2025 06 10 PCPLANNING COMMISSION AGENDA Page 1 of 4 JUNE 10, 2025
PLANNING COMMISSION
AGENDA
CITY HALL COUNCIL CHAMBER
78495 Calle Tampico, La Quinta
TUESDAY, JUNE 10, 2025, AT 5:00 P.M.
Members of the public may listen to this meeting by tuning-in live via
www.laquintaca.gov/livemeetings.
CALL TO ORDER
Roll Call: Commissioners: Guerrero, Hernandez, Hundt, McCune, Nieto, and Chair Hassett
PLEDGE OF ALLEGIANCE
PUBLIC COMMENT ON MATTERS NOT ON THE AGENDA
At this time, members of the public may address the Commission on any matter not listed
on the agenda pursuant to the “Public Comments – Instructions” listed at the end of the
agenda. The Commission values your comments; however, in accordance with State
law, no action shall be taken on any item not appearing on the agenda unless it is an
emergency item authorized by the Brown Act [Government Code § 54954.2(b)].
CONFIRMATION OF AGENDA
ANNOUNCEMENTS, PRESENTATIONS AND WRITTEN COMMUNICATIONS – NONE
CONSENT CALENDAR
NOTE: Consent Calendar items are routine in nature and can be approved by one motion.
PAGE
1. RECEIVE AND FILE MEETING MINUTES DATED MARCH 11, 2025 MAY 13,
2025
5
BUSINESS SESSION – NONE
PUBLIC HEARINGS – 5:00 p.m. or thereafter
For all Public Hearings on the agenda, a completed “Request to Speak” form must be
filed with the Commission Secretary prior to consideration of that item; comments are
limited to three (3) minutes (approximately 350 words).
Planning Commission agendas and staff reports
are now available on the City’s web page:
www.laquintaca.gov
Amended Agenda Packet
See redline edits on page 1.
PLANNING COMMISSION AGENDA Page 2 of 4 JUNE 10, 2025
Any person may submit written comments to the Planning Commission prior to the public
hearing and/or may appear and be heard in support of or opposition to the project(s) at
the time of the public hearing. If you challenge a project(s) in court, you may be limited to
raising only those issues you or someone else raised at the public hearing or in written
correspondence delivered to the City at or prior to the public hearing.
PAGE
1. CONSIDER ADOPTING A RESOLUTION TO RECOMMEND CITY COUNCIL
APPROVE SPECIFIC PLAN 2024-0005 (AMENDMENT NO. 3 TO SP 1989-014),
CONDITIONAL USE PERMIT 2024-0007 AND SITE DEVELOPMENT PERMIT
2024-0014 FOR AN APPROXIMATE 3,690 SQUARE FOOT DRIVE THRU
BUILDING FOR THE HIGHWAY 111/ADAMS STREET DRIVE THRU PROJECT;
CEQA: THIS PROJECT IS EXEMPT FROM ENVIRONMENTAL REVIEW
PURSUANT TO SECTION 15332 (CLASS 32) IN-FILL DEVELOPMENT;
PROJECT LOCATION: SOUTHWEST CORNER OF ADAMS STREET AND
CORPORATE CENTER DRIVE
9
STUDY SESSION – NONE
STAFF ITEMS
COMMISSIONERS’ ITEMS
ADJOURNMENT
*********************************
The next regular meeting of the La Quinta Planning Commission will be held on
June 24, 2025, commencing at 5:00 p.m. at the La Quinta City Hall Council Chamber,
78495 Calle Tampico, La Quinta, CA 92253.
DECLARATION OF POSTING
I, Tania Flores, Secretary of the Planning Commission of the City of La Quinta, do hereby
declare that the foregoing Agenda for the Commission meeting of June 10, 2025, was
posted on the City’s website, near the entrance to the Council Chamber at 78495 Calle
Tampico and the bulletin board at 51321 Avenida Bermudas, on June 6, 2025.
DATED: June 6, 2025
Tania Flores, Commission Secretary
City of La Quinta, California
PLANNING COMMISSION AGENDA Page 3 of 4 JUNE 10, 2025
Public Notices
Agenda packet materials are available for public inspection: 1) at the Clerk’s Office at La
Quinta City Hall, located at 78495 Calle Tampico, La Quinta, California 92253; and 2) on the
City’s website at https://www.laquintaca.gov/business/boards-and-commissions/planning-
commission, in accordance with the Brown Act [Government Code § 54957.5; AB 2647 (Stats.
2022, Ch. 971)].
The La Quinta City Council Chamber is handicapped accessible. If special equipment is
needed for the hearing impaired, please contact the Commission Secretary at (760) 777-
7023, 24 hours in advance of the meeting, and accommodations will be made.
If background material is to be presented to the Commission during a Commission meeting,
please be advised that 10 copies of all documents, exhibits, etc., must be supplied to the
Commission Secretary for distribution. It is requested that this take place prior to the
beginning of the meeting.
PUBLIC COMMENTS – INSTRUCTIONS
Members of the public may address the Commission on any matter listed or not listed on the
agenda as follows:
WRITTEN PUBLIC COMMENTS can be provided either in-person during the meeting by
submitting 10 copies to the Commission Secretary, it is requested that this takes place prior to
the beginning of the meeting; or can be emailed in advance to TFlores@LaQuintaCA.gov, no later
than 12:00 p.m., on the day of the meeting. Written public comments will be distributed to the
Commission, made public, and will be incorporated into the public record of the meeting, but will
not be read during the meeting unless, upon the request of the Chair, a brief summary of public
comments is asked to be reported.
If written public comments are emailed, the email subject line must clearly state “Written
Comments” and should include: 1) full name, 2) city of residence, and 3) subject matter .
VERBAL PUBLIC COMMENTS can be provided in-person during the meeting by completing a
“Request to Speak” form and submitting it to the Commission Secretary; it is requested that this
takes place prior to the beginning of the meeting. Please limit your comments to three (3) minutes
(or approximately 350 words). Members of the public shall be called upon by the Chair to speak.
In accordance with City Council Resolution No. 2022-028, a one-time additional speaker time
donation of three (3) minutes per individual is permitted; please note that the member of the public
donating time must: 1) submit this in writing to the Commission Secretary by completing a
“Request to Speak” form noting the name of the person to whom time is being donated to, and 2)
be present at the time the speaker provides verbal comments.
Verbal public comments are defined as comments provided in the speakers’ own voice and may
not include video or sound recordings of the speaker or of other individuals or entities, unless
permitted by the Chair.
Public speakers may elect to use printed presentation materials to aid their comments; 10 copies
of such printed materials shall be provided to the Commission Secretary to be disseminated to
the Commission, made public, and incorporated into the public record of the meeting; it is
requested that the printed materials are provided prior to the beginning of the meeting. There
PLANNING COMMISSION AGENDA Page 4 of 4 JUNE 10, 2025
shall be no use of Chamber resources and technology to display visual or audible presentations
during public comments unless permitted by the Chair.
All writings or documents, including but not limited to emails and attachments to emails, submitted
to the City regarding any item(s) listed or not listed on this agenda are public records. All
information in such writings and documents is subject to disclosure as being in the public domain
and subject to search and review by electronic means, including but not limited to the City’s
Internet website and any other Internet Web-based platform or other Web-based form of
communication. All information in such writings and documents similarly is subject to disclosure
pursuant to the California Public Records Act [Government Code § 7920.000 et seq.].
TELECONFERENCE ACCESSIBILITY – INSTRUCTIONS
Teleconference accessibility may be triggered in accordance with AB 2449 (Stats. 2022, Ch. 285),
codified in the Brown Act [Government Code § 54953], if a member of the Commission requests
to attend and participate in this meeting remotely due to “just cause” or “emergency
circumstances,” as defined, and only if the request is approved. In such instances, remote public
accessibility and participation will be facilitated via Zoom Webinar as detailed at the end of this
Agenda.
*** TELECONFERENCE PROCEDURES – PURSUANT TO AB 2449***
APPLICABLE ONLY WHEN TELECONFERENCE ACCESSIBILITY IS IN EFFECT
Verbal public comments via Teleconference – members of the public may attend and
participate in this meeting by teleconference via Zoom and use the “raise your hand” feature
when public comments are prompted by the Chair; the City will facilitate the ability for a member
of the public to be audible to the Commission and general public and allow him/her/they to speak
on the item(s) requested. Please note – members of the public must unmute themselves
when prompted upon being recognized by the Chair, in order to become audible to the
Commission and the public.
Only one person at a time may speak by teleconference and only after being recognized by the
Chair.
ZOOM LINK: https://us06web.zoom.us/j/82853067939
Meeting ID: 828 5306 7939
Or join by phone: (253) 215 – 8782
Written public comments – can be provided in person during the meeting or emailed to
TFlores@LaQuintaCA.gov any time prior to the adjournment of the meeting, and will be
distributed to the Commission, made public, incorporated into the public record of the meeting,
and will not be read during the meeting unless, upon the request of the Chair, a brief summary of
any public comment is asked to be read, to the extent the Committee can accommodate such
request.
PLANNING COMMISSION MINUTES Page 1 of 4 MAY 13, 2025
PLANNING COMMISSION
MINUTES
TUESDAY, MAY 13, 2025
CALL TO ORDER
A regular meeting of the La Quinta Planning Commission (Commission) was called to
order at 5:00 p.m. by Chairperson Hassett.
PRESENT: Commissioners Guerrero, Hernandez, Hundt, McCune, and
Chairperson Hassett
ABSENT: Commissioner Nieto
VACANT: One (1)
STAFF PRESENT: Design and Development Director Danny Castro, Public Works
Director Bryan McKinney, Planning Manager Cheri Flores, Senior
Planner Scott Nespor, Deputy City Attorney Jessica Sanders (via
teleconference), and Commission Secretary Tania Flores
PLEDGE OF ALLEGIANCE
Vice Chairperson Guerrero led the audience in the Pledge of Allegiance.
PUBLIC COMMENT ON MATTERS NOT ON THE AGENDA
Commission Secretary Flores stated that there was one written public comment
received, which was distributed to the Commission prior to the meeting, and one
member of the public had submitted a request to speak.
PUBLIC SPEAKER: Linda Mann, La Quinta – expressed concerns regarding the
environmental impacts of the Club at Coral Mountain project relating to the installation
of the bighorn sheep barrier at the perimeter of the project; and reconsideration of the
previously approved Environmental Impact Report for this project.
CONFIRMATION OF AGENDA
Commission Secretary Flores said a HAND-OUT was distributed to the Commission
correcting the numbering of the proposed Conditions of Approval (COAs) for Public
Hearing Item No. 1, listed in Exhibit A of the proposed resolution, on page 33 of the
agenda packet, under the “Landscape and Irrigation” section, to correctly follow the
sequential numbering of the COAs; the COAs were renumbered from 32 – 36 to 58.1 –
58.6, however, the COAs remained unchanged; and the hand-out was made public,
published on the City’s website, and included in the public records of this meeting.
CONSENT CALENDAR ITEM NO. 1
5
PLANNING COMMISSION MINUTES Page 2 of 4 MAY 13, 2025
MOTION – A motion was made and seconded by Commissioner Guerrero/Chairperson
Hassett to confirm the agenda as published.
Motion passed: ayes – 5, noes – 0, absent – 1 (Nieto), abstain – 0, vacant – 1.
ANNOUNCEMENTS, PRESENTATIONS, AND WRITTEN COMMUNICATIONS – None.
CONSENT CALENDAR
1. RECEIVE AND FILE MEETING MINUTES DATED MARCH 11, 2025
2. RECEIVE AND FILE MEETING MINUTES DATED MARCH 23, 2025
MOTION – A motion was made and seconded by Commissioner Guerrero/Chairperson
Hassett to approve the Consent Calendar as presented.
Motion passed: ayes – 5, noes – 0, absent – 1 (Nieto), abstain – 0, vacant – 1.
BUSINESS SESSION – None.
PUBLIC HEARINGS
1. CONSIDER ADOPTING A RESOLUTION TO APPROVE CONDITIONAL USE
PERMIT 2024-0004 AND SITE DEVELOPMENT PERMIT 2024-0010 FOR AN
APPROXIMATE 16,000 SQUARE FOOT DENTAL OFFICE BUILDING; CEQA:
THIS PROJECT IS EXEMPT FROM ENVIRONMENTAL REVIEW PURSUANT TO
SECTION 15332 (CLASS 32) IN-FILL DEVELOPMENT; PROJECT LOCATION
47705 CALEO BAY
DECLARATIONS OF COMMISSION PUBLIC CONTACT OR CONFLICTS: None.
Senior Planner Nespor presented the staff report, which is on file in the Design and
Development Department.
The Commission discussed traffic flow and noise impacts of roof-mounted HVAC
equipment; ownership of land between the project site and the existing memory care
facility to the south; movement of the existing Imperial Irrigation District (IID) transformer
identified on the plans; traffic and parking monitoring and review procedures, parking
requirements for medical/dental uses, the ability to use reciprocal parking agreements
to meet parking standards, and recourse of non-compliance; public access and
availability of office space within the second floor per the current plans; landscape
review and approval procedures; retention basin types and locations; re-use of
previously approved plans and partial structures.
CHAIRPERSON HASSETT DECLARED THE PUBLIC HEARING OPEN AT 5:31 P.M.
PUBLIC SPEAKER: John Gamlin, Applicant Representative – introduced himself and
provided additional background information regarding the applicant and the purpose of
6
PLANNING COMMISSION MINUTES Page 3 of 4 MAY 13, 2025
the project; parking calculations for dental practice uses and covered parking rooftop
solar generation; proposed business and emergency hours of the practice; coordination
with IID and any proposed back up generation; second floor usage for storage and
private access; retention basin types and locations on and near the project site; future
signage program and architectural changes from previously approved project plans;
hazardous and biological waste removal; fencing for patio space identified on plans;
and proposed construction schedule.
Commission Secretary Flores said that the City received no public comment on this item
and that there were no requests to speak.
CHAIRPERSON HASSETT DECLARED THE PUBLIC HEARING CLOSED AT 5:51 P.M.
Commission discussion followed regarding appreciation for the project and
presentation.
MOTION – A motion was made and seconded by Commissioner Guerrero/Chairperson
Hassett to adopt Planning Commission Resolution No. 2025-005 approving Conditional
Use Permit 2024-0004 and Site Development Permit 2024-0010 and find the project
exempt from environmental review pursuant to Section 15332 (Class 32) in-fill
development project, as recommended:
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LA
QUINTA, CALIFORNIA, APPROVING A CONDITIONAL USE PERMIT AND SITE
DEVELOPMENT PERMIT FOR CONSTRUCTION OF AN APPROXIMATE
16,000 SQUARE-FOOT DENTAL OFFICE BUILDING LOCATED AT 47705
CALEO BAY AND FIND THAT THE PROJECT IS EXEMPT FROM
ENVIRONMENTAL REVIEW PURSUANT TO SECTION 15332 IN-FILL
DEVELOPMENT PROJECT
CASE NUMBERS: CONDITIONAL USE PERMIT 2024-0004; SITE
DEVELOPMENT PERMIT 2024-0010
PROJECT: BLISS DENTISTRY
APPLICANT: JOHN GAMLIN; SOFIA INVESTMENTS, INC.
Motion passed: ayes – 5, noes – 0, absent – 1 (Nieto), abstain – 0, vacant – 1.
STUDY SESSION – None.
STAFF ITEMS
Planning Manager Flores provided information on: (1) upcoming projects, including
PGA West in-fill lots, the Club at Coral Mountain Golf Course, a Highway 111/Adams
Street Drive Thru, and the Costco Fuel Center Expansion; (2) recently approved
projects, including the Calle Estado Mixed Use project and the McQuaid Studio project;
(3) projects under construction, including Chick-fil-A and Quick Quack carwash, Daiso
retail store, Rancho La Quinta Fitness Center, Oasis residential community, and the
Jefferson Street Apartments; (4) the Highway 111 Corridor Specific Plan and
7
PLANNING COMMISSION MINUTES Page 4 of 4 MAY 13, 2025
Development Code; (5) the Village Parking analysis; and (6) the Sphere of Influence
studies.
Commission discussion followed regarding the previously approved Hampton Inn, La
Quinta Village Apartments, and La Quinta Landing projects.
COMMISSIONER ITEMS – None.
ADJOURNMENT
There being no further business, a motion was made and seconded by Chairperson
Hassett/Commissioner Guerrero to adjourn this meeting at 6:05 p.m.
Motion passed: ayes – 5, noes – 0, absent – 1 (Nieto), abstain – 0, vacant – 1.
Respectfully submitted,
TANIA FLORES, Commission Secretary
City of La Quinta, California
8
PUBLIC HEARING ITEM NO. 1
City of La Quinta
PLANNING COMMISSION MEETING: June 10, 2025
STAFF REPORT
AGENDA TITLE: CONSIDER ADOPTING A RESOLUTION TO RECOMMEND CITY
COUNCIL APPROVE SPECIFIC PLAN 2024-0005 (AMENDMENT NO. 3 TO SP 1989-
014), CONDITIONAL USE PERMIT 2024-0007 AND SITE DEVELOPMENT PERMIT 2024-
0014 FOR AN APPROXIMATE 3,690 SQUARE FOOT DRIVE-THROUGH BUILDING FOR
THE HIGHWAY 111/ADAMS STREET DRIVE-THROUGH PROJECT; CEQA: THIS
PROJECT IS EXEMPT FROM ENVIRONMENTAL REVIEW PURSUANT TO SECTION
15332 (CLASS 32) INFILL DEVELOPMENT; PROJECT LOCATION: SOUTHWEST
CORNER OF ADAMS STREET AND CORPORATE CENTER DRIVE
RECOMMENDATION
Consider adopting a resolution to recommend City Council approve Specific Plan
2024-0005 (Amendment No. 3 to SP1989-014), Conditional Use Permit 2024-0007
and Site Development Permit 2024-0014 for an approximate 3,690 square foot drive
-through building for the Highway 111/Adams Street Drive-through project and
recommend a finding that the project is exempt from environmental review pursuant
to Section 15332 (Class 32) Infill Development.
EXECUTIVE SUMMARY
The One-Eleven La Quinta Shopping Center Specific Plan (SP1989-014) was
originally approved in 1990 and has been amended two times. Currently, there are
conditions of approval on the Specific Plan (SP) that limit the number of drive-
through buildings in the Shopping Center to five and require each drive-through use
to obtain a Conditional Use Permit (CUP). There are currently five drive-through
buildings located in the Shopping Center.
The Applicant, PVG Architects, is proposing to construct a drive-through building on
a vacant pad within the Shopping Center (Attachment 1) and requests to amend a
condition of approval of SP1989-014 to allow for six drive-through buildings in the
One-Eleven La Quinta Shopping Center and a CUP to allow the drive-through use
as well as a Site Development Permit (SDP) for the architectural, landscape and site
design of the drive-through building (Attachment 2).
In order to make a recommendation for approval of the project, the Planning
Commission must:
1) Determine that this project is exempt from environmental review pursuant to
Section 15332 (Class 32) infill development project for compliance with the
requirements of the California Environmental Quality Act (CEQA) in that the
proposed project can be characterized as infill development.
9
2) Make findings and apply conditions of approval (COAs) in support of the SP, CUP,
and SDP, and apply COAs in support of the applications (Attachment 3).
BACKGROUND/ANALYSIS
The One-Eleven La Quinta Shopping Center Specific Plan was originally approved in 1990
and has been amended two times. Currently, there are conditions of approval on the SP
that limit the number of drive-through buildings in the Shopping Center to five and require
each drive-through use to obtain CUPs. There are currently five drive-through buildings
permitted in the Shopping Center. The Applicant is proposing to construct a sixth drive-
through building on a vacant site within the Shopping Center at the southwest corner of
Adams Street and Corporate Center Drive. In order to allow for this, an amendment to
SP1989-014 and a CUP are required. An SDP is required for the architectural, landscape,
and site design of the drive-through building.
Specific Plan Amendment (SPA)
The SPA proposes revising COA No. 71 of SP1989-014 to increase the number of drive-
through buildings allowed from five to six to facilitate the project (Exhibit A to Resolution).
There are no other changes to the SP with this amendment.
Conditional Use Permit
The CUP is required to permit drive-through use in this shopping center per COA No. 71 of
SP1989-014. As part of the CUP, the applicant submitted a Statement of Operations
describing the hours of operation and the anticipated number of employees (Attachment 4).
Traffic and Drive-through Stacking Analysis
A traffic analysis was prepared for the project per the City’s Traffic Impact Analysis
Guidelines (Attachment 5). To determine the trip generation for the project, the analysis
used the trip generation rate for coffee shop drive-through use which has a higher rate than
fast-food drive-through use. The analysis determined that the project would not significantly
impact Level of Service (LOS) of the Adams Street/Corporate Center Drive intersection.
A drive-through stacking study was prepared that reviewed two other drive-throughs within
the shopping center (McDonald’s and Starbucks) and their stacking and operations, and
compared them to the proposed project to provide recommendations on stacking for this
project. Based on this study, the recommendation for vehicle stacking is 16 vehicles. If the
queue exceeds this number, personnel from the business would be available to direct
vehicles to queue in the drive aisle to the south of the drive-through entrance. The City’s
traffic engineer reviewed and approved of the double drive-through configuration and
recommendations.
Site Development Permit (SDP)
The drive-through building is proposed to be 3,690 square feet (sf) with an indoor dining
area and outdoor dining area of approximately 650 sf. The building reflects a modern
design with architectural breaks and varying roof lines on all frontages and a simple color
design incorporating grey and white colors with wood grain tile accents and steel wall
elements. The building height is 22 feet (ft) with a parapet wall extending 1.5 ft above and
incorporates a tower element on the east elevation at 30 ft in height. The building meets the
10
development standards of SP1989-014 and the Regional Commercial zone. The project
plans are included as Attachment 6. The project is required to provide 43 parking spaces
per the City’s Municipal Code parking requirements and provides 46 spaces.
Landscaping
New landscaping is proposed throughout the site. The assorted species of plants and trees,
including Palo Verde and Date Palm trees, assorted agave and lantana plants, and cactus,
are consistent with desert landscaping palettes in the City, and provide sufficient screening
and accents around the vehicular circulation areas.
AGENCY AND PUBLIC REVIEW
Public Agency Review
All written comments received are on file and available for review with the Design and
Development Department. All applicable comments have been adequately addressed
and/or incorporated into the recommended COAs.
Public Hearing Notice
The public hearing for this project was publicized in The Desert Sun newspaper on May 30,
2025, and distributed to properties within 500 feet of the site, as required by the City’s
Municipal Code, Section 9.200.100. At the time of publication, Staff received no written
comments.
ENVIRONMENTAL REVIEW
The La Quinta Design and Development Department has determined that this project is
exempt from environmental review pursuant to Section 15332 (Class 32) of the California
Environmental Quality Act, Infill Development, since the project consists of an approximate
3,690 sf building and meets the criteria for infill development as it is less than 5 acres and
is located in an urbanized and built-out area. The project site has no value as habitat for
endangered, rare, or threatened species. Approval of the project will not result in any
significant effects relating to traffic, noise, air quality, or water quality based on the memo
attached to the Resolution as Exhibit B.
Prepared by: Cheri Flores, Planning Manager
Approved by: Danny Castro, Design and Development Director
Attachments: 1. Vicinity Map
2. Project Information
3. Findings for Approval
4. Statement of Operations
5. Traffic Analysis with Drive-through Queue Analysis
6. Plan Set
11
PLANNING COMMISSION RESOLUTION 2025 - XXX
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY
OF LA QUINTA, CALIFORNIA, RECOMMENDING APPROVAL OF A
SPECIFIC PLAN AMENDMENT, CONDITIONAL USE PERMIT AND
SITE DEVELOPMENT PERMIT FOR CONSTRUCTION OF AN
APPROXIMATE 3,690 SQUARE-FOOT DRIVE-THROUGH BUILDING
LOCATED AT THE SOUTHWEST CORNER OF ADAMS STREET
AND CORPORATE CENTER DRIVE WITHIN THE ONE-ELEVEN LA
QUINTA SHOPPING CENTER, AND FIND THAT THE PROJECT IS
EXEMPT FROM ENVIRONMENTAL REVIEW PURSUANT TO
SECTION 15332 INFILL DEVELOPMENT PROJECT
CASE NUMBERS:
SPECIFIC PLAN 2024-0005
(AMENDMENT NO 3 SP1989-014)
CONDITIONAL USE PERMIT 2024-0007
SITE DEVELOPMENT PERMIT 2024-0014
PROJECT: HIGHWAY 111/ADAMS STREET DRIVE THROUGH
APPLICANT: PVG ARCHITECTS
WHEREAS, the Planning Commission of the City of La Quinta, California, did, on
June 10, 2025, hold a duly noticed Public Hearing to consider a request by PVG Architects
for approval of a Specific Plan Amendment, a Conditional Use Permit, and a Site
Development Permit for the construction of an approximate 3,690 square foot drive
through building on approximately 0.45 acres located at the southwest corner of Adams
Street and Corporate Center Drive within the One-Eleven La Quinta Shopping Center,
more particularly described as:
APN: 643-080-064
WHEREAS, the Design and Development Department published a public hearing
notice in The Desert Sun newspaper on May 30, 2025, as prescribed by the Municipal
Code. Public hearing notices were also mailed to all property owners within 500 feet of
the site and emailed or mailed to all interested parties who have requested notification
relating to the project; and
Specific Plan 2024-0005
(Amendment No 3 to SP1989-014)
WHEREAS, at said Public Hearing, upon hearing and considering all testimony
and arguments, if any, of all interested persons desiring to be heard, the Planning
12
PLANNING COMMISSION RESOLUTION 2025-XXX
SPECIFIC PLAN 2024-0005
CONDITIONAL USE PERMIT 2024-0007
SITE DEVELOPMENT PERMIT 2024-0014
PROJECT: HIGHWAY 111/ADAMS STREET DRIVE THROUGH
LOCATION: SOUTHWEST CORNER OF ADAMS STREET AND CORPORATE CENTER DRIVE
ADOPTED:
PAGE 2 OF 5
Commission did make the following mandatory findings pursuant to Section 9.240.010 of
the Municipal Code to justify approval of said Specific Plan Amendment [Exhibit A]:
1. The proposed Specific Plan Amendment is consistent with the General Plan land
use designation of General Commercial. The City’s General Plan policies relating
to the General Commercial designation encourage a full range of commercial uses,
including drive through restaurants, coffee shops, or other drive through uses.
2. Approval of the Specific Plan Amendment will not create conditions materially
detrimental to the public health, safety, and general welfare, as development
already occurs within this Specific Plan area, and further development of the area
will be consistent with the urbanized nature where the project is located.
3. The proposed Specific Plan Amendment is compatible with zoning on surrounding
properties, which allows and contains commercial retail and restaurant
development.
4. The proposed Specific Plan Amendment is suitable and appropriate for the subject
property, as the site is flat, already developed with parking areas and drive aisles,
and commercial development.
Conditional Use Permit 2024-0007
WHEREAS, at said Public Hearing, upon hearing and considering all testimony
and arguments, if any, of all interested persons desiring to be heard, said Planning
Commission did make the following mandatory findings pursuant to Section 9.210.020 of
the Municipal Code to justify approval of said Conditional Use Permit:
1. The proposed development is consistent with the General Plan land use
designation of General Commercial. The City’s General Plan policies relating
to the General Commercial designation encourage a full range of commercial
uses, including drive-through restaurants, coffee shops, or other drive through
uses. The proposed project meets the Goals and Policies of the General Plan
as follows:
- Goals LU-6 and ED-1 as it will contribute to a balanced and varied economic
base which provides fiscal stability to the City, and a broad range of goods
and services to its residents and the region.
- The project's conceptual landscape design is consistent with Goal WR-1
and Policy UTL-1.2, as it will result in the efficient use and conservation of
the City’s water resources.
13
PLANNING COMMISSION RESOLUTION 2025-XXX
SPECIFIC PLAN 2024-0005
CONDITIONAL USE PERMIT 2024-0007
SITE DEVELOPMENT PERMIT 2024-0014
PROJECT: HIGHWAY 111/ADAMS STREET DRIVE THROUGH
LOCATION: SOUTHWEST CORNER OF ADAMS STREET AND CORPORATE CENTER DRIVE
ADOPTED:
PAGE 3 OF 5
2. The proposed development, as conditioned, is consistent with the intent of the
Regional Commercial District as well as the development standards of the
City’s Zoning Code. The project satisfies the District’s intent to provide for
automobile-oriented sales and services for the regionally oriented commercial
area along Highway 111. The project is consistent with the non-residential
development standards.
3. The La Quinta Design and Development Department has determined that this
project is exempt from environmental review pursuant to Section 15332 (Class
32) of the California Environmental Quality Act for Infill Development as the
project consists of an approximate 3,690 square foot building and meets the
criteria for infill development since it is less than five acres and is located in an
urbanized and built-out area. The project site has no value as habitat for
endangered, rare, or threatened species. Approval of the project will not result
in any significant effects relating to traffic, noise, air quality, or water quality.
The site can be adequately served by all required utilities and public services
[Exhibit B].
4. Approval of the application will not create conditions materially detrimental to
the public health, safety, and general welfare or injurious to or incompatible
with other properties or land uses in the vicinity. The project consists of a local-
serving drive through use.
Site Development Permit 2024-0014
WHEREAS, at said Public Hearing, upon hearing and considering all testimony
and arguments, if any, of all interested persons desiring to be heard, said Planning
Commission did make the following mandatory findings pursuant to Section 9.210.010 of
the Municipal Code to justify approval of said Site Development Permit:
1. The proposed development is consistent with the General Plan land use
designation of General Commercial. The City’s General Plan policies relating
to the General Commercial designation encourage a full range of commercial
uses, including drive through restaurants, coffee shops, or other drive through
uses. The proposed project meets the Goals and Policies of the General Plan
as follows:
- Goals LU-6 and ED-1 as it will contribute to a balanced and varied economic
base which provides fiscal stability to the City, and a broad range of goods
and services to its residents and the region.
14
PLANNING COMMISSION RESOLUTION 2025-XXX
SPECIFIC PLAN 2024-0005
CONDITIONAL USE PERMIT 2024-0007
SITE DEVELOPMENT PERMIT 2024-0014
PROJECT: HIGHWAY 111/ADAMS STREET DRIVE THROUGH
LOCATION: SOUTHWEST CORNER OF ADAMS STREET AND CORPORATE CENTER DRIVE
ADOPTED:
PAGE 4 OF 5
- The project's conceptual landscape design is consistent with Goal WR-1
and Policy UTL-1.2, as it will result in the efficient use and conservation of
the City’s water resources.
2. The proposed development, as conditioned, is consistent with the development
standards of the City’s Zoning Code in terms of site plan and landscaping. The
Site Development Permit is compliant with the Zoning Code’s development
standards, including standards for setbacks, heights, and parking.
3. The La Quinta Design and Development Department has determined that this
project is exempt from environmental review pursuant to Section 15332 (Class
32) of the California Environmental Quality Act for Infill Development as the
project consists of an approximate 3,690 square foot building and meets the
criteria for infill development since it is less than five acres and is located in an
urbanized and built-out area. The project site has no value as habitat for
endangered, rare, or threatened species. Approval of the project will not result
in any significant effects relating to traffic, noise, air quality, or water quality.
The site can be adequately served by all required utilities and public services
4. The architecture and layout of the project are compatible with, and not
detrimental to, the existing surrounding commercial land uses and are
consistent with the development standards in the Municipal Code.
5. The site design of the project is compatible with the surrounding development
and with the quality of design prevalent in the city. The proposed building is
compatible with the surrounding development within the shopping center.
6. The proposed project implements the standards for landscaping and aesthetics
established in the General Plan and Zoning Code. The landscape palette is
consistent with the City’s drought-tolerant landscaping requirements.
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the
City of La Quinta, California, as follows:
SECTION 1. That the above recitations are true and constitute the Findings of the
Planning Commission in this case.
SECTION 2. That the above project is exempt from environmental review pursuant to
Section 15332 (Class 32) Infill Development project for compliance with the requirements
of the California Environmental Quality Act (CEQA) in that the proposed project involves
15
PLANNING COMMISSION RESOLUTION 2025-XXX
SPECIFIC PLAN 2024-0005
CONDITIONAL USE PERMIT 2024-0007
SITE DEVELOPMENT PERMIT 2024-0014
PROJECT: HIGHWAY 111/ADAMS STREET DRIVE THROUGH
LOCATION: SOUTHWEST CORNER OF ADAMS STREET AND CORPORATE CENTER DRIVE
ADOPTED:
PAGE 5 OF 5
construction of an approximate 3,690 square-foot, drive through building on a lot less than
five acres that can be characterized as infill development [Exhibit B].
SECTION 3. That it does hereby approve Specific Plan 2024-0005, Conditional Use
Permit 2024-0007, and Site Development Permit 2024-0014 for the reasons set forth in
this Resolution and subject to the attached Conditions of Approval [Exhibit C].
PASSED, APPROVED, and ADOPTED at a regular meeting of the City of La
Quinta Planning Commission, held on June 10, 2025, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
DOUG HASSETT, Chairperson
City of La Quinta, California
ATTEST:
DANNY CASTRO, Design and Development Director
City of La Quinta, California
16
44530 SAN PABLO AVE SUITE 200 PALM DESERT CA 92260 T • 760 779 5393 F • 760 779 5395
SPECIFIC PLAN AMENDMENT
TO: City of La Quinta
CC:
FROM: Prest Vuksic Greenwood Architects
DATE: December 16, 2024
RE: Specific Plan Amendment
PROJECT: 111 La Quinta Drive-Thru Pad
Amendment to CC Resolution 1996-053:
71.+ Drive through facilities shall be developed as follows:
++ A. Not more than five (six) drive through facilities shall be permitted within the
specific plan.
B.All drive through facilities shall be screened by a combination of berms,
walls and landscaping so that the cars using the drive through facilities will not be visible
by pedestrians and cars on the perimeter sidewalk and street in a manner satisfactory
to the Community Development Director.
C.Conditional Use Permit applications shall be processed for each drive
through facility.
PLANNING COMMISSION RESOLUTION 202-XXX
EXHIBIT A
17
34200 Bob Hope Drive, Rancho Mirage, CA 92270 | 760.320.9811 | msaconsultinginc.com
June 2, 2025
Mr. Brian Tracy
Retain Net Lease Properties, Inc.
78206 Varner Road, Suite D 251
Palm Desert, CA 92211
Subject: California Environmental Quality Act (CEQA) Notice of Exemption (NOE)
Dear Mr. Tracy:
MSA Consulting, Inc. has reviewed the project site, which is an undeveloped, vacant commercial
pad. The property is approximately 0.45 acres of land (APNs 643-080-064, -060), located at
Corporate Centre Drive and Adams Street in the City of La Quinta. The site is located in an
existing and mostly developed shopping center. The project is surrounded by paved streets to the
north (Corporate Centre Drive) and east (Adams Street), and paved parking lots to the west and
south. Developed commercial businesses are located south (Jiffy Lube), east (various offices and
businesses), and approximately 250 feet to the north (Kohls). Similar to surrounding land uses,
the property has a General Plan Land Use designation of General Commercial (CG) and is zoned
Regional Commercial (CR) district. CR zones are intended to provide a broad range of goods and
services serving the entire region. Drive-through restaurants are permitted within CR districts.
CEQA provides several categorical exemptions which are applicable to categories of projects and
activities that the Lead Agency has determined generally do not pose a risk of significant impacts
on the environment. The project proposes a 3,800-square-foot coffee shop with drive-through,
and an approximately 600-square-foot outdoor seating area on a previously graded and vacant
site within a developed urban area in the City of La Quinta. Site access is proposed at the
southwestern corner of the proposed building. The project is exempt under Section 15332 of
the State CEQA Guidelines (Class 32 In-fill Development Projects). The project meets the
conditions for an infill exemption description as explained below:
The project is consistent with the applicable General Plan designation, applicable
policies and applicable zoning designation and regulations: The project site is
designated as CG by the City’s Land Use map and CR by the City’s Zoning map. The
project’s proposed commercial development will be developed in a manner that is
consistent with the City’s CR development standards and applicable district standards, as
identified in Chapter 9.70, Section 9.70.030 and Chapter 9.90 of the City’s Zoning Code.
The City will require design review to ensure the design and quality of the development is
consistent with City standards.
The proposed development occurs within City limits on a project site of no more
than five acres substantially surrounded by urban uses: The proposed project occurs
within the City limits of La Quinta on approximately 0.45 acres and is less than the
maximum five acres. The site is surrounded by existing commercial uses.
PLANNING1COMMISSION1RESOLUTION12025-XXX1
EXHIBIT1B
18
California Environmental Quality Act (CEQA) Notice of Exemption (NOE)
111 & Adams Street – La Quinta, CA
Page 2
June 2, 2025
34200 Bob Hope Drive, Rancho Mirage, CA 92270 | 760.320.9811 | msaconsultinginc.com
The project site has no habitat for endangered, rare or threatened species: The site
has been completely disturbed and cleared of vegetation. The northeast and eastern side
of the project includes a paved sidewalk, and utilities (i.e., traffic lights, transmission and
distribution combination electrical poles, and utility boxes). The perimeter of the site is
delineated by curb and gutter improvements. The project site is located in an area of the
City with commercial and business park land uses. Due to the graded and cleared
condition of the project site, and the existing surrounding commercial uses, the project
property does not provide suitable or sensitive habitat for special status species and has
no value for endangered, rare or threatened species due to its disturbed condition and the
lack of habitat.
Approval of the project would not result in significant effects relating to traffic,
noise, air quality, or water quality: The project is proposing a 3,800-square-foot drive-
through restaurant and 600-square-foot outdoor area. As discussed previously, the site
has been cleared of vegetation and graded and has remained vacant since 2015 (based
on historical imagery). The site was previously developed by 2002, however, in 2015, the
site was demolished and cleared and has remained undeveloped and vacant since. The
project is consistent with the City’s existing CG Land Use designation for the site. The
proposed infill project would not result in impacts relating to traffic. A project-specific Traffic
Impact Analysis (TIA) was completed by TJW Engineering on January 30, 2025. The TIA
concluded that the project would provide adequate access to the site and the project would
be responsible for their fair share of improvement costs. See Attachment 1.
The proposed project is projected to generate 2,028 daily trips which includes 356 AM
peak hour trips and 148 PM peak hour trips. The TIA analyzed the impacts to one study
intersection in the vicinity of the project: Adams Street and Corporate Centre Drive
intersection. The City of La Quinta mandates that the City strive to maintain the minimum
level of service for its intersections at no worse than LOS D in the General Plan. The TIA
concluded that the study intersection is projected to operate at an acceptable LOS during
the AM and PM peak hours for the Existing, Opening Year (OY), and Opening Year Plus
Project (OYP) traffic conditions. Therefore, the project would not result in impacts to traffic.
As a land use, coffee shops and drive-through restaurants do not generate excessive
noise levels. This, combined with the location of the site in a commercial district
surrounded by commercial uses and adjacent to a major roadway (Adams Street
immediately east and Highway 111 approximately 500 feet south) presents no evidence
that noise impacts would reach substantial levels.
The project is located in a developed area of La Quinta. Currently, the areas east, west,
and south of the property are fully developed and operational. The vacant project site is
surrounded by existing curb and gutter improvements. All projects greater than 5,000
square feet are subject to preparation and implementation of a Local Air Quality
Management Plan for the City. This addresses physical improvements and Best
Management Practices (BMPs), during construction, that mitigate any offsite release of
surface pollutants from the property. This includes regular compliance reporting. The
project would comply with CVWD’s storm-water requirements, which would prevent
19
20
January 30, 2025
Prepared by:
TJW ENGINEERING, INC.
9841 Irvine Center Drive, Suite 200
Irvine, CA 92618
949.878.3509 | www.tjwengineering.com
Adams Street & Corporate Centre Drive
Traffic Impact Analysis
City of La Quinta, California
21
January 30, 2025
Mr. Michael J. Shovlin
ADAMS ONE ELEVEN LLC
900 Island Drive, Unit 312
Rancho Mirage, CA 92270
Subject: Traffic Impact Analysis – Adams Street & Corporate Centre Drive, City of La Quinta, CA
Dear Mr. Shovlin:
TJW ENGINEERING, INC. (TJW) is pleased to present to you with this traffic impact analysis for the proposed
project located at the southwest corner of Adams Street and Corporate Centre Drive in the City of La Quinta,
California. The development is for the construction of a 3,800 square coffee shop with a drive-through
window.
This traffic study has been prepared to meet the traffic study requirements for the City of La Quinta and
assesses the forecast traffic operations associated with the proposed project and its impact on the local street
network. This report is being submitted to you for review and forwarding to the City of La Quinta.
Please contact us at (949) 878-3509 if you have any questions regarding this analysis.
Sincerely,
Thomas Wheat, PE, TE David Chew, PTP
President Transportation Planner
Registered Civil Engineer #69467
Registered Traffic Engineer #2565
Daniel Flores, EIT
Project Engineer
22
Adams Street & Corporate Centre Drive
Traffic Impact Analysis
City of La Quinta, California
January 30, 2025
Prepared for:
Mr. Michael J. Shovlin
ADAMS ONE ELEVEN LLC
900 Island Drive, Unit 312
Rancho Mirage, CA 92270
Prepared by:
Thomas Wheat, PE, TE
David Chew, PTP
Daniel Flores, EIT
TJW ENGINEERING, INC.
9841 Irvine Center Drive, Suite 200
Irvine, CA 92618
949.878.3509 | www.tjwengineering.com
23
MSA-24-001
4
Table of Contents
1.0 EXECUTIVE SUMMARY ....................................................................................................................................6
1.1 SUMMARY OF LEVEL OF SERVICE ANALYSIS RESULTS ..............................................................................6
1.2 ON-SITE ROADWAY AND SITE ACCESS IMPROVEMENTS ..........................................................................7
2.0 INTRODUCTION ..............................................................................................................................................8
2.1 PROJECT DESCRIPTION ..............................................................................................................................8
2.2 STUDY AREA ..............................................................................................................................................8
2.3 INTERSECTION ANALYSIS METHODOLOGY ...............................................................................................9
2.4 CITY OF LA QUINTA PERFORMANCE CRITERIA ....................................................................................... 10
3.0 EXISTING CONDITIONS ................................................................................................................................ 13
3.1 EXISTING CIRCULATION NETWORK/STUDY AREA CONDITIONS ............................................................ 13
3.2 EXISTING PUBLIC TRANSIT SERVICES ..................................................................................................... 13
3.3 PEDESTRIANS AND BICYCLES .................................................................................................................. 13
3.4 EXISTING TRAFFIC VOLUMES ................................................................................................................. 13
3.5 EXISTING CONDITIONS INTERSECTION LEVEL OF SERVICE ANALYSIS .................................................... 14
4.0 PROPOSED PROJECT .................................................................................................................................... 17
4.1 PROJECT DESCRIPTION ........................................................................................................................... 17
4.2 PROJECT TRIP GENERATION ................................................................................................................... 17
4.3 PROJECT TRIP DISTRIBUTION ................................................................................................................. 17
4.4 SIGHT DISTANCE ANALYSIS .................................................................................................................... 18
4.5 ON-SITE CIRCULATION ANALYSIS ........................................................................................................... 18
5.0 OPENING YEAR (OY) TRAFFIC CONDITIONS ................................................................................................. 22
5.1 ROADWAY IMPROVEMENTS .................................................................................................................. 22
5.2 CUMULATIVE PROJECTS TRAFFIC ........................................................................................................... 22
5.3 OPENING YEAR TRAFFIC VOLUMES ........................................................................................................ 23
5.4 OPENING YEAR INTERSECTION LOS ANALYSIS ....................................................................................... 24
6.0 OPENING YEAR PLUS PROJECT (OYP) TRAFFIC CONDITIONS ....................................................................... 27
6.1 ROADWAY IMPROVEMENTS .................................................................................................................. 27
6.2 OPENING YEAR PLUS PROJECT TRAFFIC VOLUMES ................................................................................ 27
6.3 OPENING YEAR PLUS PROJECT INTERSECTION LEVEL OF SERVICE ANALYSIS ........................................ 27
6.4 ALTERNATIVE SCENARIOS OPENING YEAR PLUS PROJECT INTERSECTION LEVEL OF SERVICE ANALYSIS ..... 28
7.0 DRIVE-THROUGH QUEUE ANALYSIS ............................................................................................................ 31
7.1 Drive-Through Queue Analysis Methodology ........................................................................................ 31
7.2 Drive-Through Queue Observation Results ........................................................................................... 31
24
MSA-24-001
5
List of Tables
Table 1: HCM – LOS & Delay Ranges – Signalized Intersections ........................................................................ 9
Table 2: Roadway Characteristics within Study Area ....................................................................................... 13
Table 3: Intersection Analysis – Existing Conditions ........................................................................................ 14
Table 4: Proposed Project Trip Generation ...................................................................................................... 17
Table 5: Cumulative Projects List and Trip Generation .................................................................................... 23
Table 6: Intersection Analysis – Opening Year Conditions ............................................................................... 24
Table 7: Intersection Analysis – Opening Year Plus Project Conditions ........................................................... 27
Table 8: Intersection Analysis – Opening Year Plus Project Conditions ........................................................... 28
Table 9: Summary of Drive-Through Queue Observations and Analysis ......................................................... 32
List of Exhibits
Exhibit 1: Project Location ................................................................................................................................ 11
Exhibit 2: Proposed Project Site Plan ............................................................................................................... 12
Exhibit 3: Lane Geometry and Intersection Controls ....................................................................................... 15
Exhibit 4: Existing AM and PM Peak Hour Volumes ......................................................................................... 16
Exhibit 5: Proposed Trip Distribution ............................................................................................................... 19
Exhibit 6: Sight Distance Analysis ..................................................................................................................... 20
Exhibit 7: On-Site Circulation ........................................................................................................................... 21
Exhibit 8: Cumulative Project Locations ........................................................................................................... 25
Exhibit 9: Opening Year AM and PM Peak Hour Volumes ............................................................................... 26
Exhibit 10: Opening Year Plus Project AM and PM Peak Hour Volumes ......................................................... 29
Exhibit 11: Lane Geometry and Intersection Controls for Alternative OYP Scenarios .................................... 30
Exhibit 12: Proposed Queue ............................................................................................................................. 33
Exhibit 13: Comparable Site Locations ............................................................................................................. 34
Appendices
Appendix A: Glossary of Terminology
Appendix B: Scoping Agreement
Appendix C: Existing Traffic Counts
Appendix D: HCM Analysis Sheets
25
MSA-24-001
6
1.0 EXECUTIVE SUMMARY
This traffic impact analysis (TIA) analyzes the projected traffic operations associated with the proposed
land use project located at the southwest corner of Adams Street and Corporate Centre Drive in the City of
La Quinta, California. The purpose of this TIA is to evaluate potential circulation system deficiencies that may
result from the development of the proposed project, and to recommend improvements to achieve
acceptable operations, if applicable. This analysis has been prepared in coordination with the City of La
Quinta via a scoping agreement (See Appendix B) and follows the City of La Quinta 2035 General Plan (City
General Plan) (November 2013) and the City of La Quinta Traffic Impact Study Guidelines (City Guidelines)
(June 2012).
The proposed project is for the construction of a 3,800 square coffee shop with a drive-through window. The
proposed project will be accessible via the existing driveway west of the intersection of Adams Street and
Corporate Centre Drive. The project site is currently designated for General Commercial (CG) land use. The
site is zoned as Regional Commercial (CR). The project site is currently vacant.
The proposed project is anticipated to be built and generating trips in 2025. The proposed project is projected
to generate 2,028 new daily trips including 326 AM peak hour trips and 148 PM peak hour trips.
One (1) intersection in the vicinity of the project site have been included in the intersection level of service
(LOS) analysis:
1. Adams Street/Corporate Centre Drive
The study intersection is analyzed for the following study scenarios:
• Existing Traffic Conditions;
• Opening Year (OY) Traffic Conditions;
• Opening Year Plus Project (OYP) Traffic Conditions.
1.1 SUMMARY OF LEVEL OF SERVICE ANALYSIS RESULTS
Table ES-1 summarizes the results of the intersection level of service analysis based on the City of La Quinta
thresholds of significance for analyzing transportation deficiencies.
26
MSA-24-001
7
Table ES-1
Summary of Transportation Deficiencies at the Study Intersection
Intersection Existing Opening Year Opening Year
+Project
1 Adams Street Corporate Centre Drive - - -
Existing Traffic Conditions
The study intersection is projected to operate at an acceptable LOS during the AM and PM peak hours for
Existing traffic conditions.
Opening Year (OY) Traffic Conditions
The study intersection is projected to operate at an acceptable LOS during the AM and PM peak hours for
Opening Year traffic conditions.
Opening Year Plus Project (OYP) Traffic Conditions
The study intersection is projected to operate at an acceptable LOS during the AM and PM peak hours for
Background traffic conditions.
1.2 ON-SITE ROADWAY AND SITE ACCESS IMPROVEMENTS
Wherever necessary, roadways adjacent to the proposed project site and site access points will be
constructed in compliance with recommended roadway classifications and respective cross-sections in the
City General Plan or as directed by the City Engineer.
Sight distance at each project access point should be reviewed with respect to standard Caltrans and City
sight distance standards at the time of final grading, landscaping and street improvement plans.
Signing and stripping shall be implemented in conjunction with detailed construction plans for the project
site.
27
MSA-24-001
8
2.0 INTRODUCTION
This traffic impact analysis (TIA) analyzes the projected traffic operations associated with the proposed
land use project located at the southwest corner of Adams Street and Corporate Centre Drive in the City of
La Quinta, California. The purpose of this TIA is to evaluate potential circulation system deficiencies that may
result from the development of the proposed project, and to recommend improvements to achieve
acceptable operations, if applicable. This analysis has been prepared in coordination with the City of La
Quinta via a scoping agreement (See Appendix B) and follows the City of La Quinta 2035 General Plan (City
General Plan) (November 2013) and the City of La Quinta Traffic Impact Study Guidelines (City Guidelines)
(June 2012).
2.1 PROJECT DESCRIPTION
The proposed project is for the construction of a 3,800 square coffee shop with a drive-through window. The
proposed project will be accessible via the existing driveway west of the intersection of Adams Street and
Corporate Centre Drive. The project site is currently designated for General Commercial (CG) land use. The
site is zoned as Regional Commercial (CR). The project site is currently vacant.
Exhibit 1 displays a map with the proposed project location. Exhibit 2 shows the project site plan.
2.2 STUDY AREA
One (1) intersection in the vicinity of the project site has been included in the intersection level of service
(LOS) analysis:
1. Adams Street/Corporate Centre Drive
The intersection is located within the City of La Quinta. The study intersection is analyzed for the following
study scenarios:
• Existing Traffic Conditions;
• Opening Year (OY) Traffic Conditions;
• Opening Year Plus Project (OYP) Traffic Conditions.
Traffic operations are evaluated for the following time periods:
• Weekday AM Peak Hour occurring between 7:00 AM to 9:00 AM;
• Weekday PM Peak Hour occurring between 4:00 PM to 6:00 PM.
28
MSA-24-001
9
2.3 INTERSECTION ANALYSIS METHODOLOGY
Level of Service (LOS) is commonly used to describe the quality of flow on roadways and at intersections
using a range of LOS from LOS A (free flow with little congestion) to LOS F (severely congested conditions).
The definitions for LOS for interruption of traffic flow differ depending on the type of traffic control (traffic
signal, unsignalized intersection with side street stops, unsignalized intersection with all-way stops). The
Highway Capacity Manual 7th Edition (HCM) (Transportation Research Board, 2022) methodology expresses
the LOS of an intersection in terms of delay time for the intersection approaches. The HCM methodology
utilizes different procedures for different types of intersection controls.
City Guidelines allow signalized intersection operations to be analyzed utilizing the HCM methodology.
Intersection LOS for signalized intersections is based on the intersection’s average control delay for all
movements at the intersection during the peak hour. Control delay includes initial deceleration delay, queue
move-up time, stopped delay, and final acceleration delay. The procedure for stop-control analysis
determines the average total delay, expressed in seconds of delay per vehicle, for left turns from the major
street and from the stop-controlled minor street traffic stream. Delay values are calculated based on the
relationship between traffic on the major street and the availability of acceptable “gaps” in this stream
through which conflicting traffic movements can be made.
Intersection operation for unsignalized intersections is based on the weighted average control delay
expressed in seconds per vehicle. At a two-way or side-street stop-controlled intersection, LOS is calculated
for each stop-controlled minor street movement, for the left-turn movement(s) from the major street, and
for the intersection as a whole. For approaches consisting of a single lane, the delay is calculated as the
average of all movements in that lane. For all-way stop-controlled intersection, LOS is computed for the
intersection as a whole.
Table 1 describes the general characteristics of traffic flow and accompanying delay ranges at signalized
intersections.
Table 1:
HCM – LOS & Delay Ranges – Signalized Intersections
Level of
Service
Average Control Delay (Seconds/Vehicle)
Signalized Intersections Unsignalized Intersections
A 0 – 10.00 0 – 10.00
B 10.01 – 20.00 10.01 – 15.00
C 20.01 – 35.00 15.01 – 25.00
D 35.01 – 55.00 25.01 – 35.00
E 55.01 – 80.00 35.01 – 50.00
F > 80.01 > 50.01
Source: Highway Capacity Manual, 7th Edition (Transportation Research Board, 2022).
