Loading...
Urban_Habitat_50.1_9-26-2045.52 734.19 San Jacinto, CA 92583 258 W. 7th St., Spc. 80 Fringe Detail: Annuity: $11.20/$0.35, Pension: $32.00/$1.00, Health & Welfare: $84.80/$2.65, Vacation/ Holiday: $32.96/$1.03 0 0Landscape Irr. Tender 0 Sergio Carrillo S D 0 0 00000 8.00 8.008.00 8.00 0 17.0032.00 0.00 0.00 0.000.00 16.00 7.93 10.65 0.00 87.44 646.75 626545633 0.00 7.34 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 544.00 63970 Other Deduction Detail: SDI: 7.34 Male Hispanic American 45.52 734.19 San Jacinto, CA 92583 258 W. 7th St., Spc. 80 Fringe Detail: Annuity: $5.005/$0.91, Training Fund: $3.85/$0.70, Administrative Fund: $0.33/$0.06, Indust. Stab.Fund: $0.66/$0.12, Health & Welfare: $44.00/$8.00, Pension: $46.20/$8.40, Vacation/ Holiday: $26.785/$4.87, Contract Compliance: $1.65/$0.30 0 0Landscape Irrigation Labor 0 Sergio Carrillo S D 0 5.50 00000 0 000 0 34.585.50 0.00 0.00 0.000.00 16.00 7.93 10.65 0.00 87.44 646.75 626545633 0.00 7.34 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 190.19 63970 Other Deduction Detail: SDI: 7.34 Male Hispanic American 74.69 1204.64 Apple Valley, CA 92308 20250 Itasca Rd. Fringe Detail: Health & Welfare: $145.582/$9.87, Pension: $145.582/$9.87, Vacation: $71.39/$4.84, Training Fund: $22.125/$1.50, Annuity: $3.688/$0.25, Contract Compliance: $4.425/$0.30, Administrative Fund: $0. 885/$0.06, Indust. Stab.Fund: $1.77/$0.12 0 0Landscape Oper. Eng 2 Cameron D. Cleland S D 0 7.50 00000 0 7.2500 0 38.4514.75 0.00 0.00 0.000.00 90.00 18.76 17.47 0.00 212.96 991.68 565931366 0.00 12.04 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 567.13 63919 Other Deduction Detail: SDI: 12.04 Male Caucasian 44.21 713.09 Thermal, CA 92274 68990 Harrison St. Space #101 Fringe Detail: Health & Welfare: $84.80/$2.65, Pension: $32.00/$1.00, Vacation: $32.96/$1.03, Annuity: $11.20/$0.35 0 0Landscape Irr. Tender 5 Pedro J. Clemente S D 0 0 00000 8.00 8.008.00 8.00 0 15.5332.00 0.00 0.00 0.000.00 7.00 0.00 10.34 0.00 68.68 644.41 657090571 0.00 7.13 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 496.96 63963 Other Deduction Detail: SDI: 7.13 Male 2) Local Tax 2 * Other Deductions - 1) Local Tax 1 3) Other Deductions TOTAL DEDUCTIONS PAYROLL (For Contractor's Optional Use; See Instructions, Form WH-347 Inst.) OR SUBCONTRACTORNAME OF CONTRACTOR ADDRESS PROJECT AND LOCATION PROJECT OR CONTRACT NO.FOR WEEK ENDINGPAYROLL NO. (1)(2)(3) DEDUCTIONS (5)(6)(7)(8)(9)(4) DAY AND DATE Identification Number NAME, ADDRESS, AND OF EMPLOYEE WORK CLASSIFICATION HOURS WORKED EACH DAY TOTAL HOURS RATE OF PAY GROSS AMOUNT EARNED FICA WITH- HOLDING TAX SWH OTHER* NET WAGES PAID FOR WEEK/NO. OF WITHHOLDING EXEMPTIONSST, OT or DTUrban Habitat PO Box 1177 La Quinta, CA 92247 50.1 La Quinta SilverRock Park Venue La Quinta SilverRock Resort09/26/2020 2016-08/2016-08 20 21 22 23 24 25 26 Medicare SUN MON TUE WED THU FRI SAT CA-SC-UHWage Det: Check No. Sex Race While completion of Form WH-347 is optional, it is mandatory for covered contractors and subcontractors performing work on Federally financed or assisted construction contracts to respond to the information collection contained in 29 C.F.R. §§ 3.3, 5.5(a). The Copeland Act (40 U.S.C. § 3145) contractors and subcontractors performing work on Federally financed or assisted