Loading...
BRES2019-0330 HERS ReportCERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 1 of 18 Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16 Registration Number:Registration Date/Time:HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41    GENERAL INFORMATION 01 Project Name An Apartment Complex for Nispero Properties, Inc 02 Calculation Description Title 24 Analysis 03 Project Location 51-480 Desert Club Dr / North bldg   04 City La Quinta, CA 05 Standards Version Compliance 2017 06 Zip Code 92253 07 Compliance Manager Version BEMCmpMgr 2016.3.1 (1149) 08 Climate Zone CZ15 09 Software Version CBECC-Res 2016.3.1 (1019) 10 Building Type Multifamily 11 Front Orientation (deg/Cardinal)90 12 Project Scope Newly Constructed 13 Number of Dwelling Units 8 14 Total Cond. Floor Area (ft2)7448 15 Number of Zones 8 16 Slab Area (ft2)3724 17 Number of Stories 2 18 Addition Cond. Floor Area(ft2)n/a 19 Natural Gas Available No 20 Addition Slab Area (ft2)n/a 21 Glazing Percentage (%)10.4% COMPLIANCE RESULTS 01 Building Complies with Computer Performance 02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider. 03 This building incorporates one or more Special Features shown below . ENERGY USE SUMMARY 04 05 06 07 08 Energy Use (kTDV/ft2-yr)Standard Design Proposed Design Compliance Margin Percent Improvement Space Heating 0.57 0.49 0.08 14.0% Space Cooling 87.79 75.89 11.90 13.6% IAQ Ventilation 2.49 2.49 0.00 0.0% Water Heating 22.75 33.75 -11.00 -48.4% Photovoltaic Offset ----0.00 0.00 ---- Compliance Energy Total 113.60 112.62 0.98 0.9% REQUIRED SPECIAL FEATURES The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis.  •Cool roof •Window overhangs and/or fins 424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 2 of 18 Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16 Registration Number:Registration Date/Time:HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41    HERS FEATURE SUMMARY The following is a summary of the features that must be field-verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis.  Additional detail is provided in the building components tables below. Building-level Verifications: •High quality insulation installation (QII) •IAQ mechanical ventilation Cooling System Verifications: •-- None -- HVAC Distribution System Verifications: •Duct Sealing Domestic Hot Water System Verifications: •-- None -- ZONE INFORMATION 01 02 03 04 05 Zone Name Zone Type Zone Floor Area (ft2)Avg. Ceiling Height Number of Dwelling Units UNIT 105 Conditioned 931 9 1 UNIT 106 Conditioned 931 9 1 UNIT 107 Conditioned 931 9 1 UNIT 108 Conditioned 931 9 1 UNIT 205 Conditioned 931 9 1 UNIT 206 Conditioned 931 9 1 UNIT 207 Conditioned 931 9 1 UNIT 208 Conditioned 931 9 1 DWELLING UNIT INFORMATION 01 02 03 Dwelling Unit Name Dwelling Unit Type Zone DwellingUnit 105-(1/1)U-105 UNIT 105 DwellingUnit 106-(1/1)U-106 UNIT 106 DwellingUnit 107-(1/1)U-107 UNIT 107 DwellingUnit 108-(1/1)U-108 UNIT 108 DwellingUnit 205-(1/1)U-205 UNIT 205 DwellingUnit 206-(1/1)U-206 UNIT 206 DwellingUnit 207-(1/1)U-207 UNIT 207 DwellingUnit 208-(1/1)U-208 UNIT 208 424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 3 of 18 Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16 Registration Number:Registration Date/Time:HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41    DWELLING UNIT TYPES 01 02 03 04 05 06 07 Name CFA (ft2) Number of Bedrooms Number in Building Space Conditioning Systems Assigned DHW System Name IAQ Vent Fan Name U-105 931 2 1 DwellingUnit 105 | :Heat Pump System 1:Distribution System 1:HVAC Fan System 1:2:3 DHW System 1 Default Minimum IAQ Fan U-106 931 2 1 DwellingUnit 106 | :Heat Pump System 2:Distribution System 2:HVAC Fan System 2:2:3 DHW System 2 Default Minimum IAQ Fan U-107 931 2 1 DwellingUnit 107 | :Heat Pump System 3:Distribution System 3:HVAC Fan System 3:2:3 DHW System 3 Default Minimum IAQ Fan U-108 931 2 1 DwellingUnit 108 | :Heat Pump System 4:Distribution System 4:HVAC Fan System 4:2:3 DHW System 4 Default Minimum IAQ Fan U-205 931 2 1 DwellingUnit 205 | :Heat Pump System 5:Distribution System 5:HVAC Fan System 5:2:3 DHW System 5 Default Minimum IAQ Fan U-206 931 2 1 DwellingUnit 206 | :Heat Pump System 6:Distribution System 6:HVAC Fan System 6:2:3 DHW System 6 Default Minimum IAQ Fan U-207 931 2 1 DwellingUnit 207 | :Heat Pump System 7:Distribution System 7:HVAC Fan System 7:2:3 DHW System 7 Default Minimum IAQ Fan U-208 931 2 1 DwellingUnit 208 | :Heat Pump System 8:Distribution System 8:HVAC Fan System 8:2:3 DHW System 8 Default Minimum IAQ Fan 424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 4 of 18 Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16 Registration Number:Registration Date/Time:HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41    OPAQUE SURFACES 01 02 03 04 05 06 07 08 Name Zone Construction Azimuth Orientation Gross Area (ft2)Window & Door Area (ft2)Tilt (deg) Wall-n-F UNIT 105 Wall new 90 Front 232 33 90 Wall-n-L UNIT 105 Wall new 180 Left 383 46 90 Wall-n-B UNIT 105 Wall new 270 Back 205 64 90 Interior Wall-n to UNIT 106 UNIT 105>>UNIT 106 Wall Int R0 n/a n/a 384 0 n/a Interior Wall-n to WH Room 1 UNIT 105>>WH Rooms Wall Int new n/a n/a 29 0 n/a Wall-n-F 2 UNIT 106 Wall new 90 Front 230 33 90 Wall-n-B 2 UNIT 106 Wall new 270 Back 203 64 90 Wall-n-R UNIT 106 Wall new 0 Right 119 14 90 Interior Wall-n to UNIT 107 UNIT 106>>UNIT 107 Wall Int R0 n/a n/a 265 0 n/a Interior Wall-n to WH Room 2 UNIT 106>>WH Rooms Wall Int new n/a n/a 29 0 n/a Wall-n-F 3 UNIT 107 Wall new 90 Front 230 33 90 Wall-n-L 2 UNIT 107 Wall new 180 Left 119 14 90 Wall-n-B 3 UNIT 107 Wall new 270 Back 203 64 90 Interior Wall-n to UNIT 108 UNIT 107>>UNIT 108 Wall Int R0 n/a n/a 384 0 n/a Interior Wall-n to WH Room 3 UNIT 107>>WH Rooms Wall Int new n/a n/a 29 0 n/a Wall-n-F 4 UNIT 108 Wall new 90 Front 232 33 90 Wall-n-B 4 UNIT 108 Wall new 270 Back 205 64 90 Wall-n-R 2 UNIT 108 Wall new 0 Right 383 34 90 Interior Wall-n to WH Room 4 UNIT 108>>WH Rooms Wall Int new n/a n/a 29 0 n/a Wall-n-F 5 UNIT 205 Wall new 90 Front 232 47.5 90 Wall-n-L 3 UNIT 205 Wall new 180 Left 383 46 90 Wall-n-B 5 UNIT 205 Wall new 270 Back 205 68 90 Interior Wall-n to UNIT 206 UNIT 205>>UNIT 206 Wall Int R0 n/a n/a 384 0 n/a Interior Wall-n to WH Room 5 UNIT 205>>WH Rooms Wall Int new n/a n/a 29 0 n/a Ceiling-n 1 UNIT 205 Ceiling attic new n/a n/a 263 n/a n/a Ceiling-n 1-2 UNIT 205 Ceiling attic new n/a n/a 668 n/a n/a Interior Floor-n over UNIT 105 UNIT 205>>UNIT 105 Floor Int R0 n/a n/a 931 n/a n/a Wall-n-F 6 UNIT 206 Wall new 90 Front 230 47.5 90 Wall-n-B 6 UNIT 206 Wall new 270 Back 203 68 90 Wall-n-R 3 UNIT 206 Wall new 0 Right 119 14 90 424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 5 of 18 Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16 Registration Number:Registration Date/Time:HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41    Interior Wall-n to UNIT 207 UNIT 206>>UNIT 207 Wall Int R0 n/a n/a 265 0 n/a Interior Wall-n to WH Room 6 UNIT 206>>WH Rooms Wall Int new n/a n/a 29 0 n/a Ceiling-n 2 UNIT 206 Ceiling attic new n/a n/a 263 n/a n/a Ceiling-n 2-2 UNIT 206 Ceiling attic new n/a n/a 668 n/a n/a Interior Floor-n over UNIT 106 UNIT 206>>UNIT 106 Floor Int R0 n/a n/a 931 n/a n/a Wall-n-F 7 UNIT 207 Wall new 90 Front 230 47.5 90 Wall-n-L 4 UNIT 207 Wall new 180 Left 119 14 90 Wall-n-B 7 UNIT 207 Wall new 270 Back 203 68 90 Interior Wall-n to UNIT 208 UNIT 207>>UNIT 208 Wall Int R0 n/a n/a 384 0 n/a Interior Wall-n to WH Room 7 UNIT 207>>WH Rooms Wall Int new n/a n/a 29 0 n/a Ceiling-n 3 UNIT 207 Ceiling attic new n/a n/a 263 n/a n/a Ceiling-n 3-2 UNIT 207 Ceiling attic new n/a n/a 668 n/a n/a Interior Floor-n over UNIT 107 UNIT 207>>UNIT 107 Floor Int R0 n/a n/a 931 n/a n/a Wall-n-F 8 UNIT 208 Wall new 90 Front 232 47.5 90 Wall-n-B 8 UNIT 208 Wall new 270 Back 205 68 90 Wall-n-R 4 UNIT 208 Wall new 0 Right 383 34 90 Interior Wall-n to WH Room 8 UNIT 208>>WH Rooms Wall Int new n/a n/a 29 0 n/a Ceiling-n 4 UNIT 208 Ceiling attic new n/a n/a 263 n/a n/a Ceiling-n 4-2 UNIT 208 Ceiling attic new n/a n/a 668 n/a n/a Interior Floor-n over UNIT 108 UNIT 208>>UNIT 108 Floor Int R0 n/a n/a 931 n/a n/a GWall-n-L WH Rooms Wall Gar 180 Left 324 0 90 GWall-n-B WH Rooms Wall Gar 270 Back 245 0 90 GWall-n-R WH Rooms Wall Gar 0 Right 324 0 90 GCeiling-n WH Rooms Ceiling attic Gar n/a n/a 80 n/a n/a     ATTIC 01 02 03 04 05 06 07 08 Name Construction Type Roof Rise Roof Reflectance Roof Emittance Radiant Barrier Cool Roof Attic Tile Tile Roof RB Ventilated 4 0.2 0.85 Yes Yes Attic-BU Built-Up Roof RB Ventilated 0.25 0.5 0.85 Yes Yes   424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 6 of 18 Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16 Registration Number:Registration Date/Time:HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41    FENESTRATION / GLAZING 01 02 03 04 05 06 07 08 09 10 Name Type Surface (Orientation-Azimuth)Width (ft) Height (ft)Multiplier Area (ft2)U-factor SHGC Exterior Shading Wind-n-A Window Wall-n-F (Front-90)2.0 4.5 1 9.0 0.30 0.28 Insect Screen (default) Wind-n-B Window Wall-n-L (Left-180)3.5 4.0 1 14.0 0.30 0.28 Insect Screen (default) Wind-n-W Window Wall-n-L (Left-180)5.0 4.0 1 20.0 0.30 0.28 Insect Screen (default) Wind-n-I Window Wall-n-L (Left-180)2.0 2.0 1 4.0 0.27 0.30 Insect Screen (default) Wind-n-J Window Wall-n-L (Left-180)2.0 2.0 1 4.0 0.27 0.30 Insect Screen (default) Wind-n-K Window Wall-n-L (Left-180)2.0 2.0 1 4.0 0.27 0.30 Insect Screen (default) Wind-n-S Window Wall-n-B (Back-270)4.0 5.0 1 20.0 0.30 0.26 Insect Screen (default) Wind-n-R Window Wall-n-B (Back-270)5.0 4.0 1 20.0 0.30 0.28 Insect Screen (default) Wind-n-D Window Wall-n-F 2 (Front-90)2.0 4.5 1 9.0 0.30 0.28 Insect Screen (default) Wind-n-Q Window Wall-n-B 2 (Back-270)5.0 4.0 1 20.0 0.30 0.26 Insect Screen (default) Wind-n-P Window Wall-n-B 2 (Back-270)5.0 4.0 1 20.0 0.30 0.26 Insect Screen (default) Wind-n-C Window Wall-n-R (Right-0)3.5 4.0 1 14.0 0.30 0.28 Insect Screen (default) Wind-n-E Window Wall-n-F 3 (Front-90)2.0 4.5 1 9.0 0.30 0.28 Insect Screen (default) Wind-n-F Window Wall-n-L 2 (Left-180)3.5 4.0 1 14.0 0.30 0.28 Insect Screen (default) Wind-n-O Window Wall-n-B 3 (Back-270)5.0 4.0 1 20.0 0.30 0.26 Insect Screen (default) Wind-n-N Window Wall-n-B 3 (Back-270)5.0 4.0 1 20.0 0.30 0.26 Insect Screen (default) Wind-n-H Window Wall-n-F 4 (Front-90)2.0 4.5 1 9.0 0.30 0.28 Insect Screen (default) Wind-n-M Window Wall-n-B 4 (Back-270)5.0 4.0 1 20.0 0.30 0.26 Insect Screen (default) Wind-n-L Window Wall-n-B 4 (Back-270)5.0 4.0 1 20.0 0.30 0.26 Insect Screen (default) Wind-n-I 2 Window Wall-n-R 2 (Right-0)5.0 4.0 1 20.0 0.30 0.28 Insect Screen (default) Wind-n-G Window Wall-n-R 2 (Right-0)3.5 4.0 1 14.0 0.30 0.28 Insect Screen (default) Wind-n-Z Window Wall-n-F 5 (Front-90)5.0 2.0 1 10.0 0.30 0.28 Insect Screen (default) Wind-n-X Window Wall-n-F 5 (Front-90)3.0 4.5 1 13.5 0.30 0.28 Insect Screen (default) Wind-n-Y Window Wall-n-L 3 (Left-180)3.5 4.0 1 14.0 0.30 0.28 Insect Screen (default) Wind-n-UU Window Wall-n-L 3 (Left-180)5.0 4.0 1 20.0 0.30 0.28 Insect Screen (default) Wind-n-MM Window Wall-n-L 3 (Left-180)2.0 2.0 1 4.0 0.27 0.30 Insect Screen (default) Wind-n-LL Window Wall-n-L 3 (Left-180)2.0 2.0 1 4.0 0.27 0.30 Insect Screen (default) Wind-n-KK Window Wall-n-L 3 (Left-180)2.0 2.0 1 4.0 0.27 0.30 Insect Screen (default) Wind-n-QQ Window Wall-n-B 5 (Back-270)5.0 4.0 1 20.0 0.30 0.26 Insect Screen (default) 424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 7 of 18 Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16 Registration Number:Registration Date/Time:HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41    GlDoor-n-67 Window Wall-n-B 5 (Back-270)6.0 8.0 1 48.0 0.31 0.28 Insect Screen (default) Wind-n-CC Window Wall-n-F 6 (Front-90)3.0 4.5 1 13.5 0.30 0.28 Insect Screen (default) Wind-n-AA Window Wall-n-F 6 (Front-90)5.0 2.0 1 10.0 0.30 0.28 Insect Screen (default) Wind-n-PP Window Wall-n-B 6 (Back-270)5.0 4.0 1 20.0 0.30 0.26 Insect Screen (default) GlDoor-n-77 Window Wall-n-B 6 (Back-270)6.0 8.0 1 48.0 0.31 0.28 Insect Screen (default) Wind-n-BB Window Wall-n-R 3 (Right-0)3.5 4.0 1 14.0 0.30 0.28 Insect Screen (default) Wind-n-FF Window Wall-n-F 7 (Front-90)5.0 2.0 1 10.0 0.30 0.28 Insect Screen (default) Wind-n-DD Window Wall-n-F 7 (Front-90)3.0 4.5 1 13.5 0.30 0.28 Insect Screen (default) Wind-n-EE Window Wall-n-L 4 (Left-180)3.5 4.0 1 14.0 0.30 0.28 Insect Screen (default) Wind-n-OO Window Wall-n-B 7 (Back-270)5.0 4.0 1 20.0 0.30 0.26 Insect Screen (default) GlDoor-n-87 Window Wall-n-B 7 (Back-270)6.0 8.0 1 48.0 0.31 0.28 Insect Screen (default) Wind-n-II Window Wall-n-F 8 (Front-90)3.0 4.5 1 13.5 0.30 0.28 Insect Screen (default) Wind-n-GG Window Wall-n-F 8 (Front-90)5.0 2.0 1 10.0 0.30 0.28 Insect Screen (default) Wind-n-NN Window Wall-n-B 8 (Back-270)5.0 4.0 1 20.0 0.30 0.26 Insect Screen (default) GlDoor-n-97 Window Wall-n-B 8 (Back-270)6.0 8.0 1 48.0 0.31 0.28 Insect Screen (default) Wind-n-JJ Window Wall-n-R 4 (Right-0)5.0 4.0 1 20.0 0.30 0.26 Insect Screen (default) Wind-n-HH Window Wall-n-R 4 (Right-0)3.5 4.0 1 14.0 0.30 0.28 Insect Screen (default) OPAQUE DOORS 01 02 03 04 Name Side of Building Area (ft2)U-factor Door-n-1 Wall-n-F 24.0 0.50 Door-n-10 Wall-n-B 24.0 0.50 Door-n-11 Wall-n-F 2 24.0 0.50 Door-n-20 Wall-n-B 2 24.0 0.50 Door-n-21 Wall-n-F 3 24.0 0.50 Door-n-30 Wall-n-B 3 24.0 0.50 Door-n-31 Wall-n-F 4 24.0 0.50 Door-n-39 Wall-n-B 4 24.0 0.50 Door-n-58 Wall-n-F 5 24.0 0.50 Door-n-68 Wall-n-F 6 24.0 0.50 Door-n-78 Wall-n-F 7 24.0 0.50 Door-n-88 Wall-n-F 8 24.0 0.50 424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 8 of 18 Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16 Registration Number:Registration Date/Time:HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41    OVERHANGS AND FINS 01 02 03 04 05 06 07 08 09 10 11 12 13 14  Overhang Left Fin Right Fin Window Depth Dist Up Left Extent Right Extent Flap Ht.Depth Top Up Dist L Bot Up Depth Top Up Dist R Bot Up Wind-n-A 6 2 2.7 7 0 0 0 0 0 0 0  0 0 Wind-n-B 13 2 1 2 0 0 0 0 0 0 0  0 0 Wind-n-S 6 2 4 4 0 0 0 0 0 0 0  0 0 Wind-n-D 6 2 7.5 15 0 0 0 0 0 0 0  0 0 Wind-n-P 6 2 1 4 0 0 0 0 0 0 0  0 0 Wind-n-C 25 2 2 1 0 0 0 0 0 0 0  0 0 Wind-n-E 6 2 15 7 0 0 0 0 0 0 0  0 0 Wind-n-F 25 2 1 2 0 0 0 0 0 0 0  0 0 Wind-n-O 6 2 4 1 0 0 0 0 0 0 0  0 0 Wind-n-H 6 2 9 1.8 0 0 0 0 0 0 0  0 0 Wind-n-L 6 2 4 4 0 0 0 0 0 0 0  0 0 Wind-n-G 13 2 2 1 0 0 0 0 0 0 0  0 0 424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 9 of 18 Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16 Registration Number:Registration Date/Time:HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41    OPAQUE SURFACE CONSTRUCTIONS 01 02 03 04 05 06 07 Construction Name Surface Type Construction Type Framing Total Cavity R-value Winter Design U-factor Assembly Layers Built-Up Roof RB Attic Roofs Wood Framed Ceiling 2x10 @ 24 in. O.C.R 30 0.036 •Cavity / Frame: R-30 / 2x10 •Roof Deck: Wood Siding/sheathing/decking •Roofing: Light Roof (Asphalt Shingle) Tile Roof RB Attic Roofs Wood Framed Ceiling 2x10 @ 24 in. O.C.R 30 0.035 •Cavity / Frame: R-30 / 2x10 •Roof Deck: Wood Siding/sheathing/decking •Tile Gap: present •Roofing: 10 PSF (RoofTile) Wall new Exterior Walls Wood Framed Wall 2x6 @ 16 in. O.C.R 21 0.065 •Inside Finish: Gypsum Board •Cavity / Frame: R-21 / 2x6 •Sheathing / Insulation: Wood Siding/sheathing/decking •Exterior Finish: 3 Coat Stucco Wall Gar Exterior Walls Wood Framed Wall 2x4 @ 16 in. O.C.none 0.387 •Inside Finish: Gypsum Board •Cavity / Frame: no insul. / 2x4 Wall Int R0 Interior Walls Wood Framed Wall 2x4 @ 16 in. O.C.none 0.277 •Inside Finish: Gypsum Board •Cavity / Frame: no insul. / 2x4 •Other Side Finish: Gypsum Board Wall Int new Interior Walls Wood Framed Wall 2x6 @ 16 in. O.C.R 21 0.064 •Inside Finish: Gypsum Board •Cavity / Frame: R-21 / 2x6 •Other Side Finish: Gypsum Board Floor Int R0 Interior Floors Wood Framed Floor 2x6 @ 16 in. O.C.none 0.199 •Floor Surface: Carpeted •Floor Deck: Wood Siding/sheathing/decking •Cavity / Frame: no insul. / 2x6 •Ceiling Below Finish: Gypsum Board Ceiling attic new Ceilings (below attic)Wood Framed Ceiling 2x4 @ 24 in. O.C.R 30 0.032 •Inside Finish: Gypsum Board •Cavity / Frame: R-9.1 / 2x4 •Over Ceiling Joists: R-20.9 insul. Ceiling attic Gar Ceilings (below attic)Wood Framed Ceiling 2x4 @ 16 in. O.C.none 0.472 •Inside Finish: Gypsum Board •Cavity / Frame: no insul. / 2x4 424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 10 of 18 Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16 Registration Number:Registration Date/Time:HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41    SLAB FLOORS 01 02 03 04 05 06 07 Name Zone Area (ft2)Perimeter (ft)Edge Insul. R-value & Depth Carpeted Fraction Heated Slab On Grade-n 1 UNIT 105 931 92 None 0.8 No Slab On Grade-n 2 UNIT 106 931 62 None 0.8 No Slab On Grade-n 3 UNIT 107 931 62 None 0.8 No Slab On Grade-n 4 UNIT 108 931 92 None 0.8 No GSlab On Grade-n WH Rooms 80 48 None 0 No BUILDING ENVELOPE - HERS VERIFICATION 01 02 03 04 Quality Insulation Installation (QII)Quality Installation of Spray Foam Insulation Building Envelope Air Leakage CFM50 Required Not Required Not Required n/a WATER HEATING SYSTEMS 01 02 03 04 05 06 07 Name System Type Number of Systems in Building Multi-Family  Distribution Type Water Heater Number of Water Heaters/System Solar Fraction (%) DHW System 1 Standard 1 Multi-family: No loops or recirc pump Water Heater 1 (1)1 n/a DHW System 2 Standard 1 Multi-family: No loops or recirc pump Water Heater 2 (1)1 n/a DHW System 3 Standard 1 Multi-family: No loops or recirc pump Water Heater 3 (1)1 n/a DHW System 4 Standard 1 Multi-family: No loops or recirc pump Water Heater 4 (1)1 n/a DHW System 5 Standard 1 Multi-family: No loops or recirc pump Water Heater 5 (1)1 n/a DHW System 6 Standard 1 Multi-family: No loops or recirc pump Water Heater 6 (1)1 n/a DHW System 7 Standard 1 Multi-family: No loops or recirc pump Water Heater 7 (1)1 n/a DHW System 8 Standard 1 Multi-family: No loops or recirc pump Water Heater 8 (1)1 n/a 424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 11 of 18 Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16 Registration Number:Registration Date/Time:HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41    WATER HEATERS 01 02 03 04 05 06 07 08 09 10 11 12 Name Heater Element Type Tank Type Number of Units Tank Volume (gal) Uniform Energy Factor / Energy Factor / Efficiency Input Rating / Pilot / Thermal Efficiency Tank Insulation R-value (Int/Ext) Standby Loss / Recovery Eff First Hour Rating / Flow Rate NEEA Heat Pump Brand / Model Tank Location or Ambient Condition Water Heater 1 Electric Resistance Small Storage 1 50 0.945 EF <= 12 kW 0 n/a n/a n/a WH Rooms Water Heater 2 Electric Resistance Small Storage 1 50 0.945 EF <= 12 kW 0 n/a n/a n/a WH Rooms Water Heater 3 Electric Resistance Small Storage 1 50 0.945 EF <= 12 kW 0 n/a n/a n/a WH Rooms Water Heater 4 Electric Resistance Small Storage 1 50 0.945 EF <= 12 kW 0 n/a n/a n/a WH Rooms Water Heater 5 Electric Resistance Small Storage 1 50 0.945 EF <= 12 kW 0 n/a n/a n/a WH Rooms Water Heater 6 Electric Resistance Small Storage 1 50 0.945 EF <= 12 kW 0 n/a n/a n/a WH Rooms Water Heater 7 Electric Resistance Small Storage 1 50 0.945 EF <= 12 kW 0 n/a n/a n/a WH Rooms Water Heater 8 Electric Resistance Small Storage 1 50 0.945 EF <= 12 kW 0 n/a n/a n/a WH Rooms 424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 12 of 18 Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16 Registration Number:Registration Date/Time:HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41    SPACE CONDITIONING SYSTEMS 01 02 03 04 05 06 SC Sys Name System Type Heating Unit Name Cooling Unit Name Fan Name Distribution Name DwellingUnit 105 | :Heat Pump System 1:Distribution System 1:HVAC Fan System 1:2:3 Heat Pump Heating and Cooling System Heat Pump System 1 Heat Pump System 1 HVAC Fan System 1 Distribution System 1 DwellingUnit 106 | :Heat Pump System 2:Distribution System 2:HVAC Fan System 2:2:3 Heat Pump Heating and Cooling System Heat Pump System 2 Heat Pump System 2 HVAC Fan System 2 Distribution System 2 DwellingUnit 107 | :Heat Pump System 3:Distribution System 3:HVAC Fan System 3:2:3 Heat Pump Heating and Cooling System Heat Pump System 3 Heat Pump System 3 HVAC Fan System 3 Distribution System 3 DwellingUnit 108 | :Heat Pump System 4:Distribution System 4:HVAC Fan System 4:2:3 Heat Pump Heating and Cooling System Heat Pump System 4 Heat Pump System 4 HVAC Fan System 4 Distribution System 4 DwellingUnit 205 | :Heat Pump System 5:Distribution System 5:HVAC Fan System 5:2:3 Heat Pump Heating and Cooling System Heat Pump System 5 Heat Pump System 5 HVAC Fan System 5 Distribution System 5 DwellingUnit 206 | :Heat Pump System 6:Distribution System 6:HVAC Fan System 6:2:3 Heat Pump Heating and Cooling System Heat Pump System 6 Heat Pump System 6 HVAC Fan System 6 Distribution System 6 DwellingUnit 207 | :Heat Pump System 7:Distribution System 7:HVAC Fan System 7:2:3 Heat Pump Heating and Cooling System Heat Pump System 7 Heat Pump System 7 HVAC Fan System 7 Distribution System 7 DwellingUnit 208 | :Heat Pump System 8:Distribution System 8:HVAC Fan System 8:2:3 Heat Pump Heating and Cooling System Heat Pump System 8 Heat Pump System 8 HVAC Fan System 8 Distribution System 8 424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 13 of 18 Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16 Registration Number:Registration Date/Time:HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41    HVAC - HEAT PUMPS 01 02 03 04 05 06 07 08 09 10   Heating Cooling Zonally Multispeed HERS Name System Type HSPF/COP Cap 47 Cap 17 SEER EER Controlled Compressor Verification Heat Pump System 1 PkgHeatPump 8.2 36000 29000 15 12.44 No No Heat Pump System 1-hers-cool Heat Pump System 2 PkgHeatPump 8.2 36000 29000 15 12.44 No No Heat Pump System 2-hers-cool Heat Pump System 3 PkgHeatPump 8.2 36000 29000 15 12.44 No No Heat Pump System 3-hers-cool Heat Pump System 4 PkgHeatPump 8.2 36000 29000 15 12.44 No No Heat Pump System 4-hers-cool Heat Pump System 5 PkgHeatPump 8.2 36000 29000 15 12.44 No No Heat Pump System 5-hers-cool Heat Pump System 6 PkgHeatPump 8.2 36000 29000 15 12.44 No No Heat Pump System 6-hers-cool Heat Pump System 7 PkgHeatPump 8.2 36000 29000 15 12.44 No No Heat Pump System 7-hers-cool Heat Pump System 8 PkgHeatPump 8.2 36000 29000 15 12.44 No No Heat Pump System 8-hers-cool HVAC COOLING - HERS VERIFICATION 01 02 03 04 05 06 Name Verified Airflow Airflow Target (CFM)Verified EER Verified SEER Verified Refrigerant Charge Heat Pump System 1-hers-cool Required 350 Not Required Required Not Required Heat Pump System 2-hers-cool Required 350 Not Required Required Not Required Heat Pump System 3-hers-cool Required 350 Not Required Required Not Required Heat Pump System 4-hers-cool Required 350 Not Required Required Not Required Heat Pump System 5-hers-cool Required 350 Not Required Required Not Required Heat Pump System 6-hers-cool Required 350 Not Required Required Not Required Heat Pump System 7-hers-cool Required 350 Not Required Required Not Required Heat Pump System 8-hers-cool Required 350 Not Required Required Not Required 424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 14 of 18 Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16 Registration Number:Registration Date/Time:HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41    HVAC -  DISTRIBUTION SYSTEMS 01 02 03 04 05 06 07 Name Type Duct Leakage Insulation R-value Duct Location Bypass Duct HERS Verification Distribution System 1 DuctsAttic Sealed and tested 8 Attic None Distribution System 1-hers-dist Distribution System 2 DuctsAttic Sealed and tested 8 Attic None Distribution System 1-hers-dist Distribution System 3 DuctsAttic Sealed and tested 8 Attic None Distribution System 1-hers-dist Distribution System 4 DuctsAttic Sealed and tested 8 Attic None Distribution System 1-hers-dist Distribution System 5 DuctsAttic Sealed and tested 8 Attic None Distribution System 1-hers-dist Distribution System 6 DuctsAttic Sealed and tested 8 Attic None Distribution System 1-hers-dist Distribution System 7 DuctsAttic Sealed and tested 8 Attic None Distribution System 1-hers-dist Distribution System 8 DuctsAttic Sealed and tested 8 Attic None Distribution System 1-hers-dist 424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 15 of 18 Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16 Registration Number:Registration Date/Time:HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41    HVAC DISTRIBUTION - HERS VERIFICATION 01 02 03 04 05 06 07 08  Duct Leakage Duct Leakage Verified Duct Verified Duct Buried Deeply Buried Low-leakage Name  Verification Target (%)Location Design Ducts Ducts Air Handler Distribution System 1-hers-dist Required total leakage <= 12.0 or leakage to outdoors <= 5.0 Not Required Not Required Not Required Not Required n/a Distribution System 2-hers-dist Required total leakage <= 12.0 or leakage to outdoors <= 5.0 Not Required Not Required Not Required Not Required n/a Distribution System 3-hers-dist Required total leakage <= 12.0 or leakage to outdoors <= 5.0 Not Required Not Required Not Required Not Required n/a Distribution System 4-hers-dist Required total leakage <= 12.0 or leakage to outdoors <= 5.0 Not Required Not Required Not Required Not Required n/a Distribution System 5-hers-dist Required total leakage <= 12.0 or leakage to outdoors <= 5.0 Not Required Not Required Not Required Not Required n/a Distribution System 6-hers-dist Required total leakage <= 12.0 or leakage to outdoors <= 5.0 Not Required Not Required Not Required Not Required n/a Distribution System 7-hers-dist Required total leakage <= 12.0 or leakage to outdoors <= 5.0 Not Required Not Required Not Required Not Required n/a Distribution System 8-hers-dist Required total leakage <= 12.0 or leakage to outdoors <= 5.0 Not Required Not Required Not Required Not Required n/a 424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 16 of 18 Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16 Registration Number:Registration Date/Time:HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41    HVAC - FAN  SYSTEMS 01 02 03 04 Name Type Fan Power (Watts/CFM)HERS Verification HVAC Fan System 1 Single Speed PSC Furnace Fan 0.58 HVAC Fan System 1-hers-fan HVAC Fan System 2 Single Speed PSC Furnace Fan 0.58 HVAC Fan System 1-hers-fan HVAC Fan System 3 Single Speed PSC Furnace Fan 0.58 HVAC Fan System 1-hers-fan HVAC Fan System 4 Single Speed PSC Furnace Fan 0.58 HVAC Fan System 1-hers-fan HVAC Fan System 5 Single Speed PSC Furnace Fan 0.58 HVAC Fan System 1-hers-fan HVAC Fan System 6 Single Speed PSC Furnace Fan 0.58 HVAC Fan System 1-hers-fan HVAC Fan System 7 Single Speed PSC Furnace Fan 0.58 HVAC Fan System 1-hers-fan HVAC Fan System 8 Single Speed PSC Furnace Fan 0.58 HVAC Fan System 1-hers-fan HVAC FAN SYSTEMS - HERS VERIFICATION 01 02 03 Name Verified Fan Watt Draw Required Fan Efficiency (Watts/CFM) HVAC Fan System 1-hers-fan Required 0.58 HVAC Fan System 2-hers-fan Required 0.58 HVAC Fan System 3-hers-fan Required 0.58 HVAC Fan System 4-hers-fan Required 0.58 HVAC Fan System 5-hers-fan Required 0.58 HVAC Fan System 6-hers-fan Required 0.58 HVAC Fan System 7-hers-fan Required 0.58 HVAC Fan System 8-hers-fan Required 0.58 424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 17 of 18 Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16 Registration Number:Registration Date/Time:HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41    IAQ (Indoor Air Quality) FANS 01 02 03 04 05 06 Dwelling Unit IAQ CFM IAQ Watts/CFM IAQ Fan Type IAQ Recovery Effectiveness(%)HERS Verification DwellingUnit 105 1/1 50 0.25 Default 0 Required DwellingUnit 106 1/1 50 0.25 Default 0 Required DwellingUnit 107 1/1 50 0.25 Default 0 Required DwellingUnit 108 1/1 50 0.25 Default 0 Required DwellingUnit 205 1/1 50 0.25 Default 0 Required DwellingUnit 206 1/1 50 0.25 Default 0 Required DwellingUnit 207 1/1 50 0.25 Default 0 Required DwellingUnit 208 1/1 50 0.25 Default 0 Required   424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 18 of 18 Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16 Registration Number:Registration Date/Time:HERS Provider: CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41    DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name:Documentation Author Signature: Company:Signature Date: Address:CEA/HERS Certification Identification (If applicable): City/State/Zip:Phone: RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance. 2.I certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 3.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Responsible Designer Name:Responsible Designer Signature: Company:Date Signed: Address:License: City/State/Zip:Phone: Igor Pichko Energy Consult LLC 10/21/2024 1252 W 22nd St Unit #2 R19-14-30005 San Pedro, CA 90731 4242477658 Stephen Nieto South West Concepts, Inc.10/21/2024 78115 Calle Estado, Suite 106 La Quinta, CA 92253 7605646409 424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-001-E21001A-0000 Registration Date/Time: 2024-10-23   12:15:24 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 CERTIFICATE OF INSTALLATION CF2R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 105) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Signature Date: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-001-E22002A-0000 Registration Date/Time: 2024-10-23   12:15:28 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 CERTIFICATE OF INSTALLATION CF2R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 105) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Signature Date: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-001-E23003A-0000 Registration Date/Time: 2024-10-23   12:15:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 CERTIFICATE OF INSTALLATION CF2R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 105) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Signature Date: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-002-E21001A-0000 Registration Date/Time: 2024-10-23   12:55:09 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:16 CERTIFICATE OF INSTALLATION CF2R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 106) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-002-E22002A-0000 Registration Date/Time: 2024-10-23   12:55:17 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:16 CERTIFICATE OF INSTALLATION CF2R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 106) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-002-E23003A-0000 Registration Date/Time: 2024-10-23   12:55:30 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:16 CERTIFICATE OF INSTALLATION CF2R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 106) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-003-E21001A-0000 Registration Date/Time: 2024-10-23   12:59:12 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:17 CERTIFICATE OF INSTALLATION CF2R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 107) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-003-E22002A-0000 Registration Date/Time: 2024-10-23   12:59:18 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:18 CERTIFICATE OF INSTALLATION CF2R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 107) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-003-E23003A-0000 Registration Date/Time: 2024-10-23   12:59:21 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:19 CERTIFICATE OF INSTALLATION CF2R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 107) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-004-E21001A-0000 Registration Date/Time: 2024-10-23   13:02:14 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:20 CERTIFICATE OF INSTALLATION CF2R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 108) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-004-E22002A-0000 Registration Date/Time: 2024-10-23   13:02:17 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:20 CERTIFICATE OF INSTALLATION CF2R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 108) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-004-E23003A-0000 Registration Date/Time: 2024-10-23   13:02:19 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 CERTIFICATE OF INSTALLATION CF2R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 108) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-005-E21001A-0000 Registration Date/Time: 2024-10-23   13:06:04 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:23 CERTIFICATE OF INSTALLATION CF2R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 205) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-005-E22002A-0000 Registration Date/Time: 2024-10-23   13:06:06 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:23 CERTIFICATE OF INSTALLATION CF2R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 205) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-005-E23003A-0000 Registration Date/Time: 2024-10-23   13:06:09 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:24 CERTIFICATE OF INSTALLATION CF2R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 205) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-006-E21001A-0000 Registration Date/Time: 2024-10-23   13:09:08 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 CERTIFICATE OF INSTALLATION CF2R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 206) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-006-E22002A-0000 Registration Date/Time: 2024-10-23   13:09:10 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:26 CERTIFICATE OF INSTALLATION CF2R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 206) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-006-E23003A-0000 Registration Date/Time: 2024-10-23   13:09:12 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 CERTIFICATE OF INSTALLATION CF2R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 206) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-007-E21001A-0000 Registration Date/Time: 2024-10-23   13:12:20 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:28 CERTIFICATE OF INSTALLATION CF2R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 207) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-007-E22002A-0000 Registration Date/Time: 2024-10-23   13:12:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:28 CERTIFICATE OF INSTALLATION CF2R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 207) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-007-E23003A-0000 Registration Date/Time: 2024-10-23   13:12:26 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:29 CERTIFICATE OF INSTALLATION CF2R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 207) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-008-E21001A-0000 Registration Date/Time: 2024-10-23   13:16:29 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:30 CERTIFICATE OF INSTALLATION CF2R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 208) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-008-E22002A-0000 Registration Date/Time: 2024-10-23   13:16:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:30 CERTIFICATE OF INSTALLATION CF2R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 208) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-008-E23003A-0000 Registration Date/Time: 2024-10-23   13:16:35 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 CERTIFICATE OF INSTALLATION CF2R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 1 of 1) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 208) City: La Quinta Zip Code: 92253 Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0, 150.1(c), and 110.7(a) and (b). Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-001-M01004A-0000 Registration Date/Time: 2024-10-23   12:20:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 1 of 10) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 105) City: La Quinta Zip Code: 92253 A. General Information 01 Dwelling Unit Name DwellingUnit 105 02 Climate Zone 15 03 Dwelling Unit Total Conditioned Floor Area (ft2)931 04 Number of Space Conditioning Systems in this dwelling unit. 1 05 Certificate of Compliance Type Performance (CF1R-PRF)06 Method Used to Calculate HVAC Loads ACCA Manual J 07 Calculated Dwelling Unit Sensible Cooling Load (Btu/h) 36000 08 Calculated Dwelling Unit Heating Load (Btu/h)36000 09 Dwelling Unit Number of Bedrooms 2 MCH-01a - Space Conditioning Systems Ducts and Fans - For use with Performance Certificate of Compliance NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 2 of 10) Registration Number: 424-P010255225A-001-001-M01004A-0000 Registration Date/Time: 2024-10-23   12:20:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 B. Design Space Conditioning (SC) System Component Specifications from CF1R This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project. 01 02 03 04 05 06 07 08 09 10 11 12 Zone Name SC System Identification or Name SC System Type Heating System Type Cooling System Type SC Fan Type Distribution System Type Required Thermostat Type Low Leakage Air-Handling Unit (LLAHU) Status Bypass Duct Status Cooling Zoning Type Cooling System Compressor Speed This field or section is not applicable UNIT 105 HVACSys Heat pump heating cooling Central packaged HP Central packaged HP PSC Permanent Split Capacitor Unconditione d attic OCST per JA5 No, credit is not taken No Bypass Duct Not Zonal Single Speed Notes: C. Design Space Conditioning (SC) System Compliance Requirements from CF1R This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project. 01 02 03 04 05 06 07 08 09 10 SC System Identification or Name Heating Efficiency Type Minimum Heating Efficiency Value Heat Pump Heating Capacity at 47°F Heat Pump Heating Capacity at 17°F Minimum Cooling Efficiency SEER Minimum Cooling Efficiency EER Minimum Cooling System Airflow Rate (CFM/ton) Maximum Fan Efficacy (W/CFM) Minimum Duct R-Value UNIT 105 HVACSys Heating Seasonal Performance Factor (HSPF) 8.2 36000 29000 15 12.44 350 0.58 R-8 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 3 of 10) Registration Number: 424-P010255225A-001-001-M01004A-0000 Registration Date/Time: 2024-10-23   12:20:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 D. Installed Space Conditioning (SC) System Component Information 01 02 03 04 05 06 07 08 09 10 11 SC System Identification or Name SC System Location or Area Served Conditioned Floor Area Served by the System (ft2) Heating System Type Cooling System Type SC Fan Type Distribution System Type SC System Thermostat Type Cooling Zoning Type Cooling System Compressor Speed Type Central Fan Integrated (CFI) Ventilation System Status UNIT 105 HVACSys Main 931 Central packaged HP Central packaged HP PSC Permanent Split Capacitor Unconditioned attic OCST per JA5 Not Zonal Single Speed Not a CFI system Notes: E. Installed Heating System Equipment Information (not heat pumps) This section does not apply to this project. F. Installed Cooling System Outdoor Condensing Unit or Package Unit Equipment Information (not heat pumps) This section does not apply to this project. G. Installed Split System Indoor Coil or Fan Coil Unit Equipment Information (applicable to DX or hydronic heating/cooling coils or fan coil units) Systems with more than one indoor coil or fan coil unit (e.g. multi-split systems) shall provide information for each of the system indoor coils or fan coil units. This section does not apply to this project. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 4 of 10) Registration Number: 424-P010255225A-001-001-M01004A-0000 Registration Date/Time: 2024-10-23   12:20:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 H. Installed Heat Pump System - Split System Condensing Unit or Package Unit Equipment Information 01 02 03 04 05 SC System Identification or Name SC System Location or Area Served Condenser or Package Unit Manufacturer Condenser or Package Unit Model Number Condenser or Package Unit Serial Number UNIT 105 HVACSys Main RHEEM RHPAZR036JT000NA F422302304 Notes: I. Installed Heat Pump System -Efficiency and Performance Compliance Information 01 02 03 04 05 06 07 08 09 10 SC System Identification or Name SC System Location or Area Served Heating Efficiency Type Heating Efficiency Value System Rated Heating Capacity at 47°F System Rated Heating Capacity at 17°F System Rated Cooling Efficiency SEER System Rated Cooling Efficiency EER System Rated Cooling Capacity at Design Conditions (Btu/h) Condenser Rated Nominal Capacity (ton) UNIT 105 HVACSys Main Heating Seasonal Performance Factor (HSPF) 8.2 36000 29000 15 12.44 36000 3 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 5 of 10) Registration Number: 424-P010255225A-001-001-M01004A-0000 Registration Date/Time: 2024-10-23   12:20:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 J. Installed Duct System Information 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identification or Name SC System Location or Area Served Supply Duct Location Supply Duct R-Value Return Duct Location Return Duct R-Value Exemption from Min R-Value for Ducts In Conditioned Space Method of compliance with duct and filter grille sizing Req's in 150.0(m)13 Exemption From Duct Leakage Requirement s Bypass Duct Status Number of Air Filter Devices on System Can RA3.3 Airflow Protocols be used to test this System? UNIT 105 HVACSys Main Unconditio ned attic R-8 Unconditio ned attic R-8 Not applicable HERS verified fan efficacy (W/cfm) and airflow rate (cfm/ton) None No Bypass Duct 1 Yes Notes: K. Installed Air Filter Device Information Mandatory requirements for air filter devices are specified Section 150.0(m)12. 01 02 03 04 05 06 07 SC System Identification or Name SC System Location or Area Served Air Filter Device Identification or Name Air Filter Device Type Air Filter Device Location Determined Design Airflow Rate for Air Filter Device (cfm) Determined Design Allowable Pressure Drop for Air Filter Device (inch W.C.) UNIT 105 HVACSys Main Filter Filter Grille return 1050 0.1 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 6 of 10) Registration Number: 424-P010255225A-001-001-M01004A-0000 Registration Date/Time: 2024-10-23   12:20:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 L. Air Filter Device Requirements 01 The system shall be designed to ensure that all recirculated air and all outdoor air supplied to the occupiable space is filtered before passing through the system's thermal conditioning components. 02 The system shall be designed to accommodate the clean-filter pressure drop imposed by the system air filter device(s). The design airflow rate and maximum allowable clean-filter pressure drop at the design airflow rate applicable to each air filter device shall be determined, and all system air filter device locations shall be labeled to disclose the applicable design airflow rate and the maximum allowable clean-filter pressure drop. The labels shall be permanently affixed to the air filter device, readily legible, and visible to a person replacing the air filter media, and the air filter devices shall be provided with air filter media that conforms to these determined or labeled maximum allowable clean-filter pressure drop values as rated using AHRI Standard 680. 03 All system air filter devices shall be located and installed in such a manner as to allow access and regular service by the system owner. 04 The system shall be provided with air filter media having a designated efficiency equal to or greater than MERV 6 when tested in accordance with ASHRAE Standard 52.2, or a particle size efficiency rating equal to or greater than 50% in the 3.0 to10 µm range when tested in accordance with AHRI Standard 680. 05 The system shall be provided with air filter media that has been labeled by the manufacturer to disclose the efficiency and pressure drop ratings that conform to the required efficiency and pressure drop requirements for the air filter device. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met M. HERS Verification Requirements 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identificati on or Name SC System Location or Area Served MCH-20 . . Duct Leakage Test MCH-21 . Duct Location Verification MCH-22 . AHU Fan Efficacy (W/cfm) MCH-23 . AHU Airflow Rate (cfm/ton) MCH-25 . . Refrigerant Charge MCH-26 Rated SC System Equipment Verification MCH-27 . IAQ Mechanical Ventilation MCH-28 Return Duct Design Table 150.0-B or C MCH-29 Supply Duct Surface Area R-Value Buried Ducts MCH30 . Ventilation Cooling Credit UNIT 105 HVACSys Main Yes No Yes Yes No Yes Yes No No No NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 7 of 10) Registration Number: 424-P010255225A-001-001-M01004A-0000 Registration Date/Time: 2024-10-23   12:20:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 M. HERS Verification Requirements 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identificati on or Name SC System Location or Area Served MCH-20 . . Duct Leakage Test MCH-21 . Duct Location Verification MCH-22 . AHU Fan Efficacy (W/cfm) MCH-23 . AHU Airflow Rate (cfm/ton) MCH-25 . . Refrigerant Charge MCH-26 Rated SC System Equipment Verification MCH-27 . IAQ Mechanical Ventilation MCH-28 Return Duct Design Table 150.0-B or C MCH-29 Supply Duct Surface Area R-Value Buried Ducts MCH30 . Ventilation Cooling Credit Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 8 of 10) Registration Number: 424-P010255225A-001-001-M01004A-0000 Registration Date/Time: 2024-10-23   12:20:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. Heating Equipment 01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(i), 110.2(b). 03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections 150.0(h)1 and 2). 04 Furnace Temperature Rise: Central forced-air heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum inlet-to-outlet temperature rise specification. See Section 150.0(h)4. 05 Standby Losses and Pilot Lights: Fan-type central furnaces may not have a continuously burning pilot light. Section 110.5 and Section 110.2(d). Cooling Equipment 06 Equipment Efficiency: All cooling equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 07 Refrigerant Line Insulation: All refrigerant line insulation in split system air conditioners and heat pumps must meet the R-value and protection requirements of Section 150.0(j)2 and 3, and Section 150.0(m)9. 08 Condensing Unit Location: Condensing units shall not be placed within five (5) feet of a dryer vent outlet. See Section 150.0(h)3A. 09 Liquid Line Filter Drier: If applicable, a liquid line filter drier shall be installed according to the manufacturer's specifications. Section 150.0(h)3B 10 Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section 150.0(h)1 and 2. Air Distribution System Ducts, Plenums and Fans NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 9 of 10) Registration Number: 424-P010255225A-001-001-M01004A-0000 Registration Date/Time: 2024-10-23   12:20:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. 11 Insulation: In all cases, unless ducts are enclosed entirely in directly conditioned space, the minimum duct insulation value is R-6. Note that higher values may be required by the prescriptive or performance requirements. See Section 150.0(m)1. 12 Connections and Closures: All installed air-distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0, 602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006: Supply-air and return-air ducts and plenums must be insulated to a minimum installed level of R-6.0 or enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing in accordance with the requirements of Reference Residential Appendix RA3.1.4.3.8. Heat Pump Thermostat 13 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c). 14 The thermostat shall be installed in accordance with the manufacturers published installation specifications 15 First stage of heating shall be assigned to heat pump heating. 16 Second stage back up heating shall be set to come on only when the indoor set temperature cannot be met. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 10 of 10) Registration Number: 424-P010255225A-001-001-M01004A-0000 Registration Date/Time: 2024-10-23   12:20:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-001-M27005A-0000 Registration Date/Time: 2024-10-23   12:21:38 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 1 of 7) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 105) City: La Quinta Zip Code: 92253 Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010. A. Dwelling Mechanical Ventilation - General Information 01 Dwelling unit name DwellingUnit 105 02 Building Type Single Family 03 Project scope Newly constructed building 04 Total Conditioned Floor Area of Dwelling Unit (For addition projects the conditioned floor area equals existing area plus addition area. ) 931 05 Number of bedrooms in dwelling unit (For addition projects the number of bedrooms equals the existing bedrooms plus addition bedrooms) 2 06 Ventilation Operation Schedule Continuous 07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1) 08 Whole Building Ventilation System Type Standalone - Balanced 09 IAQ Fan Location Note: Non-dwelling units do not meet the definition for a dwelling unit as defined in Section 100.1(b). Non-dwelling units are not designed to provide independent living facilities and do not provide permanent provisions for living, sleeping, eating, cooking and sanitation. MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with outdoor air each hour at no less than the rate in equation 4.1a. 01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81 02 Installed Continuous Whole-Building Ventilation Rate 136 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 2 of 7) Registration Number: 424-P010255225A-001-001-M27005A-0000 Registration Date/Time: 2024-10-23   12:21:38 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 C. Compliance Statement 01 Building passes continuous whole-building ventilation rate test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 3 of 7) Registration Number: 424-P010255225A-001-001-M27005A-0000 Registration Date/Time: 2024-10-23   12:21:38 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 D. Local Mechanical Exhaust System - Fan selection and duct design criteria for compliance Local mechanical exhaust fans shall be installed in each kitchen and bathroom. Delivered local ventilation rates: •All local ventilation rates have been measured using a flow hood, flow grid, or other airflow measuring device and meet the requirements of 62.2 Tables 5.1 or 5.2. OR •The airflow rating at a pressure of 0.25 in. w.c. of a certified fan is assumed because the local ventilation system duct sizing meets the prescriptive requirements of 62.2 Table 5.3, or manufacturer's design criteria. Table 5.1 Intermittent Local Ventilation Exhaust Airflow Rates Application Airflow Notes Kitchen 100 cfm Vented range hood (including appliance-range hood combinations) required if exhaust fan flow is less than 5 ACH. Bathroom 50 cfm Table 5.2 Continuous Local Ventilation Exhaust Airflow Rates Application Airflow Notes Kitchen 5 ACH Based on Kitchen volume. Bathroom 20 cfm Table 5.3 Prescriptive Duct Sizing Requirements Duct Type Flex Duct Smooth Duct Fan Rating cfm @ 0.25 in. w.g. 50 80 100 125 50 80 100 125 Maximum Allowable Duct Length (ft) Diameter, (in)Flex Duct Smooth Duct 3 X X X X 5 X X X 4 70 3 X X 105 35 5 X 5 NL 70 35 20 NL 135 85 55 6 NL NL 125 95 NL NL NL 145 7 and above NL NL NL NL NL NL NL NL This table assumes no elbows. Deduct 15 ft of allowable duct length for each turn, elbow, or fitting. Interpolation and extrapolation in 62.2 Table 5.3 is not allowed. For airflow values not listed, use the next higher value. This table is not applicable for airflow > 125 cfm. NL = no limit on duct length of this size. X = not allowed, any length of duct of this size with assumed turns, elbows, fittings will exceed the rated pressure drop. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 4 of 7) Registration Number: 424-P010255225A-001-001-M27005A-0000 Registration Date/Time: 2024-10-23   12:21:38 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 E. Other Requirements The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if applicable. 01 6.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components to occupiable spaces from garages, unconditioned crawl spaces, and unconditioned attics. Supply and balanced ventilation systems shall be designed and constructed to provide ventilation air directly from the outdoors. 02 6.2 Instructions and Labeling.Information on the ventilation design and/or ventilation systems installed, instructions on their proper operation to meet the requirements of this standard, and instructions detailing any required maintenance (similar to that provided for HVAC systems) shall be provided to the owner and the occupant of the dwelling unit. Controls shall be labeled as to their function (unless that function is obvious, such as toilet exhaust fan switches). See Chapter 13 of Guideline 24 2 for information on instructions and labeling. 03 6.3 Clothes Dryers.Clothes dryers shall be exhausted directly to the outdoors 04 6.4 Combustion and Solid-Fuel Burning Appliances.Combustion and solid-fuel burning appliances must be provided with adequate combustion and ventilation air and vented in accordance with manufacturer installation instructions, NFPA 54 ANSI Z223.1, National Fuel Gas Code, NFPA 31, Standard for the Installation of Oil-Burning Equipment, or NFPA 211, Standard for Chimneys, Fireplaces, Vents, and Solid-Fuel Burning Appliances, or other equivalent code acceptable to the building official. Where atmospherically vented combustion appliances or solid-fuel burning appliances are located inside the pressure boundary, the total net exhaust flow of the two largest exhaust fans (not including a summer cooling fan intended to be operated only when windows or other air inlets are open) shall not exceed 15 cfm/100 ft 2 (75 Lps/100 m2) of occupiable space when in operation at full capacity. If the designed total net flow exceeds this limit, the net exhaust flow must be reduced by reducing the exhaust flow or providing compensating outdoor airflow. Atmospherically vented combustion appliances do not include direct-vent appliances. 05 6.5 Garages.When an occupiable space adjoins a garage, the design must prevent migration of contaminants to the adjoining occupiable space. Air seal the walls, ceilings, and floors that separate garages from occupiable space. To be considered air sealed, all joints, seams, penetrations, openings between door assemblies and their respective jambs and framing, and other sources of air leakage through wall and ceiling assemblies separating the garage from the residence and its attic area shall be caulked, gasketed, weather stripped, wrapped, or otherwise sealed to limit air movement. Doors between garages and occupiable spaces shall be gasketed or made substantially airtight with weather stripping. 06 6.6 Ventilation Opening Area.Spaces shall have ventilation openings as listed below. Such openings shall meet the requirements of Section 6.8 07 6.7 Minimum Filtration.Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 ft (3 m) in length and through a thermal conditioning component, except evaporative coolers, shall be provided with a filter having a designated minimum efficiency of MERV 6, or better, when tested in accordance with ANSI ASHRAE Standard 52.2, Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size, or a minimum Particle Size Efficiency of 50 percent in the 3.0-10 µm range in accordance with AHRI Standard 680, Performance Rating of Residential Air Filter Equipment. The system shall be designed such that all recirculated and mechanically supplied outdoor air is filtered before passing through the thermal conditioning components. The filter shall be located and installed in such a manner as to facilitate access and regular service by the owner. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 5 of 7) Registration Number: 424-P010255225A-001-001-M27005A-0000 Registration Date/Time: 2024-10-23   12:21:38 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 E. Other Requirements The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if applicable. 08 6.8 Air Inlets.Air inlets that are part of the ventilation design shall be located a minimum of 10 ft (3 m) from known sources of contamination such as a stack, vent, exhaust hood, or vehicle exhaust. The intake shall be placed so that entering air is not obstructed by snow, plantings, or other material. Forced air inlets shall be provided with rodent insect screens (mesh not larger than 1/2 inch). 09 6.9 Carbon Monoxide Detectors.A carbon monoxide alarm shall be installed in each dwelling unit in accordance with NFPA 720,Standard for the Installation of Carbon Monoxide (CO) Detection and Warning Equipment 14, and shall be consistent with requirements of applicable laws, codes, and standards. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met. F. Air Moving Equipment The items listed below (7.1 through 7.3) correspond to the information given in ASHRAE 62.2 Section 7 Air-Moving Equipment. Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.6) for information describing these requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 7.1 through 7.3 if applicable. 01 7.1 Selection and Installation.Ventilation devices and equipment shall be tested and listed in accordance with specific standards. Installations of systems or equipment shall be carried out in accordance with manufacturers' design requirements and installation instructions. 02 7.2 Sound Ratings for Fans.Ventilation fans shall be rated for sound at no less than the minimum airflow rate required by this standard, as noted below. These sound ratings shall be at a minimum of 0.1 in. w.c. (25 Pa) static pressure.      7.2.1 Whole Building or Continuous Ventilation Fans.These fans shall be rated for sound at a maximum of 1.0 sone.      7.2.2 Intermittent Local Exhaust Fans.Fans used to comply with Section 5.2 shall be rated for sound at a maximum of 3 sone, unless their maximum rated airflow exceeds 400 cfm (200 L/s). (Some exceptions may apply.) 03 7.3 Multibranch Exhaust Ducting.If more than one of the exhaust fans in a dwelling unit shares a common exhaust duct, each fan shall be equipped with a back draft damper to prevent the recirculation of exhaust air from one room to another through the exhaust ducting system. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 6 of 7) Registration Number: 424-P010255225A-001-001-M27005A-0000 Registration Date/Time: 2024-10-23   12:21:38 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 G. Multifamily Buildings -Other Requirements The items listed below correspond to the information given in ASHRAE 62.2 Section 8 "Multifamily Buildings". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 8, if applicable. 01 8.2 Whole-Building Mechanical Ventilation.For multifamily buildings, the term "building" in Section 4 refers to a single dwelling unit. 8.4.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components separating dwelling units, including sealing penetrations in the common walls, ceilings, and floors of each unit and by sealing vertical chases adjacent to the units. All doors between dwelling units and common hallways shall be gasketed or made substantially airtight. 8.4.1.1 Compliance.One method of demonstrating compliance with Section 8.4.1 shall be to verify a leakage rate below a maximum of 0.2 cfm/ ft2 (100 L/s per 100 m2) of the dwelling unit envelope area (i.e., the sum of the area of the walls between dwelling units, exterior walls, ceiling and floor) at a test pressure of 50 Pa by a blower door test. The test shall be conducted with the dwelling unit as if it were exposed to outdoor air on all sides, top, and bottom by opening doors and windows of adjacent dwelling units. 8.5.1 Exhaust Ducts.Exhaust fans in separate dwelling units shall not share a common exhaust duct. Exhaust inlets from more than one dwelling unit may be served by a single exhaust fan downstream of all the exhaust inlets if the fan is designated and intended to run continuously or if each inlet is equipped with a back-draft damper to prevent cross-contamination when the fan is not running. 8.5.2 Supply Ducts.Supply outlets to more than one dwelling unit may be served by a single fan upstream of all the supply outlets if the fan is designed and intended to run continuously or if each supply outlet is equipped with a back-draft damper to prevent cross-contamination when the fan is not running. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 7 of 7) Registration Number: 424-P010255225A-001-001-M27005A-0000 Registration Date/Time: 2024-10-23   12:21:38 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-001-M20006A-0000 Registration Date/Time: 2024-10-23   12:26:24 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 105) City: La Quinta Zip Code: 92253 A. System Information 01 Space Conditioning System Identification or Name UNIT 105 HVACSys 02 Space Conditioning System Location or Area Served Main 03 Building Type from CF-1R Multi-family 04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from CF1R? No, credit is not taken 05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit from CF1R? No, credit is not taken 06 Duct System Compliance Category New MCH-20a - Completely New Duct System B. Duct Leakage Diagnostic Test 01 Condenser Nominal Cooling Capacity (ton)3 02 Heating Capacity (kBtu/h)36 03 Conditioned Floor Area Served by this HVAC System (ft2)931 04 Duct Leakage Test Conditions Test final 05 Duct Leakage Test Method Total leakage 06 Leakage Factor 0.12 07 Air Handling Unit Airflow (AHUAirflow) Determination Method Cooling system method 08 Measured AHUAirflow (cfm)This field or section is not applicable 09 Calculated Target Allowable Duct Leakage (cfm)144 10 Actual Duct Leakage Rate from Leakage Test Measurement (cfm) 59.5 11 Compliance Statement System passes leakage test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 2 of 3) Registration Number: 424-P010255225A-001-001-M20006A-0000 Registration Date/Time: 2024-10-23   12:26:24 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. 02 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 All supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in). After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed 07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed. 08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. 09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 3 of 3) Registration Number: 424-P010255225A-001-001-M20006A-0000 Registration Date/Time: 2024-10-23   12:26:24 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable): NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-001-M23007A-0000 Registration Date/Time: 2024-10-23   12:27:31 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 105) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 105 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus ALNOR 03 Model number of Airflow Measurement Apparatus EB† 731 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas /index.html NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 2 of 3) Registration Number: 424-P010255225A-001-001-M23007A-0000 Registration Date/Time: 2024-10-23   12:27:31 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1050 03 Actual System Airflow Rate Measurement (cfm)1108 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Installation. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Installation was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 3 of 3) Registration Number: 424-P010255225A-001-001-M23007A-0000 Registration Date/Time: 2024-10-23   12:27:31 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-001-M22008A-0000 Registration Date/Time: 2024-10-23   12:28:09 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 105) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 105 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable watt meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 642.64 02 Actual Tested Airflow from MCH-23 (cfm)1108 03 Required Fan Efficacy (watts/cfm)0.58 04 Actual Fan Efficacy (watts/cfm)0.58 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 2 of 3) Registration Number: 424-P010255225A-001-001-M22008A-0000 Registration Date/Time: 2024-10-23   12:28:09 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 05 Compliance Statement:System fan efficacy complies D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 3 of 3) Registration Number: 424-P010255225A-001-001-M22008A-0000 Registration Date/Time: 2024-10-23   12:28:09 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:14 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-001-M26009A-0000 Registration Date/Time: 2024-10-23   12:32:33 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:16 CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 105) City: La Quinta Zip Code: 92253 A. System Information Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system requiring verification must use a separate form. 01 System Name or Identification/Tag UNIT 105 HVACSys 02 System Location or Area Served Main 03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required 04 Directory used to certify product performance AHRI 05 AHRI certification number for the installed space conditioning system from http://www.ahridirectory.org 208650564 06 Does the directory used to certify product performance require a specific air handler/furnace make and model? Yes 07 Does the directory used to certify product performance require a time delay relay (+TDR)? Yes 08 Does the directory used to certify product performance require a TXV (+TXV)? Yes B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Data from Nameplate of Installed system component Data from the Directory used to certify product performance for the rated system component Outdoor Condenser or Package Unit - Installed Manufacturer Name 01 RHEEM 02 RHEEM Outdoor Condenser or Package Unit - Installed Model Number 03 RHPAZR036JT000NA 04 RHPAZR036JT000NA Inside Coil - Installed Manufacturer Name 05 06 This field or section is not applicable Inside Coil - Installed Model Number 07 08 This field or section is not applicable NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 2 of 3) Registration Number: 424-P010255225A-001-001-M26009A-0000 Registration Date/Time: 2024-10-23   12:32:33 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:16 B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Air Handler/Furnace - Installed Manufacturer Name 09 10 RHEEM Air Handler/Furnace - Installed Model Number 11 12 RHPAZR036AJT C. Verified Cooling System SEER 01 Required minimum SEER 15 02 Installed SEER 15 03 Compliance Statement:System passes SEER verification Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed on the CF1R. D. Verified Cooling System EER This section does not apply to this project. E. Verified Cooling System Air Handler/Furnace 01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory. F. Verified Cooling System Time Delay Relay 01 If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of RA3.4.3. G. Verified Cooling System TXV 01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 3 of 3) Registration Number: 424-P010255225A-001-001-M26009A-0000 Registration Date/Time: 2024-10-23   12:32:33 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:16 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-002-M01004A-0000 Registration Date/Time: 2024-10-23   12:56:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:16 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 1 of 10) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 106) City: La Quinta Zip Code: 92253 A. General Information 01 Dwelling Unit Name DwellingUnit 106 02 Climate Zone 15 03 Dwelling Unit Total Conditioned Floor Area (ft2)931 04 Number of Space Conditioning Systems in this dwelling unit. 1 05 Certificate of Compliance Type Performance (CF1R-PRF)06 Method Used to Calculate HVAC Loads ACCA Manual J 07 Calculated Dwelling Unit Sensible Cooling Load (Btu/h) 36000 08 Calculated Dwelling Unit Heating Load (Btu/h)36000 09 Dwelling Unit Number of Bedrooms 2 MCH-01a - Space Conditioning Systems Ducts and Fans - For use with Performance Certificate of Compliance NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 2 of 10) Registration Number: 424-P010255225A-001-002-M01004A-0000 Registration Date/Time: 2024-10-23   12:56:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:16 B. Design Space Conditioning (SC) System Component Specifications from CF1R This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project. 01 02 03 04 05 06 07 08 09 10 11 12 Zone Name SC System Identification or Name SC System Type Heating System Type Cooling System Type SC Fan Type Distribution System Type Required Thermostat Type Low Leakage Air-Handling Unit (LLAHU) Status Bypass Duct Status Cooling Zoning Type Cooling System Compressor Speed This field or section is not applicable UNIT 106 HVACSys Heat pump heating cooling Central packaged HP Central packaged HP PSC Permanent Split Capacitor Unconditione d attic OCST per JA5 No, credit is not taken No Bypass Duct Not Zonal Single Speed Notes: C. Design Space Conditioning (SC) System Compliance Requirements from CF1R This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project. 01 02 03 04 05 06 07 08 09 10 SC System Identification or Name Heating Efficiency Type Minimum Heating Efficiency Value Heat Pump Heating Capacity at 47°F Heat Pump Heating Capacity at 17°F Minimum Cooling Efficiency SEER Minimum Cooling Efficiency EER Minimum Cooling System Airflow Rate (CFM/ton) Maximum Fan Efficacy (W/CFM) Minimum Duct R-Value UNIT 106 HVACSys Heating Seasonal Performance Factor (HSPF) 8.2 36000 29000 15 12.44 350 0.58 R-8 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 3 of 10) Registration Number: 424-P010255225A-001-002-M01004A-0000 Registration Date/Time: 2024-10-23   12:56:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:16 D. Installed Space Conditioning (SC) System Component Information 01 02 03 04 05 06 07 08 09 10 11 SC System Identification or Name SC System Location or Area Served Conditioned Floor Area Served by the System (ft2) Heating System Type Cooling System Type SC Fan Type Distribution System Type SC System Thermostat Type Cooling Zoning Type Cooling System Compressor Speed Type Central Fan Integrated (CFI) Ventilation System Status UNIT 106 HVACSys Main 931 Central packaged HP Central packaged HP PSC Permanent Split Capacitor Unconditioned attic OCST per JA5 Not Zonal Single Speed Not a CFI system Notes: E. Installed Heating System Equipment Information (not heat pumps) This section does not apply to this project. F. Installed Cooling System Outdoor Condensing Unit or Package Unit Equipment Information (not heat pumps) This section does not apply to this project. G. Installed Split System Indoor Coil or Fan Coil Unit Equipment Information (applicable to DX or hydronic heating/cooling coils or fan coil units) Systems with more than one indoor coil or fan coil unit (e.g. multi-split systems) shall provide information for each of the system indoor coils or fan coil units. This section does not apply to this project. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 4 of 10) Registration Number: 424-P010255225A-001-002-M01004A-0000 Registration Date/Time: 2024-10-23   12:56:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:16 H. Installed Heat Pump System - Split System Condensing Unit or Package Unit Equipment Information 01 02 03 04 05 SC System Identification or Name SC System Location or Area Served Condenser or Package Unit Manufacturer Condenser or Package Unit Model Number Condenser or Package Unit Serial Number UNIT 106 HVACSys Main RHEEM RHPAZR036JT000NA F362301330 Notes: I. Installed Heat Pump System -Efficiency and Performance Compliance Information 01 02 03 04 05 06 07 08 09 10 SC System Identification or Name SC System Location or Area Served Heating Efficiency Type Heating Efficiency Value System Rated Heating Capacity at 47°F System Rated Heating Capacity at 17°F System Rated Cooling Efficiency SEER System Rated Cooling Efficiency EER System Rated Cooling Capacity at Design Conditions (Btu/h) Condenser Rated Nominal Capacity (ton) UNIT 106 HVACSys Main Heating Seasonal Performance Factor (HSPF) 8.2 36000 29000 15 12.44 36000 3 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 5 of 10) Registration Number: 424-P010255225A-001-002-M01004A-0000 Registration Date/Time: 2024-10-23   12:56:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:16 J. Installed Duct System Information 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identification or Name SC System Location or Area Served Supply Duct Location Supply Duct R-Value Return Duct Location Return Duct R-Value Exemption from Min R-Value for Ducts In Conditioned Space Method of compliance with duct and filter grille sizing Req's in 150.0(m)13 Exemption From Duct Leakage Requirement s Bypass Duct Status Number of Air Filter Devices on System Can RA3.3 Airflow Protocols be used to test this System? UNIT 106 HVACSys Main Unconditio ned attic R-8 Unconditio ned attic R-8 Not applicable HERS verified fan efficacy (W/cfm) and airflow rate (cfm/ton) None No Bypass Duct 1 Yes Notes: K. Installed Air Filter Device Information Mandatory requirements for air filter devices are specified Section 150.0(m)12. 