BRES2019-0330 HERS ReportCERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01
Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 1 of 18
Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16
Registration Number:Registration Date/Time:HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41
GENERAL INFORMATION
01 Project Name An Apartment Complex for Nispero Properties, Inc
02 Calculation Description Title 24 Analysis
03 Project Location 51-480 Desert Club Dr / North bldg
04 City La Quinta, CA 05 Standards Version Compliance 2017
06 Zip Code 92253 07 Compliance Manager Version BEMCmpMgr 2016.3.1 (1149)
08 Climate Zone CZ15 09 Software Version CBECC-Res 2016.3.1 (1019)
10 Building Type Multifamily 11 Front Orientation (deg/Cardinal)90
12 Project Scope Newly Constructed 13 Number of Dwelling Units 8
14 Total Cond. Floor Area (ft2)7448 15 Number of Zones 8
16 Slab Area (ft2)3724 17 Number of Stories 2
18 Addition Cond. Floor Area(ft2)n/a 19 Natural Gas Available No
20 Addition Slab Area (ft2)n/a 21 Glazing Percentage (%)10.4%
COMPLIANCE RESULTS
01 Building Complies with Computer Performance
02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider.
03 This building incorporates one or more Special Features shown below
.
ENERGY USE SUMMARY
04 05 06 07 08
Energy Use (kTDV/ft2-yr)Standard Design Proposed Design Compliance Margin Percent Improvement
Space Heating 0.57 0.49 0.08 14.0%
Space Cooling 87.79 75.89 11.90 13.6%
IAQ Ventilation 2.49 2.49 0.00 0.0%
Water Heating 22.75 33.75 -11.00 -48.4%
Photovoltaic Offset ----0.00 0.00 ----
Compliance Energy Total 113.60 112.62 0.98 0.9%
REQUIRED SPECIAL FEATURES
The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis.
•Cool roof
•Window overhangs and/or fins
424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01
Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 2 of 18
Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16
Registration Number:Registration Date/Time:HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41
HERS FEATURE SUMMARY
The following is a summary of the features that must be field-verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional detail is
provided in the building components tables below.
Building-level Verifications:
•High quality insulation installation (QII)
•IAQ mechanical ventilation
Cooling System Verifications:
•-- None --
HVAC Distribution System Verifications:
•Duct Sealing
Domestic Hot Water System Verifications:
•-- None --
ZONE INFORMATION
01 02 03 04 05
Zone Name Zone Type Zone Floor Area (ft2)Avg. Ceiling Height Number of Dwelling Units
UNIT 105 Conditioned 931 9 1
UNIT 106 Conditioned 931 9 1
UNIT 107 Conditioned 931 9 1
UNIT 108 Conditioned 931 9 1
UNIT 205 Conditioned 931 9 1
UNIT 206 Conditioned 931 9 1
UNIT 207 Conditioned 931 9 1
UNIT 208 Conditioned 931 9 1
DWELLING UNIT INFORMATION
01 02 03
Dwelling Unit Name Dwelling Unit Type Zone
DwellingUnit 105-(1/1)U-105 UNIT 105
DwellingUnit 106-(1/1)U-106 UNIT 106
DwellingUnit 107-(1/1)U-107 UNIT 107
DwellingUnit 108-(1/1)U-108 UNIT 108
DwellingUnit 205-(1/1)U-205 UNIT 205
DwellingUnit 206-(1/1)U-206 UNIT 206
DwellingUnit 207-(1/1)U-207 UNIT 207
DwellingUnit 208-(1/1)U-208 UNIT 208
424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01
Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 3 of 18
Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16
Registration Number:Registration Date/Time:HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41
DWELLING UNIT TYPES
01 02 03 04 05 06 07
Name CFA (ft2)
Number of
Bedrooms
Number in
Building Space Conditioning Systems Assigned DHW System Name IAQ Vent Fan Name
U-105 931 2 1 DwellingUnit 105 | :Heat Pump System 1:Distribution
System 1:HVAC Fan System 1:2:3 DHW System 1 Default Minimum IAQ Fan
U-106 931 2 1 DwellingUnit 106 | :Heat Pump System 2:Distribution
System 2:HVAC Fan System 2:2:3 DHW System 2 Default Minimum IAQ Fan
U-107 931 2 1 DwellingUnit 107 | :Heat Pump System 3:Distribution
System 3:HVAC Fan System 3:2:3 DHW System 3 Default Minimum IAQ Fan
U-108 931 2 1 DwellingUnit 108 | :Heat Pump System 4:Distribution
System 4:HVAC Fan System 4:2:3 DHW System 4 Default Minimum IAQ Fan
U-205 931 2 1 DwellingUnit 205 | :Heat Pump System 5:Distribution
System 5:HVAC Fan System 5:2:3 DHW System 5 Default Minimum IAQ Fan
U-206 931 2 1 DwellingUnit 206 | :Heat Pump System 6:Distribution
System 6:HVAC Fan System 6:2:3 DHW System 6 Default Minimum IAQ Fan
U-207 931 2 1 DwellingUnit 207 | :Heat Pump System 7:Distribution
System 7:HVAC Fan System 7:2:3 DHW System 7 Default Minimum IAQ Fan
U-208 931 2 1 DwellingUnit 208 | :Heat Pump System 8:Distribution
System 8:HVAC Fan System 8:2:3 DHW System 8 Default Minimum IAQ Fan
424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01
Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 4 of 18
Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16
Registration Number:Registration Date/Time:HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41
OPAQUE SURFACES
01 02 03 04 05 06 07 08
Name Zone Construction Azimuth Orientation Gross Area (ft2)Window & Door Area (ft2)Tilt (deg)
Wall-n-F UNIT 105 Wall new 90 Front 232 33 90
Wall-n-L UNIT 105 Wall new 180 Left 383 46 90
Wall-n-B UNIT 105 Wall new 270 Back 205 64 90
Interior Wall-n to UNIT 106 UNIT 105>>UNIT 106 Wall Int R0 n/a n/a 384 0 n/a
Interior Wall-n to WH Room 1 UNIT 105>>WH Rooms Wall Int new n/a n/a 29 0 n/a
Wall-n-F 2 UNIT 106 Wall new 90 Front 230 33 90
Wall-n-B 2 UNIT 106 Wall new 270 Back 203 64 90
Wall-n-R UNIT 106 Wall new 0 Right 119 14 90
Interior Wall-n to UNIT 107 UNIT 106>>UNIT 107 Wall Int R0 n/a n/a 265 0 n/a
Interior Wall-n to WH Room 2 UNIT 106>>WH Rooms Wall Int new n/a n/a 29 0 n/a
Wall-n-F 3 UNIT 107 Wall new 90 Front 230 33 90
Wall-n-L 2 UNIT 107 Wall new 180 Left 119 14 90
Wall-n-B 3 UNIT 107 Wall new 270 Back 203 64 90
Interior Wall-n to UNIT 108 UNIT 107>>UNIT 108 Wall Int R0 n/a n/a 384 0 n/a
Interior Wall-n to WH Room 3 UNIT 107>>WH Rooms Wall Int new n/a n/a 29 0 n/a
Wall-n-F 4 UNIT 108 Wall new 90 Front 232 33 90
Wall-n-B 4 UNIT 108 Wall new 270 Back 205 64 90
Wall-n-R 2 UNIT 108 Wall new 0 Right 383 34 90
Interior Wall-n to WH Room 4 UNIT 108>>WH Rooms Wall Int new n/a n/a 29 0 n/a
Wall-n-F 5 UNIT 205 Wall new 90 Front 232 47.5 90
Wall-n-L 3 UNIT 205 Wall new 180 Left 383 46 90
Wall-n-B 5 UNIT 205 Wall new 270 Back 205 68 90
Interior Wall-n to UNIT 206 UNIT 205>>UNIT 206 Wall Int R0 n/a n/a 384 0 n/a
Interior Wall-n to WH Room 5 UNIT 205>>WH Rooms Wall Int new n/a n/a 29 0 n/a
Ceiling-n 1 UNIT 205 Ceiling attic new n/a n/a 263 n/a n/a
Ceiling-n 1-2 UNIT 205 Ceiling attic new n/a n/a 668 n/a n/a
Interior Floor-n over UNIT 105 UNIT 205>>UNIT 105 Floor Int R0 n/a n/a 931 n/a n/a
Wall-n-F 6 UNIT 206 Wall new 90 Front 230 47.5 90
Wall-n-B 6 UNIT 206 Wall new 270 Back 203 68 90
Wall-n-R 3 UNIT 206 Wall new 0 Right 119 14 90
424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01
Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 5 of 18
Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16
Registration Number:Registration Date/Time:HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41
Interior Wall-n to UNIT 207 UNIT 206>>UNIT 207 Wall Int R0 n/a n/a 265 0 n/a
Interior Wall-n to WH Room 6 UNIT 206>>WH Rooms Wall Int new n/a n/a 29 0 n/a
Ceiling-n 2 UNIT 206 Ceiling attic new n/a n/a 263 n/a n/a
Ceiling-n 2-2 UNIT 206 Ceiling attic new n/a n/a 668 n/a n/a
Interior Floor-n over UNIT 106 UNIT 206>>UNIT 106 Floor Int R0 n/a n/a 931 n/a n/a
Wall-n-F 7 UNIT 207 Wall new 90 Front 230 47.5 90
Wall-n-L 4 UNIT 207 Wall new 180 Left 119 14 90
Wall-n-B 7 UNIT 207 Wall new 270 Back 203 68 90
Interior Wall-n to UNIT 208 UNIT 207>>UNIT 208 Wall Int R0 n/a n/a 384 0 n/a
Interior Wall-n to WH Room 7 UNIT 207>>WH Rooms Wall Int new n/a n/a 29 0 n/a
Ceiling-n 3 UNIT 207 Ceiling attic new n/a n/a 263 n/a n/a
Ceiling-n 3-2 UNIT 207 Ceiling attic new n/a n/a 668 n/a n/a
Interior Floor-n over UNIT 107 UNIT 207>>UNIT 107 Floor Int R0 n/a n/a 931 n/a n/a
Wall-n-F 8 UNIT 208 Wall new 90 Front 232 47.5 90
Wall-n-B 8 UNIT 208 Wall new 270 Back 205 68 90
Wall-n-R 4 UNIT 208 Wall new 0 Right 383 34 90
Interior Wall-n to WH Room 8 UNIT 208>>WH Rooms Wall Int new n/a n/a 29 0 n/a
Ceiling-n 4 UNIT 208 Ceiling attic new n/a n/a 263 n/a n/a
Ceiling-n 4-2 UNIT 208 Ceiling attic new n/a n/a 668 n/a n/a
Interior Floor-n over UNIT 108 UNIT 208>>UNIT 108 Floor Int R0 n/a n/a 931 n/a n/a
GWall-n-L WH Rooms Wall Gar 180 Left 324 0 90
GWall-n-B WH Rooms Wall Gar 270 Back 245 0 90
GWall-n-R WH Rooms Wall Gar 0 Right 324 0 90
GCeiling-n WH Rooms Ceiling attic Gar n/a n/a 80 n/a n/a
ATTIC
01 02 03 04 05 06 07 08
Name Construction Type Roof Rise Roof Reflectance Roof Emittance Radiant Barrier Cool Roof
Attic Tile Tile Roof RB Ventilated 4 0.2 0.85 Yes Yes
Attic-BU Built-Up Roof RB Ventilated 0.25 0.5 0.85 Yes Yes
424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01
Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 6 of 18
Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16
Registration Number:Registration Date/Time:HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41
FENESTRATION / GLAZING
01 02 03 04 05 06 07 08 09 10
Name Type Surface (Orientation-Azimuth)Width (ft)
Height
(ft)Multiplier
Area
(ft2)U-factor SHGC Exterior Shading
Wind-n-A Window Wall-n-F (Front-90)2.0 4.5 1 9.0 0.30 0.28 Insect Screen (default)
Wind-n-B Window Wall-n-L (Left-180)3.5 4.0 1 14.0 0.30 0.28 Insect Screen (default)
Wind-n-W Window Wall-n-L (Left-180)5.0 4.0 1 20.0 0.30 0.28 Insect Screen (default)
Wind-n-I Window Wall-n-L (Left-180)2.0 2.0 1 4.0 0.27 0.30 Insect Screen (default)
Wind-n-J Window Wall-n-L (Left-180)2.0 2.0 1 4.0 0.27 0.30 Insect Screen (default)
Wind-n-K Window Wall-n-L (Left-180)2.0 2.0 1 4.0 0.27 0.30 Insect Screen (default)
Wind-n-S Window Wall-n-B (Back-270)4.0 5.0 1 20.0 0.30 0.26 Insect Screen (default)
Wind-n-R Window Wall-n-B (Back-270)5.0 4.0 1 20.0 0.30 0.28 Insect Screen (default)
Wind-n-D Window Wall-n-F 2 (Front-90)2.0 4.5 1 9.0 0.30 0.28 Insect Screen (default)
Wind-n-Q Window Wall-n-B 2 (Back-270)5.0 4.0 1 20.0 0.30 0.26 Insect Screen (default)
Wind-n-P Window Wall-n-B 2 (Back-270)5.0 4.0 1 20.0 0.30 0.26 Insect Screen (default)
Wind-n-C Window Wall-n-R (Right-0)3.5 4.0 1 14.0 0.30 0.28 Insect Screen (default)
Wind-n-E Window Wall-n-F 3 (Front-90)2.0 4.5 1 9.0 0.30 0.28 Insect Screen (default)
Wind-n-F Window Wall-n-L 2 (Left-180)3.5 4.0 1 14.0 0.30 0.28 Insect Screen (default)
Wind-n-O Window Wall-n-B 3 (Back-270)5.0 4.0 1 20.0 0.30 0.26 Insect Screen (default)
Wind-n-N Window Wall-n-B 3 (Back-270)5.0 4.0 1 20.0 0.30 0.26 Insect Screen (default)
Wind-n-H Window Wall-n-F 4 (Front-90)2.0 4.5 1 9.0 0.30 0.28 Insect Screen (default)
Wind-n-M Window Wall-n-B 4 (Back-270)5.0 4.0 1 20.0 0.30 0.26 Insect Screen (default)
Wind-n-L Window Wall-n-B 4 (Back-270)5.0 4.0 1 20.0 0.30 0.26 Insect Screen (default)
Wind-n-I 2 Window Wall-n-R 2 (Right-0)5.0 4.0 1 20.0 0.30 0.28 Insect Screen (default)
Wind-n-G Window Wall-n-R 2 (Right-0)3.5 4.0 1 14.0 0.30 0.28 Insect Screen (default)
Wind-n-Z Window Wall-n-F 5 (Front-90)5.0 2.0 1 10.0 0.30 0.28 Insect Screen (default)
Wind-n-X Window Wall-n-F 5 (Front-90)3.0 4.5 1 13.5 0.30 0.28 Insect Screen (default)
Wind-n-Y Window Wall-n-L 3 (Left-180)3.5 4.0 1 14.0 0.30 0.28 Insect Screen (default)
Wind-n-UU Window Wall-n-L 3 (Left-180)5.0 4.0 1 20.0 0.30 0.28 Insect Screen (default)
Wind-n-MM Window Wall-n-L 3 (Left-180)2.0 2.0 1 4.0 0.27 0.30 Insect Screen (default)
Wind-n-LL Window Wall-n-L 3 (Left-180)2.0 2.0 1 4.0 0.27 0.30 Insect Screen (default)
Wind-n-KK Window Wall-n-L 3 (Left-180)2.0 2.0 1 4.0 0.27 0.30 Insect Screen (default)
Wind-n-QQ Window Wall-n-B 5 (Back-270)5.0 4.0 1 20.0 0.30 0.26 Insect Screen (default)
424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01
Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 7 of 18
Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16
Registration Number:Registration Date/Time:HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41
GlDoor-n-67 Window Wall-n-B 5 (Back-270)6.0 8.0 1 48.0 0.31 0.28 Insect Screen (default)
Wind-n-CC Window Wall-n-F 6 (Front-90)3.0 4.5 1 13.5 0.30 0.28 Insect Screen (default)
Wind-n-AA Window Wall-n-F 6 (Front-90)5.0 2.0 1 10.0 0.30 0.28 Insect Screen (default)
Wind-n-PP Window Wall-n-B 6 (Back-270)5.0 4.0 1 20.0 0.30 0.26 Insect Screen (default)
GlDoor-n-77 Window Wall-n-B 6 (Back-270)6.0 8.0 1 48.0 0.31 0.28 Insect Screen (default)
Wind-n-BB Window Wall-n-R 3 (Right-0)3.5 4.0 1 14.0 0.30 0.28 Insect Screen (default)
Wind-n-FF Window Wall-n-F 7 (Front-90)5.0 2.0 1 10.0 0.30 0.28 Insect Screen (default)
Wind-n-DD Window Wall-n-F 7 (Front-90)3.0 4.5 1 13.5 0.30 0.28 Insect Screen (default)
Wind-n-EE Window Wall-n-L 4 (Left-180)3.5 4.0 1 14.0 0.30 0.28 Insect Screen (default)
Wind-n-OO Window Wall-n-B 7 (Back-270)5.0 4.0 1 20.0 0.30 0.26 Insect Screen (default)
GlDoor-n-87 Window Wall-n-B 7 (Back-270)6.0 8.0 1 48.0 0.31 0.28 Insect Screen (default)
Wind-n-II Window Wall-n-F 8 (Front-90)3.0 4.5 1 13.5 0.30 0.28 Insect Screen (default)
Wind-n-GG Window Wall-n-F 8 (Front-90)5.0 2.0 1 10.0 0.30 0.28 Insect Screen (default)
Wind-n-NN Window Wall-n-B 8 (Back-270)5.0 4.0 1 20.0 0.30 0.26 Insect Screen (default)
GlDoor-n-97 Window Wall-n-B 8 (Back-270)6.0 8.0 1 48.0 0.31 0.28 Insect Screen (default)
Wind-n-JJ Window Wall-n-R 4 (Right-0)5.0 4.0 1 20.0 0.30 0.26 Insect Screen (default)
Wind-n-HH Window Wall-n-R 4 (Right-0)3.5 4.0 1 14.0 0.30 0.28 Insect Screen (default)
OPAQUE DOORS
01 02 03 04
Name Side of Building Area (ft2)U-factor
Door-n-1 Wall-n-F 24.0 0.50
Door-n-10 Wall-n-B 24.0 0.50
Door-n-11 Wall-n-F 2 24.0 0.50
Door-n-20 Wall-n-B 2 24.0 0.50
Door-n-21 Wall-n-F 3 24.0 0.50
Door-n-30 Wall-n-B 3 24.0 0.50
Door-n-31 Wall-n-F 4 24.0 0.50
Door-n-39 Wall-n-B 4 24.0 0.50
Door-n-58 Wall-n-F 5 24.0 0.50
Door-n-68 Wall-n-F 6 24.0 0.50
Door-n-78 Wall-n-F 7 24.0 0.50
Door-n-88 Wall-n-F 8 24.0 0.50
424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01
Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 8 of 18
Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16
Registration Number:Registration Date/Time:HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41
OVERHANGS AND FINS
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Overhang Left Fin Right Fin
Window Depth Dist Up
Left
Extent
Right
Extent Flap Ht.Depth Top Up Dist L Bot Up Depth Top Up Dist R Bot Up
Wind-n-A 6 2 2.7 7 0 0 0 0 0 0 0 0 0
Wind-n-B 13 2 1 2 0 0 0 0 0 0 0 0 0
Wind-n-S 6 2 4 4 0 0 0 0 0 0 0 0 0
Wind-n-D 6 2 7.5 15 0 0 0 0 0 0 0 0 0
Wind-n-P 6 2 1 4 0 0 0 0 0 0 0 0 0
Wind-n-C 25 2 2 1 0 0 0 0 0 0 0 0 0
Wind-n-E 6 2 15 7 0 0 0 0 0 0 0 0 0
Wind-n-F 25 2 1 2 0 0 0 0 0 0 0 0 0
Wind-n-O 6 2 4 1 0 0 0 0 0 0 0 0 0
Wind-n-H 6 2 9 1.8 0 0 0 0 0 0 0 0 0
Wind-n-L 6 2 4 4 0 0 0 0 0 0 0 0 0
Wind-n-G 13 2 2 1 0 0 0 0 0 0 0 0 0
424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01
Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 9 of 18
Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16
Registration Number:Registration Date/Time:HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41
OPAQUE SURFACE CONSTRUCTIONS
01 02 03 04 05 06 07
Construction Name Surface Type Construction Type Framing
Total Cavity
R-value
Winter Design
U-factor Assembly Layers
Built-Up Roof RB Attic Roofs Wood Framed Ceiling 2x10 @ 24 in. O.C.R 30 0.036
•Cavity / Frame: R-30 / 2x10
•Roof Deck: Wood Siding/sheathing/decking
•Roofing: Light Roof (Asphalt Shingle)
Tile Roof RB Attic Roofs Wood Framed Ceiling 2x10 @ 24 in. O.C.R 30 0.035
•Cavity / Frame: R-30 / 2x10
•Roof Deck: Wood Siding/sheathing/decking
•Tile Gap: present
•Roofing: 10 PSF (RoofTile)
Wall new Exterior Walls Wood Framed Wall 2x6 @ 16 in. O.C.R 21 0.065
•Inside Finish: Gypsum Board
•Cavity / Frame: R-21 / 2x6
•Sheathing / Insulation: Wood
Siding/sheathing/decking
•Exterior Finish: 3 Coat Stucco
Wall Gar Exterior Walls Wood Framed Wall 2x4 @ 16 in. O.C.none 0.387
•Inside Finish: Gypsum Board
•Cavity / Frame: no insul. / 2x4
Wall Int R0 Interior Walls Wood Framed Wall 2x4 @ 16 in. O.C.none 0.277
•Inside Finish: Gypsum Board
•Cavity / Frame: no insul. / 2x4
•Other Side Finish: Gypsum Board
Wall Int new Interior Walls Wood Framed Wall 2x6 @ 16 in. O.C.R 21 0.064
•Inside Finish: Gypsum Board
•Cavity / Frame: R-21 / 2x6
•Other Side Finish: Gypsum Board
Floor Int R0 Interior Floors Wood Framed Floor 2x6 @ 16 in. O.C.none 0.199
•Floor Surface: Carpeted
•Floor Deck: Wood Siding/sheathing/decking
•Cavity / Frame: no insul. / 2x6
•Ceiling Below Finish: Gypsum Board
Ceiling attic new
Ceilings (below
attic)Wood Framed Ceiling 2x4 @ 24 in. O.C.R 30 0.032
•Inside Finish: Gypsum Board
•Cavity / Frame: R-9.1 / 2x4
•Over Ceiling Joists: R-20.9 insul.
Ceiling attic Gar
Ceilings (below
attic)Wood Framed Ceiling 2x4 @ 16 in. O.C.none 0.472
•Inside Finish: Gypsum Board
•Cavity / Frame: no insul. / 2x4
424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01
Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 10 of 18
Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16
Registration Number:Registration Date/Time:HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41
SLAB FLOORS
01 02 03 04 05 06 07
Name Zone Area (ft2)Perimeter (ft)Edge Insul. R-value & Depth Carpeted Fraction Heated
Slab On Grade-n 1 UNIT 105 931 92 None 0.8 No
Slab On Grade-n 2 UNIT 106 931 62 None 0.8 No
Slab On Grade-n 3 UNIT 107 931 62 None 0.8 No
Slab On Grade-n 4 UNIT 108 931 92 None 0.8 No
GSlab On Grade-n WH Rooms 80 48 None 0 No
BUILDING ENVELOPE - HERS VERIFICATION
01 02 03 04
Quality Insulation Installation (QII)Quality Installation of Spray Foam Insulation Building Envelope Air Leakage CFM50
Required Not Required Not Required n/a
WATER HEATING SYSTEMS
01 02 03 04 05 06 07
Name System Type
Number of
Systems
in Building
Multi-Family
Distribution Type Water Heater
Number of
Water
Heaters/System
Solar
Fraction
(%)
DHW System 1 Standard 1 Multi-family: No loops or
recirc pump Water Heater 1 (1)1 n/a
DHW System 2 Standard 1 Multi-family: No loops or
recirc pump Water Heater 2 (1)1 n/a
DHW System 3 Standard 1 Multi-family: No loops or
recirc pump Water Heater 3 (1)1 n/a
DHW System 4 Standard 1 Multi-family: No loops or
recirc pump Water Heater 4 (1)1 n/a
DHW System 5 Standard 1 Multi-family: No loops or
recirc pump Water Heater 5 (1)1 n/a
DHW System 6 Standard 1 Multi-family: No loops or
recirc pump Water Heater 6 (1)1 n/a
DHW System 7 Standard 1 Multi-family: No loops or
recirc pump Water Heater 7 (1)1 n/a
DHW System 8 Standard 1 Multi-family: No loops or
recirc pump Water Heater 8 (1)1 n/a
424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01
Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 11 of 18
Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16
Registration Number:Registration Date/Time:HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41
WATER HEATERS
01 02 03 04 05 06 07 08 09 10 11 12
Name
Heater
Element
Type Tank Type
Number
of Units
Tank
Volume
(gal)
Uniform Energy
Factor / Energy
Factor / Efficiency
Input Rating /
Pilot /
Thermal
Efficiency
Tank
Insulation
R-value
(Int/Ext)
Standby
Loss /
Recovery
Eff
First Hour
Rating /
Flow Rate
NEEA Heat Pump
Brand / Model
Tank Location
or Ambient
Condition
Water Heater 1 Electric
Resistance Small Storage 1 50 0.945 EF <= 12 kW 0 n/a n/a n/a WH Rooms
Water Heater 2 Electric
Resistance Small Storage 1 50 0.945 EF <= 12 kW 0 n/a n/a n/a WH Rooms
Water Heater 3 Electric
Resistance Small Storage 1 50 0.945 EF <= 12 kW 0 n/a n/a n/a WH Rooms
Water Heater 4 Electric
Resistance Small Storage 1 50 0.945 EF <= 12 kW 0 n/a n/a n/a WH Rooms
Water Heater 5 Electric
Resistance Small Storage 1 50 0.945 EF <= 12 kW 0 n/a n/a n/a WH Rooms
Water Heater 6 Electric
Resistance Small Storage 1 50 0.945 EF <= 12 kW 0 n/a n/a n/a WH Rooms
Water Heater 7 Electric
Resistance Small Storage 1 50 0.945 EF <= 12 kW 0 n/a n/a n/a WH Rooms
Water Heater 8 Electric
Resistance Small Storage 1 50 0.945 EF <= 12 kW 0 n/a n/a n/a WH Rooms
424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01
Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 12 of 18
Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16
Registration Number:Registration Date/Time:HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41
SPACE CONDITIONING SYSTEMS
01 02 03 04 05 06
SC Sys Name System Type Heating Unit Name Cooling Unit Name Fan Name Distribution Name
DwellingUnit 105 | :Heat Pump System
1:Distribution System 1:HVAC Fan System 1:2:3
Heat Pump Heating and
Cooling System Heat Pump System 1 Heat Pump System 1 HVAC Fan System 1 Distribution System 1
DwellingUnit 106 | :Heat Pump System
2:Distribution System 2:HVAC Fan System 2:2:3
Heat Pump Heating and
Cooling System Heat Pump System 2 Heat Pump System 2 HVAC Fan System 2 Distribution System 2
DwellingUnit 107 | :Heat Pump System
3:Distribution System 3:HVAC Fan System 3:2:3
Heat Pump Heating and
Cooling System Heat Pump System 3 Heat Pump System 3 HVAC Fan System 3 Distribution System 3
DwellingUnit 108 | :Heat Pump System
4:Distribution System 4:HVAC Fan System 4:2:3
Heat Pump Heating and
Cooling System Heat Pump System 4 Heat Pump System 4 HVAC Fan System 4 Distribution System 4
DwellingUnit 205 | :Heat Pump System
5:Distribution System 5:HVAC Fan System 5:2:3
Heat Pump Heating and
Cooling System Heat Pump System 5 Heat Pump System 5 HVAC Fan System 5 Distribution System 5
DwellingUnit 206 | :Heat Pump System
6:Distribution System 6:HVAC Fan System 6:2:3
Heat Pump Heating and
Cooling System Heat Pump System 6 Heat Pump System 6 HVAC Fan System 6 Distribution System 6
DwellingUnit 207 | :Heat Pump System
7:Distribution System 7:HVAC Fan System 7:2:3
Heat Pump Heating and
Cooling System Heat Pump System 7 Heat Pump System 7 HVAC Fan System 7 Distribution System 7
DwellingUnit 208 | :Heat Pump System
8:Distribution System 8:HVAC Fan System 8:2:3
Heat Pump Heating and
Cooling System Heat Pump System 8 Heat Pump System 8 HVAC Fan System 8 Distribution System 8
424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01
Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 13 of 18
Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16
Registration Number:Registration Date/Time:HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41
HVAC - HEAT PUMPS
01 02 03 04 05 06 07 08 09 10
Heating Cooling Zonally Multispeed HERS
Name System Type HSPF/COP Cap 47 Cap 17 SEER EER Controlled Compressor Verification
Heat Pump System 1 PkgHeatPump 8.2 36000 29000 15 12.44 No No Heat Pump System
1-hers-cool
Heat Pump System 2 PkgHeatPump 8.2 36000 29000 15 12.44 No No Heat Pump System
2-hers-cool
Heat Pump System 3 PkgHeatPump 8.2 36000 29000 15 12.44 No No Heat Pump System
3-hers-cool
Heat Pump System 4 PkgHeatPump 8.2 36000 29000 15 12.44 No No Heat Pump System
4-hers-cool
Heat Pump System 5 PkgHeatPump 8.2 36000 29000 15 12.44 No No Heat Pump System
5-hers-cool
Heat Pump System 6 PkgHeatPump 8.2 36000 29000 15 12.44 No No Heat Pump System
6-hers-cool
Heat Pump System 7 PkgHeatPump 8.2 36000 29000 15 12.44 No No Heat Pump System
7-hers-cool
Heat Pump System 8 PkgHeatPump 8.2 36000 29000 15 12.44 No No Heat Pump System
8-hers-cool
HVAC COOLING - HERS VERIFICATION
01 02 03 04 05 06
Name Verified Airflow Airflow Target (CFM)Verified EER Verified SEER
Verified Refrigerant
Charge
Heat Pump System 1-hers-cool Required 350 Not Required Required Not Required
Heat Pump System 2-hers-cool Required 350 Not Required Required Not Required
Heat Pump System 3-hers-cool Required 350 Not Required Required Not Required
Heat Pump System 4-hers-cool Required 350 Not Required Required Not Required
Heat Pump System 5-hers-cool Required 350 Not Required Required Not Required
Heat Pump System 6-hers-cool Required 350 Not Required Required Not Required
Heat Pump System 7-hers-cool Required 350 Not Required Required Not Required
Heat Pump System 8-hers-cool Required 350 Not Required Required Not Required
424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01
Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 14 of 18
Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16
Registration Number:Registration Date/Time:HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41
HVAC - DISTRIBUTION SYSTEMS
01 02 03 04 05 06 07
Name Type Duct Leakage Insulation R-value Duct Location Bypass Duct HERS Verification
Distribution System 1 DuctsAttic Sealed and tested 8 Attic None Distribution System
1-hers-dist
Distribution System 2 DuctsAttic Sealed and tested 8 Attic None Distribution System
1-hers-dist
Distribution System 3 DuctsAttic Sealed and tested 8 Attic None Distribution System
1-hers-dist
Distribution System 4 DuctsAttic Sealed and tested 8 Attic None Distribution System
1-hers-dist
Distribution System 5 DuctsAttic Sealed and tested 8 Attic None Distribution System
1-hers-dist
Distribution System 6 DuctsAttic Sealed and tested 8 Attic None Distribution System
1-hers-dist
Distribution System 7 DuctsAttic Sealed and tested 8 Attic None Distribution System
1-hers-dist
Distribution System 8 DuctsAttic Sealed and tested 8 Attic None Distribution System
1-hers-dist
424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01
Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 15 of 18
Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16
Registration Number:Registration Date/Time:HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41
HVAC DISTRIBUTION - HERS VERIFICATION
01 02 03 04 05 06 07 08
Duct Leakage Duct Leakage Verified Duct Verified Duct Buried Deeply Buried Low-leakage
Name Verification Target (%)Location Design Ducts Ducts Air Handler
Distribution System 1-hers-dist Required
total leakage <= 12.0
or leakage to
outdoors <= 5.0
Not Required Not Required Not Required Not Required n/a
Distribution System 2-hers-dist Required
total leakage <= 12.0
or leakage to
outdoors <= 5.0
Not Required Not Required Not Required Not Required n/a
Distribution System 3-hers-dist Required
total leakage <= 12.0
or leakage to
outdoors <= 5.0
Not Required Not Required Not Required Not Required n/a
Distribution System 4-hers-dist Required
total leakage <= 12.0
or leakage to
outdoors <= 5.0
Not Required Not Required Not Required Not Required n/a
Distribution System 5-hers-dist Required
total leakage <= 12.0
or leakage to
outdoors <= 5.0
Not Required Not Required Not Required Not Required n/a
Distribution System 6-hers-dist Required
total leakage <= 12.0
or leakage to
outdoors <= 5.0
Not Required Not Required Not Required Not Required n/a
Distribution System 7-hers-dist Required
total leakage <= 12.0
or leakage to
outdoors <= 5.0
Not Required Not Required Not Required Not Required n/a
Distribution System 8-hers-dist Required
total leakage <= 12.0
or leakage to
outdoors <= 5.0
Not Required Not Required Not Required Not Required n/a
424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01
Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 16 of 18
Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16
Registration Number:Registration Date/Time:HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41
HVAC - FAN SYSTEMS
01 02 03 04
Name Type Fan Power (Watts/CFM)HERS Verification
HVAC Fan System 1 Single Speed PSC Furnace Fan 0.58 HVAC Fan System 1-hers-fan
HVAC Fan System 2 Single Speed PSC Furnace Fan 0.58 HVAC Fan System 1-hers-fan
HVAC Fan System 3 Single Speed PSC Furnace Fan 0.58 HVAC Fan System 1-hers-fan
HVAC Fan System 4 Single Speed PSC Furnace Fan 0.58 HVAC Fan System 1-hers-fan
HVAC Fan System 5 Single Speed PSC Furnace Fan 0.58 HVAC Fan System 1-hers-fan
HVAC Fan System 6 Single Speed PSC Furnace Fan 0.58 HVAC Fan System 1-hers-fan
HVAC Fan System 7 Single Speed PSC Furnace Fan 0.58 HVAC Fan System 1-hers-fan
HVAC Fan System 8 Single Speed PSC Furnace Fan 0.58 HVAC Fan System 1-hers-fan
HVAC FAN SYSTEMS - HERS VERIFICATION
01 02 03
Name Verified Fan Watt Draw Required Fan Efficiency (Watts/CFM)
HVAC Fan System 1-hers-fan Required 0.58
HVAC Fan System 2-hers-fan Required 0.58
HVAC Fan System 3-hers-fan Required 0.58
HVAC Fan System 4-hers-fan Required 0.58
HVAC Fan System 5-hers-fan Required 0.58
HVAC Fan System 6-hers-fan Required 0.58
HVAC Fan System 7-hers-fan Required 0.58
HVAC Fan System 8-hers-fan Required 0.58
424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01
Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 17 of 18
Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16
Registration Number:Registration Date/Time:HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41
IAQ (Indoor Air Quality) FANS
01 02 03 04 05 06
Dwelling Unit IAQ CFM IAQ Watts/CFM IAQ Fan Type
IAQ Recovery
Effectiveness(%)HERS Verification
DwellingUnit 105 1/1 50 0.25 Default 0 Required
DwellingUnit 106 1/1 50 0.25 Default 0 Required
DwellingUnit 107 1/1 50 0.25 Default 0 Required
DwellingUnit 108 1/1 50 0.25 Default 0 Required
DwellingUnit 205 1/1 50 0.25 Default 0 Required
DwellingUnit 206 1/1 50 0.25 Default 0 Required
DwellingUnit 207 1/1 50 0.25 Default 0 Required
DwellingUnit 208 1/1 50 0.25 Default 0 Required
424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01
Project Name:An Apartment Complex for Nispero Properties, Inc Calculation Date/Time:14:55, Thu, Feb 08, 2024 Page 18 of 18
Calculation Description:Title 24 Analysis Input File Name:51-480_Desert_Club_MF-N_r2.ribd16
Registration Number:Registration Date/Time:HERS Provider:
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1R-01162019-1149 Report Generated at: 2024-02-08 14:56:41
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name:Documentation Author Signature:
Company:Signature Date:
Address:CEA/HERS Certification Identification (If applicable):
City/State/Zip:Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance.
