Loading...
2004 Centre Pointe - Disposition and DA Amendment 1 - CP Development, LLCAMENDMENT NO. 1 TO DISPOSITION AND DEVELOPMENT AGREEMENT THIS AMENDMENT NO. 1 TO DISPOSITION AND DEVELOPMENT AGREEMENT ("Amendment No. 1") is made and entered into as of a2 r , 2004 ("Effective Date") by and between LA QUINTA REDEVELOPMENT AGENCY, a public body, corporate and politic ("Agency"), and CP DEVELOPMENT LA QUINTA, LLC, a California limited liability company ("Developer"). RECITALS: A. On or about December 18, 2003, the Agency and Developer entered into that certain Disposition and Development Agreement (the "DDA"), pursuant to which Agency agreed to sell to Developer, and Developer agreed to purchase from Agency that certain real property located southeast of the Miles Avenue and Washington Street intersection in the City of La Quinta, California 92253 (the "Property") and to construct, complete, and operate thereon a commercial project containing a medical office/surgical facility, a development containing sanctuary villas, a mid -price suites hotel, a resort -style condominium/casitas development, two (2) sit-down restaurants, and two (2) single-family residential developments, with forty (40) of the single-family homes restricted for sale to "Eligible Buyers" at an "Affordable Housing Cost" (as those terms are defined in the DDA (collectively, the "Project"). B. Agency and Developer now desire to amend the DDA to revise (i) certain timeframes in the schedule of performance attached to the DDA; (ii) certain conditions that must be satisfied prior to the Agency's conveyance to Developer of the Property; and (iii) the transfer and assignment provisions. AGREEMENT: NOW, THEREFORE, in consideration of the foregoing recitals which are incorporated herein by this reference and for valuable consideration the receipt and sufficiency of which is hereby acknowledged, the parties hereto agree as follows: l . The DDA is hereby amended as follows: 1.1 To replace Section 205.1(d) and Section 205.2(f) with the following: Design Approvals. If Developer elects to purchase the Property pursuant to Option "A", Developer shall have obtained approval by the City of the Design Development Drawings for the Suites Hotel, as set forth in Section 302 herein, schematic design drawings for the Parcel 2 Casitas Development Component, and preliminary engineering drawings for Seeley Drive. If Developer elects to purchase the Property pursuant to Option "B", Developer shall have obtained approval by the City of the Design Development Drawings for the Phase of Development applicable to each Parcel to be acquired at the Closing, as set forth in Section 302 hereof. 882/015610-0061 540839.02 a09/18/04 1.2 To delete Section 205.1(i). 1.3 To revise Section 205.10) by deleting the phrase "the Parcel 2 Casitas Development Component." 1.4 To replace Section 205.1(k) with the following: (k) Performance Bond. The Developer shall have obtained from Developer's contractor and delivered to the Agency evidence, in a form satisfactory to Agency, that said contractor has the ability to obtain Contractor Bonds at the time of the issuance of building permits for the completion of the construction of (i) the Suites Hotel, and Seeley Drive, if Developer has elected to purchase the Property pursuant to Option "A", or (ii) the Phase of Development applicable to each Parcel to be acquired at the Closing, if Developer has elected to purchase the Property pursuant to Option "B". Said Contractor Bonds shall provide that the Agency is authorized to enforce the same as a third party beneficiary 1.5 To replace Section 205.2(h) with the following: (h) Grading Plans and Permits. If Developer elects to purchase the Property pursuant to Option "A", Developer shall have obtained City approval of its final grading plans for the Property, and grading permits shall be ready to be issued (upon payment of necessary fees, posting of required security, and similar items). If Developer elects to purchase the Property pursuant to Option `B", Developer shall have obtained City approval of its final grading plans for the Phase of Development applicable to each Parcel to be acquired at the Closing, and grading permits shall be ready to be issued (on payment of necessary fees, posting of required security, and similar items. 1.6 To add a new Section 311.1(c), as follows: (c) Notwithstanding anything in this Section 311.1 to the contrary, Developer may satisfy its obligation to provide evidence of the financing necessary to develop the Casitas Development (or applicable Phase of Development thereof) by presenting a letter from Lennar Homes of California, Inc. ("Lennar"), certifying that Lennar has the necessary resources to develop the Casitas Development (or applicable Phase of Development thereof), and identifying the source of such resources, in a manner satisfactory to the Agency's Executive Director, in his or her reasonable discretion. 1.7 To replace Section 703.2(c) with the following: (c) A transfer of the Suites Hotel or the Suites Hotel Parcel to a limited liability company in which Developer is the managing member. 882/015610-0061 540839.02 a09/18/04 -2- 1.8 To replace Section 703.2(d) with the following: (d) A transfer of any of the Parcel 8 Sanctuary Villas Component, Sanctuary Villas Parcel 8, the Parcel 9 Sanctuary Villas Component, and/or Sanctuary Villas Parcel 9 to Lennar or to Center Point Sanctuary, LLC, a California limited liability company. 1.9 To replace Section 703.2(f) with the following: (f) A transfer of any of the Parcel 2 Casitas Development Component, Casitas Parcel 2, the Parcel 3 Casitas Development Component, Casitas Parcel 3, the Parcel 4 Casitas Development Component, Casitas Parcel 4, the Parcel 5 Residential Development, Residential Parcel 5, the Parcel 7 Residential Development, and/or Residential Parcel 7 to Lennar. 1.10 To replace the last paragraph of Section 703.2 with the following: In the event of a Transfer by Developer under subparagraphs (a), (b), (c), (d), (e), or (f) above not requiring the Agency's prior approval, Developer nevertheless agrees that at least thirty (30) days prior to such Transfer it shall give written notice to Agency of such assignment and satisfactory evidence that the assignee has assumed in writing through an assignment and assumption agreement all of the obligations of this Agreement; provided, however, that no such assignment and assumption agreement shall be required for transfers under subparagraphs (d) or (f) to Lennar, and upon such assignment Lennar shall be deemed to have assumed only those obligations hereunder that pertain to the Parcel(s) and the Phase(s) of Development transferred to Lennar. In the event such transfer is under subparagraph (c) or (e) above, Developer shall, along with the notice required to be given pursuant to the immediately preceding sentence, provide Agency with evidence that such proposed transferee entity has been duly formed in accordance with the laws of the State of California. Any Transfer by Developer to Lennar of both Residential Parcel 7 and the Parcel 7 Residential Development under subparagraph (f) above shall include the right to receive disbursements of the Agency Loan pursuant to the terms of this Agreement. 1.11 To add a new paragraph to the end of Section 309.1, as follows: Nothing herein constitutes a representation or warranty by Agency that the construction of the Project is not subject to California Health and Safety Code Sections 33423 through 33426, or Chapter 1 of Part 7 of the California Labor Code (commencing with section 1720), and all applicable statutory and regulatory provisions related thereto, and Developer expressly waives any right of reimbursement for any "increased costs" under California Labor Code Section 1781 or otherwise with respect to the Property or the Project. Developer shall indemnify, defend, and hold Agency harmless, including litigation costs and reasonable attorneys' fees, from and against any and all claims pertaining to the payment of wages for the Property or Project. 