Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
BSOL2024-0228
BUILDING PERMIT DESIGN & DEVELOPMENT DEPARTMENT 78-495 CALLE TAMPICO ta Qa�fra LA QUINTA, CALIFORNIA 92253 CALIFORNIA Permit Type: Solar Owner: Permit Number: BSOL2024-0228 Applicant: Property Address: 79242 TOM FAZIO LN APN: 766042001 Legal Description Lot 7 MB 249/1 TR 27728 Contractor: Property Zoning: RL, 7 Valuation: $30,951.00 PHONE (760) 777-7125 WWW.LAQUINTACA.GOV APPLIED DATE: 07/19/2024 ISSUED DATE: 09/16/2024 Stonefield Development Judy Hallock 12582 2nd Street Sp#17 Sp#17 Sp#17, YUCAIPA, CA 92399 Chad Young / 970445 PO BOX 460267, ESCONDIDO, CA 92046 PRIOR TO THE ISSUANCE OF THIS PERMIT FOR CONSTRUCTION, ALTERATION, IMPROVEMENT, DEMOLITION, OR REPAIR THE OWNER, APPLICANT AND/OR CONTRACTOR UNDER PENALTY OF PERJURY HAVE AFFIRMED WHEN APPLICABLE, THROUGH THE SUBMITTAL OF FORMS OR BY OTHER ELECTRONIC MEANS, THE FOLLOWING: LICENSED CONTRACTOR OR OWNER -BUILDER DECLARATION (1 or 2) 1) They are licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and the referenced License is in full force and effect, or; 2) That they are exempt from the Contractors' State License Law for the reason(s) indicated by either (2)(a) and/or (2)(b), or (2)(c) where he or she is exempt from licensure by a valid exemption. [Section 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractors' State License Law (Chapter (commencing with Section 7000) of Division 3 of the Business and Professions Code] Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).) a) As owner of the property, or my employees with wages as their sole compensation, will do all of or portions of the work, and the structure is not intended or offered for sale (Section 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who, through employees' or personal effort, builds or improves the property, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the Owner -Builder will have the burden of proving that it was not built or improved for the purpose of sale.). b) As owner of the property, will be exclusively contracting with licensed c) Are exempt from licensure under the Contractors' State License Law. As an Owner -Builder, they acknowledge that, except for their personal residence in which they must have resided in for at least one year prior to completion of the improvements covered by this permit, they cannot legally sell a structure built as an owner -builder if it has not been constructed in its entirety by licensed contractors. It is understood that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application was submitted at the following Web site: http://www.leginfo.ca.gov/calaw.html. DECLARATION REGARDING CONSTRUCTION LENDING AGENCY (If applicable) A construction lender will be used for completion of the improvements covered by this permit and the name and information of which is on file for public inspection during the regular business hours of the public entity. Failure of the applicant to indicate the construction lender on the application does not relieve that person of the requirement to give the construction lender preliminary notice from that duty. WORKERS' COMPENSATION DECLARATION (1, 2 or 3) WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. 1) Has and will maintain a certificate of consent to self -insure for workers' compensation, issued by the Director of Industrial Relations as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 2) Has and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 3) Certifies that, in the performance of the work for which this permit is issued, shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, shall forthwith comply with those provisions. NOTICE TO APPLICANT (1, 2 and 3) 1) Each person upon whose behalf this application was made, each person at whose request and for whose benefit work is being performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents, and employees for any act or omission related to the work being performed under or following issuance of this permit. 2) Any permit issued as a result of this application becomes null and void if work is not commenced within 360 days from date of issuance of such permit, or if cessation of work for 180 days will subject permit to cancellation. On or after January 1, 2019, every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 12 months after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 12 months after the time the work is commenced. 3) Certified that they read the application and state that the information provided is correct. Agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above -mentioned property for inspection purposes. IMPORTANT: An Application for Permit was made to the Building Official, subject to the conditions and restrictions set forth at the time of application, which is now hereby an Issued Permit. If any part of the information being supplied on this permit is inaccurate or untrue, please contact the City of La Quinta at (760) 777-7125 immediately for correction. Printed: 9/5/25 2:38 pm Page 1 of 3 Permit Type: Solar BUILDING PERMIT Permit Number: Property Address BSOL2024-0228 79242 TOM FAZIO LN 6.15kWDC ROOF MOUNTED SOLAR PV SYSTEM - (15) 410W HANWHA Q.PEAK DUO BLK ML-G10+410 MODULES, (1) 200 AMP TESLA BACK-UP GATEWAY ATS, (1) TESLA POWERWALL 3 13.5kWH BATTERY STORAGE SYSTEM, (1) 125 AMP ESSENTIAL LOADS PANEL, 200 AMP AC DISCONNECT, TIED INTO EXISTING 400 AMP MAIN SERVICE ELECTRICAL PANEL (317SF). 2022 CALIFORNIA ELECTRICAL CODE. REVISION 1 FEEDER FROM MAIN SERVICE PANEL TO TESLA BACK-UP GATEWAY AND ESSENTIAL LOADS PANEL REVISED TO 1/0 ALUMINUM. 2022 CALIFORNIA ELECTRICAL CODE. PV System Type Residential System Size (kW DC) 6.15 PV Strings (EA) 2 PV Miscellaneous 1 Zoning RL General Plan LDR Equipment EA City Limits Within La Quinta Limits Subdivision Name TR 27728 Lot Number 7 Lot Size 3481.07 Centerlines 96257 Legal Description Lot 7 MB 249/1 TR 27728 Type Group Sq Ft Value Invoice No. Fee Fee Amount Amount Paid INV-00009223 Digital Archiving and Records Management Fee - OTC $12.00 $12.00 Building Standards Administration $2.00 $2.00 Credit Card Convenience Fee $8.79 $8.79 Solar (PV) Less than 10kW PC $30.51 $30.51 Solar (PV) Less than 10kW $30.51 $30.51 Technology Enhancement Fee $8.00 $8.00 Electrical Miscellaneous Apparatus,Conduits,&Co PC $30.51 $30.51 Electrical Miscellaneous Apparatus,Conduits,&Condu $30.51 $30.51 Permit Issuance $115.94 $115.94 Building Staff Time $91.50 $91.50 Total for Invoice INV-00009223 $360.27 $360.27 INV-00009981 Building Staff Time $45.75 $45.75 Total for Invoice INV-00009981 $45.75 $45.75 Grand Total for Permit $406.02 $406.02 Workflow Step / Action Name Action Type Start Date End Date Application Completeness Check v.1 07/19/2024 15:15 07/19/2024 15:15 ---------------------------------------------------------------------------------------------------------------------------------------- Submittal Document Verification v.1 Generic Action 07/19/2024 15:15 Plan Check v.1 07/19/2024 0:00 09/11/2024 16:45 ---------------------------------------------------------------------------------------------------------------------------------------- Building Review (1 Day) v.1 Receive Submittal 07/19/2024 0:00 08/02/2024 14:41 ---------------------------------------------------------------------------------------------------------------------------------------- Building Review (1 Day) v.2 Receive Submittal 08/06/2024 0:00 08/22/2024 9:15 ---------------------------------- Building Review (1 Day) v.3 - Receive Submittal 09/09/2024 ..