construction contracts to "furnish weekly a statement with respect to the wages paid each employee during the preceding week." U.S. Department of Labor (DOL) regulations at 29 C.F.R. § 5.5(a)(3)(ii) require contractors to submit weekly a copy of all payrolls to the Federal agency contracting for or financing the construction project, accompanied by a signed "Statement of Compliance" indicating that the payrolls are correct and complete and that each laborer or mechanic has been paid not less than the proper Davis-Bacon prevailing wage rate for the work performed. DOL and federal contracting agencies receiving this information review the information to determine that employees have received legally required wages and fringe benefits. 58.79 948.22 Thermal, CA 92274 55550 Tyler St. Fringe Detail: Training Fund: $45.44/$1.42, Annuity: $16.32/$0.51, Pension: $268.80/$8.40, Contract Compliance: $9.60/$0.30, Indust. Stab.Fund: $2.56/$0.08, Administrative Fund: $1.92/$0.06, Health & Welfare: $239. 04/$7.47, Vacation: $42.56/$1.33 0 0Landscape Irrigation Labor 5 Maurilio P. Cortez S D 0 0 00000 8.00 8.008.00 8.00 0 24.7932.00 0.00 0.00 0.000.00 31.00 0.39 13.75 0.00 113.41 834.81 604521749 0.00 9.48 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 793.28 Apprentice Level 3 63952 Other Deduction Detail: SDI: 9.48 Male Hispanic American 80.39 1296.75 Temecula, CA 92592 30240 Miraloma Dr. Fringe Detail: Annuity: $34.125/$0.91, Training Fund: $26.25/$0.70, Administrative Fund: $2.25/$0.06, Indust. Stab.Fund: $4.50/$0.12, Contract Compliance: $11.25/$0.30, Vacation: $182.625/$4.87, Health & Welfare: $315. 00/$8.40, Pension: $300.00/$8.00 0 0Landscape Irrigation Labor 0 Oscar Diaz S D 0 5.50 00000 8.00 8.008.00 8.00 0 34.5837.50 0.00 0.00 0.000.00 43.00 58.67 18.80 0.00 213.82 1082.93 615121373 0.00 12.96 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 1296.75 63961 Other Deduction Detail: SDI: 12.96 Male Hispanic American 44.64 720.00 Coachella, CA 92236 84711 Ave. 51 Fringe Detail: Annuity: $8.40/$0.35, Health & Welfare: $63.60/$2.65, Vacation/ Holiday: $24.72/$1.03, Pension: $24.00/$1.00 0 0Landscape Irr. Tender 2 Marco A. Garcia Alonso S D 0 0 00000 0 8.008.00 8.00 0 18.0024.00 0.00 0.00 0.000.00 33.00 3.11 10.44 0.00 98.39 621.61 641513170 0.00 7.20 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 432.00 63949 Other Deduction Detail: SDI: 7.20 Male Hispanic American 53.42 861.60 Thermal, CA 92274 69455 Pierce St. Fringe Detail: Training Fund: $13.60/$0.85 0 0Painter: Industrial 8 Juan Guitron Gonzalez S D 0 0 00000 0 08.00 8.00 0 35.5216.00 0.00 26.13 0.000.00 0.00 3.24 12.50 0.00 77.77 783.83 655290807 0.00 8.61 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 986.40 4278 Other Deduction Detail: SDI: 8.61 Male Hispanic American 2) Local Tax 2 * Other Deductions - 1) Local Tax 1 3) Other Deductions TOTAL DEDUCTIONS PAYROLL (For Contractor's Optional Use; See Instructions, Form WH-347 Inst.) OR SUBCONTRACTORNAME OF CONTRACTOR ADDRESS PROJECT AND LOCATION PROJECT OR CONTRACT NO.FOR WEEK ENDINGPAYROLL NO. (1)(2)(3) DEDUCTIONS (5)(6)(7)(8)(9)(4) DAY AND DATE Identification Number NAME, ADDRESS, AND OF EMPLOYEE WORK CLASSIFICATION HOURS WORKED EACH DAY TOTAL HOURS RATE OF PAY GROSS AMOUNT EARNED FICA WITH- HOLDING TAX SWH OTHER* NET WAGES