882/015610-0061 540839.02 a09/18/04 -3- 1.12 To replace the Schedule of Performance attached to the DDA as Attachment No. 20 with Exhibit "A" hereto, which exhibit is incorporated herein by this reference. 2. For purposes of clarification, all references to "grading plans" and "grading permits" in Section 205 of the DDA, as amended by this Amendment No. 1, shall refer to mass or rough grading, and all references to "grading plans" and "grading permits" in the Schedule of Performance, as amended by this Amendment No. 1, shall refer to precise grading. 3. Agency's approval of this Amendment No. 1 is conditioned upon Developer's execution, concurrently with the execution hereof, of an Indemnification Agreement substantially in the form attached hereto and incorporated herein as Exhibit `B". 4. Except as otherwise expressly provided in this Amendment No. 1, all of the terms and conditions of the DDA shall remain in full force and effect. 5. In the event of any action between Agency and Developer seeking enforcement of any of the terms and conditions to this Amendment No. 1, the prevailing party in such action shall be awarded, in addition to damages, injunctive or other relief, its reasonable costs and expenses, including without limitation its expert witness fees and reasonable attorney's fees. 6. This Amendment No. 1 shall be construed according to its fair meaning and as if prepared by both parties hereto. 7. This Amendment No. 1 shall be governed by the internal laws of the State of California and any question arising hereunder shall be construed or determined according to such law. The Municipal and Superior Courts of the State of California in and for the County of Riverside, or such other appropriate court in such county, shall have exclusive jurisdiction of any litigation between the parties concerning this Amendment No. 1. Service of process on Agency shall be made in accordance with California law. Service of process on Developer shall be made in any manner permitted by California law and shall be effective whether served inside or outside California. 8. Time is of the essence of this Amendment No. 1 and of each and every term and provision hereof. 9. A waiver of a provision hereof, or modification of any provision herein contained, shall be effective only if said waiver or modification is in writing, and signed by both Agency and Developer. No waiver of any breach or default by any party hereto shall be considered to be a waiver of any breach or default unless expressly provided herein or in the waiver. 10. Signatures of the parties transmitted by facsimile shall be deemed binding. However, each party agrees to submit their original signature to the other party within five (5.) business days after execution hereof. 11. This Amendment No. 1 may be executed in counterparts, each of which, when this Amendment No. 1 has been signed by all the parties hereto, shall be deemed an original, and such counterparts shall constitute one and the same instrument. 88v015610-0061 540839.02 a09/18/04 -4- 12. The person(s) executing this Amendment No. 1 on behalf of each of the parties hereto represent and warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Amendment No. 1 on behalf of said party, (iii) by so executing this Amendment No. 1 such parry is formally bound to the provisions of this Amendment No. 1, and (iv) the entering into this Amendment No. 1 does not violate any provision of any other agreement to which such party is bound. [End — Signature Page Follows] 882/015610-0061 540839.02 a09/18/04 -5- IN WITNESS WHEREOF, Agency and Developer each hereby represents that it has read this Amendment No. 1, understands it and hereby executes this Amendment No. 1 to be effective as of the day and year first written above. Date: (nx-r -.M. , 2004 Date: ac-r. 7-E , 2004 Date: Ia - a9 , 2004 ATTEST: Jbae-&eek, Agency Secretary APPROVED AS TO FORM: RUTAN TU R, LP By: /zX - a rine Jenson, A en Counsel "Developer" CP DEVELOPMENT LA QUINTA, LLC, a California limited liability company By: Oliphant Family Trust Its: Member By: _ Richard Oliphant Its: Trustee By: Oliphant Enterprises, Inc. Its: Manager By: Richard Oliphant Its: President "Agency" LA QUINTA REDEVELOPMENT AGENCY, a public body, co r orate politic By: Agency ClAr 882/015610-0061 540839.02 a09/18/04 -6- EXHIBIT "A" SCHEDULE OF PERFORMANCE [See Following Pages] 882/015610-0061 540839.02 a09/18/04 -7- ATTACHMENT NO.20 SCHEDULE OF PERFORMANCE' [See attached individual schedules for each of the (i) Sanctuary Villas Development, (ii) Suites Hotel, (iii) Parcel 5 Residential Development and Parcel 7 Residential Development, (iv) Medical Office/Surgical Facility, (v) Parcel 1 Restaurant and Parcel 2 Restaurant, and (vi) Casitas Development Developer shall have a thirty (30) day grace period for the completion of each of the tasks hereinafter described. Agency shall not declare a default for Developer's failure to timely complete any of the tasks described in this Schedule until such thirty (30) day grace period has expired. 1 All days are calendar days in this Schedule of Performance. 882/015610-0061 540839.02 a09/18/04 ' 1 SCHEDULE OF PERFORMANCE FOR SANCTUARY VILLAS DEVELOPMENT (ALL PHASES OF DEVELOPMENT) Item of Performance Time for Completion 1. Developer execution of DDA. Within 7 days after Developer and Agency approve final draft. 2. Developer's submission of complete Site On or before December 31, 2006. Development Permit Application "SDPA", which will include: • Detailed Site Plan • Floor Plans and Layout • Elevations • Conceptual Landscaping • Master Grading Plan* • Tract Ma 3. Review of SDPA by all applicable City* * Agency will use reasonable efforts to cause such departments. review within 21 days after Developer's submission of SDPA. 4. Agency response to Developer as to City Within 7 days after receipt of final comments, but no comments on SDPA. later than 30 days after Developer's submission of SDPA. 5. Developer and City responses. Developer will respond to any request within 7 days and Agency will use reasonable efforts to cause City to respond to any submission within 7 days. 6. Agency publishes Notice of Public Hearing Within 10 days after City responds to Developer's before the Planning Commission. comments in the preceding section. 7. Planning Commission Public Hearing and Approximately 10 days after first publication. consideration of SDPA and Tract Map. 8 City Council consideration of Tract Map.* Within 21 days after Planning Commission approval if required). 9. City's issuance of SDPA, Tract Map (if Within 7 days after approval by both City Council and applicable) and conditions. Planning Commission as applicable). 10A Developer's preparation of final grading Within 180 days after City's issuance of SDPA and plans and Design Development Drawings Tract Map (if applicable). for Sanctuary Villas Parcel 8. lOB Developer's preparation of final grading Within 180 days after Developer's completion of plans and Design Development Drawings construction of Sanctuary Villas Parcel 8. for Sanctuary Villas Parcel 9. 11A. Developer's submission of evidence of Within 120 days after Developer's completion of financing necessary to complete the Parcel Design Development Drawings for Parcel 8 Sanctuary 8 Sanctuary Villas Component Villas Component. 