2020 08 04 Urban Habitat Change Order 11City of La Quinta CITY COUNCIL MEETING: August 4, 2020 STAFF REPORT AGENDA TITLE: APPROVE CHANGE ORDER NO. 11 TO CONTRACT WITH URBAN HABITAT FOR THE SILVERROCK PARK VENUE PROJECT NO. 2016-08 FOR IRRIGATION POINT OF CONNECTION MODIFICATION, SEWER LINE MODIFICATION, RESTROOM CIRCUIT BREAKER PANEL, AND REPLACE STOLONS WITH HYDROSEED RECOMMENDATION Approve Change Order No. 11 in the amount of $60,602, to Contract with Urban Habitat for the SilverRock Park Venue project irrigation point of connection modification, sewer line modification, restroom circuit breaker panel, and replace stolons with hydroseed; and authorize the City Manager to execute the change order. EXECUTIVE SUMMARY •On August 6, 2019, a contract was awarded to Urban Habitat (Contractor) for the construction of the La Quinta SilverRock Park Venue Project (Project) (Attachment 1) and construction began in September 2019. •Change Order No. 11 (Attachment 2) includes improvements for irrigation point of connection modifications in the amount of $78,485 to add a second pump at the existing lake on-site to provide water for the irrigation system. This change order also includes improvements for sewer line modifications in the amount of $5,712 to modify the point of connection to the restroom building. •Change Order No. 11 includes the addition of a 3-phase 30 circuit electric panel attached to the restroom in the amount of $760. The change order also includes a credit for replacing stolons with hydroseed in the amount of $24,356. FISCAL IMPACT There are sufficient funds in the project budget (Account No. 401-0000-60188, Project No. 2016-08) for the irrigation point of connection modification, sewer line modification, and circuit breaker panel in the amount of $60,602. This change order amount also accounts for a credit for replacing stolons with hydroseed. The following table shows the projects budgeted revenue sources: CONSENT CALENDAR ITEM NO. 7 83 Budget Arts in Public Spaces $ 300,000 Measure G Funding $ 1,621,900 Park & Rec DIF Fund $ 2,400,000 Quimby Funding $ 2,000,000 Total Budget: $ 6,321,900 The following is a list of all change orders to date: Total Contract Original Contract Amount: $ 4,218,880 Contract Change Order No. 1: $ 5,630 Contract Change Order No. 2: $ 8,759 Contract Change Order No. 3: $ 42,996 Contract Change Order No. 4: $ 35,195 Contract Change Order No. 5: $ 209,856 Contract Change Order No. 6: $ 321,900 Contract Change Order No. 7: $ 3,563 Contract Change Order No. 8: $ (14,695) Contract Change Order No. 9: $ 98,161 Contract Change Order No. 10: $ 30,345 This Contract Change Order No. 11 $ 60,602 Final Contract Amount: $ 5,021,192 BACKGROUND/ANALYSIS Proposed Change Order No. 11 is recommended for approval in the amount of $60,602 for the following: Irrigation point of connection modification and sewer line modification in the amount of $78,485. The irrigation point of connection needs to be modified because the original