Loading...
2020 10 20 Hermann Design Group - Amend 3City of La Quinta CITY COUNCIL MEETING: October 20, 2020 STAFF REPORT AGENDA TITLE: APPROVE AMENDMENT NO. 3 TO AGREEMENT FOR CONTRACT SERVICES WITH HERMANN DESIGN GROUP, INC FOR ADDITIONAL DESIGN SERVICES FOR THE SILVERROCK EVENT SITE (PROJECT NO. 2016-08) RECOMMENDATION Approve Amendment No. 3 to Agreement for Contract Services with Hermann Design Group, Inc. for SilverRock Event Site design services to include additional construction support and overflow parking lot irrigation design in the scope of services; increase the total not to exceed contract amount to $357,300; and authorize the City Manager to execute the amendment. EXECUTIVE SUMMARY •On July 3, 2018, Council approved a Contract Services Agreement with Hermann Design group, Inc. for the SilverRock Event Site (Agreement). •In March 2020, Amendment No. 1 extended the contract term, and in June 2020, Amendment, No. 2 revised the scope of services. •Amendment No. 3 (Attachment 1) proposes to add construction support and design of the overflow parking irrigation to the scope of services; and will increase the contract sum by $17,800. FISCAL IMPACT There is sufficient funding in the SilverRock Event Site project budget for this amendment (Account No. 401-0000-60185, Project No. 201608D). Contract Services Agreement $339,500 Amendment No. 1 $0 Amendment No. 2 $0 Amendment No. 3 $17,800 Revised Not to Exceed $357,300 CONSENT CALENDAR ITEM NO. 4 39 The following is the total revised SilverRock Venue Site project budget: Design $ 569,159 Design to be paid by Alongi Budget $ (46,955) Professional $ 60,000 Construction Manager $ 125,000 Inspection/Testing/Survey/Monitors $ 89,921 Pre-Construction (Mass Grading) $ 88,630 Bidding Costs $ 4,741 Restroom Building $ 115,291 Construction $ 5,065,312 Change Order to be paid by Alongi Budget $ (98,161) Utility Fees $ 288,021 Contingency $ 60,941 TOTAL $ 6,321,900 BACKGROUND/ANALYSIS On July 3, 2018, Council approved an Agreement with Hermann Design Group to design the SilverRock Venue Site (Project 2016-08) with a not to exceed amount of $339,500. In April 2020, Amendment No. 1 extended the contract term. In June 2020, Amendment No. 2 amended the scope of services to include tasks related to the design of Alongi building and remove tasks related to plumbing and structural design. Due to the additional Alongi building design and the length of construction, additional construction support is needed. Irrigation design services are required for the overflow parking lot and were not included in the original contract scope. Amendment No. 3 includes additional construction support in the amount of $12,800 and overflow parking lot irrigation design in the amount of $5,000 to the scope of services and contract sum. ALTERNATIVES Staff does not recommend other alternatives. Prepared by: Julie Mignogna, Management Analyst Approved by: Bryan McKinney, Public Works Director/City Engineer Attachment: 1. Amendment No. 3 to Agreement for Contract Services 40 AMENDMENT NO. 3 TO AGREEMENT FOR CONTRACT SERVICES WITH HERMANN DESIGN GROUP, INC. This Amendment No. 3 to Agreement for Contract Services (“Agreement”) with Hermann Design Group, Inc. ("Amendment No. 3") is made and entered into as of the 21st day of October 2020 ("Effective Date") by and between the CITY OF LA QUINTA ("City"), a California municipal corporation and Hermann Design Group, Inc. (“Contracting Party”). RECITALS WHEREAS, on or about July 19, 2018, the City and Contracting Party entered into an Agreement to provide those services related to Design of the SilverRock Event Site, Project No. 2016-08. The term of the Agreement expires on June 30, 2021; and WHEREAS, Amendment No. 1, executed on or about April 28, 2020, amended Section 3.4 Term to extend the contract term through June 30, 2021 and Section 4.2 Contract Officer, to designate Bryan McKinney, Public Works Director/City Engineer as the contract officer; and WHEREAS, Amendment No. 