVY COLORADO INTERIOR DETAIL & …217089M & A AUTO CAR WASH DET…501-0000-60676 2,537.99Vehicle Repair & Maintenan…SKID STEER REPAIR217099QUINN COMPANY 501-0000-60676 779.61Vehicle Repair & Maintenan…05/2025 - CAR WASH MEMBERSHIP217102S&D CARWASH MANAGEME…501-0000-60676 Fund 501 - FACILITY & FLEET REPLACEMENT Total:8,692.80 Fund: 502 - INFORMATION TECHNOLOGY 499.00Software Licenses06/2025 - EMAIL PROTECTION SOFTWA…217059BMO FINANCIAL GROUP 502-0000-60301 475.38Software LicensesCITY WEBSITE DOMAIN RENEWAL217059BMO FINANCIAL GROUP 502-0000-60301 400.00Software LicensesMOBILE SVC MGNT 05/28 - 06/28/25217059BMO FINANCIAL GROUP 502-0000-60301 99.98Software Licenses25/26 RING SUSCRIPTION217059BMO FINANCIAL GROUP 502-0000-60301 53.20Software Licenses05/07 - 05/28/25 - MGNT SVC UPGRADE217059BMO FINANCIAL GROUP 502-0000-60301 91.32Operating SuppliesOPERATING SUPPLIES217059BMO FINANCIAL GROUP 502-0000-60420 86.95Operating SuppliesIT STOCK SUPPLIES217059BMO FINANCIAL GROUP 502-0000-60420 167.37Operating SuppliesIT STOCK SUPPLIES217059BMO FINANCIAL GROUP 502-0000-60420 440.02Operating SuppliesIT STOCK SUPPLIES217059BMO FINANCIAL GROUP 502-0000-60420 38.37Operating SuppliesIT STOCK SUPPLIES217059BMO FINANCIAL GROUP 502-0000-60420 24.99Operating SuppliesCOFFEE MACHINE SUPPLIES217059BMO FINANCIAL GROUP 502-0000-60420 87.99Cable/Internet - Utilities06/2025 HULU SUBSCRIPTION217059BMO FINANCIAL GROUP 502-0000-61400 254.48Machinery & EquipmentIT STOCK SUPPLIES217059BMO FINANCIAL GROUP 502-0000-80100 180.00Software LicensesASSISTANCE TOOL FOR PRESENTATIONS217059BMO FINANCIAL GROUP 502-0000-60301 597.04Operating SuppliesEXTERNAL STORAGE FOR MARKETING217059BMO FINANCIAL GROUP 502-0000-60420 814.49Operating SuppliesMARKETING OPERATING SUPPLIES217059BMO FINANCIAL GROUP 502-0000-60420 914.15Cable/Internet - Utilities05/21-06/20/25 - WC FIBER CONNECT P…217067CHARTER COMMUNICATIONS…502-0000-61400 25,055.10Prepaid Expense07/01/25-03/31/26 MICROSOFT OFFICE…217073DELL MARKETING LP 502-0000-13600 8,351.70Software Licenses04/01-06/30/25 MICROSOFT OFFICE 365…217073DELL MARKETING LP 502-0000-60301 132.13Cable/Internet - Utilities05/25-06/24/25 - CH INTERNET217083FRONTIER COMMUNICATIO…502-0000-61400 116.47Cable/Internet - Utilities05/27-06/26/25 - BLACKHAWK/LQ PARK…217083FRONTIER COMMUNICATIO…502-0000-61400 Fund 502 - INFORMATION TECHNOLOGY Total:38,880.13 Fund: 503 - PARK EQUIP & FACILITY FUND 14,950.00ParksSPORTS COMPLEX FENCING REPAIR217074DESERT CONCEPTS CONSTR…503-0000-71060 43,554.00ParksCIVIC CENTER LAKE PUMP REPLACEMENT217112VARIABLE SPEED SOLUTIONS …503-0000-71060 Fund 503 - PARK EQUIP & FACILITY FUND Total:58,504.00 Fund: 504 - INSURANCE FUND 359.49Operating SuppliesSAFETY SUPPLIES217059BMO FINANCIAL GROUP 504-1010-60420 92.95Operating SuppliesSAFETY SUPPLIES217059BMO FINANCIAL GROUP 504-1010-60420 39.16Operating SuppliesSAFETY SUPPLIES217059BMO FINANCIAL GROUP 504-1010-60420 350.00Operating SuppliesSHARED WORKSPACE ERGO EVALUATION217078ERGO SOLUTION, INC.504-1010-60420 Fund 504 - INSURANCE FUND Total:841.60 Grand Total:421,608.67 133 Demand Register Packet: APPKT04192 - 06/13/25 DR 6/23/2025 10:38:56 AM Page 6 of 8 Fund Summary Fund Expense Amount 101 - GENERAL FUND 127,300.33 201 - GAS TAX FUND 276.73 202 - LIBRARY & MUSEUM FUND 5,555.96 215 - LIGHTING & LANDSCAPING FUND 72,322.14 241 - HOUSING AUTHORITY 687.79 247 - ECONOMIC DEVELOPMENT FUND 2,203.82 401 - CAPITAL IMPROVEMENT PROGRAMS 106,343.37 501 - FACILITY & FLEET REPLACEMENT 8,692.80 502 - INFORMATION TECHNOLOGY 38,880.13 503 - PARK EQUIP & FACILITY FUND 58,504.00 504 - INSURANCE FUND 841.60 Grand Total:421,608.67 Account Summary Account Number Account Name Expense Amount 101-0000-20981 United Way Deductions 108.00 101-0000-20985 Garnishments Payable 224.39 101-1001-60320 Travel & Training 1,118.78 101-1002-60351 Membership Dues 800.00 101-1004-50252 Annual Wellness Dollar …913.17 101-1004-60104 Consultants/Employee S…60.04 101-1004-60129 Recruiting/Pre-Employm…97.94 101-1004-60320 Travel & Training 362.79 101-1004-60340 Employee Recognition E…2,620.11 101-1005-60103 Professional Services 1,800.00 101-1005-60420 Operating Supplies 695.45 101-1006-60103 Professional Services 4,000.00 101-1006-60320 Travel & Training 241.73 101-1006-60352 Subscriptions & Publicat…530.00 101-1006-60400 Office Supplies 179.99 101-1007-60403 Citywide Supplies 907.91 101-1007-60405 Miscellaneous Supplies 255.15 101-2001-60109 LQ Police Volunteers 674.41 101-2001-60168 School Officer 12,587.39 101-2001-60175 Special Enforcement Fu…3,195.65 101-2001-61300 Telephone - Utilities 888.90 101-2001-61400 Cable/Internet - Utilities 535.68 101-2002-60320 Travel & Training 149.24 101-2002-60400 Office Supplies 135.15 101-2002-60670 Fire Station 574.37 101-2002-61101 Electricity - Utilities 1,424.41 101-2002-61200 Water - Utilities 143.53 101-2002-61400 Cable/Internet - Utilities 120.02 101-3002-60420 Operating Supplies 375.15 101-3003-60149 Community Experiences 1,385.26 101-3005-60184 Fritz Burns Pool Mainten…389.72 101-3005-60423 Supplies-Graffiti and Va…5,450.00 101-3005-60427 Safety Gear 130.39 101-3005-60431 Materials/Supplies 3,372.40 101-3005-60691 Maintenance/Services 21,589.95 101-3005-61108 Electric - Colonel Paige -…557.45 101-3005-61203 Water -Eisenhower Park …187.01 101-3005-61204 Water -Fritz Burns Park -…2,642.78 101-3005-61205 Water -Velasco Park - Uti…127.13 101-3005-61207 Water -Pioneer Park - Uti…868.93 101-3007-60351 Membership Dues 265.95 101-3008-60115 Janitorial 15,833.98 101-3008-60123 Security & Alarm 1,359.81 101-3008-60196 Annual Permits/Inspecti…1,516.14 134 Demand Register Packet: APPKT04192 - 06/13/25 DR 6/23/2025 10:38:56 AM Page 7 of 8 Account Summary Account Number Account Name Expense Amount 101-3008-60431 Materials/Supplies 4,132.01 101-3008-60667 HVAC 13,182.00 101-3008-61200 Water - Utilities 810.98 101-6001-60400 Office Supplies 325.98 101-6004-60103 Professional Services 648.00 101-6004-60111 Administrative Citation …62.55 101-6004-60120 Lot Cleaning/Gravel Prog…924.20 101-6004-60320 Travel & Training 1,350.00 101-6004-60400 Office Supplies 549.33 101-6004-60425 Supplies - Field 97.02 101-6006-60320 Travel & Training 345.00 101-7001-60320 Travel & Training 99.74 101-7001-60400 Office Supplies 36.38 101-7002-60183 Map/Plan Checking 2,130.00 101-7002-60320 Travel & Training 105.07 101-7003-60320 Travel & Training 2,698.41 101-7003-60420 Operating Supplies 1,285.88 101-7003-60432 Tools/Equipment 3,329.07 101-7006-60146 PM 10 - Dust Control 232.33 101-7006-60320 Travel & Training 99.74 101-7006-60480 Contributions to Other A…3,460.39 201-7003-60431 Materials/Supplies 276.73 202-3004-60115 Janitorial 3,264.32 202-3004-60123 Security & Alarm 381.86 202-3004-60664 Fire Extinguisher Service 187.83 202-3006-60115 Janitorial 989.54 202-3006-60123 Security & Alarm 530.89 202-3006-60664 Fire Extinguisher Service 201.52 215-7004-60320 Travel & Training 150.00 215-7004-60423 Supplies-Graffiti and Va…14,008.04 215-7004-60427 Safety Gear 260.95 215-7004-60431 Materials/Supplies 24,811.33 215-7004-60673 Tree Maintenance/Palm …19,980.00 215-7004-60691 Maintenance/Services 2,613.59 215-7004-61116 Electric - Utilities 246.40 215-7004-61211 Water - Medians - Utiliti…10,251.83 241-9101-60320 Travel & Training 687.79 247-0000-60320 Travel & Training 1,900.00 247-0000-60461 Marketing & Tourism Pr…303.82 401-0000-60103 Professional Services 44,881.00 401-0000-60185 Design 61,462.37 501-0000-60675 Parts, Accessories, and …352.31 501-0000-60676 Vehicle Repair & Maint…8,340.49 502-0000-13600 Prepaid Expense 25,055.10 502-0000-60301 Software Licenses 10,059.26 502-0000-60420 Operating Supplies 2,260.55 502-0000-61400 Cable/Internet - Utilities 1,250.74 502-0000-80100 Machinery & Equipment 254.48 503-0000-71060 Parks 58,504.00 504-1010-60420 Operating Supplies 841.60 Grand Total:421,608.67 Project Account Summary Project Account Key Expense AmountProject Account Name Project Name **None**174,289.92**None****None** 111205D 3,686.62Design Expense Dune Palms Bridge Imp/BRLKS-5433(014) 111205P 2,621.00Professional Expense Dune Palms Bridge Imp/BRLKS-5433(014) 201804E 27,424.92Landscape & Lighting Median Islan…Landscape & Lighting Median Island Improvements 135 Demand Register Packet: APPKT04192 - 06/13/25 DR 6/23/2025 10:38:56 AM Page 8 of 8 Project Account Summary Project Account Key Expense AmountProject Account Name Project Name 201805D 57,775.75Design Expense Corporate Yard Admin Offices & Crew Quarters 201805P 2,325.00Professional Expense Corporate Yard Admin Offices & Crew Quarters 201901P 1,403.00Professional Expense Village Art Plaza Promenade & Cultural Campus 201902P 1,670.00Professional Expense Avenue 50 Bridge Spanning the Evacuation Channel 201905P 427.50Professional Expense Highway 111 Corridor Area Plan Implementation 202008CB 3,460.39Contribution Expense Avenue 48 Art and Music Line Project 202008P 585.00Professional Expense Avenue 48 Art and Music Line Project 202102P 5,977.00Professional Expense Fritz Burns Park Improvements 202205P 47.50Professional Expense Avenue 50 Widening Improvements (Jeff to Madison) 202212P 780.00Professional Expense Phase II Camera System 202216E 34,350.00General PW Maint - Desert Concep…General PW Maintenance - Desert Concepts 202225P 6,931.50Professional Expense Highway 111 Rehabilitation Project 202301P 11,366.50Professional Expense Miles Avenue Pavement Rehab 202302P 1,331.00Professional Expense Avenue 52 Monroe Street 202303P 1,150.00Professional Expense Washington St Sidewalk Imp (Ave 50 to CalleTamp) 202309P 1,887.50Professional Expense Washington Street Connector to Art and Music Line 202328E 20,273.63Citywide Landscape Maintenance …Citywide Landscape Maintenance Srvcs (L&L AD 89-1) 202330E 11,026.47Park Landscape Maintenance Servi…Park Landscape Maintenance Services 202333P 63.50Professional Expense Bridge Preventative Maint Program 202335P 585.00Eisenhower Retention Basin Slope…Miscellaneous Retention Basin Improvements 202403P 1,987.50Professional Expense Cove Area Slurry Seal Improvements Phase 1 202404P 290.00Professional Expense City Hall Drainage Improvements 202405P 2,187.50Professional Expense Citywide Miscellaneous ADA Improvements 202407P 390.00Professional Expense Citywide Dog Park Improvements 202410P 875.00Professional Expense Aveue 52 at Jefferson Street Roundabout Improvemen 202416E 43,554.00Civic Center Lake Pump Replacem…Civic Center Lake Pump Replacement CONCERTE 237.97Concert Expense Master Account for all SRR Concert Series STVRE 648.00Short Term Vacation Rental Expen…Short Term Vacation Rental Tracking Grand Total:421,608.67 *Project codes are generally used to track Capital Improvement Program (CIP) projects, other large public works projects, developer deposits, or city-wide events. Normal operational expenditures are not project coded and, therefore, will report as "none" in this section. 136 City of La Quinta Bank Transactions 06/02/2025-06/13/2025 Wire Transaction Listed below are the wire transfers from 06/02/2025-06/13/2025. Wire Transfers: 06/05/2025 - WIRE TRANSFER - LANDMARK $146,471.62 06/06/2025 - WIRE TRANSFER - LQCEA $583.00 06/06/2025 - WIRE TRANSFER - MISSION SQUARE $4,105.00 06/06/2025 - WIRE TRANSFER - MISSION SQUARE $15,927.16 06/09/2025 - WIRE TRANSFER - CALPERS $7,779.36 06/09/2025 - WIRE TRANSFER - CALPERS $15,430.49 06/09/2025 - WIRE TRANSFER - CALPERS $36,665.82 06/09/2025 - WIRE TRANSFER - CALPERS $161,724.13 06/10/2025 - WIRE TRANSFER - STERLING $1,426.45 06/10/2025 - WIRE TRANSFER - STANDARD OF OREGON $1,899.04 06/10/2025 - WIRE TRANSFER - SILVERROCK PHASE 1 LLC (1)$629,772.27 06/11/2025 - WIRE TRANSFER - US BANK $2,000,000.00 06/11/2025 - WIRE TRANSFER - J&H ASSET PROPERTY MANAGEMENT, INC.$38,187.57 TOTAL WIRE TRANSFERS OUT $3,059,971.91 (1)These funds represent a loan under the Debtor-in-Possession (DIP) financing. This disbursement does not reflect the City financing of construction or development at SilverRock. ATTACHMENT 2 137 138 City of La Quinta CITY COUNCIL MEETING: July 1, 2025 STAFF REPORT AGENDA TITLE: APPROVE CANCELLING THE REGULAR CITY COUNCIL MEETINGS OF AUGUST 19 AND SEPTEMBER 2, 2025 RECOMMENDATION Approve cancelling the regular City Council meetings of August 19 and September 2, 2025. EXECUTIVE SUMMARY Council traditionally modifies its meeting schedule during summer months if there are no known time-sensitive matters requiring Council action. Advance notice of cancelled meetings allows Councilmembers, staff, and the public to properly plan for deadlines and workflow. FISCAL IMPACT There would be a cost savings consisting of the time and materials associated with production of agenda packets. BACKGROUND/ANALYSIS The City Manager and Executive Team have reviewed the items requiring Council consideration, and all matters that require Council review have been scheduled for the July 15 and August 5, 2025 meetings. The recommended summer meeting schedule is as follows:  July 15 regular meeting  August 5 regular meeting  August 19 CANCELLED  September 2 CANCELLED  September 16 regular meeting Should a pressing situation or matter require Council direction or action before the next regular meeting, a special meeting will be called. ALTERNATIVES Council may select alternate dates for cancelled meetings, cancel only one meeting, cancel two meetings, or cancel no meetings. Prepared by: Olivia Rodriguez, Deputy City Clerk Approved by: Monika Radeva, City Clerk BUSINESS SESSION ITEM NO. 1 19 140 City of La Quinta CITY COUNCIL MEETING: July 1, 2025 STAFF REPORT AGENDA TITLE: APPROVE CITY HALL MURAL DESIGN RECOMMENDATION Approve City Hall mural design. EXECUTIVE SUMMARY On December 9, 2024, the Arts and Community Services Commission (Commission) reviewed a City Hall mural design by artist Nate Frizzell (Frizzell). In February 2025, staff contracted with Frizzell to further develop and paint the mural. On June 9, 2025, the Commission reviewed a revised mural concept and recommended the updated design to City Council for approval. FISCAL IMPACT Fiscal year (FY) 2025/26 budget includes a $25,000 allocation in the Art in Public Places Art Purchases (APP) Account No. 270-0000-74800 to design and paint the mural. BACKGROUND/ANALYSIS The City is committed to enriching the community through the promotion and integration of public art, as demonstrated by the ongoing Art in Public Places program. Staff continually seeks opportunities to introduce highly visible and engaging artwork for residents and visitors to enjoy, enhancing the cultural vibrancy of the community. In alignment with this commitment, staff identified an exterior wall of City Hall (Attachment 1) as an ideal location for a new mural and has contracted with artist Nate Frizzell to design and paint the mural. In December 2024, staff presented Frizzell’s initial mural concept to the Commission, which provided thoughtful feedback to ensure the artwork reflects the character of La Quinta. Staff shared the Commission’s input with Frizzell, and an updated concept was presented to the Commission in June 2025. The Commission expressed support for the revised mural and is recommending that Council approve the proposed design. BUSINESS SESSION ITEM NO. 2 141 The mural prominently features “La Quinta” in the City’s distinctive, flowing script immediately establishing a strong visual identity. Provided for Council consideration are two mural design options featuring the “La Quinta” script in off white lettering (Attachment 2) and in gold lettering (Attachment 3). The foreground depicts the purple sand verbena and the smoke tree, highlighting the region’s ecological diversity. The mural also features native desert animals – the roadrunner, coyote, bighorn sheep, and the majestic Gamel’s quail, each selected to represent adaptability and the natural wildlife of the surrounding landscape. The Santa Rosa Mountains provide a recognizable backdrop, shown in silhouette against a desert sunset, a view closely associated with La Quinta’s natural scenery. The mural’s color palette, rich purples, pinks and golds, reflect the tones commonly seen during seasonal wildflower blooms and desert sunsets. The mural serves as a visual representation of La Quinta’s heritage and natural scenic environment. It emphasizes the region’s native plant and animal life and encourages greater appreciation for the surrounding desert habitat. Positioned at City Hall, the mural is designed to serve as a welcoming landmark that reflects the City’s appreciation for art, nature, and its unique desert setting. If approved, Frizzell will prepare for installation with an anticipated completion date of Fall 2025. ALTERNATIVES Council may choose not to approve the mural design and ask staff to explore other concepts. Prepared by: Michael Calderon, Senior Management Analyst Approved by: Christina Calderon, Community Services Deputy Director Attachments: 1. City Hall Exterior Wall 2. Mural Concept – Off White Lettering 3. Mural Concept – Gold Lettering 142 ATTACHMENT 1 143 144 ATTACHMENT 2  -- ATTACHMENT 3  City of La Quinta CITY COUNCIL MEETING: July 1, 2025 STAFF REPORT AGENDA TITLE: APPROVE AMENDMENT NO. 1 TO AGREEMENT FOR CONTRACT SERVICES WITH VISUAL EDGE IT FOR (1) MANAGED INFORMATION TECHNOLOGY SERVICES, AND (2) ADDITIONAL EQUIPMENT AND PROFESSIONAL SERVICES RECOMMENDATION Approve Amendment No. 1 to Agreement for Contract Services with Visual Edge IT for (1) Managed Information Technology Services, and (2) additional equipment and professional services; and authorize the City Manager to execute the amendment. EXECUTIVE SUMMARY On May 7, 2024, following the competitive Requests for Proposals (RFP) procurement process, Council approved a five-year agreement with Visual Edge IT for managed information technology (IT) service, comprehensive technology support, cybersecurity management, and IT infrastructure maintenance. Over the last year, staff identified critical IT infrastructure needs requiring immediate attention, including server hardware replacement, network security upgrades, cybersecurity, facility Wi-Fi improvements, and equipment modernization to maintain operational continuity and security standards. Amendment No. 1 (Attachment 1) proposes to add the IT infrastructure upgrades noted above to the agreement’s scope of work along with updated annual security services costs, and increase compensation by $1,090,000, for a total not to exceed amount of $3,400,000 million for the agreement term. FISCAL IMPACT Proposed Amendment No. 1, if approved, amends the agreement’s scope of work to include additional security services and imperative IT infrastructure upgrades, and provides an increase of $1,090,000, for a total not to exceed compensation of $3,400,000 for the agreement term as detailed in the table below. Funds are available and budgeted in Account No. 502-0000-60104 (Consultants) for services, Account Nos. 502-0000- 80100 and 502-0000-80103 (Machinery and Equipment and Computers) for hardware, and Account No. 502-0000-60301 for software purchases. BUSINESS SESSION ITEM NO. 3 147 BACKGROUND/ANALYSIS In February 2024, staff published an RFP for IT services and received 13 responses. Four firms were interviewed, and Visual Edge IT was selected as the top contender. On May 7, 2024, Council approved a five-year agreement with Visual Edge IT for Managed IT Services for a not to exceed amount of $2,310,000. The agreement provides comprehensive IT support, including network management and monitoring, cybersecurity management, user support, mobile device management, Office 365 administration, and IT infrastructure and system maintenance. Visual Edge IT has successfully implemented the initial onboarding phase and has been providing ongoing managed services since July 2024. The company maintains an onsite full-time network engineer and IT technician at City facilities, with additional 24/7 remote helpdesk support. Staff has conducted a comprehensive assessment of the City's IT infrastructure with Visual Edge IT and identified several critical areas requiring immediate attention to maintain operational continuity, enhance security, and support growing technology demands: Infrastructure Modernization: The City's server hardware, originally installed late 2016, has reached its end-of-life and requires replacement to prevent system failures and maintain support coverage. The proposed Scale Hypervisor system will consolidate 18 aging physical and virtual servers into a modern three-node configuration, improving reliability and reducing maintenance requirements. Network Security and Capacity: Current network infrastructure requires upgrades to support increased data demands and implement enhanced security protocols. The City Hall Wi-Fi upgrade will provide modern 802.11ax/be wireless technology with tri-band capabilities, while UPS battery backup systems will ensure network continuity during power disruptions. 148 Facility Infrastructure: Both the main server room and museum facility require network infrastructure improvements. The server room cleanup project will replace aging equipment racks and improve cable management, while the museum network buildout will provide modern connectivity to support public services and facility operations. Equipment Refresh: The proposed laptop inventory replenishment addresses the need to replace aging workstations with modern devices that support current software applications and security requirements. All proposed projects align with industry best practices for municipal IT infrastructure and are essential for maintaining the City's operational capabilities. The equipment and services outlined in the amendment will be procured through Visual Edge IT in accordance with the City's Purchasing and Contracting Policy, which permits contract amendments for additional services when they are related to existing contract scope of work and authorized by the contract provisions. Proposed Amendment No. 1, if approved, amends the agreement’s scope of work to include additional security services and imperative IT infrastructure upgrades, as detailed above, and provides an increase of $1,090,000, for a total not to exceed compensation of $3,400,000 for the agreement term as detailed in the Fiscal Impact section of this report. ALTERNATIVES Council may elect not to approve this amendment. However, delaying these critical infrastructure improvements would result in increased risk of system failures, potential security vulnerabilities, and potential service disruptions to City operations and public services. Staff does not recommend this alternative. Prepared by: Doug Kinley III, Senior Management Analyst Approved by: Gilbert Villalpando, Director of Business Unit and Housing Development Attachment: 1. Amendment No. 1 to Agreement with Visual Edge IT 149 AMENDMENT NO. 1 TO MANAGED IT SERVICES WITH VISUAL EDGE IT This Amendment No. 1 (“Amendment 1”) to Agreement for Contract Services ("Agreement”) is made and entered into as of the 1st day of July, 2025, ("Effective Date") by and between the CITY OF LA QUINTA ("City"), a California municipal corporation and VISUAL EDGE IT, a Delaware Corporation (“Contracting Party”). RECITALS WHEREAS, on or about May 8, 2024, the City and Contracting Party entered into a five-year Agreement to provide managed information technology (IT) services for a total not to exceed amount of $2,310,000; the Agreement expires June 30, 2029; and WHEREAS, the City and Contracting Party mutually agree to amend Section 1.1 Scope of Services and related Exhibit A of the Agreement to include additional equipment and professional services related to IT Infrastructure Project Upgrades, as well as essential equipment and professional services for 7 priority projects, increased cybersecurity and data protection, risk reduction, and contingency planning for operational needs; and WHEREAS, the City and Contracting Party mutually agree to amend Section 2.1 Contract Sum and related Exhibit B of the Agreement to increase the total not to exceed compensation amount from $2,310,000 to $3,400,000 for the additional services listed above for the Agreement Term. NOW THEREFORE, in consideration of the mutual covenant herein contained, the parties agree as follows: AMENDMENT In consideration of the foregoing Recitals and the covenants and promises hereinafter contained, and for good and valuable consideration, the sufficiency and receipt of which are hereby acknowledged, the parties hereto agree as follows: 1. Section 1.1 Scope of Services is amended to read as follows: 1.1 Scope of Services. In Compliance with all terms and conditions of this Agreement, Contracting Party shall provide those services related to Managed IT Services, and additional equipment and professional services related to IT Infrastructure Projects Upgrades, as specified in the “Scope of Services” attached hereto as “Exhibit A” and incorporated herein by this reference (the “Services”). Contracting Party represents and warrants that Contracting Party is a provider of first-class work and/or services and Contracting Party is experienced in performing the Services contemplated herein and, in light of such status and experience, Contracting Party covenants that it shall follow industry standards in performing the Services required hereunder, and that all materials, if any, will be of good quality, fit for the purpose intended. For purposes of this Agreement, the phrase “industry standards” shall mean those standards of practice recognized by one or more first-class performing similar services under similar circumstances. ATTACHMENT 1 150 2. “Exhibit A” – Scope of Services is amended to include the additional services detailed in Exhibit A, attached to this Amendment No. 1, and incorporated herein by this reference. 3. Section 2.1 Contract Sum is amended to read as follows: 2.1 Contract Sum. For the services rendered pursuant to this Agreement, Contracting Party shall be compensated in accordance with the following revised “Exhibit B” (the “Schedule of Compensation”) in a total amount not to exceed Three Million Four Hundred Thousand Dollars ($3,400,000), for the life of the Agreement, encompassing the Initial and any Extended Terms (the “Contract Sum”), except as provided in Section 1.7. 4. “Exhibit B” – Schedule of Compensation is amended as listed in “Exhibit B,” attached hereto and incorporated herein by this reference. In all other respects, the original Agreement shall remain in effect. IN WITNESS WHEREOF, the City and Contracting Party have executed this Amendment No. 1 to the Agreement on the respective dates set forth below. CITY OF LA QUINTA VISUAL EDGE IT, INC. a California municipal corporation a Delaware Corporation __________________________ JON McMILLEN, City Manager ERIC STAVOLA, Vice President City of La Quinta, California Managed Services Dated: ___________________ Dated: ___________________ ATTEST: MONIKA RADEVA, City Clerk City of La Quinta, California APPROVED AS TO FORM: WILLIAM H. IHRKE, City Attorney City of La Quinta, California 151 Exhibit A Scope of Services Exhibit A incorporated in the Agreement remains in full force and effect. Contracting Party is to provide additional equipment and professional services related to IT infrastructure upgrades. Contracting Party’s quotes for 7 additional IT priority projects are attached hereto and incorporated herein by this reference in enclosed Exhibit A: a) City Hall Wi-Fi Upgrades b) UPS Battery Back-ups for Network Racks c) Server Room Clean-up and Server Rack Additions d) Museum Network Clean-up and Build-out e) Server Hardware Replacement and Migration f) Laptop Inventory Replenishment g) Civic Center Campus Park Wi-Fi Upgrades 152 We have prepared a quote for you City Hall Wifi Upgrades Quote # 034097 Version 1 Prepared for: City of La Quinta Prepared by: Visual Edge IT Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com "EXHIBIT A" SCOPE OF SERVICES 153 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com Hardware Description Price Qty Ext. Price Ubiquiti U7 Pro Max Tri Band IEEE 802.11 a/b/g/n/ac/ax/be 8.60 Gbit/s Wireless Access Point - 2.40 GHz, 5 GHz, 6 GHz - MIMO Technology - Multi User MIMO - 1 x Network (RJ-45) - 2.5 Gigabit Ethernet, Gigabit Ethernet - 25 W - Wall Mountable, Ceiling Mounta $388.05 15 $5,820.75 Subtotal:$5,820.75 Visual Edge IT Professional Services Description Price Qty Ext. Price Visual Edge IT Professional Services $15,384.62 1 $15,384.62 Subtotal:$15,384.62 2 Visual Edge IT | 3874 Highland Park | North Canton, OH 44720Quote # 034097 Version 1 154 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com Managed IT Services and Projects Overview Terms of Agreement This agreement is between City of La Quinta, herein referred to as Client, and Visual Edge IT, hereinafter referred to as Service Provider. This agreement will be effective upon the date signed, unless otherwise stated. Contract prices and fees may be subject to change after the initial and subsequent terms. The Professional Services hours listed in the proposal are an approximation of the project requirements as described by the client. The actual cost may change after commencement of the project if unforeseen circumstances are encountered. The client will be informed of any changes in cost in advance. Any additional services requested by the company that are not covered by the project parameters will incur additional fees. Payment Terms: Current Clients: VEIT may require milestone (progress) billing for labor for projects projected to last longer than 30 days. Hardware will be invoiced upon delivery to the customer. New customers (or previous customers who have not had an invoice generated in more than 12 months), or customers with current or previous payment challenges, a deposit invoice will be generated for the full invoice amount. NET New Clients: 100% of order invoice total payment must be received before any product is ordered or any work begins. For projects projected to last longer than 30 days, milestone invoicing will be defined and completed. For Managed Services/Onboarding: 100% of Onboarding fee will be invoiced and received before onboarding can begin. The first MRR invoice will be sent 30 days after onboarding begins. Deposit Exceptions: Public, State, City, Federal, Nation, and Educational entities - must provide a Purchase Order. Leases, Project and Implementation-As-A-Service, and Installation Payment Agreement orders – must have signed agreements. Taxes, Shipping, and Fees This Quote is valid for a period of 30 days. We reserve the right to cancel orders arising from pricing changes, availability, or other updates or errors. We specifically disclaim any and all warranties, expressed or implied, including but not limited to any licensed products. We shall not be liable for any loss of profits, business, goodwill, data, interruption of business, nor for incidental or consequential merchantability or fitness of purpose, nor damages related to this agreement 3 Visual Edge IT | 3874 Highland Park | North Canton, OH 44720Quote # 034097 Version 1 155 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com City Hall Wifi Upgrades Quote Information:Prepared for:Prepared by: Quote #: 034097 City of La Quinta Visual Edge IT Version: 1 Delivery Date: 06/23/2025 Expiration Date: 02/14/2025 78495 Calle Tampico La Quinta, CA 92253 Gilbert Villalpando (760) 777-7000 gvillalpando@laquintaca.gov Chris Sanchez (866) 863-2266 csanchez@visualedgeit.com One Time Payment Summary Description Amount Hardware Visual Edge IT Professional Services Total:$21,205.37 All services will be invoiced in the month services begin and will be invoiced until service is terminated. All taxes, shipping, and handling fees on quote are estimated. Billing Invoice will have all actual taxes, shipping and fees. By endorsing, you agree that you have read and accept the Terms and Conditions of the Master Services Agreement v. 2024.01. Visual Edge IT City of La Quinta Signature: Name:Christopher Sanchez Title:Technical Account Manager Date:06/23/2025 Signature: Name:Gilbert Villalpando Date: 4 Visual Edge IT | 3874 Highland Park | North Canton, OH 44720Quote # 034097 Version 1 156 We have prepared a quote for you UPS Battery Backups for Network Racks Quote # 034098 Version 1 Prepared for: City of La Quinta Prepared by: Visual Edge IT Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com 157 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com Hardware Description Price Qty Ext. Price APC Smart-UPS C, Line Interactive, 1440VA, Rackmount 2U, 120V, 6x NEMA 5-15R outlets, SmartConnect port, USB and Serial communication, AVR,Graphic LCD - 2U Rack-mountable - 3 Hour Recharge - 10.10 Minute Stand-by - 120 V Input - 120 V AC Output - Sine Wav $939.40 8 $7,515.20 Subtotal:$7,515.20 Managed IT Services and Projects Overview Terms of Agreement This agreement is between City of La Quinta, herein referred to as Client, and Visual Edge IT, hereinafter referred to as Service Provider. This agreement will be effective upon the date signed, unless otherwise stated. Contract prices and fees may be subject to change after the initial and subsequent terms. The Professional Services hours listed in the proposal are an approximation of the project requirements as described by the client. The actual cost may change after commencement of the project if unforeseen circumstances are encountered. The client will be informed of any changes in cost in advance. Any additional services requested by the company that are not covered by the project parameters will incur additional fees. Payment Terms: Current Clients: VEIT may require milestone (progress) billing for labor for projects projected to last longer than 30 days. Hardware will be invoiced upon delivery to the customer. New customers (or previous customers who have not had an invoice generated in more than 12 months), or customers with current or previous payment challenges, a deposit invoice will be generated for the full invoice amount. NET New Clients: 100% of order invoice total payment must be received before any product is ordered or any work begins. For projects projected to last longer than 30 days, milestone invoicing will be defined and completed. For Managed Services/Onboarding: 100% of Onboarding fee will be invoiced and received before onboarding can begin. The first MRR invoice will be sent 30 days after onboarding begins. Deposit Exceptions: Public, State, City, Federal, Nation, and Educational entities - must provide a Purchase Order. Leases, Project and Implementation-As-A-Service, and Installation Payment Agreement orders – must have signed agreements. Taxes, Shipping, and Fees This Quote is valid for a period of 30 days. We reserve the right to cancel orders arising from pricing changes, availability, or other updates or errors. We specifically disclaim any and all warranties, expressed or implied, including but not limited to any licensed products. We shall not be liable for any loss of profits, business, goodwill, data, interruption of business, nor for incidental or consequential merchantability or fitness of purpose, nor damages related to this agreement 2 Visual Edge IT | 3874 Highland Park | North Canton, OH 44720Quote # 034098 Version 1 158 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com UPS Battery Backups for Network Racks Quote Information:Prepared for:Prepared by: Quote #: 034098 City of La Quinta Visual Edge IT Version: 1 Delivery Date: 06/23/2025 Expiration Date: 02/14/2025 78495 Calle Tampico La Quinta, CA 92253 Gilbert Villalpando (760) 777-7000 gvillalpando@laquintaca.gov Chris Sanchez (866) 863-2266 csanchez@visualedgeit.com One Time Payment Summary Description Amount Hardware Total:$7,515.20 All services will be invoiced in the month services begin and will be invoiced until service is terminated. All taxes, shipping, and handling fees on quote are estimated. Billing Invoice will have all actual taxes, shipping and fees. By endorsing, you agree that you have read and accept the Terms and Conditions of the Master Services Agreement v. 2024.01. Visual Edge IT City of La Quinta Signature: Name:Christopher Sanchez Title:Technical Account Manager Date:06/23/2025 Signature: Name:Gilbert Villalpando Date: 3 Visual Edge IT | 3874 Highland Park | North Canton, OH 44720Quote # 034098 Version 1 159 We have prepared a quote for you Server Room Clean Up and Adding of Server Racks Quote # 034329 Version 1 Prepared for: City of La Quinta Prepared by: IMS - Image Source Main: 9098904040 Email: csanchez@visualedgeit.com Web: https://imagesourceusa.com/ 160 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: https://imagesourceusa.com/ Visual Edge IT Professional Services Description Price Qty Ext. Price Visual Edge IT Professional Services 2 42U RACKS, PATCH CORDS, STRAPS, MISC EQUIPMENT PROVIDED BY PSI - $6,153.85 (Hardware) SERVER RACK REPLACEMENT AND CLEAN UP REPLACE EXISTING RACK WITH RACK NOT AS DEEP (NEW 42U NAVEPOINT) REMOVE ALL CABLES, PATCH PANELS, SERVERS, SWITCHES OUT OF OLD ONE AND TRANSFER TO NEW ONE INSTALL NEW 42U NAVEPOINT FOR BACKUP. TEST ALL EXISTING EQUIPMENT WORK NEEDS TO BE DONE ON WEEKEND SO CUSTOMER IS NOT DOWN DURING DAY 2 TECHS @ 2 DAYS SAT/SUN - $11046.15 (Labor with Prevailing Wages) $17,200.00 1 $17,200.00 Subtotal:$17,200.00 2 IMS - Image Source | 650 E Hospitality Lane Suite 540 | San Bernardino, CA 92408 Quote # 034329 Version 1 161 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: https://imagesourceusa.com/ Managed IT Services and Projects Overview Terms of Agreement This agreement is between City of La Quinta, herein referred to