29
MSA-24-001
10
Collected peak hour traffic volumes have been adjusted using a peak hour factor (PHF) to reflect peak 15-
minute volumes. It is a common practice in LOS analysis to conservatively use a peak 15-minute flow rate
applied to the entire hour to derive flow rates in vehicles per hour that are used in the LOS analysis. The PHF
is the relationship between the peak 15-minute flow rate and the full hourly volume. PHF = [Hourly Volume]/
[4 * Peak 15-Minute Volume]. The use of a 15-minute PHF produces a more detailed and conservative
analysis compared to analyzing vehicles per hour. Existing PHFs, obtained from the existing traffic counts
have been used for all analysis scenarios in this study.
This analysis utilizes PTV Vistro, Version 2025 analysis software for all signalized intersections. Vistro is a
macroscopic traffic software program that is based on the signalized intersection capacity analysis specified
in Chapter 16 of the HCM. The level of service and capacity analysis performed within Vistro takes the
optimization and coordination of signalized intersections within a network into consideration.
2.4 CITY OF LA QUINTA PERFORMANCE CRITERIA
The City General Plan has established City of La Quinta mandates that the City strive to maintain the minimum
level of service for its intersections at no worse than LOS D.
30
Not to Scale
džŚŝďŝt ϭ͗ Wƌoũect >ocatŝoŶ
Adam St and Corporate Centre Dr Queue Study MSA-24-001
Legend:
Project Site
Highwa
y
1
1
1
Corporate Centre Drive
Ad
a
m
S
t
r
e
e
t
Study Intersection Location#
1
31
Not to Scale
džŚŝďŝt Ϯ͗ WƌoƉoƐeĚ Sŝte WlaŶ
Adam St and Corporate Centre Dr Queue Study MSA-24-001 32
MSA-24-001
13
3.0 EXISTING CONDITIONS
3.1 EXISTING CIRCULATION NETWORK/STUDY AREA CONDITIONS
The characteristics of the roadways in the study intersection are described in Table 2.
Table 2:
Roadway Characteristics within Study Area
Roadway Classification1 Jurisdiction Direction Existing
Travel Lanes
Median
Type2
Speed
Limit (mph)
On-Street
Parking
Adams Street Secondary Arterial 4UD La Quinta North-South 4 RM 45 No
Corporate Centre Drive Collector La Quinta East-West 2 NM 25 No
1: Source: City of La Quinta 2035 General Plan (November 2013).
2: RM= Raised Median, NM = No Median.
Exhibit 3 shows the Existing study area lane geometry and intersection controls.
3.2 EXISTING PUBLIC TRANSIT SERVICES
The City of La Quinta is served by the SunLine Transit Agency which provides bus service throughout the
Coachella Valley region. SunLine Route 7 travels between census-designated Bermuda Dunes and the City of
La Quinta and travels past the proposed project along Adams Street. It includes two (2) stops less than one-
third (1/3) of a mile from the site. Appendix B contains a map and schedule of SunLine Route 7.
3.3 PEDESTRIANS AND BICYCLES
The City General Plan indicates a Class III bicycle path is planned for Adams Street along the proposed project
frontage. There are pedestrian crosswalks at all four approaches of the study intersection. Sidewalks exist on
Adams Street and the westbound leg of Corporate Centre Drive. The proposed project includes the
construction of a sidewalk on the eastbound leg of Corporate Centre Drive along the project frontage.
3.4 EXISTING TRAFFIC VOLUMES
To determine the existing operation of the study intersection, AM and PM peak period traffic volumes were
collected on Tuesday, December 17, 2024. Detailed traffic count data is provided in Appendix C. The existing
AM and PM peak hour volumes at the study intersection is shown in Exhibit 4.
33
MSA-24-001
14
3.5 EXISTING CONDITIONS INTERSECTION LEVEL OF SERVICE ANALYSIS
The intersection analysis of the AM and PM peak hours for Existing traffic conditions is shown in Table 3.
Calculations are based on the Existing geometrics at the study area intersection as shown previously in
Exhibit 3. HCM analysis sheets are provided in Appendix D.
Table 3:
Intersection Analysis – Existing Conditions
Intersection Control Type Peak Hour
Existing Conditions
Delay1 LOS
1 Adams Street Corporate Centre Drive Signal
AM 18.2 B
PM 18.8 B
1: Delay shown in seconds per vehicle. Per the Highway Capacity Manual 7th Edition, overall average delay and LOS are shown for signalized and all-way stop-
controlled intersections.
As shown in Table 3, the study intersection is currently operating at an acceptable LOS during the AM and
PM peak hours for Existing traffic conditions.
34
Not to Scale
džŚŝďŝt ϯ͗ >aŶe 'eoŵetƌLJ aŶĚ /ŶteƌƐectŝoŶ oŶtƌolƐ
Adam St and Corporate Centre Dr Queue Study MSA-24-001
Legend:
Project Site
Highway 1
1
1
Study Intersection Location#
1 Corporate Centre Drive
Ad
a
m
S
t
r
e
e
t
Adam Street/
Corporate Centre Drive-Driveway
35
Not to Scale
džŚŝďŝt ϰ͗ džŝƐtŝŶŐ D aŶĚ WD WeaŬ ,oƵƌ solƵŵeƐ
Adam St and Corporate Centre Dr Queue Study MSA-24-001
Legend:
Project Site
Highway 1
1
1
Study Intersection Location#
1 Corporate Centre Drive
Ad
a
m
S
t
r
e
e
t
Adam Street/
Corporate Centre Drive-Driveway
AM Peak Hour Volumes PM Peak Hour Volumes
Adam Street/
Corporate Centre Drive-Driveway
36
MSA-24-001
17
4.0 PROPOSED PROJECT
4.1 PROJECT DESCRIPTION
The proposed project is for the construction of a 3,800 square foot coffee shop with a drive-through window.
The proposed project will be accessible via the existing driveway west of the intersection of Adams Street
and Corporate Centre Drive. The project site is currently designated for General Commercial (CG) land use.
The site is zoned as Regional Commercial (CR). The project site is currently vacant.
Exhibit 2 previously showed the proposed project site plan.
4.2 PROJECT TRIP GENERATION
Trip generation represents the amount of traffic, both inbound and outbound, produced by a development.
Determining trip generation for a proposed project is based on projecting the amount of traffic that the
specific land uses being proposed will produce. Industry standard Institute of Transportation Engineers (ITE)
Trip Generation Manual (11th Edition, 2021) trip generation rates were used to determine trip generation of
for the proposed project land uses.
Table 4 summarizes the projected AM peak hour, PM peak hour and daily trip generation of the proposed
project. The proposed project is projected to generate 2,028 new daily trips including 326 AM peak hour trips
and 148 PM peak hour trips.
Table 4:
Proposed Project Trip Generation
1: Trip generation and pass-by rates from ITE Trip Generation Manual (11th Edition, 2021).
2: TSF = Thousand Square Feet.
4.3 PROJECT TRIP DISTRIBUTION
Projecting trip distribution involves the process of identifying probable destinations and traffic routes that
will be utilized by the proposed project’s traffic. The potential interaction between the proposed land use
and surrounding regional access routes are considered to identify the probable routes onto which project
traffic would distribute. The projected trip distribution for the proposed project is based on anticipated travel
patterns to and from the project site. Exhibit 5 shows the project proposed trip distribution.
Proposed Land Use1 ITE
Code Qty Unit2
Daily AM Peak Hour PM Peak Hour
Rate Volume Rate In:Out
Split
Volume
Rate In:Out
Split
Volume
In Out Total In Out Total
Coffee/Donut shop with
Drive-Through Window 937 3.80 TSF 533.57 2,028 85.88 51:49 166 160 326 38.99 50:50 74 74 148
37
MSA-24-001
18
4.4 SIGHT DISTANCE ANALYSIS
Corner sight distance was reviewed at the proposed exiting drive-through. The parking lot of the shopping
center was assumed to be 15 miles per hour. As such, the recommended minimum stopping sight distance
would be 100 feet, the corner sight distance to the right 145 feet, and the corner sight distance to the left
165 feet. Currently there is more sight distance available than these minimum recommended values at the
proposed parking lot connection so long as the drive-through is designed with the appropriate sight lines.
Exhibit 6 displays the sight distance analysis template.
4.5 ON-SITE CIRCULATION ANALYSIS
A template displaying navigation of a passenger vehicle circulating in and out of the drive-through of the
proposed project was generated to demonstrate the sufficiency of space to maneuver through the project.
A standard passenger vehicle of 20-feet in length was used for the template. The template is provided in
Exhibit 7.
38
Not to Scale
džŚŝďŝt ϱ͗ WƌoƉoƐeĚ dƌŝƉ ŝƐtƌŝďƵtŝoŶ
Adam St and Corporate Centre Dr Queue Study MSA-24-001
Legend:
Project Site
Highwa
y
1
1
1
Study Intersection Location#
1 Corporate Centre Drive
Ad
a
m
S
t
r
e
e
t
(XX%) Percent Trip Distribution
45%
55%
39
džŚŝďŝt ϲ͗ SŝŐŚt ŝƐtaŶce ŶalLJƐŝƐ
Adam St and Corporate Centre Dr Queue Study MSA-24-001
Project Site
Adams
S
t
r
e
e
t
40
Passenger Car - P
Pa
s
s
e
n
g
e
r
C
a
r
-
P
Passenger Car - P
džŚŝďŝt ϳ͗ KŶͲSŝte ŝƌcƵlatŝoŶ
Adam St and Corporate Centre Dr Queue Study MSA-24-001
Legend:
19
3 11
P - Passenger Car
Overall Length 19.000ft
Overall Width 7.000ft
Overall Body Height 5.101ft
Min Body Ground Clearance 1.116ft
Track Width 6.000ft
Lock-to-lock time 4.00s
Curb to Curb Turning Radius 24.000ft
41
MSA-24-001
22
5.0 OPENING YEAR (OY) TRAFFIC CONDITIONS
The Opening Year (OY) traffic conditions analysis is intended to analyze the traffic conditions projected for
the proposed project opening year. This study scenario includes analysis of traffic generated by nearby
cumulative projects. It does not include traffic generated by the proposed project.
5.1 ROADWAY IMPROVEMENTS
The lane configurations and traffic controls assumed to be in place for the OY traffic conditions scenario are
consistent with those previously shown in Exhibit 3.
5.2 CUMULATIVE PROJECTS TRAFFIC
City Guidelines require that other reasonably foreseeable development projects which are either approved
or are currently being processed in the study area also be included as part of a cumulative analysis scenario.
A list of cumulative projects was developed for this analysis through consultation with City of La Quinta
staff, and obtainment of current development status reports. A summary of the cumulative projects
including their land uses and trip generation are shown in Table 5. The cumulative project locations are
shown on the map in Exhibit 8.
42
MSA-24-001
23
Table 5:
Cumulative Projects List and Trip Generation
Project Land Use1 ITE
Code Qty Unit3
Daily AM Peak Hour PM Peak Hour
Rate Volume Rate In:Out
Split
Volume
Rate In:Out
Split
Volume
In Out Total In Out Total
1 Flora at Jefferson
Square
Multifamily Housing
(Low-Rise) 220 88 DU 6.74 593 0.4 24:76 8 27 35 0.51 63:37 28 17 45
2 Jefferson Street
Apartments
Multifamily Housing
(Low-Rise) 220 42 DU 6.74 283 0.4 24:76 4 13 17 0.51 63:37 13 8 21
3 Dune Palm
Mixed Use
Coffee shop w/ Drive
Through Window 934 4.76 TSF 467.48 2,226 44.61 51:49 108 104 212 33.0
3 52:48 82 75 157
Pass By-Trips
(0.5 Daily, 0.5 AM, 0.55 -1,113 -54 -52 -106 -45 -41 -86
Single-Tunnel Automated
Car Wash2 1.0 Tunnel 1858 1,858 124 50:50 62 62 124 190 50:50 95 95 190
Pass By-Trips
(0.2 Daily, 0.2 AM, 0.2 PM) -372 -12 -12 -25 -19 -19 -38 -372
Multifamily Housing
(Low-Rise) 210 180 DU 6.74 1,213 0.4 24:76 17 55 72 0.51 63:37 58 34 92
4 Hampton Inn Hotel 310 125 RM 7.99 999 0.46 56:44 32 26 58 0.59 51:49 38 36 74
5 St. Francis
Expansion Church 560 22.50 TSF 7.6 171 0.32 62:38 4 3 7 0.49 44:56 5 6 11
6 La Quinta Village
Apartments
Multifamily Housing
(Low-Rise) 220 178 DU 6.74 1,200 0.4 24:76 17 54 71 0.51 63:37 57 34 91
Affordable Housing 223 74 DU 4.81 356 0.36 29:71 8 19 27 0.46 59:41 20 14 34
7 Rancho La Quinta
Club Expansion General Office Building 710 2.92 TSF 10.84 32 1.52 88:12 4 0 4 1.44 17:83 1 3 4
8 Rancho La Quinta
Fitness Health/Fitness Club 492 11.54 TSF 0 0 1.31 51:49 8 7 15 3.45 57:43 23 17 40
Results Daily Volume
AM
Peak
Hour
In Out Total PM
Peak Hour In Out Total
Subtotal 8,93
1
272 370 642 420 339 759
Pass-By Trips -1,485 -66 -64 -131 -64 -60 -124
Net Total 7,44
6
206 306 511 356 279 635
1: Trip generation and pass-by rates are from the ITE Trip Generation Manual (11th Edition, 2021) except where noted.
2: Trip generation and pass-by rates are derived from Fast5Xpress Glendora Traffic Impact Analysis FCW21002 (March 2022) prepared by TJW Engineering, Inc.
3: DU = Dwelling Units; TSF = Thousand Square Feet; RM = Room.
5.3 OPENING YEAR TRAFFIC VOLUMES
OY traffic volumes are volumes projected for the proposed project opening year, 2025, including volumes
from nearby cumulative projects. To project traffic volumes for 2025, an annual growth rate of 2% for one
year was applied to the Existing traffic volumes. The projected volumes are then added to the cumulative
project volumes. Exhibit 9 shows OY AM and PM peak hour volumes at the study intersection.
OY Volumes = (Existing (2024) Counts * 1.02) + Cumulative Projects
43
MSA-24-001
24
5.4 OPENING YEAR INTERSECTION LOS ANALYSIS
The intersection analysis for AM and PM peak hours under OY traffic conditions is shown in Table 6. HCM
worksheets are shown in Appendix D.
Table 6:
Intersection Analysis – Opening Year Conditions
Intersection Control Type Peak Hour
OY Conditions
Delay1 LOS
1 Adams Street Corporate Centre Drive Signal
AM 17.7 B
PM 18.3 B
1: Delay is shown in seconds per vehicle. Per the Highway Capacity Manual 7th Edition, overall average delay and LOS are shown for signalized and all-way
stop-controlled intersections.
As shown in Table 6, the study intersection is projected to operate at an acceptable LOS during the AM and
PM peak hours for OY traffic conditions.
44
džŚŝďŝt ϴ͗ ƵŵƵlatŝǀe Wƌoũect >ocatŝoŶƐ
Adam St and Corporate Centre Dr Queue Study MSA-24-001
Legend:
Project Site
Approximate Cumulative Project LocationsX
45
3
8
7
6
2
1
PROJECT
SITE
45
Not to Scale
džŚŝďŝt ϵ͗ KƉeŶŝŶŐ zeaƌ D aŶĚ WD WeaŬ ,oƵƌ solƵŵeƐ
Adam St and Corporate Centre Dr Queue Study MSA-24-001
Legend:
Project Site
Highway 1
1
1
Corporate Centre Drive
Ad
a
m
S
t
r
e
e
t
Study Intersection Location#
1
Adam Street/
Corporate Centre Drive-Driveway
AM Peak Hour Volumes PM Peak Hour Volumes
Adam Street/
Corporate Centre Drive-Driveway
46
MSA-24-001
27
6.0 OPENING YEAR PLUS PROJECT (OYP) TRAFFIC CONDITIONS
The Opening Year Plus Project (OYP) traffic conditions analysis is intended to analyze impact the proposed
project has on the traffic conditions projected for the proposed project opening year. This study scenario
includes analysis of traffic generated by nearby cumulative projects.
6.1 ROADWAY IMPROVEMENTS
The lane configurations and traffic controls assumed to be in place for the OYP traffic conditions scenario are
consistent with those previously shown in Exhibit 3.
6.2 OPENING YEAR PLUS PROJECT TRAFFIC VOLUMES
OYP traffic volumes are volumes projected for the proposed project opening year, 2025, including volumes
generated by the proposed project and nearby cumulative projects. To project traffic volumes for 2025, an
annual growth rate of 2% for one year was applied to the Existing traffic volumes. The projected volumes are
then added to the volumes of both the proposed project and cumulative projects. Exhibit 10 shows OYP AM
and PM peak hour volumes at the study intersection.
OYP Volumes = (Existing (2024) Counts * 1.02) + Proposed Project + Cumulative Projects
6.3 OPENING YEAR PLUS PROJECT INTERSECTION LEVEL OF SERVICE ANALYSIS
The OYP traffic conditions AM and PM peak hour intersection analysis is shown in Table 7. HCM analysis
sheets are provided in Appendix D.
Table 7:
Intersection Analysis – Opening Year Plus Project Conditions
Intersection Control Type Peak
Hour
E Conditions OYP Conditions
Delay1 LOS Delay1 LOS
1 Adams Street Corporate Centre Drive Signal
AM 18.2 B 25.2 B
PM 18.8 B 22.2 C
1: Delay is shown in seconds per vehicle. Per the Highway Capacity Manual 7th Edition, overall average delay and LOS are shown for signalized and all-way
stop-controlled intersections.
As shown in Table 7, the study intersection is projected to operate at an acceptable LOS during the AM and
PM peak hours for OYP traffic conditions.
47
MSA-24-001
28
6.4 ALTERNATIVE SCENARIOS OPENING YEAR PLUS PROJECT INTERSECTION LEVEL OF SERVICE ANALYSIS
The City of La Quinta requested 3 different alternative scenarios to be analyzed at the study intersection of
Adams Street and Corporate Centre Drive.
• Alternative 1 – Four (4) lane configuration at Corporate Centre Drive
• Alternative 2 – One (1) lane configuration along Adams Street (road diet)
• Alternative 3 – Roundabout
Exhibit 11 shows Alternative OYP lane geometry and intersection controls. The Alternative OYP traffic
conditions AM and PM peak hour intersection analysis is shown in Table 8. HCM analysis sheets are provided
in Appendix D.
Table 8:
Intersection Analysis – Opening Year Plus Project Conditions
Intersection Peak
Hour
OYP Conditions Alternative #1 Alternative #2 Alternative #3
Delay1 LOS Delay1 LOS Delay1 LOS Delay1 LOS
1 Adams Street Corporate Centre Drive
AM 25.2 B 24.4 C 31.6 C 14.6 B
PM 22.2 C 22.0 C 24.6 C 14.0 B
1: Delay is shown in seconds per vehicle. Per the Highway Capacity Manual 7th Edition, overall average delay and LOS are shown for signalized and all-way
stop-controlled intersections.
As shown in Table 8, the study intersection is projected to operate at an acceptable LOS during the AM and
PM peak hours for Alternative OYP traffic conditions.
48
Not to Scale
džŚŝďŝt ϭϬ͗ KƉeŶŝŶŐ zeaƌ WlƵƐ Wƌoũect D aŶĚ WD WeaŬ ,oƵƌ solƵŵeƐ
Adam St and Corporate Centre Dr Queue Study MSA-24-001
Legend:
Project Site
Highway 1
1
1
Study Intersection Location#
1 Corporate Centre Drive
Ad
a
m
S
t
r
e
e
t
Adam Street/
Corporate Centre Drive-Driveway
AM Peak Hour Volumes PM Peak Hour Volumes
Adam Street/
Corporate Centre Drive-Driveway
49
Not to Scale
džŚŝďŝt ϭϭ͗ >aŶe 'eoŵetƌLJ aŶĚ /ŶteƌƐectŝoŶ oŶtƌolƐ Ĩoƌ lteƌŶatŝǀe KzW SceŶaƌŝoƐ
Adam St and Corporate Centre Dr Queue Study MSA-24-001
Legend:
Project Site
Highway 1
1
1
Study Intersection Location#
1 Corporate Centre Drive
Ad
a
m
S
t
r
e
e
t
Adam Street/
Corporate Centre Drive-Driveway
Alternative #1
Adam Street/
Corporate Centre Drive-Driveway
Adam Street/
Corporate Centre Drive-Driveway
Alternative #2 Alternative #3
50
MSA-24-001
31
7.0 DRIVE-THROUGH QUEUE ANALYSIS
The project proposes a coffee shop drive-through window which would have a capacity of approximately 13
vehicles (280 feet) before a queue begins to form outside of the drive-through lane. Comparable sites for
drive-through queue analysis were determined based on discussions with the project applicant and City staff.
The two locations have similar adjacent major roadways. Drive-through queue were collected at the following
two existing comparable locations:
1) McDonald’s: 78-962 CA-111, La Quinta, CA 92253;
2) Starbucks: 78752 CA-111, La Quinta, CA 92253.
Exhibit 12 demonstrates the proposed queue using a standard passenger vehicle and Exhibit 13 shows the
proposed comparable site locations.
7.1 Drive-Through Queue Analysis Methodology
Peak periods for coffee shops are typically weekdays in the morning, lunchtime, and in the evening.
Therefore, site queue observations were conducted on a typical weekday and Saturday from 7:00-9:00 AM,
11:00 AM-2:00 PM, and 4:00-7:00 PM. Data was collected in 10-minute increments on Saturday, December
14, 2025 and Tuesday, December 17, 2025.
The data collection resulted in a sample size of 102 data points on each day for a total of 208 data points.
The data collected can be used to determine the 85th percentile queue length, which is typically used to
determine the appropriate vehicle stacking needed for drive-through restaurants.
7.2 Drive-Through Queue Observation Results
Based on the collected data, Table 9 shows the number of times a certain queue length occurred and the
probability of that queue length not being exceeded. Complete observation data is provided in Appendix A.
51
MSA-24-001
32
Table 9:
Summary of Drive-Through Queue Observations and Analysis
Drive-Through Queue Analysis
Queue Length
(Vehicles)
Number of
Occurrences
Total Number of
Data Points
Probability of Exceeding
Queue Length
0 6 6 2.94%
1 19 25 12.25%
2 21 46 22.55%
3 24 70 34.31%
4 22 92 45.10%
5 13 105 51.47%
6 19 124 60.78%
7 17 141 69.12%
8 13 154 75.49%
9 16 170 83.33%
10 10 180 88.24%
11 5 185 90.69%
12 7 192 94.12%
13 3 195 95.59%
14 6 201 98.53%
15 2 203 99.51%
16 1 204 100.00%
85th Percentile Info
Queue Length: 10 Vehicles Data Point: 174th
When determining the appropriate queue storage, a drive-through should typically be designed to
accommodate the 85th percentile queue length. Based on the data collected at the existing locations, the 85th
percentile queue length is 10 vehicles which occurred at the 88nd data point. The maximum observed queue
was 16 vehicles occurring one time.
In the event that the queue extends beyond 13 vehicles, coffee shop associates can direct traffic through the
drive aisles in the parking lot to stack south of the drive-through lane entrance. This will leave the coffee shop
drive-through entrance accessible and will only block off parking spaces near the coffee shop itself.
52
Not to Scale
džŚŝďŝt ϭϮ͗ WƌoƉoƐeĚ YƵeƵe
Adam St and Corporate Centre Dr Queue Study MSA-24-001
Project Site
Legend:
19
3 11
P - Passenger Car
Overall Length 19.000ft
Overall Width 7.000ft
Overall Body Height 5.101ft
Min Body Ground Clearance 1.116ft
Track Width 6.000ft
Lock-to-lock time 4.00s
Curb to Curb Turning Radius 24.000ft
1 2 3 4
5
6
7
8910111213
53
Not to Scale
džŚŝďŝt ϭϯ͗ oŵƉaƌaďle Sŝte >ocatŝoŶƐ
Adam St and Corporate Centre Dr Queue Study MSA-24-001
Starbucks McDonald's
Project Site
Highway 111
A
d
a
m
S
t
r
e
e
t
Simon Drive
La Quinta Center Drive
54
MSA-24-001
APPENDIX
Appendix A: Glossary of Terminology
Appendix B: Scoping Agreement
Appendix C: Existing Traffic Counts
Appendix D: HCM Analysis Sheets
55
APPENDIX A
GLOSSARY OF TERMINOLOGY
56
Glossary of Terminology
ACRONYMS:
AC Acres
ADT Average Daily Traffic
Caltrans California Department of Transportation
DU Dwelling Unit
ICU Intersection Capacity Utilization
LOS Level of Service
TSF Thousand Square Feet
V/C Volume/Capacity
VMT Vehicle Miles Traveled
TERMS
AVERAGE DAILY TRAFFIC – The average 24-hour volume for a stated period divided by the number of days in
that period. For example, Annual Average Daily Traffic is the total volume during a year divided by 365 days.
CAPACITY – The maximum number of vehicles that can be reasonably expected to pass over a given section
of a lane or a roadway in a given time period.
CYCLE LENGTH – The time period in seconds required for a traffic signal to complete one full cycle of
indications.
DAILY CAPACITY – A theoretical value representing the daily traffic volume that will typically result in a peak
hour volume equal to the capacity of the roadway.
DELAY – The time consumed while traffic is impeded in its movement by some element over which it has no
control, usually expressed in seconds per vehicle.
DENSITY – The number of vehicles occupying in a unit length of the through traffic lanes of a roadway at any
given instant. Usually expressed in vehicles per mile.
DESIGN SPEED – A speed selected for purposes of design. Features of a highway, such as curvature,
superelevation, and sight distance (upon which the safe operation of vehicles is dependent) are correlated to
design speed.
DIRECTIONAL SPLIT – The percent of traffic in the peak direction at any point in time.
57
FREE FLOW – Volumes are well below capacity. Vehicles can maneuver freely and travel is unimpeded by other
traffic.
HEADWAY – Time or distance spacing between successive vehicles in a traffic stream, front bumper to front
bumper.
LEVEL OF SERVICE – A qualitative measure of a number of factors, which include speed and travel time, traffic
interruptions, freedom to maneuver, safety, driving comfort and convenience, and operating costs.
PASSENGER CAR EQUIVALENT (PCE) – A metric used to assess the impact of larger vehicles, such as trucks,
recreational vehicles, and buses, by converting the traffic volume of larger vehicles to an equivalent number
of passenger cars.
PEAK HOUR – The 60 consecutive minutes with the highest number of vehicles.
QUEUE LENGTH – The length of vehicle queue, typically expressed in feet, waiting at a service area such as a
Traffic signal, stop sign, or access gate.
SIGHT DISTANCE – The continuous length of roadway visible to a driver or roadway user.
SIGNAL CYCLE – The time period in seconds required for one complete sequence of signal indications.
SIGNAL PHASE – The part of the signal cycle allocated to one or more traffic movements.
STARTING DELAY – The delay experienced in initiating the movement of queued traffic from a stop to an
average running speed through an intersection.
TRAFFIC-ACTUATED SIGNAL – A type of traffic signal that directs traffic to stop and go in accordance with the
demands of traffic, as registered by the actuation of detectors.
TRIP – The movement of a person or vehicle from one location (origin) to another (destination). For example,
from home to store to home is two trips, not one.
TRIP GENERATION RATE – The quantity of trips produced and/or attracted by a specific land use stated in
terms of units such as per dwelling, per acre, and per 1,000 square feet of floor space.
VEHICLE MILES OF TRAVEL – A measure of the amount of usage of a section of highway, obtained by
multiplying the average daily traffic by length of facility in miles.
58
APPENDIX B
SCOPING AGREEMENT AND CITY DOCUMENTS
59
ATTACHMENT 4
CITY OF LA QUINTA
DATE ________________
TRAFFIC IMPACTS ANALYSIS SCOPE
Work to be done per Engineering Bulletin 06-13
Project Name: __________________________________________________________
Project Location: ________________________________________________________
Project Description: _____________________________________________________
________________________________________________________________________
Developer Traffic Engineer
Name
Address
Contact
Phone
Email
Study Intersection Study Segments
ITE Land Use Code ITE Trip
Gen. Rate
Unit of
Measure
Daily Trips Pass by
%
Time periods to be analyzed: Year(s) to be analyzed:
AM PM Sat
Other
________________________
__________________________________
Adams St and Corporate Centre Dr Drive-Through Queue Study
Adams St and Corporate Centre Dr
3,800 square foot drive-through facility
TJW Engineering, Inc.
9841 Irvine Center Drive, Suite 200.
Irvine, Ca 92618
Daniel Flores
(949) 878-3509
Daniel@tjwengineering.com
ADAMS ONE ELEVEN, LLC.
900 Island Drive, Unit 312
Rancho Mirage, Ca 92270
Michael J. Shovlin
Adams St and Corporate Centre Dr
Fast-Food Restaurant with
Drive-Through Window
934 TSF 1,776 50% AM
50% PM
55% Daily
Existing, Opening Year (2025) without
Project and Opening Year (2025) with
Project scenarios
N/A
12/11/24
60
Special issues to be addressed:
Attachments: Site Plan Study Intersections/Segments Map
Distribution Assumption Map Cumulative Impacts
City Approval ________________________ Date _____________________
Collect drive-through queue data in 10-minute increments
at up to two (2) comparable sites during the peak periods. The peak period data collection will occur
on a typical weekday and a Saturday from 7:00-9:00 AM, 11:00 AM-2:00 PM, and 4:00-7:00 PM.
Additional Items to be address:
Provide a site distance exhibit for the
exiting drive-through driveway and
provide vehicle turning movements to
illustrate on-site circulation.
City of La Quinta to provide
cumulative projects for for
opening year scenario
1/16/25
61
Adams Street and Corpporate Centre Drive
Drive-Through Queue Study
In Out Total In Out Total
Fast-Food Restaurant with Drive-Through
Window 934 3.80 TSF 467.48 1,776 44.61 51:49 87 83 170 33.03 52:48 66 60 126
Pass-By Trips (0.5 Daily, 0.5 AM, 0.55 PM)-888 -44 -42 -86 -36 -33 -69
Net Total 888 43 41 84 30 27 57
1: Trip generation and pass-by rates from ITE Trip Generation (11th Edition, 2021).
2: TSF = Thousand Square Feet.
Table 1
Project Trip Generation
Proposed Land Use1 ITE
Code Qty Unit2
Daily AM Peak Hour PM Peak Hour
Rate Volume Rate
In:Out
Split
Volume Rate In:Out
Split
Volume
MSA-24-001
62
1
60
60
30
08-7
7
1
0
.
1
20-1
0
0
0
9
2
2
Adam
s
S
t
r
e
e
t
B
r
i
d
g
e
,
L
a
Quinta
1
RBF
Consu
l
t
a
n
t
s
02-1
6
-
0
8
1
1
40'
RBF
Consu
l
t
a
n
t
s
220180
0
N
220200
0
N
220220
0
N
220240
0
N
2202600 N2202800 N2203000 N2203200 N2203400 N2203600 N2203800 N2204000 N
220180
0
N
2202000 N2202200 N2202400 N2202600 N2202800 N2203000 N2203200 N2203400 N2203600 N2203800 N2204000 N6549800 E6550000 E6550200 E6550400 E6550600 E6550800 E6551000 E6551200 E
6
5
4
9
8
0
0
E
6
5
5
0
0
0
0
E
6
5
5
0
2
0
0
E
6
5
5
0
4
0
0
E
6
5
5
0
6
0
0
E
6
5
5
0
8
0
0
E
6
5
5
1
0
0
0
E
6
5
5
1
2
0
0
E
SHEET
No.
OF
SHTS.
THIS
M
A
P
C
O
M
P
I
L
E
D
P
H
O
T
O
G
R
A
M
M
E
T
R
I
C
A
L
L
Y
BY:
IAS P
R
O
J
E
C
T
NUMB
E
R
:
IAS P
R
O
J
E
C
T
NAME:
PLOTT
E
D
C
O
N
T
O
U
R
INTER
V
A
L
MAP A
N
D
D
I
G
I
T
A
L
D
A
T
A
P
R
E
P
A
R
E
D
F
O
R
:
DASHE
D
L
I
N
E
S
M
A
Y
N
O
T
M
E
E
T
M
A
P
A
C
C
U
R
A
C
Y
STAND
A
R
D
S
BUILD
I
N
G
O
U
T
L
I
N
E
S
I
N
D
I
C
A
T
E
D
R
I
P
L
I
N
E
B
U
T
M
A
Y
A
L
S
O
I
N
C
L
U
D
E
S
T
A
I
R
S AND
APPU
R
T
E
N
A
N
C
E
S
.
FEATU
R
E
S
I
N
S
H
A
D
O
W
S
A
N
D
V
E
G
E
T
A
T
I
O
N
M
A
Y
B
E
O
B
S
C
U
R
E
D
,
F
E
A
T
U
R
E
S
N
E
AR TA
L
L
O
B
J
E
C
T
S
M
A
Y
B
E
O
B
S
C
U
R
E
D
DUE
T
O
P
H
O
T
O
G
R
A
P
H
I
C
A
N
G
L
E
"LEAN
"
MAPPI
N
G
O
U
T
S
I
D
E
L
I
M
I
T
S
O
F
S
U
R
V
E
Y
C
O
N
T
R
O
L
P
E
R
I
M
E
T
E
R
M
A
Y
N
O
T
M
E
E
T
MAP
A
C
C
U
R
A
C
Y
STAND
A
R
D
S
HORIZ
O
N
T
A
L
A
C
C
U
R
A
C
Y
F
O
R
1
"
=
A
N
D
V
E
R
T
I
C
A
L
A
C
C
U
R
A
C
Y
F
O
R
F
O
O
T
CON
T
O
U
R
INTER
V
A
L
.
MAP H
A
S
B
E
E
N
C
O
M
P
I
L
E
D
P
H
O
T
O
G
R
A
M
M
E
T
R
I
C
A
L
L
Y
A
N
D
S
H
O
U
L
D
B
E
F
I
E
L
D
V
ERIFIE
D
A
C
C
O
R
D
I
N
G
L
Y
B
Y
USER.
SURVE
Y
G
R
O
U
N
D
C
O
N
T
R
O
L
P
R
O
V
I
D
E
D
BY:
THIS
M
A
P
A
N
D
A
S
S
O
C
I
A
T
E
D
D
I
G
I
T
A
L
D
A
T
A
C
O
M
P
I
L
E
D
F
R
O
M
A
E
R
I
A
L
P
H
O
T
O
GRAPH
Y
DATED
:
NOTES
:
COPYR
I
G
H
T
2008
CURB
A
N
D
G
U
T
T
E
R
AWNIN
G
SIDEW
A
L
K
BUILD
I
N
G
EDGE
O
F
D
I
R
T
EDGE
O
F
C
O
N
C
.
EDGE
O
F
A
S
P
H
.
CONTR
O
L
ROAD
S
T
R
I
P
I
N
G
POOL
GUAR
D
R
A
I
L
STRIP
E
SPARK
I
N
G
PIPE
L
I
N
E
WALL
RETAI
N
I
N
G
W
A
L
L
FENC
E
STAND
P
I
P
E
INTER
C
O
N
T
O
U
R
POWE
R
P
O
L
E
STREE
T
L
I
G
H
T
POWE
R
P
O
L
E
STREE
T
L
I
G
H
T
MISCE
L
L
A
N
E
O
U
S
SINGL
E
T
R
E
E
INDEX
C
O
N
T
O
U
R
FIRE
H
Y
D
R
A
N
T
MANH
O
L
E
WATER
L
I
N
E
CATC
H
B
A
S
I
N
VALVE
DROP
I
N
L
E
T
PALM
TREES
STOP
L
I
G
H
T
VAULT
TANK
RAILR
O
A
D
RAIL
S
I
G
N
A
L
GUY W
I
R
E
SIGN
A.-As
p
h
.
=
A
S
P
H
A
L
T
C
.
-
C
o
n
c
=
C
O
N
C
R
E
T
E
O
B
S
.
=
O
B
S
C
U
R
E
D
ABBR
E
V
I
A
T
I
O
N
S
:
U/C =
U
N
D
E
R
C
O
N
S
T
R
U
C
T
I
O
N
W
/
L
=
W
A
T
E
R
L
E
V
E
L
.
FOOT7117
A
r
l
i
n
g
t
o
n
A
v
e
.
,
S
u
i
t
e
A
Rivers
i
d
e
,
C
A
92503
Fx (9
5
1
)
687-
4
1
2
0
Ph (9
5
1
)
687-
4
2
5
2
www.i
n
l
a
n
d
a
e
r
i
a
l
.
c
o
m
ias@
i
n
l
a
n
d
a
e
r
i
a
l
.
c
o
m
COMM
E
N
T
S
:
P
R
OF
ESSIO N A L L A N D SURV
E
Y
O
R
DERE K C .HOOD
A
Topogr
a
p
h
i
c
m
a
p
p
r
e
p
a
r
e
d
under t
h
e
s
u
p
e
r
v
i
s
i
o
n
o
f
:
Derek C
.
H
o
o
d
,
P
.
L
.
S
.
Inland
A
e
r
i
a
l
S
u
r
v
e
y
s
,
I
n
c
.
Date
ST L
TE O F C A
RNFIO
A
I
No. 67
9
9
Exp. 9
-
3
0
-
2
0
0
8
0
HV-1
1350.0
0
1350.0
0
V-1
Pool
P
SP
1340
MH
1350
NLANDI
ERIALA
URVEY
S
,
S
NC.I
GRAPH
I
C
S
C
A
L
E
INLAN
D
A
E
R
I
A
L
MHMHMHSTOP STOP STOP MH
MH
MH
AHEA
D AHEA
D
SIGN
A
L SIGN
A
L
MHMH MHMH STOPSTOPMH C.O.C.O.BOMHMH
LANDS
C
A
P
E
S
B
10'-0"SETBA
C
K20'-0"
B
U
I
L
D
I
N
G
DN
C
O
M
P
A
C
T
PROPERTY LINE
P
R
O
P
E
R
T
Y
L
I
N
E
P
R
O
P
E
R
T
Y
L
I
N
E
PR
O
P
E
R
T
Y
L
I
N
E
26'-0"6'-0"15'-0"4'-0"
18'-0"
PROPERTY LINE
OUTDOOR SEATING
APPROX. 650 SF
1 2 3 4 5
PRE-
ORDER
ORDER
DIRECTIONAL
SIGN
A
D
A
M
S
S
T
R
E
E
T
DN
DN
6
11 101213
PROPOSED DRIVE-THRU
3,800 SF
DNDN
7
8
9
DN
13
'
-
0
"
4'
-
0
"
10'-0"13'-0"
R
2
5
'
-
0
"
R 25'-0
"
R 1
1
'
-
0
"
R
1
1
'
-
0
"
3'
-
0
"
13
'
-
0
"
104 112 114
113
TYP.
103
103
TYP.
105
TYP.
103
106
TYP.
111
TYP.
107
TYP.
116
100
102
TYP.
118117
119
103102
102
TYP.
115
TYP.
103
102
101
TYP.
105 108
110 109
3'
-
6
"
5
'
-
0
"
2
'
-
0
"
4'
-
0
"
TYP.
103
115
TYP.
111
TYP.
116103107
TYP.
