Loading...
NV5 Daily and Staking Grade Sheet 2019-10-11 Parking LotProject Name: Client: 0! L-A teOt r TA Job Number: 2-2-lo 1 II I �D000UO '7 Weather: Date: J 11 120} rs Work ordered by: of at on Work Order received by: of Nolte at on Client has ordered staking per: Approved Plans Unapproved Plans n I' Personnel Manager WSurvey S Rate I Hoursi Total Notes v Senior Surveyor S7 Associate Surveyor S8 Assistant Surveyor S9 Junior Surveyor S] Senior Party Chief S2* Associate Party Chief S2* Assistant Party Chief S2* Associate Field Surveyor S2* Assistant Field Surveyor S2* Junior Field Surveyor S2* -vereuu Laoor koae Detailed Work Request Request Completion Date I Detailed Work Report t, It is agreed that the company making the above request is liable for the charges of said request as stated above, If Client has ordered staking per unapproved plans, Client accepts all risk for any additional re -staking costs, Contract: T&M: Total T&M Charge: $ WHITE: OFFICE COPY Signed: 7/--- Signed: YELLOW: FIELD COPY RE ER[t SENTp7[VE L7X/TfE ✓� I lit i REPRESE14TAVIVE DATE PINK: CLIENT COPY WO: 226719-0000078.03 SHEET No. 9 OF 3 CLIENT/CONTRACTOR:. CITY OF LA QUINTA N�V15 PREPARED BY: DB DATE: 10-9-2019 42-829 COOK ST., SUITE 104 PALM DESERT, CA 02260 CHECKED BY: DATE: SCALE: 1 " = 30' CREW: 700.341.3101 TEL 700.341.5990 FAX WWW.NV6.COM SILVERROCK PARK VENUE SITE CONSTRUCTION STAKING GRADE SHEET IMPROVEMENTS: PARKING AREA EDGING B.M. DESC. & ELEV. (MBI) HORIZONTAL CONTROL: (MBI) LOCATION VICINITY: PARKING AREAS PLAN: SHEETS G-3, G-4, G-5, G-6 NORTH [OFFSET & DESC.: 3'OS STEEL EDGING (SEE DETAIL SHT. L1.10 F) UNLESS NOTED OTHERWISE STAKED ELEVATIONS TO: FG (FINISH GRADE) REFERENCES & REMARKS: SE = STAKE ELEV. PLAN NOTES/STAKING CHANGES: STORED POINTS: STAKING RECORD: DATE STAKED: Q (0 'Z0\NOTES BY: `7t / CHECKED BY: , FG24.000 3' OS FG EDGE AT PCC 10096 r jd SE y� 10077 211 1^FG FG 24.210 '��3' 0$ FG EDGE $ 3' OS FG EDGE z SE Z 0 SE E 3s1.85' 10095 .340 ' FG 3' OS FG EDGE 2`• —st 452F 10094 F kk —22.560 �' FG 3' OS FG EDGE 24 24F8 10093 0 3 FG a� 22.780 SO S FG SE E-ZZ � 23.4 10092 � G 110091 _ FG OS EDGE PCC 23.210 3' FG AT 3. FG ED 2 3 01 70090 23.710 FG 124,700 10088 Z 3' OS FG EDGEFG 10089 sE 24.200 , a""!]