PAID FOR WEEK/NO. OF WITHHOLDING EXEMPTIONSST, OT or DTUrban Habitat PO Box 1177 La Quinta, CA 92247 50.1 La Quinta SilverRock Park Venue La Quinta SilverRock Resort09/26/2020 2016-08/2016-08 20 21 22 23 24 25 26 Medicare SUN MON TUE WED THU FRI SAT CA-SC-UHWage Det: Check No. Sex Race While completion of Form WH-347 is optional, it is mandatory for covered contractors and subcontractors performing work on Federally financed or assisted construction contracts to respond to the information collection contained in 29 C.F.R. §§ 3.3, 5.5(a). The Copeland Act (40 U.S.C. § 3145) contractors and subcontractors performing work on Federally financed or assisted construction contracts to "furnish weekly a statement with respect to the wages paid each employee during the preceding week." U.S. Department of Labor (DOL) regulations at 29 C.F.R. § 5.5(a)(3)(ii) require contractors to submit weekly a copy of all payrolls to the Federal agency contracting for or financing the construction project, accompanied by a signed "Statement of Compliance" indicating that the payrolls are correct and complete and that each laborer or mechanic has been paid not less than the proper Davis-Bacon prevailing wage rate for the work performed. DOL and federal contracting agencies receiving this information review the information to determine that employees have received legally required wages and fringe benefits. 80.40 1296.75 San Jacinto, CA 92583 258 W. 7th St., Spc. 80 Fringe Detail: Annuity: $34.125/$0.91, Training Fund: $26.25/$0.70, Pension: $315.00/$8.40, Health & Welfare: $300.00/$8.00, Administrative Fund: $2.25/$0.06, Indust. Stab.Fund: $4.50/$0.12, Contract Compliance: $11. 25/$0.30, Vacation: $182.625/$4.87 0 0Landscape Irrigation Labor 0 Jose Gutierrez S D 0 5.50 00000 8.00 8.008.00 8.00 0 34.5837.50 0.00 0.00 0.000.00 0.00 17.66 18.80 0.00 129.82 1166.93 571210268 0.00 12.96 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 1296.75 63941 Other Deduction Detail: SDI: 12.96 Male Hispanic American 50.52 814.73 Desert Hot Springs, CA 92240 66886 Camino Idilio Fringe Detail: Health & Welfare: $293.12/$9.16, Pension: $12.16/$0.38, Training Fund: $45.12/$1.41, Other: $34.24/$1.07 0 0Landscape Irrigation Labor 4 Luis F. Lopez Quintero S D 0 0 00000 8.00 8.008.00 8.00 0 21.3032.00 0.00 0.00 0.000.00 46.00 20.79 11.81 0.00 137.26 677.47 164777350 0.00 8.14 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 681.60 Apprentice Level 2 63947 Other Deduction Detail: SDI: 8.14 Male 44.98 725.59 Thermal, CA 92274 55550 Tyler St. Space #3 Fringe Detail: Health & Welfare: $84.80/$2.65, Pension: $32.00/$1.00, Annuity: $11.20/$0.35, Vacation: $32.96/$1.03 0 0Landscape Irr. Tender 5 Juan LopezMendez S D 0 0 00000 8.00 8.008.00 8.00 0 15.5332.00 0.00 0.00 0.000.00 8.00 0.00 10.52 0.00 70.76 654.83 620099088 0.00 7.26 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 496.96 63944 Other Deduction Detail: SDI: 7.26 Male 85.84 1384.48 Desert Hot Springs, CA 92240 66886 Camino Idilio Fringe Detail: Health & Welfare: $236.88/$9.87, Pension: $236.88/$9.87, Vacation: $116.16/$4.84, Annuity: $6.00/$0.25, Training Fund: $36.00/$1.50, Contract Compliance: $7.20/$0.30, Administrative Fund: $1.44/$0.06, Indust. Stab.Fund: $288.00/$12.00 0 0Landscape Oper. Eng 5 Felipe Lopez S D 0 0 00000 