Loading...
2020 09 15 Urban Habitat Change Orders 12City of La Quinta CITY COUNCIL MEETING: September 15, 2020 STAFF REPORT AGENDA TITLE: APPROVE CHANGE ORDER NO. 12 TO CONTRACT WITH URBAN HABITAT FOR THE SILVERROCK PARK VENUE PROJECT NO. 2016-08 FOR HYDROSEED OF OVERFLOW PARKING LOT AND REDUCTION OF LANDSCAPE AREA IN RETENTION BASIN RECOMMENDATION Approve Change Order No. 12 in the amount of $44,120 to Contract with Urban Habitat for the SilverRock Park Venue project to hydroseed the overflow parking lot and reduce landscaped area in the retention basin; and authorize the City Manager to execute the change order. EXECUTIVE SUMMARY •On August 6, 2019, a contract was awarded to Urban Habitat (Contractor) for the construction of the La Quinta SilverRock Park Venue Project (Project) (Attachment 1) and construction began in September 2019. •Change Order No. 12 (Attachment 2) includes improvements for hydroseeding of the overflow parking lot in lieu of native soil in the amount of $59,072. •Change Order No. 12 also reduces the landscaped area in the retention basin resulting in a credit in the amount of $14,952. FISCAL IMPACT There are sufficient funds in the project budget (Account No. 401-0000-60188, Project No. 2016-08) for the improvements in the amount of $44,120. This change order amount also accounts for a credit for reducing the landscaped area in the retention basin. The following table shows the projects budgeted revenue sources: Budget Arts in Public Spaces $ 300,000 Measure G Funding $ 1,621,900 Park & Rec DIF Fund $ 2,400,000 Quimby Funding $ 2,000,000 Total Budget: $ 6,321,900 CONSENT CALENDAR ITEM NO. 5 129 The following is a list of all change orders to date: Total Contract Original Contract Amount: $ 4,218,880 Contract Change Order No. 1: $ 5,630 Contract Change Order No. 2: $ 8,759 Contract Change Order No. 3: $ 42,996 Contract Change Order No. 4: $ 35,195 Contract Change Order No. 5: $ 209,856 Contract Change Order No. 6: $ 321,900 Contract Change Order No. 7: $ 3,563 Contract Change Order No. 8: $ (14,695) Contract Change Order No. 9: $ 98,161 Contract Change Order No. 10: $ 30,345 Contract Change Order No. 11 $ 60,602 This Contract Change Order No. 12 $ 44,120 Final Contract Amount: $ 5,065,312 BACKGROUND/ANALYSIS Proposed Change Order No. 12 is recommended for approval in the amount of $44,120 for the following: Hydroseed and irrigation of the overflow parking lot in the amount of $59,072. Completing these improvements at this time could provide savings of future soft costs including design and staff resources. If the proposed improvements are not accepted, the overflow parking lot will remain as stabilized native soil. The proposed Change Order No. 12 also accounts for a credit in the amount of $14,952 for reduction of the landscaped area in the retention basin. Staff recommends the reduction because this is not a high visibility area. ALTERNATIVES Council may elect to not approve the change order or approve only parts of the change order. Prepared by: Julie Mignogna, Management Analyst Approved by: Bryan McKinney, P.E., Public Works Director/City Engineer Attachments: 1.Project Vicinity Map 2. Change Order No. 12 130 131131 132 CONTRACT: SilverRock Park Venue PROJECT NO. 2016-08 CONTRACTOR: Urban Habitat PO Box 1177 La Quinta, CA 92247 CONTRACT CHANGE ORDER NO. 12 Pursuant to the terms of the original Contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated all work shall conform to the terms, general conditions, and special provisions of the original Contract. DESCRIPTION OF CHANGE This Contract Change Order allows for improvements for hydroseeding of overflow parking lot (10d) Total $ 59,071.92 This Contract Change Order allows for a credit for shrub removal Total $ (14,951.74) By reason of this contract change order the time of completion is adjusted as follows: - 10 - days added to contract time. The contract completion date shall be: 9/22/2020 Submitted By: Date: Approved By: Date: We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, perform all labor, except as may be noted above, and perform all services necessary to complete the above specified work, and hereby accept as full payment the amount shown above, which includes all direct and indirect overhead expenses for any delays. Accepted By: Title: Contractor: Date: Previous Contract Amount Through CCO #11 $5,021,191.58 Add This Change Order No. 12 $44,120.18 Revised Contract Total $5,065,311.76 ATTACHMENT 2 133 134 135 136