103 102
102 102
102
119
119
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
1" = 10'-0"
A101
SITE PLAN
AU
G
U
S
T
2
7
,
2
0
2
4
111 LA QUINTA DRIVE-THRU PAD
HIGHWAY 111 - LA QUINTA, CA 22
4
0
0
4
0'5' 10' 20'40'
NORTH
KEYNOTES
NO.DESCRIPTION
100 3'H 8" CMU WALL
101 3' H 8" CMU PLANTER WALL W/ STUCCO FINISH
102 PLANTER
103 NEW CONCRETE CURB, SEE CIVIL
104 EXISTING CONCRETE CURB, SEE CIVIL
105 EXISITNG CONCRETE CURB TO BE REMOVED, SEE
CIVIL
106 NEW ACCESSIBLE PARKING STALL
107 NEW CURB RAMP, SEE CIVIL
108 NEW TRASH ENCLOSURE TO MATCH EXISTING
109 EXISTING SITE WALL
110 EXISTING TRASH ENCLOSURE
111 TRUNCATED DOMES, MIN. 3'
112 NEW SIDEWALK PER CITY STANDARDS, SEE CIVIL
113 EXISTING SIDEWALK
114 EXISITNG CURB RAMP
115 NEW CONCRETE HARDSCAPE, SEE CIVIL AND
LANDSCAPE
116 NEW ACCESSIBLE PATH STRIPING
117 NEW ACCESSIBLE PARKING SIGN
118 NEW CONCRETE WHEEL STOP
119 ACCESSIBLE PATH
63
Site
64
APPENDIX C
EXISTING TRAFFIC COUNTS
65
File Name : LQA_Adams_CC AM
Site Code : 241097
Start Date : 12/17/2024
Page No : 1
City of La Quinta
N/S: Adams Street
E/W: Corporate Centre Drive
Weather: Clear
Groups Printed- Total Volume
Adams Street
Southbound
Corporate Centre Drive
Westbound
Adams Street
Northbound
Corporate Centre Drive
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
07:00 AM 11 28 9 48 6 3 1 10 1 21 9 31 3 3 3 9 98
07:15 AM 11 52 15 78 10 1 6 17 0 35 12 47 11 0 1 12 154
07:30 AM 16 47 11 74 7 2 2 11 2 32 20 54 5 2 3 10 149
07:45 AM 23 97 26 146 18 1 4 23 5 32 25 62 4 3 4 11 242
Total 61 224 61 346 41 7 13 61 8 120 66 194 23 8 11 42 643
08:00 AM 19 90 29 138 16 3 7 26 3 46 24 73 21 1 3 25 262
08:15 AM 19 102 25 146 22 3 11 36 5 64 21 90 12 6 8 26 298
08:30 AM 23 96 28 147 25 1 9 35 5 64 13 82 15 9 3 27 291
08:45 AM 18 98 23 139 19 4 9 32 6 100 29 135 28 4 10 42 348
Total 79 386 105 570 82 11 36 129 19 274 87 380 76 20 24 120 1199
Grand Total 140 610 166 916 123 18 49 190 27 394 153 574 99 28 35 162 1842
Apprch %15.3 66.6 18.1 64.7 9.5 25.8 4.7 68.6 26.7 61.1 17.3 21.6
Total %7.6 33.1 9 49.7 6.7 1 2.7 10.3 1.5 21.4 8.3 31.2 5.4 1.5 1.9 8.8
Adams Street
Southbound
Corporate Centre Drive
Westbound
Adams Street
Northbound
Corporate Centre Drive
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM
08:00 AM 19 90 29 138 16 3 7 26 3 46 24 73 21 1 3 25 262
08:15 AM 19 102 25 146 22 3 11 36 5 64 21 90 12 6 8 26 298
08:30 AM 23 96 28 147 25 1 9 35 5 64 13 82 15 9 3 27 291
08:45 AM 18 98 23 139 19 4 9 32 6 100 29 135 28 4 10 42 348
Total Volume 79 386 105 570 82 11 36 129 19 274 87 380 76 20 24 120 1199
% App. Total 13.9 67.7 18.4 63.6 8.5 27.9 5 72.1 22.9 63.3 16.7 20
PHF .859 .946 .905 .969 .820 .688 .818 .896 .792 .685 .750 .704 .679 .556 .600 .714 .861
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268
66
File Name : LQA_Adams_CC AM
Site Code : 241097
Start Date : 12/17/2024
Page No : 2
City of La Quinta
N/S: Adams Street
E/W: Corporate Centre Drive
Weather: Clear
Adams Street
C
o
r
p
o
r
a
t
e
C
e
n
t
r
e
D
r
i
v
e
C
o
r
p
o
r
a
t
e
C
e
n
t
r
e
D
r
i
v
e
Adams Street
Right
105
Thru
386
Left
79
InOut Total
386 570 956
Ri
g
h
t
36
Th
r
u
11
Le
f
t
82
Ou
t
To
t
a
l
In
18
6
12
9
31
5
Left
19
Thru
274
Right
87
Out TotalIn
492 380 872
Le
f
t
76
Th
r
u
20
Ri
g
h
t
24
To
t
a
l
Ou
t
In
13
5
12
0
25
5
Peak Hour Begins at 08:00 AM
Total Volume
Peak Hour Data
North
Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Each Approach Begins at:
07:45 AM 08:00 AM 08:00 AM 08:00 AM
+0 mins.23 97 26 146 16 3 7 26 3 46 24 73 21 1 3 25
+15 mins.19 90 29 138 22 3 11 36 5 64 21 90 12 6 8 26
+30 mins.19 102 25 146 25 1 9 35 5 64 13 82 15 9 3 27
+45 mins.23 96 28 147 19 4 9 32 6 100 29 135 28 4 10 42
Total Volume 84 385 108 577 82 11 36 129 19 274 87 380 76 20 24 120
% App. Total 14.6 66.7 18.7 63.6 8.5 27.9 5 72.1 22.9 63.3 16.7 20
PHF .913 .944 .931 .981 .820 .688 .818 .896 .792 .685 .750 .704 .679 .556 .600 .714
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268
67
File Name : LQA_Adams_CC PM
Site Code : 241097
Start Date : 12/17/2024
Page No : 1
City of La Quinta
N/S: Adams Street
E/W: Corporate Centre Drive
Weather: Clear
Groups Printed- Total Volume
Adams Street
Southbound
Corporate Centre Drive
Westbound
Adams Street
Northbound
Corporate Centre Drive
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
04:00 PM 31 123 32 186 35 8 27 70 13 82 22 117 38 2 26 66 439
04:15 PM 30 103 31 164 30 6 27 63 6 94 18 118 32 6 18 56 401
04:30 PM 25 115 22 162 24 4 29 57 15 92 26 133 28 7 22 57 409
04:45 PM 25 85 31 141 32 3 20 55 18 105 25 148 41 2 21 64 408
Total 111 426 116 653 121 21 103 245 52 373 91 516 139 17 87 243 1657
05:00 PM 5 92 23 120 24 2 23 49 14 93 8 115 28 0 27 55 339
05:15 PM 6 107 27 140 21 1 11 33 13 108 6 127 22 1 26 49 349
05:30 PM 10 117 28 155 6 4 10 20 12 74 7 93 27 1 16 44 312
05:45 PM 7 82 25 114 12 1 9 22 9 75 7 91 19 0 7 26 253
Total 28 398 103 529 63 8 53 124 48 350 28 426 96 2 76 174 1253
Grand Total 139 824 219 1182 184 29 156 369 100 723 119 942 235 19 163 417 2910
Apprch %11.8 69.7 18.5 49.9 7.9 42.3 10.6 76.8 12.6 56.4 4.6 39.1
Total %4.8 28.3 7.5 40.6 6.3 1 5.4 12.7 3.4 24.8 4.1 32.4 8.1 0.7 5.6 14.3
Adams Street
Southbound
Corporate Centre Drive
Westbound
Adams Street
Northbound
Corporate Centre Drive
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:00 PM
04:00 PM 31 123 32 186 35 8 27 70 13 82 22 117 38 2 26 66 439
04:15 PM 30 103 31 164 30 6 27 63 6 94 18 118 32 6 18 56 401
04:30 PM 25 115 22 162 24 4 29 57 15 92 26 133 28 7 22 57 409
04:45 PM 25 85 31 141 32 3 20 55 18 105 25 148 41 2 21 64 408
Total Volume 111 426 116 653 121 21 103 245 52 373 91 516 139 17 87 243 1657
% App. Total 17 65.2 17.8 49.4 8.6 42 10.1 72.3 17.6 57.2 7 35.8
PHF .895 .866 .906 .878 .864 .656 .888 .875 .722 .888 .875 .872 .848 .607 .837 .920 .944
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268
68
File Name : LQA_Adams_CC PM
Site Code : 241097
Start Date : 12/17/2024
Page No : 2
City of La Quinta
N/S: Adams Street
E/W: Corporate Centre Drive
Weather: Clear
Adams Street
C
o
r
p
o
r
a
t
e
C
e
n
t
r
e
D
r
i
v
e
C
o
r
p
o
r
a
t
e
C
e
n
t
r
e
D
r
i
v
e
Adams Street
Right
116
Thru
426
Left
111
InOut Total
615 653 1268
Ri
g
h
t
10
3
Th
r
u
21
Le
f
t
12
1
Ou
t
To
t
a
l
In
21
9
24
5
46
4
Left
52
Thru
373
Right
91
Out TotalIn
634 516 1150
Le
f
t
13
9
Th
r
u
17
Ri
g
h
t
87
To
t
a
l
Ou
t
In
18
9
24
3
43
2
Peak Hour Begins at 04:00 PM
Total Volume
Peak Hour Data
North
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Each Approach Begins at:
04:00 PM 04:00 PM 04:30 PM 04:00 PM
+0 mins.31 123 32 186 35 8 27 70 15 92 26 133 38 2 26 66
+15 mins.30 103 31 164 30 6 27 63 18 105 25 148 32 6 18 56
+30 mins.25 115 22 162 24 4 29 57 14 93 8 115 28 7 22 57
+45 mins.25 85 31 141 32 3 20 55 13 108 6 127 41 2 21 64
Total Volume 111 426 116 653 121 21 103 245 60 398 65 523 139 17 87 243
% App. Total 17 65.2 17.8 49.4 8.6 42 11.5 76.1 12.4 57.2 7 35.8
PHF .895 .866 .906 .878 .864 .656 .888 .875 .833 .921 .625 .883 .848 .607 .837 .920
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268
69
DRIVE THRU SURVEY
LOCATION: McDonalds, 78-962 Highway 111 DAY: Tuesday
CITY: La Quinta DATE: 12/17/2024
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
7:00 5 2 0 7
7:10 4 1 0 5
7:20 5 4 0 9
7:30 2 2 0 4
7:40 3 0 0 3
7:50 1 0 0 1
8:00 3 1 0 4
8:10 3 0 0 3
8:20 1 1 0 2
8:30 1 1 0 2
8:40 3 1 0 4
8:50 4 5 1 10
9:00 5 6 1 12
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
11:00 0 4 0 4
11:10 6 7 1 14
11:20 2 6 2 10
11:30 5 5 0 10
11:40 2 5 0 7
11:50 5 5 0 10
12:00 1 1 0 2
12:10 4 5 0 9
12:20 4 6 1 11
12:30 0 7 3 10
12:40 4 5 3 12
12:50 3 5 1 9
13:00 5 7 4 16
13:10 3 5 0 8
13:20 3 6 1 10
13:30 4 4 0 8
13:40 5 4 0 9
13:50 3 3 0 6
14:00 4 2 0 6
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
951-268-6268 70
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
16:00 4 8 2 14
16:10 4 6 0 10
16:20 4 4 0 8
16:30 4 2 0 6
16:40 2 6 3 11
16:50 3 4 0 7
17:00 4 2 0 6
17:10 2 1 0 3
17:20 3 0 0 3
17:30 3 2 0 5
17:40 4 5 0 9
17:50 5 7 0 12
18:00 5 6 1 12
18:10 6 6 2 14
18:20 5 4 2 11
18:30 5 2 0 7
18:40 3 0 0 3
18:50 1 2 0 3
19:00 5 3 0 8
DRIVE THRU SURVEY
LOCATION: McDonalds, 78-962 Highway 111 DAY: Tuesday
CITY: La Quinta DATE: 12/17/2024
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
951-268-6268 71
DRIVE THRU SURVEY
LOCATION: McDonalds, 78-962 Highway 111 DAY: Saturday
CITY: La Quinta DATE: 12/14/2024
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
7:00 3 0 0 3
7:10 5 4 0 9
7:20 4 5 0 9
7:30 5 7 0 12
7:40 3 1 0 4
7:50 1 0 0 1
8:00 2 2 0 4
8:10 2 4 0 6
8:20 4 5 0 9
8:30 3 6 0 9
8:40 3 1 0 4
8:50 2 1 0 3
9:00 4 4 0 8
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
11:00 2 2 0 4
11:10 2 2 0 4
11:20 0 2 0 2
11:30 1 0 0 1
11:40 4 3 0 7
11:50 4 1 0 5
12:00 2 1 0 3
12:10 4 2 0 6
12:20 5 5 0 10
12:30 3 4 1 8
12:40 3 5 1 9
12:50 3 3 0 6
13:00 5 7 2 14
13:10 5 6 0 11
13:20 3 7 5 15
13:30 4 7 3 14
13:40 5 6 3 14
13:50 5 7 1 13
14:00 3 3 0 6
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
951-268-6268 72
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
16:00 5 7 1 13
16:10 5 7 1 13
16:20 3 5 0 8
16:30 3 5 0 8
16:40 3 0 0 3
16:50 4 2 0 6
17:00 4 4 0 8
17:10 5 4 0 9
17:20 3 1 0 4
17:30 4 5 0 9
17:40 4 3 0 7
17:50 2 6 0 8
18:00 4 6 5 15
18:10 4 5 3 12
18:20 4 7 1 12
18:30 3 6 1 10
18:40 6 3 0 9
18:50 4 3 0 7
19:00 1 1 0 2
DRIVE THRU SURVEY
LOCATION: McDonalds, 78-962 Highway 111 DAY: Saturday
CITY: La Quinta DATE: 12/14/2024
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
951-268-6268 73
DRIVE THRU SURVEY
LOCATION: Starbucks, 78752 Highway 111 DAY: Tuesday
CITY: La Quinta DATE: 12/17/2024
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
7:00 1 0 0 1
7:10 0 0 0 0
7:20 0 1 0 1
7:30 0 0 0 0
7:40 2 1 0 3
7:50 2 2 0 4
8:00 1 0 0 1
8:10 3 3 1 7
8:20 2 3 3 8
8:30 2 3 2 7
8:40 3 3 1 7
8:50 3 0 0 3
9:00 3 3 0 6
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
11:00 4 1 0 5
11:10 6 3 0 9
11:20 0 2 0 2
11:30 2 0 0 2
11:40 2 0 0 2
11:50 1 2 0 3
12:00 3 2 0 5
12:10 3 2 0 5
12:20 3 1 0 4
12:30 5 1 0 6
12:40 6 1 0 7
12:50 2 0 0 2
13:00 3 3 0 6
13:10 2 2 0 4
13:20 2 2 0 4
13:30 1 2 0 3
13:40 0 1 0 1
13:50 2 1 0 3
14:00 3 2 0 5
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
951-268-6268 74
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
16:00 2 0 0 2
16:10 1 1 0 2
16:20 0 3 0 3
16:30 0 0 0 0
16:40 2 0 0 2
16:50 3 2 0 5
17:00 1 2 0 3
17:10 1 0 0 1
17:20 2 1 0 3
17:30 0 0 0 0
17:40 2 0 0 2
17:50 1 0 0 1
18:00 1 0 0 1
18:10 0 0 0 0
18:20 0 0 0 0
18:30 1 1 0 2
18:40 0 1 0 1
18:50 0 1 0 1
19:00 1 0 0 1
DRIVE THRU SURVEY
LOCATION: Starbucks, 78752 Highway 111 DAY: Tuesday
CITY: La Quinta DATE: 12/17/2024
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
951-268-6268 75
DRIVE THRU SURVEY
LOCATION: Starbucks, 78752 Highway 111 DAY: Saturday
CITY: La Quinta DATE: 12/14/2024
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
7:00 2 1 0 3
7:10 1 0 0 1
7:20 1 0 0 1
7:30 3 0 0 3
7:40 4 2 0 6
7:50 2 0 0 2
8:00 2 0 0 2
8:10 5 2 0 7
8:20 5 0 0 5
8:30 0 3 1 4
8:40 5 1 0 6
8:50 2 2 0 4
9:00 1 2 0 3
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
11:00 1 2 0 3
11:10 4 2 0 6
11:20 6 2 1 9
11:30 4 3 2 9
11:40 6 3 1 10
11:50 6 3 2 11
12:00 5 2 0 7
12:10 4 0 0 4
12:20 6 1 0 7
12:30 2 2 0 4
12:40 2 3 0 5
12:50 2 3 0 5
13:00 4 2 0 6
13:10 6 2 0 8
13:20 1 1 0 2
13:30 3 2 0 5
13:40 4 3 0 7
13:50 5 2 0 7
14:00 2 0 0 2
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
951-268-6268 76
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
16:00 2 2 0 4
16:10 1 1 0 2
16:20 1 0 0 1
16:30 5 1 0 6
16:40 5 2 0 7
16:50 5 3 0 8
17:00 2 1 0 3
17:10 4 0 0 4
17:20 3 1 0 4
17:30 1 0 0 1
17:40 3 3 0 6
17:50 0 1 0 1
18:00 1 1 0 2
18:10 2 3 1 6
18:20 4 1 0 5
18:30 0 1 0 1
18:40 2 0 0 2
18:50 3 0 0 3
19:00 1 3 0 4
DRIVE THRU SURVEY
LOCATION: Starbucks, 78752 Highway 111 DAY: Saturday
CITY: La Quinta DATE: 12/14/2024
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
951-268-6268 77
APPENDIX D
HCM ANALYSIS WORKSHEETS
78
EXISTING
TRAFFIC CONDITIONS
79
Generated with
Scenario 1: 1 E AMVersion 2025 (SP 0-1)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Signalized Delay (sec / veh):18.2
Analysis Method:HCM 7th Edition Level Of Service:B
Analysis Period:15 minutes Volume to Capacity (v/c):0.318
YesYesYesYesCrosswalk
NoNoNoNoCurb Present
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft]
001001001001No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
1 1/8/2025
80
Generated with
Scenario 1: 1 E AMVersion 2025 (SP 0-1)
0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
4213952823881224489210131822Total Analysis Volume [veh/h]
103247622301122325806Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
361182242076105386798727419Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386798727419Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
2 1/8/2025
81
Generated with
Scenario 1: 1 E AMVersion 2025 (SP 0-1)
16.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
80Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s]
0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
NoNoNoNoRest In Walk
0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s]
0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s]
0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s]
0.01.01.00.01.01.00.01.01.00.01.01.0All red [s]
0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s]
0229022901780156Maximum Green [s]
Auxiliary Signal Groups
047083025061Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing (Basic)
NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall
0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s]
0105010501050105Minimum Green [s]
--Lead--Lead--Lead--LeadLead / Lag
0.026.017.00.026.017.00.024.016.00.021.013.0Split [s]
Phasing & Timing: Pattern 1
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
3 1/8/2025
82
Generated with
Scenario 1: 1 E AMVersion 2025 (SP 0-1)
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
1.529.691.4310.250.570.539.310.470.428.71d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.110.500.500.110.500.500.11k, delay calibration
34.2436.6134.4836.846.846.8336.638.118.0838.54d1, Uniform Delay [s]
14912314611510771161121992107944c, Capacity [veh/h]
1648178117051781173418701781171918701781s, saturation flow rate [veh/h]
0.030.050.030.050.160.160.050.120.120.01(v / s)_i Volume / Saturation Flow Rate
0.090.070.090.060.620.620.070.580.580.02g / C, Green / Cycle
7.25.56.85.149.749.75.446.246.21.9g_i, Effective Green Time [s]
2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s]
0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s]
80808080808080808080C, Calculated Cycle Length [s]
CLCLCCLCCLLane Group
Lane Group Calculations
47.8096.3444.4190.2479.1183.9488.9666.1269.4522.9195th-Percentile Queue Length [ft/ln]
1.913.851.783.613.163.363.562.642.780.9295th-Percentile Queue Length [veh/ln]
26.5553.5224.6750.1343.9546.6349.4236.7338.5812.7350th-Percentile Queue Length [ft/ln]
1.062.140.992.011.761.871.981.471.540.5150th-Percentile Queue Length [veh/ln]
NoYesYesNoYesNoNoNoNoYesCritical Lane Group
DDDDAADAADLane Group LOS
35.7646.2935.9147.107.417.3645.958.578.5047.25d, Delay for Lane Group [s/veh]
0.370.770.350.770.260.250.760.200.200.50X, volume / capacity
Lane Group Results
4 1/8/2025
83
Generated with
Scenario 1: 1 E AMVersion 2025 (SP 0-1)
Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh]47.25 8.52 8.57 45.95 7.37 7.41 47.10 35.91 35.91 46.29 35.76 35.76
Movement LOS D A A D A A D D D D D D
d_A, Approach Delay [s/veh]10.47 12.74 42.99 42.43
Approach LOS B B D D
d_I, Intersection Delay [s/veh]18.24
Intersection LOS B
Intersection V/C 0.318
Emissions
Vehicle Miles Traveled [mph]1.40 13.77 12.97 7.07 22.66 21.17 2.63 1.52 6.31 3.65
Stops [stops/h]22.91 69.45 66.12 88.96 83.94 79.11 90.24 44.41 96.34 47.80
Fuel consumption [US gal/h]0.54 1.71 1.62 2.21 2.26 2.12 1.31 0.61 1.55 0.75
CO [g/h]38.06 119.43 113.33 154.39 158.07 148.51 91.41 42.75 108.21 52.27
NOx [g/h]7.41 23.24 22.05 30.04 30.76 28.89 17.78 8.32 21.05 10.17
VOC [g/h]8.82 27.68 26.27 35.78 36.63 34.42 21.19 9.91 25.08 12.11
Other Modes
g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
d_p, Pedestrian Delay [s]31.51 31.51 31.51 31.51
I_p,int, Pedestrian LOS Score for Intersectio 2.592 2.620 2.016 2.035
Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000
c_b, Capacity of the bicycle lane [bicycles/h]425 500 550 550
d_b, Bicycle Delay [s]24.81 22.50 21.03 21.03
I_b,int, Bicycle LOS Score for Intersection 1.923 2.106 1.789 1.807
Bicycle LOS A B A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
5 1/8/2025
84
Generated with
Scenario 2: 2 E PMVersion 2025 (SP 0-1)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Signalized Delay (sec / veh):18.8
Analysis Method:HCM 7th Edition Level Of Service:B
Analysis Period:15 minutes Volume to Capacity (v/c):0.356
YesYesYesYesCrosswalk
NoNoNoNoCurb Present
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft]
001001001001No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
1 1/8/2025
85
Generated with
Scenario 2: 2 E PMVersion 2025 (SP 0-1)
0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
4213952823881224489210643360Total Analysis Volume [veh/h]
10324762230112232610815Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
361182242076105386799137352Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386799137352Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
2 1/8/2025
86
Generated with
Scenario 2: 2 E PMVersion 2025 (SP 0-1)
16.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
80Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s]
0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
NoNoNoNoRest In Walk
0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s]
0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s]
0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s]
0.01.01.00.01.01.00.01.01.00.01.01.0All red [s]
0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s]
0229022901680157Maximum Green [s]
Auxiliary Signal Groups
047083025061Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing (Basic)
NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall
0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s]
0105010501050105Minimum Green [s]
--Lead--Lead--Lead--LeadLead / Lag
0.026.016.00.026.016.00.024.015.00.023.014.0Split [s]
Phasing & Timing: Pattern 1
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
3 1/8/2025
87
Generated with
Scenario 2: 2 E PMVersion 2025 (SP 0-1)
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
1.529.771.4310.340.620.579.360.620.5811.48d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.110.500.500.110.500.500.11k, delay calibration
34.2436.6234.4836.857.647.6336.648.408.3937.65d1, Uniform Delay [s]
149123146114103911201211008108083c, Capacity [veh/h]
1648178117051781173418701781174518701781s, saturation flow rate [veh/h]
0.030.050.030.050.160.160.050.150.150.03(v / s)_i Volume / Saturation Flow Rate
0.090.070.090.060.600.600.070.580.580.05g / C, Green / Cycle
7.25.56.85.148.048.05.446.246.23.7g_i, Effective Green Time [s]
2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s]
0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s]
80808080808080808080C, Calculated Cycle Length [s]
CLCLCCLCCLLane Group
Lane Group Calculations
47.8096.4644.4190.3586.6091.9189.0388.3492.9961.1195th-Percentile Queue Length [ft/ln]
1.913.861.783.613.463.683.563.533.722.4495th-Percentile Queue Length [veh/ln]
26.5653.5924.6750.2048.1151.0649.4649.0851.6633.9550th-Percentile Queue Length [ft/ln]
1.062.140.992.011.922.041.981.962.071.3650th-Percentile Queue Length [veh/ln]
NoYesYesNoNoNoYesYesNoNoCritical Lane Group
DDDDAADAADLane Group LOS
35.7646.3935.9147.208.278.2046.009.038.9649.13d, Delay for Lane Group [s/veh]
0.370.770.350.770.260.260.760.260.260.73X, volume / capacity
Lane Group Results
4 1/8/2025
88
Generated with
Scenario 2: 2 E PMVersion 2025 (SP 0-1)
Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh]49.13 8.99 9.03 46.00 8.23 8.27 47.20 35.91 35.91 46.39 35.76 35.76
Movement LOS D A A D A A D D D D D D
d_A, Approach Delay [s/veh]13.01 13.48 43.06 42.49
Approach LOS B B D D
d_I, Intersection Delay [s/veh]18.76
Intersection LOS B
Intersection V/C 0.356
Emissions
Vehicle Miles Traveled [mph]3.83 17.70 16.69 7.07 22.66 21.17 2.63 1.52 6.31 3.65
Stops [stops/h]61.11 92.99 88.34 89.03 91.91 86.60 90.35 44.41 96.46 47.80
Fuel consumption [US gal/h]1.49 2.27 2.15 2.21 2.41 2.27 1.31 0.61 1.55 0.75
CO [g/h]104.21 158.62 150.34 154.52 168.56 158.37 91.56 42.75 108.37 52.27
NOx [g/h]20.28 30.86 29.25 30.06 32.80 30.81 17.82 8.32 21.09 10.17
VOC [g/h]24.15 36.76 34.84 35.81 39.07 36.70 21.22 9.91 25.12 12.11
Other Modes
g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
d_p, Pedestrian Delay [s]31.51 31.51 31.51 31.51
I_p,int, Pedestrian LOS Score for Intersectio 2.638 2.654 2.026 2.036
Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000
c_b, Capacity of the bicycle lane [bicycles/h]475 500 550 550
d_b, Bicycle Delay [s]23.26 22.50 21.03 21.03
I_b,int, Bicycle LOS Score for Intersection 2.054 2.106 1.789 1.807
Bicycle LOS B B A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
5 1/8/2025
89
OPENING YEAR
TRAFFIC CONDITIONS
90
Generated with Adams St and Corporate Centre Dr
Scenario 3: 3 EAC AMTJW Engineering, Inc.Version 2025 (SP 0-1)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Signalized Delay (sec / veh):17.7
Analysis Method:HCM 7th Edition Level Of Service:B
Analysis Period:15 minutes Volume to Capacity (v/c):0.344
YesYesYesYesCrosswalk
NoNoNoNoCurb Present
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft]
001001001001No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
1 1/28/2025
91
Generated with Adams St and Corporate Centre Dr
Scenario 3: 3 EAC AMTJW Engineering, Inc.Version 2025 (SP 0-1)
0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
4313982823911245129410338822Total Analysis Volume [veh/h]
113247623311282426976Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
371184242078107441818933419Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
00000004700550Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386798727419Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
2 1/28/2025
92
Generated with Adams St and Corporate Centre Dr
Scenario 3: 3 EAC AMTJW Engineering, Inc.Version 2025 (SP 0-1)
16.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
80Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s]
0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
NoNoNoNoRest In Walk
0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s]
0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s]
0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s]
0.01.01.00.01.01.00.01.01.00.01.01.0All red [s]
0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s]
0221202212021120189Maximum Green [s]
Auxiliary Signal Groups
047083025061Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing (Basic)
NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall
0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s]
0105010501050105Minimum Green [s]
--Lead--Lead--Lead--LeadLead / Lag
0.026.016.00.026.016.00.025.016.00.022.013.0Split [s]
Phasing & Timing: Pattern 1
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
3 1/28/2025
93
Generated with Adams St and Corporate Centre Dr
Scenario 3: 3 EAC AMTJW Engineering, Inc.Version 2025 (SP 0-1)
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
1.579.571.4310.080.660.619.170.570.528.71d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.110.500.500.110.500.500.11k, delay calibration
34.2636.5234.4836.757.067.0536.578.428.4038.54d1, Uniform Delay [s]
14912714611810801157124997107344c, Capacity [veh/h]
1647178117051781174618701781173818701781s, saturation flow rate [veh/h]
0.030.060.030.050.180.180.050.140.140.01(v / s)_i Volume / Saturation Flow Rate
0.090.070.090.070.620.620.070.570.570.02g / C, Green / Cycle
7.25.76.85.349.649.65.546.046.01.9g_i, Effective Green Time [s]
2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s]
0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s]
80808080808080808080C, Calculated Cycle Length [s]
CLCLCCLCCLLane Group
Lane Group Calculations
48.7499.0944.4192.9791.1796.5390.6280.3384.3222.9195th-Percentile Queue Length [ft/ln]
1.953.961.783.723.653.863.623.213.370.9295th-Percentile Queue Length [veh/ln]
27.0855.0524.6751.6550.6553.6350.3444.6346.8512.7350th-Percentile Queue Length [ft/ln]
1.082.200.992.072.032.152.011.791.870.5150th-Percentile Queue Length [veh/ln]
YesNoNoYesNoNoYesYesNoNoCritical Lane Group
DDDDAADAADLane Group LOS
35.8346.0935.9146.837.727.6645.748.988.9147.25d, Delay for Lane Group [s/veh]
0.380.770.350.770.280.280.760.240.240.50X, volume / capacity
Lane Group Results
4 1/28/2025
94
Generated with Adams St and Corporate Centre Dr
Scenario 3: 3 EAC AMTJW Engineering, Inc.Version 2025 (SP 0-1)
Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh]47.25 8.94 8.98 45.74 7.68 7.72 46.83 35.91 35.91 46.09 35.83 35.83
Movement LOS D A A D A A D D D D D D
d_A, Approach Delay [s/veh]10.59 12.59 42.91 42.36
Approach LOS B B D D
d_I, Intersection Delay [s/veh]17.70
Intersection LOS B
Intersection V/C 0.344
Emissions
Vehicle Miles Traveled [mph]1.40 16.12 15.21 7.23 25.24 23.66 2.72 1.52 6.51 3.72
Stops [stops/h]22.91 84.32 80.33 90.62 96.53 91.17 92.97 44.41 99.09 48.74
Fuel consumption [US gal/h]0.54 2.06 1.96 2.25 2.58 2.43 1.35 0.61 1.59 0.76
CO [g/h]38.06 143.92 136.75 157.23 180.15 169.72 94.09 42.75 111.26 53.29
NOx [g/h]7.41 28.00 26.61 30.59 35.05 33.02 18.31 8.32 21.65 10.37
VOC [g/h]8.82 33.36 31.69 36.44 41.75 39.33 21.81 9.91 25.79 12.35
Other Modes
g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
d_p, Pedestrian Delay [s]31.51 31.51 31.51 31.51
I_p,int, Pedestrian LOS Score for Intersectio 2.632 2.662 2.017 2.037
Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000
c_b, Capacity of the bicycle lane [bicycles/h]450 525 550 550
d_b, Bicycle Delay [s]24.03 21.76 21.03 21.03
I_b,int, Bicycle LOS Score for Intersection 1.983 2.162 1.794 1.814
Bicycle LOS A B A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
5 1/28/2025
95
Generated with Adams St and Corporate Centre Dr
Scenario 4: 4 EAC PMTJW Engineering, Inc.Version 2025 (SP 0-1)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Signalized Delay (sec / veh):18.3
Analysis Method:HCM 7th Edition Level Of Service:B
Analysis Period:15 minutes Volume to Capacity (v/c):0.385
YesYesYesYesCrosswalk
NoNoNoNoCurb Present
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft]
001001001001No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
1 1/28/2025
96
Generated with Adams St and Corporate Centre Dr
Scenario 4: 4 EAC PMTJW Engineering, Inc.Version 2025 (SP 0-1)
0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
4313982823911245359410850862Total Analysis Volume [veh/h]
11324762331134242712715Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
371184242078107461819343753Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
00000006700570Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386799137352Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
2 1/28/2025
97
Generated with Adams St and Corporate Centre Dr
Scenario 4: 4 EAC PMTJW Engineering, Inc.Version 2025 (SP 0-1)
16.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
80Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s]
0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
NoNoNoNoRest In Walk
0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s]
0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s]
0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s]
0.01.01.00.01.01.00.01.01.00.01.01.0All red [s]
0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s]
02212022120201101910Maximum Green [s]
Auxiliary Signal Groups
047083025061Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing (Basic)
NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall
0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s]
0105010501050105Minimum Green [s]
--Lead--Lead--Lead--LeadLead / Lag
0.026.016.00.026.016.00.024.015.00.023.014.0Split [s]
Phasing & Timing: Pattern 1
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
3 1/28/2025
98
Generated with Adams St and Corporate Centre Dr
Scenario 4: 4 EAC PMTJW Engineering, Inc.Version 2025 (SP 0-1)
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
1.579.571.4310.080.760.719.210.750.7011.98d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.110.500.500.110.500.500.11k, delay calibration
34.2636.5234.4836.757.977.9736.578.758.7437.63d1, Uniform Delay [s]
149127146118104311151241009107384c, Capacity [veh/h]
1647178117051781175018701781175818701781s, saturation flow rate [veh/h]
0.030.060.030.050.180.180.050.170.170.03(v / s)_i Volume / Saturation Flow Rate
0.090.070.090.070.600.600.070.570.570.05g / C, Green / Cycle
7.25.76.85.347.847.85.546.046.03.8g_i, Effective Green Time [s]
2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s]
0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s]
80808080808080808080C, Calculated Cycle Length [s]
CLCLCCLCCLLane Group
Lane Group Calculations
48.7499.0944.4192.97104.59110.6490.66105.10110.4463.4795th-Percentile Queue Length [ft/ln]
1.953.961.783.724.184.433.634.204.422.5495th-Percentile Queue Length [veh/ln]
27.0855.0524.6751.6558.1161.4650.3758.3961.3635.2650th-Percentile Queue Length [ft/ln]
1.082.200.992.072.322.462.012.342.451.4150th-Percentile Queue Length [veh/ln]
YesNoNoYesNoNoYesYesNoNoCritical Lane Group
DDDDAADAADLane Group LOS
35.8346.0935.9146.838.738.6745.789.509.4449.62d, Delay for Lane Group [s/veh]
0.380.770.350.770.310.300.760.300.300.74X, volume / capacity
Lane Group Results
4 1/28/2025
99
Generated with Adams St and Corporate Centre Dr
Scenario 4: 4 EAC PMTJW Engineering, Inc.Version 2025 (SP 0-1)
Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh]49.62 9.46 9.50 45.78 8.69 8.73 46.83 35.91 35.91 46.09 35.83 35.83
Movement LOS D A A D A A D D D D D D
d_A, Approach Delay [s/veh]13.14 13.33 42.91 42.36
Approach LOS B B D D
d_I, Intersection Delay [s/veh]18.28
Intersection LOS B
Intersection V/C 0.385
Emissions
Vehicle Miles Traveled [mph]3.96 20.21 19.10 7.23 26.13 24.54 2.72 1.52 6.51 3.72
Stops [stops/h]63.47 110.44 105.10 90.66 110.64 104.59 92.97 44.41 99.09 48.74
Fuel consumption [US gal/h]1.55 2.67 2.54 2.25 2.87 2.71 1.35 0.61 1.59 0.76
CO [g/h]108.39 186.93 177.57 157.32 200.70 189.33 94.09 42.75 111.26 53.29
NOx [g/h]21.09 36.37 34.55 30.61 39.05 36.84 18.31 8.32 21.65 10.37
VOC [g/h]25.12 43.32 41.15 36.46 46.52 43.88 21.81 9.91 25.79 12.35
Other Modes
g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
d_p, Pedestrian Delay [s]31.51 31.51 31.51 31.51
I_p,int, Pedestrian LOS Score for Intersectio 2.687 2.704 2.028 2.039
Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000
c_b, Capacity of the bicycle lane [bicycles/h]475 500 550 550
d_b, Bicycle Delay [s]23.26 22.50 21.03 21.03
I_b,int, Bicycle LOS Score for Intersection 2.119 2.181 1.794 1.814
Bicycle LOS B B A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
5 1/28/2025
100
OPENING YEAR PLUS PROJECT
TRAFFIC CONDITIONS
101
Generated with Adams St and Corporate Centre Dr
Scenario 5: 5 EACP AMTJW Engineering, Inc.Version 2025 (SP 0-1)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Signalized Delay (sec / veh):25.2
Analysis Method:HCM 7th Edition Level Of Service:C
Analysis Period:15 minutes Volume to Capacity (v/c):0.516
YesYesYesYesCrosswalk
NoNoNoNoCurb Present
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft]
001001001001No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
1 1/28/2025
102
Generated with Adams St and Corporate Centre Dr
Scenario 5: 5 EACP AMTJW Engineering, Inc.Version 2025 (SP 0-1)
0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
4313981302317421151294103388128Total Analysis Volume [veh/h]
11324336445312824269732Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
371184112201501824418189334110Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000880727547005591Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386798727419Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
2 1/28/2025
103
Generated with Adams St and Corporate Centre Dr
Scenario 5: 5 EACP AMTJW Engineering, Inc.Version 2025 (SP 0-1)
16.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
90Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s]
0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
NoNoNoNoRest In Walk
0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s]
0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s]
0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s]
0.01.01.00.01.01.00.01.01.00.01.01.0All red [s]
0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s]
02212022120201201810Maximum Green [s]
Auxiliary Signal Groups
047083025061Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing (Basic)
NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall
0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s]
0105010501050105Minimum Green [s]
--Lead--Lead--Lead--LeadLead / Lag
0.026.019.00.026.019.00.028.019.00.026.017.0Split [s]
Phasing & Timing: Pattern 1
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
3 1/28/2025
104
Generated with Adams St and Corporate Centre Dr
Scenario 5: 5 EACP AMTJW Engineering, Inc.Version 2025 (SP 0-1)
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
1.849.514.398.991.261.149.260.620.578.02d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.120.500.500.110.500.500.11k, delay calibration
39.0041.0837.4538.8012.6012.6041.1510.5610.5440.01d1, Uniform Delay [s]
1401272142108909871239551028163c, Capacity [veh/h]
1647178116261781168718701781173718701781s, saturation flow rate [veh/h]
0.030.060.090.100.200.200.050.140.140.07(v / s)_i Volume / Saturation Flow Rate
0.080.070.130.120.530.530.070.550.550.09g / C, Green / Cycle
7.66.411.810.647.647.66.249.649.68.2g_i, Effective Green Time [s]
2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s]
0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s]
90909090909090909090C, Calculated Cycle Length [s]
CLCLCCLCCLLane Group
Lane Group Calculations
56.00111.06156.63191.29173.57190.01102.31102.33108.39135.1895th-Percentile Queue Length [ft/ln]
2.244.446.277.656.947.604.094.094.345.4195th-Percentile Queue Length [veh/ln]
31.1161.7087.01106.6296.43105.7056.8456.8560.2275.1050th-Percentile Queue Length [ft/ln]
1.242.473.484.263.864.232.272.272.413.0050th-Percentile Queue Length [veh/ln]
NoYesYesNoYesNoNoNoNoYesCritical Lane Group
DDDDBBDBBDLane Group LOS
40.8550.5841.8547.7913.8713.7350.4111.1811.1148.03d, Delay for Lane Group [s/veh]
0.400.770.710.830.390.380.760.250.250.78X, volume / capacity
Lane Group Results
4 1/28/2025
105
Generated with Adams St and Corporate Centre Dr
Scenario 5: 5 EACP AMTJW Engineering, Inc.Version 2025 (SP 0-1)
Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh]48.03 11.14 11.18 50.41 13.77 13.87 47.79 41.85 41.85 50.58 40.85 40.85
Movement LOS D B B D B B D D D D D D
d_A, Approach Delay [s/veh]18.77 18.01 45.01 47.04
Approach LOS B B D D
d_I, Intersection Delay [s/veh]25.19
Intersection LOS C
Intersection V/C 0.516
Emissions
Vehicle Miles Traveled [mph]8.17 16.17 15.16 7.23 29.19 26.40 5.20 4.57 6.51 3.72
Stops [stops/h]120.16 96.34 90.96 90.94 169.12 154.29 170.59 139.22 98.72 49.78
Fuel consumption [US gal/h]3.02 2.33 2.19 2.34 4.16 3.79 2.58 2.04 1.68 0.82
CO [g/h]211.44 162.53 153.18 163.76 291.09 265.09 180.35 142.77 117.43 57.57
NOx [g/h]41.14 31.62 29.80 31.86 56.63 51.58 35.09 27.78 22.85 11.20
VOC [g/h]49.00 37.67 35.50 37.95 67.46 61.44 41.80 33.09 27.22 13.34
Other Modes
g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45
I_p,int, Pedestrian LOS Score for Intersectio 2.699 2.717 2.126 2.043
Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000
c_b, Capacity of the bicycle lane [bicycles/h]489 533 489 489
d_b, Bicycle Delay [s]25.69 24.20 25.69 25.69
I_b,int, Bicycle LOS Score for Intersection 2.070 2.234 2.099 1.814
Bicycle LOS B B B A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
5 1/28/2025
106
Generated with Adams St and Corporate Centre Dr
Scenario 6: 6 EACP PMTJW Engineering, Inc.Version 2025 (SP 0-1)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Signalized Delay (sec / veh):22.2
Analysis Method:HCM 7th Edition Level Of Service:C
Analysis Period:15 minutes Volume to Capacity (v/c):0.450
YesYesYesYesCrosswalk
NoNoNoNoCurb Present
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft]
001001001001No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
1 1/28/2025
107
Generated with Adams St and Corporate Centre Dr
Scenario 6: 6 EACP PMTJW Engineering, Inc.Version 2025 (SP 0-1)
0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
431398752312916353594108508109Total Analysis Volume [veh/h]
113241963241134242712727Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
3711846520111140461819343794Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000410333367005741Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386799137352Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
2 1/28/2025
108
Generated with Adams St and Corporate Centre Dr
Scenario 6: 6 EACP PMTJW Engineering, Inc.Version 2025 (SP 0-1)
16.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
90Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s]
0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
NoNoNoNoRest In Walk
0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s]
0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s]
0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s]
0.01.01.00.01.01.00.01.01.00.01.01.0All red [s]
0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s]
02211022110211102010Maximum Green [s]
Auxiliary Signal Groups
047083025061Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing (Basic)
NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall
0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s]
0105010501050105Minimum Green [s]
--Lead--Lead--Lead--LeadLead / Lag
0.026.018.00.026.018.00.028.018.00.028.018.0Split [s]
Phasing & Timing: Pattern 1
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
3 1/28/2025
109
Generated with Adams St and Corporate Centre Dr
Scenario 6: 6 EACP PMTJW Engineering, Inc.Version 2025 (SP 0-1)
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
1.849.602.918.560.960.889.300.740.698.55d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.110.500.500.110.500.500.11k, delay calibration
39.0041.0938.3440.0910.4810.4841.169.709.7040.62d1, Uniform Delay [s]
140127173162976106012310141079141c, Capacity [veh/h]
1647178116471781172218701781175818701781s, saturation flow rate [veh/h]
0.030.060.060.070.190.190.050.170.170.06(v / s)_i Volume / Saturation Flow Rate
0.080.070.100.090.570.570.070.580.580.08g / C, Green / Cycle
7.66.49.48.251.151.16.252.052.07.1g_i, Effective Green Time [s]
2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s]
0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s]
90909090909090909090C, Calculated Cycle Length [s]
CLCLCCLCCLLane Group
Lane Group Calculations
56.00111.1998.81142.95147.27158.36102.35122.66129.27116.7595th-Percentile Queue Length [ft/ln]
2.244.453.955.725.896.334.094.915.174.6795th-Percentile Queue Length [veh/ln]
31.1161.7754.8979.4281.8287.9856.8668.1571.8264.8650th-Percentile Queue Length [ft/ln]
1.242.472.203.183.273.522.272.732.872.5950th-Percentile Queue Length [veh/ln]
NoYesYesNoYesNoNoNoNoYesCritical Lane Group
DDDDBBDBBDLane Group LOS
40.8550.6941.2448.6411.4411.3650.4510.4410.3949.17d, Delay for Lane Group [s/veh]
0.400.770.570.800.340.340.760.290.290.77X, volume / capacity
Lane Group Results
4 1/28/2025
110
Generated with Adams St and Corporate Centre Dr
Scenario 6: 6 EACP PMTJW Engineering, Inc.Version 2025 (SP 0-1)
Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh]49.17 10.41 10.44 50.45 11.38 11.44 48.64 41.24 41.24 50.69 40.85 40.85
Movement LOS D B B D B B D D D D D D
d_A, Approach Delay [s/veh]16.24 16.03 45.45 47.11
Approach LOS B B D D
d_I, Intersection Delay [s/veh]22.15
Intersection LOS C
Intersection V/C 0.450
Emissions
Vehicle Miles Traveled [mph]6.96 20.22 19.08 7.23 27.90 25.77 3.85 2.93 6.51 3.72
Stops [stops/h]103.78 114.91 109.04 90.98 140.76 130.90 127.06 87.83 98.84 49.78
Fuel consumption [US gal/h]2.62 2.79 2.65 2.34 3.55 3.29 1.94 1.29 1.68 0.82
CO [g/h]183.09 195.15 184.92 163.84 247.81 230.06 135.44 90.25 117.61 57.57
NOx [g/h]35.62 37.97 35.98 31.88 48.22 44.76 26.35 17.56 22.88 11.20
VOC [g/h]42.43 45.23 42.86 37.97 57.43 53.32 31.39 20.92 27.26 13.34
Other Modes
g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45
I_p,int, Pedestrian LOS Score for Intersectio 2.721 2.732 2.080 2.044
Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000
c_b, Capacity of the bicycle lane [bicycles/h]533 533 489 489
d_b, Bicycle Delay [s]24.20 24.20 25.69 25.69
I_b,int, Bicycle LOS Score for Intersection 2.158 2.213 1.934 1.814
Bicycle LOS B B A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
5 1/28/2025
111
OPENING YEAR PLUS PROJECT PLUS
ALTERNATIVE #1
TRAFFIC CONDITIONS
112
Generated with Adams St and Corporate Centre Dr
Scenario 11: 11 EACP Alt 1 AMTJW Engineering, Inc.Version 2025 (SP 0-1)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Signalized Delay (sec / veh):24.4
Analysis Method:HCM 7th Edition Level Of Service:C
Analysis Period:15 minutes Volume to Capacity (v/c):0.626
YesYesYesYesCrosswalk
NoNoNoNoCurb Present
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft]
001001001001No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
1 1/28/2025
113
Generated with Adams St and Corporate Centre Dr
Scenario 11: 11 EACP Alt 1 AMTJW Engineering, Inc.Version 2025 (SP 0-1)
0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
4313981302317421151294103388128Total Analysis Volume [veh/h]
11324336445312824269732Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
371184112201501824418189334110Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000880727547005591Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386798727419Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
2 1/28/2025
114
Generated with Adams St and Corporate Centre Dr
Scenario 11: 11 EACP Alt 1 AMTJW Engineering, Inc.Version 2025 (SP 0-1)
16.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
80Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
0.02.02.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s]
0.02.02.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
NoNoNoNoRest In Walk
0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s]
0.017.00.00.017.00.00.014.00.00.014.00.0Pedestrian Clearance [s]
0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s]
0.01.01.00.01.00.00.01.01.00.01.01.0All red [s]
0.03.03.00.03.00.00.03.03.00.03.03.0Amber [s]
0361002200211301911Maximum Green [s]
Auxiliary Signal Groups
047080025061Signal Group
PermissPermissProtectePermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing (Basic)
NoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoMinimum Recall
0.03.03.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s]
0105010001050105Minimum Green [s]
--Lead-----Lead--LeadLead / Lag
0.040.014.00.026.00.00.025.017.00.023.015.0Split [s]
Phasing & Timing: Pattern 1
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
3 1/28/2025
115
Generated with Adams St and Corporate Centre Dr
Scenario 11: 11 EACP Alt 1 AMTJW Engineering, Inc.Version 2025 (SP 0-1)
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
0.089.811.191.672.272.049.441.010.927.83d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.110.500.500.110.500.500.11k, delay calibration
18.4736.5527.7532.4116.5516.5436.6014.0714.0535.53d1, Uniform Delay [s]
547126313306719796123780839164c, Capacity [veh/h]
1647178114801020168718701781173718701781s, saturation flow rate [veh/h]
0.030.060.100.170.200.200.050.140.140.07(v / s)_i Volume / Saturation Flow Rate
0.330.070.210.210.430.430.070.450.450.09g / C, Green / Cycle
26.55.716.916.934.134.15.535.935.97.4g_i, Effective Green Time [s]
2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s]
0.000.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s]
80808080808080808080C, Calculated Cycle Length [s]
CLCCCCLCCLLane Group
Lane Group Calculations
32.3699.42118.87150.38196.44210.7390.98117.25124.08119.1595th-Percentile Queue Length [ft/ln]
1.293.984.756.027.868.433.644.694.964.7795th-Percentile Queue Length [veh/ln]
17.9855.2466.0483.55110.31120.6650.5565.1468.9366.2050th-Percentile Queue Length [ft/ln]
0.722.212.643.344.414.832.022.612.762.6550th-Percentile Queue Length [veh/ln]
NoYesNoYesYesNoNoNoNoYesCritical Lane Group
BDCCBBDBBDLane Group LOS
18.5646.3628.9434.0818.8218.5846.0415.0814.9843.36d, Delay for Lane Group [s/veh]
0.100.780.490.570.480.480.760.300.300.78X, volume / capacity
Lane Group Results
4 1/28/2025
116
Generated with Adams St and Corporate Centre Dr
Scenario 11: 11 EACP Alt 1 AMTJW Engineering, Inc.Version 2025 (SP 0-1)
Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh]43.36 15.01 15.08 46.04 18.64 18.82 34.08 28.94 28.94 46.36 18.56 18.56
Movement LOS D B B D B B C C C D B B
d_A, Approach Delay [s/veh]20.89 21.84 31.68 36.25
Approach LOS C C C D
d_I, Intersection Delay [s/veh]24.37
Intersection LOS C
Intersection V/C 0.626
Emissions
Vehicle Miles Traveled [mph]8.17 16.17 15.16 7.23 29.19 26.40 5.20 4.57 6.51 3.72
Stops [stops/h]119.15 124.08 117.25 90.98 217.18 198.56 150.38 118.87 99.42 32.36
Fuel consumption [US gal/h]2.89 2.87 2.71 2.26 5.14 4.69 2.02 1.56 1.60 0.50
CO [g/h]202.08 200.55 189.20 157.95 359.04 327.76 141.02 109.22 111.73 35.14
NOx [g/h]39.32 39.02 36.81 30.73 69.86 63.77 27.44 21.25 21.74 6.84
VOC [g/h]46.83 46.48 43.85 36.61 83.21 75.96 32.68 25.31 25.89 8.15
Other Modes
g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
d_p, Pedestrian Delay [s]31.51 31.51 31.51 31.51
I_p,int, Pedestrian LOS Score for Intersectio 2.693 2.959 2.120 2.203
Crosswalk LOS B C B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000
c_b, Capacity of the bicycle lane [bicycles/h]475 525 550 900
d_b, Bicycle Delay [s]23.26 21.76 21.03 12.10
I_b,int, Bicycle LOS Score for Intersection 2.070 2.234 1.829 1.814
Bicycle LOS B B A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4-21Ring 1
Sequence
5 1/28/2025
117
Generated with Adams St and Corporate Centre Dr
Scenario 12: 12 EACP Alt 1 PMTJW Engineering, Inc.Version 2025 (SP 0-1)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Signalized Delay (sec / veh):22.0
Analysis Method:HCM 7th Edition Level Of Service:C
Analysis Period:15 minutes Volume to Capacity (v/c):0.560
YesYesYesYesCrosswalk
NoNoNoNoCurb Present
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft]
001001001001No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
1 1/28/2025
118
Generated with Adams St and Corporate Centre Dr
Scenario 12: 12 EACP Alt 1 PMTJW Engineering, Inc.Version 2025 (SP 0-1)
0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
431398752312916353594108508109Total Analysis Volume [veh/h]
113241963241134242712727Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
3711846520111140461819343794Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000410333367005741Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386799137352Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
2 1/28/2025
119
Generated with Adams St and Corporate Centre Dr
Scenario 12: 12 EACP Alt 1 PMTJW Engineering, Inc.Version 2025 (SP 0-1)
16.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
80Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
0.02.02.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s]
0.02.02.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
NoNoNoNoRest In Walk
0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s]
0.017.00.00.017.00.00.010.00.00.014.00.0Pedestrian Clearance [s]
0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s]
0.01.01.00.01.00.00.01.01.00.01.01.0All red [s]
0.03.03.00.03.00.00.03.03.00.03.03.0Amber [s]
0361002200211202011Maximum Green [s]
Auxiliary Signal Groups
047080025061Signal Group
PermissPermissProtectePermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing (Basic)
NoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoMinimum Recall
0.03.03.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s]
0105010001050105Minimum Green [s]
--Lead-----Lead--LeadLead / Lag
0.040.014.00.026.00.00.025.016.00.024.015.0Split [s]
Phasing & Timing: Pattern 1
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
3 1/28/2025
120
Generated with Adams St and Corporate Centre Dr
Scenario 12: 12 EACP Alt 1 PMTJW Engineering, Inc.Version 2025 (SP 0-1)
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
0.109.810.841.511.551.429.401.151.088.49d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.110.500.500.110.500.500.11k, delay calibration
20.3536.5528.9133.9413.8713.8636.6012.9312.9236.10d1, Uniform Delay [s]
492126267257812882123847901142c, Capacity [veh/h]
164717811499939172218701781175818701781s, saturation flow rate [veh/h]
0.030.060.070.140.190.190.050.170.170.06(v / s)_i Volume / Saturation Flow Rate
0.300.070.180.180.470.470.070.480.480.08g / C, Green / Cycle
23.95.714.314.337.737.75.538.638.66.4g_i, Effective Green Time [s]
2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s]
0.000.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s]
80808080808080808080C, Calculated Cycle Length [s]
CLCCCCLCCLLane Group
Lane Group Calculations
34.3399.4276.44112.74168.82181.3390.92141.09148.59103.2895th-Percentile Queue Length [ft/ln]
1.373.983.064.516.757.253.645.645.944.1395th-Percentile Queue Length [veh/ln]
19.0755.2442.4662.6393.79100.7450.5178.3882.5557.3850th-Percentile Queue Length [ft/ln]
0.762.211.702.513.754.032.023.143.302.3050th-Percentile Queue Length [veh/ln]
NoYesNoYesYesNoNoNoNoYesCritical Lane Group
CDCDBBDBBDLane Group LOS
20.4546.3629.7535.4515.4215.2845.9914.0914.0044.59d, Delay for Lane Group [s/veh]
0.110.780.370.500.410.410.760.350.350.77X, volume / capacity
Lane Group Results
4 1/28/2025
121
Generated with Adams St and Corporate Centre Dr
Scenario 12: 12 EACP Alt 1 PMTJW Engineering, Inc.Version 2025 (SP 0-1)
Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh]44.59 14.03 14.09 45.99 15.32 15.42 35.45 29.75 29.75 46.36 20.45 20.45
Movement LOS D B B D B B D C C D C C
d_A, Approach Delay [s/veh]18.64 18.98 32.99 36.94
Approach LOS B B C D
d_I, Intersection Delay [s/veh]21.98
Intersection LOS C
Intersection V/C 0.560
Emissions
Vehicle Miles Traveled [mph]6.96 20.22 19.08 7.23 27.90 25.77 3.85 2.93 6.51 3.72
Stops [stops/h]103.28 148.59 141.09 90.92 181.33 168.82 112.74 76.44 99.42 34.33
Fuel consumption [US gal/h]2.51 3.44 3.27 2.26 4.34 4.03 1.54 1.02 1.60 0.53
CO [g/h]175.56 240.71 228.29 157.84 303.32 281.95 107.38 71.17 111.73 37.18
NOx [g/h]34.16 46.83 44.42 30.71 59.01 54.86 20.89 13.85 21.74 7.23
VOC [g/h]40.69 55.79 52.91 36.58 70.30 65.34 24.89 16.49 25.89 8.62
Other Modes
g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
d_p, Pedestrian Delay [s]31.51 31.51 31.51 31.51
I_p,int, Pedestrian LOS Score for Intersectio 2.715 2.910 2.075 2.204
Crosswalk LOS B C B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000
c_b, Capacity of the bicycle lane [bicycles/h]500 525 550 900
d_b, Bicycle Delay [s]22.50 21.76 21.03 12.10
I_b,int, Bicycle LOS Score for Intersection 2.158 2.213 1.747 1.814
Bicycle LOS B B A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4-21Ring 1
Sequence
5 1/28/2025
122
OPENING YEAR PLUS PROJECT PLUS
ALTERNATIVE #2
TRAFFIC CONDITIONS
123
Generated with Adams St and Corporate Centre Dr
Scenario 7: 7 EACP Alt 2 AMTJW Engineering, Inc.Version 2025 (SP 0-1)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Signalized Delay (sec / veh):31.6
Analysis Method:HCM 7th Edition Level Of Service:C
Analysis Period:15 minutes Volume to Capacity (v/c):0.784
YesYesYesYesCrosswalk
NoNoNoNoCurb Present
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00110.00100.00100.00110.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft]
001001000000No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
1 1/28/2025
124
Generated with Adams St and Corporate Centre Dr
Scenario 7: 7 EACP Alt 2 AMTJW Engineering, Inc.Version 2025 (SP 0-1)
0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
4313981302317421151294103388128Total Analysis Volume [veh/h]
11324336445312824269732Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
371184112201501824418189334110Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000880727547005591Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386798727419Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
2 1/28/2025
125
Generated with Adams St and Corporate Centre Dr
Scenario 7: 7 EACP Alt 2 AMTJW Engineering, Inc.Version 2025 (SP 0-1)
16.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
150Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s]
0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s]
NoNoNoNoRest In Walk
0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s]
0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s]
0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s]
0.01.01.00.01.01.00.01.00.00.01.00.0All red [s]
0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s]
022100221004600460Maximum Green [s]
Auxiliary Signal Groups
047083020060Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type
Phasing & Timing (Basic)
NoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoMinimum Recall
0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s]
0105010501000100Minimum Green [s]
--Lead--Lead------Lead / Lag
0.026.023.00.028.025.00.099.00.00.099.00.0Split [s]
Phasing & Timing: Pattern 1
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
3 1/28/2025
126
Generated with Adams St and Corporate Centre Dr
Scenario 7: 7 EACP Alt 2 AMTJW Engineering, Inc.Version 2025 (SP 0-1)
1.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.00d3, Initial Queue Delay [s]
3.8412.0912.1021.044.044.18d2, Incremental Delay [s]
1.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.220.500.50k, delay calibration
67.8268.9665.8265.7210.5311.58d1, Uniform Delay [s]
1081211761971129905c, Capacity [veh/h]
164717811626178114821178s, saturation flow rate [veh/h]
0.030.060.090.100.550.53(v / s)_i Volume / Saturation Flow Rate
0.060.070.110.110.740.74g / C, Green / Cycle
9.710.116.216.6111.7111.7g_i, Effective Green Time [s]
2.002.002.002.002.002.00l2, Clearance Lost Time [s]
0.000.000.000.002.002.00l1_p, Permitted Start-Up Lost Time [s]
4.004.004.004.004.004.00L, Total Lost Time per Cycle [s]
150150150150150150C, Calculated Cycle Length [s]
CLCLCCLane Group
Lane Group Calculations
99.87187.18264.37309.07498.46446.0495th-Percentile Queue Length [ft/ln]
3.997.4910.5712.3619.9417.8495th-Percentile Queue Length [veh/ln]
55.49103.99160.49194.66345.94303.2550th-Percentile Queue Length [ft/ln]
2.224.166.427.7913.8412.1350th-Percentile Queue Length [veh/ln]
NoYesYesNoYesNoCritical Lane Group
EFEFBBLane Group LOS
71.6681.0577.9286.7614.5715.76d, Delay for Lane Group [s/veh]
0.520.810.870.880.720.68X, volume / capacity
Lane Group Results
4 1/28/2025
127
Generated with Adams St and Corporate Centre Dr
Scenario 7: 7 EACP Alt 2 AMTJW Engineering, Inc.Version 2025 (SP 0-1)
Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh]15.76 15.76 15.76 14.57 14.57 14.57 86.76 77.92 77.92 81.05 71.66 71.66
Movement LOS B B B B B B F E E F E E
d_A, Approach Delay [s/veh]15.76 14.57 82.63 77.64
Approach LOS B B F E
d_I, Intersection Delay [s/veh]31.63
Intersection LOS C
Intersection V/C 0.784
Emissions
Vehicle Miles Traveled [mph]39.50 62.81 5.20 4.57 6.51 3.72
Stops [stops/h]291.12 332.10 186.88 154.07 99.83 53.27
Fuel consumption [US gal/h]6.96 8.70 4.02 3.22 2.29 1.19
CO [g/h]486.44 608.44 281.17 225.25 160.19 83.04
NOx [g/h]94.64 118.38 54.70 43.82 31.17 16.16
VOC [g/h]112.74 141.01 65.16 52.20 37.12 19.25
Other Modes
g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
d_p, Pedestrian Delay [s]66.27 66.27 66.27 66.27
I_p,int, Pedestrian LOS Score for Intersectio 2.628 2.659 2.332 2.201
Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000
c_b, Capacity of the bicycle lane [bicycles/h]1267 1267 320 293
d_b, Bicycle Delay [s]10.08 10.08 52.92 54.61
I_b,int, Bicycle LOS Score for Intersection 2.581 2.908 2.099 1.814
Bicycle LOS B C B A
----------------Ring 4
----------------Ring 3
------------876-Ring 2
------------432-Ring 1
Sequence
5 1/28/2025
128
Generated with Adams St and Corporate Centre Dr
Scenario 8: 8 EACP Alt 2 PMTJW Engineering, Inc.Version 2025 (SP 0-1)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Signalized Delay (sec / veh):24.6
Analysis Method:HCM 7th Edition Level Of Service:C
Analysis Period:15 minutes Volume to Capacity (v/c):1.103
YesYesYesYesCrosswalk
NoNoNoNoCurb Present
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00110.00100.00100.00110.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft]
001001000000No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
1 1/28/2025
129
Generated with Adams St and Corporate Centre Dr
Scenario 8: 8 EACP Alt 2 PMTJW Engineering, Inc.Version 2025 (SP 0-1)
0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
431398752312916353594108508109Total Analysis Volume [veh/h]
113241963241134242712727Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
3711846520111140461819343794Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000410333367005741Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386799137352Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