2.I certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of
Regulations.
3.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
Responsible Designer Name:Responsible Designer Signature:
Company:Date Signed:
Address:License:
City/State/Zip:Phone:
Igor Pichko
Energy Consult LLC 10/21/2024
1252 W 22nd St Unit #2 R19-14-30005
San Pedro, CA 90731 4242477658
Stephen Nieto
South West Concepts, Inc.10/21/2024
78115 Calle Estado, Suite 106
La Quinta, CA 92253 7605646409
424-P010255225A-000-000-0000000-0000 10/21/2024 14:36 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-001-E21001A-0000
Registration Date/Time: 2024-10-23 12:15:24 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
CERTIFICATE OF INSTALLATION CF2R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 105)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Signature Date:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-001-E22002A-0000
Registration Date/Time: 2024-10-23 12:15:28 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
CERTIFICATE OF INSTALLATION CF2R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 105)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Signature Date:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-001-E23003A-0000
Registration Date/Time: 2024-10-23 12:15:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
CERTIFICATE OF INSTALLATION CF2R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 105)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Signature Date:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-002-E21001A-0000
Registration Date/Time: 2024-10-23 12:55:09 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:16
CERTIFICATE OF INSTALLATION CF2R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 106)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-002-E22002A-0000
Registration Date/Time: 2024-10-23 12:55:17 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:16
CERTIFICATE OF INSTALLATION CF2R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 106)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-002-E23003A-0000
Registration Date/Time: 2024-10-23 12:55:30 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:16
CERTIFICATE OF INSTALLATION CF2R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 106)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-003-E21001A-0000
Registration Date/Time: 2024-10-23 12:59:12 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:17
CERTIFICATE OF INSTALLATION CF2R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 107)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-003-E22002A-0000
Registration Date/Time: 2024-10-23 12:59:18 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:18
CERTIFICATE OF INSTALLATION CF2R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 107)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-003-E23003A-0000
Registration Date/Time: 2024-10-23 12:59:21 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:19
CERTIFICATE OF INSTALLATION CF2R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 107)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-004-E21001A-0000
Registration Date/Time: 2024-10-23 13:02:14 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:20
CERTIFICATE OF INSTALLATION CF2R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 108)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-004-E22002A-0000
Registration Date/Time: 2024-10-23 13:02:17 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:20
CERTIFICATE OF INSTALLATION CF2R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 108)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-004-E23003A-0000
Registration Date/Time: 2024-10-23 13:02:19 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
CERTIFICATE OF INSTALLATION CF2R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 108)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-005-E21001A-0000
Registration Date/Time: 2024-10-23 13:06:04 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:23
CERTIFICATE OF INSTALLATION CF2R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 205)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-005-E22002A-0000
Registration Date/Time: 2024-10-23 13:06:06 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:23
CERTIFICATE OF INSTALLATION CF2R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 205)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-005-E23003A-0000
Registration Date/Time: 2024-10-23 13:06:09 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:24
CERTIFICATE OF INSTALLATION CF2R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 205)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-006-E21001A-0000
Registration Date/Time: 2024-10-23 13:09:08 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
CERTIFICATE OF INSTALLATION CF2R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 206)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-006-E22002A-0000
Registration Date/Time: 2024-10-23 13:09:10 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:26
CERTIFICATE OF INSTALLATION CF2R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 206)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-006-E23003A-0000
Registration Date/Time: 2024-10-23 13:09:12 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
CERTIFICATE OF INSTALLATION CF2R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 206)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-007-E21001A-0000
Registration Date/Time: 2024-10-23 13:12:20 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:28
CERTIFICATE OF INSTALLATION CF2R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 207)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-007-E22002A-0000
Registration Date/Time: 2024-10-23 13:12:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:28
CERTIFICATE OF INSTALLATION CF2R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 207)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-007-E23003A-0000
Registration Date/Time: 2024-10-23 13:12:26 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:29
CERTIFICATE OF INSTALLATION CF2R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 207)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-008-E21001A-0000
Registration Date/Time: 2024-10-23 13:16:29 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:30
CERTIFICATE OF INSTALLATION CF2R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 208)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-008-E22002A-0000
Registration Date/Time: 2024-10-23 13:16:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:30
CERTIFICATE OF INSTALLATION CF2R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 208)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-008-E23003A-0000
Registration Date/Time: 2024-10-23 13:16:35 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
CERTIFICATE OF INSTALLATION CF2R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 1 of 1)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 208)
City: La Quinta Zip Code: 92253
Quality Insulation Installation (QII) applies to the entire thermal envelope of the building. By signing below, you are
certifying that all of the applicable requirements in Residential Appendices (RA) 3.5 have been met. A qualified Home
Energy Rating System (HERS) rater will need to verify its conformance for meeting the requirements of Sections 150.0,
150.1(c), and 110.7(a) and (b).
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number: 424-P010255225A-001-001-M01004A-0000 Registration Date/Time: 2024-10-23 12:20:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 1 of 10)
Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La Quinta
(DwellingUnit 105)
City: La Quinta Zip Code: 92253
A. General Information
01 Dwelling Unit Name DwellingUnit 105 02 Climate Zone 15
03 Dwelling Unit Total
Conditioned Floor Area (ft2)931 04
Number of Space
Conditioning Systems in this
dwelling unit.
1
05 Certificate of Compliance
Type Performance (CF1R-PRF)06 Method Used to Calculate
HVAC Loads ACCA Manual J
07
Calculated Dwelling Unit
Sensible Cooling Load
(Btu/h)
36000 08 Calculated Dwelling Unit
Heating Load (Btu/h)36000
09 Dwelling Unit Number of
Bedrooms 2
MCH-01a - Space Conditioning Systems Ducts and Fans - For use with Performance Certificate of Compliance
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 2 of 10)
Registration Number: 424-P010255225A-001-001-M01004A-0000 Registration Date/Time: 2024-10-23 12:20:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
B. Design Space Conditioning (SC) System Component Specifications from CF1R
This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project.
01 02 03 04 05 06 07 08 09 10 11 12
Zone Name
SC System
Identification
or Name
SC System
Type
Heating
System
Type
Cooling
System Type SC Fan Type Distribution
System Type
Required
Thermostat
Type
Low
Leakage
Air-Handling
Unit
(LLAHU)
Status
Bypass Duct
Status
Cooling
Zoning Type
Cooling
System
Compressor
Speed
This field or
section is
not
applicable
UNIT 105
HVACSys
Heat pump
heating
cooling
Central
packaged
HP
Central
packaged
HP
PSC
Permanent
Split Capacitor
Unconditione
d attic OCST per JA5 No, credit is
not taken
No Bypass
Duct Not Zonal Single Speed
Notes:
C. Design Space Conditioning (SC) System Compliance Requirements from CF1R
This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project.
01 02 03 04 05 06 07 08 09 10
SC System
Identification or
Name
Heating
Efficiency Type
Minimum
Heating
Efficiency Value
Heat Pump
Heating
Capacity at 47°F
Heat Pump
Heating
Capacity at 17°F
Minimum
Cooling
Efficiency SEER
Minimum
Cooling
Efficiency EER
Minimum
Cooling System
Airflow Rate
(CFM/ton)
Maximum Fan
Efficacy
(W/CFM)
Minimum Duct
R-Value
UNIT 105
HVACSys
Heating
Seasonal
Performance
Factor (HSPF)
8.2 36000 29000 15 12.44 350 0.58 R-8
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 3 of 10)
Registration Number: 424-P010255225A-001-001-M01004A-0000 Registration Date/Time: 2024-10-23 12:20:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
D. Installed Space Conditioning (SC) System Component Information
01 02 03 04 05 06 07 08 09 10 11
SC System
Identification
or Name
SC System
Location or
Area Served
Conditioned
Floor Area
Served by the
System (ft2)
Heating
System Type
Cooling
System Type SC Fan Type Distribution
System Type
SC System
Thermostat
Type
Cooling Zoning
Type
Cooling
System
Compressor
Speed Type
Central Fan
Integrated
(CFI)
Ventilation
System Status
UNIT 105
HVACSys Main 931 Central
packaged HP
Central
packaged HP
PSC
Permanent
Split Capacitor
Unconditioned
attic OCST per JA5 Not Zonal Single Speed Not a CFI
system
Notes:
E. Installed Heating System Equipment Information (not heat pumps)
This section does not apply to this project.
F. Installed Cooling System Outdoor Condensing Unit or Package Unit Equipment Information (not heat pumps)
This section does not apply to this project.
G. Installed Split System Indoor Coil or Fan Coil Unit Equipment Information (applicable to DX or hydronic heating/cooling coils or fan coil units)
Systems with more than one indoor coil or fan coil unit (e.g. multi-split systems) shall provide information for each of the system indoor coils or fan coil units.
This section does not apply to this project.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 4 of 10)
Registration Number: 424-P010255225A-001-001-M01004A-0000 Registration Date/Time: 2024-10-23 12:20:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
H. Installed Heat Pump System - Split System Condensing Unit or Package Unit Equipment Information
01 02 03 04 05
SC System
Identification or
Name
SC System Location
or Area Served Condenser or Package Unit Manufacturer
Condenser or Package Unit Model
Number Condenser or Package Unit Serial Number
UNIT 105 HVACSys Main RHEEM RHPAZR036JT000NA F422302304
Notes:
I. Installed Heat Pump System -Efficiency and Performance Compliance Information
01 02 03 04 05 06 07 08 09 10
SC System
Identification
or Name
SC System
Location or
Area Served
Heating
Efficiency Type
Heating
Efficiency Value
System Rated
Heating
Capacity at 47°F
System Rated
Heating
Capacity at 17°F
System Rated
Cooling
Efficiency SEER
System Rated
Cooling
Efficiency EER
System Rated
Cooling
Capacity at
Design
Conditions
(Btu/h)
Condenser
Rated Nominal
Capacity (ton)
UNIT 105
HVACSys Main
Heating
Seasonal
Performance
Factor (HSPF)
8.2 36000 29000 15 12.44 36000 3
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 5 of 10)
Registration Number: 424-P010255225A-001-001-M01004A-0000 Registration Date/Time: 2024-10-23 12:20:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
J. Installed Duct System Information
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identification
or Name
SC System
Location or
Area Served
Supply Duct
Location
Supply Duct
R-Value
Return Duct
Location
Return Duct
R-Value
Exemption
from Min
R-Value for
Ducts In
Conditioned
Space
Method of
compliance
with duct
and filter
grille sizing
Req's in
150.0(m)13
Exemption
From Duct
Leakage
Requirement
s
Bypass Duct
Status
Number of
Air Filter
Devices on
System
Can RA3.3
Airflow
Protocols be
used to test
this System?
UNIT 105
HVACSys Main Unconditio
ned attic R-8 Unconditio
ned attic R-8 Not
applicable
HERS
verified fan
efficacy
(W/cfm)
and airflow
rate
(cfm/ton)
None No Bypass
Duct 1 Yes
Notes:
K. Installed Air Filter Device Information
Mandatory requirements for air filter devices are specified Section 150.0(m)12.
01 02 03 04 05 06 07
SC System
Identification or Name
SC System Location or
Area Served
Air Filter Device
Identification or Name Air Filter Device Type
Air Filter Device
Location
Determined Design
Airflow Rate for Air
Filter Device (cfm)
Determined Design
Allowable Pressure
Drop for Air Filter
Device (inch W.C.)
UNIT 105 HVACSys Main Filter Filter Grille return 1050 0.1
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 6 of 10)
Registration Number: 424-P010255225A-001-001-M01004A-0000 Registration Date/Time: 2024-10-23 12:20:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
L. Air Filter Device Requirements
01 The system shall be designed to ensure that all recirculated air and all outdoor air supplied to the occupiable space is filtered before passing through the system's
thermal conditioning components.
02
The system shall be designed to accommodate the clean-filter pressure drop imposed by the system air filter device(s). The design airflow rate and maximum
allowable clean-filter pressure drop at the design airflow rate applicable to each air filter device shall be determined, and all system air filter device locations shall be
labeled to disclose the applicable design airflow rate and the maximum allowable clean-filter pressure drop. The labels shall be permanently affixed to the air filter
device, readily legible, and visible to a person replacing the air filter media, and the air filter devices shall be provided with air filter media that conforms to these
determined or labeled maximum allowable clean-filter pressure drop values as rated using AHRI Standard 680.
03 All system air filter devices shall be located and installed in such a manner as to allow access and regular service by the system owner.
04 The system shall be provided with air filter media having a designated efficiency equal to or greater than MERV 6 when tested in accordance with ASHRAE Standard
52.2, or a particle size efficiency rating equal to or greater than 50% in the 3.0 to10 µm range when tested in accordance with AHRI Standard 680.
05 The system shall be provided with air filter media that has been labeled by the manufacturer to disclose the efficiency and pressure drop ratings that conform to the
required efficiency and pressure drop requirements for the air filter device.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met
M. HERS Verification Requirements
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identificati
on or
Name
SC System
Location or
Area
Served
MCH-20
.
.
Duct
Leakage
Test
MCH-21
.
Duct
Location
Verification
MCH-22
.
AHU Fan
Efficacy
(W/cfm)
MCH-23
.
AHU
Airflow
Rate
(cfm/ton)
MCH-25
.
.
Refrigerant
Charge
MCH-26
Rated SC
System
Equipment
Verification
MCH-27
.
IAQ
Mechanical
Ventilation
MCH-28
Return
Duct
Design
Table
150.0-B or
C
MCH-29
Supply
Duct
Surface
Area
R-Value
Buried
Ducts
MCH30
.
Ventilation
Cooling
Credit
UNIT 105
HVACSys Main Yes No Yes Yes No Yes Yes No No No
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 7 of 10)
Registration Number: 424-P010255225A-001-001-M01004A-0000 Registration Date/Time: 2024-10-23 12:20:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
M. HERS Verification Requirements
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identificati
on or
Name
SC System
Location or
Area
Served
MCH-20
.
.
Duct
Leakage
Test
MCH-21
.
Duct
Location
Verification
MCH-22
.
AHU Fan
Efficacy
(W/cfm)
MCH-23
.
AHU
Airflow
Rate
(cfm/ton)
MCH-25
.
.
Refrigerant
Charge
MCH-26
Rated SC
System
Equipment
Verification
MCH-27
.
IAQ
Mechanical
Ventilation
MCH-28
Return
Duct
Design
Table
150.0-B or
C
MCH-29
Supply
Duct
Surface
Area
R-Value
Buried
Ducts
MCH30
.
Ventilation
Cooling
Credit
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 8 of 10)
Registration Number: 424-P010255225A-001-001-M01004A-0000 Registration Date/Time: 2024-10-23 12:20:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures
Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly
installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements.
Heating Equipment
01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency
Regulations.
02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant
to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(i), 110.2(b).
03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections
150.0(h)1 and 2).
04 Furnace Temperature Rise: Central forced-air heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum
inlet-to-outlet temperature rise specification. See Section 150.0(h)4.
05 Standby Losses and Pilot Lights: Fan-type central furnaces may not have a continuously burning pilot light. Section 110.5 and Section 110.2(d).
Cooling Equipment
06 Equipment Efficiency: All cooling equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency
Regulations.
07 Refrigerant Line Insulation: All refrigerant line insulation in split system air conditioners and heat pumps must meet the R-value and protection requirements of Section
150.0(j)2 and 3, and Section 150.0(m)9.
08 Condensing Unit Location: Condensing units shall not be placed within five (5) feet of a dryer vent outlet. See Section 150.0(h)3A.
09 Liquid Line Filter Drier: If applicable, a liquid line filter drier shall be installed according to the manufacturer's specifications. Section 150.0(h)3B
10 Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section
150.0(h)1 and 2.
Air Distribution System Ducts, Plenums and Fans
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 9 of 10)
Registration Number: 424-P010255225A-001-001-M01004A-0000 Registration Date/Time: 2024-10-23 12:20:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures
Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly
installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements.
11 Insulation: In all cases, unless ducts are enclosed entirely in directly conditioned space, the minimum duct insulation value is R-6. Note that higher values may be
required by the prescriptive or performance requirements. See Section 150.0(m)1.
12
Connections and Closures: All installed air-distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0,
602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006: Supply-air and return-air ducts and plenums must be insulated to a minimum installed level of R-6.0 or
enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing in accordance with the requirements of Reference
Residential Appendix RA3.1.4.3.8.
Heat Pump Thermostat
13 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c).
14 The thermostat shall be installed in accordance with the manufacturers published installation specifications
15 First stage of heating shall be assigned to heat pump heating.
16 Second stage back up heating shall be set to come on only when the indoor set temperature cannot be met.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 10 of 10)
Registration Number: 424-P010255225A-001-001-M01004A-0000 Registration Date/Time: 2024-10-23 12:20:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of
features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized
representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the
installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency.
4.I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all
applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-001-M27005A-0000
Registration Date/Time: 2024-10-23 12:21:38 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 1 of 7)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 105)
City: La Quinta Zip Code: 92253
Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE
Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on
this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010.
A. Dwelling Mechanical Ventilation - General Information
01 Dwelling unit name DwellingUnit 105
02 Building Type Single Family
03 Project scope Newly constructed building
04
Total Conditioned Floor Area of Dwelling Unit
(For addition projects the conditioned floor area equals
existing area plus addition area. )
931
05
Number of bedrooms in dwelling unit
(For addition projects the number of bedrooms equals the
existing bedrooms plus addition bedrooms)
2
06 Ventilation Operation Schedule Continuous
07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1)
08 Whole Building Ventilation System Type Standalone - Balanced
09 IAQ Fan Location
Note:
Non-dwelling units do not meet the definition for a dwelling unit as defined in Section 100.1(b). Non-dwelling units are not
designed to provide independent living facilities and do not provide permanent provisions for living, sleeping, eating, cooking and
sanitation.
MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method
B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method
A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with
outdoor air each hour at no less than the rate in equation 4.1a.
01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81
02 Installed Continuous Whole-Building Ventilation Rate 136
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 2 of 7)
Registration Number:
424-P010255225A-001-001-M27005A-0000
Registration Date/Time: 2024-10-23 12:21:38 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
C. Compliance Statement
01 Building passes continuous whole-building ventilation rate test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 3 of 7)
Registration Number:
424-P010255225A-001-001-M27005A-0000
Registration Date/Time: 2024-10-23 12:21:38 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
D. Local Mechanical Exhaust System - Fan selection and duct design criteria for compliance
Local mechanical exhaust fans shall be installed in each kitchen and bathroom. Delivered local ventilation rates:
•All local ventilation rates have been measured using a flow hood, flow grid, or other airflow measuring device and meet the
requirements of 62.2 Tables 5.1 or 5.2. OR
•The airflow rating at a pressure of 0.25 in. w.c. of a certified fan is assumed because the local ventilation system duct sizing
meets the prescriptive requirements of 62.2 Table 5.3, or manufacturer's design criteria.
Table 5.1
Intermittent Local Ventilation Exhaust Airflow Rates
Application Airflow Notes
Kitchen 100 cfm
Vented range hood (including
appliance-range hood combinations)
required if exhaust fan flow is less than 5
ACH.
Bathroom 50 cfm
Table 5.2
Continuous Local Ventilation Exhaust Airflow Rates
Application Airflow Notes
Kitchen 5 ACH Based on Kitchen volume.
Bathroom 20 cfm
Table 5.3
Prescriptive Duct Sizing Requirements
Duct Type Flex Duct Smooth Duct
Fan Rating
cfm @ 0.25
in. w.g.
50 80 100 125 50 80 100 125
Maximum Allowable Duct Length (ft)
Diameter,
(in)Flex Duct Smooth Duct
3 X X X X 5 X X X
4 70 3 X X 105 35 5 X
5 NL 70 35 20 NL 135 85 55
6 NL NL 125 95 NL NL NL 145
7 and above NL NL NL NL NL NL NL NL
This table assumes no elbows. Deduct 15 ft of allowable duct length for each turn, elbow, or fitting. Interpolation and extrapolation
in 62.2 Table 5.3 is not allowed. For airflow values not listed, use the next higher value. This table is not applicable for airflow > 125
cfm.
NL = no limit on duct length of this size.
X = not allowed, any length of duct of this size with assumed turns, elbows, fittings will exceed the rated pressure drop.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 4 of 7)
Registration Number:
424-P010255225A-001-001-M27005A-0000
Registration Date/Time: 2024-10-23 12:21:38 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
E. Other Requirements
The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other
Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information
describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if
applicable.
01
6.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components to occupiable spaces from
garages, unconditioned crawl spaces, and unconditioned attics. Supply and balanced ventilation systems shall be designed
and constructed to provide ventilation air directly from the outdoors.
02
6.2 Instructions and Labeling.Information on the ventilation design and/or ventilation systems installed, instructions on
their proper operation to meet the requirements of this standard, and instructions detailing any required maintenance
(similar to that provided for HVAC systems) shall be provided to the owner and the occupant of the dwelling unit. Controls
shall be labeled as to their function (unless that function is obvious, such as toilet exhaust fan switches). See Chapter 13 of
Guideline 24 2 for information on instructions and labeling.
03 6.3 Clothes Dryers.Clothes dryers shall be exhausted directly to the outdoors
04
6.4 Combustion and Solid-Fuel Burning Appliances.Combustion and solid-fuel burning appliances must be provided with
adequate combustion and ventilation air and vented in accordance with manufacturer installation instructions, NFPA 54
ANSI Z223.1, National Fuel Gas Code, NFPA 31, Standard for the Installation of Oil-Burning Equipment, or NFPA 211,
Standard for Chimneys, Fireplaces, Vents, and Solid-Fuel Burning Appliances, or other equivalent code acceptable to the
building official.
Where atmospherically vented combustion appliances or solid-fuel burning appliances are located inside the pressure
boundary, the total net exhaust flow of the two largest exhaust fans (not including a summer cooling fan intended to be
operated only when windows or other air inlets are open) shall not exceed 15 cfm/100 ft 2 (75 Lps/100 m2) of occupiable
space when in operation at full capacity. If the designed total net flow exceeds this limit, the net exhaust flow must be
reduced by reducing the exhaust flow or providing compensating outdoor airflow. Atmospherically vented combustion
appliances do not include direct-vent appliances.
05
6.5 Garages.When an occupiable space adjoins a garage, the design must prevent migration of contaminants to the
adjoining occupiable space. Air seal the walls, ceilings, and floors that separate garages from occupiable space. To be
considered air sealed, all joints, seams, penetrations, openings between door assemblies and their respective jambs and
framing, and other sources of air leakage through wall and ceiling assemblies separating the garage from the residence and
its attic area shall be caulked, gasketed, weather stripped, wrapped, or otherwise sealed to limit air movement. Doors
between garages and occupiable spaces shall be gasketed or made substantially airtight with weather stripping.
06 6.6 Ventilation Opening Area.Spaces shall have ventilation openings as listed below. Such openings shall meet the
requirements of Section 6.8
07
6.7 Minimum Filtration.Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 ft (3 m)
in length and through a thermal conditioning component, except evaporative coolers, shall be provided with a filter having
a designated minimum efficiency of MERV 6, or better, when tested in accordance with ANSI ASHRAE Standard 52.2,
Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size, or a minimum Particle
Size Efficiency of 50 percent in the 3.0-10 µm range in accordance with AHRI Standard 680, Performance Rating of
Residential Air Filter Equipment. The system shall be designed such that all recirculated and mechanically supplied outdoor
air is filtered before passing through the thermal conditioning components. The filter shall be located and installed in such a
manner as to facilitate access and regular service by the owner.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 5 of 7)
Registration Number:
424-P010255225A-001-001-M27005A-0000
Registration Date/Time: 2024-10-23 12:21:38 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
E. Other Requirements
The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other
Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information
describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if
applicable.
08
6.8 Air Inlets.Air inlets that are part of the ventilation design shall be located a minimum of 10 ft (3 m) from known sources
of contamination such as a stack, vent, exhaust hood, or vehicle exhaust. The intake shall be placed so that entering air is
not obstructed by snow, plantings, or other material. Forced air inlets shall be provided with rodent insect screens (mesh
not larger than 1/2 inch).
09
6.9 Carbon Monoxide Detectors.A carbon monoxide alarm shall be installed in each dwelling unit in accordance with NFPA
720,Standard for the Installation of Carbon Monoxide (CO) Detection and Warning Equipment 14, and shall be consistent
with requirements of applicable laws, codes, and standards.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met.
F. Air Moving Equipment
The items listed below (7.1 through 7.3) correspond to the information given in ASHRAE 62.2 Section 7 Air-Moving
Equipment. Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.6) for information describing
these requirements in more detail. The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 7.1 through 7.3 if
applicable.
01
7.1 Selection and Installation.Ventilation devices and equipment shall be tested and listed in accordance with specific
standards. Installations of systems or equipment shall be carried out in accordance with manufacturers' design
requirements and installation instructions.
02
7.2 Sound Ratings for Fans.Ventilation fans shall be rated for sound at no less than the minimum airflow rate required by
this standard, as noted below. These sound ratings shall be at a minimum of 0.1 in. w.c. (25 Pa) static pressure.
7.2.1 Whole Building or Continuous Ventilation Fans.These fans shall be rated for sound at a maximum of 1.0 sone.
7.2.2 Intermittent Local Exhaust Fans.Fans used to comply with Section 5.2 shall be rated for sound at a maximum of 3
sone, unless their maximum rated airflow exceeds 400 cfm (200 L/s). (Some exceptions may apply.)
03
7.3 Multibranch Exhaust Ducting.If more than one of the exhaust fans in a dwelling unit shares a common exhaust duct,
each fan shall be equipped with a back draft damper to prevent the recirculation of exhaust air from one room to another
through the exhaust ducting system.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 6 of 7)
Registration Number:
424-P010255225A-001-001-M27005A-0000
Registration Date/Time: 2024-10-23 12:21:38 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
G. Multifamily Buildings -Other Requirements
The items listed below correspond to the information given in ASHRAE 62.2 Section 8 "Multifamily Buildings". Refer
also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these
requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that
the building complies with these requirements specified in ASHRAE 62.2 Section 8, if applicable.
01
8.2 Whole-Building Mechanical Ventilation.For multifamily buildings, the term "building" in Section 4 refers to a single
dwelling unit.
8.4.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components separating dwelling
units, including sealing penetrations in the common walls, ceilings, and floors of each unit and by sealing vertical chases
adjacent to the units. All doors between dwelling units and common hallways shall be gasketed or made substantially
airtight.
8.4.1.1 Compliance.One method of demonstrating compliance with Section 8.4.1 shall be to verify a leakage rate below a
maximum of 0.2 cfm/ ft2 (100 L/s per 100 m2) of the dwelling unit envelope area (i.e., the sum of the area of the walls
between dwelling units, exterior walls, ceiling and floor) at a test pressure of 50 Pa by a blower door test. The test shall be
conducted with the dwelling unit as if it were exposed to outdoor air on all sides, top, and bottom by opening doors and
windows of adjacent dwelling units.
8.5.1 Exhaust Ducts.Exhaust fans in separate dwelling units shall not share a common exhaust duct. Exhaust inlets from
more than one dwelling unit may be served by a single exhaust fan downstream of all the exhaust inlets if the fan is
designated and intended to run continuously or if each inlet is equipped with a back-draft damper to prevent
cross-contamination when the fan is not running.
8.5.2 Supply Ducts.Supply outlets to more than one dwelling unit may be served by a single fan upstream of all the supply
outlets if the fan is designed and intended to run continuously or if each supply outlet is equipped with a back-draft damper
to prevent cross-contamination when the fan is not running.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 7 of 7)
Registration Number:
424-P010255225A-001-001-M27005A-0000
Registration Date/Time: 2024-10-23 12:21:38 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-001-M20006A-0000
Registration Date/Time: 2024-10-23 12:26:24 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 105)
City: La Quinta Zip Code: 92253
A. System Information
01 Space Conditioning System Identification or Name UNIT 105 HVACSys
02 Space Conditioning System Location or Area Served Main
03 Building Type from CF-1R Multi-family
04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS)
Credit from CF1R?
No, credit is not taken
05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit
from CF1R?
No, credit is not taken
06 Duct System Compliance Category New
MCH-20a - Completely New Duct System
B. Duct Leakage Diagnostic Test
01 Condenser Nominal Cooling Capacity (ton)3
02 Heating Capacity (kBtu/h)36
03 Conditioned Floor Area Served by this HVAC System (ft2)931
04 Duct Leakage Test Conditions Test final
05 Duct Leakage Test Method Total leakage
06 Leakage Factor 0.12
07 Air Handling Unit Airflow (AHUAirflow) Determination
Method
Cooling system method
08 Measured AHUAirflow (cfm)This field or section is not applicable
09 Calculated Target Allowable Duct Leakage (cfm)144
10 Actual Duct Leakage Rate from Leakage Test Measurement
(cfm)
59.5
11 Compliance Statement System passes leakage test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 2 of 3)
Registration Number:
424-P010255225A-001-001-M20006A-0000
Registration Date/Time: 2024-10-23 12:26:24 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
C. Additional Requirements for Compliance
01 System was tested in its normal operation condition. No temporary taping allowed.
02
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage
testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation
Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required,
may configure the OA damper to the closed position during duct leakage testing.
03 All supply and return register boots were sealed to the drywall.
04 Building cavities were not used as plenums or platform returns in lieu of ducts.
05 If cloth backed tape was used it was covered with Mastic and draw bands.
06 All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in).
After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must
be performed
07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are
properly sealed.
08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points
between the air handler and the supply and return plenums to verify that the connection points are properly sealed.
09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 3 of 3)
Registration Number:
424-P010255225A-001-001-M20006A-0000
Registration Date/Time: 2024-10-23 12:26:24 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-001-M23007A-0000
Registration Date/Time: 2024-10-23 12:27:31 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 105)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 105 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement
B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP)
in the Supply Plenum.
Procedures for installing HSPP or PSPP are specified in RA3.3.1.1.
01 Method Used to Demonstrate Compliance with the
HSPP/PSPP Requirement
HSPP installed and labeled consistent with Figure RA3.3-1
C. Airflow Rate Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given
in RA3.3.2.
01 Airflow Rate Measurement Type used for this airflow rate
verification.
Traditional Flow Capture Hood according to procedure in
RA3.3.3.1.4
02 Manufacturer of Airflow Measurement Apparatus ALNOR
03 Model number of Airflow Measurement Apparatus EB† 731
04
Certification Status of the Airflow Measurement Apparatus
Accuracy
Certified by Manufacturer and listed on CEC Website at
http://www.energy.ca.gov/title24/equipment_cert/ama_fas
/index.html
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 2 of 3)
Registration Number:
424-P010255225A-001-001-M23007A-0000
Registration Date/Time: 2024-10-23 12:27:31 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
D. Forced Air System Airflow Rate Measurement
The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3.
01 Required Minimum System Airflow Rate (cfm/ton)350
02 Required Minimum System Airflow Target (cfm)1050
03 Actual System Airflow Rate Measurement (cfm)1108
04 Compliance Statement:System airflow rate complies
E. Additional Requirements
01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in
the system during system air flow rate measurement identified on this Certificate of Installation.
02
The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of
Installation was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the
instrumentation specifications given in RA3.3.1.
03
A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning
system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate
of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance
Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance.
04 All registers were fully open during the diagnostic test.
05 System fan was set at maximum speed during the diagnostic test.
06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
08
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 3 of 3)
Registration Number:
424-P010255225A-001-001-M23007A-0000
Registration Date/Time: 2024-10-23 12:27:31 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-001-M22008A-0000
Registration Date/Time: 2024-10-23 12:28:09 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 105)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 105 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement
B. Fan Watt Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in
RA3.3.2.2.
