Loading...
2016-08 NV5 Surveying Services - 2019-10-03September 24, 2019 P26719-0006821.00 Leonard R. St. Sauver City of La Quinta 78495 Calle Tampico La Quinta, CA 92253 Subject: Professional Surveying Services Silver Rock Park Venue Site La Quinta, CA Dear Leonard, N V 5 Email: Istsa u ve@ l a-o u i nta .o r Pursuant to your request, we are pleased to present our proposal for providing construction -staking services for the above -referenced project. Based upon what we believe to be your goals; we propose to provide the following services on above - mentioned project: Task 1: Control Verify, establish and maintain horizontal and vertical control during the construction staking process. (Control disturbed or destroyed during construction by any panty other than NV5, will be reset/replaced on a time and expenses basis.). Task 2: Sidewalk Provide office calculations and one set of stakes for on -site sidewalks. Sidewalk will be stake on one side only at 25' intervals off set to be determined by client and graded to finish surface. Cut sheets will be provided. Four site visits are included in our fee. Task3: Parking Area Provide office calculations and one set of stakes for Parking area. The edge of the Parking area will be staked at 25' intervals off set to be determined by client and graded to finish grade. Cut sheets will be provided. Three site visits are included in our fee. Task 4: Site Features Provide office calculations and one set of stakes for Site Features which include Crossings over water features and Art Display features. These features will be stake at a offset to be determined by the client and graded to finish surface. Cut sheets will be provided. Two site visits are included in our fee. 42-829 Cook Street, Suite 104 1 Palm Desert, CA 92211 1 www.NV5.com I Office 760.341.3101 1 Fax 760.469.4086 CONSTRUCTION QUALITY ASSURANCE - INFRASTRUCTURE - ENERGY - PROGRAM MANAGEMENT - ENVIRONMENTAL City of La Quinta P26719-0006821.00 Silver Rock Park Venue Site La Quinta, CA September 24, 2019 Page 2 of 4 Task 5: Water Provide office calculations and one set of stakes for water lines. Stakes will be set on a pre -determined offset to centerline of water pipe at intervals of 50 feet, fire hydrants and all appurtenances. Stakes will be set for line only, no grades will be provided. One site visit is included in our fee. Task 6: Sewer Provide office calculations and one set of stakes for sewer lines. Stakes will be set on a pre -determined offset to centerline of sewer pipe at intervals of 25 feet and all appurtenances. Grades will be marked to flow line of sewer pipe. Cut sheets will be provided. One site visit is included in our fee. Task 7: Block Walls Provide office calculations and one set of stakes for Garden and Retaining Walls. Stakes will be set on a pre -determined offset from the face of wall at 25' intervals and graded to top of footing and top of wall. Cut sheets will be provided. One site visit is included in our fee. Task 8: Restroom Building Provide office calculations and one set of stakes for Restroom Building. Stakes will be set on a pre -determined offset and graded to finish floor. Cut sheets will be provided. One site visit is included in our fee. Task 9: Parking Lot Lights Provide office calculations and one set of stakes for Parking Lot Lights. A stake will be set at each location for the lights in the proposed parking area. Cut sheets will be provided. One site visit is included in our fee. Task 10: Discharge Line Provide office calculations and one set of stakes for the Discharge Line. Stakes will be set on a pre -determined offset and graded to flow line. Cut sheets will be provided. One site visit is included in our fee. Task 11: Trench Drain Provide office calculations and one set of stakes for the Trench Drain. Stakes will be set on a pre -determined offset and graded to flow line and top of grate. Cut sheets will be provided. One site visit is included in our fee. Task 12: Equipment Vaults (per Partell Engineering Plan) Provide office calculations and one set of stakes for the Equipment Vaults. Stakes will be set on a pre -determined offset and graded to finish grade. Cut sheets will be provided. One site visit is included in our fee. Task 13: Meetings/Survey Management Meetings, research, revisions and consultations with client and others as requested or required. ► all hi CONSTRUCTION QUALITY ASSURANCE - INFRASTRUCTURE - ENERGY - PROGRAM MANAGEMENT - ENVIRONMENTAL City of La Quinta P26719-0006821.00 Silver Rock Park Venue Site La Quinta, CA September 24, 2019 Page 3 of 4 Task 14: Additional Services Additional services, stakes, or restaking will be provided when requested by the client on a T&M basis at the applicable Charge Rate Schedule. NV5 will produce the fieldwork order for approval and signature by the client at the time services are provided. PROJECT FEES We propose to provide the foregoing services for the following fees. All fees listed will be considered Time and Materials based upon the attached rate schedule. NV5 will invoice monthly by subtotal groupings based upon time spent on each task. Task 1: Control $4,780 Task 2: Sidewalk $8,920 Task 3: Parking Area $5,900 Task 4: Site Features $3,430 Task 5: Water $2,820 Task 6: Sewer $3,430 Task 7: Block Walls $1,795 Task 8: Restroom Building $1,170 Task 9: Parking Lot Lights $1,730 Task 10: Discharge Line $1,235 Task 11: Trench Drain $1,105 Task 12: Equipment Vaults $1,475 Task 13: Meetings/Survey Management $3,200 Task 14: Additional Services $10,000 Total Not to Exceed Budget $50,990 We propose to provide the foregoing on a time and expense basis with an estimated budget of $50,990. These services are to be included in the on call agreement between the City of La Quinta and NV5. The client will provide a digital copy of the files in AutoCAD format. Per your direction, this is a prevailing wage project. CONSTRUCTION QUALITY ASSURANCE - INFRASTRUCTURE - ENERGY - PROGRAM MANAGEMENT - ENVIRONMENTAL City of La Quinta P26719-0006821.00 Silver Rock Park Venue Site La Quinta, CA September 24, 2019 Page 4 of 4 This opportunity to provide continued service to you is appreciated. If you have any questions, please contact me at 760.341.3101. Sincerely, NV5, Inc. ay F'�hrion, PLS Office/Survey Manager Attachment: NV5 Charge Rates Accepted By: Leonard R. St. Sauver ignature / Print Name Date: P26719-0006821.00 NV5 " ?