point of connection location could not be found. Adding a second pump to pull water directly from the existing lake was determined to be the most cost-efficient option to provide irrigation water to the site. Staff is currently coordinating with the Coachella Valley Water District to ultimately convert the lake water on the Venue Site from well water to canal water. Once this coordination is completed, Staff will bring this option for Council’s consideration. The sewer line alignment at the restroom, in the amount of $5,712, is recommended to be modified for functionality to reduce the amount of joints in the line, which will help with maintenance in the future. The addition of a 3-phase 30-circuit electric panel attached to the restroom, in the amount of $760, is recommended to have a safer system with the ability to expand in the future. The panel provided with the restroom building does 84 not contain enough breaker spaces for all the circuits indicated on the drawings, or for any future loads. The proposed Change Order No. 11 also accounts for a credit in the amount of $24,356 for replacing stolons with hydroseed. Aside from receiving a credit to change material, hydroseed was also chosen to replace stolon because it will cover the area better and there will be less labor involved. Staff does not recommend approval of adding irrigation and soil preparation for the overflow parking lot at this time. ALTERNATIVES Council may elect to not approve the change order or approve only parts of the change order. Prepared by: Julie Mignogna, Management Analyst Approved by: Bryan McKinney, P.E., Public Works Director/City Engineer Attachments: 1.Project Vicinity Map 2. Change Order No. 11 85 86 13187 88 Sheet 1 of 13 CONTRACT: SilverRock Park Venue PROJECT NO. 2016-08 CONTRACTOR: Urban Habitat PO Box 1177 La Quinta, CA 92247 CONTRACT CHANGE ORDER NO. 11 Pursuant to the terms of the original Contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated all work shall conform to the terms, general conditions, and special provisions of the original Contract. DESCRIPTION OF CHANGE This Contract Change Order allows for Restroom Sewer Realignment (2d) Total $ 5,712.40 This Contract Change Order allows for a Second Pump at the existing lake on-site (10d) Total $ 78,485.40 This Contract Change Order allows for Restroom 3-phase 30-circuit Panel (0d) Total $ 759.59 This Contract Change Order is a credit for replacing solons with hydroseed (0d) Total $(24,355.52) By reason of this contract change order the time of completion is adjusted as follows: - 12 - days added to contract time. The contract completion date shall be: 9/8/2020 Submitted By: Date: Approved By: Date: We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, perform all labor, except as may be noted above, and perform all services necessary to complete the above specified work, and hereby accept as full payment the amount shown above, which includes all direct and indirect overhead expenses