Loading...
2020 05 05 Urban Habitat Change Order 1City of La Quinta CITY COUNCIL MEETING: May 5, 2020 STAFF REPORT AGENDA TITLE: APPROVE CHANGE ORDER NO. 5 TO CONTRACT WITH URBAN HABITAT FOR THE SILVERROCK PARK VENUE PROJECT NO. 2016-08 FOR ELECTRICAL CONTRACTOR SERVICES TO COMPLY WITH THE LABOR UNION AGREEMENT RECOMMENDATION Approve Change Order No. 5 to the contract with Urban Habitat, in the amount of $210,171, for the SilverRock Park Venue, Project No. 2016-08, for electrical contractor services that comply with the labor union agreement; and authorize the City Manager to execute the change order. EXECUTIVE SUMMARY •On August 6, 2019, a contract was awarded to Urban Habitat for the construction of the La Quinta SilverRock Park Venue Project (Project) (Attachment 1) and construction began in September 2019. •The electrical sub-contractor and the restroom installer were unable to comply with the projects required labor union agreement (PLA). Urban Habitat provided the City with a change order requesting $90,175 for additional electrical costs and $175,282 for the restroom installation to comply with the PLA. •In order to help offset this change order, the restroom installer contract was previously reduced by $127,985 and staff recommends changing the method of installing/placing grass from installing sod to placing grass stolons, which will save $55,286. FISCAL IMPACT The project budget is $6.0 Million with the following revenue sources: Total Budget Arts in Public Spaces $ 300,000 Measure G Funding $ 1,300,000 Park & Rec DIF Fund $ 2,400,000 Quimby Funding $ 2,000,000 Total Budget: $ 6,000,000 CONSENT CALENDAR ITEM NO. 8 55 The following is a list of all change orders to date: Total Contract Original Contract Amount: $ 4,218,880 Contract Change Order No. 1: $ 5,630 Contract Change Order No. 2: $ 8,759 Contract Change Order No. 3: $ 42,996 Contract Change Order No. 4: $ 35,195 This Contract Change Order No. 5: $ 210,171 Final Contract Amount: $ 4,521,631 There will be a remaining $174,274 in contingency with the approval of this change order. BACKGROUND/ANALYSIS Contract Change Order No. 1 was issued for extra work to repair the adjacent retention basin. Contract Change Order No. 2 was issued for the repair of an unknown lake pipeline that was hit during construction. Contract Change Order No. 3 was issued to find the location of a pipeline and for the addition of electrical scope to construct improvements for IID to provide power to the site. Contract Change Order No. 4 was issued for additional drainage both in the parking lot and for the terrace walls near the stage area. Proposed Contract Change Order No. 5 is recommended for approval to include the cost increase for using an electrical subcontractor that can comply with the PLA ($90,175); and, for the contractor to install the restroom building since the manufacturer cannot comply with the PLA ($175,282). The contract with the restroom manufacturer, Romtec, was previously reduced by $127,985, which was the cost allocated for the installation of the restroom and bonding. The increase to the initial budgeted restroom installation cost is $47,297. To help offset these costs Staff recommends changing the way the grass is placed on this project by using a more cost-efficient method (-$55,286). The use of stolons will increase the amount of time for the grass to be established. ALTERNATIVES Staff does not recommend an alternative due to the time constraints. Prepared by: Ubaldo Ayón, Assistant Construction Manager Approved by: Bryan McKinney, P.E., Public Works Director/City Engineer Attachments: 1.Project Vicinity Map 2. Change Oder No. 5 56 57 58 Sheet 1 of 3 CONTRACT: SilverRock Park Venue PROJECT NO. 2016-08 CONTRACTOR: Urban Habitat PO Box 1177 La Quinta, CA 92247 CONTRACT CHANGE ORDER NO. 5 ********************************************************************** Pursuant to the terms of the original Contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated all work shall conform to the terms, general conditions, and special provisions of the original Contract. ********************************************************************** DESCRIPTION OF CHANGE This Contract Change Order allows for the installation of the restroom building: Total $ 175,282.33 This Contract Change Order allows for a new Electrical Subcontractor: Total $ 90,174.54 This Contract Change Order allows for replacing sod with stolon: Total -$55,286.10 ********************************************************************** By reason of this contract change order the time of completion is adjusted as follows: - 0 - days added to contract time. The contract completion date shall be: 5/01/2020 (contract completion date and working days will be adjusted after City Council approval) ********************************************************************** Submitted By: Date: Approved By: Date: ********************************************************************** We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, perform all labor, except as may be noted above, and perform all services necessary to complete the above specified work, and hereby accept as full payment the amount shown above, which includes all direct and indirect overhead expenses for any delays. Accepted By: Title: Contractor: Date: Previous Contract Amount Through CCO #4 $ 4,311,460.03 Add This Change Order No. 5 $ 210,170.77 Revised Contract Total $ 4,521,630.80 ATTACHMENT 2 59 10 days 60 61 62