as Client, and Visual Edge IT, hereinafter referred to as Service Provider. This agreement will be effective upon the date signed, unless otherwise stated. Contract prices and fees may be subject to change after the initial and subsequent terms. The Professional Services hours listed in the proposal are an approximation of the project requirements as described by the client. The actual cost may change after commencement of the project if unforeseen circumstances are encountered. The client will be informed of any changes in cost in advance. Any additional services requested by the company that are not covered by the project parameters will incur additional fees. Payment Terms: Current Clients: VEIT may require milestone (progress) billing for labor for projects projected to last longer than 30 days. Hardware will be invoiced upon delivery to the customer. New customers (or previous customers who have not had an invoice generated in more than 12 months), or customers with current or previous payment challenges, a deposit invoice will be generated for the full invoice amount. NET New Clients: 100% of order invoice total payment must be received before any product is ordered or any work begins. For projects projected to last longer than 30 days, milestone invoicing will be defined and completed. For Managed Services/Onboarding: 100% of Onboarding fee will be invoiced and received before onboarding can begin. The first MRR invoice will be sent 30 days after onboarding begins. Deposit Exceptions: Public, State, City, Federal, Nation, and Educational entities - must provide a Purchase Order. Leases, Project and Implementation-As-A-Service, and Installation Payment Agreement orders – must have signed agreements. Taxes, Shipping, and Fees This Quote is valid for a period of 30 days. We reserve the right to cancel orders arising from pricing changes, availability, or other updates or errors. We specifically disclaim any and all warranties, expressed or implied, including but not limited to any licensed products. We shall not be liable for any loss of profits, business, goodwill, data, interruption of business, nor for incidental or consequential merchantability or fitness of purpose, nor damages related to this agreement 3 IMS - Image Source | 650 E Hospitality Lane Suite 540 | San Bernardino, CA 92408 Quote # 034329 Version 1 162 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: https://imagesourceusa.com/ Server Room Clean Up and Adding of Server Racks Quote Information:Prepared for:Prepared by: Quote #: 034329 City of La Quinta IMS - Image Source Version: 1 Delivery Date: 06/23/2025 Expiration Date: 06/27/2025 78495 Calle Tampico La Quinta, CA 92253 Gilbert Villalpando (760) 777-7000 gvillalpando@laquintaca.gov Chris Sanchez (866) 863-2266 csanchez@visualedgeit.com One Time Payment Summary Description Amount Visual Edge IT Professional Services Total:$17,200.00 All services will be invoiced in the month services begin and will be invoiced until service is terminated. All taxes, shipping, and handling fees on quote are estimated. Billing Invoice will have all actual taxes, shipping and fees. By endorsing, you agree that you have read and accept the Terms and Conditions of the Master Services Agreement v. 2024.01. IMS - Image Source City of La Quinta Signature: Name:Christopher Sanchez Title:Technical Account Manager Date:06/23/2025 Signature: Name:Gilbert Villalpando Date: 4 IMS - Image Source | 650 E Hospitality Lane Suite 540 | San Bernardino, CA 92408 Quote # 034329 Version 1 163 We have prepared a quote for you Museum Network Cleanup and Buildout Quote # 035341 Version 1 Prepared for: City of La Quinta Prepared by: Visual Edge IT Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com 164 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com Statement of Work Business Objectives City of LaQuinta is looking to have their network rack and cabling cleaned up. Project Brief & Solution Requirements The project will installing a new 18U rack, patch panels, and conduit for cabling. Implementation Visual Edge IT will: Clean up the backboard where the new rack will be mounted. Install new 18U 600m-deep lockable wall rack Remove old 2-post rack and ladder. Reroute all data cables into the new rack and existing equipment. Install (2) 48-port patch panels in the new rack. Terminate data cables. Run patch cables from patch panels to the switches. Install two 2-inch EMT conduits at a length of an estimated 150-feet in the museum from the storage room to the workspace as outlined in the PSI quote. Strap and secure conduit to walls and ceilings as needed. Install pull strings in the conduit. Test all connections after deployments City of LaQuinta will: Provide windows for downtime, coordination with users, any passwords that we do not already have, and access to vendors Provide access to all systems in the old suite and the new suite Work with VEIT project engineers throughout the project to ensure the goals are understood and agreed to by all parties Verify that everything is working correctly after the changes Deliverables All material including all required RJ45 ethernet cabling, patch cables, patch panels, the 2” EMT conduit, elbows, couplings, straps, and struts are to be provided by PSI as outlined in the quote. Constraints & Assumptions Assumptions Project Engineers must be knowledgeable about the client’s environment as well as the solution being implemented. Project Engineer must ensure that they have all necessary tools required to implement the technology identified in this project. This SOW was designed based on information provided at the time of creation. Any changes that take place between SOW creation and the quote being signed could require a project change order. This may cause a delay in the project as additional licensing, labor, and/or quotes may be necessary. Any deviation from the steps outlined in this SOW will require a project change order. This may cause a delay in the project as 2 Visual Edge IT | 3874 Highland Park | North Canton, OH 44720Quote # 035341 Version 1 165 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com additional licensing, labor, and/or quotes may be necessary. PSI will perform the work as outlined over an estimated 3 days, and will provide all required materials. Administrative Credentials Admin rights must be provided to VEIT . Required and Unplanned Down Time There will be required downtime with this project. VEIT will do everything to prevent unplanned downtime. Third Parties Coordination Client will be responsible for coordinating any 3rd-party interaction required. Expected Outcome At the conclusion of the network cleanup project, the City of LaQuinta will have a new rack installed and cabling cleaned up. The project will not necessarily follow the exact order outlined in the calculator SOW assumes that all labor can be performed during business hours   3 Visual Edge IT | 3874 Highland Park | North Canton, OH 44720Quote # 035341 Version 1 166 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com Visual Edge IT Professional Services Description Price Qty Ext. Price Visual Edge IT Professional Services INSTALL NEW 18U 600M DEEP LOCKABLE WALL RACK. CLEAN UP BACKBOARD WHERE NEW RACK WILL GO. REMOVE OLD 2 POST RACK & LADDER, REROUTE ALL DATA CABLES INTO NEW RACK AND EXISTING EQUIPMENT. INSTALL 2 48 PORT PATCH PANELS IN NEW RACK, RE TERMINATE DATA CABLES AND PATCH OVER CABLES TO SWITCHES. NEW PATCH PANELS & PATCH CORDS PROVIDED BY PSI. INSTALL AN ESTIMATED 150FT OF 2 2" EMT CONDUITS IN MUSUEM FROM STORAGE ROOM TO WORKSPACE. STRAP AND SECURE CONDUIT TO WALLS/CEILINGS. INSTALL PULL STRINGS IN BOTH CONDUITS. 2 TECHS @ AN ESTIMATED 3 DAYS - $13,961.54 (Labor with prevailing wages) ALL MATERIAL INCLUDING 2" EMT CONDUIT/2" 90 ELBOWS/COUPLINGS/STRAPS/STRUT PSI TO PROVIDE. - $3,569.23 (Hardware) $17,530.77 1 $17,530.77 Subtotal:$17,530.77 4 Visual Edge IT | 3874 Highland Park | North Canton, OH 44720Quote # 035341 Version 1 167 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com Managed IT Services and Projects Overview Terms of Agreement This agreement is between City of La Quinta, herein referred to as Client, and Visual Edge IT, hereinafter referred to as Service Provider. This agreement will be effective upon the date signed, unless otherwise stated. Contract prices and fees may be subject to change after the initial and subsequent terms. The Professional Services hours listed in the proposal are an approximation of the project requirements as described by the client. The actual cost may change after commencement of the project if unforeseen circumstances are encountered. The client will be informed of any changes in cost in advance. Any additional services requested by the company that are not covered by the project parameters will incur additional fees. Payment Terms: Consumption-Based Usage and Billing: Pricing is based on actual usage, and estimates provided are for reference only. Final charges may differ from initial estimates due to variations in usage. Current Clients: VEIT may require milestone (progress) billing for labor for projects projected to last longer than 30 days. Hardware will be invoiced upon delivery to the customer. New customers (or previous customers who have not had an invoice generated in more than 12 months), or customers with current or previous payment challenges, a deposit invoice will be generated for the full invoice amount. NET New Clients: 100% of order invoice total payment must be received before any product is ordered or any work begins. For projects projected to last longer than 30 days, milestone invoicing will be defined and completed. For Managed Services/Onboarding: 100% of Onboarding fee will be invoiced and received before onboarding can begin. The first MRR invoice will be sent 30 days after onboarding begins. Deposit Exceptions: Public, State, City, Federal, Nation, and Educational entities - must provide a Purchase Order. Leases, Project and Implementation-As-A-Service, and Installation Payment Agreement orders – must have signed agreements. Taxes, Shipping, and Fees This Quote is valid for a period of 30 days. We reserve the right to cancel orders arising from pricing changes, availability, or other updates or errors. We specifically disclaim any and all warranties, expressed or implied, including but not limited to any licensed products. We shall not be liable for any loss of profits, business, goodwill, data, interruption of business, nor for incidental or consequential merchantability or fitness of purpose, nor damages related to this agreement. 5 Visual Edge IT | 3874 Highland Park | North Canton, OH 44720Quote # 035341 Version 1 168 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com Museum Network Cleanup and Buildout Quote Information:Prepared for:Prepared by: Quote #: 035341 City of La Quinta Visual Edge IT Version: 1 Delivery Date: 06/23/2025 Expiration Date: 06/27/2025 78495 Calle Tampico La Quinta, CA 92253 Gilbert Villalpando (760) 777-7000 gvillalpando@laquintaca.gov Chris Sanchez (866) 863-2266 csanchez@visualedgeit.com One Time Payment Summary Description Amount Visual Edge IT Professional Services Total:$17,530.77 All services will be invoiced in the month services begin and will be invoiced until service is terminated. All taxes, shipping, and handling fees on quote are estimated. Billing Invoice will have all actual taxes, shipping and fees. By endorsing, you agree that you have read and accept the Terms and Conditions of the Master Services Agreement v. 2024.01. Visual Edge IT City of La Quinta Signature: Name:Christopher Sanchez Title:Technical Account Manager Date:06/23/2025 Signature: Name:Gilbert Villalpando Date: 6 Visual Edge IT | 3874 Highland Park | North Canton, OH 44720Quote # 035341 Version 1 169 We have prepared a quote for you Server Hardware Replacement & Migration Quote # 036709 Version 1 Prepared for: City of La Quinta Prepared by: Visual Edge IT Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com 170 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com Statement of Work Business Objectives The City of La Quinta has approximately 18 servers in production that are a mix of physical and virtual servers. The virtual servers are in a VMWare cluster with a SAN as backend storage. The hardware has become aged and is starting to experience technical deficiencies and the city would like to see an option for upgrading the infrastructure. The proposed solution is to implement a Scale Hypervisor system to replace the aging physical servers and SAN. The Scale solution will reduce the number of existing physical servers and SAN into one three node configuration that includes the compute and storage functionality. Project Brief and Solution Requirements The project will consist of performing the tasks as stated above, and in more detail, below. Implementation Visual Edge IT Responsibilities: Install and configure a new Scale Hypervisor system Meet with client to plan the migration process – order of servers, schedule, downtime, and testing o Each server will be tested after being migrated. Testing will include starting up the new virtual server, verifying domain login, verifying IP address, verifying that there are no critical server errors, and verifying access to the rest of the network o Any application testing will need to be completed by the client Migrate and test servers based on the agreed upon plan Provide information for e-cycling the hardware (physical servers and SAN) Client Responsibilities: Provide a dedicated user/team to work with the VEIT team throughout the project to ensure the goals are understood and agreed to by all parties Provide a dedicated user/team to work with the VEIT team during the testing phases of the project to verify user acceptance Provide windows for downtime, coordination with users, and any passwords that we do not already have Provide admin access to all systems as needed Visual Edge IT Responsibilities: Install and configure a new Scale Hypervisor system Meet with client to plan the migration process – order of servers, schedule, downtime, and testing o Each server will be tested after being migrated. Testing will include starting up the new virtual server, verifying domain login, verifying IP address, verifying that there are no critical server errors, and verifying access to the rest of the network o Any application testing will need to be completed by the client Migrate and test servers based on the agreed upon plan Provide information for e-cycling the hardware (physical servers and SAN) Client Responsibilities: Provide a dedicated user/team to work with the VEIT team throughout the project to ensure the goals are understood and agreed to by all parties Provide a dedicated user/team to work with the VEIT team during the testing phases of the project to verify user 2 Visual Edge IT | 3874 Highland Park | North Canton, OH 44720Quote # 036709 Version 1 171 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com acceptance Provide windows for downtime, coordination with users, and any passwords that we do not already have Provide admin access to all systems as needed Constraints & Assumptions Assumptions The SOW assumes that all physical servers (outside of the VMWare hosts) will be migrated to the Scale Hypervisor, along with all virtual servers. This SOW was designed based on information in place at the time of creation. Any changes that take place between SOW creation and the quote being signed could require a project change order. This may cause a delay in the project as additional licensing, labor, and/or quotes may be necessary. Any deviation from the steps outlined in this SOW will require a project change order. This may cause a delay in the project as additional licensing, labor, and/or quotes may be necessary. Administrative Credentials Admin rights must be provided to VEIT Required and Unplanned Down Time There will be required downtime with this project VEIT will do everything to prevent unplanned downtime Third Parties Coordination The client will be responsible for coordinating and paying for any 3rd-party interaction required. Expected Outcome The project will be considered complete once the following parameters have been met: Scale Hypervisor system installed and configured All physical production servers migrated to Scale All virtual servers migrated to Scale All servers tested after the migrations Scale Description Price Qty Ext. Price Scale Computing Server $80,811.26 1 $80,811.26 XEON SP CPU 3X HDDHC1350 CHASSIS 3 8C/16T 2.8GHZ 2666MT/SINTEL XEON SILVER 4309Y 3 32GB DDR4 3200 MHZ RDIMM32GB DDR4 RDIMM 18 7.68TB 3.5IN SATA SSD7.68TB 3.5IN SATA SSD 3 3 Visual Edge IT | 3874 Highland Park | North Canton, OH 44720Quote # 036709 Version 1 172 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com Scale Description Price Qty Ext. Price "12TB 3.5IN SAS HDD12TB 3.5IN SAS HDD 9 INTEL E810-XXVDA4 SFP284-PORT 10/25GB SCALE COMPUTING 4-PORT 10/25Gb SFP28 NIC 3 SC HYPERCORE 60 MONTH PROFESSIO ESSENTIALS SOFTWARE AND SUPP SC HYPERCORE 60 MONTH PROFESSIO ESSENTIALS SOFTWARE AND SUPPORT 1 5YR LICS AND SW SC//FLEET LICS MANAGER - 5 CLUSTER 5YR LICS AND SW SC//FLEET LICS MANAGER - 5 CLUSTER 1 5YR HW WARRANTY SVCS 5YR HW WARRANTY SVCS 1 SUP ADV OS INSTL SVC HW AND SW SVCS SCALECARE SVC- SUP ADV OS INSTL SVC HW AND SW SVCS SCALECARE SVC-ADV OS INSTALL 1 VMWARE REPLACE PARTNER PROMO SVCS OFFER PER CUSTOMER MARKETNG DISC SOFTWARE SERVICES ADVANCED TRAINING QHAT 1 PROMO HC3 MOVE POWERED BY DT SVCS WINDOWS/LINUX SE 1 SC//HYPERCORE ADV TRAINING CLAS SC//HYPERCORE ADV TRAINING CLAS 1 Subtotal:$80,811.26 Visual Edge IT Professional Services Description Price Qty Ext. Price Visual Edge IT Professional Services $6,890.00 1 $6,890.00 Subtotal:$6,890.00 4 Visual Edge IT | 3874 Highland Park | North Canton, OH 44720Quote # 036709 Version 1 173 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com Managed IT Services and Projects Overview Terms of Agreement This agreement is between City of La Quinta, herein referred to as Client, and Visual Edge IT, hereinafter referred to as Service Provider. This agreement will be effective upon the date signed, unless otherwise stated. Contract prices and fees may be subject to change after the initial and subsequent terms. The Professional Services hours listed in the proposal are an approximation of the project requirements as described by the client. The actual cost may change after commencement of the project if unforeseen circumstances are encountered. The client will be informed of any changes in cost in advance. Any additional services requested by the company that are not covered by the project parameters will incur additional fees. Payment Terms: Consumption-Based Usage and Billing: Pricing is based on actual usage, and estimates provided are for reference only. Final charges may differ from initial estimates due to variations in usage. Current Clients: VEIT may require milestone (progress) billing for labor for projects projected to last longer than 30 days. Hardware will be invoiced upon delivery to the customer. New customers (or previous customers who have not had an invoice generated in more than 12 months), or customers with current or previous payment challenges, a deposit invoice will be generated for the full invoice amount. NET New Clients: 100% of order invoice total payment must be received before any product is ordered or any work begins. For projects projected to last longer than 30 days, milestone invoicing will be defined and completed. For Managed Services/Onboarding: 100% of Onboarding fee will be invoiced and received before onboarding can begin. The first MRR invoice will be sent 30 days after onboarding begins. Deposit Exceptions: Public, State, City, Federal, Nation, and Educational entities - must provide a Purchase Order. Leases, Project and Implementation-As-A-Service, and Installation Payment Agreement orders – must have signed agreements. Taxes, Shipping, and Fees This Quote is valid for a period of 30 days. We reserve the right to cancel orders arising from pricing changes, availability, or other updates or errors. We specifically disclaim any and all warranties, expressed or implied, including but not limited to any licensed products. We shall not be liable for any loss of profits, business, goodwill, data, interruption of business, nor for incidental or consequential merchantability or fitness of purpose, nor damages related to this agreement. 5 Visual Edge IT | 3874 Highland Park | North Canton, OH 44720Quote # 036709 Version 1 174 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com Server Hardware Replacement & Migration Quote Information:Prepared for:Prepared by: Quote #: 036709 City of La Quinta Visual Edge IT Version: 1 Delivery Date: 06/23/2025 Expiration Date: 07/10/2025 78495 Calle Tampico La Quinta, CA 92253 Gilbert Villalpando (760) 777-7000 gvillalpando@laquintaca.gov Chris Sanchez (866) 863-2266 csanchez@visualedgeit.com One Time Payment Summary Description Amount Scale Visual Edge IT Professional Services Total:$87,701.26 All services will be invoiced in the month services begin and will be invoiced until service is terminated. All taxes, shipping, and handling fees on quote are estimated. Billing Invoice will have all actual taxes, shipping and fees. By endorsing, you agree that you have read and accept the Terms and Conditions of the Master Services Agreement v. 2024.01. Visual Edge IT City of La Quinta Signature: Name:Christopher Sanchez Title:Technical Account Manager Date:06/23/2025 Signature: Name:Gilbert Villalpando Date: 6 Visual Edge IT | 3874 Highland Park | North Canton, OH 44720Quote # 036709 Version 1 175 We have prepared a quote for you Laptop Inventory Replenishment (25/26) Quote # 036938 Version 1 Prepared for: City of La Quinta Prepared by: Visual Edge IT Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com 176 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com Hardware Description Price Qty Ext. Price Lenovo ThinkPad P14s Gen 5 Mobile Workstation Lenovo ThinkPad P14s Gen 5 14.5" Mobile Workstation - WQXGA - Intel Core Ultra 7 165H - vPro Technology - 32 GB - 1 TB SSD - English Keyboard - Black $2,101.96 20 $42,039.20 Subtotal:$42,039.20 Software Description Price Qty Ext. Price Lenovo Premier Support Plus - 5 YR Extended Service Lenovo Premier Support Plus - Extended Service (Upgrade) - 5 Year - Service $418.28 20 $8,365.60 Subtotal:$8,365.60 2 Visual Edge IT | 3874 Highland Park | North Canton, OH 44720Quote # 036938 Version 1 177 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com Managed IT Services and Projects Overview Terms of Agreement This agreement is between City of La Quinta, herein referred to as Client, and Visual Edge IT, hereinafter referred to as Service Provider. This agreement will be effective upon the date signed, unless otherwise stated. Contract prices and fees may be subject to change after the initial and subsequent terms. The Professional Services hours listed in the proposal are an approximation of the project requirements as described by the client. The actual cost may change after commencement of the project if unforeseen circumstances are encountered. The client will be informed of any changes in cost in advance. Any additional services requested by the company that are not covered by the project parameters will incur additional fees. Payment Terms: Consumption-Based Usage and Billing: Pricing is based on actual usage, and estimates provided are for reference only. Final charges may differ from initial estimates due to variations in usage. Current Clients: VEIT may require milestone (progress) billing for labor for projects projected to last longer than 30 days. Hardware will be invoiced upon delivery to the customer. New customers (or previous customers who have not had an invoice generated in more than 12 months), or customers with current or previous payment challenges, a deposit invoice will be generated for the full invoice amount. NET New Clients: 100% of order invoice total payment must be received before any product is ordered or any work begins. For projects projected to last longer than 30 days, milestone invoicing will be defined and completed. For Managed Services/Onboarding: 100% of Onboarding fee will be invoiced and received before onboarding can begin. The first MRR invoice will be sent 30 days after onboarding begins. Deposit Exceptions: Public, State, City, Federal, Nation, and Educational entities - must provide a Purchase Order. Leases, Project and Implementation-As-A-Service, and Installation Payment Agreement orders – must have signed agreements. Taxes, Shipping, and Fees This Quote is valid for a period of 30 days. We reserve the right to cancel orders arising from pricing changes, availability, or other updates or errors. We specifically disclaim any and all warranties, expressed or implied, including but not limited to any licensed products. We shall not be liable for any loss of profits, business, goodwill, data, interruption of business, nor for incidental or consequential merchantability or fitness of purpose, nor damages related to this agreement. 3 Visual Edge IT | 3874 Highland Park | North Canton, OH 44720Quote # 036938 Version 1 178 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com Laptop Inventory Replenishment (25/26) Quote Information:Prepared for:Prepared by: Quote #: 036938 City of La Quinta Visual Edge IT Version: 1 Delivery Date: 06/23/2025 Expiration Date: 07/23/2025 78495 Calle Tampico La Quinta, CA 92253 Gilbert Villalpando (760) 777-7000 gvillalpando@laquintaca.gov Chris Sanchez (866) 863-2266 csanchez@visualedgeit.com One Time Payment Summary Description Amount Hardware Software Total:$50,404.80 This agreement shall be enforceable from date of signing and shall remain in effect through no less than 36 consecutive monthly payments for Visual Edge IT Managed Services. All services will be invoiced in the month services begin and will be invoiced until service is terminated. All taxes, shipping, and handling fees on quote are estimated. Billing Invoice will have all actual taxes, shipping and fees. By endorsing, you agree that you have read and accept the Terms and Conditions of the Master Services Agreement v. 2024.01. Visual Edge IT City of La Quinta Signature: Name:Christopher Sanchez Title:Technical Account Manager Date:06/23/2025 Signature: Name:Gilbert Villalpando Date: 4 Visual Edge IT | 3874 Highland Park | North Canton, OH 44720Quote # 036938 Version 1 179 We have prepared a quote for you Civic Center Campus Park Wifi Quote # 034096 Version 1 Prepared for: City of La Quinta Prepared by: Visual Edge IT Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com 180 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com Statement of Work Business Objectives To provide extended wireless coverage across the Civic Center campus and park area by installing outdoor-grade Wi-Fi access points. Implementation 1.Hardware Installation: o Install five (5) Ubiquiti E7 Audience access points on the rooftops of the following buildings: Library (2 units) Wellness Center (1 unit) City Hall (2 units) o Mounting will ensure optimal signal distribution across the open outdoor areas of the Civic Center and adjacent park. 2.Cabling: o Run outdoor-rated CAT6 cabling from each rooftop AP location to the nearest network switch within each building. o Cable runs will be secured, weatherproofed, and tested to ensure reliability and performance. 3.Switch Integration: o Terminate and patch each CAT6 run into an available port on the building’s existing switch infrastructure. o Confirm PoE (Power over Ethernet) functionality for each AP. 4.Testing & Validation: o Conduct signal and performance testing post-installation. o Validate full coverage across targeted outdoor areas. Deliverables Fully installed and functional Ubiquiti E7 Audience AP network Cabling tested and documented Basic support documentation for IT reference 2 Visual Edge IT | 3874 Highland Park | North Canton, OH 44720Quote # 034096 Version 1 181 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com Visual Edge IT Professional Services Description Price Qty Ext. Price Visual Edge IT Professional Services (Labor)$9,230.77 1 $9,230.77 Subtotal:$9,230.77 Managed IT Services and Projects Overview Terms of Agreement This agreement is between City of La Quinta, herein referred to as Client, and Visual Edge IT, hereinafter referred to as Service Provider. This agreement will be effective upon the date signed, unless otherwise stated. Contract prices and fees may be subject to change after the initial and subsequent terms. The Professional Services hours listed in the proposal are an approximation of the project requirements as described by the client. The actual cost may change after commencement of the project if unforeseen circumstances are encountered. The client will be informed of any changes in cost in advance. Any additional services requested by the company that are not covered by the project parameters will incur additional fees. Payment Terms: Current Clients: VEIT may require milestone (progress) billing for labor for projects projected to last longer than 30 days. Hardware will be invoiced upon delivery to the customer. New customers (or previous customers who have not had an invoice generated in more than 12 months), or customers with current or previous payment challenges, a deposit invoice will be generated for the full invoice amount. NET New Clients: 100% of order invoice total payment must be received before any product is ordered or any work begins. For projects projected to last longer than 30 days, milestone invoicing will be defined and completed. For Managed Services/Onboarding: 100% of Onboarding fee will be invoiced and received before onboarding can begin. The first MRR invoice will be sent 30 days after onboarding begins. Deposit Exceptions: Public, State, City, Federal, Nation, and Educational entities - must provide a Purchase Order. Leases, Project and Implementation-As-A-Service, and Installation Payment Agreement orders – must have signed agreements. Taxes, Shipping, and Fees This Quote is valid for a period of 30 days. We reserve the right to cancel orders arising from pricing changes, availability, or other updates or errors. We specifically disclaim any and all warranties, expressed or implied, including but not limited to any licensed products. We shall not be liable for any loss of profits, business, goodwill, data, interruption of business, nor for incidental or consequential merchantability or fitness of purpose, nor damages related to this agreement 3 Visual Edge IT | 3874 Highland Park | North Canton, OH 44720Quote # 034096 Version 1 182 Main: (866) 863-2266 Email: csanchez@visualedgeit.com Web: www.visualedgeit.com Civic Center Campus Park Wifi Quote Information:Prepared for:Prepared by: Quote #: 034096 City of La Quinta Visual Edge IT Version: 1 Delivery Date: 06/25/2025 Expiration Date: 07/31/2025 78495 Calle Tampico La Quinta, CA 92253 Gilbert Villalpando (760) 777-7000 gvillalpando@laquintaca.gov Chris Sanchez (866) 863-2266 csanchez@visualedgeit.com One Time Payment Summary Description Amount Visual Edge IT Professional Services Total:$9,230.77 All services will be invoiced in the month services begin and will be invoiced until service is terminated. All taxes, shipping, and handling fees on quote are estimated. Billing Invoice will have all actual taxes, shipping and fees. By endorsing, you agree that you have read and accept the Terms and Conditions of the Master Services Agreement v. 2024.01. Visual Edge IT City of La Quinta Signature: Name:Christopher Sanchez Title:Technical Account Manager Date:06/25/2025 Signature: Name:Gilbert Villalpando Date: 4 Visual Edge IT | 3874 Highland Park | North Canton, OH 44720Quote # 034096 Version 1 183 Exhibit B Schedule of Compensation With the exception of compensation for Additional Services, provided for in Section 2.3 of this Agreement, the maximum total compensation to be paid to Contracting Party under this Agreement during the life of the contract is Three Million Four Hundred Thousand Dollars ($3,400,000) (“Contract Sum”). The Contract Sum shall be paid to Contracting Party in installment payments made on a monthly basis and in an amount identified in Contracting Party’s schedule of compensation originally attached for the work tasks performed and properly invoiced by Contracting Party in conformance with Section 2.2 of the Original Agreement. 184 PUBLIC HEARING ITEM NO. 1 City of La Quinta CITY COUNCIL MEETING: July 1, 2025 STAFF REPORT AGENDA TITLE: ADOPT RESOLUTION TO APPROVE SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT NO. 3), CONDITIONAL USE PERMIT 2024-0007 AND SITE DEVELOPMENT PERMIT 2024-0014 FOR AN APPROXIMATE 3,690 SQUARE FOOT DRIVE-THROUGH BUILDING FOR THE HIGHWAY 111 / ADAMS STREET DRIVE- THROUGH PROJECT; CEQA: THIS PROJECT IS EXEMPT FROM ENVIRONMENTAL REVIEW PURSUANT TO SECTION 15332 (CLASS 32) INFILL DEVELOPMENT; PROJECT LOCATION: SOUTHWEST CORNER OF ADAMS STREET AND CORPORATE CENTRE DRIVE RECOMMENDATION Adopt a resolution to approve Specific Plan 2024-0005 (SP 1989-014 Amendment No. 3), Conditional Use Permit 2024-0007 and Site Development Permit 2024-0014 for an approximate 3,690 square foot drive-through building for the Highway 111/Adams Street Drive-through project and find that the project is exempt from environmental review pursuant to Section 15332 (Class 32) Infill Development. EXECUTIVE SUMMARY The One-Eleven La Quinta Center Specific Plan (SP 1989-014) was originally approved in 1990 and has since been amended twice. There are conditions of approval on the Specific Plan (SP) that limit the number of drive-through buildings in the One-Eleven La Quinta Center to five and require each drive-through use to obtain a Conditional Use Permit (CUP). Currently, there are five drive-through buildings located in the Shopping Center. The Applicant, PVG Architects, is proposing to construct a drive-through building on a vacant pad within the Shopping Center (Attachment 1) and requests to amend a condition of approval of SP 1989-014 Amendment No. 2 to allow for six drive- through buildings in the One-Eleven La Quinta Center and a CUP to allow the drive- through use as well as a Site Development Permit (SDP) for the architectural, landscape and site design of the drive-through building (Attachment 2). In order to make a recommendation for approval of the project, the City Council must: 1) Determine that this project is exempt from environmental review pursuant to Section 15332 (Class 32) infill development project for compliance with the requirements of the California Environmental Quality Act (CEQA) in that the proposed project can be characterized as infill development. 185 2) Make findings and apply conditions of approval (COAs) in support of the SP 2024- 0005 (SP 1989-014 Amendment No. 3), CUP 2024-0007, and SDP 2024-0014, and apply COAs in support of the applications (Attachment 3). On June 10, 2025, the Planning Commission (PC) approved PC Resolution 2025- 0006 recommending Council approval of SP 2024-0005 (SP 1989-014 Amendment No. 3), CUP 2024-0007, and SDP 2024-0014 FISCAL IMPACT The proposed project would generate property tax and sales tax in addition to development impact fees. BACKGROUND/ANALYSIS The One-Eleven La Quinta Center Specific Plan was originally approved in 1990 and has been amended twice. Currently, there are conditions of approval on the SP that limit the number of drive-through buildings in the Shopping Center to five and require each drive- through use to obtain CUPs. There are currently five drive-through buildings permitted in the Shopping Center. The Applicant is proposing to construct a sixth drive-through building on a vacant site within the Shopping Center at the southwest corner of Adams Street and Corporate Centre Drive. In order to allow for this, an amendment to SP 1989-014 and a CUP are required. An SDP is required for the architectural, landscape, and site design of the drive-through building. Specific Plan Amendment (SPA) The SPA proposes revising COA No. 71 of SP 1989-014, Amendment No. 2, to increase the number of drive-through buildings allowed from five to six to facilitate the project (Exhibit A to Resolution). There are no other changes to the SP with this amendment. Conditional Use Permit The CUP is required to permit drive-through use in this shopping center per COA No. 71 of SP 1989-014 Amendment No. 1. As part of the CUP, the applicant submitted a Statement of Operations describing the hours of operation and the anticipated number of employees (Attachment 4). Traffic and Drive-through Stacking Analysis A traffic analysis was prepared for the project per the City’s Traffic Impact Analysis Guidelines (Exhibit B to Resolution). To determine the trip generation for the project, the analysis used the trip generation rate for coffee shop drive-through use which has a higher rate than fast-food drive-through use. The analysis determined that the project would not significantly impact Level of Service (LOS) of the Adams Street/Corporate Centre Drive intersection. A drive-through stacking study was prepared that reviewed two other drive-throughs within the shopping center (McDonald’s and Starbucks), their stacking and operations, and compared them to the proposed project to provide recommendations on stacking. The 186 study collected data in ten-minute increments on a typical weekday and a Saturday. The maximum number of queued vehicles observed at both locations was 16. Based on this analysis, the recommendation for vehicle stacking at the proposed project is to accommodate 16 vehicles. If the queue exceeds this number, personnel from the business would be available to direct vehicles to queue in the drive aisle to the south of the drive- through entrance. The City’s traffic engineer reviewed and approved the double drive- through configuration and recommendations in the traffic and stacking study. Site Development Permit (SDP) The drive-through building is proposed to be 3,690 square feet (sf) with an indoor dining area and outdoor dining area of approximately 650 sf. The building reflects a modern design with architectural breaks and varying roof lines on all frontages and a simple color design incorporating grey and white colors with wood grain tile accents and steel wall elements. The building height is 22 feet (ft) with a parapet wall extending 1.5 ft above and incorporates a tower element on the east elevation at 30 ft in height. The building meets the development standards of SP 1989-014 and the Regional Commercial zone. The project plans are included as Attachment 5. The project is required to provide 43 parking spaces per the City’s Municipal Code parking requirements and provides 46 spaces in the existing parking field to the west of the site. Landscaping New landscaping is proposed throughout the site. The assorted species of plants and trees, including Palo Verde and Date Palm trees, assorted agave and lantana plants, and cactus, are consistent with desert landscaping palettes in the City. AGENCY AND PUBLIC REVIEW Planning Commission Review The Planning Commission held a public hearing on the project on June 10, 2025. The Commission discussed several issues, mainly internal circulation and drive-through stacking. After this discussion, the Commission adopted Planning Commission Resolution No. 2025-006 recommending Council approval of the project. Public Agency Review All written comments received are on file and available for review with the Design and Development Department. All applicable comments have been adequately addressed and/or incorporated into the recommended COAs. Public Hearing Notice The public hearing for this project was publicized in The Desert Sun newspaper on June 20, 2025, and distributed to properties within 500 feet of the site, as required by the City’s Municipal Code, Section 9.200.100. At the time of publication, Staff received no written comments. 