01 Fan Watt Verification Device Used.Portable watt meter
MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
01 Actual Tested Watts 642.64
02 Actual Tested Airflow from MCH-23 (cfm)1108
03 Required Fan Efficacy (watts/cfm)0.58
04 Actual Fan Efficacy (watts/cfm)0.58
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 2 of 3)
Registration Number:
424-P010255225A-001-001-M22008A-0000
Registration Date/Time: 2024-10-23 12:28:09 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
05 Compliance Statement:System fan efficacy complies
D. Additional Requirements
01 All registers were fully open during the diagnostic test.
02 System fan was set at maximum speed during the diagnostic test.
03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
05
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy
(Watt/cfm) criteria in every zonal control mode.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 3 of 3)
Registration Number:
424-P010255225A-001-001-M22008A-0000
Registration Date/Time: 2024-10-23 12:28:09 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:14
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-001-M26009A-0000
Registration Date/Time: 2024-10-23 12:32:33 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:16
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 105)
City: La Quinta Zip Code: 92253
A. System Information
Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system
requiring verification must use a separate form.
01 System Name or Identification/Tag UNIT 105 HVACSys
02 System Location or Area Served Main
03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required
04 Directory used to certify product performance AHRI
05 AHRI certification number for the installed space
conditioning system from http://www.ahridirectory.org
208650564
06 Does the directory used to certify product performance
require a specific air handler/furnace make and model?
Yes
07 Does the directory used to certify product performance
require a time delay relay (+TDR)?
Yes
08 Does the directory used to certify product performance
require a TXV (+TXV)?
Yes
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the
Directory used to certify product performance in order to demonstrate compliance.
Data from Nameplate of Installed system
component
Data from the Directory used to certify
product performance for the rated system
component
Outdoor Condenser or Package Unit -
Installed Manufacturer Name
01 RHEEM 02 RHEEM
Outdoor Condenser or Package Unit -
Installed Model Number
03 RHPAZR036JT000NA 04 RHPAZR036JT000NA
Inside Coil - Installed Manufacturer
Name
05 06 This field or section is not applicable
Inside Coil - Installed Model Number 07 08 This field or section is not applicable
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 2 of 3)
Registration Number:
424-P010255225A-001-001-M26009A-0000
Registration Date/Time: 2024-10-23 12:32:33 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:16
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the
Directory used to certify product performance in order to demonstrate compliance.
Air Handler/Furnace - Installed
Manufacturer Name
09 10 RHEEM
Air Handler/Furnace - Installed Model
Number
11 12 RHPAZR036AJT
C. Verified Cooling System SEER
01 Required minimum SEER 15
02 Installed SEER 15
03 Compliance Statement:System passes SEER verification
Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed
on the CF1R.
D. Verified Cooling System EER
This section does not apply to this project.
E. Verified Cooling System Air Handler/Furnace
01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party
certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory.
F. Verified Cooling System Time Delay Relay
01
If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by
signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of
RA3.4.3.
G. Verified Cooling System TXV
01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below
that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 3 of 3)
Registration Number:
424-P010255225A-001-001-M26009A-0000
Registration Date/Time: 2024-10-23 12:32:33 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:16
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number: 424-P010255225A-001-002-M01004A-0000 Registration Date/Time: 2024-10-23 12:56:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:16
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 1 of 10)
Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La Quinta
(DwellingUnit 106)
City: La Quinta Zip Code: 92253
A. General Information
01 Dwelling Unit Name DwellingUnit 106 02 Climate Zone 15
03 Dwelling Unit Total
Conditioned Floor Area (ft2)931 04
Number of Space
Conditioning Systems in this
dwelling unit.
1
05 Certificate of Compliance
Type Performance (CF1R-PRF)06 Method Used to Calculate
HVAC Loads ACCA Manual J
07
Calculated Dwelling Unit
Sensible Cooling Load
(Btu/h)
36000 08 Calculated Dwelling Unit
Heating Load (Btu/h)36000
09 Dwelling Unit Number of
Bedrooms 2
MCH-01a - Space Conditioning Systems Ducts and Fans - For use with Performance Certificate of Compliance
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 2 of 10)
Registration Number: 424-P010255225A-001-002-M01004A-0000 Registration Date/Time: 2024-10-23 12:56:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:16
B. Design Space Conditioning (SC) System Component Specifications from CF1R
This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project.
01 02 03 04 05 06 07 08 09 10 11 12
Zone Name
SC System
Identification
or Name
SC System
Type
Heating
System
Type
Cooling
System Type SC Fan Type Distribution
System Type
Required
Thermostat
Type
Low
Leakage
Air-Handling
Unit
(LLAHU)
Status
Bypass Duct
Status
Cooling
Zoning Type
Cooling
System
Compressor
Speed
This field or
section is
not
applicable
UNIT 106
HVACSys
Heat pump
heating
cooling
Central
packaged
HP
Central
packaged
HP
PSC
Permanent
Split Capacitor
Unconditione
d attic OCST per JA5 No, credit is
not taken
No Bypass
Duct Not Zonal Single Speed
Notes:
C. Design Space Conditioning (SC) System Compliance Requirements from CF1R
This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project.
01 02 03 04 05 06 07 08 09 10
SC System
Identification or
Name
Heating
Efficiency Type
Minimum
Heating
Efficiency Value
Heat Pump
Heating
Capacity at 47°F
Heat Pump
Heating
Capacity at 17°F
Minimum
Cooling
Efficiency SEER
Minimum
Cooling
Efficiency EER
Minimum
Cooling System
Airflow Rate
(CFM/ton)
Maximum Fan
Efficacy
(W/CFM)
Minimum Duct
R-Value
UNIT 106
HVACSys
Heating
Seasonal
Performance
Factor (HSPF)
8.2 36000 29000 15 12.44 350 0.58 R-8
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 3 of 10)
Registration Number: 424-P010255225A-001-002-M01004A-0000 Registration Date/Time: 2024-10-23 12:56:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:16
D. Installed Space Conditioning (SC) System Component Information
01 02 03 04 05 06 07 08 09 10 11
SC System
Identification
or Name
SC System
Location or
Area Served
Conditioned
Floor Area
Served by the
System (ft2)
Heating
System Type
Cooling
System Type SC Fan Type Distribution
System Type
SC System
Thermostat
Type
Cooling Zoning
Type
Cooling
System
Compressor
Speed Type
Central Fan
Integrated
(CFI)
Ventilation
System Status
UNIT 106
HVACSys Main 931 Central
packaged HP
Central
packaged HP
PSC
Permanent
Split Capacitor
Unconditioned
attic OCST per JA5 Not Zonal Single Speed Not a CFI
system
Notes:
E. Installed Heating System Equipment Information (not heat pumps)
This section does not apply to this project.
F. Installed Cooling System Outdoor Condensing Unit or Package Unit Equipment Information (not heat pumps)
This section does not apply to this project.
G. Installed Split System Indoor Coil or Fan Coil Unit Equipment Information (applicable to DX or hydronic heating/cooling coils or fan coil units)
Systems with more than one indoor coil or fan coil unit (e.g. multi-split systems) shall provide information for each of the system indoor coils or fan coil units.
This section does not apply to this project.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 4 of 10)
Registration Number: 424-P010255225A-001-002-M01004A-0000 Registration Date/Time: 2024-10-23 12:56:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:16
H. Installed Heat Pump System - Split System Condensing Unit or Package Unit Equipment Information
01 02 03 04 05
SC System
Identification or
Name
SC System Location
or Area Served Condenser or Package Unit Manufacturer
Condenser or Package Unit Model
Number Condenser or Package Unit Serial Number
UNIT 106 HVACSys Main RHEEM RHPAZR036JT000NA F362301330
Notes:
I. Installed Heat Pump System -Efficiency and Performance Compliance Information
01 02 03 04 05 06 07 08 09 10
SC System
Identification
or Name
SC System
Location or
Area Served
Heating
Efficiency Type
Heating
Efficiency Value
System Rated
Heating
Capacity at 47°F
System Rated
Heating
Capacity at 17°F
System Rated
Cooling
Efficiency SEER
System Rated
Cooling
Efficiency EER
System Rated
Cooling
Capacity at
Design
Conditions
(Btu/h)
Condenser
Rated Nominal
Capacity (ton)
UNIT 106
HVACSys Main
Heating
Seasonal
Performance
Factor (HSPF)
8.2 36000 29000 15 12.44 36000 3
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 5 of 10)
Registration Number: 424-P010255225A-001-002-M01004A-0000 Registration Date/Time: 2024-10-23 12:56:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:16
J. Installed Duct System Information
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identification
or Name
SC System
Location or
Area Served
Supply Duct
Location
Supply Duct
R-Value
Return Duct
Location
Return Duct
R-Value
Exemption
from Min
R-Value for
Ducts In
Conditioned
Space
Method of
compliance
with duct
and filter
grille sizing
Req's in
150.0(m)13
Exemption
From Duct
Leakage
Requirement
s
Bypass Duct
Status
Number of
Air Filter
Devices on
System
Can RA3.3
Airflow
Protocols be
used to test
this System?
UNIT 106
HVACSys Main Unconditio
ned attic R-8 Unconditio
ned attic R-8 Not
applicable
HERS
verified fan
efficacy
(W/cfm)
and airflow
rate
(cfm/ton)
None No Bypass
Duct 1 Yes
Notes:
K. Installed Air Filter Device Information
Mandatory requirements for air filter devices are specified Section 150.0(m)12.
01 02 03 04 05 06 07
SC System
Identification or Name
SC System Location or
Area Served
Air Filter Device
Identification or Name Air Filter Device Type
Air Filter Device
Location
Determined Design
Airflow Rate for Air
Filter Device (cfm)
Determined Design
Allowable Pressure
Drop for Air Filter
Device (inch W.C.)
UNIT 106 HVACSys Main Filter Filter Grille return 1050 0.1
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 6 of 10)
Registration Number: 424-P010255225A-001-002-M01004A-0000 Registration Date/Time: 2024-10-23 12:56:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:16
L. Air Filter Device Requirements
01 The system shall be designed to ensure that all recirculated air and all outdoor air supplied to the occupiable space is filtered before passing through the system's
thermal conditioning components.
02
The system shall be designed to accommodate the clean-filter pressure drop imposed by the system air filter device(s). The design airflow rate and maximum
allowable clean-filter pressure drop at the design airflow rate applicable to each air filter device shall be determined, and all system air filter device locations shall be
labeled to disclose the applicable design airflow rate and the maximum allowable clean-filter pressure drop. The labels shall be permanently affixed to the air filter
device, readily legible, and visible to a person replacing the air filter media, and the air filter devices shall be provided with air filter media that conforms to these
determined or labeled maximum allowable clean-filter pressure drop values as rated using AHRI Standard 680.
03 All system air filter devices shall be located and installed in such a manner as to allow access and regular service by the system owner.
04 The system shall be provided with air filter media having a designated efficiency equal to or greater than MERV 6 when tested in accordance with ASHRAE Standard
52.2, or a particle size efficiency rating equal to or greater than 50% in the 3.0 to10 µm range when tested in accordance with AHRI Standard 680.
05 The system shall be provided with air filter media that has been labeled by the manufacturer to disclose the efficiency and pressure drop ratings that conform to the
required efficiency and pressure drop requirements for the air filter device.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met
M. HERS Verification Requirements
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identificati
on or
Name
SC System
Location or
Area
Served
MCH-20
.
.
Duct
Leakage
Test
MCH-21
.
Duct
Location
Verification
MCH-22
.
AHU Fan
Efficacy
(W/cfm)
MCH-23
.
AHU
Airflow
Rate
(cfm/ton)
MCH-25
.
.
Refrigerant
Charge
MCH-26
Rated SC
System
Equipment
Verification
MCH-27
.
IAQ
Mechanical
Ventilation
MCH-28
Return
Duct
Design
Table
150.0-B or
C
MCH-29
Supply
Duct
Surface
Area
R-Value
Buried
Ducts
MCH30
.
Ventilation
Cooling
Credit
UNIT 106
HVACSys Main Yes No Yes Yes No Yes Yes No No No
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 7 of 10)
Registration Number: 424-P010255225A-001-002-M01004A-0000 Registration Date/Time: 2024-10-23 12:56:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:16
M. HERS Verification Requirements
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identificati
on or
Name
SC System
Location or
Area
Served
MCH-20
.
.
Duct
Leakage
Test
MCH-21
.
Duct
Location
Verification
MCH-22
.
AHU Fan
Efficacy
(W/cfm)
MCH-23
.
AHU
Airflow
Rate
(cfm/ton)
MCH-25
.
.
Refrigerant
Charge
MCH-26
Rated SC
System
Equipment
Verification
MCH-27
.
IAQ
Mechanical
Ventilation
MCH-28
Return
Duct
Design
Table
150.0-B or
C
MCH-29
Supply
Duct
Surface
Area
R-Value
Buried
Ducts
MCH30
.
Ventilation
Cooling
Credit
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 8 of 10)
Registration Number: 424-P010255225A-001-002-M01004A-0000 Registration Date/Time: 2024-10-23 12:56:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:16
N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures
Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly
installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements.
Heating Equipment
01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency
Regulations.
02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant
to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(i), 110.2(b).
03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections
150.0(h)1 and 2).
04 Furnace Temperature Rise: Central forced-air heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum
inlet-to-outlet temperature rise specification. See Section 150.0(h)4.
05 Standby Losses and Pilot Lights: Fan-type central furnaces may not have a continuously burning pilot light. Section 110.5 and Section 110.2(d).
Cooling Equipment
06 Equipment Efficiency: All cooling equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency
Regulations.
07 Refrigerant Line Insulation: All refrigerant line insulation in split system air conditioners and heat pumps must meet the R-value and protection requirements of Section
150.0(j)2 and 3, and Section 150.0(m)9.
08 Condensing Unit Location: Condensing units shall not be placed within five (5) feet of a dryer vent outlet. See Section 150.0(h)3A.
09 Liquid Line Filter Drier: If applicable, a liquid line filter drier shall be installed according to the manufacturer's specifications. Section 150.0(h)3B
10 Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section
150.0(h)1 and 2.
Air Distribution System Ducts, Plenums and Fans
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 9 of 10)
Registration Number: 424-P010255225A-001-002-M01004A-0000 Registration Date/Time: 2024-10-23 12:56:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:16
N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures
Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly
installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements.
11 Insulation: In all cases, unless ducts are enclosed entirely in directly conditioned space, the minimum duct insulation value is R-6. Note that higher values may be
required by the prescriptive or performance requirements. See Section 150.0(m)1.
12
Connections and Closures: All installed air-distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0,
602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006: Supply-air and return-air ducts and plenums must be insulated to a minimum installed level of R-6.0 or
enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing in accordance with the requirements of Reference
Residential Appendix RA3.1.4.3.8.
Heat Pump Thermostat
13 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c).
14 The thermostat shall be installed in accordance with the manufacturers published installation specifications
15 First stage of heating shall be assigned to heat pump heating.
16 Second stage back up heating shall be set to come on only when the indoor set temperature cannot be met.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 10 of 10)
Registration Number: 424-P010255225A-001-002-M01004A-0000 Registration Date/Time: 2024-10-23 12:56:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:16
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of
features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized
representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the
installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency.
4.I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all
applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-002-M27005A-0000
Registration Date/Time: 2024-10-23 12:57:15 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:17
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 1 of 7)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 106)
City: La Quinta Zip Code: 92253
Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE
Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on
this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010.
A. Dwelling Mechanical Ventilation - General Information
01 Dwelling unit name DwellingUnit 106
02 Building Type Single Family
03 Project scope Newly constructed building
04
Total Conditioned Floor Area of Dwelling Unit
(For addition projects the conditioned floor area equals
existing area plus addition area. )
931
05
Number of bedrooms in dwelling unit
(For addition projects the number of bedrooms equals the
existing bedrooms plus addition bedrooms)
2
06 Ventilation Operation Schedule Continuous
07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1)
08 Whole Building Ventilation System Type Standalone - Balanced
09 IAQ Fan Location
Note:
Non-dwelling units do not meet the definition for a dwelling unit as defined in Section 100.1(b). Non-dwelling units are not
designed to provide independent living facilities and do not provide permanent provisions for living, sleeping, eating, cooking and
sanitation.
MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method
B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method
A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with
outdoor air each hour at no less than the rate in equation 4.1a.
01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81
02 Installed Continuous Whole-Building Ventilation Rate 138
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 2 of 7)
Registration Number:
424-P010255225A-001-002-M27005A-0000
Registration Date/Time: 2024-10-23 12:57:15 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:17
C. Compliance Statement
01 Building passes continuous whole-building ventilation rate test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 3 of 7)
Registration Number:
424-P010255225A-001-002-M27005A-0000
Registration Date/Time: 2024-10-23 12:57:15 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:17
D. Local Mechanical Exhaust System - Fan selection and duct design criteria for compliance
Local mechanical exhaust fans shall be installed in each kitchen and bathroom. Delivered local ventilation rates:
•All local ventilation rates have been measured using a flow hood, flow grid, or other airflow measuring device and meet the
requirements of 62.2 Tables 5.1 or 5.2. OR
•The airflow rating at a pressure of 0.25 in. w.c. of a certified fan is assumed because the local ventilation system duct sizing
meets the prescriptive requirements of 62.2 Table 5.3, or manufacturer's design criteria.
Table 5.1
Intermittent Local Ventilation Exhaust Airflow Rates
Application Airflow Notes
Kitchen 100 cfm
Vented range hood (including
appliance-range hood combinations)
required if exhaust fan flow is less than 5
ACH.
Bathroom 50 cfm
Table 5.2
Continuous Local Ventilation Exhaust Airflow Rates
Application Airflow Notes
Kitchen 5 ACH Based on Kitchen volume.
Bathroom 20 cfm
Table 5.3
Prescriptive Duct Sizing Requirements
Duct Type Flex Duct Smooth Duct
Fan Rating
cfm @ 0.25
in. w.g.
50 80 100 125 50 80 100 125
Maximum Allowable Duct Length (ft)
Diameter,
(in)Flex Duct Smooth Duct
3 X X X X 5 X X X
4 70 3 X X 105 35 5 X
5 NL 70 35 20 NL 135 85 55
6 NL NL 125 95 NL NL NL 145
7 and above NL NL NL NL NL NL NL NL
This table assumes no elbows. Deduct 15 ft of allowable duct length for each turn, elbow, or fitting. Interpolation and extrapolation
in 62.2 Table 5.3 is not allowed. For airflow values not listed, use the next higher value. This table is not applicable for airflow > 125
cfm.
NL = no limit on duct length of this size.
X = not allowed, any length of duct of this size with assumed turns, elbows, fittings will exceed the rated pressure drop.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 4 of 7)
Registration Number:
424-P010255225A-001-002-M27005A-0000
Registration Date/Time: 2024-10-23 12:57:15 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:17
E. Other Requirements
The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other
Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information
describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if
applicable.
01
6.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components to occupiable spaces from
garages, unconditioned crawl spaces, and unconditioned attics. Supply and balanced ventilation systems shall be designed
and constructed to provide ventilation air directly from the outdoors.
02
6.2 Instructions and Labeling.Information on the ventilation design and/or ventilation systems installed, instructions on
their proper operation to meet the requirements of this standard, and instructions detailing any required maintenance
(similar to that provided for HVAC systems) shall be provided to the owner and the occupant of the dwelling unit. Controls
shall be labeled as to their function (unless that function is obvious, such as toilet exhaust fan switches). See Chapter 13 of
Guideline 24 2 for information on instructions and labeling.
03 6.3 Clothes Dryers.Clothes dryers shall be exhausted directly to the outdoors
04
6.4 Combustion and Solid-Fuel Burning Appliances.Combustion and solid-fuel burning appliances must be provided with
adequate combustion and ventilation air and vented in accordance with manufacturer installation instructions, NFPA 54
ANSI Z223.1, National Fuel Gas Code, NFPA 31, Standard for the Installation of Oil-Burning Equipment, or NFPA 211,
Standard for Chimneys, Fireplaces, Vents, and Solid-Fuel Burning Appliances, or other equivalent code acceptable to the
building official.
Where atmospherically vented combustion appliances or solid-fuel burning appliances are located inside the pressure
boundary, the total net exhaust flow of the two largest exhaust fans (not including a summer cooling fan intended to be
operated only when windows or other air inlets are open) shall not exceed 15 cfm/100 ft 2 (75 Lps/100 m2) of occupiable
space when in operation at full capacity. If the designed total net flow exceeds this limit, the net exhaust flow must be
reduced by reducing the exhaust flow or providing compensating outdoor airflow. Atmospherically vented combustion
appliances do not include direct-vent appliances.
05
6.5 Garages.When an occupiable space adjoins a garage, the design must prevent migration of contaminants to the
adjoining occupiable space. Air seal the walls, ceilings, and floors that separate garages from occupiable space. To be
considered air sealed, all joints, seams, penetrations, openings between door assemblies and their respective jambs and
framing, and other sources of air leakage through wall and ceiling assemblies separating the garage from the residence and
its attic area shall be caulked, gasketed, weather stripped, wrapped, or otherwise sealed to limit air movement. Doors
between garages and occupiable spaces shall be gasketed or made substantially airtight with weather stripping.
06 6.6 Ventilation Opening Area.Spaces shall have ventilation openings as listed below. Such openings shall meet the
requirements of Section 6.8
07
6.7 Minimum Filtration.Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 ft (3 m)
in length and through a thermal conditioning component, except evaporative coolers, shall be provided with a filter having
a designated minimum efficiency of MERV 6, or better, when tested in accordance with ANSI ASHRAE Standard 52.2,
Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size, or a minimum Particle
Size Efficiency of 50 percent in the 3.0-10 µm range in accordance with AHRI Standard 680, Performance Rating of
Residential Air Filter Equipment. The system shall be designed such that all recirculated and mechanically supplied outdoor
air is filtered before passing through the thermal conditioning components. The filter shall be located and installed in such a
manner as to facilitate access and regular service by the owner.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 5 of 7)
Registration Number:
424-P010255225A-001-002-M27005A-0000
Registration Date/Time: 2024-10-23 12:57:15 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:17
E. Other Requirements
The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other
Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information
describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if
applicable.
08
6.8 Air Inlets.Air inlets that are part of the ventilation design shall be located a minimum of 10 ft (3 m) from known sources
of contamination such as a stack, vent, exhaust hood, or vehicle exhaust. The intake shall be placed so that entering air is
not obstructed by snow, plantings, or other material. Forced air inlets shall be provided with rodent insect screens (mesh
not larger than 1/2 inch).
09
6.9 Carbon Monoxide Detectors.A carbon monoxide alarm shall be installed in each dwelling unit in accordance with NFPA
720,Standard for the Installation of Carbon Monoxide (CO) Detection and Warning Equipment 14, and shall be consistent
with requirements of applicable laws, codes, and standards.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met.
F. Air Moving Equipment
The items listed below (7.1 through 7.3) correspond to the information given in ASHRAE 62.2 Section 7 Air-Moving
Equipment. Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.6) for information describing
these requirements in more detail. The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 7.1 through 7.3 if
applicable.
01
7.1 Selection and Installation.Ventilation devices and equipment shall be tested and listed in accordance with specific
standards. Installations of systems or equipment shall be carried out in accordance with manufacturers' design
requirements and installation instructions.
02
7.2 Sound Ratings for Fans.Ventilation fans shall be rated for sound at no less than the minimum airflow rate required by
this standard, as noted below. These sound ratings shall be at a minimum of 0.1 in. w.c. (25 Pa) static pressure.
7.2.1 Whole Building or Continuous Ventilation Fans.These fans shall be rated for sound at a maximum of 1.0 sone.
7.2.2 Intermittent Local Exhaust Fans.Fans used to comply with Section 5.2 shall be rated for sound at a maximum of 3
sone, unless their maximum rated airflow exceeds 400 cfm (200 L/s). (Some exceptions may apply.)
03
7.3 Multibranch Exhaust Ducting.If more than one of the exhaust fans in a dwelling unit shares a common exhaust duct,
each fan shall be equipped with a back draft damper to prevent the recirculation of exhaust air from one room to another
through the exhaust ducting system.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 6 of 7)
Registration Number:
424-P010255225A-001-002-M27005A-0000
Registration Date/Time: 2024-10-23 12:57:15 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:17
G. Multifamily Buildings -Other Requirements
The items listed below correspond to the information given in ASHRAE 62.2 Section 8 "Multifamily Buildings". Refer
also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these
requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that
the building complies with these requirements specified in ASHRAE 62.2 Section 8, if applicable.
01
8.2 Whole-Building Mechanical Ventilation.For multifamily buildings, the term "building" in Section 4 refers to a single
dwelling unit.
8.4.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components separating dwelling
units, including sealing penetrations in the common walls, ceilings, and floors of each unit and by sealing vertical chases
adjacent to the units. All doors between dwelling units and common hallways shall be gasketed or made substantially
airtight.
8.4.1.1 Compliance.One method of demonstrating compliance with Section 8.4.1 shall be to verify a leakage rate below a
maximum of 0.2 cfm/ ft2 (100 L/s per 100 m2) of the dwelling unit envelope area (i.e., the sum of the area of the walls
between dwelling units, exterior walls, ceiling and floor) at a test pressure of 50 Pa by a blower door test. The test shall be
conducted with the dwelling unit as if it were exposed to outdoor air on all sides, top, and bottom by opening doors and
windows of adjacent dwelling units.
8.5.1 Exhaust Ducts.Exhaust fans in separate dwelling units shall not share a common exhaust duct. Exhaust inlets from
more than one dwelling unit may be served by a single exhaust fan downstream of all the exhaust inlets if the fan is
designated and intended to run continuously or if each inlet is equipped with a back-draft damper to prevent
cross-contamination when the fan is not running.
8.5.2 Supply Ducts.Supply outlets to more than one dwelling unit may be served by a single fan upstream of all the supply
outlets if the fan is designed and intended to run continuously or if each supply outlet is equipped with a back-draft damper
to prevent cross-contamination when the fan is not running.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 7 of 7)
Registration Number:
424-P010255225A-001-002-M27005A-0000
Registration Date/Time: 2024-10-23 12:57:15 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:17
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-002-M20006A-0000
Registration Date/Time: 2024-10-23 12:57:38 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:17
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 106)
City: La Quinta Zip Code: 92253
A. System Information
01 Space Conditioning System Identification or Name UNIT 106 HVACSys
02 Space Conditioning System Location or Area Served Main
03 Building Type from CF-1R Multi-family
04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS)
Credit from CF1R?
No, credit is not taken
05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit
from CF1R?
No, credit is not taken
06 Duct System Compliance Category New
MCH-20a - Completely New Duct System
B. Duct Leakage Diagnostic Test
01 Condenser Nominal Cooling Capacity (ton)3
02 Heating Capacity (kBtu/h)36
03 Conditioned Floor Area Served by this HVAC System (ft2)931
04 Duct Leakage Test Conditions Test final
05 Duct Leakage Test Method Total leakage
06 Leakage Factor 0.12
07 Air Handling Unit Airflow (AHUAirflow) Determination
Method
Cooling system method
08 Measured AHUAirflow (cfm)This field or section is not applicable
09 Calculated Target Allowable Duct Leakage (cfm)144
10 Actual Duct Leakage Rate from Leakage Test Measurement
(cfm)
68.6
11 Compliance Statement System passes leakage test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 2 of 3)
Registration Number:
424-P010255225A-001-002-M20006A-0000
Registration Date/Time: 2024-10-23 12:57:38 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:17
C. Additional Requirements for Compliance
01 System was tested in its normal operation condition. No temporary taping allowed.
02
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage
testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation
Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required,
may configure the OA damper to the closed position during duct leakage testing.
03 All supply and return register boots were sealed to the drywall.
04 Building cavities were not used as plenums or platform returns in lieu of ducts.
05 If cloth backed tape was used it was covered with Mastic and draw bands.
06 All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in).
After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must
be performed
07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are
properly sealed.
08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points
between the air handler and the supply and return plenums to verify that the connection points are properly sealed.
09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 3 of 3)
Registration Number:
424-P010255225A-001-002-M20006A-0000
Registration Date/Time: 2024-10-23 12:57:38 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:17
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-002-M23007A-0000
Registration Date/Time: 2024-10-23 12:58:10 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:17
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 106)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 106 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement
B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP)
in the Supply Plenum.
Procedures for installing HSPP or PSPP are specified in RA3.3.1.1.
01 Method Used to Demonstrate Compliance with the
HSPP/PSPP Requirement
HSPP installed and labeled consistent with Figure RA3.3-1
C. Airflow Rate Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given
in RA3.3.2.
01 Airflow Rate Measurement Type used for this airflow rate
verification.
Traditional Flow Capture Hood according to procedure in
RA3.3.3.1.4
02 Manufacturer of Airflow Measurement Apparatus ALNOR
03 Model number of Airflow Measurement Apparatus EB† 731
04
Certification Status of the Airflow Measurement Apparatus
Accuracy
Certified by Manufacturer and listed on CEC Website at
http://www.energy.ca.gov/title24/equipment_cert/ama_fas
/index.html
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 2 of 3)
Registration Number:
424-P010255225A-001-002-M23007A-0000
Registration Date/Time: 2024-10-23 12:58:10 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:17
MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
D. Forced Air System Airflow Rate Measurement
The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3.
01 Required Minimum System Airflow Rate (cfm/ton)350
02 Required Minimum System Airflow Target (cfm)1050
03 Actual System Airflow Rate Measurement (cfm)1077
04 Compliance Statement:System airflow rate complies
E. Additional Requirements
01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in
the system during system air flow rate measurement identified on this Certificate of Installation.
02
The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of
Installation was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the
instrumentation specifications given in RA3.3.1.
03
A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning
system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate
of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance
Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance.
04 All registers were fully open during the diagnostic test.
05 System fan was set at maximum speed during the diagnostic test.
06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
08
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 3 of 3)
Registration Number:
424-P010255225A-001-002-M23007A-0000
Registration Date/Time: 2024-10-23 12:58:10 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:17
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-002-M22008A-0000
Registration Date/Time: 2024-10-23 12:58:39 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:17
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 106)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 106 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement
B. Fan Watt Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in
RA3.3.2.2.
01 Fan Watt Verification Device Used.Portable watt meter
MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
01 Actual Tested Watts 624.66
02 Actual Tested Airflow from MCH-23 (cfm)1077
03 Required Fan Efficacy (watts/cfm)0.58
04 Actual Fan Efficacy (watts/cfm)0.58
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 2 of 3)
Registration Number:
424-P010255225A-001-002-M22008A-0000
Registration Date/Time: 2024-10-23 12:58:39 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:17
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
05 Compliance Statement:System fan efficacy complies
D. Additional Requirements
01 All registers were fully open during the diagnostic test.
02 System fan was set at maximum speed during the diagnostic test.
03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
05
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy
(Watt/cfm) criteria in every zonal control mode.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 3 of 3)
Registration Number:
424-P010255225A-001-002-M22008A-0000
Registration Date/Time: 2024-10-23 12:58:39 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:17
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-002-M26009A-0000
Registration Date/Time: 2024-10-23 12:58:58 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:17
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 106)
City: La Quinta Zip Code: 92253
A. System Information
Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system
requiring verification must use a separate form.
01 System Name or Identification/Tag UNIT 106 HVACSys
02 System Location or Area Served Main
03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required
04 Directory used to certify product performance AHRI
05 AHRI certification number for the installed space
conditioning system from http://www.ahridirectory.org
208650564
06 Does the directory used to certify product performance
require a specific air handler/furnace make and model?
Yes
07 Does the directory used to certify product performance
require a time delay relay (+TDR)?
Yes
08 Does the directory used to certify product performance
require a TXV (+TXV)?
Yes
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the
Directory used to certify product performance in order to demonstrate compliance.
Data from Nameplate of Installed system
component
Data from the Directory used to certify
product performance for the rated system
component
Outdoor Condenser or Package Unit -
Installed Manufacturer Name
01 RHEEM 02 RHEEM
Outdoor Condenser or Package Unit -
Installed Model Number
03 RHPAZR036JT000NA 04 RHPAZR036JT000NA
Inside Coil - Installed Manufacturer
Name
05 06 This field or section is not applicable
Inside Coil - Installed Model Number 07 08 This field or section is not applicable
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 2 of 3)
Registration Number:
424-P010255225A-001-002-M26009A-0000
Registration Date/Time: 2024-10-23 12:58:58 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:17
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the
Directory used to certify product performance in order to demonstrate compliance.
Air Handler/Furnace - Installed
Manufacturer Name
09 10 RHEEM
Air Handler/Furnace - Installed Model
Number
11 12 RHPAZR036AJT
C. Verified Cooling System SEER
01 Required minimum SEER 15
02 Installed SEER 15
03 Compliance Statement:System passes SEER verification
Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed
on the CF1R.
D. Verified Cooling System EER
This section does not apply to this project.
E. Verified Cooling System Air Handler/Furnace
01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party
certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory.
F. Verified Cooling System Time Delay Relay
01
If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by
signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of
RA3.4.3.
G. Verified Cooling System TXV
01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below
that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 3 of 3)
Registration Number:
424-P010255225A-001-002-M26009A-0000
Registration Date/Time: 2024-10-23 12:58:58 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:17
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number: 424-P010255225A-001-003-M01004A-0000 Registration Date/Time: 2024-10-23 13:00:13 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:19
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 1 of 10)
Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La Quinta
(DwellingUnit 107)
City: La Quinta Zip Code: 92253
A. General Information
01 Dwelling Unit Name DwellingUnit 107 02 Climate Zone 15
03 Dwelling Unit Total
Conditioned Floor Area (ft2)931 04
Number of Space
Conditioning Systems in this
dwelling unit.