882/015610-0061 540839.02 a09/18/04 _2_ Item of Performance Time for Completion 11A. Developer's submission of evidence of Within 120 days after Developer's completion of financing necessary to complete the Parcel Design Development Drawings for Parcel 9 Sanctuary 9 Sanctuary Villas Component Villas Component. 12. Agency review and approval, approval with Within 30 days after Agency's receipt of applicable conditions, or denial of Developer's evidence of financing. evidence of financing for Parcel 8 Sanctuary Villas Component and Parcel 9 Sanctuary Villas Component. 13A. Developer's submission of grading permit Within 300 days after City's issuance of the SDPA. and building permit applications for SanctuaryVillas Parcel 8. 13B. Developer's submission of grading permit Within 180 days after Developer's completion of and building permit applications for Parcel 8 Sanctuary Villas Component. Sanctuary Villas Parcel 9. 14A. City's issuance of grading permit for Within 56 days after City's receipt of grading permit Sanctuary Villas Parcel 8. application for Sanctuary Villas Parcel 8. 14B. City's issuance of grading permit for Within 56 days after City's receipt of grading permit Sanctuary Villas Parcel 9. application for Sanctuary Villas Parcel 9. 15A. City's issuance of building permit for By the earlier of. (i) within 98 days after City's receipt Sanctuary Villas Parcel 8. of building permit application for Parcel 8 Sanctuary Villas Component, which is 42 days after City's issuance of grading permit for Sanctuary Villas Parcel 8, or (ii) on or before December 31, 2007. 15B. City's issuance of building permit for Within 98 days after City's receipt of building permit Sanctuary Villas Parcel 9. application for Parcel 9 Sanctuary Villas Component, which is 42 days after City's issuance of grading permit for Sanctuary Villas Parcel 9. 16A. Developer commences construction of Within thirty (30) days after City's issuance of Parcel 8 Sanctuary Villas Component. building permits for the Parcel 8 Sanctuary Villas Component. 16B. Developer commences construction of Within thirty (30) days after City's issuance of Parcel 9 Sanctuary Villas Component. building permits for the Parcel 9 Sanctuary Villas Component. 17A. Developer's completion of Parcel 8 Within 30-36 months after City's issuance of final Sanctuary Villas Component. building permits for the Parcel 8 Sanctuary Villas Component. 17B. Developer's completion of Parcel 9 Within 30-36 months after City's issuance of final Sanctuary Villas Component. building permits for the Parcel 9 Sanctuary Villas Component. * In the event that a master grading plan and total parcel map for the entire Property are submitted with the SDPA for the Suites Hotel, then no further master grading plan or tract map is required for the SDPA for the Parcels included in this Schedule and City Council consideration shall not be required. 882/015610-0061 540839.02 a09/18/04 -3- ** Nothing herein shall be construed to limit the City's legislative authority, which City may exercise, in City's sole and absolute discretion. In all cases where City action is required, Agency shall use reasonable efforts to cause City to take such action in the time prescribed herein. 882/015610-0061 540839.02 a09/18/04 -4- OUTSIDE DATES FOR CLOSING OPTION A Outside Date For Closing for Sanctuary Villas Parcel 8 and Sanctuary Villas Parcel 9: 365 days after the Effective Date. OPTION B Parcel Closing Milestones Sanctuary Villas Parcel 8 Within 180 days after the Developer's completion of the foundation for the Suites Hotel. Sanctuary Villas Parcel 9 Within 180 days after the City's issuance of building permits for the Parcel 8 Sanctuary Villas Component. 882/015610-0061 540839.02 a09/18/04 -5- SCHEDULE OF PERFORMANCE FOR SUITES HOTEL Item of Performance Time for Completion 1. Developer execution of DDA. Within 7 days after Developer and Agency approve final draft. 2. Developer and Agency execute Early Entry Within 7 days after the Effective Date. A Bement. 3. Developer makes purchase election, and Within 7 days after the Effective Date. Agency and Developer open the Initial Escrow or the Property Escrow (as applicable). 4. Agency provides Developer with (i) copies of Within 30 days after the Effective Date. environmental studies and reports regarding the Property and (ii) the Preliminary Title Re ort. 5. Developer submission of complete Site Within 180 days after Effective Date. Development Permit Application "SDPA", which will include: • Detailed Site Plan • Floor Plans and Layout • Elevations • Conceptual Landscaping • Master Grading Plan • Tract Ma 6. Review of SDPA by all applicable City* Agency will use reasonable efforts to cause such departments. review within 21 days after Developer's submittal receipt of SDPA. 7. Agency response to Developer as to City Within 7 days after Agency's receipt of City's comments on SDPA. final comments, but no later than 30 days after Developer's submission of SDPA. 8. Developer and City Responses. Developer will respond to any request within 7 days and Agency will use reasonable efforts to cause City to respond to any submission within 7 da s. 9. Agency publishes Notice of Public Hearing Within 10 days after City responds to Developer's before the Planning Commission. comments in the preceding section. 10. Planning Commission Public Hearing and Approximately 10 days after first publication. consideration of SDPA and Tract Map. 11. City Council consideration of Tract Map. Within 21 days after Planning Commission approval. 'Nothing herein shall be construed to limit the City's legislative authority, which City may excise, in City's sole and absolute discretion. In all cases where City action is required, Agency shall use reasonable efforts to cause City to take such action in the time prescribed herein. 882/015610-0061 540839.02 a09/18/04 -6- Item of Performance Time for Completion 12. City's issuance of SDPA, Tract Map and Within 7 days after City Council approval. conditions. 13. Developer's preparation of final grading plans On or before September 21, 2004. and Design Development Drawings for the Suites Hotel and Seeley Drive. 14. Developer's submission of (i) evidence of Developer shall provide evidence of financing on financing necessary to complete the Suites or before August 30, 2004; and Developer shall Hotel, and (iii) grading permit and building submit grading and building permit applications permit applications for the Suites Hotel and on or before October 31, 2004. Seeley Drive. 15. Agency review and approval, approval with Within 30 days after Agency's receipt of evidence conditions, or denial of Developer's evidence of financing of financing submitted in Item No. 14. 16. City's issuance of grading permit for the Suites Within 56 days after City's receipt of grading Hotel Parcel, the Parcel on which Developer permit application for the Suites Hotel Parcel, the shall construct the first Phase of Development Parcel on which Developer shall construct the first of the Casitas Development and Seeley Drive. Phase of Development of the Casitas Development, and Seel e Drive. 17. Developer's completion of first pavement lift Within (30) days after Developer's installation of and curbs and gutters of Seeley Drive. the foundation for the Suites Hotel. 18. City's issuance of building permits for the Within 98 days after City's receipt of building Suites Hotel and Seeley Drive. permit application for the Suites Hotel and Seeley Drive, which is 42 days after City's issuance of grading permit for the Suites Hotel and Seeley Drive. 19. Developer commences construction of Suites Within 30 days after Developer's receipt of Hotel. building permits for the Suites Hotel. 