187 ENVIRONMENTAL REVIEW The La Quinta Design and Development Department has determined that this project is exempt from environmental review pursuant to Section 15332 (Class 32) of the California Environmental Quality Act, Infill Development, since the project consists of an approximate 3,690 sf building and meets the criteria for infill development as it is less than five acres and is located in an urbanized and built-out area. The project site has no value as habitat for endangered, rare, or threatened species. Approval of the project will not result in any significant effects relating to traffic, noise, air quality, or water quality based on the memo attached to the Resolution as Exhibit B. ALTERNATIVES Council may choose to approve the project as presented, add conditions of approval and approve as amended or deny the project. Prepared by: Cheri Flores, Planning Manager Approved by: Danny Castro, Design and Development Director Attachments: 1. Vicinity Map 2. Project Information 3. Findings for Approval 4. Statement of Operations 5. Plan Set 188 RESOLUTION NO. 2025 - XXX A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA QUINTA, CALIFORNIA, TO APPROVE A SPECIFIC PLAN AMENDMENT, CONDITIONAL USE PERMIT AND SITE DEVELOPMENT PERMIT FOR CONSTRUCTION OF AN APPROXIMATE 3,690 SQUARE-FOOT DRIVE-THROUGH BUILDING LOCATED AT THE SOUTHWEST CORNER OF ADAMS STREET AND CORPORATE CENTRE DRIVE WITHIN THE ONE-ELEVEN LA QUINTA SHOPPING CENTER, AND FIND THAT THE PROJECT IS EXEMPT FROM ENVIRONMENTAL REVIEW PURSUANT TO SECTION 15332 INFILL DEVELOPMENT PROJECT CASE NUMBERS: SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT 3) CONDITIONAL USE PERMIT 2024-0007 SITE DEVELOPMENT PERMIT 2024-0014 PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH APPLICANT: PVG ARCHITECTS WHEREAS, the City Council of the City of La Quinta, California, did, on July 1, 2025, hold a duly noticed Public Hearing to consider a request by PVG Architects for approval of a Specific Plan Amendment, a Conditional Use Permit, and a Site Development Permit for the construction of an approximate 3,690 square foot drive- through building on approximately 0.45 acres located at the southwest corner of Adams Street and Corporate Centre Drive within the One-Eleven La Quinta Shopping Center, more particularly described as: APN: 643-080-064 WHEREAS, the Design and Development Department published a public hearing notice in The Desert Sun newspaper on June 20, 2025, as prescribed by the Municipal Code. Public hearing notices were also mailed to all property owners within 500 feet of the site and emailed or mailed to all interested parties who have requested notification relating to the project; and WHEREAS, the Planning Commission of the City of La Quinta, California, did, on June 10, 2025, hold a duly noticed Public Hearing where they considered said request and approved Planning Commission Resolution 2025-0006 recommending the City Council approve the Specific Plan Amendment, Conditional Use Permit, and Site Development Permit; and 189 RESOLUTION NO. 2025-XXX SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT 3) CONDITIONAL USE PERMIT 2024-0007 SITE DEVELOPMENT PERMIT 2024-0014 PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH LOCATION: SOUTHWEST CORNER OF ADAMS STREET AND CORPORATE CENTRE DRIVE ADOPTED: PAGE 2 OF 5 Specific Plan 2024-0005 (SP 1989-014 Amendment No. 3) WHEREAS, at said Public Hearing, upon hearing and considering all testimony and arguments, if any, of all interested persons desiring to be heard, the City Council did make the following mandatory findings pursuant to Section 9.240.010 of the Municipal Code to justify approval of said Specific Plan Amendment [Exhibit A]: 1. The proposed Specific Plan Amendment is consistent with the General Plan land use designation of General Commercial. The City’s General Plan policies relating to the General Commercial designation encourage a full range of commercial uses, including drive-through restaurants, coffee shops, or other drive-through uses. 2. Approval of the Specific Plan Amendment will not create conditions materially detrimental to the public health, safety, and general welfare, as development already occurs within this Specific Plan area, and further development of the area will be consistent with the urbanized nature where the project is located. 3. The proposed Specific Plan Amendment is compatible with zoning on surrounding properties, which allows and contains commercial retail and restaurant development. 4. The proposed Specific Plan Amendment is suitable and appropriate for the subject property, as the site is flat, already developed with parking areas and drive aisles, and commercial development. Conditional Use Permit 2024-0007 WHEREAS, at said Public Hearing, upon hearing and considering all testimony and arguments, if any, of all interested persons desiring to be heard, said City Council did make the following mandatory findings pursuant to Section 9.210.020 of the Municipal Code to justify approval of said Conditional Use Permit: 1. The proposed development is consistent with the General Plan land use designation of General Commercial. The City’s General Plan policies relating to the General Commercial designation encourage a full range of commercial uses, including drive-through restaurants, coffee shops, or other drive-through uses. The proposed project meets the Goals and Policies of the General Plan as follows: -Goals LU-6 and ED-1 as it will contribute to a balanced and varied economic base which provides fiscal stability to the City, and a broad range of goods and services to its residents and the region. 190 RESOLUTION NO. 2025-XXX SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT 3) CONDITIONAL USE PERMIT 2024-0007 SITE DEVELOPMENT PERMIT 2024-0014 PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH LOCATION: SOUTHWEST CORNER OF ADAMS STREET AND CORPORATE CENTRE DRIVE ADOPTED: PAGE 3 OF 5 -The project's conceptual landscape design is consistent with Goal WR-1 and Policy UTL-1.2, as it will result in the efficient use and conservation of the City’s water resources. 2. The proposed development, as conditioned, is consistent with the intent of the Regional Commercial District as well as the development standards of the City’s Zoning Code. The project satisfies the District’s intent to provide for automobile-oriented sales and services for the regionally oriented commercial area along Highway 111. The project is consistent with the non-residential development standards. 3. The La Quinta Design and Development Department has determined that this project is exempt from environmental review pursuant to Section 15332 (Class 32) of the California Environmental Quality Act for Infill Development as the project consists of an approximate 3,690 square foot building and meets the criteria for infill development since it is less than five acres and is located in an urbanized and built-out area. The project site has no value as habitat for endangered, rare, or threatened species. Approval of the project will not result in any significant effects relating to traffic, noise, air quality, or water quality. The site can be adequately served by all required utilities and public services [Exhibit B]. 4. Approval of the application will not create conditions materially detrimental to the public health, safety, and general welfare or injurious to or incompatible with other properties or land uses in the vicinity. The project consists of a local- serving drive-through use. Site Development Permit 2024-0014 WHEREAS, at said Public Hearing, upon hearing and considering all testimony and arguments, if any, of all interested persons desiring to be heard, said City Council did make the following mandatory findings pursuant to Section 9.210.010 of the Municipal Code to justify approval of said Site Development Permit: 1. The proposed development is consistent with the General Plan land use designation of General Commercial. The City’s General Plan policies relating to the General Commercial designation encourage a full range of commercial uses, including drive-through restaurants, coffee shops, or other drive-through uses. The proposed project meets the Goals and Policies of the General Plan as follows: 191 RESOLUTION NO. 2025-XXX SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT 3) CONDITIONAL USE PERMIT 2024-0007 SITE DEVELOPMENT PERMIT 2024-0014 PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH LOCATION: SOUTHWEST CORNER OF ADAMS STREET AND CORPORATE CENTRE DRIVE ADOPTED: PAGE 4 OF 5 -Goals LU-6 and ED-1 as it will contribute to a balanced and varied economic base which provides fiscal stability to the City, and a broad range of goods and services to its residents and the region. -The project's conceptual landscape design is consistent with Goal WR-1 and Policy UTL-1.2, as it will result in the efficient use and conservation of the City’s water resources. 2. The proposed development, as conditioned, is consistent with the development standards of the City’s Zoning Code in terms of site plan and landscaping. The Site Development Permit is compliant with the Zoning Code’s development standards, including standards for setbacks, heights, and parking. 3. The La Quinta Design and Development Department has determined that this project is exempt from environmental review pursuant to Section 15332 (Class 32) of the California Environmental Quality Act for Infill Development as the project consists of an approximate 3,690 square foot building and meets the criteria for infill development since it is less than five acres and is located in an urbanized and built-out area. The project site has no value as habitat for endangered, rare, or threatened species. Approval of the project will not result in any significant effects relating to traffic, noise, air quality, or water quality. The site can be adequately served by all required utilities and public services 4. The architecture and layout of the project are compatible with, and not detrimental to, the existing surrounding commercial land uses and are consistent with the development standards in the Municipal Code. 5. The site design of the project is compatible with the surrounding development and with the quality of design prevalent in the city. The proposed building is compatible with the surrounding development within the shopping center. 6. The proposed project implements the standards for landscaping and aesthetics established in the General Plan and Zoning Code. The landscape palette is consistent with the City’s drought-tolerant landscaping requirements. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of La Quinta, California, as follows: SECTION 1. That the above recitations are true and constitute the Findings of the City Council in this case. 192 RESOLUTION NO. 2025-XXX SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT 3) CONDITIONAL USE PERMIT 2024-0007 SITE DEVELOPMENT PERMIT 2024-0014 PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH LOCATION: SOUTHWEST CORNER OF ADAMS STREET AND CORPORATE CENTRE DRIVE ADOPTED: PAGE 5 OF 5 SECTION 2. That the above project is exempt from environmental review pursuant to Section 15332 (Class 32) Infill Development project for compliance with the requirements of the California Environmental Quality Act (CEQA) in that the proposed project involves construction of an approximate 3,690 square-foot, drive-through building on a lot less than five acres that can be characterized as infill development [Exhibit B]. SECTION 3. That it does hereby approve Specific Plan 2024-0005 (SP 1989-014 Amendment No. 3), Conditional Use Permit 2024-0007, and Site Development Permit 2024-0014 for the reasons set forth in this Resolution and subject to the attached Conditions of Approval [Exhibit C]. PASSED, APPROVED, and ADOPTED at a regular meeting of the City of La Quinta City Council, held on July 1, 2025, by the following vote: AYES: NOES: ABSENT: ABSTAIN: LINDA EVANS, Mayor City of La Quinta, California ATTEST: MONIKA RADEVA, City Clerk City of La Quinta, California APPROVED AS TO FORM: WILLIAM H. IHRKE, City Attorney City of La Quinta, California 193 44530 SAN PABLO AVE SUITE 200 PALM DESERT CA 92260 T • 760 779 5393 F • 760 779 5395 EXHIBIT ARESOLUTION NO. 2025-XXX SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT NO. 3) CONDITIONAL USE PERMIT 2024-0007 SITE DEVELOPMENT PERMIT 2024-0014 PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH LOCATION: SOUTHWEST CORNER OF ADAMS STREET AND CORPORATE CENTRE DRIVE ADOPTED: SPECIFIC PLAN AMENDMENT TO: CC: FROM: DATE: RE: PROJECT: City of La Quinta Prest Vuksic Greenwood Architects December 16, 2024 Specific Plan Amendment 111 La Quinta Drive-Thru Pad Amendment to CC Resolution 1996-053: 71.+ Drive through facilities shall be developed as follows: Not more than five (six) drive through facilities shall be permitted within the++ A. specific plan. B.All drive through facilities shall be screened by a combination of berms, walls and landscaping so that the cars using the drive through facilities will not be visible by pedestrians and cars on the perimeter sidewalk and street in a manner satisfactory to the Community Development Director. C. Conditional Use Permit applications shall be processed for each drive through facility. 194 34200 Bob Hope Drive, Rancho Mirage, CA 92270 | 760.320.9811 | msaconsultinginc.com June 2, 2025 Mr. Brian Tracy Retain Net Lease Properties, Inc. 78206 Varner Road, Suite D 251 Palm Desert, CA 92211 Subject: California Environmental Quality Act (CEQA) Notice of Exemption (NOE) Dear Mr. Tracy: MSA Consulting, Inc. has reviewed the project site, which is an undeveloped, vacant commercial pad. The property is approximately 0.45 acres of land (APNs 643-080-064, -060), located at Corporate Centre Drive and Adams Street in the City of La Quinta. The site is located in an existing and mostly developed shopping center. The project is surrounded by paved streets to the north (Corporate Centre Drive) and east (Adams Street), and paved parking lots to the west and south. Developed commercial businesses are located south (Jiffy Lube), east (various offices and businesses), and approximately 250 feet to the north (Kohls). Similar to surrounding land uses, the property has a General Plan Land Use designation of General Commercial (CG) and is zoned Regional Commercial (CR) district. CR zones are intended to provide a broad range of goods and services serving the entire region. Drive-through restaurants are permitted within CR districts. CEQA provides several categorical exemptions which are applicable to categories of projects and activities that the Lead Agency has determined generally do not pose a risk of significant impacts on the environment. The project proposes a 3,800-square-foot coffee shop with drive-through, and an approximately 600-square-foot outdoor seating area on a previously graded and vacant site within a developed urban area in the City of La Quinta. Site access is proposed at the southwestern corner of the proposed building. The project is exempt under Section 15332 of the State CEQA Guidelines (Class 32 In-fill Development Projects). The project meets the conditions for an infill exemption description as explained below: The project is consistent with the applicable General Plan designation, applicable policies and applicable zoning designation and regulations: The project site is designated as CG by the City’s Land Use map and CR by the City’s Zoning map. The project’s proposed commercial development will be developed in a manner that is consistent with the City’s CR development standards and applicable district standards, as identified in Chapter 9.70, Section 9.70.030 and Chapter 9.90 of the City’s Zoning Code. The City will require design review to ensure the design and quality of the development is consistent with City standards. The proposed development occurs within City limits on a project site of no more than five acres substantially surrounded by urban uses: The proposed project occurs within the City limits of La Quinta on approximately 0.45 acres and is less than the maximum five acres. The site is surrounded by existing commercial uses. 1EXHIBIT1BRESOLUTION NO. 2025-XXX SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT NO. 3) CONDITIONAL USE PERMIT 2024-0007 SITE DEVELOPMENT PERMIT 2024-0014 PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH LOCATION: SOUTHWEST CORNER OF ADAMS STREET AND CORPORATE CENTRE DRIVE ADOPTED: 195 California Environmental Quality Act (CEQA) Notice of Exemption (NOE) 111 & Adams Street – La Quinta, CA Page 2 June 2, 2025 34200 Bob Hope Drive, Rancho Mirage, CA 92270 | 760.320.9811 | msaconsultinginc.com The project site has no habitat for endangered, rare or threatened species: The site has been completely disturbed and cleared of vegetation. The northeast and eastern side of the project includes a paved sidewalk, and utilities (i.e., traffic lights, transmission and distribution combination electrical poles, and utility boxes). The perimeter of the site is delineated by curb and gutter improvements. The project site is located in an area of the City with commercial and business park land uses. Due to the graded and cleared condition of the project site, and the existing surrounding commercial uses, the project property does not provide suitable or sensitive habitat for special status species and has no value for endangered, rare or threatened species due to its disturbed condition and the lack of habitat. Approval of the project would not result in significant effects relating to traffic, noise, air quality, or water quality: The project is proposing a 3,800-square-foot drive- through restaurant and 600-square-foot outdoor area. As discussed previously, the site has been cleared of vegetation and graded and has remained vacant since 2015 (based on historical imagery). The site was previously developed by 2002, however, in 2015, the site was demolished and cleared and has remained undeveloped and vacant since. The project is consistent with the City’s existing CG Land Use designation for the site. The proposed infill project would not result in impacts relating to traffic. A project-specific Traffic Impact Analysis (TIA) was completed by TJW Engineering on January 30, 2025. The TIA concluded that the project would provide adequate access to the site and the project would be responsible for their fair share of improvement costs. See Attachment 1. The proposed project is projected to generate 2,028 daily trips which includes 356 AM peak hour trips and 148 PM peak hour trips. The TIA analyzed the impacts to one study intersection in the vicinity of the project: Adams Street and Corporate Centre Drive intersection. The City of La Quinta mandates that the City strive to maintain the minimum level of service for its intersections at no worse than LOS D in the General Plan. The TIA concluded that the study intersection is projected to operate at an acceptable LOS during the AM and PM peak hours for the Existing, Opening Year (OY), and Opening Year Plus Project (OYP) traffic conditions. Therefore, the project would not result in impacts to traffic. As a land use, coffee shops and drive-through restaurants do not generate excessive noise levels. This, combined with the location of the site in a commercial district surrounded by commercial uses and adjacent to a major roadway (Adams Street immediately east and Highway 111 approximately 500 feet south) presents no evidence that noise impacts would reach substantial levels. The project is located in a developed area of La Quinta. Currently, the areas east, west, and south of the property are fully developed and operational. The vacant project site is surrounded by existing curb and gutter improvements. All projects greater than 5,000 square feet are subject to preparation and implementation of a Local Air Quality Management Plan for the City. This addresses physical improvements and Best Management Practices (BMPs), during construction, that mitigate any offsite release of surface pollutants from the property. This includes regular compliance reporting. The project would comply with CVWD’s storm-water requirements, which would prevent 196 197 April 25, 2025 Prepared by: TJW ENGINEERING, INC. 9841 Irvine Center Drive, Suite 200 Irvine, CA 92618 949.878.3509 | www.tjwengineering.com Adams Street & Corporate Centre Drive Traffic Impact Analysis City of La Quinta, California ATTACHMENT 1 198 April 25, 2025 Mr. Michael J. Shovlin ADAMS ONE ELEVEN LLC 900 Island Drive, Unit 312 Rancho Mirage, CA 92270 Subject: Traffic Impact Analysis – Adams Street & Corporate Centre Drive, City of La Quinta, CA Dear Mr. Shovlin: TJW ENGINEERING, INC. (TJW) is pleased to present to you with this traffic impact analysis for the proposed project located at the southwest corner of Adams Street and Corporate Centre Drive in the City of La Quinta, California. The development is for the construction of a 3,800 square coffee shop with a drive-through window. This traffic study has been prepared to meet the traffic study requirements for the City of La Quinta and assesses the forecast traffic operations associated with the proposed project and its impact on the local street network. This report is being submitted to you for review and forwarding to the City of La Quinta. Please contact us at (949) 878-3509 if you have any questions regarding this analysis. Sincerely, Thomas Wheat, PE, TE David Chew, PTP President Transportation Planner Registered Civil Engineer #69467 Registered Traffic Engineer #2565 199 Adams Street & Corporate Centre Drive Traffic Impact Analysis City of La Quinta, California April 25, 2025 Prepared for: Mr. Michael J. Shovlin ADAMS ONE ELEVEN LLC 900 Island Drive, Unit 312 Rancho Mirage, CA 92270 Prepared by: Thomas Wheat, PE, TE David Chew, PTP TJW ENGINEERING, INC. 9841 Irvine Center Drive, Suite 200 Irvine, CA 92618 949.878.3509 | www.tjwengineering.com 200 MSA-24-001 4 Table of Contents 1.0 EXECUTIVE SUMMARY ................................................................................................................................... 6 1.1 SUMMARY OF LEVEL OF SERVICE ANALYSIS RESULTS ..................................................................... 6 1.2 ON-SITE ROADWAY AND SITE ACCESS IMPROVEMENTS ................................................................. 7 2.0 INTRODUCTION ............................................................................................................................................. 8 2.1 PROJECT DESCRIPTION .................................................................................................................... 8 2.2 STUDY AREA .................................................................................................................................... 8 2.3 INTERSECTION ANALYSIS METHODOLOGY ...................................................................................... 9 2.4 CITY OF LA QUINTA PERFORMANCE CRITERIA .............................................................................. 10 3.0 EXISTING CONDITIONS ................................................................................................................................ 13 3.1 EXISTING CIRCULATION NETWORK/STUDY AREA CONDITIONS .................................................... 13 3.2 EXISTING PUBLIC TRANSIT SERVICES ............................................................................................. 13 3.3 PEDESTRIANS AND BICYCLES ......................................................................................................... 13 3.4 EXISTING TRAFFIC VOLUMES ........................................................................................................ 13 3.5 EXISTING CONDITIONS INTERSECTION LEVEL OF SERVICE ANALYSIS ............................................ 14 4.0 PROPOSED PROJECT .................................................................................................................................... 17 4.1 PROJECT DESCRIPTION .................................................................................................................. 17 4.2 PROJECT TRIP GENERATION .......................................................................................................... 17 4.3 PROJECT TRIP DISTRIBUTION ........................................................................................................ 17 4.4 SIGHT DISTANCE ANALYSIS ........................................................................................................... 18 4.5 ON-SITE CIRCULATION ANALYSIS .................................................................................................. 18 5.0 OPENING YEAR (OY) TRAFFIC CONDITIONS ................................................................................................. 22 5.1 ROADWAY IMPROVEMENTS ......................................................................................................... 22 5.2 CUMULATIVE PROJECTS TRAFFIC .................................................................................................. 22 5.3 OPENING YEAR TRAFFIC VOLUMES ............................................................................................... 23 5.4 OPENING YEAR INTERSECTION LOS ANALYSIS ............................................................................... 24 6.0 OPENING YEAR PLUS PROJECT (OYP) TRAFFIC CONDITIONS ....................................................................... 27 6.1 ROADWAY IMPROVEMENTS ......................................................................................................... 27 6.2 OPENING YEAR PLUS PROJECT TRAFFIC VOLUMES ....................................................................... 27 6.3 OPENING YEAR PLUS PROJECT INTERSECTION LEVEL OF SERVICE ANALYSIS ................................ 27 6.4 ALTERNATIVE SCENARIOS OPENING YEAR PLUS PROJECT INTERSECTION LEVEL OF SERVICE ANALYSIS ................................................................................................................................................... 28 7.0 DRIVE-THROUGH QUEUE ANALYSIS ............................................................................................................ 31 7.1 DRIVE-THROUGH QUEUE ANALYSIS METHODOLOGY ................................................................... 31 7.2 DRIVE-THROUGH QUEUE OBSERVATION RESULTS ........................................................................ 31 201 MSA-24-001 5 List of Tables Table 1: HCM – LOS & Delay Ranges – Signalized Intersections ...................................................................... 9 Table 2: Roadway Characteristics within Study Area ..................................................................................... 13 Table 3: Intersection Analysis – Existing Conditions ...................................................................................... 14 Table 4: Proposed Project Trip Generation ................................................................................................... 17 Table 5: Cumulative Projects List and Trip Generation .................................................................................. 23 Table 6: Intersection Analysis – Opening Year Conditions ............................................................................. 24 Table 7: Intersection Analysis – Opening Year Plus Project Conditions ......................................................... 27 Table 8: Intersection Analysis – Opening Year Plus Project Conditions ......................................................... 28 Table 9: Summary of Drive-Through Queue Observations and Analysis ........................................................ 32 List of Exhibits Exhibit 1: Project Location ............................................................................................................................. 11 Exhibit 2: Proposed Project Site Plan ............................................................................................................. 12 Exhibit 3: Lane Geometry and Intersection Controls ..................................................................................... 15 Exhibit 4: Existing AM and PM Peak Hour Volumes ....................................................................................... 16 Exhibit 5: Proposed Trip Distribution ............................................................................................................. 19 Exhibit 6: Sight Distance Analysis .................................................................................................................. 20 Exhibit 7: On-Site Circulation ......................................................................................................................... 21 Exhibit 8: Cumulative Project Locations ........................................................................................................ 25 Exhibit 9: Opening Year AM and PM Peak Hour Volumes ............................................................................. 26 Exhibit 10: Opening Year Plus Project AM and PM Peak Hour Volumes ........................................................ 29 Exhibit 11: Lane Geometry and Intersection Controls for Alternative OYP Scenarios .................................... 30 Exhibit 12: Proposed Queue .......................................................................................................................... 33 Exhibit 13: Comparable Site Locations .......................................................................................................... 34 Appendices Appendix A: Glossary of Terminology Appendix B: Scoping Agreement Appendix C: Existing Traffic Counts Appendix D: HCM Analysis Sheets 202 MSA-24-001 6 1.0 EXECUTIVE SUMMARY This traffic impact analysis (TIA) analyzes the projected traffic operations associated with the proposed land use project located at the southwest corner of Adams Street and Corporate Centre Drive in the City of La Quinta, California. The purpose of this TIA is to evaluate potential circulation system deficiencies that may result from the development of the proposed project, and to recommend improvements to achieve acceptable operations, if applicable. This analysis has been prepared in coordination with the City of La Quinta via a scoping agreement (See Appendix B) and follows the City of La Quinta 2035 General Plan (City General Plan) (November 2013) and the City of La Quinta Traffic Impact Study Guidelines (City Guidelines) (June 2012). The proposed project is for the construction of a 3,800 square coffee shop with a drive-through window. The proposed project will be accessible via the existing driveway west of the intersection of Adams Street and Corporate Centre Drive. The project site is currently designated for General Commercial (CG) land use. The site is zoned as Regional Commercial (CR). The project site is currently vacant. The proposed project is anticipated to be built and generating trips in 2025. The proposed project is projected to generate 2,028 new daily trips including 326 AM peak hour trips and 148 PM peak hour trips. One (1) intersection in the vicinity of the project site have been included in the intersection level of service (LOS) analysis: 1.Adams Street/Corporate Centre Drive The study intersection is analyzed for the following study scenarios: •Existing Traffic Conditions; •Opening Year (OY) Traffic Conditions; •Opening Year Plus Project (OYP) Traffic Conditions. 1.1 SUMMARY OF LEVEL OF SERVICE ANALYSIS RESULTS Table ES-1 summarizes the results of the intersection level of service analysis based on the City of La Quinta thresholds of significance for analyzing transportation deficiencies. 203 MSA-24-001 7 Table ES-1 Summary of Transportation Deficiencies at the Study Intersection Intersection Existing Opening Year Opening Year +Project 1 Adams Street Corporate Centre Drive - - - Existing Traffic Conditions The study intersection is projected to operate at an acceptable LOS during the AM and PM peak hours for Existing traffic conditions. Opening Year (OY) Traffic Conditions The study intersection is projected to operate at an acceptable LOS during the AM and PM peak hours for Opening Year traffic conditions. Opening Year Plus Project (OYP) Traffic Conditions The study intersection is projected to operate at an acceptable LOS during the AM and PM peak hours for Background traffic conditions. 1.2 ON-SITE ROADWAY AND SITE ACCESS IMPROVEMENTS Wherever necessary, roadways adjacent to the proposed project site and site access points will be constructed in compliance with recommended roadway classifications and respective cross-sections in the City General Plan or as directed by the City Engineer. Sight distance at each project access point should be reviewed with respect to standard Caltrans and City sight distance standards at the time of final grading, landscaping and street improvement plans. Signing and stripping shall be implemented in conjunction with detailed construction plans for the project site. 204 MSA-24-001 8 2.0 INTRODUCTION This traffic impact analysis (TIA) analyzes the projected traffic operations associated with the proposed land use project located at the southwest corner of Adams Street and Corporate Centre Drive in the City of La Quinta, California. The purpose of this TIA is to evaluate potential circulation system deficiencies that may result from the development of the proposed project, and to recommend improvements to achieve acceptable operations, if applicable. This analysis has been prepared in coordination with the City of La Quinta via a scoping agreement (See Appendix B) and follows the City of La Quinta 2035 General Plan (City General Plan) (November 2013) and the City of La Quinta Traffic Impact Study Guidelines (City Guidelines) (June 2012). 