1
05 Certificate of Compliance
Type Performance (CF1R-PRF)06 Method Used to Calculate
HVAC Loads ACCA Manual J
07
Calculated Dwelling Unit
Sensible Cooling Load
(Btu/h)
36000 08 Calculated Dwelling Unit
Heating Load (Btu/h)36000
09 Dwelling Unit Number of
Bedrooms 2
MCH-01a - Space Conditioning Systems Ducts and Fans - For use with Performance Certificate of Compliance
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 2 of 10)
Registration Number: 424-P010255225A-001-003-M01004A-0000 Registration Date/Time: 2024-10-23 13:00:13 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:19
B. Design Space Conditioning (SC) System Component Specifications from CF1R
This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project.
01 02 03 04 05 06 07 08 09 10 11 12
Zone Name
SC System
Identification
or Name
SC System
Type
Heating
System
Type
Cooling
System Type SC Fan Type Distribution
System Type
Required
Thermostat
Type
Low
Leakage
Air-Handling
Unit
(LLAHU)
Status
Bypass Duct
Status
Cooling
Zoning Type
Cooling
System
Compressor
Speed
This field or
section is
not
applicable
UNIT 107
HVACSys
Heat pump
heating
cooling
Central
packaged
HP
Central
packaged
HP
PSC
Permanent
Split Capacitor
Unconditione
d attic OCST per JA5 No, credit is
not taken
No Bypass
Duct Not Zonal Single Speed
Notes:
C. Design Space Conditioning (SC) System Compliance Requirements from CF1R
This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project.
01 02 03 04 05 06 07 08 09 10
SC System
Identification or
Name
Heating
Efficiency Type
Minimum
Heating
Efficiency Value
Heat Pump
Heating
Capacity at 47°F
Heat Pump
Heating
Capacity at 17°F
Minimum
Cooling
Efficiency SEER
Minimum
Cooling
Efficiency EER
Minimum
Cooling System
Airflow Rate
(CFM/ton)
Maximum Fan
Efficacy
(W/CFM)
Minimum Duct
R-Value
UNIT 107
HVACSys
Heating
Seasonal
Performance
Factor (HSPF)
8.2 36000 29000 15 12.44 350 0.58 R-8
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 3 of 10)
Registration Number: 424-P010255225A-001-003-M01004A-0000 Registration Date/Time: 2024-10-23 13:00:13 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:19
D. Installed Space Conditioning (SC) System Component Information
01 02 03 04 05 06 07 08 09 10 11
SC System
Identification
or Name
SC System
Location or
Area Served
Conditioned
Floor Area
Served by the
System (ft2)
Heating
System Type
Cooling
System Type SC Fan Type Distribution
System Type
SC System
Thermostat
Type
Cooling Zoning
Type
Cooling
System
Compressor
Speed Type
Central Fan
Integrated
(CFI)
Ventilation
System Status
UNIT 107
HVACSys Main 931 Central
packaged HP
Central
packaged HP
PSC
Permanent
Split Capacitor
Unconditioned
attic OCST per JA5 Not Zonal Single Speed Not a CFI
system
Notes:
E. Installed Heating System Equipment Information (not heat pumps)
This section does not apply to this project.
F. Installed Cooling System Outdoor Condensing Unit or Package Unit Equipment Information (not heat pumps)
This section does not apply to this project.
G. Installed Split System Indoor Coil or Fan Coil Unit Equipment Information (applicable to DX or hydronic heating/cooling coils or fan coil units)
Systems with more than one indoor coil or fan coil unit (e.g. multi-split systems) shall provide information for each of the system indoor coils or fan coil units.
This section does not apply to this project.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 4 of 10)
Registration Number: 424-P010255225A-001-003-M01004A-0000 Registration Date/Time: 2024-10-23 13:00:13 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:19
H. Installed Heat Pump System - Split System Condensing Unit or Package Unit Equipment Information
01 02 03 04 05
SC System
Identification or
Name
SC System Location
or Area Served Condenser or Package Unit Manufacturer
Condenser or Package Unit Model
Number Condenser or Package Unit Serial Number
UNIT 107 HVACSys Main RHEEM RHPAZR036JT000NA F422302306
Notes:
I. Installed Heat Pump System -Efficiency and Performance Compliance Information
01 02 03 04 05 06 07 08 09 10
SC System
Identification
or Name
SC System
Location or
Area Served
Heating
Efficiency Type
Heating
Efficiency Value
System Rated
Heating
Capacity at 47°F
System Rated
Heating
Capacity at 17°F
System Rated
Cooling
Efficiency SEER
System Rated
Cooling
Efficiency EER
System Rated
Cooling
Capacity at
Design
Conditions
(Btu/h)
Condenser
Rated Nominal
Capacity (ton)
UNIT 107
HVACSys Main
Heating
Seasonal
Performance
Factor (HSPF)
8.2 36000 29000 15 12.44 36000 3
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 5 of 10)
Registration Number: 424-P010255225A-001-003-M01004A-0000 Registration Date/Time: 2024-10-23 13:00:13 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:19
J. Installed Duct System Information
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identification
or Name
SC System
Location or
Area Served
Supply Duct
Location
Supply Duct
R-Value
Return Duct
Location
Return Duct
R-Value
Exemption
from Min
R-Value for
Ducts In
Conditioned
Space
Method of
compliance
with duct
and filter
grille sizing
Req's in
150.0(m)13
Exemption
From Duct
Leakage
Requirement
s
Bypass Duct
Status
Number of
Air Filter
Devices on
System
Can RA3.3
Airflow
Protocols be
used to test
this System?
UNIT 107
HVACSys Main Unconditio
ned attic R-8 Unconditio
ned attic R-8 Not
applicable
HERS
verified fan
efficacy
(W/cfm)
and airflow
rate
(cfm/ton)
None No Bypass
Duct 1 Yes
Notes:
K. Installed Air Filter Device Information
Mandatory requirements for air filter devices are specified Section 150.0(m)12.
01 02 03 04 05 06 07
SC System
Identification or Name
SC System Location or
Area Served
Air Filter Device
Identification or Name Air Filter Device Type
Air Filter Device
Location
Determined Design
Airflow Rate for Air
Filter Device (cfm)
Determined Design
Allowable Pressure
Drop for Air Filter
Device (inch W.C.)
UNIT 107 HVACSys Main Filter Filter Grille return 1050 0.1
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 6 of 10)
Registration Number: 424-P010255225A-001-003-M01004A-0000 Registration Date/Time: 2024-10-23 13:00:13 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:19
L. Air Filter Device Requirements
01 The system shall be designed to ensure that all recirculated air and all outdoor air supplied to the occupiable space is filtered before passing through the system's
thermal conditioning components.
02
The system shall be designed to accommodate the clean-filter pressure drop imposed by the system air filter device(s). The design airflow rate and maximum
allowable clean-filter pressure drop at the design airflow rate applicable to each air filter device shall be determined, and all system air filter device locations shall be
labeled to disclose the applicable design airflow rate and the maximum allowable clean-filter pressure drop. The labels shall be permanently affixed to the air filter
device, readily legible, and visible to a person replacing the air filter media, and the air filter devices shall be provided with air filter media that conforms to these
determined or labeled maximum allowable clean-filter pressure drop values as rated using AHRI Standard 680.
03 All system air filter devices shall be located and installed in such a manner as to allow access and regular service by the system owner.
04 The system shall be provided with air filter media having a designated efficiency equal to or greater than MERV 6 when tested in accordance with ASHRAE Standard
52.2, or a particle size efficiency rating equal to or greater than 50% in the 3.0 to10 µm range when tested in accordance with AHRI Standard 680.
05 The system shall be provided with air filter media that has been labeled by the manufacturer to disclose the efficiency and pressure drop ratings that conform to the
required efficiency and pressure drop requirements for the air filter device.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met
M. HERS Verification Requirements
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identificati
on or
Name
SC System
Location or
Area
Served
MCH-20
.
.
Duct
Leakage
Test
MCH-21
.
Duct
Location
Verification
MCH-22
.
AHU Fan
Efficacy
(W/cfm)
MCH-23
.
AHU
Airflow
Rate
(cfm/ton)
MCH-25
.
.
Refrigerant
Charge
MCH-26
Rated SC
System
Equipment
Verification
MCH-27
.
IAQ
Mechanical
Ventilation
MCH-28
Return
Duct
Design
Table
150.0-B or
C
MCH-29
Supply
Duct
Surface
Area
R-Value
Buried
Ducts
MCH30
.
Ventilation
Cooling
Credit
UNIT 107
HVACSys Main Yes No Yes Yes No Yes Yes No No No
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 7 of 10)
Registration Number: 424-P010255225A-001-003-M01004A-0000 Registration Date/Time: 2024-10-23 13:00:13 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:19
M. HERS Verification Requirements
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identificati
on or
Name
SC System
Location or
Area
Served
MCH-20
.
.
Duct
Leakage
Test
MCH-21
.
Duct
Location
Verification
MCH-22
.
AHU Fan
Efficacy
(W/cfm)
MCH-23
.
AHU
Airflow
Rate
(cfm/ton)
MCH-25
.
.
Refrigerant
Charge
MCH-26
Rated SC
System
Equipment
Verification
MCH-27
.
IAQ
Mechanical
Ventilation
MCH-28
Return
Duct
Design
Table
150.0-B or
C
MCH-29
Supply
Duct
Surface
Area
R-Value
Buried
Ducts
MCH30
.
Ventilation
Cooling
Credit
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 8 of 10)
Registration Number: 424-P010255225A-001-003-M01004A-0000 Registration Date/Time: 2024-10-23 13:00:13 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:19
N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures
Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly
installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements.
Heating Equipment
01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency
Regulations.
02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant
to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(i), 110.2(b).
03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections
150.0(h)1 and 2).
04 Furnace Temperature Rise: Central forced-air heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum
inlet-to-outlet temperature rise specification. See Section 150.0(h)4.
05 Standby Losses and Pilot Lights: Fan-type central furnaces may not have a continuously burning pilot light. Section 110.5 and Section 110.2(d).
Cooling Equipment
06 Equipment Efficiency: All cooling equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency
Regulations.
07 Refrigerant Line Insulation: All refrigerant line insulation in split system air conditioners and heat pumps must meet the R-value and protection requirements of Section
150.0(j)2 and 3, and Section 150.0(m)9.
08 Condensing Unit Location: Condensing units shall not be placed within five (5) feet of a dryer vent outlet. See Section 150.0(h)3A.
09 Liquid Line Filter Drier: If applicable, a liquid line filter drier shall be installed according to the manufacturer's specifications. Section 150.0(h)3B
10 Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section
150.0(h)1 and 2.
Air Distribution System Ducts, Plenums and Fans
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 9 of 10)
Registration Number: 424-P010255225A-001-003-M01004A-0000 Registration Date/Time: 2024-10-23 13:00:13 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:19
N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures
Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly
installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements.
11 Insulation: In all cases, unless ducts are enclosed entirely in directly conditioned space, the minimum duct insulation value is R-6. Note that higher values may be
required by the prescriptive or performance requirements. See Section 150.0(m)1.
12
Connections and Closures: All installed air-distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0,
602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006: Supply-air and return-air ducts and plenums must be insulated to a minimum installed level of R-6.0 or
enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing in accordance with the requirements of Reference
Residential Appendix RA3.1.4.3.8.
Heat Pump Thermostat
13 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c).
14 The thermostat shall be installed in accordance with the manufacturers published installation specifications
15 First stage of heating shall be assigned to heat pump heating.
16 Second stage back up heating shall be set to come on only when the indoor set temperature cannot be met.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 10 of 10)
Registration Number: 424-P010255225A-001-003-M01004A-0000 Registration Date/Time: 2024-10-23 13:00:13 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:19
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of
features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized
representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the
installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency.
4.I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all
applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-003-M27005A-0000
Registration Date/Time: 2024-10-23 13:00:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:20
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 1 of 7)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 107)
City: La Quinta Zip Code: 92253
Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE
Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on
this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010.
A. Dwelling Mechanical Ventilation - General Information
01 Dwelling unit name DwellingUnit 107
02 Building Type Single Family
03 Project scope Newly constructed building
04
Total Conditioned Floor Area of Dwelling Unit
(For addition projects the conditioned floor area equals
existing area plus addition area. )
931
05
Number of bedrooms in dwelling unit
(For addition projects the number of bedrooms equals the
existing bedrooms plus addition bedrooms)
2
06 Ventilation Operation Schedule Continuous
07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1)
08 Whole Building Ventilation System Type Standalone - Balanced
09 IAQ Fan Location
Note:
Non-dwelling units do not meet the definition for a dwelling unit as defined in Section 100.1(b). Non-dwelling units are not
designed to provide independent living facilities and do not provide permanent provisions for living, sleeping, eating, cooking and
sanitation.
MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method
B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method
A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with
outdoor air each hour at no less than the rate in equation 4.1a.
01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81
02 Installed Continuous Whole-Building Ventilation Rate 178
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 2 of 7)
Registration Number:
424-P010255225A-001-003-M27005A-0000
Registration Date/Time: 2024-10-23 13:00:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:20
C. Compliance Statement
01 Building passes continuous whole-building ventilation rate test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 3 of 7)
Registration Number:
424-P010255225A-001-003-M27005A-0000
Registration Date/Time: 2024-10-23 13:00:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:20
D. Local Mechanical Exhaust System - Fan selection and duct design criteria for compliance
Local mechanical exhaust fans shall be installed in each kitchen and bathroom. Delivered local ventilation rates:
•All local ventilation rates have been measured using a flow hood, flow grid, or other airflow measuring device and meet the
requirements of 62.2 Tables 5.1 or 5.2. OR
•The airflow rating at a pressure of 0.25 in. w.c. of a certified fan is assumed because the local ventilation system duct sizing
meets the prescriptive requirements of 62.2 Table 5.3, or manufacturer's design criteria.
Table 5.1
Intermittent Local Ventilation Exhaust Airflow Rates
Application Airflow Notes
Kitchen 100 cfm
Vented range hood (including
appliance-range hood combinations)
required if exhaust fan flow is less than 5
ACH.
Bathroom 50 cfm
Table 5.2
Continuous Local Ventilation Exhaust Airflow Rates
Application Airflow Notes
Kitchen 5 ACH Based on Kitchen volume.
Bathroom 20 cfm
Table 5.3
Prescriptive Duct Sizing Requirements
Duct Type Flex Duct Smooth Duct
Fan Rating
cfm @ 0.25
in. w.g.
50 80 100 125 50 80 100 125
Maximum Allowable Duct Length (ft)
Diameter,
(in)Flex Duct Smooth Duct
3 X X X X 5 X X X
4 70 3 X X 105 35 5 X
5 NL 70 35 20 NL 135 85 55
6 NL NL 125 95 NL NL NL 145
7 and above NL NL NL NL NL NL NL NL
This table assumes no elbows. Deduct 15 ft of allowable duct length for each turn, elbow, or fitting. Interpolation and extrapolation
in 62.2 Table 5.3 is not allowed. For airflow values not listed, use the next higher value. This table is not applicable for airflow > 125
cfm.
NL = no limit on duct length of this size.
X = not allowed, any length of duct of this size with assumed turns, elbows, fittings will exceed the rated pressure drop.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 4 of 7)
Registration Number:
424-P010255225A-001-003-M27005A-0000
Registration Date/Time: 2024-10-23 13:00:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:20
E. Other Requirements
The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other
Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information
describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if
applicable.
01
6.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components to occupiable spaces from
garages, unconditioned crawl spaces, and unconditioned attics. Supply and balanced ventilation systems shall be designed
and constructed to provide ventilation air directly from the outdoors.
02
6.2 Instructions and Labeling.Information on the ventilation design and/or ventilation systems installed, instructions on
their proper operation to meet the requirements of this standard, and instructions detailing any required maintenance
(similar to that provided for HVAC systems) shall be provided to the owner and the occupant of the dwelling unit. Controls
shall be labeled as to their function (unless that function is obvious, such as toilet exhaust fan switches). See Chapter 13 of
Guideline 24 2 for information on instructions and labeling.
03 6.3 Clothes Dryers.Clothes dryers shall be exhausted directly to the outdoors
04
6.4 Combustion and Solid-Fuel Burning Appliances.Combustion and solid-fuel burning appliances must be provided with
adequate combustion and ventilation air and vented in accordance with manufacturer installation instructions, NFPA 54
ANSI Z223.1, National Fuel Gas Code, NFPA 31, Standard for the Installation of Oil-Burning Equipment, or NFPA 211,
Standard for Chimneys, Fireplaces, Vents, and Solid-Fuel Burning Appliances, or other equivalent code acceptable to the
building official.
Where atmospherically vented combustion appliances or solid-fuel burning appliances are located inside the pressure
boundary, the total net exhaust flow of the two largest exhaust fans (not including a summer cooling fan intended to be
operated only when windows or other air inlets are open) shall not exceed 15 cfm/100 ft 2 (75 Lps/100 m2) of occupiable
space when in operation at full capacity. If the designed total net flow exceeds this limit, the net exhaust flow must be
reduced by reducing the exhaust flow or providing compensating outdoor airflow. Atmospherically vented combustion
appliances do not include direct-vent appliances.
05
6.5 Garages.When an occupiable space adjoins a garage, the design must prevent migration of contaminants to the
adjoining occupiable space. Air seal the walls, ceilings, and floors that separate garages from occupiable space. To be
considered air sealed, all joints, seams, penetrations, openings between door assemblies and their respective jambs and
framing, and other sources of air leakage through wall and ceiling assemblies separating the garage from the residence and
its attic area shall be caulked, gasketed, weather stripped, wrapped, or otherwise sealed to limit air movement. Doors
between garages and occupiable spaces shall be gasketed or made substantially airtight with weather stripping.
06 6.6 Ventilation Opening Area.Spaces shall have ventilation openings as listed below. Such openings shall meet the
requirements of Section 6.8
07
6.7 Minimum Filtration.Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 ft (3 m)
in length and through a thermal conditioning component, except evaporative coolers, shall be provided with a filter having
a designated minimum efficiency of MERV 6, or better, when tested in accordance with ANSI ASHRAE Standard 52.2,
Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size, or a minimum Particle
Size Efficiency of 50 percent in the 3.0-10 µm range in accordance with AHRI Standard 680, Performance Rating of
Residential Air Filter Equipment. The system shall be designed such that all recirculated and mechanically supplied outdoor
air is filtered before passing through the thermal conditioning components. The filter shall be located and installed in such a
manner as to facilitate access and regular service by the owner.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 5 of 7)
Registration Number:
424-P010255225A-001-003-M27005A-0000
Registration Date/Time: 2024-10-23 13:00:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:20
E. Other Requirements
The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other
Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information
describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if
applicable.
08
6.8 Air Inlets.Air inlets that are part of the ventilation design shall be located a minimum of 10 ft (3 m) from known sources
of contamination such as a stack, vent, exhaust hood, or vehicle exhaust. The intake shall be placed so that entering air is
not obstructed by snow, plantings, or other material. Forced air inlets shall be provided with rodent insect screens (mesh
not larger than 1/2 inch).
09
6.9 Carbon Monoxide Detectors.A carbon monoxide alarm shall be installed in each dwelling unit in accordance with NFPA
720,Standard for the Installation of Carbon Monoxide (CO) Detection and Warning Equipment 14, and shall be consistent
with requirements of applicable laws, codes, and standards.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met.
F. Air Moving Equipment
The items listed below (7.1 through 7.3) correspond to the information given in ASHRAE 62.2 Section 7 Air-Moving
Equipment. Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.6) for information describing
these requirements in more detail. The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 7.1 through 7.3 if
applicable.
01
7.1 Selection and Installation.Ventilation devices and equipment shall be tested and listed in accordance with specific
standards. Installations of systems or equipment shall be carried out in accordance with manufacturers' design
requirements and installation instructions.
02
7.2 Sound Ratings for Fans.Ventilation fans shall be rated for sound at no less than the minimum airflow rate required by
this standard, as noted below. These sound ratings shall be at a minimum of 0.1 in. w.c. (25 Pa) static pressure.
7.2.1 Whole Building or Continuous Ventilation Fans.These fans shall be rated for sound at a maximum of 1.0 sone.
7.2.2 Intermittent Local Exhaust Fans.Fans used to comply with Section 5.2 shall be rated for sound at a maximum of 3
sone, unless their maximum rated airflow exceeds 400 cfm (200 L/s). (Some exceptions may apply.)
03
7.3 Multibranch Exhaust Ducting.If more than one of the exhaust fans in a dwelling unit shares a common exhaust duct,
each fan shall be equipped with a back draft damper to prevent the recirculation of exhaust air from one room to another
through the exhaust ducting system.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 6 of 7)
Registration Number:
424-P010255225A-001-003-M27005A-0000
Registration Date/Time: 2024-10-23 13:00:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:20
G. Multifamily Buildings -Other Requirements
The items listed below correspond to the information given in ASHRAE 62.2 Section 8 "Multifamily Buildings". Refer
also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these
requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that
the building complies with these requirements specified in ASHRAE 62.2 Section 8, if applicable.
01
8.2 Whole-Building Mechanical Ventilation.For multifamily buildings, the term "building" in Section 4 refers to a single
dwelling unit.
8.4.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components separating dwelling
units, including sealing penetrations in the common walls, ceilings, and floors of each unit and by sealing vertical chases
adjacent to the units. All doors between dwelling units and common hallways shall be gasketed or made substantially
airtight.
8.4.1.1 Compliance.One method of demonstrating compliance with Section 8.4.1 shall be to verify a leakage rate below a
maximum of 0.2 cfm/ ft2 (100 L/s per 100 m2) of the dwelling unit envelope area (i.e., the sum of the area of the walls
between dwelling units, exterior walls, ceiling and floor) at a test pressure of 50 Pa by a blower door test. The test shall be
conducted with the dwelling unit as if it were exposed to outdoor air on all sides, top, and bottom by opening doors and
windows of adjacent dwelling units.
8.5.1 Exhaust Ducts.Exhaust fans in separate dwelling units shall not share a common exhaust duct. Exhaust inlets from
more than one dwelling unit may be served by a single exhaust fan downstream of all the exhaust inlets if the fan is
designated and intended to run continuously or if each inlet is equipped with a back-draft damper to prevent
cross-contamination when the fan is not running.
8.5.2 Supply Ducts.Supply outlets to more than one dwelling unit may be served by a single fan upstream of all the supply
outlets if the fan is designed and intended to run continuously or if each supply outlet is equipped with a back-draft damper
to prevent cross-contamination when the fan is not running.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 7 of 7)
Registration Number:
424-P010255225A-001-003-M27005A-0000
Registration Date/Time: 2024-10-23 13:00:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:20
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-003-M20006A-0000
Registration Date/Time: 2024-10-23 13:01:01 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:20
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 107)
City: La Quinta Zip Code: 92253
A. System Information
01 Space Conditioning System Identification or Name UNIT 107 HVACSys
02 Space Conditioning System Location or Area Served Main
03 Building Type from CF-1R Multi-family
04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS)
Credit from CF1R?
No, credit is not taken
05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit
from CF1R?
No, credit is not taken
06 Duct System Compliance Category New
MCH-20a - Completely New Duct System
B. Duct Leakage Diagnostic Test
01 Condenser Nominal Cooling Capacity (ton)3
02 Heating Capacity (kBtu/h)36
03 Conditioned Floor Area Served by this HVAC System (ft2)931
04 Duct Leakage Test Conditions Test final
05 Duct Leakage Test Method Total leakage
06 Leakage Factor 0.12
07 Air Handling Unit Airflow (AHUAirflow) Determination
Method
Cooling system method
08 Measured AHUAirflow (cfm)This field or section is not applicable
09 Calculated Target Allowable Duct Leakage (cfm)144
10 Actual Duct Leakage Rate from Leakage Test Measurement
(cfm)
56.6
11 Compliance Statement System passes leakage test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 2 of 3)
Registration Number:
424-P010255225A-001-003-M20006A-0000
Registration Date/Time: 2024-10-23 13:01:01 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:20
C. Additional Requirements for Compliance
01 System was tested in its normal operation condition. No temporary taping allowed.
02
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage
testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation
Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required,
may configure the OA damper to the closed position during duct leakage testing.
03 All supply and return register boots were sealed to the drywall.
04 Building cavities were not used as plenums or platform returns in lieu of ducts.
05 If cloth backed tape was used it was covered with Mastic and draw bands.
06 All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in).
After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must
be performed
07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are
properly sealed.
08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points
between the air handler and the supply and return plenums to verify that the connection points are properly sealed.
09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 3 of 3)
Registration Number:
424-P010255225A-001-003-M20006A-0000
Registration Date/Time: 2024-10-23 13:01:01 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:20
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-003-M23007A-0000
Registration Date/Time: 2024-10-23 13:01:26 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:20
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 107)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 107 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement
B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP)
in the Supply Plenum.
Procedures for installing HSPP or PSPP are specified in RA3.3.1.1.
01 Method Used to Demonstrate Compliance with the
HSPP/PSPP Requirement
HSPP installed and labeled consistent with Figure RA3.3-1
C. Airflow Rate Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given
in RA3.3.2.
01 Airflow Rate Measurement Type used for this airflow rate
verification.
Traditional Flow Capture Hood according to procedure in
RA3.3.3.1.4
02 Manufacturer of Airflow Measurement Apparatus ALNOR
03 Model number of Airflow Measurement Apparatus EB† 731
04
Certification Status of the Airflow Measurement Apparatus
Accuracy
Certified by Manufacturer and listed on CEC Website at
http://www.energy.ca.gov/title24/equipment_cert/ama_fas
/index.html
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 2 of 3)
Registration Number:
424-P010255225A-001-003-M23007A-0000
Registration Date/Time: 2024-10-23 13:01:26 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:20
MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
D. Forced Air System Airflow Rate Measurement
The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3.
01 Required Minimum System Airflow Rate (cfm/ton)350
02 Required Minimum System Airflow Target (cfm)1050
03 Actual System Airflow Rate Measurement (cfm)1136
04 Compliance Statement:System airflow rate complies
E. Additional Requirements
01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in
the system during system air flow rate measurement identified on this Certificate of Installation.
02
The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of
Installation was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the
instrumentation specifications given in RA3.3.1.
03
A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning
system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate
of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance
Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance.
04 All registers were fully open during the diagnostic test.
05 System fan was set at maximum speed during the diagnostic test.
06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
08
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 3 of 3)
Registration Number:
424-P010255225A-001-003-M23007A-0000
Registration Date/Time: 2024-10-23 13:01:26 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:20
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-003-M22008A-0000
Registration Date/Time: 2024-10-23 13:01:51 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:20
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 107)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 107 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement
B. Fan Watt Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in
RA3.3.2.2.
01 Fan Watt Verification Device Used.Portable watt meter
MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
01 Actual Tested Watts 658.88
02 Actual Tested Airflow from MCH-23 (cfm)1136
03 Required Fan Efficacy (watts/cfm)0.58
04 Actual Fan Efficacy (watts/cfm)0.58
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 2 of 3)
Registration Number:
424-P010255225A-001-003-M22008A-0000
Registration Date/Time: 2024-10-23 13:01:51 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:20
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
05 Compliance Statement:System fan efficacy complies
D. Additional Requirements
01 All registers were fully open during the diagnostic test.
02 System fan was set at maximum speed during the diagnostic test.
03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
05
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy
(Watt/cfm) criteria in every zonal control mode.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 3 of 3)
Registration Number:
424-P010255225A-001-003-M22008A-0000
Registration Date/Time: 2024-10-23 13:01:51 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:20
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-003-M26009A-0000
Registration Date/Time: 2024-10-23 13:02:07 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:20
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 107)
City: La Quinta Zip Code: 92253
A. System Information
Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system
requiring verification must use a separate form.
01 System Name or Identification/Tag UNIT 107 HVACSys
02 System Location or Area Served Main
03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required
04 Directory used to certify product performance AHRI
05 AHRI certification number for the installed space
conditioning system from http://www.ahridirectory.org
208650564
06 Does the directory used to certify product performance
require a specific air handler/furnace make and model?
Yes
07 Does the directory used to certify product performance
require a time delay relay (+TDR)?
Yes
08 Does the directory used to certify product performance
require a TXV (+TXV)?
Yes
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the
Directory used to certify product performance in order to demonstrate compliance.
Data from Nameplate of Installed system
component
Data from the Directory used to certify
product performance for the rated system
component
Outdoor Condenser or Package Unit -
Installed Manufacturer Name
01 RHEEM 02 RHEEM
Outdoor Condenser or Package Unit -
Installed Model Number
03 RHPAZR036JT000NA 04 RHPAZR036JT000NA
Inside Coil - Installed Manufacturer
Name
05 06 This field or section is not applicable
Inside Coil - Installed Model Number 07 08 This field or section is not applicable
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 2 of 3)
Registration Number:
424-P010255225A-001-003-M26009A-0000
Registration Date/Time: 2024-10-23 13:02:07 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:20
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the
Directory used to certify product performance in order to demonstrate compliance.
Air Handler/Furnace - Installed
Manufacturer Name
09 10 RHEEM
Air Handler/Furnace - Installed Model
Number
11 12 RHPAZR036AJT
C. Verified Cooling System SEER
01 Required minimum SEER 15
02 Installed SEER 15
03 Compliance Statement:System passes SEER verification
Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed
on the CF1R.
D. Verified Cooling System EER
This section does not apply to this project.
E. Verified Cooling System Air Handler/Furnace
01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party
certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory.
F. Verified Cooling System Time Delay Relay
01
If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by
signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of
RA3.4.3.
G. Verified Cooling System TXV
01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below
that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 3 of 3)
Registration Number:
424-P010255225A-001-003-M26009A-0000
Registration Date/Time: 2024-10-23 13:02:07 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:20
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number: 424-P010255225A-001-004-M01004A-0000 Registration Date/Time: 2024-10-23 13:03:55 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 1 of 10)
Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La Quinta
(DwellingUnit 108)
City: La Quinta Zip Code: 92253
A. General Information
01 Dwelling Unit Name DwellingUnit 108 02 Climate Zone 15
03 Dwelling Unit Total
Conditioned Floor Area (ft2)931 04
Number of Space
Conditioning Systems in this
dwelling unit.
1
05 Certificate of Compliance
Type Performance (CF1R-PRF)06 Method Used to Calculate
HVAC Loads ACCA Manual J
07
Calculated Dwelling Unit
Sensible Cooling Load
(Btu/h)
36000 08 Calculated Dwelling Unit
Heating Load (Btu/h)36000
09 Dwelling Unit Number of
Bedrooms 2
MCH-01a - Space Conditioning Systems Ducts and Fans - For use with Performance Certificate of Compliance
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 2 of 10)
Registration Number: 424-P010255225A-001-004-M01004A-0000 Registration Date/Time: 2024-10-23 13:03:55 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
B. Design Space Conditioning (SC) System Component Specifications from CF1R
This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project.
01 02 03 04 05 06 07 08 09 10 11 12
Zone Name
SC System
Identification
or Name
SC System
Type
Heating
System
Type
Cooling
System Type SC Fan Type Distribution
System Type
Required
Thermostat
Type
Low
Leakage
Air-Handling
Unit
(LLAHU)
Status
Bypass Duct
Status
Cooling
Zoning Type
Cooling
System
Compressor
Speed
This field or
section is
not
applicable
UNIT 108
HVACSys
Heat pump
heating
cooling
Central
packaged
HP
Central
packaged
HP
PSC
Permanent
Split Capacitor
Unconditione
d attic OCST per JA5 No, credit is
not taken
No Bypass
Duct Not Zonal Single Speed
Notes:
C. Design Space Conditioning (SC) System Compliance Requirements from CF1R
This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project.
01 02 03 04 05 06 07 08 09 10
SC System
Identification or
Name
Heating
Efficiency Type
Minimum
Heating
Efficiency Value
Heat Pump
Heating
Capacity at 47°F
Heat Pump
Heating
Capacity at 17°F
Minimum
Cooling
Efficiency SEER
Minimum
Cooling
Efficiency EER
Minimum
Cooling System
Airflow Rate
(CFM/ton)
Maximum Fan
Efficacy
(W/CFM)
Minimum Duct
R-Value
UNIT 108
HVACSys
Heating
Seasonal
Performance
Factor (HSPF)
8.2 36000 29000 15 12.44 350 0.58 R-8
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 3 of 10)
Registration Number: 424-P010255225A-001-004-M01004A-0000 Registration Date/Time: 2024-10-23 13:03:55 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
D. Installed Space Conditioning (SC) System Component Information
01 02 03 04 05 06 07 08 09 10 11
SC System
Identification
or Name
SC System
Location or
Area Served
Conditioned
Floor Area
Served by the
System (ft2)
Heating
System Type
Cooling
System Type SC Fan Type Distribution
System Type
SC System
Thermostat
Type
Cooling Zoning
Type
Cooling
System
Compressor
Speed Type
Central Fan
Integrated
(CFI)
Ventilation
System Status
UNIT 108
HVACSys Main 931 Central
packaged HP
Central
packaged HP
PSC
Permanent
Split Capacitor
Unconditioned
attic OCST per JA5 Not Zonal Single Speed Not a CFI
system
Notes:
E. Installed Heating System Equipment Information (not heat pumps)
This section does not apply to this project.
F. Installed Cooling System Outdoor Condensing Unit or Package Unit Equipment Information (not heat pumps)
This section does not apply to this project.
G. Installed Split System Indoor Coil or Fan Coil Unit Equipment Information (applicable to DX or hydronic heating/cooling coils or fan coil units)
Systems with more than one indoor coil or fan coil unit (e.g. multi-split systems) shall provide information for each of the system indoor coils or fan coil units.