�?4 �4 �0 4; Paul Robotta, PLS Director of Survey, VP CONSTRUCTION QUALITY ASSURANCE - INFRASTRUCTURE - ENERGY - PROGRAM MANAGEMENT - ENVIRONMENTAL NV5 CHARGE RATES NV5 would like to bill the City on a monthly basis. The billings will include fees earned for the billing period. Project will be billed on a Time & Materials not to exceed for each project authorization per the rate sheet included with this proposal. Possible additional charges if requested by the City may include geotechnical testing, UAV or aerial topography, and mileage if over 40 miles from the City. UFf1Gt Technical Services Engineering Aide/Planning Aide................................................................................................. $55.00/hour ProjectAssistant....................................................................................................... •----............. $70.00/hour ProjectAdministrator................................................................................................................... $85.00/hour CADDTechnician I........................................................................................................................ $90.00/hour CADDTechnician II.....................................................................................................................$110.00/hour CADDTechnician III....................................................................................................................$115.00/hour Senior CADD Technician/Designer...........................................................................................$120.00/hour DesignSupervisor ................... ................................................................................................... $130.00/hour Professional Junior Engineer/Planner/Surveyor............................................................................................. $75.00/hour Assistant Engineer/Planner/Surveyor......................................................................................$100.00/hour Associate Engineer/Planner/Surveyor.....................................................................................$115.00/hour Senior Engineer/Planner/Surveyor................................................. ......................................... $130.00/hour StructuralEngineer....................................................................................................................$150.00/hour Manager..................................................................................................................................... $165.00/hour Associate.... .............................................................................................................................. .. $195.00/hou r Principal...................................................................................................................................... $210.00/hour Construction Management JuniorField Engineer................................................................................................................. $141.00/hour Assistant Field Engineer............................................................................................................$166.00/hour AssociateField Engineer...........................................................................................................$183.00/hour Senior Field Engineer ......................... ....................................................................................... $193.00/hour ConstructionManager...............................................................................................................$198.00/hour Surveying 1-Person Survey Crew................................................................................................................$140.00/hour 2-Person Survey Crew................................................................................................................ $240.00/hou r 3-Person Survey Crew................................................................................................................$280.00/hour SurveyManager.........................................................................................................................$160.00/hour EXPENSU Plotting and In -House Reproduction.............................................................................................. 1.15 x Cost Subsistence..................................................................................................................................... 1.15 x Cost Other Expenses - Including Subconsultants & Purchased Services through Subcontracts ...... 1.15 x Cost Mileage - Outside Local Area.......................................................................................Per Accepted IRS Rate Rates are effective one year from issuance. If contract assignment extends beyond that date, NV5 will meet with the city to confirm a mutually acceptable increase not to exceed the Consumer Price Index for Riverside County rates based on "Prevailing Wage" (PW) for Construction Management and Surveying. Note: Each individual project will be based upon a detailed not -to -exceed fee proposal using a project specific scope of services.