2 1/28/2025
130
Generated with Adams St and Corporate Centre Dr
Scenario 8: 8 EACP Alt 2 PMTJW Engineering, Inc.Version 2025 (SP 0-1)
16.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s]
0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
NoNoNoNoRest In Walk
0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s]
0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s]
0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s]
0.01.01.00.01.01.00.01.01.00.01.01.0All red [s]
0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s]
02212022120151002110Maximum Green [s]
Auxiliary Signal Groups
047083025061Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtPerPermissPermissProtPerControl Type
Phasing & Timing (Basic)
NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoYesNoYesMinimum Recall
0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s]
0105010501050105Minimum Green [s]
--Lead--Lead--Lead--LeadLead / Lag
0.026.016.00.026.016.00.019.053.00.025.059.0Split [s]
Phasing & Timing: Pattern 1
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
3 1/28/2025
131
Generated with Adams St and Corporate Centre Dr
Scenario 8: 8 EACP Alt 2 PMTJW Engineering, Inc.Version 2025 (SP 0-1)
1.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.00d3, Initial Queue Delay [s]
3.0311.385.1018.684.855.93d2, Incremental Delay [s]
1.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.200.500.50k, delay calibration
53.6255.0752.9153.918.779.60d1, Uniform Delay [s]
1171221471551058945c, Capacity [veh/h]
164717811647178113361181s, saturation flow rate [veh/h]
0.030.060.060.070.590.61(v / s)_i Volume / Saturation Flow Rate
0.070.070.090.090.740.74g / C, Green / Cycle
8.58.210.710.489.189.1g_i, Effective Green Time [s]
2.002.002.002.000.000.00l2, Clearance Lost Time [s]
0.000.000.000.002.002.00l1_p, Permitted Start-Up Lost Time [s]
4.004.004.004.004.004.00L, Total Lost Time per Cycle [s]
120120120120120120C, Calculated Cycle Length [s]
CLCLCCLane Group
Lane Group Calculations
78.30149.87139.29205.26384.63393.0695th-Percentile Queue Length [ft/ln]
3.135.995.578.2115.3915.7295th-Percentile Queue Length [veh/ln]
43.5083.2677.38116.68253.95260.6750th-Percentile Queue Length [ft/ln]
1.743.333.104.6710.1610.4350th-Percentile Queue Length [veh/ln]
NoYesYesNoYesYesCritical Lane Group
EEEEBBLane Group LOS
56.6566.4558.0172.5913.6215.53d, Delay for Lane Group [s/veh]
0.480.800.670.830.750.77X, volume / capacity
Lane Group Results
4 1/28/2025
132
Generated with Adams St and Corporate Centre Dr
Scenario 8: 8 EACP Alt 2 PMTJW Engineering, Inc.Version 2025 (SP 0-1)
Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh]15.53 15.53 15.53 13.62 13.62 13.62 72.59 58.01 58.01 66.45 56.65 56.65
Movement LOS B B B B B B E E E E E E
d_A, Approach Delay [s/veh]15.53 13.62 66.30 62.89
Approach LOS B B E E
d_I, Intersection Delay [s/veh]24.65
Intersection LOS C
Intersection V/C 1.103
Emissions
Vehicle Miles Traveled [mph]46.26 60.89 3.85 2.93 6.51 3.72
Stops [stops/h]312.80 304.75 140.02 92.86 99.91 52.20
Fuel consumption [US gal/h]7.77 8.07 2.62 1.64 2.00 1.01
CO [g/h]542.84 564.21 182.85 114.97 139.86 70.80
NOx [g/h]105.62 109.78 35.58 22.37 27.21 13.78
VOC [g/h]125.81 130.76 42.38 26.64 32.41 16.41
Other Modes
g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
d_p, Pedestrian Delay [s]51.34 51.34 51.34 51.34
I_p,int, Pedestrian LOS Score for Intersectio 2.654 2.673 3.125 3.185
Crosswalk LOS B B C C
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000
c_b, Capacity of the bicycle lane [bicycles/h]1233 1233 367 367
d_b, Bicycle Delay [s]8.82 8.82 40.02 40.02
I_b,int, Bicycle LOS Score for Intersection 2.756 2.866 1.934 1.814
Bicycle LOS C C A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
5 1/28/2025
133
OPENING YEAR PLUS PROJECT PLUS
ALTERNATIVE #3
TRAFFIC CONDITIONS
134
Generated with Adams St and Corporate Centre Dr
Scenario 9: 9 EACP Alt 3 AMTJW Engineering, Inc.Version 2025 (SP 0-1)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Roundabout Delay (sec / veh):14.6
Analysis Method:HCM 7th Edition Level Of Service:B
Analysis Period:15 minutes
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft]
000000000000No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
0000Pedestrian Volume [ped/h]
4313981302317421151294103388128Total Analysis Volume [veh/h]
11324336445312824269732Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
371184112201501824418189334110Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000880727547005591Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386798727419Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
1 1/28/2025
135
Generated with Adams St and Corporate Centre Dr
Scenario 9: 9 EACP Alt 3 AMTJW Engineering, Inc.Version 2025 (SP 0-1)
4313981302317421151294103388128Adjusted Demand Flow Rate [veh/h]
371184112201501824418189334110Demand Flow Rate [veh/h]
224359617755Exiting Flow Rate [veh/h]
704718244297Circulating Flow Rate [veh/h]
1111Number of Conflicting Circulating Lanes
Intersection Settings
0.230.500.770.62X, volume / capacity
66065110561000Capacity per Entry Lane [veh/h]
1.001.001.001.00Pedestrian Impedance
67466410771020Capacity of Entry and Bypass Lanes [veh/h]
158334834632Entry Flow Rate [veh/h]
0.980.980.980.98HV Adjustment Factor
0.001020.001020.001020.00102B (coefficient)
1380.001380.001380.001380.00A (intercept)
3.003.003.003.00User-Defined Follow-Up Time [s]
NoNoNoNoOverwrite Calculated Follow-Up Time
4.004.004.004.00User-Defined Critical Headway [s]
NoNoNoNoOverwrite Calculated Critical Headway
Lanes
BIntersection LOS
14.59Intersection Delay [s/veh]
ABCBApproach LOS
8.2713.5117.8912.37Approach Delay [s/veh]
22.5170.86202.34111.5495th-Percentile Queue Length [ft]
0.902.838.094.4695th-Percentile Queue Length [veh]
ABCBLane LOS
Movement, Approach, & Intersection Results
2 1/28/2025
136
Generated with Adams St and Corporate Centre Dr
Scenario 10: 10 EACP Alt 3 PMTJW Engineering, Inc.Version 2025 (SP 0-1)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Roundabout Delay (sec / veh):14.0
Analysis Method:HCM 7th Edition Level Of Service:B
Analysis Period:15 minutes
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft]
000000000000No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
0000Pedestrian Volume [ped/h]
431398752312916353594108508109Total Analysis Volume [veh/h]
113241963241134242712727Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
3711846520111140461819343794Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000410333367005741Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386799137352Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
1 1/28/2025
137
Generated with Adams St and Corporate Centre Dr
Scenario 10: 10 EACP Alt 3 PMTJW Engineering, Inc.Version 2025 (SP 0-1)
431398752312916353594108508109Adjusted Demand Flow Rate [veh/h]
3711846520111140461819343794Demand Flow Rate [veh/h]
230291694722Exiting Flow Rate [veh/h]
761742224251Circulating Flow Rate [veh/h]
1111Number of Conflicting Circulating Lanes
Intersection Settings
0.250.360.740.69X, volume / capacity
62363610771048Capacity per Entry Lane [veh/h]
1.001.001.001.00Pedestrian Impedance
63664810981069Capacity of Entry and Bypass Lanes [veh/h]
158232808740Entry Flow Rate [veh/h]
0.980.980.980.98HV Adjustment Factor
0.001020.001020.001020.00102B (coefficient)
1380.001380.001380.001380.00A (intercept)
3.003.003.003.00User-Defined Follow-Up Time [s]
NoNoNoNoOverwrite Calculated Follow-Up Time
4.004.004.004.00User-Defined Critical Headway [s]
NoNoNoNoOverwrite Calculated Critical Headway
Lanes
BIntersection LOS
13.98Intersection Delay [s/veh]
ABCBApproach LOS
8.9110.5815.7114.24Approach Delay [s/veh]
24.2540.44174.68147.1595th-Percentile Queue Length [ft]
0.971.626.995.8995th-Percentile Queue Length [veh]
ABCBLane LOS
Movement, Approach, & Intersection Results
2 1/28/2025
138
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
1 / 47
Adams Street and Corporate Centre Drive Project Detailed Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Year, Unmitigated
2.4. Operations Emissions Compared Against Thresholds
2.5. Operations Emissions by Sector, Unmitigated
3. Construction Emissions Details
3.1. Demolition (2025) - Unmitigated
3.3. Site Preparation (2025) - Unmitigated
3.5. Grading (2025) - Unmitigated
3.7. Building Construction (2025) - Unmitigated
3.9. Paving (2025) - Unmitigated
139
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
2 / 47
3.11. Architectural Coating (2025) - Unmitigated
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
4.3. Area Emissions by Source
4.3.1. Unmitigated
4.4. Water Emissions by Land Use
4.4.1. Unmitigated
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
4.8. Stationary Emissions By Equipment Type
140
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
3 / 47
4.8.1. Unmitigated
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.3. Construction Vehicles
5.3.1. Unmitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
141
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
4 / 47
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.9. Operational Mobile Sources
5.9.1. Unmitigated
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
5.10.2. Architectural Coatings
5.10.3. Landscape Equipment
5.11. Operational Energy Consumption
5.11.1. Unmitigated
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
5.13. Operational Waste Generation
5.13.1. Unmitigated
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
142
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
5 / 47
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
5.16.2. Process Boilers
5.17. User Defined
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
6.4. Climate Risk Reduction Measures
143
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
6 / 47
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
7.2. Healthy Places Index Scores
7.3. Overall Health & Equity Scores
7.4. Health & Equity Measures
7.5. Evaluation Scorecard
7.6. Health & Equity Custom Measures
8. User Changes to Default Data
144
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
7 / 47
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name Adams Street and Corporate Centre Drive Project
Construction Start Date 4/1/2025
Operational Year 2026
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s)3.00
Precipitation (days)0.80
Location 33.710242118798206, -116.28655847069649
County Riverside-Salton Sea
City La Quinta
Air District South Coast AQMD
Air Basin Salton Sea
TAZ 5656
EDFZ 19
Electric Utility Imperial Irrigation District
Gas Utility Southern California Gas
App Version 2022.1.1.29
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft)Landscape Area (sq
ft)
Special Landscape
Area (sq ft)
Population Description
145
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
8 / 47
Building——0.003,8000.091000sqft3.80Fast Food
Restaurant with
Drive Thru
Other Asphalt
Surfaces
15.8 1000sqft 0.36 0.00 9,481 ——Hardscape and
Landscaping
1.3. User-Selected Emission Reduction Measures by Emissions Sector
No measures selected
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Un/Mit.TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,
Summer
(Max)
——————————————————
Unmit.8.08 8.06 10.1 10.6 0.02 0.46 2.14 2.60 0.43 1.02 1.44 —1,791 1,791 0.07 0.02 0.62 1,798
Average
Daily
(Max)
——————————————————
Unmit.0.32 0.29 1.67 2.27 < 0.005 0.07 0.02 0.09 0.06 0.01 0.07 —420 420 0.02 < 0.005 0.02 421
Annual
(Max)
——————————————————
Unmit.0.06 0.05 0.31 0.41 < 0.005 0.01 < 0.005 0.02 0.01 < 0.005 0.01 —69.5 69.5 < 0.005 < 0.005 < 0.005 69.8
2.2. Construction Emissions by Year, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily -
Summer
(Max)
——————————————————
146
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
9 / 47
2025 8.08 8.06 10.1 10.6 0.02 0.46 2.14 2.60 0.43 1.02 1.44 —1,791 1,791 0.07 0.02 0.62 1,798
Daily -
Winter
(Max)
——————————————————
Average
Daily
——————————————————
2025 0.32 0.29 1.67 2.27 < 0.005 0.07 0.02 0.09 0.06 0.01 0.07 —420 420 0.02 < 0.005 0.02 421
Annual ——————————————————
2025 0.06 0.05 0.31 0.41 < 0.005 0.01 < 0.005 0.02 0.01 < 0.005 0.01 —69.5 69.5 < 0.005 < 0.005 < 0.005 69.8
2.4. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Un/Mit.TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,
Summer
(Max)
——————————————————
Unmit.7.80 7.38 5.09 46.4 0.10 0.08 7.74 7.82 0.07 1.96 2.04 25.8 10,150 10,176 3.09 0.51 35.4 10,440
Daily,
Winter
(Max)
——————————————————
Unmit.6.25 5.82 5.48 34.2 0.09 0.08 7.74 7.82 0.07 1.96 2.04 25.8 9,082 9,107 3.13 0.52 6.71 9,348
Average
Daily
(Max)
——————————————————
Unmit.6.24 5.94 3.84 26.0 0.05 0.05 4.22 4.27 0.05 1.07 1.12 25.8 5,519 5,545 3.01 0.35 12.9 5,737
Annual
(Max)
——————————————————
Unmit.1.14 1.08 0.70 4.74 0.01 0.01 0.77 0.78 0.01 0.20 0.20 4.27 914 918 0.50 0.06 2.13 950
2.5. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)147
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
10 / 47
Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,
Summer
(Max)
——————————————————
Mobile 7.67 7.25 4.99 46.1 0.10 0.07 7.74 7.81 0.07 1.96 2.03 —9,831 9,831 0.47 0.50 29.5 10,021
Area 0.12 0.12 < 0.005 0.17 < 0.005 < 0.005 —< 0.005 < 0.005 —< 0.005 —0.68 0.68 < 0.005 < 0.005 —0.68
Energy 0.01 0.01 0.11 0.09 < 0.005 0.01 —0.01 0.01 —0.01 —314 314 0.03 < 0.005 —316
Water ———————————2.21 4.34 6.55 0.23 0.01 —13.9
Waste ———————————23.6 0.00 23.6 2.36 0.00 —82.5
Refrig.————————————————5.94 5.94
Total 7.80 7.38 5.09 46.4 0.10 0.08 7.74 7.82 0.07 1.96 2.04 25.8 10,150 10,176 3.09 0.51 35.4 10,440
Daily,
Winter
(Max)
——————————————————
Mobile 6.15 5.72 5.37 34.1 0.09 0.07 7.74 7.81 0.07 1.96 2.03 —8,763 8,763 0.51 0.51 0.76 8,930
Area 0.09 0.09 ————————————————
Energy 0.01 0.01 0.11 0.09 < 0.005 0.01 —0.01 0.01 —0.01 —314 314 0.03 < 0.005 —316
Water ———————————2.21 4.34 6.55 0.23 0.01 —13.9
Waste ———————————23.6 0.00 23.6 2.36 0.00 —82.5
Refrig.————————————————5.94 5.94
Total 6.25 5.82 5.48 34.2 0.09 0.08 7.74 7.82 0.07 1.96 2.04 25.8 9,082 9,107 3.13 0.52 6.71 9,348
Average
Daily
——————————————————
Mobile 6.12 5.83 3.73 25.8 0.05 0.04 4.22 4.26 0.04 1.07 1.11 —5,200 5,200 0.39 0.34 6.94 5,318
Area 0.11 0.11 < 0.005 0.08 < 0.005 < 0.005 —< 0.005 < 0.005 —< 0.005 —0.34 0.34 < 0.005 < 0.005 —0.34
Energy 0.01 0.01 0.11 0.09 < 0.005 0.01 —0.01 0.01 —0.01 —314 314 0.03 < 0.005 —316
Water ———————————2.21 4.34 6.55 0.23 0.01 —13.9
Waste ———————————23.6 0.00 23.6 2.36 0.00 —82.5
Refrig.————————————————5.94 5.94
Total 6.24 5.94 3.84 26.0 0.05 0.05 4.22 4.27 0.05 1.07 1.12 25.8 5,519 5,545 3.01 0.35 12.9 5,737148
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
11 / 47
Annual ——————————————————
Mobile 1.12 1.06 0.68 4.70 0.01 0.01 0.77 0.78 0.01 0.20 0.20 —861 861 0.06 0.06 1.15 881
Area 0.02 0.02 < 0.005 0.01 < 0.005 < 0.005 —< 0.005 < 0.005 —< 0.005 —0.06 0.06 < 0.005 < 0.005 —0.06
Energy < 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 —< 0.005 < 0.005 —< 0.005 —52.0 52.0 0.01 < 0.005 —52.3
Water ———————————0.37 0.72 1.08 0.04 < 0.005 —2.29
Waste ———————————3.91 0.00 3.91 0.39 0.00 —13.7
Refrig.————————————————0.98 0.98
Total 1.14 1.08 0.70 4.74 0.01 0.01 0.77 0.78 0.01 0.20 0.20 4.27 914 918 0.50 0.06 2.13 950
3. Construction Emissions Details
3.1. Demolition (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Onsite ——————————————————
Daily,
Summer
(Max)
——————————————————
Off-Roa
d
Equipm
ent
0.56 0.47 4.33 5.65 0.01 0.16 —0.16 0.14 —0.14 —852 852 0.03 0.01 —855
Demoliti
on
——————0.00 0.00 —0.00 0.00 ———————
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Daily,
Winter
(Max)
——————————————————
Average
Daily
——————————————————
149
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
12 / 47
23.4—<0.005< 0.00523.323.3—< 0.005—< 0.005< 0.005—< 0.005< 0.0050.150.120.010.02Off-Roa
d
Demoliti
on
——————0.00 0.00 —0.00 0.00 ———————
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Annual ——————————————————
Off-Roa
d
Equipm
ent
< 0.005 < 0.005 0.02 0.03 < 0.005 < 0.005 —< 0.005 < 0.005 —< 0.005 —3.87 3.87 < 0.005 < 0.005 —3.88
Demoliti
on
——————0.00 0.00 —0.00 0.00 ———————
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Offsite ——————————————————
Daily,
Summer
(Max)
——————————————————
Worker 0.05 0.05 0.04 0.68 0.00 0.00 0.09 0.09 0.00 0.02 0.02 —103 103 < 0.005 < 0.005 0.35 105
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Daily,
Winter
(Max)
——————————————————
Average
Daily
——————————————————
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 —2.57 2.57 < 0.005 < 0.005 < 0.005 2.61
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Annual ——————————————————
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 —0.43 0.43 < 0.005 < 0.005 < 0.005 0.43
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00150
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
13 / 47
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
3.3. Site Preparation (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Onsite ——————————————————
Daily,
Summer
(Max)
——————————————————
Off-Roa
d
Equipm
ent
0.56 0.47 4.16 5.57 0.01 0.21 —0.21 0.20 —0.20 —859 859 0.03 0.01 —862
Dust
From
Material
Movement
——————0.21 0.21 —0.02 0.02 ———————
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Daily,
Winter
(Max)
——————————————————
Average
Daily
——————————————————
Off-Roa
d
Equipm
ent
< 0.005 < 0.005 0.01 0.02 < 0.005 < 0.005 —< 0.005 < 0.005 —< 0.005 —2.35 2.35 < 0.005 < 0.005 —2.36
Dust
From
Material
Movement
——————< 0.005 < 0.005 —< 0.005 < 0.005 ———————
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Annual ——————————————————151
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
14 / 47
Off-Roa
Equipment
< 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 —< 0.005 < 0.005 —< 0.005 —0.39 0.39 < 0.005 < 0.005 —0.39
Dust
From
Material
Movement
——————< 0.005 < 0.005 —< 0.005 < 0.005 ———————
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Offsite ——————————————————
Daily,
Summer
(Max)
——————————————————
Worker 0.03 0.02 0.02 0.34 0.00 0.00 0.05 0.05 0.00 0.01 0.01 —51.5 51.5 < 0.005 < 0.005 0.18 52.3
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Daily,
Winter
(Max)
——————————————————
Average
Daily
——————————————————
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 —0.13 0.13 < 0.005 < 0.005 < 0.005 0.13
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Annual ——————————————————
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 —0.02 0.02 < 0.005 < 0.005 < 0.005 0.02
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
3.5. Grading (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Onsite ——————————————————152
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
15 / 47
Daily,
Summer
(Max)
——————————————————
Off-Roa
d
Equipm
ent
1.29 1.09 10.1 10.0 0.02 0.46 —0.46 0.43 —0.43 —1,714 1,714 0.07 0.01 —1,720
Dust
From
Material
Movement
——————2.07 2.07 —1.00 1.00 ———————
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Daily,
Winter
(Max)
——————————————————
Average
Daily
——————————————————
Off-Roa
d
Equipm
ent
0.01 0.01 0.06 0.06 < 0.005 < 0.005 —< 0.005 < 0.005 —< 0.005 —9.39 9.39 < 0.005 < 0.005 —9.42
Dust
From
Material
Movement
——————0.01 0.01 —0.01 0.01 ———————
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Annual ——————————————————
Off-Roa
d
Equipm
ent
< 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 —< 0.005 < 0.005 —< 0.005 —1.55 1.55 < 0.005 < 0.005 —1.56
Dust
From
Material
Movement
——————< 0.005 < 0.005 —< 0.005 < 0.005 ———————
153
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
16 / 47
0.000.000.000.000.000.00—0.000.000.000.000.000.000.000.000.000.000.00Onsite
truck
Offsite ——————————————————
Daily,
Summer
(Max)
——————————————————
Worker 0.04 0.04 0.03 0.51 0.00 0.00 0.07 0.07 0.00 0.02 0.02 —77.3 77.3 < 0.005 < 0.005 0.27 78.5
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Daily,
Winter
(Max)
——————————————————
Average
Daily
——————————————————
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 —0.39 0.39 < 0.005 < 0.005 < 0.005 0.39
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Annual ——————————————————
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 —0.06 0.06 < 0.005 < 0.005 < 0.005 0.06
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
3.7. Building Construction (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Onsite ——————————————————
Daily,
Summer
(Max)
——————————————————
154
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
17 / 47
1,309—0.010.051,3051,305—0.20—0.200.22—0.220.016.945.140.520.62Off-Roa
d
Equipm
ent
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Daily,
Winter
(Max)
——————————————————
Average
Daily
——————————————————
Off-Roa
d
Equipm
ent
0.17 0.14 1.41 1.90 < 0.005 0.06 —0.06 0.05 —0.05 —357 357 0.01 < 0.005 —359
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Annual ——————————————————
Off-Roa
d
Equipm
ent
0.03 0.03 0.26 0.35 < 0.005 0.01 —0.01 0.01 —0.01 —59.2 59.2 < 0.005 < 0.005 —59.4
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Offsite ——————————————————
Daily,
Summer
(Max)
——————————————————
Worker 0.01 0.01 0.01 0.11 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 —16.4 16.4 < 0.005 < 0.005 0.06 16.7
Vendor < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 —16.2 16.2 < 0.005 < 0.005 0.04 16.9
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Daily,
Winter
(Max)
——————————————————
Average
Daily
——————————————————
155
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
18 / 47
Worker < 0.005 < 0.005 < 0.005 0.02 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 —4.10 4.10 < 0.005 < 0.005 0.01 4.16
Vendor < 0.005 < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 —4.45 4.45 < 0.005 < 0.005 0.01 4.64
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Annual ——————————————————
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 —0.68 0.68 < 0.005 < 0.005 < 0.005 0.69
Vendor < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 —0.74 0.74 < 0.005 < 0.005 < 0.005 0.77
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
3.9. Paving (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Onsite ——————————————————
Daily,
Summer
(Max)
——————————————————
Off-Roa
d
Equipm
ent
0.61 0.51 4.37 5.31 0.01 0.19 —0.19 0.18 —0.18 —823 823 0.03 0.01 —826
Paving 0.19 0.19 ————————————————
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Daily,
Winter
(Max)
——————————————————
Average
Daily
——————————————————
Off-Roa
d
Equipm
ent
0.01 0.01 0.06 0.07 < 0.005 < 0.005 —< 0.005 < 0.005 —< 0.005 —11.3 11.3 < 0.005 < 0.005 —11.3
Paving < 0.005 < 0.005 ————————————————
156
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
19 / 47
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Annual ——————————————————
Off-Roa
d
Equipm
ent
< 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 —< 0.005 < 0.005 —< 0.005 —1.87 1.87 < 0.005 < 0.005 —1.87
Paving < 0.005 < 0.005 ————————————————
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Offsite ——————————————————
Daily,
Summer
(Max)
——————————————————
Worker 0.09 0.09 0.07 1.20 0.00 0.00 0.16 0.16 0.00 0.04 0.04 —180 180 0.01 0.01 0.62 183
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Daily,
Winter
(Max)
——————————————————
Average
Daily
——————————————————
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 —2.25 2.25 < 0.005 < 0.005 < 0.005 2.28
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Annual ——————————————————
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 —0.37 0.37 < 0.005 < 0.005 < 0.005 0.38
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
3.11. Architectural Coating (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)157
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
20 / 47
Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Onsite ——————————————————
Daily,
Summer
(Max)
——————————————————
Off-Roa
d
Equipm
ent
0.15 0.13 0.88 1.14 < 0.005 0.03 —0.03 0.03 —0.03 —134 134 0.01 < 0.005 —134
Architect
ural
Coating
s
7.93 7.93 ————————————————
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Daily,
Winter
(Max)
——————————————————
Average
Daily
——————————————————
Off-Roa
d
Equipm
ent
< 0.005 < 0.005 0.01 0.02 < 0.005 < 0.005 —< 0.005 < 0.005 —< 0.005 —1.83 1.83 < 0.005 < 0.005 —1.84
Architect
ural
Coating
s
0.11 0.11 ————————————————
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Annual ——————————————————
Off-Roa
d
Equipm
ent
< 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 —< 0.005 < 0.005 —< 0.005 —0.30 0.30 < 0.005 < 0.005 —0.30
158
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
21 / 47
————————————————0.020.02Architect
ural
Coating
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Offsite ——————————————————
Daily,
Summer
(Max)
——————————————————
Worker < 0.005 < 0.005 < 0.005 0.02 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 —3.29 3.29 < 0.005 < 0.005 0.01 3.34
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Daily,
Winter
(Max)
——————————————————
Average
Daily
——————————————————
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 —0.04 0.04 < 0.005 < 0.005 < 0.005 0.04
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Annual ——————————————————
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 —0.01 0.01 < 0.005 < 0.005 < 0.005 0.01
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
159
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
22 / 47
Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,
Summer
(Max)
——————————————————
Fast
Food
Restaurant
with
Drive
Thru
7.67 7.25 4.99 46.1 0.10 0.07 7.74 7.81 0.07 1.96 2.03 —9,831 9,831 0.47 0.50 29.5 10,021
Other
Asphalt
Surfaces
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Total 7.67 7.25 4.99 46.1 0.10 0.07 7.74 7.81 0.07 1.96 2.03 —9,831 9,831 0.47 0.50 29.5 10,021
Daily,
Winter
(Max)
——————————————————
Fast
Food
Restaurant
with
Drive
Thru
6.15 5.72 5.37 34.1 0.09 0.07 7.74 7.81 0.07 1.96 2.03 —8,763 8,763 0.51 0.51 0.76 8,930
Other
Asphalt
Surfaces
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
Total 6.15 5.72 5.37 34.1 0.09 0.07 7.74 7.81 0.07 1.96 2.03 —8,763 8,763 0.51 0.51 0.76 8,930
Annual ——————————————————
Fast
Food
Restaurant
with
Drive
Thru
1.12 1.06 0.68 4.70 0.01 0.01 0.77 0.78 0.01 0.20 0.20 —861 861 0.06 0.06 1.15 881
Other
Asphalt
Surfaces
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00
160
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
23 / 47
Total 1.12 1.06 0.68 4.70 0.01 0.01 0.77 0.78 0.01 0.20 0.20 —861 861 0.06 0.06 1.15 881
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,
Summer
(Max)
——————————————————
Fast
Food
Restaurant
with
Drive
Thru
————————————185 185 0.02 < 0.005 —186
Other
Asphalt
Surfaces
————————————0.00 0.00 0.00 0.00 —0.00
Total ————————————185 185 0.02 < 0.005 —186
Daily,
Winter
(Max)
——————————————————
Fast
Food
Restaurant
with
Drive
Thru
————————————185 185 0.02 < 0.005 —186
Other
Asphalt
Surfaces
————————————0.00 0.00 0.00 0.00 —0.00
Total ————————————185 185 0.02 < 0.005 —186
Annual ——————————————————
161
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
24 / 47
Fast
Food
Restaurant
with
Drive
Thru
————————————30.6 30.6 < 0.005 < 0.005 —30.8
Other
Asphalt
Surfaces
————————————0.00 0.00 0.00 0.00 —0.00
Total ————————————30.6 30.6 < 0.005 < 0.005 —30.8
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,
Summer
(Max)
——————————————————
Fast
Food
Restaurant
with
Drive
Thru
0.01 0.01 0.11 0.09 < 0.005 0.01 —0.01 0.01 —0.01 —129 129 0.01 < 0.005 —130
Other
Asphalt
Surfaces
0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 —0.00 —0.00 0.00 0.00 0.00 —0.00
Total 0.01 0.01 0.11 0.09 < 0.005 0.01 —0.01 0.01 —0.01 —129 129 0.01 < 0.005 —130
Daily,
Winter
(Max)
——————————————————
Fast
Food
Restaurant
with
Drive
Thru
0.01 0.01 0.11 0.09 < 0.005 0.01 —0.01 0.01 —0.01 —129 129 0.01 < 0.005 —130
162
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
25 / 47
Other
Asphalt
Surfaces
0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 —0.00 —0.00 0.00 0.00 0.00 —0.00
Total 0.01 0.01 0.11 0.09 < 0.005 0.01 —0.01 0.01 —0.01 —129 129 0.01 < 0.005 —130
Annual ——————————————————
Fast
Food
Restaurant
with
Drive
Thru
< 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 —< 0.005 < 0.005 —< 0.005 —21.4 21.4 < 0.005 < 0.005 —21.5
Other
Asphalt
Surfaces
0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 —0.00 —0.00 0.00 0.00 0.00 —0.00
Total < 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 —< 0.005 < 0.005 —< 0.005 —21.4 21.4 < 0.005 < 0.005 —21.5
4.3. Area Emissions by Source
4.3.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,
Summer
(Max)
——————————————————
Consum
er
Product
s
0.08 0.08 ————————————————
Architect
ural
Coating
s
0.01 0.01 ————————————————
Landsca
pe
Equipm
ent
0.03 0.03 < 0.005 0.17 < 0.005 < 0.005 —< 0.005 < 0.005 —< 0.005 —0.68 0.68 < 0.005 < 0.005 —0.68
163
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
26 / 47
Total 0.12 0.12 < 0.005 0.17 < 0.005 < 0.005 —< 0.005 < 0.005 —< 0.005 —0.68 0.68 < 0.005 < 0.005 —0.68
Daily,
Winter
(Max)
——————————————————
Consum
er
Product
s
0.08 0.08 ————————————————
Architect
ural
Coating
s
0.01 0.01 ————————————————
Total 0.09 0.09 ————————————————
Annual ——————————————————
Consum
er
Product
s
0.02 0.02 ————————————————
Architect
ural
Coating
s
< 0.005 < 0.005 ————————————————
Landsca
pe
Equipm
ent
< 0.005 < 0.005 < 0.005 0.01 < 0.005 < 0.005 —< 0.005 < 0.005 —< 0.005 —0.06 0.06 < 0.005 < 0.005 —0.06
Total 0.02 0.02 < 0.005 0.01 < 0.005 < 0.005 —< 0.005 < 0.005 —< 0.005 —0.06 0.06 < 0.005 < 0.005 —0.06
4.4. Water Emissions by Land Use
4.4.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
164
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
27 / 47
——————————————————Daily,
Summer
(Max)
Fast
Food
Restaurant
with
Drive
Thru
———————————2.21 3.93 6.14 0.23 0.01 —13.4
Other
Asphalt
Surfaces
———————————0.00 0.41 0.41 < 0.005 < 0.005 —0.41
Total ———————————2.21 4.34 6.55 0.23 0.01 —13.9
Daily,
Winter
(Max)
——————————————————
Fast
Food
Restaurant
with
Drive
Thru
———————————2.21 3.93 6.14 0.23 0.01 —13.4
Other
Asphalt
Surfaces
———————————0.00 0.41 0.41 < 0.005 < 0.005 —0.41
Total ———————————2.21 4.34 6.55 0.23 0.01 —13.9
Annual ——————————————————
Fast
Food
Restaurant
with
Drive
Thru
———————————0.37 0.65 1.02 0.04 < 0.005 —2.23
Other
Asphalt
Surfaces
———————————0.00 0.07 0.07 < 0.005 < 0.005 —0.07
Total ———————————0.37 0.72 1.08 0.04 < 0.005 —2.29
165
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
28 / 47
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,
Summer
(Max)
——————————————————
Fast
Food
Restaurant
with
Drive
Thru
———————————23.6 0.00 23.6 2.36 0.00 —82.5
Other
Asphalt
Surfaces
———————————0.00 0.00 0.00 0.00 0.00 —0.00
Total ———————————23.6 0.00 23.6 2.36 0.00 —82.5
Daily,
Winter
(Max)
——————————————————
Fast
Food
Restaurant
with
Drive
Thru
———————————23.6 0.00 23.6 2.36 0.00 —82.5
Other
Asphalt
Surfaces
———————————0.00 0.00 0.00 0.00 0.00 —0.00
Total ———————————23.6 0.00 23.6 2.36 0.00 —82.5
Annual ——————————————————
166
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
29 / 47
13.7—0.000.393.910.003.91———————————Fast
Food
Restaurant
with
Drive
Thru
Other
Asphalt
Surfaces
———————————0.00 0.00 0.00 0.00 0.00 —0.00
Total ———————————3.91 0.00 3.91 0.39 0.00 —13.7
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,
Summer
(Max)
——————————————————
Fast
Food
Restaurant
with
Drive
Thru
————————————————5.94 5.94
Total ————————————————5.94 5.94
Daily,
Winter
(Max)
——————————————————
Fast
Food
Restaurant
with
Drive
Thru
————————————————5.94 5.94
Total ————————————————5.94 5.94167
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
30 / 47
Annual ——————————————————
Fast
Food
Restaurant
with
Drive
Thru
————————————————0.98 0.98
Total ————————————————0.98 0.98
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,
Summer
(Max)
——————————————————
Total ——————————————————
Daily,
Winter
(Max)
——————————————————
Total ——————————————————
Annual ——————————————————
Total ——————————————————
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
168
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
31 / 47
CO2eRN2OCH4CO2TNBCO2BCO2PM2.5TPM2.5DPM2.5EPM10TPM10DPM10ESO2CONOxROGTOGEquipm
ent
Type
Daily,
Summer
(Max)
——————————————————
Total ——————————————————
Daily,
Winter
(Max)
——————————————————
Total ——————————————————
Annual ——————————————————
Total ——————————————————
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,
Summer
(Max)
——————————————————
Total ——————————————————
Daily,
Winter
(Max)
——————————————————
Total ——————————————————
Annual ——————————————————
Total ——————————————————
169
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
32 / 47
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,
Summer
(Max)
——————————————————
Total ——————————————————
Daily,
Winter
(Max)
——————————————————
Total ——————————————————
Annual ——————————————————
Total ——————————————————
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,
Summer
(Max)
——————————————————
Total ——————————————————
Daily,
Winter
(Max)
——————————————————
Total ——————————————————
Annual ——————————————————
Total ——————————————————
170
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
33 / 47
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,
Summer
(Max)
——————————————————
Avoided ——————————————————
Subtotal ——————————————————
Sequest
ered
——————————————————
Subtotal ——————————————————
Remove
d
——————————————————
Subtotal ——————————————————
———————————————————
Daily,
Winter
(Max)
——————————————————
Avoided ——————————————————
Subtotal ——————————————————
Sequest
ered
——————————————————
Subtotal ——————————————————
Remove
d
——————————————————
Subtotal ——————————————————
———————————————————
Annual ——————————————————
Avoided ——————————————————
Subtotal ——————————————————
171
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
34 / 47
——————————————————Sequest
ered
Subtotal ——————————————————
Remove
d
——————————————————
Subtotal ——————————————————
———————————————————
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description
Demolition Demolition 4/1/2025 4/15/2025 5.00 10.0 —
Site Preparation Site Preparation 4/16/2025 4/17/2025 5.00 1.00 —
Grading Grading 4/18/2025 4/20/2025 5.00 2.00 —
Building Construction Building Construction 4/21/2025 9/8/2025 5.00 100 —
Paving Paving 9/9/2025 9/16/2025 5.00 5.00 —
Architectural Coating Architectural Coating 9/17/2025 9/24/2025 5.00 5.00 —
5.2. Off-Road Equipment
5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
Demolition Tractors/Loaders/Back
hoes
Diesel Average 2.00 6.00 84.0 0.37
Demolition Rubber Tired Dozers Diesel Average 1.00 1.00 367 0.40
Demolition Concrete/Industrial
Saws
Diesel Average 1.00 8.00 33.0 0.73
Site Preparation Graders Diesel Average 1.00 8.00 148 0.41 172
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
35 / 47
Site Preparation Tractors/Loaders/Back Diesel Average 1.00 8.00 84.0 0.37
Grading Graders Diesel Average 1.00 6.00 148 0.41
Grading Rubber Tired Dozers Diesel Average 1.00 6.00 367 0.40
Grading Tractors/Loaders/Back
hoes
Diesel Average 1.00 7.00 84.0 0.37
Building Construction Cranes Diesel Average 1.00 4.00 367 0.29
Building Construction Forklifts Diesel Average 2.00 6.00 82.0 0.20
Building Construction Tractors/Loaders/Back
hoes
Diesel Average 2.00 8.00 84.0 0.37
Paving Tractors/Loaders/Back
hoes
Diesel Average 1.00 7.00 84.0 0.37
Paving Cement and Mortar
Mixers
Diesel Average 4.00 6.00 10.0 0.56
Paving Pavers Diesel Average 1.00 7.00 81.0 0.42
Paving Rollers Diesel Average 1.00 7.00 36.0 0.38
Architectural Coating Air Compressors Diesel Average 1.00 6.00 37.0 0.48
5.3. Construction Vehicles
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix
Demolition ————
Demolition Worker 10.0 12.8 LDA,LDT1,LDT2
Demolition Vendor —8.33 HHDT,MHDT
Demolition Hauling 0.00 20.0 HHDT
Demolition Onsite truck ——HHDT
Site Preparation ————
Site Preparation Worker 5.00 12.8 LDA,LDT1,LDT2
Site Preparation Vendor —8.33 HHDT,MHDT
Site Preparation Hauling 0.00 20.0 HHDT 173
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
36 / 47
Site Preparation Onsite truck ——HHDT
Grading ————
Grading Worker 7.50 12.8 LDA,LDT1,LDT2
Grading Vendor —8.33 HHDT,MHDT
Grading Hauling 0.00 20.0 HHDT
Grading Onsite truck ——HHDT
Building Construction ————
Building Construction Worker 1.60 12.8 LDA,LDT1,LDT2
Building Construction Vendor 0.62 8.33 HHDT,MHDT
Building Construction Hauling 0.00 20.0 HHDT
Building Construction Onsite truck ——HHDT
Paving ————
Paving Worker 17.5 12.8 LDA,LDT1,LDT2
Paving Vendor —8.33 HHDT,MHDT
Paving Hauling 0.00 20.0 HHDT
Paving Onsite truck ——HHDT
Architectural Coating ————
Architectural Coating Worker 0.32 12.8 LDA,LDT1,LDT2
Architectural Coating Vendor —8.33 HHDT,MHDT
Architectural Coating Hauling 0.00 20.0 HHDT
Architectural Coating Onsite truck ——HHDT
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
Control Strategies Applied PM10 Reduction PM2.5 Reduction
Water unpaved roads twice daily 55%55%
174
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
37 / 47
5.5. Architectural Coatings
Phase Name Residential Interior Area
Coated (sq ft)
Residential Exterior Area
Coated (sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
Architectural Coating 0.00 0.00 5,700 1,900 948
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (cy)Material Exported (cy)Acres Graded (acres)Material Demolished (sq. ft.)Acres Paved (acres)
Demolition 0.00 0.00 0.00 ——
Site Preparation ——0.50 0.00 —
Grading ——1.50 0.00 —
Paving 0.00 0.00 0.00 0.00 0.36
5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day)PM10 Reduction PM2.5 Reduction
Water Exposed Area 2 61%61%
Water Demolished Area 2 36%36%
5.7. Construction Paving
Land Use Area Paved (acres)% Asphalt
Fast Food Restaurant with Drive Thru 0.00 0%
Other Asphalt Surfaces 0.36 100%
5.8. Construction Electricity Consumption and Emissions Factors
kWh per Year and Emission Factor (lb/MWh)
175
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
38 / 47
Year kWh per Year CO2 CH4 N2O
2025 0.00 223 0.03 < 0.005
5.9. Operational Mobile Sources
5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year
Fast Food
Restaurant with
Drive Thru
2,028 2,028 2,028 740,062 3,974 10,945 10,945 2,177,523
Other Asphalt
Surfaces
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
5.10.2. Architectural Coatings
Residential Interior Area Coated (sq
ft)
Residential Exterior Area Coated (sq
ft)
Non-Residential Interior Area Coated
(sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
0 0.00 5,700 1,900 948
5.10.3. Landscape Equipment
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 180
176
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
39 / 47
5.11. Operational Energy Consumption
5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr)
Land Use Electricity (kWh/yr)CO2 CH4 N2O Natural Gas (kBTU/yr)
Fast Food Restaurant with
Drive Thru
256,811 262 0.0330 0.0040 403,242
Other Asphalt Surfaces 0.00 262 0.0330 0.0040 0.00
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
Land Use Indoor Water (gal/year)Outdoor Water (gal/year)
Fast Food Restaurant with Drive Thru 1,153,428 0.00
Other Asphalt Surfaces 0.00 177,917
5.13. Operational Waste Generation
5.13.1. Unmitigated
Land Use Waste (ton/year)Cogeneration (kWh/year)
Fast Food Restaurant with Drive Thru 43.8 —
Other Asphalt Surfaces 0.00 —
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg)Operations Leak Rate Service Leak Rate Times Serviced
177
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
40 / 47
1.000.000.600.001,430R-134aFast Food Restaurant
with Drive Thru
Household
refrigerators and/or
freezers
Fast Food Restaurant
with Drive Thru
Other commercial A/C
and heat pumps
R-410A 2,088 1.80 4.00 4.00 18.0
Fast Food Restaurant
with Drive Thru
Walk-in refrigerators
and freezers
R-404A 3,922 < 0.005 7.50 7.50 20.0
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
Equipment Type Fuel Type Number per Day Hours per Day Hours per Year Horsepower Load Factor
5.16.2. Process Boilers
Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr)Daily Heat Input (MMBtu/day)Annual Heat Input (MMBtu/yr)
5.17. User Defined
Equipment Type Fuel Type
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
178
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
41 / 47
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which
assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 24.4 annual days of extreme heat
Extreme Precipitation 0.00 annual days with precipitation above 20 mm
Sea Level Rise —meters of inundation depth
Wildfire 0.14 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from
observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if
received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and
consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with
extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters
179
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
42 / 47
Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data
of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The
four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of
different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score
Temperature and Extreme Heat 1 0 0 N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought 0 0 0 N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the
greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5
representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction
measures.
6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score
Temperature and Extreme Heat 1 1 1 2
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought 1 1 1 2
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A 180
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
43 / 47
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the
greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5
representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction
measures.
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 93.6
AQ-PM 8.51
AQ-DPM 57.4
Drinking Water 53.9
Lead Risk Housing 13.5
Pesticides 45.7
Toxic Releases 2.39
Traffic 70.2
Effect Indicators —
CleanUp Sites 0.00
Groundwater 0.00
Haz Waste Facilities/Generators 26.7
Impaired Water Bodies 77.3
Solid Waste 0.00
Sensitive Population —
Asthma 19.8
181
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
44 / 47
Cardio-vascular 22.9
Low Birth Weights 48.5
Socioeconomic Factor Indicators —
Education 33.5
Housing 10.8
Linguistic 60.6
Poverty 46.6
Unemployment 45.8
7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census Tract
Economic —
Above Poverty 77.22314898
Employed 96.63800847
Median HI 77.50545361
Education —
Bachelor's or higher 55.99897344
High school enrollment 21.68612858
Preschool enrollment 57.19235211
Transportation —
Auto Access 60.64416784
Active commuting 24.04722187
Social —
2-parent households 46.33645579
Voting 62.08135506
Neighborhood —
Alcohol availability 89.83703323 182
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
45 / 47
Park access 39.65096882
Retail density 60.54151161
Supermarket access 31.45130245
Tree canopy 8.546131143
Housing —
Homeownership 85.85910432
Housing habitability 92.37777493
Low-inc homeowner severe housing cost burden 72.35981009
Low-inc renter severe housing cost burden 90.94058771
Uncrowded housing 92.9038881
Health Outcomes —
Insured adults 68.18940074
Arthritis 5.8
Asthma ER Admissions 81.7
High Blood Pressure 8.6
Cancer (excluding skin)8.0
Asthma 46.1
Coronary Heart Disease 13.8
Chronic Obstructive Pulmonary Disease 27.0
Diagnosed Diabetes 57.0
Life Expectancy at Birth 60.2
Cognitively Disabled 78.9
Physically Disabled 68.4
Heart Attack ER Admissions 74.8
Mental Health Not Good 63.6
Chronic Kidney Disease 27.1
Obesity 44.4
Pedestrian Injuries 54.9
183
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
46 / 47
Physical Health Not Good 55.3
Stroke 34.3
Health Risk Behaviors —
Binge Drinking 50.7
Current Smoker 60.5
No Leisure Time for Physical Activity 65.6
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 48.8
Elderly 57.9
English Speaking 63.3
Foreign-born 14.4
Outdoor Workers 55.7
Climate Change Adaptive Capacity —
Impervious Surface Cover 48.4
Traffic Density 39.8
Traffic Access 23.0
Other Indices —
Hardship 32.9
Other Decision Support —
2016 Voting 76.5
7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a)27.0
Healthy Places Index Score for Project Location (b)75.0
Project Located in a Designated Disadvantaged Community (Senate Bill 535)No 184
Adams Street and Corporate Centre Drive Project Detailed Report, 1/31/2025
47 / 47
Project Located in a Low-Income Community (Assembly Bill 1550)No
Project Located in a Community Air Protection Program Community (Assembly Bill 617)No
a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
7.4. Health & Equity Measures
No Health & Equity Measures selected.
7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.
7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.
8. User Changes to Default Data
Screen Justification
Characteristics: Project Details Start of construction date is for analysis purposes only. The project scope involves a coffee
shop with drive-through window with a building area of approximately 3,800 square feet. The
current version of CalEEMod does not have ITE code 937 corresponding to this use. Therefore,
for analysis purposes, this model uses ITE code 934 corresponding to Fast Food Restaurant
with Drive-Through, but the daily trip generation rate per TSF has been increased to match ITE
937, as provided in the Adams Street & Corporate Centre Drive Traffic Impact Analysis, dated
January 30, 2025.
Operations: Vehicle Data Trip generation rates were adjusted (increased) to 533.57 trips per TSF based on the
project-specific report corresponding to ITE 937 (Coffee/Donut shop with Drive-Through
Window).
185
PLANNING COMMISSION RESOLUTION 2025-XXX EXHIBIT C
CONDITIONS OF APPROVAL - RECOMMENDED
SPECIFIC PLAN 2024-0005
CONDITIONAL USE PERMIT 2024-0007
SITE DEVELOPMENT PERMIT 2024-0014
PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH
ADOPTED:
PAGE 1 OF 14
GENERAL
1. The applicant agrees to defend, indemnify, and hold harmless the City of La Quinta
(“City”), its agents, officers, and employees from any claim, action, or proceeding
to attack, set aside, void, or annul the approval of this Conditional Use Permit. The
City shall have sole discretion in selecting its defense counsel.
The City shall promptly notify the applicant of any claim, action, or proceeding and
cooperate fully in the defense.
2. All the following approvals shall comply with all applicable conditions and mitigation
measures:
Specific Plan 2024-0005
Conditional Use Permit 2024-0007
Site Development Permit 2024-0014
Specific Plan 1989-014
Environmental Assessment 1996-319
In the event of any conflict(s) between approval conditions and/or provisions of
these approvals, the Design and Development Director shall adjudicate the conflict
by determining the precedence.
3. The applicant shall comply with all applicable provisions of the La Quinta Municipal
Code (LQMC), including LQMC Sections 9.210.010, 9.210.020, and 9.240.010.
4. Conditional Use Permit 2024-0007 and Site Development Permit 2024-0014 shall
expire on June 10, 2027, and shall become null and void in accordance with La
Quinta Municipal Code Section 9.200.080, unless the required ministerial permits
have been issued. A time extension may be requested per LQMC Section
9.200.080.
5. The drive-through shall be screened by a combination of berms, walls, and
landscaping so that the cars using the drive-through facilities will not be visible to
pedestrians and cars on the perimeter sidewalk and street.
6. Prior to the issuance of any grading, construction, or building permit by the City,
the applicant shall obtain any necessary clearances and/or permits from the
following agencies, if required:
186
PLANNING COMMISSION RESOLUTION 2025-XXX
CONDITIONS OF APPROVAL - RECOMMENDED
SPECIFIC PLAN 2024-0005
CONDITIONAL USE PERMIT 2024-0007
SITE DEVELOPMENT PERMIT 2024-0014
PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH
ADOPTED:
PAGE 2 OF 14
Riverside County Fire Marshal
La Quinta Public Works Department (Grading Permit, Green Sheet (Public
Works Clearance) for Building Permits, Water Quality Management Plan
(WQMP) Exemption Form – Whitewater River Region, Improvement
Permit)
La Quinta Design and Development Department - Planning Division and
Building Division
Riverside County Environmental Health Department
Desert Sands Unified School District (DSUSD)
Coachella Valley Water District (CVWD)
Imperial Irrigation District (IID)
California Regional Water Quality Control Board (CRWQCB)
State Water Resources Control Board
SunLine Transit Agency
South Coast Air Quality Management District Coachella Valley (SCAQMD)
The applicant is responsible for all requirements of the permits and/or clearances
from the above-listed agencies. When these requirements include approval of
improvement plans, the applicant shall furnish proof of such approvals when
submitting those improvement plans for City approval.
7. The applicant shall comply with applicable provisions of the City’s NPDES
stormwater discharge permit, LQMC Sections 8.70.010 et seq. (Stormwater
Management and Discharge Controls), and 13.24.170 (Clean Air/Clean Water);
Riverside County Ordinance No. 457; the California Regional Water Quality
Control Board – Colorado River Basin Region Board Order No. R7-2013-0011 and
the State Water Resources Control Board’s Order No. 2012-0006-DWQ.
A. The applicant shall include provisions for all of the following Best
Management Practices (“BMPs”) (LQMC Section 8.70.020 (Definitions)):
1) Temporary Soil Stabilization (erosion control).
2) Temporary Sediment Control.
3) Wind Erosion Control.
4) Tracking Control.
5) Non-Storm Water Management.
6) Waste Management and Materials Pollution Control.
B. The BMPs shall remain in effect for the entire duration of project
construction until all improvements are completed.
187
PLANNING COMMISSION RESOLUTION 2025-XXX
CONDITIONS OF APPROVAL - RECOMMENDED
SPECIFIC PLAN 2024-0005
CONDITIONAL USE PERMIT 2024-0007
SITE DEVELOPMENT PERMIT 2024-0014
PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH
ADOPTED:
PAGE 3 OF 14
8. Developer shall reimburse the City, within thirty (30) days of presentment of the
invoice, all costs and actual attorney’s fees incurred by the City Attorney to review,
negotiate and/or modify any documents or instruments required by these
conditions, if Developer requests that the City modify or revise any documents or
instruments prepared initially by the City to effect these conditions. This obligation
shall be paid in the time noted above without deduction or offset, and Developer’s
failure to make such payment shall be a material breach of the Conditions of
Approval.
9. Developer shall reimburse the City, within thirty (30) days of presentment of the
invoice, all costs and actual consultants’ fees incurred by the City for engineering
and/or surveying consultants to review and/or modify any documents or
instruments required by this project. This obligation shall be paid in the time noted
above without deduction or offset, and Developer’s failure to make such payment
shall be a material breach of the Conditions of Approval.
PROPERTY RIGHTS
10. Prior to issuance of any permit(s), the applicant shall acquire or confer easements
and other property rights necessary for the construction or proper functioning of
the proposed development.
11. Pursuant to the aforementioned condition, conferred rights shall include approvals
from the master developer over easements and other property rights necessary
for construction and proper functioning of the proposed development not limited to
access rights over proposed and/or existing parking lot that access public streets
and open space/drainage facilities of the master development.
12. The applicant shall furnish proof of easements or written permission, as
appropriate, from those owners of all abutting properties on which grading,
retaining wall construction, or other encroachments will occur.
PARKING LOTS and ACCESS POINTS
13. The design of parking facilities shall conform to LQMC Chapter 9.150 and, in
particular, the following:
A. The parking spaces and aisle widths and the double hairpin stripe parking
space design shall conform to LQMC Chapter 9.150.
B. Cross slopes should be a maximum of 2% where accessibility is required,
including accessibility routes between buildings.
188
PLANNING COMMISSION RESOLUTION 2025-XXX
CONDITIONS OF APPROVAL - RECOMMENDED
SPECIFIC PLAN 2024-0005
CONDITIONAL USE PERMIT 2024-0007
SITE DEVELOPMENT PERMIT 2024-0014
PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH
ADOPTED:
PAGE 4 OF 14
C. Building access points shall be shown on the Precise Grading Plans so that
accessibility issues can be evaluated.
D. Accessibility routes to public streets and adjacent development shall be
shown on the Precise Grading Plan.
E. Parking space lengths shall be according to LQMC Chapter 9.150 and be a
minimum of 18 feet in length with a 2-foot overhang for all parking spaces
or as approved by the City Engineer. One van accessible parking space is
required per 6 accessible parking spaces.
F. Drive aisles between parking spaces shall be a minimum of 26 feet, with
access drive aisles to Public Streets a minimum of 30 feet or as approved
by the City Engineer.
14. The applicant shall design street pavement sections using CalTrans' design
procedure for 20-year life pavement, and the site-specific data for soil strength and
anticipated traffic loading (including construction traffic). Minimum structural
sections shall be as follows:
Parking Lot & Aisles (Low Traffic) 3.0" a.c./4.5" c.a.b.
Parking Lot & Aisles (High Traffic) 4.5” a.c./5.5” c.a.b.
or the approved equivalents of alternate materials.
15. The applicant shall submit current mix designs (less than two years old at the time
of construction) for base, asphalt concrete, and Portland cement concrete. The
submittal shall include test results for all specimens used in the mix design
procedure. For mix designs over six months old, the submittal shall include recent
(less than six months old at the time of construction) aggregate gradation test
results confirming that design gradations can be achieved in current production.
The applicant shall not schedule construction operations until mix designs are
approved.
16. Improvements shall include appurtenances such as traffic control signs, markings,
and other devices, raised medians if required, street name signs, and sidewalks.
17. Improvements shall be designed and constructed in accordance with City adopted
standards, supplemental drawings and specifications, or as approved by the City
Engineer. Improvement plans for streets, access gates, and parking areas shall be
stamped and signed by qualified engineers.
189
PLANNING COMMISSION RESOLUTION 2025-XXX
CONDITIONS OF APPROVAL - RECOMMENDED
SPECIFIC PLAN 2024-0005
CONDITIONAL USE PERMIT 2024-0007
SITE DEVELOPMENT PERMIT 2024-0014
PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH
ADOPTED:
PAGE 5 OF 14
IMPROVEMENT PLANS
18. As used throughout these Conditions of Approval, professional titles such as
“engineer,” “surveyor,” and “architect” refer to persons currently certified or
licensed to practice their respective professions in the State of California.
19. Improvement plans shall be prepared by or under the direct supervision of qualified
engineers and/or architects, as appropriate, and shall comply with the provisions
of LQMC Section 13.24.040 (Improvement Plans).
20. The following improvement plans shall be prepared and submitted for review and
approval by the Public Works Department. A separate set of plans for each line
item specified below shall be prepared. The plans shall utilize the minimum scale
specified, unless otherwise authorized by the City Engineer in writing. Plans may
be prepared at a larger scale if additional detail or plan clarity is desired. Note, the
applicant may be required to prepare other improvement plans not listed here
pursuant to improvements required by other agencies and utility purveyors.
A. Final WQMP (Plan submitted in Report Form)
B. On-Site Commercial Precise Grading 1" = 20' Horizontal
C. Hydrology Report
NOTE: A through C to be submitted concurrently.
(Separate Storm Drain Plans if applicable)
Other engineered improvement plans prepared for City approval that are not listed
above shall be prepared in formats approved by the City Engineer prior to
commencing plan preparation.
“On-Site Commercial Precise Grading” plan is required to be submitted for
approval by the Building Official, Planning Manager, and the City Engineer.
“On-Site Commercial Precise Grading” plans shall normally include all on-site
surface improvements, including but not necessarily limited to finish grades for
curbs & gutters, building floor elevations, parking lot improvements, and
accessibility requirements.
21. The City maintains standard plans, detail sheets, and/or construction notes for
elements of construction which can be accessed via the Public Works
Development “Plans, Notes and Design Guidance” section of the City website
190
PLANNING COMMISSION RESOLUTION 2025-XXX
CONDITIONS OF APPROVAL - RECOMMENDED
SPECIFIC PLAN 2024-0005
CONDITIONAL USE PERMIT 2024-0007
SITE DEVELOPMENT PERMIT 2024-0014
PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH
ADOPTED:
PAGE 6 OF 14
(www.laquintaca.gov). Please navigate to the Public Works Department home
page and look for the Standard Drawings hyperlink.
