2025 Ortiz Enterprises - Project 2011-05 Dune Palms Bridge - Change Order No. 20ta Qai fra - — GEM ojtlx DESER"I — TO: Jon McMillen, City Manager FROM: Bryan McKinney, P.E., Public Works Director/City Engineer Via: Carley Escarrega, Administrative Technician DATE: July 16, 2025 RE: Contract Change Order No. 20 Dune Palms Road Bridge Project No. 2011-05 Attached for your signatures is one (1) electronic Contract Change Order No. 20 between Ortiz Enterprises, Inc. and the City of La Quinta for the project referenced above. DESCRIPTION OF CHANGE This Contract Change Order allows for additional labor, time, & materials Total $167,045.21 Please sign and return the original to the City Clerk for final distribution. REQUESTING DEPARTMENT TO CHECK THE ITEMS BELOW AS APPROPRIATE: X Contract payments will be charged to the construction account number: 401-0000-60188-111205-CT Authority to execute this agreement is based upon: City Manager's signature authority provided under Resolution No. 2019-021 for budgeted expenditures of $50,000 or less. _X— City Council approval on October 18, 2022 The following Budget Summary is provided: Project Budget $ 29,756,245 Contract Amount ($ 21,626,759.60) Change Order No. 1 - 19 ($ 874,011.97) This Contract Change Order No. 20 ($ 167,045.21) Balance Remaining $ 7,088,428.22 As indicated, adequate funding is available. 78-495 Calle Tampico La Quinta, CA 92253 760.777.7000 taQaiwra CALIFORNIA - Sheet 1 of 2 CONTRACT: Dune Palms Road Bridge Improvement Project PROJECT M 2011-05 CONTRACTOR: ORTIZ ENTERPRISES, INC. 6 Cushing Suite 200 Irvine, CA 92618-4221 CONTRACT CHANGE ORDER NO. 020 Designer submitted a revised drawing for the Northeast access ramp to allow greater width for driveway access between the bridge barrier wall and the garden wall and to remove the steep cross slope inside the driveway. Pursuant to the terms of the original Contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated all work shall conform to the terms, general conditions, and special provisions of the original Contract. DESCRIPTION OF CHANGE This change order provides for partial removal of bridge barrier wall, 3" epoxy chamfer and 3" epoxy over top of sidewalk, re -staining of bridge barrier finish, construction of 96' long retaining wall, crushed miscellaneous base and compaction, concrete pavement, 16' wide metal gate assembly and raising of sewer manhole as shown on attached revised drawings. Price total will constitute full and complete compensation, including markups for construction work and delays incurred. Current Contract Amount $ 22,500,771.57 Add This Change Order No. 020 $ 167,045.21 Revised Contract Total $ 22,667,816.78 By reason of this contract change order the time of completion is adjusted as follows: No additional time granted. The contract completion date shall remain : 03/28/2025 Submitted By: 6/13/25 Nman Mcki;vie� . Approved By: B, , Mi...y(Ju,28,202512:36PDT Date: 2a Jon McMillen, City Manager We, the