20. Completion of Suites Hotel. Before June 30, 2006, subject to the provisions of Section 702 of the DDA. 21. Developer completes final pavement lift of Within one hundred eighty (180) days after Seeley Drive. Developer's completion of the Suites Hotel. Outside Date for Closint for Suites Hotel Parcel, Landscape Parcel C, Landscape Parcel E, and the Seeley Drive Parcel (under Option A or Option B): 365 days after the Effective Date. 882/015610-0061 540839.02 a09/18/04 -7- SCHEDULE OF PERFORMANCE FOR PARCEL 5 RESIDENTIAL, DEVELOPMENT AND PARCEL 7 RESIDENTIAL DEVELOPMENT Item of Performance Time of Completion 1. Developer's execution of the DDA. Within 7 days after Developer and Agency approve final draft. 2. Developer's submission of (i) evidence of On or before December 31, 2005. financing necessary to complete the Parcel 5 Residential Development and the Parcel 7 Residential Development, and (ii) complete Site Development Permit Application "SDPA", including: • Detailed Site Plan • Floor Plans and Layout • Elevations • Conceptual Landscaping • Master Grading Plan • Tentative Tract Ma 3. Review of SDPA by all applicable City* Agency will use reasonable efforts to cause such departments. review within 21 days after Developer's submission of SDPA. 4. Agency response to Developer as to City Within 7 days after receipt of final comments, but no comments on SDPA. later than 30 days after Developer's submission of SDPA. 5. Developer and City Responses. Developer will respond to any request within 7 days and Agency will use reasonable efforts to cause City to respond to any submission within 7 days. 6. Agency publishes Notice of Public Hearing Within 10 days after City responds to Developer's before the Planning Commission. comments in the preceding Section. 7. Planning Commission public hearing and Approximately 10 days after first publication. consideration of SDPA and Tentative Tract Map. 8. City Council consideration of Tentative Within 21 days after Planning Commission approval. Tract Map. 9. City's issuance of SDPA, Tentative Tract Within 7 days after City Council approval. Map and conditions of approval. 10. Preparation of Grading Plans and Design By the earlier of. (i) within 180 days after City's Development Drawings for the Parcel 5 issuance of SDPA and Tentative Tract Map, or (ii) by Residential Development and the Parcel 7 June 30, 2006. Residential Development. 882/015610-0061 540839.02 a09/18/04 _8_ Item of Performance Time of Completion 11. Developer's submission of grading permit Within 120 days after Developer's completion of and building permit application for Design Development Drawings. backbone infrastructure for the Parcel 5 Residential Development and the Parcel 7 Residential Development. 12. City's issuance of Grading Permit for the Within 56 days after City's receipt of grading permit Parcel 5 Residential Development and the application. Parcel 7 Residential Development. 13 City's issuance of building permit for Within 98 days after City's receipt of Building Permit backbone infrastructure for the Parcel 5 application, which is 42 days after City's issuance of Residential Development and the Parcel 7 Grading Permit. Residential Development. 14. Developer's commencement of construction Within 30 days following City's issuance of Building of backbone infrastructure of the Parcel 5 Permits. Residential Development and the Parcel 7 Residential Development. 15 Within 90 days after Developer's completion of Developer's commencement of Construction construction of the backbone infrastructure described of the Parcel 5 Residential Development and in Item 14 above, provided City has not delayed in the Parcel 7 Residential Development. issuing a building permit. 16 Developer's completion of construction of Within 30 months following City's issuance of the Parcel 5 Residential Development. Building Permits for the Parcel 5 Residential Development. 17. Developer's completion of construction of Within 18 months following City's issuance of the Parcel 7 Residential Development Building Permits for the Parcel 7 Residential Development. *Nothing herein shall be construed to limit City's legislative authority, which City may exercise, in City's sole and absolute discretion. In all cases where City action is required, Agency shall use reasonable efforts to cause City to take such action in the time prescribed herein. OUTSIDE DATES FOR CLOSING OPTION A Outside Date For Closing for Residential Parcel 5 and Residential Parcel 7: 365 days after the Effective Date. OPTION B Outside Date For Closing for Residential Parcel 5 and Residential Parcel 7: 30 days after the Developer's completion of the exterior walls and roof of the, Suites Hotel. 882/015610-0061 540839.02 a09/18/04 -9- SCHEDULE OF PERFORMANCE FOR MEDICAL OFFICE/SURGICAL CILITY (ALL PHASES OF D Item of Performance Time for Completion 1. Developer execution of DDA. Within 7 days after Developer and Agency approve final draft. 2A/B. Developer's submission of complete Site On or before December 31, 2005. Development Permit Application for the Parcel A Medical Office/Surgical Facility Component and for the first and second Phases of Development of the Medical Office/Surgical Facility, "First/Second MOB SDPA", which will include: • Detailed Site Plan • Floor Plans and Layout • Elevations • Conceptual Landscaping • Master Grading Plan* • Tract Map* 2C. Developer's submission of complete Site Within 90 days after City's issuance of building Development Permit Application for the permits for Lhe first and second Phases of third Phase of Development of the Developme it of the Medical Office/Surgical Medical Office/Surgical Facility, "Third Facility. MOB SDPA," which will include: • Detailed Site Plan • Floor Plans and Layout • Elevations • Conceptual Landscaping • Master Grading Plan* • Tract Map* 3A. Review of First/Second MOB SDPA by Agency wil I use reasonable efforts to cause such all applicable City** departments. review within 21 days after Developer's submittal of First/Secon MOB SDPA. 3B. Review of Third MOB SDPA by all Agency wil I use reasonable efforts to cause such applicable City departments. review within 21 days after Developer's submittal of Third MOB SDPA. 4A. Agency response to Developer as to City Within 7 days after Agency's receipt of City's final comments on First/Second MOB SDPA. comments, but no later than 30 days after Developer's submission of First/Second MOB SDPA. 882/015610-0061 540839.02 a09/18/04 -10- Item of Performance Time for Completion 4B. Agency response to Developer as to City 'Within 7 days after Agency's receipt of City's final comments on Third MOB SDPA. comments, but no later than 30 days after Developer's submission of Third MOB SDPA. 5. Developer and City Responses. Developer will respond to any request within 7 days and Agency will use reasonable efforts to cause City to respond to any submission within 7 days. 6A. Agency publishes Notice of Public Within 10 days after City responds to Developer's Hearing for the First/Second MOB SDPA comments regarding the First/Second MOB SDPA. before the Planning Commission. 6B. Agency publishes Notice of Public Within 10 days after City responds to Developer's Hearing for the Third MOB SDPA before comments regarding the Third MOB SDPA. the Planning Commission. 7A. Planning Commission Public Hearing and Approximately 10 days after first publication of consideration of First/Second MOB notice of the same. SDPA and Tract Map. 7B. Planning Commission Public Hearing and Approximately 10 days after first publication of consideration of Third MOB SDPA and notice of the same. Tract Map. 8A. City Council consideration of Tract Within 21 days after Planning Commission approval Map.