22. Upon completion of construction and prior to final acceptance of the improvements
by the City, the applicant shall furnish the City with reproducible record drawings
of all improvement plans that were approved by the City. Each sheet shall be
clearly marked "Record Drawing" and shall be stamped and signed by the engineer
or surveyor certifying to the accuracy and completeness of the drawings. The
applicant shall have all approved plans previously submitted to the City, revised to
reflect the as-built conditions. The applicant shall employ or retain the Engineer of
Record during the construction phase of the project so that the EOR can make site
visits in support of preparing "Record Drawing". However, if subsequent approved
revisions have been approved by the City Engineer and reflect said "Record
Drawing" conditions, the Engineer of Record may submit a letter attesting to said
fact to the City Engineer instead.
PRECISE GRADING
23. The applicant shall comply with the provisions of LQMC Section 13.24.050
(Grading Improvements).
24. Prior to occupancy of the project site for any construction or other purposes, the
applicant shall obtain a grading permit approved by the City Engineer.
To obtain an approved grading permit, the applicant shall submit and obtain
approval of all of the following:
A. A grading plan prepared by a civil engineer registered in the State of
California,
B. A preliminary geotechnical (“soils”) report prepared by a professional
registered in the State of California,
C. A Fugitive Dust Control Plan prepared in accordance with LQMC Chapter
6.16 (Fugitive Dust Control), and
D. A WQMP prepared by an authorized professional registered in the State of
California, and
All grading shall conform with the recommendations contained in the Soils Report
and shall be certified as being adequate by a soils engineer or an engineering
geologist registered in the State of California.
191
PLANNING COMMISSION RESOLUTION 2025-XXX
CONDITIONS OF APPROVAL - RECOMMENDED
SPECIFIC PLAN 2024-0005
CONDITIONAL USE PERMIT 2024-0007
SITE DEVELOPMENT PERMIT 2024-0014
PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH
ADOPTED:
PAGE 7 OF 14
The applicant shall furnish security, in a form acceptable to the City, and in an
amount sufficient to guarantee compliance with the approved Fugitive Dust Control
Plan provisions. Additionally, the applicant shall replenish said security if expended
by the City of La Quinta to comply with the Plan as required by the City Engineer.
25. The applicant shall maintain all open graded, undeveloped land in order to prevent
wind and/or water erosion of such land. All open, graded, undeveloped land shall
either be planted with interim landscaping or stabilized with such other erosion
control measures as were approved in the Fugitive Dust Control Plan.
26. Building pad elevations on the precise grading plan submitted for City Engineer’s
approval shall conform with the pad elevation shown on the Site Development
Permit Preliminary Grading Plans, unless the pad elevations have other
requirements imposed elsewhere in these Conditions of Approval. Pad elevation
will need to be shown on the final precise grading plan.
27. Prior to any site grading or regrading that will raise or lower any portion of the site
by more than plus or minus five tenths of a foot (0.5’) from the elevations shown
on the Site Development Permit Preliminary Grading Plans, the applicant shall
submit the proposed grading changes to the City Staff for a substantial
conformance finding review.
28. Prior to the issuance of a building permit for any building lot, the applicant shall
provide a lot pad certification stamped and signed by a qualified engineer or
surveyor with applicable compaction tests and over excavation documentation.
Each pad certification shall list the pad elevation as shown on the approved
grading plan, the actual pad elevation, and the difference between the two, if any.
Such pad certification shall also list the relative compaction of the pad soil.
DRAINAGE
29. Stormwater handling shall conform with the approved hydrology and drainage
report for One-Eleven La Quinta Shopping Center and/or for SDP2024-0014, or as
approved by the City Engineer.
30. Stormwater may not be retained in landscaped parkways or landscaped setback
lots. Only incidental stormwater (precipitation that directly falls onto the setback)
will be permitted to be retained in the landscape setback areas. The perimeter
setback and parkway areas in the street right-of-way shall be shaped with berms
and mounds, pursuant to LQMC Section 9.100.040(B)(7), as feasible.
192
PLANNING COMMISSION RESOLUTION 2025-XXX
CONDITIONS OF APPROVAL - RECOMMENDED
SPECIFIC PLAN 2024-0005
CONDITIONAL USE PERMIT 2024-0007
SITE DEVELOPMENT PERMIT 2024-0014
PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH
ADOPTED:
PAGE 8 OF 14
31. The applicant shall comply with applicable provisions for post construction runoff
per the City’s NPDES stormwater discharge permit, LQMC Sections 8.70.010 et
seq. (Stormwater Management and Discharge Controls), and 13.24.170 (Clean
Air/Clean Water); Riverside County Ordinance No. 457; and the California
Regional Water Quality Control Board – Colorado River Basin (CRWQCB-CRB)
Region Board Order No. R7-2013-0011.
A. For post-construction urban runoff from New Development and
Redevelopment Projects, the applicant shall implement requirements of the
NPDES permit for the design, construction, and perpetual operation and
maintenance of BMPs per the approved Water Quality Management Plan
(WQMP) for the project as required by the California Regional Water Quality
Control Board – Colorado River Basin (CRWQCB-CRB) Region Board
Order No. R7-2013-0011.
B. The applicant shall implement the WQMP Design Standards per
(CRWQCB-CRB) Region Board Order No. R7-2013-0011 utilizing BMPs
approved by the City Engineer. A project-specific WQMP shall be provided,
which incorporates Site Design and Treatment BMPs utilizing first flush
infiltration as a preferred method of NPDES Permit Compliance for
Whitewater River receiving water, as applicable.
C. The developer shall execute and record a Stormwater Management/BMP
Facilities Agreement that provides for the perpetual maintenance and
operation of all post-construction stormwater BMPs.
UTILITIES
32. The applicant shall comply with the provisions of LQMC Section 13.24.110
(Utilities).
33. The applicant shall obtain the approval of the City Engineer for the location of all
utility lines within any right-of-way, and all above-ground utility structures,
including, but not limited to, traffic signal cabinets, electric vaults, water valves, and
telephone stands, to ensure optimum placement for practical and aesthetic
purposes.
34. Underground utilities shall be installed prior to overlying hardscape. For installation
of utilities in existing improved streets, the applicant shall comply with trench
restoration requirements maintained or required by the City Engineer. The
applicant shall provide certified reports of all utility trench compaction for approval
193
PLANNING COMMISSION RESOLUTION 2025-XXX
CONDITIONS OF APPROVAL - RECOMMENDED
SPECIFIC PLAN 2024-0005
CONDITIONAL USE PERMIT 2024-0007
SITE DEVELOPMENT PERMIT 2024-0014
PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH
ADOPTED:
PAGE 9 OF 14
by the City Engineer. Additionally, grease traps and the maintenance thereof shall
be located as to not conflict with access aisles/entrances.
CONSTRUCTION
35. The City will conduct final inspections of habitable buildings only when the
buildings have parking lot improvements and (if required) sidewalk access to
publicly maintained streets. The improvements shall include required traffic control
devices, pavement markings, and street name signs, if applicable.
LANDSCAPE AND IRRIGATION
36. The applicant shall comply with LQMC Sections 13.24.130 (Landscaping
Setbacks) & 13.24.140 (Landscaping Plans).
37. The applicant shall provide landscaping in the required setbacks, retention basins,
and common lots. Said landscaping shall be constantly maintained by the center
owner, with damaged, dead, or dying plant material immediately replaced with
healthy plant material of equivalent size.
38. Landscape and irrigation plans for landscaped lots and setbacks, medians,
retention basins, and parks shall be signed and stamped by a licensed landscape
architect.
39. All new and modified landscape areas shall have landscaping and permanent
irrigation improvements in compliance with the City’s Water Efficient Landscape
regulations contained in LQMC Section 8.13 (Water Efficient Landscape).
40. Lighting plans shall be submitted with the final landscaping plans for a
recommendation to the Planning Manager for his approval. Exterior lighting shall
be consistent with LQMC Section 9.100.150 (Outdoor Lighting).
41. All water features shall be designed to minimize “splash”, and use high efficiency
pumps and lighting to the satisfaction of the Planning Manager. They shall be
included in the landscape plan water efficiency calculations per Municipal Code
Chapter 8.13.
42. All rooftop mechanical equipment shall be completely screened from view. Utility
transformers or other ground-mounted mechanical equipment shall be fully
screened with a screening wall or landscaping and painted to match the adjacent
buildings.
194
PLANNING COMMISSION RESOLUTION 2025-XXX
CONDITIONS OF APPROVAL - RECOMMENDED
SPECIFIC PLAN 2024-0005
CONDITIONAL USE PERMIT 2024-0007
SITE DEVELOPMENT PERMIT 2024-0014
PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH
ADOPTED:
PAGE 10 OF 14
43. The applicant shall submit the final landscape plans for review, processing, and
approval to the Design and Development Department, in accordance with the Final
Landscape Plan application process. Final Landscape Plans shall be consistent
with the Preliminary landscaping plans shown in Site Development Permit 2024-
0014. Planning Manager approval of the final landscape plans is required prior to
issuance of the first building permit unless the Planning Manager determines that
extenuating circumstances exist that justify an alternative processing schedule.
NOTE: Plans are not approved for construction until signed by the appropriate City
official, including the Planning Manager and/or City Engineer.
44. The applicant or his agent has the responsibility for proper sight distance
requirements per guidelines in the AASHTO “A Policy on Geometric Design of
Highways and Streets, 5th Edition” or the latest, in the design and/or installation of
all landscaping and appurtenances abutting and within the private and public street
right-of-way.
MAINTENANCE
45. The applicant shall comply with the provisions of LQMC Section 13.24.160
(Maintenance).
46. The applicant shall make provisions for the continuous and perpetual maintenance
of all private on-site improvements, perimeter landscaping, access drives,
sidewalks, and stormwater BMPs.
FEES AND DEPOSITS
47. The applicant shall comply with the provisions of LQMC Section 13.24.180 (Fees
and Deposits). These fees include all deposits and fees required by the City for
plan checking and construction inspection. Deposits and fee amounts shall be
those in effect when the applicant makes application for plan check and permits.
48. Permits issued under this approval shall be subject to the provisions of the
Development Impact Fee and Transportation Uniform Mitigation Fee programs in
effect at the time of issuance of building permit(s).
BUILDING DIVISION
49. Plans shall be prepared to the applicable code at the time of submittal for the
building permit. Currently, these are the 2022 California Building Codes. As of
January 1, 2026, the 2025 California Building Codes will take effect.
195
PLANNING COMMISSION RESOLUTION 2025-XXX
CONDITIONS OF APPROVAL - RECOMMENDED
SPECIFIC PLAN 2024-0005
CONDITIONAL USE PERMIT 2024-0007
SITE DEVELOPMENT PERMIT 2024-0014
PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH
ADOPTED:
PAGE 11 OF 14
a. Plans shall show that the proper number of plumbing fixtures are being
provided for the proposed occupancy meeting the requirements of Chapter
4 of the 2022 California Plumbing Code (CPC), Table 422.1. Fixture
calculations requiring multiple fixtures per each sex require privacy
partitions to be provided in accordance with CBC Sections 1210.3.1 and
1210.3.2.
b. Plans shall show requirements for both EV capable spaces and spaces
equipped with EV Supply Equipment (EVSE) that create EV Charging
Spaces (EVCS) in the number indicated in Table 5.106.5.3.1, including
those required to be accessible per CBC 11B-228.3.
c. Plans shall include a note that separate permitting is required for Trash
Enclosure, Flagpoles, Site Lighting, Menu Boards, and Building Signage.
50. Photovoltaic and Energy Storage System required based on Solar Access Roof
Areas (SARA) @ 14 Watts or CFA x A / 1000 of Table 140.10-A, applies to
Grocery, Office, Unleased Tenant Space, Retail, Warehouse, Auditorium,
Convention Center, Hotel/Motel, Library, Medical, Restaurant, Theater.
FIRE DEPARTMENT
51. Fire Protection Water Supplies/Fire Flow - Prior to building permit issuance, the
applicant shall provide documentation showing a water system capable of
delivering 1,000 gallons per minute at 20 psi for 2 hours. A minimum of one fire
hydrant is required. The fire hydrant shall be located no more than 400 feet from
all portions of the exterior of the building as measured along an approved route.
The fire hydrant shall be located within 20 to 100 feet of the fire department
connection. The size and number of outlets required for the approved fire hydrant
are 4” x 2 ½” x 2 ½”.
52. Prior to building permit issuance, a fire access site plan shall be submitted for
review and approval. Fire apparatus access roads shall be provided to within 150
feet of all exterior portions of buildings, unless otherwise approved by the Fire
Department. Fire apparatus access roads shall have an unobstructed width of not
less than 24 feet.
53. Building Plan Review - Submittal of construction plans to the Fire Department will
be required. Final fire and life safety conditions will be addressed when the Fire
Department reviews these plans. These conditions will be based on California Fire
Code, California Building Code (CBC), and related codes/standards adopted at the
time of construction plan submittal.
196
PLANNING COMMISSION RESOLUTION 2025-XXX
CONDITIONS OF APPROVAL - RECOMMENDED
SPECIFIC PLAN 2024-0005
CONDITIONAL USE PERMIT 2024-0007
SITE DEVELOPMENT PERMIT 2024-0014
PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH
ADOPTED:
PAGE 12 OF 14
54. Fire Alarm and Detection System - A water flow monitoring system and/or fire
alarm system may be required as determined at the time of building construction
plan review.
55. Fire Sprinkler System - All new commercial buildings and structures 3,600 square
feet or larger shall be protected by a fire sprinkler system. Reference CFC 903.2
as amended by the City of La Quinta.
56. An automatic fire extinguishing system must be installed over cooking equipment
that produces grease-laden vapors. System plans must be submitted to the Fire
Department for review and approval prior to installation.
TRIBAL CULTURAL RESOURCES
57. Workers Environmental Awareness Program: A qualified archaeologist who meets
or exceeds the Secretary of Interior’s Professional Qualification Standards for
archaeology (NPS, 1983) shall conduct Workers Environmental Awareness
Program (WEAP) training on archaeological sensitivity for all construction
personnel prior to the commencement of any ground-disturbing activities.
Archaeological sensitivity training shall include a description of the types of cultural
material that may be encountered, cultural sensitivity issues, the regulatory
environment, and the proper protocol for the treatment of the materials in the event
of a find. The WEAP training document shall include materials that convey the
information noted above, which shall be maintained in an area accessible to all
construction personnel so that it may be reviewed regularly by construction staff.
58. Native American Monitor: Prior to issuance of grading permits, the applicant/owner
or contractor shall provide executed contracts or agreements with a Native
American monitor associated with local tribes. The purpose of this agreement shall
be to formalize protocols and procedures between the Applicant/Owner and the
Native American monitor for the protection and treatment of, including but not
limited to, Native American human remains, funerary objects, cultural and religious
landscapes, ceremonial items, and traditional gathering areas and tribal cultural
resources located and/or discovered through a monitoring program in conjunction
with the construction of the proposed project. At the discretion of the Native
American monitor, artifacts may be made available for 3D scanning/printing, with
scanned/printed materials to be curated at a local repository meeting the federal
standards of 36CFR79. The Native American Monitor shall attend all applicable
pre-construction meetings with the General Contractor and shall be present on-
site full time during grubbing, grading, and other ground-altering activities,
including the placement of imported fill materials, to identify evidence of potential
tribal resources.
197
PLANNING COMMISSION RESOLUTION 2025-XXX
CONDITIONS OF APPROVAL - RECOMMENDED
SPECIFIC PLAN 2024-0005
CONDITIONAL USE PERMIT 2024-0007
SITE DEVELOPMENT PERMIT 2024-0014
PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH
ADOPTED:
PAGE 13 OF 14
59. Potential Discovery of Tribal Cultural Resources: The Native American Monitor can
stop ground-disturbing activities if unknown tribal cultural resources or artifacts are
found. All work must cease in the vicinity of any archaeological discovery until the
Native American Monitor can assess its significance and potential eligibility for the
California Register of Historical Resources (CRHR). If buried cultural deposits are
encountered, the monitor may request that construction halt nearby and must
notify a qualified archaeologist within 24 hours for investigation.
Work will be redirected away from these areas for assessment. Minor finds will be
documented and secured for later repatriation; if items cannot be securely stored
on-site, they may be stored off-site. If the discovered resources are deemed
potentially significant, the involved Tribes will be notified for consultation on their
respectful treatment. Avoidance of significant resources is preferred, but if not
feasible, a data recovery plan may be required. The Tribes will be consulted on
this plan as well.
60. Treatment of Tribal Cultural Resources: The landowner shall relinquish ownership
of all tribal cultural resources unearthed during the cultural resource mitigation
monitoring conducted during all ground disturbing activities, and from any previous
archaeological studies or excavations on the Project site to the affiliated TCA Tribe,
as determined through the appropriate process, for respectful and dignified
treatment and disposition, including reburial at a protected location on-site, in
accordance with the Tribe’s cultural and spiritual traditions. All cultural materials
that are associated with burial and/or funerary goods would be repatriated to the
Most Likely Descendant as determined by the NAHC per California Public
Resources Code Section 5097.98. No tribal cultural resources shall be subject to
curation.
61. Unanticipated Discovery of Human Remains: As specified by California Health and
Safety Code Section 7050.5, if human remains are found on the Project site during
construction or during archaeological work, the person responsible for the
excavation, or his or her authorized representative, shall immediately notify the
Riverside County Coroner’s Office by telephone. No further excavation or
disturbance of the site or any nearby area reasonably suspected to overlie
adjacent remains shall occur until the Coroner Medical Examiner has made the
necessary findings as to origin and disposition pursuant to Public Resources Code
5097.98. If such a discovery occurs, a temporary construction exclusion zone shall
be established surrounding the area of the discovery so that the area would be
protected, and consultation and treatment could occur as prescribed by law. If
suspected Native American remains are discovered, the remains shall be kept in-
situ, or in a secure location in close proximity to where they were found, and the
198
PLANNING COMMISSION RESOLUTION 2025-XXX
CONDITIONS OF APPROVAL - RECOMMENDED
SPECIFIC PLAN 2024-0005
CONDITIONAL USE PERMIT 2024-0007
SITE DEVELOPMENT PERMIT 2024-0014
PROJECT: HIGHWAY 111/ADAMS STREET DRIVE-THROUGH
ADOPTED:
PAGE 14 OF 14
analysis of the remains shall only occur on-site in the presence of a Native
American Monitor. By law, the Coroner Medical Examiner shall determine within
two working days of being notified if the remains are subject to his or her authority.
If the Coroner Medical Examiner identifies the remains to be of Native American
ancestry, he or she shall contact the NAHC within 24 hours. The NAHC shall make
a determination as to the Most Likely Descendent.
199
ATTACHMENT 1
Vicinity Map
200
ATTACHMENT 2
FINDINGS
Specific Plan 2024-0005
(Amendment No. 3 to SP1989-014)
1. The proposed Specific Plan Amendment is consistent with the General Plan land
use designation of General Commercial. The City’s General Plan policies relating to
the General Commercial designation encourage a full range of commercial uses,
including drive through restaurants, coffee shops, or other drive through uses.
2. Approval of the Specific Plan Amendment will not create conditions materially
detrimental to the public health, safety, and general welfare, as development already
occurs within this Specific Plan area, and further development of the area will be
consistent with the urbanized nature where the project is located.
3. The proposed Specific Plan Amendment is compatible with zoning on surrounding
properties, which allows and contains commercial retail and restaurant
development.
4. The proposed Specific Plan Amendment is suitable and appropriate for the subject
property, as the site is flat, already developed with parking areas and drive aisles,
and commercial development.
Conditional Use Permit 2024-0007
1. The proposed development is consistent with the General Plan land use designation
of General Commercial. The City’s General Plan policies relating to the General
Commercial designation encourage a full range of commercial uses, including drive
through restaurants, coffee shops, or other drive through uses. The proposed project
meets the Goals and Policies of the General Plan as follows:
a. Goals LU-6 and ED-1 as it will contribute to a balanced and varied economic
base, which provides fiscal stability to the City, and a broad range of goods
and services to its residents and the region.
b. The project's conceptual landscape design is consistent with Goal WR-1
and Policy UTL-1.2, as it will result in the efficient use and conservation of
the City’s water resources.
2. The proposed development, as conditioned, is consistent with the intent of the
Regional Commercial District as well as the development standards of the City’s
Zoning Code. The project satisfies the District’s intent to provide for automobile-
oriented sales and services for the regionally oriented commercial area along
Highway 111. The project is consistent with the non-residential development
standards.
201
3. The La Quinta Design and Development Department has determined that this
project is exempt from environmental review pursuant to Section 15332 (Class 32)
of the California Environmental Quality Act for Infill Development since the project
consists of an approximate 3,690 square foot building and meets the criteria for infill
development since it is less than five acres and is located in an urbanized and built-
out area. The project site has no value as habitat for endangered, rare, or threatened
species. Approval of the project will not result in any significant effects relating to
traffic, noise, air quality, or water quality. The site can be adequately served by all
required utilities and public services [Exhibit B].
4. Approval of the application will not create conditions materially detrimental to the
public health, safety, and general welfare or injurious to or incompatible with other
properties or land uses in the vicinity. The project consists of a local-serving drive
through use.
Site Development Permit 2024-0014
1. The proposed development is consistent with the General Plan land use designation
of General Commercial. The City’s General Plan policies relating to the General
Commercial designation encourage a full range of commercial uses, including drive
through restaurants, coffee shops, or other drive through uses. The proposed project
meets the Goals and Policies of the General Plan as follows:
a. Goals LU-6 and ED-1 as it will contribute to a balanced and varied economic
base, which provides fiscal stability to the City, and a broad range of goods
and services to its residents and the region.
b. The project's conceptual landscape design is consistent with Goal WR-1
and Policy UTL-1.2, as it will result in the efficient use and conservation of
the City’s water resources.
2. The proposed development, as conditioned, is consistent with the development
standards of the City’s Zoning Code in terms of site plan and landscaping. The Site
Development Permit is compliant with the Zoning Code’s development standards,
including standards for setbacks, heights, and parking.
3. The La Quinta Design and Development Department has determined that this
project is exempt from environmental review pursuant to Section 15332 (Class 32)
of the California Environmental Quality Act for Infill Development since the project
consists of an approximate 3,690 square foot building and meets the criteria for infill
development since it is less than five acres and is located in an urbanized and built-
out area. The project site has no value as habitat for endangered, rare, or threatened
species. Approval of the project will not result in any significant effects relating to
traffic, noise, air quality, or water quality. The site can be adequately served by all
required utilities and public services
202
4. The architecture and layout of the project are compatible with, and not detrimental
to, the existing surrounding commercial land uses and are consistent with the
development standards in the Municipal Code.
5. The site design of the project is compatible with the surrounding development and
with the quality of design prevalent in the city. The proposed building is compatible
with the surrounding development within the shopping center.
6. The proposed project implements the standards for landscaping and aesthetics
established in the General Plan and Zoning Code. The landscape palette is
consistent with the City’s drought-tolerant landscaping requirements.
203
ATTACHMENT 3
PROJECT INFORMATION
CASE NUMBER: SPECIFIC PLAN AMENDMENT 2024-0005
CONDITIONAL USE PERMIT 2024-0007
SITE DEVELOPMENT PERMIT 2024-0014
REQUEST: CONSIDER ADOPTING A RESOLUTION TO RECOMMEND CITY
COUNCIL APPROVE A SPECIFIC PLAN AMENDMENT,
CONDITIONAL USE PERMIT, AND SITE DEVELOPMENT PERMIT
FOR AN APPROXIMATE 3,690 SQUARE FOOT DRIVE THROUGH
BUILDING
LOCATION: APN: 643-080-064
CEQA: THE LA QUINTA DESIGN AND DEVELOPMENT DEPARTMENT
HAS DETERMINED THAT THIS PROJECT IS EXEMPT FROM
ENVIRONMENTAL REVIEW PURSUANT TO SECTION 15332
(CLASS 32) OF THE CALIFORNIA ENVIRONMENTAL QUALITY
ACT FOR INFILL DEVELOPMENT SINCE THE PROJECT
CONSISTS OF AN APPROXIMATE 3,690 SQUARE-FOOT
BUILDING AND MEETS THE CRITERIA FOR INFILL
DEVELOPMENT.
GENERAL PLAN
DESIGNATION: GENERAL COMMERCIAL
ZONING
DESIGNATION: REGIONAL COMMERCIAL
SURROUNDING
ZONING/
LAND USES: NORTH: REGIONAL COMMERCIAL / RETAIL STORE
SOUTH: REGIONAL COMMERCIAL / SERVICE STATION AND
GAS STATION
EAST: REGIONAL COMMERCIAL / SHOPPING CENTER
WEST: REGIONAL COMMERCIAL / SHOPPING CENTER
204
44530 SAN PABLO AVE SUITE 200 PALM DESERT CA 92260 T • 760 779 5393 F • 760 779 5395
STATEMENT OF OPERATIONS
TO: City of La Quinta
CC:
FROM: Prest Vuksic Greenwood Architects
DATE: December 12, 2024
RE: Statement of Operations
PROJECT: 111 La Quinta Drive-Thru Pad
111 La Quinta Drive-Thru Pad Statement of Operations:
Description of Proposed Use:
The drive-thru facility will serve as a convenient service point for customers to purchase
a variety of products, including but not limited to coffee, specialty beverages, quick-
service meals, baked goods, fast food items, and retail convenience products. The
primary objective is to offer high-quality, fast, and efficient service to meet customer
needs across a wide range of offerings.
Hours of Operation:
The drive-thru will operate from 6:00 AM to 10:00 PM, with flexibility to adjust hours based
on customer demand and peak traffic periods. Early morning and evening service will
cater to commuters and late-night patrons, respectively.
Number of Employees:
The operation will employ 8–14 staff members per shift, depending on the time of day
and expected customer volume. Roles include order takers, cashiers, food preparers,
and shift supervisors.
List of Local/State/Federal Licenses/Permits Required:
1.Local business license
2.Food service establishment permit
3.Health department certification
4.Fire safety inspection approval
5.Building/zoning permits (specific to drive-thru operations)
6.Environmental compliance certifications (if applicable)
ATTACHMENT 4
205
- 2 -
44530 SAN PABLO AVE SUITE 200 PALM DESERT CA 92260 T • 760 779 5393 F • 760 779 5395
Types of Equipment and Processes Used:
1. Equipment:
o Point-of-sale (POS) system for order processing
o Drive-thru communication headsets and speaker systems
o Food preparation equipment (grills, fryers, ovens, blenders)
o Beverage machines (coffee makers, espresso machines, soda dispensers)
o Refrigeration and storage units for perishable items
2. Processes:
o Streamlined workflows for order-taking, preparation, and delivery
o Integration of mobile ordering and contactless payment options
o Regular cleaning and maintenance schedules for equipment and
facilities
List of Any Hazardous Materials Used/Stored/Produced:
• Small quantities of cleaning supplies (e.g., degreasers, disinfectants) will be
stored and used following safety guidelines.
• No hazardous waste or materials will be produced during normal operations.
206
April 25, 2025
Prepared by:
TJW ENGINEERING, INC.
9841 Irvine Center Drive, Suite 200
Irvine, CA 92618
949.878.3509 | www.tjwengineering.com
Adams Street & Corporate Centre Drive
Traffic Impact Analysis
City of La Quinta, California
ATTACHMENT 5
207
April 25, 2025
Mr. Michael J. Shovlin
ADAMS ONE ELEVEN LLC
900 Island Drive, Unit 312
Rancho Mirage, CA 92270
Subject: Traffic Impact Analysis – Adams Street & Corporate Centre Drive, City of La Quinta, CA
Dear Mr. Shovlin:
TJW ENGINEERING, INC. (TJW) is pleased to present to you with this traffic impact analysis for the proposed
project located at the southwest corner of Adams Street and Corporate Centre Drive in the City of La Quinta,
California. The development is for the construction of a 3,800 square coffee shop with a drive-through
window.
This traffic study has been prepared to meet the traffic study requirements for the City of La Quinta and
assesses the forecast traffic operations associated with the proposed project and its impact on the local street
network. This report is being submitted to you for review and forwarding to the City of La Quinta.
Please contact us at (949) 878-3509 if you have any questions regarding this analysis.
Sincerely,
Thomas Wheat, PE, TE David Chew, PTP
President Transportation Planner
Registered Civil Engineer #69467
Registered Traffic Engineer #2565
208
Adams Street & Corporate Centre Drive
Traffic Impact Analysis
City of La Quinta, California
April 25, 2025
Prepared for:
Mr. Michael J. Shovlin
ADAMS ONE ELEVEN LLC
900 Island Drive, Unit 312
Rancho Mirage, CA 92270
Prepared by:
Thomas Wheat, PE, TE
David Chew, PTP
TJW ENGINEERING, INC.
9841 Irvine Center Drive, Suite 200
Irvine, CA 92618
949.878.3509 | www.tjwengineering.com
209
MSA-24-001
4
Table of Contents
1.0 EXECUTIVE SUMMARY ................................................................................................................................... 6
1.1 SUMMARY OF LEVEL OF SERVICE ANALYSIS RESULTS ..................................................................... 6
1.2 ON-SITE ROADWAY AND SITE ACCESS IMPROVEMENTS ................................................................. 7
2.0 INTRODUCTION ............................................................................................................................................. 8
2.1 PROJECT DESCRIPTION .................................................................................................................... 8
2.2 STUDY AREA .................................................................................................................................... 8
2.3 INTERSECTION ANALYSIS METHODOLOGY ...................................................................................... 9
2.4 CITY OF LA QUINTA PERFORMANCE CRITERIA .............................................................................. 10
3.0 EXISTING CONDITIONS ................................................................................................................................ 13
3.1 EXISTING CIRCULATION NETWORK/STUDY AREA CONDITIONS .................................................... 13
3.2 EXISTING PUBLIC TRANSIT SERVICES ............................................................................................. 13
3.3 PEDESTRIANS AND BICYCLES ......................................................................................................... 13
3.4 EXISTING TRAFFIC VOLUMES ........................................................................................................ 13
3.5 EXISTING CONDITIONS INTERSECTION LEVEL OF SERVICE ANALYSIS ............................................ 14
4.0 PROPOSED PROJECT .................................................................................................................................... 17
4.1 PROJECT DESCRIPTION .................................................................................................................. 17
4.2 PROJECT TRIP GENERATION .......................................................................................................... 17
4.3 PROJECT TRIP DISTRIBUTION ........................................................................................................ 17
4.4 SIGHT DISTANCE ANALYSIS ........................................................................................................... 18
4.5 ON-SITE CIRCULATION ANALYSIS .................................................................................................. 18
5.0 OPENING YEAR (OY) TRAFFIC CONDITIONS ................................................................................................. 22
5.1 ROADWAY IMPROVEMENTS ......................................................................................................... 22
5.2 CUMULATIVE PROJECTS TRAFFIC .................................................................................................. 22
5.3 OPENING YEAR TRAFFIC VOLUMES ............................................................................................... 23
5.4 OPENING YEAR INTERSECTION LOS ANALYSIS ............................................................................... 24
6.0 OPENING YEAR PLUS PROJECT (OYP) TRAFFIC CONDITIONS ....................................................................... 27
6.1 ROADWAY IMPROVEMENTS ......................................................................................................... 27
6.2 OPENING YEAR PLUS PROJECT TRAFFIC VOLUMES ....................................................................... 27
6.3 OPENING YEAR PLUS PROJECT INTERSECTION LEVEL OF SERVICE ANALYSIS ................................ 27
6.4 ALTERNATIVE SCENARIOS OPENING YEAR PLUS PROJECT INTERSECTION LEVEL OF SERVICE
ANALYSIS ................................................................................................................................................... 28
7.0 DRIVE-THROUGH QUEUE ANALYSIS ............................................................................................................ 31
7.1 DRIVE-THROUGH QUEUE ANALYSIS METHODOLOGY ................................................................... 31
7.2 DRIVE-THROUGH QUEUE OBSERVATION RESULTS ........................................................................ 31
210
MSA-24-001
5
List of Tables
Table 1: HCM – LOS & Delay Ranges – Signalized Intersections ...................................................................... 9
Table 2: Roadway Characteristics within Study Area ..................................................................................... 13
Table 3: Intersection Analysis – Existing Conditions ...................................................................................... 14
Table 4: Proposed Project Trip Generation ................................................................................................... 17
Table 5: Cumulative Projects List and Trip Generation .................................................................................. 23
Table 6: Intersection Analysis – Opening Year Conditions ............................................................................. 24
Table 7: Intersection Analysis – Opening Year Plus Project Conditions ......................................................... 27
Table 8: Intersection Analysis – Opening Year Plus Project Conditions ......................................................... 28
Table 9: Summary of Drive-Through Queue Observations and Analysis ........................................................ 32
List of Exhibits
Exhibit 1: Project Location ............................................................................................................................. 11
Exhibit 2: Proposed Project Site Plan ............................................................................................................. 12
Exhibit 3: Lane Geometry and Intersection Controls ..................................................................................... 15
Exhibit 4: Existing AM and PM Peak Hour Volumes ....................................................................................... 16
Exhibit 5: Proposed Trip Distribution ............................................................................................................. 19
Exhibit 6: Sight Distance Analysis .................................................................................................................. 20
Exhibit 7: On-Site Circulation ......................................................................................................................... 21
Exhibit 8: Cumulative Project Locations ........................................................................................................ 25
Exhibit 9: Opening Year AM and PM Peak Hour Volumes ............................................................................. 26
Exhibit 10: Opening Year Plus Project AM and PM Peak Hour Volumes ........................................................ 29
Exhibit 11: Lane Geometry and Intersection Controls for Alternative OYP Scenarios .................................... 30
Exhibit 12: Proposed Queue .......................................................................................................................... 33
Exhibit 13: Comparable Site Locations .......................................................................................................... 34
Appendices
Appendix A: Glossary of Terminology
Appendix B: Scoping Agreement
Appendix C: Existing Traffic Counts
Appendix D: HCM Analysis Sheets
211
MSA-24-001
6
1.0 EXECUTIVE SUMMARY
This traffic impact analysis (TIA) analyzes the projected traffic operations associated with the proposed
land use project located at the southwest corner of Adams Street and Corporate Centre Drive in the City of
La Quinta, California. The purpose of this TIA is to evaluate potential circulation system deficiencies that may
result from the development of the proposed project, and to recommend improvements to achieve
acceptable operations, if applicable. This analysis has been prepared in coordination with the City of La
Quinta via a scoping agreement (See Appendix B) and follows the City of La Quinta 2035 General Plan (City
General Plan) (November 2013) and the City of La Quinta Traffic Impact Study Guidelines (City Guidelines)
(June 2012).
The proposed project is for the construction of a 3,800 square coffee shop with a drive-through window. The
proposed project will be accessible via the existing driveway west of the intersection of Adams Street and
Corporate Centre Drive. The project site is currently designated for General Commercial (CG) land use. The
site is zoned as Regional Commercial (CR). The project site is currently vacant.
The proposed project is anticipated to be built and generating trips in 2025. The proposed project is projected
to generate 2,028 new daily trips including 326 AM peak hour trips and 148 PM peak hour trips.
One (1) intersection in the vicinity of the project site have been included in the intersection level of service
(LOS) analysis:
1. Adams Street/Corporate Centre Drive
The study intersection is analyzed for the following study scenarios:
• Existing Traffic Conditions;
• Opening Year (OY) Traffic Conditions;
• Opening Year Plus Project (OYP) Traffic Conditions.
1.1 SUMMARY OF LEVEL OF SERVICE ANALYSIS RESULTS
Table ES-1 summarizes the results of the intersection level of service analysis based on the City of La Quinta
thresholds of significance for analyzing transportation deficiencies.
212
MSA-24-001
7
Table ES-1
Summary of Transportation Deficiencies at the Study Intersection
Intersection Existing Opening Year Opening Year
+Project
1 Adams Street Corporate Centre Drive - - -
Existing Traffic Conditions
The study intersection is projected to operate at an acceptable LOS during the AM and PM peak hours for
Existing traffic conditions.
Opening Year (OY) Traffic Conditions
The study intersection is projected to operate at an acceptable LOS during the AM and PM peak hours for
Opening Year traffic conditions.
Opening Year Plus Project (OYP) Traffic Conditions
The study intersection is projected to operate at an acceptable LOS during the AM and PM peak hours for
Background traffic conditions.
1.2 ON-SITE ROADWAY AND SITE ACCESS IMPROVEMENTS
Wherever necessary, roadways adjacent to the proposed project site and site access points will be
constructed in compliance with recommended roadway classifications and respective cross-sections in the
City General Plan or as directed by the City Engineer.
Sight distance at each project access point should be reviewed with respect to standard Caltrans and City
sight distance standards at the time of final grading, landscaping and street improvement plans.
Signing and stripping shall be implemented in conjunction with detailed construction plans for the project
site.
213
MSA-24-001
8
2.0 INTRODUCTION
This traffic impact analysis (TIA) analyzes the projected traffic operations associated with the proposed
land use project located at the southwest corner of Adams Street and Corporate Centre Drive in the City of
La Quinta, California. The purpose of this TIA is to evaluate potential circulation system deficiencies that may
result from the development of the proposed project, and to recommend improvements to achieve
acceptable operations, if applicable. This analysis has been prepared in coordination with the City of La
Quinta via a scoping agreement (See Appendix B) and follows the City of La Quinta 2035 General Plan (City
General Plan) (November 2013) and the City of La Quinta Traffic Impact Study Guidelines (City Guidelines)
(June 2012).
2.1 PROJECT DESCRIPTION
The proposed project is for the construction of a 3,800 square coffee shop with a drive-through window. The
proposed project will be accessible via the existing driveway west of the intersection of Adams Street and
Corporate Centre Drive. The project site is currently designated for General Commercial (CG) land use. The
site is zoned as Regional Commercial (CR). The project site is currently vacant.
Exhibit 1 displays a map with the proposed project location. Exhibit 2 shows the project site plan.
2.2 STUDY AREA
One (1) intersection in the vicinity of the project site has been included in the intersection level of service
(LOS) analysis:
1. Adams Street/Corporate Centre Drive
The intersection is located within the City of La Quinta. The study intersection is analyzed for the following
study scenarios:
• Existing Traffic Conditions;
• Opening Year (OY) Traffic Conditions;
• Opening Year Plus Project (OYP) Traffic Conditions.
Traffic operations are evaluated for the following time periods:
• Weekday AM Peak Hour occurring between 7:00 AM to 9:00 AM;
• Weekday PM Peak Hour occurring between 4:00 PM to 6:00 PM.
214
MSA-24-001
9
2.3 INTERSECTION ANALYSIS METHODOLOGY
Level of Service (LOS) is commonly used to describe the quality of flow on roadways and at intersections
using a range of LOS from LOS A (free flow with little congestion) to LOS F (severely congested conditions).
The definitions for LOS for interruption of traffic flow differ depending on the type of traffic control (traffic
signal, unsignalized intersection with side street stops, unsignalized intersection with all-way stops). The
Highway Capacity Manual 7th Edition (HCM) (Transportation Research Board, 2022) methodology expresses
the LOS of an intersection in terms of delay time for the intersection approaches. The HCM methodology
utilizes different procedures for different types of intersection controls.
City Guidelines allow signalized intersection operations to be analyzed utilizing the HCM methodology.
Intersection LOS for signalized intersections is based on the intersection’s average control delay for all
movements at the intersection during the peak hour. Control delay includes initial deceleration delay, queue
move-up time, stopped delay, and final acceleration delay. The procedure for stop-control analysis
determines the average total delay, expressed in seconds of delay per vehicle, for left turns from the major
street and from the stop-controlled minor street traffic stream. Delay values are calculated based on the
relationship between traffic on the major street and the availability of acceptable “gaps” in this stream
through which conflicting traffic movements can be made.
Intersection operation for unsignalized intersections is based on the weighted average control delay
expressed in seconds per vehicle. At a two-way or side-street stop-controlled intersection, LOS is calculated
for each stop-controlled minor street movement, for the left-turn movement(s) from the major street, and
for the intersection as a whole. For approaches consisting of a single lane, the delay is calculated as the
average of all movements in that lane. For all-way stop-controlled intersection, LOS is computed for the
intersection as a whole.
Table 1 describes the general characteristics of traffic flow and accompanying delay ranges at signalized
intersections.
Table 1:
HCM – LOS & Delay Ranges – Signalized Intersections
Level of
Service
Average Control Delay (Seconds/Vehicle)
Signalized Intersections Unsignalized Intersections
A 0 – 10.00 0 – 10.00
B 10.01 – 20.00 10.01 – 15.00
C 20.01 – 35.00 15.01 – 25.00
D 35.01 – 55.00 25.01 – 35.00
E 55.01 – 80.00 35.01 – 50.00
F > 80.01 > 50.01
Source: Highway Capacity Manual, 7th Edition (Transportation Research Board, 2022).
215
MSA-24-001
10
Collected peak hour traffic volumes have been adjusted using a peak hour factor (PHF) to reflect peak 15-
minute volumes. It is a common practice in LOS analysis to conservatively use a peak 15-minute flow rate
applied to the entire hour to derive flow rates in vehicles per hour that are used in the LOS analysis. The PHF
is the relationship between the peak 15-minute flow rate and the full hourly volume. PHF = [Hourly Volume]/
[4 * Peak 15-Minute Volume]. The use of a 15-minute PHF produces a more detailed and conservative
analysis compared to analyzing vehicles per hour. Existing PHFs, obtained from the existing traffic counts
have been used for all analysis scenarios in this study.
This analysis utilizes PTV Vistro, Version 2025 analysis software for all signalized intersections. Vistro is a
macroscopic traffic software program that is based on the signalized intersection capacity analysis specified
in Chapter 16 of the HCM. The level of service and capacity analysis performed within Vistro takes the
optimization and coordination of signalized intersections within a network into consideration.
2.4 CITY OF LA QUINTA PERFORMANCE CRITERIA
The City General Plan has established City of La Quinta mandates that the City strive to maintain the minimum
level of service for its intersections at no worse than LOS D.
216
Not to Scale
džŚŝďŝt ϭ͗ Wƌoũect >ocatŝoŶ
Adams Street and Corporate Centre Drive Traffic Impact Analysis MSA-24-001
Legend:
Project Site
Highwa
y
1
1
1
Corporate Centre Drive
Ad
a
m
S
t
r
e
e
t
Study Intersection Location#
1
217
Not to Scale
džŚŝďŝt Ϯ͗ WƌoƉoƐeĚ Sŝte WlaŶ
Adams Street and Corporate Centre Drive Traffic Impact Analysis MSA-24-001 218
MSA-24-001
13
3.0 EXISTING CONDITIONS
3.1 EXISTING CIRCULATION NETWORK/STUDY AREA CONDITIONS
The characteristics of the roadways in the study intersection are described in Table 2.
Table 2:
Roadway Characteristics within Study Area
Roadway Classification1 Jurisdiction Direction Existing
Travel Lanes
Median
Type2
Speed
Limit (mph)
On-Street
Parking
Adams Street Secondary Arterial 4UD La Quinta North-South 4 RM 45 No
Corporate Centre Drive Collector La Quinta East-West 2 NM 25 No
1: Source: City of La Quinta 2035 General Plan (November 2013).
2: RM= Raised Median, NM = No Median.
Exhibit 3 shows the Existing study area lane geometry and intersection controls.
3.2 EXISTING PUBLIC TRANSIT SERVICES
The City of La Quinta is served by the SunLine Transit Agency which provides bus service throughout the
Coachella Valley region. SunLine Route 7 travels between census-designated Bermuda Dunes and the City of
La Quinta and travels past the proposed project along Adams Street. It includes two (2) stops less than one-
third (1/3) of a mile from the site. Appendix B contains a map and schedule of SunLine Route 7.
3.3 PEDESTRIANS AND BICYCLES
The City General Plan indicates a Class III bicycle path is planned for Adams Street along the proposed project
frontage. There are pedestrian crosswalks at all four approaches of the study intersection. Sidewalks exist on
Adams Street and the westbound leg of Corporate Centre Drive. The proposed project includes the
construction of a sidewalk on the eastbound leg of Corporate Centre Drive along the project frontage.
3.4 EXISTING TRAFFIC VOLUMES
To determine the existing operation of the study intersection, AM and PM peak period traffic volumes were
collected on Tuesday, December 17, 2024. Detailed traffic count data is provided in Appendix C. The existing
AM and PM peak hour volumes at the study intersection is shown in Exhibit 4.
219
MSA-24-001
14
3.5 EXISTING CONDITIONS INTERSECTION LEVEL OF SERVICE ANALYSIS
The intersection analysis of the AM and PM peak hours for Existing traffic conditions is shown in Table 3.
Calculations are based on the Existing geometrics at the study area intersection as shown previously in
Exhibit 3. HCM analysis sheets are provided in Appendix D.
Table 3:
Intersection Analysis – Existing Conditions
Intersection Control Type Peak Hour
Existing Conditions
Delay1 LOS
1 Adams Street Corporate Centre Drive Signal AM 18.2 B
PM 18.8 B
1: Delay shown in seconds per vehicle. Per the Highway Capacity Manual 7th Edition, overall average delay and LOS are shown for signalized and all-way stop-
controlled intersections.
As shown in Table 3, the study intersection is currently operating at an acceptable LOS during the AM and
PM peak hours for Existing traffic conditions.
220
Not to Scale
džŚŝďŝt ϯ͗ >aŶe 'eoŵetƌLJ aŶĚ /ŶteƌƐectŝoŶ oŶtƌolƐ
Adams Street and Corporate Centre Drive Traffic Impact Analysis MSA-24-001
Legend:
Project Site
Highway 1
1
1
Study Intersection Location#
1 Corporate Centre Drive
Ad
a
m
S
t
r
e
e
t
Adam Street/
Corporate Centre Drive-Driveway
221
Not to Scale
džŚŝďŝt ϰ͗ džŝƐtŝŶŐ D aŶĚ WD WeaŬ ,oƵƌ solƵŵeƐ
Adams Street and Corporate Centre Drive Traffic Impact Analysis MSA-24-001
Legend:
Project Site
Highway 1
1
1
Study Intersection Location#
1 Corporate Centre Drive
Ad
a
m
S
t
r
e
e
t
Adam Street/
Corporate Centre Drive-Driveway
AM Peak Hour Volumes PM Peak Hour Volumes
Adam Street/
Corporate Centre Drive-Driveway
222
MSA-24-001
17
4.0 PROPOSED PROJECT
4.1 PROJECT DESCRIPTION
The proposed project is for the construction of a 3,800 square foot coffee shop with a drive-through window.
The proposed project will be accessible via the existing driveway west of the intersection of Adams Street
and Corporate Centre Drive. The project site is currently designated for General Commercial (CG) land use.
The site is zoned as Regional Commercial (CR). The project site is currently vacant.
Exhibit 2 previously showed the proposed project site plan.
4.2 PROJECT TRIP GENERATION
Trip generation represents the amount of traffic, both inbound and outbound, produced by a development.
Determining trip generation for a proposed project is based on projecting the amount of traffic that the
specific land uses being proposed will produce. Industry standard Institute of Transportation Engineers (ITE)
Trip Generation Manual (11th Edition, 2021) trip generation rates were used to determine trip generation of
for the proposed project land uses.
Table 4 summarizes the projected AM peak hour, PM peak hour and daily trip generation of the proposed
project. The proposed project is projected to generate 2,028 new daily trips including 326 AM peak hour trips
and 148 PM peak hour trips.
Table 4:
Proposed Project Trip Generation
1: Trip generation and pass-by rates from ITE Trip Generation Manual (11th Edition, 2021).
2: TSF = Thousand Square Feet.
4.3 PROJECT TRIP DISTRIBUTION
Projecting trip distribution involves the process of identifying probable destinations and traffic routes that
will be utilized by the proposed project’s traffic. The potential interaction between the proposed land use
and surrounding regional access routes are considered to identify the probable routes onto which project
traffic would distribute. The projected trip distribution for the proposed project is based on anticipated travel
patterns to and from the project site. Exhibit 5 shows the project proposed trip distribution.
Proposed Land Use1 ITE
Code Qty Unit2
Daily AM Peak Hour PM Peak Hour
Rate Volume Rate In:Out
Split
Volume
Rate In:Out
Split
Volume
In Out Total In Out Total
Coffee/Donut shop with
Drive-Through Window 937 3.80 TSF 533.57 2,028 85.88 51:49 166 160 326 38.99 50:50 74 74 148
223
MSA-24-001
18
4.4 SIGHT DISTANCE ANALYSIS
Corner sight distance was reviewed at the proposed exiting drive-through. The parking lot of the shopping
center was assumed to be 15 miles per hour. As such, the recommended minimum stopping sight distance
would be 100 feet, the corner sight distance to the right 145 feet, and the corner sight distance to the left
165 feet. Currently there is more sight distance available than these minimum recommended values at the
proposed parking lot connection so long as the drive-through is designed with the appropriate sight lines.
Exhibit 6 displays the sight distance analysis template.
4.5 ON-SITE CIRCULATION ANALYSIS
A template displaying navigation of a passenger vehicle circulating in and out of the drive-through of the
proposed project was generated to demonstrate the sufficiency of space to maneuver through the project.
A standard passenger vehicle of 20-feet in length was used for the template. The template is provided in
Exhibit 7.
224
Not to Scale
džŚŝďŝt ϱ͗ WƌoƉoƐeĚ dƌŝƉ ŝƐtƌŝďƵtŝoŶ
Adams Street and Corporate Centre Drive Traffic Impact Analysis MSA-24-001
Legend:
Project Site
Highwa
y
1
1
1
Study Intersection Location#
1 Corporate Centre Drive
Ad
a
m
S
t
r
e
e
t
(XX%) Percent Trip Distribution
45%
55%
225
2
0
'
-
0
"
B
U
I
L
D
I
N
G
DN
PR
O
P
E
R
T
Y
L
I
N
E
PROP
E
R
T
Y
L
I
N
E
PROPERTY LINE
26
'
-
0
"
6'
-
0
"
15
'
-
0
"
4
'
-
0
"
1
8
'
-
0
"
PR
O
P
E
R
T
Y
L
I
N
E
OU
T
D
O
O
R
S
E
A
T
I
N
G
AP
P
R
O
X
.
6
5
0
S
F
OR
D
E
R
DIR
E
C
T
I
O
N
A
L
SI
G
N
ADAM
S
S
T
R
E
E
T
DN
DN
DN
4'-0"13'-0"
10
'
-
0
"
10
4
11
2
11
4
10
3
TY
P
.
10
5
TY
P
.
10
3
10
6
TY
P
.
11
6
10
0
10
2
TY
P
.
11
8
11
9
10
2
TY
P
.
11
5
10
8
11
0
10
9
4'-0"3'-6" 5'-0"2'-0"
TY
P
.
10
3
10
3
11
9
DN
TY
P
.
11
1
TY
P
.
10
5
RIGHT TURN
ONLY
1'-0"24'-6"1'-6"
R 11
'
-
0
"
R 2
5
'
-
0
"
R
2
5
'
-
0
"
DN
PI
C
K
UP
Exhibit 6: Sight Distance Analysis
Adam St and Corporate Centre Dr Queue Study MSA-24-001
Project Site
Adams S
t
r
e
e
t
226
MH
LAND
S
C
A
P
E
S
B
10'-0"SETBA
C
K20'-0"
B
U
I
L
D
I
N
G
DN
C
O
M
P
A
C
T
PROPERTY LINE
P
R
O
P
E
R
T
Y
L
I
N
E
P
R
O
P
E
R
T
Y
L
I
N
E
PR
O
P
E
R
T
Y
L
I
N
E
26'-0"6'-0"15'-0"4'-0"
18'-0
"
PROPERTY LIN
E
OUTDOOR SEATING
APPROX. 650 SF
ORDER
DIRECTIONAL
SIGN
A
D
A
M
S
S
T
R
E
E
T
DN
DN DN
4'-
0
"
13
'
-
0
"
10'-0"
104 112 114
113
103
TYP.
105
TYP.
103
106
TYP.
116
100
102
TYP.
117 118
119
102
TYP.
115
108
110 109
4'-
0
"
3'-
6
"
5'-
0
"
2
'
-
0
"
TYP.
103
103 102
119
DN
TYP.
111
TYP.
105
RI
G
H
T
T
U
R
N
ON
L
Y
1'-
0
"
24
'
-
6
"
1'-
6
"
R
1
1
'
-
0
"
R
2
5
'
-
0
"
R 25'
-
0
"
DN
PICK
UP
Passenger Car - P
Passenger Car - P
MH
LAND
S
C
A
P
E
S
B
10'-0"SETBA
C
K20'-0"
B
U
I
L
D
I
N
G
DN
C
O
M
P
A
C
T
PROPERTY LINE
P
R
O
P
E
R
T
Y
L
I
N
E
P
R
O
P
E
R
T
Y
L
I
N
E
PR
O
P
E
R
T
Y
L
I
N
E
26'-0"6'-0"15'-0"4'-0"
18'-0"
PROPERTY LINE
OUTDOOR SEATING
APPROX. 650 SF
ORDER
DIRECTIONAL
SIGN
A
D
A
M
S
S
T
R
E
E
T
DN
DN DN
4'-
0
"
13
'
-
0
"
10'-0"
104 112
114
113
103
TYP.
105
TYP.
103
106
TYP.
116
100
102
TYP.
117 118
119
102
TYP.
115
108
110 109
4'
-
0
"
3'-
6
"
5'-
0
"
2
'
-
0
"
TYP.
103
103 102
119
DN
TYP.
111
TYP.
