Loading...
2020 07 07 Urban Habitat Change Orders 9 & 10City of La Quinta CITY COUNCIL MEETING: July 7, 2020 STAFF REPORT AGENDA TITLE: APPROVE CHANGE ORDER6 NO. 9 AND NO. 10 TO CONTRACT WITH URBAN HABITAT FOR THE SILVERROCK PARK VENUE PROJECT NO. 2016-08 FOR ALONGI BUILDING PAD AND MISCELLANEOUS ADDITIONAL WORK REQUESTS RECOMMENDATION Approve Change Order No. 9 in the amount of $98,161 and Change Order No. 10 in the amount of $30,345 to Fontract with Urban Habitat for the SilverRock Park Venue 3roject Alongi building pad and miscellaneous additional work requests; and authorize the City Manager to execute the change order. EXECUTIVE SUMMARY • On August 6, 2019, a contract was awarded to Urban Habitat (Contractor) for the construction of the La Quinta SilverRock Park Venue Project (Project) (Attachment 1) and construction began in September 2019. • On January 21, 2020, Council approved funding in the amount of $330,000 for engineering and construction of the Alongi building. • Change Order No. 9 (Attachment 2) includes improvements for the Alongi building in the amount of $98,161 for the foundation pad and utility adjustments. • Change Order No. 10 (Attachment 3) relates to miscellaneous additional work in the amount of $30,345 which includes an overflow to the lake system and over-excavation and compaction for the restroom foundation. FISCAL IMPACT There are sufficient funds in the project budget (Account No. 401-0000-60188, Project No. 151608) for the lake system overflow and over-excavation of the restroom in the amount of $30,345. The following table shows the projects budgeted revenue sources: Budget Arts in Public Spaces $ 300,000 CONSENT CALENDAR ITEM NO.  75 Measure G Funding $ 1,621,900 Park & Rec DIF Fund $ 2,400,000 Quimby Funding $ 2,000,000 Total Budget: $ 6,321,900 The Alongi building improvements in the amount of $98,161 are budgeted separately in Account No. 101-1007-71050 and there are sufficient funds available for this work. The following is a list of all change orders to date: Total Contract Original Contract Amount: $ 4,218,880 Contract Change Order No. 1: $ 5,630 Contract Change Order No. 2: $ 8,759 Contract Change Order No. 3: $ 42,996 Contract Change Order No. 4: $ 35,195 Contract Change Order No. 5: $ 209,856 Contract Change Order No. 6: $ 321,900 Contract Change Order No. 7: $ 3,563 Contract Change Order No. 8: $ (14,695) This Contract Change Order No. 9: $ 98,161 This Contract Change Order No. 10: $ 30,345 Final Contract Amount: $ 4,960,590 BACKGROUND/ANALYSIS Proposed Change Order No. 9 is recommended for approval in the amount of $98,161 for the grading and construction of the Alongi building pad and necessary utility adjustments. Proposed Change Order No. 10 is recommended for approval in the amount of $30,345 for installation of an additional overflow to the lake system line from the top lake to the existing basin and for over-excavation and compaction for the restroom foundation. In an abundance of caution, the additional overflow from the top of the lake system to the existing basin will prevent an accident or large storm from flooding or affecting the park. Additionally, the soils engineer recommended an added step of over-excavation and compaction prior to the installation of the restroom foundation. ALTERNATIVES Council may elect to not approve these change orders. Prepared by: Julie Mignogna, Management Analyst Approved by: Bryan McKinney, P.E., Public Works Director/City Engineer 76 Attachments: 1. Project Vicinity Map 2. Change Order No. 9 3. Change Order No. 10 77 78 79 80 CONTRACT: SilverRock Park Venue PROJECT NO. 2016-08 CONTRACTOR: Urban Habitat PO Box 1177 La Quinta, CA 92247 CONTRACT CHANGE ORDER NO. 9 Pursuant to the terms of the original Contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated all work shall conform to the terms, general conditions, and special provisions of the original Contract. DESCRIPTION OF CHANGE This Contract Change Order allows for Alongi Building Pad and Utility Adjustment Total $ 98,160.57 By reason of this contract change order the time of completion is adjusted as follows: - 6 - days added to contract time. The contract completion date shall be: 8/14/2020 Submitted By:Date: Approved By:Date: We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, perform all labor, except as may be noted above, and perform all services necessary to complete the above specified work, and hereby accept as full payment the amount shown above, which includes all direct and indirect overhead expenses for any delays. Accepted By:Title: Contractor:Date: Previous Contract Amount Through CCO #8 $4,832,398.97 Add This Change Order No. 9 $98,160.57 Revised Contract Total $4,930,559.54 $77$&+0(17 81 82 CONTRACT: SilverRock Park Venue PROJECT NO. 2016-08 CONTRACTOR: Urban Habitat PO Box 1177 La Quinta, CA 92247 CONTRACT CHANGE ORDER NO. 10 Pursuant to the terms of the original Contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated all work shall conform to the terms, general conditions, and special provisions of the original Contract. DESCRIPTION OF CHANGE This Contract Change Order allows for Installation of an overflow for lake system Total $ 24,512.23 This Contract Change Order allows for Over Excavation for restroom Total $ 5,832.69 By reason of this contract change order the time of completion is adjusted as follows: - 10 - days added to contract time. The contract completion date shall be: 8/20/2020 Submitted By:Date: Approved By:Date: We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, perform all labor, except as may be noted above, and perform all services necessary to complete the above specified work, and hereby accept as full payment the amount shown above, which includes all direct and indirect overhead expenses for any delays. Accepted By:Title: Contractor:Date: Previous Contract Amount Through CCO #9 $4,930,559.54 Add This Change Order No. 10 $30,344.92 Revised Contract Total $4,960,904.46 $77$&+0(17 83 84