�G 3' 05 FG E0 SE 3' OS FG EDGE SE 2 7 10087 •25.500 FG 3' OS FG EDGE COR SE 36 FG 500 )S FG EDGE COR *** ATTENTION *** NOTE TO CONTRACTOR THE CONTRACTOR IS CAUTIONED TO OBSERVE THE FOLLOWING RULES IN USING THE GRADE STAKES REFERRED TO ON THIS SHEET FOR THE CONSTRUCTION OF CURBS, SEWERS, DRAINAGE STRUCTURES, ECT, 1. THREE CONSECUTIVE POINTS THAT ARE SHOWN TO BE ON THE SAME RATE OF SLOPE MUST BE USED IN COMMON SO THAT ANY VARIATION FROM A STRAIGHT GRADE MAY BE DETECTED, AND IN CASE ANY SUCH DISCREPANCY IS FOUND, IT SHALL BE REPORTED TO THE ENGINEER PRIOR TO CONSTRUCTION. 2, CONSTRUCTION OF ALL GRAVITY FLOW IMPROVEMENTS SHALL BEGIN AT THE DOWNSTREAM END. 3. WHERE PROPOSED IMPROVEMENTS JOIN AN EXISTING UNDERGROUND PIPELINE OR STRUCTURE, IT SHALL BE EXPOSED BY THE CONTRACTOR AND THE ELEVATION AND LOCATION VERIFIED BY THE ENGINEER PRIOR TO CONSTRUCTION, THIS OFFICE WILL NOT BE RESPONSIBLE FOR ANY ERROR IN GRADE OF FINISHED WORK IF THE ABOVE RULES ARE NOT FOLLOWED. WO: 226719-0000078.03 SHEET No. OF CLIENT/CONTRACTOR: CITY OF LA QUINTA NIV�5 PREPARED BY: DB DATE: 10-9-2019 42-829 COOK ST., SUITE 104 PALM DESERT, CA 02260 CHECKED BY: DATE: " 30' 760.341.3101 TEL 760.341.6999 FAX WWW.NV6.COM SCALE: 1 = CREW: vo SILVERROCK PARK VENUE SITE CONSTRUCTION STAKING GRADE SHEET IMPROVEMENTS: PARKING AREA EDGING B.M. DESC. & ELEV. (MBI) HORIZONTAL CONTROL: (MBI) LOCATION VICINITY: PARKING AREAS PLAN; SHEETS G-3, G-4, G-5, G-6 NORTH OFFSET & DESC.: 3' OS STEEL EDGING (SEE DETAIL SHT. L 1.10 F) UNLESS NOTED OTHERWISE STAKED ELEVATIONS TO: FG (FINISH GRADE) REFERENCES & REMARKS: SE = STAKE ELEV. PLAN NOTES/STAKING CHANGES: STORED POINTS: STAKING RECORD: DATE STAKED: U I NOTES BY: CHECKED BY: , 10066 3' OS FG EDGE FG 21.640 SE 3' DSSE G EDGE —'FG21080❑ �_ 067 10.69 FG OS FG EDGE '3OS 3' OS FG EDGE SE I (� 1 QD6$ 21� 2 .—F41.$$0�4 ]S FG EDGE `_ r SE 10101 ,E 10069 20.900 �1 FG �G 1 D 130 OS FG l7GE sE I FG EDGE 20.9:X3' 0 _ 30 , 09 �E 21.15 �FG f1.15Q10099 2140O �3 OS FG EDSE P (2 10098 �� 21.B5D FG �3' OS FG ED� SE �c) 10097 FG 21 9 21.900 n� 3' OS FG DGE SE IZI 16H 10096 FG ---�22.120 3OS FG EDGE SE *** ATTENTION *** NOTE TO CONTRACTOR THE CONTRACTOR IS CAUTIONED TO OBSERVE THE FOLLOWING RULES IN USING THE GRADE STAKES REFERRED TO ON THIS SHEET FOR THE CONSTRUCTION OF CURBS, SEWERS, DRAINAGE STRUCTURES, ECT 1. THREE CONSECUTIVE POINTS THAT ARE SHOWN TO BE ON THE SAME RATE OF SLOPE MUST BE USED IN COMMON SO THAT ANY VARIATION FROM A STRAIGHT GRADE MAY BE DETECTED, AND IN CASE ANY SUCH DISCREPANCY IS FOUND, IT SHALL BE REPORTED TO THE ENGINEER PRIOR TO CONSTRUCTION. 