SilverRock Park Venue Notice of Delay & Time Extention - Schedule
IDTask ModeItem Task NameDuration Start Finish1SilverRock Park Venue ‐ City of La Quinta165 daysMon 9/16/19Fri 5/1/202General 153 daysMon 9/16/19Wed 4/15/2031Mobilization10 daysMon 9/16/19Fri 9/27/1943Dust Control 129 daysMon 9/16/19Thu 3/12/2054Storm Water Pollution Preventation Plan (SWPPP)153 daysMon 9/16/19Wed 4/15/2065Demolition & Disposal 5 daysMon 9/30/19Fri 10/4/197Demobilize11 daysWed 4/1/20Wed 4/15/208Site Construction, Improvements, & Amentities 133 daysMon 10/14/19Wed 4/15/2096aSub‐Grade / Finish Grade48 daysMon 1/27/20Wed 4/1/20107Remove and replace stabilizer11 daysWed 4/1/20Wed 4/15/20118Stablized DG over Base ‐ Parking15 daysMon 3/16/20Fri 4/3/20129(Site Entrance) Interlocking Pavers Over Class II Aggregate Base15 daysMon 3/16/20Fri 4/3/201310Gravel Pave2 with 3/8" Crushed Rock Over Class II Aggregate Base with Permaloc (Delayed ‐ Re‐Design)11 daysWed 4/1/20Wed 4/15/20141112" Wide curbing (paver)10 daysMon 3/2/20Fri 3/13/201512Class II over native (basin road)22 daysThu 12/26/19Fri 1/24/2016136" PCC flat (site flat work) (delayed at Alongi area)45 daysMon 1/27/20Fri 3/27/2017146" PCC landscape (site work)20 daysMon 1/27/20Fri 2/21/201815DG Trail (basin trial)15 daysMon 1/6/20Fri 1/24/2019166" Concrete Vertical Curb 8 daysWed 1/15/20Fri 1/24/2020174" Concrete Rolled Curb 8 daysWed 1/15/20Fri 1/24/202118Concrete Cross Gutter and Spandrel (Modified with Rolled Curb)4 daysTue 3/3/20Fri 3/6/2022192' Transition from 4" Rolled curb Height to 0"8 daysWed 1/15/20Fri 1/24/202320Parking Lot Wheel Stops 11 daysWed 4/1/20Wed 4/15/202422Site Signage11 daysWed 4/1/20Wed 4/15/20252436" Wide Truncated Domes 10 daysMon 2/17/20Fri 2/28/2026256' CMU Irrigation Equipment Screen Wall / Freestanding 25 daysMon 10/14/19Fri 11/15/1927Water / Sewer / Irrigation 148 daysMon 9/23/19Wed 4/15/2028266" PVC C‐900 Fire Line 15 daysMon 10/7/19Fri 10/25/1929271‐1/2" PVC Sch 40 Water Line 20 daysMon 10/28/19Fri 11/22/193028Connect to Existing Domestic Water Meter (Delayed ‐ no meter)123 daysMon 10/28/19Wed 4/15/2031296" Fire Hydrant Assembly (Wet Barrel)15 daysMon 10/7/19Fri 10/25/1932306" PVC C‐900 Irrigation Line 15 daysMon 9/23/19Fri 10/11/193331Connection to Existing 15" Line (Delayed)135 daysThu 10/10/19Wed 4/15/2034323/4" PVC Sch 40 Water Line (Delayed ‐ no meter)63 daysMon 1/20/20Wed 4/15/2035336" PVC (SDR‐35) Sewer Line 15 daysMon 9/30/19Fri 10/18/193634Install Grinder pump (Delayed ‐ no water, no power, no restroom)15 daysMon 10/21/19Fri 11/8/1937352" HDP SDR 11 Force Main 15 daysMon 11/18/19Fri 12/6/1938Site Storm Drainage98 daysMon 12/2/19Wed 4/15/2039366" ABS Drain Line at 1.0% 5 daysMon 2/17/20Fri 2/21/2040378" HDPE N‐12 Storm Drain Line 25 daysMon 12/2/19Fri 1/3/20413812" HDPE N‐12 Storm Drain Line 25 daysMon 12/2/19Fri 1/3/20423912" Square area drain per NDS‐900 and 9168 daysWed 4/1/20Fri 4/10/2043409" Square area drain per NDS‐9008 daysWed 4/1/20Fri 4/10/20444124" Inline drain basin per Nyloplast 2824AG (Delayer ‐ need redesign)58 daysMon 1/27/20Wed 4/15/204542Trench drain per NDS part 550 and Cast Iron Grate (Ordered ‐ need redesign on drain connect)9 daysFri 4/3/20Wed 4/15/2046438" ABS End Caps 8 daysWed 4/1/20Fri 4/10/20474418" ADS Flared End Section Model No. 1810 NP25 daysMon 12/2/19Fri 1/3/204845300 lb Rock Rip‐Rap (Delayed ‐ design detail)11 daysWed 4/1/20Wed 4/15/204946Modify 54" Storm Drain Construct Headwall, and place 1/4 ton frouted rip‐rap (Delayed ‐ re design)11 daysWed 4/1/20Wed 4/15/2050Water Feature 11 daysWed 4/1/20Wed 4/15/205147Furnish and Install Water Feature (Delayed ‐ no power)11 daysWed 4/1/20Wed 4/15/2052Site Amentities 138 daysMon 10/7/19Wed 4/15/205348Restroom Building Utility and Construction Coordination (Delayed ‐ Owner Supplied)11 daysWed 4/1/20Wed 