for any delays. Accepted By: Title: Contractor: Date: Previous Contract Amount Through CCO #10 $4,960,589.71 Add This Change Order No. 11 $60,601.87 Revised Contract Total $5,021,191.58 ATTACHMENT 2 89 CHANGE ORDER PROJECT: SILVERROCK PARK VENUE CONTRACTOR: URBAN HABITAT OWNER: CITY OF LA QUINTA CHANGE ORDER NUMBER: DATE: PROJECT NO.: ~4 7/29/20 2016-08 CO NTRACT DATE: CONTRACT FOR: Urban Habitat The Contract is changed as follows: Restroom Sewer Realignment (per the attached) $5,712.40 Not valid until si ned b the Owner, Architect and Contractor. The original Contract Sum was Net change by previously authorized Change orders The Contract Sum prior to this Change order was The Contract Sum will be amended by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be amended by The date of Substantial Completion as of the date of this Change Order therefore is $ 4,218,879.75 $ 741,709.71 $ 4,960,589.46 $5,712.40 $ 4,966,301.86 2 days N/A Urban Habitat City of La Quinta SUBCONTRACTO R CONTRACTOR OWNER PO Box 11771 La Quinta, CA92247 Address "]\uJ\ ~ Address BY BY BY~ iM. DATE DATE ili~~l~<),Q DATE AIA Form G701 90 Q ty Units Name Cost Cost Tax Subtotal Labor Material/ Subtotal Bonding Grand Total Each Markup Equipment Markup Takeoff Item: 6" Sewerline 5-7 feet deep Material 66 LF PIPESDR 6" SOR 35 PVC GSKT PIPE SOLID (20 FT) $2.66 $175.56 $15.36 $190.92 $28.64 $219.56 $4.39 $223.95 Material 66 LF #10 Tracer Wire $0.35 $23.10 $2.02 $25.12 $3.77 $28.89 $0.58 $29.47 Material 3 CY Pea Gravel $24.00 $72.00 $6.30 $78.30 $11.75 $90.05 $1.80 $91.85 Labor 8 HR Foreman Labor 6" Sewerline 5- 7 feet deep $80.46 $643.68 $643.68 $160.92 $804.60 $16.09 $820.69 Labor 8 HR Drainage Labor 6" Sewerline 5-7 feet deep $53.26 $426.08 $426.08 $106.52 $532.60 $10.65 $543.25 Labor 8 HR Equipment Operator Labor 6" Sewerline 5-7 feet deep $89.55 $716.40 $716.40 $179.10 $895.50 $17.91 $913.41 Equipment 8 HRS BackHoe 6" Sewerline 5-7 feet deep $49.79 $398.32 $34.85 $433.17 $64.98 $498.15 $9.96 $508.11 Equipment 8 HRS Lazer Level 6" Sewerline 5-7 feet deep $10.00 $80.00 $7.00 $87.00 $13.05 $100.05 $2.00 $102.05 Takeoff Item : Add 6" SDR-35 Cap 4' deep Material 1 EA FTGSWDRN 6" PVC SDR35 CAP (Hub) $8.50 $8.50 $0.74 $9.24 $1.39 $10.63 $0.21 $10.84 Labor 1 HR Drainage Labor Add 6" SDR-35 Cap 4' deep $53.26 $53.26 $53.26 $13.32 $66.58 $1.33 $67.91 Takeoff Item: Excavate and Remove 6" Sewerline- 4' deep Labor 5 HR Foreman Labor Excavate and Remove 6" Sewerline- 4' deep $80.46 $402.30 $402.30 $100.58 $502.88 $10.06 $512.93 Labor 5 HR Drainage Labor Excavate and Remove 6" Sewerline- 4' deep $53.26 $266.30 $266.30 $66.58 $332.88 $6.66 $339.53 Labor 6 HR Equipment Operator Labor Excavate and Remove 6" Sewerline- 4' deep $89.55 $537.30 $537.30 $134.33 $671.63 $13.43 $685.06 Equipment 6 HRS BackHoe Excavate and Remove 6" Sewerline- 4' deep $49.79 $298.74 $26.14 $324.88 $48.73 $373.61 $7.47 $381.08 Takeoff Item : Install new 6" SDR35 wye to Existing sewerline 6.5' deep Material 4 EA