- 0:00 ...... 09/11/2024 16:45 Permit Issuance v.1 ��k7f Biv�lYz �l b'7iCY���%7!1 [:Iiz1Yz �:iEi%3 Printed: 9/5/25 2:38 pm Page 2 of 3 BUILDING PERMIT Permit Type: Solar Permit Number: BSOL2024-0228 Property Address: 79242 TOM FAZIO LN Verify Contractor info & Conditions have been met v.1 Generic Action 09/13/2024 15:32 ---------------------------------------------------------------------------------------------------------------------------------------- Verify & Invoice Fees v.1 Generic Action 09/13/2024 15:32 ---------------------------------------------------------------------------------------------------------------------------------------- Verify Fee Payment & Issue Permit v.1 Generic Action 09/16/2024 8:38 ---------------------------------------------------------------------------------------------------------------------------------------- Print, Attach, and Email Building Permit v.1 Create Report 09/16/2024 8:38 09/16/2024 8:38 Revisions v.1 10/03/2024 0:00 10/22/2024 9:23 ---------------------------------------------------------------------------------------------------------------------------------------- Revision Submittal v.1 Receive Submittal 10/03/2024 0:00 10/22/2024 9:23 Solar Inspections v.1 09/18/2024 0:00 ---------------------------------------------------------------------------------------------------------------------------------------- Rough Electrical v.1 Inspection 09/18/2024 0:00 09/19/2024 13:35 ---------------------------------------------------------------------------------------------------------------------------------------- Rough Electrical v.2 Inspection 09/23/2024 7:32 09/23/2024 13:52 ---------------------------------------------------------------------------------------------------------------------------------------- Rough Electrical v.3 Inspection 10/22/2024 14:09 10/22/2024 14:09 ---------------------------------------------------------------------------------------------------------------------------------------- �rmanent Power Inspection Inspections - Final v.1 11/05/2024 16:33 11/06/2024 14:41 ---------------------------------------------------------------------------------------------------------------------------------------- Solar Final v.1 Inspection 11/05/2024 16:33 11/06/2024 14:41 Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work shall remain visible and able to be accessed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of the applicable code and other ordinances of the jurisdiction shall not be valid. It shall be the duty of the owner or the owner's authorized agent to cause the work to remain visible and able to be accessed for inspection purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this code. A building or structure shall not be used or occupied in whole or in part, and a change of occupancy of a building or structure or portion thereof shall not be made, until the building official has issued a certificate of occupancy therefor as provided herein. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the jurisdiction shall not be valid. A person shall not make connections from a utility, a source of energy, fuel, or power, or a water system or sewer system to any building or system that is regulated by the applicable code and other ordinances of the jurisdiction for which a permit is required, until approved by the building official. Printed: 9/5/25 2:38 pm Page 3 of 3 CALIFORNIA PREMIER SOLAR CONSTRUCTION To Whom It May Concern, Please allow this letter to serve as authorization for the following individuals to serve on our behalf, as a duly authorized agent for above mentioned company. And as such, the following individuals may obtain building/trade permits and obtain business licenses on our behalf. Please contact this office if you have any questions or comments. Aldo Mantellassi David Jackson Dede Williams Doug Randall Jennifer Cole Judy Hallock Melvin Tam Michael Mills Michael Walker Randy Cole Robert Ramsey Rylinde Cole Victor Luna Sincer' � L'-C Signdtuf- Name: CPAO YouNCr CSLB# g7OL}4$ SEE ATTACHED DOCUMENT ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of San Diego On lqtn U� before me, Patsy Rosado Martinez, Notary Public (insert name and title of the officer) personally appeared I i VIUOl who proved to me on the b sis of satisf ctory e dence to be the person ) whose names/�e d� I subscribed to the within instrument and acknowledged to me that he/s /they executed the dame in his/h?f/th94fauthorized capacity(), and that by his/Tier/ eir signature,() on the instrument the person( , or the entity upon behalf of which the personacted, executed the instrument. certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature (Seal) PATSY ROSADO MARTINEZ < _> COMM.# 2402146 o NOTARY PUBLIC. CALIFORNIA > SAN Di=GO CO.!i,7r " MY COMM, Ev. A?.,R. =B, 3U26 "' CITY OF LAQUINTA STONEFIELD DEVELOPMENT LOT 7 6.15kW PHOTOVOLTAIC BUILDING DIVISION REVIEWED FOR CALIFORNIA PREMIER N CODE SOLAR CONSTRUCTION COMPLIANCE DATE 09/11/2024 Ry�� RrmtRa wnk: J J w BSOL2024-0228 - 79242 TOM FAZIO AREAS --NEWAR ARRAY ON ROOF tEW 1_ RrC)l 0 G Chid `"""""`Officer U _ 0 C- - C-fOLicense#970445 L ❑ EAT SENSOR LOCATION INSTALLED ON CEILING ABOVE ESS 3 6.15kWDC ROOF MOUNTED SOLAR PV PER R328.7 IN ACCORDANCE W/SECTION R314 & 1207.5.4 CFC REQ. ``x/ C ro SYSTEM - (15) 41 OW HANWHA Q.PEAK I j ® = DUO BILK ML-G10+410 MODULES, (1) 200 j TESLA POWERWALL 3 BATTERY i/\�� i TESLAGATEWAY ENERGY STORAGE LOCATION AMP TESLA BACK-UP GATEWAY ATS, (1) ; ► \ i -STOP BUTTON LOCKABLE RPO SWITCH TESLA POWERWALL 3 13.5kWH o �/ y i AC DISCONNECT Q1 BATTERY STORAGE SYSTEM, (1) 125-------- 1 ARE°A2 ® NG AMP ESSENTIAL LOADS PANEL, (1) 200 AMP AC DISCONNECT, TIED INTO EXISTING 400 AMP MAIN SERVICE /15 ELECTRICAL PANEL (317SF). 