* of First/Second MOB SDPA. 8B. City Council consideration of Tract Within 21 days after Planning Commission approval Map. * of Third MOB SDPA. 9A. City's Issuance of First/Second MOB Within 7 days after approval of First/Second MOB SDPA Tract Map, if applicable. SDPA by both Planning Commission and City Council. 9B. City's Issuance of Third MOB SDPA Within 7 days after approval of Third MOB SDPA Tract Map, if applicable. by both Planning Commission and City Council. 10A. Developer's preparation of final grading Within 180 days after City's issuance of plans and Design Development Drawings First/Second MOB SDPA and Tract Map (if for the Parcel A Medical Office/Surgical applicable). Facility Component and the first and second Phases of Development of the Medical Office/Surgical Facility. 10B. Developer's preparation of final grading Within 180 days after City's issuance of Third MOB plans and Design Development Drawings SDPA and Tract Map (if applicable). for the third Phase of Development of the Medical Office/Surgical Facility. 882/015610-0061 540839.02 a09/18/04 -11- Item of Performance Time for Completion 1 IA. Developer's submission of evidence of Within 120 days after Developer's completion of financing necessary to complete the Design Development Drawings for the Parcel A Parcel A Medical Office/Surgical Facility Medical Office/Surgical Facility Component and the Component and the first and second first and second Phases of Development of the Phases of Development of the Medical Medical Office/Surgical Facility. Office/Surgical Facility and of grading permit and building permit applications for the Parcel A Medical Office/Surgical Facility Component and the first and second Phases of Development of the Medical Office/Surgical Facility. 1113. Developer's submission of evidence of Within 120 days after Developer's completion of financing necessary to complete the third Design Development Drawings for the third Phase of Phase of Development of the Medical Development of the Medical Office/Surgical Office/Surgical Facility and of grading Facility. permit and building permit applications for the third Phase of Development of the Medical Office/Surgical Facility. 12A. Agency's review and approval, approval Within 30 days after Agency's receipt of the same. with conditions or denial of Developer's evidence of financing submittal in Item 11A. 12B. Agency's review and approval, approval Within 30 days after Agency's receipt of the same. with conditions or denial of Developer's evidence of financing submittal in Item 1113. 13A. City's issuance of grading permit for the The later of (i) within 56 days after City's receipt of Parcel A Medical Office/Surgical Facility building permit application for first Phase of Component and first Phase of Development of the Medical Office/Surgical Facility Development of the Medical or (ii) upon Developer's completion of foundation Office/Surgical Facility. for Suites Hotel. 13B. City's issuance of grading permit for The later of (i) within 56 days after City's receipt of second Phase of Development of the building permit application for the second Phase of Medical Office/Surgical Facility. Development of the Medical Office/Surgical Facility or (ii) upon Developer's completion of framing of exterior walls of the Suites Hotel. 13C. City's issuance of grading permit for the The later of (i) within 56 days after City's receipt of third Phase of Development of the building permit application for the third Phase of Medical Office/Surgical Facility. Development of the Medical Office/Surgical Facility or (ii) upon Developer's completion of exterior walls and roof for the Suites Hotel. 882/015610-0061 540839.02 a09/18/04 -12- Item of Performance Time for Completion 14A. City's issuance of building permit for By the earlier of. (i) within 98 days after City's Parcel A Medical Office/Surgical Facility receipt of building permit application for the first and first Phase of Development of the Phase of Development of the Medical Medical Office/Surgical Facility. Office/Surgical Facility, which is 42 days after issuance of grading permit for the first Phase of Development of the Medical Office/Surgical Facility, or ii on or before December 31, 2006. 14B. City's issuance of building permit for Within 98 days after City's receipt of building second Phase of Development of the permit application for the second Phase of Medical Office/Surgical Facility. Development of the Medical Office/Surgical Facility, which is 42 days after issuance of grading permit for the second Phase of Development of the Medical Office/Surgical Facility. 14C. City's issuance of building permit for Within 98 days after City's receipt of building third Phase of Development of the permit application for the third Phase of Medical Office/Surgical Facility. Development of the Medical Office/Surgical Facility, which is 42 days after issuance of grading permit for the third Phase of Development of the Medical Office/Surgical Facility. 15A. Developer commences construction of With thirty (30) days after City's issuance of Parcel A Medical Office/Surgical Facility building permits for the first Phase of Development and first Phase of Development of the of the Medical Office/Surgical Facility. Medical Office/Surgical Facility. 15B. Developer commences construction of With thirty (30) days after City's issuance of second Phase of Development of the building permits for the second Phase of Medical Office/Surgical Facility. Development of the Medical Office/Surgical Facility. 15C. Developer commences construction of With thirty (30) days after City's issuance of third Phase of Development of the building permits for the third Phase of Development Medical Office/Surgical Facility. of the Medical Office/Surgical Facility. 16A. Developer's completion of Parcel A Within 30-36 months after City's issuance of Medical Office/Surgical Facility and the building permits for Parcel A Medical first Phase of Development of the Medical Office/Surgical Facility Component and the first Office/Surgical Facility. Phase of Development of the Medical Office/Surgical Facility. 16B. Developer's completion of second Phase Within 30-36 months after City's issuance of of Development of the Medical building permit for second Phase of Development of Office/Surgical Facility. the Medical Office/Surgical Facility Component. 16C. Developer's completion of third Phase of Within 30-36 months after City's issuance of Development of the Medical building permit for third Phase of Development of Office/Surgical Facility. the Medical Office/Surgical Facility Component. * In the event that a master grading plan and total parcel map for the entire Property are submitted with the SDPA for the Suites Hotel, then no further master grading plan or tract map is required for the SDPA for any of the Parcels included in this Schedule and City Council consideration shall not required. 882/015610-0061 540839.02 a09/18/04 -13- ** Nothing herein shall be construed to limit City's legislative authority, which City may exercise, in City's sole and absolute discretion. In all cases where City action is required, Agency shall use reasonable efforts to cause City to take such action in the time prescribed herein. 