2.1 PROJECT DESCRIPTION The proposed project is for the construction of a 3,800 square coffee shop with a drive-through window. The proposed project will be accessible via the existing driveway west of the intersection of Adams Street and Corporate Centre Drive. The project site is currently designated for General Commercial (CG) land use. The site is zoned as Regional Commercial (CR). The project site is currently vacant. Exhibit 1 displays a map with the proposed project location. Exhibit 2 shows the project site plan. 2.2 STUDY AREA One (1) intersection in the vicinity of the project site has been included in the intersection level of service (LOS) analysis: 1.Adams Street/Corporate Centre Drive The intersection is located within the City of La Quinta. The study intersection is analyzed for the following study scenarios: •Existing Traffic Conditions; •Opening Year (OY) Traffic Conditions; •Opening Year Plus Project (OYP) Traffic Conditions. Traffic operations are evaluated for the following time periods: •Weekday AM Peak Hour occurring between 7:00 AM to 9:00 AM; •Weekday PM Peak Hour occurring between 4:00 PM to 6:00 PM. 205 MSA-24-001 9 2.3 INTERSECTION ANALYSIS METHODOLOGY Level of Service (LOS) is commonly used to describe the quality of flow on roadways and at intersections using a range of LOS from LOS A (free flow with little congestion) to LOS F (severely congested conditions). The definitions for LOS for interruption of traffic flow differ depending on the type of traffic control (traffic signal, unsignalized intersection with side street stops, unsignalized intersection with all-way stops). The Highway Capacity Manual 7th Edition (HCM) (Transportation Research Board, 2022) methodology expresses the LOS of an intersection in terms of delay time for the intersection approaches. The HCM methodology utilizes different procedures for different types of intersection controls. City Guidelines allow signalized intersection operations to be analyzed utilizing the HCM methodology. Intersection LOS for signalized intersections is based on the intersection’s average control delay for all movements at the intersection during the peak hour. Control delay includes initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay. The procedure for stop-control analysis determines the average total delay, expressed in seconds of delay per vehicle, for left turns from the major street and from the stop-controlled minor street traffic stream. Delay values are calculated based on the relationship between traffic on the major street and the availability of acceptable “gaps” in this stream through which conflicting traffic movements can be made. Intersection operation for unsignalized intersections is based on the weighted average control delay expressed in seconds per vehicle. At a two-way or side-street stop-controlled intersection, LOS is calculated for each stop-controlled minor street movement, for the left-turn movement(s) from the major street, and for the intersection as a whole. For approaches consisting of a single lane, the delay is calculated as the average of all movements in that lane. For all-way stop-controlled intersection, LOS is computed for the intersection as a whole. Table 1 describes the general characteristics of traffic flow and accompanying delay ranges at signalized intersections. Table 1: HCM – LOS & Delay Ranges – Signalized Intersections Level of Service Average Control Delay (Seconds/Vehicle) Signalized Intersections Unsignalized Intersections A 0 – 10.00 0 – 10.00 B 10.01 – 20.00 10.01 – 15.00 C 20.01 – 35.00 15.01 – 25.00 D 35.01 – 55.00 25.01 – 35.00 E 55.01 – 80.00 35.01 – 50.00 F > 80.01 > 50.01 Source: Highway Capacity Manual, 7th Edition (Transportation Research Board, 2022). 206 MSA-24-001 10 Collected peak hour traffic volumes have been adjusted using a peak hour factor (PHF) to reflect peak 15- minute volumes. It is a common practice in LOS analysis to conservatively use a peak 15-minute flow rate applied to the entire hour to derive flow rates in vehicles per hour that are used in the LOS analysis. The PHF is the relationship between the peak 15-minute flow rate and the full hourly volume. PHF = [Hourly Volume]/ [4 * Peak 15-Minute Volume]. The use of a 15-minute PHF produces a more detailed and conservative analysis compared to analyzing vehicles per hour. Existing PHFs, obtained from the existing traffic counts have been used for all analysis scenarios in this study. This analysis utilizes PTV Vistro, Version 2025 analysis software for all signalized intersections. Vistro is a macroscopic traffic software program that is based on the signalized intersection capacity analysis specified in Chapter 16 of the HCM. The level of service and capacity analysis performed within Vistro takes the optimization and coordination of signalized intersections within a network into consideration. 2.4 CITY OF LA QUINTA PERFORMANCE CRITERIA The City General Plan has established City of La Quinta mandates that the City strive to maintain the minimum level of service for its intersections at no worse than LOS D. 207 Not to Scale Exhibit ϭ: Wroũect >ocation Adams Street and Corporate Centre Drive Traffic Impact Analysis MSA-24-001 Legend: Project Site Highwa y 1 1 1 Corporate Centre Drive Ad a m S t r e e t Study Intersection Location# 1 208 Not to Scale Exhibit Ϯ: WroƉoseĚ Site Wlan Adams Street and Corporate Centre Drive Traffic Impact Analysis MSA-24-001209 MSA-24-001 13 3.0 EXISTING CONDITIONS 3.1 EXISTING CIRCULATION NETWORK/STUDY AREA CONDITIONS The characteristics of the roadways in the study intersection are described in Table 2. Table 2: Roadway Characteristics within Study Area Roadway Classification1 Jurisdiction Direction Existing Travel Lanes Median Type2 Speed Limit (mph) On-Street Parking Adams Street Secondary Arterial 4UD La Quinta North-South 4 RM 45 No Corporate Centre Drive Collector La Quinta East-West 2 NM 25 No 1: Source: City of La Quinta 2035 General Plan (November 2013). 2: RM= Raised Median, NM = No Median. Exhibit 3 shows the Existing study area lane geometry and intersection controls. 3.2 EXISTING PUBLIC TRANSIT SERVICES The City of La Quinta is served by the SunLine Transit Agency which provides bus service throughout the Coachella Valley region. SunLine Route 7 travels between census-designated Bermuda Dunes and the City of La Quinta and travels past the proposed project along Adams Street. It includes two (2) stops less than one- third (1/3) of a mile from the site. Appendix B contains a map and schedule of SunLine Route 7. 3.3 PEDESTRIANS AND BICYCLES The City General Plan indicates a Class III bicycle path is planned for Adams Street along the proposed project frontage. There are pedestrian crosswalks at all four approaches of the study intersection. Sidewalks exist on Adams Street and the westbound leg of Corporate Centre Drive. The proposed project includes the construction of a sidewalk on the eastbound leg of Corporate Centre Drive along the project frontage. 3.4 EXISTING TRAFFIC VOLUMES To determine the existing operation of the study intersection, AM and PM peak period traffic volumes were collected on Tuesday, December 17, 2024. Detailed traffic count data is provided in Appendix C. The existing AM and PM peak hour volumes at the study intersection is shown in Exhibit 4. 210 MSA-24-001 14 3.5 EXISTING CONDITIONS INTERSECTION LEVEL OF SERVICE ANALYSIS The intersection analysis of the AM and PM peak hours for Existing traffic conditions is shown in Table 3. Calculations are based on the Existing geometrics at the study area intersection as shown previously in Exhibit 3. HCM analysis sheets are provided in Appendix D. Table 3: Intersection Analysis – Existing Conditions Intersection Control Type Peak Hour Existing Conditions Delay1 LOS 1 Adams Street Corporate Centre Drive Signal AM 18.2 B PM 18.8 B 1: Delay shown in seconds per vehicle. Per the Highway Capacity Manual 7th Edition, overall average delay and LOS are shown for signalized and all-way stop- controlled intersections. As shown in Table 3, the study intersection is currently operating at an acceptable LOS during the AM and PM peak hours for Existing traffic conditions. 211 Not to Scale Exhibit ϯ: >ane 'eoŵetry anĚ /ntersection Controls Adams Street and Corporate Centre Drive Traffic Impact Analysis MSA-24-001 Legend: Project Site Highway 1 1 1 Study Intersection Location# 1 Corporate Centre Drive Ad a m S t r e e t Adam Street/ Corporate Centre Drive-Driveway 212 Not to Scale Exhibit ϰ: Existing AD anĚ WD WeaŬ ,our soluŵes Adams Street and Corporate Centre Drive Traffic Impact Analysis MSA-24-001 Legend: Project Site Highway 1 1 1 Study Intersection Location# 1 Corporate Centre Drive Ad a m S t r e e t Adam Street/ Corporate Centre Drive-Driveway AM Peak Hour Volumes PM Peak Hour Volumes Adam Street/ Corporate Centre Drive-Driveway 213 MSA-24-001 17 4.0 PROPOSED PROJECT 4.1 PROJECT DESCRIPTION The proposed project is for the construction of a 3,800 square foot coffee shop with a drive-through window. The proposed project will be accessible via the existing driveway west of the intersection of Adams Street and Corporate Centre Drive. The project site is currently designated for General Commercial (CG) land use. The site is zoned as Regional Commercial (CR). The project site is currently vacant. Exhibit 2 previously showed the proposed project site plan. 4.2 PROJECT TRIP GENERATION Trip generation represents the amount of traffic, both inbound and outbound, produced by a development. Determining trip generation for a proposed project is based on projecting the amount of traffic that the specific land uses being proposed will produce. Industry standard Institute of Transportation Engineers (ITE) Trip Generation Manual (11th Edition, 2021) trip generation rates were used to determine trip generation of for the proposed project land uses. Table 4 summarizes the projected AM peak hour, PM peak hour and daily trip generation of the proposed project. The proposed project is projected to generate 2,028 new daily trips including 326 AM peak hour trips and 148 PM peak hour trips. Table 4: Proposed Project Trip Generation 1: Trip generation and pass-by rates from ITE Trip Generation Manual (11th Edition, 2021). 2: TSF = Thousand Square Feet. 4.3 PROJECT TRIP DISTRIBUTION Projecting trip distribution involves the process of identifying probable destinations and traffic routes that will be utilized by the proposed project’s traffic. The potential interaction between the proposed land use and surrounding regional access routes are considered to identify the probable routes onto which project traffic would distribute. The projected trip distribution for the proposed project is based on anticipated travel patterns to and from the project site. Exhibit 5 shows the project proposed trip distribution. Proposed Land Use1 ITE Code Qty Unit2 Daily AM Peak Hour PM Peak Hour Rate Volume Rate In:Out Split Volume Rate In:Out Split Volume In Out Total In Out Total Coffee/Donut shop with Drive-Through Window 937 3.80 TSF 533.57 2,028 85.88 51:49 166 160 326 38.99 50:50 74 74 148 214 MSA-24-001 18 4.4 SIGHT DISTANCE ANALYSIS Corner sight distance was reviewed at the proposed exiting drive-through. The parking lot of the shopping center was assumed to be 15 miles per hour. As such, the recommended minimum stopping sight distance would be 100 feet, the corner sight distance to the right 145 feet, and the corner sight distance to the left 165 feet. Currently there is more sight distance available than these minimum recommended values at the proposed parking lot connection so long as the drive-through is designed with the appropriate sight lines. Exhibit 6 displays the sight distance analysis template. 4.5 ON-SITE CIRCULATION ANALYSIS A template displaying navigation of a passenger vehicle circulating in and out of the drive-through of the proposed project was generated to demonstrate the sufficiency of space to maneuver through the project. A standard passenger vehicle of 20-feet in length was used for the template. The template is provided in Exhibit 7. 215 Not to Scale Exhibit ϱ: WroƉoseĚ driƉ Distribution Adams Street and Corporate Centre Drive Traffic Impact Analysis MSA-24-001 Legend: Project Site Highwa y 1 1 1 Study Intersection Location# 1 Corporate Centre Drive Ad a m S t r e e t (XX%) Percent Trip Distribution 45% 55% 216 2 0 ' - 0 " B U I L D I N G DN PR O P E R T Y L I N E PROP E R T Y L I N E PROPERTY LINE 26 ' - 0 " 6' - 0 " 15 ' - 0 " 4 ' - 0 " 1 8 ' - 0 " PR O P E R T Y L I N E OU T D O O R S E A T I N G AP P R O X . 6 5 0 S F OR D E R DIR E C T I O N A L SI G N ADAM S S T R E E T DN DN DN 4'-0"13'-0" 10 ' - 0 " 10 4 11 2 11 4 10 3 TY P . 10 5 TY P . 10 3 10 6 TY P . 11 6 10 0 10 2 TY P . 11 8 11 9 10 2 TY P . 11 5 10 8 11 0 10 9 4'-0"3'-6" 5'-0"2'-0" TY P . 10 3 10 3 11 9 DN TY P . 11 1 TY P . 10 5 RIGHT TURN ONLY 1'-0"24'-6"1'-6" R 11 ' - 0 " R 2 5 ' - 0 " R 2 5 ' - 0 " DN PI C K UP Exhibit 6: Sight Distance Analysis Adam St and Corporate Centre Dr Queue Study MSA-24-001 Project Site Adams S t r e e t 217 MH LAND S C A P E S B 10'-0"SETBA C K20'-0" B U I L D I N G DN C O M P A C T PROPERTY LINE P R O P E R T Y L I N E P R O P E R T Y L I N E PR O P E R T Y L I N E 26'-0"6'-0"15'-0"4'-0" 18'-0 " PROPERTY LIN E OUTDOOR SEATING APPROX. 650 SF ORDER DIRECTIONAL SIGN A D A M S S T R E E T DN DN DN 4'- 0 " 13 ' - 0 " 10'-0" 104 112 114 113 103 TYP. 105 TYP. 103 106 TYP. 116 100 102 TYP. 117 118 119 102 TYP. 115 108 110 109 4'- 0 " 3'- 6 " 5'- 0 " 2 ' - 0 " TYP. 103 103 102 119 DN TYP. 111 TYP. 105 RI G H T T U R N ON L Y 1'- 0 " 24 ' - 6 " 1'- 6 " R 1 1 ' - 0 " R 2 5 ' - 0 " R 25' - 0 " DN PICK UP Passenger Car - P Passenger Car - P MH LAND S C A P E S B 10'-0"SETBA C K20'-0" B U I L D I N G DN C O M P A C T PROPERTY LINE P R O P E R T Y L I N E P R O P E R T Y L I N E PR O P E R T Y L I N E 26'-0"6'-0"15'-0"4'-0" 18'-0" PROPERTY LINE OUTDOOR SEATING APPROX. 650 SF ORDER DIRECTIONAL SIGN A D A M S S T R E E T DN DN DN 4'- 0 " 13 ' - 0 " 10'-0" 104 112 114 113 103 TYP. 105 TYP. 103 106 TYP. 116 100 102 TYP. 117 118 119 102 TYP. 115 108 110 109 4' - 0 " 3'- 6 " 5'- 0 " 2 ' - 0 " TYP. 103 103 102 119 DN TYP. 111 TYP. 105 RIG H T T U R N ON L Y 1'- 0 " 24 ' - 6 " 1'- 6 " R 1 1 ' - 0 " R 2 5 ' - 0 " R 25 ' - 0 " DN PICK UP Passenger Car - P Pa s s e n g e r C a r - P Exhibit 7: On-Site Circulation Adam St and Corporate Centre Dr Queue Study MSA-24-001 Legend: 19 3 11 P - Passenger Car Overall Length 19.000ft Overall Width 7.000ft Overall Body Height 5.101ft Min Body Ground Clearance 1.116ft Track Width 6.000ft Lock-to-lock time 4.00s Curb to Curb Turning Radius 24.000ft CIRCULATION EXHIBIT 1 CIRCULATION EXHIBIT 2 218 MSA-24-001 22 5.0 OPENING YEAR (OY) TRAFFIC CONDITIONS The Opening Year (OY) traffic conditions analysis is intended to analyze the traffic conditions projected for the proposed project opening year. This study scenario includes analysis of traffic generated by nearby cumulative projects. It does not include traffic generated by the proposed project. 5.1 ROADWAY IMPROVEMENTS The lane configurations and traffic controls assumed to be in place for the OY traffic conditions scenario are consistent with those previously shown in Exhibit 3. 5.2 CUMULATIVE PROJECTS TRAFFIC City Guidelines require that other reasonably foreseeable development projects which are either approved or are currently being processed in the study area also be included as part of a cumulative analysis scenario. A list of cumulative projects was developed for this analysis through consultation with City of La Quinta staff, and obtainment of current development status reports. A summary of the cumulative projects including their land uses and trip generation are shown in Table 5. The cumulative project locations are shown on the map in Exhibit 8. 219 MSA-24-001 23 Table 5: Cumulative Projects List and Trip Generation Project Land Use1 ITE Code Qty Unit3 Daily AM Peak Hour PM Peak Hour Rate Volume Rate In:Out Split Volume Rate In:Out Split Volume In Out Total In Out Total 1 Flora at Jefferson Square Multifamily Housing (Low-Rise) 220 88 DU 6.74 593 0.4 24:76 8 27 35 0.51 63:37 28 17 45 2 Jefferson Street Apartments Multifamily Housing (Low-Rise) 220 42 DU 6.74 283 0.4 24:76 4 13 17 0.51 63:37 13 8 21 3 Dune Palm Mixed Use Coffee shop w/ Drive Through Window 934 4.76 TSF 467.48 2,226 44.61 51:49 108 104 212 33.0 3 52:48 82 75 157 Pass By-Trips (0.5 Daily, 0.5 AM, 0.55 -1,113 -54 -52 -106 -45 -41 -86 Single-Tunnel Automated Car Wash2 1.0 Tunnel 1858 1,858 124 50:50 62 62 124 190 50:50 95 95 190 Pass By-Trips (0.2 Daily, 0.2 AM, 0.2 PM) -372 -12 -12 -25 -19 -19 -38 -372 Multifamily Housing (Low-Rise) 210 180 DU 6.74 1,213 0.4 24:76 17 55 72 0.51 63:37 58 34 92 4 Hampton Inn Hotel 310 125 RM 7.99 999 0.46 56:44 32 26 58 0.59 51:49 38 36 74 5 St. Francis Expansion Church 560 22.50 TSF 7.6 171 0.32 62:38 4 3 7 0.49 44:56 5 6 11 6 La Quinta Village Apartments Multifamily Housing (Low-Rise) 220 178 DU 6.74 1,200 0.4 24:76 17 54 71 0.51 63:37 57 34 91 Affordable Housing 223 74 DU 4.81 356 0.36 29:71 8 19 27 0.46 59:41 20 14 34 7 Rancho La Quinta Club Expansion General Office Building 710 2.92 TSF 10.84 32 1.52 88:12 4 0 4 1.44 17:83 1 3 4 8 Rancho La Quinta Fitness Health/Fitness Club 492 11.54 TSF 0 0 1.31 51:49 8 7 15 3.45 57:43 23 17 40 Results Daily Volume AM Peak Hour In Out Total PM Peak Hour In Out Total Subtotal 8,93 272 370 642 420 339 759 Pass-By Trips -1,485 -66 -64 -131 -64 -60 -124 Net Total 7,44 206 306 511 356 279 635 1: Trip generation and pass-by rates are from the ITE Trip Generation Manual (11th Edition, 2021) except where noted. 2: Trip generation and pass-by rates are derived from Fast5Xpress Glendora Traffic Impact Analysis FCW21002 (March 2022) prepared by TJW Engineering, Inc. 3: DU = Dwelling Units; TSF = Thousand Square Feet; RM = Room. 5.3 OPENING YEAR TRAFFIC VOLUMES OY traffic volumes are volumes projected for the proposed project opening year, 2025, including volumes from nearby cumulative projects. To project traffic volumes for 2025, an annual growth rate of 2% for one year was applied to the Existing traffic volumes. The projected volumes are then added to the cumulative project volumes. Exhibit 9 shows OY AM and PM peak hour volumes at the study intersection. OY Volumes = (Existing (2024) Counts * 1.02) + Cumulative Projects 220 MSA-24-001 24 5.4 OPENING YEAR INTERSECTION LOS ANALYSIS The intersection analysis for AM and PM peak hours under OY traffic conditions is shown in Table 6. HCM worksheets are shown in Appendix D. Table 6: Intersection Analysis – Opening Year Conditions Intersection Control Type Peak Hour OY Conditions Delay1 LOS 1 Adams Street Corporate Centre Drive Signal AM 17.7 B PM 18.3 B 1: Delay is shown in seconds per vehicle. Per the Highway Capacity Manual 7th Edition, overall average delay and LOS are shown for signalized and all-way stop-controlled intersections. As shown in Table 6, the study intersection is projected to operate at an acceptable LOS during the AM and PM peak hours for OY traffic conditions. 221 Exhibit ϴ: Cuŵulatiǀe Wroũect >ocations Adams Street and Corporate Centre Drive Traffic Impact Analysis MSA-24-001 Legend: Project Site Approximate Cumulative Project LocationsX 45 3 8 7 6 2 1 PROJECT SITE 222 Not to Scale Exhibit ϵ: OƉening zear AD anĚ WD WeaŬ ,our soluŵes Adams Street and Corporate Centre Drive Traffic Impact Analysis MSA-24-001 Legend: Project Site Highway 1 1 1 Corporate Centre Drive Ad a m S t r e e t Study Intersection Location# 1 Adam Street/ Corporate Centre Drive-Driveway AM Peak Hour Volumes PM Peak Hour Volumes Adam Street/ Corporate Centre Drive-Driveway 223 MSA-24-001 27 6.0 OPENING YEAR PLUS PROJECT (OYP) TRAFFIC CONDITIONS The Opening Year Plus Project (OYP) traffic conditions analysis is intended to analyze impact the proposed project has on the traffic conditions projected for the proposed project opening year. This study scenario includes analysis of traffic generated by nearby cumulative projects. 6.1 ROADWAY IMPROVEMENTS The lane configurations and traffic controls assumed to be in place for the OYP traffic conditions scenario are consistent with those previously shown in Exhibit 3. 6.2 OPENING YEAR PLUS PROJECT TRAFFIC VOLUMES OYP traffic volumes are volumes projected for the proposed project opening year, 2025, including volumes generated by the proposed project and nearby cumulative projects. To project traffic volumes for 2025, an annual growth rate of 2% for one year was applied to the Existing traffic volumes. The projected volumes are then added to the volumes of both the proposed project and cumulative projects. Exhibit 10 shows OYP AM and PM peak hour volumes at the study intersection. OYP Volumes = (Existing (2024) Counts * 1.02) + Proposed Project + Cumulative Projects 6.3 OPENING YEAR PLUS PROJECT INTERSECTION LEVEL OF SERVICE ANALYSIS The OYP traffic conditions AM and PM peak hour intersection analysis is shown in Table 7. HCM analysis sheets are provided in Appendix D. Table 7: Intersection Analysis – Opening Year Plus Project Conditions Intersection Control Type Peak Hour E Conditions OYP Conditions Delay1 LOS Delay1 LOS 1 Adams Street Corporate Centre Drive Signal AM 18.2 B 25.2 B PM 18.8 B 22.2 C 1: Delay is shown in seconds per vehicle. Per the Highway Capacity Manual 7th Edition, overall average delay and LOS are shown for signalized and all-way stop-controlled intersections. As shown in Table 7, the study intersection is projected to operate at an acceptable LOS during the AM and PM peak hours for OYP traffic conditions. 224 MSA-24-001 28 6.4 ALTERNATIVE SCENARIOS OPENING YEAR PLUS PROJECT INTERSECTION LEVEL OF SERVICE ANALYSIS The City of La Quinta requested 3 different alternative scenarios to be analyzed at the study intersection of Adams Street and Corporate Centre Drive. • Alternative 1 – Four (4) lane configuration at Corporate Centre Drive • Alternative 2 – One (1) lane configuration along Adams Street (road diet) • Alternative 3 – Roundabout Exhibit 11 shows Alternative OYP lane geometry and intersection controls. The Alternative OYP traffic conditions AM and PM peak hour intersection analysis is shown in Table 8. HCM analysis sheets are provided in Appendix D. Table 8: Intersection Analysis – Opening Year Plus Project Conditions Intersection Peak Hour OYP Conditions Alternative #1 Alternative #2 Alternative #3 Delay1 LOS Delay1 LOS Delay1 LOS Delay1 LOS 1 Adams Street Corporate Centre Drive AM 25.2 B 24.4 C 22.3 C 14.6 B PM 22.2 C 22.0 C 18.7 B 14.0 B 1: Delay is shown in seconds per vehicle. Per the Highway Capacity Manual 7th Edition, overall average delay and LOS are shown for signalized and all-way stop-controlled intersections. As shown in Table 8, the study intersection is projected to operate at an acceptable LOS during the AM and PM peak hours for Alternative OYP traffic conditions. Of note, for all three alternative scenarios, each individual movement of all four legs of the intersection were projected to operate at acceptable LOS during both AM and PM peak hours. The HCM analysis sheets of Appendix D show the delays and corresponding LOS for each individual movement of each leg for all three scenarios. 225 Not to Scale Exhibit ϭϬ: OƉening zear Wlus Wroũect AD anĚ WD WeaŬ ,our soluŵes Adams Street and Corporate Centre Drive Traffic Impact Analysis MSA-24-001 Legend: Project Site Highway 1 1 1 Study Intersection Location# 1 Corporate Centre Drive Ad a m S t r e e t Adam Street/ Corporate Centre Drive-Driveway AM Peak Hour Volumes PM Peak Hour Volumes Adam Street/ Corporate Centre Drive-Driveway 226 Not to Scale Exhibit ϭϭ: >ane 'eoŵetry anĚ /ntersection Controls Ĩor Alternatiǀe OzW Scenarios Adams Street and Corporate Centre Drive Traffic Impact Analysis MSA-24-001 Legend: Project Site Highway 1 1 1 Study Intersection Location# 1 Corporate Centre Drive Ad a m S t r e e t Adam Street/ Corporate Centre Drive-Driveway Alternative #1 Adam Street/ Corporate Centre Drive-Driveway Adam Street/ Corporate Centre Drive-Driveway Alternative #2 Alternative #3 227 MSA-24-001 31 7.0 DRIVE-THROUGH QUEUE ANALYSIS The project proposes a coffee shop drive-through window which would have a capacity of approximately 17 vehicles before a queue begins to form outside of the drive-through lane. Comparable sites for the drive- through queue analysis were determined based on discussions with the project applicant and City staff. The two locations have similar adjacent major roadways. The drive-through queue data was collected at the following two existing comparable locations: 1) McDonald’s: 78-962 CA-111, La Quinta, CA 92253; 2) Starbucks: 78-752 CA-111, La Quinta, CA 92253. Exhibit 12 demonstrates the proposed queue using a standard passenger vehicle and Exhibit 13 shows the proposed comparable site locations. 7.1 DRIVE-THROUGH QUEUE ANALYSIS METHODOLOGY Peak periods for coffee shops are typically weekdays in the morning, lunchtime, and in the evening. Therefore, site queue observations were conducted on a typical weekday and Saturday from 7:00-9:00 AM, 11:00 AM-2:00 PM, and 4:00-7:00 PM. Data was collected in 10-minute increments on Saturday, December 14, 2025 and Tuesday, December 17, 2025. The data collection resulted in a sample size of 102 data points on each day for a total of 208 data points. The data collected can be used to determine the 85th percentile queue length, which is typically used to determine the appropriate vehicle stacking needed for drive-through restaurants. 7.2 DRIVE-THROUGH QUEUE OBSERVATION RESULTS Based on the collected data, Table 9 shows the number of times a certain queue length occurred and the probability of that queue length not being exceeded. Complete observation data is provided in Appendix A. 228 MSA-24-001 32 Table 9: Summary of Drive-Through Queue Observations and Analysis Drive-Through Queue Analysis Queue Length (Vehicles) Number of Occurrences Total Number of Data Points Probability of Exceeding Queue Length 0 6 6 2.94% 1 19 25 12.25% 2 21 46 22.55% 3 24 70 34.31% 4 22 92 45.10% 5 13 105 51.47% 6 19 124 60.78% 7 17 141 69.12% 8 13 154 75.49% 9 16 170 83.33% 10 10 180 88.24% 11 5 185 90.69% 12 7 192 94.12% 13 3 195 95.59% 14 6 201 98.53% 15 2 203 99.51% 16 1 204 100.00% 85th Percentile Info Queue Length: 10 Vehicles Data Point: 174th When determining the appropriate queue storage, a drive-through should typically be designed to accommodate the 85th percentile queue length. Based on the data collected at the existing locations, the 85th percentile queue length is 10 vehicles which occurred at the 88th data point. The maximum observed queue was 16 vehicles occurring one time. In the event that the queue extends beyond 17 vehicles, coffee shop associates can direct traffic through the drive aisles in the parking lot to stack south of the drive-through lane entrance. This will leave the coffee shop drive-through entrance accessible and will only block off parking spaces near the coffee shop itself. 229 SETB A C K20'-0" B U I L D I N G DN PROPERTY LINEPR O P E R T Y L I N E 26'-0"6'-0"15'-0" 4'-0" OUTDOOR SEATING APPROX. 650 SF ORDER DIRECTIONAL SIGN DN DN DN 4' - 0 " 1 3 ' - 0 " 10'-0" TYP. 105 TYP. 103 106 TYP. 116 100 102 119 TYP. 115 108 4' - 0 " 3' - 6 " 5 ' - 0 " 2 ' - 0 " 103 119 DN TYP. 111 105 RI G H T T U R N ON L Y 1' - 0 " 24 ' - 6 " 1' - 6 " R 1 1 ' - 0 " R 2 5 ' - 0 " R 25 ' - 0 " DN PICK UP Not to Scale Exhibit ϭϮ: WroƉoseĚ Yueue Adam St and Corporate Centre Dr Queue Study MSA-24-001 Project Site Legend: 19 3 11 P - Passenger Car Overall Length 19.000ft Overall Width 7.000ft Overall Body Height 5.101ft Min Body Ground Clearance 1.116ft Track Width 6.000ft Lock-to-lock time 4.00s Curb to Curb Turning Radius 24.000ft 1 2 3 4 5 6 7 8 9 10 11 12 13 14 151617 230 Not to Scale Exhibit ϭϯ: CoŵƉarable Site >ocations Adams Street and Corporate Centre Drive Traffic Impact Analysis MSA-24-001 Starbucks McDonald's Project Site Highway 111 A d a m S t r e e t Simon Drive La Quinta Center Drive 231 MSA-24-001 APPENDIX Appendix A: Glossary of Terminology Appendix B: Scoping Agreement Appendix C: Existing Traffic Counts Appendix D: HCM Analysis Sheets 232 APPENDIX A GLOSSARY OF TERMINOLOGY 233 Glossary of Terminology ACRONYMS: AC Acres ADT Average Daily Traffic Caltrans California Department of Transportation DU Dwelling Unit ICU Intersection Capacity Utilization LOS Level of Service TSF Thousand Square Feet V/C Volume/Capacity VMT Vehicle Miles Traveled TERMS AVERAGE DAILY TRAFFIC – The average 24-hour volume for a stated period divided by the number of days in that period. For example, Annual Average Daily Traffic is the total volume during a year divided by 365 days. CAPACITY – The maximum number of vehicles that can be reasonably expected to pass over a given section of a lane or a roadway in a given time period. CYCLE LENGTH – The time period in seconds required for a traffic signal to complete one full cycle of indications. DAILY CAPACITY – A theoretical value representing the daily traffic volume that will typically result in a peak hour volume equal to the capacity of the roadway. DELAY – The time consumed while traffic is impeded in its movement by some element over which it has no control, usually expressed in seconds per vehicle. DENSITY – The number of vehicles occupying in a unit length of the through traffic lanes of a roadway at any given instant. Usually expressed in vehicles per mile. DESIGN SPEED – A speed selected for purposes of design. Features of a highway, such as curvature, superelevation, and sight distance (upon which the safe operation of vehicles is dependent) are correlated to design speed. DIRECTIONAL SPLIT – The percent of traffic in the peak direction at any point in time. 234 FREE FLOW – Volumes are well below capacity. Vehicles can maneuver freely and travel is unimpeded by other traffic. HEADWAY – Time or distance spacing between successive vehicles in a traffic stream, front bumper to front bumper. LEVEL OF SERVICE – A qualitative measure of a number of factors, which include speed and travel time, traffic interruptions, freedom to maneuver, safety, driving comfort and convenience, and operating costs. PASSENGER CAR EQUIVALENT (PCE) – A metric used to assess the impact of larger vehicles, such as trucks, recreational vehicles, and buses, by converting the traffic volume of larger vehicles to an equivalent number of passenger cars. PEAK HOUR – The 60 consecutive minutes with the highest number of vehicles. QUEUE LENGTH – The length of vehicle queue, typically expressed in feet, waiting at a service area such as a Traffic signal, stop sign, or access gate. SIGHT DISTANCE – The continuous length of roadway visible to a driver or roadway user. SIGNAL CYCLE – The time period in seconds required for one complete sequence of signal indications. SIGNAL PHASE – The part of the signal cycle allocated to one or more traffic movements. STARTING DELAY – The delay experienced in initiating the movement of queued traffic from a stop to an average running speed through an intersection. TRAFFIC-ACTUATED SIGNAL – A type of traffic signal that directs traffic to stop and go in accordance with the demands of traffic, as registered by the actuation of detectors. TRIP – The movement of a person or vehicle from one location (origin) to another (destination). For example, from home to store to home is two trips, not one. TRIP GENERATION RATE – The quantity of trips produced and/or attracted by a specific land use stated in terms of units such as per dwelling, per acre, and per 1,000 square feet of floor space. VEHICLE MILES OF TRAVEL – A measure of the amount of usage of a section of highway, obtained by multiplying the average daily traffic by length of facility in miles. 235 APPENDIX B SCOPING AGREEMENT AND CITY DOCUMENTS 236 ATTACHMENT 4 CITY OF LA QUINTA DATE ________________ TRAFFIC IMPACTS ANALYSIS SCOPE Work to be done per Engineering Bulletin 06-13 Project Name: __________________________________________________________ Project Location: ________________________________________________________ Project Description: _____________________________________________________ ________________________________________________________________________ Developer Traffic Engineer Name Address Contact Phone Email Study Intersection Study Segments ITE Land Use Code ITE Trip Gen. Rate Unit of Measure Daily Trips Pass by % Time periods to be analyzed: Year(s) to be analyzed: † AM † PM † Sat † Other ________________________ __________________________________ Adams St and Corporate Centre Dr Drive-Through Queue Study Adams St and Corporate Centre Dr 3,800 square foot drive-through facility TJW Engineering, Inc. 9841 Irvine Center Drive, Suite 200. Irvine, Ca 92618 Daniel Flores (949) 878-3509 Daniel@tjwengineering.com ADAMS ONE ELEVEN, LLC. 900 Island Drive, Unit 312 Rancho Mirage, Ca 92270 Michael J. Shovlin Adams St and Corporate Centre Dr Fast-Food Restaurant with Drive-Through Window 934 TSF 1,776 50% AM 50% PM 55% Daily Existing, Opening Year (2025) without Project and Opening Year (2025) with Project scenarios N/A 12/11/24 237 Special issues to be addressed: Attachments: † Site Plan † Study Intersections/Segments Map † Distribution Assumption Map † Cumulative Impacts City Approval ________________________ Date _____________________ Collect drive-through queue data in 10-minute increments at up to two (2) comparable sites during the peak periods. The peak period data collection will occur on a typical weekday and a Saturday from 7:00-9:00 AM, 11:00 AM-2:00 PM, and 4:00-7:00 PM. Additional Items to be address: Provide a site distance exhibit for the exiting drive-through driveway and provide vehicle turning movements to illustrate on-site circulation. City of La Quinta to provide cumulative projects for for opening year scenario 1/16/25 238 Adams Street and Corpporate Centre Drive Drive-Through Queue Study In Out Total In Out Total Fast-Food Restaurant with Drive-Through Window 934 3.80 TSF 467.48 1,776 44.61 51:49 87 83 170 33.03 52:48 66 60 126 Pass-By Trips (0.5 Daily, 0.5 AM, 0.55 PM)-888 -44 -42 -86 -36 -33 -69 Net Total 888 43 41 84 30 27 57 1: Trip generation and pass-by rates from ITE Trip Generation (11th Edition, 2021). 2: TSF = Thousand Square Feet. Table 1 Project Trip Generation Proposed Land Use1 ITE Code Qty Unit2 Daily AM Peak Hour PM Peak Hour Rate Volume Rate In:Out Split Volume Rate In:Out Split Volume MSA-24-001 239 1 60 60 30 08-7 7 1 0 . 1 20-1 0 0 0 9 2 2 Adam s S t r e e t B r i d g e , L a Quinta 1 RBF Consu l t a n t s 02-1 6 - 0 8 1 1 40' RBF Consu l t a n t s 22018 0 0 N 22020 0 0 N 22022 0 0 N 22024 0 0 N 2202600 N2202800 N2203000 N2203200 N2203400 N2203600 N2203800 N2204000 N 22018 0 0 N 2202000 N2202200 N2202400 N2202600 N2202800 N2203000 N2203200 N2203400 N2203600 N2203800 N2204000 N6549800 E6550000 E6550200 E6550400 E6550600 E6550800 E6551000 E6551200 E 6 5 4 9 8 0 0 E 6 5 5 0 0 0 0 E 6 5 5 0 2 0 0 E 6 5 5 0 4 0 0 E 6 5 5 0 6 0 0 E 6 5 5 0 8 0 0 E 6 5 5 1 0 0 0 E 6 5 5 1 2 0 0 E SHEET No. OF SHTS. THIS M A P C O M P I L E D P H O T O G R A M M E T R I C A L L Y BY: IAS P R O J E C T NUMB E R : IAS P R O J E C T NAME: PLOTT E D C O N T O U R INTER V A L MAP A N D D I G I T A L D A T A P R E P A R E D F O R : DASHE D L I N E S M A Y N O T M E E T M A P A C C U R A C Y STAND A R D S BUILD I N G O U T L I N E S I N D I C A T E D R I P L I N E B U T M A Y A L S O I N C L U D E S T A I R S AND APPU R T E N A N C E S . FEATU R E S I N S H A D O W S A N D V E G E T A T I O N M A Y B E O B S C U R E D , F E A T U R E S N E AR TA L L O B J E C T S M A Y B E O B S C U R E D DUE T O P H O T O G R A P H I C A N G L E "LEAN " MAPPI N G O U T S I D E L I M I T S O F S U R V E Y C O N T R O L P E R I M E T E R M A Y N O T M E E T MAP A C C U R A C Y STAND A R D S HORIZ O N T A L A C C U R A C Y F O R 1 " = A N D V E R T I C A L A C C U R A C Y F O R F O O T CON T O U R INTER V A L . MAP H A S B E E N C O M P I L E D P H O T O G R A M M E T R I C A L L Y A N D S H O U L D B E F I E L D V ERIFIE D A C C O R D I N G L Y B Y USER. SURVE Y G R O U N D C O N T R O L P R O V I D E D BY: THIS M A P A N D A S S O C I A T E D D I G I T A L D A T A C O M P I L E D F R O M A E R I A L P H O T O GRAPH Y DATED : NOTES : COPYR I G H T 2008 CURB A N D G U T T E R AWNIN G SIDEW A L K BUILD I N G EDGE O F D I R T EDGE O F C O N C . EDGE O F A S P H . CONTR O L ROAD S T R I P I N G POOL GUAR D R A I L STRIP E SPARK I N G PIPE L I N E WALL RETAI N I N G W A L L FENC E STAND P I P E INTER C O N T O U R POWE R P O L E STREE T L I G H T POWE R P O L E STREE T L I G H T MISCE L L A N E O U S SINGL E T R E E INDEX C O N T O U R FIRE H Y D R A N T MANH O L E WATER L I N E CATC H B A S I N VALVE DROP I N L E T PALM TREES STOP L I G H T VAULT TANK RAILR O A D RAIL S I G N A L GUY W I R E SIGN A.-As p h . = A S P H A L T C . - C o n c = C O N C R E T E O B S . = O B S C U R E D ABBR E V I A T I O N S : U/C = U N D E R C O N S T R U C T I O N W / L = W A T E R L E V E L . FOOT7117 A r l i n g t o n A v e . , S u i t e A Rivers i d e , C A 92503 Fx (9 5 1 ) 687- 4 1 2 0 Ph (9 5 1 ) 687- 4 2 5 2 www.i n l a n d a e r i a l . c o m ias@ i n l a n d a e r i a l . c o m COMM E N T S : P R OF ESSIO N A L L A N D SURV E Y O R DERE K C .HOO D A Topog r a p h i c m a p p r e p a r e d under t h e s u p e r v i s i o n o f : Derek C . H o o d , P . L . S . Inland A e r i a l S u r v e y s , I n c . Date ST L TE O F C A R NFIO A I No. 67 9 9 Exp. 9 - 3 0 - 2 0 0 8 0 HV-1 1350.0 0 1350.0 0 V-1 Pool P SP 1340 MH 1350 NLANDI ERIALA URVEY S , S NC.I GRAP H I C S C A L E INLAN D A E R I A L MHMHMHSTOP STOP STOP MH MH MH AHEA D AHEA D SIGN A L SIGN A L MHMH MHMH STOPSTOPMH C.O.C.O.BOMHMH LAND S C A P E S B 10'-0"SETBA C K20'-0" B U I L D I N G DN C O M P A C T PROPERTY LINE P R O P E R T Y L I N E P R O P E R T Y L I N E PR O P E R T Y L I N E 26'-0"6'-0"15'-0"4'-0" 18'-0 " PROPERTY LINE OUTDOOR SEATING APPROX. 