8.00 08.00 8.00 0 38.4524.00 0.00 0.00 0.000.00 81.00 22.77 20.08 0.00 223.53 1160.95 604137146 0.00 13.84 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 922.80 6392563976 Other Deduction Detail: SDI: 13.84 Male 2) Local Tax 2 * Other Deductions - 1) Local Tax 1 3) Other Deductions TOTAL DEDUCTIONS PAYROLL (For Contractor's Optional Use; See Instructions, Form WH-347 Inst.) OR SUBCONTRACTORNAME OF CONTRACTOR ADDRESS PROJECT AND LOCATION PROJECT OR CONTRACT NO.FOR WEEK ENDINGPAYROLL NO. (1)(2)(3) DEDUCTIONS (5)(6)(7)(8)(9)(4) DAY AND DATE Identification Number NAME, ADDRESS, AND OF EMPLOYEE WORK CLASSIFICATION HOURS WORKED EACH DAY TOTAL HOURS RATE OF PAY GROSS AMOUNT EARNED FICA WITH- HOLDING TAX SWH OTHER* NET WAGES PAID FOR WEEK/NO. OF WITHHOLDING EXEMPTIONSST, OT or DTUrban Habitat PO Box 1177 La Quinta, CA 92247 50.1 La Quinta SilverRock Park Venue La Quinta SilverRock Resort09/26/2020 2016-08/2016-08 20 21 22 23 24 25 26 Medicare SUN MON TUE WED THU FRI SAT CA-SC-UHWage Det: Check No. Sex Race While completion of Form WH-347 is optional, it is mandatory for covered contractors and subcontractors performing work on Federally financed or assisted construction contracts to respond to the information collection contained in 29 C.F.R. §§ 3.3, 5.5(a). The Copeland Act (40 U.S.C. § 3145) contractors and subcontractors performing work on Federally financed or assisted construction contracts to "furnish weekly a statement with respect to the wages paid each employee during the preceding week." U.S. Department of Labor (DOL) regulations at 29 C.F.R. § 5.5(a)(3)(ii) require contractors to submit weekly a copy of all payrolls to the Federal agency contracting for or financing the construction project, accompanied by a signed "Statement of Compliance" indicating that the payrolls are correct and complete and that each laborer or mechanic has been paid not less than the proper Davis-Bacon prevailing wage rate for the work performed. DOL and federal contracting agencies receiving this information review the information to determine that employees have received legally required wages and fringe benefits. 85.84 1384.48 Desert Hot Springs, CA 92240 66886 Camino Idilio Fringe Detail: Health & Welfare: $8.00/$8.00, Pension: $8.40/$8.40, Annuity: $0.91/$0.91, Vacation: $4.87/$4.87, Training Fund: $0.70/$0.70, Contract Compliance: $0.30/$0.30, Administrative Fund: $0.06/$0.06, Indust. Stab.Fund: $0.12/$0.12 0 0Landscape Irrigation Labor 5 Felipe Lopez S D 0 1.00 00000 0 000 0 34.581.00 0.00 0.00 0.000.00 81.00 22.77 20.08 0.00 223.53 1160.95 604137146 0.00 13.84 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 34.58 6392563976 Other Deduction Detail: SDI: 13.84 Male 39.53 637.50 Coachella, CA 92236 51285 Frederick St Fringe Detail: Annuity: $4.725/$0.35, Vacation: $13.905/$1.03, Pension: $13.50/$1.00, Health & Welfare: $35.775/$2.65 0 0Landscape Irr. Tender 3 Otoniel A. Penalosa S D 0 5.50 00000 0 8.0000 0 17.0013.50 0.00 0.00 0.000.00 16.00 0.00 9.25 0.00 71.15 566.35 621666061 0.00 6.37 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 229.50 63962 Other Deduction Detail: SDI: 6.37 Male Hispanic American 90.72 1463.20 Indio, CA 92201 81921 Victoria St. Fringe Detail: Administrative Fund: $1.44/$0.06, Pension: $201.60/$8.40, Annuity: $21.84/$0.91, Vacation: $116.88/$4.87, Contract Compliance: $7.20/$0.30, Indust. Stab.Fund: $2.88/$0.12, Health & Welfare: $192.00/$8.00, Training Fund: $16.80/$0.70 0 0Landscape Irrigation Labor 0 Gerardo Saldivar Mejia S D 0 0 00000 8.00 8.0008.00 0 36.5824.00 0.00 0.00 0.000.00 141.00 41.03 21.21 0.00 308.59 1154.61 607068060 0.00 14.63 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 877.92 63928 Other Deduction Detail: SDI: 14.63 Male Hispanic American 72.68 1172.24 Thermal, CA 92274 56725 Harrison St. Fringe Detail: Annuity: $18.20/$0.91, Pension: $168.00/$8.40, Contract Compliance: $6.00/$0.30, Vacation: $97.40/$4.87, Administrative Fund: $1.20/$0.06, Training Fund: $14.00/$0.70, Indust. Stab.Fund: $2.40/$0.12, Health & Welfare: $160.00/$8.00 0 0Landscape Irrigation Labor 0 Rafael Sanchez Garcia S D 0 0 00000 0 8.004.00 8.00 0 34.5820.00 0.00 0.00 0.000.00 106.00 22.50 17.00 0.00 229.90 942.34 614126878 0.00 11.72 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 691.60 63967 Other Deduction Detail: SDI: 11.72 Male Hispanic American 2) Local Tax 2 * Other Deductions - 1) Local Tax 1 3) Other Deductions TOTAL DEDUCTIONS PAYROLL (For Contractor's Optional Use; See Instructions, Form WH-347 Inst.) OR SUBCONTRACTORNAME OF CONTRACTOR ADDRESS PROJECT AND LOCATION PROJECT OR CONTRACT NO.FOR WEEK ENDINGPAYROLL NO. (1)(2)(3) DEDUCTIONS (5)(6)(7)(8)(9)(4) DAY AND DATE Identification Number NAME, ADDRESS, AND OF EMPLOYEE WORK CLASSIFICATION HOURS WORKED EACH DAY TOTAL HOURS RATE OF PAY GROSS AMOUNT EARNED FICA WITH- HOLDING TAX SWH OTHER* NET WAGES PAID FOR WEEK/NO. OF WITHHOLDING EXEMPTIONSST, OT or DTUrban Habitat PO Box 1177 La Quinta, CA 92247 50.1 La Quinta SilverRock Park Venue La Quinta SilverRock Resort09/26/2020 2016-08/2016-08 20 21 22 23 24 25 26 Medicare SUN MON TUE WED THU FRI SAT CA-SC-UHWage Det: Check No. Sex Race While completion of Form WH-347 is optional, it is mandatory for covered contractors and subcontractors performing work on Federally financed or assisted construction contracts to respond to the information collection contained in 29 C.F.R. §§ 3.3, 5.5(a). The Copeland Act (40 U.S.C. § 3145) contractors and subcontractors performing work on Federally financed or assisted construction contracts to "furnish weekly a statement with respect to the wages paid each employee during the preceding week." U.S. Department of Labor (DOL) regulations at 29 C.F.R. § 5.5(a)(3)(ii) require contractors to submit weekly a copy of all payrolls to the Federal agency contracting for or financing the construction project, accompanied by a signed "Statement of Compliance" indicating that the payrolls are correct and complete and that each laborer or mechanic has been paid not less than the proper Davis-Bacon prevailing wage rate for the work performed. DOL and federal contracting agencies receiving this information review the information to determine that employees have received legally required wages and fringe benefits. 