105
RIG
H
T
T
U
R
N
ON
L
Y
1'-
0
"
24
'
-
6
"
1'-
6
"
R
1
1
'
-
0
"
R
2
5
'
-
0
"
R 25
'
-
0
"
DN
PICK
UP
Passenger Car - P
Pa
s
s
e
n
g
e
r
C
a
r
-
P
Exhibit 7: On-Site Circulation
Adam St and Corporate Centre Dr Queue Study MSA-24-001
Legend:
19
3 11
P - Passenger Car
Overall Length 19.000ft
Overall Width 7.000ft
Overall Body Height 5.101ft
Min Body Ground Clearance 1.116ft
Track Width 6.000ft
Lock-to-lock time 4.00s
Curb to Curb Turning Radius 24.000ft
CIRCULATION EXHIBIT 1 CIRCULATION EXHIBIT 2
227
MSA-24-001
22
5.0 OPENING YEAR (OY) TRAFFIC CONDITIONS
The Opening Year (OY) traffic conditions analysis is intended to analyze the traffic conditions projected for
the proposed project opening year. This study scenario includes analysis of traffic generated by nearby
cumulative projects. It does not include traffic generated by the proposed project.
5.1 ROADWAY IMPROVEMENTS
The lane configurations and traffic controls assumed to be in place for the OY traffic conditions scenario are
consistent with those previously shown in Exhibit 3.
5.2 CUMULATIVE PROJECTS TRAFFIC
City Guidelines require that other reasonably foreseeable development projects which are either approved
or are currently being processed in the study area also be included as part of a cumulative analysis scenario.
A list of cumulative projects was developed for this analysis through consultation with City of La Quinta
staff, and obtainment of current development status reports. A summary of the cumulative projects
including their land uses and trip generation are shown in Table 5. The cumulative project locations are
shown on the map in Exhibit 8.
228
MSA-24-001
23
Table 5:
Cumulative Projects List and Trip Generation
Project Land Use1 ITE
Code Qty Unit3
Daily AM Peak Hour PM Peak Hour
Rate Volume Rate In:Out
Split
Volume Rate In:Out
Split
Volume
In Out Total In Out Total
1 Flora at Jefferson
Square
Multifamily Housing
(Low-Rise) 220 88 DU 6.74 593 0.4 24:76 8 27 35 0.51 63:37 28 17 45
2 Jefferson Street
Apartments
Multifamily Housing
(Low-Rise) 220 42 DU 6.74 283 0.4 24:76 4 13 17 0.51 63:37 13 8 21
3 Dune Palm
Mixed Use
Coffee shop w/ Drive
Through Window 934 4.76 TSF 467.48 2,226 44.61 51:49 108 104 212 33.0
3 52:48 82 75 157
Pass By-Trips
(0.5 Daily, 0.5 AM, 0.55 -1,113 -54 -52 -106 -45 -41 -86
Single-Tunnel Automated
Car Wash2 1.0 Tunnel 1858 1,858 124 50:50 62 62 124 190 50:50 95 95 190
Pass By-Trips
(0.2 Daily, 0.2 AM, 0.2 PM) -372 -12 -12 -25 -19 -19 -38 -372
Multifamily Housing
(Low-Rise) 210 180 DU 6.74 1,213 0.4 24:76 17 55 72 0.51 63:37 58 34 92
4 Hampton Inn Hotel 310 125 RM 7.99 999 0.46 56:44 32 26 58 0.59 51:49 38 36 74
5 St. Francis
Expansion Church 560 22.50 TSF 7.6 171 0.32 62:38 4 3 7 0.49 44:56 5 6 11
6 La Quinta Village
Apartments
Multifamily Housing
(Low-Rise) 220 178 DU 6.74 1,200 0.4 24:76 17 54 71 0.51 63:37 57 34 91
Affordable Housing 223 74 DU 4.81 356 0.36 29:71 8 19 27 0.46 59:41 20 14 34
7 Rancho La Quinta
Club Expansion General Office Building 710 2.92 TSF 10.84 32 1.52 88:12 4 0 4 1.44 17:83 1 3 4
8 Rancho La Quinta
Fitness Health/Fitness Club 492 11.54 TSF 0 0 1.31 51:49 8 7 15 3.45 57:43 23 17 40
Results Daily Volume AM
Peak Hour In Out Total PM
Peak Hour In Out Total
Subtotal 8,93 272 370 642 420 339 759
Pass-By Trips -1,485 -66 -64 -131 -64 -60 -124
Net Total 7,44 206 306 511 356 279 635
1: Trip generation and pass-by rates are from the ITE Trip Generation Manual (11th Edition, 2021) except where noted.
2: Trip generation and pass-by rates are derived from Fast5Xpress Glendora Traffic Impact Analysis FCW21002 (March 2022) prepared by TJW Engineering, Inc.
3: DU = Dwelling Units; TSF = Thousand Square Feet; RM = Room.
5.3 OPENING YEAR TRAFFIC VOLUMES
OY traffic volumes are volumes projected for the proposed project opening year, 2025, including volumes
from nearby cumulative projects. To project traffic volumes for 2025, an annual growth rate of 2% for one
year was applied to the Existing traffic volumes. The projected volumes are then added to the cumulative
project volumes. Exhibit 9 shows OY AM and PM peak hour volumes at the study intersection.
OY Volumes = (Existing (2024) Counts * 1.02) + Cumulative Projects
229
MSA-24-001
24
5.4 OPENING YEAR INTERSECTION LOS ANALYSIS
The intersection analysis for AM and PM peak hours under OY traffic conditions is shown in Table 6. HCM
worksheets are shown in Appendix D.
Table 6:
Intersection Analysis – Opening Year Conditions
Intersection Control Type Peak Hour
OY Conditions
Delay1 LOS
1 Adams Street Corporate Centre Drive Signal AM 17.7 B
PM 18.3 B
1: Delay is shown in seconds per vehicle. Per the Highway Capacity Manual 7th Edition, overall average delay and LOS are shown for signalized and all-way
stop-controlled intersections.
As shown in Table 6, the study intersection is projected to operate at an acceptable LOS during the AM and
PM peak hours for OY traffic conditions.
230
džŚŝďŝt ϴ͗ ƵŵƵlatŝǀe Wƌoũect >ocatŝoŶƐ
Adams Street and Corporate Centre Drive Traffic Impact Analysis MSA-24-001
Legend:
Project Site
Approximate Cumulative Project LocationsX
45
3
8
7
6
2
1
PROJECT
SITE
231
Not to Scale
džŚŝďŝt ϵ͗ KƉeŶŝŶŐ zeaƌ D aŶĚ WD WeaŬ ,oƵƌ solƵŵeƐ
Adams Street and Corporate Centre Drive Traffic Impact Analysis MSA-24-001
Legend:
Project Site
Highway 1
1
1
Corporate Centre Drive
Ad
a
m
S
t
r
e
e
t
Study Intersection Location#
1
Adam Street/
Corporate Centre Drive-Driveway
AM Peak Hour Volumes PM Peak Hour Volumes
Adam Street/
Corporate Centre Drive-Driveway
232
MSA-24-001
27
6.0 OPENING YEAR PLUS PROJECT (OYP) TRAFFIC CONDITIONS
The Opening Year Plus Project (OYP) traffic conditions analysis is intended to analyze impact the proposed
project has on the traffic conditions projected for the proposed project opening year. This study scenario
includes analysis of traffic generated by nearby cumulative projects.
6.1 ROADWAY IMPROVEMENTS
The lane configurations and traffic controls assumed to be in place for the OYP traffic conditions scenario are
consistent with those previously shown in Exhibit 3.
6.2 OPENING YEAR PLUS PROJECT TRAFFIC VOLUMES
OYP traffic volumes are volumes projected for the proposed project opening year, 2025, including volumes
generated by the proposed project and nearby cumulative projects. To project traffic volumes for 2025, an
annual growth rate of 2% for one year was applied to the Existing traffic volumes. The projected volumes are
then added to the volumes of both the proposed project and cumulative projects. Exhibit 10 shows OYP AM
and PM peak hour volumes at the study intersection.
OYP Volumes = (Existing (2024) Counts * 1.02) + Proposed Project + Cumulative Projects
6.3 OPENING YEAR PLUS PROJECT INTERSECTION LEVEL OF SERVICE ANALYSIS
The OYP traffic conditions AM and PM peak hour intersection analysis is shown in Table 7. HCM analysis
sheets are provided in Appendix D.
Table 7:
Intersection Analysis – Opening Year Plus Project Conditions
Intersection Control Type Peak
Hour
E Conditions OYP Conditions
Delay1 LOS Delay1 LOS
1 Adams Street Corporate Centre Drive Signal AM 18.2 B 25.2 B
PM 18.8 B 22.2 C
1: Delay is shown in seconds per vehicle. Per the Highway Capacity Manual 7th Edition, overall average delay and LOS are shown for signalized and all-way
stop-controlled intersections.
As shown in Table 7, the study intersection is projected to operate at an acceptable LOS during the AM and
PM peak hours for OYP traffic conditions.
233
MSA-24-001
28
6.4 ALTERNATIVE SCENARIOS OPENING YEAR PLUS PROJECT INTERSECTION LEVEL OF SERVICE ANALYSIS
The City of La Quinta requested 3 different alternative scenarios to be analyzed at the study intersection of
Adams Street and Corporate Centre Drive.
• Alternative 1 – Four (4) lane configuration at Corporate Centre Drive
• Alternative 2 – One (1) lane configuration along Adams Street (road diet)
• Alternative 3 – Roundabout
Exhibit 11 shows Alternative OYP lane geometry and intersection controls. The Alternative OYP traffic
conditions AM and PM peak hour intersection analysis is shown in Table 8. HCM analysis sheets are provided
in Appendix D.
Table 8:
Intersection Analysis – Opening Year Plus Project Conditions
Intersection Peak
Hour
OYP Conditions Alternative #1 Alternative #2 Alternative #3
Delay1 LOS Delay1 LOS Delay1 LOS Delay1 LOS
1 Adams Street Corporate Centre Drive
AM 25.2 B 24.4 C 22.3 C 14.6 B
PM 22.2 C 22.0 C 18.7 B 14.0 B
1: Delay is shown in seconds per vehicle. Per the Highway Capacity Manual 7th Edition, overall average delay and LOS are shown for signalized and all-way
stop-controlled intersections.
As shown in Table 8, the study intersection is projected to operate at an acceptable LOS during the AM and
PM peak hours for Alternative OYP traffic conditions. Of note, for all three alternative scenarios, each
individual movement of all four legs of the intersection were projected to operate at acceptable LOS during
both AM and PM peak hours. The HCM analysis sheets of Appendix D show the delays and corresponding
LOS for each individual movement of each leg for all three scenarios.
234
Not to Scale
džŚŝďŝt ϭϬ͗ KƉeŶŝŶŐ zeaƌ WlƵƐ Wƌoũect D aŶĚ WD WeaŬ ,oƵƌ solƵŵeƐ
Adams Street and Corporate Centre Drive Traffic Impact Analysis MSA-24-001
Legend:
Project Site
Highway 1
1
1
Study Intersection Location#
1 Corporate Centre Drive
Ad
a
m
S
t
r
e
e
t
Adam Street/
Corporate Centre Drive-Driveway
AM Peak Hour Volumes PM Peak Hour Volumes
Adam Street/
Corporate Centre Drive-Driveway
235
Not to Scale
džŚŝďŝt ϭϭ͗ >aŶe 'eoŵetƌLJ aŶĚ /ŶteƌƐectŝoŶ oŶtƌolƐ Ĩoƌ lteƌŶatŝǀe KzW SceŶaƌŝoƐ
Adams Street and Corporate Centre Drive Traffic Impact Analysis MSA-24-001
Legend:
Project Site
Highway 1
1
1
Study Intersection Location#
1 Corporate Centre Drive
Ad
a
m
S
t
r
e
e
t
Adam Street/
Corporate Centre Drive-Driveway
Alternative #1
Adam Street/
Corporate Centre Drive-Driveway
Adam Street/
Corporate Centre Drive-Driveway
Alternative #2 Alternative #3
236
MSA-24-001
31
7.0 DRIVE-THROUGH QUEUE ANALYSIS
The project proposes a coffee shop drive-through window which would have a capacity of approximately 17
vehicles before a queue begins to form outside of the drive-through lane. Comparable sites for the drive-
through queue analysis were determined based on discussions with the project applicant and City staff. The
two locations have similar adjacent major roadways. The drive-through queue data was collected at the
following two existing comparable locations:
1) McDonald’s: 78-962 CA-111, La Quinta, CA 92253;
2) Starbucks: 78-752 CA-111, La Quinta, CA 92253.
Exhibit 12 demonstrates the proposed queue using a standard passenger vehicle and Exhibit 13 shows the
proposed comparable site locations.
7.1 DRIVE-THROUGH QUEUE ANALYSIS METHODOLOGY
Peak periods for coffee shops are typically weekdays in the morning, lunchtime, and in the evening.
Therefore, site queue observations were conducted on a typical weekday and Saturday from 7:00-9:00 AM,
11:00 AM-2:00 PM, and 4:00-7:00 PM. Data was collected in 10-minute increments on Saturday, December
14, 2025 and Tuesday, December 17, 2025.
The data collection resulted in a sample size of 102 data points on each day for a total of 208 data points.
The data collected can be used to determine the 85th percentile queue length, which is typically used to
determine the appropriate vehicle stacking needed for drive-through restaurants.
7.2 DRIVE-THROUGH QUEUE OBSERVATION RESULTS
Based on the collected data, Table 9 shows the number of times a certain queue length occurred and the
probability of that queue length not being exceeded. Complete observation data is provided in Appendix A.
237
MSA-24-001
32
Table 9:
Summary of Drive-Through Queue Observations and Analysis
Drive-Through Queue Analysis
Queue Length
(Vehicles)
Number of
Occurrences
Total Number of
Data Points
Probability of Exceeding
Queue Length
0 6 6 2.94%
1 19 25 12.25%
2 21 46 22.55%
3 24 70 34.31%
4 22 92 45.10%
5 13 105 51.47%
6 19 124 60.78%
7 17 141 69.12%
8 13 154 75.49%
9 16 170 83.33%
10 10 180 88.24%
11 5 185 90.69%
12 7 192 94.12%
13 3 195 95.59%
14 6 201 98.53%
15 2 203 99.51%
16 1 204 100.00%
85th Percentile Info
Queue Length: 10 Vehicles Data Point: 174th
When determining the appropriate queue storage, a drive-through should typically be designed to
accommodate the 85th percentile queue length. Based on the data collected at the existing locations, the 85th
percentile queue length is 10 vehicles which occurred at the 88th data point. The maximum observed queue
was 16 vehicles occurring one time.
In the event that the queue extends beyond 17 vehicles, coffee shop associates can direct traffic through the
drive aisles in the parking lot to stack south of the drive-through lane entrance. This will leave the coffee shop
drive-through entrance accessible and will only block off parking spaces near the coffee shop itself.
238
SETB
A
C
K20'-0"
B
U
I
L
D
I
N
G
DN
PROPERTY LINEPR
O
P
E
R
T
Y
L
I
N
E
26'-0"6'-0"15'-0" 4'-0"
OUTDOOR SEATING
APPROX. 650 SF
ORDER
DIRECTIONAL
SIGN
DN
DN DN
4'
-
0
"
1
3
'
-
0
"
10'-0"
TYP.
105
TYP.
103
106
TYP.
116
100
102
119
TYP.
115
108
4'
-
0
"
3'
-
6
"
5
'
-
0
"
2
'
-
0
"
103
119
DN
TYP.
111
105
RI
G
H
T
T
U
R
N
ON
L
Y
1'
-
0
"
24
'
-
6
"
1'
-
6
"
R
1
1
'
-
0
"
R
2
5
'
-
0
"
R 25
'
-
0
"
DN
PICK
UP
Not to Scale
džŚŝďŝt ϭϮ͗ WƌoƉoƐeĚ YƵeƵe
Adam St and Corporate Centre Dr Queue Study MSA-24-001
Project Site
Legend:
19
3 11
P - Passenger Car
Overall Length 19.000ft
Overall Width 7.000ft
Overall Body Height 5.101ft
Min Body Ground Clearance 1.116ft
Track Width 6.000ft
Lock-to-lock time 4.00s
Curb to Curb Turning Radius 24.000ft
1 2 3
4
5
6 7
8
9
10
11
12
13
14
151617
239
Not to Scale
džŚŝďŝt ϭϯ͗ oŵƉaƌaďle Sŝte >ocatŝoŶƐ
Adams Street and Corporate Centre Drive Traffic Impact Analysis MSA-24-001
Starbucks McDonald's
Project Site
Highway 111
A
d
a
m
S
t
r
e
e
t
Simon Drive
La Quinta Center Drive
240
MSA-24-001
APPENDIX
Appendix A: Glossary of Terminology
Appendix B: Scoping Agreement
Appendix C: Existing Traffic Counts
Appendix D: HCM Analysis Sheets
241
APPENDIX A
GLOSSARY OF TERMINOLOGY
242
Glossary of Terminology
ACRONYMS:
AC Acres
ADT Average Daily Traffic
Caltrans California Department of Transportation
DU Dwelling Unit
ICU Intersection Capacity Utilization
LOS Level of Service
TSF Thousand Square Feet
V/C Volume/Capacity
VMT Vehicle Miles Traveled
TERMS
AVERAGE DAILY TRAFFIC – The average 24-hour volume for a stated period divided by the number of days in
that period. For example, Annual Average Daily Traffic is the total volume during a year divided by 365 days.
CAPACITY – The maximum number of vehicles that can be reasonably expected to pass over a given section
of a lane or a roadway in a given time period.
CYCLE LENGTH – The time period in seconds required for a traffic signal to complete one full cycle of
indications.
DAILY CAPACITY – A theoretical value representing the daily traffic volume that will typically result in a peak
hour volume equal to the capacity of the roadway.
DELAY – The time consumed while traffic is impeded in its movement by some element over which it has no
control, usually expressed in seconds per vehicle.
DENSITY – The number of vehicles occupying in a unit length of the through traffic lanes of a roadway at any
given instant. Usually expressed in vehicles per mile.
DESIGN SPEED – A speed selected for purposes of design. Features of a highway, such as curvature,
superelevation, and sight distance (upon which the safe operation of vehicles is dependent) are correlated to
design speed.
DIRECTIONAL SPLIT – The percent of traffic in the peak direction at any point in time.
243
FREE FLOW – Volumes are well below capacity. Vehicles can maneuver freely and travel is unimpeded by other
traffic.
HEADWAY – Time or distance spacing between successive vehicles in a traffic stream, front bumper to front
bumper.
LEVEL OF SERVICE – A qualitative measure of a number of factors, which include speed and travel time, traffic
interruptions, freedom to maneuver, safety, driving comfort and convenience, and operating costs.
PASSENGER CAR EQUIVALENT (PCE) – A metric used to assess the impact of larger vehicles, such as trucks,
recreational vehicles, and buses, by converting the traffic volume of larger vehicles to an equivalent number
of passenger cars.
PEAK HOUR – The 60 consecutive minutes with the highest number of vehicles.
QUEUE LENGTH – The length of vehicle queue, typically expressed in feet, waiting at a service area such as a
Traffic signal, stop sign, or access gate.
SIGHT DISTANCE – The continuous length of roadway visible to a driver or roadway user.
SIGNAL CYCLE – The time period in seconds required for one complete sequence of signal indications.
SIGNAL PHASE – The part of the signal cycle allocated to one or more traffic movements.
STARTING DELAY – The delay experienced in initiating the movement of queued traffic from a stop to an
average running speed through an intersection.
TRAFFIC-ACTUATED SIGNAL – A type of traffic signal that directs traffic to stop and go in accordance with the
demands of traffic, as registered by the actuation of detectors.
TRIP – The movement of a person or vehicle from one location (origin) to another (destination). For example,
from home to store to home is two trips, not one.
TRIP GENERATION RATE – The quantity of trips produced and/or attracted by a specific land use stated in
terms of units such as per dwelling, per acre, and per 1,000 square feet of floor space.
VEHICLE MILES OF TRAVEL – A measure of the amount of usage of a section of highway, obtained by
multiplying the average daily traffic by length of facility in miles.
244
APPENDIX B
SCOPING AGREEMENT AND CITY DOCUMENTS
245
ATTACHMENT 4
CITY OF LA QUINTA
DATE ________________
TRAFFIC IMPACTS ANALYSIS SCOPE
Work to be done per Engineering Bulletin 06-13
Project Name: __________________________________________________________
Project Location: ________________________________________________________
Project Description: _____________________________________________________
________________________________________________________________________
Developer Traffic Engineer
Name
Address
Contact
Phone
Email
Study Intersection Study Segments
ITE Land Use Code ITE Trip
Gen. Rate
Unit of
Measure
Daily Trips Pass by
%
Time periods to be analyzed: Year(s) to be analyzed:
AM PM Sat
Other
________________________
__________________________________
Adams St and Corporate Centre Dr Drive-Through Queue Study
Adams St and Corporate Centre Dr
3,800 square foot drive-through facility
TJW Engineering, Inc.
9841 Irvine Center Drive, Suite 200.
Irvine, Ca 92618
Daniel Flores
(949) 878-3509
Daniel@tjwengineering.com
ADAMS ONE ELEVEN, LLC.
900 Island Drive, Unit 312
Rancho Mirage, Ca 92270
Michael J. Shovlin
Adams St and Corporate Centre Dr
Fast-Food Restaurant with
Drive-Through Window
934 TSF 1,776 50% AM
50% PM
55% Daily
Existing, Opening Year (2025) without
Project and Opening Year (2025) with
Project scenarios
N/A
12/11/24
246
Special issues to be addressed:
Attachments: Site Plan Study Intersections/Segments Map
Distribution Assumption Map Cumulative Impacts
City Approval ________________________ Date _____________________
Collect drive-through queue data in 10-minute increments
at up to two (2) comparable sites during the peak periods. The peak period data collection will occur
on a typical weekday and a Saturday from 7:00-9:00 AM, 11:00 AM-2:00 PM, and 4:00-7:00 PM.
Additional Items to be address:
Provide a site distance exhibit for the
exiting drive-through driveway and
provide vehicle turning movements to
illustrate on-site circulation.
City of La Quinta to provide
cumulative projects for for
opening year scenario
1/16/25
247
Adams Street and Corpporate Centre Drive
Drive-Through Queue Study
In Out Total In Out Total
Fast-Food Restaurant with Drive-Through
Window 934 3.80 TSF 467.48 1,776 44.61 51:49 87 83 170 33.03 52:48 66 60 126
Pass-By Trips (0.5 Daily, 0.5 AM, 0.55 PM)-888 -44 -42 -86 -36 -33 -69
Net Total 888 43 41 84 30 27 57
1: Trip generation and pass-by rates from ITE Trip Generation (11th Edition, 2021).
2: TSF = Thousand Square Feet.
Table 1
Project Trip Generation
Proposed Land Use1 ITE
Code Qty Unit2
Daily AM Peak Hour PM Peak Hour
Rate Volume Rate
In:Out
Split
Volume Rate In:Out
Split
Volume
MSA-24-001
248
1
60
60
30
08-7
7
1
0
.
1
20-1
0
0
0
9
2
2
Adam
s
S
t
r
e
e
t
B
r
i
d
g
e
,
L
a
Quinta
1
RBF
Consu
l
t
a
n
t
s
02-1
6
-
0
8
1
1
40'
RBF
Consu
l
t
a
n
t
s
220180
0
N
220200
0
N
220220
0
N
220240
0
N
2202600 N2202800 N2203000 N2203200 N2203400 N2203600 N2203800 N2204000 N
220180
0
N
2202000 N2202200 N2202400 N2202600 N2202800 N2203000 N2203200 N2203400 N2203600 N2203800 N2204000 N6549800 E6550000 E6550200 E6550400 E6550600 E6550800 E6551000 E6551200 E
6
5
4
9
8
0
0
E
6
5
5
0
0
0
0
E
6
5
5
0
2
0
0
E
6
5
5
0
4
0
0
E
6
5
5
0
6
0
0
E
6
5
5
0
8
0
0
E
6
5
5
1
0
0
0
E
6
5
5
1
2
0
0
E
SHEET
No.
OF
SHTS.
THIS
M
A
P
C
O
M
P
I
L
E
D
P
H
O
T
O
G
R
A
M
M
E
T
R
I
C
A
L
L
Y
BY:
IAS P
R
O
J
E
C
T
NUMB
E
R
:
IAS P
R
O
J
E
C
T
NAME:
PLOTT
E
D
C
O
N
T
O
U
R
INTER
V
A
L
MAP A
N
D
D
I
G
I
T
A
L
D
A
T
A
P
R
E
P
A
R
E
D
F
O
R
:
DASHE
D
L
I
N
E
S
M
A
Y
N
O
T
M
E
E
T
M
A
P
A
C
C
U
R
A
C
Y
STAND
A
R
D
S
BUILD
I
N
G
O
U
T
L
I
N
E
S
I
N
D
I
C
A
T
E
D
R
I
P
L
I
N
E
B
U
T
M
A
Y
A
L
S
O
I
N
C
L
U
D
E
S
T
A
I
R
S AND
APPU
R
T
E
N
A
N
C
E
S
.
FEATU
R
E
S
I
N
S
H
A
D
O
W
S
A
N
D
V
E
G
E
T
A
T
I
O
N
M
A
Y
B
E
O
B
S
C
U
R
E
D
,
F
E
A
T
U
R
E
S
N
E
AR TA
L
L
O
B
J
E
C
T
S
M
A
Y
B
E
O
B
S
C
U
R
E
D
DUE
T
O
P
H
O
T
O
G
R
A
P
H
I
C
A
N
G
L
E
"LEAN
"
MAPPI
N
G
O
U
T
S
I
D
E
L
I
M
I
T
S
O
F
S
U
R
V
E
Y
C
O
N
T
R
O
L
P
E
R
I
M
E
T
E
R
M
A
Y
N
O
T
M
E
E
T
MAP
A
C
C
U
R
A
C
Y
STAND
A
R
D
S
HORIZ
O
N
T
A
L
A
C
C
U
R
A
C
Y
F
O
R
1
"
=
A
N
D
V
E
R
T
I
C
A
L
A
C
C
U
R
A
C
Y
F
O
R
F
O
O
T
CON
T
O
U
R
INTER
V
A
L
.
MAP H
A
S
B
E
E
N
C
O
M
P
I
L
E
D
P
H
O
T
O
G
R
A
M
M
E
T
R
I
C
A
L
L
Y
A
N
D
S
H
O
U
L
D
B
E
F
I
E
L
D
V
ERIFIE
D
A
C
C
O
R
D
I
N
G
L
Y
B
Y
USER.
SURVE
Y
G
R
O
U
N
D
C
O
N
T
R
O
L
P
R
O
V
I
D
E
D
BY:
THIS
M
A
P
A
N
D
A
S
S
O
C
I
A
T
E
D
D
I
G
I
T
A
L
D
A
T
A
C
O
M
P
I
L
E
D
F
R
O
M
A
E
R
I
A
L
P
H
O
T
O
GRAPH
Y
DATED
:
NOTES
:
COPYR
I
G
H
T
2008
CURB
A
N
D
G
U
T
T
E
R
AWNIN
G
SIDEW
A
L
K
BUILD
I
N
G
EDGE
O
F
D
I
R
T
EDGE
O
F
C
O
N
C
.
EDGE
O
F
A
S
P
H
.
CONTR
O
L
ROAD
S
T
R
I
P
I
N
G
POOL
GUAR
D
R
A
I
L
STRIP
E
SPARK
I
N
G
PIPE
L
I
N
E
WALL
RETAI
N
I
N
G
W
A
L
L
FENC
E
STAND
P
I
P
E
INTER
C
O
N
T
O
U
R
POWE
R
P
O
L
E
STREE
T
L
I
G
H
T
POWE
R
P
O
L
E
STREE
T
L
I
G
H
T
MISCE
L
L
A
N
E
O
U
S
SINGL
E
T
R
E
E
INDEX
C
O
N
T
O
U
R
FIRE
H
Y
D
R
A
N
T
MANH
O
L
E
WATER
L
I
N
E
CATC
H
B
A
S
I
N
VALVE
DROP
I
N
L
E
T
PALM
TREES
STOP
L
I
G
H
T
VAULT
TANK
RAILR
O
A
D
RAIL
S
I
G
N
A
L
GUY W
I
R
E
SIGN
A.-As
p
h
.
=
A
S
P
H
A
L
T
C
.
-
C
o
n
c
=
C
O
N
C
R
E
T
E
O
B
S
.
=
O
B
S
C
U
R
E
D
ABBR
E
V
I
A
T
I
O
N
S
:
U/C =
U
N
D
E
R
C
O
N
S
T
R
U
C
T
I
O
N
W
/
L
=
W
A
T
E
R
L
E
V
E
L
.
FOOT7117
A
r
l
i
n
g
t
o
n
A
v
e
.
,
S
u
i
t
e
A
Rivers
i
d
e
,
C
A
92503
Fx (9
5
1
)
687-
4
1
2
0
Ph (9
5
1
)
687-
4
2
5
2
www.i
n
l
a
n
d
a
e
r
i
a
l
.
c
o
m
ias@
i
n
l
a
n
d
a
e
r
i
a
l
.
c
o
m
COMM
E
N
T
S
:
P
R
OF
ESSIO N A L L A N D SURV
E
Y
O
R
DERE K C .HOOD
A
Topogr
a
p
h
i
c
m
a
p
p
r
e
p
a
r
e
d
under t
h
e
s
u
p
e
r
v
i
s
i
o
n
o
f
:
Derek C
.
H
o
o
d
,
P
.
L
.
S
.
Inland
A
e
r
i
a
l
S
u
r
v
e
y
s
,
I
n
c
.
Date
ST L
TE O F C A
RNFIO
A
I
No. 67
9
9
Exp. 9
-
3
0
-
2
0
0
8
0
HV-1
1350.0
0
1350.0
0
V-1
Pool
P
SP
1340
MH
1350
NLANDI
ERIALA
URVEY
S
,
S
NC.I
GRAPH
I
C
S
C
A
L
E
INLAN
D
A
E
R
I
A
L
MHMHMHSTOP STOP STOP MH
MH
MH
AHEA
D AHEA
D
SIGN
A
L SIGN
A
L
MHMH MHMH STOPSTOPMH C.O.C.O.BOMHMH
LANDS
C
A
P
E
S
B
10'-0"SETBA
C
K20'-0"
B
U
I
L
D
I
N
G
DN
C
O
M
P
A
C
T
PROPERTY LINE
P
R
O
P
E
R
T
Y
L
I
N
E
P
R
O
P
E
R
T
Y
L
I
N
E
PR
O
P
E
R
T
Y
L
I
N
E
26'-0"6'-0"15'-0"4'-0"
18'-0"
PROPERTY LINE
OUTDOOR SEATING
APPROX. 650 SF
1 2 3 4 5
PRE-
ORDER
ORDER
DIRECTIONAL
SIGN
A
D
A
M
S
S
T
R
E
E
T
DN
DN
6
11 101213
PROPOSED DRIVE-THRU
3,800 SF
DNDN
7
8
9
DN
13
'
-
0
"
4'
-
0
"
10'-0"13'-0"
R
2
5
'
-
0
"
R 25'-0
"
R 1
1
'
-
0
"
R
1
1
'
-
0
"
3'
-
0
"
13
'
-
0
"
104 112 114
113
TYP.
103
103
TYP.
105
TYP.
103
106
TYP.
111
TYP.
107
TYP.
116
100
102
TYP.
118117
119
103102
102
TYP.
115
TYP.
103
102
101
TYP.
105 108
110 109
3'
-
6
"
5
'
-
0
"
2
'
-
0
"
4'
-
0
"
TYP.
103
115
TYP.
111
TYP.
116103107
TYP.
103 102
102 102
102
119
119
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
1" = 10'-0"
A101
SITE PLAN
AU
G
U
S
T
2
7
,
2
0
2
4
111 LA QUINTA DRIVE-THRU PAD
HIGHWAY 111 - LA QUINTA, CA 22
4
0
0
4
0'5' 10' 20'40'
NORTH
KEYNOTES
NO.DESCRIPTION
100 3'H 8" CMU WALL
101 3' H 8" CMU PLANTER WALL W/ STUCCO FINISH
102 PLANTER
103 NEW CONCRETE CURB, SEE CIVIL
104 EXISTING CONCRETE CURB, SEE CIVIL
105 EXISITNG CONCRETE CURB TO BE REMOVED, SEE
CIVIL
106 NEW ACCESSIBLE PARKING STALL
107 NEW CURB RAMP, SEE CIVIL
108 NEW TRASH ENCLOSURE TO MATCH EXISTING
109 EXISTING SITE WALL
110 EXISTING TRASH ENCLOSURE
111 TRUNCATED DOMES, MIN. 3'
112 NEW SIDEWALK PER CITY STANDARDS, SEE CIVIL
113 EXISTING SIDEWALK
114 EXISITNG CURB RAMP
115 NEW CONCRETE HARDSCAPE, SEE CIVIL AND
LANDSCAPE
116 NEW ACCESSIBLE PATH STRIPING
117 NEW ACCESSIBLE PARKING SIGN
118 NEW CONCRETE WHEEL STOP
119 ACCESSIBLE PATH
249
Site
250
APPENDIX C
EXISTING TRAFFIC COUNTS
251
File Name : LQA_Adams_CC AM
Site Code : 241097
Start Date : 12/17/2024
Page No : 1
City of La Quinta
N/S: Adams Street
E/W: Corporate Centre Drive
Weather: Clear
Groups Printed- Total Volume
Adams Street
Southbound
Corporate Centre Drive
Westbound
Adams Street
Northbound
Corporate Centre Drive
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
07:00 AM 11 28 9 48 6 3 1 10 1 21 9 31 3 3 3 9 98
07:15 AM 11 52 15 78 10 1 6 17 0 35 12 47 11 0 1 12 154
07:30 AM 16 47 11 74 7 2 2 11 2 32 20 54 5 2 3 10 149
07:45 AM 23 97 26 146 18 1 4 23 5 32 25 62 4 3 4 11 242
Total 61 224 61 346 41 7 13 61 8 120 66 194 23 8 11 42 643
08:00 AM 19 90 29 138 16 3 7 26 3 46 24 73 21 1 3 25 262
08:15 AM 19 102 25 146 22 3 11 36 5 64 21 90 12 6 8 26 298
08:30 AM 23 96 28 147 25 1 9 35 5 64 13 82 15 9 3 27 291
08:45 AM 18 98 23 139 19 4 9 32 6 100 29 135 28 4 10 42 348
Total 79 386 105 570 82 11 36 129 19 274 87 380 76 20 24 120 1199
Grand Total 140 610 166 916 123 18 49 190 27 394 153 574 99 28 35 162 1842
Apprch %15.3 66.6 18.1 64.7 9.5 25.8 4.7 68.6 26.7 61.1 17.3 21.6
Total %7.6 33.1 9 49.7 6.7 1 2.7 10.3 1.5 21.4 8.3 31.2 5.4 1.5 1.9 8.8
Adams Street
Southbound
Corporate Centre Drive
Westbound
Adams Street
Northbound
Corporate Centre Drive
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM
08:00 AM 19 90 29 138 16 3 7 26 3 46 24 73 21 1 3 25 262
08:15 AM 19 102 25 146 22 3 11 36 5 64 21 90 12 6 8 26 298
08:30 AM 23 96 28 147 25 1 9 35 5 64 13 82 15 9 3 27 291
08:45 AM 18 98 23 139 19 4 9 32 6 100 29 135 28 4 10 42 348
Total Volume 79 386 105 570 82 11 36 129 19 274 87 380 76 20 24 120 1199
% App. Total 13.9 67.7 18.4 63.6 8.5 27.9 5 72.1 22.9 63.3 16.7 20
PHF .859 .946 .905 .969 .820 .688 .818 .896 .792 .685 .750 .704 .679 .556 .600 .714 .861
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268
252
File Name : LQA_Adams_CC AM
Site Code : 241097
Start Date : 12/17/2024
Page No : 2
City of La Quinta
N/S: Adams Street
E/W: Corporate Centre Drive
Weather: Clear
Adams Street
C
o
r
p
o
r
a
t
e
C
e
n
t
r
e
D
r
i
v
e
C
o
r
p
o
r
a
t
e
C
e
n
t
r
e
D
r
i
v
e
Adams Street
Right
105
Thru
386
Left
79
InOut Total
386 570 956
Ri
g
h
t
36
Th
r
u
11
Le
f
t
82
Ou
t
To
t
a
l
In
18
6
12
9
31
5
Left
19
Thru
274
Right
87
Out TotalIn
492 380 872
Le
f
t
76
Th
r
u
20
Ri
g
h
t
24
To
t
a
l
Ou
t
In
13
5
12
0
25
5
Peak Hour Begins at 08:00 AM
Total Volume
Peak Hour Data
North
Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Each Approach Begins at:
07:45 AM 08:00 AM 08:00 AM 08:00 AM
+0 mins.23 97 26 146 16 3 7 26 3 46 24 73 21 1 3 25
+15 mins.19 90 29 138 22 3 11 36 5 64 21 90 12 6 8 26
+30 mins.19 102 25 146 25 1 9 35 5 64 13 82 15 9 3 27
+45 mins.23 96 28 147 19 4 9 32 6 100 29 135 28 4 10 42
Total Volume 84 385 108 577 82 11 36 129 19 274 87 380 76 20 24 120
% App. Total 14.6 66.7 18.7 63.6 8.5 27.9 5 72.1 22.9 63.3 16.7 20
PHF .913 .944 .931 .981 .820 .688 .818 .896 .792 .685 .750 .704 .679 .556 .600 .714
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268
253
File Name : LQA_Adams_CC PM
Site Code : 241097
Start Date : 12/17/2024
Page No : 1
City of La Quinta
N/S: Adams Street
E/W: Corporate Centre Drive
Weather: Clear
Groups Printed- Total Volume
Adams Street
Southbound
Corporate Centre Drive
Westbound
Adams Street
Northbound
Corporate Centre Drive
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
04:00 PM 31 123 32 186 35 8 27 70 13 82 22 117 38 2 26 66 439
04:15 PM 30 103 31 164 30 6 27 63 6 94 18 118 32 6 18 56 401
04:30 PM 25 115 22 162 24 4 29 57 15 92 26 133 28 7 22 57 409
04:45 PM 25 85 31 141 32 3 20 55 18 105 25 148 41 2 21 64 408
Total 111 426 116 653 121 21 103 245 52 373 91 516 139 17 87 243 1657
05:00 PM 5 92 23 120 24 2 23 49 14 93 8 115 28 0 27 55 339
05:15 PM 6 107 27 140 21 1 11 33 13 108 6 127 22 1 26 49 349
05:30 PM 10 117 28 155 6 4 10 20 12 74 7 93 27 1 16 44 312
05:45 PM 7 82 25 114 12 1 9 22 9 75 7 91 19 0 7 26 253
Total 28 398 103 529 63 8 53 124 48 350 28 426 96 2 76 174 1253
Grand Total 139 824 219 1182 184 29 156 369 100 723 119 942 235 19 163 417 2910
Apprch %11.8 69.7 18.5 49.9 7.9 42.3 10.6 76.8 12.6 56.4 4.6 39.1
Total %4.8 28.3 7.5 40.6 6.3 1 5.4 12.7 3.4 24.8 4.1 32.4 8.1 0.7 5.6 14.3
Adams Street
Southbound
Corporate Centre Drive
Westbound
Adams Street
Northbound
Corporate Centre Drive
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:00 PM
04:00 PM 31 123 32 186 35 8 27 70 13 82 22 117 38 2 26 66 439
04:15 PM 30 103 31 164 30 6 27 63 6 94 18 118 32 6 18 56 401
04:30 PM 25 115 22 162 24 4 29 57 15 92 26 133 28 7 22 57 409
04:45 PM 25 85 31 141 32 3 20 55 18 105 25 148 41 2 21 64 408
Total Volume 111 426 116 653 121 21 103 245 52 373 91 516 139 17 87 243 1657
% App. Total 17 65.2 17.8 49.4 8.6 42 10.1 72.3 17.6 57.2 7 35.8
PHF .895 .866 .906 .878 .864 .656 .888 .875 .722 .888 .875 .872 .848 .607 .837 .920 .944
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268
254
File Name : LQA_Adams_CC PM
Site Code : 241097
Start Date : 12/17/2024
Page No : 2
City of La Quinta
N/S: Adams Street
E/W: Corporate Centre Drive
Weather: Clear
Adams Street
C
o
r
p
o
r
a
t
e
C
e
n
t
r
e
D
r
i
v
e
C
o
r
p
o
r
a
t
e
C
e
n
t
r
e
D
r
i
v
e
Adams Street
Right
116
Thru
426
Left
111
InOut Total
615 653 1268
Ri
g
h
t
10
3
Th
r
u
21
Le
f
t
12
1
Ou
t
To
t
a
l
In
21
9
24
5
46
4
Left
52
Thru
373
Right
91
Out TotalIn
634 516 1150
Le
f
t
13
9
Th
r
u
17
Ri
g
h
t
87
To
t
a
l
Ou
t
In
18
9
24
3
43
2
Peak Hour Begins at 04:00 PM
Total Volume
Peak Hour Data
North
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Each Approach Begins at:
04:00 PM 04:00 PM 04:30 PM 04:00 PM
+0 mins.31 123 32 186 35 8 27 70 15 92 26 133 38 2 26 66
+15 mins.30 103 31 164 30 6 27 63 18 105 25 148 32 6 18 56
+30 mins.25 115 22 162 24 4 29 57 14 93 8 115 28 7 22 57
+45 mins.25 85 31 141 32 3 20 55 13 108 6 127 41 2 21 64
Total Volume 111 426 116 653 121 21 103 245 60 398 65 523 139 17 87 243
% App. Total 17 65.2 17.8 49.4 8.6 42 11.5 76.1 12.4 57.2 7 35.8
PHF .895 .866 .906 .878 .864 .656 .888 .875 .833 .921 .625 .883 .848 .607 .837 .920
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268
255
DRIVE THRU SURVEY
LOCATION: McDonalds, 78-962 Highway 111 DAY: Tuesday
CITY: La Quinta DATE: 12/17/2024
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
7:00 5 2 0 7
7:10 4 1 0 5
7:20 5 4 0 9
7:30 2 2 0 4
7:40 3 0 0 3
7:50 1 0 0 1
8:00 3 1 0 4
8:10 3 0 0 3
8:20 1 1 0 2
8:30 1 1 0 2
8:40 3 1 0 4
8:50 4 5 1 10
9:00 5 6 1 12
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
11:00 0 4 0 4
11:10 6 7 1 14
11:20 2 6 2 10
11:30 5 5 0 10
11:40 2 5 0 7
11:50 5 5 0 10
12:00 1 1 0 2
12:10 4 5 0 9
12:20 4 6 1 11
12:30 0 7 3 10
12:40 4 5 3 12
12:50 3 5 1 9
13:00 5 7 4 16
13:10 3 5 0 8
13:20 3 6 1 10
13:30 4 4 0 8
13:40 5 4 0 9
13:50 3 3 0 6
14:00 4 2 0 6
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
951-268-6268 256
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
16:00 4 8 2 14
16:10 4 6 0 10
16:20 4 4 0 8
16:30 4 2 0 6
16:40 2 6 3 11
16:50 3 4 0 7
17:00 4 2 0 6
17:10 2 1 0 3
17:20 3 0 0 3
17:30 3 2 0 5
17:40 4 5 0 9
17:50 5 7 0 12
18:00 5 6 1 12
18:10 6 6 2 14
18:20 5 4 2 11
18:30 5 2 0 7
18:40 3 0 0 3
18:50 1 2 0 3
19:00 5 3 0 8
DRIVE THRU SURVEY
LOCATION: McDonalds, 78-962 Highway 111 DAY: Tuesday
CITY: La Quinta DATE: 12/17/2024
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
951-268-6268 257
DRIVE THRU SURVEY
LOCATION: McDonalds, 78-962 Highway 111 DAY: Saturday
CITY: La Quinta DATE: 12/14/2024
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
7:00 3 0 0 3
7:10 5 4 0 9
7:20 4 5 0 9
7:30 5 7 0 12
7:40 3 1 0 4
7:50 1 0 0 1
8:00 2 2 0 4
8:10 2 4 0 6
8:20 4 5 0 9
8:30 3 6 0 9
8:40 3 1 0 4
8:50 2 1 0 3
9:00 4 4 0 8
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
11:00 2 2 0 4
11:10 2 2 0 4
11:20 0 2 0 2
11:30 1 0 0 1
11:40 4 3 0 7
11:50 4 1 0 5
12:00 2 1 0 3
12:10 4 2 0 6
12:20 5 5 0 10
12:30 3 4 1 8
12:40 3 5 1 9
12:50 3 3 0 6
13:00 5 7 2 14
13:10 5 6 0 11
13:20 3 7 5 15
13:30 4 7 3 14
13:40 5 6 3 14
13:50 5 7 1 13
14:00 3 3 0 6
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
951-268-6268 258
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
16:00 5 7 1 13
16:10 5 7 1 13
16:20 3 5 0 8
16:30 3 5 0 8
16:40 3 0 0 3
16:50 4 2 0 6
17:00 4 4 0 8
17:10 5 4 0 9
17:20 3 1 0 4
17:30 4 5 0 9
17:40 4 3 0 7
17:50 2 6 0 8
18:00 4 6 5 15
18:10 4 5 3 12
18:20 4 7 1 12
18:30 3 6 1 10
18:40 6 3 0 9
18:50 4 3 0 7
19:00 1 1 0 2
DRIVE THRU SURVEY
LOCATION: McDonalds, 78-962 Highway 111 DAY: Saturday
CITY: La Quinta DATE: 12/14/2024
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
951-268-6268 259
DRIVE THRU SURVEY
LOCATION: Starbucks, 78752 Highway 111 DAY: Tuesday
CITY: La Quinta DATE: 12/17/2024
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
7:00 1 0 0 1
7:10 0 0 0 0
7:20 0 1 0 1
7:30 0 0 0 0
7:40 2 1 0 3
7:50 2 2 0 4
8:00 1 0 0 1
8:10 3 3 1 7
8:20 2 3 3 8
8:30 2 3 2 7
8:40 3 3 1 7
8:50 3 0 0 3
9:00 3 3 0 6
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
11:00 4 1 0 5
11:10 6 3 0 9
11:20 0 2 0 2
11:30 2 0 0 2
11:40 2 0 0 2
11:50 1 2 0 3
12:00 3 2 0 5
12:10 3 2 0 5
12:20 3 1 0 4
12:30 5 1 0 6
12:40 6 1 0 7
12:50 2 0 0 2
13:00 3 3 0 6
13:10 2 2 0 4
13:20 2 2 0 4
13:30 1 2 0 3
13:40 0 1 0 1
13:50 2 1 0 3
14:00 3 2 0 5
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
951-268-6268 260
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
16:00 2 0 0 2
16:10 1 1 0 2
16:20 0 3 0 3
16:30 0 0 0 0
16:40 2 0 0 2
16:50 3 2 0 5
17:00 1 2 0 3
17:10 1 0 0 1
17:20 2 1 0 3
17:30 0 0 0 0
17:40 2 0 0 2
17:50 1 0 0 1
18:00 1 0 0 1
18:10 0 0 0 0
18:20 0 0 0 0
18:30 1 1 0 2
18:40 0 1 0 1
18:50 0 1 0 1
19:00 1 0 0 1
DRIVE THRU SURVEY
LOCATION: Starbucks, 78752 Highway 111 DAY: Tuesday
CITY: La Quinta DATE: 12/17/2024
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
951-268-6268 261
DRIVE THRU SURVEY
LOCATION: Starbucks, 78752 Highway 111 DAY: Saturday
CITY: La Quinta DATE: 12/14/2024
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
7:00 2 1 0 3
7:10 1 0 0 1
7:20 1 0 0 1
7:30 3 0 0 3
7:40 4 2 0 6
7:50 2 0 0 2
8:00 2 0 0 2
8:10 5 2 0 7
8:20 5 0 0 5
8:30 0 3 1 4
8:40 5 1 0 6
8:50 2 2 0 4
9:00 1 2 0 3
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
11:00 1 2 0 3
11:10 4 2 0 6
11:20 6 2 1 9
11:30 4 3 2 9
11:40 6 3 1 10
11:50 6 3 2 11
12:00 5 2 0 7
12:10 4 0 0 4
12:20 6 1 0 7
12:30 2 2 0 4
12:40 2 3 0 5
12:50 2 3 0 5
13:00 4 2 0 6
13:10 6 2 0 8
13:20 1 1 0 2
13:30 3 2 0 5
13:40 4 3 0 7
13:50 5 2 0 7
14:00 2 0 0 2
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
951-268-6268 262
TIME
Pick Up Window
to
Order Board
Order Board
to
Drive Thru Entrance
Drive Thru Entrance
Overflow TOTAL
16:00 2 2 0 4
16:10 1 1 0 2
16:20 1 0 0 1
16:30 5 1 0 6
16:40 5 2 0 7
16:50 5 3 0 8
17:00 2 1 0 3
17:10 4 0 0 4
17:20 3 1 0 4
17:30 1 0 0 1
17:40 3 3 0 6
17:50 0 1 0 1
18:00 1 1 0 2
18:10 2 3 1 6
18:20 4 1 0 5
18:30 0 1 0 1
18:40 2 0 0 2
18:50 3 0 0 3
19:00 1 3 0 4
DRIVE THRU SURVEY
LOCATION: Starbucks, 78752 Highway 111 DAY: Saturday
CITY: La Quinta DATE: 12/14/2024
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
951-268-6268 263
APPENDIX D
HCM ANALYSIS WORKSHEETS
264
EXISTING
TRAFFIC CONDITIONS
265
Generated with
Scenario 1: 1 E AMVersion 2025 (SP 0-1)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Signalized Delay (sec / veh):18.2
Analysis Method:HCM 7th Edition Level Of Service:B
Analysis Period:15 minutes Volume to Capacity (v/c):0.318
YesYesYesYesCrosswalk
NoNoNoNoCurb Present
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft]
001001001001No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
1 1/8/2025
266
Generated with
Scenario 1: 1 E AMVersion 2025 (SP 0-1)
0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
4213952823881224489210131822Total Analysis Volume [veh/h]
103247622301122325806Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
361182242076105386798727419Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386798727419Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
2 1/8/2025
267
Generated with
Scenario 1: 1 E AMVersion 2025 (SP 0-1)
16.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
80Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s]
0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
NoNoNoNoRest In Walk
0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s]
0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s]
0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s]
0.01.01.00.01.01.00.01.01.00.01.01.0All red [s]
0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s]
0229022901780156Maximum Green [s]
Auxiliary Signal Groups
047083025061Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing (Basic)
NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall
0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s]
0105010501050105Minimum Green [s]
--Lead--Lead--Lead--LeadLead / Lag
0.026.017.00.026.017.00.024.016.00.021.013.0Split [s]
Phasing & Timing: Pattern 1
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
3 1/8/2025
268
Generated with
Scenario 1: 1 E AMVersion 2025 (SP 0-1)
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
1.529.691.4310.250.570.539.310.470.428.71d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.110.500.500.110.500.500.11k, delay calibration
34.2436.6134.4836.846.846.8336.638.118.0838.54d1, Uniform Delay [s]
14912314611510771161121992107944c, Capacity [veh/h]
1648178117051781173418701781171918701781s, saturation flow rate [veh/h]
0.030.050.030.050.160.160.050.120.120.01(v / s)_i Volume / Saturation Flow Rate
0.090.070.090.060.620.620.070.580.580.02g / C, Green / Cycle
7.25.56.85.149.749.75.446.246.21.9g_i, Effective Green Time [s]
2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s]
0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s]
80808080808080808080C, Calculated Cycle Length [s]
CLCLCCLCCLLane Group
Lane Group Calculations
47.8096.3444.4190.2479.1183.9488.9666.1269.4522.9195th-Percentile Queue Length [ft/ln]
1.913.851.783.613.163.363.562.642.780.9295th-Percentile Queue Length [veh/ln]
26.5553.5224.6750.1343.9546.6349.4236.7338.5812.7350th-Percentile Queue Length [ft/ln]
1.062.140.992.011.761.871.981.471.540.5150th-Percentile Queue Length [veh/ln]
NoYesYesNoYesNoNoNoNoYesCritical Lane Group
DDDDAADAADLane Group LOS
35.7646.2935.9147.107.417.3645.958.578.5047.25d, Delay for Lane Group [s/veh]
0.370.770.350.770.260.250.760.200.200.50X, volume / capacity
Lane Group Results
4 1/8/2025
269
Generated with
Scenario 1: 1 E AMVersion 2025 (SP 0-1)
Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh]47.25 8.52 8.57 45.95 7.37 7.41 47.10 35.91 35.91 46.29 35.76 35.76
Movement LOS D A A D A A D D D D D D
d_A, Approach Delay [s/veh]10.47 12.74 42.99 42.43
Approach LOS B B D D
d_I, Intersection Delay [s/veh]18.24
Intersection LOS B
Intersection V/C 0.318
Emissions
Vehicle Miles Traveled [mph]1.40 13.77 12.97 7.07 22.66 21.17 2.63 1.52 6.31 3.65
Stops [stops/h]22.91 69.45 66.12 88.96 83.94 79.11 90.24 44.41 96.34 47.80
Fuel consumption [US gal/h]0.54 1.71 1.62 2.21 2.26 2.12 1.31 0.61 1.55 0.75
CO [g/h]38.06 119.43 113.33 154.39 158.07 148.51 91.41 42.75 108.21 52.27
NOx [g/h]7.41 23.24 22.05 30.04 30.76 28.89 17.78 8.32 21.05 10.17
VOC [g/h]8.82 27.68 26.27 35.78 36.63 34.42 21.19 9.91 25.08 12.11
Other Modes
g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
d_p, Pedestrian Delay [s]31.51 31.51 31.51 31.51
I_p,int, Pedestrian LOS Score for Intersectio 2.592 2.620 2.016 2.035
Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000
c_b, Capacity of the bicycle lane [bicycles/h]425 500 550 550
d_b, Bicycle Delay [s]24.81 22.50 21.03 21.03
I_b,int, Bicycle LOS Score for Intersection 1.923 2.106 1.789 1.807
Bicycle LOS A B A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
5 1/8/2025
270
Generated with
Scenario 2: 2 E PMVersion 2025 (SP 0-1)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Signalized Delay (sec / veh):18.8
Analysis Method:HCM 7th Edition Level Of Service:B
Analysis Period:15 minutes Volume to Capacity (v/c):0.356
YesYesYesYesCrosswalk
NoNoNoNoCurb Present
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft]
001001001001No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
1 1/8/2025
271
Generated with
Scenario 2: 2 E PMVersion 2025 (SP 0-1)
0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
4213952823881224489210643360Total Analysis Volume [veh/h]
10324762230112232610815Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
361182242076105386799137352Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386799137352Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
2 1/8/2025
272
Generated with
Scenario 2: 2 E PMVersion 2025 (SP 0-1)
16.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
80Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s]
0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
NoNoNoNoRest In Walk
0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s]
0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s]
0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s]
0.01.01.00.01.01.00.01.01.00.01.01.0All red [s]
0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s]
0229022901680157Maximum Green [s]
Auxiliary Signal Groups
047083025061Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing (Basic)
NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall
0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s]
0105010501050105Minimum Green [s]
--Lead--Lead--Lead--LeadLead / Lag
0.026.016.00.026.016.00.024.015.00.023.014.0Split [s]
Phasing & Timing: Pattern 1
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
3 1/8/2025
273
Generated with
Scenario 2: 2 E PMVersion 2025 (SP 0-1)
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
1.529.771.4310.340.620.579.360.620.5811.48d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.110.500.500.110.500.500.11k, delay calibration
34.2436.6234.4836.857.647.6336.648.408.3937.65d1, Uniform Delay [s]
149123146114103911201211008108083c, Capacity [veh/h]
1648178117051781173418701781174518701781s, saturation flow rate [veh/h]
0.030.050.030.050.160.160.050.150.150.03(v / s)_i Volume / Saturation Flow Rate
0.090.070.090.060.600.600.070.580.580.05g / C, Green / Cycle
7.25.56.85.148.048.05.446.246.23.7g_i, Effective Green Time [s]
2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s]
0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s]
80808080808080808080C, Calculated Cycle Length [s]
CLCLCCLCCLLane Group
Lane Group Calculations
47.8096.4644.4190.3586.6091.9189.0388.3492.9961.1195th-Percentile Queue Length [ft/ln]
1.913.861.783.613.463.683.563.533.722.4495th-Percentile Queue Length [veh/ln]
26.5653.5924.6750.2048.1151.0649.4649.0851.6633.9550th-Percentile Queue Length [ft/ln]
1.062.140.992.011.922.041.981.962.071.3650th-Percentile Queue Length [veh/ln]
NoYesYesNoNoNoYesYesNoNoCritical Lane Group
DDDDAADAADLane Group LOS
35.7646.3935.9147.208.278.2046.009.038.9649.13d, Delay for Lane Group [s/veh]
0.370.770.350.770.260.260.760.260.260.73X, volume / capacity
Lane Group Results
4 1/8/2025
274
Generated with
Scenario 2: 2 E PMVersion 2025 (SP 0-1)
Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh]49.13 8.99 9.03 46.00 8.23 8.27 47.20 35.91 35.91 46.39 35.76 35.76
Movement LOS D A A D A A D D D D D D
d_A, Approach Delay [s/veh]13.01 13.48 43.06 42.49
Approach LOS B B D D
d_I, Intersection Delay [s/veh]18.76
Intersection LOS B
Intersection V/C 0.356
Emissions
Vehicle Miles Traveled [mph]3.83 17.70 16.69 7.07 22.66 21.17 2.63 1.52 6.31 3.65
Stops [stops/h]61.11 92.99 88.34 89.03 91.91 86.60 90.35 44.41 96.46 47.80
Fuel consumption [US gal/h]1.49 2.27 2.15 2.21 2.41 2.27 1.31 0.61 1.55 0.75
CO [g/h]104.21 158.62 150.34 154.52 168.56 158.37 91.56 42.75 108.37 52.27
NOx [g/h]20.28 30.86 29.25 30.06 32.80 30.81 17.82 8.32 21.09 10.17
VOC [g/h]24.15 36.76 34.84 35.81 39.07 36.70 21.22 9.91 25.12 12.11
Other Modes
g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
d_p, Pedestrian Delay [s]31.51 31.51 31.51 31.51
I_p,int, Pedestrian LOS Score for Intersectio 2.638 2.654 2.026 2.036
Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000
c_b, Capacity of the bicycle lane [bicycles/h]475 500 550 550
d_b, Bicycle Delay [s]23.26 22.50 21.03 21.03
I_b,int, Bicycle LOS Score for Intersection 2.054 2.106 1.789 1.807
Bicycle LOS B B A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
5 1/8/2025
275
OPENING YEAR
TRAFFIC CONDITIONS
276
Generated with Adams St and Corporate Centre Dr
Scenario 3: 3 EAC AMTJW Engineering, Inc.Version 2025 (SP 0-1)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Signalized Delay (sec / veh):17.7
Analysis Method:HCM 7th Edition Level Of Service:B
Analysis Period:15 minutes Volume to Capacity (v/c):0.344
YesYesYesYesCrosswalk
NoNoNoNoCurb Present
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft]
001001001001No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
1 1/28/2025
277
Generated with Adams St and Corporate Centre Dr