4/15/20SilverRock Park Venue - City of La QuintaGeneral 9/16 9/279/163/129/164/159/30 10/44/1 4/15Site Construction, Improvements, & Amentities 1/274/14/1 4/153/16 4/33/16 4/34/1 4/153/2 3/1312/26 1/241/273/271/27 2/211/6 1/241/15 1/241/15 1/243/3 3/61/15 1/244/1 4/154/1 4/152/17 2/2810/14 11/15Water / Sewer / Irrigation 10/7 10/2510/28 11/2210/284/1510/7 10/259/23 10/1110/104/151/204/159/30 10/1810/21 11/811/18 12/6Site Storm Drainage2/17 2/2112/2 1/312/2 1/34/1 4/104/1 4/101/274/154/3 4/154/1 4/1012/2 1/34/1 4/154/1 4/15Water Feature 4/1 4/15Site Amentities 4/1 4/15SepOctNovDecJanFebMarAprMayQtr 4, 2019Qtr 1, 2020Qtr 2, 2020TaskSplitMilestoneSummaryProject SummaryInactive TaskInactive MilestoneInactive SummaryManual TaskDuration-onlyManual Summary RollupManual SummaryStart-onlyFinish-onlyExternal TasksExternal MilestoneDeadlineProgressManual ProgressPage 1Project: Master Schedule - SilveDate: Sun 1/26/20 IDTask ModeItem Task NameDuration Start Finish5449PCC Stage, Stage Apron, Ramp, Railing and Step Slab 48 daysMon 1/27/20Wed 4/1/205550Decorative Brick Pavers 15 daysMon 3/16/20Fri 4/3/205651Stage Retainign Walls 45 daysMon 1/27/20Fri 3/27/205752Bike Racks with Concrete Pad 45 daysMon 1/27/20Fri 3/27/205853Benches with Concrete 45 daysMon 1/27/20Fri 3/27/205954Drinking fountains with Concrete Pads Sumps 45 daysMon 1/27/20Fri 3/27/206055Tubular Steel Fence and Gates 21 daysMon 10/7/19Mon 11/4/196156Concrete Mow Curb 32 daysFri 2/14/20Sat 3/28/206257Permaloc Steel Edging 13 daysMon 3/16/20Wed 4/1/2063Site Electrical and Lighting70 daysMon 1/27/20Fri 5/1/206458Pedestal, Conduit (Including Empty Conduit), Wire and Circuiting 50 daysMon 1/27/20Fri 4/3/206559Parking Lot Lighting 15 daysMon 2/17/20Fri 3/6/206660Pole Lights15 daysMon 2/24/20Fri 3/13/206761Bollards 21 daysFri 3/6/20Fri 4/3/206862Ingrade Uplight with Wide Flood Distribution 11 daysFri 3/6/20Fri 3/20/206963Ingrade Uplight with Wide Spot Distribution 11 daysFri 3/6/20Fri 3/20/207064color Changing Tree Uplights5 daysMon 3/30/20Fri 4/3/207165Steplights for Stage Area15 daysMon 3/16/20Fri 4/3/207266Transformer Pad (Delayer)11 daysWed 4/1/20Wed 4/15/207367Panel Boards and Panel Board Feeders 11 daysFri 4/17/20Fri 5/1/207468Pull Boxes 20 daysMon 2/24/20Fri 3/20/2075Landscape and Irrigation 73 daysMon 1/6/20Wed 4/15/207669Soil Prep and fine Grade25 daysMon 2/10/20Fri 3/13/207770Weed Abatement 11 daysMon 1/6/20Mon 1/20/207871Concrete Vault15 daysMon 3/2/20Fri 3/20/207972Furnish and Install Landscaping (Delayed ‐ Irr water, Alongi, Restroom)73 daysMon 1/6/20Wed 4/15/208073Furnish and Install Irrigation (Delayed ‐ Irr water, Alongi, Restroom)73 daysMon 1/6/20Wed 4/15/208174Furnish and Install Boulders 11 daysFri 2/7/20Fri 2/21/208275Furnish and Install 6" Minus Baja Cresta Rubble 11 daysFri 3/20/20Fri 4/3/208376Furnish and Install 3/8" Minus Desert Gold Crushed Rock 11 daysFri 3/20/20Fri 4/3/2084Bid Alternates58 daysMon 1/27/20Wed 4/15/2085Metal Screens11 daysFri 2/21/20Fri 3/6/2086Additional Terence Walls25 daysMon 1/27/20Fri 2/28/2087Additional Irrigation21 daysFri 2/14/20Fri 3/13/2088Floating Fountain 11 daysWed 4/1/20Wed 4/15/201/274/13/16 4/31/273/271/273/271/273/271/273/2710/7 11/42/14 3/283/16 4/1Site Electrical and Lighting1/274/32/17 3/62/24 3/133/6 4/33/6 3/203/6 3/203/30 4/33/16 4/34/1 4/154/17 5/12/24 3/20Landscape and Irrigation 2/10 3/131/6 1/203/2 3/201/64/151/64/152/7 2/213/20 4/33/20 4/3Bid Alternates2/21 3/61/27 2/282/14 3/134/1 4/15SepOctNovDecJanFebMarAprMayQtr 4, 2019Qtr 1, 2020Qtr 2, 2020TaskSplitMilestoneSummaryProject SummaryInactive TaskInactive MilestoneInactive SummaryManual TaskDuration-onlyManual Summary RollupManual SummaryStart-onlyFinish-onlyExternal TasksExternal MilestoneDeadlineProgressManual ProgressPage 2Project: Master Schedule - SilveDate: Sun 1/26/20