2, executed on or about June 12, 2020, amended the Scope of Services to include tasks related to the design of Alongi building and remove tasks related to plumbing and structural design/construction support services for the SilverRock Event Site; and WHEREAS, the City and Contracting Party mutually agree to amend Section 1.1 Scope of Services of the Agreement to include additional construction support and design of overflow parking lot irrigation; and WHEREAS, the City and Contracting Party mutually agree to amend Section 2.1 Contract Sum of the Agreement for a total not to exceed amount of $357,300 due to the amendment to the Scope of Services outlined in the above recital; and NOW THEREFORE, in consideration of the mutual covenant herein contained, the parties agree as follows: AMENDMENT In consideration of the foregoing Recitals and the covenants and promises hereinafter contained, and for good and valuable consideration, the sufficiency and receipt of which are hereby acknowledged, the parties hereto agree as follows: 1.Section 1.1 Scope of Services is amended to include the enhancements listed and depicted in the attached “Exhibit A”, incorporated herewith ATTACHMENT 1 41 by this reference. 2.Section 2.1 Contract Sum is amended to read: 2.1 Contract Sum. For the Services rendered pursuant to this Agreement, Contracting Party shall be compensated in accordance with “Exhibit B” (the “Schedule of Compensation”) in a total amount not to exceed Three Hundred Fifty Seven Thousand Three Hundred Dollars ($357,300) (the “Contract Sum”), except as provided in Section 1.6. “Exhibit B” – Budget is amended as listed in “Exhibit B”, attached hereto and incorporated by this reference. In all other respects, the Original Agreement shall remain in effect. IN WITNESS WHEREOF, the City and Consultant have executed this Amendment No. 3 to the Agreement for Contract Services on the respective dates set forth below. CITY OF LA QUINTA a California municipal corporation 42 Dated: Jon McMillen, City Manager ATTEST: Monika Radeva, City Clerk APPROVED AS TO FORM: William H. Ihrke, City Attorney CONSULTANT: HERMANN DESIGN GROUP, INC. By: Dated: ________________ Name: Chris Hermann Title: CEO/President 43 HERMANN DESIGN GROUP, INC. SCOPE OF WORK SILVERROCK VENUE SITE – CITY OF LA QUINTA “EXHIBIT A” Hermann Design Group (HDG) will provide the services as outlined below. These hours represent anticipated hours spent in the months August through December for the venue site. All other provisions of the professional services agreement shall apply herein. ADDITIONAL CONSTRUCTION SERVICES Additional time will be provided by Hermann Design Group as well as their electrical and architectural subconsultants on an hourly basis not to exceed $12,800. Tasks anticipated to be included are: o RFI Responses and Coordination o Construction Layout o Planting Placement Review o Meetings and Coordination o Irrigation Coverage Testing o Final Punch List o Final Acceptance ADDITIONAL IRRIGATION DESIGN AND DRAFTING The City has tasked Hermann Design Group to provide additional irrigation and design for the overflow parking area. This is requiring the update of ten sheets of the plan set, including irrigation plan, planting plan, and irrigation/planting details. Additionally, we are coordinating with the City for distribution. These services are to be provided on a lump sum basis of $5,000. Exhibit A Scope of Services 44 Exhibit B Budget The maximum total compensation to be paid to Contracting Party for the additional services to be provided under Amendment 1 to the Agreement is Seventeen Thousand Eight Hundred Dollars ($17,800), for a total not to exceed Agreement amount of Three Hundred Fifty-Seven Thousand Three Hundred Dollars ($357,300) (“Contract Sum”). The Contract Sum shall be paid to Consultant in conformance with Section 2.3 of the Agreement. Base Contract Amount: $ 339,500 Amendment No. 1: $0 Amendment No. 2: $0 Amendment No. 3: $17,800 Revised Contract Total: $ 357,300 45 46