2022 CALIFORNIA ELECTRICAL CODE. 1 1 o AREA 1 ® '7 DRIVEWAY 5 ENPHASE CONNECTOR SHALL SERVE AS AC DISCONNECT ON ROOF (TYP. IK d > o IN COMPLIANCE W/ 690.15(B) DISCONNECTING MEANS AND 690.33 MATING / 4 Of D- CONNECTORS - DO NOT DISCONNECT UNDER LOAD 4 a C3 L w CONDUIT ROUTED FROM ROOF THROUGH ATTIC SPACE T " _ INVERTER ALL CONDUITS IN THE ATTIC SPACE SHALL BE w a LOCATED A MINIMUM OF 18 INCHES FROM THE ROOF DECKING H i STAMP AREA: ROOF ACCESS POINTS PER �m E 2022 CRC SECTION R331.4.1 9 ro ° s= ROOF LAYOUT SITE PLAN 1 SCALE: O NOTES: SCOPE: - -PHOTOVOLTAIC PROJECT INFORMATION: 1. SOLAR PHOTOVOLTAIC SYSTEM TO BE INSTALLED ON RESIDENTIAL STRUCTURE. INSTALL 6. SYSTEM CONSISTING OF OWNER: SOLAR CONTRACTOR: - 2. DESIGN COMPLYING WITH THE FOLLOWING: (15) HANWHA Q.PEAK DUO BLK ML-G10+q10 SOLAR PANELS ON STONEFIELD DEVELOPMENT CAL PREM SOLAR o $ 2.1. THE 2022 EDITION OF THE CALIFORNIA BUILDING CODE (CBC) ADOPTS THE 2021 INTERNATIONAL BUILDING CODE (IBC) AND THE INTERNATIONAL FLAT ROOF AT AN ORIENTATION OF 180 DEGREES A� B LICENSE #970445 N Q- 2021 RESIDENTIAL CODE (IRC). 2.2. THE 2022 EDITION OF THE CALIFORNIA ELECTRICAL CODE (CEC) ADOPTS THE 2019 NATIONAL ELECTRICAL CODE (NEC) 2.3. THE 2022 EDITION OF THE CALIFORNIA ENERGY CODE PROJECT ADDRESS: PO BOX 460267 79242 TOM FAZIO LANE ESCONDIDO, CA 92046 Q SHEET INDEX: LAQUINTA, CA 93311 2.4. 2022 FIRE CODE BASED ON THE 2021 INTERNATIONAL FIRE CODE (IFC) 3. THIS PROJECT HAS BEEN DESIGNED IN COMPLIANCE WITH THE CBC SECTION 1609 TO WITHSTAND A MINIMUM 110 MPH WIND LOAD. PV-1A COVER SHEET / ROOF LAYOUT BUILDING DEPARTMENT: 4. THE STRUCTURE IS 1 STORY(IES) TALL, THE RAFTERS ARE 2 X 6 AND 24" ON CENTER. PV-1 B SITE PLAN CITY OF LAQUINTA 5. THE SYSTEM WILL NOT BE INTERCONNECTED UNTIL APPROVAL FROM THE LOCAL JURISDICTION AND THE UTILITY IS OBTAINED. PV-2 SINGLE LINE DIAGRAM 6. THIS SYSTEM IS AN UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. PV-3 ATTACHMENT DETAIL 7. THE SOLAR PHOTOVOLTAIC INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. PV-4 PLACARDS VICINITY MAP: 8. IF THE EXISTING MAIN SERVICE PANEL DOES NOT HAVE VERIFIABLE GROUNDING ELECTRODE CONDUCTOR (GEC), IT IS THE 18. THIS SITE IS MONITORED BY A LISTED PCS. PV AND ESS RESPONSIBILITY OF THE CONTRACTOR TO INSTALL A SUPPLEMENTAL GROUNDING ELECTRODE CONDUCTOR PER NEC TABLE 250.66. INTERCONNECTION SHALL MEET NEC 705.13 REQUIREMENTS owOMNM - 9. EACH MODULE WILL BE GROUNDED USING THE SUPPLIED CONNECTION POINTS IDENTIFIED ON THE MODULE AND THE 19. PCS CONTROLLED BUSBAR LIMIT: 80% OF BUSBAR RATING PROJECT MANUFACTURER'S INSTALLATION INSTRUCTIONS. 20. IF PCS MONITORED CURRENTS REACHES OR EXCEEDS THE PCS 10. A LADDER SHALL BE IN PLACE FOR THE INSPECTION IN COMPLIANCE WITH CAL -OSHA REGULATIONS. CONTROLLED BUSBAR LIMIT, THE PCS ELECTRONICALLY CONTROLS DATE DM" V./_- 11. PROPER ACCESS AND WORKING CLEARANCE WILL BE PROVIDED AS PER SECTION 110.26 FROM THE CEC AND CURTAILS THE OUTPUT CURRENT FROM THIS SYSTEM 12. 4" MINIMUM DISTANCE TO SOLAR PANEL, IF REQUIRED TO OFFSET, PLUMBING PERMIT WILL BE REQUIRED. 21. THE PCS IS CERTIFIED FOR ESS IMPORT ONLY MODE. THE ESS CAN BE +* s DUM W - 13. ANY ARRAYS INTERWOVEN WITH THE ROOFING MEMBRANE SHALL HAVE A CLASS W ROOF RATING CONFIGURED IN THIS MODE TO ENSURE ZERO EXPORT OF THE ESS TO : €' 14. PHOTOVOLTAIC ARRAY WILL NOT EXCEED 150' BY 150' IN EITHER AXIS GRID DMS REV. 15. ALL CONDUIT, WHEN POSSIBLE, TO BE CONCEALED IN ATTIC AND GARAGE, NOT EXPOSED ON ROOF 22. THE PCS IS CERTIFIED AS A SECONDARY OVERCURRENT PROTECTION 16. ROUTE CONDUIT VERTICALLY DOWN WALL ADJACENT TO RAIN SPOUT IF POSSIBLE, MAKE SMALLEST FOOTPRINT POSSIBLE. PAINT UNDER UL 1741 CRD. AN OVERCURRENT PROTECTION DEVICE FOR CONDUIT TO MATCH BACKGROUND. 17. THE PVS6 IS LISTED PVS6 IS LISTED AS PCS EQUIPMENT EACH CIRCUIT IS REQUIRED PER NFPA 70: ARTICLE 240-OVERCURRENT PROTECTION O P V -1 A CALIFORNIA PREMIER SOLAR CONSTRUCTION Ln Plbftd Namea&& yl--� -i --T -i w ui u zMlfE—WOfficer cl C- 10 License #970445 (D 3 xlw I 0 Z c (D L—J:: ;;L X— ; ; : .............. ----- - - -- ---------- - ----------------- -------------- ....... ... ------------- .... -------------- ........ r7 *MH F7!:W F I 0 > 133.0- < xl— =) 3x 0r -y Lr) La —:rn (o II y F— E ---------- ..................... . z H TOM ZIO NE OUT BSOL2024-0228 i- l i 11 M �1)SITE PLAN. CITY OF LA QU I NTA SCALE: 1/32"=1 PMEM BUILDING DIVISION /m— REVIEWED FOR CODE DRAWN r COMPLIANCE DNS REV. - DATE 09/11/2024 D,--D C SHEET PV-1 B BSOL2024-0228 CITY OF LA QUINTA BUILDING DIVISION REVIEWED FOR CODE COMPLIANCE UTILITY )ATE 09/11/2024 BY-D C BI-DIRECTIONAL M ELECTRIC METER AT METER PED MODULE SPECIFICATION BATTERY SPECIFICATION r----- MANUFACTURER HANWHA Q CELLS MANUFACTURER ITESLA 400A 240VAC, 1 PH, 3W+G i CB MODEL NO. Q.PEAK DUO BLK ML-G10+410 MODEL NO. POWERWALL 3 (1707000-XX-Y) SERVICE)—)M400) 1 4 POWER AT MPP 4low kWH RATING 13.5kWH (EXISTING) I SHORT CIRCUIT CURRENT (ISO 1.13A I OPEN CIRCUIT VOLTAGE (VOC) 5 1.62 I CURRENT AT MPP (Impp0 ) .61 A VOLTAGE AT MPP(Vmpp) 38.63 INSPECTOR'S NOTE: VERIFY MAIN EFFICIENCY 120.9 SERVICE 400AMP DISCONNECT 1 A 1-11(25A 1— CONDUCTOR SIZING FOR TAG 2 PER NEC ART. 310 MAX MODULE CURRENT W AMPS TEMPERATURE ADDER TABLE 310.15(B)2(c) M C DESIGN TEMPERATURE +TEMPERATURE ADDER 47 C TEMP. ADJUSTMENT FACTOR [TABLE 310-161 .82 CONDUCTOR FILL DERATING FACTOR 31D-15(B)(2x.) 2 (4-6) AMPACRY USED FOR TEMP & COND. FILL 20/.8V.8�30A9 AMPS REQUIRED CONDUCTOR SIZE #10 THWN-2 CU 125A BREAKER TO DIRECTLY LUG FEED DISCONNECT SWITCH, NO BRANCH CIRCUIT OVERCURRENT DEVICES INSTALLED AT MSP CALIFORNIA PREMIER SOLAR CONSTRUCTION N J Printed Name: J W By: (7 U C N .0 Ch Chief Exec mr Officer C-10 License #970445 C ro NEW ESSENTIAL �1 z o LOAD PANEL a lu TESLA 120/240V 200A AC DISCONNECTI j m a } rc 18-2 COMM. CABLE O ////���� PO 3 1PH 3W 240V 1PH I too K a a L-P 1 1707000-XX-Y LOCKABLE RPO 125A 125A BUSS CLASS J OR O z Q c ROOF MOUNTED ARRAY #1 MODULES (TYP.x8) CLASS T FUSES z — ROOF MOUNTED ARRAY #2 MODULES_L P_x�JUNCTION / WALL MOUNT NEXTTCH TO MSP N O I NEW TESLA X z u'I RANSITION 13.5kW PER 706.15(A)(1), BACK-UP w BOX BATTERY PACK (2), & (3) ATEWAY/AT j j OF 2 (D 2 STORAGE 120/240V 1 PH 1-1/4" SER CABLE ~ SYSTEM --- O O 3W 200A W/ 3#1 THWN-2 CU o O 1#6GND (N) - O O 120/240V 125AF LL 125AT o 8 3 00 00 60A Na 1-1/4" SER CABLE W/ 3#1 THWN-2 CU, 5) GND " 1"EMT W/3#8 1#6GND(N) O N L1 L2 THWN-2 CU, 1#6GND (N) ^ O F. WIRE/CONDUIT/INSTALLATION SCHEDULE SINGLE LINE DIAGRAM TAG DESCRIPTION CONDUIT CONDUCTOR 1-WAY LENGTH NOTES TYPE/SIZE SIZERYPE (FEET) SCALE: NA GENERAL ELECTRICAL NOTES: z ENPHA07BQ-F E Q CABLE In compliance W/ 690.15(B) disconnecting means & 690.33 mating connectors. Array to UL Listed 4s Deep Junction Box TYPE#10 TYPE H07BQ-F The DC connectors for panels have been evaluated and approved by UL for use 1. EQUIPMENT USED SHALL BE NEW, UNLESS OTHERWISE NOTED. o N € 1 through roof penetration per detail PHOTOVOLTAIC CU WIRE +/-20' as the load -break disconnect means required by NEC 690 and C22.1-2018 Rule 2• EQUIPMENT USED SHALL BE UL LISTED, UNLESS OTHERWISE NOTED. � 3S (1) #8GND (TYP. NUMBER 64-220. Strain relief fittings to be used for wires entering J-box 3. EQUIPMENT SHALL BE INSTALLED PROVIDING ADEQUATE PHYSICAL WORKING SPACE rc IY� OF STRINGS) AROUND THE EQUIPMENT AND SHALL COMPLY WITH NEC. 4. MODULES SHALL BE POSITIVELY GROUNDED. GROUNDED (POSITIVE) CONDUCTORS ' Q Photovoltaic conductors entering the building shall be installed in a metallic raceway and shall be identified every 10 feet -- and within 1 foot of turns or bends SHALL BE UN -FUSED AND UN -BROKEN FROM THE ARRAY TO THE INVERTER TERMINAL. 