This section does not apply to this project.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 4 of 10)
Registration Number: 424-P010255225A-001-004-M01004A-0000 Registration Date/Time: 2024-10-23 13:03:55 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
H. Installed Heat Pump System - Split System Condensing Unit or Package Unit Equipment Information
01 02 03 04 05
SC System
Identification or
Name
SC System Location
or Area Served Condenser or Package Unit Manufacturer
Condenser or Package Unit Model
Number Condenser or Package Unit Serial Number
UNIT 108 HVACSys Main RHEEM RHPAZR036JT000NA F422302307
Notes:
I. Installed Heat Pump System -Efficiency and Performance Compliance Information
01 02 03 04 05 06 07 08 09 10
SC System
Identification
or Name
SC System
Location or
Area Served
Heating
Efficiency Type
Heating
Efficiency Value
System Rated
Heating
Capacity at 47°F
System Rated
Heating
Capacity at 17°F
System Rated
Cooling
Efficiency SEER
System Rated
Cooling
Efficiency EER
System Rated
Cooling
Capacity at
Design
Conditions
(Btu/h)
Condenser
Rated Nominal
Capacity (ton)
UNIT 108
HVACSys Main
Heating
Seasonal
Performance
Factor (HSPF)
8.2 36000 29000 15 12.44 36000 3
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 5 of 10)
Registration Number: 424-P010255225A-001-004-M01004A-0000 Registration Date/Time: 2024-10-23 13:03:55 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
J. Installed Duct System Information
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identification
or Name
SC System
Location or
Area Served
Supply Duct
Location
Supply Duct
R-Value
Return Duct
Location
Return Duct
R-Value
Exemption
from Min
R-Value for
Ducts In
Conditioned
Space
Method of
compliance
with duct
and filter
grille sizing
Req's in
150.0(m)13
Exemption
From Duct
Leakage
Requirement
s
Bypass Duct
Status
Number of
Air Filter
Devices on
System
Can RA3.3
Airflow
Protocols be
used to test
this System?
UNIT 108
HVACSys Main Unconditio
ned attic R-8 Unconditio
ned attic R-8 Not
applicable
HERS
verified fan
efficacy
(W/cfm)
and airflow
rate
(cfm/ton)
None No Bypass
Duct 1 Yes
Notes:
K. Installed Air Filter Device Information
Mandatory requirements for air filter devices are specified Section 150.0(m)12.
01 02 03 04 05 06 07
SC System
Identification or Name
SC System Location or
Area Served
Air Filter Device
Identification or Name Air Filter Device Type
Air Filter Device
Location
Determined Design
Airflow Rate for Air
Filter Device (cfm)
Determined Design
Allowable Pressure
Drop for Air Filter
Device (inch W.C.)
UNIT 108 HVACSys Main Filter Filter Grille return 1050 0.1
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 6 of 10)
Registration Number: 424-P010255225A-001-004-M01004A-0000 Registration Date/Time: 2024-10-23 13:03:55 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
L. Air Filter Device Requirements
01 The system shall be designed to ensure that all recirculated air and all outdoor air supplied to the occupiable space is filtered before passing through the system's
thermal conditioning components.
02
The system shall be designed to accommodate the clean-filter pressure drop imposed by the system air filter device(s). The design airflow rate and maximum
allowable clean-filter pressure drop at the design airflow rate applicable to each air filter device shall be determined, and all system air filter device locations shall be
labeled to disclose the applicable design airflow rate and the maximum allowable clean-filter pressure drop. The labels shall be permanently affixed to the air filter
device, readily legible, and visible to a person replacing the air filter media, and the air filter devices shall be provided with air filter media that conforms to these
determined or labeled maximum allowable clean-filter pressure drop values as rated using AHRI Standard 680.
03 All system air filter devices shall be located and installed in such a manner as to allow access and regular service by the system owner.
04 The system shall be provided with air filter media having a designated efficiency equal to or greater than MERV 6 when tested in accordance with ASHRAE Standard
52.2, or a particle size efficiency rating equal to or greater than 50% in the 3.0 to10 µm range when tested in accordance with AHRI Standard 680.
05 The system shall be provided with air filter media that has been labeled by the manufacturer to disclose the efficiency and pressure drop ratings that conform to the
required efficiency and pressure drop requirements for the air filter device.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met
M. HERS Verification Requirements
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identificati
on or
Name
SC System
Location or
Area
Served
MCH-20
.
.
Duct
Leakage
Test
MCH-21
.
Duct
Location
Verification
MCH-22
.
AHU Fan
Efficacy
(W/cfm)
MCH-23
.
AHU
Airflow
Rate
(cfm/ton)
MCH-25
.
.
Refrigerant
Charge
MCH-26
Rated SC
System
Equipment
Verification
MCH-27
.
IAQ
Mechanical
Ventilation
MCH-28
Return
Duct
Design
Table
150.0-B or
C
MCH-29
Supply
Duct
Surface
Area
R-Value
Buried
Ducts
MCH30
.
Ventilation
Cooling
Credit
UNIT 108
HVACSys Main Yes No Yes Yes No Yes Yes No No No
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 7 of 10)
Registration Number: 424-P010255225A-001-004-M01004A-0000 Registration Date/Time: 2024-10-23 13:03:55 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
M. HERS Verification Requirements
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identificati
on or
Name
SC System
Location or
Area
Served
MCH-20
.
.
Duct
Leakage
Test
MCH-21
.
Duct
Location
Verification
MCH-22
.
AHU Fan
Efficacy
(W/cfm)
MCH-23
.
AHU
Airflow
Rate
(cfm/ton)
MCH-25
.
.
Refrigerant
Charge
MCH-26
Rated SC
System
Equipment
Verification
MCH-27
.
IAQ
Mechanical
Ventilation
MCH-28
Return
Duct
Design
Table
150.0-B or
C
MCH-29
Supply
Duct
Surface
Area
R-Value
Buried
Ducts
MCH30
.
Ventilation
Cooling
Credit
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 8 of 10)
Registration Number: 424-P010255225A-001-004-M01004A-0000 Registration Date/Time: 2024-10-23 13:03:55 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures
Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly
installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements.
Heating Equipment
01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency
Regulations.
02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant
to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(i), 110.2(b).
03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections
150.0(h)1 and 2).
04 Furnace Temperature Rise: Central forced-air heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum
inlet-to-outlet temperature rise specification. See Section 150.0(h)4.
05 Standby Losses and Pilot Lights: Fan-type central furnaces may not have a continuously burning pilot light. Section 110.5 and Section 110.2(d).
Cooling Equipment
06 Equipment Efficiency: All cooling equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency
Regulations.
07 Refrigerant Line Insulation: All refrigerant line insulation in split system air conditioners and heat pumps must meet the R-value and protection requirements of Section
150.0(j)2 and 3, and Section 150.0(m)9.
08 Condensing Unit Location: Condensing units shall not be placed within five (5) feet of a dryer vent outlet. See Section 150.0(h)3A.
09 Liquid Line Filter Drier: If applicable, a liquid line filter drier shall be installed according to the manufacturer's specifications. Section 150.0(h)3B
10 Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section
150.0(h)1 and 2.
Air Distribution System Ducts, Plenums and Fans
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 9 of 10)
Registration Number: 424-P010255225A-001-004-M01004A-0000 Registration Date/Time: 2024-10-23 13:03:55 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures
Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly
installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements.
11 Insulation: In all cases, unless ducts are enclosed entirely in directly conditioned space, the minimum duct insulation value is R-6. Note that higher values may be
required by the prescriptive or performance requirements. See Section 150.0(m)1.
12
Connections and Closures: All installed air-distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0,
602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006: Supply-air and return-air ducts and plenums must be insulated to a minimum installed level of R-6.0 or
enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing in accordance with the requirements of Reference
Residential Appendix RA3.1.4.3.8.
Heat Pump Thermostat
13 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c).
14 The thermostat shall be installed in accordance with the manufacturers published installation specifications
15 First stage of heating shall be assigned to heat pump heating.
16 Second stage back up heating shall be set to come on only when the indoor set temperature cannot be met.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 10 of 10)
Registration Number: 424-P010255225A-001-004-M01004A-0000 Registration Date/Time: 2024-10-23 13:03:55 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of
features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized
representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the
installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency.
4.I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all
applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-004-M27005A-0000
Registration Date/Time: 2024-10-23 13:04:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 1 of 7)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 108)
City: La Quinta Zip Code: 92253
Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE
Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on
this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010.
A. Dwelling Mechanical Ventilation - General Information
01 Dwelling unit name DwellingUnit 108
02 Building Type Single Family
03 Project scope Newly constructed building
04
Total Conditioned Floor Area of Dwelling Unit
(For addition projects the conditioned floor area equals
existing area plus addition area. )
931
05
Number of bedrooms in dwelling unit
(For addition projects the number of bedrooms equals the
existing bedrooms plus addition bedrooms)
2
06 Ventilation Operation Schedule Continuous
07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1)
08 Whole Building Ventilation System Type Standalone - Balanced
09 IAQ Fan Location
Note:
Non-dwelling units do not meet the definition for a dwelling unit as defined in Section 100.1(b). Non-dwelling units are not
designed to provide independent living facilities and do not provide permanent provisions for living, sleeping, eating, cooking and
sanitation.
MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method
B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method
A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with
outdoor air each hour at no less than the rate in equation 4.1a.
01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81
02 Installed Continuous Whole-Building Ventilation Rate 122
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 2 of 7)
Registration Number:
424-P010255225A-001-004-M27005A-0000
Registration Date/Time: 2024-10-23 13:04:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
C. Compliance Statement
01 Building passes continuous whole-building ventilation rate test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 3 of 7)
Registration Number:
424-P010255225A-001-004-M27005A-0000
Registration Date/Time: 2024-10-23 13:04:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
D. Local Mechanical Exhaust System - Fan selection and duct design criteria for compliance
Local mechanical exhaust fans shall be installed in each kitchen and bathroom. Delivered local ventilation rates:
•All local ventilation rates have been measured using a flow hood, flow grid, or other airflow measuring device and meet the
requirements of 62.2 Tables 5.1 or 5.2. OR
•The airflow rating at a pressure of 0.25 in. w.c. of a certified fan is assumed because the local ventilation system duct sizing
meets the prescriptive requirements of 62.2 Table 5.3, or manufacturer's design criteria.
Table 5.1
Intermittent Local Ventilation Exhaust Airflow Rates
Application Airflow Notes
Kitchen 100 cfm
Vented range hood (including
appliance-range hood combinations)
required if exhaust fan flow is less than 5
ACH.
Bathroom 50 cfm
Table 5.2
Continuous Local Ventilation Exhaust Airflow Rates
Application Airflow Notes
Kitchen 5 ACH Based on Kitchen volume.
Bathroom 20 cfm
Table 5.3
Prescriptive Duct Sizing Requirements
Duct Type Flex Duct Smooth Duct
Fan Rating
cfm @ 0.25
in. w.g.
50 80 100 125 50 80 100 125
Maximum Allowable Duct Length (ft)
Diameter,
(in)Flex Duct Smooth Duct
3 X X X X 5 X X X
4 70 3 X X 105 35 5 X
5 NL 70 35 20 NL 135 85 55
6 NL NL 125 95 NL NL NL 145
7 and above NL NL NL NL NL NL NL NL
This table assumes no elbows. Deduct 15 ft of allowable duct length for each turn, elbow, or fitting. Interpolation and extrapolation
in 62.2 Table 5.3 is not allowed. For airflow values not listed, use the next higher value. This table is not applicable for airflow > 125
cfm.
NL = no limit on duct length of this size.
X = not allowed, any length of duct of this size with assumed turns, elbows, fittings will exceed the rated pressure drop.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 4 of 7)
Registration Number:
424-P010255225A-001-004-M27005A-0000
Registration Date/Time: 2024-10-23 13:04:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
E. Other Requirements
The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other
Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information
describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if
applicable.
01
6.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components to occupiable spaces from
garages, unconditioned crawl spaces, and unconditioned attics. Supply and balanced ventilation systems shall be designed
and constructed to provide ventilation air directly from the outdoors.
02
6.2 Instructions and Labeling.Information on the ventilation design and/or ventilation systems installed, instructions on
their proper operation to meet the requirements of this standard, and instructions detailing any required maintenance
(similar to that provided for HVAC systems) shall be provided to the owner and the occupant of the dwelling unit. Controls
shall be labeled as to their function (unless that function is obvious, such as toilet exhaust fan switches). See Chapter 13 of
Guideline 24 2 for information on instructions and labeling.
03 6.3 Clothes Dryers.Clothes dryers shall be exhausted directly to the outdoors
04
6.4 Combustion and Solid-Fuel Burning Appliances.Combustion and solid-fuel burning appliances must be provided with
adequate combustion and ventilation air and vented in accordance with manufacturer installation instructions, NFPA 54
ANSI Z223.1, National Fuel Gas Code, NFPA 31, Standard for the Installation of Oil-Burning Equipment, or NFPA 211,
Standard for Chimneys, Fireplaces, Vents, and Solid-Fuel Burning Appliances, or other equivalent code acceptable to the
building official.
Where atmospherically vented combustion appliances or solid-fuel burning appliances are located inside the pressure
boundary, the total net exhaust flow of the two largest exhaust fans (not including a summer cooling fan intended to be
operated only when windows or other air inlets are open) shall not exceed 15 cfm/100 ft 2 (75 Lps/100 m2) of occupiable
space when in operation at full capacity. If the designed total net flow exceeds this limit, the net exhaust flow must be
reduced by reducing the exhaust flow or providing compensating outdoor airflow. Atmospherically vented combustion
appliances do not include direct-vent appliances.
05
6.5 Garages.When an occupiable space adjoins a garage, the design must prevent migration of contaminants to the
adjoining occupiable space. Air seal the walls, ceilings, and floors that separate garages from occupiable space. To be
considered air sealed, all joints, seams, penetrations, openings between door assemblies and their respective jambs and
framing, and other sources of air leakage through wall and ceiling assemblies separating the garage from the residence and
its attic area shall be caulked, gasketed, weather stripped, wrapped, or otherwise sealed to limit air movement. Doors
between garages and occupiable spaces shall be gasketed or made substantially airtight with weather stripping.
06 6.6 Ventilation Opening Area.Spaces shall have ventilation openings as listed below. Such openings shall meet the
requirements of Section 6.8
07
6.7 Minimum Filtration.Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 ft (3 m)
in length and through a thermal conditioning component, except evaporative coolers, shall be provided with a filter having
a designated minimum efficiency of MERV 6, or better, when tested in accordance with ANSI ASHRAE Standard 52.2,
Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size, or a minimum Particle
Size Efficiency of 50 percent in the 3.0-10 µm range in accordance with AHRI Standard 680, Performance Rating of
Residential Air Filter Equipment. The system shall be designed such that all recirculated and mechanically supplied outdoor
air is filtered before passing through the thermal conditioning components. The filter shall be located and installed in such a
manner as to facilitate access and regular service by the owner.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 5 of 7)
Registration Number:
424-P010255225A-001-004-M27005A-0000
Registration Date/Time: 2024-10-23 13:04:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
E. Other Requirements
The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other
Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information
describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if
applicable.
08
6.8 Air Inlets.Air inlets that are part of the ventilation design shall be located a minimum of 10 ft (3 m) from known sources
of contamination such as a stack, vent, exhaust hood, or vehicle exhaust. The intake shall be placed so that entering air is
not obstructed by snow, plantings, or other material. Forced air inlets shall be provided with rodent insect screens (mesh
not larger than 1/2 inch).
09
6.9 Carbon Monoxide Detectors.A carbon monoxide alarm shall be installed in each dwelling unit in accordance with NFPA
720,Standard for the Installation of Carbon Monoxide (CO) Detection and Warning Equipment 14, and shall be consistent
with requirements of applicable laws, codes, and standards.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met.
F. Air Moving Equipment
The items listed below (7.1 through 7.3) correspond to the information given in ASHRAE 62.2 Section 7 Air-Moving
Equipment. Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.6) for information describing
these requirements in more detail. The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 7.1 through 7.3 if
applicable.
01
7.1 Selection and Installation.Ventilation devices and equipment shall be tested and listed in accordance with specific
standards. Installations of systems or equipment shall be carried out in accordance with manufacturers' design
requirements and installation instructions.
02
7.2 Sound Ratings for Fans.Ventilation fans shall be rated for sound at no less than the minimum airflow rate required by
this standard, as noted below. These sound ratings shall be at a minimum of 0.1 in. w.c. (25 Pa) static pressure.
7.2.1 Whole Building or Continuous Ventilation Fans.These fans shall be rated for sound at a maximum of 1.0 sone.
7.2.2 Intermittent Local Exhaust Fans.Fans used to comply with Section 5.2 shall be rated for sound at a maximum of 3
sone, unless their maximum rated airflow exceeds 400 cfm (200 L/s). (Some exceptions may apply.)
03
7.3 Multibranch Exhaust Ducting.If more than one of the exhaust fans in a dwelling unit shares a common exhaust duct,
each fan shall be equipped with a back draft damper to prevent the recirculation of exhaust air from one room to another
through the exhaust ducting system.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 6 of 7)
Registration Number:
424-P010255225A-001-004-M27005A-0000
Registration Date/Time: 2024-10-23 13:04:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
G. Multifamily Buildings -Other Requirements
The items listed below correspond to the information given in ASHRAE 62.2 Section 8 "Multifamily Buildings". Refer
also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these
requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that
the building complies with these requirements specified in ASHRAE 62.2 Section 8, if applicable.
01
8.2 Whole-Building Mechanical Ventilation.For multifamily buildings, the term "building" in Section 4 refers to a single
dwelling unit.
8.4.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components separating dwelling
units, including sealing penetrations in the common walls, ceilings, and floors of each unit and by sealing vertical chases
adjacent to the units. All doors between dwelling units and common hallways shall be gasketed or made substantially
airtight.
8.4.1.1 Compliance.One method of demonstrating compliance with Section 8.4.1 shall be to verify a leakage rate below a
maximum of 0.2 cfm/ ft2 (100 L/s per 100 m2) of the dwelling unit envelope area (i.e., the sum of the area of the walls
between dwelling units, exterior walls, ceiling and floor) at a test pressure of 50 Pa by a blower door test. The test shall be
conducted with the dwelling unit as if it were exposed to outdoor air on all sides, top, and bottom by opening doors and
windows of adjacent dwelling units.
8.5.1 Exhaust Ducts.Exhaust fans in separate dwelling units shall not share a common exhaust duct. Exhaust inlets from
more than one dwelling unit may be served by a single exhaust fan downstream of all the exhaust inlets if the fan is
designated and intended to run continuously or if each inlet is equipped with a back-draft damper to prevent
cross-contamination when the fan is not running.
8.5.2 Supply Ducts.Supply outlets to more than one dwelling unit may be served by a single fan upstream of all the supply
outlets if the fan is designed and intended to run continuously or if each supply outlet is equipped with a back-draft damper
to prevent cross-contamination when the fan is not running.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 7 of 7)
Registration Number:
424-P010255225A-001-004-M27005A-0000
Registration Date/Time: 2024-10-23 13:04:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-004-M20006A-0000
Registration Date/Time: 2024-10-23 13:05:04 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 108)
City: La Quinta Zip Code: 92253
A. System Information
01 Space Conditioning System Identification or Name UNIT 108 HVACSys
02 Space Conditioning System Location or Area Served Main
03 Building Type from CF-1R Multi-family
04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS)
Credit from CF1R?
No, credit is not taken
05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit
from CF1R?
No, credit is not taken
06 Duct System Compliance Category New
MCH-20a - Completely New Duct System
B. Duct Leakage Diagnostic Test
01 Condenser Nominal Cooling Capacity (ton)3
02 Heating Capacity (kBtu/h)36
03 Conditioned Floor Area Served by this HVAC System (ft2)931
04 Duct Leakage Test Conditions Test final
05 Duct Leakage Test Method Total leakage
06 Leakage Factor 0.12
07 Air Handling Unit Airflow (AHUAirflow) Determination
Method
Cooling system method
08 Measured AHUAirflow (cfm)This field or section is not applicable
09 Calculated Target Allowable Duct Leakage (cfm)144
10 Actual Duct Leakage Rate from Leakage Test Measurement
(cfm)
72.9
11 Compliance Statement System passes leakage test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 2 of 3)
Registration Number:
424-P010255225A-001-004-M20006A-0000
Registration Date/Time: 2024-10-23 13:05:04 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
C. Additional Requirements for Compliance
01 System was tested in its normal operation condition. No temporary taping allowed.
02
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage
testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation
Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required,
may configure the OA damper to the closed position during duct leakage testing.
03 All supply and return register boots were sealed to the drywall.
04 Building cavities were not used as plenums or platform returns in lieu of ducts.
05 If cloth backed tape was used it was covered with Mastic and draw bands.
06 All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in).
After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must
be performed
07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are
properly sealed.
08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points
between the air handler and the supply and return plenums to verify that the connection points are properly sealed.
09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 3 of 3)
Registration Number:
424-P010255225A-001-004-M20006A-0000
Registration Date/Time: 2024-10-23 13:05:04 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-004-M23007A-0000
Registration Date/Time: 2024-10-23 13:05:29 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 108)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 108 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement
B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP)
in the Supply Plenum.
Procedures for installing HSPP or PSPP are specified in RA3.3.1.1.
01 Method Used to Demonstrate Compliance with the
HSPP/PSPP Requirement
HSPP installed and labeled consistent with Figure RA3.3-1
C. Airflow Rate Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given
in RA3.3.2.
01 Airflow Rate Measurement Type used for this airflow rate
verification.
Traditional Flow Capture Hood according to procedure in
RA3.3.3.1.4
02 Manufacturer of Airflow Measurement Apparatus ALNOR
03 Model number of Airflow Measurement Apparatus EB† 731
04
Certification Status of the Airflow Measurement Apparatus
Accuracy
Certified by Manufacturer and listed on CEC Website at
http://www.energy.ca.gov/title24/equipment_cert/ama_fas
/index.html
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 2 of 3)
Registration Number:
424-P010255225A-001-004-M23007A-0000
Registration Date/Time: 2024-10-23 13:05:29 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
D. Forced Air System Airflow Rate Measurement
The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3.
01 Required Minimum System Airflow Rate (cfm/ton)350
02 Required Minimum System Airflow Target (cfm)1050
03 Actual System Airflow Rate Measurement (cfm)1092
04 Compliance Statement:System airflow rate complies
E. Additional Requirements
01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in
the system during system air flow rate measurement identified on this Certificate of Installation.
02
The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of
Installation was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the
instrumentation specifications given in RA3.3.1.
03
A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning
system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate
of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance
Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance.
04 All registers were fully open during the diagnostic test.
05 System fan was set at maximum speed during the diagnostic test.
06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
08
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 3 of 3)
Registration Number:
424-P010255225A-001-004-M23007A-0000
Registration Date/Time: 2024-10-23 13:05:29 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-004-M22008A-0000
Registration Date/Time: 2024-10-23 13:05:49 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 108)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 108 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement
B. Fan Watt Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in
RA3.3.2.2.
01 Fan Watt Verification Device Used.Portable watt meter
MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
01 Actual Tested Watts 633.36
02 Actual Tested Airflow from MCH-23 (cfm)1092
03 Required Fan Efficacy (watts/cfm)0.58
04 Actual Fan Efficacy (watts/cfm)0.58
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 2 of 3)
Registration Number:
424-P010255225A-001-004-M22008A-0000
Registration Date/Time: 2024-10-23 13:05:49 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
05 Compliance Statement:System fan efficacy complies
D. Additional Requirements
01 All registers were fully open during the diagnostic test.
02 System fan was set at maximum speed during the diagnostic test.
03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
05
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy
(Watt/cfm) criteria in every zonal control mode.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 3 of 3)
Registration Number:
424-P010255225A-001-004-M22008A-0000
Registration Date/Time: 2024-10-23 13:05:49 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-004-M26009A-0000
Registration Date/Time: 2024-10-23 13:05:57 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 108)
City: La Quinta Zip Code: 92253
A. System Information
Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system
requiring verification must use a separate form.
01 System Name or Identification/Tag UNIT 108 HVACSys
02 System Location or Area Served Main
03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required
04 Directory used to certify product performance AHRI
05 AHRI certification number for the installed space
conditioning system from http://www.ahridirectory.org
208650564
06 Does the directory used to certify product performance
require a specific air handler/furnace make and model?
Yes
07 Does the directory used to certify product performance
require a time delay relay (+TDR)?
Yes
08 Does the directory used to certify product performance
require a TXV (+TXV)?
Yes
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the
Directory used to certify product performance in order to demonstrate compliance.
Data from Nameplate of Installed system
component
Data from the Directory used to certify
product performance for the rated system
component
Outdoor Condenser or Package Unit -
Installed Manufacturer Name
01 RHEEM 02 RHEEM
Outdoor Condenser or Package Unit -
Installed Model Number
03 RHPAZR036JT000NA 04 RHPAZR036JT000NA
Inside Coil - Installed Manufacturer
Name
05 06 This field or section is not applicable
Inside Coil - Installed Model Number 07 08 This field or section is not applicable
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 2 of 3)
Registration Number:
424-P010255225A-001-004-M26009A-0000
Registration Date/Time: 2024-10-23 13:05:57 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the
Directory used to certify product performance in order to demonstrate compliance.
Air Handler/Furnace - Installed
Manufacturer Name
09 10 RHEEM
Air Handler/Furnace - Installed Model
Number
11 12 RHPAZR036AJT
C. Verified Cooling System SEER
01 Required minimum SEER 15
02 Installed SEER 15
03 Compliance Statement:System passes SEER verification
Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed
on the CF1R.
D. Verified Cooling System EER
This section does not apply to this project.
E. Verified Cooling System Air Handler/Furnace
01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party
certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory.
F. Verified Cooling System Time Delay Relay
01
If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by
signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of
RA3.4.3.
G. Verified Cooling System TXV
01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below
that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 3 of 3)
Registration Number:
424-P010255225A-001-004-M26009A-0000
Registration Date/Time: 2024-10-23 13:05:57 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:22
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number: 424-P010255225A-001-005-M01004A-0000 Registration Date/Time: 2024-10-23 13:06:59 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 1 of 10)
Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La Quinta
(DwellingUnit 205)
City: La Quinta Zip Code: 92253
A. General Information
01 Dwelling Unit Name DwellingUnit 205 02 Climate Zone 15
03 Dwelling Unit Total
Conditioned Floor Area (ft2)931 04
Number of Space
Conditioning Systems in this
dwelling unit.
1
05 Certificate of Compliance
Type Performance (CF1R-PRF)06 Method Used to Calculate
HVAC Loads ACCA Manual J
07
Calculated Dwelling Unit
Sensible Cooling Load
(Btu/h)
36000 08 Calculated Dwelling Unit
Heating Load (Btu/h)36000
09 Dwelling Unit Number of
Bedrooms 2
MCH-01a - Space Conditioning Systems Ducts and Fans - For use with Performance Certificate of Compliance
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 2 of 10)
Registration Number: 424-P010255225A-001-005-M01004A-0000 Registration Date/Time: 2024-10-23 13:06:59 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
B. Design Space Conditioning (SC) System Component Specifications from CF1R
This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project.
01 02 03 04 05 06 07 08 09 10 11 12
Zone Name
SC System
Identification
or Name
SC System
Type
Heating
System
Type
Cooling
System Type SC Fan Type Distribution
System Type
Required
Thermostat
Type
Low
Leakage
Air-Handling
Unit
(LLAHU)
Status
Bypass Duct
Status
Cooling
Zoning Type
Cooling
System
Compressor
Speed
This field or
section is
not
applicable
UNIT 205
HVACSys
Heat pump
heating
cooling
Central
packaged
HP
Central
packaged
HP
PSC
Permanent
Split Capacitor
Unconditione
d attic OCST per JA5 No, credit is
not taken
No Bypass
Duct Not Zonal Single Speed
Notes:
C. Design Space Conditioning (SC) System Compliance Requirements from CF1R
This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project.
01 02 03 04 05 06 07 08 09 10
SC System
Identification or
Name
Heating
Efficiency Type
Minimum
Heating
Efficiency Value
Heat Pump
Heating
Capacity at 47°F
Heat Pump
Heating
Capacity at 17°F
Minimum
Cooling
Efficiency SEER
Minimum
Cooling
Efficiency EER
Minimum
Cooling System
Airflow Rate
(CFM/ton)
Maximum Fan
Efficacy
(W/CFM)
Minimum Duct
R-Value
UNIT 205
HVACSys
Heating
Seasonal
Performance
Factor (HSPF)
8.2 36000 29000 15 12.44 350 0.58 R-8
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 3 of 10)
Registration Number: 424-P010255225A-001-005-M01004A-0000 Registration Date/Time: 2024-10-23 13:06:59 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
D. Installed Space Conditioning (SC) System Component Information
01 02 03 04 05 06 07 08 09 10 11
SC System
Identification
or Name
SC System
Location or
Area Served
Conditioned
Floor Area
Served by the
System (ft2)
Heating
System Type
Cooling
System Type SC Fan Type Distribution
System Type
SC System
Thermostat
Type
Cooling Zoning
Type
Cooling
System
Compressor
Speed Type
Central Fan
Integrated
(CFI)
Ventilation
System Status
UNIT 205
HVACSys Main 931 Central
packaged HP
Central
packaged HP
PSC
Permanent
Split Capacitor
Unconditioned
attic OCST per JA5 Not Zonal Single Speed Not a CFI
system
Notes:
E. Installed Heating System Equipment Information (not heat pumps)
This section does not apply to this project.
F. Installed Cooling System Outdoor Condensing Unit or Package Unit Equipment Information (not heat pumps)
This section does not apply to this project.
G. Installed Split System Indoor Coil or Fan Coil Unit Equipment Information (applicable to DX or hydronic heating/cooling coils or fan coil units)
Systems with more than one indoor coil or fan coil unit (e.g. multi-split systems) shall provide information for each of the system indoor coils or fan coil units.
This section does not apply to this project.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 4 of 10)
Registration Number: 424-P010255225A-001-005-M01004A-0000 Registration Date/Time: 2024-10-23 13:06:59 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
H. Installed Heat Pump System - Split System Condensing Unit or Package Unit Equipment Information
01 02 03 04 05
SC System
Identification or
Name
SC System Location
or Area Served Condenser or Package Unit Manufacturer
Condenser or Package Unit Model
Number Condenser or Package Unit Serial Number
UNIT 205 HVACSys Main RHEEM RHPAZR036JT000NA F422302303
Notes:
I. Installed Heat Pump System -Efficiency and Performance Compliance Information
01 02 03 04 05 06 07 08 09 10
SC System
Identification
or Name
SC System
Location or
Area Served
Heating
Efficiency Type
Heating
Efficiency Value
System Rated
Heating
Capacity at 47°F
System Rated
Heating
Capacity at 17°F
System Rated
Cooling
Efficiency SEER
System Rated
Cooling
Efficiency EER
System Rated
Cooling
Capacity at
Design
Conditions
(Btu/h)
Condenser
Rated Nominal
Capacity (ton)
UNIT 205
HVACSys Main
Heating
Seasonal
Performance
Factor (HSPF)
8.2 36000 29000 15 12.44 36000 3
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 5 of 10)
Registration Number: 424-P010255225A-001-005-M01004A-0000 Registration Date/Time: 2024-10-23 13:06:59 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
J. Installed Duct System Information
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identification
or Name
SC System
Location or
Area Served
Supply Duct
Location
Supply Duct
R-Value
Return Duct
Location
Return Duct
R-Value
Exemption
from Min
R-Value for
Ducts In
Conditioned
Space
Method of
compliance
with duct
and filter
grille sizing
Req's in
150.0(m)13
Exemption
From Duct
Leakage
Requirement
s
Bypass Duct
Status
Number of
Air Filter
Devices on
System
Can RA3.3
Airflow
Protocols be
used to test
this System?
UNIT 205
HVACSys Main Unconditio
ned attic R-8 Unconditio
ned attic R-8 Not
applicable
HERS
verified fan
efficacy
(W/cfm)
and airflow
rate
(cfm/ton)
None No Bypass
Duct 1 Yes
Notes:
K. Installed Air Filter Device Information
Mandatory requirements for air filter devices are specified Section 150.0(m)12.
01 02 03 04 05 06 07
SC System
Identification or Name
SC System Location or
Area Served
Air Filter Device
Identification or Name Air Filter Device Type
Air Filter Device
Location
Determined Design
Airflow Rate for Air
Filter Device (cfm)
Determined Design
Allowable Pressure
Drop for Air Filter
Device (inch W.C.)
UNIT 205 HVACSys Main Filter Filter Grille return 1050 0.1
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 6 of 10)
Registration Number: 424-P010255225A-001-005-M01004A-0000 Registration Date/Time: 2024-10-23 13:06:59 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
L. Air Filter Device Requirements
01 The system shall be designed to ensure that all recirculated air and all outdoor air supplied to the occupiable space is filtered before passing through the system's
thermal conditioning components.
02
The system shall be designed to accommodate the clean-filter pressure drop imposed by the system air filter device(s). The design airflow rate and maximum
allowable clean-filter pressure drop at the design airflow rate applicable to each air filter device shall be determined, and all system air filter device locations shall be
labeled to disclose the applicable design airflow rate and the maximum allowable clean-filter pressure drop. The labels shall be permanently affixed to the air filter
device, readily legible, and visible to a person replacing the air filter media, and the air filter devices shall be provided with air filter media that conforms to these
determined or labeled maximum allowable clean-filter pressure drop values as rated using AHRI Standard 680.
03 All system air filter devices shall be located and installed in such a manner as to allow access and regular service by the system owner.
04 The system shall be provided with air filter media having a designated efficiency equal to or greater than MERV 6 when tested in accordance with ASHRAE Standard
52.2, or a particle size efficiency rating equal to or greater than 50% in the 3.0 to10 µm range when tested in accordance with AHRI Standard 680.
05 The system shall be provided with air filter media that has been labeled by the manufacturer to disclose the efficiency and pressure drop ratings that conform to the
required efficiency and pressure drop requirements for the air filter device.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met
M. HERS Verification Requirements
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identificati
on or
Name
SC System
Location or
Area
Served
MCH-20
.
.
Duct
Leakage
Test
MCH-21
.
Duct
Location
Verification
MCH-22
.
AHU Fan
Efficacy
(W/cfm)
MCH-23
.
AHU
Airflow
Rate
(cfm/ton)
MCH-25
.
.
Refrigerant
Charge
MCH-26
Rated SC
System
Equipment
Verification
MCH-27
.
IAQ
Mechanical
Ventilation
MCH-28
Return
Duct
Design
Table
150.0-B or
C
MCH-29
Supply
Duct
Surface
Area
R-Value
Buried
Ducts
MCH30
.