FTGSWDRN 6" PVC WYE (Hubx Hub x Hub) $35.78 $143.12 $12.52 $155.64 $23.35 $178.99 $3.58 $182.57 Material 1 EA 6" Fernco $22.00 $22.00 $1.93 $23.93 $3.59 $27.51 $0.55 $28.06 Labor 4 HR Drainage Labor Install new 6" SDR35 wye to Existing sewerline 6.5' deep $53.26 $213.04 $213.04 $53.26 $266.30 $5.33 $271.63 To tal: $5,712.40 91 CHANGE ORD ER PROJECT: SIL VERROCK PARK VENUE CONTRA CTOR: URBAN HABITAT OWNER: CITY OF LA QUINTA CHANGE ORDER NUMB ER: DATE: PROJECT NO.: 35 7/29/20 2016-08 CO NTRACT DATE: CONTRACT FOR: Urban Habitat The Contract is changed as follows: Pump Station (per the attached) $66,758.26 Subcontractor Brudvik Grand Total $ 10,452.00 Markup $ 1,045.20 Subtotal $ 11,497.20 Bonding $ 229.94 Total $ 11,727.14 $ 78,485.40 Not valid until si ned b the 0-.vner, Architect and Contractor. The original Contract Sum was Net change by previously authorized Change orders The Contract Sum prior to this Change order was The Contract Sum will be amended by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be amended by The date of Substantial Completion as of the date of this Change Order therefore is $ 4,218,879.75 $ 741,709.71 $ 4,960,589.46 $78,485.40 $ 5,039,074.86 10 days N/A Urban Habitat City of La Quinta SUBCONTRACTO R CO NTRACTOR OWNER Address Address BY BY DATE DATE AIA Form G701 92 Qty Units Nam e Cost Cost Tax Subotal Labor M aterial Subtotal Bonding Grand Total Each M arkup Equip. M ark up Takeoff Item : 6" Concret e Slab fo r Pum p Ba se- Sub Contract or Subcontract 31 SQ Fr 6" Concrete Slab for Pump Base- Sub Contractor SF $22.00 $682.00 $682.00 $682.00 $13.64 $695.64 Takeoff Item: 6" DUCTILE IRON GATE W/2" OPERATING NUT LEEMCO Material 1 EA 6" Cast Iron Flanged Gate Valve $285.53 $285.53 $24.98 $310.51 $46.58 $357.09 $7.14 $364.23 Material 1 EA TORO 10" ROUND VALVE BOX WI TH BLACK LID $9.56 $9.56 $0.84 $10.40 $1.56 $11.96 $0.24 $12.20 Material 2 LF ft. 8" PVC SDR35 SEWE R PIPE Slee ve $3.81 $7.62 $0.67 $8.29 $1.24 $9.53 $0.19 $9.72 Material 1 EA PURPLE RECLAIMED WATER TAG $2.44 $2.44 $0.21 $2.65 $0.40 $3.05 $0.06 $3.11 Material 2 EA 6" HDPE Flange Adapter DR9 machined to DR11 / Resin 4710 $19.61 $39.22 $3.43 $42.65 $6.40 $49.05 $0.98 $50.03 Material 2 EA NBG Kit 6" STAI NLESS STEEL BO LTS $48.16 $96.32 $8.43 $104.75 $15.71 $120.46 $2.41 $122.87 Material 2 EA Back Up Rings 6" DR7 EPOXY COATED $13.29 $26.58 $2.33 $28.91 $4.34 $33.24 $0.66 $33.91 La bor 1 HR IRRIGATI ON LA BOR 6" DUCTILE IRON GATE W/2" OPERATING NUT LEEMCO $53.26 $53.26 $53.26 $13.32 $66.58 $1.33 $67.91 Takeoff Item : 6"- 45 deg Sch 80 Solvent Weld Material 6 EA 6" 45 ELL, SXS SCH 40 PVC $22.53 $135.18 $11.83 $147.01 $22.05 $169.06 $3.38 $172.44 Material 12 EA NBG Kit 6" STAINLESS STEEL BOLTS $48.16 $577.92 $50.57 $628.49 $94.27 $722.76 $14.46 $737.22 Labor 6 HR Irrigation Labor 6"- 45 deg Sch 80 Solvent Weld $53.26 $319.56 $319.56 $79.89 $399.45 $7.99 $407.44 Takeoff Item : 6" PVC C-900 Irrigation Line and conduit Material 180 Fr 6" CL235 DR 18 PVC PIPE, AWWA