2 Array to Powerwall 3/4" EMT (2) #10 THWN-2 CU (1) #8G A50' and within 1 foot above and below penetrations of roof/ceiling assemblies, walls, UN -GROUNDED (NEGATIVE) CONDUCTORS SHALL BE FUSED AND/OR SWITCHED. or barriers --with minimum 3/8-inch- high while lettering on red background 5. COPPER CONDUCTORS SHALL BE USED AND SHALL HAVE INSULATION RATING 600V 90C, reading: 'WARNING: PHOTOVOLTAIC POWER SOURCE'." UNLESS OTHERWISE NOTED. 6. CONDUCTORS SHALL BE SIZED IN ACCORDANCE TO NEC. CONDUCTORS AMPACITY SHALL 5 'o Ilsco Grounding Lug 3 Stainless Steel 1/4" Ground Lug, Use GBL-4SS w/ Stainless Steel UL 467; UL #E34440/E6207 BE DE -RATED FOR TEMPERATURE INCREASE, CONDUIT FILL AND VOLTAGE DROP. & stainless steel hardware to mount SS Screw or equal 7. ALL CONDUCTORS, EXCEPT USE-2, SHALL BE INSTALLED IN APPROVED CONDUITS OR RACEWAY. CONDUITS SHALL BE ADEQUATELY SUPPORTED AS PER NEC. 8. MODULES SHALL BE GROUNDED USING GROUNDING LUG, SUCH AS ILSCO GBL-4DBT OR BURNDY CL50-DB-T, AND STAINLESS STEEL HARDWARE (BOLT, WASHERS, AND NUT). STAR WASHERS SHALL BE USED BETWEEN THE GROUNDING LUG AND THE MODULE FRAME. 9• AC DISCONNECT MAY BE REQUIRED IF THE UTILITY REQUIRES VISIBLE -BLADE SWITCH. 10. EXPOSED NON -CURRENT CARRYING METAL PARTS SHALL BE GROUNDED AS PER NEC. 11. LOAD -SIDE INTER -CONNECTION SHALL COMPLY WITH NEC 12. MONITORING SYSTEM AND ITS CONNECTION SHOWN IS OPTIONAL. IF USED, REFER TO INSTALLATION MANUAL FOR WIRING METHODS AND OPERATION PROCEDURE. 4 End Cap Plug protective end Cap installed on the last module of the Branch Circuit CPPoxruxin - 5 Not Used PROJECT - 6 Bare Copper Wire N/A EGC -#6 (NEC250.120(C) Continuous Equipment #6 Bare Copper Grounding Conductor Method DATE oRAwx s/a/zoz. 7 Grounding Electrode Conductor GEC to be #6 To Existing Grounding Electrode 8 MSP to Sub -panel ISER (3) #3/0 THWN-2 CU, 1-#6G See Note #2 for conduit label:'WARNING: PHOTOVOLTAIC POWER SOURCE'. oRAwx er - 9 Not Used oxs h• 10 Not Used 11 MSP to Monitoring System �' EMT/ROMEX (3) #12 THWN-2 CU, #12G SHEET P V - 2 12 *Inverter to Data Logger Conn. I ICAT5 13 Comm. Wire RSD to Powerwall 1 118-2 RSO 26) 4" STANDOFFS @ 4- CL MAX SPAN (TYP.) IRONRIDGE SOLAR RAILS (MOUNTED PER INSTALLATION MANUAL) (TYP.}-� 2 2 RAILS TO EXTEND AT LEAST 1-1/2" BEYOND EDGE OF PV PANEL FOR END \\ CLAMP ATTACHMENT ,z " z BSOL2024-0228 CITY OF LA QUINTA BUILDING DIVISION REVIEWED FOR CODE COMPLIANCE DATE 09/11/2024 By- C ,. ,, 2 ,.. z z SOLAR PANEL SIRONRIDGE II SOLAR RAILS — — — — — — SCREW SOLAR PANEL�7 RPANEL FLASHING-\ RAFTER BENEATH FIAT ROOF 1 ATTACHM ENT DETAIL - (2) 5/16" X 3-,/2" PER STANDOFF LAGGED INTO RAFTER WITH 2-1/2" MINIMUM EMBEDMENT INTO RAFTER TATTACHMENT PLAN SCALI= NA CALIFORNIA PREMIE Ln J J W U 0 /D L 3 C /0 OPPORTUNITY - PROJECT DATE DRAWN 5/6/2— DRAWN SY - O S /: REV. SHEET PV-3 BSOL2024-0228 CITY OF LA QUINTA BUILDING DIVISION REVIEWED FOR CODE COMPLIANCE 09/11 /2024 0 --D C �•: •' 1u •� 0 : CAUTION :.' SOLAR AC VOLTAGE PRESENT AUTHORIZED PERSONNEL ONLY STICKER FOR AC CONDUIT EVERY 10': LABEL FOR MAIN SERVICE PANEL AND COMBINER PANEL PER NEC 690.54: PERMANENT RIVOT (TYP) ! CAUTION MULTIPLE SOURCES OF POWER &3/4" 3/4" TEXT 1 /4" TEXT 3/8"TEXT - SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN PERMANENT RIVOT (TYP) TURN RAPID SHUTDOWN SWITCH TO THE "o"p "OFF" POSITION TO ILI 3/16" TEXT SHUTDOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY REQUIRED PLACARDS SCAL@ NA WARNING SOLAR POWER SYSTEM BREAKER IS BACKFED, DO NOT RELOCATE 1 THIS OVERCURRENT DEVICE \v CALIFORNIA PREMIE OPPORTUNITY - PROJECT DATE DRAWN 5/6/2— DRAWN RY o S x: REV. SHEET PV-4 0,PEAK DUO BLK IVIL-G10+ SERIES 385 - 410 Wp 1132 Cells 20.9% Maximum Module Efficiency MODEL Q.PEAK DUO BLK ML-G101 6 busbar cell technology The ideal solution for: Rooftop arrays on 0 o residential buildings 12 busbar cell technology 11 T Breaking the 20% efficiency barrier Q.ANTUM DUO Z Technology with zero gap cell layout boosts module efficiency up to 20.9%. A reliable investment a Inclusive 25-year product warranty and 25-year linear Warranty performance warranty'. O Enduring high performance Long-term yield security with Anti LeTID Technology, ocells Anti PID Technology2 and Hot -Spot Protect. Extreme weather rating C High-tech aluminium alloy frame, certified for high snow (5400 Pa) and wind loads (4000 Pa). Innovative all-weather technology �J Optimal yields, whatever the weather with excellent low -light and temperature behaviour. The most thorough testing programme in the industry Qcells is the first solar module manufacturer to pass the most comprehensive quality programme in the industry: The new "Quality Controlled PV" of the independent certifcation institute TUV Rheinland. 1 See data sheet on rear for further information. 2 APT test conditions according to IEC/TS 62804-1:2015, method A (-1500 V, 96 h) ¢ueliry nauae pcxroq vecano com,ollaew 2022' TUVPM1eInIanC 'wV� ;. USA iir� O.PEAK DUO BLK ML-G10+ SERIES in Mechanical Specification Format 74.0in x 41.1in x 1.26in (including frame) (1879 mm x 1045 mm x 32 mm) n Weight 48.5lbs(22.Okg) Front Cover 0.13 in (3.2 mm) thermally pre -stressed glass with anti -reflection technology Back Cover Composite film Frame Black anodised aluminium Cell 6 x 22 monocrystalline Q.ANTUM solar half cells Junction box 2.09-3.98 in x 1.26-2.36 in x 0.59-0.71 in (53-101 mm x 32-60 mm x 15-18 mm), IP67, with bypass diodes Cable 4mm2Solar cable; (+)>49.2in(1250mm),I-)>-49.2in(1250mm) -s (,n99mm, 5 ,_ L L 4 F Gr... ding polnis a 0.18",4.5 mm) Frame 1492• (1250 mml .2.199E Jebel _0 �z .T (12 O mm)« I`-11 �IJ,JIII airuge h- + nting slo s(oETA� a Dr 1 0.6 •t6 mm 0.6 •t6 mm Connector Staubli MC4; IP68 12s'(32 mm1 n-A I-i 0.96 (24s mm1 T�I0.33",8.5 mm) in Electrical Characteristics POWER CLASS 138 400 40 MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS, STC' (POWER TOLERANCE+SW/-OW) Power at MPP' PMPP [W] 385 390 395 400 405 410 Short Circuit Current' Isc [A] 11.04 