Loading...
20200627 Staking Notes SSCO Alongi BldgProject Name:�IL'Veizy&Gk-- Vxj4g S['T-E Client: 65i'Fl of % OlixtAsTA Job Number; opodD-78.03 Weather: Date: - 202y Work ordered by: of at on Work Order received by: of Nolte at on Client has ordered staking per: ❑ Approved Plans Unapproved Plans Personnel Survey Manager S Senior Surveyor S7 ' T` Associate Surveyor Sa Assistant Surveyor S9 Junior Surveyor SJ Senior Party Chief S2* Associate Party Chief S2* Assistant Party Chief S2* Associate Field Surveyor S2* Assistant Field Surveyor S2* Junior Field Surveyor S2* -UCP4ULc LaMr %-VUe Detailed Work Request Request Completion Date i Detailed Work Report It Is agreed that the company making the above request Is liable for the charges of said request as stated above, If Client has ordered staking per unapproved plans, Client accepts all risk for any additional re -staking costs, Contract: T&M: _ Signed: AUTHORIZED CLIENT REPRESENTATIVE DATE Total T&M Charge: $ Signed: AUTHORIZED NOLTE REPRESENTArm DATE WHITE: OFFICE COPY YELLOW: FIELD COPY PINK: CLIENT COPY i J NV5.1nc. 42-929 Cook Street, Suite 104 Pahu Dcscrt, CA 94211 let: (760)341-3101 Fax:(760)469-4096 REQUEST FOR SURVEY STAKING Note: This form must be faxed to NV5's of Ice a minimum of 48 hours in advance of requested staking to allow for office calculations. All work needed must be included in fax; if not included, client must not expect NV5 Survey Crews to commence work. *Information to be completed by NV5. All other information to be completed by client, REQUEST FROM: COMPANY NAME: DATE: TIME: �Kc�T' U N 1 C' 1251 2c� *REQUEST RECER'FD B`Y: *JOB 4: *DATE: *TIME: NAME: ., . r�a....v ... V U co ■ c LP l%-u nD3, a1L"rr. a 1 AgliNfr, JE W N:K, L I U.). ti TO BE STAKED PER: DRAWING NO. SHEET NO. LATEST REVISION DATF/A AREA TO BE STAKED (USE STATIONS IF APPLICABLE): OFFSET DISTANCE: ON WHICH SIDE? (Right or Left looking up station): bFECIFIC INSTRUCTION (Be specific — mark up and fax portions of plans for clarity): * CONTRACT INFO: * 1S WORK REQUESTED INCLUDED IN CONTRACT? YES NO DATE AND TIME REQUESTED FOR SURVEY CREW TO BEGIN WORK: DATE AND TIME SURVEYORS ARE ABLE TO SCHEDULE CREWS: WO: 226719-0000078.03 SHEET No. I OF _ CLIENT/CONTRACTOR NIV15 CITY OF LA [� 6NT2 -2020 PREPARED BY: D:e DATE: 42-829 COOK ST., SUITE 104 PALM DESERT, CA 92260 CHECKED BY: DATE: 760.341.3101 TEL 760.341.5999 FAX WWW.NV5.COM SCALE: 1 " = 10, CREW: I.IL SILVERROCK PARK VENUE SITE CONSTRUCTION STAKING GRADE SHEET IMPROVEMENTS: REVISED SEWER CLEANOUT AT ALONGI BUILDING B.M. DESC. & ELEV. HORIZONTAL CONTROL: %C qq QI LOCATION VICINITY: ALONGI BLDG. SITE PLAN: SEPARATE PLANS NORTH OFFSET & DESC.: 5' OS (SSCO) STAKED ELEVATIONS TO: INV (INVERT) UNLESS NOTED OTHERWISE REFERENCES & REMARKS; SE = STAKE ELEV. PLAN NOTES/STAKING CHANGES: PLAN DID NOT PROVIDE INVERT AT BLDG SSCO STORED POINTS: p 7- `]d STAKING RECORD: DATE STAKED: G)- Z 7-20 NOTES BY: T I f% CHECKED BY: 1 11086 0.00-1 5' S£ 1 11085 y 11082 -0.00 5' OS NEW SSCO 1 �I f 1 NEW CO SE `l INV 11084 24.26— 5' OS SSCO INV 11081 SE 24.26 NEW SSCO 1 L/ NV 11083 '.� 24.26— 5' OS SSCO IIVV SE 'Z l *** ATTEINTION *** NOTE TO CONTRACTOR THE CONTRACTOR IS CAUTIONED TO OBSERVE THE FOLLOWING RULES IN USING THE GRADE STAKES REFERRED TO ON THIS SHEET FOR THE CONSTRUCTION OF CURBS, SEWERS, DRAINAGE STRUCTURES, ECT, 1. THREE CONSECUTIVE POINTS THAT ARE SHOWN TO BE ON THE SAME RATE OF SLOPE MUST BE USED IN COMMON SO THAT ANY VARIATION FROM A STRAIGHT GRADE MAY BE DETECTED, AND IN CASE ANY SUCH DISCREPANCY IS FOUND, IT SHALL BE REPORTED TO THE ENGINEER PRIOR TO CONSTRUCTION. 2. CONSTRUCTION OF ALL GRAVITY FLOW IMPROVEMENTS SHALL BEGIN AT THE DOWNSTREAM END, 3. WHERE PROPOSED IMPROVEMENTS JOIN AN EXISTING UNDERGROUND PIPELINE OR STRUCTURE, IT SHALL BE EXPOSED BY THE CONTRACTOR AND THE ELEVATION AND LOCATION VERIFIED BY THE ENGINEER PRIOR TO CONSTRUCTION. THIS OFFICE WILL NOT BE RESPONSIBLE FOR ANY ERROR IN GRADE OF FINISHED WORK IF rHE ABOVE RULES ARE NOT FOLLOWED.