Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Proposal - RY + AO (Cost)
yrhl o Fee Schedule X-PARK BUILDING ADA IMPROVEMENTS PROJECT NO.2023-08 March 4, 2025 ry-aoa rch itects.com We propose to provide Architectural & Engineering services for the scope of services outlined in our proposal for X-Park Building ADA Improvements, City Project No. 2023-08, on a fixed fee basis as follows. FEE BY DISCIPLINE Option 1: Elevator/Lift Option 2: Lift with Discipline with Fully AE Designed Pre -Fab Enclosure Enclosure Architectural $68,900 $59,800 Structural $40,200 $24,800 Electrical $8,800 Cost Estimating $11,500 Total $129,400 F-$104,900 FEE BY PHASE Option 1: Elevator/Lift with Option 2: Lift with Project Phase Fully AE Designed Enclo- pre -Fab Enclosure sure Phase 1 - Concept Design $16,700 Phase 2 - Schematic Design $9,200 $8,600 Phase 3 - Design $31,500 $23,500 Development Phase 4 - Construction $47,100 $32,300 Documents / Permitting Phase 5 - Bidding / $24,900 $23,800 Construction Administration Total $129,400 $104,900 Estimated Reimbursable Expenses $ 6,300.00 X-Park Building ADA Improvements I Project No. 2023-08 r•- r- Billing Classification RY+AO Principal Design Director Project Director Senior Associate Associate Senior Designer Senior Project Architect Senior Project Manager Project Manager Project Architect Designer SeniorJob Captain Job Captain Draftsperson Junior Designer Junior Draftsperson Professional Staff HOLMES US Principal Associate Principal Senior Engineer Project Engineer Structural Designer Senior Revit Specialist Revit Specialist Administration ELEN CONSULTING Principal Engineer Senior Engineer Engineer Senior Designer Designer CADD Operator Clerical CUMMING Managing Director Associate Director, Lead Senior Cost Manager Cost Manager HOURLY RATE SCHEDULES Hourly Rate $250.00 $230.00 $230.00 $210.00 $190.00 $190.00 $190.00 $190.00 $180.00 $170.00 $165.00 $155.00 $145.00 $135.00 $130.00 $130.00 $105.00 $280.00-$325.00 $225.00-$255.00 $190.00-$210.00 $160.00-$170.00 $150.00 $175.00 $150.00-$170.00 $90.00 $250.00 $190.00 $160.00 $130.00 $110.00 $ 90.00 $ 80.00 $255.00 $225.00 $200.00 $190.00 X-Park Building ADA Improvements I Project No. 2023-08 731 South Highway101,SuitelM Solana Beach, CA 92075 619.224.3605 RY+A'wOry-aoarchitects.ccm