C900-07, 20' LENGTHS $4.71 $847.80 $74.18 $921.98 $138.30 $1,060.28 $21.21 $1,081.4~ Material 180 Fr 3" DETECTABLE TAPE IRRIGATION BLUE 1000' ROLL $0.05 $9.00 $0.79 $9.79 $1.47 $11.26 $0.23 $11.48 Material 340 Fr 2" GREY SCH 40 PVC CONDUIT BE, 20' LENGTH $0.68 $231.20 $20.23 $251.43 $37.71 $289.14 $5.78 $294.93 Labor 9 HR Irrigation Labor 6" PVC C-900 Irrigation Line and conduit $53.26 $479.34 $479.34 $119.84 $599.18 $11.98 $611.16 Labor 9 HR Irrigation Labor 6" PVC C-900 Irrigation Line and conduit $53.26 $479.34 $479.34 $119.84 $599.18 $11.98 $611.16 Labor 9 HR Irrigation Labor 6" PVC C-900 Irrigation Line and conduit $80.46 $724.14 $724.14 $181.04 $905.18 $18.10 $923.28 Labor 9 HR Equipment Operator Labor 6" PVC C-900 Irrigation Line and conduit $89.55 $805.95 $805.95 $201.49 $1,007.44 $20.15 $1,027.5~ Equipment 9 HRS BackHoe 6" PVC C-900 Irrigation Line and conduit $49.79 $448.11 $39.21 $487.32 $73.10 $560.42 $11.21 $571.63 Takeoff Item : 6" PVC C-900 Irrigation Line- FILL Line to new POC by Pump Material 260 Fr 6" CL235 DR 18 PVC PIPE, AWWA C900-07, 20' LENGTHS $4.71 $1,224.60 $107.15 $1,331.75 $199.76 $1,531.52 $30.63 $1,562.1~ Material 253 Fr 3" DETECTABLE TAPE IRRIGATION BLUE 1000' ROLL $0.05 $12.65 $1.11 $13.76 $2.06 $15.82 $0.32 $16.14 Labor 13 HR Irrigation Labor 6" PVC C-900 Irrigation Line- FILL Line to new POC by Pump $53.26 $692.38 $692.38 $173.10 $865.48 $17.31 $882.78 La bor 13 HR Irrigation Labor 6" PVC C-900 Irrigation Line- FILL Line to new POC by Pump $53.26 $692.38 $692.38 $173.10 $865.48 $17.31 $882.78 La bor 13 HR Fo reman Labo r 6" PVC C-900 Irrigation Line- FILL Line to new POC by Pump $80.46 $1,045.98 $1,045.98 $261.50 $1,307.48 $26.15 $1,333.6, Labor 13 HR Equipment Operator Labor 6" PVC C-900 Irrigation Line- FILL Line to new POC by Pump $89.55 $1,164.15 $1,164.15 $291.04 $1,455.19 $29.10 $1,484.2~ Equipment 13 HRS BackHoe 6" PVC C-900 Irrigation Line- FILL Line to new POC by Pump $49.79 $647.27 $56.64 $703.91 $105.59 $809.49 $16.19 $825.68 Takeoff Item : 6" PVC SCH Fill line (in Lake) Material 40 Fr 6" CL235 DR 18 PVC PIPE, AWWA C900-07, 20' LENGTHS $4.71 $188.40 $16.49 $204.89 $30.73 $235.62 $4.71 $240.33 Labor 3 HR Foreman Labor 6" PVC SCH RII line (in Lake) $80.46 $241.38 $241.38 $60.35 $301.73 $6.03 $307.76 Labor 3 HR Equipment Operator Labor 6" PVC SCH Fill line (in Lake) $89.55 $268.65 $268.65 $67.16 $335.81 $6.72 $342.53 Equipment 3 HRS BackHoe 6" PVC SCH Fill line (in Lake) $49.79 $149.37 $13.07 $162.44 $24.37 $186.81 $3.74 $190.54 93 Takeoff Item : Concrete Th rust Blocks $0.00 Material 7 EA Concrete Thrust Blocks $15.00 $105.00 $9.19 $114.19 $17.13 $131.32 $2.63 $133.94 La bor 6 HR Irrigation Labo r Concre te Thrust Blocks $53.26 $319.56 $319.56 $79.89 $399.45 $7.99 $407.44 Takeoff Item: Lake Pump- Enclosure Assembly, Skid and Enclosure (Flange to Flange) Material 1 EA La ke Pump- Enclos ure Assembly, Skid and Enclosure (Flange to Flange) $30,857.00 $30,857.00$2,699.99$33,556.99 $5,033.55 $38,590.54 $771.81 $39,362.35' La bor 24 HR Fo reman Labo r La ke Pump- Enclosure Assembly, Skid and Enclosure (Flange to Flange) $80.46 $1,931.04 $1,931.04 $482.76 $2,413.80 $48.28 $2,462.08 La bor 24 HR Irrigation Labo r La ke Pump- Enclosure Assembly, Skid and Enclosure (Flange to Flange) $53.26 $1,278.24 $1,278.24 $319.56 $1,597.80 $31.96 $1,629.76 Labor 24 HR Equipment Operator Labor Lake Pump- Enclosure Assembly, Skid and Enclosure (Flange to $89.55 $2,149.20 Flange) $2,149.20 $537.30 $2,686.50 $53.73 $2,740.2:!i Equipment 8 HRS 10 Ton Lift Lake Pump- Enclosure Assembly, Skid and Enclosure (Flange to Range) $100.00 $800.00 $8.75 $808.75 $121.31 $930.06 $18.60 $948.66 Takeoff Item : Pump suction Line and Strainer Material 12 EA Masonry Blocks $2.25 $27.00 $2.36 $29.36 $4.40 $33.77 $0.68 $34.44 Material 1 EA 6" Pump Suction Screen and Foot Valve $175.00 $175.00 $15.31 $190.31 $28.55 $218.86 $4.38 $223.24 Material 2 EA 5' long x 2" wide Stainless Steel Clamps $125.00 $250.00 $21.88 $271.88 $40.78 $312.66 $6.25 $318.91 Material 10 EA Bags of Grout/Epoxy Bond $15.00 $150.00 $13.13 $163.13 $24.47 $187.59 $3.75 $191.35 Labor 8 HR Irrigation Labor Pump suction Line and Strainer $53.26 $426.08 $426.08 $106.52 $532.60 $10.65 $543.25 Labor 8 HR Foreman Labor Pump suction Line and Strainer $80.46 $643.68 $643.68 $160.92 $804.60 $16.09 $820.69 Takeoff Item : Repair and Replace Existing Irrigation system and Transplant Shrubs Material 1 EA Repair and Replace Existing Irrigation system and Transplant Shrubs $100.00 $100.00 $8.75 $108.75 $16.31 $125.06 $2.50 $127.56 Labor 8 HR Irrigation Labor Repair and Replace Existing Irrigation system and Transplant Shrubs $53.26 $426.08 $426.08 $106.52 $532.60 $10.65 $543.25 Takeoff Item: Rock Base for Pump Pad Material 2 TON Rock Base for Pump Pad $40.00 $80.00 $7.00 $87.00 $13.05 $100.05 $2.00 $102.05 Labor 1 HR Landscape Labor Rock Base for Pump Pad $53.26 $53.26 $53.26 $13.32 $66.58 $1.33 $67.91 Labor 1 HR Landscape Labor Rock Base for Pump Pad $53.26 $53.26 $53.26 $13.32 $66.58 $1.33 $67.91 Labor 1 HR Equipment Operator Labor Rock Base for Pump Pad $89.55 $89.55 $89.55 $22.39 $111.94 $2.24 $114.18 Equipment 1 HRS T300 Bobcat Skid Steer Rock Base for Pump Pad $35.00 $35.00 $35.00 $5.25 $40.25 $0.81 $41.06 Total $66,758.26 94 B ru d v ik , In c . 600 Eugene Road Palm Springs, CA 92264 Phone: (760) 320-4429 Fax: (760) 323-3302 License #482623 CHANGE ORDER REQUEST To: Urban Habitat Date: 7/28/2020 Attn: ---,-~---------- Project: LQ Silverrock Park Venue Job# _ COR# 6R Description of Work: Provide and install a 125-amp 3-pole breaker in main service panel, provide and install feeder conductors, and terminate line voltage conductors to lake pump. Also includes connections to controls provided with packaged pump station. Excludes trenching, conduit, and conduit installation. Price this Request $10,452.00 Signed: Larry "Bo" Ford Brudvik, Inc. Date: 7/28/2020 Accepted: _ Date: _ 95 P r ic e S u mm a r y R e p o rt La Quinta Silverrock