Loading...
20200917 Staking Notes 54in SDN V 5 SURVEY WORK REQUEST / DAILY REPORT FORM Project Name: 91.U� R� Job Number: f?Z(�7 (ICf-onco6,0.3 Date: Client: Ci U Weather: sm'piy d� L,� G�t1yn1�►A _ ^ Work ordered by: Work [order received by: Client has ordered staking per: Approved Plans of of Nolte at Unapproved Plans at on on Survey Manager Code Rate S Ho"rs Total Notes Senior Surveyor S7 v _ Associate Surveyor S8 Assistant Surveyor 59 4 _ Junior Surveyor Si YS2* Senior Party Chief Associate Party Chief f S2* Assistant Party Chief S2* Associate Field Surveyor S2* Assistant Field Surveyor S2* junior Field Surveyor S2* tDefault Labor Code Detailed Work ReqUE35t Request Completion Date S7Akrz 0l5 tv,Lf1LSZ A s -ar s-r — ReportDetailod Work It is agreed that the company making the above request is liable for the charges of said request as skated above, if Client has ordered staking per unapproved plans, Client accepts all risk for any additional re -staking costs, Contract: T&M: Signed: --- - [7RTE�- _ ,- Ai�THOFt1ZEbEEPRLENT;L Total T&M Charge: $ Signed: _ _ 17-U AUTHOwEDFOLrE AlPRE NTA'CIVE DATE WHITE: OFFICE COPY YELLOW: FIELD COPY PINK: CLIENT COPY WO: 226719-0000078.03 SHEET No. OF CLIENT/CONTRACTOR: CITY OF LA QUINTA IV,I{ PREPARED BY: DB DATE: 9-25-2020 42-820 COOK ST., SUITE 104 PALM DESERT, CA 02260 CHECKED BY: DATE: 700.841.3101 TEL 700.341.5909 FAX WWW.NV6.COM SCALE: 1" = 20' APPROX. CREW: ESL./ ICI,' SILVERROCK PARK VENUE SITE 7CONSTRUCTION STAKING GRADE SHEET IMPROVEMENTS: STORM DRAINPIPE AND STRUCTURES - 54" RCP B.M. DESC. & ELEV. HORIZONTAL CONTROL: LOCATION/VICINITY: EAST SIDE OF VENUE SITE PLAN: CIVIL SHEET 9 NORTH OFFSET & DESC.: 25' OS (CENTER OF PIPE) UNLESS NOTED OTHERWISE STAKED ELEVATIONS TO: INV (INVERT) UNLESS NOTED OTHERWISE REFERENCES & REMARKS: SE = STAKE ELEV. PLAN NOTES/STAKING CHANGES: STORED POINTS: STAKING RECORD: DATE STAKED: 11- I %. > NOTES BY: CHECKED BY: 11294 11292 \ 19.04 INV \� INV. 19.04 25' OS SD MH INV 11+37 �� 25' OS SD MH INV 11 +37 SE SE 11293 3� LINE ONLY 1 9• 04 1 �i 319' OS SD MH INV 11+37 SE'!� k 11291 LINE ONLY 18.16 30' OS SD MH INV 11 +32.33 �1 SIG_. 11rl 8 90 INV 25' OS SD MH INV 11+32.33 SE _ .5 11289 WV 14.65 25' OS SD INV 11+13.58 -/1pX9�gA SE () 61 r a- 11288 INV. 11.13 25' OS SD INV 10+94.84 11286 SE . /I y� INV. 7.62 �.// 25 OS SD MH INV 10+76.09� ; 1ok��2 11282 287 SE 13 i� �1 Z37 INV. 11 287 / � � 25' OS SD INV 10+65. LINE ONLY 7.62 SE 30' SD MH INV 10+76.09 1 SE 11285 LINE ONLY Z37 30' OS SD H INV 10+71.42 C Li — - I� SE I� 1� q"L11284 11283 � ' INV. 7.37 Z37 ' OS MH INV 10+71.42 25' OS SD INV 1045.75 )SD .`7 SE II 57 *** ATTENTION *** NOTE TO CONTRACTOR THE CONTRACTOR IS CAUTIONED TO OBSERVE THE FOLLOWING RULES IN USING THE GRADE STAKES REFERRED TO ON THIS SHEET FOR THE CONSTRUCTION OF CURBS, SEWERS, DRAINAGE STRUCTURES, ECT. 1. THREE CONSECUTIVE POINTS THAT ARE SHOWN TO BE ON THE SAME RATE OF SLOPE MUST BE USED IN COMMON SO THAT ANY VARIATION FROM A STRAIGHT GRADE MAY BE DETECTED, AND IN CASE ANY SUCH DISCREPANCY IS FOUND, IT SHALL BE REPORTED TO THE ENGINEER PRIOR TO CONSTRUCTION. 2. CONSTRUCTION OF ALL GRAVITY FLOW IMPROVEMENTS SHALL BEGIN AT THE DOWNSTREAM END. 3. WHERE PROPOSED IMPROVEMENTS JOIN AN EXISTING UNDERGROUND PIPELINE OR STRUCTURE, IT SHALL BE EXPOSED BY THE CONTRACTOR AND THE ELEVATION AND LOCATION VERIFIED BY THE ENGINEER PRIOR TO CONSTRUCTION. THIS OFFICE WILL NOT BE RESPONSIBLE FOR ANY ERROR IN GRADE OF FINISHED WORK IF THE ABOVE RULES ARE NOT FOLLOWED.