72.68 1172.24 Thermal, CA 92274 56725 Harrison St. Fringe Detail: Health & Welfare: $9.80/$2.45, Pension: $4.00/$1.00, Vacation: $4.12/$1.03, Annuity: $1.00/$0.25 0 0Landscape Irr. Tender 0 Rafael Sanchez Garcia S D 0 4.00 00000 0 000 0 17.004.00 0.00 0.00 0.000.00 106.00 22.50 17.00 0.00 229.90 942.34 614126878 0.00 11.72 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 68.00 63967 Other Deduction Detail: SDI: 11.72 Male Hispanic American 81.39 1312.75 Thermal, CA 92274 55550 Tyler St. Space #3 Fringe Detail: Health & Welfare: $232.00/$8.00, Pension: $243.60/$8.40, Vacation: $141.23/$4.87, Training Fund: $20.30/$0.70, Annuity: $26.39/$0.91, Contract Compliance: $8.70/$0.30, Administrative Fund: $1.74/$0.06, Indust. Stab.Fund: $3.48/$0.12 0 0Landscape Irrigation Labor 4 Miguel L. Sanchez S D 0 5.00 00000 8.00 8.0008.00 0 34.5829.00 0.00 0.00 0.000.00 119.00 55.14 19.04 0.00 287.70 1025.05 622987861 0.00 13.13 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 1002.82 63955 Other Deduction Detail: SDI: 13.13 Male 81.39 1312.75 Thermal, CA 92274 55550 Tyler St. Space #3 Fringe Detail: Health & Welfare: $64.00/$8.00, Pension: $67.20/$8.40, Vacation: $38.96/$4.87, Training Fund: $5.60/$0.70, Annuity: $7.28/$0.91, Contract Compliance: $2.40/$0.30, Administrative Fund: $0.48/$0.06, Indust. Stab.Fund: $0.96/$0.12 0 0Landscape Irrigation Labor 4 Miguel L. Sanchez S D 0 0 00000 0 08.00 0 0 36.588.00 0.00 0.00 0.000.00 119.00 55.14 19.04 0.00 287.70 1025.05 622987861 0.00 13.13 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 292.64 63955 Other Deduction Detail: SDI: 13.13 Male 90.00 1451.49 Lake Elsinore, CA 92530 15212 Lincoln St. #A Fringe Detail: Training Fund: $37.75/$1.00, Pension: $402.038/$10.65, Health & Welfare: $432.237/$11.45, Vacation/ Holiday: $134.012/$3.55, Other: $5.662/$0.15 0 0Landscape Oper. Eng 0 Jose D. Sandoval Becerra S D 0 5.75 00000 8.00 8.008.00 8.00 0 38.4537.75 0.00 0.00 0.000.00 23.00 27.25 21.04 0.00 175.81 1275.68 612336635 0.00 14.52 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 1451.48 63939 Other Deduction Detail: SDI: 14.52 Male Hispanic American 2) Local Tax 2 * Other Deductions - 1) Local Tax 1 3) Other Deductions TOTAL DEDUCTIONS PAYROLL (For Contractor's Optional Use; See Instructions, Form WH-347 Inst.) OR SUBCONTRACTORNAME OF CONTRACTOR ADDRESS PROJECT AND LOCATION PROJECT OR CONTRACT NO.FOR WEEK ENDINGPAYROLL NO. (1)(2)(3) DEDUCTIONS (5)(6)(7)(8)(9)(4) DAY AND DATE Identification Number NAME, ADDRESS, AND OF EMPLOYEE WORK CLASSIFICATION HOURS WORKED EACH DAY TOTAL HOURS RATE OF PAY GROSS AMOUNT EARNED FICA WITH- HOLDING TAX SWH OTHER* NET WAGES PAID FOR WEEK/NO. OF WITHHOLDING EXEMPTIONSST, OT or DTUrban Habitat PO Box 1177 La Quinta, CA 92247 50.1 La Quinta SilverRock Park Venue La Quinta SilverRock Resort09/26/2020 2016-08/2016-08 20 21 22 23 24 25 26 Medicare SUN MON TUE WED THU FRI SAT CA-SC-UHWage Det: Check No. Sex Race While completion of Form WH-347 is optional, it is mandatory for covered contractors and subcontractors performing work on Federally financed or assisted construction contracts to respond to the information collection contained in 29 C.F.R. §§ 3.3, 5.5(a). The Copeland Act (40 U.S.C. § 3145) contractors and subcontractors performing work on Federally financed or assisted construction contracts to "furnish weekly a statement with respect to the wages paid each employee during the preceding week." U.S. Department of Labor (DOL) regulations at 29 C.F.R. § 5.5(a)(3)(ii) require contractors to submit weekly a copy of all payrolls to the Federal agency contracting for or financing the construction project, accompanied by a signed "Statement of Compliance" indicating that the payrolls are correct and complete and that each laborer or mechanic has been paid not less than the proper Davis-Bacon prevailing wage rate for the work performed. DOL and federal contracting agencies receiving this information review the information to determine that employees have received legally required wages and fringe benefits. 