2020 05 19 Urban Habitat Change Order 6City of La Quinta CITY COUNCIL MEETING: May 19, 2020 STAFF REPORT AGENDA TITLE: APPROPRIATE FUNDING AND APPROVE CHANGE ORDER NO. 6 TO CONTRACT WITH URBAN HABITAT FOR THE SILVERROCK PARK VENUE PROJECT (NO. 2016-08) FOR STORM DAMAGE REPAIR AND MISCELLANOUS ADDITIONAL WORK REQUESTS RECOMMENDATION Appropriate funding in the amount of $321,900 from Measure G Funds; approve Change Order No. 6 to Contract with Urban Habitat in the amount of $321,900 for the SilverRock Park Venue project for storm damage repair and miscellaneous additional work requests; and authorize the City Manager to execute the change order. EXECUTIVE SUMMARY •On August 6, 2019, a contract was awarded to Urban Habitat (Contractor) for the construction of the La Quinta SilverRock Park Venue Project (Project) (Attachment 1) and construction began in September 2019. •During the bid and award of the Project, a rain event occurred that eroded one of the retention basin slopes and damaged an outlet structure that was planned to be replaced. This damage was made worse by subsequent rain events. •The Contractor requested five bids and received three responses from subcontractors to perform the work. The lowest price was selected in the amount of $256,441. •The additional miscellaneous extra work in the amount of $65,459 includes irrigation main repairs for the SilverRock frontage, additional potholing costs, stage modifications, temporary retention basin repairs, and replacing gravel pave with grass pave for fire department access. CONSENT CALENDAR ITEM NO. 12 83 FISCAL IMPACT Staff requests an appropriation of FY 2020/21 Measure G funds in the amount of $321,900. The following table shows the original project budget and proposed project budget with revenue sources: Original Budget Proposed Budget Arts in Public Spaces $ 300,000 $ 300,000 Measure G Funding $ 1,300,000 $ 1,621,900 Park & Rec DIF Fund $ 2,400,000 $ 2,400,000 Quimby Funding $ 2,000,000 $ 2,000,000 Total Budget: $ 6,000,000 $ 6,321,900 The following is a list of all change orders to date: Total Contract Original Contract Amount: $ 4,218,880 Contract Change Order No. 1: $ 5,630 Contract Change Order No. 2: $ 8,759 Contract Change Order No. 3: $ 42,996 Contract Change Order No. 4: $ 35,195 Contract Change Order No. 5: $ 210,171 This Contract Change Order No. 6: $ 321,900 Final Contract Amount: $ 4,843,531 The full amount is requested for the change order to maintain the current remaining contingency in the amount of $170,227 since this project is not near completion. BACKGROUND/ANALYSIS Proposed Change Order No. 6 is recommended for approval for the following: • $256,441 - To repair the severely damaged retention basin slope and damaged outlet structure. Staff recommends this work be performed now to ensure the repairs are made before the summer monsoon season. • $31,670 – To repair irrigation conduit in the parkway along Avenue 52 adjacent to the project site that was discovered to be non-functional. • $5,154 – Cost incurred for additional potholing needed to locate a well line. • $1,657 – Cost incurred to make modifications to the stage area to add a portion of retaining wall for functionality. 84 • $14,699 – Cost incurred to place temporary protection measures on the eroded retention basin slope and cost incurred to pump water out of the damaged retention basin to place temporary measures. • $12,279 – To replace a proposed gravel pave surface with grass pave surface used for fire department access to the site for aesthetic purposes. ALTERNATIVES Council may elect to not appropriate funds or approve this this change order. Prepared by: Ubaldo Ayón, Assistant Construction Manager Approved by: Bryan McKinney, P.E., Public Works Director/City Engineer Attachments: 1. Project Vicinity Map 2. Storm Damage Photos 3. Change Oder No. 6 85 86 13187 88 PHOTOS OF STORM DAMAGE ATTACHMENT 2 89 90 91 92 Sheet 1 of 3 CONTRACT: SilverRock Park Venue PROJECT NO. 2016-08 CONTRACTOR: Urban Habitat PO Box 1177 La Quinta, CA 92247 CONTRACT CHANGE ORDER NO. 6 Pursuant to the terms of the original Contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated all work shall conform to the terms, general conditions, and special provisions of the original Contract. DESCRIPTION OF CHANGE This Contract Change Order allows for approval to repair the severely damaged retention basin slope and damaged outlet structure: Total $ 256,441.00 This Contract Change Order allows for approval to repair irrigation conduit in the parkway along Avenue 52 adjacent to the project site that was discovered to be non-functional: Total $ 31,670.00 This Contract Change Order allows for approval for costs incurred for additional potholing needed to locate a well line: Total $ 5,154.00 This Contract Change Order allows for approval for costs incurred to make modifications to the stage area to add a portion of retaining wall for functionality: Total $ 1,657.00 This Contract Change Order allows for approval for costs incurred to place temporary protection measures on the eroded retention basin slope and to pump water out of the damaged retention basin to place temporary measures: Total $ 14,699.00 This Contract Change Order allows for approval to replace a proposed gravel pave surface with grass pave surface used for fire department access to the site: Total $ 12,279.00 By reason of this contract change order the time of completion is adjusted as follows: - 0 - days added to contract time. The contract completion date shall be: 5/01/2020 (contract completion date and working days will be adjusted after City Council approval) Submitted By:Date: Approved By:Date: We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, perform all labor, except as may be noted above, and perform all services necessary to complete the above specified work, and hereby accept as full payment the amount shown above, which includes all direct and indirect overhead expenses for any delays. Accepted By:Title: Contractor:Date: Previous Contract Amount Through CCO #5 $ 4,521,630.80 Add This Change Order No. 6 $ 321,900.00 Revised Contract Total $ 4,843,530.80 ATTACHMENT 3 93 94