01 02 03 04 05 06 07 SC System Identification or Name SC System Location or Area Served Air Filter Device Identification or Name Air Filter Device Type Air Filter Device Location Determined Design Airflow Rate for Air Filter Device (cfm) Determined Design Allowable Pressure Drop for Air Filter Device (inch W.C.) UNIT 106 HVACSys Main Filter Filter Grille return 1050 0.1 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 6 of 10) Registration Number: 424-P010255225A-001-002-M01004A-0000 Registration Date/Time: 2024-10-23   12:56:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:16 L. Air Filter Device Requirements 01 The system shall be designed to ensure that all recirculated air and all outdoor air supplied to the occupiable space is filtered before passing through the system's thermal conditioning components. 02 The system shall be designed to accommodate the clean-filter pressure drop imposed by the system air filter device(s). The design airflow rate and maximum allowable clean-filter pressure drop at the design airflow rate applicable to each air filter device shall be determined, and all system air filter device locations shall be labeled to disclose the applicable design airflow rate and the maximum allowable clean-filter pressure drop. The labels shall be permanently affixed to the air filter device, readily legible, and visible to a person replacing the air filter media, and the air filter devices shall be provided with air filter media that conforms to these determined or labeled maximum allowable clean-filter pressure drop values as rated using AHRI Standard 680. 03 All system air filter devices shall be located and installed in such a manner as to allow access and regular service by the system owner. 04 The system shall be provided with air filter media having a designated efficiency equal to or greater than MERV 6 when tested in accordance with ASHRAE Standard 52.2, or a particle size efficiency rating equal to or greater than 50% in the 3.0 to10 µm range when tested in accordance with AHRI Standard 680. 05 The system shall be provided with air filter media that has been labeled by the manufacturer to disclose the efficiency and pressure drop ratings that conform to the required efficiency and pressure drop requirements for the air filter device. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met M. HERS Verification Requirements 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identificati on or Name SC System Location or Area Served MCH-20 . . Duct Leakage Test MCH-21 . Duct Location Verification MCH-22 . AHU Fan Efficacy (W/cfm) MCH-23 . AHU Airflow Rate (cfm/ton) MCH-25 . . Refrigerant Charge MCH-26 Rated SC System Equipment Verification MCH-27 . IAQ Mechanical Ventilation MCH-28 Return Duct Design Table 150.0-B or C MCH-29 Supply Duct Surface Area R-Value Buried Ducts MCH30 . Ventilation Cooling Credit UNIT 106 HVACSys Main Yes No Yes Yes No Yes Yes No No No NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 7 of 10) Registration Number: 424-P010255225A-001-002-M01004A-0000 Registration Date/Time: 2024-10-23   12:56:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:16 M. HERS Verification Requirements 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identificati on or Name SC System Location or Area Served MCH-20 . . Duct Leakage Test MCH-21 . Duct Location Verification MCH-22 . AHU Fan Efficacy (W/cfm) MCH-23 . AHU Airflow Rate (cfm/ton) MCH-25 . . Refrigerant Charge MCH-26 Rated SC System Equipment Verification MCH-27 . IAQ Mechanical Ventilation MCH-28 Return Duct Design Table 150.0-B or C MCH-29 Supply Duct Surface Area R-Value Buried Ducts MCH30 . Ventilation Cooling Credit Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 8 of 10) Registration Number: 424-P010255225A-001-002-M01004A-0000 Registration Date/Time: 2024-10-23   12:56:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:16 N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. Heating Equipment 01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(i), 110.2(b). 03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections 150.0(h)1 and 2). 04 Furnace Temperature Rise: Central forced-air heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum inlet-to-outlet temperature rise specification. See Section 150.0(h)4. 05 Standby Losses and Pilot Lights: Fan-type central furnaces may not have a continuously burning pilot light. Section 110.5 and Section 110.2(d). Cooling Equipment 06 Equipment Efficiency: All cooling equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 07 Refrigerant Line Insulation: All refrigerant line insulation in split system air conditioners and heat pumps must meet the R-value and protection requirements of Section 150.0(j)2 and 3, and Section 150.0(m)9. 08 Condensing Unit Location: Condensing units shall not be placed within five (5) feet of a dryer vent outlet. See Section 150.0(h)3A. 09 Liquid Line Filter Drier: If applicable, a liquid line filter drier shall be installed according to the manufacturer's specifications. Section 150.0(h)3B 10 Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section 150.0(h)1 and 2. Air Distribution System Ducts, Plenums and Fans NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 9 of 10) Registration Number: 424-P010255225A-001-002-M01004A-0000 Registration Date/Time: 2024-10-23   12:56:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:16 N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. 11 Insulation: In all cases, unless ducts are enclosed entirely in directly conditioned space, the minimum duct insulation value is R-6. Note that higher values may be required by the prescriptive or performance requirements. See Section 150.0(m)1. 12 Connections and Closures: All installed air-distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0, 602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006: Supply-air and return-air ducts and plenums must be insulated to a minimum installed level of R-6.0 or enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing in accordance with the requirements of Reference Residential Appendix RA3.1.4.3.8. Heat Pump Thermostat 13 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c). 14 The thermostat shall be installed in accordance with the manufacturers published installation specifications 15 First stage of heating shall be assigned to heat pump heating. 16 Second stage back up heating shall be set to come on only when the indoor set temperature cannot be met. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 10 of 10) Registration Number: 424-P010255225A-001-002-M01004A-0000 Registration Date/Time: 2024-10-23   12:56:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:16 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-002-M27005A-0000 Registration Date/Time: 2024-10-23   12:57:15 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:17 CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 1 of 7) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 106) City: La Quinta Zip Code: 92253 Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010. A. Dwelling Mechanical Ventilation - General Information 01 Dwelling unit name DwellingUnit 106 02 Building Type Single Family 03 Project scope Newly constructed building 04 Total Conditioned Floor Area of Dwelling Unit (For addition projects the conditioned floor area equals existing area plus addition area. ) 931 05 Number of bedrooms in dwelling unit (For addition projects the number of bedrooms equals the existing bedrooms plus addition bedrooms) 2 06 Ventilation Operation Schedule Continuous 07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1) 08 Whole Building Ventilation System Type Standalone - Balanced 09 IAQ Fan Location Note: Non-dwelling units do not meet the definition for a dwelling unit as defined in Section 100.1(b). Non-dwelling units are not designed to provide independent living facilities and do not provide permanent provisions for living, sleeping, eating, cooking and sanitation. MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with outdoor air each hour at no less than the rate in equation 4.1a. 01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81 02 Installed Continuous Whole-Building Ventilation Rate 138 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 2 of 7) Registration Number: 424-P010255225A-001-002-M27005A-0000 Registration Date/Time: 2024-10-23   12:57:15 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:17 C. Compliance Statement 01 Building passes continuous whole-building ventilation rate test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 3 of 7) Registration Number: 424-P010255225A-001-002-M27005A-0000 Registration Date/Time: 2024-10-23   12:57:15 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:17 D. Local Mechanical Exhaust System - Fan selection and duct design criteria for compliance Local mechanical exhaust fans shall be installed in each kitchen and bathroom. Delivered local ventilation rates: •All local ventilation rates have been measured using a flow hood, flow grid, or other airflow measuring device and meet the requirements of 62.2 Tables 5.1 or 5.2. OR •The airflow rating at a pressure of 0.25 in. w.c. of a certified fan is assumed because the local ventilation system duct sizing meets the prescriptive requirements of 62.2 Table 5.3, or manufacturer's design criteria. Table 5.1 Intermittent Local Ventilation Exhaust Airflow Rates Application Airflow Notes Kitchen 100 cfm Vented range hood (including appliance-range hood combinations) required if exhaust fan flow is less than 5 ACH. Bathroom 50 cfm Table 5.2 Continuous Local Ventilation Exhaust Airflow Rates Application Airflow Notes Kitchen 5 ACH Based on Kitchen volume. Bathroom 20 cfm Table 5.3 Prescriptive Duct Sizing Requirements Duct Type Flex Duct Smooth Duct Fan Rating cfm @ 0.25 in. w.g. 50 80 100 125 50 80 100 125 Maximum Allowable Duct Length (ft) Diameter, (in)Flex Duct Smooth Duct 3 X X X X 5 X X X 4 70 3 X X 105 35 5 X 5 NL 70 35 20 NL 135 85 55 6 NL NL 125 95 NL NL NL 145 7 and above NL NL NL NL NL NL NL NL This table assumes no elbows. Deduct 15 ft of allowable duct length for each turn, elbow, or fitting. Interpolation and extrapolation in 62.2 Table 5.3 is not allowed. For airflow values not listed, use the next higher value. This table is not applicable for airflow > 125 cfm. NL = no limit on duct length of this size. X = not allowed, any length of duct of this size with assumed turns, elbows, fittings will exceed the rated pressure drop. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 4 of 7) Registration Number: 424-P010255225A-001-002-M27005A-0000 Registration Date/Time: 2024-10-23   12:57:15 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:17 E. Other Requirements The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if applicable. 01 6.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components to occupiable spaces from garages, unconditioned crawl spaces, and unconditioned attics. Supply and balanced ventilation systems shall be designed and constructed to provide ventilation air directly from the outdoors. 02 6.2 Instructions and Labeling.Information on the ventilation design and/or ventilation systems installed, instructions on their proper operation to meet the requirements of this standard, and instructions detailing any required maintenance (similar to that provided for HVAC systems) shall be provided to the owner and the occupant of the dwelling unit. Controls shall be labeled as to their function (unless that function is obvious, such as toilet exhaust fan switches). See Chapter 13 of Guideline 24 2 for information on instructions and labeling. 03 6.3 Clothes Dryers.Clothes dryers shall be exhausted directly to the outdoors 04 6.4 Combustion and Solid-Fuel Burning Appliances.Combustion and solid-fuel burning appliances must be provided with adequate combustion and ventilation air and vented in accordance with manufacturer installation instructions, NFPA 54 ANSI Z223.1, National Fuel Gas Code, NFPA 31, Standard for the Installation of Oil-Burning Equipment, or NFPA 211, Standard for Chimneys, Fireplaces, Vents, and Solid-Fuel Burning Appliances, or other equivalent code acceptable to the building official. Where atmospherically vented combustion appliances or solid-fuel burning appliances are located inside the pressure boundary, the total net exhaust flow of the two largest exhaust fans (not including a summer cooling fan intended to be operated only when windows or other air inlets are open) shall not exceed 15 cfm/100 ft 2 (75 Lps/100 m2) of occupiable space when in operation at full capacity. If the designed total net flow exceeds this limit, the net exhaust flow must be reduced by reducing the exhaust flow or providing compensating outdoor airflow. Atmospherically vented combustion appliances do not include direct-vent appliances. 05 6.5 Garages.When an occupiable space adjoins a garage, the design must prevent migration of contaminants to the adjoining occupiable space. Air seal the walls, ceilings, and floors that separate garages from occupiable space. To be considered air sealed, all joints, seams, penetrations, openings between door assemblies and their respective jambs and framing, and other sources of air leakage through wall and ceiling assemblies separating the garage from the residence and its attic area shall be caulked, gasketed, weather stripped, wrapped, or otherwise sealed to limit air movement. Doors between garages and occupiable spaces shall be gasketed or made substantially airtight with weather stripping. 06 6.6 Ventilation Opening Area.Spaces shall have ventilation openings as listed below. Such openings shall meet the requirements of Section 6.8 07 6.7 Minimum Filtration.Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 ft (3 m) in length and through a thermal conditioning component, except evaporative coolers, shall be provided with a filter having a designated minimum efficiency of MERV 6, or better, when tested in accordance with ANSI ASHRAE Standard 52.2, Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size, or a minimum Particle Size Efficiency of 50 percent in the 3.0-10 µm range in accordance with AHRI Standard 680, Performance Rating of Residential Air Filter Equipment. The system shall be designed such that all recirculated and mechanically supplied outdoor air is filtered before passing through the thermal conditioning components. The filter shall be located and installed in such a manner as to facilitate access and regular service by the owner. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 5 of 7) Registration Number: 424-P010255225A-001-002-M27005A-0000 Registration Date/Time: 2024-10-23   12:57:15 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:17 E. Other Requirements The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if applicable. 08 6.8 Air Inlets.Air inlets that are part of the ventilation design shall be located a minimum of 10 ft (3 m) from known sources of contamination such as a stack, vent, exhaust hood, or vehicle exhaust. The intake shall be placed so that entering air is not obstructed by snow, plantings, or other material. Forced air inlets shall be provided with rodent insect screens (mesh not larger than 1/2 inch). 09 6.9 Carbon Monoxide Detectors.A carbon monoxide alarm shall be installed in each dwelling unit in accordance with NFPA 720,Standard for the Installation of Carbon Monoxide (CO) Detection and Warning Equipment 14, and shall be consistent with requirements of applicable laws, codes, and standards. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met. F. Air Moving Equipment The items listed below (7.1 through 7.3) correspond to the information given in ASHRAE 62.2 Section 7 Air-Moving Equipment. Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.6) for information describing these requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 7.1 through 7.3 if applicable. 01 7.1 Selection and Installation.Ventilation devices and equipment shall be tested and listed in accordance with specific standards. Installations of systems or equipment shall be carried out in accordance with manufacturers' design requirements and installation instructions. 02 7.2 Sound Ratings for Fans.Ventilation fans shall be rated for sound at no less than the minimum airflow rate required by this standard, as noted below. These sound ratings shall be at a minimum of 0.1 in. w.c. (25 Pa) static pressure.      7.2.1 Whole Building or Continuous Ventilation Fans.These fans shall be rated for sound at a maximum of 1.0 sone.      7.2.2 Intermittent Local Exhaust Fans.Fans used to comply with Section 5.2 shall be rated for sound at a maximum of 3 sone, unless their maximum rated airflow exceeds 400 cfm (200 L/s). (Some exceptions may apply.) 03 7.3 Multibranch Exhaust Ducting.If more than one of the exhaust fans in a dwelling unit shares a common exhaust duct, each fan shall be equipped with a back draft damper to prevent the recirculation of exhaust air from one room to another through the exhaust ducting system. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 6 of 7) Registration Number: 424-P010255225A-001-002-M27005A-0000 Registration Date/Time: 2024-10-23   12:57:15 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:17 G. Multifamily Buildings -Other Requirements The items listed below correspond to the information given in ASHRAE 62.2 Section 8 "Multifamily Buildings". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 8, if applicable. 01 8.2 Whole-Building Mechanical Ventilation.For multifamily buildings, the term "building" in Section 4 refers to a single dwelling unit. 8.4.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components separating dwelling units, including sealing penetrations in the common walls, ceilings, and floors of each unit and by sealing vertical chases adjacent to the units. All doors between dwelling units and common hallways shall be gasketed or made substantially airtight. 8.4.1.1 Compliance.One method of demonstrating compliance with Section 8.4.1 shall be to verify a leakage rate below a maximum of 0.2 cfm/ ft2 (100 L/s per 100 m2) of the dwelling unit envelope area (i.e., the sum of the area of the walls between dwelling units, exterior walls, ceiling and floor) at a test pressure of 50 Pa by a blower door test. The test shall be conducted with the dwelling unit as if it were exposed to outdoor air on all sides, top, and bottom by opening doors and windows of adjacent dwelling units. 8.5.1 Exhaust Ducts.Exhaust fans in separate dwelling units shall not share a common exhaust duct. Exhaust inlets from more than one dwelling unit may be served by a single exhaust fan downstream of all the exhaust inlets if the fan is designated and intended to run continuously or if each inlet is equipped with a back-draft damper to prevent cross-contamination when the fan is not running. 8.5.2 Supply Ducts.Supply outlets to more than one dwelling unit may be served by a single fan upstream of all the supply outlets if the fan is designed and intended to run continuously or if each supply outlet is equipped with a back-draft damper to prevent cross-contamination when the fan is not running. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 7 of 7) Registration Number: 424-P010255225A-001-002-M27005A-0000 Registration Date/Time: 2024-10-23   12:57:15 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:17 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-002-M20006A-0000 Registration Date/Time: 2024-10-23   12:57:38 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:17 CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 106) City: La Quinta Zip Code: 92253 A. System Information 01 Space Conditioning System Identification or Name UNIT 106 HVACSys 02 Space Conditioning System Location or Area Served Main 03 Building Type from CF-1R Multi-family 04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from CF1R? No, credit is not taken 05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit from CF1R? No, credit is not taken 06 Duct System Compliance Category New MCH-20a - Completely New Duct System B. Duct Leakage Diagnostic Test 01 Condenser Nominal Cooling Capacity (ton)3 02 Heating Capacity (kBtu/h)36 03 Conditioned Floor Area Served by this HVAC System (ft2)931 04 Duct Leakage Test Conditions Test final 05 Duct Leakage Test Method Total leakage 06 Leakage Factor 0.12 07 Air Handling Unit Airflow (AHUAirflow) Determination Method Cooling system method 08 Measured AHUAirflow (cfm)This field or section is not applicable 09 Calculated Target Allowable Duct Leakage (cfm)144 10 Actual Duct Leakage Rate from Leakage Test Measurement (cfm) 68.6 11 Compliance Statement System passes leakage test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 2 of 3) Registration Number: 424-P010255225A-001-002-M20006A-0000 Registration Date/Time: 2024-10-23   12:57:38 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:17 C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. 02 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 All supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in). After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed 07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed. 08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. 09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 3 of 3) Registration Number: 424-P010255225A-001-002-M20006A-0000 Registration Date/Time: 2024-10-23   12:57:38 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:17 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable): NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-002-M23007A-0000 Registration Date/Time: 2024-10-23   12:58:10 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:17 CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 106) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 106 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus ALNOR 03 Model number of Airflow Measurement Apparatus EB† 731 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas /index.html NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 2 of 3) Registration Number: 424-P010255225A-001-002-M23007A-0000 Registration Date/Time: 2024-10-23   12:58:10 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:17 MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1050 03 Actual System Airflow Rate Measurement (cfm)1077 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Installation. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Installation was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 3 of 3) Registration Number: 424-P010255225A-001-002-M23007A-0000 Registration Date/Time: 2024-10-23   12:58:10 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:17 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-002-M22008A-0000 Registration Date/Time: 2024-10-23   12:58:39 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:17 CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 106) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 106 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable watt meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 624.66 02 Actual Tested Airflow from MCH-23 (cfm)1077 03 Required Fan Efficacy (watts/cfm)0.58 04 Actual Fan Efficacy (watts/cfm)0.58 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 2 of 3) Registration Number: 424-P010255225A-001-002-M22008A-0000 Registration Date/Time: 2024-10-23   12:58:39 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:17 C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 05 Compliance Statement:System fan efficacy complies D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 3 of 3) Registration Number: 424-P010255225A-001-002-M22008A-0000 Registration Date/Time: 2024-10-23   12:58:39 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:17 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-002-M26009A-0000 Registration Date/Time: 2024-10-23   12:58:58 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:17 CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 106) City: La Quinta Zip Code: 92253 A. System Information Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system requiring verification must use a separate form. 01 System Name or Identification/Tag UNIT 106 HVACSys 02 System Location or Area Served Main 03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required 04 Directory used to certify product performance AHRI 05 AHRI certification number for the installed space conditioning system from http://www.ahridirectory.org 208650564 06 Does the directory used to certify product performance require a specific air handler/furnace make and model? Yes 07 Does the directory used to certify product performance require a time delay relay (+TDR)? Yes 08 Does the directory used to certify product performance require a TXV (+TXV)? Yes B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Data from Nameplate of Installed system component Data from the Directory used to certify product performance for the rated system component Outdoor Condenser or Package Unit - Installed Manufacturer Name 01 RHEEM 02 RHEEM Outdoor Condenser or Package Unit - Installed Model Number 03 RHPAZR036JT000NA 04 RHPAZR036JT000NA Inside Coil - Installed Manufacturer Name 05 06 This field or section is not applicable Inside Coil - Installed Model Number 07 08 This field or section is not applicable NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 2 of 3) Registration Number: 424-P010255225A-001-002-M26009A-0000 Registration Date/Time: 2024-10-23   12:58:58 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:17 B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Air Handler/Furnace - Installed Manufacturer Name 09 10 RHEEM Air Handler/Furnace - Installed Model Number 11 12 RHPAZR036AJT C. Verified Cooling System SEER 01 Required minimum SEER 15 02 Installed SEER 15 03 Compliance Statement:System passes SEER verification Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed on the CF1R. D. Verified Cooling System EER This section does not apply to this project. E. Verified Cooling System Air Handler/Furnace 01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory. F. Verified Cooling System Time Delay Relay 01 If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of RA3.4.3. G. Verified Cooling System TXV 01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 3 of 3) Registration Number: 424-P010255225A-001-002-M26009A-0000 Registration Date/Time: 2024-10-23   12:58:58 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:17 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-003-M01004A-0000 Registration Date/Time: 2024-10-23   13:00:13 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:19 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 1 of 10) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 107) City: La Quinta Zip Code: 92253 A. General Information 01 Dwelling Unit Name DwellingUnit 107 02 Climate Zone 15 03 Dwelling Unit Total Conditioned Floor Area (ft2)931 04 Number of Space Conditioning Systems in this dwelling unit. 1 05 Certificate of Compliance Type Performance (CF1R-PRF)06 Method Used to Calculate HVAC Loads ACCA Manual J 07 Calculated Dwelling Unit Sensible Cooling Load (Btu/h) 36000 08 Calculated Dwelling Unit Heating Load (Btu/h)36000 09 Dwelling Unit Number of Bedrooms 2 MCH-01a - Space Conditioning Systems Ducts and Fans - For use with Performance Certificate of Compliance NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 2 of 10) Registration Number: 424-P010255225A-001-003-M01004A-0000 Registration Date/Time: 2024-10-23   13:00:13 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:19 B. Design Space Conditioning (SC) System Component Specifications from CF1R This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project. 01 02 03 04 05 06 07 08 09 10 11 12 Zone Name SC System Identification or Name SC System Type Heating System Type Cooling System Type SC Fan Type Distribution System Type Required Thermostat Type Low Leakage Air-Handling Unit (LLAHU) Status Bypass Duct Status Cooling Zoning Type Cooling System Compressor Speed This field or section is not applicable UNIT 107 HVACSys Heat pump heating cooling Central packaged HP Central packaged HP PSC Permanent Split Capacitor Unconditione d attic OCST per JA5 No, credit is not taken No Bypass Duct Not Zonal Single Speed Notes: C. Design Space Conditioning (SC) System Compliance Requirements from CF1R This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project. 01 02 03 04 05 06 07 08 09 10 SC System Identification or Name Heating Efficiency Type Minimum Heating Efficiency Value Heat Pump Heating Capacity at 47°F Heat Pump Heating Capacity at 17°F Minimum Cooling Efficiency SEER Minimum Cooling Efficiency EER Minimum Cooling System Airflow Rate (CFM/ton) Maximum Fan Efficacy (W/CFM) Minimum Duct R-Value UNIT 107 HVACSys Heating Seasonal Performance Factor (HSPF) 8.2 36000 29000 15 12.44 350 0.58 R-8 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 3 of 10) Registration Number: 424-P010255225A-001-003-M01004A-0000 Registration Date/Time: 2024-10-23   13:00:13 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:19 D. Installed Space Conditioning (SC) System Component Information 01 02 03 04 05 06 07 08 09 10 11 SC System Identification or Name SC System Location or Area Served Conditioned Floor Area Served by the System (ft2) Heating System Type Cooling System Type SC Fan Type Distribution System Type SC System Thermostat Type Cooling Zoning Type Cooling System Compressor Speed Type Central Fan Integrated (CFI) Ventilation System Status UNIT 107 HVACSys Main 931 Central packaged HP Central packaged HP PSC Permanent Split Capacitor Unconditioned attic OCST per JA5 Not Zonal Single Speed Not a CFI system Notes: E. Installed Heating System Equipment Information (not heat pumps) This section does not apply to this project. F. Installed Cooling System Outdoor Condensing Unit or Package Unit Equipment Information (not heat pumps) This section does not apply to this project. G. Installed Split System Indoor Coil or Fan Coil Unit Equipment Information (applicable to DX or hydronic heating/cooling coils or fan coil units) Systems with more than one indoor coil or fan coil unit (e.g. multi-split systems) shall provide information for each of the system indoor coils or fan coil units. This section does not apply to this project. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 4 of 10) Registration Number: 424-P010255225A-001-003-M01004A-0000 Registration Date/Time: 2024-10-23   13:00:13 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:19 H. Installed Heat Pump System - Split System Condensing Unit or Package Unit Equipment Information 01 02 03 04 05 SC System Identification or Name SC System Location or Area Served Condenser or Package Unit Manufacturer Condenser or Package Unit Model Number Condenser or Package Unit Serial Number UNIT 107 HVACSys Main RHEEM RHPAZR036JT000NA F422302306 Notes: I. Installed Heat Pump System -Efficiency and Performance Compliance Information 01 02 03 04 05 06 07 08 09 10 SC System Identification or Name SC System Location or Area Served Heating Efficiency Type Heating Efficiency Value System Rated Heating Capacity at 47°F System Rated Heating Capacity at 17°F System Rated Cooling Efficiency SEER System Rated Cooling Efficiency EER System Rated Cooling Capacity at Design Conditions (Btu/h) Condenser Rated Nominal Capacity (ton) UNIT 107 HVACSys Main Heating Seasonal Performance Factor (HSPF) 8.2 36000 29000 15 12.44 36000 3 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 5 of 10) Registration Number: 424-P010255225A-001-003-M01004A-0000 Registration Date/Time: 2024-10-23   13:00:13 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:19 J. Installed Duct System Information 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identification or Name SC System Location or Area Served Supply Duct Location Supply Duct R-Value Return Duct Location Return Duct R-Value Exemption from Min R-Value for Ducts In Conditioned Space Method of compliance with duct and filter grille sizing Req's in 150.0(m)13 Exemption From Duct Leakage Requirement s Bypass Duct Status Number of Air Filter Devices on System Can RA3.3 Airflow Protocols be used to test this System? UNIT 107 HVACSys Main Unconditio ned attic R-8 Unconditio ned attic R-8 Not applicable HERS verified fan efficacy (W/cfm) and airflow rate (cfm/ton) None No Bypass Duct 1 Yes Notes: K. Installed Air Filter Device Information Mandatory requirements for air filter devices are specified Section 150.0(m)12. 01 02 03 04 05 06 07 SC System Identification or Name SC System Location or Area Served Air Filter Device Identification or Name Air Filter Device Type Air Filter Device Location Determined Design Airflow Rate for Air Filter Device (cfm) Determined Design Allowable Pressure Drop for Air Filter Device (inch W.C.) UNIT 107 HVACSys Main Filter Filter Grille return 1050 0.1 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 6 of 10) Registration Number: 424-P010255225A-001-003-M01004A-0000 Registration Date/Time: 2024-10-23   13:00:13 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:19 L. Air Filter Device Requirements 01 The system shall be designed to ensure that all recirculated air and all outdoor air supplied to the occupiable space is filtered before passing through the system's thermal conditioning components. 02 The system shall be designed to accommodate the clean-filter pressure drop imposed by the system air filter device(s). The design airflow rate and maximum allowable clean-filter pressure drop at the design airflow rate applicable to each air filter device shall be determined, and all system air filter device locations shall be labeled to disclose the applicable design airflow rate and the maximum allowable clean-filter pressure drop. The labels shall be permanently affixed to the air filter device, readily legible, and visible to a person replacing the air filter media, and the air filter devices shall be provided with air filter media that conforms to these determined or labeled maximum allowable clean-filter pressure drop values as rated using AHRI Standard 680. 03 All system air filter devices shall be located and installed in such a manner as to allow access and regular service by the system owner. 04 The system shall be provided with air filter media having a designated efficiency equal to or greater than MERV 6 when tested in accordance with ASHRAE Standard 52.2, or a particle size efficiency rating equal to or greater than 50% in the 3.0 to10 µm range when tested in accordance with AHRI Standard 680. 05 The system shall be provided with air filter media that has been labeled by the manufacturer to disclose the efficiency and pressure drop ratings that conform to the required efficiency and pressure drop requirements for the air filter device. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met M. HERS Verification Requirements 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identificati on or Name SC System Location or Area Served MCH-20 . . Duct Leakage Test MCH-21 . Duct Location Verification MCH-22 . AHU Fan Efficacy (W/cfm) MCH-23 . AHU Airflow Rate (cfm/ton) MCH-25 . . Refrigerant Charge MCH-26 Rated SC System Equipment Verification MCH-27 . IAQ Mechanical Ventilation MCH-28 Return Duct Design Table 150.0-B or C MCH-29 Supply Duct Surface Area R-Value Buried Ducts MCH30 . Ventilation Cooling Credit UNIT 107 HVACSys Main Yes No Yes Yes No Yes Yes No No No NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 7 of 10) Registration Number: 424-P010255225A-001-003-M01004A-0000 Registration Date/Time: 2024-10-23   13:00:13 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:19 M. HERS Verification Requirements 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identificati on or Name SC System Location or Area Served MCH-20 . . Duct Leakage Test MCH-21 . Duct Location Verification MCH-22 . AHU Fan Efficacy (W/cfm) MCH-23 . AHU Airflow Rate (cfm/ton) MCH-25 . . Refrigerant Charge MCH-26 Rated SC System Equipment Verification MCH-27 . IAQ Mechanical Ventilation MCH-28 Return Duct Design Table 150.0-B or C MCH-29 Supply Duct Surface Area R-Value Buried Ducts MCH30 . Ventilation Cooling Credit Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 8 of 10) Registration Number: 424-P010255225A-001-003-M01004A-0000 Registration Date/Time: 2024-10-23   13:00:13 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:19 N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. Heating Equipment 01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(i), 110.2(b). 03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections 150.0(h)1 and 2). 04 Furnace Temperature Rise: Central forced-air heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum inlet-to-outlet temperature rise specification. See Section 150.0(h)4. 05 Standby Losses and Pilot Lights: Fan-type central furnaces may not have a continuously burning pilot light. Section 110.5 and Section 110.2(d). Cooling Equipment 06 Equipment Efficiency: All cooling equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 07 Refrigerant Line Insulation: All refrigerant line insulation in split system air conditioners and heat pumps must meet the R-value and protection requirements of Section 150.0(j)2 and 3, and Section 150.0(m)9. 08 Condensing Unit Location: Condensing units shall not be placed within five (5) feet of a dryer vent outlet. See Section 150.0(h)3A. 09 Liquid Line Filter Drier: If applicable, a liquid line filter drier shall be installed according to the manufacturer's specifications. Section 150.0(h)3B 10 Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section 150.0(h)1 and 2. Air Distribution System Ducts, Plenums and Fans NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 9 of 10) Registration Number: 424-P010255225A-001-003-M01004A-0000 Registration Date/Time: 2024-10-23   13:00:13 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:19 N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. 11 Insulation: In all cases, unless ducts are enclosed entirely in directly conditioned space, the minimum duct insulation value is R-6. Note that higher values may be required by the prescriptive or performance requirements. See Section 150.0(m)1. 12 Connections and Closures: All installed air-distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0, 602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006: Supply-air and return-air ducts and plenums must be insulated to a minimum installed level of R-6.0 or enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing in accordance with the requirements of Reference Residential Appendix RA3.1.4.3.8. Heat Pump Thermostat 13 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c). 14 The thermostat shall be installed in accordance with the manufacturers published installation specifications 15 First stage of heating shall be assigned to heat pump heating. 16 Second stage back up heating shall be set to come on only when the indoor set temperature cannot be met. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 10 of 10) Registration Number: 424-P010255225A-001-003-M01004A-0000 Registration Date/Time: 2024-10-23   13:00:13 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:19 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-003-M27005A-0000 Registration Date/Time: 2024-10-23   13:00:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:20 CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 1 of 7) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 107) City: La Quinta Zip Code: 92253 Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010. A. Dwelling Mechanical Ventilation - General Information 01 Dwelling unit name DwellingUnit 107 02 Building Type Single Family 03 Project scope Newly constructed building 04 Total Conditioned Floor Area of Dwelling Unit (For addition projects the conditioned floor area equals existing area plus addition area. ) 931 05 Number of bedrooms in dwelling unit (For addition projects the number of bedrooms equals the existing bedrooms plus addition bedrooms) 2 06 Ventilation Operation Schedule Continuous 07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1) 08 Whole Building Ventilation System Type Standalone - Balanced 09 IAQ Fan Location Note: Non-dwelling units do not meet the definition for a dwelling unit as defined in Section 100.1(b). Non-dwelling units are not designed to provide independent living facilities and do not provide permanent provisions for living, sleeping, eating, cooking and sanitation. MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with outdoor air each hour at no less than the rate in equation 4.1a. 01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81 02 Installed Continuous Whole-Building Ventilation Rate 178 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 2 of 7) Registration Number: 424-P010255225A-001-003-M27005A-0000 Registration Date/Time: 2024-10-23   13:00:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:20 C. Compliance Statement 01 Building passes continuous whole-building ventilation rate test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 3 of 7) Registration Number: 424-P010255225A-001-003-M27005A-0000 Registration Date/Time: 2024-10-23   13:00:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:20 D. Local Mechanical Exhaust System - Fan selection and duct design criteria for compliance Local mechanical exhaust fans shall be installed in each kitchen and bathroom. Delivered local ventilation rates: •All local ventilation rates have been measured using a flow hood, flow grid, or other airflow measuring device and meet the requirements of 62.2 Tables 5.1 or 5.2. OR •The airflow rating at a pressure of 0.25 in. w.c. of a certified fan is assumed because the local ventilation system duct sizing meets the prescriptive requirements of 62.2 Table 5.3, or manufacturer's design criteria. Table 5.1 Intermittent Local Ventilation Exhaust Airflow Rates Application Airflow Notes Kitchen 100 cfm Vented range hood (including appliance-range hood combinations) required if exhaust fan flow is less than 5 ACH. Bathroom 50 cfm Table 5.2 Continuous Local Ventilation Exhaust Airflow Rates Application Airflow Notes Kitchen 5 ACH Based on Kitchen volume. Bathroom 20 cfm Table 5.3 Prescriptive Duct Sizing Requirements Duct Type Flex Duct Smooth Duct Fan Rating cfm @ 0.25 in. w.g. 50 80 100 125 50 80 100 125 Maximum Allowable Duct Length (ft) Diameter, (in)Flex Duct Smooth Duct 3 X X X X 5 X X X 4 70 3 X X 105 35 5 X 5 NL 70 35 20 NL 135 85 55 6 NL NL 125 95 NL NL NL 145 7 and above NL NL NL NL NL NL NL NL This table assumes no elbows. Deduct 15 ft of allowable duct length for each turn, elbow, or fitting. Interpolation and extrapolation in 62.2 Table 5.3 is not allowed. For airflow values not listed, use the next higher value. This table is not applicable for airflow > 125 cfm. NL = no limit on duct length of this size. X = not allowed, any length of duct of this size with assumed turns, elbows, fittings will exceed the rated pressure drop. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 4 of 7) Registration Number: 424-P010255225A-001-003-M27005A-0000 Registration Date/Time: 2024-10-23   13:00:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:20 E. Other Requirements The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if applicable. 01 6.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components to occupiable spaces from garages, unconditioned crawl spaces, and unconditioned attics. Supply and balanced ventilation systems shall be designed and constructed to provide ventilation air directly from the outdoors. 02 6.2 Instructions and Labeling.Information on the ventilation design and/or ventilation systems installed, instructions on their proper operation to meet the requirements of this standard, and instructions detailing any required maintenance (similar to that provided for HVAC systems) shall be provided to the owner and the occupant of the dwelling unit. Controls shall be labeled as to their function (unless that function is obvious, such as toilet exhaust fan switches). See Chapter 13 of Guideline 24 2 for information on instructions and labeling. 03 6.3 Clothes Dryers.Clothes dryers shall be exhausted directly to the outdoors 04 6.4 Combustion and Solid-Fuel Burning Appliances.Combustion and solid-fuel burning appliances must be provided with adequate combustion and ventilation air and vented in accordance with manufacturer installation instructions, NFPA 54 ANSI Z223.1, National Fuel Gas Code, NFPA 31, Standard for the Installation of Oil-Burning Equipment, or NFPA 211, Standard for Chimneys, Fireplaces, Vents, and Solid-Fuel Burning Appliances, or other equivalent code acceptable to the building official. Where atmospherically vented combustion appliances or solid-fuel burning appliances are located inside the pressure boundary, the total net exhaust flow of the two largest exhaust fans (not including a summer cooling fan intended to be operated only when windows or other air inlets are open) shall not exceed 15 cfm/100 ft 2 (75 Lps/100 m2) of occupiable space when in operation at full capacity. If the designed total net flow exceeds this limit, the net exhaust flow must be reduced by reducing the exhaust flow or providing compensating outdoor airflow. Atmospherically vented combustion appliances do not include direct-vent appliances. 05 6.5 Garages.When an occupiable space adjoins a garage, the design must prevent migration of contaminants to the adjoining occupiable space. Air seal the walls, ceilings, and floors that separate garages from occupiable space. To be considered air sealed, all joints, seams, penetrations, openings between door assemblies and their respective jambs and framing, and other sources of air leakage through wall and ceiling assemblies separating the garage from the residence and its attic area shall be caulked, gasketed, weather stripped, wrapped, or otherwise sealed to limit air movement. Doors between garages and occupiable spaces shall be gasketed or made substantially airtight with weather stripping. 06 6.6 Ventilation Opening Area.Spaces shall have ventilation openings as listed below. Such openings shall meet the requirements of Section 6.8 07 6.7 Minimum Filtration.Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 ft (3 m) in length and through a thermal conditioning component, except evaporative coolers, shall be provided with a filter having a designated minimum efficiency of MERV 6, or better, when tested in accordance with ANSI ASHRAE Standard 52.2, Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size, or a minimum Particle Size Efficiency of 50 percent in the 3.0-10 µm range in accordance with AHRI Standard 680, Performance Rating of Residential Air Filter Equipment. The system shall be designed such that all recirculated and mechanically supplied outdoor air is filtered before passing through the thermal conditioning components. The filter shall be located and installed in such a manner as to facilitate access and regular service by the owner. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 5 of 7) Registration Number: 424-P010255225A-001-003-M27005A-0000 Registration Date/Time: 2024-10-23   13:00:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:20 E. Other Requirements The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if applicable. 08 6.8 Air Inlets.Air inlets that are part of the ventilation design shall be located a minimum of 10 ft (3 m) from known sources of contamination such as a stack, vent, exhaust hood, or vehicle exhaust. The intake shall be placed so that entering air is not obstructed by snow, plantings, or other material. Forced air inlets shall be provided with rodent insect screens (mesh not larger than 1/2 inch). 09 6.9 Carbon Monoxide Detectors.A carbon monoxide alarm shall be installed in each dwelling unit in accordance with NFPA 720,Standard for the Installation of Carbon Monoxide (CO) Detection and Warning Equipment 14, and shall be consistent with requirements of applicable laws, codes, and standards. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met. F. Air Moving Equipment The items listed below (7.1 through 7.3) correspond to the information given in ASHRAE 62.2 Section 7 Air-Moving Equipment. Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.6) for information describing these requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 7.1 through 7.3 if applicable. 01 7.1 Selection and Installation.Ventilation devices and equipment shall be tested and listed in accordance with specific standards. Installations of systems or equipment shall be carried out in accordance with manufacturers' design requirements and installation instructions. 02 7.2 Sound Ratings for Fans.Ventilation fans shall be rated for sound at no less than the minimum airflow rate required by this standard, as noted below. These sound ratings shall be at a minimum of 0.1 in. w.c. (25 Pa) static pressure.      7.2.1 Whole Building or Continuous Ventilation Fans.These fans shall be rated for sound at a maximum of 1.0 sone.      7.2.2 Intermittent Local Exhaust Fans.Fans used to comply with Section 5.2 shall be rated for sound at a maximum of 3 sone, unless their maximum rated airflow exceeds 400 cfm (200 L/s). (Some exceptions may apply.) 03 7.3 Multibranch Exhaust Ducting.If more than one of the exhaust fans in a dwelling unit shares a common exhaust duct, each fan shall be equipped with a back draft damper to prevent the recirculation of exhaust air from one room to another through the exhaust ducting system. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 6 of 7) Registration Number: 424-P010255225A-001-003-M27005A-0000 Registration Date/Time: 2024-10-23   13:00:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:20 G. Multifamily Buildings -Other Requirements The items listed below correspond to the information given in ASHRAE 62.2 Section 8 "Multifamily Buildings". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 8, if applicable. 01 8.2 Whole-Building Mechanical Ventilation.For multifamily buildings, the term "building" in Section 4 refers to a single dwelling unit. 8.4.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components separating dwelling units, including sealing penetrations in the common walls, ceilings, and floors of each unit and by sealing vertical chases adjacent to the units. All doors between dwelling units and common hallways shall be gasketed or made substantially airtight. 8.4.1.1 Compliance.One method of demonstrating compliance with Section 8.4.1 shall be to verify a leakage rate below a maximum of 0.2 cfm/ ft2 (100 L/s per 100 m2) of the dwelling unit envelope area (i.e., the sum of the area of the walls between dwelling units, exterior walls, ceiling and floor) at a test pressure of 50 Pa by a blower door test. The test shall be conducted with the dwelling unit as if it were exposed to outdoor air on all sides, top, and bottom by opening doors and windows of adjacent dwelling units. 8.5.1 Exhaust Ducts.Exhaust fans in separate dwelling units shall not share a common exhaust duct. Exhaust inlets from more than one dwelling unit may be served by a single exhaust fan downstream of all the exhaust inlets if the fan is designated and intended to run continuously or if each inlet is equipped with a back-draft damper to prevent cross-contamination when the fan is not running. 8.5.2 Supply Ducts.Supply outlets to more than one dwelling unit may be served by a single fan upstream of all the supply outlets if the fan is designed and intended to run continuously or if each supply outlet is equipped with a back-draft damper to prevent cross-contamination when the fan is not running. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 7 of 7) Registration Number: 424-P010255225A-001-003-M27005A-0000 Registration Date/Time: 2024-10-23   13:00:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:20 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-003-M20006A-0000 Registration Date/Time: 2024-10-23   13:01:01 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:20 CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 107) City: La Quinta Zip Code: 92253 A. System Information 01 Space Conditioning System Identification or Name UNIT 107 HVACSys 02 Space Conditioning System Location or Area Served Main 03 Building Type from CF-1R Multi-family 04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from CF1R? No, credit is not taken 05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit from CF1R? No, credit is not taken 06 Duct System Compliance Category New MCH-20a - Completely New Duct System B. Duct Leakage Diagnostic Test 01 Condenser Nominal Cooling Capacity (ton)3 02 Heating Capacity (kBtu/h)36 03 Conditioned Floor Area Served by this HVAC System (ft2)931 04 Duct Leakage Test Conditions Test final 05 Duct Leakage Test Method Total leakage 06 Leakage Factor 0.12 07 Air Handling Unit Airflow (AHUAirflow) Determination Method Cooling system method 08 Measured AHUAirflow (cfm)This field or section is not applicable 09 Calculated Target Allowable Duct Leakage (cfm)144 10 Actual Duct Leakage Rate from Leakage Test Measurement (cfm) 56.6 11 Compliance Statement System passes leakage test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 2 of 3) Registration Number: 424-P010255225A-001-003-M20006A-0000 Registration Date/Time: 2024-10-23   13:01:01 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:20 C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. 02 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 All supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in). After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed 07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed. 08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. 09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 3 of 3) Registration Number: 424-P010255225A-001-003-M20006A-0000 Registration Date/Time: 2024-10-23   13:01:01 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:20 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable): NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-003-M23007A-0000 Registration Date/Time: 2024-10-23   13:01:26 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:20 CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 107) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 107 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus ALNOR 03 Model number of Airflow Measurement Apparatus EB† 731 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas /index.html NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 2 of 3) Registration Number: 424-P010255225A-001-003-M23007A-0000 Registration Date/Time: 2024-10-23   13:01:26 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:20 MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1050 03 Actual System Airflow Rate Measurement (cfm)1136 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Installation. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Installation was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 3 of 3) Registration Number: 424-P010255225A-001-003-M23007A-0000 Registration Date/Time: 2024-10-23   13:01:26 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:20 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-003-M22008A-0000 Registration Date/Time: 2024-10-23   13:01:51 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:20 CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 107) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 107 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable watt meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 658.88 02 Actual Tested Airflow from MCH-23 (cfm)1136 03 Required Fan Efficacy (watts/cfm)0.58 04 Actual Fan Efficacy (watts/cfm)0.58 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 2 of 3) Registration Number: 424-P010255225A-001-003-M22008A-0000 Registration Date/Time: 2024-10-23   13:01:51 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:20 C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 05 Compliance Statement:System fan efficacy complies D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 3 of 3) Registration Number: 424-P010255225A-001-003-M22008A-0000 Registration Date/Time: 2024-10-23   13:01:51 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:20 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-003-M26009A-0000 Registration Date/Time: 2024-10-23   13:02:07 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:20 CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 107) City: La Quinta Zip Code: 92253 A. System Information Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system requiring verification must use a separate form. 01 System Name or Identification/Tag UNIT 107 HVACSys 02 System Location or Area Served Main 03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required 04 Directory used to certify product performance AHRI 05 AHRI certification number for the installed space conditioning system from http://www.ahridirectory.org 208650564 06 Does the directory used to certify product performance require a specific air handler/furnace make and model? Yes 07 Does the directory used to certify product performance require a time delay relay (+TDR)? Yes 08 Does the directory used to certify product performance require a TXV (+TXV)? Yes B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Data from Nameplate of Installed system component Data from the Directory used to certify product performance for the rated system component Outdoor Condenser or Package Unit - Installed Manufacturer Name 01 RHEEM 02 RHEEM Outdoor Condenser or Package Unit - Installed Model Number 03 RHPAZR036JT000NA 04 RHPAZR036JT000NA Inside Coil - Installed Manufacturer Name 05 06 This field or section is not applicable Inside Coil - Installed Model Number 07 08 This field or section is not applicable NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 2 of 3) Registration Number: 424-P010255225A-001-003-M26009A-0000 Registration Date/Time: 2024-10-23   13:02:07 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:20 B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Air Handler/Furnace - Installed Manufacturer Name 09 10 RHEEM Air Handler/Furnace - Installed Model Number 11 12 RHPAZR036AJT C. Verified Cooling System SEER 01 Required minimum SEER 15 02 Installed SEER 15 03 Compliance Statement:System passes SEER verification Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed on the CF1R. D. Verified Cooling System EER This section does not apply to this project. E. Verified Cooling System Air Handler/Furnace 01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory. F. Verified Cooling System Time Delay Relay 01 If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of RA3.4.3. G. Verified Cooling System TXV 01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 3 of 3) Registration Number: 424-P010255225A-001-003-M26009A-0000 Registration Date/Time: 2024-10-23   13:02:07 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:20 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-004-M01004A-0000 Registration Date/Time: 2024-10-23   13:03:55 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 1 of 10) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 108) City: La Quinta Zip Code: 92253 A. General Information 01 Dwelling Unit Name DwellingUnit 108 02 Climate Zone 15 03 Dwelling Unit Total Conditioned Floor Area (ft2)931 04 Number of Space Conditioning Systems in this dwelling unit. 1 05 Certificate of Compliance Type Performance (CF1R-PRF)06 Method Used to Calculate HVAC Loads ACCA Manual J 07 Calculated Dwelling Unit Sensible Cooling Load (Btu/h) 36000 08 Calculated Dwelling Unit Heating Load (Btu/h)36000 09 Dwelling Unit Number of Bedrooms 2 MCH-01a - Space Conditioning Systems Ducts and Fans - For use with Performance Certificate of Compliance NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 2 of 10) Registration Number: 424-P010255225A-001-004-M01004A-0000 Registration Date/Time: 2024-10-23   13:03:55 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 B. Design Space Conditioning (SC) System Component Specifications from CF1R This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project. 01 02 03 04 05 06 07 08 09 10 11 12 Zone Name SC System Identification or Name SC System Type Heating System Type Cooling System Type SC Fan Type Distribution System Type Required Thermostat Type Low Leakage Air-Handling Unit (LLAHU) Status Bypass Duct Status Cooling Zoning Type Cooling System Compressor Speed This field or section is not applicable UNIT 108 HVACSys Heat pump heating cooling Central packaged HP Central packaged HP PSC Permanent Split Capacitor Unconditione d attic OCST per JA5 No, credit is not taken No Bypass Duct Not Zonal Single Speed Notes: C. Design Space Conditioning (SC) System Compliance Requirements from CF1R This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project. 01 02 03 04 05 06 07 08 09 10 SC System Identification or Name Heating Efficiency Type Minimum Heating Efficiency Value Heat Pump Heating Capacity at 47°F Heat Pump Heating Capacity at 17°F Minimum Cooling Efficiency SEER Minimum Cooling Efficiency EER Minimum Cooling System Airflow Rate (CFM/ton) Maximum Fan Efficacy (W/CFM) Minimum Duct R-Value UNIT 108 HVACSys Heating Seasonal Performance Factor (HSPF) 8.2 36000 29000 15 12.44 350 0.58 R-8 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 3 of 10) Registration Number: 424-P010255225A-001-004-M01004A-0000 Registration Date/Time: 2024-10-23   13:03:55 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 D. Installed Space Conditioning (SC) System Component Information 01 02 03 04 05 06 07 08 09 10 11 SC System Identification or Name SC System Location or Area Served Conditioned Floor Area Served by the System (ft2) Heating System Type Cooling System Type SC Fan Type Distribution System Type SC System Thermostat Type Cooling Zoning Type Cooling System Compressor Speed Type Central Fan Integrated (CFI) Ventilation System Status UNIT 108 HVACSys Main 931 Central packaged HP Central packaged HP PSC Permanent Split Capacitor Unconditioned attic OCST per JA5 Not Zonal Single Speed Not a CFI system Notes: E. Installed Heating System Equipment Information (not heat pumps) This section does not apply to this project. F. Installed Cooling System Outdoor Condensing Unit or Package Unit Equipment Information (not heat pumps) This section does not apply to this project. G. Installed Split System Indoor Coil or Fan Coil Unit Equipment Information (applicable to DX or hydronic heating/cooling coils or fan coil units) Systems with more than one indoor coil or fan coil unit (e.g. multi-split systems) shall provide information for each of the system indoor coils or fan coil units. This section does not apply to this project. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 4 of 10) Registration Number: 424-P010255225A-001-004-M01004A-0000 Registration Date/Time: 2024-10-23   13:03:55 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 H. Installed Heat Pump System - Split System Condensing Unit or Package Unit Equipment Information 01 02 03 04 05 SC System Identification or Name SC System Location or Area Served Condenser or Package Unit Manufacturer Condenser or Package Unit Model Number Condenser or Package Unit Serial Number UNIT 108 HVACSys Main RHEEM RHPAZR036JT000NA F422302307 Notes: I. Installed Heat Pump System -Efficiency and Performance Compliance Information 01 02 03 04 05 06 07 08 09 10 SC System Identification or Name SC System Location or Area Served Heating Efficiency Type Heating Efficiency Value System Rated Heating Capacity at 47°F System Rated Heating Capacity at 17°F System Rated Cooling Efficiency SEER System Rated Cooling Efficiency EER System Rated Cooling Capacity at Design Conditions (Btu/h) Condenser Rated Nominal Capacity (ton) UNIT 108 HVACSys Main Heating Seasonal Performance Factor (HSPF) 8.2 36000 29000 15 12.44 36000 3 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 5 of 10) Registration Number: 424-P010255225A-001-004-M01004A-0000 Registration Date/Time: 2024-10-23   13:03:55 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 J. Installed Duct System Information 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identification or Name SC System Location or Area Served Supply Duct Location Supply Duct R-Value Return Duct Location Return Duct R-Value Exemption from Min R-Value for Ducts In Conditioned Space Method of compliance with duct and filter grille sizing Req's in 150.0(m)13 Exemption From Duct Leakage Requirement s Bypass Duct Status Number of Air Filter Devices on System Can RA3.3 Airflow Protocols be used to test this System? UNIT 108 HVACSys Main Unconditio ned attic R-8 Unconditio ned attic R-8 Not applicable HERS verified fan efficacy (W/cfm) and airflow rate (cfm/ton) None No Bypass Duct 1 Yes Notes: K. Installed Air Filter Device Information Mandatory requirements for air filter devices are specified Section 150.0(m)12. 01 02 03 04 05 06 07 SC System Identification or Name SC System Location or Area Served Air Filter Device Identification or Name Air Filter Device Type Air Filter Device Location Determined Design Airflow Rate for Air Filter Device (cfm) Determined Design Allowable Pressure Drop for Air Filter Device (inch W.C.) UNIT 108 HVACSys Main Filter Filter Grille return 1050 0.1 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 6 of 10) Registration Number: 424-P010255225A-001-004-M01004A-0000 Registration Date/Time: 2024-10-23   13:03:55 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 L. Air Filter Device Requirements 01 The system shall be designed to ensure that all recirculated air and all outdoor air supplied to the occupiable space is filtered before passing through the system's thermal conditioning components. 02 The system shall be designed to accommodate the clean-filter pressure drop imposed by the system air filter device(s). The design airflow rate and maximum allowable clean-filter pressure drop at the design airflow rate applicable to each air filter device shall be determined, and all system air filter device locations shall be labeled to disclose the applicable design airflow rate and the maximum allowable clean-filter pressure drop. The labels shall be permanently affixed to the air filter device, readily legible, and visible to a person replacing the air filter media, and the air filter devices shall be provided with air filter media that conforms to these determined or labeled maximum allowable clean-filter pressure drop values as rated using AHRI Standard 680. 03 All system air filter devices shall be located and installed in such a manner as to allow access and regular service by the system owner. 04 The system shall be provided with air filter media having a designated efficiency equal to or greater than MERV 6 when tested in accordance with ASHRAE Standard 52.2, or a particle size efficiency rating equal to or greater than 50% in the 3.0 to10 µm range when tested in accordance with AHRI Standard 680. 05 The system shall be provided with air filter media that has been labeled by the manufacturer to disclose the efficiency and pressure drop ratings that conform to the required efficiency and pressure drop requirements for the air filter device. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met M. HERS Verification Requirements 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identificati on or Name SC System Location or Area Served MCH-20 . . Duct Leakage Test MCH-21 . Duct Location Verification MCH-22 . AHU Fan Efficacy (W/cfm) MCH-23 . AHU Airflow Rate (cfm/ton) MCH-25 . . Refrigerant Charge MCH-26 Rated SC System Equipment Verification MCH-27 . IAQ Mechanical Ventilation MCH-28 Return Duct Design Table 150.0-B or C MCH-29 Supply Duct Surface Area R-Value Buried Ducts MCH30 . Ventilation Cooling Credit UNIT 108 HVACSys Main Yes No Yes Yes No Yes Yes No No No NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 7 of 10) Registration Number: 424-P010255225A-001-004-M01004A-0000 Registration Date/Time: 2024-10-23   13:03:55 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 M. HERS Verification Requirements 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identificati on or Name SC System Location or Area Served MCH-20 . . Duct Leakage Test MCH-21 . Duct Location Verification MCH-22 . AHU Fan Efficacy (W/cfm) MCH-23 . AHU Airflow Rate (cfm/ton) MCH-25 . . Refrigerant Charge MCH-26 Rated SC System Equipment Verification MCH-27 . IAQ Mechanical Ventilation MCH-28 Return Duct Design Table 150.0-B or C MCH-29 Supply Duct Surface Area R-Value Buried Ducts MCH30 . Ventilation Cooling Credit Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 8 of 10) Registration Number: 424-P010255225A-001-004-M01004A-0000 Registration Date/Time: 2024-10-23   13:03:55 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. Heating Equipment 01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(i), 110.2(b). 03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections 150.0(h)1 and 2). 04 Furnace Temperature Rise: Central forced-air heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum inlet-to-outlet temperature rise specification. See Section 150.0(h)4. 05 Standby Losses and Pilot Lights: Fan-type central furnaces may not have a continuously burning pilot light. Section 110.5 and Section 110.2(d). Cooling Equipment 06 Equipment Efficiency: All cooling equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 07 Refrigerant Line Insulation: All refrigerant line insulation in split system air conditioners and heat pumps must meet the R-value and protection requirements of Section 150.0(j)2 and 3, and Section 150.0(m)9. 08 Condensing Unit Location: Condensing units shall not be placed within five (5) feet of a dryer vent outlet. See Section 150.0(h)3A. 09 Liquid Line Filter Drier: If applicable, a liquid line filter drier shall be installed according to the manufacturer's specifications. Section 150.0(h)3B 10 Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section 150.0(h)1 and 2. Air Distribution System Ducts, Plenums and Fans NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 9 of 10) Registration Number: 424-P010255225A-001-004-M01004A-0000 Registration Date/Time: 2024-10-23   13:03:55 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. 11 Insulation: In all cases, unless ducts are enclosed entirely in directly conditioned space, the minimum duct insulation value is R-6. Note that higher values may be required by the prescriptive or performance requirements. See Section 150.0(m)1. 12 Connections and Closures: All installed air-distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0, 602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006: Supply-air and return-air ducts and plenums must be insulated to a minimum installed level of R-6.0 or enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing in accordance with the requirements of Reference Residential Appendix RA3.1.4.3.8. Heat Pump Thermostat 13 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c). 14 The thermostat shall be installed in accordance with the manufacturers published installation specifications 15 First stage of heating shall be assigned to heat pump heating. 16 Second stage back up heating shall be set to come on only when the indoor set temperature cannot be met. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 10 of 10) Registration Number: 424-P010255225A-001-004-M01004A-0000 Registration Date/Time: 2024-10-23   13:03:55 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-004-M27005A-0000 Registration Date/Time: 2024-10-23   13:04:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 1 of 7) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 108) City: La Quinta Zip Code: 92253 Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010. A. Dwelling Mechanical Ventilation - General Information 01 Dwelling unit name DwellingUnit 108 02 Building Type Single Family 03 Project scope Newly constructed building 04 Total Conditioned Floor Area of Dwelling Unit (For addition projects the conditioned floor area equals existing area plus addition area. ) 931 05 Number of bedrooms in dwelling unit (For addition projects the number of bedrooms equals the existing bedrooms plus addition bedrooms) 2 06 Ventilation Operation Schedule Continuous 07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1) 08 Whole Building Ventilation System Type Standalone - Balanced 09 IAQ Fan Location Note: Non-dwelling units do not meet the definition for a dwelling unit as defined in Section 100.1(b). Non-dwelling units are not designed to provide independent living facilities and do not provide permanent provisions for living, sleeping, eating, cooking and sanitation. MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with outdoor air each hour at no less than the rate in equation 4.1a. 01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81 02 Installed Continuous Whole-Building Ventilation Rate 122 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 2 of 7) Registration Number: 424-P010255225A-001-004-M27005A-0000 Registration Date/Time: 2024-10-23   13:04:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 C. Compliance Statement 01 Building passes continuous whole-building ventilation rate test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 3 of 7) Registration Number: 424-P010255225A-001-004-M27005A-0000 Registration Date/Time: 2024-10-23   13:04:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 D. Local Mechanical Exhaust System - Fan selection and duct design criteria for compliance Local mechanical exhaust fans shall be installed in each kitchen and bathroom. Delivered local ventilation rates: •All local ventilation rates have been measured using a flow hood, flow grid, or other airflow measuring device and meet the requirements of 62.2 Tables 5.1 or 5.2. OR •The airflow rating at a pressure of 0.25 in. w.c. of a certified fan is assumed because the local ventilation system duct sizing meets the prescriptive requirements of 62.2 Table 5.3, or manufacturer's design criteria. Table 5.1 Intermittent Local Ventilation Exhaust Airflow Rates Application Airflow Notes Kitchen 100 cfm Vented range hood (including appliance-range hood combinations) required if exhaust fan flow is less than 5 ACH. Bathroom 50 cfm Table 5.2 Continuous Local Ventilation Exhaust Airflow Rates Application Airflow Notes Kitchen 5 ACH Based on Kitchen volume. Bathroom 20 cfm Table 5.3 Prescriptive Duct Sizing Requirements Duct Type Flex Duct Smooth Duct Fan Rating cfm @ 0.25 in. w.g. 50 80 100 125 50 80 100 125 Maximum Allowable Duct Length (ft) Diameter, (in)Flex Duct Smooth Duct 3 X X X X 5 X X X 4 70 3 X X 105 35 5 X 5 NL 70 35 20 NL 135 85 55 6 NL NL 125 95 NL NL NL 145 7 and above NL NL NL NL NL NL NL NL This table assumes no elbows. Deduct 15 ft of allowable duct length for each turn, elbow, or fitting. Interpolation and extrapolation in 62.2 Table 5.3 is not allowed. For airflow values not listed, use the next higher value. This table is not applicable for airflow > 125 cfm. NL = no limit on duct length of this size. X = not allowed, any length of duct of this size with assumed turns, elbows, fittings will exceed the rated pressure drop. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 4 of 7) Registration Number: 424-P010255225A-001-004-M27005A-0000 Registration Date/Time: 2024-10-23   13:04:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 E. Other Requirements The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if applicable. 01 6.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components to occupiable spaces from garages, unconditioned crawl spaces, and unconditioned attics. Supply and balanced ventilation systems shall be designed and constructed to provide ventilation air directly from the outdoors. 02 6.2 Instructions and Labeling.Information on the ventilation design and/or ventilation systems installed, instructions on their proper operation to meet the requirements of this standard, and instructions detailing any required maintenance (similar to that provided for HVAC systems) shall be provided to the owner and the occupant of the dwelling unit. Controls shall be labeled as to their function (unless that function is obvious, such as toilet exhaust fan switches). See Chapter 13 of Guideline 24 2 for information on instructions and labeling. 03 6.3 Clothes Dryers.Clothes dryers shall be exhausted directly to the outdoors 04 6.4 Combustion and Solid-Fuel Burning Appliances.Combustion and solid-fuel burning appliances must be provided with adequate combustion and ventilation air and vented in accordance with manufacturer installation instructions, NFPA 54 ANSI Z223.1, National Fuel Gas Code, NFPA 31, Standard for the Installation of Oil-Burning Equipment, or NFPA 211, Standard for Chimneys, Fireplaces, Vents, and Solid-Fuel Burning Appliances, or other equivalent code acceptable to the building official. Where atmospherically vented combustion appliances or solid-fuel burning appliances are located inside the pressure boundary, the total net exhaust flow of the two largest exhaust fans (not including a summer cooling fan intended to be operated only when windows or other air inlets are open) shall not exceed 15 cfm/100 ft 2 (75 Lps/100 m2) of occupiable space when in operation at full capacity. If the designed total net flow exceeds this limit, the net exhaust flow must be reduced by reducing the exhaust flow or providing compensating outdoor airflow. Atmospherically vented combustion appliances do not include direct-vent appliances. 05 6.5 Garages.When an occupiable space adjoins a garage, the design must prevent migration of contaminants to the adjoining occupiable space. Air seal the walls, ceilings, and floors that separate garages from occupiable space. To be considered air sealed, all joints, seams, penetrations, openings between door assemblies and their respective jambs and framing, and other sources of air leakage through wall and ceiling assemblies separating the garage from the residence and its attic area shall be caulked, gasketed, weather stripped, wrapped, or otherwise sealed to limit air movement. Doors between garages and occupiable spaces shall be gasketed or made substantially airtight with weather stripping. 06 6.6 Ventilation Opening Area.Spaces shall have ventilation openings as listed below. Such openings shall meet the requirements of Section 6.8 07 6.7 Minimum Filtration.Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 ft (3 m) in length and through a thermal conditioning component, except evaporative coolers, shall be provided with a filter having a designated minimum efficiency of MERV 6, or better, when tested in accordance with ANSI ASHRAE Standard 52.2, Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size, or a minimum Particle Size Efficiency of 50 percent in the 3.0-10 µm range in accordance with AHRI Standard 680, Performance Rating of Residential Air Filter Equipment. The system shall be designed such that all recirculated and mechanically supplied outdoor air is filtered before passing through the thermal conditioning components. The filter shall be located and installed in such a manner as to facilitate access and regular service by the owner. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 5 of 7) Registration Number: 424-P010255225A-001-004-M27005A-0000 Registration Date/Time: 2024-10-23   13:04:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 E. Other Requirements The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if applicable. 08 6.8 Air Inlets.Air inlets that are part of the ventilation design shall be located a minimum of 10 ft (3 m) from known sources of contamination such as a stack, vent, exhaust hood, or vehicle exhaust. The intake shall be placed so that entering air is not obstructed by snow, plantings, or other material. Forced air inlets shall be provided with rodent insect screens (mesh not larger than 1/2 inch). 09 6.9 Carbon Monoxide Detectors.A carbon monoxide alarm shall be installed in each dwelling unit in accordance with NFPA 720,Standard for the Installation of Carbon Monoxide (CO) Detection and Warning Equipment 14, and shall be consistent with requirements of applicable laws, codes, and standards. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met. F. Air Moving Equipment The items listed below (7.1 through 7.3) correspond to the information given in ASHRAE 62.2 Section 7 Air-Moving Equipment. Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.6) for information describing these requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 7.1 through 7.3 if applicable. 01 7.1 Selection and Installation.Ventilation devices and equipment shall be tested and listed in accordance with specific standards. Installations of systems or equipment shall be carried out in accordance with manufacturers' design requirements and installation instructions. 02 7.2 Sound Ratings for Fans.Ventilation fans shall be rated for sound at no less than the minimum airflow rate required by this standard, as noted below. These sound ratings shall be at a minimum of 0.1 in. w.c. (25 Pa) static pressure.      7.2.1 Whole Building or Continuous Ventilation Fans.These fans shall be rated for sound at a maximum of 1.0 sone.      7.2.2 Intermittent Local Exhaust Fans.Fans used to comply with Section 5.2 shall be rated for sound at a maximum of 3 sone, unless their maximum rated airflow exceeds 400 cfm (200 L/s). (Some exceptions may apply.) 03 7.3 Multibranch Exhaust Ducting.If more than one of the exhaust fans in a dwelling unit shares a common exhaust duct, each fan shall be equipped with a back draft damper to prevent the recirculation of exhaust air from one room to another through the exhaust ducting system. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 6 of 7) Registration Number: 424-P010255225A-001-004-M27005A-0000 Registration Date/Time: 2024-10-23   13:04:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 G. Multifamily Buildings -Other Requirements The items listed below correspond to the information given in ASHRAE 62.2 Section 8 "Multifamily Buildings". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 8, if applicable. 01 8.2 Whole-Building Mechanical Ventilation.For multifamily buildings, the term "building" in Section 4 refers to a single dwelling unit. 8.4.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components separating dwelling units, including sealing penetrations in the common walls, ceilings, and floors of each unit and by sealing vertical chases adjacent to the units. All doors between dwelling units and common hallways shall be gasketed or made substantially airtight. 8.4.1.1 Compliance.One method of demonstrating compliance with Section 8.4.1 shall be to verify a leakage rate below a maximum of 0.2 cfm/ ft2 (100 L/s per 100 m2) of the dwelling unit envelope area (i.e., the sum of the area of the walls between dwelling units, exterior walls, ceiling and floor) at a test pressure of 50 Pa by a blower door test. The test shall be conducted with the dwelling unit as if it were exposed to outdoor air on all sides, top, and bottom by opening doors and windows of adjacent dwelling units. 8.5.1 Exhaust Ducts.Exhaust fans in separate dwelling units shall not share a common exhaust duct. Exhaust inlets from more than one dwelling unit may be served by a single exhaust fan downstream of all the exhaust inlets if the fan is designated and intended to run continuously or if each inlet is equipped with a back-draft damper to prevent cross-contamination when the fan is not running. 8.5.2 Supply Ducts.Supply outlets to more than one dwelling unit may be served by a single fan upstream of all the supply outlets if the fan is designed and intended to run continuously or if each supply outlet is equipped with a back-draft damper to prevent cross-contamination when the fan is not running. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 7 of 7) Registration Number: 424-P010255225A-001-004-M27005A-0000 Registration Date/Time: 2024-10-23   13:04:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-004-M20006A-0000 Registration Date/Time: 2024-10-23   13:05:04 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 108) City: La Quinta Zip Code: 92253 A. System Information 01 Space Conditioning System Identification or Name UNIT 108 HVACSys 02 Space Conditioning System Location or Area Served Main 03 Building Type from CF-1R Multi-family 04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from CF1R? No, credit is not taken 05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit from CF1R? No, credit is not taken 06 Duct System Compliance Category New MCH-20a - Completely New Duct System B. Duct Leakage Diagnostic Test 01 Condenser Nominal Cooling Capacity (ton)3 02 Heating Capacity (kBtu/h)36 03 Conditioned Floor Area Served by this HVAC System (ft2)931 04 Duct Leakage Test Conditions Test final 05 Duct Leakage Test Method Total leakage 06 Leakage Factor 0.12 07 Air Handling Unit Airflow (AHUAirflow) Determination Method Cooling system method 08 Measured AHUAirflow (cfm)This field or section is not applicable 09 Calculated Target Allowable Duct Leakage (cfm)144 10 Actual Duct Leakage Rate from Leakage Test Measurement (cfm) 72.9 11 Compliance Statement System passes leakage test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 2 of 3) Registration Number: 424-P010255225A-001-004-M20006A-0000 Registration Date/Time: 2024-10-23   13:05:04 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. 02 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 All supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in). After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed 07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed. 08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. 09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 3 of 3) Registration Number: 424-P010255225A-001-004-M20006A-0000 Registration Date/Time: 2024-10-23   13:05:04 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable): NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-004-M23007A-0000 Registration Date/Time: 2024-10-23   13:05:29 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 108) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 108 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus ALNOR 03 Model number of Airflow Measurement Apparatus EB† 731 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas /index.html NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 2 of 3) Registration Number: 424-P010255225A-001-004-M23007A-0000 Registration Date/Time: 2024-10-23   13:05:29 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1050 03 Actual System Airflow Rate Measurement (cfm)1092 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Installation. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Installation was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 3 of 3) Registration Number: 424-P010255225A-001-004-M23007A-0000 Registration Date/Time: 2024-10-23   13:05:29 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-004-M22008A-0000 Registration Date/Time: 2024-10-23   13:05:49 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 108) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 108 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable watt meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 633.36 02 Actual Tested Airflow from MCH-23 (cfm)1092 03 Required Fan Efficacy (watts/cfm)0.58 04 Actual Fan Efficacy (watts/cfm)0.58 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 2 of 3) Registration Number: 424-P010255225A-001-004-M22008A-0000 Registration Date/Time: 2024-10-23   13:05:49 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 05 Compliance Statement:System fan efficacy complies D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 3 of 3) Registration Number: 424-P010255225A-001-004-M22008A-0000 Registration Date/Time: 2024-10-23   13:05:49 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-004-M26009A-0000 Registration Date/Time: 2024-10-23   13:05:57 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 108) City: La Quinta Zip Code: 92253 A. System Information Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system requiring verification must use a separate form. 01 System Name or Identification/Tag UNIT 108 HVACSys 02 System Location or Area Served Main 03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required 04 Directory used to certify product performance AHRI 05 AHRI certification number for the installed space conditioning system from http://www.ahridirectory.org 208650564 06 Does the directory used to certify product performance require a specific air handler/furnace make and model? Yes 07 Does the directory used to certify product performance require a time delay relay (+TDR)? Yes 08 Does the directory used to certify product performance require a TXV (+TXV)? Yes B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Data from Nameplate of Installed system component Data from the Directory used to certify product performance for the rated system component Outdoor Condenser or Package Unit - Installed Manufacturer Name 01 RHEEM 02 RHEEM Outdoor Condenser or Package Unit - Installed Model Number 03 RHPAZR036JT000NA 04 RHPAZR036JT000NA Inside Coil - Installed Manufacturer Name 05 06 This field or section is not applicable Inside Coil - Installed Model Number 07 08 This field or section is not applicable NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 2 of 3) Registration Number: 424-P010255225A-001-004-M26009A-0000 Registration Date/Time: 2024-10-23   13:05:57 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Air Handler/Furnace - Installed Manufacturer Name 09 10 RHEEM Air Handler/Furnace - Installed Model Number 11 12 RHPAZR036AJT C. Verified Cooling System SEER 01 Required minimum SEER 15 02 Installed SEER 15 03 Compliance Statement:System passes SEER verification Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed on the CF1R. D. Verified Cooling System EER This section does not apply to this project. E. Verified Cooling System Air Handler/Furnace 01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory. F. Verified Cooling System Time Delay Relay 01 If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of RA3.4.3. G. Verified Cooling System TXV 01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 3 of 3) Registration Number: 424-P010255225A-001-004-M26009A-0000 Registration Date/Time: 2024-10-23   13:05:57 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:22 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-005-M01004A-0000 Registration Date/Time: 2024-10-23   13:06:59 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 1 of 10) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 205) City: La Quinta Zip Code: 92253 A. General Information 01 Dwelling Unit Name DwellingUnit 205 02 Climate Zone 15 03 Dwelling Unit Total Conditioned Floor Area (ft2)931 04 Number of Space Conditioning Systems in this dwelling unit. 1 05 Certificate of Compliance Type Performance (CF1R-PRF)06 Method Used to Calculate HVAC Loads ACCA Manual J 07 Calculated Dwelling Unit Sensible Cooling Load (Btu/h) 36000 08 Calculated Dwelling Unit Heating Load (Btu/h)36000 09 Dwelling Unit Number of Bedrooms 2 MCH-01a - Space Conditioning Systems Ducts and Fans - For use with Performance Certificate of Compliance NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 2 of 10) Registration Number: 424-P010255225A-001-005-M01004A-0000 Registration Date/Time: 2024-10-23   13:06:59 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 B. Design Space Conditioning (SC) System Component Specifications from CF1R This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project. 01 02 03 04 05 06 07 08 09 10 11 12 Zone Name SC System Identification or Name SC System Type Heating System Type Cooling System Type SC Fan Type Distribution System Type Required Thermostat Type Low Leakage Air-Handling Unit (LLAHU) Status Bypass Duct Status Cooling Zoning Type Cooling System Compressor Speed This field or section is not applicable UNIT 205 HVACSys Heat pump heating cooling Central packaged HP Central packaged HP PSC Permanent Split Capacitor Unconditione d attic OCST per JA5 No, credit is not taken No Bypass Duct Not Zonal Single Speed Notes: C. Design Space Conditioning (SC) System Compliance Requirements from CF1R This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project. 01 02 03 04 05 06 07 08 09 10 SC System Identification or Name Heating Efficiency Type Minimum Heating Efficiency Value Heat Pump Heating Capacity at 47°F Heat Pump Heating Capacity at 17°F Minimum Cooling Efficiency SEER Minimum Cooling Efficiency EER Minimum Cooling System Airflow Rate (CFM/ton) Maximum Fan Efficacy (W/CFM) Minimum Duct R-Value UNIT 205 HVACSys Heating Seasonal Performance Factor (HSPF) 8.2 36000 29000 15 12.44 350 0.58 R-8 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 3 of 10) Registration Number: 424-P010255225A-001-005-M01004A-0000 Registration Date/Time: 2024-10-23   13:06:59 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 D. Installed Space Conditioning (SC) System Component Information 01 02 03 04 05 06 07 08 09 10 11 SC System Identification or Name SC System Location or Area Served Conditioned Floor Area Served by the System (ft2) Heating System Type Cooling System Type SC Fan Type Distribution System Type SC System Thermostat Type Cooling Zoning Type Cooling System Compressor Speed Type Central Fan Integrated (CFI) Ventilation System Status UNIT 205 HVACSys Main 931 Central packaged HP Central packaged HP PSC Permanent Split Capacitor Unconditioned attic OCST per JA5 Not Zonal Single Speed Not a CFI system Notes: E. Installed Heating System Equipment Information (not heat pumps) This section does not apply to this project. F. Installed Cooling System Outdoor Condensing Unit or Package Unit Equipment Information (not heat pumps) This section does not apply to this project. G. Installed Split System Indoor Coil or Fan Coil Unit Equipment Information (applicable to DX or hydronic heating/cooling coils or fan coil units) Systems with more than one indoor coil or fan coil unit (e.g. multi-split systems) shall provide information for each of the system indoor coils or fan coil units. This section does not apply to this project. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 4 of 10) Registration Number: 424-P010255225A-001-005-M01004A-0000 Registration Date/Time: 2024-10-23   13:06:59 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 H. Installed Heat Pump System - Split System Condensing Unit or Package Unit Equipment Information 01 02 03 04 05 SC System Identification or Name SC System Location or Area Served Condenser or Package Unit Manufacturer Condenser or Package Unit Model Number Condenser or Package Unit Serial Number UNIT 205 HVACSys Main RHEEM RHPAZR036JT000NA F422302303 Notes: I. Installed Heat Pump System -Efficiency and Performance Compliance Information 01 02 03 04 05 06 07 08 09 10 SC System Identification or Name SC System Location or Area Served Heating Efficiency Type Heating Efficiency Value System Rated Heating Capacity at 47°F System Rated Heating Capacity at 17°F System Rated Cooling Efficiency SEER System Rated Cooling Efficiency EER System Rated Cooling Capacity at Design Conditions (Btu/h) Condenser Rated Nominal Capacity (ton) UNIT 205 HVACSys Main Heating Seasonal Performance Factor (HSPF) 8.2 36000 29000 15 12.44 36000 3 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 5 of 10) Registration Number: 424-P010255225A-001-005-M01004A-0000 Registration Date/Time: 2024-10-23   13:06:59 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 J. Installed Duct System Information 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identification or Name SC System Location or Area Served Supply Duct Location Supply Duct R-Value Return Duct Location Return Duct R-Value Exemption from Min R-Value for Ducts In Conditioned Space Method of compliance with duct and filter grille sizing Req's in 150.0(m)13 Exemption From Duct Leakage Requirement s Bypass Duct Status Number of Air Filter Devices on System Can RA3.3 Airflow Protocols be used to test this System? UNIT 205 HVACSys Main Unconditio ned attic R-8 Unconditio ned attic R-8 Not applicable HERS verified fan efficacy (W/cfm) and airflow rate (cfm/ton) None No Bypass Duct 1 Yes Notes: K. Installed Air Filter Device Information Mandatory requirements for air filter devices are specified Section 150.0(m)12. 01 02 03 04 05 06 07 SC System Identification or Name SC System Location or Area Served Air Filter Device Identification or Name Air Filter Device Type Air Filter Device Location Determined Design Airflow Rate for Air Filter Device (cfm) Determined Design Allowable Pressure Drop for Air Filter Device (inch W.C.) UNIT 205 HVACSys Main Filter Filter Grille return 1050 0.1 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 6 of 10) Registration Number: 424-P010255225A-001-005-M01004A-0000 Registration Date/Time: 2024-10-23   13:06:59 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 L. Air Filter Device Requirements 01 The system shall be designed to ensure that all recirculated air and all outdoor air supplied to the occupiable space is filtered before passing through the system's thermal conditioning components. 02 The system shall be designed to accommodate the clean-filter pressure drop imposed by the system air filter device(s). The design airflow rate and maximum allowable clean-filter pressure drop at the design airflow rate applicable to each air filter device shall be determined, and all system air filter device locations shall be labeled to disclose the applicable design airflow rate and the maximum allowable clean-filter pressure drop. The labels shall be permanently affixed to the air filter device, readily legible, and visible to a person replacing the air filter media, and the air filter devices shall be provided with air filter media that conforms to these determined or labeled maximum allowable clean-filter pressure drop values as rated using AHRI Standard 680. 03 All system air filter devices shall be located and installed in such a manner as to allow access and regular service by the system owner. 04 The system shall be provided with air filter media having a designated efficiency equal to or greater than MERV 6 when tested in accordance with ASHRAE Standard 52.2, or a particle size efficiency rating equal to or greater than 50% in the 3.0 to10 µm range when tested in accordance with AHRI Standard 680. 05 The system shall be provided with air filter media that has been labeled by the manufacturer to disclose the efficiency and pressure drop ratings that conform to the required efficiency and pressure drop requirements for the air filter device. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met M. HERS Verification Requirements 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identificati on or Name SC System Location or Area Served MCH-20 . . Duct Leakage Test MCH-21 . Duct Location Verification MCH-22 . AHU Fan Efficacy (W/cfm) MCH-23 . AHU Airflow Rate (cfm/ton) MCH-25 . . Refrigerant Charge MCH-26 Rated SC System Equipment Verification MCH-27 . IAQ Mechanical Ventilation MCH-28 Return Duct Design Table 150.0-B or C MCH-29 Supply Duct Surface Area R-Value Buried Ducts MCH30 . Ventilation Cooling Credit UNIT 205 HVACSys Main Yes No Yes Yes No Yes Yes No No No NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 7 of 10) Registration Number: 424-P010255225A-001-005-M01004A-0000 Registration Date/Time: 2024-10-23   13:06:59 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 M. HERS Verification Requirements 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identificati on or Name SC System Location or Area Served MCH-20 . . Duct Leakage Test MCH-21 . Duct Location Verification MCH-22 . AHU Fan Efficacy (W/cfm) MCH-23 . AHU Airflow Rate (cfm/ton) MCH-25 . . Refrigerant Charge MCH-26 Rated SC System Equipment Verification MCH-27 . IAQ Mechanical Ventilation MCH-28 Return Duct Design Table 150.0-B or C MCH-29 Supply Duct Surface Area R-Value Buried Ducts MCH30 . Ventilation Cooling Credit Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 8 of 10) Registration Number: 424-P010255225A-001-005-M01004A-0000 Registration Date/Time: 2024-10-23   13:06:59 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. Heating Equipment 01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(i), 110.2(b). 03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections 150.0(h)1 and 2). 04 Furnace Temperature Rise: Central forced-air heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum inlet-to-outlet temperature rise specification. See Section 150.0(h)4. 05 Standby Losses and Pilot Lights: Fan-type central furnaces may not have a continuously burning pilot light. Section 110.5 and Section 110.2(d). Cooling Equipment 06 Equipment Efficiency: All cooling equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 07 Refrigerant Line Insulation: All refrigerant line insulation in split system air conditioners and heat pumps must meet the R-value and protection requirements of Section 150.0(j)2 and 3, and Section 150.0(m)9. 08 Condensing Unit Location: Condensing units shall not be placed within five (5) feet of a dryer vent outlet. See Section 150.0(h)3A. 09 Liquid Line Filter Drier: If applicable, a liquid line filter drier shall be installed according to the manufacturer's specifications. Section 150.0(h)3B 10 Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section 150.0(h)1 and 2. Air Distribution System Ducts, Plenums and Fans NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 9 of 10) Registration Number: 424-P010255225A-001-005-M01004A-0000 Registration Date/Time: 2024-10-23   13:06:59 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. 11 Insulation: In all cases, unless ducts are enclosed entirely in directly conditioned space, the minimum duct insulation value is R-6. Note that higher values may be required by the prescriptive or performance requirements. See Section 150.0(m)1. 12 Connections and Closures: All installed air-distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0, 602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006: Supply-air and return-air ducts and plenums must be insulated to a minimum installed level of R-6.0 or enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing in accordance with the requirements of Reference Residential Appendix RA3.1.4.3.8. Heat Pump Thermostat 13 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c). 14 The thermostat shall be installed in accordance with the manufacturers published installation specifications 15 First stage of heating shall be assigned to heat pump heating. 16 Second stage back up heating shall be set to come on only when the indoor set temperature cannot be met. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 10 of 10) Registration Number: 424-P010255225A-001-005-M01004A-0000 Registration Date/Time: 2024-10-23   13:06:59 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-005-M27005A-0000 Registration Date/Time: 2024-10-23   13:07:39 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 1 of 7) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 205) City: La Quinta Zip Code: 92253 Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010. A. Dwelling Mechanical Ventilation - General Information 01 Dwelling unit name DwellingUnit 205 02 Building Type Single Family 03 Project scope Newly constructed building 04 Total Conditioned Floor Area of Dwelling Unit (For addition projects the conditioned floor area equals existing area plus addition area. ) 931 05 Number of bedrooms in dwelling unit (For addition projects the number of bedrooms equals the existing bedrooms plus addition bedrooms) 2 06 Ventilation Operation Schedule Continuous 07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1) 08 Whole Building Ventilation System Type Standalone - Balanced 09 IAQ Fan Location Note: Non-dwelling units do not meet the definition for a dwelling unit as defined in Section 100.1(b). Non-dwelling units are not designed to provide independent living facilities and do not provide permanent provisions for living, sleeping, eating, cooking and sanitation. MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with outdoor air each hour at no less than the rate in equation 4.1a. 01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81 02 Installed Continuous Whole-Building Ventilation Rate 154 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 2 of 7) Registration Number: 424-P010255225A-001-005-M27005A-0000 Registration Date/Time: 2024-10-23   13:07:39 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 C. Compliance Statement 01 Building passes continuous whole-building ventilation rate test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 3 of 7) Registration Number: 424-P010255225A-001-005-M27005A-0000 Registration Date/Time: 2024-10-23   13:07:39 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 D. Local Mechanical Exhaust System - Fan selection and duct design criteria for compliance Local mechanical exhaust fans shall be installed in each kitchen and bathroom. Delivered local ventilation rates: •All local ventilation rates have been measured using a flow hood, flow grid, or other airflow measuring device and meet the requirements of 62.2 Tables 5.1 or 5.2. OR •The airflow rating at a pressure of 0.25 in. w.c. of a certified fan is assumed because the local ventilation system duct sizing meets the prescriptive requirements of 62.2 Table 5.3, or manufacturer's design criteria. Table 5.1 Intermittent Local Ventilation Exhaust Airflow Rates Application Airflow Notes Kitchen 100 cfm Vented range hood (including appliance-range hood combinations) required if exhaust fan flow is less than 5 ACH. Bathroom 50 cfm Table 5.2 Continuous Local Ventilation Exhaust Airflow Rates Application Airflow Notes Kitchen 5 ACH Based on Kitchen volume. Bathroom 20 cfm Table 5.3 Prescriptive Duct Sizing Requirements Duct Type Flex Duct Smooth Duct Fan Rating cfm @ 0.25 in. w.g. 50 80 100 125 50 80 100 125 Maximum Allowable Duct Length (ft) Diameter, (in)Flex Duct Smooth Duct 3 X X X X 5 X X X 4 70 3 X X 105 35 5 X 5 NL 70 35 20 NL 135 85 55 6 NL NL 125 95 NL NL NL 145 7 and above NL NL NL NL NL NL NL NL This table assumes no elbows. Deduct 15 ft of allowable duct length for each turn, elbow, or fitting. Interpolation and extrapolation in 62.2 Table 5.3 is not allowed. For airflow values not listed, use the next higher value. This table is not applicable for airflow > 125 cfm. NL = no limit on duct length of this size. X = not allowed, any length of duct of this size with assumed turns, elbows, fittings will exceed the rated pressure drop. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 4 of 7) Registration Number: 424-P010255225A-001-005-M27005A-0000 Registration Date/Time: 2024-10-23   13:07:39 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 E. Other Requirements The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if applicable. 01 6.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components to occupiable spaces from garages, unconditioned crawl spaces, and unconditioned attics. Supply and balanced ventilation systems shall be designed and constructed to provide ventilation air directly from the outdoors. 02 6.2 Instructions and Labeling.Information on the ventilation design and/or ventilation systems installed, instructions on their proper operation to meet the requirements of this standard, and instructions detailing any required maintenance (similar to that provided for HVAC systems) shall be provided to the owner and the occupant of the dwelling unit. Controls shall be labeled as to their function (unless that function is obvious, such as toilet exhaust fan switches). See Chapter 13 of Guideline 24 2 for information on instructions and labeling. 03 6.3 Clothes Dryers.Clothes dryers shall be exhausted directly to the outdoors 04 6.4 Combustion and Solid-Fuel Burning Appliances.Combustion and solid-fuel burning appliances must be provided with adequate combustion and ventilation air and vented in accordance with manufacturer installation instructions, NFPA 54 ANSI Z223.1, National Fuel Gas Code, NFPA 31, Standard for the Installation of Oil-Burning Equipment, or NFPA 211, Standard for Chimneys, Fireplaces, Vents, and Solid-Fuel Burning Appliances, or other equivalent code acceptable to the building official. Where atmospherically vented combustion appliances or solid-fuel burning appliances are located inside the pressure boundary, the total net exhaust flow of the two largest exhaust fans (not including a summer cooling fan intended to be operated only when windows or other air inlets are open) shall not exceed 15 cfm/100 ft 2 (75 Lps/100 m2) of occupiable space when in operation at full capacity. If the designed total net flow exceeds this limit, the net exhaust flow must be reduced by reducing the exhaust flow or providing compensating outdoor airflow. Atmospherically vented combustion appliances do not include direct-vent appliances. 05 6.5 Garages.When an occupiable space adjoins a garage, the design must prevent migration of contaminants to the adjoining occupiable space. Air seal the walls, ceilings, and floors that separate garages from occupiable space. To be considered air sealed, all joints, seams, penetrations, openings between door assemblies and their respective jambs and framing, and other sources of air leakage through wall and ceiling assemblies separating the garage from the residence and its attic area shall be caulked, gasketed, weather stripped, wrapped, or otherwise sealed to limit air movement. Doors between garages and occupiable spaces shall be gasketed or made substantially airtight with weather stripping. 06 6.6 Ventilation Opening Area.Spaces shall have ventilation openings as listed below. Such openings shall meet the requirements of Section 6.8 07 6.7 Minimum Filtration.Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 ft (3 m) in length and through a thermal conditioning component, except evaporative coolers, shall be provided with a filter having a designated minimum efficiency of MERV 6, or better, when tested in accordance with ANSI ASHRAE Standard 52.2, Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size, or a minimum Particle Size Efficiency of 50 percent in the 3.0-10 µm range in accordance with AHRI Standard 680, Performance Rating of Residential Air Filter Equipment. The system shall be designed such that all recirculated and mechanically supplied outdoor air is filtered before passing through the thermal conditioning components. The filter shall be located and installed in such a manner as to facilitate access and regular service by the owner. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 5 of 7) Registration Number: 424-P010255225A-001-005-M27005A-0000 Registration Date/Time: 2024-10-23   13:07:39 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 E. Other Requirements The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if applicable. 08 6.8 Air Inlets.Air inlets that are part of the ventilation design shall be located a minimum of 10 ft (3 m) from known sources of contamination such as a stack, vent, exhaust hood, or vehicle exhaust. The intake shall be placed so that entering air is not obstructed by snow, plantings, or other material. Forced air inlets shall be provided with rodent insect screens (mesh not larger than 1/2 inch). 09 6.9 Carbon Monoxide Detectors.A carbon monoxide alarm shall be installed in each dwelling unit in accordance with NFPA 720,Standard for the Installation of Carbon Monoxide (CO) Detection and Warning Equipment 14, and shall be consistent with requirements of applicable laws, codes, and standards. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met. F. Air Moving Equipment The items listed below (7.1 through 7.3) correspond to the information given in ASHRAE 62.2 Section 7 Air-Moving Equipment. Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.6) for information describing these requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 7.1 through 7.3 if applicable. 01 7.1 Selection and Installation.Ventilation devices and equipment shall be tested and listed in accordance with specific standards. Installations of systems or equipment shall be carried out in accordance with manufacturers' design requirements and installation instructions. 02 7.2 Sound Ratings for Fans.Ventilation fans shall be rated for sound at no less than the minimum airflow rate required by this standard, as noted below. These sound ratings shall be at a minimum of 0.1 in. w.c. (25 Pa) static pressure.      7.2.1 Whole Building or Continuous Ventilation Fans.These fans shall be rated for sound at a maximum of 1.0 sone.      7.2.2 Intermittent Local Exhaust Fans.Fans used to comply with Section 5.2 shall be rated for sound at a maximum of 3 sone, unless their maximum rated airflow exceeds 400 cfm (200 L/s). (Some exceptions may apply.) 03 7.3 Multibranch Exhaust Ducting.If more than one of the exhaust fans in a dwelling unit shares a common exhaust duct, each fan shall be equipped with a back draft damper to prevent the recirculation of exhaust air from one room to another through the exhaust ducting system. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 6 of 7) Registration Number: 424-P010255225A-001-005-M27005A-0000 Registration Date/Time: 2024-10-23   13:07:39 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 G. Multifamily Buildings -Other Requirements The items listed below correspond to the information given in ASHRAE 62.2 Section 8 "Multifamily Buildings". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 8, if applicable. 01 8.2 Whole-Building Mechanical Ventilation.For multifamily buildings, the term "building" in Section 4 refers to a single dwelling unit. 8.4.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components separating dwelling units, including sealing penetrations in the common walls, ceilings, and floors of each unit and by sealing vertical chases adjacent to the units. All doors between dwelling units and common hallways shall be gasketed or made substantially airtight. 8.4.1.1 Compliance.One method of demonstrating compliance with Section 8.4.1 shall be to verify a leakage rate below a maximum of 0.2 cfm/ ft2 (100 L/s per 100 m2) of the dwelling unit envelope area (i.e., the sum of the area of the walls between dwelling units, exterior walls, ceiling and floor) at a test pressure of 50 Pa by a blower door test. The test shall be conducted with the dwelling unit as if it were exposed to outdoor air on all sides, top, and bottom by opening doors and windows of adjacent dwelling units. 8.5.1 Exhaust Ducts.Exhaust fans in separate dwelling units shall not share a common exhaust duct. Exhaust inlets from more than one dwelling unit may be served by a single exhaust fan downstream of all the exhaust inlets if the fan is designated and intended to run continuously or if each inlet is equipped with a back-draft damper to prevent cross-contamination when the fan is not running. 8.5.2 Supply Ducts.Supply outlets to more than one dwelling unit may be served by a single fan upstream of all the supply outlets if the fan is designed and intended to run continuously or if each supply outlet is equipped with a back-draft damper to prevent cross-contamination when the fan is not running. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 7 of 7) Registration Number: 424-P010255225A-001-005-M27005A-0000 Registration Date/Time: 2024-10-23   13:07:39 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-005-M20006A-0000 Registration Date/Time: 2024-10-23   13:08:02 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 205) City: La Quinta Zip Code: 92253 A. System Information 01 Space Conditioning System Identification or Name UNIT 205 HVACSys 02 Space Conditioning System Location or Area Served Main 03 Building Type from CF-1R Multi-family 04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from CF1R? No, credit is not taken 05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit from CF1R? No, credit is not taken 06 Duct System Compliance Category New MCH-20a - Completely New Duct System B. Duct Leakage Diagnostic Test 01 Condenser Nominal Cooling Capacity (ton)3 02 Heating Capacity (kBtu/h)36 03 Conditioned Floor Area Served by this HVAC System (ft2)931 04 Duct Leakage Test Conditions Test final 05 Duct Leakage Test Method Total leakage 06 Leakage Factor 0.12 07 Air Handling Unit Airflow (AHUAirflow) Determination Method Cooling system method 08 Measured AHUAirflow (cfm)This field or section is not applicable 09 Calculated Target Allowable Duct Leakage (cfm)144 10 Actual Duct Leakage Rate from Leakage Test Measurement (cfm) 45 11 Compliance Statement System passes leakage test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 2 of 3) Registration Number: 424-P010255225A-001-005-M20006A-0000 Registration Date/Time: 2024-10-23   13:08:02 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. 02 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 All supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in). After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed 07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed. 08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. 09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 3 of 3) Registration Number: 424-P010255225A-001-005-M20006A-0000 Registration Date/Time: 2024-10-23   13:08:02 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable): NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-005-M23007A-0000 Registration Date/Time: 2024-10-23   13:08:26 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 205) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 205 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus ALNOR 03 Model number of Airflow Measurement Apparatus EB† 731 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas /index.html NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 2 of 3) Registration Number: 424-P010255225A-001-005-M23007A-0000 Registration Date/Time: 2024-10-23   13:08:26 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1050 03 Actual System Airflow Rate Measurement (cfm)1544 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Installation. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Installation was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 3 of 3) Registration Number: 424-P010255225A-001-005-M23007A-0000 Registration Date/Time: 2024-10-23   13:08:26 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-005-M22008A-0000 Registration Date/Time: 2024-10-23   13:08:49 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 205) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 205 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable watt meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 895.52 02 Actual Tested Airflow from MCH-23 (cfm)1544 03 Required Fan Efficacy (watts/cfm)0.58 04 Actual Fan Efficacy (watts/cfm)0.58 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 2 of 3) Registration Number: 424-P010255225A-001-005-M22008A-0000 Registration Date/Time: 2024-10-23   13:08:49 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 05 Compliance Statement:System fan efficacy complies D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 3 of 3) Registration Number: 424-P010255225A-001-005-M22008A-0000 Registration Date/Time: 2024-10-23   13:08:49 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-005-M26009A-0000 Registration Date/Time: 2024-10-23   13:08:59 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 205) City: La Quinta Zip Code: 92253 A. System Information Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system requiring verification must use a separate form. 01 System Name or Identification/Tag UNIT 205 HVACSys 02 System Location or Area Served Main 03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required 04 Directory used to certify product performance AHRI 05 AHRI certification number for the installed space conditioning system from http://www.ahridirectory.org 208650564 06 Does the directory used to certify product performance require a specific air handler/furnace make and model? Yes 07 Does the directory used to certify product performance require a time delay relay (+TDR)? Yes 08 Does the directory used to certify product performance require a TXV (+TXV)? Yes B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Data from Nameplate of Installed system component Data from the Directory used to certify product performance for the rated system component Outdoor Condenser or Package Unit - Installed Manufacturer Name 01 RHEEM 02 RHEEM Outdoor Condenser or Package Unit - Installed Model Number 03 RHPAZR036JT000NA 04 RHPAZR036JT000NA Inside Coil - Installed Manufacturer Name 05 06 This field or section is not applicable Inside Coil - Installed Model Number 07 08 This field or section is not applicable NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 2 of 3) Registration Number: 424-P010255225A-001-005-M26009A-0000 Registration Date/Time: 2024-10-23   13:08:59 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Air Handler/Furnace - Installed Manufacturer Name 09 10 RHEEM Air Handler/Furnace - Installed Model Number 11 12 RHPAZR036AJT C. Verified Cooling System SEER 01 Required minimum SEER 15 02 Installed SEER 15 03 Compliance Statement:System passes SEER verification Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed on the CF1R. D. Verified Cooling System EER This section does not apply to this project. E. Verified Cooling System Air Handler/Furnace 01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory. F. Verified Cooling System Time Delay Relay 01 If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of RA3.4.3. G. Verified Cooling System TXV 01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 3 of 3) Registration Number: 424-P010255225A-001-005-M26009A-0000 Registration Date/Time: 2024-10-23   13:08:59 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:25 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-006-M01004A-0000 Registration Date/Time: 2024-10-23   13:09:52 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 1 of 10) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 206) City: La Quinta Zip Code: 92253 A. General Information 01 Dwelling Unit Name DwellingUnit 206 02 Climate Zone 15 03 Dwelling Unit Total Conditioned Floor Area (ft2)931 04 Number of Space Conditioning Systems in this dwelling unit. 1 05 Certificate of Compliance Type Performance (CF1R-PRF)06 Method Used to Calculate HVAC Loads ACCA Manual J 07 Calculated Dwelling Unit Sensible Cooling Load (Btu/h) 36000 08 Calculated Dwelling Unit Heating Load (Btu/h)36000 09 Dwelling Unit Number of Bedrooms 2 MCH-01a - Space Conditioning Systems Ducts and Fans - For use with Performance Certificate of Compliance NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 2 of 10) Registration Number: 424-P010255225A-001-006-M01004A-0000 Registration Date/Time: 2024-10-23   13:09:52 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 B. Design Space Conditioning (SC) System Component Specifications from CF1R This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project. 01 02 03 04 05 06 07 08 09 10 11 12 Zone Name SC System Identification or Name SC System Type Heating System Type Cooling System Type SC Fan Type Distribution System Type Required Thermostat Type Low Leakage Air-Handling Unit (LLAHU) Status Bypass Duct Status Cooling Zoning Type Cooling System Compressor Speed This field or section is not applicable UNIT 206 HVACSys Heat pump heating cooling Central packaged HP Central packaged HP PSC Permanent Split Capacitor Unconditione d attic OCST per JA5 No, credit is not taken No Bypass Duct Not Zonal Single Speed Notes: C. Design Space Conditioning (SC) System Compliance Requirements from CF1R This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project. 01 02 03 04 05 06 07 08 09 10 SC System Identification or Name Heating Efficiency Type Minimum Heating Efficiency Value Heat Pump Heating Capacity at 47°F Heat Pump Heating Capacity at 17°F Minimum Cooling Efficiency SEER Minimum Cooling Efficiency EER Minimum Cooling System Airflow Rate (CFM/ton) Maximum Fan Efficacy (W/CFM) Minimum Duct R-Value UNIT 206 HVACSys Heating Seasonal Performance Factor (HSPF) 8.2 36000 29000 15 12.44 350 0.58 R-8 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 3 of 10) Registration Number: 424-P010255225A-001-006-M01004A-0000 Registration Date/Time: 2024-10-23   13:09:52 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 D. Installed Space Conditioning (SC) System Component Information 01 02 03 04 05 06 07 08 09 10 11 SC System Identification or Name SC System Location or Area Served Conditioned Floor Area Served by the System (ft2) Heating System Type Cooling System Type SC Fan Type Distribution System Type SC System Thermostat Type Cooling Zoning Type Cooling System Compressor Speed Type Central Fan Integrated (CFI) Ventilation System Status UNIT 206 HVACSys Main 931 Central packaged HP Central packaged HP PSC Permanent Split Capacitor Unconditioned attic OCST per JA5 Not Zonal Single Speed Not a CFI system Notes: E. Installed Heating System Equipment Information (not heat pumps) This section does not apply to this project. F. Installed Cooling System Outdoor Condensing Unit or Package Unit Equipment Information (not heat pumps) This section does not apply to this project. G. Installed Split System Indoor Coil or Fan Coil Unit Equipment Information (applicable to DX or hydronic heating/cooling coils or fan coil units) Systems with more than one indoor coil or fan coil unit (e.g. multi-split systems) shall provide information for each of the system indoor coils or fan coil units. This section does not apply to this project. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 4 of 10) Registration Number: 424-P010255225A-001-006-M01004A-0000 Registration Date/Time: 2024-10-23   13:09:52 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 H. Installed Heat Pump System - Split System Condensing Unit or Package Unit Equipment Information 01 02 03 04 05 SC System Identification or Name SC System Location or Area Served Condenser or Package Unit Manufacturer Condenser or Package Unit Model Number Condenser or Package Unit Serial Number UNIT 206 HVACSys Main RHEEM RHPAZR036JT000NA F502300814 Notes: I. Installed Heat Pump System -Efficiency and Performance Compliance Information 01 02 03 04 05 06 07 08 09 10 SC System Identification or Name SC System Location or Area Served Heating Efficiency Type Heating Efficiency Value System Rated Heating Capacity at 47°F System Rated Heating Capacity at 17°F System Rated Cooling Efficiency SEER System Rated Cooling Efficiency EER System Rated Cooling Capacity at Design Conditions (Btu/h) Condenser Rated Nominal Capacity (ton) UNIT 206 HVACSys Main Heating Seasonal Performance Factor (HSPF) 8.2 36000 29000 15 12.44 36000 3 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 5 of 10) Registration Number: 424-P010255225A-001-006-M01004A-0000 Registration Date/Time: 2024-10-23   13:09:52 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 J. Installed Duct System Information 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identification or Name SC System Location or Area Served Supply Duct Location Supply Duct R-Value Return Duct Location Return Duct R-Value Exemption from Min R-Value for Ducts In Conditioned Space Method of compliance with duct and filter grille sizing Req's in 150.0(m)13 Exemption From Duct Leakage Requirement s Bypass Duct Status Number of Air Filter Devices on System Can RA3.3 Airflow Protocols be used to test this System? UNIT 206 HVACSys Main Unconditio ned attic R-8 Unconditio ned attic R-8 Not applicable HERS verified fan efficacy (W/cfm) and airflow rate (cfm/ton) None No Bypass Duct 1 Yes Notes: K. Installed Air Filter Device Information Mandatory requirements for air filter devices are specified Section 150.0(m)12. 01 02 03 04 05 06 07 SC System Identification or Name SC System Location or Area Served Air Filter Device Identification or Name Air Filter Device Type Air Filter Device Location Determined Design Airflow Rate for Air Filter Device (cfm) Determined Design Allowable Pressure Drop for Air Filter Device (inch W.C.) UNIT 206 HVACSys Main Filter Filter Grille return 1050 0.1 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 6 of 10) Registration Number: 424-P010255225A-001-006-M01004A-0000 Registration Date/Time: 2024-10-23   13:09:52 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 L. Air Filter Device Requirements 01 The system shall be designed to ensure that all recirculated air and all outdoor air supplied to the occupiable space is filtered before passing through the system's thermal conditioning components. 02 The system shall be designed to accommodate the clean-filter pressure drop imposed by the system air filter device(s). The design airflow rate and maximum allowable clean-filter pressure drop at the design airflow rate applicable to each air filter device shall be determined, and all system air filter device locations shall be labeled to disclose the applicable design airflow rate and the maximum allowable clean-filter pressure drop. The labels shall be permanently affixed to the air filter device, readily legible, and visible to a person replacing the air filter media, and the air filter devices shall be provided with air filter media that conforms to these determined or labeled maximum allowable clean-filter pressure drop values as rated using AHRI Standard 680. 03 All system air filter devices shall be located and installed in such a manner as to allow access and regular service by the system owner. 04 The system shall be provided with air filter media having a designated efficiency equal to or greater than MERV 6 when tested in accordance with ASHRAE Standard 52.2, or a particle size efficiency rating equal to or greater than 50% in the 3.0 to10 µm range when tested in accordance with AHRI Standard 680. 05 The system shall be provided with air filter media that has been labeled by the manufacturer to disclose the efficiency and pressure drop ratings that conform to the required efficiency and pressure drop requirements for the air filter device. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met M. HERS Verification Requirements 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identificati on or Name SC System Location or Area Served MCH-20 . . Duct Leakage Test MCH-21 . Duct Location Verification MCH-22 . AHU Fan Efficacy (W/cfm) MCH-23 . AHU Airflow Rate (cfm/ton) MCH-25 . . Refrigerant Charge MCH-26 Rated SC System Equipment Verification MCH-27 . IAQ Mechanical Ventilation MCH-28 Return Duct Design Table 150.0-B or C MCH-29 Supply Duct Surface Area R-Value Buried Ducts MCH30 . Ventilation Cooling Credit UNIT 206 HVACSys Main Yes No Yes Yes No Yes Yes No No No NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 7 of 10) Registration Number: 424-P010255225A-001-006-M01004A-0000 Registration Date/Time: 2024-10-23   13:09:52 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 M. HERS Verification Requirements 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identificati on or Name SC System Location or Area Served MCH-20 . . Duct Leakage Test MCH-21 . Duct Location Verification MCH-22 . AHU Fan Efficacy (W/cfm) MCH-23 . AHU Airflow Rate (cfm/ton) MCH-25 . . Refrigerant Charge MCH-26 Rated SC System Equipment Verification MCH-27 . IAQ Mechanical Ventilation MCH-28 Return Duct Design Table 150.0-B or C MCH-29 Supply Duct Surface Area R-Value Buried Ducts MCH30 . Ventilation Cooling Credit Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 8 of 10) Registration Number: 424-P010255225A-001-006-M01004A-0000 Registration Date/Time: 2024-10-23   13:09:52 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. Heating Equipment 01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(i), 110.2(b). 03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections 150.0(h)1 and 2). 04 Furnace Temperature Rise: Central forced-air heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum inlet-to-outlet temperature rise specification. See Section 150.0(h)4. 05 Standby Losses and Pilot Lights: Fan-type central furnaces may not have a continuously burning pilot light. Section 110.5 and Section 110.2(d). Cooling Equipment 06 Equipment Efficiency: All cooling equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 07 Refrigerant Line Insulation: All refrigerant line insulation in split system air conditioners and heat pumps must meet the R-value and protection requirements of Section 150.0(j)2 and 3, and Section 150.0(m)9. 08 Condensing Unit Location: Condensing units shall not be placed within five (5) feet of a dryer vent outlet. See Section 150.0(h)3A. 09 Liquid Line Filter Drier: If applicable, a liquid line filter drier shall be installed according to the manufacturer's specifications. Section 150.0(h)3B 10 Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section 150.0(h)1 and 2. Air Distribution System Ducts, Plenums and Fans NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 9 of 10) Registration Number: 424-P010255225A-001-006-M01004A-0000 Registration Date/Time: 2024-10-23   13:09:52 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. 11 Insulation: In all cases, unless ducts are enclosed entirely in directly conditioned space, the minimum duct insulation value is R-6. Note that higher values may be required by the prescriptive or performance requirements. See Section 150.0(m)1. 12 Connections and Closures: All installed air-distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0, 602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006: Supply-air and return-air ducts and plenums must be insulated to a minimum installed level of R-6.0 or enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing in accordance with the requirements of Reference Residential Appendix RA3.1.4.3.8. Heat Pump Thermostat 13 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c). 14 The thermostat shall be installed in accordance with the manufacturers published installation specifications 15 First stage of heating shall be assigned to heat pump heating. 16 Second stage back up heating shall be set to come on only when the indoor set temperature cannot be met. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 10 of 10) Registration Number: 424-P010255225A-001-006-M01004A-0000 Registration Date/Time: 2024-10-23   13:09:52 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-006-M27005A-0000 Registration Date/Time: 2024-10-23   13:10:31 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 1 of 7) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 206) City: La Quinta Zip Code: 92253 Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010. A. Dwelling Mechanical Ventilation - General Information 01 Dwelling unit name DwellingUnit 206 02 Building Type Single Family 03 Project scope Newly constructed building 04 Total Conditioned Floor Area of Dwelling Unit (For addition projects the conditioned floor area equals existing area plus addition area. ) 931 05 Number of bedrooms in dwelling unit (For addition projects the number of bedrooms equals the existing bedrooms plus addition bedrooms) 2 06 Ventilation Operation Schedule Continuous 07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1) 08 Whole Building Ventilation System Type Standalone - Balanced 09 IAQ Fan Location Note: Non-dwelling units do not meet the definition for a dwelling unit as defined in Section 100.1(b). Non-dwelling units are not designed to provide independent living facilities and do not provide permanent provisions for living, sleeping, eating, cooking and sanitation. MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with outdoor air each hour at no less than the rate in equation 4.1a. 01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81 02 Installed Continuous Whole-Building Ventilation Rate 125 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 2 of 7) Registration Number: 424-P010255225A-001-006-M27005A-0000 Registration Date/Time: 2024-10-23   13:10:31 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 C. Compliance Statement 01 Building passes continuous whole-building ventilation rate test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 3 of 7) Registration Number: 424-P010255225A-001-006-M27005A-0000 Registration Date/Time: 2024-10-23   13:10:31 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 D. Local Mechanical Exhaust System - Fan selection and duct design criteria for compliance Local mechanical exhaust fans shall be installed in each kitchen and bathroom. Delivered local ventilation rates: •All local ventilation rates have been measured using a flow hood, flow grid, or other airflow measuring device and meet the requirements of 62.2 Tables 5.1 or 5.2. OR •The airflow rating at a pressure of 0.25 in. w.c. of a certified fan is assumed because the local ventilation system duct sizing meets the prescriptive requirements of 62.2 Table 5.3, or manufacturer's design criteria. Table 5.1 Intermittent Local Ventilation Exhaust Airflow Rates Application Airflow Notes Kitchen 100 cfm Vented range hood (including appliance-range hood combinations) required if exhaust fan flow is less than 5 ACH. Bathroom 50 cfm Table 5.2 Continuous Local Ventilation Exhaust Airflow Rates Application Airflow Notes Kitchen 5 ACH Based on Kitchen volume. Bathroom 20 cfm Table 5.3 Prescriptive Duct Sizing Requirements Duct Type Flex Duct Smooth Duct Fan Rating cfm @ 0.25 in. w.g. 50 80 100 125 50 80 100 125 Maximum Allowable Duct Length (ft) Diameter, (in)Flex Duct Smooth Duct 3 X X X X 5 X X X 4 70 3 X X 105 35 5 X 5 NL 70 35 20 NL 135 85 55 6 NL NL 125 95 NL NL NL 145 7 and above NL NL NL NL NL NL NL NL This table assumes no elbows. Deduct 15 ft of allowable duct length for each turn, elbow, or fitting. Interpolation and extrapolation in 62.2 Table 5.3 is not allowed. For airflow values not listed, use the next higher value. This table is not applicable for airflow > 125 cfm. NL = no limit on duct length of this size. X = not allowed, any length of duct of this size with assumed turns, elbows, fittings will exceed the rated pressure drop. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 4 of 7) Registration Number: 424-P010255225A-001-006-M27005A-0000 Registration Date/Time: 2024-10-23   13:10:31 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 E. Other Requirements The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if applicable. 01 6.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components to occupiable spaces from garages, unconditioned crawl spaces, and unconditioned attics. Supply and balanced ventilation systems shall be designed and constructed to provide ventilation air directly from the outdoors. 02 6.2 Instructions and Labeling.Information on the ventilation design and/or ventilation systems installed, instructions on their proper operation to meet the requirements of this standard, and instructions detailing any required maintenance (similar to that provided for HVAC systems) shall be provided to the owner and the occupant of the dwelling unit. Controls shall be labeled as to their function (unless that function is obvious, such as toilet exhaust fan switches). See Chapter 13 of Guideline 24 2 for information on instructions and labeling. 03 6.3 Clothes Dryers.Clothes dryers shall be exhausted directly to the outdoors 04 6.4 Combustion and Solid-Fuel Burning Appliances.Combustion and solid-fuel burning appliances must be provided with adequate combustion and ventilation air and vented in accordance with manufacturer installation instructions, NFPA 54 ANSI Z223.1, National Fuel Gas Code, NFPA 31, Standard for the Installation of Oil-Burning Equipment, or NFPA 211, Standard for Chimneys, Fireplaces, Vents, and Solid-Fuel Burning Appliances, or other equivalent code acceptable to the building official. Where atmospherically vented combustion appliances or solid-fuel burning appliances are located inside the pressure boundary, the total net exhaust flow of the two largest exhaust fans (not including a summer cooling fan intended to be operated only when windows or other air inlets are open) shall not exceed 15 cfm/100 ft 2 (75 Lps/100 m2) of occupiable space when in operation at full capacity. If the designed total net flow exceeds this limit, the net exhaust flow must be reduced by reducing the exhaust flow or providing compensating outdoor airflow. Atmospherically vented combustion appliances do not include direct-vent appliances. 05 6.5 Garages.When an occupiable space adjoins a garage, the design must prevent migration of contaminants to the adjoining occupiable space. Air seal the walls, ceilings, and floors that separate garages from occupiable space. To be considered air sealed, all joints, seams, penetrations, openings between door assemblies and their respective jambs and framing, and other sources of air leakage through wall and ceiling assemblies separating the garage from the residence and its attic area shall be caulked, gasketed, weather stripped, wrapped, or otherwise sealed to limit air movement. Doors between garages and occupiable spaces shall be gasketed or made substantially airtight with weather stripping. 06 6.6 Ventilation Opening Area.Spaces shall have ventilation openings as listed below. Such openings shall meet the requirements of Section 6.8 07 6.7 Minimum Filtration.Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 ft (3 m) in length and through a thermal conditioning component, except evaporative coolers, shall be provided with a filter having a designated minimum efficiency of MERV 6, or better, when tested in accordance with ANSI ASHRAE Standard 52.2, Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size, or a minimum Particle Size Efficiency of 50 percent in the 3.0-10 µm range in accordance with AHRI Standard 680, Performance Rating of Residential Air Filter Equipment. The system shall be designed such that all recirculated and mechanically supplied outdoor air is filtered before passing through the thermal conditioning components. The filter shall be located and installed in such a manner as to facilitate access and regular service by the owner. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 5 of 7) Registration Number: 424-P010255225A-001-006-M27005A-0000 Registration Date/Time: 2024-10-23   13:10:31 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 E. Other Requirements The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if applicable. 08 6.8 Air Inlets.Air inlets that are part of the ventilation design shall be located a minimum of 10 ft (3 m) from known sources of contamination such as a stack, vent, exhaust hood, or vehicle exhaust. The intake shall be placed so that entering air is not obstructed by snow, plantings, or other material. Forced air inlets shall be provided with rodent insect screens (mesh not larger than 1/2 inch). 09 6.9 Carbon Monoxide Detectors.A carbon monoxide alarm shall be installed in each dwelling unit in accordance with NFPA 720,Standard for the Installation of Carbon Monoxide (CO) Detection and Warning Equipment 14, and shall be consistent with requirements of applicable laws, codes, and standards. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met. F. Air Moving Equipment The items listed below (7.1 through 7.3) correspond to the information given in ASHRAE 62.2 Section 7 Air-Moving Equipment. Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.6) for information describing these requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 7.1 through 7.3 if applicable. 01 7.1 Selection and Installation.Ventilation devices and equipment shall be tested and listed in accordance with specific standards. Installations of systems or equipment shall be carried out in accordance with manufacturers' design requirements and installation instructions. 02 7.2 Sound Ratings for Fans.Ventilation fans shall be rated for sound at no less than the minimum airflow rate required by this standard, as noted below. These sound ratings shall be at a minimum of 0.1 in. w.c. (25 Pa) static pressure.      7.2.1 Whole Building or Continuous Ventilation Fans.These fans shall be rated for sound at a maximum of 1.0 sone.      7.2.2 Intermittent Local Exhaust Fans.Fans used to comply with Section 5.2 shall be rated for sound at a maximum of 3 sone, unless their maximum rated airflow exceeds 400 cfm (200 L/s). (Some exceptions may apply.) 03 7.3 Multibranch Exhaust Ducting.If more than one of the exhaust fans in a dwelling unit shares a common exhaust duct, each fan shall be equipped with a back draft damper to prevent the recirculation of exhaust air from one room to another through the exhaust ducting system. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 6 of 7) Registration Number: 424-P010255225A-001-006-M27005A-0000 Registration Date/Time: 2024-10-23   13:10:31 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 G. Multifamily Buildings -Other Requirements The items listed below correspond to the information given in ASHRAE 62.2 Section 8 "Multifamily Buildings". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 8, if applicable. 01 8.2 Whole-Building Mechanical Ventilation.For multifamily buildings, the term "building" in Section 4 refers to a single dwelling unit. 8.4.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components separating dwelling units, including sealing penetrations in the common walls, ceilings, and floors of each unit and by sealing vertical chases adjacent to the units. All doors between dwelling units and common hallways shall be gasketed or made substantially airtight. 8.4.1.1 Compliance.One method of demonstrating compliance with Section 8.4.1 shall be to verify a leakage rate below a maximum of 0.2 cfm/ ft2 (100 L/s per 100 m2) of the dwelling unit envelope area (i.e., the sum of the area of the walls between dwelling units, exterior walls, ceiling and floor) at a test pressure of 50 Pa by a blower door test. The test shall be conducted with the dwelling unit as if it were exposed to outdoor air on all sides, top, and bottom by opening doors and windows of adjacent dwelling units. 8.5.1 Exhaust Ducts.Exhaust fans in separate dwelling units shall not share a common exhaust duct. Exhaust inlets from more than one dwelling unit may be served by a single exhaust fan downstream of all the exhaust inlets if the fan is designated and intended to run continuously or if each inlet is equipped with a back-draft damper to prevent cross-contamination when the fan is not running. 8.5.2 Supply Ducts.Supply outlets to more than one dwelling unit may be served by a single fan upstream of all the supply outlets if the fan is designed and intended to run continuously or if each supply outlet is equipped with a back-draft damper to prevent cross-contamination when the fan is not running. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 7 of 7) Registration Number: 424-P010255225A-001-006-M27005A-0000 Registration Date/Time: 2024-10-23   13:10:31 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-006-M20006A-0000 Registration Date/Time: 2024-10-23   13:11:08 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 206) City: La Quinta Zip Code: 92253 A. System Information 01 Space Conditioning System Identification or Name UNIT 206 HVACSys 02 Space Conditioning System Location or Area Served Main 03 Building Type from CF-1R Multi-family 04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from CF1R? No, credit is not taken 05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit from CF1R? No, credit is not taken 06 Duct System Compliance Category New MCH-20a - Completely New Duct System B. Duct Leakage Diagnostic Test 01 Condenser Nominal Cooling Capacity (ton)3 02 Heating Capacity (kBtu/h)36 03 Conditioned Floor Area Served by this HVAC System (ft2)931 04 Duct Leakage Test Conditions Test final 05 Duct Leakage Test Method Total leakage 06 Leakage Factor 0.12 07 Air Handling Unit Airflow (AHUAirflow) Determination Method Cooling system method 08 Measured AHUAirflow (cfm)This field or section is not applicable 09 Calculated Target Allowable Duct Leakage (cfm)144 10 Actual Duct Leakage Rate from Leakage Test Measurement (cfm) 56.6 11 Compliance Statement System passes leakage test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 2 of 3) Registration Number: 424-P010255225A-001-006-M20006A-0000 Registration Date/Time: 2024-10-23   13:11:08 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. 02 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 All supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in). After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed 07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed. 08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. 09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 3 of 3) Registration Number: 424-P010255225A-001-006-M20006A-0000 Registration Date/Time: 2024-10-23   13:11:08 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable): NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-006-M23007A-0000 Registration Date/Time: 2024-10-23   13:11:34 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 206) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 206 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus ALNOR 03 Model number of Airflow Measurement Apparatus EB† 731 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas /index.html NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 2 of 3) Registration Number: 424-P010255225A-001-006-M23007A-0000 Registration Date/Time: 2024-10-23   13:11:34 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1050 03 Actual System Airflow Rate Measurement (cfm)1627 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Installation. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Installation was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 3 of 3) Registration Number: 424-P010255225A-001-006-M23007A-0000 Registration Date/Time: 2024-10-23   13:11:34 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-006-M22008A-0000 Registration Date/Time: 2024-10-23   13:11:58 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 206) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 206 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable watt meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 943.66 02 Actual Tested Airflow from MCH-23 (cfm)1627 03 Required Fan Efficacy (watts/cfm)0.58 04 Actual Fan Efficacy (watts/cfm)0.58 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 2 of 3) Registration Number: 424-P010255225A-001-006-M22008A-0000 Registration Date/Time: 2024-10-23   13:11:58 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 05 Compliance Statement:System fan efficacy complies D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 3 of 3) Registration Number: 424-P010255225A-001-006-M22008A-0000 Registration Date/Time: 2024-10-23   13:11:58 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-006-M26009A-0000 Registration Date/Time: 2024-10-23   13:12:07 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 206) City: La Quinta Zip Code: 92253 A. System Information Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system requiring verification must use a separate form. 01 System Name or Identification/Tag UNIT 206 HVACSys 02 System Location or Area Served Main 03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required 04 Directory used to certify product performance AHRI 05 AHRI certification number for the installed space conditioning system from http://www.ahridirectory.org 208650564 06 Does the directory used to certify product performance require a specific air handler/furnace make and model? Yes 07 Does the directory used to certify product performance require a time delay relay (+TDR)? Yes 08 Does the directory used to certify product performance require a TXV (+TXV)? Yes B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Data from Nameplate of Installed system component Data from the Directory used to certify product performance for the rated system component Outdoor Condenser or Package Unit - Installed Manufacturer Name 01 RHEEM 02 RHEEM Outdoor Condenser or Package Unit - Installed Model Number 03 RHPAZR036JT000NA 04 RHPAZR036JT000NA Inside Coil - Installed Manufacturer Name 05 06 This field or section is not applicable Inside Coil - Installed Model Number 07 08 This field or section is not applicable NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 2 of 3) Registration Number: 424-P010255225A-001-006-M26009A-0000 Registration Date/Time: 2024-10-23   13:12:07 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Air Handler/Furnace - Installed Manufacturer Name 09 10 RHEEM Air Handler/Furnace - Installed Model Number 11 12 RHPAZR036AJT C. Verified Cooling System SEER 01 Required minimum SEER 15 02 Installed SEER 15 03 Compliance Statement:System passes SEER verification Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed on the CF1R. D. Verified Cooling System EER This section does not apply to this project. E. Verified Cooling System Air Handler/Furnace 01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory. F. Verified Cooling System Time Delay Relay 01 If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of RA3.4.3. G. Verified Cooling System TXV 01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 3 of 3) Registration Number: 424-P010255225A-001-006-M26009A-0000 Registration Date/Time: 2024-10-23   13:12:07 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:27 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-007-M01004A-0000 Registration Date/Time: 2024-10-23   13:13:11 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:29 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 1 of 10) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 207) City: La Quinta Zip Code: 92253 A. General Information 01 Dwelling Unit Name DwellingUnit 207 02 Climate Zone 15 03 Dwelling Unit Total Conditioned Floor Area (ft2)931 04 Number of Space Conditioning Systems in this dwelling unit. 1 05 Certificate of Compliance Type Performance (CF1R-PRF)06 Method Used to Calculate HVAC Loads ACCA Manual J 07 Calculated Dwelling Unit Sensible Cooling Load (Btu/h) 36000 08 Calculated Dwelling Unit Heating Load (Btu/h)36000 09 Dwelling Unit Number of Bedrooms 2 MCH-01a - Space Conditioning Systems Ducts and Fans - For use with Performance Certificate of Compliance NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 2 of 10) Registration Number: 424-P010255225A-001-007-M01004A-0000 Registration Date/Time: 2024-10-23   13:13:11 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:29 B. Design Space Conditioning (SC) System Component Specifications from CF1R This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project. 01 02 03 04 05 06 07 08 09 10 11 12 Zone Name SC System Identification or Name SC System Type Heating System Type Cooling System Type SC Fan Type Distribution System Type Required Thermostat Type Low Leakage Air-Handling Unit (LLAHU) Status Bypass Duct Status Cooling Zoning Type Cooling System Compressor Speed This field or section is not applicable UNIT 207 HVACSys Heat pump heating cooling Central packaged HP Central packaged HP PSC Permanent Split Capacitor Unconditione d attic OCST per JA5 No, credit is not taken No Bypass Duct Not Zonal Single Speed Notes: C. Design Space Conditioning (SC) System Compliance Requirements from CF1R This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project. 01 02 03 04 05 06 07 08 09 10 SC System Identification or Name Heating Efficiency Type Minimum Heating Efficiency Value Heat Pump Heating Capacity at 47°F Heat Pump Heating Capacity at 17°F Minimum Cooling Efficiency SEER Minimum Cooling Efficiency EER Minimum Cooling System Airflow Rate (CFM/ton) Maximum Fan Efficacy (W/CFM) Minimum Duct R-Value UNIT 207 HVACSys Heating Seasonal Performance Factor (HSPF) 8.2 36000 29000 15 12.44 350 0.58 R-8 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 3 of 10) Registration Number: 424-P010255225A-001-007-M01004A-0000 Registration Date/Time: 2024-10-23   13:13:11 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:29 D. Installed Space Conditioning (SC) System Component Information 01 02 03 04 05 06 07 08 09 10 11 SC System Identification or Name SC System Location or Area Served Conditioned Floor Area Served by the System (ft2) Heating System Type Cooling System Type SC Fan Type Distribution System Type SC System Thermostat Type Cooling Zoning Type Cooling System Compressor Speed Type Central Fan Integrated (CFI) Ventilation System Status UNIT 207 HVACSys Main 931 Central packaged HP Central packaged HP PSC Permanent Split Capacitor Unconditioned attic OCST per JA5 Not Zonal Single Speed Not a CFI system Notes: E. Installed Heating System Equipment Information (not heat pumps) This section does not apply to this project. F. Installed Cooling System Outdoor Condensing Unit or Package Unit Equipment Information (not heat pumps) This section does not apply to this project. G. Installed Split System Indoor Coil or Fan Coil Unit Equipment Information (applicable to DX or hydronic heating/cooling coils or fan coil units) Systems with more than one indoor coil or fan coil unit (e.g. multi-split systems) shall provide information for each of the system indoor coils or fan coil units. This section does not apply to this project. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 4 of 10) Registration Number: 424-P010255225A-001-007-M01004A-0000 Registration Date/Time: 2024-10-23   13:13:11 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:29 H. Installed Heat Pump System - Split System Condensing Unit or Package Unit Equipment Information 01 02 03 04 05 SC System Identification or Name SC System Location or Area Served Condenser or Package Unit Manufacturer Condenser or Package Unit Model Number Condenser or Package Unit Serial Number UNIT 207 HVACSys Main RHEEM RHPAZR036JT000NA F422302310 Notes: I. Installed Heat Pump System -Efficiency and Performance Compliance Information 01 02 03 04 05 06 07 08 09 10 SC System Identification or Name SC System Location or Area Served Heating Efficiency Type Heating Efficiency Value System Rated Heating Capacity at 47°F System Rated Heating Capacity at 17°F System Rated Cooling Efficiency SEER System Rated Cooling Efficiency EER System Rated Cooling Capacity at Design Conditions (Btu/h) Condenser Rated Nominal Capacity (ton) UNIT 207 HVACSys Main Heating Seasonal Performance Factor (HSPF) 8.2 36000 29000 15 12.44 36000 3 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 5 of 10) Registration Number: 424-P010255225A-001-007-M01004A-0000 Registration Date/Time: 2024-10-23   13:13:11 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:29 J. Installed Duct System Information 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identification or Name SC System Location or Area Served Supply Duct Location Supply Duct R-Value Return Duct Location Return Duct R-Value Exemption from Min R-Value for Ducts In Conditioned Space Method of compliance with duct and filter grille sizing Req's in 150.0(m)13 Exemption From Duct Leakage Requirement s Bypass Duct Status Number of Air Filter Devices on System Can RA3.3 Airflow Protocols be used to test this System? UNIT 207 HVACSys Main Unconditio ned attic R-8 Unconditio ned attic R-8 Not applicable HERS verified fan efficacy (W/cfm) and airflow rate (cfm/ton) None No Bypass Duct 1 Yes Notes: K. Installed Air Filter Device Information Mandatory requirements for air filter devices are specified Section 150.0(m)12. 01 02 03 04 05 06 07 SC System Identification or Name SC System Location or Area Served Air Filter Device Identification or Name Air Filter Device Type Air Filter Device Location Determined Design Airflow Rate for Air Filter Device (cfm) Determined Design Allowable Pressure Drop for Air Filter Device (inch W.C.) UNIT 207 HVACSys Main Filter Filter Grille return 1050 0.1 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 6 of 10) Registration Number: 424-P010255225A-001-007-M01004A-0000 Registration Date/Time: 2024-10-23   13:13:11 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:29 L. Air Filter Device Requirements 01 The system shall be designed to ensure that all recirculated air and all outdoor air supplied to the occupiable space is filtered before passing through the system's thermal conditioning components. 02 The system shall be designed to accommodate the clean-filter pressure drop imposed by the system air filter device(s). The design airflow rate and maximum allowable clean-filter pressure drop at the design airflow rate applicable to each air filter device shall be determined, and all system air filter device locations shall be labeled to disclose the applicable design airflow rate and the maximum allowable clean-filter pressure drop. The labels shall be permanently affixed to the air filter device, readily legible, and visible to a person replacing the air filter media, and the air filter devices shall be provided with air filter media that conforms to these determined or labeled maximum allowable clean-filter pressure drop values as rated using AHRI Standard 680. 03 All system air filter devices shall be located and installed in such a manner as to allow access and regular service by the system owner. 04 The system shall be provided with air filter media having a designated efficiency equal to or greater than MERV 6 when tested in accordance with ASHRAE Standard 52.2, or a particle size efficiency rating equal to or greater than 50% in the 3.0 to10 µm range when tested in accordance with AHRI Standard 680. 05 The system shall be provided with air filter media that has been labeled by the manufacturer to disclose the efficiency and pressure drop ratings that conform to the required efficiency and pressure drop requirements for the air filter device. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met M. HERS Verification Requirements 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identificati on or Name SC System Location or Area Served MCH-20 . . Duct Leakage Test MCH-21 . Duct Location Verification MCH-22 . AHU Fan Efficacy (W/cfm) MCH-23 . AHU Airflow Rate (cfm/ton) MCH-25 . . Refrigerant Charge MCH-26 Rated SC System Equipment Verification MCH-27 . IAQ Mechanical Ventilation MCH-28 Return Duct Design Table 150.0-B or C MCH-29 Supply Duct Surface Area R-Value Buried Ducts MCH30 . Ventilation Cooling Credit UNIT 207 HVACSys Main Yes No Yes Yes No Yes Yes No No No NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 7 of 10) Registration Number: 424-P010255225A-001-007-M01004A-0000 Registration Date/Time: 2024-10-23   13:13:11 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:29 M. HERS Verification Requirements 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identificati on or Name SC System Location or Area Served MCH-20 . . Duct Leakage Test MCH-21 . Duct Location Verification MCH-22 . AHU Fan Efficacy (W/cfm) MCH-23 . AHU Airflow Rate (cfm/ton) MCH-25 . . Refrigerant Charge MCH-26 Rated SC System Equipment Verification MCH-27 . IAQ Mechanical Ventilation MCH-28 Return Duct Design Table 150.0-B or C MCH-29 Supply Duct Surface Area R-Value Buried Ducts MCH30 . Ventilation Cooling Credit Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 8 of 10) Registration Number: 424-P010255225A-001-007-M01004A-0000 Registration Date/Time: 2024-10-23   13:13:11 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:29 N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. Heating Equipment 01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(i), 110.2(b). 03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections 150.0(h)1 and 2). 04 Furnace Temperature Rise: Central forced-air heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum inlet-to-outlet temperature rise specification. See Section 150.0(h)4. 05 Standby Losses and Pilot Lights: Fan-type central furnaces may not have a continuously burning pilot light. Section 110.5 and Section 110.2(d). Cooling Equipment 06 Equipment Efficiency: All cooling equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 07 Refrigerant Line Insulation: All refrigerant line insulation in split system air conditioners and heat pumps must meet the R-value and protection requirements of Section 150.0(j)2 and 3, and Section 150.0(m)9. 08 Condensing Unit Location: Condensing units shall not be placed within five (5) feet of a dryer vent outlet. See Section 150.0(h)3A. 09 Liquid Line Filter Drier: If applicable, a liquid line filter drier shall be installed according to the manufacturer's specifications. Section 150.0(h)3B 10 Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section 150.0(h)1 and 2. Air Distribution System Ducts, Plenums and Fans NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 9 of 10) Registration Number: 424-P010255225A-001-007-M01004A-0000 Registration Date/Time: 2024-10-23   13:13:11 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:29 N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. 11 Insulation: In all cases, unless ducts are enclosed entirely in directly conditioned space, the minimum duct insulation value is R-6. Note that higher values may be required by the prescriptive or performance requirements. See Section 150.0(m)1. 12 Connections and Closures: All installed air-distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0, 602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006: Supply-air and return-air ducts and plenums must be insulated to a minimum installed level of R-6.0 or enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing in accordance with the requirements of Reference Residential Appendix RA3.1.4.3.8. Heat Pump Thermostat 13 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c). 14 The thermostat shall be installed in accordance with the manufacturers published installation specifications 15 First stage of heating shall be assigned to heat pump heating. 16 Second stage back up heating shall be set to come on only when the indoor set temperature cannot be met. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 10 of 10) Registration Number: 424-P010255225A-001-007-M01004A-0000 Registration Date/Time: 2024-10-23   13:13:11 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:29 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-007-M27005A-0000 Registration Date/Time: 2024-10-23   13:13:49 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:30 CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 1 of 7) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 207) City: La Quinta Zip Code: 92253 Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010. A. Dwelling Mechanical Ventilation - General Information 01 Dwelling unit name DwellingUnit 207 02 Building Type Single Family 03 Project scope Newly constructed building 04 Total Conditioned Floor Area of Dwelling Unit (For addition projects the conditioned floor area equals existing area plus addition area. ) 931 05 Number of bedrooms in dwelling unit (For addition projects the number of bedrooms equals the existing bedrooms plus addition bedrooms) 2 06 Ventilation Operation Schedule Continuous 07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1) 08 Whole Building Ventilation System Type Standalone - Balanced 09 IAQ Fan Location Note: Non-dwelling units do not meet the definition for a dwelling unit as defined in Section 100.1(b). Non-dwelling units are not designed to provide independent living facilities and do not provide permanent provisions for living, sleeping, eating, cooking and sanitation. MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with outdoor air each hour at no less than the rate in equation 4.1a. 01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81 02 Installed Continuous Whole-Building Ventilation Rate 109 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 2 of 7) Registration Number: 424-P010255225A-001-007-M27005A-0000 Registration Date/Time: 2024-10-23   13:13:49 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:30 C. Compliance Statement 01 Building passes continuous whole-building ventilation rate test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 3 of 7) Registration Number: 424-P010255225A-001-007-M27005A-0000 Registration Date/Time: 2024-10-23   13:13:49 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:30 D. Local Mechanical Exhaust System - Fan selection and duct design criteria for compliance Local mechanical exhaust fans shall be installed in each kitchen and bathroom. Delivered local ventilation rates: •All local ventilation rates have been measured using a flow hood, flow grid, or other airflow measuring device and meet the requirements of 62.2 Tables 5.1 or 5.2. OR •The airflow rating at a pressure of 0.25 in. w.c. of a certified fan is assumed because the local ventilation system duct sizing meets the prescriptive requirements of 62.2 Table 5.3, or manufacturer's design criteria. Table 5.1 Intermittent Local Ventilation Exhaust Airflow Rates Application Airflow Notes Kitchen 100 cfm Vented range hood (including appliance-range hood combinations) required if exhaust fan flow is less than 5 ACH. Bathroom 50 cfm Table 5.2 Continuous Local Ventilation Exhaust Airflow Rates Application Airflow Notes Kitchen 5 ACH Based on Kitchen volume. Bathroom 20 cfm Table 5.3 Prescriptive Duct Sizing Requirements Duct Type Flex Duct Smooth Duct Fan Rating cfm @ 0.25 in. w.g. 50 80 100 125 50 80 100 125 Maximum Allowable Duct Length (ft) Diameter, (in)Flex Duct Smooth Duct 3 X X X X 5 X X X 4 70 3 X X 105 35 5 X 5 NL 70 35 20 NL 135 85 55 6 NL NL 125 95 NL NL NL 145 7 and above NL NL NL NL NL NL NL NL This table assumes no elbows. Deduct 15 ft of allowable duct length for each turn, elbow, or fitting. Interpolation and extrapolation in 62.2 Table 5.3 is not allowed. For airflow values not listed, use the next higher value. This table is not applicable for airflow > 125 cfm. NL = no limit on duct length of this size. X = not allowed, any length of duct of this size with assumed turns, elbows, fittings will exceed the rated pressure drop. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 4 of 7) Registration Number: 424-P010255225A-001-007-M27005A-0000 Registration Date/Time: 2024-10-23   13:13:49 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:30 E. Other Requirements The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if applicable. 01 6.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components to occupiable spaces from garages, unconditioned crawl spaces, and unconditioned attics. Supply and balanced ventilation systems shall be designed and constructed to provide ventilation air directly from the outdoors. 02 6.2 Instructions and Labeling.Information on the ventilation design and/or ventilation systems installed, instructions on their proper operation to meet the requirements of this standard, and instructions detailing any required maintenance (similar to that provided for HVAC systems) shall be provided to the owner and the occupant of the dwelling unit. Controls shall be labeled as to their function (unless that function is obvious, such as toilet exhaust fan switches). See Chapter 13 of Guideline 24 2 for information on instructions and labeling. 03 6.3 Clothes Dryers.Clothes dryers shall be exhausted directly to the outdoors 04 6.4 Combustion and Solid-Fuel Burning Appliances.Combustion and solid-fuel burning appliances must be provided with adequate combustion and ventilation air and vented in accordance with manufacturer installation instructions, NFPA 54 ANSI Z223.1, National Fuel Gas Code, NFPA 31, Standard for the Installation of Oil-Burning Equipment, or NFPA 211, Standard for Chimneys, Fireplaces, Vents, and Solid-Fuel Burning Appliances, or other equivalent code acceptable to the building official. Where atmospherically vented combustion appliances or solid-fuel burning appliances are located inside the pressure boundary, the total net exhaust flow of the two largest exhaust fans (not including a summer cooling fan intended to be operated only when windows or other air inlets are open) shall not exceed 15 cfm/100 ft 2 (75 Lps/100 m2) of occupiable space when in operation at full capacity. If the designed total net flow exceeds this limit, the net exhaust flow must be reduced by reducing the exhaust flow or providing compensating outdoor airflow. Atmospherically vented combustion appliances do not include direct-vent appliances. 05 6.5 Garages.When an occupiable space adjoins a garage, the design must prevent migration of contaminants to the adjoining occupiable space. Air seal the walls, ceilings, and floors that separate garages from occupiable space. To be considered air sealed, all joints, seams, penetrations, openings between door assemblies and their respective jambs and framing, and other sources of air leakage through wall and ceiling assemblies separating the garage from the residence and its attic area shall be caulked, gasketed, weather stripped, wrapped, or otherwise sealed to limit air movement. Doors between garages and occupiable spaces shall be gasketed or made substantially airtight with weather stripping. 06 6.6 Ventilation Opening Area.Spaces shall have ventilation openings as listed below. Such openings shall meet the requirements of Section 6.8 07 6.7 Minimum Filtration.Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 ft (3 m) in length and through a thermal conditioning component, except evaporative coolers, shall be provided with a filter having a designated minimum efficiency of MERV 6, or better, when tested in accordance with ANSI ASHRAE Standard 52.2, Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size, or a minimum Particle Size Efficiency of 50 percent in the 3.0-10 µm range in accordance with AHRI Standard 680, Performance Rating of Residential Air Filter Equipment. The system shall be designed such that all recirculated and mechanically supplied outdoor air is filtered before passing through the thermal conditioning components. The filter shall be located and installed in such a manner as to facilitate access and regular service by the owner. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 5 of 7) Registration Number: 424-P010255225A-001-007-M27005A-0000 Registration Date/Time: 2024-10-23   13:13:49 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:30 E. Other Requirements The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if applicable. 08 6.8 Air Inlets.Air inlets that are part of the ventilation design shall be located a minimum of 10 ft (3 m) from known sources of contamination such as a stack, vent, exhaust hood, or vehicle exhaust. The intake shall be placed so that entering air is not obstructed by snow, plantings, or other material. Forced air inlets shall be provided with rodent insect screens (mesh not larger than 1/2 inch). 09 6.9 Carbon Monoxide Detectors.A carbon monoxide alarm shall be installed in each dwelling unit in accordance with NFPA 720,Standard for the Installation of Carbon Monoxide (CO) Detection and Warning Equipment 14, and shall be consistent with requirements of applicable laws, codes, and standards. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met. F. Air Moving Equipment The items listed below (7.1 through 7.3) correspond to the information given in ASHRAE 62.2 Section 7 Air-Moving Equipment. Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.6) for information describing these requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 7.1 through 7.3 if applicable. 01 7.1 Selection and Installation.Ventilation devices and equipment shall be tested and listed in accordance with specific standards. Installations of systems or equipment shall be carried out in accordance with manufacturers' design requirements and installation instructions. 02 7.2 Sound Ratings for Fans.Ventilation fans shall be rated for sound at no less than the minimum airflow rate required by this standard, as noted below. These sound ratings shall be at a minimum of 0.1 in. w.c. (25 Pa) static pressure.      7.2.1 Whole Building or Continuous Ventilation Fans.These fans shall be rated for sound at a maximum of 1.0 sone.      7.2.2 Intermittent Local Exhaust Fans.Fans used to comply with Section 5.2 shall be rated for sound at a maximum of 3 sone, unless their maximum rated airflow exceeds 400 cfm (200 L/s). (Some exceptions may apply.) 03 7.3 Multibranch Exhaust Ducting.If more than one of the exhaust fans in a dwelling unit shares a common exhaust duct, each fan shall be equipped with a back draft damper to prevent the recirculation of exhaust air from one room to another through the exhaust ducting system. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 6 of 7) Registration Number: 424-P010255225A-001-007-M27005A-0000 Registration Date/Time: 2024-10-23   13:13:49 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:30 G. Multifamily Buildings -Other Requirements The items listed below correspond to the information given in ASHRAE 62.2 Section 8 "Multifamily Buildings". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 8, if applicable. 01 8.2 Whole-Building Mechanical Ventilation.For multifamily buildings, the term "building" in Section 4 refers to a single dwelling unit. 8.4.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components separating dwelling units, including sealing penetrations in the common walls, ceilings, and floors of each unit and by sealing vertical chases adjacent to the units. All doors between dwelling units and common hallways shall be gasketed or made substantially airtight. 8.4.1.1 Compliance.One method of demonstrating compliance with Section 8.4.1 shall be to verify a leakage rate below a maximum of 0.2 cfm/ ft2 (100 L/s per 100 m2) of the dwelling unit envelope area (i.e., the sum of the area of the walls between dwelling units, exterior walls, ceiling and floor) at a test pressure of 50 Pa by a blower door test. The test shall be conducted with the dwelling unit as if it were exposed to outdoor air on all sides, top, and bottom by opening doors and windows of adjacent dwelling units. 8.5.1 Exhaust Ducts.Exhaust fans in separate dwelling units shall not share a common exhaust duct. Exhaust inlets from more than one dwelling unit may be served by a single exhaust fan downstream of all the exhaust inlets if the fan is designated and intended to run continuously or if each inlet is equipped with a back-draft damper to prevent cross-contamination when the fan is not running. 8.5.2 Supply Ducts.Supply outlets to more than one dwelling unit may be served by a single fan upstream of all the supply outlets if the fan is designed and intended to run continuously or if each supply outlet is equipped with a back-draft damper to prevent cross-contamination when the fan is not running. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 7 of 7) Registration Number: 424-P010255225A-001-007-M27005A-0000 Registration Date/Time: 2024-10-23   13:13:49 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:30 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-007-M20006A-0000 Registration Date/Time: 2024-10-23   13:14:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:30 CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 207) City: La Quinta Zip Code: 92253 A. System Information 01 Space Conditioning System Identification or Name UNIT 207 HVACSys 02 Space Conditioning System Location or Area Served Main 03 Building Type from CF-1R Multi-family 04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from CF1R? No, credit is not taken 05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit from CF1R? No, credit is not taken 06 Duct System Compliance Category New MCH-20a - Completely New Duct System B. Duct Leakage Diagnostic Test 01 Condenser Nominal Cooling Capacity (ton)3 02 Heating Capacity (kBtu/h)36 03 Conditioned Floor Area Served by this HVAC System (ft2)931 04 Duct Leakage Test Conditions Test final 05 Duct Leakage Test Method Total leakage 06 Leakage Factor 0.12 07 Air Handling Unit Airflow (AHUAirflow) Determination Method Cooling system method 08 Measured AHUAirflow (cfm)This field or section is not applicable 09 Calculated Target Allowable Duct Leakage (cfm)144 10 Actual Duct Leakage Rate from Leakage Test Measurement (cfm) 42.9 11 Compliance Statement System passes leakage test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 2 of 3) Registration Number: 424-P010255225A-001-007-M20006A-0000 Registration Date/Time: 2024-10-23   13:14:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:30 C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. 02 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 All supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in). After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed 07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed. 08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. 09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 3 of 3) Registration Number: 424-P010255225A-001-007-M20006A-0000 Registration Date/Time: 2024-10-23   13:14:40 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:30 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable): NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-007-M23007A-0000 Registration Date/Time: 2024-10-23   13:15:17 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:30 CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 207) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 207 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus ALNOR 03 Model number of Airflow Measurement Apparatus EB† 731 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas /index.html NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 2 of 3) Registration Number: 424-P010255225A-001-007-M23007A-0000 Registration Date/Time: 2024-10-23   13:15:17 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:30 MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1050 03 Actual System Airflow Rate Measurement (cfm)1547 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Installation. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Installation was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 3 of 3) Registration Number: 424-P010255225A-001-007-M23007A-0000 Registration Date/Time: 2024-10-23   13:15:17 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:30 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-007-M22008A-0000 Registration Date/Time: 2024-10-23   13:15:49 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:30 CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 207) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 207 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable watt meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 897.26 02 Actual Tested Airflow from MCH-23 (cfm)1547 03 Required Fan Efficacy (watts/cfm)0.58 04 Actual Fan Efficacy (watts/cfm)0.58 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 2 of 3) Registration Number: 424-P010255225A-001-007-M22008A-0000 Registration Date/Time: 2024-10-23   13:15:49 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:30 C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 05 Compliance Statement:System fan efficacy complies D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 3 of 3) Registration Number: 424-P010255225A-001-007-M22008A-0000 Registration Date/Time: 2024-10-23   13:15:49 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:30 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-007-M26009A-0000 Registration Date/Time: 2024-10-23   13:16:19 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:30 CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 207) City: La Quinta Zip Code: 92253 A. System Information Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system requiring verification must use a separate form. 01 System Name or Identification/Tag UNIT 207 HVACSys 02 System Location or Area Served Main 03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required 04 Directory used to certify product performance AHRI 05 AHRI certification number for the installed space conditioning system from http://www.ahridirectory.org 208650564 06 Does the directory used to certify product performance require a specific air handler/furnace make and model? Yes 07 Does the directory used to certify product performance require a time delay relay (+TDR)? Yes 08 Does the directory used to certify product performance require a TXV (+TXV)? Yes B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Data from Nameplate of Installed system component Data from the Directory used to certify product performance for the rated system component Outdoor Condenser or Package Unit - Installed Manufacturer Name 01 RHEEM 02 RHEEM Outdoor Condenser or Package Unit - Installed Model Number 03 RHPAZR036JT000NA 04 RHPAZR036JT000NA Inside Coil - Installed Manufacturer Name 05 06 This field or section is not applicable Inside Coil - Installed Model Number 07 08 This field or section is not applicable NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 2 of 3) Registration Number: 424-P010255225A-001-007-M26009A-0000 Registration Date/Time: 2024-10-23   13:16:19 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:30 B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Air Handler/Furnace - Installed Manufacturer Name 09 10 RHEEM Air Handler/Furnace - Installed Model Number 11 12 RHPAZR036AJT C. Verified Cooling System SEER 01 Required minimum SEER 15 02 Installed SEER 15 03 Compliance Statement:System passes SEER verification Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed on the CF1R. D. Verified Cooling System EER This section does not apply to this project. E. Verified Cooling System Air Handler/Furnace 01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory. F. Verified Cooling System Time Delay Relay 01 If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of RA3.4.3. G. Verified Cooling System TXV 01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 3 of 3) Registration Number: 424-P010255225A-001-007-M26009A-0000 Registration Date/Time: 2024-10-23   13:16:19 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:30 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-008-M01004A-0000 Registration Date/Time: 2024-10-23   13:17:26 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 1 of 10) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 208) City: La Quinta Zip Code: 92253 A. General Information 01 Dwelling Unit Name DwellingUnit 208 02 Climate Zone 15 03 Dwelling Unit Total Conditioned Floor Area (ft2)931 04 Number of Space Conditioning Systems in this dwelling unit. 1 05 Certificate of Compliance Type Performance (CF1R-PRF)06 Method Used to Calculate HVAC Loads ACCA Manual J 07 Calculated Dwelling Unit Sensible Cooling Load (Btu/h) 36000 08 Calculated Dwelling Unit Heating Load (Btu/h)36000 09 Dwelling Unit Number of Bedrooms 2 MCH-01a - Space Conditioning Systems Ducts and Fans - For use with Performance Certificate of Compliance NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 2 of 10) Registration Number: 424-P010255225A-001-008-M01004A-0000 Registration Date/Time: 2024-10-23   13:17:26 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 B. Design Space Conditioning (SC) System Component Specifications from CF1R This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project. 01 02 03 04 05 06 07 08 09 10 11 12 Zone Name SC System Identification or Name SC System Type Heating System Type Cooling System Type SC Fan Type Distribution System Type Required Thermostat Type Low Leakage Air-Handling Unit (LLAHU) Status Bypass Duct Status Cooling Zoning Type Cooling System Compressor Speed This field or section is not applicable UNIT 208 HVACSys Heat pump heating cooling Central packaged HP Central packaged HP PSC Permanent Split Capacitor Unconditione d attic OCST per JA5 No, credit is not taken No Bypass Duct Not Zonal Single Speed Notes: C. Design Space Conditioning (SC) System Compliance Requirements from CF1R This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project. 01 02 03 04 05 06 07 08 09 10 SC System Identification or Name Heating Efficiency Type Minimum Heating Efficiency Value Heat Pump Heating Capacity at 47°F Heat Pump Heating Capacity at 17°F Minimum Cooling Efficiency SEER Minimum Cooling Efficiency EER Minimum Cooling System Airflow Rate (CFM/ton) Maximum Fan Efficacy (W/CFM) Minimum Duct R-Value UNIT 208 HVACSys Heating Seasonal Performance Factor (HSPF) 8.2 36000 29000 15 12.44 350 0.58 R-8 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 3 of 10) Registration Number: 424-P010255225A-001-008-M01004A-0000 Registration Date/Time: 2024-10-23   13:17:26 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 D. Installed Space Conditioning (SC) System Component Information 01 02 03 04 05 06 07 08 09 10 11 SC System Identification or Name SC System Location or Area Served Conditioned Floor Area Served by the System (ft2) Heating System Type Cooling System Type SC Fan Type Distribution System Type SC System Thermostat Type Cooling Zoning Type Cooling System Compressor Speed Type Central Fan Integrated (CFI) Ventilation System Status UNIT 208 HVACSys Main 931 Central packaged HP Central packaged HP PSC Permanent Split Capacitor Unconditioned attic OCST per JA5 Not Zonal Single Speed Not a CFI system Notes: E. Installed Heating System Equipment Information (not heat pumps) This section does not apply to this project. F. Installed Cooling System Outdoor Condensing Unit or Package Unit Equipment Information (not heat pumps) This section does not apply to this project. G. Installed Split System Indoor Coil or Fan Coil Unit Equipment Information (applicable to DX or hydronic heating/cooling coils or fan coil units) Systems with more than one indoor coil or fan coil unit (e.g. multi-split systems) shall provide information for each of the system indoor coils or fan coil units. This section does not apply to this project. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 4 of 10) Registration Number: 424-P010255225A-001-008-M01004A-0000 Registration Date/Time: 2024-10-23   13:17:26 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 H. Installed Heat Pump System - Split System Condensing Unit or Package Unit Equipment Information 01 02 03 04 05 SC System Identification or Name SC System Location or Area Served Condenser or Package Unit Manufacturer Condenser or Package Unit Model Number Condenser or Package Unit Serial Number UNIT 208 HVACSys Main RHEEM RHPAZR036JT000NA F422302313 Notes: I. Installed Heat Pump System -Efficiency and Performance Compliance Information 01 02 03 04 05 06 07 08 09 10 SC System Identification or Name SC System Location or Area Served Heating Efficiency Type Heating Efficiency Value System Rated Heating Capacity at 47°F System Rated Heating Capacity at 17°F System Rated Cooling Efficiency SEER System Rated Cooling Efficiency EER System Rated Cooling Capacity at Design Conditions (Btu/h) Condenser Rated Nominal Capacity (ton) UNIT 208 HVACSys Main Heating Seasonal Performance Factor (HSPF) 8.2 36000 29000 15 12.44 36000 3 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 5 of 10) Registration Number: 424-P010255225A-001-008-M01004A-0000 Registration Date/Time: 2024-10-23   13:17:26 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 J. Installed Duct System Information 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identification or Name SC System Location or Area Served Supply Duct Location Supply Duct R-Value Return Duct Location Return Duct R-Value Exemption from Min R-Value for Ducts In Conditioned Space Method of compliance with duct and filter grille sizing Req's in 150.0(m)13 Exemption From Duct Leakage Requirement s Bypass Duct Status Number of Air Filter Devices on System Can RA3.3 Airflow Protocols be used to test this System? UNIT 208 HVACSys Main Unconditio ned attic R-8 Unconditio ned attic R-8 Not applicable HERS verified fan efficacy (W/cfm) and airflow rate (cfm/ton) None No Bypass Duct 1 Yes Notes: K. Installed Air Filter Device Information Mandatory requirements for air filter devices are specified Section 150.0(m)12. 01 02 03 04 05 06 07 SC System Identification or Name SC System Location or Area Served Air Filter Device Identification or Name Air Filter Device Type Air Filter Device Location Determined Design Airflow Rate for Air Filter Device (cfm) Determined Design Allowable Pressure Drop for Air Filter Device (inch W.C.) UNIT 208 HVACSys Main Filter Filter Grille return 1050 0.1 Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 6 of 10) Registration Number: 424-P010255225A-001-008-M01004A-0000 Registration Date/Time: 2024-10-23   13:17:26 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 L. Air Filter Device Requirements 01 The system shall be designed to ensure that all recirculated air and all outdoor air supplied to the occupiable space is filtered before passing through the system's thermal conditioning components. 02 The system shall be designed to accommodate the clean-filter pressure drop imposed by the system air filter device(s). The design airflow rate and maximum allowable clean-filter pressure drop at the design airflow rate applicable to each air filter device shall be determined, and all system air filter device locations shall be labeled to disclose the applicable design airflow rate and the maximum allowable clean-filter pressure drop. The labels shall be permanently affixed to the air filter device, readily legible, and visible to a person replacing the air filter media, and the air filter devices shall be provided with air filter media that conforms to these determined or labeled maximum allowable clean-filter pressure drop values as rated using AHRI Standard 680. 03 All system air filter devices shall be located and installed in such a manner as to allow access and regular service by the system owner. 04 The system shall be provided with air filter media having a designated efficiency equal to or greater than MERV 6 when tested in accordance with ASHRAE Standard 52.2, or a particle size efficiency rating equal to or greater than 50% in the 3.0 to10 µm range when tested in accordance with AHRI Standard 680. 05 The system shall be provided with air filter media that has been labeled by the manufacturer to disclose the efficiency and pressure drop ratings that conform to the required efficiency and pressure drop requirements for the air filter device. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met M. HERS Verification Requirements 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identificati on or Name SC System Location or Area Served MCH-20 . . Duct Leakage Test MCH-21 . Duct Location Verification MCH-22 . AHU Fan Efficacy (W/cfm) MCH-23 . AHU Airflow Rate (cfm/ton) MCH-25 . . Refrigerant Charge MCH-26 Rated SC System Equipment Verification MCH-27 . IAQ Mechanical Ventilation MCH-28 Return Duct Design Table 150.0-B or C MCH-29 Supply Duct Surface Area R-Value Buried Ducts MCH30 . Ventilation Cooling Credit UNIT 208 HVACSys Main Yes No Yes Yes No Yes Yes No No No NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 7 of 10) Registration Number: 424-P010255225A-001-008-M01004A-0000 Registration Date/Time: 2024-10-23   13:17:26 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 M. HERS Verification Requirements 01 02 03 04 05 06 07 08 09 10 11 12 SC System Identificati on or Name SC System Location or Area Served MCH-20 . . Duct Leakage Test MCH-21 . Duct Location Verification MCH-22 . AHU Fan Efficacy (W/cfm) MCH-23 . AHU Airflow Rate (cfm/ton) MCH-25 . . Refrigerant Charge MCH-26 Rated SC System Equipment Verification MCH-27 . IAQ Mechanical Ventilation MCH-28 Return Duct Design Table 150.0-B or C MCH-29 Supply Duct Surface Area R-Value Buried Ducts MCH30 . Ventilation Cooling Credit Notes: NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 8 of 10) Registration Number: 424-P010255225A-001-008-M01004A-0000 Registration Date/Time: 2024-10-23   13:17:26 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. Heating Equipment 01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(i), 110.2(b). 03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections 150.0(h)1 and 2). 04 Furnace Temperature Rise: Central forced-air heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum inlet-to-outlet temperature rise specification. See Section 150.0(h)4. 05 Standby Losses and Pilot Lights: Fan-type central furnaces may not have a continuously burning pilot light. Section 110.5 and Section 110.2(d). Cooling Equipment 06 Equipment Efficiency: All cooling equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 07 Refrigerant Line Insulation: All refrigerant line insulation in split system air conditioners and heat pumps must meet the R-value and protection requirements of Section 150.0(j)2 and 3, and Section 150.0(m)9. 08 Condensing Unit Location: Condensing units shall not be placed within five (5) feet of a dryer vent outlet. See Section 150.0(h)3A. 09 Liquid Line Filter Drier: If applicable, a liquid line filter drier shall be installed according to the manufacturer's specifications. Section 150.0(h)3B 10 Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section 150.0(h)1 and 2. Air Distribution System Ducts, Plenums and Fans NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 9 of 10) Registration Number: 424-P010255225A-001-008-M01004A-0000 Registration Date/Time: 2024-10-23   13:17:26 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. 11 Insulation: In all cases, unless ducts are enclosed entirely in directly conditioned space, the minimum duct insulation value is R-6. Note that higher values may be required by the prescriptive or performance requirements. See Section 150.0(m)1. 12 Connections and Closures: All installed air-distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0, 602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006: Supply-air and return-air ducts and plenums must be insulated to a minimum installed level of R-6.0 or enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing in accordance with the requirements of Reference Residential Appendix RA3.1.4.3.8. Heat Pump Thermostat 13 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c). 14 The thermostat shall be installed in accordance with the manufacturers published installation specifications 15 First stage of heating shall be assigned to heat pump heating. 16 Second stage back up heating shall be set to come on only when the indoor set temperature cannot be met. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 10 of 10) Registration Number: 424-P010255225A-001-008-M01004A-0000 Registration Date/Time: 2024-10-23   13:17:26 HERS Provider: CHEERS CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-008-M27005A-0000 Registration Date/Time: 2024-10-23   13:17:52 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 1 of 7) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 208) City: La Quinta Zip Code: 92253 Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010. A. Dwelling Mechanical Ventilation - General Information 01 Dwelling unit name DwellingUnit 208 02 Building Type Single Family 03 Project scope Newly constructed building 04 Total Conditioned Floor Area of Dwelling Unit (For addition projects the conditioned floor area equals existing area plus addition area. ) 931 05 Number of bedrooms in dwelling unit (For addition projects the number of bedrooms equals the existing bedrooms plus addition bedrooms) 2 06 Ventilation Operation Schedule Continuous 07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1) 08 Whole Building Ventilation System Type Standalone - Balanced 09 IAQ Fan Location Note: Non-dwelling units do not meet the definition for a dwelling unit as defined in Section 100.1(b). Non-dwelling units are not designed to provide independent living facilities and do not provide permanent provisions for living, sleeping, eating, cooking and sanitation. MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with outdoor air each hour at no less than the rate in equation 4.1a. 01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81 02 Installed Continuous Whole-Building Ventilation Rate 140 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 2 of 7) Registration Number: 424-P010255225A-001-008-M27005A-0000 Registration Date/Time: 2024-10-23   13:17:52 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 C. Compliance Statement 01 Building passes continuous whole-building ventilation rate test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 3 of 7) Registration Number: 424-P010255225A-001-008-M27005A-0000 Registration Date/Time: 2024-10-23   13:17:52 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 D. Local Mechanical Exhaust System - Fan selection and duct design criteria for compliance Local mechanical exhaust fans shall be installed in each kitchen and bathroom. Delivered local ventilation rates: •All local ventilation rates have been measured using a flow hood, flow grid, or other airflow measuring device and meet the requirements of 62.2 Tables 5.1 or 5.2. OR •The airflow rating at a pressure of 0.25 in. w.c. of a certified fan is assumed because the local ventilation system duct sizing meets the prescriptive requirements of 62.2 Table 5.3, or manufacturer's design criteria. Table 5.1 Intermittent Local Ventilation Exhaust Airflow Rates Application Airflow Notes Kitchen 100 cfm Vented range hood (including appliance-range hood combinations) required if exhaust fan flow is less than 5 ACH. Bathroom 50 cfm Table 5.2 Continuous Local Ventilation Exhaust Airflow Rates Application Airflow Notes Kitchen 5 ACH Based on Kitchen volume. Bathroom 20 cfm Table 5.3 Prescriptive Duct Sizing Requirements Duct Type Flex Duct Smooth Duct Fan Rating cfm @ 0.25 in. w.g. 50 80 100 125 50 80 100 125 Maximum Allowable Duct Length (ft) Diameter, (in)Flex Duct Smooth Duct 3 X X X X 5 X X X 4 70 3 X X 105 35 5 X 5 NL 70 35 20 NL 135 85 55 6 NL NL 125 95 NL NL NL 145 7 and above NL NL NL NL NL NL NL NL This table assumes no elbows. Deduct 15 ft of allowable duct length for each turn, elbow, or fitting. Interpolation and extrapolation in 62.2 Table 5.3 is not allowed. For airflow values not listed, use the next higher value. This table is not applicable for airflow > 125 cfm. NL = no limit on duct length of this size. X = not allowed, any length of duct of this size with assumed turns, elbows, fittings will exceed the rated pressure drop. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 4 of 7) Registration Number: 424-P010255225A-001-008-M27005A-0000 Registration Date/Time: 2024-10-23   13:17:52 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 E. Other Requirements The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if applicable. 01 6.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components to occupiable spaces from garages, unconditioned crawl spaces, and unconditioned attics. Supply and balanced ventilation systems shall be designed and constructed to provide ventilation air directly from the outdoors. 02 6.2 Instructions and Labeling.Information on the ventilation design and/or ventilation systems installed, instructions on their proper operation to meet the requirements of this standard, and instructions detailing any required maintenance (similar to that provided for HVAC systems) shall be provided to the owner and the occupant of the dwelling unit. Controls shall be labeled as to their function (unless that function is obvious, such as toilet exhaust fan switches). See Chapter 13 of Guideline 24 2 for information on instructions and labeling. 03 6.3 Clothes Dryers.Clothes dryers shall be exhausted directly to the outdoors 04 6.4 Combustion and Solid-Fuel Burning Appliances.Combustion and solid-fuel burning appliances must be provided with adequate combustion and ventilation air and vented in accordance with manufacturer installation instructions, NFPA 54 ANSI Z223.1, National Fuel Gas Code, NFPA 31, Standard for the Installation of Oil-Burning Equipment, or NFPA 211, Standard for Chimneys, Fireplaces, Vents, and Solid-Fuel Burning Appliances, or other equivalent code acceptable to the building official. Where atmospherically vented combustion appliances or solid-fuel burning appliances are located inside the pressure boundary, the total net exhaust flow of the two largest exhaust fans (not including a summer cooling fan intended to be operated only when windows or other air inlets are open) shall not exceed 15 cfm/100 ft 2 (75 Lps/100 m2) of occupiable space when in operation at full capacity. If the designed total net flow exceeds this limit, the net exhaust flow must be reduced by reducing the exhaust flow or providing compensating outdoor airflow. Atmospherically vented combustion appliances do not include direct-vent appliances. 05 6.5 Garages.When an occupiable space adjoins a garage, the design must prevent migration of contaminants to the adjoining occupiable space. Air seal the walls, ceilings, and floors that separate garages from occupiable space. To be considered air sealed, all joints, seams, penetrations, openings between door assemblies and their respective jambs and framing, and other sources of air leakage through wall and ceiling assemblies separating the garage from the residence and its attic area shall be caulked, gasketed, weather stripped, wrapped, or otherwise sealed to limit air movement. Doors between garages and occupiable spaces shall be gasketed or made substantially airtight with weather stripping. 06 6.6 Ventilation Opening Area.Spaces shall have ventilation openings as listed below. Such openings shall meet the requirements of Section 6.8 07 6.7 Minimum Filtration.Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 ft (3 m) in length and through a thermal conditioning component, except evaporative coolers, shall be provided with a filter having a designated minimum efficiency of MERV 6, or better, when tested in accordance with ANSI ASHRAE Standard 52.2, Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size, or a minimum Particle Size Efficiency of 50 percent in the 3.0-10 µm range in accordance with AHRI Standard 680, Performance Rating of Residential Air Filter Equipment. The system shall be designed such that all recirculated and mechanically supplied outdoor air is filtered before passing through the thermal conditioning components. The filter shall be located and installed in such a manner as to facilitate access and regular service by the owner. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 5 of 7) Registration Number: 424-P010255225A-001-008-M27005A-0000 Registration Date/Time: 2024-10-23   13:17:52 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 E. Other Requirements The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if applicable. 08 6.8 Air Inlets.Air inlets that are part of the ventilation design shall be located a minimum of 10 ft (3 m) from known sources of contamination such as a stack, vent, exhaust hood, or vehicle exhaust. The intake shall be placed so that entering air is not obstructed by snow, plantings, or other material. Forced air inlets shall be provided with rodent insect screens (mesh not larger than 1/2 inch). 09 6.9 Carbon Monoxide Detectors.A carbon monoxide alarm shall be installed in each dwelling unit in accordance with NFPA 720,Standard for the Installation of Carbon Monoxide (CO) Detection and Warning Equipment 14, and shall be consistent with requirements of applicable laws, codes, and standards. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met. F. Air Moving Equipment The items listed below (7.1 through 7.3) correspond to the information given in ASHRAE 62.2 Section 7 Air-Moving Equipment. Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.6) for information describing these requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 7.1 through 7.3 if applicable. 01 7.1 Selection and Installation.Ventilation devices and equipment shall be tested and listed in accordance with specific standards. Installations of systems or equipment shall be carried out in accordance with manufacturers' design requirements and installation instructions. 02 7.2 Sound Ratings for Fans.Ventilation fans shall be rated for sound at no less than the minimum airflow rate required by this standard, as noted below. These sound ratings shall be at a minimum of 0.1 in. w.c. (25 Pa) static pressure.      7.2.1 Whole Building or Continuous Ventilation Fans.These fans shall be rated for sound at a maximum of 1.0 sone.      7.2.2 Intermittent Local Exhaust Fans.Fans used to comply with Section 5.2 shall be rated for sound at a maximum of 3 sone, unless their maximum rated airflow exceeds 400 cfm (200 L/s). (Some exceptions may apply.) 03 7.3 Multibranch Exhaust Ducting.If more than one of the exhaust fans in a dwelling unit shares a common exhaust duct, each fan shall be equipped with a back draft damper to prevent the recirculation of exhaust air from one room to another through the exhaust ducting system. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 6 of 7) Registration Number: 424-P010255225A-001-008-M27005A-0000 Registration Date/Time: 2024-10-23   13:17:52 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 G. Multifamily Buildings -Other Requirements The items listed below correspond to the information given in ASHRAE 62.2 Section 8 "Multifamily Buildings". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 8, if applicable. 01 8.2 Whole-Building Mechanical Ventilation.For multifamily buildings, the term "building" in Section 4 refers to a single dwelling unit. 8.4.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components separating dwelling units, including sealing penetrations in the common walls, ceilings, and floors of each unit and by sealing vertical chases adjacent to the units. All doors between dwelling units and common hallways shall be gasketed or made substantially airtight. 8.4.1.1 Compliance.One method of demonstrating compliance with Section 8.4.1 shall be to verify a leakage rate below a maximum of 0.2 cfm/ ft2 (100 L/s per 100 m2) of the dwelling unit envelope area (i.e., the sum of the area of the walls between dwelling units, exterior walls, ceiling and floor) at a test pressure of 50 Pa by a blower door test. The test shall be conducted with the dwelling unit as if it were exposed to outdoor air on all sides, top, and bottom by opening doors and windows of adjacent dwelling units. 8.5.1 Exhaust Ducts.Exhaust fans in separate dwelling units shall not share a common exhaust duct. Exhaust inlets from more than one dwelling unit may be served by a single exhaust fan downstream of all the exhaust inlets if the fan is designated and intended to run continuously or if each inlet is equipped with a back-draft damper to prevent cross-contamination when the fan is not running. 8.5.2 Supply Ducts.Supply outlets to more than one dwelling unit may be served by a single fan upstream of all the supply outlets if the fan is designed and intended to run continuously or if each supply outlet is equipped with a back-draft damper to prevent cross-contamination when the fan is not running. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 7 of 7) Registration Number: 424-P010255225A-001-008-M27005A-0000 Registration Date/Time: 2024-10-23   13:17:52 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-008-M20006A-0000 Registration Date/Time: 2024-10-23   13:18:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 208) City: La Quinta Zip Code: 92253 A. System Information 01 Space Conditioning System Identification or Name UNIT 208 HVACSys 02 Space Conditioning System Location or Area Served Main 03 Building Type from CF-1R Multi-family 04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from CF1R? No, credit is not taken 05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit from CF1R? No, credit is not taken 06 Duct System Compliance Category New MCH-20a - Completely New Duct System B. Duct Leakage Diagnostic Test 01 Condenser Nominal Cooling Capacity (ton)3 02 Heating Capacity (kBtu/h)36 03 Conditioned Floor Area Served by this HVAC System (ft2)931 04 Duct Leakage Test Conditions Test final 05 Duct Leakage Test Method Total leakage 06 Leakage Factor 0.12 07 Air Handling Unit Airflow (AHUAirflow) Determination Method Cooling system method 08 Measured AHUAirflow (cfm)This field or section is not applicable 09 Calculated Target Allowable Duct Leakage (cfm)144 10 Actual Duct Leakage Rate from Leakage Test Measurement (cfm) 53.1 11 Compliance Statement System passes leakage test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 2 of 3) Registration Number: 424-P010255225A-001-008-M20006A-0000 Registration Date/Time: 2024-10-23   13:18:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. 02 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 All supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in). After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed 07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed. 08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. 09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 3 of 3) Registration Number: 424-P010255225A-001-008-M20006A-0000 Registration Date/Time: 2024-10-23   13:18:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable): NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-008-M23007A-0000 Registration Date/Time: 2024-10-23   13:20:07 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 208) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 208 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus ALNOR 03 Model number of Airflow Measurement Apparatus EB† 731 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas /index.html NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 2 of 3) Registration Number: 424-P010255225A-001-008-M23007A-0000 Registration Date/Time: 2024-10-23   13:20:07 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1050 03 Actual System Airflow Rate Measurement (cfm)1052 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Installation. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Installation was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 3 of 3) Registration Number: 424-P010255225A-001-008-M23007A-0000 Registration Date/Time: 2024-10-23   13:20:07 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-008-M22008A-0000 Registration Date/Time: 2024-10-23   13:20:31 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 208) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 208 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable watt meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 610.16 02 Actual Tested Airflow from MCH-23 (cfm)1052 03 Required Fan Efficacy (watts/cfm)0.58 04 Actual Fan Efficacy (watts/cfm)0.58 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 2 of 3) Registration Number: 424-P010255225A-001-008-M22008A-0000 Registration Date/Time: 2024-10-23   13:20:31 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 05 Compliance Statement:System fan efficacy complies D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 3 of 3) Registration Number: 424-P010255225A-001-008-M22008A-0000 Registration Date/Time: 2024-10-23   13:20:31 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-008-M26009A-0000 Registration Date/Time: 2024-10-23   13:20:48 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 208) City: La Quinta Zip Code: 92253 A. System Information Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system requiring verification must use a separate form. 01 System Name or Identification/Tag UNIT 208 HVACSys 02 System Location or Area Served Main 03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required 04 Directory used to certify product performance AHRI 05 AHRI certification number for the installed space conditioning system from http://www.ahridirectory.org 208650564 06 Does the directory used to certify product performance require a specific air handler/furnace make and model? Yes 07 Does the directory used to certify product performance require a time delay relay (+TDR)? Yes 08 Does the directory used to certify product performance require a TXV (+TXV)? Yes B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Data from Nameplate of Installed system component Data from the Directory used to certify product performance for the rated system component Outdoor Condenser or Package Unit - Installed Manufacturer Name 01 RHEEM 02 RHEEM Outdoor Condenser or Package Unit - Installed Model Number 03 RHPAZR036JT000NA 04 RHPAZR036JT000NA Inside Coil - Installed Manufacturer Name 05 06 This field or section is not applicable Inside Coil - Installed Model Number 07 08 This field or section is not applicable NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 2 of 3) Registration Number: 424-P010255225A-001-008-M26009A-0000 Registration Date/Time: 2024-10-23   13:20:48 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Air Handler/Furnace - Installed Manufacturer Name 09 10 RHEEM Air Handler/Furnace - Installed Model Number 11 12 RHPAZR036AJT C. Verified Cooling System SEER 01 Required minimum SEER 15 02 Installed SEER 15 03 Compliance Statement:System passes SEER verification Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed on the CF1R. D. Verified Cooling System EER This section does not apply to this project. E. Verified Cooling System Air Handler/Furnace 01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory. F. Verified Cooling System Time Delay Relay 01 If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of RA3.4.3. G. Verified Cooling System TXV 01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 3 of 3) Registration Number: 424-P010255225A-001-008-M26009A-0000 Registration Date/Time: 2024-10-23   13:20:48 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:32 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Paul Marcinkowski Documentation Author Signature: Company: Muskoka Development LLC Signature Date: 2024-10-23 Address: 3245 University Ave Ste 1-232 CEA/ HERS Certification Identification (if applicable): City/State/Zip: San Diego CA 92104 Phone: 7607994638 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Paul Marcinkowski Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Muskoka Development LLC Position With Company (Title): Address: 3245 University Ave Ste 1-232 CSLB License: 1100564 City/State/Zip: San Diego CA 92104 Phone: 7607994638 Date Signed: 2024-10-23 Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-001-E21001A-E21A Registration Date/Time: 2024-10-23   13:21:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:33 CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 6) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 105) City: La Quinta Zip Code: 92253 A. Air Infiltration And Insulation Installation (Qii) - Framing Stage 01 The requirements below cover the required air sealing and installation of insulation that must occur in the framing stage. 02 An air barrier is required in all thermal envelope assemblies to limit air movement between unconditioned/outside spaces and conditioned/inside spaces and must meet one of the following: 1.Using individual materials that have an air permeance not exceeding 0.004 cfm/ft 2 under pressure differential of 0.3 in w.g. (1.57 psf) (0.02 L/s.m2 at 75 pa) when tested in accordance with ASTM E2178; or •A list of example materials meeting the air permenace testing performance levels of 1 above is available in RA3.5.2 2.Using assemblies of materials and components that have an average air leakage not to exceed 0.04 cfm/ft 2 under a pressure differential of 0.3 in w.g. (1.57 psf) (0.2 L/s.m2 at 75 pa) when tested in accordance with ASTM E2357, ASTM E1677, ASTM E1680 or ASTM E283, or 3.Testing the complete building and demonstrating that the air leakage rate of the building envelope does not exceed 0.4 cfm/ft2 at a pressure differential of 0.3 in w.g. (1.57 psf) (2.0 L/m2 at 75 pa) in accordance with ASTM E779 or an equivalent approved method. 03 Air Barrier Material Installed 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Raised Floor 01 All gaps in the raised floor are sealed. 02 All chases sealed at floor level using a hard cover and the hard covers are sealed. 03 All Plumbing and electrical wires that penetrate the floor are sealed. 04 Subfloor sheathing is glued or sealed at all exterior panel edges, to create a continuous air tight subfloor. 