650 SF 1 2 3 4 5 PRE- ORDER ORDER DIRECTIONAL SIGN A D A M S S T R E E T DN DN 6 11 101213 PROPOSED DRIVE-THRU 3,800 SF DNDN 7 8 9 DN 13 ' - 0 " 4' - 0 " 10'-0"13'-0" R 2 5 ' - 0 " R 25'- 0 " R 1 1 ' - 0 " R 1 1 ' - 0 " 3' - 0 " 13 ' - 0 " 104 112 114 113 TYP. 103 103 TYP. 105 TYP. 103 106 TYP. 111 TYP. 107 TYP. 116 100 102 TYP. 118117 119 103102 102 TYP. 115 TYP. 103 102 101 TYP. 105 108 110 109 3' - 6 " 5 ' - 0 " 2 ' - 0 " 4' - 0 " TYP. 103 115 TYP. 111 TYP. 116103107 TYP. 103 102 102 102 102 119 119 Sheet: Scale: INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T 44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260 I I WWW.PVGARCHITECTS.COM PREST VUKSIC GREENWOOD A R C H I T E C T S • I N T E R I O R S 1" = 10'-0" A101 SITE PLAN AU G U S T 2 7 , 2 0 2 4 111 LA QUINTA DRIVE-THRU PAD HIGHWAY 111 - LA QUINTA, CA 22 4 0 0 4 0'5' 10' 20'40' NORTH KEYNOTES NO.DESCRIPTION 100 3'H 8" CMU WALL 101 3' H 8" CMU PLANTER WALL W/ STUCCO FINISH 102 PLANTER 103 NEW CONCRETE CURB, SEE CIVIL 104 EXISTING CONCRETE CURB, SEE CIVIL 105 EXISITNG CONCRETE CURB TO BE REMOVED, SEE CIVIL 106 NEW ACCESSIBLE PARKING STALL 107 NEW CURB RAMP, SEE CIVIL 108 NEW TRASH ENCLOSURE TO MATCH EXISTING 109 EXISTING SITE WALL 110 EXISTING TRASH ENCLOSURE 111 TRUNCATED DOMES, MIN. 3' 112 NEW SIDEWALK PER CITY STANDARDS, SEE CIVIL 113 EXISTING SIDEWALK 114 EXISITNG CURB RAMP 115 NEW CONCRETE HARDSCAPE, SEE CIVIL AND LANDSCAPE 116 NEW ACCESSIBLE PATH STRIPING 117 NEW ACCESSIBLE PARKING SIGN 118 NEW CONCRETE WHEEL STOP 119 ACCESSIBLE PATH 240 Site 241 APPENDIX C EXISTING TRAFFIC COUNTS 242 File Name : LQA_Adams_CC AM Site Code : 241097 Start Date : 12/17/2024 Page No : 1 City of La Quinta N/S: Adams Street E/W: Corporate Centre Drive Weather: Clear Groups Printed- Total Volume Adams Street Southbound Corporate Centre Drive Westbound Adams Street Northbound Corporate Centre Drive Eastbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total 07:00 AM 11 28 9 48 6 3 1 10 1 21 9 31 3 3 3 9 98 07:15 AM 11 52 15 78 10 1 6 17 0 35 12 47 11 0 1 12 154 07:30 AM 16 47 11 74 7 2 2 11 2 32 20 54 5 2 3 10 149 07:45 AM 23 97 26 146 18 1 4 23 5 32 25 62 4 3 4 11 242 Total 61 224 61 346 41 7 13 61 8 120 66 194 23 8 11 42 643 08:00 AM 19 90 29 138 16 3 7 26 3 46 24 73 21 1 3 25 262 08:15 AM 19 102 25 146 22 3 11 36 5 64 21 90 12 6 8 26 298 08:30 AM 23 96 28 147 25 1 9 35 5 64 13 82 15 9 3 27 291 08:45 AM 18 98 23 139 19 4 9 32 6 100 29 135 28 4 10 42 348 Total 79 386 105 570 82 11 36 129 19 274 87 380 76 20 24 120 1199 Grand Total 140 610 166 916 123 18 49 190 27 394 153 574 99 28 35 162 1842 Apprch %15.3 66.6 18.1 64.7 9.5 25.8 4.7 68.6 26.7 61.1 17.3 21.6 Total %7.6 33.1 9 49.7 6.7 1 2.7 10.3 1.5 21.4 8.3 31.2 5.4 1.5 1.9 8.8 Adams Street Southbound Corporate Centre Drive Westbound Adams Street Northbound Corporate Centre Drive Eastbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 AM 08:00 AM 19 90 29 138 16 3 7 26 3 46 24 73 21 1 3 25 262 08:15 AM 19 102 25 146 22 3 11 36 5 64 21 90 12 6 8 26 298 08:30 AM 23 96 28 147 25 1 9 35 5 64 13 82 15 9 3 27 291 08:45 AM 18 98 23 139 19 4 9 32 6 100 29 135 28 4 10 42 348 Total Volume 79 386 105 570 82 11 36 129 19 274 87 380 76 20 24 120 1199 % App. Total 13.9 67.7 18.4 63.6 8.5 27.9 5 72.1 22.9 63.3 16.7 20 PHF .859 .946 .905 .969 .820 .688 .818 .896 .792 .685 .750 .704 .679 .556 .600 .714 .861 Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 (951) 268-6268 243 File Name : LQA_Adams_CC AM Site Code : 241097 Start Date : 12/17/2024 Page No : 2 City of La Quinta N/S: Adams Street E/W: Corporate Centre Drive Weather: Clear Adams Street C o r p o r a t e C e n t r e D r i v e C o r p o r a t e C e n t r e D r i v e Adams Street Right 105 Thru 386 Left 79 InOut Total 386 570 956 Ri g h t 36 Th r u 11 Le f t 82 Ou t To t a l In 18 6 12 9 31 5 Left 19 Thru 274 Right 87 Out TotalIn 492 380 872 Le f t 76 Th r u 20 Ri g h t 24 To t a l Ou t In 13 5 12 0 25 5 Peak Hour Begins at 08:00 AM Total Volume Peak Hour Data North Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Each Approach Begins at: 07:45 AM 08:00 AM 08:00 AM 08:00 AM +0 mins.23 97 26 146 16 3 7 26 3 46 24 73 21 1 3 25 +15 mins.19 90 29 138 22 3 11 36 5 64 21 90 12 6 8 26 +30 mins.19 102 25 146 25 1 9 35 5 64 13 82 15 9 3 27 +45 mins.23 96 28 147 19 4 9 32 6 100 29 135 28 4 10 42 Total Volume 84 385 108 577 82 11 36 129 19 274 87 380 76 20 24 120 % App. Total 14.6 66.7 18.7 63.6 8.5 27.9 5 72.1 22.9 63.3 16.7 20 PHF .913 .944 .931 .981 .820 .688 .818 .896 .792 .685 .750 .704 .679 .556 .600 .714 Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 (951) 268-6268 244 File Name : LQA_Adams_CC PM Site Code : 241097 Start Date : 12/17/2024 Page No : 1 City of La Quinta N/S: Adams Street E/W: Corporate Centre Drive Weather: Clear Groups Printed- Total Volume Adams Street Southbound Corporate Centre Drive Westbound Adams Street Northbound Corporate Centre Drive Eastbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total 04:00 PM 31 123 32 186 35 8 27 70 13 82 22 117 38 2 26 66 439 04:15 PM 30 103 31 164 30 6 27 63 6 94 18 118 32 6 18 56 401 04:30 PM 25 115 22 162 24 4 29 57 15 92 26 133 28 7 22 57 409 04:45 PM 25 85 31 141 32 3 20 55 18 105 25 148 41 2 21 64 408 Total 111 426 116 653 121 21 103 245 52 373 91 516 139 17 87 243 1657 05:00 PM 5 92 23 120 24 2 23 49 14 93 8 115 28 0 27 55 339 05:15 PM 6 107 27 140 21 1 11 33 13 108 6 127 22 1 26 49 349 05:30 PM 10 117 28 155 6 4 10 20 12 74 7 93 27 1 16 44 312 05:45 PM 7 82 25 114 12 1 9 22 9 75 7 91 19 0 7 26 253 Total 28 398 103 529 63 8 53 124 48 350 28 426 96 2 76 174 1253 Grand Total 139 824 219 1182 184 29 156 369 100 723 119 942 235 19 163 417 2910 Apprch %11.8 69.7 18.5 49.9 7.9 42.3 10.6 76.8 12.6 56.4 4.6 39.1 Total %4.8 28.3 7.5 40.6 6.3 1 5.4 12.7 3.4 24.8 4.1 32.4 8.1 0.7 5.6 14.3 Adams Street Southbound Corporate Centre Drive Westbound Adams Street Northbound Corporate Centre Drive Eastbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:00 PM 04:00 PM 31 123 32 186 35 8 27 70 13 82 22 117 38 2 26 66 439 04:15 PM 30 103 31 164 30 6 27 63 6 94 18 118 32 6 18 56 401 04:30 PM 25 115 22 162 24 4 29 57 15 92 26 133 28 7 22 57 409 04:45 PM 25 85 31 141 32 3 20 55 18 105 25 148 41 2 21 64 408 Total Volume 111 426 116 653 121 21 103 245 52 373 91 516 139 17 87 243 1657 % App. Total 17 65.2 17.8 49.4 8.6 42 10.1 72.3 17.6 57.2 7 35.8 PHF .895 .866 .906 .878 .864 .656 .888 .875 .722 .888 .875 .872 .848 .607 .837 .920 .944 Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 (951) 268-6268 245 File Name : LQA_Adams_CC PM Site Code : 241097 Start Date : 12/17/2024 Page No : 2 City of La Quinta N/S: Adams Street E/W: Corporate Centre Drive Weather: Clear Adams Street C o r p o r a t e C e n t r e D r i v e C o r p o r a t e C e n t r e D r i v e Adams Street Right 116 Thru 426 Left 111 InOut Total 615 653 1268 Ri g h t 10 3 Th r u 21 Le f t 12 1 Ou t To t a l In 21 9 24 5 46 4 Left 52 Thru 373 Right 91 Out TotalIn 634 516 1150 Le f t 13 9 Th r u 17 Ri g h t 87 To t a l Ou t In 18 9 24 3 43 2 Peak Hour Begins at 04:00 PM Total Volume Peak Hour Data North Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Each Approach Begins at: 04:00 PM 04:00 PM 04:30 PM 04:00 PM +0 mins.31 123 32 186 35 8 27 70 15 92 26 133 38 2 26 66 +15 mins.30 103 31 164 30 6 27 63 18 105 25 148 32 6 18 56 +30 mins.25 115 22 162 24 4 29 57 14 93 8 115 28 7 22 57 +45 mins.25 85 31 141 32 3 20 55 13 108 6 127 41 2 21 64 Total Volume 111 426 116 653 121 21 103 245 60 398 65 523 139 17 87 243 % App. Total 17 65.2 17.8 49.4 8.6 42 11.5 76.1 12.4 57.2 7 35.8 PHF .895 .866 .906 .878 .864 .656 .888 .875 .833 .921 .625 .883 .848 .607 .837 .920 Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 (951) 268-6268 246 DRIVE THRU SURVEY LOCATION: McDonalds, 78-962 Highway 111 DAY: Tuesday CITY: La Quinta DATE: 12/17/2024 TIME Pick Up Window to Order Board Order Board to Drive Thru Entrance Drive Thru Entrance Overflow TOTAL 7:00 5 2 0 7 7:10 4 1 0 5 7:20 5 4 0 9 7:30 2 2 0 4 7:40 3 0 0 3 7:50 1 0 0 1 8:00 3 1 0 4 8:10 3 0 0 3 8:20 1 1 0 2 8:30 1 1 0 2 8:40 3 1 0 4 8:50 4 5 1 10 9:00 5 6 1 12 TIME Pick Up Window to Order Board Order Board to Drive Thru Entrance Drive Thru Entrance Overflow TOTAL 11:00 0 4 0 4 11:10 6 7 1 14 11:20 2 6 2 10 11:30 5 5 0 10 11:40 2 5 0 7 11:50 5 5 0 10 12:00 1 1 0 2 12:10 4 5 0 9 12:20 4 6 1 11 12:30 0 7 3 10 12:40 4 5 3 12 12:50 3 5 1 9 13:00 5 7 4 16 13:10 3 5 0 8 13:20 3 6 1 10 13:30 4 4 0 8 13:40 5 4 0 9 13:50 3 3 0 6 14:00 4 2 0 6 Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 951-268-6268 247 TIME Pick Up Window to Order Board Order Board to Drive Thru Entrance Drive Thru Entrance Overflow TOTAL 16:00 4 8 2 14 16:10 4 6 0 10 16:20 4 4 0 8 16:30 4 2 0 6 16:40 2 6 3 11 16:50 3 4 0 7 17:00 4 2 0 6 17:10 2 1 0 3 17:20 3 0 0 3 17:30 3 2 0 5 17:40 4 5 0 9 17:50 5 7 0 12 18:00 5 6 1 12 18:10 6 6 2 14 18:20 5 4 2 11 18:30 5 2 0 7 18:40 3 0 0 3 18:50 1 2 0 3 19:00 5 3 0 8 DRIVE THRU SURVEY LOCATION: McDonalds, 78-962 Highway 111 DAY: Tuesday CITY: La Quinta DATE: 12/17/2024 Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 951-268-6268 248 DRIVE THRU SURVEY LOCATION: McDonalds, 78-962 Highway 111 DAY: Saturday CITY: La Quinta DATE: 12/14/2024 TIME Pick Up Window to Order Board Order Board to Drive Thru Entrance Drive Thru Entrance Overflow TOTAL 7:00 3 0 0 3 7:10 5 4 0 9 7:20 4 5 0 9 7:30 5 7 0 12 7:40 3 1 0 4 7:50 1 0 0 1 8:00 2 2 0 4 8:10 2 4 0 6 8:20 4 5 0 9 8:30 3 6 0 9 8:40 3 1 0 4 8:50 2 1 0 3 9:00 4 4 0 8 TIME Pick Up Window to Order Board Order Board to Drive Thru Entrance Drive Thru Entrance Overflow TOTAL 11:00 2 2 0 4 11:10 2 2 0 4 11:20 0 2 0 2 11:30 1 0 0 1 11:40 4 3 0 7 11:50 4 1 0 5 12:00 2 1 0 3 12:10 4 2 0 6 12:20 5 5 0 10 12:30 3 4 1 8 12:40 3 5 1 9 12:50 3 3 0 6 13:00 5 7 2 14 13:10 5 6 0 11 13:20 3 7 5 15 13:30 4 7 3 14 13:40 5 6 3 14 13:50 5 7 1 13 14:00 3 3 0 6 Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 951-268-6268 249 TIME Pick Up Window to Order Board Order Board to Drive Thru Entrance Drive Thru Entrance Overflow TOTAL 16:00 5 7 1 13 16:10 5 7 1 13 16:20 3 5 0 8 16:30 3 5 0 8 16:40 3 0 0 3 16:50 4 2 0 6 17:00 4 4 0 8 17:10 5 4 0 9 17:20 3 1 0 4 17:30 4 5 0 9 17:40 4 3 0 7 17:50 2 6 0 8 18:00 4 6 5 15 18:10 4 5 3 12 18:20 4 7 1 12 18:30 3 6 1 10 18:40 6 3 0 9 18:50 4 3 0 7 19:00 1 1 0 2 DRIVE THRU SURVEY LOCATION: McDonalds, 78-962 Highway 111 DAY: Saturday CITY: La Quinta DATE: 12/14/2024 Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 951-268-6268 250 DRIVE THRU SURVEY LOCATION: Starbucks, 78752 Highway 111 DAY: Tuesday CITY: La Quinta DATE: 12/17/2024 TIME Pick Up Window to Order Board Order Board to Drive Thru Entrance Drive Thru Entrance Overflow TOTAL 7:00 1 0 0 1 7:10 0 0 0 0 7:20 0 1 0 1 7:30 0 0 0 0 7:40 2 1 0 3 7:50 2 2 0 4 8:00 1 0 0 1 8:10 3 3 1 7 8:20 2 3 3 8 8:30 2 3 2 7 8:40 3 3 1 7 8:50 3 0 0 3 9:00 3 3 0 6 TIME Pick Up Window to Order Board Order Board to Drive Thru Entrance Drive Thru Entrance Overflow TOTAL 11:00 4 1 0 5 11:10 6 3 0 9 11:20 0 2 0 2 11:30 2 0 0 2 11:40 2 0 0 2 11:50 1 2 0 3 12:00 3 2 0 5 12:10 3 2 0 5 12:20 3 1 0 4 12:30 5 1 0 6 12:40 6 1 0 7 12:50 2 0 0 2 13:00 3 3 0 6 13:10 2 2 0 4 13:20 2 2 0 4 13:30 1 2 0 3 13:40 0 1 0 1 13:50 2 1 0 3 14:00 3 2 0 5 Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 951-268-6268 251 TIME Pick Up Window to Order Board Order Board to Drive Thru Entrance Drive Thru Entrance Overflow TOTAL 16:00 2 0 0 2 16:10 1 1 0 2 16:20 0 3 0 3 16:30 0 0 0 0 16:40 2 0 0 2 16:50 3 2 0 5 17:00 1 2 0 3 17:10 1 0 0 1 17:20 2 1 0 3 17:30 0 0 0 0 17:40 2 0 0 2 17:50 1 0 0 1 18:00 1 0 0 1 18:10 0 0 0 0 18:20 0 0 0 0 18:30 1 1 0 2 18:40 0 1 0 1 18:50 0 1 0 1 19:00 1 0 0 1 DRIVE THRU SURVEY LOCATION: Starbucks, 78752 Highway 111 DAY: Tuesday CITY: La Quinta DATE: 12/17/2024 Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 951-268-6268 252 DRIVE THRU SURVEY LOCATION: Starbucks, 78752 Highway 111 DAY: Saturday CITY: La Quinta DATE: 12/14/2024 TIME Pick Up Window to Order Board Order Board to Drive Thru Entrance Drive Thru Entrance Overflow TOTAL 7:00 2 1 0 3 7:10 1 0 0 1 7:20 1 0 0 1 7:30 3 0 0 3 7:40 4 2 0 6 7:50 2 0 0 2 8:00 2 0 0 2 8:10 5 2 0 7 8:20 5 0 0 5 8:30 0 3 1 4 8:40 5 1 0 6 8:50 2 2 0 4 9:00 1 2 0 3 TIME Pick Up Window to Order Board Order Board to Drive Thru Entrance Drive Thru Entrance Overflow TOTAL 11:00 1 2 0 3 11:10 4 2 0 6 11:20 6 2 1 9 11:30 4 3 2 9 11:40 6 3 1 10 11:50 6 3 2 11 12:00 5 2 0 7 12:10 4 0 0 4 12:20 6 1 0 7 12:30 2 2 0 4 12:40 2 3 0 5 12:50 2 3 0 5 13:00 4 2 0 6 13:10 6 2 0 8 13:20 1 1 0 2 13:30 3 2 0 5 13:40 4 3 0 7 13:50 5 2 0 7 14:00 2 0 0 2 Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 951-268-6268 253 TIME Pick Up Window to Order Board Order Board to Drive Thru Entrance Drive Thru Entrance Overflow TOTAL 16:00 2 2 0 4 16:10 1 1 0 2 16:20 1 0 0 1 16:30 5 1 0 6 16:40 5 2 0 7 16:50 5 3 0 8 17:00 2 1 0 3 17:10 4 0 0 4 17:20 3 1 0 4 17:30 1 0 0 1 17:40 3 3 0 6 17:50 0 1 0 1 18:00 1 1 0 2 18:10 2 3 1 6 18:20 4 1 0 5 18:30 0 1 0 1 18:40 2 0 0 2 18:50 3 0 0 3 19:00 1 3 0 4 DRIVE THRU SURVEY LOCATION: Starbucks, 78752 Highway 111 DAY: Saturday CITY: La Quinta DATE: 12/14/2024 Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 951-268-6268 254 APPENDIX D HCM ANALYSIS WORKSHEETS 255 EXISTING TRAFFIC CONDITIONS 256 Generated with Scenario 1: 1 E AMVersion 2025 (SP 0-1) Intersection Level Of Service Report Intersection 1: Adams St / Corporate Center Dr Control Type:Signalized Delay (sec / veh):18.2 Analysis Method:HCM 7th Edition Level Of Service:B Analysis Period:15 minutes Volume to Capacity (v/c):0.318 YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 25.0025.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft] 001001001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Intersection Setup 1 1/8/2025 257 Generated with Scenario 1: 1 E AMVersion 2025 (SP 0-1) 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 4213952823881224489210131822Total Analysis Volume [veh/h] 103247622301122325806Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor 361182242076105386798727419Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 361182242076105386798727419Base Volume Input [veh/h] Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Volumes 2 1/8/2025 258 Generated with Scenario 1: 1 E AMVersion 2025 (SP 0-1) 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type Pattern 1Active Pattern 80Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s] 0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 0229022901780156Maximum Green [s] Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing (Basic) NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag 0.026.017.00.026.017.00.024.016.00.021.013.0Split [s] Phasing & Timing: Pattern 1 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 3 1/8/2025 259 Generated with Scenario 1: 1 E AMVersion 2025 (SP 0-1) 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.529.691.4310.250.570.539.310.470.428.71d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.500.11k, delay calibration 34.2436.6134.4836.846.846.8336.638.118.0838.54d1, Uniform Delay [s] 14912314611510771161121992107944c, Capacity [veh/h] 1648178117051781173418701781171918701781s, saturation flow rate [veh/h] 0.030.050.030.050.160.160.050.120.120.01(v / s)_i Volume / Saturation Flow Rate 0.090.070.090.060.620.620.070.580.580.02g / C, Green / Cycle 7.25.56.85.149.749.75.446.246.21.9g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 80808080808080808080C, Calculated Cycle Length [s] CLCLCCLCCLLane Group Lane Group Calculations 47.8096.3444.4190.2479.1183.9488.9666.1269.4522.9195th-Percentile Queue Length [ft/ln] 1.913.851.783.613.163.363.562.642.780.9295th-Percentile Queue Length [veh/ln] 26.5553.5224.6750.1343.9546.6349.4236.7338.5812.7350th-Percentile Queue Length [ft/ln] 1.062.140.992.011.761.871.981.471.540.5150th-Percentile Queue Length [veh/ln] NoYesYesNoYesNoNoNoNoYesCritical Lane Group DDDDAADAADLane Group LOS 35.7646.2935.9147.107.417.3645.958.578.5047.25d, Delay for Lane Group [s/veh] 0.370.770.350.770.260.250.760.200.200.50X, volume / capacity Lane Group Results 4 1/8/2025 260 Generated with Scenario 1: 1 E AMVersion 2025 (SP 0-1) Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]47.25 8.52 8.57 45.95 7.37 7.41 47.10 35.91 35.91 46.29 35.76 35.76 Movement LOS D A A D A A D D D D D D d_A, Approach Delay [s/veh]10.47 12.74 42.99 42.43 Approach LOS B B D D d_I, Intersection Delay [s/veh]18.24 Intersection LOS B Intersection V/C 0.318 Emissions Vehicle Miles Traveled [mph]1.40 13.77 12.97 7.07 22.66 21.17 2.63 1.52 6.31 3.65 Stops [stops/h]22.91 69.45 66.12 88.96 83.94 79.11 90.24 44.41 96.34 47.80 Fuel consumption [US gal/h]0.54 1.71 1.62 2.21 2.26 2.12 1.31 0.61 1.55 0.75 CO [g/h]38.06 119.43 113.33 154.39 158.07 148.51 91.41 42.75 108.21 52.27 NOx [g/h]7.41 23.24 22.05 30.04 30.76 28.89 17.78 8.32 21.05 10.17 VOC [g/h]8.82 27.68 26.27 35.78 36.63 34.42 21.19 9.91 25.08 12.11 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]31.51 31.51 31.51 31.51 I_p,int, Pedestrian LOS Score for Intersectio 2.592 2.620 2.016 2.035 Crosswalk LOS B B B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]425 500 550 550 d_b, Bicycle Delay [s]24.81 22.50 21.03 21.03 I_b,int, Bicycle LOS Score for Intersection 1.923 2.106 1.789 1.807 Bicycle LOS A B A A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence 5 1/8/2025 261 Generated with Scenario 2: 2 E PMVersion 2025 (SP 0-1) Intersection Level Of Service Report Intersection 1: Adams St / Corporate Center Dr Control Type:Signalized Delay (sec / veh):18.8 Analysis Method:HCM 7th Edition Level Of Service:B Analysis Period:15 minutes Volume to Capacity (v/c):0.356 YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 25.0025.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft] 001001001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Intersection Setup 1 1/8/2025 262 Generated with Scenario 2: 2 E PMVersion 2025 (SP 0-1) 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 4213952823881224489210643360Total Analysis Volume [veh/h] 10324762230112232610815Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor 361182242076105386799137352Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 361182242076105386799137352Base Volume Input [veh/h] Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Volumes 2 1/8/2025 263 Generated with Scenario 2: 2 E PMVersion 2025 (SP 0-1) 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type Pattern 1Active Pattern 80Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s] 0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 0229022901680157Maximum Green [s] Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing (Basic) NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag 0.026.016.00.026.016.00.024.015.00.023.014.0Split [s] Phasing & Timing: Pattern 1 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 3 1/8/2025 264 Generated with Scenario 2: 2 E PMVersion 2025 (SP 0-1) 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.529.771.4310.340.620.579.360.620.5811.48d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.500.11k, delay calibration 34.2436.6234.4836.857.647.6336.648.408.3937.65d1, Uniform Delay [s] 149123146114103911201211008108083c, Capacity [veh/h] 1648178117051781173418701781174518701781s, saturation flow rate [veh/h] 0.030.050.030.050.160.160.050.150.150.03(v / s)_i Volume / Saturation Flow Rate 0.090.070.090.060.600.600.070.580.580.05g / C, Green / Cycle 7.25.56.85.148.048.05.446.246.23.7g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 80808080808080808080C, Calculated Cycle Length [s] CLCLCCLCCLLane Group Lane Group Calculations 47.8096.4644.4190.3586.6091.9189.0388.3492.9961.1195th-Percentile Queue Length [ft/ln] 1.913.861.783.613.463.683.563.533.722.4495th-Percentile Queue Length [veh/ln] 26.5653.5924.6750.2048.1151.0649.4649.0851.6633.9550th-Percentile Queue Length [ft/ln] 1.062.140.992.011.922.041.981.962.071.3650th-Percentile Queue Length [veh/ln] NoYesYesNoNoNoYesYesNoNoCritical Lane Group DDDDAADAADLane Group LOS 35.7646.3935.9147.208.278.2046.009.038.9649.13d, Delay for Lane Group [s/veh] 0.370.770.350.770.260.260.760.260.260.73X, volume / capacity Lane Group Results 4 1/8/2025 265 Generated with Scenario 2: 2 E PMVersion 2025 (SP 0-1) Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]49.13 8.99 9.03 46.00 8.23 8.27 47.20 35.91 35.91 46.39 35.76 35.76 Movement LOS D A A D A A D D D D D D d_A, Approach Delay [s/veh]13.01 13.48 43.06 42.49 Approach LOS B B D D d_I, Intersection Delay [s/veh]18.76 Intersection LOS B Intersection V/C 0.356 Emissions Vehicle Miles Traveled [mph]3.83 17.70 16.69 7.07 22.66 21.17 2.63 1.52 6.31 3.65 Stops [stops/h]61.11 92.99 88.34 89.03 91.91 86.60 90.35 44.41 96.46 47.80 Fuel consumption [US gal/h]1.49 2.27 2.15 2.21 2.41 2.27 1.31 0.61 1.55 0.75 CO [g/h]104.21 158.62 150.34 154.52 168.56 158.37 91.56 42.75 108.37 52.27 NOx [g/h]20.28 30.86 29.25 30.06 32.80 30.81 17.82 8.32 21.09 10.17 VOC [g/h]24.15 36.76 34.84 35.81 39.07 36.70 21.22 9.91 25.12 12.11 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]31.51 31.51 31.51 31.51 I_p,int, Pedestrian LOS Score for Intersectio 2.638 2.654 2.026 2.036 Crosswalk LOS B B B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]475 500 550 550 d_b, Bicycle Delay [s]23.26 22.50 21.03 21.03 I_b,int, Bicycle LOS Score for Intersection 2.054 2.106 1.789 1.807 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence 5 1/8/2025 266 OPENING YEAR TRAFFIC CONDITIONS 267 Generated with Adams St and Corporate Centre Dr Scenario 3: 3 EAC AMTJW Engineering, Inc.Version 2025 (SP 0-1) Intersection Level Of Service Report Intersection 1: Adams St / Corporate Center Dr Control Type:Signalized Delay (sec / veh):17.7 Analysis Method:HCM 7th Edition Level Of Service:B Analysis Period:15 minutes Volume to Capacity (v/c):0.344 YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 25.0025.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft] 001001001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Intersection Setup 1 1/28/2025 268 Generated with Adams St and Corporate Centre Dr Scenario 3: 3 EAC AMTJW Engineering, Inc.Version 2025 (SP 0-1) 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 4313982823911245129410338822Total Analysis Volume [veh/h] 113247623311282426976Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor 371184242078107441818933419Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 00000004700550Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 361182242076105386798727419Base Volume Input [veh/h] Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Volumes 2 1/28/2025 269 Generated with Adams St and Corporate Centre Dr Scenario 3: 3 EAC AMTJW Engineering, Inc.Version 2025 (SP 0-1) 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type Pattern 1Active Pattern 80Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s] 0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 0221202212021120189Maximum Green [s] Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing (Basic) NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag 0.026.016.00.026.016.00.025.016.00.022.013.0Split [s] Phasing & Timing: Pattern 1 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 3 1/28/2025 270 Generated with Adams St and Corporate Centre Dr Scenario 3: 3 EAC AMTJW Engineering, Inc.Version 2025 (SP 0-1) 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.579.571.4310.080.660.619.170.570.528.71d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.500.11k, delay calibration 34.2636.5234.4836.757.067.0536.578.428.4038.54d1, Uniform Delay [s] 14912714611810801157124997107344c, Capacity [veh/h] 1647178117051781174618701781173818701781s, saturation flow rate [veh/h] 0.030.060.030.050.180.180.050.140.140.01(v / s)_i Volume / Saturation Flow Rate 0.090.070.090.070.620.620.070.570.570.02g / C, Green / Cycle 7.25.76.85.349.649.65.546.046.01.9g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 80808080808080808080C, Calculated Cycle Length [s] CLCLCCLCCLLane Group Lane Group Calculations 48.7499.0944.4192.9791.1796.5390.6280.3384.3222.9195th-Percentile Queue Length [ft/ln] 1.953.961.783.723.653.863.623.213.370.9295th-Percentile Queue Length [veh/ln] 27.0855.0524.6751.6550.6553.6350.3444.6346.8512.7350th-Percentile Queue Length [ft/ln] 1.082.200.992.072.032.152.011.791.870.5150th-Percentile Queue Length [veh/ln] YesNoNoYesNoNoYesYesNoNoCritical Lane Group DDDDAADAADLane Group LOS 35.8346.0935.9146.837.727.6645.748.988.9147.25d, Delay for Lane Group [s/veh] 0.380.770.350.770.280.280.760.240.240.50X, volume / capacity Lane Group Results 4 1/28/2025 271 Generated with Adams St and Corporate Centre Dr Scenario 3: 3 EAC AMTJW Engineering, Inc.Version 2025 (SP 0-1) Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]47.25 8.94 8.98 45.74 7.68 7.72 46.83 35.91 35.91 46.09 35.83 35.83 Movement LOS D A A D A A D D D D D D d_A, Approach Delay [s/veh]10.59 12.59 42.91 42.36 Approach LOS B B D D d_I, Intersection Delay [s/veh]17.70 Intersection LOS B Intersection V/C 0.344 Emissions Vehicle Miles Traveled [mph]1.40 16.12 15.21 7.23 25.24 23.66 2.72 1.52 6.51 3.72 Stops [stops/h]22.91 84.32 80.33 90.62 96.53 91.17 92.97 44.41 99.09 48.74 Fuel consumption [US gal/h]0.54 2.06 1.96 2.25 2.58 2.43 1.35 0.61 1.59 0.76 CO [g/h]38.06 143.92 136.75 157.23 180.15 169.72 94.09 42.75 111.26 53.29 NOx [g/h]7.41 28.00 26.61 30.59 35.05 33.02 18.31 8.32 21.65 10.37 VOC [g/h]8.82 33.36 31.69 36.44 41.75 39.33 21.81 9.91 25.79 12.35 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]31.51 31.51 31.51 31.51 I_p,int, Pedestrian LOS Score for Intersectio 2.632 2.662 2.017 2.037 Crosswalk LOS B B B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]450 525 550 550 d_b, Bicycle Delay [s]24.03 21.76 21.03 21.03 I_b,int, Bicycle LOS Score for Intersection 1.983 2.162 1.794 1.814 Bicycle LOS A B A A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence 5 1/28/2025 272 Generated with Adams St and Corporate Centre Dr Scenario 4: 4 EAC PMTJW Engineering, Inc.Version 2025 (SP 0-1) Intersection Level Of Service Report Intersection 1: Adams St / Corporate Center Dr Control Type:Signalized Delay (sec / veh):18.3 Analysis Method:HCM 7th Edition Level Of Service:B Analysis Period:15 minutes Volume to Capacity (v/c):0.385 YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 25.0025.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft] 001001001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Intersection Setup 1 1/28/2025 273 Generated with Adams St and Corporate Centre Dr Scenario 4: 4 EAC PMTJW Engineering, Inc.Version 2025 (SP 0-1) 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 4313982823911245359410850862Total Analysis Volume [veh/h] 11324762331134242712715Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor 371184242078107461819343753Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 00000006700570Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 361182242076105386799137352Base Volume Input [veh/h] Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Volumes 2 1/28/2025 274 Generated with Adams St and Corporate Centre Dr Scenario 4: 4 EAC PMTJW Engineering, Inc.Version 2025 (SP 0-1) 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type Pattern 1Active Pattern 80Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s] 0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 02212022120201101910Maximum Green [s] Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing (Basic) NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag 0.026.016.00.026.016.00.024.015.00.023.014.0Split [s] Phasing & Timing: Pattern 1 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 3 1/28/2025 275 Generated with Adams St and Corporate Centre Dr Scenario 4: 4 EAC PMTJW Engineering, Inc.Version 2025 (SP 0-1) 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.579.571.4310.080.760.719.210.750.7011.98d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.500.11k, delay calibration 34.2636.5234.4836.757.977.9736.578.758.7437.63d1, Uniform Delay [s] 149127146118104311151241009107384c, Capacity [veh/h] 1647178117051781175018701781175818701781s, saturation flow rate [veh/h] 0.030.060.030.050.180.180.050.170.170.03(v / s)_i Volume / Saturation Flow Rate 0.090.070.090.070.600.600.070.570.570.05g / C, Green / Cycle 7.25.76.85.347.847.85.546.046.03.8g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 80808080808080808080C, Calculated Cycle Length [s] CLCLCCLCCLLane Group Lane Group Calculations 48.7499.0944.4192.97104.59110.6490.66105.10110.4463.4795th-Percentile Queue Length [ft/ln] 1.953.961.783.724.184.433.634.204.422.5495th-Percentile Queue Length [veh/ln] 27.0855.0524.6751.6558.1161.4650.3758.3961.3635.2650th-Percentile Queue Length [ft/ln] 1.082.200.992.072.322.462.012.342.451.4150th-Percentile Queue Length [veh/ln] YesNoNoYesNoNoYesYesNoNoCritical Lane Group DDDDAADAADLane Group LOS 35.8346.0935.9146.838.738.6745.789.509.4449.62d, Delay for Lane Group [s/veh] 0.380.770.350.770.310.300.760.300.300.74X, volume / capacity Lane Group Results 4 1/28/2025 276 Generated with Adams St and Corporate Centre Dr Scenario 4: 4 EAC PMTJW Engineering, Inc.Version 2025 (SP 0-1) Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]49.62 9.46 9.50 45.78 8.69 8.73 46.83 35.91 35.91 46.09 35.83 35.83 Movement LOS D A A D A A D D D D D D d_A, Approach Delay [s/veh]13.14 13.33 42.91 42.36 Approach LOS B B D D d_I, Intersection Delay [s/veh]18.28 Intersection LOS B Intersection V/C 0.385 Emissions Vehicle Miles Traveled [mph]3.96 20.21 19.10 7.23 26.13 24.54 2.72 1.52 6.51 3.72 Stops [stops/h]63.47 110.44 105.10 90.66 110.64 104.59 92.97 44.41 99.09 48.74 Fuel consumption [US gal/h]1.55 2.67 2.54 2.25 2.87 2.71 1.35 0.61 1.59 0.76 CO [g/h]108.39 186.93 177.57 157.32 200.70 189.33 94.09 42.75 111.26 53.29 NOx [g/h]21.09 36.37 34.55 30.61 39.05 36.84 18.31 8.32 21.65 10.37 VOC [g/h]25.12 43.32 41.15 36.46 46.52 43.88 21.81 9.91 25.79 12.35 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]31.51 31.51 31.51 31.51 I_p,int, Pedestrian LOS Score for Intersectio 2.687 2.704 2.028 2.039 Crosswalk LOS B B B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]475 500 550 550 d_b, Bicycle Delay [s]23.26 22.50 21.03 21.03 I_b,int, Bicycle LOS Score for Intersection 2.119 2.181 1.794 1.814 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence 5 1/28/2025 277 OPENING YEAR PLUS PROJECT TRAFFIC CONDITIONS 278 Generated with Adams St and Corporate Centre Dr Scenario 5: 5 EACP AMTJW Engineering, Inc.Version 2025 (SP 0-1) Intersection Level Of Service Report Intersection 1: Adams St / Corporate Center Dr Control Type:Signalized Delay (sec / veh):25.2 Analysis Method:HCM 7th Edition Level Of Service:C Analysis Period:15 minutes Volume to Capacity (v/c):0.516 YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 25.0025.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft] 001001001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Intersection Setup 1 1/28/2025 279 Generated with Adams St and Corporate Centre Dr Scenario 5: 5 EACP AMTJW Engineering, Inc.Version 2025 (SP 0-1) 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 4313981302317421151294103388128Total Analysis Volume [veh/h] 11324336445312824269732Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor 371184112201501824418189334110Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000880727547005591Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 361182242076105386798727419Base Volume Input [veh/h] Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Volumes 2 1/28/2025 280 Generated with Adams St and Corporate Centre Dr Scenario 5: 5 EACP AMTJW Engineering, Inc.Version 2025 (SP 0-1) 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type Pattern 1Active Pattern 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s] 0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 02212022120201201810Maximum Green [s] Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing (Basic) NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag 0.026.019.00.026.019.00.028.019.00.026.017.0Split [s] Phasing & Timing: Pattern 1 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 3 1/28/2025 281 Generated with Adams St and Corporate Centre Dr Scenario 5: 5 EACP AMTJW Engineering, Inc.Version 2025 (SP 0-1) 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.849.514.398.991.261.149.260.620.578.02d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.120.500.500.110.500.500.11k, delay calibration 39.0041.0837.4538.8012.6012.6041.1510.5610.5440.01d1, Uniform Delay [s] 1401272142108909871239551028163c, Capacity [veh/h] 1647178116261781168718701781173718701781s, saturation flow rate [veh/h] 0.030.060.090.100.200.200.050.140.140.07(v / s)_i Volume / Saturation Flow Rate 0.080.070.130.120.530.530.070.550.550.09g / C, Green / Cycle 7.66.411.810.647.647.66.249.649.68.2g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090909090C, Calculated Cycle Length [s] CLCLCCLCCLLane Group Lane Group Calculations 56.00111.06156.63191.29173.57190.01102.31102.33108.39135.1895th-Percentile Queue Length [ft/ln] 2.244.446.277.656.947.604.094.094.345.4195th-Percentile Queue Length [veh/ln] 31.1161.7087.01106.6296.43105.7056.8456.8560.2275.1050th-Percentile Queue Length [ft/ln] 1.242.473.484.263.864.232.272.272.413.0050th-Percentile Queue Length [veh/ln] NoYesYesNoYesNoNoNoNoYesCritical Lane Group DDDDBBDBBDLane Group LOS 40.8550.5841.8547.7913.8713.7350.4111.1811.1148.03d, Delay for Lane Group [s/veh] 0.400.770.710.830.390.380.760.250.250.78X, volume / capacity Lane Group Results 4 1/28/2025 282 Generated with Adams St and Corporate Centre Dr Scenario 5: 5 EACP AMTJW Engineering, Inc.Version 2025 (SP 0-1) Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]48.03 11.14 11.18 50.41 13.77 13.87 47.79 41.85 41.85 50.58 40.85 40.85 Movement LOS D B B D B B D D D D D D d_A, Approach Delay [s/veh]18.77 18.01 45.01 47.04 Approach LOS B B D D d_I, Intersection Delay [s/veh]25.19 Intersection LOS C Intersection V/C 0.516 Emissions Vehicle Miles Traveled [mph]8.17 16.17 15.16 7.23 29.19 26.40 5.20 4.57 6.51 3.72 Stops [stops/h]120.16 96.34 90.96 90.94 169.12 154.29 170.59 139.22 98.72 49.78 Fuel consumption [US gal/h]3.02 2.33 2.19 2.34 4.16 3.79 2.58 2.04 1.68 0.82 CO [g/h]211.44 162.53 153.18 163.76 291.09 265.09 180.35 142.77 117.43 57.57 NOx [g/h]41.14 31.62 29.80 31.86 56.63 51.58 35.09 27.78 22.85 11.20 VOC [g/h]49.00 37.67 35.50 37.95 67.46 61.44 41.80 33.09 27.22 13.34 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersectio 2.699 2.717 2.126 2.043 Crosswalk LOS B B B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]489 533 489 489 d_b, Bicycle Delay [s]25.69 24.20 25.69 25.69 I_b,int, Bicycle LOS Score for Intersection 2.070 2.234 2.099 1.814 Bicycle LOS B B B A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence 5 1/28/2025 283 Generated with Adams St and Corporate Centre Dr Scenario 6: 6 EACP PMTJW Engineering, Inc.Version 2025 (SP 0-1) Intersection Level Of Service Report Intersection 1: Adams St / Corporate Center Dr Control Type:Signalized Delay (sec / veh):22.2 Analysis Method:HCM 7th Edition Level Of Service:C Analysis Period:15 minutes Volume to Capacity (v/c):0.450 YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 25.0025.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft] 001001001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Intersection Setup 1 1/28/2025 284 Generated with Adams St and Corporate Centre Dr Scenario 6: 6 EACP PMTJW Engineering, Inc.Version 2025 (SP 0-1) 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 431398752312916353594108508109Total Analysis Volume [veh/h] 113241963241134242712727Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor 3711846520111140461819343794Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000410333367005741Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 361182242076105386799137352Base Volume Input [veh/h] Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Volumes 2 1/28/2025 285 Generated with Adams St and Corporate Centre Dr Scenario 6: 6 EACP PMTJW Engineering, Inc.Version 2025 (SP 0-1) 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type Pattern 1Active Pattern 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] 0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s] 0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s] 0.01.01.00.01.01.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s] 02211022110211102010Maximum Green [s] Auxiliary Signal Groups 047083025061Signal Group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing (Basic) NoNoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoNoMinimum Recall 0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 0105010501050105Minimum Green [s] --Lead--Lead--Lead--LeadLead / Lag 0.026.018.00.026.018.00.028.018.00.028.018.0Split [s] Phasing & Timing: Pattern 1 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 3 1/28/2025 286 Generated with Adams St and Corporate Centre Dr Scenario 6: 6 EACP PMTJW Engineering, Inc.Version 2025 (SP 0-1) 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.849.602.918.560.960.889.300.740.698.55d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.500.11k, delay calibration 39.0041.0938.3440.0910.4810.4841.169.709.7040.62d1, Uniform Delay [s] 140127173162976106012310141079141c, Capacity [veh/h] 1647178116471781172218701781175818701781s, saturation flow rate [veh/h] 0.030.060.060.070.190.190.050.170.170.06(v / s)_i Volume / Saturation Flow Rate 0.080.070.100.090.570.570.070.580.580.08g / C, Green / Cycle 7.66.49.48.251.151.16.252.052.07.1g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 90909090909090909090C, Calculated Cycle Length [s] CLCLCCLCCLLane Group Lane Group Calculations 56.00111.1998.81142.95147.27158.36102.35122.66129.27116.7595th-Percentile Queue Length [ft/ln] 2.244.453.955.725.896.334.094.915.174.6795th-Percentile Queue Length [veh/ln] 31.1161.7754.8979.4281.8287.9856.8668.1571.8264.8650th-Percentile Queue Length [ft/ln] 1.242.472.203.183.273.522.272.732.872.5950th-Percentile Queue Length [veh/ln] NoYesYesNoYesNoNoNoNoYesCritical Lane Group DDDDBBDBBDLane Group LOS 40.8550.6941.2448.6411.4411.3650.4510.4410.3949.17d, Delay for Lane Group [s/veh] 0.400.770.570.800.340.340.760.290.290.77X, volume / capacity Lane Group Results 4 1/28/2025 287 Generated with Adams St and Corporate Centre Dr Scenario 6: 6 EACP PMTJW Engineering, Inc.Version 2025 (SP 0-1) Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]49.17 10.41 10.44 50.45 11.38 11.44 48.64 41.24 41.24 50.69 40.85 40.85 Movement LOS D B B D B B D D D D D D d_A, Approach Delay [s/veh]16.24 16.03 45.45 47.11 Approach LOS B B D D d_I, Intersection Delay [s/veh]22.15 Intersection LOS C Intersection V/C 0.450 Emissions Vehicle Miles Traveled [mph]6.96 20.22 19.08 7.23 27.90 25.77 3.85 2.93 6.51 3.72 Stops [stops/h]103.78 114.91 109.04 90.98 140.76 130.90 127.06 87.83 98.84 49.78 Fuel consumption [US gal/h]2.62 2.79 2.65 2.34 3.55 3.29 1.94 1.29 1.68 0.82 CO [g/h]183.09 195.15 184.92 163.84 247.81 230.06 135.44 90.25 117.61 57.57 NOx [g/h]35.62 37.97 35.98 31.88 48.22 44.76 26.35 17.56 22.88 11.20 VOC [g/h]42.43 45.23 42.86 37.97 57.43 53.32 31.39 20.92 27.26 13.34 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45 I_p,int, Pedestrian LOS Score for Intersectio 2.721 2.732 2.080 2.044 Crosswalk LOS B B B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]533 533 489 489 d_b, Bicycle Delay [s]24.20 24.20 25.69 25.69 I_b,int, Bicycle LOS Score for Intersection 2.158 2.213 1.934 1.814 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4321Ring 1 Sequence 5 1/28/2025 288 OPENING YEAR PLUS PROJECT PLUS ALTERNATIVE #1 TRAFFIC CONDITIONS 289 Generated with Adams St and Corporate Centre Dr Scenario 11: 11 EACP Alt 1 AMTJW Engineering, Inc.Version 2025 (SP 0-1) Intersection Level Of Service Report Intersection 1: Adams St / Corporate Center Dr Control Type:Signalized Delay (sec / veh):24.4 Analysis Method:HCM 7th Edition Level Of Service:C Analysis Period:15 minutes Volume to Capacity (v/c):0.626 YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 25.0025.