11.07 11.10 11.14 11.17 11.20 E Open Circuit Voltage' Voc M 45.19 45.23 45.27 45.30 45.34 45.37 Current at MPP I- [A] 10.59 10.65 10.71 10.77 10.83 10.89 i Voltage at MPP VMPP M 36.36 36.62 36.88 37.13 37.39 37.64 Efficiency' 11 [%] z19.6 z19.9 z20.1 z20.4 z20.6 z20.9 MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS, NMOT2 Power at MPP PMPP [W] 288.8 292.6 296.3 300.1 303.8 307.6 E Short Circuit Current Isc [A] 8.90 8.92 8.95 8.97 9.00 9.03 c Open Circuit Voltage Voc M 42.62 42.65 42.69 42.72 42.76 42.79 i Current at MPP IMPP [A] 8.35 8.41 8.46 8.51 8.57 8.62 Voltage at MPP VMPP M 34.59 34.81 35.03 35.25 35.46 'Measurement tolerances PMPP±3%; Isc: Voc+S% at STC:1000 W/m2, 25±2°C, AM 1.5 according to IEC 60904-3 • 2800 W/m2, NMOT, spectrum AM 1.5 Qcells PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE - At least 98% of nominal power no 9� 1ntl ntlef° p °"° during first year. Thereafter max. o------------------ 0.5% degradation per year. At w least 93.5% of nominal power iao --------------- i up to 10 years. At least 86%of w E, o nominal power up to 25 years. F Q w Z as u of w o es All data within measurement Lu 90 tolerances. Full warranties in aaccordance with the warranty g o eo terms of the Qcells sales so a u 0 0s io is 20 2s organisation ofyour respective 200 400 600 a0o Iwo YEARS country. IRRADIANCE IW/m'] 'Standard terms of guarantee for the 5 PV companies with the Typical module performance under low irradiance conditions in highest production capacity in 2021 (February 2021) comparison to STC conditions (25"C. 1000 W/m). TEMPERATURE COEFFICIENTS Temperature Coefficient of Isc a [%/ K] +0.04 Temperature Coefficient of Vcc Temperature Coefficient of PMpp y [%/ K] -0.34 Nominal Module Operating Temperature ■ Properties for System Design Maximum System Voltage V5 IV] 1000 (IEC)/1000 (UL) PV module classification Maximum Series Fuse Rating [A DC] 20 Fire Rating based on ANSI/UL 61730 Max. Design Load, Push/PUlla [Ibs/ft2] 75 (3600Pa)/55 (2660Pa) Permitted Module Temperature Max. Test Load, Push/Pul13 [Ibs/ft2] 113 (5400 Pa)/84 (4000 Pa) on Continuous Duty 3 See Installation Manual ■ Qualifications and Certificates UL 61730, CE-compliant, Quality Controlled PV - TUV Rheinland, IEC 61215:2016, IEC 61730:2016, U.S. Patent No. 9,893,215 (solar cells), \ FI0 C *uvxnewa�a C c ed US ULs- In 1 1,1220271 35.68 R [%/ K] -0.27 NMOT [°F] 109±5.4 (43±3 °C) Class II TYPE 2 0 -40°Fupto+185°F y (-40 °C up to +85°C) 0 0 Qcells pursues minimizing paper output in consideration of the global environment. Note: Installation instructions must be followed. Contact our technical service for further information on approved installation of this product. ��� I I Hanwha 0 CELLS America Inc 400 Spectrum Center Drive, Suite 1400, Irvine, CA 92618, USA I TEL+1 949 748 59 961 EMAIL hqc-inquiWgcells.com I WEB www.gcells.com i&. I RON RI DGE XR Rail Family Solar Is Not Always Sunny Over their lifetime, solar panels experience countless extreme weather events. Not just the worst storms in years, but the worst storms in 40 years. High winds capable of ripping panels from a roof, and snowfalls weighing enough to buckle a panel frame. XR Rails are the structural backbone preventing these results. They resist uplift, protect against buckling and safely and efficiently transfer loads into the building structure. Their superior spanning capability requires fewer roof attachments, reducing the number of roof penetrations and the amount of installation time. Sloped roofs generate both vertical and lateral forces on mounting rails which can cause them to bend and twist. The curved shape of XR Rails is specially designed to increase strength in both directions while resisting the twisting. This unique feature ensures greater security during extreme weather and a longer system lifetime. l Compatible with Flat & Pitched Roofs Corrosion -Resistant Materials LXR Rails are IronRidge offers All XR Rails are made of 6000-series compatible with �L a range of tilt leg aluminum alloy, then protected with an , FlashFoot and options for flat anodized finish. Anodizing prevents surface other pitched roof roof mounting and structural corrosion, while also providing attachments. applications. I I a more attractive appearance. Ito XR Rail Family The XR Rail Family offers the strength of a curved rail in three targeted sizes. Each size supports specific design loads, while minimizing material costs. Depending on your location, there is an XR Rail to match. XR10 XR10 is a sleek, low -profile mounting rail, designed for regions with light or no snow. It achieves spans up to 6 feet, while remaining light and economical. 6' spanning capability Moderate load capability Clear & black anodized finish Internal splices available Rail Selection XR100 XR100 is the ultimate residential mounting rail. It supports a range of wind and snow conditions, while also maximizing spans up to 10 feet. 10' spanning capability Heavy load capability Clear & black anodized finish Internal splices available XR1000 XR1000 is a heavyweight among solar mounting rails. It's built to handle extreme climates and spans up to 12 feet for commercial applications. • 12' spanning capability • Extreme load capability • Clear anodized finish • Internal splices available The table below was prepared in compliance with applicable engineering codes and standards.* Values are based on the following criteria: ASCE 7-16, Gable Roof Flush Mount, Roof Zones 1 & 2e, Exposure B, Roof Slope of 8 to 20 degrees and Mean Building Height of 30 ft. Visit IronRidge.com for detailed certification letters. IR Ojjj��=Wj I A LO E I VA I - 90 120 None 140 160 90 120 20 140 160 90 30 160 90 40 160 80 160 120 160 Rail Span 5' 4" 6' 8' XR10 XR100 XR1000 `Table is meant to be a simplified span chart for conveying general rail capabilities. Use approved certification letters for actual design guidance. © 2020 IronRidge, Inc. All rights reserved. Visit www.ironridge.com or call 1-800-227-9523 for more information. Version 1.20 Powerwall 3 FUWCr r-vur ything Powerwall 3 is a fully integrated solar and battery system, designed to accelerate the transition to sustainable energy. Customers can receive whole home backup, cost savings, and energy independence by producing and consuming their own energy while participating in grid services. Once installed, customers can manage their system using the Tesla App to customize system behavior to meet their energy goals. Powerwall 3 achieves this by supporting up to 20 kW DC of solar and providing 11.5 kW AC of continuous power per unit. It has the ability to start heavy loads up to 185 A LRA, meaning a single unit can support the power needs of most homes. Powerwall 3 