Park Venue Add 125-amp circuit for lake booster pump and connect controls Materials $ 4,96 9.68 Sales Tax 9.25% $ 459.70 Subtotal $ 5,429.3 8 Markup 15.00% $ 814.4 1 $ 6,243.78 Supplier Quotes $ Sales Tax 9.25% $ Subtotal $ Markup 15.00% $ $ Subcontractor $ Sales Tax 0.00% $ Subtotal $ Markup 10 .00% $ $ Rental Equipment $ Sales Tax 9.25% $ Subtotal $ Markup 15.00% $ $ Labor Rate Hours $72 .8 7 X 46.2 1 $ 3,367.3 2 Markup 25.0 0% $ 841.83 $ 4,209.15 Subtotal $ 10,452.94 ~ Bond $ 10,452.94 lsell Pric e 10,452.00 I $ 96 Ext Price Labor Unit Ext Labor Item # Item Nam e Q uantity Price Unit Unit Unit 40 12 THHN STR CU BLK 500 W IRE 948.00 $0.265 $251.67 0.006 5.69 43 6 THH N STR CU BLK 2000R W IRE 21 0.00 $1.145 $240.38 0.010 2.20 48 1/0 THH N STR CU BLK 500R WI RE 630.00 $3.704 $2,333.76 0.021 13.23 72 5 1 AL LB Condulet Body 2.00 $11.528 $23.06 0.3 75 0.75 72 7 1-1/2 AL LB Condulet Body 2.00 $23.974 $47.95 0.525 1.05 810 1 AL Condulet Body Cover 2.00 $2.998 $6.00 0.375 0.75 812 1-1/2 AL Condulet Body Cover 2.00 $4.4 70 $8.94 0.000 0.00 823 1 Condulet Body Gasket 2.00 $1.910 $3.82 0.375 0.75 825 1-1/2 Condulet Body Gasket 2.00 $2.224 $4.4 5 0.000 0.00 1,078 3/4" X 12" NIPPLE GRC 2.00 $12.474 $24.95 0.180 0.36 1,089 1" X 12" NIPPLE GRC 4.00 $17.154 $68.62 0.225 0.90 1,10 8 1-1/2"X 6" NIPPLE GRC 2.00 $12.834 $25.67 0.240 0.4 8 1,111 1-1/2"X 12" NIPPLE GRC 4.00 $25.623 $102.4 9 0.240 0.96 1,502 3/4 Locknut 2.00 $0.202 $0.4 0 0.015 0.03 1,503 1 Locknut 4.00 $0.334 $1.3 3 0.023 0.09 1,505 11/2 Locknut 4.00 $0.670 $2.68 0.023 0.09 1,566 3/4 Insul Grn d Bushing-D ie Cast 2.00 $4.630 $9.26 0.270 0.54 1,567 1 Insul Grn d Bushing-D ie Cast 4.00 $4.831 $19.33 0.300 1.20 1,569 11/2 Insul Grn d Bushing-D ie Cast 4.00 $6.590 $26.36 0.3 75 1.50 2,702 3/4 PVC Sch 40 90-degree Elbow 3.00 $0.858 $2.57 0.150 0.4 5 2,703 1 PVC Sch 40 90-degree elbow 4.00 $1.299 $5.20 0.150 0.60 2,705 11/2 PVC Sch 40 90-degree Elbow 4.00 $2.591 $10 .36 0.225 0.90 2,945 3/4 PVC CO UPLI N G 3.00 $0.310 $0.93 0.023 0.07 2,946 1 PVC CO UPLI N G 4.00 $0.4 70 $1.88 0.023 0.09 2,948 11/2 PVC CO UPLI N G 4.00 $0.876 $3.50 0.030 0.12 2,967 3/4 PVC FEM A LE AD PT 2.00 $0.597 $1.1 9 0.2 25 0.45 2,968 1 PVC FEM A LE AD PT 2.00 $0.813 $1.63 0.3 00 0.60 2,970 11/2 PVC FEM A LE AD PT 4.00 $1.292 $5.17 0.375 1.50 3,277 3/4 FLEX W P 6.00 $1.877 $11.2 6 0.075 0.4 5 3,278 1 FLEX W P 10.00 $2.826 $28.26 0.045 0.45 3,280 11/2 FLEX W P 10.00 $4.505 $45.05 0.075 0.75 3,301 3/4 LT Flex Conn-Steel-Str-Jns Thrt 2.00 $10 .539 $21.08 0.13 5 0.27 3,302 1 LT Flex Conn-Steel-Str-Jns Thrt 4.00 $20.711 $82.85 0.150 0.60 3,304 11/2 LT Flex Conn-Stl-Str-Jns Thrt 4.00 $42.325 $169.3 0 0.210 0.84 11 ,844 lG W P BLAN K 1.00 $2.090 $2.09 0.075 0.08 12,289 lG BELL BO X 4HU BS 3/4" 1.00 $15.764 $15.76 0.375 0.38 60,051 Ex cavate Pull Box 1.00 $0.000 $0.00 1.500 1.50 97 60,052 Pull Box Gravel 1.00 $22.500 $22.50 1.050 1.05 60,053 Brick 2.00 $3.750 $7.50 0.000 0.00 60,054 Concrete Pull Box 1.00 $54.000 $54.00 1.500 1.50 