37.44 604.00 Lake Elsinore, CA 92530 15212 Lincoln St. #A Fringe Detail: Annuity: $13.212/$0.35, Pension: $37.75/$1.00, Vacation: $38.883/$1.03, Health & Welfare: $100.037/$2.65 0 0Landscape Irr. Tender 0 Jose A. Sandoval S D 0 5.75 00000 8.00 8.008.00 8.00 0 16.0037.75 0.00 0.00 0.000.00 40.00 12.04 8.75 0.00 104.27 499.73 603024821 0.00 6.04 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 604.00 63937 Other Deduction Detail: SDI: 6.04 Male Hispanic American 47.48 765.84 Mecca, CA 92203 91889 Montenegro Dr. Fringe Detail: Pension: $24.00/$1.00, Vacation/ Holiday: $24.72/$1.03, Annuity: $8.40/$0.35, Health & Welfare: $63.60/$2.65 0 0Landscape Irr. Tender 0 Cesar Torres S D 0 0 00000 0 8.008.00 8.00 0 15.5324.00 0.00 0.00 0.000.00 21.00 17.56 11.10 0.00 104.79 661.05 604246965 0.00 7.65 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 372.72 63920 Other Deduction Detail: SDI: 7.65 Male Hispanic American 57.75 931.38 San Bernardino, CA 92404 1659 McKinley Ave. Fringe Detail: Annuity: $7.28/$0.91, Training Fund: $5.60/$0.70, Health & Welfare: $64.00/$8.00, Pension: $67.20/$8.40, Contract Compliance: $2.40/$0.30, Administrative Fund: $0.48/$0.06, Vacation/ Holiday: $38.96/$4.87, Indust. Stab.Fund: $0.96/$0.12 0 0Landscape Irrigation Labor 2 Gustavo Torres S D 0 0 00000 0 08.00 0 0 34.588.00 0.00 0.00 0.000.00 6.00 5.18 13.51 0.00 91.75 839.63 604924822 0.00 9.31 1) 2) 3)O 0 0 0 0 0 0 0 0.00 0.00 0.00 276.64 63930 Other Deduction Detail: SDI: 9.31 Male Hispanic American 2) Local Tax 2 * Other Deductions - 1) Local Tax 1 3) Other Deductions TOTAL DEDUCTIONS PAYROLL (For Contractor's Optional Use; See Instructions, Form WH-347 Inst.) OR SUBCONTRACTORNAME OF CONTRACTOR ADDRESS PROJECT AND LOCATION PROJECT OR CONTRACT NO.FOR WEEK ENDINGPAYROLL NO. (1)(2)(3) DEDUCTIONS (5)(6)(7)(8)(9)(4) DAY AND DATE Identification Number NAME, ADDRESS, AND OF EMPLOYEE WORK CLASSIFICATION HOURS WORKED EACH DAY TOTAL HOURS RATE OF PAY GROSS AMOUNT EARNED FICA WITH- HOLDING TAX SWH OTHER* NET WAGES PAID FOR WEEK/NO. OF WITHHOLDING EXEMPTIONSST, OT or DTUrban Habitat PO Box 1177 La Quinta, CA 92247 50.1 La Quinta SilverRock Park Venue La Quinta SilverRock Resort09/26/2020 2016-08/2016-08 20 21 22 23 24 25 26 Medicare SUN MON TUE WED THU FRI SAT CA-SC-UHWage Det: Check No. Sex Race While completion of Form WH-347 is optional, it is mandatory for covered contractors and subcontractors performing work on Federally financed or assisted construction contracts to respond to the information collection contained in 29 C.F.R. §§ 3.3, 5.5(a). The Copeland Act (40 U.S.C. § 3145) contractors and subcontractors performing work on Federally financed or assisted construction contracts to "furnish weekly a statement with respect to the wages paid each employee during the preceding week." U.S. Department of Labor (DOL) regulations at 29 C.F.R. § 5.5(a)(3)(ii) require contractors to