is designed for mass production, fast and efficient installations, easy system expansion, and simple connection to any electrical service. KIM,1 Powerwall 3 Technical Specifications System Technical Model Number Specifications Nominal Grid Voltage (Input & Output) 1707000-xx-y 120/240 VAC Split phase Frequency 60 Hz Overcurrent Protection Device 60 A Solar to Battery to Home/Grid Efficiency 89%1,2 Solar to Home/Grid Efficiency 97.5%3 Supported Islanding Devices Connectivity Hardware Interface AC Metering Protections Customer Interface Warranty Solar Technical Maximum Solar STC Input Specifications Withstand Voltage Backup Gateway 2, Backup Switch Wi-Fi (2.4 and 5 GHz), Dual -port switched Ethernet, Cellular (LTE/4G4) Dry contact relay. Rapid Shutdown (RSD) certified switch Revenue Grade (+/- 0.5%) Integrated arc fault circuit interrupter (AFCI), Isolation Monitor Interrupter (IMI), PV Rapid Shutdown (RSD) using Tesla Mid -Circuit Interrupters Tesla Mobile App 10 years 20 kW 600 V DC PV DC Input Voltage Range 60 — 550 V DC PV DC MPPT Voltage Range 60 — 480 V DC MPPTs 6 Maximum Current per MPPT (Imp) 13 A Maximum Short Circuit Current per MPPT (Isd 15 A5 Battery Technical Nominal Battery Energy 13.5 kWh AC Specifications Maximum Continuous Discharge Power 11.5 kW AC Maximum Continuous Charge Power 5 kW AC Output Power Factor Rating 0 -1 (Grid Code configurable) Maximum Continuous Current 48 A Maximum Output Fault Current 10 kA Load Start Capability (1 s) 185 A LRA Power Scalability Up to 4 Powerwall 3 units supported 'Typical solar shifting use case. 2 Values provided for 250C (770F), at beginning of life. 3.3 kW charge/discharge power. 3Tested using CEC weighted efficiency methodology. 4Cellular connectivity subject to network service coverage and signal strength. 5 Where the DC input current exceeds the MPPT rating, a jumper can be used to combine two MPPTs into a single input to intake DC current up to 26 A IMP / 30 A Isc• 2024 Powerwall3 Datasheet Powerwall 3 Technical Specifications Environmental Operating Temperature —20oC to 50°C (-4°F to 122°F) 6 Specifications Operating Humidity (RH) Up to 100%, condensing Storage Temperature —200C to 30°C (-4°F to 860F), up to 95% RH, non - condensing, State of Energy (SOE): 25% initial Maximum Elevation 3000 m (9843 ft) Environment Indoor and outdoor rated Enclosure Rating NEMA 311 Ingress Rating IP67 (Battery & Power Electronics) IP45 (Wiring Compartment) Pollution Rating PD3 Operating Noise @ 1 m <50 db(A) typical <62 db(A) maximum 6 Performance may be de -rated at operating temperatures above 40°C (104°F). Compliance Certifications UL 1642, UL 1699B, UL 1741, UL 1741 SA, UL 1741 SB, UL Information 1741 PCS, UL 3741, UL 1973, UL 1998, UL 9540, IEEE 1547- 2018, IEEE 1547.1, UN 38.3 Grid Connection United States Emissions FCC Part 15 Class B Environmental RoHS Directive 2011/65/EU Seismic AC156, IEEE 693-2005 (high) Fire Testing Mechanical Dimensions Specifications Weight Meets the unit level performance criteria of UL 9540A 1099 x 609 x 193 mm (43.25 x 24 x 7.6 in) 130 kg (287 lb) Mounting Options Floor or wall mount 1099 mm 0 ®® O s 'E 609 mm � 193 i mm 2024 Powerwall 3 Datasheet Solar Shutdown Device Technical Specifications The Solar Shutdown Device is a Mid -Circuit Interrupter (MCI) and is part of the PV system rapid shutdown (RSD) function in accordance with Article 690 of the applicable NEC. When paired with Powerwall 3, solar array shutdown is initiated by any loss of AC power. Electrical Model MCIA MCI-2 Specifications Nominal Input DC Current Rating (IMP) 13 A 13 A Maximum Input Short Circuit Current (Isc) 19 A 17 A Maximum System Voltage (PVHCS) 600 V DC 1000 V DC' Maximum System Voltage is limited by Powerwall to 600 V DC. RSD Module Maximum Number of Devices per String 5 5 Performance Control Power Line Excitation Power Line Excitation Passive State Normally Open Normally Open Maximum Power Consumption 7 W 7 W Warranty 25 years 25 years Environmental Operating Temperature Specifications Storage Temperature Enclosure Rating Mechanical Electrical Connections Specifications Housing -40°C to 50°C -45°C to 70°C (-40°F to 122°F) (-49°F to 158°F) —30°C to 70°C —30°C to 70°C (-220F to 158°F) (-220F to 158°F) NEMA 4X /IP65 NEMA 4X / IP65 MC4 Connector MC4 Connector Plastic Plastic Dimensions 125 x 150 x 22 mm 173 x 45 x 22 mm (5x6x1in) (6.8 x 1.8 x 1 in) Weight 350 g (0.77 lb) 120 g (0.26 lb) Mounting Options ZEP Home Run Clip Wire Clip M4 Screw (#10) M8 Bolt (5/16") Nail / Wood screw Compliance Certifications Information RSD Initiation Method UL 3741 PV Hazard Control (and PVRSA) Compatibility See Powerwall 3 Installation Manual 2024 Powerwall3 Datasheet UL 1741 PVRSE, UL 3741, PVRSA (Photovoltaic Rapid Shutdown Array) External System Shutdown Switch or Powerwall 3 Enable Switch 4 Backup Switch The Tesla Backup Switch controls connection to the grid in a Powerwall system, and can be easily installed behind the utility meter or in a standalone meter panel downstream of the utility meter. The Backup Switch automatically detects grid outages, providing a seamless transition to backup power. It communicates directly with Powerwall, allowing home energy usage monitoring from any mobile device with the Tesla app. Performance Specifications Environmental Specifications Compliance Information Mechanical Specifications Model Number 1624171-xx-y Continuous Load Rating 200 A,120/240 V split phase Maximum Supply Short Circuit Current 22 kA with breaker10 Communication CAN AC Meter Revenue accurate (+/- 0.5%) Expected Service Life 21 years Warranty 10 years 8 Breaker maximum supply short circuit current rating must be equal to or greater than the available fault current. Operating Temperature —40°C to 50°C (-40°F to 122°F) Storage Temperature —40°C to 85°C (-40°F to 185°F) Enclosure Rating NEMA 311 Pollution Rating PD3 Safety Standards Emissions Dimensions Weight USA: UL 414, UL 2735, UL 916, CA Prop 65 FCC, ICES 176 x 205 x 74 mm (6.9 x 8.1 x 2.9 in) 2.8 lb Meter and Socket Compatibility ANSI Type 2S, ringless or ring type External Service Interface Contactor manual override" Reset button Conduit Compatibility 1/2-inch NPT 9 Manually overrides the contactor position during a service event. 