882/015610-0061 540839.02 a09/18/04 -14- OUTSIDE DATES FOR CLOSING OPTION A Outside Date for Closing for Medical Office/Surgical Facility Parcel A, Medical Office/Surgical Facility Parcel 10, Medical Office/Surgical Facility Parcel 11, and Medical Office/Surgical Facility Parcel 12: 365 days after the Effective Date. OPTION B Parcel Outside Date for Closing Medical Office/Surgical Facility Parcel A Within 90 days after the Developer's completion of and one of (i) Medical Office/Surgical Facility the foundation for the Suites Hotel. Parcel 10, (ii) Medical Office/Surgical Facility Parcel 11, or (iii) Medical Office/Surgical Facility Parcel 12 One of (i) Medical Office/Surgical Facility Within 90 days after the Developer's completion of Parcel 10, (ii) Medical Office/Surgical Facility framing of all exterior walls of the Suites Hotel. Parcel 11, or (iii) Medical Office/Surgical Facility Parcel 12 The final unpurchased Parcel of the (i) Medical Within 90 days after the Developer's completion of Office/Surgical Facility Parcel 10, (ii) Medical the exterior walls and roof of the Suites Hotel. Office/Surgical Facility Parcel 11, and (iii) Medical Office/Surgical Facility Parcel 12 882/015610-0061 540839.02 a09/18/04 -15 - SCHEDULE OF PERFORMANCE FOR PARCEL 1 RESTAURANT AND PARCEL 13 RESTAURANT Item of Performance Time for Completion l . Developer execution of DDA. Within 7 days after Developer and Agency approve final draft. 2A. Developer's submission of complete Site On or before December 31, 2005. Development Permit Application for Restaurant Parcel 1 "Parcel 1 SDPA", which will include: • Detailed Site Plan • Floor Plans and Layout • Elevations • Conceptual Landscaping • Master Grading Plan* • Tract Map* 2B. Developer's submission of complete Site Within 180 days after City's issuance of building Development Permit Application for permits for Restaurant Parcel 1. Restaurant Parcel 13 "Parcel 13 SDPA", which will include: • Detailed Site Plan • Floor Plans and Layout • Elevations • Conceptual Landscaping • Master Grading Plan* • Tract Map* 3A. Review of Parcel 1 SDPA by all Agency will use reasonable efforts to cause such applicable City** departments. review within 21 days after Developer's submittal of Parcel 1 SDPA. 3B. Review of Parcel 13 SDPA by all Agency will use reasonable efforts to cause such applicable City departments. review within 21 days after Developer's submittal of Parcel 13 SDPA. 4A. Agency response to Developer as to City Within 7 days after Agency's receipt of City's comments on Parcel 1 SDPA. final comments on application, but no later than 30 days after Developer's submission of Parcel 1 SDPA. 4B. Agency response to Developer as to City Within 7 days after Agency's receipt of City's comments on Parcel 13 SDPA. final comments on application, but no later than 30 days after Developer's submission of Parcel 13 SDPA. 5. Developer and City Responses. Developer will respond to any request within 7 days and Agency will use reasonable efforts to cause City to respond to any submission within 7 days. 882/015610-0061 540839.02 a09/18/04 -16- Item of Performance Time for Completion 6A. Agency publishes Notice of Public Within 10 days after City responds to Developer's Hearing for the Parcel 1 SDPA before the comments regarding the Parcel 1 SDPA. Planning Commission. 6B. Agency publishes Notice of Public Within 10 days after City responds to Developer's Hearing for the Parcel 13 SDPA before comments regarding the Parcel 13 SDPA. the Planning Commission. 7A. Planning Commission's Public Hearing Approximately 10 days after first publication of and consideration of Parcel 1 SDPA and notice of the same. Tract Map. 7B Planning Commission's Public Hearing Approximately 10 days after first publication of and consideration of Parcel 13 SDPA and notice of the same. Tract Map. 8A. City Council's consideration of Tract Map Within 21 days after Planning Commission for Parcel 1.* approval of the Parcel 1 SDPA. 8B. City Council's consideration of Tract Map Within 21 days after Planning Commission for Parcel 13.* approval of the Parcel 13 SDPA. 9A. City's issuance of Parcel 1 SDPA and Within 7 days after approval of Parcel 1 SDPA Tract Map and conditions. and Tract Map by both Planning Commission and City Council. 9B. City's issuance of Parcel 13 SDPA and Within 7 days after approval of Parcel 13 SDPA Tract Map and conditions. and Tract Map by both Planning Commission and City Council. 10A. Developer's preparation of final grading Within 180 days after City issues Parcel 1 SDPA, plan and Design Development Drawings Tract Map, and conditions. for Restaurant Parcel 1. 1013. Developer's preparation of final grading Within 180 days after City issues Parcel 13 plan and Design Development Drawings SDPA, Tract Map, and conditions. for Restaurant Parcel 13. 1 IA. Developer's submission of (i) evidence of Within 90 days after Developer's completion of financing necessary to complete Parcel 1 Design Development Drawings for the Parcel 1 Restaurant, and (ii) grading and building Restaurant. permit applications for Restaurant Parcel 1. 11B. Developer's submission of (i) evidence of Within 20 days after Developer's completion of financing necessary to complete Parcel 1 Design Development Drawings for the Parcel 13 Restaurant, and (ii) grading and building Restaurant. permit applications for Restaurant Parcel 13. 11 C. Developer's submission of grading and Within 180 days after Developer's completion of building permit applications for the Parcel 1 Restaurant. Restaurant Parcel 13. 12A. City's issuance of grading permit for Within 56 days after City's receipt of building Restaurant Parcel 1. permit application for Restaurant Parcel 1. 882/015610-0061 540839.02 a09/18/04 -17- Item of Performance Time for Completion 12B. City's issuance of grading permit for Within 56 days after City's receipt of building Restaurant Parcel 13. permit application for Restaurant Parcel 13. 13A. City's issuance of building permit for Within 98 days after receipt of building permit Parcel 1 Restaurant.' application for Parcel 1 Restaurant, which is 42 days after City's issuance of grading permit for Restaurant Parcel 1. 13B. City's issuance of building permit for By the earlier of. (i) within 98 days after receipt of Parcel 13 Restaurant. building permit application for Parcel 13 Restaurant, which is 42 days after City's issuance of grading permit for Restaurant Parcel 13, or (ii) on or before December 31, 2006. 14A. Developer commences construction of Within thirty (30) days after City's issuance of Parcel 1 Restaurant. building permits for Parcel 1 Restaurant. 14B. Developer commences construction of Within thirty (30) days after City's issuance of Parcel 13 Restaurant. building permits for Parcel 13 Restaurant. 15A. Completion of Parcel 1 Restaurant. Within 30-36 months after City's issuance of building permits for Parcel 1 Restaurant. 15B. Completion of Parcel 13 Restaurant. Within 30-36 months after City's issuance of building permits for the Parcel 13 Restaurant. * In the event that a master grading plan and total parcel map for the entire Property are submitted with the SDPA for the Suites Hotel, then no further master grading plan or tract map is required for the SDPA for any of the Parcels included in this Schedule, and City Council consideration shall not be required. ** Nothing herein shall be construed to limit the City's legislative authority, which City may exercise, in City's sole and absolute discretion. In all cases where City action is required, Agency shall use reasonable efforts to cause City to take such action in the time prescribed herein. 882/015610-0061 540839.02 a09/18/04 -18- OUTSIDE DATES MEOW CLOSING OPTIONA Outside Closing Date for Closing for Restaurant Parcel 1 and Restaurant Parcel 13: 365 days after the Effective Date. OPTION B Parcel Closing Milestones Restaurant Parcel 1 Within 90 days after the Developer's completion of the foundation for the Suites Hotel. Restaurant Parcel 13 Within 90 days after the City's issuance of building permits for Parcel 13 Restaurant. 