undersigned Contractor a given careful consideration to the change proposed and hereby agree, if this proposal is approved, that w 111 provide all equipment, furnish all materials, perform all labor, except as may be noted above, and perform all services necessary to complete the above specified work, and hereby accept as full payment the amount shown above, which includes all direct and indire overhead expenses for any delays. Accepted B ��'�� Tine: Project Manager Y Contractor: Ortiz Enterprisk(s, Inc. Date: 6/13/25 GENERAL ENGINEERING CONTRACTOR ORrl.r--- ENTERPRISES, INC. June 13, 2025 City of La Quinta Public Works Department 78495 Calle Tampico La Quinta, Ca. 92253 Attn: Tom Nowak, R.E. Re: Dune Palms Bridge Rd. Improvement City of La Quinta Project 2011-05 Ortiz Job No. 234 Log No. 081 LICENSE NO.467088 6 CUSHING. SUITE 200, IRVINE. CALIFORNIA 92618-4221 PHONE (949) 753-1414 FAX (949) 753-1477 oeiaort¢ent oom Subject: Contract Change Order #20 -NE Corner of Bridge -CVWD Access Driveway Dear Mr. Nowak, Via e-mail Log #81 Please see attached Contract Change Order #20 (For further processing to Complete the construction of the Driveway and access on the NE Corner of the Bridge. This change order does not provide adjustment to Bid Items contained im the scope of work for this area. Bid Item quantities in this Change Order will be paid under this Change Order and no deductions to any previous Pay Estimate will be necessary. If you have any questions regarding this issue please don't hesitate to contact Mac Delaney at (949) 649- 9470. Sincerely, Ortiz Enterprises, Inc. Mac Delaney Project Manager Attached: CCO #20 1 Letter #80 LEGEND F� CONCRETE CONSTRUCTION 18 CRUSHED MISC. BASE 54 GRADE EX. GND ® REMOVE CONCRETE BARRIER RAIL END TREATMENT CONSTRUCTION NOTES O1 PROTECT IN PLACE 16 CONSTRUCT SIDEWALK PER COLA STD. 200, 240 & 241 18 CONSTRUCT DRIVEWAY APPROACH PER COLA STD. 200 & 221 20 CONSTRUCT COLORED STAMPED GONG MEDIAN PER COLA STD 720 22 CONSTRUCT CONC. SLOPE PROTECTION PER DETAILS ON SHEETS 20-21 26 CONSTRUCT 6' (TALL) GARDEN WALL, PER SPPWC STD 601-4, TYPE 1, DBL REIN. 27 MASONRY WALL PILASTER PER COLQ BUILDING DEPT DETAIL 46 METAL GATE ASSEMBLY PER DETAIL ON SHEET 16 54 CRUSHED MISC. BASE (THICKNESS PER PLAN) 72 RELOCATE SEWER APPURTENANCE PER SEWER PLAN 75 ADJUST TO GRADE, SEWER MANHOLE FRAME & COVER PER SEWER PLAN 76 RELOCATE WATER MAIN PER WATER PLAN 105 CONST. CMU RETAINING WALL PER DETAIL ON SHEET 19A 106 CONST DRIVEWAY APPROACH PER DETAIL ON SHEET 19A 10 5 0 10 20 30 SCALE: 1"=10' 64.99 FS 54 GB 64.96 FS 0 GB 64.99 FS 0. GB \2. 