Ventilation
Cooling
Credit
UNIT 205
HVACSys Main Yes No Yes Yes No Yes Yes No No No
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 7 of 10)
Registration Number: 424-P010255225A-001-005-M01004A-0000 Registration Date/Time: 2024-10-23 13:06:59 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
M. HERS Verification Requirements
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identificati
on or
Name
SC System
Location or
Area
Served
MCH-20
.
.
Duct
Leakage
Test
MCH-21
.
Duct
Location
Verification
MCH-22
.
AHU Fan
Efficacy
(W/cfm)
MCH-23
.
AHU
Airflow
Rate
(cfm/ton)
MCH-25
.
.
Refrigerant
Charge
MCH-26
Rated SC
System
Equipment
Verification
MCH-27
.
IAQ
Mechanical
Ventilation
MCH-28
Return
Duct
Design
Table
150.0-B or
C
MCH-29
Supply
Duct
Surface
Area
R-Value
Buried
Ducts
MCH30
.
Ventilation
Cooling
Credit
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 8 of 10)
Registration Number: 424-P010255225A-001-005-M01004A-0000 Registration Date/Time: 2024-10-23 13:06:59 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures
Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly
installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements.
Heating Equipment
01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency
Regulations.
02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant
to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(i), 110.2(b).
03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections
150.0(h)1 and 2).
04 Furnace Temperature Rise: Central forced-air heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum
inlet-to-outlet temperature rise specification. See Section 150.0(h)4.
05 Standby Losses and Pilot Lights: Fan-type central furnaces may not have a continuously burning pilot light. Section 110.5 and Section 110.2(d).
Cooling Equipment
06 Equipment Efficiency: All cooling equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency
Regulations.
07 Refrigerant Line Insulation: All refrigerant line insulation in split system air conditioners and heat pumps must meet the R-value and protection requirements of Section
150.0(j)2 and 3, and Section 150.0(m)9.
08 Condensing Unit Location: Condensing units shall not be placed within five (5) feet of a dryer vent outlet. See Section 150.0(h)3A.
09 Liquid Line Filter Drier: If applicable, a liquid line filter drier shall be installed according to the manufacturer's specifications. Section 150.0(h)3B
10 Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section
150.0(h)1 and 2.
Air Distribution System Ducts, Plenums and Fans
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 9 of 10)
Registration Number: 424-P010255225A-001-005-M01004A-0000 Registration Date/Time: 2024-10-23 13:06:59 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures
Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly
installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements.
11 Insulation: In all cases, unless ducts are enclosed entirely in directly conditioned space, the minimum duct insulation value is R-6. Note that higher values may be
required by the prescriptive or performance requirements. See Section 150.0(m)1.
12
Connections and Closures: All installed air-distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0,
602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006: Supply-air and return-air ducts and plenums must be insulated to a minimum installed level of R-6.0 or
enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing in accordance with the requirements of Reference
Residential Appendix RA3.1.4.3.8.
Heat Pump Thermostat
13 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c).
14 The thermostat shall be installed in accordance with the manufacturers published installation specifications
15 First stage of heating shall be assigned to heat pump heating.
16 Second stage back up heating shall be set to come on only when the indoor set temperature cannot be met.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 10 of 10)
Registration Number: 424-P010255225A-001-005-M01004A-0000 Registration Date/Time: 2024-10-23 13:06:59 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of
features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized
representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the
installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency.
4.I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all
applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-005-M27005A-0000
Registration Date/Time: 2024-10-23 13:07:39 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 1 of 7)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 205)
City: La Quinta Zip Code: 92253
Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE
Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on
this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010.
A. Dwelling Mechanical Ventilation - General Information
01 Dwelling unit name DwellingUnit 205
02 Building Type Single Family
03 Project scope Newly constructed building
04
Total Conditioned Floor Area of Dwelling Unit
(For addition projects the conditioned floor area equals
existing area plus addition area. )
931
05
Number of bedrooms in dwelling unit
(For addition projects the number of bedrooms equals the
existing bedrooms plus addition bedrooms)
2
06 Ventilation Operation Schedule Continuous
07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1)
08 Whole Building Ventilation System Type Standalone - Balanced
09 IAQ Fan Location
Note:
Non-dwelling units do not meet the definition for a dwelling unit as defined in Section 100.1(b). Non-dwelling units are not
designed to provide independent living facilities and do not provide permanent provisions for living, sleeping, eating, cooking and
sanitation.
MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method
B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method
A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with
outdoor air each hour at no less than the rate in equation 4.1a.
01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81
02 Installed Continuous Whole-Building Ventilation Rate 154
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 2 of 7)
Registration Number:
424-P010255225A-001-005-M27005A-0000
Registration Date/Time: 2024-10-23 13:07:39 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
C. Compliance Statement
01 Building passes continuous whole-building ventilation rate test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 3 of 7)
Registration Number:
424-P010255225A-001-005-M27005A-0000
Registration Date/Time: 2024-10-23 13:07:39 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
D. Local Mechanical Exhaust System - Fan selection and duct design criteria for compliance
Local mechanical exhaust fans shall be installed in each kitchen and bathroom. Delivered local ventilation rates:
•All local ventilation rates have been measured using a flow hood, flow grid, or other airflow measuring device and meet the
requirements of 62.2 Tables 5.1 or 5.2. OR
•The airflow rating at a pressure of 0.25 in. w.c. of a certified fan is assumed because the local ventilation system duct sizing
meets the prescriptive requirements of 62.2 Table 5.3, or manufacturer's design criteria.
Table 5.1
Intermittent Local Ventilation Exhaust Airflow Rates
Application Airflow Notes
Kitchen 100 cfm
Vented range hood (including
appliance-range hood combinations)
required if exhaust fan flow is less than 5
ACH.
Bathroom 50 cfm
Table 5.2
Continuous Local Ventilation Exhaust Airflow Rates
Application Airflow Notes
Kitchen 5 ACH Based on Kitchen volume.
Bathroom 20 cfm
Table 5.3
Prescriptive Duct Sizing Requirements
Duct Type Flex Duct Smooth Duct
Fan Rating
cfm @ 0.25
in. w.g.
50 80 100 125 50 80 100 125
Maximum Allowable Duct Length (ft)
Diameter,
(in)Flex Duct Smooth Duct
3 X X X X 5 X X X
4 70 3 X X 105 35 5 X
5 NL 70 35 20 NL 135 85 55
6 NL NL 125 95 NL NL NL 145
7 and above NL NL NL NL NL NL NL NL
This table assumes no elbows. Deduct 15 ft of allowable duct length for each turn, elbow, or fitting. Interpolation and extrapolation
in 62.2 Table 5.3 is not allowed. For airflow values not listed, use the next higher value. This table is not applicable for airflow > 125
cfm.
NL = no limit on duct length of this size.
X = not allowed, any length of duct of this size with assumed turns, elbows, fittings will exceed the rated pressure drop.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 4 of 7)
Registration Number:
424-P010255225A-001-005-M27005A-0000
Registration Date/Time: 2024-10-23 13:07:39 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
E. Other Requirements
The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other
Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information
describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if
applicable.
01
6.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components to occupiable spaces from
garages, unconditioned crawl spaces, and unconditioned attics. Supply and balanced ventilation systems shall be designed
and constructed to provide ventilation air directly from the outdoors.
02
6.2 Instructions and Labeling.Information on the ventilation design and/or ventilation systems installed, instructions on
their proper operation to meet the requirements of this standard, and instructions detailing any required maintenance
(similar to that provided for HVAC systems) shall be provided to the owner and the occupant of the dwelling unit. Controls
shall be labeled as to their function (unless that function is obvious, such as toilet exhaust fan switches). See Chapter 13 of
Guideline 24 2 for information on instructions and labeling.
03 6.3 Clothes Dryers.Clothes dryers shall be exhausted directly to the outdoors
04
6.4 Combustion and Solid-Fuel Burning Appliances.Combustion and solid-fuel burning appliances must be provided with
adequate combustion and ventilation air and vented in accordance with manufacturer installation instructions, NFPA 54
ANSI Z223.1, National Fuel Gas Code, NFPA 31, Standard for the Installation of Oil-Burning Equipment, or NFPA 211,
Standard for Chimneys, Fireplaces, Vents, and Solid-Fuel Burning Appliances, or other equivalent code acceptable to the
building official.
Where atmospherically vented combustion appliances or solid-fuel burning appliances are located inside the pressure
boundary, the total net exhaust flow of the two largest exhaust fans (not including a summer cooling fan intended to be
operated only when windows or other air inlets are open) shall not exceed 15 cfm/100 ft 2 (75 Lps/100 m2) of occupiable
space when in operation at full capacity. If the designed total net flow exceeds this limit, the net exhaust flow must be
reduced by reducing the exhaust flow or providing compensating outdoor airflow. Atmospherically vented combustion
appliances do not include direct-vent appliances.
05
6.5 Garages.When an occupiable space adjoins a garage, the design must prevent migration of contaminants to the
adjoining occupiable space. Air seal the walls, ceilings, and floors that separate garages from occupiable space. To be
considered air sealed, all joints, seams, penetrations, openings between door assemblies and their respective jambs and
framing, and other sources of air leakage through wall and ceiling assemblies separating the garage from the residence and
its attic area shall be caulked, gasketed, weather stripped, wrapped, or otherwise sealed to limit air movement. Doors
between garages and occupiable spaces shall be gasketed or made substantially airtight with weather stripping.
06 6.6 Ventilation Opening Area.Spaces shall have ventilation openings as listed below. Such openings shall meet the
requirements of Section 6.8
07
6.7 Minimum Filtration.Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 ft (3 m)
in length and through a thermal conditioning component, except evaporative coolers, shall be provided with a filter having
a designated minimum efficiency of MERV 6, or better, when tested in accordance with ANSI ASHRAE Standard 52.2,
Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size, or a minimum Particle
Size Efficiency of 50 percent in the 3.0-10 µm range in accordance with AHRI Standard 680, Performance Rating of
Residential Air Filter Equipment. The system shall be designed such that all recirculated and mechanically supplied outdoor
air is filtered before passing through the thermal conditioning components. The filter shall be located and installed in such a
manner as to facilitate access and regular service by the owner.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 5 of 7)
Registration Number:
424-P010255225A-001-005-M27005A-0000
Registration Date/Time: 2024-10-23 13:07:39 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
E. Other Requirements
The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other
Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information
describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if
applicable.
08
6.8 Air Inlets.Air inlets that are part of the ventilation design shall be located a minimum of 10 ft (3 m) from known sources
of contamination such as a stack, vent, exhaust hood, or vehicle exhaust. The intake shall be placed so that entering air is
not obstructed by snow, plantings, or other material. Forced air inlets shall be provided with rodent insect screens (mesh
not larger than 1/2 inch).
09
6.9 Carbon Monoxide Detectors.A carbon monoxide alarm shall be installed in each dwelling unit in accordance with NFPA
720,Standard for the Installation of Carbon Monoxide (CO) Detection and Warning Equipment 14, and shall be consistent
with requirements of applicable laws, codes, and standards.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met.
F. Air Moving Equipment
The items listed below (7.1 through 7.3) correspond to the information given in ASHRAE 62.2 Section 7 Air-Moving
Equipment. Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.6) for information describing
these requirements in more detail. The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 7.1 through 7.3 if
applicable.
01
7.1 Selection and Installation.Ventilation devices and equipment shall be tested and listed in accordance with specific
standards. Installations of systems or equipment shall be carried out in accordance with manufacturers' design
requirements and installation instructions.
02
7.2 Sound Ratings for Fans.Ventilation fans shall be rated for sound at no less than the minimum airflow rate required by
this standard, as noted below. These sound ratings shall be at a minimum of 0.1 in. w.c. (25 Pa) static pressure.
7.2.1 Whole Building or Continuous Ventilation Fans.These fans shall be rated for sound at a maximum of 1.0 sone.
7.2.2 Intermittent Local Exhaust Fans.Fans used to comply with Section 5.2 shall be rated for sound at a maximum of 3
sone, unless their maximum rated airflow exceeds 400 cfm (200 L/s). (Some exceptions may apply.)
03
7.3 Multibranch Exhaust Ducting.If more than one of the exhaust fans in a dwelling unit shares a common exhaust duct,
each fan shall be equipped with a back draft damper to prevent the recirculation of exhaust air from one room to another
through the exhaust ducting system.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 6 of 7)
Registration Number:
424-P010255225A-001-005-M27005A-0000
Registration Date/Time: 2024-10-23 13:07:39 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
G. Multifamily Buildings -Other Requirements
The items listed below correspond to the information given in ASHRAE 62.2 Section 8 "Multifamily Buildings". Refer
also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these
requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that
the building complies with these requirements specified in ASHRAE 62.2 Section 8, if applicable.
01
8.2 Whole-Building Mechanical Ventilation.For multifamily buildings, the term "building" in Section 4 refers to a single
dwelling unit.
8.4.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components separating dwelling
units, including sealing penetrations in the common walls, ceilings, and floors of each unit and by sealing vertical chases
adjacent to the units. All doors between dwelling units and common hallways shall be gasketed or made substantially
airtight.
8.4.1.1 Compliance.One method of demonstrating compliance with Section 8.4.1 shall be to verify a leakage rate below a
maximum of 0.2 cfm/ ft2 (100 L/s per 100 m2) of the dwelling unit envelope area (i.e., the sum of the area of the walls
between dwelling units, exterior walls, ceiling and floor) at a test pressure of 50 Pa by a blower door test. The test shall be
conducted with the dwelling unit as if it were exposed to outdoor air on all sides, top, and bottom by opening doors and
windows of adjacent dwelling units.
8.5.1 Exhaust Ducts.Exhaust fans in separate dwelling units shall not share a common exhaust duct. Exhaust inlets from
more than one dwelling unit may be served by a single exhaust fan downstream of all the exhaust inlets if the fan is
designated and intended to run continuously or if each inlet is equipped with a back-draft damper to prevent
cross-contamination when the fan is not running.
8.5.2 Supply Ducts.Supply outlets to more than one dwelling unit may be served by a single fan upstream of all the supply
outlets if the fan is designed and intended to run continuously or if each supply outlet is equipped with a back-draft damper
to prevent cross-contamination when the fan is not running.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 7 of 7)
Registration Number:
424-P010255225A-001-005-M27005A-0000
Registration Date/Time: 2024-10-23 13:07:39 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-005-M20006A-0000
Registration Date/Time: 2024-10-23 13:08:02 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 205)
City: La Quinta Zip Code: 92253
A. System Information
01 Space Conditioning System Identification or Name UNIT 205 HVACSys
02 Space Conditioning System Location or Area Served Main
03 Building Type from CF-1R Multi-family
04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS)
Credit from CF1R?
No, credit is not taken
05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit
from CF1R?
No, credit is not taken
06 Duct System Compliance Category New
MCH-20a - Completely New Duct System
B. Duct Leakage Diagnostic Test
01 Condenser Nominal Cooling Capacity (ton)3
02 Heating Capacity (kBtu/h)36
03 Conditioned Floor Area Served by this HVAC System (ft2)931
04 Duct Leakage Test Conditions Test final
05 Duct Leakage Test Method Total leakage
06 Leakage Factor 0.12
07 Air Handling Unit Airflow (AHUAirflow) Determination
Method
Cooling system method
08 Measured AHUAirflow (cfm)This field or section is not applicable
09 Calculated Target Allowable Duct Leakage (cfm)144
10 Actual Duct Leakage Rate from Leakage Test Measurement
(cfm)
45
11 Compliance Statement System passes leakage test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 2 of 3)
Registration Number:
424-P010255225A-001-005-M20006A-0000
Registration Date/Time: 2024-10-23 13:08:02 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
C. Additional Requirements for Compliance
01 System was tested in its normal operation condition. No temporary taping allowed.
02
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage
testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation
Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required,
may configure the OA damper to the closed position during duct leakage testing.
03 All supply and return register boots were sealed to the drywall.
04 Building cavities were not used as plenums or platform returns in lieu of ducts.
05 If cloth backed tape was used it was covered with Mastic and draw bands.
06 All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in).
After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must
be performed
07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are
properly sealed.
08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points
between the air handler and the supply and return plenums to verify that the connection points are properly sealed.
09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 3 of 3)
Registration Number:
424-P010255225A-001-005-M20006A-0000
Registration Date/Time: 2024-10-23 13:08:02 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-005-M23007A-0000
Registration Date/Time: 2024-10-23 13:08:26 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 205)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 205 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement
B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP)
in the Supply Plenum.
Procedures for installing HSPP or PSPP are specified in RA3.3.1.1.
01 Method Used to Demonstrate Compliance with the
HSPP/PSPP Requirement
HSPP installed and labeled consistent with Figure RA3.3-1
C. Airflow Rate Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given
in RA3.3.2.
01 Airflow Rate Measurement Type used for this airflow rate
verification.
Traditional Flow Capture Hood according to procedure in
RA3.3.3.1.4
02 Manufacturer of Airflow Measurement Apparatus ALNOR
03 Model number of Airflow Measurement Apparatus EB† 731
04
Certification Status of the Airflow Measurement Apparatus
Accuracy
Certified by Manufacturer and listed on CEC Website at
http://www.energy.ca.gov/title24/equipment_cert/ama_fas
/index.html
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 2 of 3)
Registration Number:
424-P010255225A-001-005-M23007A-0000
Registration Date/Time: 2024-10-23 13:08:26 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
D. Forced Air System Airflow Rate Measurement
The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3.
01 Required Minimum System Airflow Rate (cfm/ton)350
02 Required Minimum System Airflow Target (cfm)1050
03 Actual System Airflow Rate Measurement (cfm)1544
04 Compliance Statement:System airflow rate complies
E. Additional Requirements
01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in
the system during system air flow rate measurement identified on this Certificate of Installation.
02
The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of
Installation was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the
instrumentation specifications given in RA3.3.1.
03
A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning
system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate
of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance
Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance.
04 All registers were fully open during the diagnostic test.
05 System fan was set at maximum speed during the diagnostic test.
06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
08
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 3 of 3)
Registration Number:
424-P010255225A-001-005-M23007A-0000
Registration Date/Time: 2024-10-23 13:08:26 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-005-M22008A-0000
Registration Date/Time: 2024-10-23 13:08:49 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 205)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 205 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement
B. Fan Watt Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in
RA3.3.2.2.
01 Fan Watt Verification Device Used.Portable watt meter
MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
01 Actual Tested Watts 895.52
02 Actual Tested Airflow from MCH-23 (cfm)1544
03 Required Fan Efficacy (watts/cfm)0.58
04 Actual Fan Efficacy (watts/cfm)0.58
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 2 of 3)
Registration Number:
424-P010255225A-001-005-M22008A-0000
Registration Date/Time: 2024-10-23 13:08:49 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
05 Compliance Statement:System fan efficacy complies
D. Additional Requirements
01 All registers were fully open during the diagnostic test.
02 System fan was set at maximum speed during the diagnostic test.
03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
05
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy
(Watt/cfm) criteria in every zonal control mode.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 3 of 3)
Registration Number:
424-P010255225A-001-005-M22008A-0000
Registration Date/Time: 2024-10-23 13:08:49 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-005-M26009A-0000
Registration Date/Time: 2024-10-23 13:08:59 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 205)
City: La Quinta Zip Code: 92253
A. System Information
Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system
requiring verification must use a separate form.
01 System Name or Identification/Tag UNIT 205 HVACSys
02 System Location or Area Served Main
03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required
04 Directory used to certify product performance AHRI
05 AHRI certification number for the installed space
conditioning system from http://www.ahridirectory.org
208650564
06 Does the directory used to certify product performance
require a specific air handler/furnace make and model?
Yes
07 Does the directory used to certify product performance
require a time delay relay (+TDR)?
Yes
08 Does the directory used to certify product performance
require a TXV (+TXV)?
Yes
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the
Directory used to certify product performance in order to demonstrate compliance.
Data from Nameplate of Installed system
component
Data from the Directory used to certify
product performance for the rated system
component
Outdoor Condenser or Package Unit -
Installed Manufacturer Name
01 RHEEM 02 RHEEM
Outdoor Condenser or Package Unit -
Installed Model Number
03 RHPAZR036JT000NA 04 RHPAZR036JT000NA
Inside Coil - Installed Manufacturer
Name
05 06 This field or section is not applicable
Inside Coil - Installed Model Number 07 08 This field or section is not applicable
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 2 of 3)
Registration Number:
424-P010255225A-001-005-M26009A-0000
Registration Date/Time: 2024-10-23 13:08:59 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the
Directory used to certify product performance in order to demonstrate compliance.
Air Handler/Furnace - Installed
Manufacturer Name
09 10 RHEEM
Air Handler/Furnace - Installed Model
Number
11 12 RHPAZR036AJT
C. Verified Cooling System SEER
01 Required minimum SEER 15
02 Installed SEER 15
03 Compliance Statement:System passes SEER verification
Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed
on the CF1R.
D. Verified Cooling System EER
This section does not apply to this project.
E. Verified Cooling System Air Handler/Furnace
01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party
certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory.
F. Verified Cooling System Time Delay Relay
01
If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by
signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of
RA3.4.3.
G. Verified Cooling System TXV
01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below
that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 3 of 3)
Registration Number:
424-P010255225A-001-005-M26009A-0000
Registration Date/Time: 2024-10-23 13:08:59 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:25
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number: 424-P010255225A-001-006-M01004A-0000 Registration Date/Time: 2024-10-23 13:09:52 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 1 of 10)
Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La Quinta
(DwellingUnit 206)
City: La Quinta Zip Code: 92253
A. General Information
01 Dwelling Unit Name DwellingUnit 206 02 Climate Zone 15
03 Dwelling Unit Total
Conditioned Floor Area (ft2)931 04
Number of Space
Conditioning Systems in this
dwelling unit.
1
05 Certificate of Compliance
Type Performance (CF1R-PRF)06 Method Used to Calculate
HVAC Loads ACCA Manual J
07
Calculated Dwelling Unit
Sensible Cooling Load
(Btu/h)
36000 08 Calculated Dwelling Unit
Heating Load (Btu/h)36000
09 Dwelling Unit Number of
Bedrooms 2
MCH-01a - Space Conditioning Systems Ducts and Fans - For use with Performance Certificate of Compliance
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 2 of 10)
Registration Number: 424-P010255225A-001-006-M01004A-0000 Registration Date/Time: 2024-10-23 13:09:52 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
B. Design Space Conditioning (SC) System Component Specifications from CF1R
This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project.
01 02 03 04 05 06 07 08 09 10 11 12
Zone Name
SC System
Identification
or Name
SC System
Type
Heating
System
Type
Cooling
System Type SC Fan Type Distribution
System Type
Required
Thermostat
Type
Low
Leakage
Air-Handling
Unit
(LLAHU)
Status
Bypass Duct
Status
Cooling
Zoning Type
Cooling
System
Compressor
Speed
This field or
section is
not
applicable
UNIT 206
HVACSys
Heat pump
heating
cooling
Central
packaged
HP
Central
packaged
HP
PSC
Permanent
Split Capacitor
Unconditione
d attic OCST per JA5 No, credit is
not taken
No Bypass
Duct Not Zonal Single Speed
Notes:
C. Design Space Conditioning (SC) System Compliance Requirements from CF1R
This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project.
01 02 03 04 05 06 07 08 09 10
SC System
Identification or
Name
Heating
Efficiency Type
Minimum
Heating
Efficiency Value
Heat Pump
Heating
Capacity at 47°F
Heat Pump
Heating
Capacity at 17°F
Minimum
Cooling
Efficiency SEER
Minimum
Cooling
Efficiency EER
Minimum
Cooling System
Airflow Rate
(CFM/ton)
Maximum Fan
Efficacy
(W/CFM)
Minimum Duct
R-Value
UNIT 206
HVACSys
Heating
Seasonal
Performance
Factor (HSPF)
8.2 36000 29000 15 12.44 350 0.58 R-8
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 3 of 10)
Registration Number: 424-P010255225A-001-006-M01004A-0000 Registration Date/Time: 2024-10-23 13:09:52 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
D. Installed Space Conditioning (SC) System Component Information
01 02 03 04 05 06 07 08 09 10 11
SC System
Identification
or Name
SC System
Location or
Area Served
Conditioned
Floor Area
Served by the
System (ft2)
Heating
System Type
Cooling
System Type SC Fan Type Distribution
System Type
SC System
Thermostat
Type
Cooling Zoning
Type
Cooling
System
Compressor
Speed Type
Central Fan
Integrated
(CFI)
Ventilation
System Status
UNIT 206
HVACSys Main 931 Central
packaged HP
Central
packaged HP
PSC
Permanent
Split Capacitor
Unconditioned
attic OCST per JA5 Not Zonal Single Speed Not a CFI
system
Notes:
E. Installed Heating System Equipment Information (not heat pumps)
This section does not apply to this project.
F. Installed Cooling System Outdoor Condensing Unit or Package Unit Equipment Information (not heat pumps)
This section does not apply to this project.
G. Installed Split System Indoor Coil or Fan Coil Unit Equipment Information (applicable to DX or hydronic heating/cooling coils or fan coil units)
Systems with more than one indoor coil or fan coil unit (e.g. multi-split systems) shall provide information for each of the system indoor coils or fan coil units.
This section does not apply to this project.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 4 of 10)
Registration Number: 424-P010255225A-001-006-M01004A-0000 Registration Date/Time: 2024-10-23 13:09:52 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
H. Installed Heat Pump System - Split System Condensing Unit or Package Unit Equipment Information
01 02 03 04 05
SC System
Identification or
Name
SC System Location
or Area Served Condenser or Package Unit Manufacturer
Condenser or Package Unit Model
Number Condenser or Package Unit Serial Number
UNIT 206 HVACSys Main RHEEM RHPAZR036JT000NA F502300814
Notes:
I. Installed Heat Pump System -Efficiency and Performance Compliance Information
01 02 03 04 05 06 07 08 09 10
SC System
Identification
or Name
SC System
Location or
Area Served
Heating
Efficiency Type
Heating
Efficiency Value
System Rated
Heating
Capacity at 47°F
System Rated
Heating
Capacity at 17°F
System Rated
Cooling
Efficiency SEER
System Rated
Cooling
Efficiency EER
System Rated
Cooling
Capacity at
Design
Conditions
(Btu/h)
Condenser
Rated Nominal
Capacity (ton)
UNIT 206
HVACSys Main
Heating
Seasonal
Performance
Factor (HSPF)
8.2 36000 29000 15 12.44 36000 3
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 5 of 10)
Registration Number: 424-P010255225A-001-006-M01004A-0000 Registration Date/Time: 2024-10-23 13:09:52 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
J. Installed Duct System Information
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identification
or Name
SC System
Location or
Area Served
Supply Duct
Location
Supply Duct
R-Value
Return Duct
Location
Return Duct
R-Value
Exemption
from Min
R-Value for
Ducts In
Conditioned
Space
Method of
compliance
with duct
and filter
grille sizing
Req's in
150.0(m)13
Exemption
From Duct
Leakage
Requirement
s
Bypass Duct
Status
Number of
Air Filter
Devices on
System
Can RA3.3
Airflow
Protocols be
used to test
this System?
UNIT 206
HVACSys Main Unconditio
ned attic R-8 Unconditio
ned attic R-8 Not
applicable
HERS
verified fan
efficacy
(W/cfm)
and airflow
rate
(cfm/ton)
None No Bypass
Duct 1 Yes
Notes:
K. Installed Air Filter Device Information
Mandatory requirements for air filter devices are specified Section 150.0(m)12.
01 02 03 04 05 06 07
SC System
Identification or Name
SC System Location or
Area Served
Air Filter Device
Identification or Name Air Filter Device Type
Air Filter Device
Location
Determined Design
Airflow Rate for Air
Filter Device (cfm)
Determined Design
Allowable Pressure
Drop for Air Filter
Device (inch W.C.)
UNIT 206 HVACSys Main Filter Filter Grille return 1050 0.1
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 6 of 10)
Registration Number: 424-P010255225A-001-006-M01004A-0000 Registration Date/Time: 2024-10-23 13:09:52 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
L. Air Filter Device Requirements
01 The system shall be designed to ensure that all recirculated air and all outdoor air supplied to the occupiable space is filtered before passing through the system's
thermal conditioning components.
02
The system shall be designed to accommodate the clean-filter pressure drop imposed by the system air filter device(s). The design airflow rate and maximum
allowable clean-filter pressure drop at the design airflow rate applicable to each air filter device shall be determined, and all system air filter device locations shall be
labeled to disclose the applicable design airflow rate and the maximum allowable clean-filter pressure drop. The labels shall be permanently affixed to the air filter
device, readily legible, and visible to a person replacing the air filter media, and the air filter devices shall be provided with air filter media that conforms to these
determined or labeled maximum allowable clean-filter pressure drop values as rated using AHRI Standard 680.
03 All system air filter devices shall be located and installed in such a manner as to allow access and regular service by the system owner.
04 The system shall be provided with air filter media having a designated efficiency equal to or greater than MERV 6 when tested in accordance with ASHRAE Standard
52.2, or a particle size efficiency rating equal to or greater than 50% in the 3.0 to10 µm range when tested in accordance with AHRI Standard 680.
05 The system shall be provided with air filter media that has been labeled by the manufacturer to disclose the efficiency and pressure drop ratings that conform to the
required efficiency and pressure drop requirements for the air filter device.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met
M. HERS Verification Requirements
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identificati
on or
Name
SC System
Location or
Area
Served
MCH-20
.
.
Duct
Leakage
Test
MCH-21
.
Duct
Location
Verification
MCH-22
.
AHU Fan
Efficacy
(W/cfm)
MCH-23
.
AHU
Airflow
Rate
(cfm/ton)
MCH-25
.
.
Refrigerant
Charge
MCH-26
Rated SC
System
Equipment
Verification
MCH-27
.
IAQ
Mechanical
Ventilation
MCH-28
Return
Duct
Design
Table
150.0-B or
C
MCH-29
Supply
Duct
Surface
Area
R-Value
Buried
Ducts
MCH30
.
Ventilation
Cooling
Credit
UNIT 206
HVACSys Main Yes No Yes Yes No Yes Yes No No No
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 7 of 10)
Registration Number: 424-P010255225A-001-006-M01004A-0000 Registration Date/Time: 2024-10-23 13:09:52 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
M. HERS Verification Requirements
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identificati
on or
Name
SC System
Location or
Area
Served
MCH-20
.
.
Duct
Leakage
Test
MCH-21
.
Duct
Location
Verification
MCH-22
.
AHU Fan
Efficacy
(W/cfm)
MCH-23
.
AHU
Airflow
Rate
(cfm/ton)
MCH-25
.
.
Refrigerant
Charge
MCH-26
Rated SC
System
Equipment
Verification
MCH-27
.
IAQ
Mechanical
Ventilation
MCH-28
Return
Duct
Design
Table
150.0-B or
C
MCH-29
Supply
Duct
Surface
Area
R-Value
Buried
Ducts
MCH30
.
Ventilation
Cooling
Credit
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 8 of 10)
Registration Number: 424-P010255225A-001-006-M01004A-0000 Registration Date/Time: 2024-10-23 13:09:52 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures
Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly
installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements.
Heating Equipment
01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency
Regulations.
02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant
to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(i), 110.2(b).
03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections
150.0(h)1 and 2).
04 Furnace Temperature Rise: Central forced-air heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum
inlet-to-outlet temperature rise specification. See Section 150.0(h)4.
05 Standby Losses and Pilot Lights: Fan-type central furnaces may not have a continuously burning pilot light. Section 110.5 and Section 110.2(d).
Cooling Equipment
06 Equipment Efficiency: All cooling equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency
Regulations.
07 Refrigerant Line Insulation: All refrigerant line insulation in split system air conditioners and heat pumps must meet the R-value and protection requirements of Section
150.0(j)2 and 3, and Section 150.0(m)9.
08 Condensing Unit Location: Condensing units shall not be placed within five (5) feet of a dryer vent outlet. See Section 150.0(h)3A.
09 Liquid Line Filter Drier: If applicable, a liquid line filter drier shall be installed according to the manufacturer's specifications. Section 150.0(h)3B
10 Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section
150.0(h)1 and 2.
Air Distribution System Ducts, Plenums and Fans
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 9 of 10)
Registration Number: 424-P010255225A-001-006-M01004A-0000 Registration Date/Time: 2024-10-23 13:09:52 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures
Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly
installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements.
11 Insulation: In all cases, unless ducts are enclosed entirely in directly conditioned space, the minimum duct insulation value is R-6. Note that higher values may be
required by the prescriptive or performance requirements. See Section 150.0(m)1.
12
Connections and Closures: All installed air-distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0,
602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006: Supply-air and return-air ducts and plenums must be insulated to a minimum installed level of R-6.0 or
enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing in accordance with the requirements of Reference
Residential Appendix RA3.1.4.3.8.
Heat Pump Thermostat
13 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c).
14 The thermostat shall be installed in accordance with the manufacturers published installation specifications
15 First stage of heating shall be assigned to heat pump heating.
16 Second stage back up heating shall be set to come on only when the indoor set temperature cannot be met.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 10 of 10)
Registration Number: 424-P010255225A-001-006-M01004A-0000 Registration Date/Time: 2024-10-23 13:09:52 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of
features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized
representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the
installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency.
4.I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all
applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-006-M27005A-0000
Registration Date/Time: 2024-10-23 13:10:31 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 1 of 7)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 206)
City: La Quinta Zip Code: 92253
Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE
Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on
this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010.
A. Dwelling Mechanical Ventilation - General Information
01 Dwelling unit name DwellingUnit 206
02 Building Type Single Family
03 Project scope Newly constructed building
04
Total Conditioned Floor Area of Dwelling Unit
(For addition projects the conditioned floor area equals
existing area plus addition area. )
931
05
Number of bedrooms in dwelling unit
(For addition projects the number of bedrooms equals the
existing bedrooms plus addition bedrooms)
2
06 Ventilation Operation Schedule Continuous
07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1)
08 Whole Building Ventilation System Type Standalone - Balanced
09 IAQ Fan Location
Note:
Non-dwelling units do not meet the definition for a dwelling unit as defined in Section 100.1(b). Non-dwelling units are not
designed to provide independent living facilities and do not provide permanent provisions for living, sleeping, eating, cooking and
sanitation.
MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method
B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method
A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with
outdoor air each hour at no less than the rate in equation 4.1a.
01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81
02 Installed Continuous Whole-Building Ventilation Rate 125
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 2 of 7)
Registration Number:
424-P010255225A-001-006-M27005A-0000
Registration Date/Time: 2024-10-23 13:10:31 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
C. Compliance Statement
01 Building passes continuous whole-building ventilation rate test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 3 of 7)
Registration Number:
424-P010255225A-001-006-M27005A-0000
Registration Date/Time: 2024-10-23 13:10:31 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
D. Local Mechanical Exhaust System - Fan selection and duct design criteria for compliance
Local mechanical exhaust fans shall be installed in each kitchen and bathroom. Delivered local ventilation rates:
•All local ventilation rates have been measured using a flow hood, flow grid, or other airflow measuring device and meet the
requirements of 62.2 Tables 5.1 or 5.2. OR
•The airflow rating at a pressure of 0.25 in. w.c. of a certified fan is assumed because the local ventilation system duct sizing
meets the prescriptive requirements of 62.2 Table 5.3, or manufacturer's design criteria.
Table 5.1
Intermittent Local Ventilation Exhaust Airflow Rates
Application Airflow Notes
Kitchen 100 cfm
Vented range hood (including
appliance-range hood combinations)
required if exhaust fan flow is less than 5
ACH.
Bathroom 50 cfm
Table 5.2
Continuous Local Ventilation Exhaust Airflow Rates
Application Airflow Notes
Kitchen 5 ACH Based on Kitchen volume.
Bathroom 20 cfm
Table 5.3
Prescriptive Duct Sizing Requirements
Duct Type Flex Duct Smooth Duct
Fan Rating
cfm @ 0.25
in. w.g.
50 80 100 125 50 80 100 125
Maximum Allowable Duct Length (ft)
Diameter,
(in)Flex Duct Smooth Duct
3 X X X X 5 X X X
4 70 3 X X 105 35 5 X
5 NL 70 35 20 NL 135 85 55
6 NL NL 125 95 NL NL NL 145
7 and above NL NL NL NL NL NL NL NL
This table assumes no elbows. Deduct 15 ft of allowable duct length for each turn, elbow, or fitting. Interpolation and extrapolation
in 62.2 Table 5.3 is not allowed. For airflow values not listed, use the next higher value. This table is not applicable for airflow > 125
cfm.
NL = no limit on duct length of this size.
X = not allowed, any length of duct of this size with assumed turns, elbows, fittings will exceed the rated pressure drop.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 4 of 7)
Registration Number:
424-P010255225A-001-006-M27005A-0000
Registration Date/Time: 2024-10-23 13:10:31 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
E. Other Requirements
The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other
Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information
describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if
applicable.
01
6.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components to occupiable spaces from
garages, unconditioned crawl spaces, and unconditioned attics. Supply and balanced ventilation systems shall be designed
and constructed to provide ventilation air directly from the outdoors.
02
6.2 Instructions and Labeling.Information on the ventilation design and/or ventilation systems installed, instructions on
their proper operation to meet the requirements of this standard, and instructions detailing any required maintenance
(similar to that provided for HVAC systems) shall be provided to the owner and the occupant of the dwelling unit. Controls
shall be labeled as to their function (unless that function is obvious, such as toilet exhaust fan switches). See Chapter 13 of
Guideline 24 2 for information on instructions and labeling.
03 6.3 Clothes Dryers.Clothes dryers shall be exhausted directly to the outdoors
04
6.4 Combustion and Solid-Fuel Burning Appliances.Combustion and solid-fuel burning appliances must be provided with
adequate combustion and ventilation air and vented in accordance with manufacturer installation instructions, NFPA 54
ANSI Z223.1, National Fuel Gas Code, NFPA 31, Standard for the Installation of Oil-Burning Equipment, or NFPA 211,
Standard for Chimneys, Fireplaces, Vents, and Solid-Fuel Burning Appliances, or other equivalent code acceptable to the
building official.
Where atmospherically vented combustion appliances or solid-fuel burning appliances are located inside the pressure
boundary, the total net exhaust flow of the two largest exhaust fans (not including a summer cooling fan intended to be
operated only when windows or other air inlets are open) shall not exceed 15 cfm/100 ft 2 (75 Lps/100 m2) of occupiable
space when in operation at full capacity. If the designed total net flow exceeds this limit, the net exhaust flow must be
reduced by reducing the exhaust flow or providing compensating outdoor airflow. Atmospherically vented combustion
appliances do not include direct-vent appliances.
05
6.5 Garages.When an occupiable space adjoins a garage, the design must prevent migration of contaminants to the
adjoining occupiable space. Air seal the walls, ceilings, and floors that separate garages from occupiable space. To be
considered air sealed, all joints, seams, penetrations, openings between door assemblies and their respective jambs and
framing, and other sources of air leakage through wall and ceiling assemblies separating the garage from the residence and
its attic area shall be caulked, gasketed, weather stripped, wrapped, or otherwise sealed to limit air movement. Doors
between garages and occupiable spaces shall be gasketed or made substantially airtight with weather stripping.
06 6.6 Ventilation Opening Area.Spaces shall have ventilation openings as listed below. Such openings shall meet the
requirements of Section 6.8
07
6.7 Minimum Filtration.Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 ft (3 m)
in length and through a thermal conditioning component, except evaporative coolers, shall be provided with a filter having
a designated minimum efficiency of MERV 6, or better, when tested in accordance with ANSI ASHRAE Standard 52.2,
Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size, or a minimum Particle
Size Efficiency of 50 percent in the 3.0-10 µm range in accordance with AHRI Standard 680, Performance Rating of
Residential Air Filter Equipment. The system shall be designed such that all recirculated and mechanically supplied outdoor
air is filtered before passing through the thermal conditioning components. The filter shall be located and installed in such a
manner as to facilitate access and regular service by the owner.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 5 of 7)
Registration Number:
424-P010255225A-001-006-M27005A-0000
Registration Date/Time: 2024-10-23 13:10:31 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
E. Other Requirements
The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other
Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information
describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if
applicable.
08
6.8 Air Inlets.Air inlets that are part of the ventilation design shall be located a minimum of 10 ft (3 m) from known sources
of contamination such as a stack, vent, exhaust hood, or vehicle exhaust. The intake shall be placed so that entering air is
not obstructed by snow, plantings, or other material. Forced air inlets shall be provided with rodent insect screens (mesh
not larger than 1/2 inch).
09
6.9 Carbon Monoxide Detectors.A carbon monoxide alarm shall be installed in each dwelling unit in accordance with NFPA
720,Standard for the Installation of Carbon Monoxide (CO) Detection and Warning Equipment 14, and shall be consistent
with requirements of applicable laws, codes, and standards.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met.
F. Air Moving Equipment
The items listed below (7.1 through 7.3) correspond to the information given in ASHRAE 62.2 Section 7 Air-Moving
Equipment. Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.6) for information describing
these requirements in more detail. The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 7.1 through 7.3 if
applicable.
01
7.1 Selection and Installation.Ventilation devices and equipment shall be tested and listed in accordance with specific
standards. Installations of systems or equipment shall be carried out in accordance with manufacturers' design
requirements and installation instructions.
02
7.2 Sound Ratings for Fans.Ventilation fans shall be rated for sound at no less than the minimum airflow rate required by
this standard, as noted below. These sound ratings shall be at a minimum of 0.1 in. w.c. (25 Pa) static pressure.
7.2.1 Whole Building or Continuous Ventilation Fans.These fans shall be rated for sound at a maximum of 1.0 sone.
7.2.2 Intermittent Local Exhaust Fans.Fans used to comply with Section 5.2 shall be rated for sound at a maximum of 3
sone, unless their maximum rated airflow exceeds 400 cfm (200 L/s). (Some exceptions may apply.)
03
7.3 Multibranch Exhaust Ducting.If more than one of the exhaust fans in a dwelling unit shares a common exhaust duct,
each fan shall be equipped with a back draft damper to prevent the recirculation of exhaust air from one room to another
through the exhaust ducting system.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 6 of 7)
Registration Number:
424-P010255225A-001-006-M27005A-0000
Registration Date/Time: 2024-10-23 13:10:31 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
G. Multifamily Buildings -Other Requirements
The items listed below correspond to the information given in ASHRAE 62.2 Section 8 "Multifamily Buildings". Refer
also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these
requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that
the building complies with these requirements specified in ASHRAE 62.2 Section 8, if applicable.
01
8.2 Whole-Building Mechanical Ventilation.For multifamily buildings, the term "building" in Section 4 refers to a single
dwelling unit.
8.4.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components separating dwelling
units, including sealing penetrations in the common walls, ceilings, and floors of each unit and by sealing vertical chases
adjacent to the units. All doors between dwelling units and common hallways shall be gasketed or made substantially
airtight.
8.4.1.1 Compliance.One method of demonstrating compliance with Section 8.4.1 shall be to verify a leakage rate below a
maximum of 0.2 cfm/ ft2 (100 L/s per 100 m2) of the dwelling unit envelope area (i.e., the sum of the area of the walls
between dwelling units, exterior walls, ceiling and floor) at a test pressure of 50 Pa by a blower door test. The test shall be
conducted with the dwelling unit as if it were exposed to outdoor air on all sides, top, and bottom by opening doors and
windows of adjacent dwelling units.
8.5.1 Exhaust Ducts.Exhaust fans in separate dwelling units shall not share a common exhaust duct. Exhaust inlets from
more than one dwelling unit may be served by a single exhaust fan downstream of all the exhaust inlets if the fan is
designated and intended to run continuously or if each inlet is equipped with a back-draft damper to prevent
cross-contamination when the fan is not running.
8.5.2 Supply Ducts.Supply outlets to more than one dwelling unit may be served by a single fan upstream of all the supply
outlets if the fan is designed and intended to run continuously or if each supply outlet is equipped with a back-draft damper
to prevent cross-contamination when the fan is not running.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 7 of 7)
Registration Number:
424-P010255225A-001-006-M27005A-0000
Registration Date/Time: 2024-10-23 13:10:31 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-006-M20006A-0000
Registration Date/Time: 2024-10-23 13:11:08 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 206)
City: La Quinta Zip Code: 92253
A. System Information
01 Space Conditioning System Identification or Name UNIT 206 HVACSys
02 Space Conditioning System Location or Area Served Main
03 Building Type from CF-1R Multi-family
04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS)
Credit from CF1R?
No, credit is not taken
05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit
from CF1R?
No, credit is not taken
06 Duct System Compliance Category New
MCH-20a - Completely New Duct System
B. Duct Leakage Diagnostic Test
01 Condenser Nominal Cooling Capacity (ton)3
02 Heating Capacity (kBtu/h)36
03 Conditioned Floor Area Served by this HVAC System (ft2)931
04 Duct Leakage Test Conditions Test final
05 Duct Leakage Test Method Total leakage
06 Leakage Factor 0.12
07 Air Handling Unit Airflow (AHUAirflow) Determination
Method
Cooling system method
08 Measured AHUAirflow (cfm)This field or section is not applicable
09 Calculated Target Allowable Duct Leakage (cfm)144
10 Actual Duct Leakage Rate from Leakage Test Measurement
(cfm)
56.6
11 Compliance Statement System passes leakage test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 2 of 3)
Registration Number:
424-P010255225A-001-006-M20006A-0000
Registration Date/Time: 2024-10-23 13:11:08 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
C. Additional Requirements for Compliance
01 System was tested in its normal operation condition. No temporary taping allowed.
02
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage
testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation
Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required,
may configure the OA damper to the closed position during duct leakage testing.
03 All supply and return register boots were sealed to the drywall.
04 Building cavities were not used as plenums or platform returns in lieu of ducts.
05 If cloth backed tape was used it was covered with Mastic and draw bands.
06 All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in).
After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must
be performed
07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are
properly sealed.
08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points
between the air handler and the supply and return plenums to verify that the connection points are properly sealed.
09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 3 of 3)
Registration Number:
424-P010255225A-001-006-M20006A-0000
Registration Date/Time: 2024-10-23 13:11:08 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-006-M23007A-0000
Registration Date/Time: 2024-10-23 13:11:34 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 206)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 206 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement
B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP)
in the Supply Plenum.
Procedures for installing HSPP or PSPP are specified in RA3.3.1.1.
01 Method Used to Demonstrate Compliance with the
HSPP/PSPP Requirement
HSPP installed and labeled consistent with Figure RA3.3-1
C. Airflow Rate Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given
in RA3.3.2.
01 Airflow Rate Measurement Type used for this airflow rate
verification.
Traditional Flow Capture Hood according to procedure in
RA3.3.3.1.4
02 Manufacturer of Airflow Measurement Apparatus ALNOR
03 Model number of Airflow Measurement Apparatus EB† 731
04
Certification Status of the Airflow Measurement Apparatus
Accuracy
Certified by Manufacturer and listed on CEC Website at
http://www.energy.ca.gov/title24/equipment_cert/ama_fas
/index.html
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 2 of 3)
Registration Number:
424-P010255225A-001-006-M23007A-0000
Registration Date/Time: 2024-10-23 13:11:34 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
D. Forced Air System Airflow Rate Measurement
The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3.
01 Required Minimum System Airflow Rate (cfm/ton)350
02 Required Minimum System Airflow Target (cfm)1050
03 Actual System Airflow Rate Measurement (cfm)1627
04 Compliance Statement:System airflow rate complies
E. Additional Requirements
01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in
the system during system air flow rate measurement identified on this Certificate of Installation.
02
The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of
Installation was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the
instrumentation specifications given in RA3.3.1.
03
A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning
system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate
of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance
Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance.
04 All registers were fully open during the diagnostic test.
05 System fan was set at maximum speed during the diagnostic test.
06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
08
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 3 of 3)
Registration Number:
424-P010255225A-001-006-M23007A-0000
Registration Date/Time: 2024-10-23 13:11:34 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-006-M22008A-0000
Registration Date/Time: 2024-10-23 13:11:58 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 206)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 206 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement
B. Fan Watt Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in
RA3.3.2.2.
01 Fan Watt Verification Device Used.Portable watt meter
MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
01 Actual Tested Watts 943.66
02 Actual Tested Airflow from MCH-23 (cfm)1627
03 Required Fan Efficacy (watts/cfm)0.58
04 Actual Fan Efficacy (watts/cfm)0.58
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 2 of 3)
Registration Number:
424-P010255225A-001-006-M22008A-0000
Registration Date/Time: 2024-10-23 13:11:58 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
05 Compliance Statement:System fan efficacy complies
D. Additional Requirements
01 All registers were fully open during the diagnostic test.
02 System fan was set at maximum speed during the diagnostic test.
03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
05
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy
(Watt/cfm) criteria in every zonal control mode.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 3 of 3)
Registration Number:
424-P010255225A-001-006-M22008A-0000
Registration Date/Time: 2024-10-23 13:11:58 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-006-M26009A-0000
Registration Date/Time: 2024-10-23 13:12:07 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 206)
City: La Quinta Zip Code: 92253
A. System Information
Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system
requiring verification must use a separate form.
01 System Name or Identification/Tag UNIT 206 HVACSys
02 System Location or Area Served Main
03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required
04 Directory used to certify product performance AHRI
05 AHRI certification number for the installed space
conditioning system from http://www.ahridirectory.org
208650564
06 Does the directory used to certify product performance
require a specific air handler/furnace make and model?
Yes
07 Does the directory used to certify product performance
require a time delay relay (+TDR)?
Yes
08 Does the directory used to certify product performance
require a TXV (+TXV)?
Yes
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the
Directory used to certify product performance in order to demonstrate compliance.
Data from Nameplate of Installed system
component
Data from the Directory used to certify
product performance for the rated system
component
Outdoor Condenser or Package Unit -
Installed Manufacturer Name
01 RHEEM 02 RHEEM
Outdoor Condenser or Package Unit -
Installed Model Number
03 RHPAZR036JT000NA 04 RHPAZR036JT000NA
Inside Coil - Installed Manufacturer
Name
05 06 This field or section is not applicable
Inside Coil - Installed Model Number 07 08 This field or section is not applicable
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 2 of 3)
Registration Number:
424-P010255225A-001-006-M26009A-0000
Registration Date/Time: 2024-10-23 13:12:07 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the
Directory used to certify product performance in order to demonstrate compliance.
Air Handler/Furnace - Installed
Manufacturer Name
09 10 RHEEM
Air Handler/Furnace - Installed Model
Number
11 12 RHPAZR036AJT
C. Verified Cooling System SEER
01 Required minimum SEER 15
02 Installed SEER 15
03 Compliance Statement:System passes SEER verification
Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed
on the CF1R.
D. Verified Cooling System EER
This section does not apply to this project.
E. Verified Cooling System Air Handler/Furnace
01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party
certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory.
F. Verified Cooling System Time Delay Relay
01
If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by
signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of
RA3.4.3.
G. Verified Cooling System TXV
01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below
that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 3 of 3)
Registration Number:
424-P010255225A-001-006-M26009A-0000
Registration Date/Time: 2024-10-23 13:12:07 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:27
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number: 424-P010255225A-001-007-M01004A-0000 Registration Date/Time: 2024-10-23 13:13:11 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:29
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 1 of 10)
Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La Quinta
(DwellingUnit 207)
City: La Quinta Zip Code: 92253
A. General Information
01 Dwelling Unit Name DwellingUnit 207 02 Climate Zone 15
03 Dwelling Unit Total
Conditioned Floor Area (ft2)931 04
Number of Space
Conditioning Systems in this
dwelling unit.
1
05 Certificate of Compliance
Type Performance (CF1R-PRF)06 Method Used to Calculate
HVAC Loads ACCA Manual J
07
Calculated Dwelling Unit
Sensible Cooling Load
(Btu/h)
36000 08 Calculated Dwelling Unit
Heating Load (Btu/h)36000
09 Dwelling Unit Number of
Bedrooms 2
MCH-01a - Space Conditioning Systems Ducts and Fans - For use with Performance Certificate of Compliance
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 2 of 10)
Registration Number: 424-P010255225A-001-007-M01004A-0000 Registration Date/Time: 2024-10-23 13:13:11 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:29
B. Design Space Conditioning (SC) System Component Specifications from CF1R
This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project.
01 02 03 04 05 06 07 08 09 10 11 12
Zone Name
SC System
Identification
or Name
SC System
Type
Heating
System
Type
Cooling
System Type SC Fan Type Distribution
System Type
Required
Thermostat
Type
Low
Leakage
Air-Handling
Unit
(LLAHU)
Status
Bypass Duct
Status
Cooling
Zoning Type
Cooling
System
Compressor
Speed
This field or
section is
not
applicable
UNIT 207
HVACSys
Heat pump
heating
cooling
Central
packaged
HP
Central
packaged
HP
PSC
Permanent
Split Capacitor
Unconditione
d attic OCST per JA5 No, credit is
not taken
No Bypass
Duct Not Zonal Single Speed
Notes:
C. Design Space Conditioning (SC) System Compliance Requirements from CF1R
This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project.
01 02 03 04 05 06 07 08 09 10
SC System
Identification or
Name
Heating
Efficiency Type
Minimum
Heating
Efficiency Value
Heat Pump
Heating
Capacity at 47°F
Heat Pump
Heating
Capacity at 17°F
Minimum
Cooling
Efficiency SEER
Minimum
Cooling
Efficiency EER
Minimum
Cooling System
Airflow Rate
(CFM/ton)
Maximum Fan
Efficacy
(W/CFM)
Minimum Duct
R-Value
UNIT 207
HVACSys
Heating
Seasonal
Performance
Factor (HSPF)
8.2 36000 29000 15 12.44 350 0.58 R-8
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 3 of 10)
Registration Number: 424-P010255225A-001-007-M01004A-0000 Registration Date/Time: 2024-10-23 13:13:11 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:29
D. Installed Space Conditioning (SC) System Component Information
01 02 03 04 05 06 07 08 09 10 11
SC System
Identification
or Name
SC System
Location or
Area Served
Conditioned
Floor Area
Served by the
System (ft2)
Heating
System Type
Cooling
System Type SC Fan Type Distribution
System Type
SC System
Thermostat
Type
Cooling Zoning
Type
Cooling
System
Compressor
Speed Type
Central Fan
Integrated
(CFI)
Ventilation
System Status
UNIT 207
HVACSys Main 931 Central
packaged HP
Central
packaged HP
PSC
Permanent
Split Capacitor
Unconditioned
attic OCST per JA5 Not Zonal Single Speed Not a CFI
system
Notes:
E. Installed Heating System Equipment Information (not heat pumps)
This section does not apply to this project.
F. Installed Cooling System Outdoor Condensing Unit or Package Unit Equipment Information (not heat pumps)
This section does not apply to this project.
G. Installed Split System Indoor Coil or Fan Coil Unit Equipment Information (applicable to DX or hydronic heating/cooling coils or fan coil units)
Systems with more than one indoor coil or fan coil unit (e.g. multi-split systems) shall provide information for each of the system indoor coils or fan coil units.
This section does not apply to this project.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 4 of 10)
Registration Number: 424-P010255225A-001-007-M01004A-0000 Registration Date/Time: 2024-10-23 13:13:11 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:29
H. Installed Heat Pump System - Split System Condensing Unit or Package Unit Equipment Information
01 02 03 04 05
SC System
Identification or
Name
SC System Location
or Area Served Condenser or Package Unit Manufacturer
Condenser or Package Unit Model
Number Condenser or Package Unit Serial Number
UNIT 207 HVACSys Main RHEEM RHPAZR036JT000NA F422302310
Notes:
I. Installed Heat Pump System -Efficiency and Performance Compliance Information
01 02 03 04 05 06 07 08 09 10
SC System
Identification
or Name
SC System
Location or
Area Served
Heating
Efficiency Type
Heating
Efficiency Value
System Rated
Heating
Capacity at 47°F
System Rated
Heating
Capacity at 17°F
System Rated
Cooling
Efficiency SEER
System Rated
Cooling
Efficiency EER
System Rated
Cooling
Capacity at
Design
Conditions
(Btu/h)
Condenser
Rated Nominal
Capacity (ton)
UNIT 207
HVACSys Main
Heating
Seasonal
Performance
Factor (HSPF)
8.2 36000 29000 15 12.44 36000 3
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 5 of 10)
Registration Number: 424-P010255225A-001-007-M01004A-0000 Registration Date/Time: 2024-10-23 13:13:11 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:29
J. Installed Duct System Information
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identification
or Name
SC System
Location or
Area Served
Supply Duct
Location
Supply Duct
R-Value
Return Duct
Location
Return Duct
R-Value
Exemption
from Min
R-Value for
Ducts In
Conditioned
Space
Method of
compliance
with duct
and filter
grille sizing
Req's in
150.0(m)13
Exemption
From Duct
Leakage
Requirement
s
Bypass Duct
Status
Number of
Air Filter
Devices on
System
Can RA3.3
Airflow
Protocols be
used to test
this System?
UNIT 207
HVACSys Main Unconditio
ned attic R-8 Unconditio
ned attic R-8 Not
applicable
HERS
verified fan
efficacy
(W/cfm)
and airflow
rate
(cfm/ton)
None No Bypass
Duct 1 Yes
Notes:
K. Installed Air Filter Device Information
Mandatory requirements for air filter devices are specified Section 150.0(m)12.
01 02 03 04 05 06 07
SC System
Identification or Name
SC System Location or
Area Served
Air Filter Device
Identification or Name Air Filter Device Type
Air Filter Device
Location
Determined Design
Airflow Rate for Air
Filter Device (cfm)
Determined Design
Allowable Pressure
Drop for Air Filter
Device (inch W.C.)
UNIT 207 HVACSys Main Filter Filter Grille return 1050 0.1
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 6 of 10)
Registration Number: 424-P010255225A-001-007-M01004A-0000 Registration Date/Time: 2024-10-23 13:13:11 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:29
L. Air Filter Device Requirements
01 The system shall be designed to ensure that all recirculated air and all outdoor air supplied to the occupiable space is filtered before passing through the system's
thermal conditioning components.
02
The system shall be designed to accommodate the clean-filter pressure drop imposed by the system air filter device(s). The design airflow rate and maximum
allowable clean-filter pressure drop at the design airflow rate applicable to each air filter device shall be determined, and all system air filter device locations shall be
labeled to disclose the applicable design airflow rate and the maximum allowable clean-filter pressure drop. The labels shall be permanently affixed to the air filter
device, readily legible, and visible to a person replacing the air filter media, and the air filter devices shall be provided with air filter media that conforms to these
determined or labeled maximum allowable clean-filter pressure drop values as rated using AHRI Standard 680.
03 All system air filter devices shall be located and installed in such a manner as to allow access and regular service by the system owner.
04 The system shall be provided with air filter media having a designated efficiency equal to or greater than MERV 6 when tested in accordance with ASHRAE Standard
52.2, or a particle size efficiency rating equal to or greater than 50% in the 3.0 to10 µm range when tested in accordance with AHRI Standard 680.
05 The system shall be provided with air filter media that has been labeled by the manufacturer to disclose the efficiency and pressure drop ratings that conform to the
required efficiency and pressure drop requirements for the air filter device.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met
M. HERS Verification Requirements
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identificati
on or
Name
SC System
Location or
Area
Served
MCH-20
.
.
Duct
Leakage
Test
MCH-21
.
Duct
Location
Verification
MCH-22
.
AHU Fan
Efficacy
(W/cfm)
MCH-23
.
AHU
Airflow
Rate
(cfm/ton)
MCH-25
.
.
Refrigerant
Charge
MCH-26
Rated SC
System
Equipment
Verification
MCH-27
.
IAQ
Mechanical
Ventilation
MCH-28
Return
Duct
Design
Table
150.0-B or
C
MCH-29
Supply
Duct
Surface
Area
R-Value
Buried
Ducts
MCH30
.
Ventilation
Cooling
Credit
UNIT 207
HVACSys Main Yes No Yes Yes No Yes Yes No No No
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 7 of 10)
Registration Number: 424-P010255225A-001-007-M01004A-0000 Registration Date/Time: 2024-10-23 13:13:11 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:29
M. HERS Verification Requirements
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identificati
on or
Name
SC System
Location or
Area
Served
MCH-20
.
.
Duct
Leakage
Test
MCH-21
.
Duct
Location
Verification
MCH-22
.
AHU Fan
Efficacy
(W/cfm)
MCH-23
.
AHU
Airflow
Rate
(cfm/ton)
MCH-25
.
.
Refrigerant
Charge
MCH-26
Rated SC
System
Equipment
Verification
MCH-27
.
IAQ
Mechanical
Ventilation
MCH-28
Return
Duct
Design
Table
150.0-B or
C
MCH-29
Supply
Duct
Surface
Area
R-Value
Buried
Ducts
MCH30
.
Ventilation
Cooling
Credit
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 8 of 10)
Registration Number: 424-P010255225A-001-007-M01004A-0000 Registration Date/Time: 2024-10-23 13:13:11 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:29
N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures
Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly
installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements.
Heating Equipment
01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency
Regulations.
02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant
to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(i), 110.2(b).
03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections
150.0(h)1 and 2).
04 Furnace Temperature Rise: Central forced-air heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum
inlet-to-outlet temperature rise specification. See Section 150.0(h)4.
05 Standby Losses and Pilot Lights: Fan-type central furnaces may not have a continuously burning pilot light. Section 110.5 and Section 110.2(d).
Cooling Equipment
06 Equipment Efficiency: All cooling equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency
Regulations.
07 Refrigerant Line Insulation: All refrigerant line insulation in split system air conditioners and heat pumps must meet the R-value and protection requirements of Section
150.0(j)2 and 3, and Section 150.0(m)9.
08 Condensing Unit Location: Condensing units shall not be placed within five (5) feet of a dryer vent outlet. See Section 150.0(h)3A.
09 Liquid Line Filter Drier: If applicable, a liquid line filter drier shall be installed according to the manufacturer's specifications. Section 150.0(h)3B
10 Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section
150.0(h)1 and 2.
Air Distribution System Ducts, Plenums and Fans
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 9 of 10)
Registration Number: 424-P010255225A-001-007-M01004A-0000 Registration Date/Time: 2024-10-23 13:13:11 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:29
N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures
Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly
installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements.
11 Insulation: In all cases, unless ducts are enclosed entirely in directly conditioned space, the minimum duct insulation value is R-6. Note that higher values may be
required by the prescriptive or performance requirements. See Section 150.0(m)1.
12
Connections and Closures: All installed air-distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0,
602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006: Supply-air and return-air ducts and plenums must be insulated to a minimum installed level of R-6.0 or
enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing in accordance with the requirements of Reference
Residential Appendix RA3.1.4.3.8.
Heat Pump Thermostat
13 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c).
14 The thermostat shall be installed in accordance with the manufacturers published installation specifications
15 First stage of heating shall be assigned to heat pump heating.
16 Second stage back up heating shall be set to come on only when the indoor set temperature cannot be met.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 10 of 10)
Registration Number: 424-P010255225A-001-007-M01004A-0000 Registration Date/Time: 2024-10-23 13:13:11 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:29
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of
features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized
representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the
installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency.
4.I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all
applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-007-M27005A-0000
Registration Date/Time: 2024-10-23 13:13:49 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:30
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 1 of 7)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 207)
City: La Quinta Zip Code: 92253
Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE
Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on
this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010.
A. Dwelling Mechanical Ventilation - General Information
01 Dwelling unit name DwellingUnit 207
02 Building Type Single Family
03 Project scope Newly constructed building
04
Total Conditioned Floor Area of Dwelling Unit
(For addition projects the conditioned floor area equals
existing area plus addition area. )
931
05
Number of bedrooms in dwelling unit
(For addition projects the number of bedrooms equals the
existing bedrooms plus addition bedrooms)
2
06 Ventilation Operation Schedule Continuous
07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1)
08 Whole Building Ventilation System Type Standalone - Balanced
09 IAQ Fan Location
Note:
Non-dwelling units do not meet the definition for a dwelling unit as defined in Section 100.1(b). Non-dwelling units are not
designed to provide independent living facilities and do not provide permanent provisions for living, sleeping, eating, cooking and
sanitation.
MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method
B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method
A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with
outdoor air each hour at no less than the rate in equation 4.1a.
01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81
02 Installed Continuous Whole-Building Ventilation Rate 109
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 2 of 7)
Registration Number:
424-P010255225A-001-007-M27005A-0000
Registration Date/Time: 2024-10-23 13:13:49 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:30
C. Compliance Statement
01 Building passes continuous whole-building ventilation rate test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 3 of 7)
Registration Number:
424-P010255225A-001-007-M27005A-0000
Registration Date/Time: 2024-10-23 13:13:49 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:30
D. Local Mechanical Exhaust System - Fan selection and duct design criteria for compliance
Local mechanical exhaust fans shall be installed in each kitchen and bathroom. Delivered local ventilation rates:
•All local ventilation rates have been measured using a flow hood, flow grid, or other airflow measuring device and meet the
requirements of 62.2 Tables 5.1 or 5.2. OR
•The airflow rating at a pressure of 0.25 in. w.c. of a certified fan is assumed because the local ventilation system duct sizing
meets the prescriptive requirements of 62.2 Table 5.3, or manufacturer's design criteria.
Table 5.1
Intermittent Local Ventilation Exhaust Airflow Rates
Application Airflow Notes
Kitchen 100 cfm
Vented range hood (including
appliance-range hood combinations)
required if exhaust fan flow is less than 5
ACH.
Bathroom 50 cfm
Table 5.2
Continuous Local Ventilation Exhaust Airflow Rates
Application Airflow Notes
Kitchen 5 ACH Based on Kitchen volume.
Bathroom 20 cfm
Table 5.3
Prescriptive Duct Sizing Requirements
Duct Type Flex Duct Smooth Duct
Fan Rating
cfm @ 0.25
in. w.g.
50 80 100 125 50 80 100 125
Maximum Allowable Duct Length (ft)
Diameter,
(in)Flex Duct Smooth Duct
3 X X X X 5 X X X
4 70 3 X X 105 35 5 X
5 NL 70 35 20 NL 135 85 55
6 NL NL 125 95 NL NL NL 145
7 and above NL NL NL NL NL NL NL NL
This table assumes no elbows. Deduct 15 ft of allowable duct length for each turn, elbow, or fitting. Interpolation and extrapolation
in 62.2 Table 5.3 is not allowed. For airflow values not listed, use the next higher value. This table is not applicable for airflow > 125
cfm.
NL = no limit on duct length of this size.
X = not allowed, any length of duct of this size with assumed turns, elbows, fittings will exceed the rated pressure drop.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 4 of 7)
Registration Number:
424-P010255225A-001-007-M27005A-0000
Registration Date/Time: 2024-10-23 13:13:49 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:30
E. Other Requirements
The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other
Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information
describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if
applicable.
01
6.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components to occupiable spaces from
garages, unconditioned crawl spaces, and unconditioned attics. Supply and balanced ventilation systems shall be designed
and constructed to provide ventilation air directly from the outdoors.
02
6.2 Instructions and Labeling.Information on the ventilation design and/or ventilation systems installed, instructions on
their proper operation to meet the requirements of this standard, and instructions detailing any required maintenance
(similar to that provided for HVAC systems) shall be provided to the owner and the occupant of the dwelling unit. Controls
shall be labeled as to their function (unless that function is obvious, such as toilet exhaust fan switches). See Chapter 13 of
Guideline 24 2 for information on instructions and labeling.
03 6.3 Clothes Dryers.Clothes dryers shall be exhausted directly to the outdoors
04
6.4 Combustion and Solid-Fuel Burning Appliances.Combustion and solid-fuel burning appliances must be provided with
adequate combustion and ventilation air and vented in accordance with manufacturer installation instructions, NFPA 54
ANSI Z223.1, National Fuel Gas Code, NFPA 31, Standard for the Installation of Oil-Burning Equipment, or NFPA 211,
Standard for Chimneys, Fireplaces, Vents, and Solid-Fuel Burning Appliances, or other equivalent code acceptable to the
building official.