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft] 001001001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Intersection Setup 1 1/28/2025 290 Generated with Adams St and Corporate Centre Dr Scenario 11: 11 EACP Alt 1 AMTJW Engineering, Inc.Version 2025 (SP 0-1) 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 4313981302317421151294103388128Total Analysis Volume [veh/h] 11324336445312824269732Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor 371184112201501824418189334110Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000880727547005591Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 361182242076105386798727419Base Volume Input [veh/h] Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Volumes 2 1/28/2025 291 Generated with Adams St and Corporate Centre Dr Scenario 11: 11 EACP Alt 1 AMTJW Engineering, Inc.Version 2025 (SP 0-1) 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type Pattern 1Active Pattern 80Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] 0.02.02.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0.017.00.00.017.00.00.014.00.00.014.00.0Pedestrian Clearance [s] 0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s] 0.01.01.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.00.00.03.03.00.03.03.0Amber [s] 0361002200211301911Maximum Green [s] Auxiliary Signal Groups 047080025061Signal Group PermissPermissProtectePermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing (Basic) NoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoMinimum Recall 0.03.03.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 0105010001050105Minimum Green [s] --Lead-----Lead--LeadLead / Lag 0.040.014.00.026.00.00.025.017.00.023.015.0Split [s] Phasing & Timing: Pattern 1 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 3 1/28/2025 292 Generated with Adams St and Corporate Centre Dr Scenario 11: 11 EACP Alt 1 AMTJW Engineering, Inc.Version 2025 (SP 0-1) 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.089.811.191.672.272.049.441.010.927.83d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.500.11k, delay calibration 18.4736.5527.7532.4116.5516.5436.6014.0714.0535.53d1, Uniform Delay [s] 547126313306719796123780839164c, Capacity [veh/h] 1647178114801020168718701781173718701781s, saturation flow rate [veh/h] 0.030.060.100.170.200.200.050.140.140.07(v / s)_i Volume / Saturation Flow Rate 0.330.070.210.210.430.430.070.450.450.09g / C, Green / Cycle 26.55.716.916.934.134.15.535.935.97.4g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 80808080808080808080C, Calculated Cycle Length [s] CLCCCCLCCLLane Group Lane Group Calculations 32.3699.42118.87150.38196.44210.7390.98117.25124.08119.1595th-Percentile Queue Length [ft/ln] 1.293.984.756.027.868.433.644.694.964.7795th-Percentile Queue Length [veh/ln] 17.9855.2466.0483.55110.31120.6650.5565.1468.9366.2050th-Percentile Queue Length [ft/ln] 0.722.212.643.344.414.832.022.612.762.6550th-Percentile Queue Length [veh/ln] NoYesNoYesYesNoNoNoNoYesCritical Lane Group BDCCBBDBBDLane Group LOS 18.5646.3628.9434.0818.8218.5846.0415.0814.9843.36d, Delay for Lane Group [s/veh] 0.100.780.490.570.480.480.760.300.300.78X, volume / capacity Lane Group Results 4 1/28/2025 293 Generated with Adams St and Corporate Centre Dr Scenario 11: 11 EACP Alt 1 AMTJW Engineering, Inc.Version 2025 (SP 0-1) Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]43.36 15.01 15.08 46.04 18.64 18.82 34.08 28.94 28.94 46.36 18.56 18.56 Movement LOS D B B D B B C C C D B B d_A, Approach Delay [s/veh]20.89 21.84 31.68 36.25 Approach LOS C C C D d_I, Intersection Delay [s/veh]24.37 Intersection LOS C Intersection V/C 0.626 Emissions Vehicle Miles Traveled [mph]8.17 16.17 15.16 7.23 29.19 26.40 5.20 4.57 6.51 3.72 Stops [stops/h]119.15 124.08 117.25 90.98 217.18 198.56 150.38 118.87 99.42 32.36 Fuel consumption [US gal/h]2.89 2.87 2.71 2.26 5.14 4.69 2.02 1.56 1.60 0.50 CO [g/h]202.08 200.55 189.20 157.95 359.04 327.76 141.02 109.22 111.73 35.14 NOx [g/h]39.32 39.02 36.81 30.73 69.86 63.77 27.44 21.25 21.74 6.84 VOC [g/h]46.83 46.48 43.85 36.61 83.21 75.96 32.68 25.31 25.89 8.15 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]31.51 31.51 31.51 31.51 I_p,int, Pedestrian LOS Score for Intersectio 2.693 2.959 2.120 2.203 Crosswalk LOS B C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]475 525 550 900 d_b, Bicycle Delay [s]23.26 21.76 21.03 12.10 I_b,int, Bicycle LOS Score for Intersection 2.070 2.234 1.829 1.814 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4-21Ring 1 Sequence 5 1/28/2025 294 Generated with Adams St and Corporate Centre Dr Scenario 12: 12 EACP Alt 1 PMTJW Engineering, Inc.Version 2025 (SP 0-1) Intersection Level Of Service Report Intersection 1: Adams St / Corporate Center Dr Control Type:Signalized Delay (sec / veh):22.0 Analysis Method:HCM 7th Edition Level Of Service:C Analysis Period:15 minutes Volume to Capacity (v/c):0.560 YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 25.0025.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft] 001001001001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Intersection Setup 1 1/28/2025 295 Generated with Adams St and Corporate Centre Dr Scenario 12: 12 EACP Alt 1 PMTJW Engineering, Inc.Version 2025 (SP 0-1) 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 431398752312916353594108508109Total Analysis Volume [veh/h] 113241963241134242712727Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor 3711846520111140461819343794Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000410333367005741Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 361182242076105386799137352Base Volume Input [veh/h] Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Volumes 2 1/28/2025 296 Generated with Adams St and Corporate Centre Dr Scenario 12: 12 EACP Alt 1 PMTJW Engineering, Inc.Version 2025 (SP 0-1) 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type Pattern 1Active Pattern 80Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] 0.02.02.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0.017.00.00.017.00.00.010.00.00.014.00.0Pedestrian Clearance [s] 0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s] 0.01.01.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.03.00.03.00.00.03.03.00.03.03.0Amber [s] 0361002200211202011Maximum Green [s] Auxiliary Signal Groups 047080025061Signal Group PermissPermissProtectePermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing (Basic) NoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoMinimum Recall 0.03.03.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 0105010001050105Minimum Green [s] --Lead-----Lead--LeadLead / Lag 0.040.014.00.026.00.00.025.016.00.024.015.0Split [s] Phasing & Timing: Pattern 1 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 3 1/28/2025 297 Generated with Adams St and Corporate Centre Dr Scenario 12: 12 EACP Alt 1 PMTJW Engineering, Inc.Version 2025 (SP 0-1) 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.109.810.841.511.551.429.401.151.088.49d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.500.11k, delay calibration 20.3536.5528.9133.9413.8713.8636.6012.9312.9236.10d1, Uniform Delay [s] 492126267257812882123847901142c, Capacity [veh/h] 164717811499939172218701781175818701781s, saturation flow rate [veh/h] 0.030.060.070.140.190.190.050.170.170.06(v / s)_i Volume / Saturation Flow Rate 0.300.070.180.180.470.470.070.480.480.08g / C, Green / Cycle 23.95.714.314.337.737.75.538.638.66.4g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 80808080808080808080C, Calculated Cycle Length [s] CLCCCCLCCLLane Group Lane Group Calculations 34.3399.4276.44112.74168.82181.3390.92141.09148.59103.2895th-Percentile Queue Length [ft/ln] 1.373.983.064.516.757.253.645.645.944.1395th-Percentile Queue Length [veh/ln] 19.0755.2442.4662.6393.79100.7450.5178.3882.5557.3850th-Percentile Queue Length [ft/ln] 0.762.211.702.513.754.032.023.143.302.3050th-Percentile Queue Length [veh/ln] NoYesNoYesYesNoNoNoNoYesCritical Lane Group CDCDBBDBBDLane Group LOS 20.4546.3629.7535.4515.4215.2845.9914.0914.0044.59d, Delay for Lane Group [s/veh] 0.110.780.370.500.410.410.760.350.350.77X, volume / capacity Lane Group Results 4 1/28/2025 298 Generated with Adams St and Corporate Centre Dr Scenario 12: 12 EACP Alt 1 PMTJW Engineering, Inc.Version 2025 (SP 0-1) Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]44.59 14.03 14.09 45.99 15.32 15.42 35.45 29.75 29.75 46.36 20.45 20.45 Movement LOS D B B D B B D C C D C C d_A, Approach Delay [s/veh]18.64 18.98 32.99 36.94 Approach LOS B B C D d_I, Intersection Delay [s/veh]21.98 Intersection LOS C Intersection V/C 0.560 Emissions Vehicle Miles Traveled [mph]6.96 20.22 19.08 7.23 27.90 25.77 3.85 2.93 6.51 3.72 Stops [stops/h]103.28 148.59 141.09 90.92 181.33 168.82 112.74 76.44 99.42 34.33 Fuel consumption [US gal/h]2.51 3.44 3.27 2.26 4.34 4.03 1.54 1.02 1.60 0.53 CO [g/h]175.56 240.71 228.29 157.84 303.32 281.95 107.38 71.17 111.73 37.18 NOx [g/h]34.16 46.83 44.42 30.71 59.01 54.86 20.89 13.85 21.74 7.23 VOC [g/h]40.69 55.79 52.91 36.58 70.30 65.34 24.89 16.49 25.89 8.62 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]31.51 31.51 31.51 31.51 I_p,int, Pedestrian LOS Score for Intersectio 2.715 2.910 2.075 2.204 Crosswalk LOS B C B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]500 525 550 900 d_b, Bicycle Delay [s]22.50 21.76 21.03 12.10 I_b,int, Bicycle LOS Score for Intersection 2.158 2.213 1.747 1.814 Bicycle LOS B B A A ----------------Ring 4 ----------------Ring 3 ------------8765Ring 2 ------------4-21Ring 1 Sequence 5 1/28/2025 299 OPENING YEAR PLUS PROJECT PLUS ALTERNATIVE #2 TRAFFIC CONDITIONS 300 Generated with Adams St and Corporate Centre Dr Scenario 7: 7 EACP Alt 2 AMTJW Engineering, Inc.Version 2025 (SP 0-2) Intersection Level Of Service Report Intersection 1: Adams St / Corporate Center Dr Control Type:Signalized Delay (sec / veh):22.3 Analysis Method:HCM 7th Edition Level Of Service:C Analysis Period:15 minutes Volume to Capacity (v/c):0.855 YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 25.0025.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00110.00100.00100.00110.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Intersection Setup 1 4/11/2025 301 Generated with Adams St and Corporate Centre Dr Scenario 7: 7 EACP Alt 2 AMTJW Engineering, Inc.Version 2025 (SP 0-2) 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 4313981302317421151294103388128Total Analysis Volume [veh/h] 11324336445312824269732Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor 371184112201501824418189334110Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000880727547005591Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 361182242076105386798727419Base Volume Input [veh/h] Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Volumes 2 4/11/2025 302 Generated with Adams St and Corporate Centre Dr Scenario 7: 7 EACP Alt 2 AMTJW Engineering, Inc.Version 2025 (SP 0-2) 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type Pattern 1Active Pattern 80Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] 0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s] 0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s] 0.01.01.00.01.01.00.01.00.00.01.00.0All red [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s] 018190242109500950Maximum Green [s] Auxiliary Signal Groups 047083020060Signal Group Flashing Yellow Arrow PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing (Basic) NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 0105010501000100Minimum Green [s] --Lead--Lead------Lead / Lag 0.022.020.00.022.020.00.038.00.00.038.00.0Split [s] Phasing & Timing: Pattern 1 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 3 4/11/2025 303 Generated with Adams St and Corporate Centre Dr Scenario 7: 7 EACP Alt 2 AMTJW Engineering, Inc.Version 2025 (SP 0-2) 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.589.033.587.206.396.30d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.50k, delay calibration 34.2936.4532.7834.3010.489.46d1, Uniform Delay [s] 1481282252141027822c, Capacity [veh/h] 164717811626178115271201s, saturation flow rate [veh/h] 0.030.060.090.100.540.52(v / s)_i Volume / Saturation Flow Rate 0.090.070.140.120.640.64g / C, Green / Cycle 7.25.711.09.651.251.2g_i, Effective Green Time [s] 2.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.002.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 808080808080C, Calculated Cycle Length [s] CLCLCCLane Group Lane Group Calculations 48.7898.35135.45165.89343.54245.4395th-Percentile Queue Length [ft/ln] 1.953.935.426.6413.749.8295th-Percentile Queue Length [veh/ln] 27.1054.6475.2592.16221.50146.2650th-Percentile Queue Length [ft/ln] 1.082.193.013.698.865.8550th-Percentile Queue Length [veh/ln] NoYesYesNoYesNoCritical Lane Group DDDDBBLane Group LOS 35.8745.4836.3641.5016.8615.77d, Delay for Lane Group [s/veh] 0.380.760.680.810.800.75X, volume / capacity Lane Group Results 4 4/11/2025 304 Generated with Adams St and Corporate Centre Dr Scenario 7: 7 EACP Alt 2 AMTJW Engineering, Inc.Version 2025 (SP 0-2) Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]15.77 15.77 15.77 16.86 16.86 16.86 41.50 36.36 36.36 45.48 35.87 35.87 Movement LOS B B B B B B D D D D D D d_A, Approach Delay [s/veh]15.77 16.86 39.10 41.98 Approach LOS B B D D d_I, Intersection Delay [s/veh]22.32 Intersection LOS C Intersection V/C 0.855 Emissions Vehicle Miles Traveled [mph]39.50 62.81 5.20 4.57 6.51 3.72 Stops [stops/h]263.27 398.70 165.89 135.45 98.35 48.78 Fuel consumption [US gal/h]6.61 9.91 2.34 1.86 1.58 0.76 CO [g/h]462.26 692.99 163.54 129.82 110.22 53.34 NOx [g/h]89.94 134.83 31.82 25.26 21.44 10.38 VOC [g/h]107.13 160.61 37.90 30.09 25.54 12.36 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]31.51 31.51 31.51 31.51 I_p,int, Pedestrian LOS Score for Intersectio 2.598 2.629 2.302 2.171 Crosswalk LOS B B B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]850 850 450 450 d_b, Bicycle Delay [s]13.23 13.23 24.03 24.03 I_b,int, Bicycle LOS Score for Intersection 2.581 2.908 2.099 1.814 Bicycle LOS B C B A ----------------Ring 4 ----------------Ring 3 ------------876-Ring 2 ------------432-Ring 1 Sequence 5 4/11/2025 305 Generated with Adams St and Corporate Centre Dr Scenario 8: 8 EACP Alt 2 PMTJW Engineering, Inc.Version 2025 (SP 0-2) Intersection Level Of Service Report Intersection 1: Adams St / Corporate Center Dr Control Type:Signalized Delay (sec / veh):18.7 Analysis Method:HCM 7th Edition Level Of Service:B Analysis Period:15 minutes Volume to Capacity (v/c):0.796 YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 25.0025.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00110.00100.00100.00110.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Intersection Setup 1 4/11/2025 306 Generated with Adams St and Corporate Centre Dr Scenario 8: 8 EACP Alt 2 PMTJW Engineering, Inc.Version 2025 (SP 0-2) 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 431398752312916353594108508109Total Analysis Volume [veh/h] 113241963241134242712727Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor 3711846520111140461819343794Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000410333367005741Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 361182242076105386799137352Base Volume Input [veh/h] Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Volumes 2 4/11/2025 307 Generated with Adams St and Corporate Centre Dr Scenario 8: 8 EACP Alt 2 PMTJW Engineering, Inc.Version 2025 (SP 0-2) 16.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type Pattern 1Active Pattern 80Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] 0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s] 0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s] 0.01.01.00.01.01.00.01.00.00.01.00.0All red [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s] 018160181603400340Maximum Green [s] Auxiliary Signal Groups 047083020060Signal Group Flashing Yellow Arrow PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing (Basic) NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 0105010501000100Minimum Green [s] --Lead--Lead------Lead / Lag 0.022.020.00.022.020.00.038.00.00.038.00.0Split [s] Phasing & Timing: Pattern 1 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 3 4/11/2025 308 Generated with Adams St and Corporate Centre Dr Scenario 8: 8 EACP Alt 2 PMTJW Engineering, Inc.Version 2025 (SP 0-2) 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.549.032.387.804.794.77d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.50k, delay calibration 34.2136.4533.5635.508.548.20d1, Uniform Delay [s] 1501281841651061991c, Capacity [veh/h] 164717811647178115171410s, saturation flow rate [veh/h] 0.030.060.060.070.520.51(v / s)_i Volume / Saturation Flow Rate 0.090.070.110.090.670.67g / C, Green / Cycle 7.25.78.97.453.453.4g_i, Effective Green Time [s] 2.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.002.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 808080808080C, Calculated Cycle Length [s] CLCLCCLane Group Lane Group Calculations 48.6798.3585.61125.68277.73248.0495th-Percentile Queue Length [ft/ln] 1.953.933.425.0311.119.9295th-Percentile Queue Length [veh/ln] 27.0454.6447.5669.82170.62148.2150th-Percentile Queue Length [ft/ln] 1.082.191.902.796.825.9350th-Percentile Queue Length [veh/ln] NoYesYesNoYesNoCritical Lane Group DDDDBBLane Group LOS 35.7445.4835.9443.3013.3312.97d, Delay for Lane Group [s/veh] 0.370.760.530.780.750.73X, volume / capacity Lane Group Results 4 4/11/2025 309 Generated with Adams St and Corporate Centre Dr Scenario 8: 8 EACP Alt 2 PMTJW Engineering, Inc.Version 2025 (SP 0-2) Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]12.97 12.97 12.97 13.33 13.33 13.33 43.30 35.94 35.94 45.48 35.74 35.74 Movement LOS B B B B B B D D D D D D d_A, Approach Delay [s/veh]12.97 13.33 40.12 41.94 Approach LOS B B D D d_I, Intersection Delay [s/veh]18.72 Intersection LOS B Intersection V/C 0.796 Emissions Vehicle Miles Traveled [mph]46.26 60.89 3.85 2.93 6.51 3.72 Stops [stops/h]266.78 307.12 125.68 85.61 98.35 48.67 Fuel consumption [US gal/h]6.82 8.05 1.79 1.18 1.58 0.76 CO [g/h]476.44 563.00 125.27 82.25 110.22 53.21 NOx [g/h]92.70 109.54 24.37 16.00 21.44 10.35 VOC [g/h]110.42 130.48 29.03 19.06 25.54 12.33 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]31.51 31.51 31.51 31.51 I_p,int, Pedestrian LOS Score for Intersectio 2.634 2.653 2.230 2.172 Crosswalk LOS B B B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]850 850 450 450 d_b, Bicycle Delay [s]13.23 13.23 24.03 24.03 I_b,int, Bicycle LOS Score for Intersection 2.756 2.866 1.934 1.814 Bicycle LOS C C A A ----------------Ring 4 ----------------Ring 3 ------------876-Ring 2 ------------432-Ring 1 Sequence 5 4/11/2025 310 OPENING YEAR PLUS PROJECT PLUS ALTERNATIVE #3 TRAFFIC CONDITIONS 311 Generated with Adams St and Corporate Centre Dr Scenario 9: 9 EACP Alt 3 AMTJW Engineering, Inc.Version 2025 (SP 0-1) Intersection Level Of Service Report Intersection 1: Adams St / Corporate Center Dr Control Type:Roundabout Delay (sec / veh):14.6 Analysis Method:HCM 7th Edition Level Of Service:B Analysis Period:15 minutes YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 25.0025.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Intersection Setup 0000Pedestrian Volume [ped/h] 4313981302317421151294103388128Total Analysis Volume [veh/h] 11324336445312824269732Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor 371184112201501824418189334110Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000880727547005591Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 361182242076105386798727419Base Volume Input [veh/h] Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Volumes 1 1/28/2025 312 Generated with Adams St and Corporate Centre Dr Scenario 9: 9 EACP Alt 3 AMTJW Engineering, Inc.Version 2025 (SP 0-1) 4313981302317421151294103388128Adjusted Demand Flow Rate [veh/h] 371184112201501824418189334110Demand Flow Rate [veh/h] 224359617755Exiting Flow Rate [veh/h] 704718244297Circulating Flow Rate [veh/h] 1111Number of Conflicting Circulating Lanes Intersection Settings 0.230.500.770.62X, volume / capacity 66065110561000Capacity per Entry Lane [veh/h] 1.001.001.001.00Pedestrian Impedance 67466410771020Capacity of Entry and Bypass Lanes [veh/h] 158334834632Entry Flow Rate [veh/h] 0.980.980.980.98HV Adjustment Factor 0.001020.001020.001020.00102B (coefficient) 1380.001380.001380.001380.00A (intercept) 3.003.003.003.00User-Defined Follow-Up Time [s] NoNoNoNoOverwrite Calculated Follow-Up Time 4.004.004.004.00User-Defined Critical Headway [s] NoNoNoNoOverwrite Calculated Critical Headway Lanes BIntersection LOS 14.59Intersection Delay [s/veh] ABCBApproach LOS 8.2713.5117.8912.37Approach Delay [s/veh] 22.5170.86202.34111.5495th-Percentile Queue Length [ft] 0.902.838.094.4695th-Percentile Queue Length [veh] ABCBLane LOS Movement, Approach, & Intersection Results 2 1/28/2025 313 Generated with Adams St and Corporate Centre Dr Scenario 10: 10 EACP Alt 3 PMTJW Engineering, Inc.Version 2025 (SP 0-1) Intersection Level Of Service Report Intersection 1: Adams St / Corporate Center Dr Control Type:Roundabout Delay (sec / veh):14.0 Analysis Method:HCM 7th Edition Level Of Service:B Analysis Period:15 minutes YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 25.0025.0045.0045.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Intersection Setup 0000Pedestrian Volume [ped/h] 431398752312916353594108508109Total Analysis Volume [veh/h] 113241963241134242712727Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor 3711846520111140461819343794Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000410333367005741Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 361182242076105386799137352Base Volume Input [veh/h] Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName Volumes 1 1/28/2025 314 Generated with Adams St and Corporate Centre Dr Scenario 10: 10 EACP Alt 3 PMTJW Engineering, Inc.Version 2025 (SP 0-1) 431398752312916353594108508109Adjusted Demand Flow Rate [veh/h] 3711846520111140461819343794Demand Flow Rate [veh/h] 230291694722Exiting Flow Rate [veh/h] 761742224251Circulating Flow Rate [veh/h] 1111Number of Conflicting Circulating Lanes Intersection Settings 0.250.360.740.69X, volume / capacity 62363610771048Capacity per Entry Lane [veh/h] 1.001.001.001.00Pedestrian Impedance 63664810981069Capacity of Entry and Bypass Lanes [veh/h] 158232808740Entry Flow Rate [veh/h] 0.980.980.980.98HV Adjustment Factor 0.001020.001020.001020.00102B (coefficient) 1380.001380.001380.001380.00A (intercept) 3.003.003.003.00User-Defined Follow-Up Time [s] NoNoNoNoOverwrite Calculated Follow-Up Time 4.004.004.004.00User-Defined Critical Headway [s] NoNoNoNoOverwrite Calculated Critical Headway Lanes BIntersection LOS 13.98Intersection Delay [s/veh] ABCBApproach LOS 8.9110.5815.7114.24Approach Delay [s/veh] 24.2540.44174.68147.1595th-Percentile Queue Length [ft] 0.971.626.995.8995th-Percentile Queue Length [veh] ABCBLane LOS Movement, Approach, & Intersection Results 2 1/28/2025 315 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 1 / 47 Adams Street and Corporate Centre Drive Project Detailed Report Table of Contents 1. Basic Project Information 1.1. Basic Project Information 1.2. Land Use Types 1.3. User-Selected Emission Reduction Measures by Emissions Sector 2. Emissions Summary 2.1. Construction Emissions Compared Against Thresholds 2.2. Construction Emissions by Year, Unmitigated 2.4. Operations Emissions Compared Against Thresholds 2.5. Operations Emissions by Sector, Unmitigated 3. Construction Emissions Details 3.1. Demolition (2025) - Unmitigated 3.3. Site Preparation (2025) - Unmitigated 3.5. Grading (2025) - Unmitigated 3.7. Building Construction (2025) - Unmitigated 3.9. Paving (2025) - Unmitigated 316 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 2 / 47 3.11. Architectural Coating (2025) - Unmitigated 4. Operations Emissions Details 4.1. Mobile Emissions by Land Use 4.1.1. Unmitigated 4.2. Energy 4.2.1. Electricity Emissions By Land Use - Unmitigated 4.2.3. Natural Gas Emissions By Land Use - Unmitigated 4.3. Area Emissions by Source 4.3.1. Unmitigated 4.4. Water Emissions by Land Use 4.4.1. Unmitigated 4.5. Waste Emissions by Land Use 4.5.1. Unmitigated 4.6. Refrigerant Emissions by Land Use 4.6.1. Unmitigated 4.7. Offroad Emissions By Equipment Type 4.7.1. Unmitigated 4.8. Stationary Emissions By Equipment Type 317 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 3 / 47 4.8.1. Unmitigated 4.9. User Defined Emissions By Equipment Type 4.9.1. Unmitigated 4.10. Soil Carbon Accumulation By Vegetation Type 4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated 4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated 4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated 5. Activity Data 5.1. Construction Schedule 5.2. Off-Road Equipment 5.2.1. Unmitigated 5.3. Construction Vehicles 5.3.1. Unmitigated 5.4. Vehicles 5.4.1. Construction Vehicle Control Strategies 5.5. Architectural Coatings 5.6. Dust Mitigation 5.6.1. Construction Earthmoving Activities 318 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 4 / 47 5.6.2. Construction Earthmoving Control Strategies 5.7. Construction Paving 5.8. Construction Electricity Consumption and Emissions Factors 5.9. Operational Mobile Sources 5.9.1. Unmitigated 5.10. Operational Area Sources 5.10.1. Hearths 5.10.1.1. Unmitigated 5.10.2. Architectural Coatings 5.10.3. Landscape Equipment 5.11. Operational Energy Consumption 5.11.1. Unmitigated 5.12. Operational Water and Wastewater Consumption 5.12.1. Unmitigated 5.13. Operational Waste Generation 5.13.1. Unmitigated 5.14. Operational Refrigeration and Air Conditioning Equipment 5.14.1. Unmitigated 319 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 5 / 47 5.15. Operational Off-Road Equipment 5.15.1. Unmitigated 5.16. Stationary Sources 5.16.1. Emergency Generators and Fire Pumps 5.16.2. Process Boilers 5.17. User Defined 5.18. Vegetation 5.18.1. Land Use Change 5.18.1.1. Unmitigated 5.18.1. Biomass Cover Type 5.18.1.1. Unmitigated 5.18.2. Sequestration 5.18.2.1. Unmitigated 6. Climate Risk Detailed Report 6.1. Climate Risk Summary 6.2. Initial Climate Risk Scores 6.3. Adjusted Climate Risk Scores 6.4. Climate Risk Reduction Measures 320 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 6 / 47 7. Health and Equity Details 7.1. CalEnviroScreen 4.0 Scores 7.2. Healthy Places Index Scores 7.3. Overall Health & Equity Scores 7.4. Health & Equity Measures 7.5. Evaluation Scorecard 7.6. Health & Equity Custom Measures 8. User Changes to Default Data 321 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 7 / 47 1. Basic Project Information 1.1. Basic Project Information Data Field Value Project Name Adams Street and Corporate Centre Drive Project Construction Start Date 4/1/2025 Operational Year 2026 Lead Agency — Land Use Scale Project/site Analysis Level for Defaults County Windspeed (m/s)3.00 Precipitation (days)0.80 Location 33.710242118798206, -116.28655847069649 County Riverside-Salton Sea City La Quinta Air District South Coast AQMD Air Basin Salton Sea TAZ 5656 EDFZ 19 Electric Utility Imperial Irrigation District Gas Utility Southern California Gas App Version 2022.1.1.29 1.2. Land Use Types Land Use Subtype Size Unit Lot Acreage Building Area (sq ft)Landscape Area (sq ft) Special Landscape Area (sq ft) Population Description 322 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 8 / 47 Building——0.003,8000.091000sqft3.80Fast Food Restaurant with Drive Thru Other Asphalt Surfaces 15.8 1000sqft 0.36 0.00 9,481 ——Hardscape and Landscaping 1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected 2. Emissions Summary 2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit.TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Unmit. 8.08 8.06 10.1 10.6 0.02 0.46 2.14 2.60 0.43 1.02 1.44 — 1,791 1,791 0.07 0.02 0.62 1,798 Average Daily (Max) — — — — — — — — — — — — — — — — — — Unmit. 0.32 0.29 1.67 2.27 < 0.005 0.07 0.02 0.09 0.06 0.01 0.07 — 420 420 0.02 < 0.005 0.02 421 Annual (Max) — — — — — — — — — — — — — — — — — — Unmit. 0.06 0.05 0.31 0.41 < 0.005 0.01 < 0.005 0.02 0.01 < 0.005 0.01 — 69.5 69.5 < 0.005 < 0.005 < 0.005 69.8 2.2. Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - Summer (Max) — — — — — — — — — — — — — — — — — — 323 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 9 / 47 2025 8.08 8.06 10.1 10.6 0.02 0.46 2.14 2.60 0.43 1.02 1.44 —1,791 1,791 0.07 0.02 0.62 1,798 Daily - Winter (Max) — — — — — — — — — — — — — — — — — — Average Daily — — — — — — — — — — — — — — — — — — 2025 0.32 0.29 1.67 2.27 < 0.005 0.07 0.02 0.09 0.06 0.01 0.07 — 420 420 0.02 < 0.005 0.02 421 Annual — — — — — — — — — — — — — — — — — — 2025 0.06 0.05 0.31 0.41 < 0.005 0.01 < 0.005 0.02 0.01 < 0.005 0.01 — 69.5 69.5 < 0.005 < 0.005 < 0.005 69.8 2.4. Operations Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit.TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Unmit. 7.80 7.38 5.09 46.4 0.10 0.08 7.74 7.82 0.07 1.96 2.04 25.8 10,150 10,176 3.09 0.51 35.4 10,440 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Unmit. 6.25 5.82 5.48 34.2 0.09 0.08 7.74 7.82 0.07 1.96 2.04 25.8 9,082 9,107 3.13 0.52 6.71 9,348 Average Daily (Max) — — — — — — — — — — — — — — — — — — Unmit. 6.24 5.94 3.84 26.0 0.05 0.05 4.22 4.27 0.05 1.07 1.12 25.8 5,519 5,545 3.01 0.35 12.9 5,737 Annual (Max) — — — — — — — — — — — — — — — — — — Unmit. 1.14 1.08 0.70 4.74 0.01 0.01 0.77 0.78 0.01 0.20 0.20 4.27 914 918 0.50 0.06 2.13 950 2.5. Operations Emissions by Sector, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)324 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 10 / 47 Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Mobile 7.67 7.25 4.99 46.1 0.10 0.07 7.74 7.81 0.07 1.96 2.03 — 9,831 9,831 0.47 0.50 29.5 10,021 Area 0.12 0.12 < 0.005 0.17 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.68 0.68 < 0.005 < 0.005 — 0.68 Energy 0.01 0.01 0.11 0.09 < 0.005 0.01 — 0.01 0.01 — 0.01 — 314 314 0.03 < 0.005 — 316 Water — — — — — — — — — — — 2.21 4.34 6.55 0.23 0.01 — 13.9 Waste — — — — — — — — — — — 23.6 0.00 23.6 2.36 0.00 — 82.5 Refrig. — — — — — — — — — — — — — — — — 5.94 5.94 Total 7.80 7.38 5.09 46.4 0.10 0.08 7.74 7.82 0.07 1.96 2.04 25.8 10,150 10,176 3.09 0.51 35.4 10,440 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Mobile 6.15 5.72 5.37 34.1 0.09 0.07 7.74 7.81 0.07 1.96 2.03 — 8,763 8,763 0.51 0.51 0.76 8,930 Area 0.09 0.09 — — — — — — — — — — — — — — — — Energy 0.01 0.01 0.11 0.09 < 0.005 0.01 — 0.01 0.01 — 0.01 — 314 314 0.03 < 0.005 — 316 Water — — — — — — — — — — — 2.21 4.34 6.55 0.23 0.01 — 13.9 Waste — — — — — — — — — — — 23.6 0.00 23.6 2.36 0.00 — 82.5 Refrig. — — — — — — — — — — — — — — — — 5.94 5.94 Total 6.25 5.82 5.48 34.2 0.09 0.08 7.74 7.82 0.07 1.96 2.04 25.8 9,082 9,107 3.13 0.52 6.71 9,348 Average Daily — — — — — — — — — — — — — — — — — — Mobile 6.12 5.83 3.73 25.8 0.05 0.04 4.22 4.26 0.04 1.07 1.11 — 5,200 5,200 0.39 0.34 6.94 5,318 Area 0.11 0.11 < 0.005 0.08 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.34 0.34 < 0.005 < 0.005 — 0.34 Energy 0.01 0.01 0.11 0.09 < 0.005 0.01 — 0.01 0.01 — 0.01 — 314 314 0.03 < 0.005 — 316 Water — — — — — — — — — — — 2.21 4.34 6.55 0.23 0.01 — 13.9 Waste — — — — — — — — — — — 23.6 0.00 23.6 2.36 0.00 — 82.5 Refrig. — — — — — — — — — — — — — — — — 5.94 5.94 Total 6.24 5.94 3.84 26.0 0.05 0.05 4.22 4.27 0.05 1.07 1.12 25.8 5,519 5,545 3.01 0.35 12.9 5,737325 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 11 / 47 Annual —————————————————— Mobile 1.12 1.06 0.68 4.70 0.01 0.01 0.77 0.78 0.01 0.20 0.20 — 861 861 0.06 0.06 1.15 881 Area 0.02 0.02 < 0.005 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.06 0.06 < 0.005 < 0.005 — 0.06 Energy < 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 52.0 52.0 0.01 < 0.005 — 52.3 Water — — — — — — — — — — — 0.37 0.72 1.08 0.04 < 0.005 — 2.29 Waste — — — — — — — — — — — 3.91 0.00 3.91 0.39 0.00 — 13.7 Refrig. — — — — — — — — — — — — — — — — 0.98 0.98 Total 1.14 1.08 0.70 4.74 0.01 0.01 0.77 0.78 0.01 0.20 0.20 4.27 914 918 0.50 0.06 2.13 950 3. Construction Emissions Details 3.1. Demolition (2025) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.56 0.47 4.33 5.65 0.01 0.16 — 0.16 0.14 — 0.14 — 852 852 0.03 0.01 — 855 Demoliti on — — — — — — 0.00 0.00 — 0.00 0.00 — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Average Daily — — — — — — — — — — — — — — — — — — 326 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 12 / 47 23.4—<0.005< 0.00523.323.3—< 0.005—< 0.005< 0.005—< 0.005< 0.0050.150.120.010.02Off-Roa d Demoliti on — — — — — — 0.00 0.00 — 0.00 0.00 — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent < 0.005 < 0.005 0.02 0.03 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 3.87 3.87 < 0.005 < 0.005 — 3.88 Demoliti on — — — — — — 0.00 0.00 — 0.00 0.00 — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Worker 0.05 0.05 0.04 0.68 0.00 0.00 0.09 0.09 0.00 0.02 0.02 — 103 103 < 0.005 < 0.005 0.35 105 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Average Daily — — — — — — — — — — — — — — — — — — Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 2.57 2.57 < 0.005 < 0.005 < 0.005 2.61 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.43 0.43 < 0.005 < 0.005 < 0.005 0.43 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00327 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 13 / 47 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00 3.3. Site Preparation (2025) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.56 0.47 4.16 5.57 0.01 0.21 — 0.21 0.20 — 0.20 — 859 859 0.03 0.01 — 862 Dust From Material Movement — — — — — — 0.21 0.21 — 0.02 0.02 — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Average Daily — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent < 0.005 < 0.005 0.01 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 2.35 2.35 < 0.005 < 0.005 — 2.36 Dust From Material Movement — — — — — — < 0.005 < 0.005 — < 0.005 < 0.005 — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —328 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 14 / 47 Off-Roa Equipment < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 —< 0.005 < 0.005 —< 0.005 —0.39 0.39 < 0.005 < 0.005 —0.39 Dust From Material Movement — — — — — — < 0.005 < 0.005 — < 0.005 < 0.005 — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Worker 0.03 0.02 0.02 0.34 0.00 0.00 0.05 0.05 0.00 0.01 0.01 — 51.5 51.5 < 0.005 < 0.005 0.18 52.3 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Average Daily — — — — — — — — — — — — — — — — — — Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.13 0.13 < 0.005 < 0.005 < 0.005 0.13 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.02 0.02 < 0.005 < 0.005 < 0.005 0.02 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 3.5. Grading (2025) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —329 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 15 / 47 Daily, Summer (Max) —————————————————— Off-Roa d Equipm ent 1.29 1.09 10.1 10.0 0.02 0.46 — 0.46 0.43 — 0.43 — 1,714 1,714 0.07 0.01 — 1,720 Dust From Material Movement — — — — — — 2.07 2.07 — 1.00 1.00 — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Average Daily — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.01 0.01 0.06 0.06 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 9.39 9.39 < 0.005 < 0.005 — 9.42 Dust From Material Movement — — — — — — 0.01 0.01 — 0.01 0.01 — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 1.55 1.55 < 0.005 < 0.005 — 1.56 Dust From Material Movement — — — — — — < 0.005 < 0.005 — < 0.005 < 0.005 — — — — — — — 330 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 16 / 47 0.000.000.000.000.000.00—0.000.000.000.000.000.000.000.000.000.000.00Onsite truck Offsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Worker 0.04 0.04 0.03 0.51 0.00 0.00 0.07 0.07 0.00 0.02 0.02 — 77.3 77.3 < 0.005 < 0.005 0.27 78.5 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Average Daily — — — — — — — — — — — — — — — — — — Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.39 0.39 < 0.005 < 0.005 < 0.005 0.39 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.06 0.06 < 0.005 < 0.005 < 0.005 0.06 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 3.7. Building Construction (2025) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — 331 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 17 / 47 1,309—0.010.051,3051,305—0.20—0.200.22—0.220.016.945.140.520.62Off-Roa d Equipm ent Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Average Daily — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.17 0.14 1.41 1.90 < 0.005 0.06 — 0.06 0.05 — 0.05 — 357 357 0.01 < 0.005 — 359 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.03 0.03 0.26 0.35 < 0.005 0.01 — 0.01 0.01 — 0.01 — 59.2 59.2 < 0.005 < 0.005 — 59.4 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Worker 0.01 0.01 0.01 0.11 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 16.4 16.4 < 0.005 < 0.005 0.06 16.7 Vendor < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 16.2 16.2 < 0.005 < 0.005 0.04 16.9 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Average Daily — — — — — — — — — — — — — — — — — — 332 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 18 / 47 Worker < 0.005 < 0.005 < 0.005 0.02 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 —4.10 4.10 < 0.005 < 0.005 0.01 4.16 Vendor < 0.005 < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 4.45 4.45 < 0.005 < 0.005 0.01 4.64 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.68 0.68 < 0.005 < 0.005 < 0.005 0.69 Vendor < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 0.74 0.74 < 0.005 < 0.005 < 0.005 0.77 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 3.9. Paving (2025) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.61 0.51 4.37 5.31 0.01 0.19 — 0.19 0.18 — 0.18 — 823 823 0.03 0.01 — 826 Paving 0.19 0.19 — — — — — — — — — — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Average Daily — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.01 0.01 0.06 0.07 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 11.3 11.3 < 0.005 < 0.005 — 11.3 Paving < 0.005 < 0.005 — — — — — — — — — — — — — — — — 333 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 19 / 47 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 1.87 1.87 < 0.005 < 0.005 — 1.87 Paving < 0.005 < 0.005 — — — — — — — — — — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Worker 0.09 0.09 0.07 1.20 0.00 0.00 0.16 0.16 0.00 0.04 0.04 — 180 180 0.01 0.01 0.62 183 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Average Daily — — — — — — — — — — — — — — — — — — Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 2.25 2.25 < 0.005 < 0.005 < 0.005 2.28 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.37 0.37 < 0.005 < 0.005 < 0.005 0.38 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 3.11. Architectural Coating (2025) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)334 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 20 / 47 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.15 0.13 0.88 1.14 < 0.005 0.03 — 0.03 0.03 — 0.03 — 134 134 0.01 < 0.005 — 134 Architect ural Coating s 7.93 7.93 — — — — — — — — — — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Average Daily — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent < 0.005 < 0.005 0.01 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 1.83 1.83 < 0.005 < 0.005 — 1.84 Architect ural Coating s 0.11 0.11 — — — — — — — — — — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.30 0.30 < 0.005 < 0.005 — 0.30 335 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 21 / 47 ————————————————0.020.02Architect ural Coating Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Worker < 0.005 < 0.005 < 0.005 0.02 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 3.29 3.29 < 0.005 < 0.005 0.01 3.34 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Average Daily — — — — — — — — — — — — — — — — — — Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.04 0.04 < 0.005 < 0.005 < 0.005 0.04 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.01 0.01 < 0.005 < 0.005 < 0.005 0.01 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 4. Operations Emissions Details 4.1. Mobile Emissions by Land Use 4.1.