6' .511.11 / 00 57 BACK OF END PAY WALK LIMITS DRIVEWAY 65.13 FS 65.17 FS �� 0 18" CURB i 65.02 FS 65.05 FS i TRANSITION_A VERT TO WEDGE i BRIDGE APPROACH CURB 65.01 TC/ 64.52 TC 64.51 FS 64.52 FS A 64.55 TC/ 64.55 FS 65.06 TC 64.56 FS 18" CURB TRANSITION VERT TO WEDGE LEGEND — — — — — GRADE BREAK FACE OF CURB 9.67' 24" / 3„ H H H H HIHLnrj/ / BATTER @ a. e ---CONC PVT BRIDGE CURB SEE BRIDGE SHEET B14 FOR DOWELING CONNECTION L BRIDGE OF CURB INTO CONCRETE /� EXPANSION DECK / APPROACH SLAB. / JOINT MOD WEDGE CURB SECTION A -A DRIVEWAY DETAIL - NE CHANNEL BANK NOT TO SCALE NOT TO SCALE BEG TRANS 8" OF TO 6" WEDGE 23+50.4 END TRANS 8" CF TO 6" WEDGE 23+52.4 ME-00 N .11. BEG TRANS 6" WEDGE TO 8"CF 23+68.0 END TRANS 6" - WEDGE TO 8"CF 23+70.0 4"(TYP) BRIDGE �/ A END TRANS 6" EXPANSION / END TRANS 8" VWEDGE TO 8"CF JOINT i CF TO 6" WEDGE 23+68.10 23+50.1 BEG TRANS 6" BEG TRANS 8" WEDGE TO 8"CF CF TO 6" WEDGE 23+68.10 23+48.1 20 MEDIAN CROSSING DETAIL -UPDATE NOT TO SCALE WALL LOL'I J A. BLOCK RY CONSTRUCTION OF FOOTING PG (TF) 1' 3" CLR. RETAINING WALL DETAIL NOT TO SCALE C.V. W.D. DRAWING APPROVAL DATE Checked: PROJECT ENGINEER DWG. No. Recommended: DIRECTOR OF ENGINEERING Revisions: DATE APPR. BENCHMARK: BASIS OF BEARINGS: QUALITY, DEDICATION & EXPERIENCE 8413 E BASELINE ROAD APPROVAL BY: CITY OF LA QUINTA CITY OF LA QUINTA, CALIFORNIA S H E E T �pFEssjp SUITE 106 DESCRIPTION: THE BEARINGS SHOWN HEREON ARE BASED ON �De J. �ql MESA, Az 85209 DUNE PALMS ROAD BRIDGE IMPROVEMENT PLAN 19A BM = NGS AH9136; DATUM: NAVD88 THE LINE BETWEEN STATIONS TMAP AND �� �o H E PTAG O N PHONE: 480.757.0997 " " "PSAP" (POSITIONS PER NATIONAL �� �o ® SURVEY DISK STAMPED 931+48.33 SET IN `� � �' -�' �/%%%%//.�� OF 73 SHEETS TOP OF CONCRETE MONUMENT IN THE MEDIAN GEODETIC SURVEY, NAD83, EPOCH 2O09.00) `� m No. 68828 N/��� DATE f BRYAN MORKS I PE N E CHANNEL ACCESS AT THE INTERSECTION OF LA QUINTA CENTER AS SHOWN ON THE NATIONAL GEODETIC � � EFaR-D ,ER THE DIR SUPERVISION OF: PUBLIC WORKS DIRECTOR / CITY ENGINEER DWG. NAME Know what's 134BIOW_ AND HIGHWAY 111. SURVEY PUBLISHED DATA SHEETS, BEING * * R.C.E. NO. 49418 EXP. 09/30/2026 Ca11 before you dig_ NORTH 57'23'28.38"WEST. DATE BY DESCRIPTION APP'D DATE �TF CIVI\-OF C �~� DRAWN BD DESIGNED BD JOB NUMBER 77100021 FILE NO. DATE: 05/06/2025 SCALE CHECKED DATE FOR: ELEV. = 81.620 R E V I S 1 0 N S BRADLEY J. DONAIS, PE R.C.E. 68828 EXP. 09/30/2025 PER PLAN 05/2025 CITY PROJECT #2011-05 TOP OF SIDEWALK 3" EPDX) TOP OF SIDEW) BENCHMARK: DESCRIPTION: SAWCUT e e% & �rrr�rr� BARRIER RAL ELEVATION SCALE: 1 "-1'-0'9 1. MATCH CONCRETE COLOR. 2. DETAILS NOT SHOWN, SEE B18. 3. EPDXY GROUT FOR EXTERIOR USE, f'c = 4,000 PSI MIN. BARRER RAL MONRCA70N DETALS SCALE: 1 "-1'-O'9 0 1' 2' BENGAL ENGINEERING APPROVAL BY: CITY OF LA QUINTA CITY OF LA QUINTA, CALIFORNIA S H E E T C►'' T Q�oFEss/py DUNE PALMS RD. BRIDGE (PROD # 2011-05) DOZ360 S. HOPE AVE. SUITE C-110 SANTA BARBARA, CA 93105 �` `` DATE BYNW N0. 49838 (805) 563-0788 PUBAIC WORKSE DIRECTOR/CITY ENGINEER OF 73 SHEETS ,r * FLARED NE WALL END BLOCK DWG. NAME PREPARED UNDER THE DIRECT SUPERVISION OF: 5�9� CIVIC Q���Q R.C.E. N0. 49418 EXP. 9/30/2022 DRAWN DESIGNED JOB NUMBER FILE NO. DATE BY DESCRIPTION APP'D DATE F OF chop� DATE:05/06/25 MC MD 2011-05 R E V I S 1 0 N S Md. Wahiduzzaman R.C.E. 49838 SCALE 1"=40' CHECKED SO DATE FOR: FEDERAL AID PROJECT #BRNBIL (537)