2020 11 17 Urban Habitat - Measure G Appropriation City of La Quinta CITY COUNCIL MEETING: November 17, 2020 STAFF REPORT AGENDA TITLE:APPROPRIATE MEASURE G FUNDING FOR THE SILVERROCK PARK VENUE PROJECT NO. 2016-08 AND ALONGI BUILDING PROJECT NO. 2018-06 AND AUTHORIZE FUTURE CHANGE ORDERS TO CONTRACT WITH URBAN HABITAT FOR THE SILVERROCK PARK VENUE PROJECT RECOMMENDATION Appropriate additional Measure G funding in the amount of $244,700 for the SilverRock Park Venue Project No. 2016-08 and $160,000 for the Alongi Building Project No. 2018-06, for additional project improvements; and authorize the City Manager to execute the future change orders with Urban Habitat for the improvements. EXECUTIVE SUMMARY •On August 6, 2019, a contract was awarded to Urban Habitat (Contractor) for the construction of the La Quinta SilverRock Park Venue Project (Project) (Attachment 1) and construction began in September 2019. •Additional Measure G funding in the amount of $244,700 is needed for and additional improvements for the SilverRock Park Venue Site Project and $160,000 for the Alongi Building Project. •Staff presented the additional appropriation request to the Financial Advisory Commission (FAC) on November 4, 2020, and the FAC recommended approval. FISCAL IMPACT Additional Measure G Funding is requested in the amount of $244,700 to complete the SilverRock Park Venue Project. If approved, fiscal year 2017/18 Measure G reserves would be reduced by $404,700 and the anticipated reserve balance on June 30, 2021 would be $11,458,719. The following table shows the projects budgeted revenue sources and proposed requested funding: BUSINESS SESSION ITEM NO. 3 REVISED STAFF REPORT TO ADDRESS MINOR BUDGET ADJUSTMENT ERROR 151 Current Budget Proposed Budget Arts in Public Spaces $ 300,000 $ 300,000 Measure G Funding $ 1,621,900 $ 1,866,600 Park & Rec DIF Fund $ 2,400,000 $ 2,400,000 Quimby Funding $ 2,000,000 $ 2,000,000 Total Budget: $ 6,321,900 $ 6,566,600 The following is the breakdown of estimated additional costs needed to complete the current project: Total Budget Amphitheater Landscape Change $ 23,500 Additional Geotechnical Soils Grading Headwall Costs, Additional Slope Repair due to Drainage Water, and additional RCP Replacement $ 60,000 Electric/water delays $ 125,000 Low voltage lighting new service and pedestal - color changing lights $ 13,000 Erosion scar repairs $ 6,000 Install Concrete Crossing over Existing Drain $ 3,300 Overseeding $ 5,150 Soil stabilization on the head wall $ 8,000 Additional Core in Retaining Wall Footing at Stage $ 750 Total:$ 244,700 There is approximately $64,000 in contingency available in the project budget. It is anticipated that this would be used to cover any other additional miscellaneous change orders including the final quantity adjustment. Additional Measure G Funding is also requested in the amount of $160,000 to complete the Alongi Building Project. The following is the current and proposed Alongi Project budget: Current Budget Proposed Budget Design $ 46,955 $ 46,955 Foundation and Utility Construction $ 98,161 $ 98,161 Building Purchase $ 400,000 $ 400,000 Building Modifications 1-21-2020 $ 470,000 $ 470,000 Building Modifications 6-17-2020 $ 11,760 $ 11,760 Landscape, Irrigation and Hardscape $ 173,124 $ 323,124 Contingency $ 0 $ 10,000 Total $ 1,200,000 $ 1,360,000 BACKGROUND/ANALYSIS On August 6, 2019, a contract was awarded to Urban Habitat for the construction of the Project which began in September 2019. 152 The additional funding is requested for the following items/improvements: x Amphitheater landscape change x Additional geotechnical soils grading headwall costs, additional slope repair due to drainage water, and additional reinforced concrete pipe replacement x Electric/water delays x Low voltage lighting new service and pedestal - color changing lights x Erosion scar repairs x Install concrete crossing over existing drain x Overseeding x Soil stabilization on the head wall x Additional core in retaining wall footing at stage The Alongi Building Project requests additional funding for landscaping, irrigation, hardscape, and Americans with Disability Act (ADA) enhancements. The cost for these improvements is $323,124. Approximately $160,000 in additional funding is needed to complete these improvements and provide a small project contingency. Staff presented the request for appropriation of Measure G funds to the FAC on November 4, 2020 and the FAC recommended approval of the funding. The FAC also requested the formation of an FAC SilverRock Venue Park Subcommittee to further review and provide feedback on any future Phase II improvements and additional appropriation of Measure G funds. The SilverRock Subcommittee conducted a site visit of SilverRock Park and held review meeting to discuss the prioritization of proposed Phase II improvements. A special FAC meeting will be held on November 23, 2020 to discuss the Phase II improvements and the subcommittee’s recommendations. If funding is approved, staff will prepare change order(s) for the additional improvements for the City Manager to execute. ALTERNATIVES Staff does not recommend other alternatives. Prepared by: Julie Mignogna, Management Analyst Approved by: Bryan McKinney, Public Works Director/City Engineer Attachments: 1. Project Vicinity Map 153 154 131155 156