2025 Roy Allan Slurry Seal, Inc (2) Ch Ord 1 - PMP 24-25 Slurry Seal Improv Project 2024-034aa
CALIFORNIA
CONTRACT: FY 24/25 PMP Slurry Seal — Cove Area Slurry Seal Improvements
PROJECT #: 2024-03
CONTRACTOR: Roy Allan Slurry Seal, Inc.
11922 Bloomfield Ave.
Santa Fe Springs, CA 90670
CONTRACT CHANGE ORDER NO. 1
Pursuant to the terms of the original Contract Agreement, you are hereby directed to make the
herein described changes or do the following described work not included in the plans and
specifications for this Contract. Unless otherwise stated all work shall conform to the terms,
general conditions, and special provisions of the original Contract.
DESCRIPTION OF CHANGE
This Contract Change Order allows for striping for additional slurry seal listed in work directive
no. 1 Total $ 1,452.00
Original Contract Amount
$ 597,493.30
Add This Change Order No. 1
$ 1,452.00
Revised Contract Total
$ 598,945.30
By reason of this contract change order the time of completion is adjusted as follows: - 0
days added to contract time.
The revised contract completion date shall be: 08/11/2025
Submitted By: "bad n(.1 17, 02509:30 PDT)
Date:
Approved By: 6$�ah„MGol61/ney Date:
78495 Calle Tampico I La 9uinta, California 92253 1760.777,7000 I www,laquintaca.gov
Ottigra
CALIFORNIA -
We, the undersigned Contractor, have given careful consideration to the change proposed
and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all
materials, perform all labor, except as may be noted above, and perform all services necessary
to complete the above specified work, and hereby accept as full payment the amount shown
above, which includes all direct and indirect overhead expenses for any delays.
Accepted By: /e -&-
Contractor: ROY ALLAN SLURRY SEAL INC.
Title: Project Manager
Date: 7/17/2025
78495 Calle Tampico I La Quinta, California 92253 1760.777.7000 I www,laquintaca,gov
adifra
- CALIFORNIA
June 26, 2025
Attn: Porfirio Heredia
Roy Allan Slurry Seal, Inc.
12643 Emmens Way
Santa Fe Springs, CA 90670
Subject: FY24/25 PMP Slurry Seal
Project No. 2024-03
Work Directive No. 1
Dear Mr. Heredia,
You are hereby notified to make the following changes to the above -mentioned project:
Extend slurry project limits into the Yucatan Cove streets:
- Avenida Juarez
- Avenida Diaz
- Avenida Rubio
- Avenida Alvarado
- Avenida Obregon
- Calle Yucatan
- Avenida Montezuma
Upon completion of the additional work, and verification of the final quantities, a Contract Change
Order will be issued.
All additional quantities, associated bid item quantities, costs/credits, etc., will be accounted for
in the Final Quantities Adjustment Change Order.
If you have any further questions, please contact me at (760) 275-2789.
Thank you,
Ubaldo Ayon
Public Works Assistant Construction Manager
Cc: Bryan McKinney, P.E., City Engineer
Project File
18495 Calle Tampico I La Quinta, California 92253 1760,717.7000 I www.laquintaca.gov
adifra
- CALIFORNIA
78495 Calle Tampico I La 9uinta, California 92253 I 760 777 7000 I www.laquintaca.gov