submit weekly a copy of all payrolls to the Federal agency contracting for or financing the construction project, accompanied by a signed "Statement of Compliance" indicating that the payrolls are correct and complete and that each laborer or mechanic has been paid not less than the proper Davis-Bacon prevailing wage rate for the work performed. DOL and federal contracting agencies receiving this information review the information to determine that employees have received legally required wages and fringe benefits. Contract #2016-08, Wage Decision #CA-SC-UH Mod 0 10/01/19,Revised Payroll #50.1, Contractor License # 963744, Workers Compensation Policy # URWC004126 Urban Habitat 20th President October 7th, 2020 Urban Habitat 2020 2020SeptemberSeptember26th - * U.S. G.P.O.: 1997 519.861 in addition to the basic hourly wage rates paid to each laborer or mechanic listed in the above referenced payroll, payments of fringe benefits as listed in the contract have been or will be made to appropriate programs for the benefit of such employees, except as noted in section 4(c) below. (a) WHERE FRINGE BENEFITS ARE PAID TO APPROVED PLANS, FUNDS, OR PROGRAMS THE WILLFUL FALSIFICATION OF ANY OF THE ABOVE STATEMENTS MAY SUBJECT THE CONTRACTOR OR SUBCONTRACTOR TO CIVIL OR CRIMINAL PROSECUTION. SEE SECTION 1001 OF TITLE 18 AND SECTION 231 OF TITLE 31 OF THE UNITED STATES CODE. NAME AND TITLE:SIGNATURE: REMARKS (b) WHERE FRINGE BENEFITS ARE PAID IN CASH -Each laborer or mechanic listed in the above referenced payroll has been paid, as indicated on the payroll, an amount not less than the sum of the applicable basic hourly wage rate plus the amount of the required fringe benefits as listed in the contract, except as noted in Section 4(c) below. on the (Contractor or Subcontractor) all persons employed on said project have been paid the full weekly wages earned, that no rebates have been or will be made either directly or indirectly to or no behalf of said from any person and that no deductions have been made either directly or indirectly from the full wages earned by any person other than permissible deductions as defined in Regulations, California Labor Code, Division 2, Chapter 7, Part 1 (Public Works Section 1720 thru 1861) and or described below. (2) That the payrolls for the Public Works Project required to be submitted are true, correct and complete, that the wage rates for Laborers and Mechanics contained therein are not less than the applicable wage rates contained in any wage determination assigned to the contract, the classifications assigned to each Laborer or Mechanic conform to the work performed. (3) That any apprentices employed during the above period are duly registered in a bona fide program registered with the State apprenticeship agency and that training contributions are or will be made pursuant to California Labor Code 1777.5 (4) That: Signed ElectronicallyTheresa Brennan, President Date I, under penalty of perjury, do hereby state: (1) That I pay or supervise the payment of the persons employed by a Public Works Project commencing on the (Building or Work) , and ending theday of ,day of , Theresa Brennan (Contractor or Subcontractor) La Quinta SilverRock Park Venue (Name of Signatory Party)(Title) (c) EXCEPTIONS FICA, FWH, Medicare, State Tax, SDI