05 Verification Status Pass - all applicable requirements are met 06 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 2 of 6) Registration Number: 424-P010255225A-001-001-E21001A-E21A Registration Date/Time: 2024-10-23   13:21:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:33 C. Walls/Knee Walls 01 All penetrations through the exterior wall air barrier are sealed to provide an air-tight envelope to unconditioned spaces such as the outdoors, attic, garage and crawl space. 02 Exterior wall air barrier is sealed to the top plate and bottom plate in each stud bay. 03 All electrical boxes including knockouts that penetrate the air barrier to unconditioned space are sealed. 04 All openings in top and bottom plate, including all interior and exterior walls, to unconditioned space are sealed. Such as holes drilled for electrical and plumbing. 05 Exterior bottom plates (all stories) are sealed to the floor using the appropriate sealing method. 06 All gaps around windows and doors are sealed. Proper sealant used was specified by window manufacturer. 07 Rim Joists all gaps and openings fully sealed. 08 Fan exhaust ducts that run between conditioned floors to exterior walls have a damper at the exterior wall. 09 Metal tie downs are insulated between exterior framing and tie down. 10 Insulation is installed in hard to access wall stud cavities, such as corner channels, wall intersections are insulated to the proper R-value prior to exterior sheathing, or the exterior stucco lath. 11 Insulation is installed behind tub, shower, fireplace enclosures, and exterior stairwells to the R-value listed on the CF1R when located against exterior walls. Insulation is required to be installed before tub, shower, and fireplace are installed. 12 A solid air barrier is installed on the interior wall from floor to ceiling tub, shower, and fireplace enclosures are installed in exterior walls. Insulation in contact on all six sides of air barrier on exterior walls. 13 All single-member window and door headers shall be insulated to a minimum of R-3 for a 2x4 framing, or equivalent width, and a minimum of R-5 for all other assemblies. Insulation is to be placed between the interior face of the header and inside surface of the interior wall finish. If continuous exterior rigid insulation is used an insulated header is not required. No header insulation is required for single-member headers that are the same width as the wall, so long as the entire wall has at least R-2 insulation. 14 Knee walls have solid and sealed blocking at the bottom, top, left side and right side of the knee wall. 15 Verification Status Pass - all applicable requirements are met 16 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Ceiling/Attic 01 For vented attics much of the ceiling air barrier is verified after the ceiling drywall is installed using the ENV-22. 02 For non-vented attics ensure all penetrations through the roof deck and gable ends are sealed and air tight. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 3 of 6) Registration Number: 424-P010255225A-001-001-E21001A-E21A Registration Date/Time: 2024-10-23   13:21:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:33 D. Ceiling/Attic 03 All eave vents are covered with a rigid ventilation baffle that maintains the Net free-ventilation area. 04 All dropped ceilings and soffits are covered with hard covers and sealed to framing. 05 All chases are covered with hard covers and sealed to framing. 06 HVAC ducts that travel down a chase the chase is sealed at the ceiling level. 07 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The flashing shall be sealed to the surrounding framing. 08 All Eave/soffit baffles are installed to stop air movement around the baffle and into insulation. Net free-ventilation of the eave/soffit shall be maintained. 09 Double walls that open to attic are covered with an air barrier and cover has an air tight seal to the framing. 10 Verification Status Pass - all applicable requirements are met 11 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Conditioned Space Above Or Adjacent To Garage Air Barrier 01 All penetrations in the subfloor above the garage into conditioned space must follow the raised floor air barrier requirements above. 02 Infiltration between the space above the garage and subfloor is prevented by one of the following methods: •Seal all edges of garage ceiling (typically drywall) at the perimeter of the garage to create a continuous air tight surface between the garage and adjacent conditioned envelope. Seal all plumbing, electric and mechanical penetrations between the garage and the adjacent conditioned space. For an open-web truss, airtight blocking is added on four sides of the garage perimeter. Insulation can be placed on the garage ceiling. •Seal band joist above the wall at the garage to conditioned space transition. Seal all subfloor seams and penetrations between the conditioned space and the garage. Insulation must be placed in contact of subfloor below conditioned space. 03 Verification Status Pass - all applicable requirements are met 04 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. F. Walls For Attached Porch, Attic, Double Wall 01 All walls that separate conditioned and unconditioned space includes a continuous air barrier on the interior and exterior wall. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 4 of 6) Registration Number: 424-P010255225A-001-001-E21001A-E21A Registration Date/Time: 2024-10-23   13:21:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:33 F. Walls For Attached Porch, Attic, Double Wall 02 Exterior wall, air barrier required at the intersection of the porch and exterior wall when there is conditioned space on the other side. The exterior wall where the attic attaches to the conditioned space does includes an air barrier. 03 Truss framing blocking is used at the top and bottom of each wall/roof section. 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. G. Cantilevered Floor Air Barrier 01 Airtight blocking is installed between joists where the wall rim joist would have been located in the absence of a cantilever. 02 Exterior sheathing is installed to the bottom of the cantilever so that there is a continuous air and weather barrier for the cantilever. The cantilevered joist must be insulated to the same R value as would be required for the subfloor prior to closing. 03 Any gaps, cracks or penetrations in the air barrier of the cantilever are sealed. Can lights in the cantilever are IC and AT rated and properly sealed to sheathing. 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Multifamily Air Barrier 01 Multifamily buildings must meet all air sealing requirements for single family buildings listed above. 02 Each dwelling unit must be air sealed to stop air movement from one unit to another. 03 Floor AND Ceiling of each Dwelling Unit: All penetrations through the floor and ceiling of each unit are sealed including, electric and gas utilities, water pipes, drain pipes, fire protection service pipes, communication wiring. 04 Elevator penthouse, mechanical penthouse, stairwell doors, roof access hatch, plumbing stacks sealed to reduce air transfer from attached spaces. 05 Common Walls: Bottom plate between units is sealed to the subfloor. All penetrations in the common walls are sealed including electrical boxes, wiring and plumbing penetrations. Perpendicular Interior walls that open into the common walls are sealed. 06 Vertical Chases for garbage chutes, elevator shafts, and HVAC ducting plumbing must be sealed to the floor and ceiling of each unit to stop air movement up and around the chase due to stack effect. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 5 of 6) Registration Number: 424-P010255225A-001-001-E21001A-E21A Registration Date/Time: 2024-10-23   13:21:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:33 H. Multifamily Air Barrier 07 Vertical Chases such as garbage chutes, elevator shafts, and HVAC ducting plumbing, wiring etc. must be sealed to stop air movement through the chase to the surrounding spaces. 08 Common Hallways - Penetrations between dwelling unit and common hallways are sealed, doors to the dwelling unit are gasketed or made substantially airtight . 09 Verification Status Pass - all applicable requirements are met 10 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. I. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 6 of 6) Registration Number: 424-P010255225A-001-001-E21001A-E21A Registration Date/Time: 2024-10-23   13:21:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:33 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-001-E22002A-E22A Registration Date/Time: 2024-10-23   13:21:34 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:33 CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 105) City: La Quinta Zip Code: 92253 For typical vented attics where the insulation is at the roof deck ceiling air barrier must be verified after the ceiling drywall is installed and before attic insulation is installed. If SPF will be used in the attic this can be considered the air barrier. Soffit and chases must still be covered and chimneys and flues require metal flashing. Buildings with a Non vented attic all air sealing requirements appropriate for the roof must be verified. A. Ceiling Inspection - Vented Attics 01 If there is a continuous air barrier at the ceiling level; All opening into walls, drops, chasses, double walls are sealed. Examples are below. 02 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The flashing shall be sealed to the surrounding framing. 03 All penetration through the top plate of interior and exterior walls are sealed. 04 All penetrations shall be sealed to the surrounding drywall or have a secondary air barrier created around the fixture; with the exception of fire sprinklers. 05 All installed recessed light fixtures that penetrate the ceiling to unconditioned space, or where insulation is present, are rated to be Insulation Contact and Air Tight (IC and AT) which allows direct contact with insulation. Housing is sealed to the drywall. 06 Exhaust fan housing is sealed to surrounding drywall and all holes and seams in the housing sealed. 07 All soffits and chases are covered with a hard cover that is sealed to the framing with caulk or foam. 08 Double walls that open to attic are covered and the cover sealed to the framing. 09 Attic Access forms airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical compression using screws, or latches. 10 Knee walls require solid and sealed blocking at the bottom, top left side and right side of the knee wall. When the knee wall is placed on top of a subfloor the open cavity below the subfloor and the ceiling below are sealed. 11 HVAC ducts that travel down a chase the chase are sealed at the ceiling level. 12 HVAC boots that penetrate the ceiling are sealed to the surrounding drywall. 13 All top plates of interior and exterior walls sealed to drywall. 14 Attic access must be surrounded with a dam at least the same depth as the insulation to prevent loss of ceiling insulation. 15 There must be a dam placed at the exterior edge of all kneewalls and all edges of insulation to stop air movement through insulation. 16 Verification Status:Pass - all applicable requirements are met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 2 of 3) Registration Number: 424-P010255225A-001-001-E22002A-E22A Registration Date/Time: 2024-10-23   13:21:34 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:33 A. Ceiling Inspection - Vented Attics 17 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Roof Inspection - Non-Vented Attics 01 There is a continuous air barrier at the roof deck and gable ends. 02 Chimney and Flue require sheet metal flashing at the roof deck. The flashing is sealed to the chimney or flue with fire rated caulk. The flashing is sealed to the surrounding framing. 03 All penetrations for plumbing, electrical etc in the roof deck and gable ends are sealed. 04 Verification Status:Pass - all applicable requirements are met 05 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. C. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 3 of 3) Registration Number: 424-P010255225A-001-001-E22002A-E22A Registration Date/Time: 2024-10-23   13:21:34 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:33 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-001-E23003A-E23A Registration Date/Time: 2024-10-23   13:21:36 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:34 CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 1 of 7) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 105) City: La Quinta Zip Code: 92253 A. Quality Insulation Installation (QII) Preparation For Insulation 01 Air barrier installation and preparation for insulation was done and verified at framing stage prior to insulation being installed. Where applicable, CF3R-ENV21 and 22 compliance documents have been signed off. 02 All structural framing areas shall be insulated in a manner that resists thermal bridging of the assembly separating conditioned from unconditioned space. Structural bracing, tie-downs, and framing of steel, or specialized framing used to meet structural requirements of the CBC are allowed and must be insulated. These areas shall be called out on the building plans with diagrams and or specific design drawings indicating the R-value of insulation and fastening method to be used. It is recommended that spray foam be used. 03 All insulation was installed to the manufactures insulation installation instructions. 04 Verification Status:Pass - all applicable requirements are met 05 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Quality Of All Installed Insulation 01 Installed insulation R-values is the same or greater than specified on the CF1R. 02 No gaps or voids between the insulation and framing. 03 Gaps between studs shall be filled with insulation. 04 Batt - ensure the ends are cut so there are no gaps. 05 Batt - Insulation is cut around obstructions like electrical boxes and no gaps exist. 06 Batt - insulation is not compressed (no stuffing of the insulation into the cavity. 07 Batt insulation is delaminated around all plumbing and electrical lines in ceilings, walls and floors. 08 An air barrier is installed at all exposed faces of batt, loose fill and SPF insulation. 09 Loose-fill insulation installed to the minimum installed weight per ft 2 per the manufacturer labeled R-value specification. 10 SPF insulation shall be spray-applied to fully adhere to structural assembly framing, floor and ceiling joists, and other framing surfaces within the construction cavity. 11 SPF - with multiple layers applied, each foam lift (i.e. spray application) adheres to the substrate and foam interfaces. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 2 of 7) Registration Number: 424-P010255225A-001-001-E23003A-E23A Registration Date/Time: 2024-10-23   13:21:36 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:34 B. Quality Of All Installed Insulation 12 SPF - if values other than R-5.8 per inch for closed-cell SPF (ccSPF) and R-3.6 per inch for open-cell SPF (ocSPF) are used, the ICC Evaluation Service Report (ESR) number (e.g. ESR-xxxx) will be documented in the CF2R-ENV-03. 13 ccSPF in areas where an air barrier is required the foam is at least 2 inches thick. 14 ocSPF depressions in the foam insulation surface is not greater than 1-inch of the required thickness provided these depressions do not exceed 10 percent of the surface area being insulated. 15 ocSPF insulation completely fills cavities of 2x4 inch framing or less. 16 ocSPF cavities greater than 2x4 inch framing are filled to the thickness that meets the required R-value used for compliance. 17 SPF installed as an air barrier is sprayed at a minimum thickness of 5.5 inches for open cell and 2.0 inches for closed cell. 18 The insulation installer provided a CF2R-ENV-03. Labels or specification/data sheets are attached to the CF2R-ENV-03 for each insulating material. The material datasheet for the installed material meets the performance specifications of the required R-Values. Blown in material also includes insulation material bag labels or coverage charts. 19 Verification Status:Pass - all applicable requirements are met 20 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. C. Ceiling/Roof Insulation Quality 01 Insulation extends to the outside edge of the exterior top plates and is flush against any ventilation dams or baffles. 02 Insulation is in direct contact with ceiling so there are no gaps between the ceiling and the insulation. 03 Chimneys and flues (except for zero clearance) require a sheet metal collar around the stack. The collar must be at least as tall as the depth of the insulation. The collar shall be 1 inch from the chimney or flue for double wall vents, and 6 inches from the chimney/flue for single wall vents unless the manufacturer requires otherwise. The collar must be sealed to the ceiling with high temperature sealant to prevent air leakage. The insulation is in contact with the sheet metal collar. 04 Required eave ventilation shall not be obstructed - the net free-ventilation area of the eave vent is maintained 05 Eave vent baffles are installed to prevent air movement under or into the ceiling insulation 06 Recessed downlights are covered with insulation. If they are not covered to the same depth as required by the CF1R for ceiling insulation then a area weighted calculation is required. Recessed downlights are AT and IC rated. 07 SPF insulation shall not be applied directly to recessed lighting fixtures. Recessed downlights where SPF insulation is installed shall:      (a) be covered with a minimum of 1.5 inches of mineral fiber insulation, or      (b) be enclosed in a box fabricated from 1/4 inch plywood, 18 gauge metal, 3/8 inch hard board or gypboard. Hard board or gypboard does not cause a recessed downlights to meet the zero clearance insulation contact requirements. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 3 of 7) Registration Number: 424-P010255225A-001-001-E23003A-E23A Registration Date/Time: 2024-10-23   13:21:36 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:34 C. Ceiling/Roof Insulation Quality 08 Walkways and mechanical platforms are insulated to the same R-value as required by the CF1R for ceiling insulation. If not, an area weighted calculation is completed and turned in with this compliance document. 09 Soffits, chasses and drop ceiling areas have a sealed hard cover and the insulation is in direct contact with the hard cover. 10 Knee walls - an air dam the full depth of the ceiling insulation is added to the exterior edge of the knee wall so the ceiling insulation overlaps the knee wall to the full depth of the ceiling insulation. 11 Attic access doors are insulated to the same R-value required by the CF1R for roof insulation and the insulation is permanently attached using adhesive or mechanical fasteners. The preferred method is rigid insulation. 12 Attic access forms an airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical compression using screws, or latches. 13 Attic access must have a dam around the access to at least the same depth as the insulation. 14 Insulation batts must be cut to fit around cross bracings and truss webs. 15 Attic rulers appropriate to the material are installed and evenly distributed throughout the attic to verify depth (one ruler for every 250 ft2) The rulers are clearly readable from the attic access and scaled to read inches of insulation and the R-value installed. 16 Loose-fill and SPF insulation - a HERS rater shall measure the installed thickness (including low and high areas) and density of insulation in at least 6 random locations on roof/ceilings and floors to ensure minimum thickness levels and installed density necessary to meet the R-value specified on the Certificate of Compliance, and consistency with the manufacturer coverage chart. 17 Steel-framed knee walls, skylight shafts, and gable ends, external surfaces of steel studs are covered with insulation 18 Verification Status:Pass - all applicable requirements are met 19 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Wall Insulation 01 Batts, loose fill mineral fiber, mineral and natural wool, and cellulose:fills cavity and is in contact with air barrier on six sides. 02 ocSPF:completely fill cavities of 2x4 inch framing or less. Not required to fill cavities greater than 2x4 inch framing unless required to meet R-value. 03 ccSPF:insulation is not required to fill the cavities of framed assemblies unless required to meet R-value. 04 Double walls and bump-outs - insulation fills the cavity, or additional air barrier is installed so the insulation fills the cavity and is in contact with the insulation on all six sides unless SPF is used. Insulation shall be installed on the exterior of the double walls or bump-outs. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 4 of 7) Registration Number: 424-P010255225A-001-001-E23003A-E23A Registration Date/Time: 2024-10-23   13:21:36 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:34 D. Wall Insulation 05 Low expanding foam used around windows and doors, if allowed by the manufacturer. If not allowed fill cavity with insulation. Batts are not allowed to be stuffed into space. 06 Electrical panel in exterior insulated wall the panel is air tight and insulation is installed behind the panel. 07 Skylight shafts and attic knee wall insulation must meet all the requirements for walls and is in contact with the air barrier on six sides unless SPF is used. 08 Skylight shafts and attic kneewalls insulation shall be in full contact with the drywall or other interior wall finish. Batt insulation must be cut to fit around 2x4 framing that are laid flat. 09 Skylight shafts and attic kneewalls shall be completely enclosed by vertical and horizontal framing, including horizontal plates at top and bottom of the insulation. 10 Band/Rim joists are insulated to the same R-value as the wall. 11 Verification Status:Pass - all applicable requirements are met 12 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Raised Floor Insulation Quality 01 Insulation is in full contact with subfloor. 02 Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation. 03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 04 When daylight basements are adjacent to crawlspaces, if the basement is conditioned the walls adjacent to the crawlspace are insulated to the R-value listed on the CF1R. This includes framed stem walls, and vertical concrete retaining walls. 05 If access to the crawlspace is from the conditioned area the raised floor includes an airtight insulated access hatch. Where possible locate crawl space access from the exterior. 06 Verification Status:Pass - all applicable requirements are met 07 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. F. Floor Above Garage Insulation Quality 01 Insulation must be in full contact with subfloor if the air barrier is at the band joist at the garage house wall. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 5 of 7) Registration Number: 424-P010255225A-001-001-E23003A-E23A Registration Date/Time: 2024-10-23   13:21:36 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:34 F. Floor Above Garage Insulation Quality 02 Insulation hangers spaced at 18 inches or less, insulation hangers must not compress insulation. 03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 04 If air barrier is at the perimeter of the garage below the conditioned subfloor then the insulation may be placed on the garage ceiling. Perimeter of subfloor must also be insulated. 05 Verification Status:Pass - all applicable requirements are met 06 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. G. Cantilevered Floor Insulation Quality 01 Insulation is in full contact with cantilevered subfloor. Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation. Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 02 Sealed Blocking shall be installed between joists where the wall rim joist would have been located in the absence of a cantilever. Insulation shall be placed on both sides of this block. 03 Verification Status:Pass - all applicable requirements are met 04 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Attached Porch Roof Insulation Quality 01 Exterior wall at the intersection of the porch roof is fully insulated above, below and behind the roof line. 02 Where truss framing is used, airtight blocking is used at the top and bottom of each wall/roof section and insulated. 03 Verification Status:Pass - all applicable requirements are met 04 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 6 of 7) Registration Number: 424-P010255225A-001-001-E23003A-E23A Registration Date/Time: 2024-10-23   13:21:36 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:34 I. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 7 of 7) Registration Number: 424-P010255225A-001-001-E23003A-E23A Registration Date/Time: 2024-10-23   13:21:36 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:34 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-002-E21001A-E21A Registration Date/Time: 2024-10-23   13:22:17 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:37 CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 6) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 106) City: La Quinta Zip Code: 92253 A. Air Infiltration And Insulation Installation (Qii) - Framing Stage 01 The requirements below cover the required air sealing and installation of insulation that must occur in the framing stage. 02 An air barrier is required in all thermal envelope assemblies to limit air movement between unconditioned/outside spaces and conditioned/inside spaces and must meet one of the following: 1.Using individual materials that have an air permeance not exceeding 0.004 cfm/ft 2 under pressure differential of 0.3 in w.g. (1.57 psf) (0.02 L/s.m2 at 75 pa) when tested in accordance with ASTM E2178; or •A list of example materials meeting the air permenace testing performance levels of 1 above is available in RA3.5.2 2.Using assemblies of materials and components that have an average air leakage not to exceed 0.04 cfm/ft 2 under a pressure differential of 0.3 in w.g. (1.57 psf) (0.2 L/s.m2 at 75 pa) when tested in accordance with ASTM E2357, ASTM E1677, ASTM E1680 or ASTM E283, or 3.Testing the complete building and demonstrating that the air leakage rate of the building envelope does not exceed 0.4 cfm/ft2 at a pressure differential of 0.3 in w.g. (1.57 psf) (2.0 L/m2 at 75 pa) in accordance with ASTM E779 or an equivalent approved method. 03 Air Barrier Material Installed 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Raised Floor 01 All gaps in the raised floor are sealed. 02 All chases sealed at floor level using a hard cover and the hard covers are sealed. 03 All Plumbing and electrical wires that penetrate the floor are sealed. 04 Subfloor sheathing is glued or sealed at all exterior panel edges, to create a continuous air tight subfloor. 05 Verification Status Pass - all applicable requirements are met 06 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 2 of 6) Registration Number: 424-P010255225A-001-002-E21001A-E21A Registration Date/Time: 2024-10-23   13:22:17 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:37 C. Walls/Knee Walls 01 All penetrations through the exterior wall air barrier are sealed to provide an air-tight envelope to unconditioned spaces such as the outdoors, attic, garage and crawl space. 02 Exterior wall air barrier is sealed to the top plate and bottom plate in each stud bay. 03 All electrical boxes including knockouts that penetrate the air barrier to unconditioned space are sealed. 04 All openings in top and bottom plate, including all interior and exterior walls, to unconditioned space are sealed. Such as holes drilled for electrical and plumbing. 05 Exterior bottom plates (all stories) are sealed to the floor using the appropriate sealing method. 06 All gaps around windows and doors are sealed. Proper sealant used was specified by window manufacturer. 07 Rim Joists all gaps and openings fully sealed. 08 Fan exhaust ducts that run between conditioned floors to exterior walls have a damper at the exterior wall. 09 Metal tie downs are insulated between exterior framing and tie down. 10 Insulation is installed in hard to access wall stud cavities, such as corner channels, wall intersections are insulated to the proper R-value prior to exterior sheathing, or the exterior stucco lath. 11 Insulation is installed behind tub, shower, fireplace enclosures, and exterior stairwells to the R-value listed on the CF1R when located against exterior walls. Insulation is required to be installed before tub, shower, and fireplace are installed. 12 A solid air barrier is installed on the interior wall from floor to ceiling tub, shower, and fireplace enclosures are installed in exterior walls. Insulation in contact on all six sides of air barrier on exterior walls. 13 All single-member window and door headers shall be insulated to a minimum of R-3 for a 2x4 framing, or equivalent width, and a minimum of R-5 for all other assemblies. Insulation is to be placed between the interior face of the header and inside surface of the interior wall finish. If continuous exterior rigid insulation is used an insulated header is not required. No header insulation is required for single-member headers that are the same width as the wall, so long as the entire wall has at least R-2 insulation. 14 Knee walls have solid and sealed blocking at the bottom, top, left side and right side of the knee wall. 15 Verification Status Pass - all applicable requirements are met 16 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Ceiling/Attic 01 For vented attics much of the ceiling air barrier is verified after the ceiling drywall is installed using the ENV-22. 02 For non-vented attics ensure all penetrations through the roof deck and gable ends are sealed and air tight. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 3 of 6) Registration Number: 424-P010255225A-001-002-E21001A-E21A Registration Date/Time: 2024-10-23   13:22:17 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:37 D. Ceiling/Attic 03 All eave vents are covered with a rigid ventilation baffle that maintains the Net free-ventilation area. 04 All dropped ceilings and soffits are covered with hard covers and sealed to framing. 05 All chases are covered with hard covers and sealed to framing. 06 HVAC ducts that travel down a chase the chase is sealed at the ceiling level. 07 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The flashing shall be sealed to the surrounding framing. 08 All Eave/soffit baffles are installed to stop air movement around the baffle and into insulation. Net free-ventilation of the eave/soffit shall be maintained. 09 Double walls that open to attic are covered with an air barrier and cover has an air tight seal to the framing. 10 Verification Status Pass - all applicable requirements are met 11 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Conditioned Space Above Or Adjacent To Garage Air Barrier 01 All penetrations in the subfloor above the garage into conditioned space must follow the raised floor air barrier requirements above. 02 Infiltration between the space above the garage and subfloor is prevented by one of the following methods: •Seal all edges of garage ceiling (typically drywall) at the perimeter of the garage to create a continuous air tight surface between the garage and adjacent conditioned envelope. Seal all plumbing, electric and mechanical penetrations between the garage and the adjacent conditioned space. For an open-web truss, airtight blocking is added on four sides of the garage perimeter. Insulation can be placed on the garage ceiling. •Seal band joist above the wall at the garage to conditioned space transition. Seal all subfloor seams and penetrations between the conditioned space and the garage. Insulation must be placed in contact of subfloor below conditioned space. 03 Verification Status Pass - all applicable requirements are met 04 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. F. Walls For Attached Porch, Attic, Double Wall 01 All walls that separate conditioned and unconditioned space includes a continuous air barrier on the interior and exterior wall. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 4 of 6) Registration Number: 424-P010255225A-001-002-E21001A-E21A Registration Date/Time: 2024-10-23   13:22:17 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:37 F. Walls For Attached Porch, Attic, Double Wall 02 Exterior wall, air barrier required at the intersection of the porch and exterior wall when there is conditioned space on the other side. The exterior wall where the attic attaches to the conditioned space does includes an air barrier. 03 Truss framing blocking is used at the top and bottom of each wall/roof section. 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. G. Cantilevered Floor Air Barrier 01 Airtight blocking is installed between joists where the wall rim joist would have been located in the absence of a cantilever. 02 Exterior sheathing is installed to the bottom of the cantilever so that there is a continuous air and weather barrier for the cantilever. The cantilevered joist must be insulated to the same R value as would be required for the subfloor prior to closing. 03 Any gaps, cracks or penetrations in the air barrier of the cantilever are sealed. Can lights in the cantilever are IC and AT rated and properly sealed to sheathing. 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Multifamily Air Barrier 01 Multifamily buildings must meet all air sealing requirements for single family buildings listed above. 02 Each dwelling unit must be air sealed to stop air movement from one unit to another. 03 Floor AND Ceiling of each Dwelling Unit: All penetrations through the floor and ceiling of each unit are sealed including, electric and gas utilities, water pipes, drain pipes, fire protection service pipes, communication wiring. 04 Elevator penthouse, mechanical penthouse, stairwell doors, roof access hatch, plumbing stacks sealed to reduce air transfer from attached spaces. 05 Common Walls: Bottom plate between units is sealed to the subfloor. All penetrations in the common walls are sealed including electrical boxes, wiring and plumbing penetrations. Perpendicular Interior walls that open into the common walls are sealed. 06 Vertical Chases for garbage chutes, elevator shafts, and HVAC ducting plumbing must be sealed to the floor and ceiling of each unit to stop air movement up and around the chase due to stack effect. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 5 of 6) Registration Number: 424-P010255225A-001-002-E21001A-E21A Registration Date/Time: 2024-10-23   13:22:17 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:37 H. Multifamily Air Barrier 07 Vertical Chases such as garbage chutes, elevator shafts, and HVAC ducting plumbing, wiring etc. must be sealed to stop air movement through the chase to the surrounding spaces. 08 Common Hallways - Penetrations between dwelling unit and common hallways are sealed, doors to the dwelling unit are gasketed or made substantially airtight . 09 Verification Status Pass - all applicable requirements are met 10 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. I. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 6 of 6) Registration Number: 424-P010255225A-001-002-E21001A-E21A Registration Date/Time: 2024-10-23   13:22:17 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:37 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-002-E22002A-E22A Registration Date/Time: 2024-10-23   13:22:20 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:37 CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 106) City: La Quinta Zip Code: 92253 For typical vented attics where the insulation is at the roof deck ceiling air barrier must be verified after the ceiling drywall is installed and before attic insulation is installed. If SPF will be used in the attic this can be considered the air barrier. Soffit and chases must still be covered and chimneys and flues require metal flashing. Buildings with a Non vented attic all air sealing requirements appropriate for the roof must be verified. A. Ceiling Inspection - Vented Attics 01 If there is a continuous air barrier at the ceiling level; All opening into walls, drops, chasses, double walls are sealed. Examples are below. 02 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The flashing shall be sealed to the surrounding framing. 03 All penetration through the top plate of interior and exterior walls are sealed. 04 All penetrations shall be sealed to the surrounding drywall or have a secondary air barrier created around the fixture; with the exception of fire sprinklers. 05 All installed recessed light fixtures that penetrate the ceiling to unconditioned space, or where insulation is present, are rated to be Insulation Contact and Air Tight (IC and AT) which allows direct contact with insulation. Housing is sealed to the drywall. 06 Exhaust fan housing is sealed to surrounding drywall and all holes and seams in the housing sealed. 07 All soffits and chases are covered with a hard cover that is sealed to the framing with caulk or foam. 08 Double walls that open to attic are covered and the cover sealed to the framing. 09 Attic Access forms airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical compression using screws, or latches. 10 Knee walls require solid and sealed blocking at the bottom, top left side and right side of the knee wall. When the knee wall is placed on top of a subfloor the open cavity below the subfloor and the ceiling below are sealed. 11 HVAC ducts that travel down a chase the chase are sealed at the ceiling level. 12 HVAC boots that penetrate the ceiling are sealed to the surrounding drywall. 13 All top plates of interior and exterior walls sealed to drywall. 14 Attic access must be surrounded with a dam at least the same depth as the insulation to prevent loss of ceiling insulation. 15 There must be a dam placed at the exterior edge of all kneewalls and all edges of insulation to stop air movement through insulation. 16 Verification Status:Pass - all applicable requirements are met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 2 of 3) Registration Number: 424-P010255225A-001-002-E22002A-E22A Registration Date/Time: 2024-10-23   13:22:20 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:37 A. Ceiling Inspection - Vented Attics 17 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Roof Inspection - Non-Vented Attics 01 There is a continuous air barrier at the roof deck and gable ends. 02 Chimney and Flue require sheet metal flashing at the roof deck. The flashing is sealed to the chimney or flue with fire rated caulk. The flashing is sealed to the surrounding framing. 03 All penetrations for plumbing, electrical etc in the roof deck and gable ends are sealed. 04 Verification Status:Pass - all applicable requirements are met 05 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. C. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 3 of 3) Registration Number: 424-P010255225A-001-002-E22002A-E22A Registration Date/Time: 2024-10-23   13:22:20 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:37 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-002-E23003A-E23A Registration Date/Time: 2024-10-23   13:22:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:37 CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 1 of 7) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 106) City: La Quinta Zip Code: 92253 A. Quality Insulation Installation (QII) Preparation For Insulation 01 Air barrier installation and preparation for insulation was done and verified at framing stage prior to insulation being installed. Where applicable, CF3R-ENV21 and 22 compliance documents have been signed off. 02 All structural framing areas shall be insulated in a manner that resists thermal bridging of the assembly separating conditioned from unconditioned space. Structural bracing, tie-downs, and framing of steel, or specialized framing used to meet structural requirements of the CBC are allowed and must be insulated. These areas shall be called out on the building plans with diagrams and or specific design drawings indicating the R-value of insulation and fastening method to be used. It is recommended that spray foam be used. 03 All insulation was installed to the manufactures insulation installation instructions. 04 Verification Status:Pass - all applicable requirements are met 05 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Quality Of All Installed Insulation 01 Installed insulation R-values is the same or greater than specified on the CF1R. 02 No gaps or voids between the insulation and framing. 03 Gaps between studs shall be filled with insulation. 04 Batt - ensure the ends are cut so there are no gaps. 05 Batt - Insulation is cut around obstructions like electrical boxes and no gaps exist. 06 Batt - insulation is not compressed (no stuffing of the insulation into the cavity. 07 Batt insulation is delaminated around all plumbing and electrical lines in ceilings, walls and floors. 08 An air barrier is installed at all exposed faces of batt, loose fill and SPF insulation. 09 Loose-fill insulation installed to the minimum installed weight per ft 2 per the manufacturer labeled R-value specification. 10 SPF insulation shall be spray-applied to fully adhere to structural assembly framing, floor and ceiling joists, and other framing surfaces within the construction cavity. 11 SPF - with multiple layers applied, each foam lift (i.e. spray application) adheres to the substrate and foam interfaces. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 2 of 7) Registration Number: 424-P010255225A-001-002-E23003A-E23A Registration Date/Time: 2024-10-23   13:22:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:37 B. Quality Of All Installed Insulation 12 SPF - if values other than R-5.8 per inch for closed-cell SPF (ccSPF) and R-3.6 per inch for open-cell SPF (ocSPF) are used, the ICC Evaluation Service Report (ESR) number (e.g. ESR-xxxx) will be documented in the CF2R-ENV-03. 13 ccSPF in areas where an air barrier is required the foam is at least 2 inches thick. 14 ocSPF depressions in the foam insulation surface is not greater than 1-inch of the required thickness provided these depressions do not exceed 10 percent of the surface area being insulated. 15 ocSPF insulation completely fills cavities of 2x4 inch framing or less. 16 ocSPF cavities greater than 2x4 inch framing are filled to the thickness that meets the required R-value used for compliance. 17 SPF installed as an air barrier is sprayed at a minimum thickness of 5.5 inches for open cell and 2.0 inches for closed cell. 18 The insulation installer provided a CF2R-ENV-03. Labels or specification/data sheets are attached to the CF2R-ENV-03 for each insulating material. The material datasheet for the installed material meets the performance specifications of the required R-Values. Blown in material also includes insulation material bag labels or coverage charts. 19 Verification Status:Pass - all applicable requirements are met 20 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. C. Ceiling/Roof Insulation Quality 01 Insulation extends to the outside edge of the exterior top plates and is flush against any ventilation dams or baffles. 02 Insulation is in direct contact with ceiling so there are no gaps between the ceiling and the insulation. 03 Chimneys and flues (except for zero clearance) require a sheet metal collar around the stack. The collar must be at least as tall as the depth of the insulation. The collar shall be 1 inch from the chimney or flue for double wall vents, and 6 inches from the chimney/flue for single wall vents unless the manufacturer requires otherwise. The collar must be sealed to the ceiling with high temperature sealant to prevent air leakage. The insulation is in contact with the sheet metal collar. 04 Required eave ventilation shall not be obstructed - the net free-ventilation area of the eave vent is maintained 05 Eave vent baffles are installed to prevent air movement under or into the ceiling insulation 06 Recessed downlights are covered with insulation. If they are not covered to the same depth as required by the CF1R for ceiling insulation then a area weighted calculation is required. Recessed downlights are AT and IC rated. 07 SPF insulation shall not be applied directly to recessed lighting fixtures. Recessed downlights where SPF insulation is installed shall:      (a) be covered with a minimum of 1.5 inches of mineral fiber insulation, or      (b) be enclosed in a box fabricated from 1/4 inch plywood, 18 gauge metal, 3/8 inch hard board or gypboard. Hard board or gypboard does not cause a recessed downlights to meet the zero clearance insulation contact requirements. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 3 of 7) Registration Number: 424-P010255225A-001-002-E23003A-E23A Registration Date/Time: 2024-10-23   13:22:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:37 C. Ceiling/Roof Insulation Quality 08 Walkways and mechanical platforms are insulated to the same R-value as required by the CF1R for ceiling insulation. If not, an area weighted calculation is completed and turned in with this compliance document. 09 Soffits, chasses and drop ceiling areas have a sealed hard cover and the insulation is in direct contact with the hard cover. 10 Knee walls - an air dam the full depth of the ceiling insulation is added to the exterior edge of the knee wall so the ceiling insulation overlaps the knee wall to the full depth of the ceiling insulation. 11 Attic access doors are insulated to the same R-value required by the CF1R for roof insulation and the insulation is permanently attached using adhesive or mechanical fasteners. The preferred method is rigid insulation. 12 Attic access forms an airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical compression using screws, or latches. 13 Attic access must have a dam around the access to at least the same depth as the insulation. 14 Insulation batts must be cut to fit around cross bracings and truss webs. 15 Attic rulers appropriate to the material are installed and evenly distributed throughout the attic to verify depth (one ruler for every 250 ft2) The rulers are clearly readable from the attic access and scaled to read inches of insulation and the R-value installed. 16 Loose-fill and SPF insulation - a HERS rater shall measure the installed thickness (including low and high areas) and density of insulation in at least 6 random locations on roof/ceilings and floors to ensure minimum thickness levels and installed density necessary to meet the R-value specified on the Certificate of Compliance, and consistency with the manufacturer coverage chart. 17 Steel-framed knee walls, skylight shafts, and gable ends, external surfaces of steel studs are covered with insulation 18 Verification Status:Pass - all applicable requirements are met 19 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Wall Insulation 01 Batts, loose fill mineral fiber, mineral and natural wool, and cellulose:fills cavity and is in contact with air barrier on six sides. 02 ocSPF:completely fill cavities of 2x4 inch framing or less. Not required to fill cavities greater than 2x4 inch framing unless required to meet R-value. 03 ccSPF:insulation is not required to fill the cavities of framed assemblies unless required to meet R-value. 04 Double walls and bump-outs - insulation fills the cavity, or additional air barrier is installed so the insulation fills the cavity and is in contact with the insulation on all six sides unless SPF is used. Insulation shall be installed on the exterior of the double walls or bump-outs. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 4 of 7) Registration Number: 424-P010255225A-001-002-E23003A-E23A Registration Date/Time: 2024-10-23   13:22:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:37 D. Wall Insulation 05 Low expanding foam used around windows and doors, if allowed by the manufacturer. If not allowed fill cavity with insulation. Batts are not allowed to be stuffed into space. 06 Electrical panel in exterior insulated wall the panel is air tight and insulation is installed behind the panel. 07 Skylight shafts and attic knee wall insulation must meet all the requirements for walls and is in contact with the air barrier on six sides unless SPF is used. 08 Skylight shafts and attic kneewalls insulation shall be in full contact with the drywall or other interior wall finish. Batt insulation must be cut to fit around 2x4 framing that are laid flat. 09 Skylight shafts and attic kneewalls shall be completely enclosed by vertical and horizontal framing, including horizontal plates at top and bottom of the insulation. 10 Band/Rim joists are insulated to the same R-value as the wall. 11 Verification Status:Pass - all applicable requirements are met 12 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Raised Floor Insulation Quality 01 Insulation is in full contact with subfloor. 02 Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation. 03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 04 When daylight basements are adjacent to crawlspaces, if the basement is conditioned the walls adjacent to the crawlspace are insulated to the R-value listed on the CF1R. This includes framed stem walls, and vertical concrete retaining walls. 05 If access to the crawlspace is from the conditioned area the raised floor includes an airtight insulated access hatch. Where possible locate crawl space access from the exterior. 06 Verification Status:Pass - all applicable requirements are met 07 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. F. Floor Above Garage Insulation Quality 01 Insulation must be in full contact with subfloor if the air barrier is at the band joist at the garage house wall. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 5 of 7) Registration Number: 424-P010255225A-001-002-E23003A-E23A Registration Date/Time: 2024-10-23   13:22:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:37 F. Floor Above Garage Insulation Quality 02 Insulation hangers spaced at 18 inches or less, insulation hangers must not compress insulation. 03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 04 If air barrier is at the perimeter of the garage below the conditioned subfloor then the insulation may be placed on the garage ceiling. Perimeter of subfloor must also be insulated. 05 Verification Status:Pass - all applicable requirements are met 06 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. G. Cantilevered Floor Insulation Quality 01 Insulation is in full contact with cantilevered subfloor. Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation. Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 02 Sealed Blocking shall be installed between joists where the wall rim joist would have been located in the absence of a cantilever. Insulation shall be placed on both sides of this block. 03 Verification Status:Pass - all applicable requirements are met 04 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Attached Porch Roof Insulation Quality 01 Exterior wall at the intersection of the porch roof is fully insulated above, below and behind the roof line. 02 Where truss framing is used, airtight blocking is used at the top and bottom of each wall/roof section and insulated. 03 Verification Status:Pass - all applicable requirements are met 04 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 6 of 7) Registration Number: 424-P010255225A-001-002-E23003A-E23A Registration Date/Time: 2024-10-23   13:22:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:37 I. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 7 of 7) Registration Number: 424-P010255225A-001-002-E23003A-E23A Registration Date/Time: 2024-10-23   13:22:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:37 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-003-E21001A-E21A Registration Date/Time: 2024-10-23   13:22:25 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:37 CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 6) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 107) City: La Quinta Zip Code: 92253 A. Air Infiltration And Insulation Installation (Qii) - Framing Stage 01 The requirements below cover the required air sealing and installation of insulation that must occur in the framing stage. 02 An air barrier is required in all thermal envelope assemblies to limit air movement between unconditioned/outside spaces and conditioned/inside spaces and must meet one of the following: 1.Using individual materials that have an air permeance not exceeding 0.004 cfm/ft 2 under pressure differential of 0.3 in w.g. (1.57 psf) (0.02 L/s.m2 at 75 pa) when tested in accordance with ASTM E2178; or •A list of example materials meeting the air permenace testing performance levels of 1 above is available in RA3.5.2 2.Using assemblies of materials and components that have an average air leakage not to exceed 0.04 cfm/ft 2 under a pressure differential of 0.3 in w.g. (1.57 psf) (0.2 L/s.m2 at 75 pa) when tested in accordance with ASTM E2357, ASTM E1677, ASTM E1680 or ASTM E283, or 3.Testing the complete building and demonstrating that the air leakage rate of the building envelope does not exceed 0.4 cfm/ft2 at a pressure differential of 0.3 in w.g. (1.57 psf) (2.0 L/m2 at 75 pa) in accordance with ASTM E779 or an equivalent approved method. 03 Air Barrier Material Installed 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Raised Floor 01 All gaps in the raised floor are sealed. 02 All chases sealed at floor level using a hard cover and the hard covers are sealed. 03 All Plumbing and electrical wires that penetrate the floor are sealed. 04 Subfloor sheathing is glued or sealed at all exterior panel edges, to create a continuous air tight subfloor. 05 Verification Status Pass - all applicable requirements are met 06 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 2 of 6) Registration Number: 424-P010255225A-001-003-E21001A-E21A Registration Date/Time: 2024-10-23   13:22:25 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:37 C. Walls/Knee Walls 01 All penetrations through the exterior wall air barrier are sealed to provide an air-tight envelope to unconditioned spaces such as the outdoors, attic, garage and crawl space. 02 Exterior wall air barrier is sealed to the top plate and bottom plate in each stud bay. 03 All electrical boxes including knockouts that penetrate the air barrier to unconditioned space are sealed. 04 All openings in top and bottom plate, including all interior and exterior walls, to unconditioned space are sealed. Such as holes drilled for electrical and plumbing. 05 Exterior bottom plates (all stories) are sealed to the floor using the appropriate sealing method. 06 All gaps around windows and doors are sealed. Proper sealant used was specified by window manufacturer. 07 Rim Joists all gaps and openings fully sealed. 08 Fan exhaust ducts that run between conditioned floors to exterior walls have a damper at the exterior wall. 09 Metal tie downs are insulated between exterior framing and tie down. 10 Insulation is installed in hard to access wall stud cavities, such as corner channels, wall intersections are insulated to the proper R-value prior to exterior sheathing, or the exterior stucco lath. 11 Insulation is installed behind tub, shower, fireplace enclosures, and exterior stairwells to the R-value listed on the CF1R when located against exterior walls. Insulation is required to be installed before tub, shower, and fireplace are installed. 12 A solid air barrier is installed on the interior wall from floor to ceiling tub, shower, and fireplace enclosures are installed in exterior walls. Insulation in contact on all six sides of air barrier on exterior walls. 13 All single-member window and door headers shall be insulated to a minimum of R-3 for a 2x4 framing, or equivalent width, and a minimum of R-5 for all other assemblies. Insulation is to be placed between the interior face of the header and inside surface of the interior wall finish. If continuous exterior rigid insulation is used an insulated header is not required. No header insulation is required for single-member headers that are the same width as the wall, so long as the entire wall has at least R-2 insulation. 14 Knee walls have solid and sealed blocking at the bottom, top, left side and right side of the knee wall. 15 Verification Status Pass - all applicable requirements are met 16 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Ceiling/Attic 01 For vented attics much of the ceiling air barrier is verified after the ceiling drywall is installed using the ENV-22. 02 For non-vented attics ensure all penetrations through the roof deck and gable ends are sealed and air tight. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 3 of 6) Registration Number: 424-P010255225A-001-003-E21001A-E21A Registration Date/Time: 2024-10-23   13:22:25 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:37 D. Ceiling/Attic 03 All eave vents are covered with a rigid ventilation baffle that maintains the Net free-ventilation area. 04 All dropped ceilings and soffits are covered with hard covers and sealed to framing. 05 All chases are covered with hard covers and sealed to framing. 06 HVAC ducts that travel down a chase the chase is sealed at the ceiling level. 07 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The flashing shall be sealed to the surrounding framing. 08 All Eave/soffit baffles are installed to stop air movement around the baffle and into insulation. Net free-ventilation of the eave/soffit shall be maintained. 09 Double walls that open to attic are covered with an air barrier and cover has an air tight seal to the framing. 10 Verification Status Pass - all applicable requirements are met 11 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Conditioned Space Above Or Adjacent To Garage Air Barrier 01 All penetrations in the subfloor above the garage into conditioned space must follow the raised floor air barrier requirements above. 02 Infiltration between the space above the garage and subfloor is prevented by one of the following methods: •Seal all edges of garage ceiling (typically drywall) at the perimeter of the garage to create a continuous air tight surface between the garage and adjacent conditioned envelope. Seal all plumbing, electric and mechanical penetrations between the garage and the adjacent conditioned space. For an open-web truss, airtight blocking is added on four sides of the garage perimeter. Insulation can be placed on the garage ceiling. •Seal band joist above the wall at the garage to conditioned space transition. Seal all subfloor seams and penetrations between the conditioned space and the garage. Insulation must be placed in contact of subfloor below conditioned space. 03 Verification Status Pass - all applicable requirements are met 04 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. F. Walls For Attached Porch, Attic, Double Wall 01 All walls that separate conditioned and unconditioned space includes a continuous air barrier on the interior and exterior wall. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 4 of 6) Registration Number: 424-P010255225A-001-003-E21001A-E21A Registration Date/Time: 2024-10-23   13:22:25 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:37 F. Walls For Attached Porch, Attic, Double Wall 02 Exterior wall, air barrier required at the intersection of the porch and exterior wall when there is conditioned space on the other side. The exterior wall where the attic attaches to the conditioned space does includes an air barrier. 03 Truss framing blocking is used at the top and bottom of each wall/roof section. 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. G. Cantilevered Floor Air Barrier 01 Airtight blocking is installed between joists where the wall rim joist would have been located in the absence of a cantilever. 02 Exterior sheathing is installed to the bottom of the cantilever so that there is a continuous air and weather barrier for the cantilever. The cantilevered joist must be insulated to the same R value as would be required for the subfloor prior to closing. 03 Any gaps, cracks or penetrations in the air barrier of the cantilever are sealed. Can lights in the cantilever are IC and AT rated and properly sealed to sheathing. 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Multifamily Air Barrier 01 Multifamily buildings must meet all air sealing requirements for single family buildings listed above. 02 Each dwelling unit must be air sealed to stop air movement from one unit to another. 03 Floor AND Ceiling of each Dwelling Unit: All penetrations through the floor and ceiling of each unit are sealed including, electric and gas utilities, water pipes, drain pipes, fire protection service pipes, communication wiring. 04 Elevator penthouse, mechanical penthouse, stairwell doors, roof access hatch, plumbing stacks sealed to reduce air transfer from attached spaces. 05 Common Walls: Bottom plate between units is sealed to the subfloor. All penetrations in the common walls are sealed including electrical boxes, wiring and plumbing penetrations. Perpendicular Interior walls that open into the common walls are sealed. 06 Vertical Chases for garbage chutes, elevator shafts, and HVAC ducting plumbing must be sealed to the floor and ceiling of each unit to stop air movement up and around the chase due to stack effect. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 5 of 6) Registration Number: 424-P010255225A-001-003-E21001A-E21A Registration Date/Time: 2024-10-23   13:22:25 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:37 H. Multifamily Air Barrier 07 Vertical Chases such as garbage chutes, elevator shafts, and HVAC ducting plumbing, wiring etc. must be sealed to stop air movement through the chase to the surrounding spaces. 08 Common Hallways - Penetrations between dwelling unit and common hallways are sealed, doors to the dwelling unit are gasketed or made substantially airtight . 09 Verification Status Pass - all applicable requirements are met 10 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. I. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 6 of 6) Registration Number: 424-P010255225A-001-003-E21001A-E21A Registration Date/Time: 2024-10-23   13:22:25 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:37 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-003-E22002A-E22A Registration Date/Time: 2024-10-23   13:22:29 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:38 CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 107) City: La Quinta Zip Code: 92253 For typical vented attics where the insulation is at the roof deck ceiling air barrier must be verified after the ceiling drywall is installed and before attic insulation is installed. If SPF will be used in the attic this can be considered the air barrier. Soffit and chases must still be covered and chimneys and flues require metal flashing. Buildings with a Non vented attic all air sealing requirements appropriate for the roof must be verified. A. Ceiling Inspection - Vented Attics 01 If there is a continuous air barrier at the ceiling level; All opening into walls, drops, chasses, double walls are sealed. Examples are below. 02 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The flashing shall be sealed to the surrounding framing. 03 All penetration through the top plate of interior and exterior walls are sealed. 04 All penetrations shall be sealed to the surrounding drywall or have a secondary air barrier created around the fixture; with the exception of fire sprinklers. 05 All installed recessed light fixtures that penetrate the ceiling to unconditioned space, or where insulation is present, are rated to be Insulation Contact and Air Tight (IC and AT) which allows direct contact with insulation. Housing is sealed to the drywall. 06 Exhaust fan housing is sealed to surrounding drywall and all holes and seams in the housing sealed. 07 All soffits and chases are covered with a hard cover that is sealed to the framing with caulk or foam. 08 Double walls that open to attic are covered and the cover sealed to the framing. 09 Attic Access forms airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical compression using screws, or latches. 10 Knee walls require solid and sealed blocking at the bottom, top left side and right side of the knee wall. When the knee wall is placed on top of a subfloor the open cavity below the subfloor and the ceiling below are sealed. 11 HVAC ducts that travel down a chase the chase are sealed at the ceiling level. 12 HVAC boots that penetrate the ceiling are sealed to the surrounding drywall. 13 All top plates of interior and exterior walls sealed to drywall. 14 Attic access must be surrounded with a dam at least the same depth as the insulation to prevent loss of ceiling insulation. 15 There must be a dam placed at the exterior edge of all kneewalls and all edges of insulation to stop air movement through insulation. 16 Verification Status:Pass - all applicable requirements are met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 2 of 3) Registration Number: 424-P010255225A-001-003-E22002A-E22A Registration Date/Time: 2024-10-23   13:22:29 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:38 A. Ceiling Inspection - Vented Attics 17 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Roof Inspection - Non-Vented Attics 01 There is a continuous air barrier at the roof deck and gable ends. 02 Chimney and Flue require sheet metal flashing at the roof deck. The flashing is sealed to the chimney or flue with fire rated caulk. The flashing is sealed to the surrounding framing. 03 All penetrations for plumbing, electrical etc in the roof deck and gable ends are sealed. 04 Verification Status:Pass - all applicable requirements are met 05 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. C. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 3 of 3) Registration Number: 424-P010255225A-001-003-E22002A-E22A Registration Date/Time: 2024-10-23   13:22:29 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:38 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-003-E23003A-E23A Registration Date/Time: 2024-10-23   13:22:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:38 CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 1 of 7) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 107) City: La Quinta Zip Code: 92253 A. Quality Insulation Installation (QII) Preparation For Insulation 01 Air barrier installation and preparation for insulation was done and verified at framing stage prior to insulation being installed. Where applicable, CF3R-ENV21 and 22 compliance documents have been signed off. 02 All structural framing areas shall be insulated in a manner that resists thermal bridging of the assembly separating conditioned from unconditioned space. Structural bracing, tie-downs, and framing of steel, or specialized framing used to meet structural requirements of the CBC are allowed and must be insulated. These areas shall be called out on the building plans with diagrams and or specific design drawings indicating the R-value of insulation and fastening method to be used. It is recommended that spray foam be used. 03 All insulation was installed to the manufactures insulation installation instructions. 04 Verification Status:Pass - all applicable requirements are met 05 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Quality Of All Installed Insulation 01 Installed insulation R-values is the same or greater than specified on the CF1R. 02 No gaps or voids between the insulation and framing. 03 Gaps between studs shall be filled with insulation. 04 Batt - ensure the ends are cut so there are no gaps. 05 Batt - Insulation is cut around obstructions like electrical boxes and no gaps exist. 06 Batt - insulation is not compressed (no stuffing of the insulation into the cavity. 07 Batt insulation is delaminated around all plumbing and electrical lines in ceilings, walls and floors. 08 An air barrier is installed at all exposed faces of batt, loose fill and SPF insulation. 09 Loose-fill insulation installed to the minimum installed weight per ft 2 per the manufacturer labeled R-value specification. 10 SPF insulation shall be spray-applied to fully adhere to structural assembly framing, floor and ceiling joists, and other framing surfaces within the construction cavity. 11 SPF - with multiple layers applied, each foam lift (i.e. spray application) adheres to the substrate and foam interfaces. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 2 of 7) Registration Number: 424-P010255225A-001-003-E23003A-E23A Registration Date/Time: 2024-10-23   13:22:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:38 B. Quality Of All Installed Insulation 12 SPF - if values other than R-5.8 per inch for closed-cell SPF (ccSPF) and R-3.6 per inch for open-cell SPF (ocSPF) are used, the ICC Evaluation Service Report (ESR) number (e.g. ESR-xxxx) will be documented in the CF2R-ENV-03. 13 ccSPF in areas where an air barrier is required the foam is at least 2 inches thick. 14 ocSPF depressions in the foam insulation surface is not greater than 1-inch of the required thickness provided these depressions do not exceed 10 percent of the surface area being insulated. 15 ocSPF insulation completely fills cavities of 2x4 inch framing or less. 16 ocSPF cavities greater than 2x4 inch framing are filled to the thickness that meets the required R-value used for compliance. 17 SPF installed as an air barrier is sprayed at a minimum thickness of 5.5 inches for open cell and 2.0 inches for closed cell. 18 The insulation installer provided a CF2R-ENV-03. Labels or specification/data sheets are attached to the CF2R-ENV-03 for each insulating material. The material datasheet for the installed material meets the performance specifications of the required R-Values. Blown in material also includes insulation material bag labels or coverage charts. 19 Verification Status:Pass - all applicable requirements are met 20 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. C. Ceiling/Roof Insulation Quality 01 Insulation extends to the outside edge of the exterior top plates and is flush against any ventilation dams or baffles. 02 Insulation is in direct contact with ceiling so there are no gaps between the ceiling and the insulation. 03 Chimneys and flues (except for zero clearance) require a sheet metal collar around the stack. The collar must be at least as tall as the depth of the insulation. The collar shall be 1 inch from the chimney or flue for double wall vents, and 6 inches from the chimney/flue for single wall vents unless the manufacturer requires otherwise. The collar must be sealed to the ceiling with high temperature sealant to prevent air leakage. The insulation is in contact with the sheet metal collar. 04 Required eave ventilation shall not be obstructed - the net free-ventilation area of the eave vent is maintained 05 Eave vent baffles are installed to prevent air movement under or into the ceiling insulation 06 Recessed downlights are covered with insulation. If they are not covered to the same depth as required by the CF1R for ceiling insulation then a area weighted calculation is required. Recessed downlights are AT and IC rated. 07 SPF insulation shall not be applied directly to recessed lighting fixtures. Recessed downlights where SPF insulation is installed shall:      (a) be covered with a minimum of 1.5 inches of mineral fiber insulation, or      (b) be enclosed in a box fabricated from 1/4 inch plywood, 18 gauge metal, 3/8 inch hard board or gypboard. Hard board or gypboard does not cause a recessed downlights to meet the zero clearance insulation contact requirements. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 3 of 7) Registration Number: 424-P010255225A-001-003-E23003A-E23A Registration Date/Time: 2024-10-23   13:22:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:38 C. Ceiling/Roof Insulation Quality 08 Walkways and mechanical platforms are insulated to the same R-value as required by the CF1R for ceiling insulation. If not, an area weighted calculation is completed and turned in with this compliance document. 09 Soffits, chasses and drop ceiling areas have a sealed hard cover and the insulation is in direct contact with the hard cover. 10 Knee walls - an air dam the full depth of the ceiling insulation is added to the exterior edge of the knee wall so the ceiling insulation overlaps the knee wall to the full depth of the ceiling insulation. 11 Attic access doors are insulated to the same R-value required by the CF1R for roof insulation and the insulation is permanently attached using adhesive or mechanical fasteners. The preferred method is rigid insulation. 12 Attic access forms an airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical compression using screws, or latches. 13 Attic access must have a dam around the access to at least the same depth as the insulation. 14 Insulation batts must be cut to fit around cross bracings and truss webs. 15 Attic rulers appropriate to the material are installed and evenly distributed throughout the attic to verify depth (one ruler for every 250 ft2) The rulers are clearly readable from the attic access and scaled to read inches of insulation and the R-value installed. 