882/015610-0061 540839.02 a09/18/04 -19- SCHEDULE OF PERFORMANCE FOR CASITAS DEVELOPMENT (ALL PHASES OF DEVELOPMENT) Item of Performance Time for Completion 1. Developer execution of DDA. Within 7 days after Developer and Agency approve final draft. 2. Developer and Agency execute Early Entry Within 7 days after the Effective Date. Agreement. 3. Developer makes purchase election, and Within 7 days after the Effective Date. Agency and Developer open the Initial Escrow or the Property Escrow (as applicable). 4. Agency provides Developer with (i) copies of Within 30 days after the Effective Date. environmental studies and reports regarding the Property and (ii) the Preliminary Title Report. 5. Developer submission of complete Site Within 180 days after Effective Date. Development Permit Application "SDPA", which will include: • Detailed Site Plan • Floor Plans and Layout • Elevations • Conceptual Landscaping • Master Grading Plan • Tract Ma 6. Review of SDPA by all applicable City' Agency will use reasonable efforts to cause such departments. review within 21 days after Developer's submittal receipt of SDPA. 7. Agency response to Developer as to City Within 7 days after Agency's receipt of City's comments on SDPA. final comments, but no later than 30 days after Developer's submission of SDPA. 8. Developer and City Responses. Developer will respond to any request within 7 days and Agency will use reasonable efforts to cause City to respond to any submission within 7 days. 9. Agency publishes Notice of Public Hearing Within 10 days after City responds to before the Planning Commission. Developer's comments in the preceding section. 10. Planning Commission Public Hearing and Approximately 10 days after first publication. consideration of SDPA and Tract Map. 11. City Council consideration of Tract Map. Within 21 days after Planning Commission approval. 'Nothing herein shall be construed to limit the City's legislative authority, which City may excise, in City's sole and absolute discretion. In all cases where City action is required, Agency shall use reasonable efforts to cause City to take such action in the time prescribed herein. 882/015610-0061 540839.02 a09/18/04 -20- Item of Performance Time for Completion 12. City's issuance of SDPA, Tract Map and 'Within 7 days after City Council approval. conditions. 13A. Developer's preparation of Design On or before December 31, 2004. Development Drawings for the first Phase of Development of the Casitas Development. 13B. Developer's preparation of Design On or before June 30, 2005. Development Drawings for the second Phase of Development of the Casitas Development. 13C. Developer's preparation of Design On or before December 31, 2005. Development Drawings for the third Phase of Development of the Casitas Development. 14. Developer's submission of evidence of Within 20 days after Developer's completion of available cash resources to complete the Design Development Drawings for the first Phase Casitas Development (all Phases of of Development of the Casitas Development. Development). 15. Agency review and approval, approval with Within 30 days after Agency's receipt of conditions, or denial of Developer's evidence evidence of financing of financing submitted in Item No. 14. 16. Developer's submission of building permit Within 120 days after Developer's completion of applications for the first Phase of Design Development Drawings for the first Phase Develo ment of the Casitas Development. of Development of the Casitas Development. 17. Developer's submission of building permit Within 120 days after Developer's completion of applications for the second Phase of the first Phase of Development of the Casitas Development of the Casitas Development. Development. 18. Developer's submission of building permit Within 120 days after Developer's completion of applications for the third Phase of the second Phase of Development of the Casitas Development of the Casitas Development. Development 19. City's issuance of building permits for the Within 56 days after City's receipt of building first Phase of Development of the Casitas permit applications for the first Phase of Development Development of the Casitas Development. 20. Developer commences construction of first Within 30 days after Developer's receipt of Phase of Development of the Casitas building permits for the first Phase of Develo ment. Development of the Casitas Development. 21. City's issuance of building permits for the Within 56 days after City's receipt of building second Phase of Development of the Casitas permit application for the second Phase of Development Development of the Casitas Development. 22. Developer commences construction of second Within 30 days after Developer's receipt of Phase of Development of the Casitas building permits for the second Phase of Development. Development of the Casitas Development. 23. City's issuance of building permits for the Within 56 days after City's receipt of building third Phase of Development of the Casitas permit application for the third Phase of Development I Development of the Casitas Development. 882/015610-0061 540839.02 a09/18/04 -21- Item of Performance Time for Completion 24. Developer commences construction of third Within 30 days after Developer's receipt of Phase of Development of the Casitas building permits for the third Phase of Development. Development of the Casitas Development. 25. Completion of first Phase of Development of Within 30-36 months after City's issuance of the Casitas Development. building permits for first Phase of Development of the Casitas Development. 26. Completion of second Phase of Development Within 30-36 months after City's issuance of of the Casitas Development. building permits for second Phase of Development of the Casitas Development. 27. Completion of third Phase of Development of Within 30-36 months after City's issuance of the Casitas Development. building permits for third Phase of Development of the Casitas Development, but in no event later than December-31, 2007. Outside Date for Closing for Suites Hotel Parcel, Landscape Parcel C, Landscape Parcel E, and the Seeley Drive Parcel (under Option A or Option B): 365 days after the Effective Date. 882/015610-0061 540839.02 a09/18/04 -22- INDEMNIFICATION AGREEMENT [See following pages] 882/015610-0061 540839.02 a09/18/04 -23- INDEMNIFICATION AGREEMENT THIS INDEMNIFICATION AGREEMENT ("Indemnification Agreement") is made and entered into as of 0&. A 9 , 2004, by and between CP DEVELOPMENT LA QUINTA, LLC, a California limited liability company ("Center Point"), and the LA QUINTA REDEVELOPMENT AGENCY, a public body, corporate and politic (the "Agency"), with reference to the following Recitals. RECITALS A. Center Point and the Agency have entered into that certain Disposition and Development Agreement dated December 18, 2003 (the "DDA"), pursuant to which, among other things, (i) Agency has agreed to sell to Center Point, and Center Point has agreed to purchase from Agency certain real property identified therein as the "Property", which is located in the City of La Quinta, County of Riverside, State of California, and (ii) Center Point has agreed to construct, complete, and operate on the Property a commercial project containing a medical office/surgical facility, a development containing "sanctuary villas," a mid -price suites hotel, a resort -style condominium/casitas development (the "Casitas Development"), two (2) sit- down restaurants, and two (2) single-family residential developments (the "Residential Component"), with forty (40) of the single-family homes restricted for sale to moderate -income buyers at restricted sales prices, all as more particularly described in the DDA (collectively, the "Project). B. Center