Scenario 3: 3 EAC AMTJW Engineering, Inc.Version 2025 (SP 0-1)
0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
4313982823911245129410338822Total Analysis Volume [veh/h]
113247623311282426976Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
371184242078107441818933419Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
00000004700550Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386798727419Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
2 1/28/2025
278
Generated with Adams St and Corporate Centre Dr
Scenario 3: 3 EAC AMTJW Engineering, Inc.Version 2025 (SP 0-1)
16.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
80Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s]
0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
NoNoNoNoRest In Walk
0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s]
0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s]
0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s]
0.01.01.00.01.01.00.01.01.00.01.01.0All red [s]
0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s]
0221202212021120189Maximum Green [s]
Auxiliary Signal Groups
047083025061Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing (Basic)
NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall
0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s]
0105010501050105Minimum Green [s]
--Lead--Lead--Lead--LeadLead / Lag
0.026.016.00.026.016.00.025.016.00.022.013.0Split [s]
Phasing & Timing: Pattern 1
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
3 1/28/2025
279
Generated with Adams St and Corporate Centre Dr
Scenario 3: 3 EAC AMTJW Engineering, Inc.Version 2025 (SP 0-1)
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
1.579.571.4310.080.660.619.170.570.528.71d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.110.500.500.110.500.500.11k, delay calibration
34.2636.5234.4836.757.067.0536.578.428.4038.54d1, Uniform Delay [s]
14912714611810801157124997107344c, Capacity [veh/h]
1647178117051781174618701781173818701781s, saturation flow rate [veh/h]
0.030.060.030.050.180.180.050.140.140.01(v / s)_i Volume / Saturation Flow Rate
0.090.070.090.070.620.620.070.570.570.02g / C, Green / Cycle
7.25.76.85.349.649.65.546.046.01.9g_i, Effective Green Time [s]
2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s]
0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s]
80808080808080808080C, Calculated Cycle Length [s]
CLCLCCLCCLLane Group
Lane Group Calculations
48.7499.0944.4192.9791.1796.5390.6280.3384.3222.9195th-Percentile Queue Length [ft/ln]
1.953.961.783.723.653.863.623.213.370.9295th-Percentile Queue Length [veh/ln]
27.0855.0524.6751.6550.6553.6350.3444.6346.8512.7350th-Percentile Queue Length [ft/ln]
1.082.200.992.072.032.152.011.791.870.5150th-Percentile Queue Length [veh/ln]
YesNoNoYesNoNoYesYesNoNoCritical Lane Group
DDDDAADAADLane Group LOS
35.8346.0935.9146.837.727.6645.748.988.9147.25d, Delay for Lane Group [s/veh]
0.380.770.350.770.280.280.760.240.240.50X, volume / capacity
Lane Group Results
4 1/28/2025
280
Generated with Adams St and Corporate Centre Dr
Scenario 3: 3 EAC AMTJW Engineering, Inc.Version 2025 (SP 0-1)
Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh]47.25 8.94 8.98 45.74 7.68 7.72 46.83 35.91 35.91 46.09 35.83 35.83
Movement LOS D A A D A A D D D D D D
d_A, Approach Delay [s/veh]10.59 12.59 42.91 42.36
Approach LOS B B D D
d_I, Intersection Delay [s/veh]17.70
Intersection LOS B
Intersection V/C 0.344
Emissions
Vehicle Miles Traveled [mph]1.40 16.12 15.21 7.23 25.24 23.66 2.72 1.52 6.51 3.72
Stops [stops/h]22.91 84.32 80.33 90.62 96.53 91.17 92.97 44.41 99.09 48.74
Fuel consumption [US gal/h]0.54 2.06 1.96 2.25 2.58 2.43 1.35 0.61 1.59 0.76
CO [g/h]38.06 143.92 136.75 157.23 180.15 169.72 94.09 42.75 111.26 53.29
NOx [g/h]7.41 28.00 26.61 30.59 35.05 33.02 18.31 8.32 21.65 10.37
VOC [g/h]8.82 33.36 31.69 36.44 41.75 39.33 21.81 9.91 25.79 12.35
Other Modes
g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
d_p, Pedestrian Delay [s]31.51 31.51 31.51 31.51
I_p,int, Pedestrian LOS Score for Intersectio 2.632 2.662 2.017 2.037
Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000
c_b, Capacity of the bicycle lane [bicycles/h]450 525 550 550
d_b, Bicycle Delay [s]24.03 21.76 21.03 21.03
I_b,int, Bicycle LOS Score for Intersection 1.983 2.162 1.794 1.814
Bicycle LOS A B A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
5 1/28/2025
281
Generated with Adams St and Corporate Centre Dr
Scenario 4: 4 EAC PMTJW Engineering, Inc.Version 2025 (SP 0-1)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Signalized Delay (sec / veh):18.3
Analysis Method:HCM 7th Edition Level Of Service:B
Analysis Period:15 minutes Volume to Capacity (v/c):0.385
YesYesYesYesCrosswalk
NoNoNoNoCurb Present
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft]
001001001001No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
1 1/28/2025
282
Generated with Adams St and Corporate Centre Dr
Scenario 4: 4 EAC PMTJW Engineering, Inc.Version 2025 (SP 0-1)
0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
4313982823911245359410850862Total Analysis Volume [veh/h]
11324762331134242712715Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
371184242078107461819343753Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
00000006700570Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386799137352Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
2 1/28/2025
283
Generated with Adams St and Corporate Centre Dr
Scenario 4: 4 EAC PMTJW Engineering, Inc.Version 2025 (SP 0-1)
16.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
80Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s]
0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
NoNoNoNoRest In Walk
0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s]
0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s]
0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s]
0.01.01.00.01.01.00.01.01.00.01.01.0All red [s]
0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s]
02212022120201101910Maximum Green [s]
Auxiliary Signal Groups
047083025061Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing (Basic)
NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall
0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s]
0105010501050105Minimum Green [s]
--Lead--Lead--Lead--LeadLead / Lag
0.026.016.00.026.016.00.024.015.00.023.014.0Split [s]
Phasing & Timing: Pattern 1
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
3 1/28/2025
284
Generated with Adams St and Corporate Centre Dr
Scenario 4: 4 EAC PMTJW Engineering, Inc.Version 2025 (SP 0-1)
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
1.579.571.4310.080.760.719.210.750.7011.98d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.110.500.500.110.500.500.11k, delay calibration
34.2636.5234.4836.757.977.9736.578.758.7437.63d1, Uniform Delay [s]
149127146118104311151241009107384c, Capacity [veh/h]
1647178117051781175018701781175818701781s, saturation flow rate [veh/h]
0.030.060.030.050.180.180.050.170.170.03(v / s)_i Volume / Saturation Flow Rate
0.090.070.090.070.600.600.070.570.570.05g / C, Green / Cycle
7.25.76.85.347.847.85.546.046.03.8g_i, Effective Green Time [s]
2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s]
0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s]
80808080808080808080C, Calculated Cycle Length [s]
CLCLCCLCCLLane Group
Lane Group Calculations
48.7499.0944.4192.97104.59110.6490.66105.10110.4463.4795th-Percentile Queue Length [ft/ln]
1.953.961.783.724.184.433.634.204.422.5495th-Percentile Queue Length [veh/ln]
27.0855.0524.6751.6558.1161.4650.3758.3961.3635.2650th-Percentile Queue Length [ft/ln]
1.082.200.992.072.322.462.012.342.451.4150th-Percentile Queue Length [veh/ln]
YesNoNoYesNoNoYesYesNoNoCritical Lane Group
DDDDAADAADLane Group LOS
35.8346.0935.9146.838.738.6745.789.509.4449.62d, Delay for Lane Group [s/veh]
0.380.770.350.770.310.300.760.300.300.74X, volume / capacity
Lane Group Results
4 1/28/2025
285
Generated with Adams St and Corporate Centre Dr
Scenario 4: 4 EAC PMTJW Engineering, Inc.Version 2025 (SP 0-1)
Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh]49.62 9.46 9.50 45.78 8.69 8.73 46.83 35.91 35.91 46.09 35.83 35.83
Movement LOS D A A D A A D D D D D D
d_A, Approach Delay [s/veh]13.14 13.33 42.91 42.36
Approach LOS B B D D
d_I, Intersection Delay [s/veh]18.28
Intersection LOS B
Intersection V/C 0.385
Emissions
Vehicle Miles Traveled [mph]3.96 20.21 19.10 7.23 26.13 24.54 2.72 1.52 6.51 3.72
Stops [stops/h]63.47 110.44 105.10 90.66 110.64 104.59 92.97 44.41 99.09 48.74
Fuel consumption [US gal/h]1.55 2.67 2.54 2.25 2.87 2.71 1.35 0.61 1.59 0.76
CO [g/h]108.39 186.93 177.57 157.32 200.70 189.33 94.09 42.75 111.26 53.29
NOx [g/h]21.09 36.37 34.55 30.61 39.05 36.84 18.31 8.32 21.65 10.37
VOC [g/h]25.12 43.32 41.15 36.46 46.52 43.88 21.81 9.91 25.79 12.35
Other Modes
g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
d_p, Pedestrian Delay [s]31.51 31.51 31.51 31.51
I_p,int, Pedestrian LOS Score for Intersectio 2.687 2.704 2.028 2.039
Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000
c_b, Capacity of the bicycle lane [bicycles/h]475 500 550 550
d_b, Bicycle Delay [s]23.26 22.50 21.03 21.03
I_b,int, Bicycle LOS Score for Intersection 2.119 2.181 1.794 1.814
Bicycle LOS B B A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
5 1/28/2025
286
OPENING YEAR PLUS PROJECT
TRAFFIC CONDITIONS
287
Generated with Adams St and Corporate Centre Dr
Scenario 5: 5 EACP AMTJW Engineering, Inc.Version 2025 (SP 0-1)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Signalized Delay (sec / veh):25.2
Analysis Method:HCM 7th Edition Level Of Service:C
Analysis Period:15 minutes Volume to Capacity (v/c):0.516
YesYesYesYesCrosswalk
NoNoNoNoCurb Present
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft]
001001001001No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
1 1/28/2025
288
Generated with Adams St and Corporate Centre Dr
Scenario 5: 5 EACP AMTJW Engineering, Inc.Version 2025 (SP 0-1)
0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
4313981302317421151294103388128Total Analysis Volume [veh/h]
11324336445312824269732Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
371184112201501824418189334110Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000880727547005591Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386798727419Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
2 1/28/2025
289
Generated with Adams St and Corporate Centre Dr
Scenario 5: 5 EACP AMTJW Engineering, Inc.Version 2025 (SP 0-1)
16.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
90Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s]
0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
NoNoNoNoRest In Walk
0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s]
0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s]
0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s]
0.01.01.00.01.01.00.01.01.00.01.01.0All red [s]
0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s]
02212022120201201810Maximum Green [s]
Auxiliary Signal Groups
047083025061Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing (Basic)
NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall
0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s]
0105010501050105Minimum Green [s]
--Lead--Lead--Lead--LeadLead / Lag
0.026.019.00.026.019.00.028.019.00.026.017.0Split [s]
Phasing & Timing: Pattern 1
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
3 1/28/2025
290
Generated with Adams St and Corporate Centre Dr
Scenario 5: 5 EACP AMTJW Engineering, Inc.Version 2025 (SP 0-1)
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
1.849.514.398.991.261.149.260.620.578.02d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.120.500.500.110.500.500.11k, delay calibration
39.0041.0837.4538.8012.6012.6041.1510.5610.5440.01d1, Uniform Delay [s]
1401272142108909871239551028163c, Capacity [veh/h]
1647178116261781168718701781173718701781s, saturation flow rate [veh/h]
0.030.060.090.100.200.200.050.140.140.07(v / s)_i Volume / Saturation Flow Rate
0.080.070.130.120.530.530.070.550.550.09g / C, Green / Cycle
7.66.411.810.647.647.66.249.649.68.2g_i, Effective Green Time [s]
2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s]
0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s]
90909090909090909090C, Calculated Cycle Length [s]
CLCLCCLCCLLane Group
Lane Group Calculations
56.00111.06156.63191.29173.57190.01102.31102.33108.39135.1895th-Percentile Queue Length [ft/ln]
2.244.446.277.656.947.604.094.094.345.4195th-Percentile Queue Length [veh/ln]
31.1161.7087.01106.6296.43105.7056.8456.8560.2275.1050th-Percentile Queue Length [ft/ln]
1.242.473.484.263.864.232.272.272.413.0050th-Percentile Queue Length [veh/ln]
NoYesYesNoYesNoNoNoNoYesCritical Lane Group
DDDDBBDBBDLane Group LOS
40.8550.5841.8547.7913.8713.7350.4111.1811.1148.03d, Delay for Lane Group [s/veh]
0.400.770.710.830.390.380.760.250.250.78X, volume / capacity
Lane Group Results
4 1/28/2025
291
Generated with Adams St and Corporate Centre Dr
Scenario 5: 5 EACP AMTJW Engineering, Inc.Version 2025 (SP 0-1)
Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh]48.03 11.14 11.18 50.41 13.77 13.87 47.79 41.85 41.85 50.58 40.85 40.85
Movement LOS D B B D B B D D D D D D
d_A, Approach Delay [s/veh]18.77 18.01 45.01 47.04
Approach LOS B B D D
d_I, Intersection Delay [s/veh]25.19
Intersection LOS C
Intersection V/C 0.516
Emissions
Vehicle Miles Traveled [mph]8.17 16.17 15.16 7.23 29.19 26.40 5.20 4.57 6.51 3.72
Stops [stops/h]120.16 96.34 90.96 90.94 169.12 154.29 170.59 139.22 98.72 49.78
Fuel consumption [US gal/h]3.02 2.33 2.19 2.34 4.16 3.79 2.58 2.04 1.68 0.82
CO [g/h]211.44 162.53 153.18 163.76 291.09 265.09 180.35 142.77 117.43 57.57
NOx [g/h]41.14 31.62 29.80 31.86 56.63 51.58 35.09 27.78 22.85 11.20
VOC [g/h]49.00 37.67 35.50 37.95 67.46 61.44 41.80 33.09 27.22 13.34
Other Modes
g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45
I_p,int, Pedestrian LOS Score for Intersectio 2.699 2.717 2.126 2.043
Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000
c_b, Capacity of the bicycle lane [bicycles/h]489 533 489 489
d_b, Bicycle Delay [s]25.69 24.20 25.69 25.69
I_b,int, Bicycle LOS Score for Intersection 2.070 2.234 2.099 1.814
Bicycle LOS B B B A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
5 1/28/2025
292
Generated with Adams St and Corporate Centre Dr
Scenario 6: 6 EACP PMTJW Engineering, Inc.Version 2025 (SP 0-1)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Signalized Delay (sec / veh):22.2
Analysis Method:HCM 7th Edition Level Of Service:C
Analysis Period:15 minutes Volume to Capacity (v/c):0.450
YesYesYesYesCrosswalk
NoNoNoNoCurb Present
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft]
001001001001No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
1 1/28/2025
293
Generated with Adams St and Corporate Centre Dr
Scenario 6: 6 EACP PMTJW Engineering, Inc.Version 2025 (SP 0-1)
0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
431398752312916353594108508109Total Analysis Volume [veh/h]
113241963241134242712727Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
3711846520111140461819343794Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000410333367005741Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386799137352Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
2 1/28/2025
294
Generated with Adams St and Corporate Centre Dr
Scenario 6: 6 EACP PMTJW Engineering, Inc.Version 2025 (SP 0-1)
16.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
90Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
0.02.02.00.02.02.00.02.02.00.02.02.0l2, Clearance Lost Time [s]
0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
NoNoNoNoRest In Walk
0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s]
0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s]
0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s]
0.01.01.00.01.01.00.01.01.00.01.01.0All red [s]
0.03.03.00.03.03.00.03.03.00.03.03.0Amber [s]
02211022110211102010Maximum Green [s]
Auxiliary Signal Groups
047083025061Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing (Basic)
NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall
0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s]
0105010501050105Minimum Green [s]
--Lead--Lead--Lead--LeadLead / Lag
0.026.018.00.026.018.00.028.018.00.028.018.0Split [s]
Phasing & Timing: Pattern 1
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
3 1/28/2025
295
Generated with Adams St and Corporate Centre Dr
Scenario 6: 6 EACP PMTJW Engineering, Inc.Version 2025 (SP 0-1)
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
1.849.602.918.560.960.889.300.740.698.55d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.110.500.500.110.500.500.11k, delay calibration
39.0041.0938.3440.0910.4810.4841.169.709.7040.62d1, Uniform Delay [s]
140127173162976106012310141079141c, Capacity [veh/h]
1647178116471781172218701781175818701781s, saturation flow rate [veh/h]
0.030.060.060.070.190.190.050.170.170.06(v / s)_i Volume / Saturation Flow Rate
0.080.070.100.090.570.570.070.580.580.08g / C, Green / Cycle
7.66.49.48.251.151.16.252.052.07.1g_i, Effective Green Time [s]
2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s]
0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s]
90909090909090909090C, Calculated Cycle Length [s]
CLCLCCLCCLLane Group
Lane Group Calculations
56.00111.1998.81142.95147.27158.36102.35122.66129.27116.7595th-Percentile Queue Length [ft/ln]
2.244.453.955.725.896.334.094.915.174.6795th-Percentile Queue Length [veh/ln]
31.1161.7754.8979.4281.8287.9856.8668.1571.8264.8650th-Percentile Queue Length [ft/ln]
1.242.472.203.183.273.522.272.732.872.5950th-Percentile Queue Length [veh/ln]
NoYesYesNoYesNoNoNoNoYesCritical Lane Group
DDDDBBDBBDLane Group LOS
40.8550.6941.2448.6411.4411.3650.4510.4410.3949.17d, Delay for Lane Group [s/veh]
0.400.770.570.800.340.340.760.290.290.77X, volume / capacity
Lane Group Results
4 1/28/2025
296
Generated with Adams St and Corporate Centre Dr
Scenario 6: 6 EACP PMTJW Engineering, Inc.Version 2025 (SP 0-1)
Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh]49.17 10.41 10.44 50.45 11.38 11.44 48.64 41.24 41.24 50.69 40.85 40.85
Movement LOS D B B D B B D D D D D D
d_A, Approach Delay [s/veh]16.24 16.03 45.45 47.11
Approach LOS B B D D
d_I, Intersection Delay [s/veh]22.15
Intersection LOS C
Intersection V/C 0.450
Emissions
Vehicle Miles Traveled [mph]6.96 20.22 19.08 7.23 27.90 25.77 3.85 2.93 6.51 3.72
Stops [stops/h]103.78 114.91 109.04 90.98 140.76 130.90 127.06 87.83 98.84 49.78
Fuel consumption [US gal/h]2.62 2.79 2.65 2.34 3.55 3.29 1.94 1.29 1.68 0.82
CO [g/h]183.09 195.15 184.92 163.84 247.81 230.06 135.44 90.25 117.61 57.57
NOx [g/h]35.62 37.97 35.98 31.88 48.22 44.76 26.35 17.56 22.88 11.20
VOC [g/h]42.43 45.23 42.86 37.97 57.43 53.32 31.39 20.92 27.26 13.34
Other Modes
g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
d_p, Pedestrian Delay [s]36.45 36.45 36.45 36.45
I_p,int, Pedestrian LOS Score for Intersectio 2.721 2.732 2.080 2.044
Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000
c_b, Capacity of the bicycle lane [bicycles/h]533 533 489 489
d_b, Bicycle Delay [s]24.20 24.20 25.69 25.69
I_b,int, Bicycle LOS Score for Intersection 2.158 2.213 1.934 1.814
Bicycle LOS B B A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
5 1/28/2025
297
OPENING YEAR PLUS PROJECT PLUS
ALTERNATIVE #1
TRAFFIC CONDITIONS
298
Generated with Adams St and Corporate Centre Dr
Scenario 11: 11 EACP Alt 1 AMTJW Engineering, Inc.Version 2025 (SP 0-1)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Signalized Delay (sec / veh):24.4
Analysis Method:HCM 7th Edition Level Of Service:C
Analysis Period:15 minutes Volume to Capacity (v/c):0.626
YesYesYesYesCrosswalk
NoNoNoNoCurb Present
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft]
001001001001No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
1 1/28/2025
299
Generated with Adams St and Corporate Centre Dr
Scenario 11: 11 EACP Alt 1 AMTJW Engineering, Inc.Version 2025 (SP 0-1)
0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
4313981302317421151294103388128Total Analysis Volume [veh/h]
11324336445312824269732Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
371184112201501824418189334110Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000880727547005591Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386798727419Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
2 1/28/2025
300
Generated with Adams St and Corporate Centre Dr
Scenario 11: 11 EACP Alt 1 AMTJW Engineering, Inc.Version 2025 (SP 0-1)
16.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
80Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
0.02.02.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s]
0.02.02.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
NoNoNoNoRest In Walk
0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s]
0.017.00.00.017.00.00.014.00.00.014.00.0Pedestrian Clearance [s]
0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s]
0.01.01.00.01.00.00.01.01.00.01.01.0All red [s]
0.03.03.00.03.00.00.03.03.00.03.03.0Amber [s]
0361002200211301911Maximum Green [s]
Auxiliary Signal Groups
047080025061Signal Group
PermissPermissProtectePermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing (Basic)
NoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoMinimum Recall
0.03.03.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s]
0105010001050105Minimum Green [s]
--Lead-----Lead--LeadLead / Lag
0.040.014.00.026.00.00.025.017.00.023.015.0Split [s]
Phasing & Timing: Pattern 1
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
3 1/28/2025
301
Generated with Adams St and Corporate Centre Dr
Scenario 11: 11 EACP Alt 1 AMTJW Engineering, Inc.Version 2025 (SP 0-1)
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
0.089.811.191.672.272.049.441.010.927.83d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.110.500.500.110.500.500.11k, delay calibration
18.4736.5527.7532.4116.5516.5436.6014.0714.0535.53d1, Uniform Delay [s]
547126313306719796123780839164c, Capacity [veh/h]
1647178114801020168718701781173718701781s, saturation flow rate [veh/h]
0.030.060.100.170.200.200.050.140.140.07(v / s)_i Volume / Saturation Flow Rate
0.330.070.210.210.430.430.070.450.450.09g / C, Green / Cycle
26.55.716.916.934.134.15.535.935.97.4g_i, Effective Green Time [s]
2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s]
0.000.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s]
80808080808080808080C, Calculated Cycle Length [s]
CLCCCCLCCLLane Group
Lane Group Calculations
32.3699.42118.87150.38196.44210.7390.98117.25124.08119.1595th-Percentile Queue Length [ft/ln]
1.293.984.756.027.868.433.644.694.964.7795th-Percentile Queue Length [veh/ln]
17.9855.2466.0483.55110.31120.6650.5565.1468.9366.2050th-Percentile Queue Length [ft/ln]
0.722.212.643.344.414.832.022.612.762.6550th-Percentile Queue Length [veh/ln]
NoYesNoYesYesNoNoNoNoYesCritical Lane Group
BDCCBBDBBDLane Group LOS
18.5646.3628.9434.0818.8218.5846.0415.0814.9843.36d, Delay for Lane Group [s/veh]
0.100.780.490.570.480.480.760.300.300.78X, volume / capacity
Lane Group Results
4 1/28/2025
302
Generated with Adams St and Corporate Centre Dr
Scenario 11: 11 EACP Alt 1 AMTJW Engineering, Inc.Version 2025 (SP 0-1)
Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh]43.36 15.01 15.08 46.04 18.64 18.82 34.08 28.94 28.94 46.36 18.56 18.56
Movement LOS D B B D B B C C C D B B
d_A, Approach Delay [s/veh]20.89 21.84 31.68 36.25
Approach LOS C C C D
d_I, Intersection Delay [s/veh]24.37
Intersection LOS C
Intersection V/C 0.626
Emissions
Vehicle Miles Traveled [mph]8.17 16.17 15.16 7.23 29.19 26.40 5.20 4.57 6.51 3.72
Stops [stops/h]119.15 124.08 117.25 90.98 217.18 198.56 150.38 118.87 99.42 32.36
Fuel consumption [US gal/h]2.89 2.87 2.71 2.26 5.14 4.69 2.02 1.56 1.60 0.50
CO [g/h]202.08 200.55 189.20 157.95 359.04 327.76 141.02 109.22 111.73 35.14
NOx [g/h]39.32 39.02 36.81 30.73 69.86 63.77 27.44 21.25 21.74 6.84
VOC [g/h]46.83 46.48 43.85 36.61 83.21 75.96 32.68 25.31 25.89 8.15
Other Modes
g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
d_p, Pedestrian Delay [s]31.51 31.51 31.51 31.51
I_p,int, Pedestrian LOS Score for Intersectio 2.693 2.959 2.120 2.203
Crosswalk LOS B C B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000
c_b, Capacity of the bicycle lane [bicycles/h]475 525 550 900
d_b, Bicycle Delay [s]23.26 21.76 21.03 12.10
I_b,int, Bicycle LOS Score for Intersection 2.070 2.234 1.829 1.814
Bicycle LOS B B A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4-21Ring 1
Sequence
5 1/28/2025
303
Generated with Adams St and Corporate Centre Dr
Scenario 12: 12 EACP Alt 1 PMTJW Engineering, Inc.Version 2025 (SP 0-1)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Signalized Delay (sec / veh):22.0
Analysis Method:HCM 7th Edition Level Of Service:C
Analysis Period:15 minutes Volume to Capacity (v/c):0.560
YesYesYesYesCrosswalk
NoNoNoNoCurb Present
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00110.00100.00100.00110.00100.00100.00320.00100.00100.0085.00Entry Pocket Length [ft]
001001001001No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
1 1/28/2025
304
Generated with Adams St and Corporate Centre Dr
Scenario 12: 12 EACP Alt 1 PMTJW Engineering, Inc.Version 2025 (SP 0-1)
0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
431398752312916353594108508109Total Analysis Volume [veh/h]
113241963241134242712727Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
3711846520111140461819343794Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000410333367005741Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386799137352Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
2 1/28/2025
305
Generated with Adams St and Corporate Centre Dr
Scenario 12: 12 EACP Alt 1 PMTJW Engineering, Inc.Version 2025 (SP 0-1)
16.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
80Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
0.02.02.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s]
0.02.02.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
NoNoNoNoRest In Walk
0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s]
0.017.00.00.017.00.00.010.00.00.014.00.0Pedestrian Clearance [s]
0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s]
0.01.01.00.01.00.00.01.01.00.01.01.0All red [s]
0.03.03.00.03.00.00.03.03.00.03.03.0Amber [s]
0361002200211202011Maximum Green [s]
Auxiliary Signal Groups
047080025061Signal Group
PermissPermissProtectePermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing (Basic)
NoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoMinimum Recall
0.03.03.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s]
0105010001050105Minimum Green [s]
--Lead-----Lead--LeadLead / Lag
0.040.014.00.026.00.00.025.016.00.024.015.0Split [s]
Phasing & Timing: Pattern 1
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
3 1/28/2025
306
Generated with Adams St and Corporate Centre Dr
Scenario 12: 12 EACP Alt 1 PMTJW Engineering, Inc.Version 2025 (SP 0-1)
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
0.109.810.841.511.551.429.401.151.088.49d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.110.500.500.110.500.500.11k, delay calibration
20.3536.5528.9133.9413.8713.8636.6012.9312.9236.10d1, Uniform Delay [s]
492126267257812882123847901142c, Capacity [veh/h]
164717811499939172218701781175818701781s, saturation flow rate [veh/h]
0.030.060.070.140.190.190.050.170.170.06(v / s)_i Volume / Saturation Flow Rate
0.300.070.180.180.470.470.070.480.480.08g / C, Green / Cycle
23.95.714.314.337.737.75.538.638.66.4g_i, Effective Green Time [s]
2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s]
0.000.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s]
80808080808080808080C, Calculated Cycle Length [s]
CLCCCCLCCLLane Group
Lane Group Calculations
34.3399.4276.44112.74168.82181.3390.92141.09148.59103.2895th-Percentile Queue Length [ft/ln]
1.373.983.064.516.757.253.645.645.944.1395th-Percentile Queue Length [veh/ln]
19.0755.2442.4662.6393.79100.7450.5178.3882.5557.3850th-Percentile Queue Length [ft/ln]
0.762.211.702.513.754.032.023.143.302.3050th-Percentile Queue Length [veh/ln]
NoYesNoYesYesNoNoNoNoYesCritical Lane Group
CDCDBBDBBDLane Group LOS
20.4546.3629.7535.4515.4215.2845.9914.0914.0044.59d, Delay for Lane Group [s/veh]
0.110.780.370.500.410.410.760.350.350.77X, volume / capacity
Lane Group Results
4 1/28/2025
307
Generated with Adams St and Corporate Centre Dr
Scenario 12: 12 EACP Alt 1 PMTJW Engineering, Inc.Version 2025 (SP 0-1)
Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh]44.59 14.03 14.09 45.99 15.32 15.42 35.45 29.75 29.75 46.36 20.45 20.45
Movement LOS D B B D B B D C C D C C
d_A, Approach Delay [s/veh]18.64 18.98 32.99 36.94
Approach LOS B B C D
d_I, Intersection Delay [s/veh]21.98
Intersection LOS C
Intersection V/C 0.560
Emissions
Vehicle Miles Traveled [mph]6.96 20.22 19.08 7.23 27.90 25.77 3.85 2.93 6.51 3.72
Stops [stops/h]103.28 148.59 141.09 90.92 181.33 168.82 112.74 76.44 99.42 34.33
Fuel consumption [US gal/h]2.51 3.44 3.27 2.26 4.34 4.03 1.54 1.02 1.60 0.53
CO [g/h]175.56 240.71 228.29 157.84 303.32 281.95 107.38 71.17 111.73 37.18
NOx [g/h]34.16 46.83 44.42 30.71 59.01 54.86 20.89 13.85 21.74 7.23
VOC [g/h]40.69 55.79 52.91 36.58 70.30 65.34 24.89 16.49 25.89 8.62
Other Modes
g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
d_p, Pedestrian Delay [s]31.51 31.51 31.51 31.51
I_p,int, Pedestrian LOS Score for Intersectio 2.715 2.910 2.075 2.204
Crosswalk LOS B C B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000
c_b, Capacity of the bicycle lane [bicycles/h]500 525 550 900
d_b, Bicycle Delay [s]22.50 21.76 21.03 12.10
I_b,int, Bicycle LOS Score for Intersection 2.158 2.213 1.747 1.814
Bicycle LOS B B A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4-21Ring 1
Sequence
5 1/28/2025
308
OPENING YEAR PLUS PROJECT PLUS
ALTERNATIVE #2
TRAFFIC CONDITIONS
309
Generated with Adams St and Corporate Centre Dr
Scenario 7: 7 EACP Alt 2 AMTJW Engineering, Inc.Version 2025 (SP 0-2)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Signalized Delay (sec / veh):22.3
Analysis Method:HCM 7th Edition Level Of Service:C
Analysis Period:15 minutes Volume to Capacity (v/c):0.855
YesYesYesYesCrosswalk
NoNoNoNoCurb Present
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00110.00100.00100.00110.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft]
001001000000No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
1 4/11/2025
310
Generated with Adams St and Corporate Centre Dr
Scenario 7: 7 EACP Alt 2 AMTJW Engineering, Inc.Version 2025 (SP 0-2)
0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
4313981302317421151294103388128Total Analysis Volume [veh/h]
11324336445312824269732Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
371184112201501824418189334110Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000880727547005591Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386798727419Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
2 4/11/2025
311
Generated with Adams St and Corporate Centre Dr
Scenario 7: 7 EACP Alt 2 AMTJW Engineering, Inc.Version 2025 (SP 0-2)
16.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
80Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s]
0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s]
NoNoNoNoRest In Walk
0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s]
0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s]
0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s]
0.01.01.00.01.01.00.01.00.00.01.00.0All red [s]
0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s]
018190242109500950Maximum Green [s]
Auxiliary Signal Groups
047083020060Signal Group
Flashing Yellow Arrow
PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type
Phasing & Timing (Basic)
NoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoMinimum Recall
0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s]
0105010501000100Minimum Green [s]
--Lead--Lead------Lead / Lag
0.022.020.00.022.020.00.038.00.00.038.00.0Split [s]
Phasing & Timing: Pattern 1
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
3 4/11/2025
312
Generated with Adams St and Corporate Centre Dr
Scenario 7: 7 EACP Alt 2 AMTJW Engineering, Inc.Version 2025 (SP 0-2)
1.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.00d3, Initial Queue Delay [s]
1.589.033.587.206.396.30d2, Incremental Delay [s]
1.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.110.500.50k, delay calibration
34.2936.4532.7834.3010.489.46d1, Uniform Delay [s]
1481282252141027822c, Capacity [veh/h]
164717811626178115271201s, saturation flow rate [veh/h]
0.030.060.090.100.540.52(v / s)_i Volume / Saturation Flow Rate
0.090.070.140.120.640.64g / C, Green / Cycle
7.25.711.09.651.251.2g_i, Effective Green Time [s]
2.002.002.002.002.002.00l2, Clearance Lost Time [s]
0.000.000.000.002.002.00l1_p, Permitted Start-Up Lost Time [s]
4.004.004.004.004.004.00L, Total Lost Time per Cycle [s]
808080808080C, Calculated Cycle Length [s]
CLCLCCLane Group
Lane Group Calculations
48.7898.35135.45165.89343.54245.4395th-Percentile Queue Length [ft/ln]
1.953.935.426.6413.749.8295th-Percentile Queue Length [veh/ln]
27.1054.6475.2592.16221.50146.2650th-Percentile Queue Length [ft/ln]
1.082.193.013.698.865.8550th-Percentile Queue Length [veh/ln]
NoYesYesNoYesNoCritical Lane Group
DDDDBBLane Group LOS
35.8745.4836.3641.5016.8615.77d, Delay for Lane Group [s/veh]
0.380.760.680.810.800.75X, volume / capacity
Lane Group Results
4 4/11/2025
313
Generated with Adams St and Corporate Centre Dr
Scenario 7: 7 EACP Alt 2 AMTJW Engineering, Inc.Version 2025 (SP 0-2)
Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh]15.77 15.77 15.77 16.86 16.86 16.86 41.50 36.36 36.36 45.48 35.87 35.87
Movement LOS B B B B B B D D D D D D
d_A, Approach Delay [s/veh]15.77 16.86 39.10 41.98
Approach LOS B B D D
d_I, Intersection Delay [s/veh]22.32
Intersection LOS C
Intersection V/C 0.855
Emissions
Vehicle Miles Traveled [mph]39.50 62.81 5.20 4.57 6.51 3.72
Stops [stops/h]263.27 398.70 165.89 135.45 98.35 48.78
Fuel consumption [US gal/h]6.61 9.91 2.34 1.86 1.58 0.76
CO [g/h]462.26 692.99 163.54 129.82 110.22 53.34
NOx [g/h]89.94 134.83 31.82 25.26 21.44 10.38
VOC [g/h]107.13 160.61 37.90 30.09 25.54 12.36
Other Modes
g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
d_p, Pedestrian Delay [s]31.51 31.51 31.51 31.51
I_p,int, Pedestrian LOS Score for Intersectio 2.598 2.629 2.302 2.171
Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000
c_b, Capacity of the bicycle lane [bicycles/h]850 850 450 450
d_b, Bicycle Delay [s]13.23 13.23 24.03 24.03
I_b,int, Bicycle LOS Score for Intersection 2.581 2.908 2.099 1.814
Bicycle LOS B C B A
----------------Ring 4
----------------Ring 3
------------876-Ring 2
------------432-Ring 1
Sequence
5 4/11/2025
314
Generated with Adams St and Corporate Centre Dr
Scenario 8: 8 EACP Alt 2 PMTJW Engineering, Inc.Version 2025 (SP 0-2)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Signalized Delay (sec / veh):18.7
Analysis Method:HCM 7th Edition Level Of Service:B
Analysis Period:15 minutes Volume to Capacity (v/c):0.796
YesYesYesYesCrosswalk
NoNoNoNoCurb Present
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00110.00100.00100.00110.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft]
001001000000No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
1 4/11/2025
315
Generated with Adams St and Corporate Centre Dr
Scenario 8: 8 EACP Alt 2 PMTJW Engineering, Inc.Version 2025 (SP 0-2)
0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
431398752312916353594108508109Total Analysis Volume [veh/h]
113241963241134242712727Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
3711846520111140461819343794Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000410333367005741Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386799137352Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
2 4/11/2025
316
Generated with Adams St and Corporate Centre Dr
Scenario 8: 8 EACP Alt 2 PMTJW Engineering, Inc.Version 2025 (SP 0-2)
16.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
80Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Advanced Detector Location [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s]
0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s]
NoNoNoNoRest In Walk
0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s]
0.017.00.00.017.00.00.010.00.00.010.00.0Pedestrian Clearance [s]
0.05.00.00.05.00.00.05.00.00.05.00.0Walk [s]
0.01.01.00.01.01.00.01.00.00.01.00.0All red [s]
0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s]
018160181603400340Maximum Green [s]
Auxiliary Signal Groups
047083020060Signal Group
Flashing Yellow Arrow
PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type
Phasing & Timing (Basic)
NoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoMinimum Recall
0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s]
0105010501000100Minimum Green [s]
--Lead--Lead------Lead / Lag
0.022.020.00.022.020.00.038.00.00.038.00.0Split [s]
Phasing & Timing: Pattern 1
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
3 4/11/2025
317
Generated with Adams St and Corporate Centre Dr
Scenario 8: 8 EACP Alt 2 PMTJW Engineering, Inc.Version 2025 (SP 0-2)
1.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.00d3, Initial Queue Delay [s]
1.549.032.387.804.794.77d2, Incremental Delay [s]
1.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.110.500.50k, delay calibration
34.2136.4533.5635.508.548.20d1, Uniform Delay [s]
1501281841651061991c, Capacity [veh/h]
164717811647178115171410s, saturation flow rate [veh/h]
0.030.060.060.070.520.51(v / s)_i Volume / Saturation Flow Rate
0.090.070.110.090.670.67g / C, Green / Cycle
7.25.78.97.453.453.4g_i, Effective Green Time [s]
2.002.002.002.002.002.00l2, Clearance Lost Time [s]
0.000.000.000.002.002.00l1_p, Permitted Start-Up Lost Time [s]
4.004.004.004.004.004.00L, Total Lost Time per Cycle [s]
808080808080C, Calculated Cycle Length [s]
CLCLCCLane Group
Lane Group Calculations
48.6798.3585.61125.68277.73248.0495th-Percentile Queue Length [ft/ln]
1.953.933.425.0311.119.9295th-Percentile Queue Length [veh/ln]
27.0454.6447.5669.82170.62148.2150th-Percentile Queue Length [ft/ln]
1.082.191.902.796.825.9350th-Percentile Queue Length [veh/ln]
NoYesYesNoYesNoCritical Lane Group
DDDDBBLane Group LOS
35.7445.4835.9443.3013.3312.97d, Delay for Lane Group [s/veh]
0.370.760.530.780.750.73X, volume / capacity
Lane Group Results
4 4/11/2025
318
Generated with Adams St and Corporate Centre Dr
Scenario 8: 8 EACP Alt 2 PMTJW Engineering, Inc.Version 2025 (SP 0-2)
Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh]12.97 12.97 12.97 13.33 13.33 13.33 43.30 35.94 35.94 45.48 35.74 35.74
Movement LOS B B B B B B D D D D D D
d_A, Approach Delay [s/veh]12.97 13.33 40.12 41.94
Approach LOS B B D D
d_I, Intersection Delay [s/veh]18.72
Intersection LOS B
Intersection V/C 0.796
Emissions
Vehicle Miles Traveled [mph]46.26 60.89 3.85 2.93 6.51 3.72
Stops [stops/h]266.78 307.12 125.68 85.61 98.35 48.67
Fuel consumption [US gal/h]6.82 8.05 1.79 1.18 1.58 0.76
CO [g/h]476.44 563.00 125.27 82.25 110.22 53.21
NOx [g/h]92.70 109.54 24.37 16.00 21.44 10.35
VOC [g/h]110.42 130.48 29.03 19.06 25.54 12.33
Other Modes
g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00
d_p, Pedestrian Delay [s]31.51 31.51 31.51 31.51
I_p,int, Pedestrian LOS Score for Intersectio 2.634 2.653 2.230 2.172
Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000
c_b, Capacity of the bicycle lane [bicycles/h]850 850 450 450
d_b, Bicycle Delay [s]13.23 13.23 24.03 24.03
I_b,int, Bicycle LOS Score for Intersection 2.756 2.866 1.934 1.814
Bicycle LOS C C A A
----------------Ring 4
----------------Ring 3
------------876-Ring 2
------------432-Ring 1
Sequence
5 4/11/2025
319
OPENING YEAR PLUS PROJECT PLUS
ALTERNATIVE #3
TRAFFIC CONDITIONS
320
Generated with Adams St and Corporate Centre Dr
Scenario 9: 9 EACP Alt 3 AMTJW Engineering, Inc.Version 2025 (SP 0-1)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Roundabout Delay (sec / veh):14.6
Analysis Method:HCM 7th Edition Level Of Service:B
Analysis Period:15 minutes
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft]
000000000000No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
0000Pedestrian Volume [ped/h]
4313981302317421151294103388128Total Analysis Volume [veh/h]
11324336445312824269732Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
371184112201501824418189334110Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000880727547005591Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386798727419Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
1 1/28/2025
321
Generated with Adams St and Corporate Centre Dr
Scenario 9: 9 EACP Alt 3 AMTJW Engineering, Inc.Version 2025 (SP 0-1)
4313981302317421151294103388128Adjusted Demand Flow Rate [veh/h]
371184112201501824418189334110Demand Flow Rate [veh/h]
224359617755Exiting Flow Rate [veh/h]
704718244297Circulating Flow Rate [veh/h]
1111Number of Conflicting Circulating Lanes
Intersection Settings
0.230.500.770.62X, volume / capacity
66065110561000Capacity per Entry Lane [veh/h]
1.001.001.001.00Pedestrian Impedance
67466410771020Capacity of Entry and Bypass Lanes [veh/h]
158334834632Entry Flow Rate [veh/h]
0.980.980.980.98HV Adjustment Factor
0.001020.001020.001020.00102B (coefficient)
1380.001380.001380.001380.00A (intercept)
3.003.003.003.00User-Defined Follow-Up Time [s]
NoNoNoNoOverwrite Calculated Follow-Up Time
4.004.004.004.00User-Defined Critical Headway [s]
NoNoNoNoOverwrite Calculated Critical Headway
Lanes
BIntersection LOS
14.59Intersection Delay [s/veh]
ABCBApproach LOS
8.2713.5117.8912.37Approach Delay [s/veh]
22.5170.86202.34111.5495th-Percentile Queue Length [ft]
0.902.838.094.4695th-Percentile Queue Length [veh]
ABCBLane LOS
Movement, Approach, & Intersection Results
2 1/28/2025
322
Generated with Adams St and Corporate Centre Dr
Scenario 10: 10 EACP Alt 3 PMTJW Engineering, Inc.Version 2025 (SP 0-1)
Intersection Level Of Service Report
Intersection 1: Adams St / Corporate Center Dr
Control Type:Roundabout Delay (sec / veh):14.0
Analysis Method:HCM 7th Edition Level Of Service:B
Analysis Period:15 minutes
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
25.0025.0045.0045.00Speed [mph]
0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft]
000000000000No. of Lanes in Exit Pocket
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft]
000000000000No. of Lanes in Entry Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Intersection Setup
0000Pedestrian Volume [ped/h]
431398752312916353594108508109Total Analysis Volume [veh/h]
113241963241134242712727Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.86100.8610Peak Hour Factor
3711846520111140461819343794Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000410333367005741Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.02001.0200Growth Factor
0.00Proportion of CAVs [%]
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
361182242076105386799137352Base Volume Input [veh/h]
Corporate Center DriveCorporate Center DriveAdams StreetAdams StreetName
Volumes
1 1/28/2025
323
Generated with Adams St and Corporate Centre Dr
Scenario 10: 10 EACP Alt 3 PMTJW Engineering, Inc.Version 2025 (SP 0-1)
431398752312916353594108508109Adjusted Demand Flow Rate [veh/h]
3711846520111140461819343794Demand Flow Rate [veh/h]
230291694722Exiting Flow Rate [veh/h]
761742224251Circulating Flow Rate [veh/h]
1111Number of Conflicting Circulating Lanes
Intersection Settings
0.250.360.740.69X, volume / capacity
62363610771048Capacity per Entry Lane [veh/h]
1.001.001.001.00Pedestrian Impedance
63664810981069Capacity of Entry and Bypass Lanes [veh/h]
158232808740Entry Flow Rate [veh/h]
0.980.980.980.98HV Adjustment Factor
0.001020.001020.001020.00102B (coefficient)
1380.001380.001380.001380.00A (intercept)
3.003.003.003.00User-Defined Follow-Up Time [s]
NoNoNoNoOverwrite Calculated Follow-Up Time
4.004.004.004.00User-Defined Critical Headway [s]
NoNoNoNoOverwrite Calculated Critical Headway
Lanes
BIntersection LOS
13.98Intersection Delay [s/veh]
ABCBApproach LOS
8.9110.5815.7114.24Approach Delay [s/veh]
24.2540.44174.68147.1595th-Percentile Queue Length [ft]
0.971.626.995.8995th-Percentile Queue Length [veh]
ABCBLane LOS
Movement, Approach, & Intersection Results
2 1/28/2025
324
PREST | VUKSIC | GREENWOOD
A R C H I T E C T S I N T E R I O R S
111 LA QUINTA
DRIVE-THRU PAD
ADAMS STREET - LA QUINTA, CA
ATTACHMENT 6
325
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
A001
SHEET INDEX
AP
R
I
L
3
0
,
2
0
2
5
111 LA QUINTA DRIVE-THRU PAD
ADAMS STREET - LA QUINTA, CA 22
4
0
0
4
PROJECT INFORMATION
APPLICANT
PREST VUKSIC GREENWOOD ARCHITECTS
44-530 SAN PABLO AVE., STE 200
PALM DESERT, CA 92260
APN
643-080-064
DEVELOPMENT SUMMARY
ZONE:
SPECIFIC PLAN:
SETBACKS:
INTERIOR SETBACKS:
HEIGHT LIMIT:
MAX. STORIES:
MAX. FAR:
PARKING DATA
PARKING REQUIRED (per LQMC Table 9-12)
STANDARD @ 1:100, NO LESS THAN 10
3,690 GSF + 650 SF OUTDOOR = 4,340 / 100 =
TOTAL:
ACCESSIBLE
LOADING
SHORT TERM BICYCLE (3%, MIN. 5)
EVSE PER CAL GREEN (per table 5.106.5.3.1)
EVCS PER CAL GREEN (per table 5.106.5.3.1)
PARKING PROVIDED PER SHARED PARKING AGREEMENT*
*PARKING TO BE MODIFIED TO ADD 1 VAN ACCESSIBLE
STALL AND EVSE
BUILDING DATA
OCCUPANCY:
TYPE OF CONSTRUCTION:
SPRINKLED
NO. OF STORIES
GREATEST HEIGHT
B
TYPE VB
YES
1
23'-6"
(35'-0" ARCHITECTURAL TOWER)
CONSULTANTS
PREST VUKSIC GREENWOOD ARCHITECTS
44-530 SAN PABLO AVE., STE 200
PALM DESERT, CA 92260
760.779.5393
JOHN VUKSIC
ARCHITECT
CIVIL ENGINEER
LANDSCAPE ARCHITECT
EGAN CIVIL
PO BOX 5282
LA QUINTA, CA 92248
760.404.7663
-
PROPERTY DATA
SITE AREA:
GROSS BUILDING AREA:
BUILDING COVERAGE:
FAR:
INTERIOR LANDSCPARE AREA:
INTERIOR LANDSCAPE COVERAGE:
PARKING AREA:
PARKING LANDSCAPE AREA:
PARKING LADSCAPE COVERAGE:
19,757 SF (0.45 AC)
3,690 GSF
19%
.19
3,513 SF
17%
8,512 SF
748 SF
8.7%
44
44
1 VAN
1
5
2
8
PROJECT DESCRIPTION / USE
The project is a new drive-thru building.