7 2024 Powerwall 3 Datasheet Backup Gateway 2 Backup Gateway 2 controls connection to the grid when paired with Powerwall 3, automatically detecting outages and providing seamless transition to backup power. Backup Gateway 2 also provides energy metering for solar self -consumption, time -based control, and backup operation. In this system configuration, Powerwall 3 acts as the Site Controller, with the Backup Gateway 2 Site Controller disabled. Performance Specifications Environmental Specifications Model Number 1232100-xx-y AC Voltage (Nominal) 120/240 V Feed -in Type Split phase Grid Frequency 60 Hz Current Rating 200 A Maximum Supply Short 10 kA8 Circuit Current Overcurrent Protection 100 - 200 A, Service Device entrance rated 9 Overvoltage Category Category IV Internal Primary AC Meter User Interface Tesla App Operating Modes Support for solar self - consumption, time -based control, and backup Backup Transition Automatic disconnect for seamless backup Modularity Optional Internal Panelboard Revenue accurate (+/- 0.2%) Warranty Internal Auxiliary Revenue accurate AC Meter (+/- 2%) Primary Connectivity Ethernet, Wi-Fi Secondary Connectivity Cellular (3G, LTE/4G)10 Operating Temperature Operating Humidity (RH) Maximum Elevation Environment Enclosure Type Compliance Certifications Information Fmiecinnc Mechanical Dimensions Specifications Weight Mounting options 660 x 411 x 149 mm (26x16x6in) 20.4 kg (45 lb) Wall mount, Semi -flush mount Supports up to 10 AC - coupled Powerwalls 200 A 6-space / 12 circuit breakers Siemens OP or Square D HOM breakers rated 10 - 80A or Eaton BR breakers rated 10 -125A 10 years ° When protected by Class J fuses, Backup Gateway 2 is suitable for use in circuits capable of delivering not more than 22kA symmetrical amperes. " The customer is expected to provide internet connectivity for Backup Gateway 2; cellular should not be used as the primary mode of connectivity. Cellular connectivity subject to network operator service coverage and signal strength. —200C to 50°C (-4°F to 122°F) Up to 100%, condensing 3000 m (9843 ft) Indoor and outdoor rated NEMA 3R UL 67, UL 869A, UL 916, UL 1741 PCS, CSA 22.2 0.19, CSA 22.2 205 FCC Part 15, ICES 003 660 mm 149 mm 2024 Powerwall 3 Datasheet 6 Powerwall 3 Example System Configurations Powerwall 3 with Backup Switch Whole Home Backup (Optional I / I Backup Switch I Solar I Meter Grid Meter socket panel Load center AL a Backup loads Powerwall 3 Powerwall 3 with Backup Gateway 2 Partial Home Backup _ _ _ (Optional I�� I I / I Utility Meter I I I —Solar I Main == Breaker Grid Meter load center Backup Gateway 2 Load center Non -essential loads Backup loads Powerwall 3 2024 Powerwall 3 Datasheet STONEFIELD DEVELOPMENT LOT 7 6.15kW PHOTOVOLTAIC CALIFORNIA PREMIER CITY OF LA QUINTA SOLAR NST BUILDING DIVISION REVIEWED FOR RNR�, J CODE '0 C COMPLIANCE AREA 3 FBSOL2024-0228 —NEW SOLAR ARRAY ON ROOF w: cme/ °X"`� CJ DATE 10/22/2024 Rv__D C 0 C----- I 97044 C-fO License #970445 L 0FM i \ i EAT SENSOR LOCATION INSTALLED ON CEILING ABOVE ESS 3 PER R328.7 IN ACCORDANCE W/ SECTION R314 & 1207.5.4 CFC REQ. rro - 79242 TOM FAZIO LANE ' ® TESLA POWERWALL 3 BATTERY ENERGY STORAGE LOCATION H5 TESLA GATEWAY G REVISION 1 i i \ i -STOP BUTTON LOCKABLE RPO SWITCH y i Q1 AC DISCONNECT FEEDER FROM MAIN SERVICE PANEL TO-------z ARE9�2 NG TESLA BACK-UP GATEWAY AND ESSENTIAL r ® LOADS PANEL REVISED TO 1/0 ALUMINUM. 2022 CALIFORNIA ELECTRICAL CODE. ® a I j 0 r AREA 1 ® a DRIVEWAY 5 ENPHASE CONNECTOR SHALL SERVE AS AC DISCONNECT ON ROOF (TYP. ® 4 > o 0 IN COMPLIANCE W/ 690.15(B) DISCONNECTING MEANS AND 690.33 MATING d rr rZ CONNECTORS - DO NOT DISCONNECT UNDER LOAD d a cy W CONDUIT ROUTED FROM ROOF THROUGH ATTIC SPACE T _ INVERTER ALL CONDUITS IN THE ATTIC SPACE SHALL BE w LOCATED A MINIMUM OF 18 INCHES FROM THE ROOF DECKING H STAMP AREA: ROOF ACCESS POINTS PER �m o 2022 CRC SECTION R331.4.1 ro u $A ROOF OUT SITE PLAN 1 SCALE: 1/16"=1' N B R NOTES: SCOPE: PROJECT INFORMATION: 1. SOLAR PHOTOVOLTAIC SYSTEM TO BE INSTALLED ON RESIDENTIAL STRUCTURE. INSTALL 6.15kW PHOTOVOLTAIC SYSTEM CONSISTING OF OWNER: SOLAR CONTRACTOR: i 2. DESIGN COMPLYING WITH THE FOLLOWING: (15) HANWHA Q.PEAK DUO BLK ML-G10+410 SOLAR PANELS ON STONEFIELD DEVELOPMENT CAL PREM SOLAR o 2.1. THE 2022 EDITION OF THE CALIFORNIA BUILDING CODE (CBC) ADOPTS THE 2021 INTERNATIONAL BUILDING CODE (IBC) AND THE 2021 INTERNATIONAL RESIDENTIAL CODE (IRC). FLAT ROOF AT AN ORIENTATION OF 180 DEGREES B LICENSE #970445 PROJECT ADDRESS: PO BOX 460267 �^ - 2.2. THE 2022 EDITION OF THE CALIFORNIA ELECTRICAL CODE (CEC) ADOPTS THE 2019 NATIONAL ELECTRICAL CODE (NEC) 79242 TOM FAZIO LANE ESCONDIDO, CA 92046 2.3. THE 2022 EDITION OF THE CALIFORNIA ENERGY CODE SHEET INDEX: LA QUINTA, CA 93311 2.4. 2022 FIRE CODE BASED ON THE 2021 INTERNATIONAL FIRE CODE (IFC) 3. THIS PROJECT HAS BEEN DESIGNED IN COMPLIANCE WITH THE CBC SECTION 1609 TO WITHSTAND A MINIMUM 110 MPH WIND LOAD. PV-1A COVER SHEET / ROOF LAYOUT BUILDING DEPARTMENT: 4. THE STRUCTURE IS 1 STORY(IES) TALL, THE RAFTERS ARE 2 X 6 AND 24" ON CENTER. PV-1 B SITE PLAN CITY OF LA QUINTA 5. THE SYSTEM WILL NOT BE INTERCONNECTED UNTIL APPROVAL FROM THE LOCAL JURISDICTION AND THE UTILITY IS OBTAINED. PV-2 SINGLE LINE DIAGRAM 6. THIS SYSTEM IS AN UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. PV-3 ATTACHMENT DETAIL 6 7. THE SOLAR PHOTOVOLTAIC INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. PV-4 PLACARDS VICINITY MAP: 8. IF THE EXISTING MAIN SERVICE PANEL DOES NOT HAVE VERIFIABLE GROUNDING ELECTRODE CONDUCTOR (GEC), IT IS THE 18. THIS SITE IS MONITORED BY A LISTED PCS. PV AND ESS RESPONSIBILITY OF THE CONTRACTOR TO INSTALL A SUPPLEMENTAL GROUNDING ELECTRODE CONDUCTOR PER NEC TABLE 250.66. INTERCONNECTION SHALL MEET NEC 705.13 REQUIREMENTS O OMNN - 9. EACH MODULE WILL BE GROUNDED USING THE SUPPLIED CONNECTION POINTS IDENTIFIED ON THE MODULE AND THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.'"' 19. PCS CONTROLLED BUSBAR LIMIT: 80% OF BUSBAR RATING 20. IF PCS MONITORED CURRENTS REACHES OR EXCEEDS THE PCS ' - X'' REM Ro,� _ 10. A LADDER SHALL BE IN PLACE FOR THE INSPECTION IN COMPLIANCE WITH CAL -OSHA REGULATIONS"Y CONTROLLED BUSBAR LIMIT, THE PCS ELECTRONICALLY CONTROLS wa DMM V./_. 11. PROPER ACCESS AND WORKING CLEARANCE WILL BE PROVIDED AS PER SECTION 110.26 FROM THE CEC 12. 4" MINIMUM DISTANCE TO SOLAR PANEL, IF REQUIRED TO OFFSET, PLUMBING PERMIT WILL BE REQUIRED. AND CURTAILS THE OUTPUT CURRENT FROM THIS SYSTEM 21. THE PCS IS CERTIFIED FOR ESS IMPORT ONLY MODE. THE ESS CAN BE "'"0 ® 13. ANY ARRAYS INTERWOVEN WITH THE ROOFING MEMBRANE SHALL HAVE A CLASS W ROOF RATING 14. PHOTOVOLTAIC ARRAY WILL NOT EXCEED 150' BY 150' IN EITHER AXIS CONFIGURED IN THIS MODE TO ENSURE ZERO EXPORT OF THE ESS TO- GRID ' uus REV. 15. ALL CONDUIT, WHEN POSSIBLE, TO BE CONCEALED IN ATTIC AND GARAGE, NOT EXPOSED ON ROOF 22. THE PCS IS CERTIFIED AS A SECONDARY OVERCURRENT PROTECTION �--' 16. ROUTE CONDUIT VERTICALLY DOWN WALL ADJACENT TO RAIN SPOUT IF POSSIBLE, MAKE SMALLEST FOOTPRINT POSSIBLE. PAINT UNDER UL 1741 CRD. AN OVERCURRENT PROTECTION DEVICE FOR CONDUIT TO MATCH BACKGROUND. 