60,13 8 125/3 Add-to-Existing w/Hardware 1.00 $1,276.500 $1,276.50 3.000 3.00 ~4 969.68 46.21 98 CHANGE ORDER PROJECT: SILVERROCK PARK VENUE CONTRACTOR: URBAN HABITAT OWNER: CITY OF LA QUINTA CHANGE ORDER NUMBER: DATE: PROJECT NO.: 36 7/29/20 2016-08 CO NTRACT DATE: CO NTRACT FOR: Urban Habitat The Contract is changed as follows: Provide a 3-phase 30-circuit panel with main circuit breaker and distribution breakers in the restroom building Brudvik $677.00 Subcontractor Markup $67.70 Subtotal $744.70 Bonding $14.89 Grand Total $759.59 Not valid until si ned b the Owner Architect and Contractor. The original Contract Sum was Net change by previously authorized Change orders The Contract Sum prior to this Change order was The Contract Sum will be amended by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be amended by The date of Substantial Completion as of the date of this Change Order therefore is $ 4,218,879.75 $ 741,709.71 $ 4,960,589.46 $759.59 $ 4,961,349.05 0 NIA Urban Habitat City of La Quinta SUBCONTRACTOR CO NTRACTOR OWNER Address Address BY BY DATE DATE AIA Form G701 99 Brudvik, Inc. 600 Eugene Road Palm Springs, CA 92264 Phone: (760) 320-4429 Fax: (760) 323-3302 License #482623 CHANGE ORDER REQUEST To: Urban Habitat Date: 7/17/2020 Attn: --------------- Project: LQ Silverrock Park Venue Job# _ COR# 5 Description of Work: Provide a 3-phase 30-circuit panel with main circuit breaker and distribution breakers in the restroom building. Price this Request $677 .00 Signed: Larry "Bo" Ford Brudvik, Inc. Date: 7/17/2020 Accepted: _ Date: ---- 100 CHANGE ORDER PROJECT: SILVERROCK PARK VENUE CONTRACTOR: URBAN HABITAT OWNER: CITY OF LA QUINTA CHANGE ORDER NUMBER: DATE: PROJECT NO.: 37 7/29/20 2016-08 CONTRACT DATE: CONTRACT FOR: Urban Habitat The Contract is changed as follows: Per COR 22, 209,600 square feet of sod was to be replaced with stolons. This change order would change the installation to hydroseed (at a cost of $0.748 per squarefoot, resulting in a furthe credit of $0.1162 per square foot ($24,355.52). 209,600 square feet of hydroseed in lieu of stolons Overflow parking 81,920 squarefeet hydroseeded Credit for Overflow parking soil stabilizer: $0.035/sqft installed Soil prep for overflow parking area Irrigation for overflow parking area Maintenance for overflow parking area Total: $ (24,355.52) $ 6,127.62 $ (2,867.20) $ 10,610.16 $ 41,005.95 $ 3,933.25 $ 34,454.26 Not valid until si ned b the Owner, Architect and Contractor. The original Contract Sum was Net change by previously authorized Change orders The Contract Sum prior to this Change order was The Contract Sum will be amended by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be amended by The date of Substantial Completion as of the date of this Change Order therefore is $ 4,218,879.75 $ 741,709.71 $ 4,960,589.46 $ 34,454.26 $ 4,995,043.72 15 days N/A Urban Habitat City of La Quinta SUBCONTRACTOR CONTRACTOR OWNER Address Address BY BY DATE DATE AIA Form G701 101 102