16 Loose-fill and SPF insulation - a HERS rater shall measure the installed thickness (including low and high areas) and density of insulation in at least 6 random locations on roof/ceilings and floors to ensure minimum thickness levels and installed density necessary to meet the R-value specified on the Certificate of Compliance, and consistency with the manufacturer coverage chart. 17 Steel-framed knee walls, skylight shafts, and gable ends, external surfaces of steel studs are covered with insulation 18 Verification Status:Pass - all applicable requirements are met 19 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Wall Insulation 01 Batts, loose fill mineral fiber, mineral and natural wool, and cellulose:fills cavity and is in contact with air barrier on six sides. 02 ocSPF:completely fill cavities of 2x4 inch framing or less. Not required to fill cavities greater than 2x4 inch framing unless required to meet R-value. 03 ccSPF:insulation is not required to fill the cavities of framed assemblies unless required to meet R-value. 04 Double walls and bump-outs - insulation fills the cavity, or additional air barrier is installed so the insulation fills the cavity and is in contact with the insulation on all six sides unless SPF is used. Insulation shall be installed on the exterior of the double walls or bump-outs. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 4 of 7) Registration Number: 424-P010255225A-001-003-E23003A-E23A Registration Date/Time: 2024-10-23   13:22:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:38 D. Wall Insulation 05 Low expanding foam used around windows and doors, if allowed by the manufacturer. If not allowed fill cavity with insulation. Batts are not allowed to be stuffed into space. 06 Electrical panel in exterior insulated wall the panel is air tight and insulation is installed behind the panel. 07 Skylight shafts and attic knee wall insulation must meet all the requirements for walls and is in contact with the air barrier on six sides unless SPF is used. 08 Skylight shafts and attic kneewalls insulation shall be in full contact with the drywall or other interior wall finish. Batt insulation must be cut to fit around 2x4 framing that are laid flat. 09 Skylight shafts and attic kneewalls shall be completely enclosed by vertical and horizontal framing, including horizontal plates at top and bottom of the insulation. 10 Band/Rim joists are insulated to the same R-value as the wall. 11 Verification Status:Pass - all applicable requirements are met 12 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Raised Floor Insulation Quality 01 Insulation is in full contact with subfloor. 02 Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation. 03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 04 When daylight basements are adjacent to crawlspaces, if the basement is conditioned the walls adjacent to the crawlspace are insulated to the R-value listed on the CF1R. This includes framed stem walls, and vertical concrete retaining walls. 05 If access to the crawlspace is from the conditioned area the raised floor includes an airtight insulated access hatch. Where possible locate crawl space access from the exterior. 06 Verification Status:Pass - all applicable requirements are met 07 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. F. Floor Above Garage Insulation Quality 01 Insulation must be in full contact with subfloor if the air barrier is at the band joist at the garage house wall. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 5 of 7) Registration Number: 424-P010255225A-001-003-E23003A-E23A Registration Date/Time: 2024-10-23   13:22:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:38 F. Floor Above Garage Insulation Quality 02 Insulation hangers spaced at 18 inches or less, insulation hangers must not compress insulation. 03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 04 If air barrier is at the perimeter of the garage below the conditioned subfloor then the insulation may be placed on the garage ceiling. Perimeter of subfloor must also be insulated. 05 Verification Status:Pass - all applicable requirements are met 06 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. G. Cantilevered Floor Insulation Quality 01 Insulation is in full contact with cantilevered subfloor. Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation. Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 02 Sealed Blocking shall be installed between joists where the wall rim joist would have been located in the absence of a cantilever. Insulation shall be placed on both sides of this block. 03 Verification Status:Pass - all applicable requirements are met 04 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Attached Porch Roof Insulation Quality 01 Exterior wall at the intersection of the porch roof is fully insulated above, below and behind the roof line. 02 Where truss framing is used, airtight blocking is used at the top and bottom of each wall/roof section and insulated. 03 Verification Status:Pass - all applicable requirements are met 04 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 6 of 7) Registration Number: 424-P010255225A-001-003-E23003A-E23A Registration Date/Time: 2024-10-23   13:22:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:38 I. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 7 of 7) Registration Number: 424-P010255225A-001-003-E23003A-E23A Registration Date/Time: 2024-10-23   13:22:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:38 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-004-E21001A-E21A Registration Date/Time: 2024-10-23   13:23:29 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:40 CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 6) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 108) City: La Quinta Zip Code: 92253 A. Air Infiltration And Insulation Installation (Qii) - Framing Stage 01 The requirements below cover the required air sealing and installation of insulation that must occur in the framing stage. 02 An air barrier is required in all thermal envelope assemblies to limit air movement between unconditioned/outside spaces and conditioned/inside spaces and must meet one of the following: 1.Using individual materials that have an air permeance not exceeding 0.004 cfm/ft 2 under pressure differential of 0.3 in w.g. (1.57 psf) (0.02 L/s.m2 at 75 pa) when tested in accordance with ASTM E2178; or •A list of example materials meeting the air permenace testing performance levels of 1 above is available in RA3.5.2 2.Using assemblies of materials and components that have an average air leakage not to exceed 0.04 cfm/ft 2 under a pressure differential of 0.3 in w.g. (1.57 psf) (0.2 L/s.m2 at 75 pa) when tested in accordance with ASTM E2357, ASTM E1677, ASTM E1680 or ASTM E283, or 3.Testing the complete building and demonstrating that the air leakage rate of the building envelope does not exceed 0.4 cfm/ft2 at a pressure differential of 0.3 in w.g. (1.57 psf) (2.0 L/m2 at 75 pa) in accordance with ASTM E779 or an equivalent approved method. 03 Air Barrier Material Installed 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Raised Floor 01 All gaps in the raised floor are sealed. 02 All chases sealed at floor level using a hard cover and the hard covers are sealed. 03 All Plumbing and electrical wires that penetrate the floor are sealed. 04 Subfloor sheathing is glued or sealed at all exterior panel edges, to create a continuous air tight subfloor. 05 Verification Status Pass - all applicable requirements are met 06 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 2 of 6) Registration Number: 424-P010255225A-001-004-E21001A-E21A Registration Date/Time: 2024-10-23   13:23:29 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:40 C. Walls/Knee Walls 01 All penetrations through the exterior wall air barrier are sealed to provide an air-tight envelope to unconditioned spaces such as the outdoors, attic, garage and crawl space. 02 Exterior wall air barrier is sealed to the top plate and bottom plate in each stud bay. 03 All electrical boxes including knockouts that penetrate the air barrier to unconditioned space are sealed. 04 All openings in top and bottom plate, including all interior and exterior walls, to unconditioned space are sealed. Such as holes drilled for electrical and plumbing. 05 Exterior bottom plates (all stories) are sealed to the floor using the appropriate sealing method. 06 All gaps around windows and doors are sealed. Proper sealant used was specified by window manufacturer. 07 Rim Joists all gaps and openings fully sealed. 08 Fan exhaust ducts that run between conditioned floors to exterior walls have a damper at the exterior wall. 09 Metal tie downs are insulated between exterior framing and tie down. 10 Insulation is installed in hard to access wall stud cavities, such as corner channels, wall intersections are insulated to the proper R-value prior to exterior sheathing, or the exterior stucco lath. 11 Insulation is installed behind tub, shower, fireplace enclosures, and exterior stairwells to the R-value listed on the CF1R when located against exterior walls. Insulation is required to be installed before tub, shower, and fireplace are installed. 12 A solid air barrier is installed on the interior wall from floor to ceiling tub, shower, and fireplace enclosures are installed in exterior walls. Insulation in contact on all six sides of air barrier on exterior walls. 13 All single-member window and door headers shall be insulated to a minimum of R-3 for a 2x4 framing, or equivalent width, and a minimum of R-5 for all other assemblies. Insulation is to be placed between the interior face of the header and inside surface of the interior wall finish. If continuous exterior rigid insulation is used an insulated header is not required. No header insulation is required for single-member headers that are the same width as the wall, so long as the entire wall has at least R-2 insulation. 14 Knee walls have solid and sealed blocking at the bottom, top, left side and right side of the knee wall. 15 Verification Status Pass - all applicable requirements are met 16 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Ceiling/Attic 01 For vented attics much of the ceiling air barrier is verified after the ceiling drywall is installed using the ENV-22. 02 For non-vented attics ensure all penetrations through the roof deck and gable ends are sealed and air tight. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 3 of 6) Registration Number: 424-P010255225A-001-004-E21001A-E21A Registration Date/Time: 2024-10-23   13:23:29 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:40 D. Ceiling/Attic 03 All eave vents are covered with a rigid ventilation baffle that maintains the Net free-ventilation area. 04 All dropped ceilings and soffits are covered with hard covers and sealed to framing. 05 All chases are covered with hard covers and sealed to framing. 06 HVAC ducts that travel down a chase the chase is sealed at the ceiling level. 07 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The flashing shall be sealed to the surrounding framing. 08 All Eave/soffit baffles are installed to stop air movement around the baffle and into insulation. Net free-ventilation of the eave/soffit shall be maintained. 09 Double walls that open to attic are covered with an air barrier and cover has an air tight seal to the framing. 10 Verification Status Pass - all applicable requirements are met 11 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Conditioned Space Above Or Adjacent To Garage Air Barrier 01 All penetrations in the subfloor above the garage into conditioned space must follow the raised floor air barrier requirements above. 02 Infiltration between the space above the garage and subfloor is prevented by one of the following methods: •Seal all edges of garage ceiling (typically drywall) at the perimeter of the garage to create a continuous air tight surface between the garage and adjacent conditioned envelope. Seal all plumbing, electric and mechanical penetrations between the garage and the adjacent conditioned space. For an open-web truss, airtight blocking is added on four sides of the garage perimeter. Insulation can be placed on the garage ceiling. •Seal band joist above the wall at the garage to conditioned space transition. Seal all subfloor seams and penetrations between the conditioned space and the garage. Insulation must be placed in contact of subfloor below conditioned space. 03 Verification Status Pass - all applicable requirements are met 04 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. F. Walls For Attached Porch, Attic, Double Wall 01 All walls that separate conditioned and unconditioned space includes a continuous air barrier on the interior and exterior wall. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 4 of 6) Registration Number: 424-P010255225A-001-004-E21001A-E21A Registration Date/Time: 2024-10-23   13:23:29 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:40 F. Walls For Attached Porch, Attic, Double Wall 02 Exterior wall, air barrier required at the intersection of the porch and exterior wall when there is conditioned space on the other side. The exterior wall where the attic attaches to the conditioned space does includes an air barrier. 03 Truss framing blocking is used at the top and bottom of each wall/roof section. 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. G. Cantilevered Floor Air Barrier 01 Airtight blocking is installed between joists where the wall rim joist would have been located in the absence of a cantilever. 02 Exterior sheathing is installed to the bottom of the cantilever so that there is a continuous air and weather barrier for the cantilever. The cantilevered joist must be insulated to the same R value as would be required for the subfloor prior to closing. 03 Any gaps, cracks or penetrations in the air barrier of the cantilever are sealed. Can lights in the cantilever are IC and AT rated and properly sealed to sheathing. 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Multifamily Air Barrier 01 Multifamily buildings must meet all air sealing requirements for single family buildings listed above. 02 Each dwelling unit must be air sealed to stop air movement from one unit to another. 03 Floor AND Ceiling of each Dwelling Unit: All penetrations through the floor and ceiling of each unit are sealed including, electric and gas utilities, water pipes, drain pipes, fire protection service pipes, communication wiring. 04 Elevator penthouse, mechanical penthouse, stairwell doors, roof access hatch, plumbing stacks sealed to reduce air transfer from attached spaces. 05 Common Walls: Bottom plate between units is sealed to the subfloor. All penetrations in the common walls are sealed including electrical boxes, wiring and plumbing penetrations. Perpendicular Interior walls that open into the common walls are sealed. 06 Vertical Chases for garbage chutes, elevator shafts, and HVAC ducting plumbing must be sealed to the floor and ceiling of each unit to stop air movement up and around the chase due to stack effect. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 5 of 6) Registration Number: 424-P010255225A-001-004-E21001A-E21A Registration Date/Time: 2024-10-23   13:23:29 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:40 H. Multifamily Air Barrier 07 Vertical Chases such as garbage chutes, elevator shafts, and HVAC ducting plumbing, wiring etc. must be sealed to stop air movement through the chase to the surrounding spaces. 08 Common Hallways - Penetrations between dwelling unit and common hallways are sealed, doors to the dwelling unit are gasketed or made substantially airtight . 09 Verification Status Pass - all applicable requirements are met 10 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. I. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 6 of 6) Registration Number: 424-P010255225A-001-004-E21001A-E21A Registration Date/Time: 2024-10-23   13:23:29 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:40 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-004-E22002A-E22A Registration Date/Time: 2024-10-23   13:23:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:41 CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 108) City: La Quinta Zip Code: 92253 For typical vented attics where the insulation is at the roof deck ceiling air barrier must be verified after the ceiling drywall is installed and before attic insulation is installed. If SPF will be used in the attic this can be considered the air barrier. Soffit and chases must still be covered and chimneys and flues require metal flashing. Buildings with a Non vented attic all air sealing requirements appropriate for the roof must be verified. A. Ceiling Inspection - Vented Attics 01 If there is a continuous air barrier at the ceiling level; All opening into walls, drops, chasses, double walls are sealed. Examples are below. 02 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The flashing shall be sealed to the surrounding framing. 03 All penetration through the top plate of interior and exterior walls are sealed. 04 All penetrations shall be sealed to the surrounding drywall or have a secondary air barrier created around the fixture; with the exception of fire sprinklers. 05 All installed recessed light fixtures that penetrate the ceiling to unconditioned space, or where insulation is present, are rated to be Insulation Contact and Air Tight (IC and AT) which allows direct contact with insulation. Housing is sealed to the drywall. 06 Exhaust fan housing is sealed to surrounding drywall and all holes and seams in the housing sealed. 07 All soffits and chases are covered with a hard cover that is sealed to the framing with caulk or foam. 08 Double walls that open to attic are covered and the cover sealed to the framing. 09 Attic Access forms airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical compression using screws, or latches. 10 Knee walls require solid and sealed blocking at the bottom, top left side and right side of the knee wall. When the knee wall is placed on top of a subfloor the open cavity below the subfloor and the ceiling below are sealed. 11 HVAC ducts that travel down a chase the chase are sealed at the ceiling level. 12 HVAC boots that penetrate the ceiling are sealed to the surrounding drywall. 13 All top plates of interior and exterior walls sealed to drywall. 14 Attic access must be surrounded with a dam at least the same depth as the insulation to prevent loss of ceiling insulation. 15 There must be a dam placed at the exterior edge of all kneewalls and all edges of insulation to stop air movement through insulation. 16 Verification Status:Pass - all applicable requirements are met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 2 of 3) Registration Number: 424-P010255225A-001-004-E22002A-E22A Registration Date/Time: 2024-10-23   13:23:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:41 A. Ceiling Inspection - Vented Attics 17 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Roof Inspection - Non-Vented Attics 01 There is a continuous air barrier at the roof deck and gable ends. 02 Chimney and Flue require sheet metal flashing at the roof deck. The flashing is sealed to the chimney or flue with fire rated caulk. The flashing is sealed to the surrounding framing. 03 All penetrations for plumbing, electrical etc in the roof deck and gable ends are sealed. 04 Verification Status:Pass - all applicable requirements are met 05 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. C. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 3 of 3) Registration Number: 424-P010255225A-001-004-E22002A-E22A Registration Date/Time: 2024-10-23   13:23:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:41 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-004-E23003A-E23A Registration Date/Time: 2024-10-23   13:23:34 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 1 of 7) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 108) City: La Quinta Zip Code: 92253 A. Quality Insulation Installation (QII) Preparation For Insulation 01 Air barrier installation and preparation for insulation was done and verified at framing stage prior to insulation being installed. Where applicable, CF3R-ENV21 and 22 compliance documents have been signed off. 02 All structural framing areas shall be insulated in a manner that resists thermal bridging of the assembly separating conditioned from unconditioned space. Structural bracing, tie-downs, and framing of steel, or specialized framing used to meet structural requirements of the CBC are allowed and must be insulated. These areas shall be called out on the building plans with diagrams and or specific design drawings indicating the R-value of insulation and fastening method to be used. It is recommended that spray foam be used. 03 All insulation was installed to the manufactures insulation installation instructions. 04 Verification Status:Pass - all applicable requirements are met 05 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Quality Of All Installed Insulation 01 Installed insulation R-values is the same or greater than specified on the CF1R. 02 No gaps or voids between the insulation and framing. 03 Gaps between studs shall be filled with insulation. 04 Batt - ensure the ends are cut so there are no gaps. 05 Batt - Insulation is cut around obstructions like electrical boxes and no gaps exist. 06 Batt - insulation is not compressed (no stuffing of the insulation into the cavity. 07 Batt insulation is delaminated around all plumbing and electrical lines in ceilings, walls and floors. 08 An air barrier is installed at all exposed faces of batt, loose fill and SPF insulation. 09 Loose-fill insulation installed to the minimum installed weight per ft 2 per the manufacturer labeled R-value specification. 10 SPF insulation shall be spray-applied to fully adhere to structural assembly framing, floor and ceiling joists, and other framing surfaces within the construction cavity. 11 SPF - with multiple layers applied, each foam lift (i.e. spray application) adheres to the substrate and foam interfaces. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 2 of 7) Registration Number: 424-P010255225A-001-004-E23003A-E23A Registration Date/Time: 2024-10-23   13:23:34 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 B. Quality Of All Installed Insulation 12 SPF - if values other than R-5.8 per inch for closed-cell SPF (ccSPF) and R-3.6 per inch for open-cell SPF (ocSPF) are used, the ICC Evaluation Service Report (ESR) number (e.g. ESR-xxxx) will be documented in the CF2R-ENV-03. 13 ccSPF in areas where an air barrier is required the foam is at least 2 inches thick. 14 ocSPF depressions in the foam insulation surface is not greater than 1-inch of the required thickness provided these depressions do not exceed 10 percent of the surface area being insulated. 15 ocSPF insulation completely fills cavities of 2x4 inch framing or less. 16 ocSPF cavities greater than 2x4 inch framing are filled to the thickness that meets the required R-value used for compliance. 17 SPF installed as an air barrier is sprayed at a minimum thickness of 5.5 inches for open cell and 2.0 inches for closed cell. 18 The insulation installer provided a CF2R-ENV-03. Labels or specification/data sheets are attached to the CF2R-ENV-03 for each insulating material. The material datasheet for the installed material meets the performance specifications of the required R-Values. Blown in material also includes insulation material bag labels or coverage charts. 19 Verification Status:Pass - all applicable requirements are met 20 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. C. Ceiling/Roof Insulation Quality 01 Insulation extends to the outside edge of the exterior top plates and is flush against any ventilation dams or baffles. 02 Insulation is in direct contact with ceiling so there are no gaps between the ceiling and the insulation. 03 Chimneys and flues (except for zero clearance) require a sheet metal collar around the stack. The collar must be at least as tall as the depth of the insulation. The collar shall be 1 inch from the chimney or flue for double wall vents, and 6 inches from the chimney/flue for single wall vents unless the manufacturer requires otherwise. The collar must be sealed to the ceiling with high temperature sealant to prevent air leakage. The insulation is in contact with the sheet metal collar. 04 Required eave ventilation shall not be obstructed - the net free-ventilation area of the eave vent is maintained 05 Eave vent baffles are installed to prevent air movement under or into the ceiling insulation 06 Recessed downlights are covered with insulation. If they are not covered to the same depth as required by the CF1R for ceiling insulation then a area weighted calculation is required. Recessed downlights are AT and IC rated. 07 SPF insulation shall not be applied directly to recessed lighting fixtures. Recessed downlights where SPF insulation is installed shall:      (a) be covered with a minimum of 1.5 inches of mineral fiber insulation, or      (b) be enclosed in a box fabricated from 1/4 inch plywood, 18 gauge metal, 3/8 inch hard board or gypboard. Hard board or gypboard does not cause a recessed downlights to meet the zero clearance insulation contact requirements. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 3 of 7) Registration Number: 424-P010255225A-001-004-E23003A-E23A Registration Date/Time: 2024-10-23   13:23:34 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 C. Ceiling/Roof Insulation Quality 08 Walkways and mechanical platforms are insulated to the same R-value as required by the CF1R for ceiling insulation. If not, an area weighted calculation is completed and turned in with this compliance document. 09 Soffits, chasses and drop ceiling areas have a sealed hard cover and the insulation is in direct contact with the hard cover. 10 Knee walls - an air dam the full depth of the ceiling insulation is added to the exterior edge of the knee wall so the ceiling insulation overlaps the knee wall to the full depth of the ceiling insulation. 11 Attic access doors are insulated to the same R-value required by the CF1R for roof insulation and the insulation is permanently attached using adhesive or mechanical fasteners. The preferred method is rigid insulation. 12 Attic access forms an airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical compression using screws, or latches. 13 Attic access must have a dam around the access to at least the same depth as the insulation. 14 Insulation batts must be cut to fit around cross bracings and truss webs. 15 Attic rulers appropriate to the material are installed and evenly distributed throughout the attic to verify depth (one ruler for every 250 ft2) The rulers are clearly readable from the attic access and scaled to read inches of insulation and the R-value installed. 16 Loose-fill and SPF insulation - a HERS rater shall measure the installed thickness (including low and high areas) and density of insulation in at least 6 random locations on roof/ceilings and floors to ensure minimum thickness levels and installed density necessary to meet the R-value specified on the Certificate of Compliance, and consistency with the manufacturer coverage chart. 17 Steel-framed knee walls, skylight shafts, and gable ends, external surfaces of steel studs are covered with insulation 18 Verification Status:Pass - all applicable requirements are met 19 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Wall Insulation 01 Batts, loose fill mineral fiber, mineral and natural wool, and cellulose:fills cavity and is in contact with air barrier on six sides. 02 ocSPF:completely fill cavities of 2x4 inch framing or less. Not required to fill cavities greater than 2x4 inch framing unless required to meet R-value. 03 ccSPF:insulation is not required to fill the cavities of framed assemblies unless required to meet R-value. 04 Double walls and bump-outs - insulation fills the cavity, or additional air barrier is installed so the insulation fills the cavity and is in contact with the insulation on all six sides unless SPF is used. Insulation shall be installed on the exterior of the double walls or bump-outs. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 4 of 7) Registration Number: 424-P010255225A-001-004-E23003A-E23A Registration Date/Time: 2024-10-23   13:23:34 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 D. Wall Insulation 05 Low expanding foam used around windows and doors, if allowed by the manufacturer. If not allowed fill cavity with insulation. Batts are not allowed to be stuffed into space. 06 Electrical panel in exterior insulated wall the panel is air tight and insulation is installed behind the panel. 07 Skylight shafts and attic knee wall insulation must meet all the requirements for walls and is in contact with the air barrier on six sides unless SPF is used. 08 Skylight shafts and attic kneewalls insulation shall be in full contact with the drywall or other interior wall finish. Batt insulation must be cut to fit around 2x4 framing that are laid flat. 09 Skylight shafts and attic kneewalls shall be completely enclosed by vertical and horizontal framing, including horizontal plates at top and bottom of the insulation. 10 Band/Rim joists are insulated to the same R-value as the wall. 11 Verification Status:Pass - all applicable requirements are met 12 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Raised Floor Insulation Quality 01 Insulation is in full contact with subfloor. 02 Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation. 03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 04 When daylight basements are adjacent to crawlspaces, if the basement is conditioned the walls adjacent to the crawlspace are insulated to the R-value listed on the CF1R. This includes framed stem walls, and vertical concrete retaining walls. 05 If access to the crawlspace is from the conditioned area the raised floor includes an airtight insulated access hatch. Where possible locate crawl space access from the exterior. 06 Verification Status:Pass - all applicable requirements are met 07 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. F. Floor Above Garage Insulation Quality 01 Insulation must be in full contact with subfloor if the air barrier is at the band joist at the garage house wall. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 5 of 7) Registration Number: 424-P010255225A-001-004-E23003A-E23A Registration Date/Time: 2024-10-23   13:23:34 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 F. Floor Above Garage Insulation Quality 02 Insulation hangers spaced at 18 inches or less, insulation hangers must not compress insulation. 03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 04 If air barrier is at the perimeter of the garage below the conditioned subfloor then the insulation may be placed on the garage ceiling. Perimeter of subfloor must also be insulated. 05 Verification Status:Pass - all applicable requirements are met 06 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. G. Cantilevered Floor Insulation Quality 01 Insulation is in full contact with cantilevered subfloor. Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation. Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 02 Sealed Blocking shall be installed between joists where the wall rim joist would have been located in the absence of a cantilever. Insulation shall be placed on both sides of this block. 03 Verification Status:Pass - all applicable requirements are met 04 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Attached Porch Roof Insulation Quality 01 Exterior wall at the intersection of the porch roof is fully insulated above, below and behind the roof line. 02 Where truss framing is used, airtight blocking is used at the top and bottom of each wall/roof section and insulated. 03 Verification Status:Pass - all applicable requirements are met 04 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 6 of 7) Registration Number: 424-P010255225A-001-004-E23003A-E23A Registration Date/Time: 2024-10-23   13:23:34 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 I. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 7 of 7) Registration Number: 424-P010255225A-001-004-E23003A-E23A Registration Date/Time: 2024-10-23   13:23:34 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-005-E21001A-E21A Registration Date/Time: 2024-10-23   13:24:04 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:47 CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 6) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 205) City: La Quinta Zip Code: 92253 A. Air Infiltration And Insulation Installation (Qii) - Framing Stage 01 The requirements below cover the required air sealing and installation of insulation that must occur in the framing stage. 02 An air barrier is required in all thermal envelope assemblies to limit air movement between unconditioned/outside spaces and conditioned/inside spaces and must meet one of the following: 1.Using individual materials that have an air permeance not exceeding 0.004 cfm/ft 2 under pressure differential of 0.3 in w.g. (1.57 psf) (0.02 L/s.m2 at 75 pa) when tested in accordance with ASTM E2178; or •A list of example materials meeting the air permenace testing performance levels of 1 above is available in RA3.5.2 2.Using assemblies of materials and components that have an average air leakage not to exceed 0.04 cfm/ft 2 under a pressure differential of 0.3 in w.g. (1.57 psf) (0.2 L/s.m2 at 75 pa) when tested in accordance with ASTM E2357, ASTM E1677, ASTM E1680 or ASTM E283, or 3.Testing the complete building and demonstrating that the air leakage rate of the building envelope does not exceed 0.4 cfm/ft2 at a pressure differential of 0.3 in w.g. (1.57 psf) (2.0 L/m2 at 75 pa) in accordance with ASTM E779 or an equivalent approved method. 03 Air Barrier Material Installed 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Raised Floor 01 All gaps in the raised floor are sealed. 02 All chases sealed at floor level using a hard cover and the hard covers are sealed. 03 All Plumbing and electrical wires that penetrate the floor are sealed. 04 Subfloor sheathing is glued or sealed at all exterior panel edges, to create a continuous air tight subfloor. 05 Verification Status Pass - all applicable requirements are met 06 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 2 of 6) Registration Number: 424-P010255225A-001-005-E21001A-E21A Registration Date/Time: 2024-10-23   13:24:04 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:47 C. Walls/Knee Walls 01 All penetrations through the exterior wall air barrier are sealed to provide an air-tight envelope to unconditioned spaces such as the outdoors, attic, garage and crawl space. 02 Exterior wall air barrier is sealed to the top plate and bottom plate in each stud bay. 03 All electrical boxes including knockouts that penetrate the air barrier to unconditioned space are sealed. 04 All openings in top and bottom plate, including all interior and exterior walls, to unconditioned space are sealed. Such as holes drilled for electrical and plumbing. 05 Exterior bottom plates (all stories) are sealed to the floor using the appropriate sealing method. 06 All gaps around windows and doors are sealed. Proper sealant used was specified by window manufacturer. 07 Rim Joists all gaps and openings fully sealed. 08 Fan exhaust ducts that run between conditioned floors to exterior walls have a damper at the exterior wall. 09 Metal tie downs are insulated between exterior framing and tie down. 10 Insulation is installed in hard to access wall stud cavities, such as corner channels, wall intersections are insulated to the proper R-value prior to exterior sheathing, or the exterior stucco lath. 11 Insulation is installed behind tub, shower, fireplace enclosures, and exterior stairwells to the R-value listed on the CF1R when located against exterior walls. Insulation is required to be installed before tub, shower, and fireplace are installed. 12 A solid air barrier is installed on the interior wall from floor to ceiling tub, shower, and fireplace enclosures are installed in exterior walls. Insulation in contact on all six sides of air barrier on exterior walls. 13 All single-member window and door headers shall be insulated to a minimum of R-3 for a 2x4 framing, or equivalent width, and a minimum of R-5 for all other assemblies. Insulation is to be placed between the interior face of the header and inside surface of the interior wall finish. If continuous exterior rigid insulation is used an insulated header is not required. No header insulation is required for single-member headers that are the same width as the wall, so long as the entire wall has at least R-2 insulation. 14 Knee walls have solid and sealed blocking at the bottom, top, left side and right side of the knee wall. 15 Verification Status Pass - all applicable requirements are met 16 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Ceiling/Attic 01 For vented attics much of the ceiling air barrier is verified after the ceiling drywall is installed using the ENV-22. 02 For non-vented attics ensure all penetrations through the roof deck and gable ends are sealed and air tight. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 3 of 6) Registration Number: 424-P010255225A-001-005-E21001A-E21A Registration Date/Time: 2024-10-23   13:24:04 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:47 D. Ceiling/Attic 03 All eave vents are covered with a rigid ventilation baffle that maintains the Net free-ventilation area. 04 All dropped ceilings and soffits are covered with hard covers and sealed to framing. 05 All chases are covered with hard covers and sealed to framing. 06 HVAC ducts that travel down a chase the chase is sealed at the ceiling level. 07 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The flashing shall be sealed to the surrounding framing. 08 All Eave/soffit baffles are installed to stop air movement around the baffle and into insulation. Net free-ventilation of the eave/soffit shall be maintained. 09 Double walls that open to attic are covered with an air barrier and cover has an air tight seal to the framing. 10 Verification Status Pass - all applicable requirements are met 11 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Conditioned Space Above Or Adjacent To Garage Air Barrier 01 All penetrations in the subfloor above the garage into conditioned space must follow the raised floor air barrier requirements above. 02 Infiltration between the space above the garage and subfloor is prevented by one of the following methods: •Seal all edges of garage ceiling (typically drywall) at the perimeter of the garage to create a continuous air tight surface between the garage and adjacent conditioned envelope. Seal all plumbing, electric and mechanical penetrations between the garage and the adjacent conditioned space. For an open-web truss, airtight blocking is added on four sides of the garage perimeter. Insulation can be placed on the garage ceiling. •Seal band joist above the wall at the garage to conditioned space transition. Seal all subfloor seams and penetrations between the conditioned space and the garage. Insulation must be placed in contact of subfloor below conditioned space. 03 Verification Status Pass - all applicable requirements are met 04 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. F. Walls For Attached Porch, Attic, Double Wall 01 All walls that separate conditioned and unconditioned space includes a continuous air barrier on the interior and exterior wall. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 4 of 6) Registration Number: 424-P010255225A-001-005-E21001A-E21A Registration Date/Time: 2024-10-23   13:24:04 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:47 F. Walls For Attached Porch, Attic, Double Wall 02 Exterior wall, air barrier required at the intersection of the porch and exterior wall when there is conditioned space on the other side. The exterior wall where the attic attaches to the conditioned space does includes an air barrier. 03 Truss framing blocking is used at the top and bottom of each wall/roof section. 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. G. Cantilevered Floor Air Barrier 01 Airtight blocking is installed between joists where the wall rim joist would have been located in the absence of a cantilever. 02 Exterior sheathing is installed to the bottom of the cantilever so that there is a continuous air and weather barrier for the cantilever. The cantilevered joist must be insulated to the same R value as would be required for the subfloor prior to closing. 03 Any gaps, cracks or penetrations in the air barrier of the cantilever are sealed. Can lights in the cantilever are IC and AT rated and properly sealed to sheathing. 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Multifamily Air Barrier 01 Multifamily buildings must meet all air sealing requirements for single family buildings listed above. 02 Each dwelling unit must be air sealed to stop air movement from one unit to another. 03 Floor AND Ceiling of each Dwelling Unit: All penetrations through the floor and ceiling of each unit are sealed including, electric and gas utilities, water pipes, drain pipes, fire protection service pipes, communication wiring. 04 Elevator penthouse, mechanical penthouse, stairwell doors, roof access hatch, plumbing stacks sealed to reduce air transfer from attached spaces. 05 Common Walls: Bottom plate between units is sealed to the subfloor. All penetrations in the common walls are sealed including electrical boxes, wiring and plumbing penetrations. Perpendicular Interior walls that open into the common walls are sealed. 06 Vertical Chases for garbage chutes, elevator shafts, and HVAC ducting plumbing must be sealed to the floor and ceiling of each unit to stop air movement up and around the chase due to stack effect. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 5 of 6) Registration Number: 424-P010255225A-001-005-E21001A-E21A Registration Date/Time: 2024-10-23   13:24:04 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:47 H. Multifamily Air Barrier 07 Vertical Chases such as garbage chutes, elevator shafts, and HVAC ducting plumbing, wiring etc. must be sealed to stop air movement through the chase to the surrounding spaces. 08 Common Hallways - Penetrations between dwelling unit and common hallways are sealed, doors to the dwelling unit are gasketed or made substantially airtight . 09 Verification Status Pass - all applicable requirements are met 10 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. I. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 6 of 6) Registration Number: 424-P010255225A-001-005-E21001A-E21A Registration Date/Time: 2024-10-23   13:24:04 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:47 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-005-E22002A-E22A Registration Date/Time: 2024-10-23   13:24:11 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 205) City: La Quinta Zip Code: 92253 For typical vented attics where the insulation is at the roof deck ceiling air barrier must be verified after the ceiling drywall is installed and before attic insulation is installed. If SPF will be used in the attic this can be considered the air barrier. Soffit and chases must still be covered and chimneys and flues require metal flashing. Buildings with a Non vented attic all air sealing requirements appropriate for the roof must be verified. A. Ceiling Inspection - Vented Attics 01 If there is a continuous air barrier at the ceiling level; All opening into walls, drops, chasses, double walls are sealed. Examples are below. 02 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The flashing shall be sealed to the surrounding framing. 03 All penetration through the top plate of interior and exterior walls are sealed. 04 All penetrations shall be sealed to the surrounding drywall or have a secondary air barrier created around the fixture; with the exception of fire sprinklers. 05 All installed recessed light fixtures that penetrate the ceiling to unconditioned space, or where insulation is present, are rated to be Insulation Contact and Air Tight (IC and AT) which allows direct contact with insulation. Housing is sealed to the drywall. 06 Exhaust fan housing is sealed to surrounding drywall and all holes and seams in the housing sealed. 07 All soffits and chases are covered with a hard cover that is sealed to the framing with caulk or foam. 08 Double walls that open to attic are covered and the cover sealed to the framing. 09 Attic Access forms airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical compression using screws, or latches. 10 Knee walls require solid and sealed blocking at the bottom, top left side and right side of the knee wall. When the knee wall is placed on top of a subfloor the open cavity below the subfloor and the ceiling below are sealed. 11 HVAC ducts that travel down a chase the chase are sealed at the ceiling level. 12 HVAC boots that penetrate the ceiling are sealed to the surrounding drywall. 13 All top plates of interior and exterior walls sealed to drywall. 14 Attic access must be surrounded with a dam at least the same depth as the insulation to prevent loss of ceiling insulation. 15 There must be a dam placed at the exterior edge of all kneewalls and all edges of insulation to stop air movement through insulation. 16 Verification Status:Pass - all applicable requirements are met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 2 of 3) Registration Number: 424-P010255225A-001-005-E22002A-E22A Registration Date/Time: 2024-10-23   13:24:11 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 A. Ceiling Inspection - Vented Attics 17 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Roof Inspection - Non-Vented Attics 01 There is a continuous air barrier at the roof deck and gable ends. 02 Chimney and Flue require sheet metal flashing at the roof deck. The flashing is sealed to the chimney or flue with fire rated caulk. The flashing is sealed to the surrounding framing. 03 All penetrations for plumbing, electrical etc in the roof deck and gable ends are sealed. 04 Verification Status:Pass - all applicable requirements are met 05 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. C. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 3 of 3) Registration Number: 424-P010255225A-001-005-E22002A-E22A Registration Date/Time: 2024-10-23   13:24:11 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-005-E23003A-E23A Registration Date/Time: 2024-10-23   13:24:14 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 1 of 7) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 205) City: La Quinta Zip Code: 92253 A. Quality Insulation Installation (QII) Preparation For Insulation 01 Air barrier installation and preparation for insulation was done and verified at framing stage prior to insulation being installed. Where applicable, CF3R-ENV21 and 22 compliance documents have been signed off. 02 All structural framing areas shall be insulated in a manner that resists thermal bridging of the assembly separating conditioned from unconditioned space. Structural bracing, tie-downs, and framing of steel, or specialized framing used to meet structural requirements of the CBC are allowed and must be insulated. These areas shall be called out on the building plans with diagrams and or specific design drawings indicating the R-value of insulation and fastening method to be used. It is recommended that spray foam be used. 03 All insulation was installed to the manufactures insulation installation instructions. 04 Verification Status:Pass - all applicable requirements are met 05 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Quality Of All Installed Insulation 01 Installed insulation R-values is the same or greater than specified on the CF1R. 02 No gaps or voids between the insulation and framing. 03 Gaps between studs shall be filled with insulation. 04 Batt - ensure the ends are cut so there are no gaps. 05 Batt - Insulation is cut around obstructions like electrical boxes and no gaps exist. 06 Batt - insulation is not compressed (no stuffing of the insulation into the cavity. 07 Batt insulation is delaminated around all plumbing and electrical lines in ceilings, walls and floors. 08 An air barrier is installed at all exposed faces of batt, loose fill and SPF insulation. 09 Loose-fill insulation installed to the minimum installed weight per ft 2 per the manufacturer labeled R-value specification. 10 SPF insulation shall be spray-applied to fully adhere to structural assembly framing, floor and ceiling joists, and other framing surfaces within the construction cavity. 11 SPF - with multiple layers applied, each foam lift (i.e. spray application) adheres to the substrate and foam interfaces. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 2 of 7) Registration Number: 424-P010255225A-001-005-E23003A-E23A Registration Date/Time: 2024-10-23   13:24:14 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 B. Quality Of All Installed Insulation 12 SPF - if values other than R-5.8 per inch for closed-cell SPF (ccSPF) and R-3.6 per inch for open-cell SPF (ocSPF) are used, the ICC Evaluation Service Report (ESR) number (e.g. ESR-xxxx) will be documented in the CF2R-ENV-03. 13 ccSPF in areas where an air barrier is required the foam is at least 2 inches thick. 14 ocSPF depressions in the foam insulation surface is not greater than 1-inch of the required thickness provided these depressions do not exceed 10 percent of the surface area being insulated. 15 ocSPF insulation completely fills cavities of 2x4 inch framing or less. 16 ocSPF cavities greater than 2x4 inch framing are filled to the thickness that meets the required R-value used for compliance. 17 SPF installed as an air barrier is sprayed at a minimum thickness of 5.5 inches for open cell and 2.0 inches for closed cell. 18 The insulation installer provided a CF2R-ENV-03. Labels or specification/data sheets are attached to the CF2R-ENV-03 for each insulating material. The material datasheet for the installed material meets the performance specifications of the required R-Values. Blown in material also includes insulation material bag labels or coverage charts. 19 Verification Status:Pass - all applicable requirements are met 20 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. C. Ceiling/Roof Insulation Quality 01 Insulation extends to the outside edge of the exterior top plates and is flush against any ventilation dams or baffles. 02 Insulation is in direct contact with ceiling so there are no gaps between the ceiling and the insulation. 03 Chimneys and flues (except for zero clearance) require a sheet metal collar around the stack. The collar must be at least as tall as the depth of the insulation. The collar shall be 1 inch from the chimney or flue for double wall vents, and 6 inches from the chimney/flue for single wall vents unless the manufacturer requires otherwise. The collar must be sealed to the ceiling with high temperature sealant to prevent air leakage. The insulation is in contact with the sheet metal collar. 04 Required eave ventilation shall not be obstructed - the net free-ventilation area of the eave vent is maintained 05 Eave vent baffles are installed to prevent air movement under or into the ceiling insulation 06 Recessed downlights are covered with insulation. If they are not covered to the same depth as required by the CF1R for ceiling insulation then a area weighted calculation is required. Recessed downlights are AT and IC rated. 07 SPF insulation shall not be applied directly to recessed lighting fixtures. Recessed downlights where SPF insulation is installed shall:      (a) be covered with a minimum of 1.5 inches of mineral fiber insulation, or      (b) be enclosed in a box fabricated from 1/4 inch plywood, 18 gauge metal, 3/8 inch hard board or gypboard. Hard board or gypboard does not cause a recessed downlights to meet the zero clearance insulation contact requirements. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 3 of 7) Registration Number: 424-P010255225A-001-005-E23003A-E23A Registration Date/Time: 2024-10-23   13:24:14 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 C. Ceiling/Roof Insulation Quality 08 Walkways and mechanical platforms are insulated to the same R-value as required by the CF1R for ceiling insulation. If not, an area weighted calculation is completed and turned in with this compliance document. 09 Soffits, chasses and drop ceiling areas have a sealed hard cover and the insulation is in direct contact with the hard cover. 10 Knee walls - an air dam the full depth of the ceiling insulation is added to the exterior edge of the knee wall so the ceiling insulation overlaps the knee wall to the full depth of the ceiling insulation. 11 Attic access doors are insulated to the same R-value required by the CF1R for roof insulation and the insulation is permanently attached using adhesive or mechanical fasteners. The preferred method is rigid insulation. 12 Attic access forms an airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical compression using screws, or latches. 13 Attic access must have a dam around the access to at least the same depth as the insulation. 14 Insulation batts must be cut to fit around cross bracings and truss webs. 15 Attic rulers appropriate to the material are installed and evenly distributed throughout the attic to verify depth (one ruler for every 250 ft2) The rulers are clearly readable from the attic access and scaled to read inches of insulation and the R-value installed. 16 Loose-fill and SPF insulation - a HERS rater shall measure the installed thickness (including low and high areas) and density of insulation in at least 6 random locations on roof/ceilings and floors to ensure minimum thickness levels and installed density necessary to meet the R-value specified on the Certificate of Compliance, and consistency with the manufacturer coverage chart. 17 Steel-framed knee walls, skylight shafts, and gable ends, external surfaces of steel studs are covered with insulation 18 Verification Status:Pass - all applicable requirements are met 19 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Wall Insulation 01 Batts, loose fill mineral fiber, mineral and natural wool, and cellulose:fills cavity and is in contact with air barrier on six sides. 02 ocSPF:completely fill cavities of 2x4 inch framing or less. Not required to fill cavities greater than 2x4 inch framing unless required to meet R-value. 03 ccSPF:insulation is not required to fill the cavities of framed assemblies unless required to meet R-value. 04 Double walls and bump-outs - insulation fills the cavity, or additional air barrier is installed so the insulation fills the cavity and is in contact with the insulation on all six sides unless SPF is used. Insulation shall be installed on the exterior of the double walls or bump-outs. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 4 of 7) Registration Number: 424-P010255225A-001-005-E23003A-E23A Registration Date/Time: 2024-10-23   13:24:14 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 D. Wall Insulation 05 Low expanding foam used around windows and doors, if allowed by the manufacturer. If not allowed fill cavity with insulation. Batts are not allowed to be stuffed into space. 06 Electrical panel in exterior insulated wall the panel is air tight and insulation is installed behind the panel. 07 Skylight shafts and attic knee wall insulation must meet all the requirements for walls and is in contact with the air barrier on six sides unless SPF is used. 08 Skylight shafts and attic kneewalls insulation shall be in full contact with the drywall or other interior wall finish. Batt insulation must be cut to fit around 2x4 framing that are laid flat. 09 Skylight shafts and attic kneewalls shall be completely enclosed by vertical and horizontal framing, including horizontal plates at top and bottom of the insulation. 10 Band/Rim joists are insulated to the same R-value as the wall. 11 Verification Status:Pass - all applicable requirements are met 12 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Raised Floor Insulation Quality 01 Insulation is in full contact with subfloor. 02 Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation. 03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 04 When daylight basements are adjacent to crawlspaces, if the basement is conditioned the walls adjacent to the crawlspace are insulated to the R-value listed on the CF1R. This includes framed stem walls, and vertical concrete retaining walls. 05 If access to the crawlspace is from the conditioned area the raised floor includes an airtight insulated access hatch. Where possible locate crawl space access from the exterior. 06 Verification Status:Pass - all applicable requirements are met 07 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. F. Floor Above Garage Insulation Quality 01 Insulation must be in full contact with subfloor if the air barrier is at the band joist at the garage house wall. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 5 of 7) Registration Number: 424-P010255225A-001-005-E23003A-E23A Registration Date/Time: 2024-10-23   13:24:14 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 F. Floor Above Garage Insulation Quality 02 Insulation hangers spaced at 18 inches or less, insulation hangers must not compress insulation. 03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 04 If air barrier is at the perimeter of the garage below the conditioned subfloor then the insulation may be placed on the garage ceiling. Perimeter of subfloor must also be insulated. 05 Verification Status:Pass - all applicable requirements are met 06 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. G. Cantilevered Floor Insulation Quality 01 Insulation is in full contact with cantilevered subfloor. Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation. Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 02 Sealed Blocking shall be installed between joists where the wall rim joist would have been located in the absence of a cantilever. Insulation shall be placed on both sides of this block. 03 Verification Status:Pass - all applicable requirements are met 04 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Attached Porch Roof Insulation Quality 01 Exterior wall at the intersection of the porch roof is fully insulated above, below and behind the roof line. 02 Where truss framing is used, airtight blocking is used at the top and bottom of each wall/roof section and insulated. 03 Verification Status:Pass - all applicable requirements are met 04 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 6 of 7) Registration Number: 424-P010255225A-001-005-E23003A-E23A Registration Date/Time: 2024-10-23   13:24:14 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 I. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 7 of 7) Registration Number: 424-P010255225A-001-005-E23003A-E23A Registration Date/Time: 2024-10-23   13:24:14 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-006-E21001A-E21A Registration Date/Time: 2024-10-23   13:24:25 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 6) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 206) City: La Quinta Zip Code: 92253 A. Air Infiltration And Insulation Installation (Qii) - Framing Stage 01 The requirements below cover the required air sealing and installation of insulation that must occur in the framing stage. 02 An air barrier is required in all thermal envelope assemblies to limit air movement between unconditioned/outside spaces and conditioned/inside spaces and must meet one of the following: 1.Using individual materials that have an air permeance not exceeding 0.004 cfm/ft 2 under pressure differential of 0.3 in w.g. (1.57 psf) (0.02 L/s.m2 at 75 pa) when tested in accordance with ASTM E2178; or •A list of example materials meeting the air permenace testing performance levels of 1 above is available in RA3.5.2 2.Using assemblies of materials and components that have an average air leakage not to exceed 0.04 cfm/ft 2 under a pressure differential of 0.3 in w.g. (1.57 psf) (0.2 L/s.m2 at 75 pa) when tested in accordance with ASTM E2357, ASTM E1677, ASTM E1680 or ASTM E283, or 3.Testing the complete building and demonstrating that the air leakage rate of the building envelope does not exceed 0.4 cfm/ft2 at a pressure differential of 0.3 in w.g. (1.57 psf) (2.0 L/m2 at 75 pa) in accordance with ASTM E779 or an equivalent approved method. 03 Air Barrier Material Installed 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Raised Floor 01 All gaps in the raised floor are sealed. 02 All chases sealed at floor level using a hard cover and the hard covers are sealed. 03 All Plumbing and electrical wires that penetrate the floor are sealed. 04 Subfloor sheathing is glued or sealed at all exterior panel edges, to create a continuous air tight subfloor. 05 Verification Status Pass - all applicable requirements are met 06 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 2 of 6) Registration Number: 424-P010255225A-001-006-E21001A-E21A Registration Date/Time: 2024-10-23   13:24:25 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 C. Walls/Knee Walls 01 All penetrations through the exterior wall air barrier are sealed to provide an air-tight envelope to unconditioned spaces such as the outdoors, attic, garage and crawl space. 02 Exterior wall air barrier is sealed to the top plate and bottom plate in each stud bay. 03 All electrical boxes including knockouts that penetrate the air barrier to unconditioned space are sealed. 04 All openings in top and bottom plate, including all interior and exterior walls, to unconditioned space are sealed. Such as holes drilled for electrical and plumbing. 05 Exterior bottom plates (all stories) are sealed to the floor using the appropriate sealing method. 06 All gaps around windows and doors are sealed. Proper sealant used was specified by window manufacturer. 07 Rim Joists all gaps and openings fully sealed. 08 Fan exhaust ducts that run between conditioned floors to exterior walls have a damper at the exterior wall. 09 Metal tie downs are insulated between exterior framing and tie down. 10 Insulation is installed in hard to access wall stud cavities, such as corner channels, wall intersections are insulated to the proper R-value prior to exterior sheathing, or the exterior stucco lath. 11 Insulation is installed behind tub, shower, fireplace enclosures, and exterior stairwells to the R-value listed on the CF1R when located against exterior walls. Insulation is required to be installed before tub, shower, and fireplace are installed. 12 A solid air barrier is installed on the interior wall from floor to ceiling tub, shower, and fireplace enclosures are installed in exterior walls. Insulation in contact on all six sides of air barrier on exterior walls. 13 All single-member window and door headers shall be insulated to a minimum of R-3 for a 2x4 framing, or equivalent width, and a minimum of R-5 for all other assemblies. Insulation is to be placed between the interior face of the header and inside surface of the interior wall finish. If continuous exterior rigid insulation is used an insulated header is not required. No header insulation is required for single-member headers that are the same width as the wall, so long as the entire wall has at least R-2 insulation. 14 Knee walls have solid and sealed blocking at the bottom, top, left side and right side of the knee wall. 15 Verification Status Pass - all applicable requirements are met 16 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Ceiling/Attic 01 For vented attics much of the ceiling air barrier is verified after the ceiling drywall is installed using the ENV-22. 02 For non-vented attics ensure all penetrations through the roof deck and gable ends are sealed and air tight. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 3 of 6) Registration Number: 424-P010255225A-001-006-E21001A-E21A Registration Date/Time: 2024-10-23   13:24:25 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 D. Ceiling/Attic 03 All eave vents are covered with a rigid ventilation baffle that maintains the Net free-ventilation area. 04 All dropped ceilings and soffits are covered with hard covers and sealed to framing. 05 All chases are covered with hard covers and sealed to framing. 06 HVAC ducts that travel down a chase the chase is sealed at the ceiling level. 07 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The flashing shall be sealed to the surrounding framing. 08 All Eave/soffit baffles are installed to stop air movement around the baffle and into insulation. Net free-ventilation of the eave/soffit shall be maintained. 09 Double walls that open to attic are covered with an air barrier and cover has an air tight seal to the framing. 10 Verification Status Pass - all applicable requirements are met 11 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Conditioned Space Above Or Adjacent To Garage Air Barrier 01 All penetrations in the subfloor above the garage into conditioned space must follow the raised floor air barrier requirements above. 02 Infiltration between the space above the garage and subfloor is prevented by one of the following methods: •Seal all edges of garage ceiling (typically drywall) at the perimeter of the garage to create a continuous air tight surface between the garage and adjacent conditioned envelope. Seal all plumbing, electric and mechanical penetrations between the garage and the adjacent conditioned space. For an open-web truss, airtight blocking is added on four sides of the garage perimeter. Insulation can be placed on the garage ceiling. •Seal band joist above the wall at the garage to conditioned space transition. Seal all subfloor seams and penetrations between the conditioned space and the garage. Insulation must be placed in contact of subfloor below conditioned space. 03 Verification Status Pass - all applicable requirements are met 04 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. F. Walls For Attached Porch, Attic, Double Wall 01 All walls that separate conditioned and unconditioned space includes a continuous air barrier on the interior and exterior wall. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 4 of 6) Registration Number: 424-P010255225A-001-006-E21001A-E21A Registration Date/Time: 2024-10-23   13:24:25 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 F. Walls For Attached Porch, Attic, Double Wall 02 Exterior wall, air barrier required at the intersection of the porch and exterior wall when there is conditioned space on the other side. The exterior wall where the attic attaches to the conditioned space does includes an air barrier. 03 Truss framing blocking is used at the top and bottom of each wall/roof section. 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. G. Cantilevered Floor Air Barrier 01 Airtight blocking is installed between joists where the wall rim joist would have been located in the absence of a cantilever. 02 Exterior sheathing is installed to the bottom of the cantilever so that there is a continuous air and weather barrier for the cantilever. The cantilevered joist must be insulated to the same R value as would be required for the subfloor prior to closing. 03 Any gaps, cracks or penetrations in the air barrier of the cantilever are sealed. Can lights in the cantilever are IC and AT rated and properly sealed to sheathing. 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Multifamily Air Barrier 01 Multifamily buildings must meet all air sealing requirements for single family buildings listed above. 02 Each dwelling unit must be air sealed to stop air movement from one unit to another. 03 Floor AND Ceiling of each Dwelling Unit: All penetrations through the floor and ceiling of each unit are sealed including, electric and gas utilities, water pipes, drain pipes, fire protection service pipes, communication wiring. 04 Elevator penthouse, mechanical penthouse, stairwell doors, roof access hatch, plumbing stacks sealed to reduce air transfer from attached spaces. 05 Common Walls: Bottom plate between units is sealed to the subfloor. All penetrations in the common walls are sealed including electrical boxes, wiring and plumbing penetrations. Perpendicular Interior walls that open into the common walls are sealed. 06 Vertical Chases for garbage chutes, elevator shafts, and HVAC ducting plumbing must be sealed to the floor and ceiling of each unit to stop air movement up and around the chase due to stack effect. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 5 of 6) Registration Number: 424-P010255225A-001-006-E21001A-E21A Registration Date/Time: 2024-10-23   13:24:25 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 H. Multifamily Air Barrier 07 Vertical Chases such as garbage chutes, elevator shafts, and HVAC ducting plumbing, wiring etc. must be sealed to stop air movement through the chase to the surrounding spaces. 08 Common Hallways - Penetrations between dwelling unit and common hallways are sealed, doors to the dwelling unit are gasketed or made substantially airtight . 09 Verification Status Pass - all applicable requirements are met 10 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. I. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 6 of 6) Registration Number: 424-P010255225A-001-006-E21001A-E21A Registration Date/Time: 2024-10-23   13:24:25 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-006-E22002A-E22A Registration Date/Time: 2024-10-23   13:24:27 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 206) City: La Quinta Zip Code: 92253 For typical vented attics where the insulation is at the roof deck ceiling air barrier must be verified after the ceiling drywall is installed and before attic insulation is installed. If SPF will be used in the attic this can be considered the air barrier. Soffit and chases must still be covered and chimneys and flues require metal flashing. Buildings with a Non vented attic all air sealing requirements appropriate for the roof must be verified. A. Ceiling Inspection - Vented Attics 01 If there is a continuous air barrier at the ceiling level; All opening into walls, drops, chasses, double walls are sealed. Examples are below. 02 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The flashing shall be sealed to the surrounding framing. 03 All penetration through the top plate of interior and exterior walls are sealed. 04 All penetrations shall be sealed to the surrounding drywall or have a secondary air barrier created around the fixture; with the exception of fire sprinklers. 05 All installed recessed light fixtures that penetrate the ceiling to unconditioned space, or where insulation is present, are rated to be Insulation Contact and Air Tight (IC and AT) which allows direct contact with insulation. Housing is sealed to the drywall. 06 Exhaust fan housing is sealed to surrounding drywall and all holes and seams in the housing sealed. 07 All soffits and chases are covered with a hard cover that is sealed to the framing with caulk or foam. 08 Double walls that open to attic are covered and the cover sealed to the framing. 09 Attic Access forms airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical compression using screws, or latches. 10 Knee walls require solid and sealed blocking at the bottom, top left side and right side of the knee wall. When the knee wall is placed on top of a subfloor the open cavity below the subfloor and the ceiling below are sealed. 11 HVAC ducts that travel down a chase the chase are sealed at the ceiling level. 12 HVAC boots that penetrate the ceiling are sealed to the surrounding drywall. 13 All top plates of interior and exterior walls sealed to drywall. 14 Attic access must be surrounded with a dam at least the same depth as the insulation to prevent loss of ceiling insulation. 15 There must be a dam placed at the exterior edge of all kneewalls and all edges of insulation to stop air movement through insulation. 16 Verification Status:Pass - all applicable requirements are met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 2 of 3) Registration Number: 424-P010255225A-001-006-E22002A-E22A Registration Date/Time: 2024-10-23   13:24:27 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 A. Ceiling Inspection - Vented Attics 17 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Roof Inspection - Non-Vented Attics 01 There is a continuous air barrier at the roof deck and gable ends. 02 Chimney and Flue require sheet metal flashing at the roof deck. The flashing is sealed to the chimney or flue with fire rated caulk. The flashing is sealed to the surrounding framing. 03 All penetrations for plumbing, electrical etc in the roof deck and gable ends are sealed. 04 Verification Status:Pass - all applicable requirements are met 05 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. C. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 3 of 3) Registration Number: 424-P010255225A-001-006-E22002A-E22A Registration Date/Time: 2024-10-23   13:24:27 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-006-E23003A-E23A Registration Date/Time: 2024-10-23   13:24:30 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 1 of 7) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 206) City: La Quinta Zip Code: 92253 A. Quality Insulation Installation (QII) Preparation For Insulation 01 Air barrier installation and preparation for insulation was done and verified at framing stage prior to insulation being installed. Where applicable, CF3R-ENV21 and 22 compliance documents have been signed off. 02 All structural framing areas shall be insulated in a manner that resists thermal bridging of the assembly separating conditioned from unconditioned space. Structural bracing, tie-downs, and framing of steel, or specialized framing used to meet structural requirements of the CBC are allowed and must be insulated. These areas shall be called out on the building plans with diagrams and or specific design drawings indicating the R-value of insulation and fastening method to be used. It is recommended that spray foam be used. 03 All insulation was installed to the manufactures insulation installation instructions. 04 Verification Status:Pass - all applicable requirements are met 05 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Quality Of All Installed Insulation 01 Installed insulation R-values is the same or greater than specified on the CF1R. 02 No gaps or voids between the insulation and framing. 03 Gaps between studs shall be filled with insulation. 04 Batt - ensure the ends are cut so there are no gaps. 05 Batt - Insulation is cut around obstructions like electrical boxes and no gaps exist. 06 Batt - insulation is not compressed (no stuffing of the insulation into the cavity. 07 Batt insulation is delaminated around all plumbing and electrical lines in ceilings, walls and floors. 08 An air barrier is installed at all exposed faces of batt, loose fill and SPF insulation. 09 Loose-fill insulation installed to the minimum installed weight per ft 2 per the manufacturer labeled R-value specification. 10 SPF insulation shall be spray-applied to fully adhere to structural assembly framing, floor and ceiling joists, and other framing surfaces within the construction cavity. 11 SPF - with multiple layers applied, each foam lift (i.e. spray application) adheres to the substrate and foam interfaces. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 2 of 7) Registration Number: 424-P010255225A-001-006-E23003A-E23A Registration Date/Time: 2024-10-23   13:24:30 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 B. Quality Of All Installed Insulation 12 SPF - if values other than R-5.8 per inch for closed-cell SPF (ccSPF) and R-3.6 per inch for open-cell SPF (ocSPF) are used, the ICC Evaluation Service Report (ESR) number (e.g. ESR-xxxx) will be documented in the CF2R-ENV-03. 13 ccSPF in areas where an air barrier is required the foam is at least 2 inches thick. 14 ocSPF depressions in the foam insulation surface is not greater than 1-inch of the required thickness provided these depressions do not exceed 10 percent of the surface area being insulated. 15 ocSPF insulation completely fills cavities of 2x4 inch framing or less. 16 ocSPF cavities greater than 2x4 inch framing are filled to the thickness that meets the required R-value used for compliance. 17 SPF installed as an air barrier is sprayed at a minimum thickness of 5.5 inches for open cell and 2.0 inches for closed cell. 18 The insulation installer provided a CF2R-ENV-03. Labels or specification/data sheets are attached to the CF2R-ENV-03 for each insulating material. The material datasheet for the installed material meets the performance specifications of the required R-Values. Blown in material also includes insulation material bag labels or coverage charts. 19 Verification Status:Pass - all applicable requirements are met 20 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. C. Ceiling/Roof Insulation Quality 01 Insulation extends to the outside edge of the exterior top plates and is flush against any ventilation dams or baffles. 02 Insulation is in direct contact with ceiling so there are no gaps between the ceiling and the insulation. 03 Chimneys and flues (except for zero clearance) require a sheet metal collar around the stack. The collar must be at least as tall as the depth of the insulation. The collar shall be 1 inch from the chimney or flue for double wall vents, and 6 inches from the chimney/flue for single wall vents unless the manufacturer requires otherwise. The collar must be sealed to the ceiling with high temperature sealant to prevent air leakage. The insulation is in contact with the sheet metal collar. 04 Required eave ventilation shall not be obstructed - the net free-ventilation area of the eave vent is maintained 05 Eave vent baffles are installed to prevent air movement under or into the ceiling insulation 06 Recessed downlights are covered with insulation. If they are not covered to the same depth as required by the CF1R for ceiling insulation then a area weighted calculation is required. Recessed downlights are AT and IC rated. 07 SPF insulation shall not be applied directly to recessed lighting fixtures. Recessed downlights where SPF insulation is installed shall:      (a) be covered with a minimum of 1.5 inches of mineral fiber insulation, or      (b) be enclosed in a box fabricated from 1/4 inch plywood, 18 gauge metal, 3/8 inch hard board or gypboard. Hard board or gypboard does not cause a recessed downlights to meet the zero clearance insulation contact requirements. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 3 of 7) Registration Number: 424-P010255225A-001-006-E23003A-E23A Registration Date/Time: 2024-10-23   13:24:30 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 C. Ceiling/Roof Insulation Quality 08 Walkways and mechanical platforms are insulated to the same R-value as required by the CF1R for ceiling insulation. If not, an area weighted calculation is completed and turned in with this compliance document. 09 Soffits, chasses and drop ceiling areas have a sealed hard cover and the insulation is in direct contact with the hard cover. 10 Knee walls - an air dam the full depth of the ceiling insulation is added to the exterior edge of the knee wall so the ceiling insulation overlaps the knee wall to the full depth of the ceiling insulation. 11 Attic access doors are insulated to the same R-value required by the CF1R for roof insulation and the insulation is permanently attached using adhesive or mechanical fasteners. The preferred method is rigid insulation. 12 Attic access forms an airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical compression using screws, or latches. 13 Attic access must have a dam around the access to at least the same depth as the insulation. 14 Insulation batts must be cut to fit around cross bracings and truss webs. 15 Attic rulers appropriate to the material are installed and evenly distributed throughout the attic to verify depth (one ruler for every 250 ft2) The rulers are clearly readable from the attic access and scaled to read inches of insulation and the R-value installed. 16 Loose-fill and SPF insulation - a HERS rater shall measure the installed thickness (including low and high areas) and density of insulation in at least 6 random locations on roof/ceilings and floors to ensure minimum thickness levels and installed density necessary to meet the R-value specified on the Certificate of Compliance, and consistency with the manufacturer coverage chart. 17 Steel-framed knee walls, skylight shafts, and gable ends, external surfaces of steel studs are covered with insulation 18 Verification Status:Pass - all applicable requirements are met 19 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Wall Insulation 01 Batts, loose fill mineral fiber, mineral and natural wool, and cellulose:fills cavity and is in contact with air barrier on six sides. 02 ocSPF:completely fill cavities of 2x4 inch framing or less. Not required to fill cavities greater than 2x4 inch framing unless required to meet R-value. 03 ccSPF:insulation is not required to fill the cavities of framed assemblies unless required to meet R-value. 04 Double walls and bump-outs - insulation fills the cavity, or additional air barrier is installed so the insulation fills the cavity and is in contact with the insulation on all six sides unless SPF is used. Insulation shall be installed on the exterior of the double walls or bump-outs. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 4 of 7) Registration Number: 424-P010255225A-001-006-E23003A-E23A Registration Date/Time: 2024-10-23   13:24:30 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 D. Wall Insulation 05 Low expanding foam used around windows and doors, if allowed by the manufacturer. If not allowed fill cavity with insulation. Batts are not allowed to be stuffed into space. 06 Electrical panel in exterior insulated wall the panel is air tight and insulation is installed behind the panel. 07 Skylight shafts and attic knee wall insulation must meet all the requirements for walls and is in contact with the air barrier on six sides unless SPF is used. 08 Skylight shafts and attic kneewalls insulation shall be in full contact with the drywall or other interior wall finish. Batt insulation must be cut to fit around 2x4 framing that are laid flat. 09 Skylight shafts and attic kneewalls shall be completely enclosed by vertical and horizontal framing, including horizontal plates at top and bottom of the insulation. 10 Band/Rim joists are insulated to the same R-value as the wall. 11 Verification Status:Pass - all applicable requirements are met 12 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Raised Floor Insulation Quality 01 Insulation is in full contact with subfloor. 02 Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation. 03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 04 When daylight basements are adjacent to crawlspaces, if the basement is conditioned the walls adjacent to the crawlspace are insulated to the R-value listed on the CF1R. This includes framed stem walls, and vertical concrete retaining walls. 05 If access to the crawlspace is from the conditioned area the raised floor includes an airtight insulated access hatch. Where possible locate crawl space access from the exterior. 06 Verification Status:Pass - all applicable requirements are met 07 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. F. Floor Above Garage Insulation Quality 01 Insulation must be in full contact with subfloor if the air barrier is at the band joist at the garage house wall. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 5 of 7) Registration Number: 424-P010255225A-001-006-E23003A-E23A Registration Date/Time: 2024-10-23   13:24:30 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 F. Floor Above Garage Insulation Quality 02 Insulation hangers spaced at 18 inches or less, insulation hangers must not compress insulation. 03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 04 If air barrier is at the perimeter of the garage below the conditioned subfloor then the insulation may be placed on the garage ceiling. Perimeter of subfloor must also be insulated. 05 Verification Status:Pass - all applicable requirements are met 06 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. G. Cantilevered Floor Insulation Quality 01 Insulation is in full contact with cantilevered subfloor. Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation. Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 02 Sealed Blocking shall be installed between joists where the wall rim joist would have been located in the absence of a cantilever. Insulation shall be placed on both sides of this block. 03 Verification Status:Pass - all applicable requirements are met 04 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Attached Porch Roof Insulation Quality 01 Exterior wall at the intersection of the porch roof is fully insulated above, below and behind the roof line. 02 Where truss framing is used, airtight blocking is used at the top and bottom of each wall/roof section and insulated. 03 Verification Status:Pass - all applicable requirements are met 04 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 6 of 7) Registration Number: 424-P010255225A-001-006-E23003A-E23A Registration Date/Time: 2024-10-23   13:24:30 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 I. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 7 of 7) Registration Number: 424-P010255225A-001-006-E23003A-E23A Registration Date/Time: 2024-10-23   13:24:30 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-007-E21001A-E21A Registration Date/Time: 2024-10-23   13:25:19 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 6) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 207) City: La Quinta Zip Code: 92253 A. Air Infiltration And Insulation Installation (Qii) - Framing Stage 01 The requirements below cover the required air sealing and installation of insulation that must occur in the framing stage. 02 An air barrier is required in all thermal envelope assemblies to limit air movement between unconditioned/outside spaces and conditioned/inside spaces and must meet one of the following: 1.Using individual materials that have an air permeance not exceeding 0.004 cfm/ft 2 under pressure differential of 0.3 in w.g. (1.57 psf) (0.02 L/s.m2 at 75 pa) when tested in accordance with ASTM E2178; or •A list of example materials meeting the air permenace testing performance levels of 1 above is available in RA3.5.2 2.Using assemblies of materials and components that have an average air leakage not to exceed 0.04 cfm/ft 2 under a pressure differential of 0.3 in w.g. (1.57 psf) (0.2 L/s.m2 at 75 pa) when tested in accordance with ASTM E2357, ASTM E1677, ASTM E1680 or ASTM E283, or 3.Testing the complete building and demonstrating that the air leakage rate of the building envelope does not exceed 0.4 cfm/ft2 at a pressure differential of 0.3 in w.g. (1.57 psf) (2.0 L/m2 at 75 pa) in accordance with ASTM E779 or an equivalent approved method. 03 Air Barrier Material Installed 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Raised Floor 01 All gaps in the raised floor are sealed. 02 All chases sealed at floor level using a hard cover and the hard covers are sealed. 03 All Plumbing and electrical wires that penetrate the floor are sealed. 04 Subfloor sheathing is glued or sealed at all exterior panel edges, to create a continuous air tight subfloor. 05 Verification Status Pass - all applicable requirements are met 06 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 2 of 6) Registration Number: 424-P010255225A-001-007-E21001A-E21A Registration Date/Time: 2024-10-23   13:25:19 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 C. Walls/Knee Walls 01 All penetrations through the exterior wall air barrier are sealed to provide an air-tight envelope to unconditioned spaces such as the outdoors, attic, garage and crawl space. 02 Exterior wall air barrier is sealed to the top plate and bottom plate in each stud bay. 03 All electrical boxes including knockouts that penetrate the air barrier to unconditioned space are sealed. 04 All openings in top and bottom plate, including all interior and exterior walls, to unconditioned space are sealed. Such as holes drilled for electrical and plumbing. 05 Exterior bottom plates (all stories) are sealed to the floor using the appropriate sealing method. 06 All gaps around windows and doors are sealed. Proper sealant used was specified by window manufacturer. 07 Rim Joists all gaps and openings fully sealed. 08 Fan exhaust ducts that run between conditioned floors to exterior walls have a damper at the exterior wall. 09 Metal tie downs are insulated between exterior framing and tie down. 10 Insulation is installed in hard to access wall stud cavities, such as corner channels, wall intersections are insulated to the proper R-value prior to exterior sheathing, or the exterior stucco lath. 11 Insulation is installed behind tub, shower, fireplace enclosures, and exterior stairwells to the R-value listed on the CF1R when located against exterior walls. Insulation is required to be installed before tub, shower, and fireplace are installed. 12 A solid air barrier is installed on the interior wall from floor to ceiling tub, shower, and fireplace enclosures are installed in exterior walls. Insulation in contact on all six sides of air barrier on exterior walls. 13 All single-member window and door headers shall be insulated to a minimum of R-3 for a 2x4 framing, or equivalent width, and a minimum of R-5 for all other assemblies. Insulation is to be placed between the interior face of the header and inside surface of the interior wall finish. If continuous exterior rigid insulation is used an insulated header is not required. No header insulation is required for single-member headers that are the same width as the wall, so long as the entire wall has at least R-2 insulation. 14 Knee walls have solid and sealed blocking at the bottom, top, left side and right side of the knee wall. 15 Verification Status Pass - all applicable requirements are met 16 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Ceiling/Attic 01 For vented attics much of the ceiling air barrier is verified after the ceiling drywall is installed using the ENV-22. 02 For non-vented attics ensure all penetrations through the roof deck and gable ends are sealed and air tight. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 3 of 6) Registration Number: 424-P010255225A-001-007-E21001A-E21A Registration Date/Time: 2024-10-23   13:25:19 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 D. Ceiling/Attic 03 All eave vents are covered with a rigid ventilation baffle that maintains the Net free-ventilation area. 04 All dropped ceilings and soffits are covered with hard covers and sealed to framing. 05 All chases are covered with hard covers and sealed to framing. 06 HVAC ducts that travel down a chase the chase is sealed at the ceiling level. 07 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The flashing shall be sealed to the surrounding framing. 08 All Eave/soffit baffles are installed to stop air movement around the baffle and into insulation. Net free-ventilation of the eave/soffit shall be maintained. 09 Double walls that open to attic are covered with an air barrier and cover has an air tight seal to the framing. 10 Verification Status Pass - all applicable requirements are met 11 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Conditioned Space Above Or Adjacent To Garage Air Barrier 01 All penetrations in the subfloor above the garage into conditioned space must follow the raised floor air barrier requirements above. 02 Infiltration between the space above the garage and subfloor is prevented by one of the following methods: •Seal all edges of garage ceiling (typically drywall) at the perimeter of the garage to create a continuous air tight surface between the garage and adjacent conditioned envelope. Seal all plumbing, electric and mechanical penetrations between the garage and the adjacent conditioned space. For an open-web truss, airtight blocking is added on four sides of the garage perimeter. Insulation can be placed on the garage ceiling. •Seal band joist above the wall at the garage to conditioned space transition. Seal all subfloor seams and penetrations between the conditioned space and the garage. Insulation must be placed in contact of subfloor below conditioned space. 03 Verification Status Pass - all applicable requirements are met 04 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. F. Walls For Attached Porch, Attic, Double Wall 01 All walls that separate conditioned and unconditioned space includes a continuous air barrier on the interior and exterior wall. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 4 of 6) Registration Number: 424-P010255225A-001-007-E21001A-E21A Registration Date/Time: 2024-10-23   13:25:19 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 F. Walls For Attached Porch, Attic, Double Wall 02 Exterior wall, air barrier required at the intersection of the porch and exterior wall when there is conditioned space on the other side. The exterior wall where the attic attaches to the conditioned space does includes an air barrier. 03 Truss framing blocking is used at the top and bottom of each wall/roof section. 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. G. Cantilevered Floor Air Barrier 01 Airtight blocking is installed between joists where the wall rim joist would have been located in the absence of a cantilever. 02 Exterior sheathing is installed to the bottom of the cantilever so that there is a continuous air and weather barrier for the cantilever. The cantilevered joist must be insulated to the same R value as would be required for the subfloor prior to closing. 03 Any gaps, cracks or penetrations in the air barrier of the cantilever are sealed. Can lights in the cantilever are IC and AT rated and properly sealed to sheathing. 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Multifamily Air Barrier 01 Multifamily buildings must meet all air sealing requirements for single family buildings listed above. 02 Each dwelling unit must be air sealed to stop air movement from one unit to another. 03 Floor AND Ceiling of each Dwelling Unit: All penetrations through the floor and ceiling of each unit are sealed including, electric and gas utilities, water pipes, drain pipes, fire protection service pipes, communication wiring. 04 Elevator penthouse, mechanical penthouse, stairwell doors, roof access hatch, plumbing stacks sealed to reduce air transfer from attached spaces. 05 Common Walls: Bottom plate between units is sealed to the subfloor. All penetrations in the common walls are sealed including electrical boxes, wiring and plumbing penetrations. Perpendicular Interior walls that open into the common walls are sealed. 06 Vertical Chases for garbage chutes, elevator shafts, and HVAC ducting plumbing must be sealed to the floor and ceiling of each unit to stop air movement up and around the chase due to stack effect. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 5 of 6) Registration Number: 424-P010255225A-001-007-E21001A-E21A Registration Date/Time: 2024-10-23   13:25:19 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 H. Multifamily Air Barrier 07 Vertical Chases such as garbage chutes, elevator shafts, and HVAC ducting plumbing, wiring etc. must be sealed to stop air movement through the chase to the surrounding spaces. 08 Common Hallways - Penetrations between dwelling unit and common hallways are sealed, doors to the dwelling unit are gasketed or made substantially airtight . 09 Verification Status Pass - all applicable requirements are met 10 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. I. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 6 of 6) Registration Number: 424-P010255225A-001-007-E21001A-E21A Registration Date/Time: 2024-10-23   13:25:19 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-007-E22002A-E22A Registration Date/Time: 2024-10-23   13:25:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:52 CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 207) City: La Quinta Zip Code: 92253 For typical vented attics where the insulation is at the roof deck ceiling air barrier must be verified after the ceiling drywall is installed and before attic insulation is installed. If SPF will be used in the attic this can be considered the air barrier. Soffit and chases must still be covered and chimneys and flues require metal flashing. Buildings with a Non vented attic all air sealing requirements appropriate for the roof must be verified. A. Ceiling Inspection - Vented Attics 01 If there is a continuous air barrier at the ceiling level; All opening into walls, drops, chasses, double walls are sealed. Examples are below. 02 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The flashing shall be sealed to the surrounding framing. 03 All penetration through the top plate of interior and exterior walls are sealed. 04 All penetrations shall be sealed to the surrounding drywall or have a secondary air barrier created around the fixture; with the exception of fire sprinklers. 05 All installed recessed light fixtures that penetrate the ceiling to unconditioned space, or where insulation is present, are rated to be Insulation Contact and Air Tight (IC and AT) which allows direct contact with insulation. Housing is sealed to the drywall. 06 Exhaust fan housing is sealed to surrounding drywall and all holes and seams in the housing sealed. 07 All soffits and chases are covered with a hard cover that is sealed to the framing with caulk or foam. 08 Double walls that open to attic are covered and the cover sealed to the framing. 09 Attic Access forms airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical compression using screws, or latches. 10 Knee walls require solid and sealed blocking at the bottom, top left side and right side of the knee wall. When the knee wall is placed on top of a subfloor the open cavity below the subfloor and the ceiling below are sealed. 11 HVAC ducts that travel down a chase the chase are sealed at the ceiling level. 12 HVAC boots that penetrate the ceiling are sealed to the surrounding drywall. 13 All top plates of interior and exterior walls sealed to drywall. 14 Attic access must be surrounded with a dam at least the same depth as the insulation to prevent loss of ceiling insulation. 15 There must be a dam placed at the exterior edge of all kneewalls and all edges of insulation to stop air movement through insulation. 16 Verification Status:Pass - all applicable requirements are met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 2 of 3) Registration Number: 424-P010255225A-001-007-E22002A-E22A Registration Date/Time: 2024-10-23   13:25:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:52 A. Ceiling Inspection - Vented Attics 17 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Roof Inspection - Non-Vented Attics 01 There is a continuous air barrier at the roof deck and gable ends. 02 Chimney and Flue require sheet metal flashing at the roof deck. The flashing is sealed to the chimney or flue with fire rated caulk. The flashing is sealed to the surrounding framing. 03 All penetrations for plumbing, electrical etc in the roof deck and gable ends are sealed. 04 Verification Status:Pass - all applicable requirements are met 05 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. C. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 3 of 3) Registration Number: 424-P010255225A-001-007-E22002A-E22A Registration Date/Time: 2024-10-23   13:25:22 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:52 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-007-E23003A-E23A Registration Date/Time: 2024-10-23   13:25:25 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:52 CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 1 of 7) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 207) City: La Quinta Zip Code: 92253 A. Quality Insulation Installation (QII) Preparation For Insulation 01 Air barrier installation and preparation for insulation was done and verified at framing stage prior to insulation being installed. Where applicable, CF3R-ENV21 and 22 compliance documents have been signed off. 02 All structural framing areas shall be insulated in a manner that resists thermal bridging of the assembly separating conditioned from unconditioned space. Structural bracing, tie-downs, and framing of steel, or specialized framing used to meet structural requirements of the CBC are allowed and must be insulated. These areas shall be called out on the building plans with diagrams and or specific design drawings indicating the R-value of insulation and fastening method to be used. It is recommended that spray foam be used. 03 All insulation was installed to the manufactures insulation installation instructions. 04 Verification Status:Pass - all applicable requirements are met 05 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Quality Of All Installed Insulation 01 Installed insulation R-values is the same or greater than specified on the CF1R. 02 No gaps or voids between the insulation and framing. 03 Gaps between studs shall be filled with insulation. 04 Batt - ensure the ends are cut so there are no gaps. 05 Batt - Insulation is cut around obstructions like electrical boxes and no gaps exist. 06 Batt - insulation is not compressed (no stuffing of the insulation into the cavity. 07 Batt insulation is delaminated around all plumbing and electrical lines in ceilings, walls and floors. 08 An air barrier is installed at all exposed faces of batt, loose fill and SPF insulation. 09 Loose-fill insulation installed to the minimum installed weight per ft 2 per the manufacturer labeled R-value specification. 10 SPF insulation shall be spray-applied to fully adhere to structural assembly framing, floor and ceiling joists, and other framing surfaces within the construction cavity. 11 SPF - with multiple layers applied, each foam lift (i.e. spray application) adheres to the substrate and foam interfaces. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 2 of 7) Registration Number: 424-P010255225A-001-007-E23003A-E23A Registration Date/Time: 2024-10-23   13:25:25 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:52 B. Quality Of All Installed Insulation 12 SPF - if values other than R-5.8 per inch for closed-cell SPF (ccSPF) and R-3.6 per inch for open-cell SPF (ocSPF) are used, the ICC Evaluation Service Report (ESR) number (e.g. ESR-xxxx) will be documented in the CF2R-ENV-03. 13 ccSPF in areas where an air barrier is required the foam is at least 2 inches thick. 14 ocSPF depressions in the foam insulation surface is not greater than 1-inch of the required thickness provided these depressions do not exceed 10 percent of the surface area being insulated. 15 ocSPF insulation completely fills cavities of 2x4 inch framing or less. 16 ocSPF cavities greater than 2x4 inch framing are filled to the thickness that meets the required R-value used for compliance. 17 SPF installed as an air barrier is sprayed at a minimum thickness of 5.5 inches for open cell and 2.0 inches for closed cell. 18 The insulation installer provided a CF2R-ENV-03. Labels or specification/data sheets are attached to the CF2R-ENV-03 for each insulating material. The material datasheet for the installed material meets the performance specifications of the required R-Values. Blown in material also includes insulation material bag labels or coverage charts. 19 Verification Status:Pass - all applicable requirements are met 20 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. C. Ceiling/Roof Insulation Quality 01 Insulation extends to the outside edge of the exterior top plates and is flush against any ventilation dams or baffles. 02 Insulation is in direct contact with ceiling so there are no gaps between the ceiling and the insulation. 03 Chimneys and flues (except for zero clearance) require a sheet metal collar around the stack. The collar must be at least as tall as the depth of the insulation. The collar shall be 1 inch from the chimney or flue for double wall vents, and 6 inches from the chimney/flue for single wall vents unless the manufacturer requires otherwise. The collar must be sealed to the ceiling with high temperature sealant to prevent air leakage. The insulation is in contact with the sheet metal collar. 04 Required eave ventilation shall not be obstructed - the net free-ventilation area of the eave vent is maintained 05 Eave vent baffles are installed to prevent air movement under or into the ceiling insulation 06 Recessed downlights are covered with insulation. If they are not covered to the same depth as required by the CF1R for ceiling insulation then a area weighted calculation is required. Recessed downlights are AT and IC rated. 07 SPF insulation shall not be applied directly to recessed lighting fixtures. Recessed downlights where SPF insulation is installed shall:      (a) be covered with a minimum of 1.5 inches of mineral fiber insulation, or      (b) be enclosed in a box fabricated from 1/4 inch plywood, 18 gauge metal, 3/8 inch hard board or gypboard. Hard board or gypboard does not cause a recessed downlights to meet the zero clearance insulation contact requirements. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 3 of 7) Registration Number: 424-P010255225A-001-007-E23003A-E23A Registration Date/Time: 2024-10-23   13:25:25 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:52 C. Ceiling/Roof Insulation Quality 08 Walkways and mechanical platforms are insulated to the same R-value as required by the CF1R for ceiling insulation. If not, an area weighted calculation is completed and turned in with this compliance document. 09 Soffits, chasses and drop ceiling areas have a sealed hard cover and the insulation is in direct contact with the hard cover. 10 Knee walls - an air dam the full depth of the ceiling insulation is added to the exterior edge of the knee wall so the ceiling insulation overlaps the knee wall to the full depth of the ceiling insulation. 11 Attic access doors are insulated to the same R-value required by the CF1R for roof insulation and the insulation is permanently attached using adhesive or mechanical fasteners. The preferred method is rigid insulation. 12 Attic access forms an airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical compression using screws, or latches. 13 Attic access must have a dam around the access to at least the same depth as the insulation. 14 Insulation batts must be cut to fit around cross bracings and truss webs. 15 Attic rulers appropriate to the material are installed and evenly distributed throughout the attic to verify depth (one ruler for every 250 ft2) The rulers are clearly readable from the attic access and scaled to read inches of insulation and the R-value installed. 16 Loose-fill and SPF insulation - a HERS rater shall measure the installed thickness (including low and high areas) and density of insulation in at least 6 random locations on roof/ceilings and floors to ensure minimum thickness levels and installed density necessary to meet the R-value specified on the Certificate of Compliance, and consistency with the manufacturer coverage chart. 17 Steel-framed knee walls, skylight shafts, and gable ends, external surfaces of steel studs are covered with insulation 18 Verification Status:Pass - all applicable requirements are met 19 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Wall Insulation 01 Batts, loose fill mineral fiber, mineral and natural wool, and cellulose:fills cavity and is in contact with air barrier on six sides. 02 ocSPF:completely fill cavities of 2x4 inch framing or less. Not required to fill cavities greater than 2x4 inch framing unless required to meet R-value. 03 ccSPF:insulation is not required to fill the cavities of framed assemblies unless required to meet R-value. 04 Double walls and bump-outs - insulation fills the cavity, or additional air barrier is installed so the insulation fills the cavity and is in contact with the insulation on all six sides unless SPF is used. Insulation shall be installed on the exterior of the double walls or bump-outs. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 4 of 7) Registration Number: 424-P010255225A-001-007-E23003A-E23A Registration Date/Time: 2024-10-23   13:25:25 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:52 D. Wall Insulation 05 Low expanding foam used around windows and doors, if allowed by the manufacturer. If not allowed fill cavity with insulation. Batts are not allowed to be stuffed into space. 06 Electrical panel in exterior insulated wall the panel is air tight and insulation is installed behind the panel. 07 Skylight shafts and attic knee wall insulation must meet all the requirements for walls and is in contact with the air barrier on six sides unless SPF is used. 08 Skylight shafts and attic kneewalls insulation shall be in full contact with the drywall or other interior wall finish. Batt insulation must be cut to fit around 2x4 framing that are laid flat. 09 Skylight shafts and attic kneewalls shall be completely enclosed by vertical and horizontal framing, including horizontal plates at top and bottom of the insulation. 10 Band/Rim joists are insulated to the same R-value as the wall. 11 Verification Status:Pass - all applicable requirements are met 12 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Raised Floor Insulation Quality 01 Insulation is in full contact with subfloor. 02 Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation. 03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 04 When daylight basements are adjacent to crawlspaces, if the basement is conditioned the walls adjacent to the crawlspace are insulated to the R-value listed on the CF1R. This includes framed stem walls, and vertical concrete retaining walls. 05 If access to the crawlspace is from the conditioned area the raised floor includes an airtight insulated access hatch. Where possible locate crawl space access from the exterior. 06 Verification Status:Pass - all applicable requirements are met 07 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. F. Floor Above Garage Insulation Quality 01 Insulation must be in full contact with subfloor if the air barrier is at the band joist at the garage house wall. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 5 of 7) Registration Number: 424-P010255225A-001-007-E23003A-E23A Registration Date/Time: 2024-10-23   13:25:25 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:52 F. Floor Above Garage Insulation Quality 02 Insulation hangers spaced at 18 inches or less, insulation hangers must not compress insulation. 03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 04 If air barrier is at the perimeter of the garage below the conditioned subfloor then the insulation may be placed on the garage ceiling. Perimeter of subfloor must also be insulated. 05 Verification Status:Pass - all applicable requirements are met 06 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. G. Cantilevered Floor Insulation Quality 01 Insulation is in full contact with cantilevered subfloor. Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation. Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 02 Sealed Blocking shall be installed between joists where the wall rim joist would have been located in the absence of a cantilever. Insulation shall be placed on both sides of this block. 03 Verification Status:Pass - all applicable requirements are met 04 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Attached Porch Roof Insulation Quality 01 Exterior wall at the intersection of the porch roof is fully insulated above, below and behind the roof line. 02 Where truss framing is used, airtight blocking is used at the top and bottom of each wall/roof section and insulated. 03 Verification Status:Pass - all applicable requirements are met 04 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 6 of 7) Registration Number: 424-P010255225A-001-007-E23003A-E23A Registration Date/Time: 2024-10-23   13:25:25 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:52 I. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 7 of 7) Registration Number: 424-P010255225A-001-007-E23003A-E23A Registration Date/Time: 2024-10-23   13:25:25 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:52 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-008-E21001A-E21A Registration Date/Time: 2024-10-23   13:25:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:53 CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 6) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 208) City: La Quinta Zip Code: 92253 A. Air Infiltration And Insulation Installation (Qii) - Framing Stage 01 The requirements below cover the required air sealing and installation of insulation that must occur in the framing stage. 02 An air barrier is required in all thermal envelope assemblies to limit air movement between unconditioned/outside spaces and conditioned/inside spaces and must meet one of the following: 1.Using individual materials that have an air permeance not exceeding 0.004 cfm/ft 2 under pressure differential of 0.3 in w.g. (1.57 psf) (0.02 L/s.m2 at 75 pa) when tested in accordance with ASTM E2178; or •A list of example materials meeting the air permenace testing performance levels of 1 above is available in RA3.5.2 2.Using assemblies of materials and components that have an average air leakage not to exceed 0.04 cfm/ft 2 under a pressure differential of 0.3 in w.g. (1.57 psf) (0.2 L/s.m2 at 75 pa) when tested in accordance with ASTM E2357, ASTM E1677, ASTM E1680 or ASTM E283, or 3.Testing the complete building and demonstrating that the air leakage rate of the building envelope does not exceed 0.4 cfm/ft2 at a pressure differential of 0.3 in w.g. (1.57 psf) (2.0 L/m2 at 75 pa) in accordance with ASTM E779 or an equivalent approved method. 03 Air Barrier Material Installed 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Raised Floor 01 All gaps in the raised floor are sealed. 02 All chases sealed at floor level using a hard cover and the hard covers are sealed. 03 All Plumbing and electrical wires that penetrate the floor are sealed. 04 Subfloor sheathing is glued or sealed at all exterior panel edges, to create a continuous air tight subfloor. 05 Verification Status Pass - all applicable requirements are met 06 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 2 of 6) Registration Number: 424-P010255225A-001-008-E21001A-E21A Registration Date/Time: 2024-10-23   13:25:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:53 C. Walls/Knee Walls 01 All penetrations through the exterior wall air barrier are sealed to provide an air-tight envelope to unconditioned spaces such as the outdoors, attic, garage and crawl space. 02 Exterior wall air barrier is sealed to the top plate and bottom plate in each stud bay. 03 All electrical boxes including knockouts that penetrate the air barrier to unconditioned space are sealed. 04 All openings in top and bottom plate, including all interior and exterior walls, to unconditioned space are sealed. Such as holes drilled for electrical and plumbing. 05 Exterior bottom plates (all stories) are sealed to the floor using the appropriate sealing method. 06 All gaps around windows and doors are sealed. Proper sealant used was specified by window manufacturer. 07 Rim Joists all gaps and openings fully sealed. 08 Fan exhaust ducts that run between conditioned floors to exterior walls have a damper at the exterior wall. 09 Metal tie downs are insulated between exterior framing and tie down. 10 Insulation is installed in hard to access wall stud cavities, such as corner channels, wall intersections are insulated to the proper R-value prior to exterior sheathing, or the exterior stucco lath. 11 Insulation is installed behind tub, shower, fireplace enclosures, and exterior stairwells to the R-value listed on the CF1R when located against exterior walls. Insulation is required to be installed before tub, shower, and fireplace are installed. 12 A solid air barrier is installed on the interior wall from floor to ceiling tub, shower, and fireplace enclosures are installed in exterior walls. Insulation in contact on all six sides of air barrier on exterior walls. 13 All single-member window and door headers shall be insulated to a minimum of R-3 for a 2x4 framing, or equivalent width, and a minimum of R-5 for all other assemblies. Insulation is to be placed between the interior face of the header and inside surface of the interior wall finish. If continuous exterior rigid insulation is used an insulated header is not required. No header insulation is required for single-member headers that are the same width as the wall, so long as the entire wall has at least R-2 insulation. 14 Knee walls have solid and sealed blocking at the bottom, top, left side and right side of the knee wall. 15 Verification Status Pass - all applicable requirements are met 16 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Ceiling/Attic 01 For vented attics much of the ceiling air barrier is verified after the ceiling drywall is installed using the ENV-22. 02 For non-vented attics ensure all penetrations through the roof deck and gable ends are sealed and air tight. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 3 of 6) Registration Number: 424-P010255225A-001-008-E21001A-E21A Registration Date/Time: 2024-10-23   13:25:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:53 D. Ceiling/Attic 03 All eave vents are covered with a rigid ventilation baffle that maintains the Net free-ventilation area. 04 All dropped ceilings and soffits are covered with hard covers and sealed to framing. 05 All chases are covered with hard covers and sealed to framing. 06 HVAC ducts that travel down a chase the chase is sealed at the ceiling level. 07 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The flashing shall be sealed to the surrounding framing. 08 All Eave/soffit baffles are installed to stop air movement around the baffle and into insulation. Net free-ventilation of the eave/soffit shall be maintained. 09 Double walls that open to attic are covered with an air barrier and cover has an air tight seal to the framing. 10 Verification Status Pass - all applicable requirements are met 11 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Conditioned Space Above Or Adjacent To Garage Air Barrier 01 All penetrations in the subfloor above the garage into conditioned space must follow the raised floor air barrier requirements above. 02 Infiltration between the space above the garage and subfloor is prevented by one of the following methods: •Seal all edges of garage ceiling (typically drywall) at the perimeter of the garage to create a continuous air tight surface between the garage and adjacent conditioned envelope. Seal all plumbing, electric and mechanical penetrations between the garage and the adjacent conditioned space. For an open-web truss, airtight blocking is added on four sides of the garage perimeter. Insulation can be placed on the garage ceiling. •Seal band joist above the wall at the garage to conditioned space transition. Seal all subfloor seams and penetrations between the conditioned space and the garage. Insulation must be placed in contact of subfloor below conditioned space. 03 Verification Status Pass - all applicable requirements are met 04 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. F. Walls For Attached Porch, Attic, Double Wall 01 All walls that separate conditioned and unconditioned space includes a continuous air barrier on the interior and exterior wall. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 4 of 6) Registration Number: 424-P010255225A-001-008-E21001A-E21A Registration Date/Time: 2024-10-23   13:25:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:53 F. Walls For Attached Porch, Attic, Double Wall 02 Exterior wall, air barrier required at the intersection of the porch and exterior wall when there is conditioned space on the other side. The exterior wall where the attic attaches to the conditioned space does includes an air barrier. 03 Truss framing blocking is used at the top and bottom of each wall/roof section. 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. G. Cantilevered Floor Air Barrier 01 Airtight blocking is installed between joists where the wall rim joist would have been located in the absence of a cantilever. 02 Exterior sheathing is installed to the bottom of the cantilever so that there is a continuous air and weather barrier for the cantilever. The cantilevered joist must be insulated to the same R value as would be required for the subfloor prior to closing. 03 Any gaps, cracks or penetrations in the air barrier of the cantilever are sealed. Can lights in the cantilever are IC and AT rated and properly sealed to sheathing. 04 Verification Status Pass - all applicable requirements are met 05 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Multifamily Air Barrier 01 Multifamily buildings must meet all air sealing requirements for single family buildings listed above. 02 Each dwelling unit must be air sealed to stop air movement from one unit to another. 03 Floor AND Ceiling of each Dwelling Unit: All penetrations through the floor and ceiling of each unit are sealed including, electric and gas utilities, water pipes, drain pipes, fire protection service pipes, communication wiring. 04 Elevator penthouse, mechanical penthouse, stairwell doors, roof access hatch, plumbing stacks sealed to reduce air transfer from attached spaces. 05 Common Walls: Bottom plate between units is sealed to the subfloor. All penetrations in the common walls are sealed including electrical boxes, wiring and plumbing penetrations. Perpendicular Interior walls that open into the common walls are sealed. 06 Vertical Chases for garbage chutes, elevator shafts, and HVAC ducting plumbing must be sealed to the floor and ceiling of each unit to stop air movement up and around the chase due to stack effect. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 5 of 6) Registration Number: 424-P010255225A-001-008-E21001A-E21A Registration Date/Time: 2024-10-23   13:25:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:53 H. Multifamily Air Barrier 07 Vertical Chases such as garbage chutes, elevator shafts, and HVAC ducting plumbing, wiring etc. must be sealed to stop air movement through the chase to the surrounding spaces. 08 Common Hallways - Penetrations between dwelling unit and common hallways are sealed, doors to the dwelling unit are gasketed or made substantially airtight . 09 Verification Status Pass - all applicable requirements are met 10 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. I. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-21-H Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 6 of 6) Registration Number: 424-P010255225A-001-008-E21001A-E21A Registration Date/Time: 2024-10-23   13:25:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:53 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-008-E22002A-E22A Registration Date/Time: 2024-10-23   13:25:44 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:55 CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 208) City: La Quinta Zip Code: 92253 For typical vented attics where the insulation is at the roof deck ceiling air barrier must be verified after the ceiling drywall is installed and before attic insulation is installed. If SPF will be used in the attic this can be considered the air barrier. Soffit and chases must still be covered and chimneys and flues require metal flashing. Buildings with a Non vented attic all air sealing requirements appropriate for the roof must be verified. A. Ceiling Inspection - Vented Attics 01 If there is a continuous air barrier at the ceiling level; All opening into walls, drops, chasses, double walls are sealed. Examples are below. 02 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The flashing shall be sealed to the surrounding framing. 03 All penetration through the top plate of interior and exterior walls are sealed. 04 All penetrations shall be sealed to the surrounding drywall or have a secondary air barrier created around the fixture; with the exception of fire sprinklers. 05 All installed recessed light fixtures that penetrate the ceiling to unconditioned space, or where insulation is present, are rated to be Insulation Contact and Air Tight (IC and AT) which allows direct contact with insulation. Housing is sealed to the drywall. 06 Exhaust fan housing is sealed to surrounding drywall and all holes and seams in the housing sealed. 07 All soffits and chases are covered with a hard cover that is sealed to the framing with caulk or foam. 08 Double walls that open to attic are covered and the cover sealed to the framing. 09 Attic Access forms airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical compression using screws, or latches. 10 Knee walls require solid and sealed blocking at the bottom, top left side and right side of the knee wall. When the knee wall is placed on top of a subfloor the open cavity below the subfloor and the ceiling below are sealed. 11 HVAC ducts that travel down a chase the chase are sealed at the ceiling level. 12 HVAC boots that penetrate the ceiling are sealed to the surrounding drywall. 13 All top plates of interior and exterior walls sealed to drywall. 14 Attic access must be surrounded with a dam at least the same depth as the insulation to prevent loss of ceiling insulation. 15 There must be a dam placed at the exterior edge of all kneewalls and all edges of insulation to stop air movement through insulation. 16 Verification Status:Pass - all applicable requirements are met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 2 of 3) Registration Number: 424-P010255225A-001-008-E22002A-E22A Registration Date/Time: 2024-10-23   13:25:44 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:55 A. Ceiling Inspection - Vented Attics 17 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Roof Inspection - Non-Vented Attics 01 There is a continuous air barrier at the roof deck and gable ends. 02 Chimney and Flue require sheet metal flashing at the roof deck. The flashing is sealed to the chimney or flue with fire rated caulk. The flashing is sealed to the surrounding framing. 03 All penetrations for plumbing, electrical etc in the roof deck and gable ends are sealed. 04 Verification Status:Pass - all applicable requirements are met 05 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. C. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-22-H Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 3 of 3) Registration Number: 424-P010255225A-001-008-E22002A-E22A Registration Date/Time: 2024-10-23   13:25:44 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:55 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-008-E23003A-E23A Registration Date/Time: 2024-10-23   13:25:48 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:55 CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 1 of 7) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 208) City: La Quinta Zip Code: 92253 A. Quality Insulation Installation (QII) Preparation For Insulation 01 Air barrier installation and preparation for insulation was done and verified at framing stage prior to insulation being installed. Where applicable, CF3R-ENV21 and 22 compliance documents have been signed off. 02 All structural framing areas shall be insulated in a manner that resists thermal bridging of the assembly separating conditioned from unconditioned space. Structural bracing, tie-downs, and framing of steel, or specialized framing used to meet structural requirements of the CBC are allowed and must be insulated. These areas shall be called out on the building plans with diagrams and or specific design drawings indicating the R-value of insulation and fastening method to be used. It is recommended that spray foam be used. 03 All insulation was installed to the manufactures insulation installation instructions. 04 Verification Status:Pass - all applicable requirements are met 05 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. B. Quality Of All Installed Insulation 01 Installed insulation R-values is the same or greater than specified on the CF1R. 02 No gaps or voids between the insulation and framing. 03 Gaps between studs shall be filled with insulation. 04 Batt - ensure the ends are cut so there are no gaps. 05 Batt - Insulation is cut around obstructions like electrical boxes and no gaps exist. 06 Batt - insulation is not compressed (no stuffing of the insulation into the cavity. 07 Batt insulation is delaminated around all plumbing and electrical lines in ceilings, walls and floors. 08 An air barrier is installed at all exposed faces of batt, loose fill and SPF insulation. 09 Loose-fill insulation installed to the minimum installed weight per ft 2 per the manufacturer labeled R-value specification. 10 SPF insulation shall be spray-applied to fully adhere to structural assembly framing, floor and ceiling joists, and other framing surfaces within the construction cavity. 11 SPF - with multiple layers applied, each foam lift (i.e. spray application) adheres to the substrate and foam interfaces. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 2 of 7) Registration Number: 424-P010255225A-001-008-E23003A-E23A Registration Date/Time: 2024-10-23   13:25:48 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:55 B. Quality Of All Installed Insulation 12 SPF - if values other than R-5.8 per inch for closed-cell SPF (ccSPF) and R-3.6 per inch for open-cell SPF (ocSPF) are used, the ICC Evaluation Service Report (ESR) number (e.g. ESR-xxxx) will be documented in the CF2R-ENV-03. 13 ccSPF in areas where an air barrier is required the foam is at least 2 inches thick. 14 ocSPF depressions in the foam insulation surface is not greater than 1-inch of the required thickness provided these depressions do not exceed 10 percent of the surface area being insulated. 15 ocSPF insulation completely fills cavities of 2x4 inch framing or less. 16 ocSPF cavities greater than 2x4 inch framing are filled to the thickness that meets the required R-value used for compliance. 17 SPF installed as an air barrier is sprayed at a minimum thickness of 5.5 inches for open cell and 2.0 inches for closed cell. 18 The insulation installer provided a CF2R-ENV-03. Labels or specification/data sheets are attached to the CF2R-ENV-03 for each insulating material. The material datasheet for the installed material meets the performance specifications of the required R-Values. Blown in material also includes insulation material bag labels or coverage charts. 19 Verification Status:Pass - all applicable requirements are met 20 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. C. Ceiling/Roof Insulation Quality 01 Insulation extends to the outside edge of the exterior top plates and is flush against any ventilation dams or baffles. 02 Insulation is in direct contact with ceiling so there are no gaps between the ceiling and the insulation. 03 Chimneys and flues (except for zero clearance) require a sheet metal collar around the stack. The collar must be at least as tall as the depth of the insulation. The collar shall be 1 inch from the chimney or flue for double wall vents, and 6 inches from the chimney/flue for single wall vents unless the manufacturer requires otherwise. The collar must be sealed to the ceiling with high temperature sealant to prevent air leakage. The insulation is in contact with the sheet metal collar. 04 Required eave ventilation shall not be obstructed - the net free-ventilation area of the eave vent is maintained 05 Eave vent baffles are installed to prevent air movement under or into the ceiling insulation 06 Recessed downlights are covered with insulation. If they are not covered to the same depth as required by the CF1R for ceiling insulation then a area weighted calculation is required. Recessed downlights are AT and IC rated. 07 SPF insulation shall not be applied directly to recessed lighting fixtures. Recessed downlights where SPF insulation is installed shall:      (a) be covered with a minimum of 1.5 inches of mineral fiber insulation, or      (b) be enclosed in a box fabricated from 1/4 inch plywood, 18 gauge metal, 3/8 inch hard board or gypboard. Hard board or gypboard does not cause a recessed downlights to meet the zero clearance insulation contact requirements. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 3 of 7) Registration Number: 424-P010255225A-001-008-E23003A-E23A Registration Date/Time: 2024-10-23   13:25:48 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:55 C. Ceiling/Roof Insulation Quality 08 Walkways and mechanical platforms are insulated to the same R-value as required by the CF1R for ceiling insulation. If not, an area weighted calculation is completed and turned in with this compliance document. 09 Soffits, chasses and drop ceiling areas have a sealed hard cover and the insulation is in direct contact with the hard cover. 10 Knee walls - an air dam the full depth of the ceiling insulation is added to the exterior edge of the knee wall so the ceiling insulation overlaps the knee wall to the full depth of the ceiling insulation. 11 Attic access doors are insulated to the same R-value required by the CF1R for roof insulation and the insulation is permanently attached using adhesive or mechanical fasteners. The preferred method is rigid insulation. 12 Attic access forms an airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical compression using screws, or latches. 13 Attic access must have a dam around the access to at least the same depth as the insulation. 14 Insulation batts must be cut to fit around cross bracings and truss webs. 15 Attic rulers appropriate to the material are installed and evenly distributed throughout the attic to verify depth (one ruler for every 250 ft2) The rulers are clearly readable from the attic access and scaled to read inches of insulation and the R-value installed. 16 Loose-fill and SPF insulation - a HERS rater shall measure the installed thickness (including low and high areas) and density of insulation in at least 6 random locations on roof/ceilings and floors to ensure minimum thickness levels and installed density necessary to meet the R-value specified on the Certificate of Compliance, and consistency with the manufacturer coverage chart. 17 Steel-framed knee walls, skylight shafts, and gable ends, external surfaces of steel studs are covered with insulation 18 Verification Status:Pass - all applicable requirements are met 19 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Wall Insulation 01 Batts, loose fill mineral fiber, mineral and natural wool, and cellulose:fills cavity and is in contact with air barrier on six sides. 02 ocSPF:completely fill cavities of 2x4 inch framing or less. Not required to fill cavities greater than 2x4 inch framing unless required to meet R-value. 03 ccSPF:insulation is not required to fill the cavities of framed assemblies unless required to meet R-value. 04 Double walls and bump-outs - insulation fills the cavity, or additional air barrier is installed so the insulation fills the cavity and is in contact with the insulation on all six sides unless SPF is used. Insulation shall be installed on the exterior of the double walls or bump-outs. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 4 of 7) Registration Number: 424-P010255225A-001-008-E23003A-E23A Registration Date/Time: 2024-10-23   13:25:48 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:55 D. Wall Insulation 05 Low expanding foam used around windows and doors, if allowed by the manufacturer. If not allowed fill cavity with insulation. Batts are not allowed to be stuffed into space. 06 Electrical panel in exterior insulated wall the panel is air tight and insulation is installed behind the panel. 07 Skylight shafts and attic knee wall insulation must meet all the requirements for walls and is in contact with the air barrier on six sides unless SPF is used. 08 Skylight shafts and attic kneewalls insulation shall be in full contact with the drywall or other interior wall finish. Batt insulation must be cut to fit around 2x4 framing that are laid flat. 09 Skylight shafts and attic kneewalls shall be completely enclosed by vertical and horizontal framing, including horizontal plates at top and bottom of the insulation. 10 Band/Rim joists are insulated to the same R-value as the wall. 11 Verification Status:Pass - all applicable requirements are met 12 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Raised Floor Insulation Quality 01 Insulation is in full contact with subfloor. 02 Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation. 03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 04 When daylight basements are adjacent to crawlspaces, if the basement is conditioned the walls adjacent to the crawlspace are insulated to the R-value listed on the CF1R. This includes framed stem walls, and vertical concrete retaining walls. 05 If access to the crawlspace is from the conditioned area the raised floor includes an airtight insulated access hatch. Where possible locate crawl space access from the exterior. 06 Verification Status:Pass - all applicable requirements are met 07 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. F. Floor Above Garage Insulation Quality 01 Insulation must be in full contact with subfloor if the air barrier is at the band joist at the garage house wall. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 5 of 7) Registration Number: 424-P010255225A-001-008-E23003A-E23A Registration Date/Time: 2024-10-23   13:25:48 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:55 F. Floor Above Garage Insulation Quality 02 Insulation hangers spaced at 18 inches or less, insulation hangers must not compress insulation. 03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 04 If air barrier is at the perimeter of the garage below the conditioned subfloor then the insulation may be placed on the garage ceiling. Perimeter of subfloor must also be insulated. 05 Verification Status:Pass - all applicable requirements are met 06 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. G. Cantilevered Floor Insulation Quality 01 Insulation is in full contact with cantilevered subfloor. Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation. Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor. 02 Sealed Blocking shall be installed between joists where the wall rim joist would have been located in the absence of a cantilever. Insulation shall be placed on both sides of this block. 03 Verification Status:Pass - all applicable requirements are met 04 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Attached Porch Roof Insulation Quality 01 Exterior wall at the intersection of the porch roof is fully insulated above, below and behind the roof line. 02 Where truss framing is used, airtight blocking is used at the top and bottom of each wall/roof section and insulated. 03 Verification Status:Pass - all applicable requirements are met 04 Correction Notes: The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 6 of 7) Registration Number: 424-P010255225A-001-008-E23003A-E23A Registration Date/Time: 2024-10-23   13:25:48 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:55 I. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-ENV-23-H Quality Insulation Installation (QII) Insulation Installation (Page 7 of 7) Registration Number: 424-P010255225A-001-008-E23003A-E23A Registration Date/Time: 2024-10-23   13:25:48 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:55 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-001-M27005A-M27A Registration Date/Time: 2024-10-23   13:21:39 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:34 CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 105) City: La Quinta Zip Code: 92253 Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010. A. Dwelling Mechanical Ventilation - General Information 01 Dwelling unit name DwellingUnit 105 02 Building Type Single family 03 Project scope Newly constructed building 04 Total Conditioned Floor Area of Dwelling Unit (For addition projects the conditioned floor area equals existing area plus addition area. ) 931 05 Number of bedrooms in dwelling unit (For addition projects the number of bedrooms equals the existing bedrooms plus addition bedrooms) 2 06 Ventilation Operation Schedule Continuous 07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1) 08 Whole Building Ventilation System Type Standalone - Balanced 09 IAQ Fan Location MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with outdoor air each hour at no less than the rate in equation 4.1a. 01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81 02 Installed Continuous Whole-Building Ventilation Rate 136 C. Compliance Statement 01 Building passes continuous whole-building ventilation rate test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 2 of 3) Registration Number: 424-P010255225A-001-001-M27005A-M27A Registration Date/Time: 2024-10-23   13:21:39 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:34 D. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 3 of 3) Registration Number: 424-P010255225A-001-001-M27005A-M27A Registration Date/Time: 2024-10-23   13:21:39 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:34 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-001-M20006A-M20A Registration Date/Time: 2024-10-23   13:21:42 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:34 CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 105) City: La Quinta Zip Code: 92253 A. System Information 01 Space Conditioning System Identification or Name UNIT 105 HVACSys 02 Space Conditioning System Location or Area Served Main 03 Building Type from CF-1R Multi-family 04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from CF1R? No, credit is not taken 05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit from CF1R? No, credit is not taken 06 Duct System Compliance Category New MCH-20a - Completely New Duct System B. Duct Leakage Diagnostic Test 01 Condenser Nominal Cooling Capacity (ton)3 02 Heating Capacity (kBtu/h)36 03 Conditioned Floor Area served by this HVAC system (ft2)931 04 Duct Leakage Test Conditions Test final 05 Duct Leakage Test Method Total leakage 06 Leakage Factor 0.12 07 Air Handling Unit Airflow (AHUAirflow) Determination Method Cooling system method 08 Measured AHUAirflow This field or section is not applicable 09 Calculated Target Allowable Duct Leakage (cfm)144 10 Actual Duct Leakage Rate from Leakage Test Measurement (cfm) 59.5 11 Compliance Statement System passes leakage test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 2 of 3) Registration Number: 424-P010255225A-001-001-M20006A-M20A Registration Date/Time: 2024-10-23   13:21:42 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:34 B. Duct Leakage Diagnostic Test 12 Notes  C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. 02 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 All supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in). After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed 07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed. 08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. 09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used. 10 Verification Status:Pass 11 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 3 of 3) Registration Number: 424-P010255225A-001-001-M20006A-M20A Registration Date/Time: 2024-10-23   13:21:42 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:34 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-001-M23007A-M23A Registration Date/Time: 2024-10-23   13:21:44 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:35 CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 1 of 4) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 105) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 105 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus ALNOR 03 Model number of Airflow Measurement Apparatus EBT731 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas /index.html NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 2 of 4) Registration Number: 424-P010255225A-001-001-M23007A-M23A Registration Date/Time: 2024-10-23   13:21:44 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:35 MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1050 03 Actual System Airflow Rate Measurement (cfm)1108 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Verification. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Verification was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 09 Verification Status:Pass - all applicable requirements are met 10 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 3 of 4) Registration Number: 424-P010255225A-001-001-M23007A-M23A Registration Date/Time: 2024-10-23   13:21:44 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:35 F. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 4 of 4) Registration Number: 424-P010255225A-001-001-M23007A-M23A Registration Date/Time: 2024-10-23   13:21:44 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:35 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-001-M22008A-M22A Registration Date/Time: 2024-10-23   13:21:47 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:35 CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 105) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 105 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable watt meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 642.64 02 Actual Tested Airflow from MCH-23 (cfm)1108 03 Required Fan Efficacy (watts/cfm)0.58 04 Actual Fan Efficacy (watts/cfm)0.58 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 2 of 3) Registration Number: 424-P010255225A-001-001-M22008A-M22A Registration Date/Time: 2024-10-23   13:21:47 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:35 C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 05 Compliance Statement:System fan efficacy complies D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. 