17. THE PVS6 IS LISTED PVS6 IS LISTED AS PCS EQUIPMENT EACH CIRCUIT IS REQUIRED PER NFPA 70: ARTICLE 240-OVERCURRENT PROTECTION N P V -1 A CALIFORNIA PREMIER SOLAR CONSTRUCTION Lri Printed Name: ChtiA yo� ui w u zCh,Chief _�y Executive Officer CY C-10 License #970445 ro 10. ro x -- - - _ ----------- . ...... ------------------ - - -- ---------- --- 00 MH io"xI III x Z�c x F.F l..W 133.0' CL x X-1 Or L0 LILT lam[ 01 x Xl- F-T-1 xl— .... ...... 0 Y 13 TOM ZIO NE OUT x —gig OSITE PLAN O SC ALE: I/ PR Em mm Dum D"m w CITY OF LA QUINTA BUILDING DIVISION REVIEWED FOR CODE COMPLIANCE MODULE SPECIFICATION BATTERY SPECIFICATION DATE 10/22/2024 Bv—D C MANUFACTURER HANWHA Q CELLS MANUFACTURER TESLA MODEL NO. 10 Q.PEAK DUO ELK ML-G+410 MODEL NO. I- RWALL 3 (1707000-XX-Y) POWER AT MPP 410 W kWH RATING 13.SkWH SHORT CIRCUIT CURRENT (Isc) 11.13A OPEN CIRCUIT VOLTAGE (VOC) 45.62 CURRENT AT MPP (Impp) 10.61 A VOLTAGE AT MPP (Vmpp) 38.63 EFFICIENCY >20.9 /1\ CONDUCTOR SIZING FOR TAG 2 PER NEC ART. 310 MAX MODULE CURRENT 20 AMPS TEMPERATURE ADDER TABLE 310.15(B)2(c) M C DESIGN TEMPERATURE +TEMPERATURE ADDER 47 C TEMP. ADJUSTMENT FACTOR [TABLE 310-161 .82 CONDUCTOR FILL DERATING FACTOR 310-15(13)(2x.) .8 (46) AMPACITY USED FOR TEMP & WIND. FILL 20/.8V.8*O.49 AMPS REC UIRED CONDUCTOR SIZE #10 THWN-2 CU q ROOF MOUNTED ARRAY #1 MODULES (TYP.xB) VIAONNCTI/ ROOF MOUNTED ARRAY #2 MODULES _LP_x�__ NSIT UTILITY BI-DIRECTIONAL ELECTRIC METER AT METER PED 400A 240VAC,1 3W+G i \MCB F ------ SERVICE 400) (EXIXI STING) I 125A BREAKER TO DIRECTLY LUG FEED DISCONNECT SWITCH, NO BRANCH CIRCUIT OVERCURRENT DEVICES INSTALLED AT MSP NEW ESSENTIAL Al o TESLA 200A AC DISCONNE POWERWALL 3 16-2 COMM. CABLE 240V 1PH 1707000-XX-Y LOCKABLE RPO 125 CLASS OR SWITCH CLASS T FUSES WALL MOUNT NEXT TO MSP NEW TES 13.5kW PER 706.15(A)(1), BACK-U BATTERY PACK (2), & (3) GATEWAY/ T STORAGE 120/240V 1 H ABLE SYSTEM 3W 200!q! 120/240V 125AF 60A125AT #1 /0 AL SER CABLE (3) 6-3 CU NM-B WITH ND (N) W/ #2GND (N) WIRE/CONDUIT/INSTALLATION SCHEDULE TAG DESCRIPTION CONDUIT CONDUCTOR 1-WAY LENGTH NOTES TYPEISIZE SIZEITYPE (FEET) (2) #10 ENPHASE Q CABLE In compliance W/ 690.15(B) disconnecting means & 690.33 mating connectors. Array to UL Listed 4s Deep Junction Box TYPE H07BQ-F The DC connectors for panels have been evaluated and approved by UL for use 1 through roof penetration per detail PHOTOVOLTAIC CU WIRE +/-20' as the load -break disconnect means required by NEC 690 and C22.1-2018 Rule NUMBER 64-220. Strain relief fillings to be used for wires entering J-box OF STRINGS) O STRINGS) S) Q Photovoltaic conductors entering the building shall be installed in a metallic raceway and shall be identified every 10 feet -- and within 1 foot of turns or bends 2 Array to Powerwall 3/4" EMT (2) #10 THWN-2 CU (1) #8G /-50' and within 1 foot above and below penetrations of roof/ceiling assemblies, walls, or barriers --with minimum 3/8-inch- high while lettering on red background reading: 'WARNING: PHOTOVOLTAIC POWER SOURCE'." Ilsco Grounding Lug 3 Stainless Steel 1/4" Ground Lug, Use GBL-4SS w/ Stainless Steel UL 467; UL #E34440/E6207 stainless steel hardware to mount SS Screw or equal 4 End Cap Plug protective end cap installed on the last module of the Branch Circuit 5 NotUsed 6 Bare Copper Wire N/A EGC -#6 (NEC250.120(C) Continuous Equipment #6 Bare Copper Grounding Conductor Method 7 Grounding Electrode Conductor GEC to be #6 To Existing Grounding Electrode 8 MSP to Sub -panel ISER (3) #3/0 THWN-2 CU, 1-#6G See Note #2 for conduit Iabel:'WARNING: PHOTOVOLTAIC POWER SOURCE'. 9 Not Used 10 Not Used 11 MSP to Monitoring System �' EMT/ROMEx (3) #12 THWN-2 CU, #12G 12 `Invener to Data Logger Conn. CAT 5 13 Comm. Wire RSD to Powerwall 18-2 RSO 125A GND N L1 L2 CALIFORNIA PREMIER SOLAR CONSTRUCTION In okha e4m, Printed N J U1 ay: 10 U C' L Cha Y ChleJExecuwOfficer C-10 License #970445 3 C S = G 19 )SINGLE LINE DIAGRAM SCALE: NA GENERAL ELECTRICAL NOTES: 1. EQUIPMENT USED SHALL BE NEW, UNLESS OTHERWISE NOTED. 2. EQUIPMENT USED SHALL BE UL LISTED, UNLESS OTHERWISE NOTED. 3. EQUIPMENT SHALL BE INSTALLED PROVIDING ADEQUATE PHYSICAL WORKING SPACE AROUND THE EQUIPMENT AND SHALL COMPLY WITH NEC. 4. MODULES SHALL BE POSITIVELY GROUNDED. GROUNDED (POSITIVE) CONDUCTORS SHALL BE UN -FUSED AND UN -BROKEN FROM THE ARRAY TO THE INVERTER TERMINAL. UN -GROUNDED (NEGATIVE) CONDUCTORS SHALL BE FUSED AND/OR SWITCHED. 5. COPPER CONDUCTORS SHALL BE USED AND SHALL HAVE INSULATION RATING 600V 90C, UNLESS OTHERWISE NOTED. 6. CONDUCTORS SHALL BE SIZED IN ACCORDANCE TO NEC. CONDUCTORS AMPACITY SHALL BE DE -RATED FOR TEMPERATURE INCREASE, CONDUIT FILL AND VOLTAGE DROP. 7. ALL CONDUCTORS, EXCEPT USE-2, SHALL BE INSTALLED IN APPROVED CONDUITS OR RACEWAY. CONDUITS SHALL BE ADEQUATELY SUPPORTED AS PER NEC. 8. MODULES SHALL BE GROUNDED USING GROUNDING LUG, SUCH AS ILSCO GBL-4DBT OR BURNDY CL50-DB-T, AND STAINLESS STEEL HARDWARE (BOLT, WASHERS, AND NUT). STAR WASHERS SHALL BE USED BETWEEN THE GROUNDING LUG AND THE MODULE FRAME. 9. AC DISCONNECT MAY BE REQUIRED IF THE UTILITY REQUIRES VISIBLE -BLADE SWITCH. 10. EXPOSED NON -CURRENT CARRYING METAL PARTS SHALL BE GROUNDED AS PER NEC. 11. LOAD -SIDE INTER -CONNECTION SHALL COMPLY WITH NEC 12. MONITORING SYSTEM AND ITS CONNECTION SHOWN IS OPTIONAL. IF USED, REFER TO INSTALLATION MANUAL FOR WIRING METHODS AND OPERATION PROCEDURE. EC Of O a c CY -Y z U0 w � � 2 t0 cD H uZ-i E O r 5 N o' OPPORTUNITY PROJECT DATE DRAWN 5/6/202+ DRAWN PY - DMs /: PEY.^ SHEET M&M 26) 4" STANDOFFS @ 4- CL MAX SPAN (TYP.) IRONRIDGE SOLAR RAILS (MOUNTED PER INSTALLATION MANUAL) (TYP.�z 2 RAILS TO EXTEND AT LEAST 1-1/2" BEYOND EDGE OF PV PANEL FOR END CLAMP ATTACHMENT z' z" z z° z 1.. z SOLAR PANEL IRONRIDGE II SOLAR RAILS STAINLESS US SCREW FOUR PANEL RPANEL FLASHING RAFTER BENEATH FIAT ROOF ATTACHMENT DETAIL - (2) 5/16" X 3-1/2" PER STANDOFF LAGGED INTO RAFTER WITH 2-1/2" MINIMUM EMBEDMENT INTO RAFTER S1 /ATTACHMENT PLAN \I/ SCALE NA RAFTER CALIFORNIA PREMIE OPPORTUNITY - PROJECT DATE DRAWN 5/E/— DRAWN BY o S R REY. SHEET PV-3 �•: •' 1u •� 0 : CAUTION :.' SOLAR AC VOLTAGE PRESENT AUTHORIZED PERSONNEL ONLY STICKER FOR AC CONDUIT EVERY 10': LABEL FOR MAIN SERVICE PANEL AND COMBINER PANEL PER NEC 690.54: PERMANENT RIVOT (TYP) ! CAUTION MULTIPLE SOURCES OF POWER S3/4" - 3/4" TEXT 1 /4" TEXT 318"TEXT SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN PERMANENT RIVOT (TYP) TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO 3/16"TEXT SHUTDOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY DREQUIRED PLACARDS SCALE . WARNING SOLAR POWER SYSTEM BREAKER IS BACKFED, DO NOT RELOCATE 1 THIS OVERCURRENT DEVICE CALIFORNIA PREMIE Ln J J W U cr N t 3 C N V OPPORTUNITY — PROJECT DATE DRAWN 5/B/— DRAWN BY o S R REv. SHEET PV-4 /q� Y — T