2. CONSTRUCTION OF ALL GRAVITY FLOW IMPROVEMENTS SHALL BEGIN AT THE DOWNSTREAM END. 3 WHERE PROPOSED IMPROVEMENTS JOIN AN EXISTING UNDERGROUND PIPELINE OR STRUCTURE, IT SHALL BE EXPOSED BY THE CONTRACTOR AND THE ELEVATION AND LOCATION VERIFIED BY THE ENGINEER PRIOR TO CONSTRUCTION. THIS OFFICE WNLL NOT BE RESPONSIBLE FOR ANY ERROR IN GRADE OF FINISHED WORK IF THE ABOVE RULES ARE NOT FOLLOWED. W0: 226719-0000078.03 SHEET No. 13 OF NIV15 CLIENT/CONTRACTOR _CITY OF LA QUINTA PREPARED BY: �B _ DATE: 10-9-2019 42-829 COOK ST., SUITE 104 PALM DESERT, CA 02260 CHECKED BY: _ _ DATE: 700.341.3101 TEL 760.341.6999 FAX WWW.NV5.COM SCALE: 1 ,, = 30' CREW: SILVERROCK PARK VENUE SITE CONSTRUCTION STAKING GRADE SHEET IMPROVEMENTS: PARKING AREA EDGING B.M. DESC. & ELEV. (MBI) HORIZONTAL CONTROL: (MBI) LOCATION/VICINITY: PARKING AREAS PLAN: SHEETS G-3, G-4, G-5, G-6 NORTH OFFSET & DESC.: 3'OSSTEEL EDGING (SEE DETAIL SHT. L 1.10 F) UNLESS NOTED OTHERWISE STAKED ELEVATIONS TO: FG (FINISH GRADE) REFERENCES & REMARKS: = PLAN NOTES/STAKING CHANGES: SE STAKE ELEV.STORED POINTS: STAKING RECORD: DATE STAKED: I� 1.�� �C� NOTES BY: �`� CHECKED BY: 10109 jj]] C 20'600 G 3' OS FG EDGE CORNER SE 10108 0060 0�20.600 G 500 3' OS FG EDGE CORNER 3NER 20.6 SE 0061 500_� 2!5 10107 p ?NER 20.440 FG — E OS FG EDGE 10062 � 7. - t1.390 10106 20.320 3' OS FG GE 10063 SE .1 21.29❑ G EDGE 10105 _ 1.200 20.200 FG ' 21.200 � 3' OS FG EDGE LP EDGE LP�� 21.2 s[ ZI 2 10104 �� 1.430 20.280 ��FG ?EDGE ��� sE S �Fg f!)GE 103 480 — FG 640 )�� ~� 3 20OS FG EDGE 40 :DGE37 SE } 7 70 10102 20,690 FG *** ATTENTION ••+ 1�10TE TO CONTRACTOR THE CONTRACTOR IS CAUTIONED TO OBSERVE THE FOLLOWING RULES IN USING THE GRADE STAKES REFERRED TO ON THIS SHEET FOR THE CONSTRUCTION OF CURBS, SEWERS, DRAINAGE STRUCTURES, ECT I. THREE CONSECUTIVE POINTS THAT ARE SHOWN TO BE ON THE SAME RATE OF SLOPE MUST BE USED IN COMMON SO THAT ANY VARIATION FROM A STRAIGHT GRADE MAY BE DETECTED, AND IN CASE ANY SUCH DISCREPANCY IS FOUND, IT SHALL BE REPORTED TO THE ENGINEER PRIOR TO CONSTRUCTION. 2. CONSTRUCTION OF ALL GRAVITY FLOW IMPROVEMENTS SHALL BEGIN AT THE DOWNSTREAM END- 3 WHERE PROPOSED IMPROVEMENTS JOIN AN EXISTING UNDERGROUND PIPELINE OR STRUCTURE, IT SHALL BE EXPOSED BY THE CONTRACTOR AND THE ELEVATION AND LOCATION VERIFIED BY THE ENGINEER PRIOR TO CONSTRUCTION. HIS OFFICE WILL NOT BE RESPONSIBLE FOR ANY ERROR UV GRAI]F nF- ciA,icucn All%n i Iw r ,t - -