C-R
SP 89-014 One Eleven Shopping Center
20 BLDG/10 LANDSCAPE
0
50
5
.35
PROJECT ADDRESS
WEST SIDE OF ADAMS ST., SOUTH OF HWY 111
LA QUINTA, CA 92253
BUILDING AREA
NAME AREA
LEASEABLE BLDG SF 3,689.5 SF
SHEET
NO.SHEET NAME
GENERAL
A000 COVER SHEET
A001 SHEET INDEX
A002 VICINITY / SITE PHOTO INDEX
A003 SITE PHOTOS
CIVIL
SHEET 1 PRELIMINARY GRADING PLAN
LANDSCAPE
L1.1 PRELIMNARY LANDSCAPE PLAN
L1.2 PRELIMINARY LIGHTING PLAN
ARCHITECTURE
A100 OVERALL SITE PLAN - PARKING & QUEUING
A101 ENLARGED SITE PLAN
A201 FLOOR PLAN
A301 ELEVATIONS
A302 ELEVATIONS
A310 COLORED ELEVATIONS
A311 COLORED ELEVATIONS
A401 ROOF PLAN
A501 3D VIEWS
A502 3D VIEWS
A601 VIEW FROM HWY 111 & ADAMS STREET
A602 VIEW FROM HWY 111 & ADAMS STREET
A603 VIEW FROM ADAMS STREET
A701 MATERIAL BOARDHSA Design Group, Inc.
PO Box 10690
Palm Desert, CA 92255
760.341.1515
SEPARATE SUBMITTALS
TRASH ENCLOSURE, FLAGPOLES, SITE LIGHTING,
MENU BOARDS AND BUILDING SIGNAGE.
326
80 354045 50505050505055555555606060 65656565 7070707575
75
85 505050 55555555556060 60606565657070 7070757590MH MHMH
STOP STOP STOP
MH
MH
MH
AHEA
D AHEA
D
SIGN
A
L SIGN
A
L
MHMH MHMH
ST
O
P
ST
O
P
MH C.O.C.O.BO MH MH
PROPOSED
DRIVE-THRU
A
D
A
M
S
S
T
R
E
E
T
HIGHWAY 111
PROPOSED
MONUMENT SIGN
1
2
3
4
5
6
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
1" = 50'-0"
A002
VICINITY / SITE PHOTO
INDEX
AP
R
I
L
3
0
,
2
0
2
5
111 LA QUINTA DRIVE-THRU PAD
ADAMS STREET - LA QUINTA, CA 22
4
0
0
4
0'25' 50' 100'200'
NORTH
327
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
A003
SITE PHOTOS
AP
R
I
L
3
0
,
2
0
2
5
111 LA QUINTA DRIVE-THRU PAD
ADAMS STREET - LA QUINTA, CA 22
4
0
0
4
VIEW 2 - PAD VIEW FROM PARKING LOTVIEW 1 - PAD VIEW FROM PARKING LOT VIEW 3 - PAD VIEW FROM ENTRY DRIVE
VIEW 5 - PAD VIEW FROM ADAMS STREETVIEW 4 - PAD VIEW FROM ADAMS SIGNAL
*PHOTO SIMULATION VIEW
VIEW 6 - PAD VIEW FRON HWY 111 & ADAMS
*PHOTO SIMULATION VIEW
328
BUIL
D
I
N
G
74.0
0
F
F
73.5
P
A
D
PP_4009B1
(C
A
T
V
)
(C
A
T
V
)71.35FS72.42EG72.33EG71.33FS71.58FS71.50FS71.71FS71.85FS72.55FS72.24FS72.02FS73.57FS73.14FS72.89FS73.37EG73.73EG73.86EG73.64EG73.48EG73.12EG73.43EG73.46EG73.97EG73.75EG73.32EG73.20EG73.25EG72.67EG72.80EG72.61EG72.11EG72.96EG72.32EG72.97EG72.83EG72.81EG72.76EG73.51EG73.79EG73.65EG73.74EG73.87EG75.00EG(
7
2
)
(
7
3
)
(
7
3
)
(
7
4
)71.63EG71.91EGSS
M
H
(7
3
.
0
5
R
I
M
)
(
7
2
.
3
3
T
C
)
(
7
1
.
9
0
F
L
)
(
7
2
.
6
2
T
C
)
(
7
2
.
1
0
F
L
)
(72.63TC
)
(72.14FL)
(72.21LI
P
)
(
7
2
.
7
5
T
C
)
(7
2
.
2
9
F
L
)
(7
2
.
5
9
T
C
)
(7
2
.
1
5
F
L
)
(
7
2
.
3
4
T
C
)
(
7
1
.
8
4
F
L
)
(
7
2
.
3
1
T
C
)
(
7
1
.
7
9
F
L
)
(
7
2
.
6
7
T
C
)
(
7
2
.
0
5
F
L
)
(
7
2
.
9
2
T
C
)
(
7
2
.
4
8
F
L
)
(
7
9
.
8
4
T
W
)
(
7
9
.
8
6
T
W
)
(
7
9
.
8
5
T
W
)
(7
2
.
1
6
L
I
P
)
(7
2
.
1
0
F
L
)
(7
2
.
3
2
L
I
P
)
(CRO
W
N
)
(72.
2
6
)
(
C
R
O
W
N
)
(
7
2
.
5
1
)
(C
R
O
W
N
)
(7
1
.
8
9
)
(S
I
D
E
W
A
L
K
)
(I
C
V
)
(SIGN)73.49EG73.73EG(S
I
D
E
W
A
L
K
)
(7
3
.
0
8
T
C
)
(7
2
.
4
7
F
L
)71.78FS73.01EG73.13EG(7
2
.
8
7
T
C
)
(7
2
.
4
1
F
L
)
(7
2
.
5
7
L
I
P
)
(V
L
V
)
(W
T
R
)
(7
3
.
1
6
T
C
)
(7
2
.
6
6
F
L
)
(7
2
.
8
5
L
I
P
)
SS
M
H
8'
'
S
S
8'
'
S
S
8'
'
S
S
8'
'
S
S
8'
'
S
S
8'
'
S
S
8'
'
S
S
8'
'
S
S
8'
'
S
S
8'
'
S
S
8'
'
S
S
8'
'
S
S
8'
'
S
S
8'
'
S
S
8'
'
S
S
8'
'
S
S
8'
'
S
S
8'
'
S
S
8'
'
S
S
8'
'
S
S
(10.00')
18
(N
2
4
°
4
1
'
1
2
"
E
6
8
.
4
7
'
)
(L=2.99')
(R=270.
00')
(
Δ=00°38'04")
(N
0
0
°
1
7
'
2
8
"
W
1
5
8
.
3
6
'
)
(N
8
9
°
4
9
'
4
0
"
E
)
(3
.
5
4
'
)
4
4
(44.00')
14
(10.00')
14
(N
0
0
°
1
7
'
2
8
"
W
)
(P
U
B
L
I
C
S
T
R
E
E
T
)
(
N
6
5
°
5
0
'
5
3
"
W
1
4
9
.
6
8
'
)
(N
2
4
°
0
9
'
0
7
"
E
2
2
.
3
8
'
)
(
N
6
5
°
5
0
'
5
3
"
W
)
(
1
6
.
1
5
'
)
(N
2
4
°
0
9
'
0
7
"
E
2
0
.
0
7
'
)
(Δ=19°16'
04"
R=250.
00')
(
L=84.
07'
)
(Δ=90°32'05"
R=20.00')
(L=31.60')
(
Δ
=
8
5
°
5
7 '
0 5 "
R =3 5.0 0')
(
L
=5 2 .
5 0')
(Δ=12°20'44"
R=230.00'
L=49.56')
(Δ=46°20'5 8"
R =3 5.
0
0 '
)
(L =2 8.31 ')
OUT
D
O
O
R
S
E
A
T
I
N
G
APP
R
O
X
.
6
5
0
S
F
1
2
3
ORD
E
R
DIRE
C
T
I
O
N
A
L
SIGN
DN
PRO
P
O
S
E
D
D
R
I
V
E
-
T
H
R
U
3,69
0
S
F
DN
DN 4
RIG
H
T
T
U
R
N
ON
L
Y
5
6
DN
16
PICK
UP
15
14
13
11
12
9
10
7
8
DN
DN
N2
4
°
4
1
'
1
2
"
E
6
8
.
4
7
'
PARCEL 2
PM 36921
(PMB 289/75-58)
PARCEL 2
CERT. OF COMP.
REC. 4/2/1994 AS
DOC. #178098
PARCEL 1
PM 36921
(PMB 289/75-58)
7
2
.
6
0
T
C
7
2
.
1
0
F
S
7
2
.
6
3
T
C
7
2
.
1
2
F
S
(
7
1
.
8
0
F
S
)
(
7
1
.
8
2
F
S
)
(
7
1
.
7
2
F
S
)
(
7
1
.
8
1
F
S
)
(
7
1
.
9
0
F
S
)
7
2
.
7
0
T
C
7
2
.
2
0
F
S
7
2
.
9
0
T
C
7
2
.
4
0
F
S
7
4
.
2
8
T
C
7
3
.
7
8
F
S
7
3
.
8
0
T
C
7
3
.
3
0
F
L
7
4
.
3
2
T
C
7
3
.
8
2
F
S
7
4
.
0
5
T
C
7
3
.
5
5
F
L
7
4
.
1
6
T
C
7
3
.
6
6
F
S
7
4
.
0
2
T
C
7
3
.
5
2
F
S
7
3
.
9
4
T
C
7
3
.
4
4
F
S
7
3
.
4
7
T
C
7
2
.
9
7
F
S
7
3
.
6
2
T
C
7
3
.
1
2
F
S
7
3
.
0
0
T
C
7
2
.
5
0
F
S
7
2
.
4
4
T
C
7
1
.
9
4
F
S
7
2
.
3
3
T
C
7
1
.
8
3
F
S
7
2
.
8
1
F
S
7
2
.
8
8
F
S
7
2
.
7
5
F
S
7
2
.
8
3
F
S
7
2
.
5
0
F
S
7
2
.
5
8
F
S
73
.
9
8
F
S
7
3
.
6
0
F
S
7
3
.
6
0
F
S
7
3
.
8
3
F
S
7
3
.
2
0
T
C
7
2
.
7
0
F
S
7
3
.
7
0
T
C
7
3
.
2
0
F
S
7
3
.
8
0
T
C
7
3
.
3
0
F
S
7
3
.
7
6
T
C
7
3
.
2
6
F
S
7
3
.
6
3
T
C
7
3
.
1
3
F
L
7
3
.
7
8
T
C
7
3
.
2
8
F
S
7
2
.
5
0
F
S
7
3
.
6
7
T
C
7
3
.
1
7
F
S
7
2
.
3
3
T
C
7
1
.
8
3
F
S
(
7
1
.
7
0
F
S
)
7
3
.
0
5
T
C
7
2
.
5
5
F
L
7
2
.
6
1
F
S
7
2
.
6
0
F
S
7
2
.
7
5
F
S
7
2
.
8
3
F
S
(
7
1
.
8
5
F
S
)
7
3
.
8
8
F
S
7
3
.
7
2
F
S
7
3
.
8
0
T
C
7
3
.
3
0
F
S
7
4
.
2
5
T
C
7
3
.
7
5
F
S
7
4
.
3
7
T
C
7
3
.
8
7
F
S
7
3
.
9
5
T
C
7
3
.
4
5
F
S
7
3
.
4
7
T
C
7
2
.
9
7
F
L
7
3
.
7
1
T
C
7
3
.
2
1
F
S
73
.
4
2
F
S
73
.
5
7
F
S
7
3
.
9
8
F
S
BR
E
A
K
G
R
A
D
E
B
R
E
A
K
(
7
1
.
6
2
F
S
)
7
2
.
6
0
F
S
7
3
.
8
8
F
S
7
4
.
1
7
T
C
7
3
.
6
7
F
S
R
2
5
.
0
0
'
R
2
5
.
0
0
'
7
4
.
3
0
T
C
7
3
.
8
0
F
L
2
6
.
0
'
2
6
.
2
'
13
.
0
'
24
.
5
'
6
.
0
'
1
9
.
0
'
5
.
0
'
8.
5
'
9.
2
'
2
6
.
3
'
7
3
.
9
5
F
S
7
3
.
4
0
F
S
7
3
.
9
5
F
S
7
3
.
8
8
F
S
13
.
0
'
1
.
5
%
2
.
1
5
%
GR
A
D
E
7
3
.
4
7
T
C
7
2
.
9
7
F
S
7
3
.
5
9
T
C
7
3
.
0
9
F
L
7
3
.
3
2
F
S
1
.
4
1
%
1
.
5
%
1.
0
%
0
.
5
%
1.
0
%
4.
7
5
%
0
.
5
%
0.
7
7
%
7
3
.
2
0
F
S
7
3
.
2
5
F
S
7.
8
%
2.
0
%
0
.
7
7
%
0
.
7
7
%
0
.
5
%
0
.
5
%
BR
E
A
K
GR
A
D
E
0.
5
%
7
3
.
8
8
F
S
4
.
7
5
%
4
.
7
5
%
7
3
.
2
7
T
C
7
3
.
3
5
F
S
7
3
.
4
5
F
S
7
3
.
7
0
T
C
7
3
.
2
0
F
S
7
3
.
1
5
F
S
3
.
3
%
1.
5
5
%
8
.
3
%
R1
1
.
0
0
'
0
.
5
%
H
P
H
P
7
2
.
6
9
T
C
7
2
.
1
9
F
L
7
.
5
%
5
.
5
%
2%
2.
7
5
%
2.
0
%
1.
0
%
1.4%
11
.
0
'
11
.
0
'
R1
1
.
0
0
'
2
.
0
%
2
.
0
%
7
3
.
6
7
F
S
MONUMENT SIGN
TO REMAIN
EXISTING
EXISTING UTILITIES
EXISTING ADA RAMP
PROTECT IN PLACE
⅊
⅊
⅊
R/
W
R/
W
RIGHT OF WAY
PROTECT IN PLACE
PRELIMINARY GRADING PLAN
IN THE CITY OF LA QUINTA, STATE OF CALIFORNIA
LOT COVERAGE:
TOTAL LOT AREA =
TOTAL BUILDING AREA =
19,757± SF (0.45 AC)
4,000± SF
BUILDING AREA/LOT AREA =20.0%
ADAMS ST & HWY 111, LA QUINTA, CA, 92253
LOT 2 OF PARCEL MAP NO. 36921 (MB 239/75-78)
ADAMS & 111 DRIVE THRU PAD
DATE
CITY OF LA QUINTA
ACTING BUILDING OFFICIAL
APPROVED FOR PERMITTING:PLANNING AND ZONING COMPLIANCE:
CHERI FLORES
COMMUNITY DEVELOPMENT MANAGER
CITY OF LA QUINTA
AJ ORTEGA DATE
LOT 2 OF PARCEL MAP NO. 36921, AS SHOWN
BY A MAP ON FILE IN BOOK 239, PAGES 75
THROUGH 78 OF PARCEL MAPS, INCLUSIVE,
OFFICIAL RECORDS, COUNTY OF RIVERSIDE,
STATE OF CALIFORNIA.
LEGAL DESCRIPTION:
PREPARED FOR:
MICHAEL SHOVLIN
900 ISLAND DRIVE, UITIT 312
RANCHO MIRAGE, CA 92270
APN
PROPERTY ADDRESS:
WEST SIDE OF ADAMS ST, SOUTH OF HWY 111
LA QUINTA, CA 92253
643-080-064
SC
A
L
E
:
1
"
=
1
0
'
UNDERGROUND SERVICE ALERT
1-800-422-4133
YOU DIG
DAYS BEFORE
TWO WORKING
A PUBLIC SERVICE BY
DIAL
BEFORE
YOU DIG
TOLL FREE
OF
SHEET
SHEETS
BENCHMARK:
BENCHMARK:CITY OF LA QUINTA # 65
ELEVATION: 94.256 DATUM: NAVD88
DESCRIPTION:
1" IRON PIPE WITH RECTANGULAR PLUG AND BRASS TACK IN
MONUMENT WELL, DOWN 1.2' AT THE INTERSECTION OF MILES AVENUE AND ADAMS
STREET.
REVISIONS
MARK BY
DATE
ENGINEER AGENCY
DATEAPPR.
BASIS OF BEARINGS:
THE BASIS OF BEARINGS FOR THIS SURVEY IS THE CENTERLINE OF ADAMS STREET
PER PARCEL MAP NO. 36921, AS SHOWN BY MAP ON FILE IN BOOK 239 OF PARCEL
MAPS, PAGES 75 THROUGH 78 INCLUSIVE, RECORDS OF THE COUNTY OF RIVERSIDE,
STATE OF CALIFORNIA, BEING:
NORTH 00° 17' 28" WEST .
BENJAMIN DANIEL EGAN, R.C.E. 73070
PREPARED UNDER THE DIRECT SUPERVISION OF:
DATE:
05/05/2025
NO. 73070BENJAMINDANIEL
E
G
A
N
R
E
G
I
STER E D P R O F E S SIONAL
E
N
G
I
N
E
ER
CI V I LSTATEOFCA L I F O R NIA
PO BOX 5282, LA QUINTA, CA 92248-5282
EGAN CIVIL, INC.
(760) 404-7663 WWW.EGANCIVIL.COM
1
PRIVATE REFERENCE #
CITY REFERENCE #
CITY OF LA QUINTA
PRELIMINARY GRADING PLAN
LOT 2 OF PARCEL MAP 36921, P.M.B. 239/75-78
ADAMS & 111 DRIVE THRU PAD
WEST SIDE OF ADAMS ST, NORTH OF HWY 111
APN: 643-080-064
PL
O
T
D
A
T
E
:
0
5
-
0
5
-
2
0
2
5
NO
T
T
O
S
C
A
L
E
VICINITY MAP
NOT TO SCALE
AVENUE 47
C
O
A
C
H
E
L
L
A
V
A
L
L
E
Y
S
T
O
R
M
C
H
A
N
N
E
L
AD
A
M
S
S
T
R
E
E
T
WA
S
H
I
N
G
T
O
N
S
T
R
E
E
T
SIM
O
N
D
R
I
V
E
QU
I
N
T
A
C
E
N
T
E
R
D
R
I
V
E
SITE
HIG
H
W
A
Y
1
1
1
LA
C
I
T
Y
O
F
LA
Q
U
I
N
T
A
CORPORATE
CENTER
DRIVE
10 10 20 30
SCALE: 1"=10'
0
1
329
MH
MH
AHEADAHEAD
SIGNALSIGNAL
ST
O
P
ST
O
P
EXISTING PARKING
LOT TREES
EXISTING PARKING
LOT TREES
L1.1
PRELIMINARY
LANDSCAPE PLAN
JA
N
U
A
R
Y
2
3
,
2
0
2
5
111 LA QUINTA DRIVE-THRU PAD
ADAMS STREET - LA QUINTA, CA 22
4
0
0
4
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
1" = 10'-0"
SYMBOL CODE BOTANICAL / COMMON NAME CONT WUCOLS QTY
TREES
PDM Parkinsonia x `Desert Museum` / Desert Museum Palo Verde 36"box LOW (.3)2
PD Phoenix dactylifera / Date Palm 20` B.T.H. minimum MED (.5)5
SHRUBS
BLJ Bougainvillea x `La Jolla` / Bougainvillea 5 gal MED (.5)8
HP Hesperaloe parviflora / Red Yucca 5 gal LOW (.2)46
LP Lantana montevidensis / Trailing Lantana 5 gal MED (.5)4
LY Lantana x `New Gold` / New Gold Lantana 5 gal MED (.5)28
LGC Leucophyllum frutescens `Green Cloud` TM / Green Cloud Texas Ranger 5 gal*LOW (.2)13
RE Russelia equisetiformis / Firecracker Plant 5 gal LOW (.2)17
DESERT ACCENTS
AA Agave americana / Century Plant 15 gal*V. LOW (.1)21
AV Agave victoriae-reginae / Queen Victoria Agave 5 gal LOW (.2)44
VINES
CH Calliandra haematocephala / Pink Powderpuff 5 gal MED (.5)9
CACTI
DW Dasylirion wheeleri / Grey Desert Spoon 5 gal LOW (.2)9
SG Stenocereus griseus / Mexican Organ Pipe 5 gal LOW (.2)4
PLANT SCHEDULE
SYMBOL DESCRIPTION QTY
1-2" CRUSHED ROCK 649 sf
SURFACE MATERIALS
BOULDERS 12
REFERENCE NOTES SCHEDULE
DECOMPOSED GRANITE
0 feet32
1" = 16'
16 48
N O R T H
PROJECT DATA
SITE AREA:19,757 SF
GROSS BUILDING AREA 3,900 GSF
BUILDING COVERAGE 20%
FAR .20
INTERIOR LANDSCAPE AREA 3,513 SF
INTERIOR LANDSCAPE COVERAGE 17%
PARKING AREA 8,512 SF
PARKING LANDSCAPE AREA 748 SF
PARKING LANDSCAPE COVERAGE 8.7%
330
MH
AHEADAHEAD
SIGNALSIGNAL
PROPERTY LINE
P
R
O
P
E
R
T
Y
L
I
N
E
P
R
O
P
E
R
T
Y
L
I
N
E
PR
O
P
E
R
T
Y
L
I
N
E
PROPERTY LIN
E
ADAMS
S
T
R
E
E
T
PROPOSED DRIVE-THRU
46 SPACES FOR
DRIVE - THRU
PER SHARED
PARKING
PARKING
LANDSCAPE
AREA
INTERIOR
LANDSCAPE
AREA
INTERIOR LANDSCAPE AREA
(LANDSCAPE AREA TO SCREEN
DRIVE-THRU & DRIVE-THRU
ELEMENTS)
1 2 3
ORDER
DIRECTIONAL
SIGN
4
5 6
16
PICK
UP
15 14 13
11
12
9
10
7 8
EXISTING WALL
NEW SCREEN
WALL
MH
AHEADAHEAD
SIGNALSIGNAL
PROPERTY LINE
P
R
O
P
E
R
T
Y
L
I
N
E
P
R
O
P
E
R
T
Y
L
I
N
E
PR
O
P
E
R
T
Y
L
I
N
E
PROPERTY LIN
E
ADAMS
S
T
R
E
E
T
PROPOSED DRIVE-THRU
46 SPACES FOR
DRIVE - THRU
PER SHARED
PARKING
PARKING
LANDSCAPE
AREA
INTERIOR
LANDSCAPE
AREA
INTERIOR LANDSCAPE AREA
(LANDSCAPE AREA TO SCREEN
DRIVE-THRU & DRIVE-THRU
ELEMENTS)
1 2 3
ORDER
DIRECTIONAL
SIGN
4
5 6
16
PICK
UP
15 14 13
11
12
9
10
7 8
EXISTING WALL
NEW SCREEN
WALL
EXISTING PARKING
LOT TREES
L1.2
PRELIMINARY
LIGHTING PLAN
JA
N
U
A
R
Y
2
3
,
2
0
2
5
111 LA QUINTA DRIVE-THRU PAD
ADAMS STREET - LA QUINTA, CA 22
4
0
0
4
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
1" = 10'-0"
PHOTO SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY
Kichler Lighting Large Accent VLO 16020
60 degree Variable Lumen Output ( VLO ) with three lumen
outputs (400, 600, 835 lumens) design at highest setting
0, (AZT) Textured Architectural Bronze, 8" In-ground stake
Lamp: 12W Integrated LED, 12W / 17VA, 2700K,
Beamspread: 16020 - High
12
LIGHTING SCHEDULE
LOW VOLTAGE UPLIGHT
1/2" = 1'-0"A HSA-LI-02
LIGHTING SETBACK
1/2" = 1'-0"B HSA-LI-03
331
80354045 50505050505055555555606060 65656565 7070707575 758550505055555555556060606065656570707070757590MHMHMHSTOPSTOPSTOPMH
MH
MH
AHEA
D AHEA
D
SIGN
A
L SIGN
A
L
MHMH MHMH
ST
O
P
S
T
O
P
MH C.O.C.O.BOMH MH8035404550505050505055555555606060656565657070707575 758550505055555555556060606065656570707070757590MHMHMHSTOPSTOPSTOPMHMHMHAHEADAHEADSIGNALSIGNALMHMHMHMHSTOPSTOPMH C.O.C.O.BOMHMH
PROPERTY LINE
P
R
O
P
E
R
T
Y
L
I
N
E
P
R
O
P
E
R
T
Y
L
I
N
E
PR
O
P
E
R
T
Y
L
I
N
E
PROPERTY LINE
A
D
A
M
S
S
T
R
E
E
T
PROPOSED DRIVE-THRU
46 SPACES FOR
DRIVE - THRU
PER SHARED
PARKING
A101
1
ENLARGED
PLAN
PARKING
LANDSCAPE
AREA
PARKING
LANDSCAPE
AREA
INTERIOR
LANDSCAPE
AREA
INTERIOR LANDSCAPE AREA
(LANDSCAPE AREA TO SCREEN
DRIVE-THRU & DRIVE-THRU
ELEMENTS)
NOTE: SEE A001 FOR BUILDING AND LANDSCAPE COVERAGE
1 2 3
ORDER
DIRECTIONAL
SIGN
4
5 6
16
PICK
UP
15 14 13
11
12
9
10
7 8
EXISTING WALL
NEW SCREEN
WALL
DIRECTIONAL
SIGN
RECYCLING
REFUSE
ORAGANICS
18
'
-
4
"
4'
-
0
"
5'-0"
13'-8"
12
'
-
0
"
6' HIGH CMU TRASH
ENCLOSURE WALL
6' HIGH METAL GATE
DN
6" CURB
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
As indicated
A100
OVERALL SITE PLAN -
PARKING & QUEUING
AP
R
I
L
3
0
,
2
0
2
5
111 LA QUINTA DRIVE-THRU PAD
ADAMS STREET - LA QUINTA, CA 22
4
0
0
4
0'8' 16' 32'64'
NORTH
3/16" = 1'-0"2 TRASH ENCLOSURE
332
803540455050505050505555555560606065656565 7070707575 758550505055555555556060606065656570707070757590MHMHMHSTOPSTOPSTOPMH
MH
MH
AHEA
D AHEA
D
SIGN
A
L SIGN
A
L
MHMH MHMH STOPSTOPMH C.O.C.O.BOMHMH
LANDS
C
A
P
E
S
B
10'-0"SETBA
C
K20'-0"
B
U
I
L
D
I
N
G
DN
C
O
M
P
A
C
T
PROPERTY LINE
P
R
O
P
E
R
T
Y
L
I
N
E
P
R
O
P
E
R
T
Y
L
I
N
E
PR
O
P
E
R
T
Y
L
I
N
E
26'-0"6'-0"14'-0"5'-0"
18'-0"
PROPERTY LINE
OUTDOOR SEATING
APPROX. 650 SF
1 2 3
ORDER
DIRECTIONAL
SIGN
A
D
A
M
S
S
T
R
E
E
T
DN
PROPOSED DRIVE-THRU
3,690 SF
DN DN
104 112 114
106
100
TYP.
118117
119
102
TYP.
115
101
110
3'
-
6
"
5
'
-
0
"
2
'
-
0
"
4'
-
0
"
115102
119
DN
TYP.
111
116
4
TYP.
105
RI
G
H
T
T
U
R
N
ON
L
Y
27
'
-
0
"
5 6
102
DN
16
PICK
UP
15 14 13
11
12
120
9
10
7 8
116
109
TYP.
111
107
102
TYP.
105
TYP.
103
102
TYP.
103
TYP.
103
103
107
102
102
102
10'-0"
R
1
1
'
-
0
"
R
2
5
'
-
0
"
R 11
'
-
0
"
R 25'-
0
"
13
'
-
0
"
4'
-
0
"
103
A100
2
ENLARGED
PLAN
121
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
1" = 10'-0"
A101
ENLARGED SITE PLAN
AP
R
I
L
3
0
,
2
0
2
5
111 LA QUINTA DRIVE-THRU PAD
ADAMS STREET - LA QUINTA, CA 22
4
0
0
4
0'5' 10' 20'40'
NORTH
KEYNOTES
NO.DESCRIPTION
100 3'H 8" CMU WALL
101 3' H 8" CMU PLANTER WALL W/ STUCCO FINISH
102 PLANTER
103 NEW CONCRETE CURB, SEE CIVIL
104 EXISTING CONCRETE CURB, SEE CIVIL
105 EXISITNG CONCRETE CURB TO BE REMOVED, SEE
CIVIL
106 NEW ACCESSIBLE PARKING STALL
107 NEW CURB RAMP, SEE CIVIL
109 EXISTING SITE WALL
110 EXISTING TRASH ENCLOSURE
111 TRUNCATED DOMES, MIN. 3'
112 NEW SIDEWALK PER CITY STANDARDS, SEE CIVIL
114 EXISITNG CURB RAMP
115 NEW CONCRETE HARDSCAPE, SEE CIVIL AND
LANDSCAPE
116 NEW ACCESSIBLE PATH STRIPING
117 NEW ACCESSIBLE PARKING SIGN
118 NEW CONCRETE WHEEL STOP
119 ACCESSIBLE PATH
120 36" SCREEN WALL
121 EXISTING MONUMENT SIGN TO REMAIN
333
A3021
A302
A301
A301
2
1
2
A
A
1 1
B
B
2 2
8'
-
0
"
41
'
-
2
"
4'-0"91'-2"
14'-3"17'-6"18'-3"16'-6"42'-6"5'-0" 1'-3"
3 3
49
'
-
2
"
6'
-
0
"
2'
-
0
"
2
'
-
0
"
4
'
-
0
"
9'
-
0
"
3'
-
6
"
12
'
-
2
"
33
'
-
6
"
2'-0"50'-0"30'-0"7'-2"4'-0"
3'-7"5'-0"
11
'
-
0
"
1'
-
3
"
28
'
-
1
1
"
8'
-
8
"
6"
ELECTRICAL
ROOM
ROOF ACCESS
4'-0"
4'-0"20'-0"4'-0"20'-0"4'-0"43'-2"
3'
-
6
"
1'
-
0
"
2'
-
6
"
1'
-
0
"
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
1/4" = 1'-0"
A201
FLOOR PLAN
AP
R
I
L
3
0
,
2
0
2
5
111 LA QUINTA DRIVE-THRU PAD
ADAMS STREET - LA QUINTA, CA 22
4
0
0
4
0'2' 4'8'16'
NORTH
334
FIRST FLOOR0"
T.O.P.23'-6"
P1 301
P3
OPEN
P1 301 P2
P1301
300
300
300
OPEN
300
P3 P3
312 TYP.
309 306305
304 P3
300
310
P2
300 300
P1
300
300
3'
-
0
"
1'
-
0
"
8'
-
2
"
20
'
-
0
"
22
'
-
0
"
30
'
-
0
"
A
R
C
H
I
T
E
C
T
U
R
A
L
T
O
W
E
R
E
L
E
M
E
N
T
22
'
-
0
"
20
'
-
0
"
1'
-
3
"
12
'
-
0
"
305
307P2
P2
300
TYP.
308
307
FIRST FLOOR0"
T.O.P.23'-6"
8'
-
2
"
1'
-
0
"
12
'
-
0
"
1'
-
3
"
20
'
-
0
"
20
'
-
6
"
2'
-
0
"
30
'
-
0
"
A
R
C
H
I
T
E
C
T
U
R
A
L
T
O
W
E
R
E
L
E
M
E
N
T
302 307
304 P3P3
308
P1
300 300
P3
P2
3'
-
0
"
300
310
300
300
P2
300
301
TYP.
315 P3305
TYP.
308
TYP.308301
6'-0" TYP.
3'
-
0
"
12
'
-
6
"
T
Y
P
.
313
302
300
35
'
-
0
"
A
R
C
H
I
T
E
C
T
U
R
A
L
T
O
W
E
R
E
L
E
M
E
N
T
302
20
'
-
0
"
22
'
-
0
"
TYP.308
13
'
-
3
"
TYP.
315
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
3/16" = 1'-0"
A301
ELEVATIONS
AP
R
I
L
3
0
,
2
0
2
5
111 LA QUINTA DRIVE-THRU PAD
ADAMS STREET - LA QUINTA, CA 22
4
0
0
4
3/16" = 1'-0"1 WEST ELEVATION
0'6'12'3'24'
KEYNOTES
NO.DESCRIPTION
300 7/8" (3 COAT) OMEGA FLEX FINE ACRYLIC FINISH, COLOR:
SEE PAINT SCHEDULE
301 CEMENT FIBER BOARD SIDING, MFR: NICHIHA, MDL: LATURA
V-GROOVE, COLOR: GREY
302 FAUX WOOD PORCELAIN TILE, MFR: ARIZONA TILE, COLOR:
ESSENCE CREAM
304 ADDRESS NUMBER PER FIRE DEPARTMENT
305 FIXED STOREFRONT GLASS, FRAME BLACK ANODIZED
ALUMINUM
306 STOREFRONT GLASS DOOR, FRAME BLACK ANODIZED
ALUMINUM
307 SIGNAGE, BY OTHERS. SEPERATE PERMIT REQUIRED.
308 #15 CONTROL JOINT, CARRY BELOW SOFFITS AND AROUND
CORNERS.
309 AWNING SUPPORT ROD, PRIMED AND PAINTED TO MATCH
AWNING
310 STEEL TUBE TRELLIS WITH PERFORATED INFILL PANELS,
PRIMED AND PAINTED. COLOR: SEE PAINT SCHEDULE
312 STEEL TUBE AWNING, PRIMED AND PAINTED. COLOR: SEE
PAINT SCHEDULE
313 HOLLOW METAL LOUVERED MECHANICAL DOOR, PAINTED
TO MATCH ADJACENT PLASTER
315 GARDEN WALL TRELLIS, SEE LANDSCAPE PLANS
3/16" = 1'-0"2 NORTH ELEVATION
PAINT LEGEND
NO.DESCRIPTION
P1 MFR: BENJAMIN MOORE, COLOR: 1541 LONDON FOG
P2 MFR: BENJAMIN MOORE, COLOR: OC-17 WHITE DOVE
P3 MFR: BENJAMIN MOORE, COLOR: 2134-30 IRON MOUNTAIN
335
FIRST FLOOR0"
T.O.P.23'-6"
OPEN
20
'
-
0
"
1'
-
3
"
12
'
-
0
"
P1
P2301
300
300
P1
300 TYP.
308
304
13
'
-
3
"
302P3
300
35
'
-
0
"
A
R
C
H
I
T
E
C
T
U
R
A
L
T
O
W
E
R
E
L
E
M
E
N
T
20
'
-
0
"
22
'
-
0
"
P3
300
FIRST FLOOR
0"
T.O.P.
23'-6"
3'
-
0
"
1'
-
0
"
8'
-
2
"
22
'
-
0
"
30
'
-
0
"
A
R
C
H
I
T
E
C
T
U
R
A
L
T
O
W
E
R
E
L
E
M
E
N
T
P3 301 P2
P2P3 P3302
310
305
300
306305
TYP.308 307
6'-0" TYP.
12
'
-
6
"
T
Y
P
.
3'
-
0
"
35
'
-
0
"
A
R
C
H
I
T
E
C
T
U
R
A
L
T
O
W
E
R
E
L
E
M
E
N
T
20
'
-
0
"
300 300
TYP.
315
TYP.
308
312TYP.
308
300
P3
313
302
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
3/16" = 1'-0"
A302
ELEVATIONS
AP
R
I
L
3
0
,
2
0
2
5
111 LA QUINTA DRIVE-THRU PAD
ADAMS STREET - LA QUINTA, CA 22
4
0
0
4
0'6'12'3'24'
3/16" = 1'-0"1 EAST ELEVATION
KEYNOTES
NO.DESCRIPTION
300 7/8" (3 COAT) OMEGA FLEX FINE ACRYLIC FINISH, COLOR:
SEE PAINT SCHEDULE
301 CEMENT FIBER BOARD SIDING, MFR: NICHIHA, MDL: LATURA
V-GROOVE, COLOR: GREY
302 FAUX WOOD PORCELAIN TILE, MFR: ARIZONA TILE, COLOR:
ESSENCE CREAM
304 ADDRESS NUMBER PER FIRE DEPARTMENT
305 FIXED STOREFRONT GLASS, FRAME BLACK ANODIZED
ALUMINUM
306 STOREFRONT GLASS DOOR, FRAME BLACK ANODIZED
ALUMINUM
307 SIGNAGE, BY OTHERS. SEPERATE PERMIT REQUIRED.
308 #15 CONTROL JOINT, CARRY BELOW SOFFITS AND AROUND
CORNERS.
310 STEEL TUBE TRELLIS WITH PERFORATED INFILL PANELS,
PRIMED AND PAINTED. COLOR: SEE PAINT SCHEDULE
312 STEEL TUBE AWNING, PRIMED AND PAINTED. COLOR: SEE
PAINT SCHEDULE
313 HOLLOW METAL LOUVERED MECHANICAL DOOR, PAINTED
TO MATCH ADJACENT PLASTER
315 GARDEN WALL TRELLIS, SEE LANDSCAPE PLANS
PAINT LEGEND
NO.DESCRIPTION
P1 MFR: BENJAMIN MOORE, COLOR: 1541 LONDON FOG
P2 MFR: BENJAMIN MOORE, COLOR: OC-17 WHITE DOVE
P3 MFR: BENJAMIN MOORE, COLOR: 2134-30 IRON MOUNTAIN
3/16" = 1'-0"2 SOUTH ELEVATION
336
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
A310
COLORED
ELEVATIONS
AP
R
I
L
3
0
,
2
0
2
5
111 LA QUINTA DRIVE-THRU PAD
ADAMS STREET - LA QUINTA, CA 22
4
0
0
4
0'6'12'3'24'
WEST ELEVATION
NORTH ELEVATION
337
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
A311
COLORED
ELEVATIONS
AP
R
I
L
3
0
,
2
0
2
5
111 LA QUINTA DRIVE-THRU PAD
ADAMS STREET - LA QUINTA, CA 22
4
0
0
4
0'6'12'3'24'
EAST ELEVATION
SOUTH ELEVATION
338
A3021
A302
A301
A301
2
1
2
A
A
1 1
B
B
2 2
3 3
SL
O
P
E
1
/
4
"
/
1
'
-
0
"
SL
O
P
E
1
/
4
"
/
1
'
-
0
"
T.O. TRELLIS 9'-2"
T.O.P. 22'-0"
T.O.P. 20'-0"T.O.P. 23'-6"
T.O.P. 22'-0"
T.O.P. 23'-6"
T.O.P. 20'-0"
T.O. AWNING 9'-2"
T.O.P. 30'-0"
SL
O
P
E
1
/
4
"
/
1
'
-
0
"
605
TYP.600
TYP.600TYP.603
TYP.603
604
TYP.
601
TYP.
601
TYP.
601TYP.
601
TYP.602
TYP.602
T.O. EQUIP 20'-6" TYP.
SLOPE 1/4" / 1'-0"
SLOPE 1/4" / 1'-0"
SL
O
P
E
1
/
4
"
/
1
'
-
0
"
TYP.600
SL
O
P
E
1
/
4
"
/
1
'
-
0
"
SL
O
P
E
1
/
4
"
/
1
'
-
0
"
SL
O
P
E
1
/
4
"
/
1
'
-
0
"
TYP.
601
TYP.
601
TYP.
601
TYP.
601
20'-0"
35'-0"
T.O.P. 13'-3"
TYP.600
310
T.O.P. 20'-0"
T.O. AWNING 9'-2"
TYP.606
TYP.602
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
1/4" = 1'-0"
A401
ROOF PLAN
AP
R
I
L
3
0
,
2
0
2
5
111 LA QUINTA DRIVE-THRU PAD
ADAMS STREET - LA QUINTA, CA 22
4
0
0
4
0'2' 4'8'16'
NORTH
KEYNOTES
NO.DESCRIPTION
310 STEEL TUBE TRELLIS WITH PERFORATED INFILL PANELS,
PRIMED AND PAINTED. COLOR: SEE PAINT SCHEDULE
600 ROOF DRAIN AND OVERFLOW. CONNECT ROOF DRAIN TO
UNDERGROUND DRAINAGE SYSTEM AND DAYLIGHT
OVERFLOW TO GRADE
601 SINGLE-PLY ROOFING MEMBRANE, ICC # ESR 1456, SEE
SPECIFICATIONS
602 2X CRICKET, SLOPE @ 1/4" PER FT. MIN., TYP.
603 MECH. EQUIP. HEIGHT BELOW TOP OF ADJACENT PARAPET.
LOCATION PER TENANT
604 KITCHEN EXHAUST, HEIGHT BELOW TOP OF ADJACENT
PARAPET. LOCATION PER TENANT
605 ROOF ACCESS HATCH. LOCATION PER TENANT
606 STEEL TUBE LOUVER INFILL
339
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
A501
3D VIEWS
AP
R
I
L
3
0
,
2
0
2
5
111 LA QUINTA DRIVE-THRU PAD
ADAMS STREET - LA QUINTA, CA 22
4
0
0
4
1 NORTH WEST VIEW
2 SOUTH WEST VIEW
340
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
A502
3D VIEWS
AP
R
I
L
3
0
,
2
0
2
5
111 LA QUINTA DRIVE-THRU PAD
ADAMS STREET - LA QUINTA, CA 22
4
0
0
4
1 SOUTH EAST VIEW FROM ADAMS STREET
2 NORTH EAST VIEW FROM ADAMS STREET
341
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
12" = 1'-0"
A601
VIEW FROM HWY 111
& ADAMS STREET
AP
R
I
L
3
0
,
2
0
2
5
111 LA QUINTA DRIVE-THRU PAD
ADAMS STREET - LA QUINTA, CA 22
4
0
0
4
The image above is a photo simulation of the proposed building project. It is intended for illustrative purposes only and may not accurately reflect the final design, materials, scale,
landscaping, or surroundings. The actual appearance of the building may vary due to design changes, construction constraints, and other factors. This simulation should not be relied
upon as a definitive representation of the completed project.
Road signage has been removed for clarity.
342
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
12" = 1'-0"
A602
VIEW FROM HWY 111
& ADAMS STREET
AP
R
I
L
3
0
,
2
0
2
5
111 LA QUINTA DRIVE-THRU PAD
ADAMS STREET - LA QUINTA, CA 22
4
0
0
4
The image above is a photo simulation of the proposed building project. It is intended for illustrative purposes only and may not accurately reflect the final design, materials, scale,
landscaping, or surroundings. The actual appearance of the building may vary due to design changes, construction constraints, and other factors. This simulation should not be relied
upon as a definitive representation of the completed project.
Road signage has been removed for clarity.
Tree obscuring view has been edited to show intent of removal or trimming.
343
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
A603
VIEW FROM
ADAMS STREET
AP
R
I
L
3
0
,
2
0
2
5
111 LA QUINTA DRIVE-THRU PAD
ADAMS STREET - LA QUINTA, CA 22
4
0
0
4
The image above is a photo simulation of the proposed building project. It is intended for illustrative purposes only and may not accurately reflect the final design, materials, scale,
landscaping, or surroundings. The actual appearance of the building may vary due to design changes, construction constraints, and other factors. This simulation should not be relied
upon as a definitive representation of the completed project.
Road signage has been removed for clarity.
Tree obscuring view has been edited to show intent of removal or trimming.
344
CF1: CEMENT FIBER BOARD SIDING
MFR: NICHIHA
MDL: LATURA V-GROOVE
COLOR: GREY
P3: PLASTER WALLS / STEEL
MFR: BENJAMIN MOORE
COLOR: 2134-30 IRON MOUNTAIN
P2: PLASTER WALLS
MFR: BENJAMIN MOORE
COLOR: OC-17 WHITE DOVE
P1: PLASTER WALLS
MFR: BENJAMIN MOORE
COLOR: 1541 LONDON FOG
WT1: FAUX WOOD PORCELAIN TILE
MFR: ARIZONA TILE
COLOR: ESSENCE CREAM
Sheet:
Scale:
INFO@PVGARCHITECTS.COM | 760 . 779 . 5393 T
44530 SAN PABLO AVE, STE 200 | PALM DESERT, CA 92260
I I
WWW.PVGARCHITECTS.COM
PREST VUKSIC GREENWOOD
A R C H I T E C T S • I N T E R I O R S
12" = 1'-0"
A701
MATERIAL BOARD
AP
R
I
L
3
0
,
2
0
2
5
111 LA QUINTA DRIVE-THRU PAD
ADAMS STREET - LA QUINTA, CA 22
4
0
0
4
P3 CF1
P1 P1 WT1P3P3
P3 WT1
P1
345
WRITTEN
PUBLIC
COMMENT
PLANNING
COMMISSION
MEETING
JUNE 10, 2025
Topic: Specific Plan Specific Plan 03-067 Amendment 5-Halt the proposed barrier fence
and plan for outdoor recreation and conservation around and on Coral Mountain - La
Quinta Planning commission public comment 10 June
1
Topic: Alternative planning options for Coral Mountain corridor to align with City
Vision, Mission and Goals
Speaker: Mary Mann La Quinta CA 92253 mobile
This is my second time offering public comment to this Commission regarding this topic.
The mitigation measures that are included in the Specific Plan Specific Plan 03-067
Amendment 5 in treatment Cultural, Historical and Unique features are not adequate.
Below is a sketch of some alternative Community amenities that speak to La Quinta’s
mission statement from our strategic plan: “As the “Gem of the Desert,” the City of La
Quinta is committed to enhancing its unique natural surroundings for the benefit of its
residents through support for the arts and culture, public safety, affordable housing,
sustainable fiscal and environmental guidelines, multi-racial and multi-generational
activities and events, and preservation of its ancient and recent history.
The land uses suggested in the image below and align with many of specific values and
goals that are throughout the current General Plan. These alternative uses could be aligned
with the new development and the private developer could support creation of these new
public spaces that show a long term investment in the Community and commitment to the
overall health of La Quinta. Including the written comments submitted to the Art and
Community Services Commission yesterday.
PLANNING COMMISSION MEETING - JUNE 10, 2025 - WRITTEN PUBLIC COMMENT FROM RESIDENT MARY MANN
MATTERS NOT ON THE AGENDA - COMMENTS REGARDING SPECIFIC PLAN 03-067 AMENDMENT NO. 5
2
Figure 1: Sketch of alternative land uses adjacent to the boundaries of area covered in current SP 03-067
Amendment 5- This makes Coral Mountain as a centerpiece and envisions connectivity around the entire
geologic feature and the Santa Rosa Wilderness. Additional parks, open space, and public facilities will
enhance Community connection, allow for sharing of our unique history recent and ancient with residents
and visitors alike, provide public spaces for hosting of outdoor events, retreats, educational opportunities.
end
La Quinta Arts and Community Services Commission Public Comment 9 June 2025
1
Topic: South La Quinta growth-Coral Mountain park and trails
Written Comments: Mary Mann La Quinta CA 92253 mobile
Thank you for the opportunity to oƯer public comments to the La Quinta Arts and Community Services
Commission. I am a resident of south La Quinta who is daily inspired artistically, academically, physically,
emotionally and spiritually in our desert and am so grateful to be living here and have access to the
outdoors. I look forward to enjoying many more years here with new discovery every day and sharing with
my son as he grows. Hundreds of new homes in walled private developments have been added in the past
several years in south La Quinta and the building continues. As a result more and more people (me
included) are using areas of the City that have been lightly used in the past. As residents continue to
populate this area they are discovering Coral Mountain the Gem of La Quinta and gateway to the Santa
Rosa Wilderness. This is an area for hiking and other outdoor pursuits and provides access to the Santa
Rosa Wilderness. This area is used daily, weekly, seasonally, by immediate neighbors, other Coachella
Valley residents, and regional visitors for all kinds of recreation. Without planning there will be a crisis soon,
where we may be cutting oƯ our access to open space, enjoyment of our natural environment, places to
walk our dogs, ride bikes, ride horses, climb, take in the quiet, discover the desert, see wildlife, and be
inspired. The County is also upgrading the Lake Cahuilla park that was featured in the Gem magazine this
month, further adding the interest in south La Quinta as an outdoor recreation hub.
The City needs to plan on the demand for and use of the access points, trails, and natural space in south La
Quinta. I have submitted written comments at recent City Council (20 May, 2 June) and Planning
Commission (May 13) meetings regarding development around Coral Mountain. I would like to get the City
engaged in the eƯort to create an integrated plan and particularly to continue to allow open access to Coral
Mountain for discovery and interpretation of its unique ecological, geological, archaeological and historical
stories. To be done right it will require engagement with the public, other agencies, landowners and
potential developers covering the whole area, not piecemeal around the Mountain. So many current users
here have a deep connection to the area, are dismayed with the potential loss of access, and see a better
way to develop this area.
In my observations on foot of this area over the past 3 years, the ‘Coral Mountain loop’ would be a welcome
addition to the La Quinta hiking map including designated trail heads on Avenue 58 and Avenue 60. This
loop would showcase our unique desert environment. On the east side of Coral Mountain the trail would
highlight the tufa formation that reveals the shoreline of the historic Lake Cahuilla and the archaeological
features that show how well loved and used this area has been for at least many hundreds of years.
The current plan seems to be to put a fence directly through these unique features to accommodate the
requirements of a large private golf course development. The fence location and construction on the west
boundary of the development were not considered in relation to identified sensitive ecological and
archaeological features that should be respected. Other considerations that were not included are the
preferred use planned for adjoining properties (park and open space), current use (park and open space),
Bureau of Reclamation and CWVD infrastructure, nor the hundreds of new neighbors that have been added
to this part of La Quinta since the original project was conceived and reconceived over the past 28+ years.
La Quinta Arts and Community Services Commission Public Comment 9 June 2025
2
Times have changed, plans need to change. The fence idea needs to be ditched and a comprehensive plan
for conservation around Coral Mountain and connection to the Wilderness boundary should be created.
This one private golf course development threatens to add another 750 residential units to the northeast
side of Coral Mountain, which will further increase the use of the surrounding natural space and access to
the Santa Rosa Wilderness. (New homes=new residents and visitors who do not stay behind walls).
Community services that are consistently demanded (when we are asked) are more parks, hiking , walking
trails, access to open space. While the current developer of the property east of Coral Mountain made
some promises regarding the building of a trail on the west boundary, this is not an integrated plan that
links the current use with the future needs. La Quinta, perhaps through this this committee, should be
working directly with any developer and other stakeholder groups to ensure that the Community Service
needs of current and future residents and visitors are taken into account. Please feel free to contact me. I
am new to the conversation but so want to be a part of it if there are avenues to get involved.
Figure 1: Concept for establishing the hiking route around Coral Mountain.
end
POWER POINTS
PLANNING
COMMISSION
MEETING
JUNE 10, 2025
June 10, 2025
1
Planning Commission Meeting
June 10, 2025
5:00 p.m.
Planning Commission Meeting
June 10, 2025
PH1 – Hwy 111/Adams Drive-Through Building
Specific Plan 2024-0005
Conditional Use Permit 2024-0007
Site Development Permit 2024-0010
1
2
June 10, 2025
2
Project
Location
Zoning
3
4
June 10, 2025
3
Background
• One Eleven Shopping Center Specific Plan
– Approved in 1990
– Amended twice
– Condition of approval limits number of drive
throughs and requires Conditional Use Permit
Proposal
• Specific Plan Amendment to allow one additional
drive through for a total of six in the center
• Conditional Use Permit for drive through use
• Site Development Permit for site, landscape and
architectural design
5
6
June 10, 2025
4
Specific Plan Amendment
• Condition of approval limits number of drive
throughs to five
• Currently five are operating
• Amendment involves changing condition of
approval to allow for six
• No other changes are proposed
Specific Plan Amendment
• Highway 111 Corridor Specific Plan
– To be considered for adoption in the next couple of
months
– Would allow for drive-through uses in a proposed Auto-
Oriented Development Overlay
– Overlay includes this site
7
8
June 10, 2025
5
Conditional Use Permit
• Required for drive throughs in this center
• Proposed Operations
• Drive through vehicle stacking
Site
Plan
9
10
June 10, 2025
6
Site Development Permit
• Architectural
Design
• Landscaping
• Site Design
– Parking
• 46 spaces
provided
North and West Elevations
West
North
11
12
June 10, 2025
7
East and South Elevations
East
South
Rendering- Adams Street facing SW
13
14
June 10, 2025
8
Rendering – Adams Street facing north
Floor Plan
15
16
June 10, 2025
9
Preliminary Landscape Plan
Findings
PC must make findings that:
– The project is exempt from environmental review
(CEQA) pursuant to Section 15332 infill development
project
– CUP and SDP are consistent with Zoning Code and
General Plan and consider the architecture,
landscaping, and site design and apply COA
17
18
June 10, 2025
10
Recommendation
Adopt a resolution to recommend City Council
approve Specific Plan 2024-0005 (Amendment
No. 3 to SP1989-014), Conditional Use Permit
2024-0007 and Site Development Permit 2024-
0014 and find the project exempt from
environmental review pursuant to Section 15332
(Class 32) infill development project
19
20
June 10, 2025
11
Site Plan
with
Parking
Level of Service
Descriptions
• Expressed in terms of delay or
waiting time to get through the
various intersection approaches
• The General Plan requires a
minimum of LOS D
21
22