Loading...
Proposal - Mulholland Consulting, INC. (Cost)mulholland' From: Mulholland Consulting, Inc. Attn: Brian M. Nieckula, P.E. Principal -in -Charge 5000 Birch St. West Tower, Suite 3000 Newport Beach, CA 92660 O 949.229.2449 To: City of La Quinta Attn: Carley Escarrega Administrative Technician Public Works Department City of La Quinta 78495 Calle Tampico La Quinta, CA 92253 Carley Escarrega: TRANSMITTAL LETTER Date: March 4, 2025 Re: La Quinta: Miscellaneous Retention Basin Improvements Mulholland Proiect No. 60.2025.3.0 FedEx Sent Via UPS USPS Courier Email Please find the Work and Cost Proposals for the "Miscellaneous Retention Basin Improvements, Project No. 2023-35" project enclosed. Thanks, Brian Nieckula, P.E. Item Date Attachments Quantity Description Work Proposal 03 04 25 X1 Cost Proposal 03 04 25 X 1 ET —AT rAi r mulholland' March 4, 2025 Mulholland Project No. 60.2025.3.0 City of La Quinta Public Works Department Attn: Carley Escarrega, Administrative Technician 78-495 Calle Tampico La Quinta, California 92253 RE: Cost Proposal for Miscellaneous Retention Basin Improvement Project I Project No. 2023-35 Dear Carley Escarrega: Thank you for the opportunity to submit this proposal for the Miscellaneous Retention Basin Improvement Project. Please find clarifications for the Fee Proposal below: Assumptions Administrative • Provide electronic plan submittals to the City of La Quinta (City). Hardcopy plans are not required. • The City intends to use the Standard Specifications for Public Works Construction (latest edition) and the Standard Plans for Public Works Construction (latest edition). The consultants shall provide copies of referenced standard plans from other sources. • Mulholland Consulting, Inc. (Mulholland) assumes meetings will be facilitated using teleconference services (i.e. Google Meet). • City will pay for all plan check, permit, inspection and miscellaneous fees at no cost to Mulholland Consulting, Inc. Right -of -Way • All right-of-way has been obtained for the proposed improvements. No right-of-way acquisitions will be required. Utility Coordination • If the proposed improvements interfere with existing utilities, Mulholland shall arrange potholes taken as Additional Services. Field Work • We assume we will receive no -fee encroachment permits for all field work. Infiltration Tests • Infiltration test pits will be refilled with native backfill. • Mulholland and its team shall not be responsible for damage to any utility lines not identified by Dig Alert (one call location service). • Mulholland assumes the Work Area Traffic Control Handbook (WATCH) can be used during design and construction and engineered traffic control plans are not required. • The cost of fire hydrant meter and water required by the infiltration tests will be paid for by the City. mulholland' Billing Rate Schedule Effective: January 1, 2025 — December 31, 2025 j City of La Quinta Mulholland Consulting, Inc. Classification Billing Rate Principal in Charge $300 hr Project Manager $250 hr Project Engineer $200 hr Engineering Technician $150 hr Provisions: • Mileage will be charged at the effective/current Internal Revenue Services (IRS) Standard Mileage Rates. • Subcontracted services and reimbursable items shall be invoiced at cost plus fifteen percent (15%). • Billing rates are subject to change once per calendar year or otherwise required by the California Department of Industrial Relations Prevailing Wage Increases. mulholland' Exclusions Please Note: Exclusions are indicated with an "X". Architecture Architectural Plans Floor, Roof, etc. Building Mechanical, Electrical, and Plumbing MEP Plans Fire Protection Plans Fire Sprinklers, Fire Alarm Systems, etc. CALGreen Plans, Specifications, and Estimates "PS&E" Title 24 Energy Calculations/Report Commissioning Building Security Designs Trash Enclosure and Debris Recycling Statements Data Cabling/Server Design Building Ingress/Egress Plans Prepared in Accordance with Fire Code Water/Sewer/Gas Service Sizing Calculations Building/Monument Si na e Solar Panel Specifications/Design Site/Plot Plan Accessibility and/or Barrier Removal Plans Parking Analysis/Tabulation Code Analysis On -site Lighting/Photometric Plans Presentation Drawings, Renderings, and Sample Boards for Materials and Colors Photorealistic, Special, or Additional Renderings Walkthrou h Animations Lifec cle Cost Analyses for Major Building Systems Consultation Concerning Replacement of Work Damaged by Fire or Other Causes not the Fault of Mulholland or its Consultants during Construction Provision of Professional Services made Necessary through no Fault of Mulholland or its Consultants but by Fault of the Contractor in the Performance of the Work, Including but not Limited to Failure to Complete the Project on Time when Liquidated Damages have been Invoked Building Information Modeling BIM Engineering Structural En ineerin /Plans/Calculations Voltage Drop and Flicker Calculations Sewer Studies Traffic Studies Public Street, Street Light, Signage, Striping, Traffic