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 336 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 22 / 47 Land Use TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Fast Food Restaurant with Drive Thru 7.67 7.25 4.99 46.1 0.10 0.07 7.74 7.81 0.07 1.96 2.03 — 9,831 9,831 0.47 0.50 29.5 10,021 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 7.67 7.25 4.99 46.1 0.10 0.07 7.74 7.81 0.07 1.96 2.03 — 9,831 9,831 0.47 0.50 29.5 10,021 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Fast Food Restaurant with Drive Thru 6.15 5.72 5.37 34.1 0.09 0.07 7.74 7.81 0.07 1.96 2.03 — 8,763 8,763 0.51 0.51 0.76 8,930 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 6.15 5.72 5.37 34.1 0.09 0.07 7.74 7.81 0.07 1.96 2.03 — 8,763 8,763 0.51 0.51 0.76 8,930 Annual — — — — — — — — — — — — — — — — — — Fast Food Restaurant with Drive Thru 1.12 1.06 0.68 4.70 0.01 0.01 0.77 0.78 0.01 0.20 0.20 — 861 861 0.06 0.06 1.15 881 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 337 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 23 / 47 Total 1.12 1.06 0.68 4.70 0.01 0.01 0.77 0.78 0.01 0.20 0.20 —861 861 0.06 0.06 1.15 881 4.2. Energy 4.2.1. Electricity Emissions By Land Use - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Fast Food Restaurant with Drive Thru — — — — — — — — — — — — 185 185 0.02 < 0.005 — 186 Other Asphalt Surfaces — — — — — — — — — — — — 0.00 0.00 0.00 0.00 — 0.00 Total — — — — — — — — — — — — 185 185 0.02 < 0.005 — 186 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Fast Food Restaurant with Drive Thru — — — — — — — — — — — — 185 185 0.02 < 0.005 — 186 Other Asphalt Surfaces — — — — — — — — — — — — 0.00 0.00 0.00 0.00 — 0.00 Total — — — — — — — — — — — — 185 185 0.02 < 0.005 — 186 Annual — — — — — — — — — — — — — — — — — — 338 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 24 / 47 Fast Food Restaurant with Drive Thru ————————————30.6 30.6 < 0.005 < 0.005 —30.8 Other Asphalt Surfaces — — — — — — — — — — — — 0.00 0.00 0.00 0.00 — 0.00 Total — — — — — — — — — — — — 30.6 30.6 < 0.005 < 0.005 — 30.8 4.2.3. Natural Gas Emissions By Land Use - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Fast Food Restaurant with Drive Thru 0.01 0.01 0.11 0.09 < 0.005 0.01 — 0.01 0.01 — 0.01 — 129 129 0.01 < 0.005 — 130 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.01 0.01 0.11 0.09 < 0.005 0.01 — 0.01 0.01 — 0.01 — 129 129 0.01 < 0.005 — 130 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Fast Food Restaurant with Drive Thru 0.01 0.01 0.11 0.09 < 0.005 0.01 — 0.01 0.01 — 0.01 — 129 129 0.01 < 0.005 — 130 339 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 25 / 47 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 —0.00 —0.00 0.00 0.00 0.00 —0.00 Total 0.01 0.01 0.11 0.09 < 0.005 0.01 — 0.01 0.01 — 0.01 — 129 129 0.01 < 0.005 — 130 Annual — — — — — — — — — — — — — — — — — — Fast Food Restaurant with Drive Thru < 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 21.4 21.4 < 0.005 < 0.005 — 21.5 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total < 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 21.4 21.4 < 0.005 < 0.005 — 21.5 4.3. Area Emissions by Source 4.3.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Consum er Product s 0.08 0.08 — — — — — — — — — — — — — — — — Architect ural Coating s 0.01 0.01 — — — — — — — — — — — — — — — — Landsca pe Equipm ent 0.03 0.03 < 0.005 0.17 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.68 0.68 < 0.005 < 0.005 — 0.68 340 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 26 / 47 Total 0.12 0.12 < 0.005 0.17 < 0.005 < 0.005 —< 0.005 < 0.005 —< 0.005 —0.68 0.68 < 0.005 < 0.005 —0.68 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Consum er Product s 0.08 0.08 — — — — — — — — — — — — — — — — Architect ural Coating s 0.01 0.01 — — — — — — — — — — — — — — — — Total 0.09 0.09 — — — — — — — — — — — — — — — — Annual — — — — — — — — — — — — — — — — — — Consum er Product s 0.02 0.02 — — — — — — — — — — — — — — — — Architect ural Coating s < 0.005 < 0.005 — — — — — — — — — — — — — — — — Landsca pe Equipm ent < 0.005 < 0.005 < 0.005 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.06 0.06 < 0.005 < 0.005 — 0.06 Total 0.02 0.02 < 0.005 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.06 0.06 < 0.005 < 0.005 — 0.06 4.4. Water Emissions by Land Use 4.4.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e 341 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 27 / 47 ——————————————————Daily, Summer (Max) Fast Food Restaurant with Drive Thru — — — — — — — — — — — 2.21 3.93 6.14 0.23 0.01 — 13.4 Other Asphalt Surfaces — — — — — — — — — — — 0.00 0.41 0.41 < 0.005 < 0.005 — 0.41 Total — — — — — — — — — — — 2.21 4.34 6.55 0.23 0.01 — 13.9 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Fast Food Restaurant with Drive Thru — — — — — — — — — — — 2.21 3.93 6.14 0.23 0.01 — 13.4 Other Asphalt Surfaces — — — — — — — — — — — 0.00 0.41 0.41 < 0.005 < 0.005 — 0.41 Total — — — — — — — — — — — 2.21 4.34 6.55 0.23 0.01 — 13.9 Annual — — — — — — — — — — — — — — — — — — Fast Food Restaurant with Drive Thru — — — — — — — — — — — 0.37 0.65 1.02 0.04 < 0.005 — 2.23 Other Asphalt Surfaces — — — — — — — — — — — 0.00 0.07 0.07 < 0.005 < 0.005 — 0.07 Total — — — — — — — — — — — 0.37 0.72 1.08 0.04 < 0.005 — 2.29 342 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 28 / 47 4.5. Waste Emissions by Land Use 4.5.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Fast Food Restaurant with Drive Thru — — — — — — — — — — — 23.6 0.00 23.6 2.36 0.00 — 82.5 Other Asphalt Surfaces — — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00 Total — — — — — — — — — — — 23.6 0.00 23.6 2.36 0.00 — 82.5 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Fast Food Restaurant with Drive Thru — — — — — — — — — — — 23.6 0.00 23.6 2.36 0.00 — 82.5 Other Asphalt Surfaces — — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00 Total — — — — — — — — — — — 23.6 0.00 23.6 2.36 0.00 — 82.5 Annual — — — — — — — — — — — — — — — — — — 343 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 29 / 47 13.7—0.000.393.910.003.91———————————Fast Food Restaurant with Drive Thru Other Asphalt Surfaces — — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00 Total — — — — — — — — — — — 3.91 0.00 3.91 0.39 0.00 — 13.7 4.6. Refrigerant Emissions by Land Use 4.6.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Fast Food Restaurant with Drive Thru — — — — — — — — — — — — — — — — 5.94 5.94 Total — — — — — — — — — — — — — — — — 5.94 5.94 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Fast Food Restaurant with Drive Thru — — — — — — — — — — — — — — — — 5.94 5.94 Total — — — — — — — — — — — — — — — — 5.94 5.94344 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 30 / 47 Annual —————————————————— Fast Food Restaurant with Drive Thru — — — — — — — — — — — — — — — — 0.98 0.98 Total — — — — — — — — — — — — — — — — 0.98 0.98 4.7. Offroad Emissions By Equipment Type 4.7.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm ent Type TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — Annual — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — 4.8. Stationary Emissions By Equipment Type 4.8.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 345 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 31 / 47 CO2eRN2OCH4CO2TNBCO2BCO2PM2.5TPM2.5DPM2.5EPM10TPM10DPM10ESO2CONOxROGTOGEquipm ent Type Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — Annual — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — 4.9. User Defined Emissions By Equipment Type 4.9.1. Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm ent Type TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — Annual — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — 346 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 32 / 47 4.10. Soil Carbon Accumulation By Vegetation Type 4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati on TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — Annual — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — 4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — Annual — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — 347 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 33 / 47 4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Avoided — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — Sequest ered — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — Remove d — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Avoided — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — Sequest ered — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — Remove d — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — Annual — — — — — — — — — — — — — — — — — — Avoided — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — 348 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 34 / 47 ——————————————————Sequest ered Subtotal — — — — — — — — — — — — — — — — — — Remove d — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 5. Activity Data 5.1. Construction Schedule Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Demolition Demolition 4/1/2025 4/15/2025 5.00 10.0 — Site Preparation Site Preparation 4/16/2025 4/17/2025 5.00 1.00 — Grading Grading 4/18/2025 4/20/2025 5.00 2.00 — Building Construction Building Construction 4/21/2025 9/8/2025 5.00 100 — Paving Paving 9/9/2025 9/16/2025 5.00 5.00 — Architectural Coating Architectural Coating 9/17/2025 9/24/2025 5.00 5.00 — 5.2. Off-Road Equipment 5.2.1. Unmitigated Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Demolition Tractors/Loaders/Back hoes Diesel Average 2.00 6.00 84.0 0.37 Demolition Rubber Tired Dozers Diesel Average 1.00 1.00 367 0.40 Demolition Concrete/Industrial Saws Diesel Average 1.00 8.00 33.0 0.73 Site Preparation Graders Diesel Average 1.00 8.00 148 0.41349 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 35 / 47 Site Preparation Tractors/Loaders/Back Diesel Average 1.00 8.00 84.0 0.37 Grading Graders Diesel Average 1.00 6.00 148 0.41 Grading Rubber Tired Dozers Diesel Average 1.00 6.00 367 0.40 Grading Tractors/Loaders/Back hoes Diesel Average 1.00 7.00 84.0 0.37 Building Construction Cranes Diesel Average 1.00 4.00 367 0.29 Building Construction Forklifts Diesel Average 2.00 6.00 82.0 0.20 Building Construction Tractors/Loaders/Back hoes Diesel Average 2.00 8.00 84.0 0.37 Paving Tractors/Loaders/Back hoes Diesel Average 1.00 7.00 84.0 0.37 Paving Cement and Mortar Mixers Diesel Average 4.00 6.00 10.0 0.56 Paving Pavers Diesel Average 1.00 7.00 81.0 0.42 Paving Rollers Diesel Average 1.00 7.00 36.0 0.38 Architectural Coating Air Compressors Diesel Average 1.00 6.00 37.0 0.48 5.3. Construction Vehicles 5.3.1. Unmitigated Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Demolition ———— Demolition Worker 10.0 12.8 LDA,LDT1,LDT2 Demolition Vendor —8.33 HHDT,MHDT Demolition Hauling 0.00 20.0 HHDT Demolition Onsite truck ——HHDT Site Preparation ———— Site Preparation Worker 5.00 12.8 LDA,LDT1,LDT2 Site Preparation Vendor —8.33 HHDT,MHDT Site Preparation Hauling 0.00 20.0 HHDT 350 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 36 / 47 Site Preparation Onsite truck ——HHDT Grading ———— Grading Worker 7.50 12.8 LDA,LDT1,LDT2 Grading Vendor —8.33 HHDT,MHDT Grading Hauling 0.00 20.0 HHDT Grading Onsite truck ——HHDT Building Construction ———— Building Construction Worker 1.60 12.8 LDA,LDT1,LDT2 Building Construction Vendor 0.62 8.33 HHDT,MHDT Building Construction Hauling 0.00 20.0 HHDT Building Construction Onsite truck ——HHDT Paving ———— Paving Worker 17.5 12.8 LDA,LDT1,LDT2 Paving Vendor —8.33 HHDT,MHDT Paving Hauling 0.00 20.0 HHDT Paving Onsite truck ——HHDT Architectural Coating ———— Architectural Coating Worker 0.32 12.8 LDA,LDT1,LDT2 Architectural Coating Vendor —8.33 HHDT,MHDT Architectural Coating Hauling 0.00 20.0 HHDT Architectural Coating Onsite truck ——HHDT 5.4. Vehicles 5.4.1. Construction Vehicle Control Strategies Control Strategies Applied PM10 Reduction PM2.5 Reduction Water unpaved roads twice daily 55%55% 351 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 37 / 47 5.5. Architectural Coatings Phase Name Residential Interior Area Coated (sq ft) Residential Exterior Area Coated (sq ft) Non-Residential Interior Area Coated (sq ft) Non-Residential Exterior Area Coated (sq ft) Parking Area Coated (sq ft) Architectural Coating 0.00 0.00 5,700 1,900 948 5.6. Dust Mitigation 5.6.1. Construction Earthmoving Activities Phase Name Material Imported (cy)Material Exported (cy)Acres Graded (acres)Material Demolished (sq. ft.)Acres Paved (acres) Demolition 0.00 0.00 0.00 —— Site Preparation ——0.50 0.00 — Grading ——1.50 0.00 — Paving 0.00 0.00 0.00 0.00 0.36 5.6.2. Construction Earthmoving Control Strategies Control Strategies Applied Frequency (per day)PM10 Reduction PM2.5 Reduction Water Exposed Area 2 61%61% Water Demolished Area 2 36%36% 5.7. Construction Paving Land Use Area Paved (acres)% Asphalt Fast Food Restaurant with Drive Thru 0.00 0% Other Asphalt Surfaces 0.36 100% 5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh) 352 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 38 / 47 Year kWh per Year CO2 CH4 N2O 2025 0.00 223 0.03 < 0.005 5.9. Operational Mobile Sources 5.9.1. Unmitigated Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Fast Food Restaurant with Drive Thru 2,028 2,028 2,028 740,062 3,974 10,945 10,945 2,177,523 Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.10. Operational Area Sources 5.10.1. Hearths 5.10.1.1. Unmitigated 5.10.2. Architectural Coatings Residential Interior Area Coated (sq ft) Residential Exterior Area Coated (sq ft) Non-Residential Interior Area Coated (sq ft) Non-Residential Exterior Area Coated (sq ft) Parking Area Coated (sq ft) 0 0.00 5,700 1,900 948 5.10.3. Landscape Equipment Season Unit Value Snow Days day/yr 0.00 Summer Days day/yr 180 353 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 39 / 47 5.11. Operational Energy Consumption 5.11.1. Unmitigated Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr)CO2 CH4 N2O Natural Gas (kBTU/yr) Fast Food Restaurant with Drive Thru 256,811 262 0.0330 0.0040 403,242 Other Asphalt Surfaces 0.00 262 0.0330 0.0040 0.00 5.12. Operational Water and Wastewater Consumption 5.12.1. Unmitigated Land Use Indoor Water (gal/year)Outdoor Water (gal/year) Fast Food Restaurant with Drive Thru 1,153,428 0.00 Other Asphalt Surfaces 0.00 177,917 5.13. Operational Waste Generation 5.13.1. Unmitigated Land Use Waste (ton/year)Cogeneration (kWh/year) Fast Food Restaurant with Drive Thru 43.8 — Other Asphalt Surfaces 0.00 — 5.14. Operational Refrigeration and Air Conditioning Equipment 5.14.1. Unmitigated Land Use Type Equipment Type Refrigerant GWP Quantity (kg)Operations Leak Rate Service Leak Rate Times Serviced 354 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 40 / 47 1.000.000.600.001,430R-134aFast Food Restaurant with Drive Thru Household refrigerators and/or freezers Fast Food Restaurant with Drive Thru Other commercial A/C and heat pumps R-410A 2,088 1.80 4.00 4.00 18.0 Fast Food Restaurant with Drive Thru Walk-in refrigerators and freezers R-404A 3,922 < 0.005 7.50 7.50 20.0 5.15. Operational Off-Road Equipment 5.15.1. Unmitigated Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor 5.16. Stationary Sources 5.16.1. Emergency Generators and Fire Pumps Equipment Type Fuel Type Number per Day Hours per Day Hours per Year Horsepower Load Factor 5.16.2. Process Boilers Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr)Daily Heat Input (MMBtu/day)Annual Heat Input (MMBtu/yr) 5.17. User Defined Equipment Type Fuel Type 5.18. Vegetation 5.18.1. Land Use Change 5.18.1.1. Unmitigated 355 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 41 / 47 Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres 5.18.1. Biomass Cover Type 5.18.1.1. Unmitigated Biomass Cover Type Initial Acres Final Acres 5.18.2. Sequestration 5.18.2.1. Unmitigated Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year) 6. Climate Risk Detailed Report 6.1. Climate Risk Summary Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100. Climate Hazard Result for Project Location Unit Temperature and Extreme Heat 24.4 annual days of extreme heat Extreme Precipitation 0.00 annual days with precipitation above 20 mm Sea Level Rise —meters of inundation depth Wildfire 0.14 annual hectares burned Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi. Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi. Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters 356 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 42 / 47 Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi. 6.2. Initial Climate Risk Scores Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 1 0 0 N/A Extreme Precipitation N/A N/A N/A N/A Sea Level Rise N/A N/A N/A N/A Wildfire N/A N/A N/A N/A Flooding N/A N/A N/A N/A Drought 0 0 0 N/A Snowpack Reduction N/A N/A N/A N/A Air Quality Degradation N/A N/A N/A N/A The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure. The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt. The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures. 6.3. Adjusted Climate Risk Scores Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 1 1 1 2 Extreme Precipitation N/A N/A N/A N/A Sea Level Rise N/A N/A N/A N/A Wildfire N/A N/A N/A N/A Flooding N/A N/A N/A N/A Drought 1 1 1 2 Snowpack Reduction N/A N/A N/A N/A Air Quality Degradation N/A N/A N/A N/A 357 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 43 / 47 The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure. The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt. The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures. 6.4. Climate Risk Reduction Measures 7. Health and Equity Details 7.1. CalEnviroScreen 4.0 Scores The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. Indicator Result for Project Census Tract Exposure Indicators — AQ-Ozone 93.6 AQ-PM 8.51 AQ-DPM 57.4 Drinking Water 53.9 Lead Risk Housing 13.5 Pesticides 45.7 Toxic Releases 2.39 Traffic 70.2 Effect Indicators — CleanUp Sites 0.00 Groundwater 0.00 Haz Waste Facilities/Generators 26.7 Impaired Water Bodies 77.3 Solid Waste 0.00 Sensitive Population — Asthma 19.8 358 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 44 / 47 Cardio-vascular 22.9 Low Birth Weights 48.5 Socioeconomic Factor Indicators — Education 33.5 Housing 10.8 Linguistic 60.6 Poverty 46.6 Unemployment 45.8 7.2. Healthy Places Index Scores The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state. Indicator Result for Project Census Tract Economic — Above Poverty 77.22314898 Employed 96.63800847 Median HI 77.50545361 Education — Bachelor's or higher 55.99897344 High school enrollment 21.68612858 Preschool enrollment 57.19235211 Transportation — Auto Access 60.64416784 Active commuting 24.04722187 Social — 2-parent households 46.33645579 Voting 62.08135506 Neighborhood — Alcohol availability 89.83703323 359 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 45 / 47 Park access 39.65096882 Retail density 60.54151161 Supermarket access 31.45130245 Tree canopy 8.546131143 Housing — Homeownership 85.85910432 Housing habitability 92.37777493 Low-inc homeowner severe housing cost burden 72.35981009 Low-inc renter severe housing cost burden 90.94058771 Uncrowded housing 92.9038881 Health Outcomes — Insured adults 68.18940074 Arthritis 5.8 Asthma ER Admissions 81.7 High Blood Pressure 8.6 Cancer (excluding skin)8.0 Asthma 46.1 Coronary Heart Disease 13.8 Chronic Obstructive Pulmonary Disease 27.0 Diagnosed Diabetes 57.0 Life Expectancy at Birth 60.2 Cognitively Disabled 78.9 Physically Disabled 68.4 Heart Attack ER Admissions 74.8 Mental Health Not Good 63.6 Chronic Kidney Disease 27.1 Obesity 44.4 Pedestrian Injuries 54.9 360 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 46 / 47 Physical Health Not Good 55.3 Stroke 34.3 Health Risk Behaviors — Binge Drinking 50.7 Current Smoker 60.5 No Leisure Time for Physical Activity 65.6 Climate Change Exposures — Wildfire Risk 0.0 SLR Inundation Area 0.0 Children 48.8 Elderly 57.9 English Speaking 63.3 Foreign-born 14.4 Outdoor Workers 55.7 Climate Change Adaptive Capacity — Impervious Surface Cover 48.4 Traffic Density 39.8 Traffic Access 23.0 Other Indices — Hardship 32.9 Other Decision Support — 2016 Voting 76.5 7.3. Overall Health & Equity Scores Metric Result for Project Census Tract CalEnviroScreen 4.0 Score for Project Location (a)27.0 Healthy Places Index Score for Project Location (b)75.0 Project Located in a Designated Disadvantaged Community (Senate Bill 535)No 361 Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025 47 / 47 Project Located in a Low-Income Community (Assembly Bill 1550)No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state. 7.4. Health & Equity Measures No Health & Equity Measures selected. 7.5. Evaluation Scorecard Health & Equity Evaluation Scorecard not completed. 7.6. Health & Equity Custom Measures No Health & Equity Custom Measures created. 8. User Changes to Default Data Screen Justification Characteristics: Project Details Start of construction date is for analysis purposes only. The project scope involves a coffee shop with drive-through window with a building area of approximately 3,800 square feet. The current version of CalEEMod does not have ITE code 937 corresponding to this use. Therefore, for analysis purposes, this model uses ITE code 934 corresponding to Fast Food Restaurant with Drive-Through, but the daily trip generation rate per TSF has been increased to match ITE 937, as provided in the Adams Street & Corporate Centre Drive Traffic Impact Analysis, dated January 30, 2025. Operations: Vehicle Data Trip generation rates were adjusted (increased) to 533.57 trips per TSF based on the project-specific report corresponding to ITE 937 (Coffee/Donut shop with Drive-Through Window). 362 RESOLUTION 2025-XXX EXHIBIT C CONDITIONS OF APPROVAL - RECOMMENDED SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT NO. 3) CONDITIONAL USE PERMIT 2024-0007 SITE DEVELOPMENT PERMIT 2024-0014 PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH ADOPTED: GENERAL 1. The applicant agrees to defend, indemnify, and hold harmless the City of La Quinta (“City”), its agents, officers, and employees from any claim, action, or proceeding to attack, set aside, void, or annul the approval of this Conditional Use Permit. The City shall have sole discretion in selecting its defense counsel. The City shall promptly notify the applicant of any claim, action, or proceeding and cooperate fully in the defense. 2. All the following approvals shall comply with all applicable conditions and mitigation measures: Specific Plan 2024-0005 (SP 1989-014 Amendment No. 3) Specific Plan 1989-014 Specific Plan 1989-014 Amendment No. 1 Specific Plan 1989-014 Amendment No. 2 Conditional Use Permit 2024-0007 Site Development Permit 2024-0014 Environmental Assessment 1996-319 In the event of any conflict(s) between approval conditions and/or provisions of these approvals, the Design and Development Director shall adjudicate the conflict by determining the precedence. 3. The applicant shall comply with all applicable provisions of the La Quinta Municipal Code (LQMC), including LQMC Sections 9.210.010, 9.210.020, and 9.240.010. 4. Conditional Use Permit 2024-0007 and Site Development Permit 2024-0014 shall expire on June 10, 2027, and shall become null and void in accordance with La Quinta Municipal Code Section 9.200.080, unless the required ministerial permits have been issued. A time extension may be requested per LQMC Section 9.200.080. 5. The drive-through shall be screened by a combination of berms, walls, and landscaping so that the cars using the drive-through facilities will not be visible to pedestrians and cars on the perimeter sidewalk and street. The screening shall be approved by the Planning Manager prior to building permit issuance. 6. Prior to the issuance of any grading, construction, or building permit by the City, the applicant shall obtain any necessary clearances and/or permits from the following agencies, if required: 363 RESOLUTION NO. 2025-XXX CONDITIONS OF APPROVAL - RECOMMENDED SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT NO. 3) CONDITIONAL USE PERMIT 2024-0007 SITE DEVELOPMENT PERMIT 2024-0014 PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH ADOPTED:  Riverside County Fire Marshal  La Quinta Public Works Department (Grading Permit, Green Sheet (Public Works Clearance) for Building Permits, Water Quality Management Plan (WQMP) Exemption Form – Whitewater River Region, Improvement Permit)  La Quinta Design and Development Department - Planning Division and Building Division  Riverside County Environmental Health Department  Desert Sands Unified School District (DSUSD)  Coachella Valley Water District (CVWD)  Imperial Irrigation District (IID)  California Regional Water Quality Control Board (CRWQCB)  State Water Resources Control Board  SunLine Transit Agency  South Coast Air Quality Management District Coachella Valley (SCAQMD) The applicant is responsible for all requirements of the permits and/or clearances from the above-listed agencies. When these requirements include approval of improvement plans, the applicant shall furnish proof of such approvals when submitting those improvement plans for City approval. 7. The applicant shall comply with applicable provisions of the City’s NPDES stormwater discharge permit, LQMC Sections 8.70.010 et seq. (Stormwater Management and Discharge Controls), and 13.24.170 (Clean Air/Clean Water); Riverside County Ordinance No. 457; the California Regional Water Quality Control Board – Colorado River Basin Region Board Order No. R7-2013-0011 and the State Water Resources Control Board’s Order No. 2012-0006-DWQ. A. The applicant shall include provisions for all of the following Best Management Practices (“BMPs”) (LQMC Section 8.70.020 (Definitions)): 1) Temporary Soil Stabilization (erosion control). 2) Temporary Sediment Control. 3) Wind Erosion Control. 4) Tracking Control. 5) Non-Storm Water Management. 6) Waste Management and Materials Pollution Control. B. The BMPs shall remain in effect for the entire duration of project construction until all improvements are completed. 364 RESOLUTION NO. 2025-XXX CONDITIONS OF APPROVAL - RECOMMENDED SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT NO. 3) CONDITIONAL USE PERMIT 2024-0007 SITE DEVELOPMENT PERMIT 2024-0014 PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH ADOPTED: 8. Developer shall reimburse the City, within thirty (30) days of presentment of the invoice, all costs and actual attorney’s fees incurred by the City Attorney to review, negotiate and/or modify any documents or instruments required by these conditions, if Developer requests that the City modify or revise any documents or instruments prepared initially by the City to effect these conditions. This obligation shall be paid in the time noted above without deduction or offset, and Developer’s failure to make such payment shall be a material breach of the Conditions of Approval. 9. Developer shall reimburse the City, within thirty (30) days of presentment of the invoice, all costs and actual consultants’ fees incurred by the City for engineering and/or surveying consultants to review and/or modify any documents or instruments required by this project. This obligation shall be paid in the time noted above without deduction or offset, and Developer’s failure to make such payment shall be a material breach of the Conditions of Approval. PROPERTY RIGHTS 10. Prior to issuance of any permit(s), the applicant shall acquire or confer easements and other property rights necessary for the construction or proper functioning of the proposed development. 11. Pursuant to the aforementioned condition, conferred rights shall include approvals from the master developer over easements and other property rights necessary for construction and proper functioning of the proposed development not limited to access rights over proposed and/or existing parking lot that access public streets and open space/drainage facilities of the master development. 12. The applicant shall furnish proof of easements or written permission, as appropriate, from those owners of all abutting properties on which grading, retaining wall construction, or other encroachments will occur. PARKING LOTS and ACCESS POINTS 13. The design of parking facilities shall conform to LQMC Chapter 9.150 and, in particular, the following: A. The parking spaces and aisle widths and the double hairpin stripe parking space design shall conform to LQMC Chapter 9.150. B. Cross slopes should be a maximum of 2% where accessibility is required, including accessibility routes between buildings. 365 RESOLUTION NO. 2025-XXX CONDITIONS OF APPROVAL - RECOMMENDED SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT NO. 3) CONDITIONAL USE PERMIT 2024-0007 SITE DEVELOPMENT PERMIT 2024-0014 PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH ADOPTED: C. Building access points shall be shown on the Precise Grading Plans so that accessibility issues can be evaluated. D. Accessibility routes to public streets and adjacent development shall be shown on the Precise Grading Plan. E. Parking space lengths shall be according to LQMC Chapter 9.150 and be a minimum of 18 feet in length with a 2-foot overhang for all parking spaces or as approved by the City Engineer. One van accessible parking space is required per 6 accessible parking spaces. F. Drive aisles between parking spaces shall be a minimum of 26 feet, with access drive aisles to Public Streets a minimum of 30 feet or as approved by the City Engineer. 14. The applicant shall design street pavement sections using CalTrans' design procedure for 20-year life pavement, and the site-specific data for soil strength and anticipated traffic loading (including construction traffic). Minimum structural sections shall be as follows: Parking Lot & Aisles (Low Traffic) 3.0" a.c./4.5" c.a.b. Parking Lot & Aisles (High Traffic) 4.5” a.c./5.5” c.a.b. or the approved equivalents of alternate materials. 15. The applicant shall submit current mix designs (less than two years old at the time of construction) for base, asphalt concrete, and Portland cement concrete. The submittal shall include test results for all specimens used in the mix design procedure. For mix designs over six months old, the submittal shall include recent (less than six months old at the time of construction) aggregate gradation test results confirming that design gradations can be achieved in current production. The applicant shall not schedule construction operations until mix designs are approved. 16. Improvements shall include appurtenances such as traffic control signs, markings, and other devices, raised medians if required, street name signs, and sidewalks. 17. Improvements shall be designed and constructed in accordance with City adopted standards, supplemental drawings and specifications, or as approved by the City Engineer. Improvement plans for streets, access gates, and parking areas shall be stamped and signed by qualified engineers. IMPROVEMENT PLANS 366 RESOLUTION NO. 2025-XXX CONDITIONS OF APPROVAL - RECOMMENDED SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT NO. 3) CONDITIONAL USE PERMIT 2024-0007 SITE DEVELOPMENT PERMIT 2024-0014 PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH ADOPTED: 18. As used throughout these Conditions of Approval, professional titles such as “engineer,” “surveyor,” and “architect” refer to persons currently certified or licensed to practice their respective professions in the State of California. 19. Improvement plans shall be prepared by or under the direct supervision of qualified engineers and/or architects, as appropriate, and shall comply with the provisions of LQMC Section 13.24.040 (Improvement Plans). 20. The following improvement plans shall be prepared and submitted for review and approval by the Public Works Department. A separate set of plans for each line item specified below shall be prepared. The plans shall utilize the minimum scale specified, unless otherwise authorized by the City Engineer in writing. Plans may be prepared at a larger scale if additional detail or plan clarity is desired. Note, the applicant may be required to prepare other improvement plans not listed here pursuant to improvements required by other agencies and utility purveyors. A. Final WQMP (Plan submitted in Report Form) B. On-Site Commercial Precise Grading 1" = 20' Horizontal C. Hydrology Report NOTE: A through C to be submitted concurrently. (Separate Storm Drain Plans if applicable) Other engineered improvement plans prepared for City approval that are not listed above shall be prepared in formats approved by the City Engineer prior to commencing plan preparation. “On-Site Commercial Precise Grading” plan is required to be submitted for approval by the Building Official, Planning Manager, and the City Engineer. “On-Site Commercial Precise Grading” plans shall normally include all on-site surface improvements, including but not necessarily limited to finish grades for curbs & gutters, building floor elevations, parking lot improvements, and accessibility requirements. 