07 Verification Status Pass - all applicable requirements are met 08 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 3 of 3) Registration Number: 424-P010255225A-001-001-M22008A-M22A Registration Date/Time: 2024-10-23   13:21:47 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:35 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-001-M26009A-M26A Registration Date/Time: 2024-10-23   13:21:51 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:35 CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 1 of 4) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 105) City: La Quinta Zip Code: 92253 A. System Information Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system requiring verification must use a separate form. 01 System Name or Identification/Tag UNIT 105 HVACSys 02 System Location or Area Served Main 03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required 04 Directory used to certify product performance AHRI 05 AHRI certification number for the installed space conditioning system from http://www.ahridirectory.org 208650564 06 Does the directory used to certify product performance require a specific air handler/furnace make and model? Yes 07 Does the directory used to certify product performance require a time delay relay (+TDR)? Yes 08 Does the directory used to certify product performance require a TXV (+TXV)? Yes B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Data from Nameplate of Installed System Component Data from the Directory Used to Certify the Rated System Component Outdoor Condenser or Package Unit - Installed Manufacturer Name 01 RHEEM 02 RHEEM Outdoor Condenser or Package Unit - Installed Model Number 03 RHPAZR036JT000NA 04 RHPAZR036JT000NA Inside Coil - Installed Manufacturer Name 05 06 This field or section is not applicable Inside Coil - Installed Model Number 07 08 This field or section is not applicable Air Handler/Furnace - Installed Manufacturer Name 09 10 RHEEM NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 2 of 4) Registration Number: 424-P010255225A-001-001-M26009A-M26A Registration Date/Time: 2024-10-23   13:21:51 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:35 B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Air Handler/Furnace - Installed Model Number 11 12 RHPAZR036AJT C. Verified Cooling System SEER 01 Required minimum SEER 15 02 Installed SEER 15 03 Compliance Statement:System passes SEER verification Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed on the CF2R. D. Verified Cooling System EER This section does not apply to this project. E. Verified Cooling System Air Handler/Furnace 01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory. 02 Verification Status:Pass - all applicable requirements are met 03 Correction Notes: F. Verified Cooling System Time Delay Relay 01 If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of RA3.4.3. 02 Verification Status:Pass - all applicable requirements are met 03 Correction Notes: G. Verified Cooling System TXV 01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb 02 Verification Status:Pass - all applicable requirements are met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 3 of 4) Registration Number: 424-P010255225A-001-001-M26009A-M26A Registration Date/Time: 2024-10-23   13:21:51 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:35 G. Verified Cooling System TXV 03 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 4 of 4) Registration Number: 424-P010255225A-001-001-M26009A-M26A Registration Date/Time: 2024-10-23   13:21:51 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:35 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-002-M27005A-M27A Registration Date/Time: 2024-10-23   13:21:56 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:36 CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 106) City: La Quinta Zip Code: 92253 Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010. A. Dwelling Mechanical Ventilation - General Information 01 Dwelling unit name DwellingUnit 106 02 Building Type Single family 03 Project scope Newly constructed building 04 Total Conditioned Floor Area of Dwelling Unit (For addition projects the conditioned floor area equals existing area plus addition area. ) 931 05 Number of bedrooms in dwelling unit (For addition projects the number of bedrooms equals the existing bedrooms plus addition bedrooms) 2 06 Ventilation Operation Schedule Continuous 07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1) 08 Whole Building Ventilation System Type Standalone - Balanced 09 IAQ Fan Location MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with outdoor air each hour at no less than the rate in equation 4.1a. 01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81 02 Installed Continuous Whole-Building Ventilation Rate 138 C. Compliance Statement 01 Building passes continuous whole-building ventilation rate test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 2 of 3) Registration Number: 424-P010255225A-001-002-M27005A-M27A Registration Date/Time: 2024-10-23   13:21:56 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:36 D. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 3 of 3) Registration Number: 424-P010255225A-001-002-M27005A-M27A Registration Date/Time: 2024-10-23   13:21:56 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:36 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-002-M20006A-M20A Registration Date/Time: 2024-10-23   13:22:02 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:36 CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 106) City: La Quinta Zip Code: 92253 A. System Information 01 Space Conditioning System Identification or Name UNIT 106 HVACSys 02 Space Conditioning System Location or Area Served Main 03 Building Type from CF-1R Multi-family 04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from CF1R? No, credit is not taken 05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit from CF1R? No, credit is not taken 06 Duct System Compliance Category New MCH-20a - Completely New Duct System B. Duct Leakage Diagnostic Test 01 Condenser Nominal Cooling Capacity (ton)3 02 Heating Capacity (kBtu/h)36 03 Conditioned Floor Area served by this HVAC system (ft2)931 04 Duct Leakage Test Conditions Test final 05 Duct Leakage Test Method Total leakage 06 Leakage Factor 0.12 07 Air Handling Unit Airflow (AHUAirflow) Determination Method Cooling system method 08 Measured AHUAirflow This field or section is not applicable 09 Calculated Target Allowable Duct Leakage (cfm)144 10 Actual Duct Leakage Rate from Leakage Test Measurement (cfm) 68.6 11 Compliance Statement System passes leakage test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 2 of 3) Registration Number: 424-P010255225A-001-002-M20006A-M20A Registration Date/Time: 2024-10-23   13:22:02 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:36 B. Duct Leakage Diagnostic Test 12 Notes  C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. 02 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 All supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in). After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed 07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed. 08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. 09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used. 10 Verification Status:Pass 11 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 3 of 3) Registration Number: 424-P010255225A-001-002-M20006A-M20A Registration Date/Time: 2024-10-23   13:22:02 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:36 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-002-M23007A-M23A Registration Date/Time: 2024-10-23   13:22:07 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:36 CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 1 of 4) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 106) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 106 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus ALNOR 03 Model number of Airflow Measurement Apparatus EBT731 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas /index.html NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 2 of 4) Registration Number: 424-P010255225A-001-002-M23007A-M23A Registration Date/Time: 2024-10-23   13:22:07 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:36 MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1050 03 Actual System Airflow Rate Measurement (cfm)1077 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Verification. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Verification was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 09 Verification Status:Pass - all applicable requirements are met 10 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 3 of 4) Registration Number: 424-P010255225A-001-002-M23007A-M23A Registration Date/Time: 2024-10-23   13:22:07 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:36 F. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 4 of 4) Registration Number: 424-P010255225A-001-002-M23007A-M23A Registration Date/Time: 2024-10-23   13:22:07 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:36 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-002-M22008A-M22A Registration Date/Time: 2024-10-23   13:22:12 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:36 CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 106) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 106 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable watt meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 624.66 02 Actual Tested Airflow from MCH-23 (cfm)1077 03 Required Fan Efficacy (watts/cfm)0.58 04 Actual Fan Efficacy (watts/cfm)0.58 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 2 of 3) Registration Number: 424-P010255225A-001-002-M22008A-M22A Registration Date/Time: 2024-10-23   13:22:12 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:36 C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 05 Compliance Statement:System fan efficacy complies D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. 07 Verification Status Pass - all applicable requirements are met 08 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 3 of 3) Registration Number: 424-P010255225A-001-002-M22008A-M22A Registration Date/Time: 2024-10-23   13:22:12 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:36 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-002-M26009A-M26A Registration Date/Time: 2024-10-23   13:22:15 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:36 CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 1 of 4) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 106) City: La Quinta Zip Code: 92253 A. System Information Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system requiring verification must use a separate form. 01 System Name or Identification/Tag UNIT 106 HVACSys 02 System Location or Area Served Main 03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required 04 Directory used to certify product performance AHRI 05 AHRI certification number for the installed space conditioning system from http://www.ahridirectory.org 208650564 06 Does the directory used to certify product performance require a specific air handler/furnace make and model? Yes 07 Does the directory used to certify product performance require a time delay relay (+TDR)? Yes 08 Does the directory used to certify product performance require a TXV (+TXV)? Yes B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Data from Nameplate of Installed System Component Data from the Directory Used to Certify the Rated System Component Outdoor Condenser or Package Unit - Installed Manufacturer Name 01 RHEEM 02 RHEEM Outdoor Condenser or Package Unit - Installed Model Number 03 RHPAZR036JT000NA 04 RHPAZR036JT000NA Inside Coil - Installed Manufacturer Name 05 06 This field or section is not applicable Inside Coil - Installed Model Number 07 08 This field or section is not applicable Air Handler/Furnace - Installed Manufacturer Name 09 10 RHEEM NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 2 of 4) Registration Number: 424-P010255225A-001-002-M26009A-M26A Registration Date/Time: 2024-10-23   13:22:15 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:36 B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Air Handler/Furnace - Installed Model Number 11 12 RHPAZR036AJT C. Verified Cooling System SEER 01 Required minimum SEER 15 02 Installed SEER 15 03 Compliance Statement:System passes SEER verification Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed on the CF2R. D. Verified Cooling System EER This section does not apply to this project. E. Verified Cooling System Air Handler/Furnace 01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory. 02 Verification Status:Pass - all applicable requirements are met 03 Correction Notes: F. Verified Cooling System Time Delay Relay 01 If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of RA3.4.3. 02 Verification Status:Pass - all applicable requirements are met 03 Correction Notes: G. Verified Cooling System TXV 01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb 02 Verification Status:Pass - all applicable requirements are met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 3 of 4) Registration Number: 424-P010255225A-001-002-M26009A-M26A Registration Date/Time: 2024-10-23   13:22:15 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:36 G. Verified Cooling System TXV 03 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 4 of 4) Registration Number: 424-P010255225A-001-002-M26009A-M26A Registration Date/Time: 2024-10-23   13:22:15 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:36 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-003-M27005A-M27A Registration Date/Time: 2024-10-23   13:22:34 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:38 CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 107) City: La Quinta Zip Code: 92253 Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010. A. Dwelling Mechanical Ventilation - General Information 01 Dwelling unit name DwellingUnit 107 02 Building Type Single family 03 Project scope Newly constructed building 04 Total Conditioned Floor Area of Dwelling Unit (For addition projects the conditioned floor area equals existing area plus addition area. ) 931 05 Number of bedrooms in dwelling unit (For addition projects the number of bedrooms equals the existing bedrooms plus addition bedrooms) 2 06 Ventilation Operation Schedule Continuous 07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1) 08 Whole Building Ventilation System Type Standalone - Balanced 09 IAQ Fan Location MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with outdoor air each hour at no less than the rate in equation 4.1a. 01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81 02 Installed Continuous Whole-Building Ventilation Rate 178 C. Compliance Statement 01 Building passes continuous whole-building ventilation rate test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 2 of 3) Registration Number: 424-P010255225A-001-003-M27005A-M27A Registration Date/Time: 2024-10-23   13:22:34 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:38 D. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 3 of 3) Registration Number: 424-P010255225A-001-003-M27005A-M27A Registration Date/Time: 2024-10-23   13:22:34 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:38 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-003-M20006A-M20A Registration Date/Time: 2024-10-23   13:22:37 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:39 CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 107) City: La Quinta Zip Code: 92253 A. System Information 01 Space Conditioning System Identification or Name UNIT 107 HVACSys 02 Space Conditioning System Location or Area Served Main 03 Building Type from CF-1R Multi-family 04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from CF1R? No, credit is not taken 05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit from CF1R? No, credit is not taken 06 Duct System Compliance Category New MCH-20a - Completely New Duct System B. Duct Leakage Diagnostic Test 01 Condenser Nominal Cooling Capacity (ton)3 02 Heating Capacity (kBtu/h)36 03 Conditioned Floor Area served by this HVAC system (ft2)931 04 Duct Leakage Test Conditions Test final 05 Duct Leakage Test Method Total leakage 06 Leakage Factor 0.12 07 Air Handling Unit Airflow (AHUAirflow) Determination Method Cooling system method 08 Measured AHUAirflow This field or section is not applicable 09 Calculated Target Allowable Duct Leakage (cfm)144 10 Actual Duct Leakage Rate from Leakage Test Measurement (cfm) 56.6 11 Compliance Statement System passes leakage test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 2 of 3) Registration Number: 424-P010255225A-001-003-M20006A-M20A Registration Date/Time: 2024-10-23   13:22:37 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:39 B. Duct Leakage Diagnostic Test 12 Notes  C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. 02 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 All supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in). After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed 07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed. 08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. 09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used. 10 Verification Status:Pass 11 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 3 of 3) Registration Number: 424-P010255225A-001-003-M20006A-M20A Registration Date/Time: 2024-10-23   13:22:37 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:39 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-003-M23007A-M23A Registration Date/Time: 2024-10-23   13:22:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:39 CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 1 of 4) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 107) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 107 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus ALNOR 03 Model number of Airflow Measurement Apparatus EBT731 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas /index.html NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 2 of 4) Registration Number: 424-P010255225A-001-003-M23007A-M23A Registration Date/Time: 2024-10-23   13:22:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:39 MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1050 03 Actual System Airflow Rate Measurement (cfm)1136 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Verification. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Verification was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 09 Verification Status:Pass - all applicable requirements are met 10 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 3 of 4) Registration Number: 424-P010255225A-001-003-M23007A-M23A Registration Date/Time: 2024-10-23   13:22:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:39 F. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 4 of 4) Registration Number: 424-P010255225A-001-003-M23007A-M23A Registration Date/Time: 2024-10-23   13:22:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:39 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-003-M22008A-M22A Registration Date/Time: 2024-10-23   13:22:47 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:39 CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 107) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 107 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable watt meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 658.88 02 Actual Tested Airflow from MCH-23 (cfm)1136 03 Required Fan Efficacy (watts/cfm)0.58 04 Actual Fan Efficacy (watts/cfm)0.58 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 2 of 3) Registration Number: 424-P010255225A-001-003-M22008A-M22A Registration Date/Time: 2024-10-23   13:22:47 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:39 C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 05 Compliance Statement:System fan efficacy complies D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. 07 Verification Status Pass - all applicable requirements are met 08 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 3 of 3) Registration Number: 424-P010255225A-001-003-M22008A-M22A Registration Date/Time: 2024-10-23   13:22:47 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:39 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-003-M26009A-M26A Registration Date/Time: 2024-10-23   13:22:55 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:39 CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 1 of 4) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 107) City: La Quinta Zip Code: 92253 A. System Information Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system requiring verification must use a separate form. 01 System Name or Identification/Tag UNIT 107 HVACSys 02 System Location or Area Served Main 03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required 04 Directory used to certify product performance AHRI 05 AHRI certification number for the installed space conditioning system from http://www.ahridirectory.org 208650564 06 Does the directory used to certify product performance require a specific air handler/furnace make and model? Yes 07 Does the directory used to certify product performance require a time delay relay (+TDR)? Yes 08 Does the directory used to certify product performance require a TXV (+TXV)? Yes B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Data from Nameplate of Installed System Component Data from the Directory Used to Certify the Rated System Component Outdoor Condenser or Package Unit - Installed Manufacturer Name 01 RHEEM 02 RHEEM Outdoor Condenser or Package Unit - Installed Model Number 03 RHPAZR036JT000NA 04 RHPAZR036JT000NA Inside Coil - Installed Manufacturer Name 05 06 This field or section is not applicable Inside Coil - Installed Model Number 07 08 This field or section is not applicable Air Handler/Furnace - Installed Manufacturer Name 09 10 RHEEM NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 2 of 4) Registration Number: 424-P010255225A-001-003-M26009A-M26A Registration Date/Time: 2024-10-23   13:22:55 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:39 B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Air Handler/Furnace - Installed Model Number 11 12 RHPAZR036AJT C. Verified Cooling System SEER 01 Required minimum SEER 15 02 Installed SEER 15 03 Compliance Statement:System passes SEER verification Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed on the CF2R. D. Verified Cooling System EER This section does not apply to this project. E. Verified Cooling System Air Handler/Furnace 01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory. 02 Verification Status:Pass - all applicable requirements are met 03 Correction Notes: F. Verified Cooling System Time Delay Relay 01 If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of RA3.4.3. 02 Verification Status:Pass - all applicable requirements are met 03 Correction Notes: G. Verified Cooling System TXV 01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb 02 Verification Status:Pass - all applicable requirements are met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 3 of 4) Registration Number: 424-P010255225A-001-003-M26009A-M26A Registration Date/Time: 2024-10-23   13:22:55 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:39 G. Verified Cooling System TXV 03 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 4 of 4) Registration Number: 424-P010255225A-001-003-M26009A-M26A Registration Date/Time: 2024-10-23   13:22:55 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:39 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-004-M27005A-M27A Registration Date/Time: 2024-10-23   13:23:02 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:39 CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 108) City: La Quinta Zip Code: 92253 Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010. A. Dwelling Mechanical Ventilation - General Information 01 Dwelling unit name DwellingUnit 108 02 Building Type Single family 03 Project scope Newly constructed building 04 Total Conditioned Floor Area of Dwelling Unit (For addition projects the conditioned floor area equals existing area plus addition area. ) 931 05 Number of bedrooms in dwelling unit (For addition projects the number of bedrooms equals the existing bedrooms plus addition bedrooms) 2 06 Ventilation Operation Schedule Continuous 07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1) 08 Whole Building Ventilation System Type Standalone - Balanced 09 IAQ Fan Location MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with outdoor air each hour at no less than the rate in equation 4.1a. 01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81 02 Installed Continuous Whole-Building Ventilation Rate 122 C. Compliance Statement 01 Building passes continuous whole-building ventilation rate test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 2 of 3) Registration Number: 424-P010255225A-001-004-M27005A-M27A Registration Date/Time: 2024-10-23   13:23:02 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:39 D. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 3 of 3) Registration Number: 424-P010255225A-001-004-M27005A-M27A Registration Date/Time: 2024-10-23   13:23:02 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:39 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-004-M20006A-M20A Registration Date/Time: 2024-10-23   13:23:05 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:39 CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 108) City: La Quinta Zip Code: 92253 A. System Information 01 Space Conditioning System Identification or Name UNIT 108 HVACSys 02 Space Conditioning System Location or Area Served Main 03 Building Type from CF-1R Multi-family 04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from CF1R? No, credit is not taken 05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit from CF1R? No, credit is not taken 06 Duct System Compliance Category New MCH-20a - Completely New Duct System B. Duct Leakage Diagnostic Test 01 Condenser Nominal Cooling Capacity (ton)3 02 Heating Capacity (kBtu/h)36 03 Conditioned Floor Area served by this HVAC system (ft2)931 04 Duct Leakage Test Conditions Test final 05 Duct Leakage Test Method Total leakage 06 Leakage Factor 0.12 07 Air Handling Unit Airflow (AHUAirflow) Determination Method Cooling system method 08 Measured AHUAirflow This field or section is not applicable 09 Calculated Target Allowable Duct Leakage (cfm)144 10 Actual Duct Leakage Rate from Leakage Test Measurement (cfm) 72.9 11 Compliance Statement System passes leakage test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 2 of 3) Registration Number: 424-P010255225A-001-004-M20006A-M20A Registration Date/Time: 2024-10-23   13:23:05 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:39 B. Duct Leakage Diagnostic Test 12 Notes  C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. 02 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 All supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in). After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed 07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed. 08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. 09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used. 10 Verification Status:Pass 11 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 3 of 3) Registration Number: 424-P010255225A-001-004-M20006A-M20A Registration Date/Time: 2024-10-23   13:23:05 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:39 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-004-M23007A-M23A Registration Date/Time: 2024-10-23   13:23:07 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:40 CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 1 of 4) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 108) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 108 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus ALNOR 03 Model number of Airflow Measurement Apparatus EBT731 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas /index.html NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 2 of 4) Registration Number: 424-P010255225A-001-004-M23007A-M23A Registration Date/Time: 2024-10-23   13:23:07 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:40 MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1050 03 Actual System Airflow Rate Measurement (cfm)1092 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Verification. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Verification was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 09 Verification Status:Pass - all applicable requirements are met 10 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 3 of 4) Registration Number: 424-P010255225A-001-004-M23007A-M23A Registration Date/Time: 2024-10-23   13:23:07 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:40 F. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 4 of 4) Registration Number: 424-P010255225A-001-004-M23007A-M23A Registration Date/Time: 2024-10-23   13:23:07 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:44:40 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-004-M22008A-M22A Registration Date/Time: 2024-10-23   13:23:38 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 108) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 108 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable watt meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 633.36 02 Actual Tested Airflow from MCH-23 (cfm)1092 03 Required Fan Efficacy (watts/cfm)0.58 04 Actual Fan Efficacy (watts/cfm)0.58 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 2 of 3) Registration Number: 424-P010255225A-001-004-M22008A-M22A Registration Date/Time: 2024-10-23   13:23:38 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 05 Compliance Statement:System fan efficacy complies D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. 07 Verification Status Pass - all applicable requirements are met 08 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 3 of 3) Registration Number: 424-P010255225A-001-004-M22008A-M22A Registration Date/Time: 2024-10-23   13:23:38 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-004-M26009A-M26A Registration Date/Time: 2024-10-23   13:23:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 1 of 4) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 108) City: La Quinta Zip Code: 92253 A. System Information Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system requiring verification must use a separate form. 01 System Name or Identification/Tag UNIT 108 HVACSys 02 System Location or Area Served Main 03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required 04 Directory used to certify product performance AHRI 05 AHRI certification number for the installed space conditioning system from http://www.ahridirectory.org 208650564 06 Does the directory used to certify product performance require a specific air handler/furnace make and model? Yes 07 Does the directory used to certify product performance require a time delay relay (+TDR)? Yes 08 Does the directory used to certify product performance require a TXV (+TXV)? Yes B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Data from Nameplate of Installed System Component Data from the Directory Used to Certify the Rated System Component Outdoor Condenser or Package Unit - Installed Manufacturer Name 01 RHEEM 02 RHEEM Outdoor Condenser or Package Unit - Installed Model Number 03 RHPAZR036JT000NA 04 RHPAZR036JT000NA Inside Coil - Installed Manufacturer Name 05 06 This field or section is not applicable Inside Coil - Installed Model Number 07 08 This field or section is not applicable Air Handler/Furnace - Installed Manufacturer Name 09 10 RHEEM NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 2 of 4) Registration Number: 424-P010255225A-001-004-M26009A-M26A Registration Date/Time: 2024-10-23   13:23:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Air Handler/Furnace - Installed Model Number 11 12 RHPAZR036AJT C. Verified Cooling System SEER 01 Required minimum SEER 15 02 Installed SEER 15 03 Compliance Statement:System passes SEER verification Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed on the CF2R. D. Verified Cooling System EER This section does not apply to this project. E. Verified Cooling System Air Handler/Furnace 01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory. 02 Verification Status:Pass - all applicable requirements are met 03 Correction Notes: F. Verified Cooling System Time Delay Relay 01 If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of RA3.4.3. 02 Verification Status:Pass - all applicable requirements are met 03 Correction Notes: G. Verified Cooling System TXV 01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb 02 Verification Status:Pass - all applicable requirements are met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 3 of 4) Registration Number: 424-P010255225A-001-004-M26009A-M26A Registration Date/Time: 2024-10-23   13:23:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 G. Verified Cooling System TXV 03 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 4 of 4) Registration Number: 424-P010255225A-001-004-M26009A-M26A Registration Date/Time: 2024-10-23   13:23:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-005-M27005A-M27A Registration Date/Time: 2024-10-23   13:23:45 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 205) City: La Quinta Zip Code: 92253 Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010. A. Dwelling Mechanical Ventilation - General Information 01 Dwelling unit name DwellingUnit 205 02 Building Type Single family 03 Project scope Newly constructed building 04 Total Conditioned Floor Area of Dwelling Unit (For addition projects the conditioned floor area equals existing area plus addition area. ) 931 05 Number of bedrooms in dwelling unit (For addition projects the number of bedrooms equals the existing bedrooms plus addition bedrooms) 2 06 Ventilation Operation Schedule Continuous 07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1) 08 Whole Building Ventilation System Type Standalone - Balanced 09 IAQ Fan Location MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with outdoor air each hour at no less than the rate in equation 4.1a. 01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81 02 Installed Continuous Whole-Building Ventilation Rate 154 C. Compliance Statement 01 Building passes continuous whole-building ventilation rate test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 2 of 3) Registration Number: 424-P010255225A-001-005-M27005A-M27A Registration Date/Time: 2024-10-23   13:23:45 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 D. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 3 of 3) Registration Number: 424-P010255225A-001-005-M27005A-M27A Registration Date/Time: 2024-10-23   13:23:45 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-005-M20006A-M20A Registration Date/Time: 2024-10-23   13:23:50 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 205) City: La Quinta Zip Code: 92253 A. System Information 01 Space Conditioning System Identification or Name UNIT 205 HVACSys 02 Space Conditioning System Location or Area Served Main 03 Building Type from CF-1R Multi-family 04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from CF1R? No, credit is not taken 05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit from CF1R? No, credit is not taken 06 Duct System Compliance Category New MCH-20a - Completely New Duct System B. Duct Leakage Diagnostic Test 01 Condenser Nominal Cooling Capacity (ton)3 02 Heating Capacity (kBtu/h)36 03 Conditioned Floor Area served by this HVAC system (ft2)931 04 Duct Leakage Test Conditions Test final 05 Duct Leakage Test Method Total leakage 06 Leakage Factor 0.12 07 Air Handling Unit Airflow (AHUAirflow) Determination Method Cooling system method 08 Measured AHUAirflow This field or section is not applicable 09 Calculated Target Allowable Duct Leakage (cfm)144 10 Actual Duct Leakage Rate from Leakage Test Measurement (cfm) 45 11 Compliance Statement System passes leakage test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 2 of 3) Registration Number: 424-P010255225A-001-005-M20006A-M20A Registration Date/Time: 2024-10-23   13:23:50 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 B. Duct Leakage Diagnostic Test 12 Notes  C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. 02 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 All supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in). After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed 07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed. 08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. 09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used. 10 Verification Status:Pass 11 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 3 of 3) Registration Number: 424-P010255225A-001-005-M20006A-M20A Registration Date/Time: 2024-10-23   13:23:50 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-005-M23007A-M23A Registration Date/Time: 2024-10-23   13:23:53 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 1 of 4) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 205) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 205 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus ALNOR 03 Model number of Airflow Measurement Apparatus EBT731 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas /index.html NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 2 of 4) Registration Number: 424-P010255225A-001-005-M23007A-M23A Registration Date/Time: 2024-10-23   13:23:53 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1050 03 Actual System Airflow Rate Measurement (cfm)1544 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Verification. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Verification was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 09 Verification Status:Pass - all applicable requirements are met 10 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 3 of 4) Registration Number: 424-P010255225A-001-005-M23007A-M23A Registration Date/Time: 2024-10-23   13:23:53 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 F. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 4 of 4) Registration Number: 424-P010255225A-001-005-M23007A-M23A Registration Date/Time: 2024-10-23   13:23:53 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-005-M22008A-M22A Registration Date/Time: 2024-10-23   13:23:58 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 205) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 205 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable watt meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 895.52 02 Actual Tested Airflow from MCH-23 (cfm)1544 03 Required Fan Efficacy (watts/cfm)0.58 04 Actual Fan Efficacy (watts/cfm)0.58 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 2 of 3) Registration Number: 424-P010255225A-001-005-M22008A-M22A Registration Date/Time: 2024-10-23   13:23:58 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 05 Compliance Statement:System fan efficacy complies D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. 07 Verification Status Pass - all applicable requirements are met 08 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 3 of 3) Registration Number: 424-P010255225A-001-005-M22008A-M22A Registration Date/Time: 2024-10-23   13:23:58 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-005-M26009A-M26A Registration Date/Time: 2024-10-23   13:24:02 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 1 of 4) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 205) City: La Quinta Zip Code: 92253 A. System Information Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system requiring verification must use a separate form. 01 System Name or Identification/Tag UNIT 205 HVACSys 02 System Location or Area Served Main 03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required 04 Directory used to certify product performance AHRI 05 AHRI certification number for the installed space conditioning system from http://www.ahridirectory.org 208650564 06 Does the directory used to certify product performance require a specific air handler/furnace make and model? Yes 07 Does the directory used to certify product performance require a time delay relay (+TDR)? Yes 08 Does the directory used to certify product performance require a TXV (+TXV)? Yes B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Data from Nameplate of Installed System Component Data from the Directory Used to Certify the Rated System Component Outdoor Condenser or Package Unit - Installed Manufacturer Name 01 RHEEM 02 RHEEM Outdoor Condenser or Package Unit - Installed Model Number 03 RHPAZR036JT000NA 04 RHPAZR036JT000NA Inside Coil - Installed Manufacturer Name 05 06 This field or section is not applicable Inside Coil - Installed Model Number 07 08 This field or section is not applicable Air Handler/Furnace - Installed Manufacturer Name 09 10 RHEEM NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 2 of 4) Registration Number: 424-P010255225A-001-005-M26009A-M26A Registration Date/Time: 2024-10-23   13:24:02 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Air Handler/Furnace - Installed Model Number 11 12 RHPAZR036AJT C. Verified Cooling System SEER 01 Required minimum SEER 15 02 Installed SEER 15 03 Compliance Statement:System passes SEER verification Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed on the CF2R. D. Verified Cooling System EER This section does not apply to this project. E. Verified Cooling System Air Handler/Furnace 01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory. 02 Verification Status:Pass - all applicable requirements are met 03 Correction Notes: F. Verified Cooling System Time Delay Relay 01 If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of RA3.4.3. 02 Verification Status:Pass - all applicable requirements are met 03 Correction Notes: G. Verified Cooling System TXV 01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb 02 Verification Status:Pass - all applicable requirements are met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 3 of 4) Registration Number: 424-P010255225A-001-005-M26009A-M26A Registration Date/Time: 2024-10-23   13:24:02 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 G. Verified Cooling System TXV 03 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 4 of 4) Registration Number: 424-P010255225A-001-005-M26009A-M26A Registration Date/Time: 2024-10-23   13:24:02 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:45 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-006-M27005A-M27A Registration Date/Time: 2024-10-23   13:24:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 206) City: La Quinta Zip Code: 92253 Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010. A. Dwelling Mechanical Ventilation - General Information 01 Dwelling unit name DwellingUnit 206 02 Building Type Single family 03 Project scope Newly constructed building 04 Total Conditioned Floor Area of Dwelling Unit (For addition projects the conditioned floor area equals existing area plus addition area. ) 931 05 Number of bedrooms in dwelling unit (For addition projects the number of bedrooms equals the existing bedrooms plus addition bedrooms) 2 06 Ventilation Operation Schedule Continuous 07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1) 08 Whole Building Ventilation System Type Standalone - Balanced 09 IAQ Fan Location MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with outdoor air each hour at no less than the rate in equation 4.1a. 01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81 02 Installed Continuous Whole-Building Ventilation Rate 125 C. Compliance Statement 01 Building passes continuous whole-building ventilation rate test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 2 of 3) Registration Number: 424-P010255225A-001-006-M27005A-M27A Registration Date/Time: 2024-10-23   13:24:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 D. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 3 of 3) Registration Number: 424-P010255225A-001-006-M27005A-M27A Registration Date/Time: 2024-10-23   13:24:32 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-006-M20006A-M20A Registration Date/Time: 2024-10-23   13:24:35 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 206) City: La Quinta Zip Code: 92253 A. System Information 01 Space Conditioning System Identification or Name UNIT 206 HVACSys 02 Space Conditioning System Location or Area Served Main 03 Building Type from CF-1R Multi-family 04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from CF1R? No, credit is not taken 05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit from CF1R? No, credit is not taken 06 Duct System Compliance Category New MCH-20a - Completely New Duct System B. Duct Leakage Diagnostic Test 01 Condenser Nominal Cooling Capacity (ton)3 02 Heating Capacity (kBtu/h)36 03 Conditioned Floor Area served by this HVAC system (ft2)931 04 Duct Leakage Test Conditions Test final 05 Duct Leakage Test Method Total leakage 06 Leakage Factor 0.12 07 Air Handling Unit Airflow (AHUAirflow) Determination Method Cooling system method 08 Measured AHUAirflow This field or section is not applicable 09 Calculated Target Allowable Duct Leakage (cfm)144 10 Actual Duct Leakage Rate from Leakage Test Measurement (cfm) 56.6 11 Compliance Statement System passes leakage test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 2 of 3) Registration Number: 424-P010255225A-001-006-M20006A-M20A Registration Date/Time: 2024-10-23   13:24:35 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 B. Duct Leakage Diagnostic Test 12 Notes  C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. 02 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 All supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in). After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed 07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed. 08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. 09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used. 10 Verification Status:Pass 11 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 3 of 3) Registration Number: 424-P010255225A-001-006-M20006A-M20A Registration Date/Time: 2024-10-23   13:24:35 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:48 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-006-M23007A-M23A Registration Date/Time: 2024-10-23   13:24:38 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:50 CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 1 of 4) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 206) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 206 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus ALNOR 03 Model number of Airflow Measurement Apparatus EBT731 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas /index.html NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 2 of 4) Registration Number: 424-P010255225A-001-006-M23007A-M23A Registration Date/Time: 2024-10-23   13:24:38 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:50 MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1050 03 Actual System Airflow Rate Measurement (cfm)1627 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Verification. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Verification was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 09 Verification Status:Pass - all applicable requirements are met 10 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 3 of 4) Registration Number: 424-P010255225A-001-006-M23007A-M23A Registration Date/Time: 2024-10-23   13:24:38 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:50 F. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 4 of 4) Registration Number: 424-P010255225A-001-006-M23007A-M23A Registration Date/Time: 2024-10-23   13:24:38 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:50 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-006-M22008A-M22A Registration Date/Time: 2024-10-23   13:24:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:50 CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 206) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 206 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable watt meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 943.66 02 Actual Tested Airflow from MCH-23 (cfm)1627 03 Required Fan Efficacy (watts/cfm)0.58 04 Actual Fan Efficacy (watts/cfm)0.58 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 2 of 3) Registration Number: 424-P010255225A-001-006-M22008A-M22A Registration Date/Time: 2024-10-23   13:24:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:50 C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 05 Compliance Statement:System fan efficacy complies D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. 07 Verification Status Pass - all applicable requirements are met 08 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 3 of 3) Registration Number: 424-P010255225A-001-006-M22008A-M22A Registration Date/Time: 2024-10-23   13:24:41 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:50 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-006-M26009A-M26A Registration Date/Time: 2024-10-23   13:24:49 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:50 CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 1 of 4) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 206) City: La Quinta Zip Code: 92253 A. System Information Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system requiring verification must use a separate form. 01 System Name or Identification/Tag UNIT 206 HVACSys 02 System Location or Area Served Main 03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required 04 Directory used to certify product performance AHRI 05 AHRI certification number for the installed space conditioning system from http://www.ahridirectory.org 208650564 06 Does the directory used to certify product performance require a specific air handler/furnace make and model? Yes 07 Does the directory used to certify product performance require a time delay relay (+TDR)? Yes 08 Does the directory used to certify product performance require a TXV (+TXV)? Yes B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Data from Nameplate of Installed System Component Data from the Directory Used to Certify the Rated System Component Outdoor Condenser or Package Unit - Installed Manufacturer Name 01 RHEEM 02 RHEEM Outdoor Condenser or Package Unit - Installed Model Number 03 RHPAZR036JT000NA 04 RHPAZR036JT000NA Inside Coil - Installed Manufacturer Name 05 06 This field or section is not applicable Inside Coil - Installed Model Number 07 08 This field or section is not applicable Air Handler/Furnace - Installed Manufacturer Name 09 10 RHEEM NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 2 of 4) Registration Number: 424-P010255225A-001-006-M26009A-M26A Registration Date/Time: 2024-10-23   13:24:49 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:50 B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Air Handler/Furnace - Installed Model Number 11 12 RHPAZR036AJT C. Verified Cooling System SEER 01 Required minimum SEER 15 02 Installed SEER 15 03 Compliance Statement:System passes SEER verification Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed on the CF2R. D. Verified Cooling System EER This section does not apply to this project. E. Verified Cooling System Air Handler/Furnace 01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory. 02 Verification Status:Pass - all applicable requirements are met 03 Correction Notes: F. Verified Cooling System Time Delay Relay 01 If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of RA3.4.3. 02 Verification Status:Pass - all applicable requirements are met 03 Correction Notes: G. Verified Cooling System TXV 01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb 02 Verification Status:Pass - all applicable requirements are met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 3 of 4) Registration Number: 424-P010255225A-001-006-M26009A-M26A Registration Date/Time: 2024-10-23   13:24:49 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:50 G. Verified Cooling System TXV 03 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 4 of 4) Registration Number: 424-P010255225A-001-006-M26009A-M26A Registration Date/Time: 2024-10-23   13:24:49 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:50 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-007-M27005A-M27A Registration Date/Time: 2024-10-23   13:24:55 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 207) City: La Quinta Zip Code: 92253 Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010. A. Dwelling Mechanical Ventilation - General Information 01 Dwelling unit name DwellingUnit 207 02 Building Type Single family 03 Project scope Newly constructed building 04 Total Conditioned Floor Area of Dwelling Unit (For addition projects the conditioned floor area equals existing area plus addition area. ) 931 05 Number of bedrooms in dwelling unit (For addition projects the number of bedrooms equals the existing bedrooms plus addition bedrooms) 2 06 Ventilation Operation Schedule Continuous 07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1) 08 Whole Building Ventilation System Type Standalone - Balanced 09 IAQ Fan Location MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with outdoor air each hour at no less than the rate in equation 4.1a. 01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81 02 Installed Continuous Whole-Building Ventilation Rate 109 C. Compliance Statement 01 Building passes continuous whole-building ventilation rate test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 2 of 3) Registration Number: 424-P010255225A-001-007-M27005A-M27A Registration Date/Time: 2024-10-23   13:24:55 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 D. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 3 of 3) Registration Number: 424-P010255225A-001-007-M27005A-M27A Registration Date/Time: 2024-10-23   13:24:55 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-007-M20006A-M20A Registration Date/Time: 2024-10-23   13:24:59 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 207) City: La Quinta Zip Code: 92253 A. System Information 01 Space Conditioning System Identification or Name UNIT 207 HVACSys 02 Space Conditioning System Location or Area Served Main 03 Building Type from CF-1R Multi-family 04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from CF1R? No, credit is not taken 05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit from CF1R? No, credit is not taken 06 Duct System Compliance Category New MCH-20a - Completely New Duct System B. Duct Leakage Diagnostic Test 01 Condenser Nominal Cooling Capacity (ton)3 02 Heating Capacity (kBtu/h)36 03 Conditioned Floor Area served by this HVAC system (ft2)931 04 Duct Leakage Test Conditions Test final 05 Duct Leakage Test Method Total leakage 06 Leakage Factor 0.12 07 Air Handling Unit Airflow (AHUAirflow) Determination Method Cooling system method 08 Measured AHUAirflow This field or section is not applicable 09 Calculated Target Allowable Duct Leakage (cfm)144 10 Actual Duct Leakage Rate from Leakage Test Measurement (cfm) 42.9 11 Compliance Statement System passes leakage test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 2 of 3) Registration Number: 424-P010255225A-001-007-M20006A-M20A Registration Date/Time: 2024-10-23   13:24:59 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 B. Duct Leakage Diagnostic Test 12 Notes  C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. 02 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 All supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in). After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed 07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed. 08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. 09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used. 10 Verification Status:Pass 11 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 3 of 3) Registration Number: 424-P010255225A-001-007-M20006A-M20A Registration Date/Time: 2024-10-23   13:24:59 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-007-M23007A-M23A Registration Date/Time: 2024-10-23   13:25:03 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 1 of 4) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 207) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 207 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus ALNOR 03 Model number of Airflow Measurement Apparatus EBT731 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas /index.html NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 2 of 4) Registration Number: 424-P010255225A-001-007-M23007A-M23A Registration Date/Time: 2024-10-23   13:25:03 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1050 03 Actual System Airflow Rate Measurement (cfm)1547 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Verification. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Verification was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 09 Verification Status:Pass - all applicable requirements are met 10 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 3 of 4) Registration Number: 424-P010255225A-001-007-M23007A-M23A Registration Date/Time: 2024-10-23   13:25:03 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 F. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 4 of 4) Registration Number: 424-P010255225A-001-007-M23007A-M23A Registration Date/Time: 2024-10-23   13:25:03 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-007-M22008A-M22A Registration Date/Time: 2024-10-23   13:25:06 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 207) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 207 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable watt meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 897.26 02 Actual Tested Airflow from MCH-23 (cfm)1547 03 Required Fan Efficacy (watts/cfm)0.58 04 Actual Fan Efficacy (watts/cfm)0.58 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 2 of 3) Registration Number: 424-P010255225A-001-007-M22008A-M22A Registration Date/Time: 2024-10-23   13:25:06 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 05 Compliance Statement:System fan efficacy complies D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. 07 Verification Status Pass - all applicable requirements are met 08 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 3 of 3) Registration Number: 424-P010255225A-001-007-M22008A-M22A Registration Date/Time: 2024-10-23   13:25:06 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-007-M26009A-M26A Registration Date/Time: 2024-10-23   13:25:10 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 1 of 4) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 207) City: La Quinta Zip Code: 92253 A. System Information Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system requiring verification must use a separate form. 01 System Name or Identification/Tag UNIT 207 HVACSys 02 System Location or Area Served Main 03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required 04 Directory used to certify product performance AHRI 05 AHRI certification number for the installed space conditioning system from http://www.ahridirectory.org 208650564 06 Does the directory used to certify product performance require a specific air handler/furnace make and model? Yes 07 Does the directory used to certify product performance require a time delay relay (+TDR)? Yes 08 Does the directory used to certify product performance require a TXV (+TXV)? Yes B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Data from Nameplate of Installed System Component Data from the Directory Used to Certify the Rated System Component Outdoor Condenser or Package Unit - Installed Manufacturer Name 01 RHEEM 02 RHEEM Outdoor Condenser or Package Unit - Installed Model Number 03 RHPAZR036JT000NA 04 RHPAZR036JT000NA Inside Coil - Installed Manufacturer Name 05 06 This field or section is not applicable Inside Coil - Installed Model Number 07 08 This field or section is not applicable Air Handler/Furnace - Installed Manufacturer Name 09 10 RHEEM NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 2 of 4) Registration Number: 424-P010255225A-001-007-M26009A-M26A Registration Date/Time: 2024-10-23   13:25:10 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Air Handler/Furnace - Installed Model Number 11 12 RHPAZR036AJT C. Verified Cooling System SEER 01 Required minimum SEER 15 02 Installed SEER 15 03 Compliance Statement:System passes SEER verification Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed on the CF2R. D. Verified Cooling System EER This section does not apply to this project. E. Verified Cooling System Air Handler/Furnace 01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory. 02 Verification Status:Pass - all applicable requirements are met 03 Correction Notes: F. Verified Cooling System Time Delay Relay 01 If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of RA3.4.3. 02 Verification Status:Pass - all applicable requirements are met 03 Correction Notes: G. Verified Cooling System TXV 01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb 02 Verification Status:Pass - all applicable requirements are met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 3 of 4) Registration Number: 424-P010255225A-001-007-M26009A-M26A Registration Date/Time: 2024-10-23   13:25:10 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 G. Verified Cooling System TXV 03 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 4 of 4) Registration Number: 424-P010255225A-001-007-M26009A-M26A Registration Date/Time: 2024-10-23   13:25:10 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:51 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-008-M27005A-M27A Registration Date/Time: 2024-10-23   13:25:51 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:55 CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 208) City: La Quinta Zip Code: 92253 Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010. A. Dwelling Mechanical Ventilation - General Information 01 Dwelling unit name DwellingUnit 208 02 Building Type Single family 03 Project scope Newly constructed building 04 Total Conditioned Floor Area of Dwelling Unit (For addition projects the conditioned floor area equals existing area plus addition area. ) 931 05 Number of bedrooms in dwelling unit (For addition projects the number of bedrooms equals the existing bedrooms plus addition bedrooms) 2 06 Ventilation Operation Schedule Continuous 07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1) 08 Whole Building Ventilation System Type Standalone - Balanced 09 IAQ Fan Location MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with outdoor air each hour at no less than the rate in equation 4.1a. 01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81 02 Installed Continuous Whole-Building Ventilation Rate 140 C. Compliance Statement 01 Building passes continuous whole-building ventilation rate test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 2 of 3) Registration Number: 424-P010255225A-001-008-M27005A-M27A Registration Date/Time: 2024-10-23   13:25:51 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:55 D. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 3 of 3) Registration Number: 424-P010255225A-001-008-M27005A-M27A Registration Date/Time: 2024-10-23   13:25:51 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:55 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-008-M20006A-M20A Registration Date/Time: 2024-10-23   13:25:54 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:55 CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 208) City: La Quinta Zip Code: 92253 A. System Information 01 Space Conditioning System Identification or Name UNIT 208 HVACSys 02 Space Conditioning System Location or Area Served Main 03 Building Type from CF-1R Multi-family 04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from CF1R? No, credit is not taken 05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit from CF1R? No, credit is not taken 06 Duct System Compliance Category New MCH-20a - Completely New Duct System B. Duct Leakage Diagnostic Test 01 Condenser Nominal Cooling Capacity (ton)3 02 Heating Capacity (kBtu/h)36 03 Conditioned Floor Area served by this HVAC system (ft2)931 04 Duct Leakage Test Conditions Test final 05 Duct Leakage Test Method Total leakage 06 Leakage Factor 0.12 07 Air Handling Unit Airflow (AHUAirflow) Determination Method Cooling system method 08 Measured AHUAirflow This field or section is not applicable 09 Calculated Target Allowable Duct Leakage (cfm)144 10 Actual Duct Leakage Rate from Leakage Test Measurement (cfm) 53.1 11 Compliance Statement System passes leakage test NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 2 of 3) Registration Number: 424-P010255225A-001-008-M20006A-M20A Registration Date/Time: 2024-10-23   13:25:54 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:55 B. Duct Leakage Diagnostic Test 12 Notes  C. Additional Requirements for Compliance 01 System was tested in its normal operation condition. No temporary taping allowed. 02 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 03 All supply and return register boots were sealed to the drywall. 04 Building cavities were not used as plenums or platform returns in lieu of ducts. 05 If cloth backed tape was used it was covered with Mastic and draw bands. 06 All connection points between the air handler and the supply and return plenums are completely sealed. Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in). After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must be performed 07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are properly sealed. 08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. 09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used. 10 Verification Status:Pass 11 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. D. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 3 of 3) Registration Number: 424-P010255225A-001-008-M20006A-M20A Registration Date/Time: 2024-10-23   13:25:54 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:55 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-008-M23007A-M23A Registration Date/Time: 2024-10-23   13:26:04 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:55 CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 1 of 4) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 208) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 208 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus ALNOR 03 Model number of Airflow Measurement Apparatus EBT731 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas /index.html NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 2 of 4) Registration Number: 424-P010255225A-001-008-M23007A-M23A Registration Date/Time: 2024-10-23   13:26:04 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:55 MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1050 03 Actual System Airflow Rate Measurement (cfm)1052 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Verification. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Verification was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 09 Verification Status:Pass - all applicable requirements are met 10 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 3 of 4) Registration Number: 424-P010255225A-001-008-M23007A-M23A Registration Date/Time: 2024-10-23   13:26:04 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:55 F. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 4 of 4) Registration Number: 424-P010255225A-001-008-M23007A-M23A Registration Date/Time: 2024-10-23   13:26:04 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2016.2.000 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:55 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-008-M22008A-M22A Registration Date/Time: 2024-10-23   13:26:09 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:56 CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 1 of 3) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 208) City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name UNIT 208 HVACSys 02 System Location or Area Served Main 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2024-10-17 10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable watt meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 610.16 02 Actual Tested Airflow from MCH-23 (cfm)1052 03 Required Fan Efficacy (watts/cfm)0.58 04 Actual Fan Efficacy (watts/cfm)0.58 NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 2 of 3) Registration Number: 424-P010255225A-001-008-M22008A-M22A Registration Date/Time: 2024-10-23   13:26:09 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:56 C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 05 Compliance Statement:System fan efficacy complies D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. 07 Verification Status Pass - all applicable requirements are met 08 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 3 of 3) Registration Number: 424-P010255225A-001-008-M22008A-M22A Registration Date/Time: 2024-10-23   13:26:09 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:56 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 424-P010255225A-001-008-M26009A-M26A Registration Date/Time: 2024-10-23   13:26:20 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:56 CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 1 of 4) Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330 Dwelling Address: 51480 Desert Club Dr, La Quinta (DwellingUnit 208) City: La Quinta Zip Code: 92253 A. System Information Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system requiring verification must use a separate form. 01 System Name or Identification/Tag UNIT 208 HVACSys 02 System Location or Area Served Main 03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required 04 Directory used to certify product performance AHRI 05 AHRI certification number for the installed space conditioning system from http://www.ahridirectory.org 208650564 06 Does the directory used to certify product performance require a specific air handler/furnace make and model? Yes 07 Does the directory used to certify product performance require a time delay relay (+TDR)? Yes 08 Does the directory used to certify product performance require a TXV (+TXV)? Yes B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Data from Nameplate of Installed System Component Data from the Directory Used to Certify the Rated System Component Outdoor Condenser or Package Unit - Installed Manufacturer Name 01 RHEEM 02 RHEEM Outdoor Condenser or Package Unit - Installed Model Number 03 RHPAZR036JT000NA 04 RHPAZR036JT000NA Inside Coil - Installed Manufacturer Name 05 06 This field or section is not applicable Inside Coil - Installed Model Number 07 08 This field or section is not applicable Air Handler/Furnace - Installed Manufacturer Name 09 10 RHEEM NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 2 of 4) Registration Number: 424-P010255225A-001-008-M26009A-M26A Registration Date/Time: 2024-10-23   13:26:20 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:56 B. Rated Space Conditioning System Equipment Verification The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. Air Handler/Furnace - Installed Model Number 11 12 RHPAZR036AJT C. Verified Cooling System SEER 01 Required minimum SEER 15 02 Installed SEER 15 03 Compliance Statement:System passes SEER verification Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed on the CF2R. D. Verified Cooling System EER This section does not apply to this project. E. Verified Cooling System Air Handler/Furnace 01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory. 02 Verification Status:Pass - all applicable requirements are met 03 Correction Notes: F. Verified Cooling System Time Delay Relay 01 If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of RA3.4.3. 02 Verification Status:Pass - all applicable requirements are met 03 Correction Notes: G. Verified Cooling System TXV 01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb 02 Verification Status:Pass - all applicable requirements are met NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 3 of 4) Registration Number: 424-P010255225A-001-008-M26009A-M26A Registration Date/Time: 2024-10-23   13:26:20 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:56 G. Verified Cooling System TXV 03 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. H. Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. CERTIFICATE OF VERIFICATION CF3R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 4 of 4) Registration Number: 424-P010255225A-001-008-M26009A-M26A Registration Date/Time: 2024-10-23   13:26:20 HERS Provider: CHEERS CA Building Energy Efficiency Standards 2016 Residential Compliance Report Version: 2018.0.001 Schema Version: rev 20180426 Report Generated: 2024-10-29   13:45:56 Documentation Author's Declaration Statement 1. I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name: Shari Sims Documentation Author Signature: Company: Advancing Home Performance, Inc. Date Signed: 2024-10-23 Address: 74998 Country Club Drive CEA/ HERS Certification Identification (if applicable): RCN14014 City/State/Zip: Palm Desert CA 92260 Phone: 760-851-8648 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): Muskoka Development LLC Responsible Builder or Installer Name: Paul Marcinkowski CSLB License: 1100564 HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) N/A HERS Rater Information HERS Rater Company Name: Advancing Home Performance, Inc. Responsible Rater Name: Shari Sims Responsible Rater Signature: Responsible Rater Certification Number w/ this HERS Provider: RCN14014 Date Signed: 2024-10-23   NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.