Signal, and Traffic Signal Modification Plans Erosion Control Plans Concrete Joining Plans On -site Utility Plans: Domestic Water, Reclaimed Water, Sewer, Storm Drain Gas Cable TV Data Power Conduit etc. ❑ Off -site Utility Plans: Domestic Water, Reclaimed Water, Sewer, Storm Drain Gas Cable/TV/Data, Power Conduit Street Lighting, etc. ❑ Utility Coordination: Domestic Water, Reclaimed Water, Sewer, Gas, Cable TV Data Power Conduit etc. ❑ On -site Hydrology/Hydraulic Reports ❑ Off -site Hydrology and Hydraulic Report ❑ Demolition Plans ❑ Wall and Fencing Plans Truck Circulation Plans Tentative Tract/Parcel Map Z Electric Vehicle Charging Station Specification and Design IZI Specifications/Bid Documents ❑ Traffic Engineering Traffic Control Plans Transportation Permit Control Panel Designs SCADA Designs and Specifications Grading Plan ❑ Grading Certifications Construction Cost Estimate ❑ Value Engineering Pump/Lift Stations Environmental Water Quality Management Plan (WQMP)/Standard Urban Stormwater Management Plan (SUSMP)/Low Impact Development (LID) Plan Proof of Filing of a Notice of Intent )NOI) with State Water Resources Control Board (SWRCB) in Order to Comply with the Requirements of the National Pollutant Discharge Elimination System JNPDESJ Stormwater Pollution Prevention Plan (SWPPP) in Accordance with SWRCB's General Permit Water Pollution Control Plan WPCP Waste Dischar er's Identification Number (WDID) Issued by the SWRCB Water Quality Improvements Planning California Environmental Quality Act (CEQA) Documentation and Regulatory Permitting National Environmental Policy Act (NEPA) Documentation and Regulatory Permitting Cultural Resource, Paleontological, Tribal, and/or Biological Work Phase I /Phase 2 Environmental Site Assessments Noise Study Z Hazardous Waste Site Assessment LEED Certification Development of Covenants, Conditions, and Restrictions CC&R's Public Art Ordinance Documentation Construction Waste Management Plan Formation of Special Districts (Lighting, etc. Construction Phasing Plan CalEEMod PS&E Surveying and Ma in Construction Survey Staking Mapping Services (Lot Line Adjustments, Final Parcel Map, Final Tract Map, Reference Maps, Easement Dedications, Legal Descriptions, Map Traverse and Closures Setting of Property Corners etc. Building Measurement Topographic Survey ❑ Aerial Survey Boundary Survey Record of Survey Corner Records American Land Title Association (ALTA) Survey Subsurface Investigation("Potholing") Subsurface Utility Location Ground Penetrating Radar Procurement of Preliminary Title Reports Common Wall Agreement, Property Line Grant Deed Radius Map for Mailing Lists/Notification CASp Report Landscape Architecture Landscape Plans Irrigation Plans Open Space Plan Agricultural/Agronomical Testing Testis Infiltration Tests ❑ Methane Investi ations/Re orts Soils/Geotechnical Investigation and Engineering ❑ Flow Monitoring Fire Flow/Hydrant Tests Fault Hazard Study 0 Fault Trenching Development Development Financial Model Administrative / Miscellaneous Site Visits ❑ Plan Submittal and Approval Processing ❑ Project Management ❑ Utility Search and Notification ❑ As -built Research ❑ Filing, Permit, Plan Check, and Miscellaneous Fees Site Utilization Ma Preparation of As-builts Powerwashin /Removal of Underground Service Alert USA Markin s Hazardous Waste Removal Bid Phase Management/Support ❑ Construction Administration/Construction Phase Support: Shop Drawing/Submittal Review ❑ Community Outreach Covenants, Conditions, and Restrictions CC&R's Labor Compliance Expert Witness M mulholland* Please let us know if you have any questions. Respectfully, Brian Nieckula, P.E. Principal in Charge Mulholland Consulting, Inc. brian.nieckula@consultmulholland.com C 951.533.4791 Attachments: • Attachment A: Fee Calculator, Revised March 4, 2025 J � Q M N Z N W C N LL O Z ,o .0 I s D E 00 00 O O O O O O O O N O O O O O O (:? O (=! O O O a 00 00 0 0 0 0 0 O 0 p d. 00 00 0 0 0 0 0 O O 0 t4r) 'o OD N 10 10 O V N O O It C- O � 16 C- Oo O F 104 404 b9 69 40 40 40 ty4 40 49 40 46 99 O 0 0 0 0 0 h ao t1 Cl) N r- •O OD N Q ic b4 6� 44 49 b4 bzy b4 409. bt} E N L O a 0 of b:) H4 401} bq iA 409 4%1i 1.0% 64 64 409. o o' o = 6'} 64 b9 64 b4 b4 V% b4 1.0% 0 0 0 o 0 0 •° 0 0 0 O O O c .p OD s \ cl Lr O y p) O b} bi b} lu i bL} V% b4 V9. � 64 +0 t� vrn 09 90 00000 0 0 O w = 0 N N O O O O O O O O M " 0 000 0 a 0 000 0 0 0 a�i s v o v �_ Oo Co O\ w b4 bbi b9 bbi EH b4 EA b9 b� "i b`} u O N O CNI O LL o o O O o O o O O 0 0 0 O O N O^ 1O O O -q a 0 O O O 0 OLO rn s O cV r O y Ca < 0 b� 6} V% b9 b9 b`} b�1 b4 6% bt} tfi b4 LO O b'i N d O . O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 16 16 66 _ ' 0 O O O O rn �' O O O O 0 U \ cl ai Ci r c O y b4 tH b4 6 b9 69 b4 b4 64 bpi 64 b} � O Ct O c b� i O O O d O O O O O 0 0 0 0 O O 9 = 0 0 O O O N N OO O O O M 72 II OO PA = N ° c s s ( } O E s t o O }` Q a h o O O 1' •°' a v a c cOc `c o V c o o m ._ ,,, o j u t H O N O N 2 O N L a-Q E 0)w a 0 a } Q O N N > ( = CL V) Lu Lu N cn a N O <n V ZCV cM I V h 10 N OO Ol O 11