Point initially informed the Agency that the Residential Component would be constructed by Ehline Development Co., a California corporation ("Ehline Development Co."). As a result, the DDA permits Center Point to transfer and assign the Residential Component to Ehline Development Co. or to an affiliated entity of Ehline Development Co. (an "Affiliated Entity"). The term "Ehline" shall be used hereinafter to refer to, collectively, Ehline Development Co. and the Affiliated Entities. C. Center Point has now requested that the DDA be revised to, among other things, omit Ehline as a permitted assignee/transferee of the Residential Component and to instead permit the assignment/transfer of the Residential Component and also the Casitas Development to Lennar Homes of California, Inc., a California corporation ("Lennar"). D. The Agency has prepared an amendment to the DDA ("Amendment No. I") that includes the requested assignment/transfer revisions. The Agency has expressly conditioned its approval of Amendment No. 1 on Center Point's execution of an indemnification agreement substantially in the form hereof. E. The parties hereto now wish to impose on Center Point the obligation to indemnify the Agency, as more particularly defined in this Indemnification Agreement, against any claims regarding the assignment/transfer revisions set forth in Amendment No. 1 or resulting from the Agency's approval of Amendment No. 1, or arising from Ehline's entry onto the Property, or Ehline's or Center Point's obligations to third parties including but not limited to those who have prepared plans or conducted work in furtherance of the Project. 882/015610-0061 541417.01 a09/17/04 NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the parties hereto agree as follows: AGREEMENT 1. Indemnification by Center Point. Center Point hereby agrees that it shall indemnify, defend, and hold harmless Agency and Agency's officers, officials, members, employees, agents, consultants, and representatives, from and against any and all claims, liabilities, damages, losses, suits, costs and expenses (including but not limited to expert witness fees and reasonable attorneys' fees) of every kind, nature, and type asserted by any person or entity arising out of the Agency's agreement, as set forth in Amendment No. 1, to revise the assignment/transfer provisions set forth in the DDA, or resulting from the Agency's approval of Amendment No. 1, or arising from Ehline's entry onto the Property, or Ehline's or Center Point's obligations to third parties including but not limited to those who have prepared plans or conducted work in furtherance of the Project, including, but not limited to, persons or entities who have designed or prepared plans or conducted any other work related to the Project on behalf of Ehline or Center Point Center Point's indemnification obligations herein are in addition to the indemnification obligations contained in the DDA, and nothing herein is intended to amend or limit Center Point's indemnification obligations set forth in the DDA. In the event of any conflict between the indemnification obligations herein and those contained in the DDA, the indemnification provisions which provide the greatest protection to the Agency shall prevail. 2. Non -liability of Agency Officers and Employees. No officer, official, member, employee, agent, or representative of Agency shall be personally liable to Center Point, or any successor or assign of same, in the event of any default or breach by Agency, or for any amount which may become due to Agency, or any successor or assign of same, or for breach of any obligation of the terms of this Indemnification Agreement 3. Successors and Assigns. This Indemnification Agreement shall be binding upon and shall inure to the benefit of the successors and assigns of the respective parties hereto. 4. Governing Law. This Indemnification Agreement shall be governed by and construed in accordance with the laws of the State of California. 5. Further Assurances. The parties covenant and agree that they will execute such other and further instruments and documents as are or may become necessary or convenient to effectuate and carry out this Indemnification Agreement. 6. Authority of Signatories to Bind Principals. The persons executing this Indemnification Agreement on behalf of their respective principals represent that (i) they have 882/015610-0061 2 541417.01 a09/17/04 been authorized to do so and that they thereby bind the principals to the terms and conditions of this Indemnification Agreement and (ii) their respective principals are properly and duly organized and existing under the laws of, and permitted to do business in, the State of California. 7. Interpretation. The paragraph headings of this Indemnification Agreement are for reference and convenience only and are not part of this Indemnification Agreement. They have no effect upon the construction or interpretation of any part hereof. The provisions of this Indemnification Agreement shall be construed in a reasonable manner to effect the purposes of the parties and of this Indemnification Agreement. 8. Attorney's Fees. In the event that a party to this Indemnification Agreement brings an action against another party hereto by reason of the breach of any condition, covenant, representation or warranty in this Indemnification Agreement, or otherwise arising out of this Indemnification Agreement, the prevailing party in such action shall be entitled to recover from the non -prevailing party expert witness fees, and its reasonable attorney's fees and costs. Attorney's fees shall include attorney's fees on any appeal, and in addition a party entitled to attorney's fees shall be entitled to all other reasonable costs for investigating such action, including the conducting of discovery. 9. Counterparts. This Indemnification Agreement may be executed in any number of counterparts, each of which when so executed and delivered shall be deemed to be an original and all of which counterparts taken together shall constitute but one and the same instrument. [END — SIGNATURE PAGE FOLLOWS] 882/015610-0061 541417.01 a09/17/04 3 IN WITNESS WHEREOF, this Indemnification Agreement has been executed by the parties as of the date set forth above. Dated: 0eq Z o , 2=04- Dated: C-r Zo Zo04 Dated: 4D J 2 g Ztv-)V `r' APPROVED AS TO FORM: RUTAN & TUCKE LLP BA.Koe ' e hngbn, Age ty Counsel 882/015610-0061 4 541417.01 a09/17/04 "Center Point" CP DEVELOPMENT LA QUINTA, LLC, a California limited liability company By: Oliphant Family Trust Its: Member , )- - By: I Richard R. Oliphant Its: Trustee By: Oliphant Enterprises, Inc. Its: Manager By: Richard R. Oliphant Its: President "Agency" LA QUINTA REDEVELOPMENT AGENCY, a public body, corporate and politic By: Thomas Genovese Title: Executive Director State of California County of Riverside On LO I a$► [ Q-,o 04 before me, Phyllis Manley, Notary Public, personally appeared Richard R. Oliphant, personally known to me (or proved to me on the basis of satisfactory evidence) to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person or the entity upon behalf of which the person acted, executed the instrument. WITNESS my hand and official seal. (Seal) -r � State of California ) ss.. County of Riverside ) On I OI'ag) -*%oC3 !4 before me, Phyllis Manley, Notary Public, personally appeared Thomas P. Genovese, personally known to me to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person or the entity upon behalf of which the person acted, executed the instrument. WITNESS my hand and official seal. (Seal) MN+It Y Commimon # ia;? 8 t1Olwy PuW - Cowwoo - RWerside County MMComm. ExpiremOct 16, 2006