2021 05 18 Urban Habitat Change Order 14City of La Quinta CITY COUNCIL MEETING: May 18, 2021 STAFF REPORT AGENDA TITLE: APPROVE CHANGE ORDER NO. 14 TO CONTRACT WITH URBAN HABITAT FOR THE SILVERROCK PARK VENUE PROJECT NO. 2016-08 FOR ADDITIONAL MISCELLANOUS WORK REQUESTS AND REPAIRS AND RELATED COMPENSATION RECOMMENDATION Approve Change Order No. 14 in the amount of $36,275 to Contract with Urban Habitat for the SilverRock Park Venue project for additional miscellaneous work requests and repairs; and authorize the City Manager to execute the change order. EXECUTIVE SUMMARY •On August 6, 2019, a contract was awarded to Urban Habitat (Contractor) for the construction of the La Quinta SilverRock Park Venue Project (Project) (Attachment 1) and construction began in September 2019. •Change Order No. 14 (Attachment 2) includes improvements for repair of the fire lane paving systems; repair of existing irrigation lines; additional work request to install concrete and pavers at Alongi building; and additional work request to raise a storm drain manhole, add an electrical panel, and seal exposed concrete walls; in the amount of $36,275. FISCAL IMPACT There are sufficient funds in the project budget (Account No. 401-0000- 60188, Project No. 2016-08) for the improvements in the amount of $36,275.39. The following table shows the projects budgeted revenue sources: Budget Arts in Public Spaces $ 300,000 Measure G Funding $ 1,866,600 Park & Rec DIF Fund $ 2,400,000 Quimby Funding $ 2,000,000 Total Budget: $ 6,566,600 If Change Order No. 14 is approved there will be approximately $174,000 remaining to close the project. CONSENT CALENDAR ITEM NO. 15 187 The portion of work performed for the Alongi Building will fund from the associated Alongi Building budget. The following is a list of all change orders to date: Total Contract Original Contract Amount: $ 4,218,880 Contract Change Order No. 1: $ 5,630 Contract Change Order No. 2: $ 8,759 Contract Change Order No. 3: $ 42,996 Contract Change Order No. 4: $ 35,195 Contract Change Order No. 5: $ 209,856 Contract Change Order No. 6: $ 321,900 Contract Change Order No. 7: $ 3,563 Contract Change Order No. 8: $ (14,695) Contract Change Order No. 9: $ 98,161 Contract Change Order No. 10: $ 30,345 Contract Change Order No. 11: $ 60,602 Contract Change Order No. 12: $ 44,120 Contract Change Order No. 13: $ 390,481 This Contract Change Order No. 14 $ 36,275 Final Contract Amount: $ 5,492,068 BACKGROUND/ANALYSIS Proposed Change Order No. 14 is recommended for approval in the amount of $36,275.39 for the following: •Gravel Pave repair to add mainline for overflow parking; •Grass Pave repair to adjust to new elevation; •Mainline repair to fix break in existing line; •Electrical panel materials and labor for lake pump; •Concrete pad for ramp and additional pavers in front for the Alongi building; •Raising storm drain manhole to new design elevation; •Wall sealer to prevent damage to turfed walls at stage. ALTERNATIVES Council may elect to not approve the change order or approve only parts of the change order. Prepared by: Carley Escarrega, Management Assistant Approved by: Bryan McKinney, P.E., Public Works Director/City Engineer Attachments: 1.Project Vicinity Map 2. Change Order No. 14 188 131189 190 Sheet 1 of 16 CONTRACT: SilverRock Park Venue PROJECT NO. 2016-08 CONTRACTOR: Urban Habitat PO Box 1177 La Quinta, CA 92247 CONTRACT CHANGE ORDER NO. 14 Pursuant to the terms of the original Contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated all work shall conform to the terms, general conditions, and special provisions of the original Contract. DESCRIPTION OF CHANGE This Contract Change Order allows for Gravel Pave repair Total $ 816.82 This Contract Change Order allows for Grass Pave repair Total $ 6,025.89 This Contract Change Order allows for mainline repair Total $ 2,402.07 This Contract Change Order allows for electrical panel materials and labor Total $ 9,020.88 This Contract Change Order allows for installation of concrete ramp for Alongi Total $ 4,216.03 This Contract Change Order allows for raising manhole to new design elevation Total $ 5,045.40 This Contract Change Order allows for wall sealer for turfed walls in amphitheater Total $ 2,767.79 This Contract Change Order allows for pavers in front of Alongi building Total $ 5,980.51 By reason of this contract change order the time of completion is adjusted as follows: - 13 - days added to contract time. The contract completion date shall be: Monday, April 1, 2021. Submitted By: Date: Approved By: Date: We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, perform all labor, except as may be noted above, and perform all services necessary to complete the above specified work, and hereby accept as full payment the amount shown above, which includes all direct and indirect overhead expenses for any delays. Accepted By: Title: Contractor: Date: Previous Contract Amount Through CCO #13 $ 5,455,792.62 Add This Change Order No. 14 $ 36,275.39 Revised Contract Total $ 5,492,068.01 191 ATTACHMENT 2 192