21. The City maintains standard plans, detail sheets, and/or construction notes for elements of construction which can be accessed via the Public Works Development “Plans, Notes and Design Guidance” section of the City website (www.laquintaca.gov). Please navigate to the Public Works Department home page and look for the Standard Drawings hyperlink. 367 RESOLUTION NO. 2025-XXX CONDITIONS OF APPROVAL - RECOMMENDED SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT NO. 3) CONDITIONAL USE PERMIT 2024-0007 SITE DEVELOPMENT PERMIT 2024-0014 PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH ADOPTED: 22. Upon completion of construction and prior to final acceptance of the improvements by the City, the applicant shall furnish the City with reproducible record drawings of all improvement plans that were approved by the City. Each sheet shall be clearly marked "Record Drawing" and shall be stamped and signed by the engineer or surveyor certifying to the accuracy and completeness of the drawings. The applicant shall have all approved plans previously submitted to the City, revised to reflect the as-built conditions. The applicant shall employ or retain the Engineer of Record during the construction phase of the project so that the EOR can make site visits in support of preparing "Record Drawing". However, if subsequent approved revisions have been approved by the City Engineer and reflect said "Record Drawing" conditions, the Engineer of Record may submit a letter attesting to said fact to the City Engineer instead. PRECISE GRADING 23. The applicant shall comply with the provisions of LQMC Section 13.24.050 (Grading Improvements). 24. Prior to occupancy of the project site for any construction or other purposes, the applicant shall obtain a grading permit approved by the City Engineer. To obtain an approved grading permit, the applicant shall submit and obtain approval of all of the following: A. A grading plan prepared by a civil engineer registered in the State of California, B. A preliminary geotechnical (“soils”) report prepared by a professional registered in the State of California, C. A Fugitive Dust Control Plan prepared in accordance with LQMC Chapter 6.16 (Fugitive Dust Control), and D. A WQMP prepared by an authorized professional registered in the State of California, and All grading shall conform with the recommendations contained in the Soils Report and shall be certified as being adequate by a soils engineer or an engineering geologist registered in the State of California. The applicant shall furnish security, in a form acceptable to the City, and in an amount sufficient to guarantee compliance with the approved Fugitive Dust Control Plan provisions. Additionally, the applicant shall replenish said security if expended by the City of La Quinta to comply with the Plan as required by the City Engineer. 368 RESOLUTION NO. 2025-XXX CONDITIONS OF APPROVAL - RECOMMENDED SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT NO. 3) CONDITIONAL USE PERMIT 2024-0007 SITE DEVELOPMENT PERMIT 2024-0014 PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH ADOPTED: 25. The applicant shall maintain all open graded, undeveloped land in order to prevent wind and/or water erosion of such land. All open, graded, undeveloped land shall either be planted with interim landscaping or stabilized with such other erosion control measures as were approved in the Fugitive Dust Control Plan. 26. Building pad elevations on the precise grading plan submitted for City Engineer’s approval shall conform with the pad elevation shown on the Site Development Permit Preliminary Grading Plans, unless the pad elevations have other requirements imposed elsewhere in these Conditions of Approval. Pad elevation will need to be shown on the final precise grading plan. 27. Prior to any site grading or regrading that will raise or lower any portion of the site by more than plus or minus five tenths of a foot (0.5’) from the elevations shown on the Site Development Permit Preliminary Grading Plans, the applicant shall submit the proposed grading changes to the City Staff for a substantial conformance finding review. 28. Prior to the issuance of a building permit for any building lot, the applicant shall provide a lot pad certification stamped and signed by a qualified engineer or surveyor with applicable compaction tests and over excavation documentation. Each pad certification shall list the pad elevation as shown on the approved grading plan, the actual pad elevation, and the difference between the two, if any. Such pad certification shall also list the relative compaction of the pad soil. DRAINAGE 29. Stormwater handling shall conform with the approved hydrology and drainage report for One-Eleven La Quinta Shopping Center and/or for SDP2024-0014, or as approved by the City Engineer. 30. Stormwater may not be retained in landscaped parkways or landscaped setback lots. Only incidental stormwater (precipitation that directly falls onto the setback) will be permitted to be retained in the landscape setback areas. The perimeter setback and parkway areas in the street right-of-way shall be shaped with berms and mounds, pursuant to LQMC Section 9.100.040(B)(7), as feasible. 31. The applicant shall comply with applicable provisions for post construction runoff per the City’s NPDES stormwater discharge permit, LQMC Sections 8.70.010 et seq. (Stormwater Management and Discharge Controls), and 13.24.170 (Clean Air/Clean Water); Riverside County Ordinance No. 457; and the California Regional Water Quality Control Board – Colorado River Basin (CRWQCB-CRB) Region Board Order No. R7-2013-0011. 369 RESOLUTION NO. 2025-XXX CONDITIONS OF APPROVAL - RECOMMENDED SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT NO. 3) CONDITIONAL USE PERMIT 2024-0007 SITE DEVELOPMENT PERMIT 2024-0014 PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH ADOPTED: A. For post-construction urban runoff from New Development and Redevelopment Projects, the applicant shall implement requirements of the NPDES permit for the design, construction, and perpetual operation and maintenance of BMPs per the approved Water Quality Management Plan (WQMP) for the project as required by the California Regional Water Quality Control Board – Colorado River Basin (CRWQCB-CRB) Region Board Order No. R7-2013-0011. B. The applicant shall implement the WQMP Design Standards per (CRWQCB-CRB) Region Board Order No. R7-2013-0011 utilizing BMPs approved by the City Engineer. A project-specific WQMP shall be provided, which incorporates Site Design and Treatment BMPs utilizing first flush infiltration as a preferred method of NPDES Permit Compliance for Whitewater River receiving water, as applicable. C. The developer shall execute and record a Stormwater Management/BMP Facilities Agreement that provides for the perpetual maintenance and operation of all post-construction stormwater BMPs. UTILITIES 32. The applicant shall comply with the provisions of LQMC Section 13.24.110 (Utilities). 33. The applicant shall obtain the approval of the City Engineer for the location of all utility lines within any right-of-way, and all above-ground utility structures, including, but not limited to, traffic signal cabinets, electric vaults, water valves, and telephone stands, to ensure optimum placement for practical and aesthetic purposes. 34. Underground utilities shall be installed prior to overlying hardscape. For installation of utilities in existing improved streets, the applicant shall comply with trench restoration requirements maintained or required by the City Engineer. The applicant shall provide certified reports of all utility trench compaction for approval by the City Engineer. Additionally, grease traps and the maintenance thereof shall be located as to not conflict with access aisles/entrances. CONSTRUCTION 35. The City will conduct final inspections of habitable buildings only when the buildings have parking lot improvements and (if required) sidewalk access to publicly maintained streets. The improvements shall include required traffic control devices, pavement markings, and street name signs, if applicable. 370 RESOLUTION NO. 2025-XXX CONDITIONS OF APPROVAL - RECOMMENDED SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT NO. 3) CONDITIONAL USE PERMIT 2024-0007 SITE DEVELOPMENT PERMIT 2024-0014 PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH ADOPTED: LANDSCAPE AND IRRIGATION 36. The applicant shall comply with LQMC Sections 13.24.130 (Landscaping Setbacks) & 13.24.140 (Landscaping Plans). 37. The applicant shall provide landscaping in the required setbacks, retention basins, and common lots. Said landscaping shall be constantly maintained by the center owner, with damaged, dead, or dying plant material immediately replaced with healthy plant material of equivalent size. 38. Landscape and irrigation plans for landscaped lots and setbacks, medians, retention basins, and parks shall be signed and stamped by a licensed landscape architect. 39. All new and modified landscape areas shall have landscaping and permanent irrigation improvements in compliance with the City’s Water Efficient Landscape regulations contained in LQMC Section 8.13 (Water Efficient Landscape). 40. Lighting plans shall be submitted with the final landscaping plans for a recommendation to the Planning Manager for his approval. Exterior lighting shall be consistent with LQMC Section 9.100.150 (Outdoor Lighting). 41. All water features shall be designed to minimize “splash”, and use high efficiency pumps and lighting to the satisfaction of the Planning Manager. They shall be included in the landscape plan water efficiency calculations per Municipal Code Chapter 8.13. 42. All rooftop mechanical equipment shall be completely screened from view. Utility transformers or other ground-mounted mechanical equipment shall be fully screened with a screening wall or landscaping and painted to match the adjacent buildings. 43. The applicant shall submit the final landscape plans for review, processing, and approval to the Design and Development Department, in accordance with the Final Landscape Plan application process. Final Landscape Plans shall be consistent with the Preliminary landscaping plans shown in Site Development Permit 2024- 0014. Planning Manager approval of the final landscape plans is required prior to issuance of the first building permit unless the Planning Manager determines that extenuating circumstances exist that justify an alternative processing schedule. NOTE: Plans are not approved for construction until signed by the appropriate City official, including the Planning Manager and/or City Engineer. 371 RESOLUTION NO. 2025-XXX CONDITIONS OF APPROVAL - RECOMMENDED SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT NO. 3) CONDITIONAL USE PERMIT 2024-0007 SITE DEVELOPMENT PERMIT 2024-0014 PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH ADOPTED: 44. The applicant or his agent has the responsibility for proper sight distance requirements per guidelines in the AASHTO “A Policy on Geometric Design of Highways and Streets, 5th Edition” or the latest, in the design and/or installation of all landscaping and appurtenances abutting and within the private and public street right-of-way. MAINTENANCE 45. The applicant shall comply with the provisions of LQMC Section 13.24.160 (Maintenance). 46. The applicant shall make provisions for the continuous and perpetual maintenance of all private on-site improvements, perimeter landscaping, access drives, sidewalks, and stormwater BMPs. FEES AND DEPOSITS 47. The applicant shall comply with the provisions of LQMC Section 13.24.180 (Fees and Deposits). These fees include all deposits and fees required by the City for plan checking and construction inspection. Deposits and fee amounts shall be those in effect when the applicant makes application for plan check and permits. 48. Permits issued under this approval shall be subject to the provisions of the Development Impact Fee and Transportation Uniform Mitigation Fee programs in effect at the time of issuance of building permit(s). BUILDING DIVISION 49. Plans shall be prepared to the applicable code at the time of submittal for the building permit. Currently, these are the 2022 California Building Codes. As of January 1, 2026, the 2025 California Building Codes will take effect. a. Plans shall show that the proper number of plumbing fixtures are being provided for the proposed occupancy meeting the requirements of Chapter 4 of the 2022 California Plumbing Code (CPC), Table 422.1. Fixture calculations requiring multiple fixtures per each sex require privacy partitions to be provided in accordance with CBC Sections 1210.3.1 and 1210.3.2. b. Plans shall show requirements for both EV capable spaces and spaces equipped with EV Supply Equipment (EVSE) that create EV Charging Spaces (EVCS) in the number indicated in Table 5.106.5.3.1, including those required to be accessible per CBC 11B-228.3. 372 RESOLUTION NO. 2025-XXX CONDITIONS OF APPROVAL - RECOMMENDED SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT NO. 3) CONDITIONAL USE PERMIT 2024-0007 SITE DEVELOPMENT PERMIT 2024-0014 PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH ADOPTED: c. Plans shall include a note that separate permitting is required for Trash Enclosure, Flagpoles, Site Lighting, Menu Boards, and Building Signage. 50. Photovoltaic and Energy Storage System required based on Solar Access Roof Areas (SARA) @ 14 Watts or CFA x A / 1000 of Table 140.10-A, applies to Grocery, Office, Unleased Tenant Space, Retail, Warehouse, Auditorium, Convention Center, Hotel/Motel, Library, Medical, Restaurant, Theater. FIRE DEPARTMENT 51. Fire Protection Water Supplies/Fire Flow - Prior to building permit issuance, the applicant shall provide documentation showing a water system capable of delivering 1,000 gallons per minute at 20 psi for 2 hours. A minimum of one fire hydrant is required. The fire hydrant shall be located no more than 400 feet from all portions of the exterior of the building as measured along an approved route. The fire hydrant shall be located within 20 to 100 feet of the fire department connection. The size and number of outlets required for the approved fire hydrant are 4” x 2 ½” x 2 ½”. 52. Prior to building permit issuance, a fire access site plan shall be submitted for review and approval. Fire apparatus access roads shall be provided to within 150 feet of all exterior portions of buildings, unless otherwise approved by the Fire Department. Fire apparatus access roads shall have an unobstructed width of not less than 24 feet. 53. Building Plan Review - Submittal of construction plans to the Fire Department will be required. Final fire and life safety conditions will be addressed when the Fire Department reviews these plans. These conditions will be based on California Fire Code, California Building Code (CBC), and related codes/standards adopted at the time of construction plan submittal. 54. Fire Alarm and Detection System - A water flow monitoring system and/or fire alarm system may be required as determined at the time of building construction plan review. 55. Fire Sprinkler System - All new commercial buildings and structures 3,600 square feet or larger shall be protected by a fire sprinkler system. Reference CFC 903.2 as amended by the City of La Quinta. 56. An automatic fire extinguishing system must be installed over cooking equipment that produces grease-laden vapors. System plans must be submitted to the Fire Department for review and approval prior to installation. 373 RESOLUTION NO. 2025-XXX CONDITIONS OF APPROVAL - RECOMMENDED SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT NO. 3) CONDITIONAL USE PERMIT 2024-0007 SITE DEVELOPMENT PERMIT 2024-0014 PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH ADOPTED: TRIBAL CULTURAL RESOURCES 57. Workers Environmental Awareness Program: A qualified archaeologist who meets or exceeds the Secretary of Interior’s Professional Qualification Standards for archaeology (NPS, 1983) shall conduct Workers Environmental Awareness Program (WEAP) training on archaeological sensitivity for all construction personnel prior to the commencement of any ground-disturbing activities. Archaeological sensitivity training shall include a description of the types of cultural material that may be encountered, cultural sensitivity issues, the regulatory environment, and the proper protocol for the treatment of the materials in the event of a find. The WEAP training document shall include materials that convey the information noted above, which shall be maintained in an area accessible to all construction personnel so that it may be reviewed regularly by construction staff. 58. Native American Monitor: Prior to issuance of grading permits, the applicant/owner or contractor shall provide executed contracts or agreements with a Native American monitor associated with local tribes. The purpose of this agreement shall be to formalize protocols and procedures between the Applicant/Owner and the Native American monitor for the protection and treatment of, including but not limited to, Native American human remains, funerary objects, cultural and religious landscapes, ceremonial items, and traditional gathering areas and tribal cultural resources located and/or discovered through a monitoring program in conjunction with the construction of the proposed project. At the discretion of the Native American monitor, artifacts may be made available for 3D scanning/printing, with scanned/printed materials to be curated at a local repository meeting the federal standards of 36CFR79. The Native American Monitor shall attend all applicable pre-construction meetings with the General Contractor and shall be present on- site full time during grubbing, grading, and other ground-altering activities, including the placement of imported fill materials, to identify evidence of potential tribal resources. 59. Potential Discovery of Tribal Cultural Resources: The Native American Monitor can stop ground-disturbing activities if unknown tribal cultural resources or artifacts are found. All work must cease in the vicinity of any archaeological discovery until the Native American Monitor can assess its significance and potential eligibility for the California Register of Historical Resources (CRHR). If buried cultural deposits are encountered, the monitor may request that construction halt nearby and must notify a qualified archaeologist within 24 hours for investigation. Work will be redirected away from these areas for assessment. Minor finds will be documented and secured for later repatriation; if items cannot be securely stored on-site, they may be stored off-site. If the discovered resources are deemed 374 RESOLUTION NO. 2025-XXX CONDITIONS OF APPROVAL - RECOMMENDED SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT NO. 3) CONDITIONAL USE PERMIT 2024-0007 SITE DEVELOPMENT PERMIT 2024-0014 PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH ADOPTED: potentially significant, the involved Tribes will be notified for consultation on their respectful treatment. Avoidance of significant resources is preferred, but if not feasible, a data recovery plan may be required. The Tribes will be consulted on this plan as well. 60. Treatment of Tribal Cultural Resources: The landowner shall relinquish ownership of all tribal cultural resources unearthed during the cultural resource mitigation monitoring conducted during all ground disturbing activities, and from any previous archaeological studies or excavations on the Project site to the affiliated TCA Tribe, as determined through the appropriate process, for respectful and dignified treatment and disposition, including reburial at a protected location on-site, in accordance with the Tribe’s cultural and spiritual traditions. All cultural materials that are associated with burial and/or funerary goods would be repatriated to the Most Likely Descendant as determined by the NAHC per California Public Resources Code Section 5097.98. No tribal cultural resources shall be subject to curation. 61. Unanticipated Discovery of Human Remains: As specified by California Health and Safety Code Section 7050.5, if human remains are found on the Project site during construction or during archaeological work, the person responsible for the excavation, or his or her authorized representative, shall immediately notify the Riverside County Coroner’s Office by telephone. No further excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent remains shall occur until the Coroner Medical Examiner has made the necessary findings as to origin and disposition pursuant to Public Resources Code 5097.98. If such a discovery occurs, a temporary construction exclusion zone shall be established surrounding the area of the discovery so that the area would be protected, and consultation and treatment could occur as prescribed by law. If suspected Native American remains are discovered, the remains shall be kept in- situ, or in a secure location in close proximity to where they were found, and the analysis of the remains shall only occur on-site in the presence of a Native American Monitor. By law, the Coroner Medical Examiner shall determine within two working days of being notified if the remains are subject to his or her authority. If the Coroner Medical Examiner identifies the remains to be of Native American ancestry, he or she shall contact the NAHC within 24 hours. The NAHC shall make a determination as to the Most Likely Descendent. 375 ATTACHMENT 1 Vicinity Map 376 ATTACHMENT 2 PROJECT INFORMATION CASE NUMBER: SPECIFIC PLAN 2024-0005 (SP 1989-014 AMENDMENT NO. 3) CONDITIONAL USE PERMIT 2024-0007 SITE DEVELOPMENT PERMIT 2024-0014 REQUEST: ADOPT A RESOLUTION TO APPROVE A SPECIFIC PLAN AMENDMENT, CONDITIONAL USE PERMIT, AND SITE DEVELOPMENT PERMIT FOR AN APPROXIMATE 3,690 SQUARE FOOT DRIVE-THROUGH BUILDING LOCATION: APN: 643-080-064 CEQA: THE LA QUINTA DESIGN AND DEVELOPMENT DEPARTMENT HAS DETERMINED THAT THIS PROJECT IS EXEMPT FROM ENVIRONMENTAL REVIEW PURSUANT TO SECTION 15332 (CLASS 32) OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR INFILL DEVELOPMENT SINCE THE PROJECT CONSISTS OF AN APPROXIMATE 3,690 SQUARE-FOOT BUILDING AND MEETS THE CRITERIA FOR INFILL DEVELOPMENT. GENERAL PLAN DESIGNATION: GENERAL COMMERCIAL ZONING DESIGNATION: REGIONAL COMMERCIAL SURROUNDING ZONING/ LAND USES: NORTH: REGIONAL COMMERCIAL / RETAIL STORE SOUTH: REGIONAL COMMERCIAL / SERVICE STATION AND GAS STATION EAST: REGIONAL COMMERCIAL / SHOPPING CENTER WEST: REGIONAL COMMERCIAL / SHOPPING CENTER 377 ATTACHMENT 3 FINDINGS Specific Plan 2024-0005 (SP1989-014 Amendment No. 3) 1. The proposed Specific Plan Amendment is consistent with the General Plan land use designation of General Commercial. The City’s General Plan policies relating to the General Commercial designation encourage a full range of commercial uses, including drive through restaurants, coffee shops, or other drive through uses. 2. Approval of the Specific Plan Amendment will not create conditions materially detrimental to the public health, safety, and general welfare, as development already occurs within this Specific Plan area, and further development of the area will be consistent with the urbanized nature where the project is located. 3. The proposed Specific Plan Amendment is compatible with zoning on surrounding properties, which allows and contains commercial retail and restaurant development. 4. The proposed Specific Plan Amendment is suitable and appropriate for the subject property, as the site is flat, already developed with parking areas and drive aisles, and commercial development. Conditional Use Permit 2024-0007 1. The proposed development is consistent with the General Plan land use designation of General Commercial. The City’s General Plan policies relating to the General Commercial designation encourage a full range of commercial uses, including drive through restaurants, coffee shops, or other drive through uses. The proposed project meets the Goals and Policies of the General Plan as follows: a. Goals LU-6 and ED-1 as it will contribute to a balanced and varied economic base, which provides fiscal stability to the City, and a broad range of goods and services to its residents and the region. b. The project's conceptual landscape design is consistent with Goal WR-1 and Policy UTL-1.2, as it will result in the efficient use and conservation of the City’s water resources. 2. The proposed development, as conditioned, is consistent with the intent of the Regional Commercial District as well as the development standards of the City’s Zoning Code. The project satisfies the District’s intent to provide for automobile- oriented sales and services for the regionally oriented commercial area along Highway 111. The project is consistent with the non-residential development standards. 378 3. The La Quinta Design and Development Department has determined that this project is exempt from environmental review pursuant to Section 15332 (Class 32) of the California Environmental Quality Act for Infill Development since the project consists of an approximate 3,690 square foot building and meets the criteria for infill development since it is less than five acres and is located in an urbanized and built- out area. The project site has no value as habitat for endangered, rare, or threatened species. Approval of the project will not result in any significant effects relating to traffic, noise, air quality, or water quality. The site can be adequately served by all required utilities and public services [Exhibit B]. 4. Approval of the application will not create conditions materially detrimental to the public health, safety, and general welfare or injurious to or incompatible with other properties or land uses in the vicinity. The project consists of a local-serving drive through use. Site Development Permit 2024-0014 1. The proposed development is consistent with the General Plan land use designation of General Commercial. The City’s General Plan policies relating to the General Commercial designation encourage a full range of commercial uses, including drive through restaurants, coffee shops, or other drive through uses. The proposed project meets the Goals and Policies of the General Plan as follows: a. Goals LU-6 and ED-1 as it will contribute to a balanced and varied economic base, which provides fiscal stability to the City, and a broad range of goods and services to its residents and the region. b. The project's conceptual landscape design is consistent with Goal WR-1 and Policy UTL-1.2, as it will result in the efficient use and conservation of the City’s water resources. 2. The proposed development, as conditioned, is consistent with the development standards of the City’s Zoning Code in terms of site plan and landscaping. The Site Development Permit is compliant with the Zoning Code’s development standards, including standards for setbacks, heights, and parking. 3. The La Quinta Design and Development Department has determined that this project is exempt from environmental review pursuant to Section 15332 (Class 32) of the California Environmental Quality Act for Infill Development since the project consists of an approximate 3,690 square foot building and meets the criteria for infill development since it is less than five acres and is located in an urbanized and built- out area. The project site has no value as habitat for endangered, rare, or threatened species. Approval of the project will not result in any significant effects relating to traffic, noise, air quality, or water quality. The site can be adequately served by all required utilities and public services 379 4. The architecture and layout of the project are compatible with, and not detrimental to, the existing surrounding commercial land uses and are consistent with the development standards in the Municipal Code. 5. The site design of the project is compatible with the surrounding development and with the quality of design prevalent in the city. The proposed building is compatible with the surrounding development within the shopping center. 6. The proposed project implements the standards for landscaping and aesthetics established in the General Plan and Zoning Code. The landscape palette is consistent with the City’s drought-tolerant landscaping requirements. 380 44530 SAN PABLO AVE SUITE 200 PALM DESERT CA 92260 T • 760 779 5393 F • 760 779 5395 STATEMENT OF OPERATIONS TO: City of La Quinta CC: FROM: Prest Vuksic Greenwood Architects DATE: December 12, 2024 RE: Statement of Operations PROJECT: 111 La Quinta Drive-Thru Pad 111 La Quinta Drive-Thru Pad Statement of Operations: Description of Proposed Use: The drive-thru facility will serve as a convenient service point for customers to purchase a variety of products, including but not limited to coffee, specialty beverages, quick- service meals, baked goods, fast food items, and retail convenience products. The primary objective is to offer high-quality, fast, and efficient service to meet customer needs across a wide range of offerings. Hours of Operation: The drive-thru will operate from 6:00 AM to 10:00 PM, with flexibility to adjust hours based on customer demand and peak traffic periods. Early morning and evening service will cater to commuters and late-night patrons, respectively. Number of Employees: The operation will employ 8–14 staff members per shift, depending on the time of day and expected customer volume. Roles include order takers, cashiers, food preparers, and shift supervisors. List of Local/State/Federal Licenses/Permits Required: 1.Local business license 2.Food service establishment permit 3.Health department certification 4.Fire safety inspection approval 5.Building/zoning permits (specific to drive-thru operations) 6.Environmental compliance certifications (if applicable) ATTACHMENT 4 381 - 2 - 44530 SAN PABLO AVE SUITE 200 PALM DESERT CA 92260 T • 760 779 5393 F • 760 779 5395 Types of Equipment and Processes Used: 1. Equipment: o Point-of-sale (POS) system for order processing o Drive-thru communication headsets and speaker systems o Food preparation equipment (grills, fryers, ovens, blenders) o Beverage machines (coffee makers, espresso machines, soda dispensers) o Refrigeration and storage units for perishable items 2. Processes: o Streamlined workflows for order-taking, preparation, and delivery o Integration of mobile ordering and contactless payment options o Regular cleaning and maintenance schedules for equipment and facilities List of Any Hazardous Materials Used/Stored/Produced: • Small quantities of cleaning supplies (e.g., degreasers, disinfectants) will be stored and used following safety guidelines. • No hazardous waste or materials will be produced during normal operations. 382 ATTACHMENT 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 FINANCING AUTHORITY MINUTES Page 1 of 2 JUNE 17, 2025 SPECIAL MEETING FINANCING AUTHORITY SPECIAL MEETING MINUTES TUESDAY, JUNE 17, 2025 CALL TO ORDER A special meeting of the La Quinta Financing Authority was called to order at 8:55 p.m. by Chairperson Evans. PRESENT: Authority Members Fitzpatrick, Peña, McGarrey, Sanchez, Chair Evans ABSENT: None PLEDGE OF ALLEGIANCE CONFIRMATION OF AGENDA – Confirmed PUBLIC COMMENT – None BUSINESS SESSION 1. ADOPT RESOLUTION OF THE LA QUINTA FINANCING AUTHORITY TO APPROVE THE FISCAL YEAR 2025/26 BUDGET [RESOLUTION NO. FA 2025-001] The Authority waived presentation of the staff report, which is on file in the Clerk’s Office. Mayor Evans noted the Authority’s fiscal year 2025/26 budget is $1,000 dollars to cover the fee for the annual filing of a State Controller’s Report. MOTION – A motion was made and seconded by Authority Members Sanchez/Fitzpatrick to adopt Resolution No. FA 2025-001 of the La Quinta Financing Authority approving the fiscal year 2025/26 La Quinta Financing Authority budget as presented: A RESOLUTION OF THE FINANCING AUTHORITY OF THE CITY OF LA QUINTA, CALIFORNIA, APPROVING FISCAL YEAR 2025/26 BUDGET Motion passed unanimously. FINANCING AUTHORITY MEMBERS' ITEMS – None ADJOURNMENT There being no further business, it was moved and seconded by Authority Members McGarrey/Sanchez to adjourn at 8:56 p.m. Motion passed unanimously. REPORTS AND INFORMATIONAL ITEM NO. 33 405 FINANCING AUTHORITY MINUTES Page 2 of 2 JUNE 17, 2025 SPECIAL MEETING Respectfully submitted, MONIKA RADEVA, Authority Secretary La Quinta Financing Authority 406 POWER POINTS CITY COUNCIL MEETING JULY 1, 2025 July 1, 2025 1 City Council Regular Meeting July 1, 2025 City Council Regular Meeting July 1, 2025 PUBLIC COMMENT – MATTERS NOT ON THE AGENDA 7/2/2025 1 2 July 1, 2025 2 City Council Regular Meeting July 1, 2025 CLOSED SESSION IN PROGRESS 3 4 July 1, 2025 3 City Council Regular Meeting July 1, 2025 PUBLIC COMMENT – MATTERS NOT ON THE AGENDA 7/2/2025 City Council Regular Meeting July 1, 2025 P1 – SilverRock Development Project Status Update 5 6 July 1, 2025 4 City Council Regular Meeting July 1, 2025 B1 – Approve Cancelling the Regular City Council Meetings of August 19 and September 2, 2025 7 8 July 1, 2025 5 City Council Meeting July 1, 2025 B2 – Approve City Hall Mural Design 9 10 July 1, 2025 6 City Hall Mural • Public art beautifies our shared spaces and reflects the unique character of La Quinta. • Art in Public Places (APP) demonstrates the City’s ongoing commitment to integrating art into the community. • Staff continuously evaluates opportunities for new public art installations and identified an exterior wall of City Hall for a community mural. City Hall Mural • Staff asked local artist Nate Frizzell to create preliminary mural concepts. • December 2024, ACSC discussed the mural designs. • February 2025, staff enter agreement with Frizzell for $25,000 to further design and paint the mural. • June 2025, ACSC discussed revised mural concept. 11 12 July 1, 2025 7 City Hall Mural 13 14 July 1, 2025 8 15 16 July 1, 2025 9 City Council Meeting July 1, 2025 B3 - Approve Amendment No. 1 to Agreement for Contract Services with Visual Edge Technology 7/2/2025 Managed IT Services 24/7 REMOTE MONITORING AND SERVICES SERVER MONITORING MOBILE DEVICE MANAGEMENT DESKTOP MONITORING NETWORK AND SECURITY ASSESSMENTS MAINTENANCE ONSITE SUPPORT 17 18 July 1, 2025 10 Current Managed IT Services Contract Initial Assessment Review • Increase security for devices • Infrastructure upgrades • Servers • Switches • Wi-Fi • Equipment 19 20 July 1, 2025 11 Proposed Amendment – Increased Managed IT Security •Servers •Laptops •Email •Network •Printers •iPads •Cell Phones Proposed Amendment – Infrastructure Upgrades • Server Hardware Replacement/ Migration • Uninterruptible Power Supply (UPS) Battery Backups for Network • Server Room Wiring and New Racks • Museum Network Cleanup and Buildout • City Hall Wi-Fi Upgrades • Civic Center Campus Park Wi-Fi • Equipment Refresh – Computers, iPads, Phones, Monitors, Docking stations 21 22 July 1, 2025 12 Proposed Managed IT Services Questions? 23 24 July 1, 2025 13 City Council Meeting July 1, 2025 PH1 – Hwy 111/Adams Drive-Through Building Specific Plan 2024-0005 Conditional Use Permit 2024-0007 Site Development Permit 2024-0010 25 26 July 1, 2025 14 Project Location Zoning 27 28 July 1, 2025 15 Background • One Eleven Shopping Center Specific Plan – Approved in 1990 – Amended twice – Condition of approval limits number of drive throughs and requires Conditional Use Permit Proposal • Specific Plan Amendment to allow one additional drive through for a total of six in the center • Conditional Use Permit for drive through use • Site Development Permit for site, landscape and architectural design 29 30 July 1, 2025 16 Specific Plan Amendment • Condition of approval limits number of drive throughs to five • Currently five are operating • Amendment involves changing condition of approval to allow for six • No other changes are proposed Specific Plan Amendment • Highway 111 Corridor Specific Plan – To be considered for adoption in the next couple of months – Would allow for drive-through uses in a proposed Auto- Oriented Development Overlay – Overlay includes this site 31 32 July 1, 2025 17 Conditional Use Permit • Required for drive throughs in this center • Proposed Operations • Drive through vehicle stacking Site Plan 33 34 July 1, 2025 18 Site Development Permit • Architectural Design • Landscaping • Site Design – Parking • 46 spaces provided North and West Elevations West North 35 36 July 1, 2025 19 East and South Elevations East South Rendering- Adams Street facing SW 37 38 July 1, 2025 20 Rendering – Adams Street facing north Floor Plan 39 40 July 1, 2025 21 Preliminary Landscape Plan Findings • The project is exempt from environmental review (CEQA) pursuant to Section 15332 infill development project • SP is consistent with General Plan and with surrounding zoning • CUP and SDP are consistent with SP, Zoning Code and General Plan and consider the architecture, landscaping, and site design and apply COA 41 42 July 1, 2025 22 43 44 July 1, 2025 23 Site Plan with Parking 45 46 July 1, 2025 24 Level of Service Descriptions • Expressed in terms of delay or waiting time to get through the various intersection approaches • The General Plan requires a minimum of LOS D 47 48