Where atmospherically vented combustion appliances or solid-fuel burning appliances are located inside the pressure
boundary, the total net exhaust flow of the two largest exhaust fans (not including a summer cooling fan intended to be
operated only when windows or other air inlets are open) shall not exceed 15 cfm/100 ft 2 (75 Lps/100 m2) of occupiable
space when in operation at full capacity. If the designed total net flow exceeds this limit, the net exhaust flow must be
reduced by reducing the exhaust flow or providing compensating outdoor airflow. Atmospherically vented combustion
appliances do not include direct-vent appliances.
05
6.5 Garages.When an occupiable space adjoins a garage, the design must prevent migration of contaminants to the
adjoining occupiable space. Air seal the walls, ceilings, and floors that separate garages from occupiable space. To be
considered air sealed, all joints, seams, penetrations, openings between door assemblies and their respective jambs and
framing, and other sources of air leakage through wall and ceiling assemblies separating the garage from the residence and
its attic area shall be caulked, gasketed, weather stripped, wrapped, or otherwise sealed to limit air movement. Doors
between garages and occupiable spaces shall be gasketed or made substantially airtight with weather stripping.
06 6.6 Ventilation Opening Area.Spaces shall have ventilation openings as listed below. Such openings shall meet the
requirements of Section 6.8
07
6.7 Minimum Filtration.Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 ft (3 m)
in length and through a thermal conditioning component, except evaporative coolers, shall be provided with a filter having
a designated minimum efficiency of MERV 6, or better, when tested in accordance with ANSI ASHRAE Standard 52.2,
Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size, or a minimum Particle
Size Efficiency of 50 percent in the 3.0-10 µm range in accordance with AHRI Standard 680, Performance Rating of
Residential Air Filter Equipment. The system shall be designed such that all recirculated and mechanically supplied outdoor
air is filtered before passing through the thermal conditioning components. The filter shall be located and installed in such a
manner as to facilitate access and regular service by the owner.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 5 of 7)
Registration Number:
424-P010255225A-001-007-M27005A-0000
Registration Date/Time: 2024-10-23 13:13:49 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:30
E. Other Requirements
The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other
Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information
describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if
applicable.
08
6.8 Air Inlets.Air inlets that are part of the ventilation design shall be located a minimum of 10 ft (3 m) from known sources
of contamination such as a stack, vent, exhaust hood, or vehicle exhaust. The intake shall be placed so that entering air is
not obstructed by snow, plantings, or other material. Forced air inlets shall be provided with rodent insect screens (mesh
not larger than 1/2 inch).
09
6.9 Carbon Monoxide Detectors.A carbon monoxide alarm shall be installed in each dwelling unit in accordance with NFPA
720,Standard for the Installation of Carbon Monoxide (CO) Detection and Warning Equipment 14, and shall be consistent
with requirements of applicable laws, codes, and standards.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met.
F. Air Moving Equipment
The items listed below (7.1 through 7.3) correspond to the information given in ASHRAE 62.2 Section 7 Air-Moving
Equipment. Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.6) for information describing
these requirements in more detail. The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 7.1 through 7.3 if
applicable.
01
7.1 Selection and Installation.Ventilation devices and equipment shall be tested and listed in accordance with specific
standards. Installations of systems or equipment shall be carried out in accordance with manufacturers' design
requirements and installation instructions.
02
7.2 Sound Ratings for Fans.Ventilation fans shall be rated for sound at no less than the minimum airflow rate required by
this standard, as noted below. These sound ratings shall be at a minimum of 0.1 in. w.c. (25 Pa) static pressure.
7.2.1 Whole Building or Continuous Ventilation Fans.These fans shall be rated for sound at a maximum of 1.0 sone.
7.2.2 Intermittent Local Exhaust Fans.Fans used to comply with Section 5.2 shall be rated for sound at a maximum of 3
sone, unless their maximum rated airflow exceeds 400 cfm (200 L/s). (Some exceptions may apply.)
03
7.3 Multibranch Exhaust Ducting.If more than one of the exhaust fans in a dwelling unit shares a common exhaust duct,
each fan shall be equipped with a back draft damper to prevent the recirculation of exhaust air from one room to another
through the exhaust ducting system.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 6 of 7)
Registration Number:
424-P010255225A-001-007-M27005A-0000
Registration Date/Time: 2024-10-23 13:13:49 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:30
G. Multifamily Buildings -Other Requirements
The items listed below correspond to the information given in ASHRAE 62.2 Section 8 "Multifamily Buildings". Refer
also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these
requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that
the building complies with these requirements specified in ASHRAE 62.2 Section 8, if applicable.
01
8.2 Whole-Building Mechanical Ventilation.For multifamily buildings, the term "building" in Section 4 refers to a single
dwelling unit.
8.4.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components separating dwelling
units, including sealing penetrations in the common walls, ceilings, and floors of each unit and by sealing vertical chases
adjacent to the units. All doors between dwelling units and common hallways shall be gasketed or made substantially
airtight.
8.4.1.1 Compliance.One method of demonstrating compliance with Section 8.4.1 shall be to verify a leakage rate below a
maximum of 0.2 cfm/ ft2 (100 L/s per 100 m2) of the dwelling unit envelope area (i.e., the sum of the area of the walls
between dwelling units, exterior walls, ceiling and floor) at a test pressure of 50 Pa by a blower door test. The test shall be
conducted with the dwelling unit as if it were exposed to outdoor air on all sides, top, and bottom by opening doors and
windows of adjacent dwelling units.
8.5.1 Exhaust Ducts.Exhaust fans in separate dwelling units shall not share a common exhaust duct. Exhaust inlets from
more than one dwelling unit may be served by a single exhaust fan downstream of all the exhaust inlets if the fan is
designated and intended to run continuously or if each inlet is equipped with a back-draft damper to prevent
cross-contamination when the fan is not running.
8.5.2 Supply Ducts.Supply outlets to more than one dwelling unit may be served by a single fan upstream of all the supply
outlets if the fan is designed and intended to run continuously or if each supply outlet is equipped with a back-draft damper
to prevent cross-contamination when the fan is not running.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 7 of 7)
Registration Number:
424-P010255225A-001-007-M27005A-0000
Registration Date/Time: 2024-10-23 13:13:49 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:30
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-007-M20006A-0000
Registration Date/Time: 2024-10-23 13:14:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:30
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 207)
City: La Quinta Zip Code: 92253
A. System Information
01 Space Conditioning System Identification or Name UNIT 207 HVACSys
02 Space Conditioning System Location or Area Served Main
03 Building Type from CF-1R Multi-family
04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS)
Credit from CF1R?
No, credit is not taken
05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit
from CF1R?
No, credit is not taken
06 Duct System Compliance Category New
MCH-20a - Completely New Duct System
B. Duct Leakage Diagnostic Test
01 Condenser Nominal Cooling Capacity (ton)3
02 Heating Capacity (kBtu/h)36
03 Conditioned Floor Area Served by this HVAC System (ft2)931
04 Duct Leakage Test Conditions Test final
05 Duct Leakage Test Method Total leakage
06 Leakage Factor 0.12
07 Air Handling Unit Airflow (AHUAirflow) Determination
Method
Cooling system method
08 Measured AHUAirflow (cfm)This field or section is not applicable
09 Calculated Target Allowable Duct Leakage (cfm)144
10 Actual Duct Leakage Rate from Leakage Test Measurement
(cfm)
42.9
11 Compliance Statement System passes leakage test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 2 of 3)
Registration Number:
424-P010255225A-001-007-M20006A-0000
Registration Date/Time: 2024-10-23 13:14:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:30
C. Additional Requirements for Compliance
01 System was tested in its normal operation condition. No temporary taping allowed.
02
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage
testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation
Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required,
may configure the OA damper to the closed position during duct leakage testing.
03 All supply and return register boots were sealed to the drywall.
04 Building cavities were not used as plenums or platform returns in lieu of ducts.
05 If cloth backed tape was used it was covered with Mastic and draw bands.
06 All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in).
After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must
be performed
07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are
properly sealed.
08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points
between the air handler and the supply and return plenums to verify that the connection points are properly sealed.
09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 3 of 3)
Registration Number:
424-P010255225A-001-007-M20006A-0000
Registration Date/Time: 2024-10-23 13:14:40 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:30
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-007-M23007A-0000
Registration Date/Time: 2024-10-23 13:15:17 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:30
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 207)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 207 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement
B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP)
in the Supply Plenum.
Procedures for installing HSPP or PSPP are specified in RA3.3.1.1.
01 Method Used to Demonstrate Compliance with the
HSPP/PSPP Requirement
HSPP installed and labeled consistent with Figure RA3.3-1
C. Airflow Rate Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given
in RA3.3.2.
01 Airflow Rate Measurement Type used for this airflow rate
verification.
Traditional Flow Capture Hood according to procedure in
RA3.3.3.1.4
02 Manufacturer of Airflow Measurement Apparatus ALNOR
03 Model number of Airflow Measurement Apparatus EB† 731
04
Certification Status of the Airflow Measurement Apparatus
Accuracy
Certified by Manufacturer and listed on CEC Website at
http://www.energy.ca.gov/title24/equipment_cert/ama_fas
/index.html
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 2 of 3)
Registration Number:
424-P010255225A-001-007-M23007A-0000
Registration Date/Time: 2024-10-23 13:15:17 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:30
MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
D. Forced Air System Airflow Rate Measurement
The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3.
01 Required Minimum System Airflow Rate (cfm/ton)350
02 Required Minimum System Airflow Target (cfm)1050
03 Actual System Airflow Rate Measurement (cfm)1547
04 Compliance Statement:System airflow rate complies
E. Additional Requirements
01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in
the system during system air flow rate measurement identified on this Certificate of Installation.
02
The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of
Installation was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the
instrumentation specifications given in RA3.3.1.
03
A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning
system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate
of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance
Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance.
04 All registers were fully open during the diagnostic test.
05 System fan was set at maximum speed during the diagnostic test.
06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
08
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 3 of 3)
Registration Number:
424-P010255225A-001-007-M23007A-0000
Registration Date/Time: 2024-10-23 13:15:17 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:30
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-007-M22008A-0000
Registration Date/Time: 2024-10-23 13:15:49 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:30
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 207)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 207 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement
B. Fan Watt Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in
RA3.3.2.2.
01 Fan Watt Verification Device Used.Portable watt meter
MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
01 Actual Tested Watts 897.26
02 Actual Tested Airflow from MCH-23 (cfm)1547
03 Required Fan Efficacy (watts/cfm)0.58
04 Actual Fan Efficacy (watts/cfm)0.58
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 2 of 3)
Registration Number:
424-P010255225A-001-007-M22008A-0000
Registration Date/Time: 2024-10-23 13:15:49 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:30
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
05 Compliance Statement:System fan efficacy complies
D. Additional Requirements
01 All registers were fully open during the diagnostic test.
02 System fan was set at maximum speed during the diagnostic test.
03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
05
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy
(Watt/cfm) criteria in every zonal control mode.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 3 of 3)
Registration Number:
424-P010255225A-001-007-M22008A-0000
Registration Date/Time: 2024-10-23 13:15:49 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:30
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-007-M26009A-0000
Registration Date/Time: 2024-10-23 13:16:19 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:30
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 207)
City: La Quinta Zip Code: 92253
A. System Information
Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system
requiring verification must use a separate form.
01 System Name or Identification/Tag UNIT 207 HVACSys
02 System Location or Area Served Main
03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required
04 Directory used to certify product performance AHRI
05 AHRI certification number for the installed space
conditioning system from http://www.ahridirectory.org
208650564
06 Does the directory used to certify product performance
require a specific air handler/furnace make and model?
Yes
07 Does the directory used to certify product performance
require a time delay relay (+TDR)?
Yes
08 Does the directory used to certify product performance
require a TXV (+TXV)?
Yes
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the
Directory used to certify product performance in order to demonstrate compliance.
Data from Nameplate of Installed system
component
Data from the Directory used to certify
product performance for the rated system
component
Outdoor Condenser or Package Unit -
Installed Manufacturer Name
01 RHEEM 02 RHEEM
Outdoor Condenser or Package Unit -
Installed Model Number
03 RHPAZR036JT000NA 04 RHPAZR036JT000NA
Inside Coil - Installed Manufacturer
Name
05 06 This field or section is not applicable
Inside Coil - Installed Model Number 07 08 This field or section is not applicable
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 2 of 3)
Registration Number:
424-P010255225A-001-007-M26009A-0000
Registration Date/Time: 2024-10-23 13:16:19 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:30
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the
Directory used to certify product performance in order to demonstrate compliance.
Air Handler/Furnace - Installed
Manufacturer Name
09 10 RHEEM
Air Handler/Furnace - Installed Model
Number
11 12 RHPAZR036AJT
C. Verified Cooling System SEER
01 Required minimum SEER 15
02 Installed SEER 15
03 Compliance Statement:System passes SEER verification
Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed
on the CF1R.
D. Verified Cooling System EER
This section does not apply to this project.
E. Verified Cooling System Air Handler/Furnace
01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party
certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory.
F. Verified Cooling System Time Delay Relay
01
If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by
signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of
RA3.4.3.
G. Verified Cooling System TXV
01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below
that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 3 of 3)
Registration Number:
424-P010255225A-001-007-M26009A-0000
Registration Date/Time: 2024-10-23 13:16:19 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:30
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number: 424-P010255225A-001-008-M01004A-0000 Registration Date/Time: 2024-10-23 13:17:26 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 1 of 10)
Project Name: Desert Club Enforcement Agency: La Quinta, City of Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La Quinta
(DwellingUnit 208)
City: La Quinta Zip Code: 92253
A. General Information
01 Dwelling Unit Name DwellingUnit 208 02 Climate Zone 15
03 Dwelling Unit Total
Conditioned Floor Area (ft2)931 04
Number of Space
Conditioning Systems in this
dwelling unit.
1
05 Certificate of Compliance
Type Performance (CF1R-PRF)06 Method Used to Calculate
HVAC Loads ACCA Manual J
07
Calculated Dwelling Unit
Sensible Cooling Load
(Btu/h)
36000 08 Calculated Dwelling Unit
Heating Load (Btu/h)36000
09 Dwelling Unit Number of
Bedrooms 2
MCH-01a - Space Conditioning Systems Ducts and Fans - For use with Performance Certificate of Compliance
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 2 of 10)
Registration Number: 424-P010255225A-001-008-M01004A-0000 Registration Date/Time: 2024-10-23 13:17:26 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
B. Design Space Conditioning (SC) System Component Specifications from CF1R
This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project.
01 02 03 04 05 06 07 08 09 10 11 12
Zone Name
SC System
Identification
or Name
SC System
Type
Heating
System
Type
Cooling
System Type SC Fan Type Distribution
System Type
Required
Thermostat
Type
Low
Leakage
Air-Handling
Unit
(LLAHU)
Status
Bypass Duct
Status
Cooling
Zoning Type
Cooling
System
Compressor
Speed
This field or
section is
not
applicable
UNIT 208
HVACSys
Heat pump
heating
cooling
Central
packaged
HP
Central
packaged
HP
PSC
Permanent
Split Capacitor
Unconditione
d attic OCST per JA5 No, credit is
not taken
No Bypass
Duct Not Zonal Single Speed
Notes:
C. Design Space Conditioning (SC) System Compliance Requirements from CF1R
This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project.
01 02 03 04 05 06 07 08 09 10
SC System
Identification or
Name
Heating
Efficiency Type
Minimum
Heating
Efficiency Value
Heat Pump
Heating
Capacity at 47°F
Heat Pump
Heating
Capacity at 17°F
Minimum
Cooling
Efficiency SEER
Minimum
Cooling
Efficiency EER
Minimum
Cooling System
Airflow Rate
(CFM/ton)
Maximum Fan
Efficacy
(W/CFM)
Minimum Duct
R-Value
UNIT 208
HVACSys
Heating
Seasonal
Performance
Factor (HSPF)
8.2 36000 29000 15 12.44 350 0.58 R-8
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 3 of 10)
Registration Number: 424-P010255225A-001-008-M01004A-0000 Registration Date/Time: 2024-10-23 13:17:26 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
D. Installed Space Conditioning (SC) System Component Information
01 02 03 04 05 06 07 08 09 10 11
SC System
Identification
or Name
SC System
Location or
Area Served
Conditioned
Floor Area
Served by the
System (ft2)
Heating
System Type
Cooling
System Type SC Fan Type Distribution
System Type
SC System
Thermostat
Type
Cooling Zoning
Type
Cooling
System
Compressor
Speed Type
Central Fan
Integrated
(CFI)
Ventilation
System Status
UNIT 208
HVACSys Main 931 Central
packaged HP
Central
packaged HP
PSC
Permanent
Split Capacitor
Unconditioned
attic OCST per JA5 Not Zonal Single Speed Not a CFI
system
Notes:
E. Installed Heating System Equipment Information (not heat pumps)
This section does not apply to this project.
F. Installed Cooling System Outdoor Condensing Unit or Package Unit Equipment Information (not heat pumps)
This section does not apply to this project.
G. Installed Split System Indoor Coil or Fan Coil Unit Equipment Information (applicable to DX or hydronic heating/cooling coils or fan coil units)
Systems with more than one indoor coil or fan coil unit (e.g. multi-split systems) shall provide information for each of the system indoor coils or fan coil units.
This section does not apply to this project.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 4 of 10)
Registration Number: 424-P010255225A-001-008-M01004A-0000 Registration Date/Time: 2024-10-23 13:17:26 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
H. Installed Heat Pump System - Split System Condensing Unit or Package Unit Equipment Information
01 02 03 04 05
SC System
Identification or
Name
SC System Location
or Area Served Condenser or Package Unit Manufacturer
Condenser or Package Unit Model
Number Condenser or Package Unit Serial Number
UNIT 208 HVACSys Main RHEEM RHPAZR036JT000NA F422302313
Notes:
I. Installed Heat Pump System -Efficiency and Performance Compliance Information
01 02 03 04 05 06 07 08 09 10
SC System
Identification
or Name
SC System
Location or
Area Served
Heating
Efficiency Type
Heating
Efficiency Value
System Rated
Heating
Capacity at 47°F
System Rated
Heating
Capacity at 17°F
System Rated
Cooling
Efficiency SEER
System Rated
Cooling
Efficiency EER
System Rated
Cooling
Capacity at
Design
Conditions
(Btu/h)
Condenser
Rated Nominal
Capacity (ton)
UNIT 208
HVACSys Main
Heating
Seasonal
Performance
Factor (HSPF)
8.2 36000 29000 15 12.44 36000 3
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 5 of 10)
Registration Number: 424-P010255225A-001-008-M01004A-0000 Registration Date/Time: 2024-10-23 13:17:26 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
J. Installed Duct System Information
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identification
or Name
SC System
Location or
Area Served
Supply Duct
Location
Supply Duct
R-Value
Return Duct
Location
Return Duct
R-Value
Exemption
from Min
R-Value for
Ducts In
Conditioned
Space
Method of
compliance
with duct
and filter
grille sizing
Req's in
150.0(m)13
Exemption
From Duct
Leakage
Requirement
s
Bypass Duct
Status
Number of
Air Filter
Devices on
System
Can RA3.3
Airflow
Protocols be
used to test
this System?
UNIT 208
HVACSys Main Unconditio
ned attic R-8 Unconditio
ned attic R-8 Not
applicable
HERS
verified fan
efficacy
(W/cfm)
and airflow
rate
(cfm/ton)
None No Bypass
Duct 1 Yes
Notes:
K. Installed Air Filter Device Information
Mandatory requirements for air filter devices are specified Section 150.0(m)12.
01 02 03 04 05 06 07
SC System
Identification or Name
SC System Location or
Area Served
Air Filter Device
Identification or Name Air Filter Device Type
Air Filter Device
Location
Determined Design
Airflow Rate for Air
Filter Device (cfm)
Determined Design
Allowable Pressure
Drop for Air Filter
Device (inch W.C.)
UNIT 208 HVACSys Main Filter Filter Grille return 1050 0.1
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 6 of 10)
Registration Number: 424-P010255225A-001-008-M01004A-0000 Registration Date/Time: 2024-10-23 13:17:26 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
L. Air Filter Device Requirements
01 The system shall be designed to ensure that all recirculated air and all outdoor air supplied to the occupiable space is filtered before passing through the system's
thermal conditioning components.
02
The system shall be designed to accommodate the clean-filter pressure drop imposed by the system air filter device(s). The design airflow rate and maximum
allowable clean-filter pressure drop at the design airflow rate applicable to each air filter device shall be determined, and all system air filter device locations shall be
labeled to disclose the applicable design airflow rate and the maximum allowable clean-filter pressure drop. The labels shall be permanently affixed to the air filter
device, readily legible, and visible to a person replacing the air filter media, and the air filter devices shall be provided with air filter media that conforms to these
determined or labeled maximum allowable clean-filter pressure drop values as rated using AHRI Standard 680.
03 All system air filter devices shall be located and installed in such a manner as to allow access and regular service by the system owner.
04 The system shall be provided with air filter media having a designated efficiency equal to or greater than MERV 6 when tested in accordance with ASHRAE Standard
52.2, or a particle size efficiency rating equal to or greater than 50% in the 3.0 to10 µm range when tested in accordance with AHRI Standard 680.
05 The system shall be provided with air filter media that has been labeled by the manufacturer to disclose the efficiency and pressure drop ratings that conform to the
required efficiency and pressure drop requirements for the air filter device.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met
M. HERS Verification Requirements
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identificati
on or
Name
SC System
Location or
Area
Served
MCH-20
.
.
Duct
Leakage
Test
MCH-21
.
Duct
Location
Verification
MCH-22
.
AHU Fan
Efficacy
(W/cfm)
MCH-23
.
AHU
Airflow
Rate
(cfm/ton)
MCH-25
.
.
Refrigerant
Charge
MCH-26
Rated SC
System
Equipment
Verification
MCH-27
.
IAQ
Mechanical
Ventilation
MCH-28
Return
Duct
Design
Table
150.0-B or
C
MCH-29
Supply
Duct
Surface
Area
R-Value
Buried
Ducts
MCH30
.
Ventilation
Cooling
Credit
UNIT 208
HVACSys Main Yes No Yes Yes No Yes Yes No No No
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 7 of 10)
Registration Number: 424-P010255225A-001-008-M01004A-0000 Registration Date/Time: 2024-10-23 13:17:26 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
M. HERS Verification Requirements
01 02 03 04 05 06 07 08 09 10 11 12
SC System
Identificati
on or
Name
SC System
Location or
Area
Served
MCH-20
.
.
Duct
Leakage
Test
MCH-21
.
Duct
Location
Verification
MCH-22
.
AHU Fan
Efficacy
(W/cfm)
MCH-23
.
AHU
Airflow
Rate
(cfm/ton)
MCH-25
.
.
Refrigerant
Charge
MCH-26
Rated SC
System
Equipment
Verification
MCH-27
.
IAQ
Mechanical
Ventilation
MCH-28
Return
Duct
Design
Table
150.0-B or
C
MCH-29
Supply
Duct
Surface
Area
R-Value
Buried
Ducts
MCH30
.
Ventilation
Cooling
Credit
Notes:
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 8 of 10)
Registration Number: 424-P010255225A-001-008-M01004A-0000 Registration Date/Time: 2024-10-23 13:17:26 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures
Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly
installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements.
Heating Equipment
01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency
Regulations.
02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant
to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(i), 110.2(b).
03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections
150.0(h)1 and 2).
04 Furnace Temperature Rise: Central forced-air heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum
inlet-to-outlet temperature rise specification. See Section 150.0(h)4.
05 Standby Losses and Pilot Lights: Fan-type central furnaces may not have a continuously burning pilot light. Section 110.5 and Section 110.2(d).
Cooling Equipment
06 Equipment Efficiency: All cooling equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency
Regulations.
07 Refrigerant Line Insulation: All refrigerant line insulation in split system air conditioners and heat pumps must meet the R-value and protection requirements of Section
150.0(j)2 and 3, and Section 150.0(m)9.
08 Condensing Unit Location: Condensing units shall not be placed within five (5) feet of a dryer vent outlet. See Section 150.0(h)3A.
09 Liquid Line Filter Drier: If applicable, a liquid line filter drier shall be installed according to the manufacturer's specifications. Section 150.0(h)3B
10 Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section
150.0(h)1 and 2.
Air Distribution System Ducts, Plenums and Fans
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 9 of 10)
Registration Number: 424-P010255225A-001-008-M01004A-0000 Registration Date/Time: 2024-10-23 13:17:26 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
N. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures
Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly
installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements.
11 Insulation: In all cases, unless ducts are enclosed entirely in directly conditioned space, the minimum duct insulation value is R-6. Note that higher values may be
required by the prescriptive or performance requirements. See Section 150.0(m)1.
12
Connections and Closures: All installed air-distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0,
602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006: Supply-air and return-air ducts and plenums must be insulated to a minimum installed level of R-6.0 or
enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing in accordance with the requirements of Reference
Residential Appendix RA3.1.4.3.8.
Heat Pump Thermostat
13 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c).
14 The thermostat shall be installed in accordance with the manufacturers published installation specifications
15 First stage of heating shall be assigned to heat pump heating.
16 Second stage back up heating shall be set to come on only when the indoor set temperature cannot be met.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 10 of 10)
Registration Number: 424-P010255225A-001-008-M01004A-0000 Registration Date/Time: 2024-10-23 13:17:26 HERS Provider: CHEERS
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of
features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized
representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the
installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency.
4.I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all
applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-008-M27005A-0000
Registration Date/Time: 2024-10-23 13:17:52 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 1 of 7)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 208)
City: La Quinta Zip Code: 92253
Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE
Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on
this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010.
A. Dwelling Mechanical Ventilation - General Information
01 Dwelling unit name DwellingUnit 208
02 Building Type Single Family
03 Project scope Newly constructed building
04
Total Conditioned Floor Area of Dwelling Unit
(For addition projects the conditioned floor area equals
existing area plus addition area. )
931
05
Number of bedrooms in dwelling unit
(For addition projects the number of bedrooms equals the
existing bedrooms plus addition bedrooms)
2
06 Ventilation Operation Schedule Continuous
07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1)
08 Whole Building Ventilation System Type Standalone - Balanced
09 IAQ Fan Location
Note:
Non-dwelling units do not meet the definition for a dwelling unit as defined in Section 100.1(b). Non-dwelling units are not
designed to provide independent living facilities and do not provide permanent provisions for living, sleeping, eating, cooking and
sanitation.
MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method
B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method
A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with
outdoor air each hour at no less than the rate in equation 4.1a.
01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81
02 Installed Continuous Whole-Building Ventilation Rate 140
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 2 of 7)
Registration Number:
424-P010255225A-001-008-M27005A-0000
Registration Date/Time: 2024-10-23 13:17:52 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
C. Compliance Statement
01 Building passes continuous whole-building ventilation rate test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 3 of 7)
Registration Number:
424-P010255225A-001-008-M27005A-0000
Registration Date/Time: 2024-10-23 13:17:52 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
D. Local Mechanical Exhaust System - Fan selection and duct design criteria for compliance
Local mechanical exhaust fans shall be installed in each kitchen and bathroom. Delivered local ventilation rates:
•All local ventilation rates have been measured using a flow hood, flow grid, or other airflow measuring device and meet the
requirements of 62.2 Tables 5.1 or 5.2. OR
•The airflow rating at a pressure of 0.25 in. w.c. of a certified fan is assumed because the local ventilation system duct sizing
meets the prescriptive requirements of 62.2 Table 5.3, or manufacturer's design criteria.
Table 5.1
Intermittent Local Ventilation Exhaust Airflow Rates
Application Airflow Notes
Kitchen 100 cfm
Vented range hood (including
appliance-range hood combinations)
required if exhaust fan flow is less than 5
ACH.
Bathroom 50 cfm
Table 5.2
Continuous Local Ventilation Exhaust Airflow Rates
Application Airflow Notes
Kitchen 5 ACH Based on Kitchen volume.
Bathroom 20 cfm
Table 5.3
Prescriptive Duct Sizing Requirements
Duct Type Flex Duct Smooth Duct
Fan Rating
cfm @ 0.25
in. w.g.
50 80 100 125 50 80 100 125
Maximum Allowable Duct Length (ft)
Diameter,
(in)Flex Duct Smooth Duct
3 X X X X 5 X X X
4 70 3 X X 105 35 5 X
5 NL 70 35 20 NL 135 85 55
6 NL NL 125 95 NL NL NL 145
7 and above NL NL NL NL NL NL NL NL
This table assumes no elbows. Deduct 15 ft of allowable duct length for each turn, elbow, or fitting. Interpolation and extrapolation
in 62.2 Table 5.3 is not allowed. For airflow values not listed, use the next higher value. This table is not applicable for airflow > 125
cfm.
NL = no limit on duct length of this size.
X = not allowed, any length of duct of this size with assumed turns, elbows, fittings will exceed the rated pressure drop.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 4 of 7)
Registration Number:
424-P010255225A-001-008-M27005A-0000
Registration Date/Time: 2024-10-23 13:17:52 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
E. Other Requirements
The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other
Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information
describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if
applicable.
01
6.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components to occupiable spaces from
garages, unconditioned crawl spaces, and unconditioned attics. Supply and balanced ventilation systems shall be designed
and constructed to provide ventilation air directly from the outdoors.
02
6.2 Instructions and Labeling.Information on the ventilation design and/or ventilation systems installed, instructions on
their proper operation to meet the requirements of this standard, and instructions detailing any required maintenance
(similar to that provided for HVAC systems) shall be provided to the owner and the occupant of the dwelling unit. Controls
shall be labeled as to their function (unless that function is obvious, such as toilet exhaust fan switches). See Chapter 13 of
Guideline 24 2 for information on instructions and labeling.
03 6.3 Clothes Dryers.Clothes dryers shall be exhausted directly to the outdoors
04
6.4 Combustion and Solid-Fuel Burning Appliances.Combustion and solid-fuel burning appliances must be provided with
adequate combustion and ventilation air and vented in accordance with manufacturer installation instructions, NFPA 54
ANSI Z223.1, National Fuel Gas Code, NFPA 31, Standard for the Installation of Oil-Burning Equipment, or NFPA 211,
Standard for Chimneys, Fireplaces, Vents, and Solid-Fuel Burning Appliances, or other equivalent code acceptable to the
building official.
Where atmospherically vented combustion appliances or solid-fuel burning appliances are located inside the pressure
boundary, the total net exhaust flow of the two largest exhaust fans (not including a summer cooling fan intended to be
operated only when windows or other air inlets are open) shall not exceed 15 cfm/100 ft 2 (75 Lps/100 m2) of occupiable
space when in operation at full capacity. If the designed total net flow exceeds this limit, the net exhaust flow must be
reduced by reducing the exhaust flow or providing compensating outdoor airflow. Atmospherically vented combustion
appliances do not include direct-vent appliances.
05
6.5 Garages.When an occupiable space adjoins a garage, the design must prevent migration of contaminants to the
adjoining occupiable space. Air seal the walls, ceilings, and floors that separate garages from occupiable space. To be
considered air sealed, all joints, seams, penetrations, openings between door assemblies and their respective jambs and
framing, and other sources of air leakage through wall and ceiling assemblies separating the garage from the residence and
its attic area shall be caulked, gasketed, weather stripped, wrapped, or otherwise sealed to limit air movement. Doors
between garages and occupiable spaces shall be gasketed or made substantially airtight with weather stripping.
06 6.6 Ventilation Opening Area.Spaces shall have ventilation openings as listed below. Such openings shall meet the
requirements of Section 6.8
07
6.7 Minimum Filtration.Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 ft (3 m)
in length and through a thermal conditioning component, except evaporative coolers, shall be provided with a filter having
a designated minimum efficiency of MERV 6, or better, when tested in accordance with ANSI ASHRAE Standard 52.2,
Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size, or a minimum Particle
Size Efficiency of 50 percent in the 3.0-10 µm range in accordance with AHRI Standard 680, Performance Rating of
Residential Air Filter Equipment. The system shall be designed such that all recirculated and mechanically supplied outdoor
air is filtered before passing through the thermal conditioning components. The filter shall be located and installed in such a
manner as to facilitate access and regular service by the owner.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 5 of 7)
Registration Number:
424-P010255225A-001-008-M27005A-0000
Registration Date/Time: 2024-10-23 13:17:52 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
E. Other Requirements
The items listed below (6.1 through 6.8) correspond to the information given in ASHRAE 62.2 Section 6 "Other
Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information
describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if
applicable.
08
6.8 Air Inlets.Air inlets that are part of the ventilation design shall be located a minimum of 10 ft (3 m) from known sources
of contamination such as a stack, vent, exhaust hood, or vehicle exhaust. The intake shall be placed so that entering air is
not obstructed by snow, plantings, or other material. Forced air inlets shall be provided with rodent insect screens (mesh
not larger than 1/2 inch).
09
6.9 Carbon Monoxide Detectors.A carbon monoxide alarm shall be installed in each dwelling unit in accordance with NFPA
720,Standard for the Installation of Carbon Monoxide (CO) Detection and Warning Equipment 14, and shall be consistent
with requirements of applicable laws, codes, and standards.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met.
F. Air Moving Equipment
The items listed below (7.1 through 7.3) correspond to the information given in ASHRAE 62.2 Section 7 Air-Moving
Equipment. Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.6) for information describing
these requirements in more detail. The signature of the Responsible Person in the declaration statement below
certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 7.1 through 7.3 if
applicable.
01
7.1 Selection and Installation.Ventilation devices and equipment shall be tested and listed in accordance with specific
standards. Installations of systems or equipment shall be carried out in accordance with manufacturers' design
requirements and installation instructions.
02
7.2 Sound Ratings for Fans.Ventilation fans shall be rated for sound at no less than the minimum airflow rate required by
this standard, as noted below. These sound ratings shall be at a minimum of 0.1 in. w.c. (25 Pa) static pressure.
7.2.1 Whole Building or Continuous Ventilation Fans.These fans shall be rated for sound at a maximum of 1.0 sone.
7.2.2 Intermittent Local Exhaust Fans.Fans used to comply with Section 5.2 shall be rated for sound at a maximum of 3
sone, unless their maximum rated airflow exceeds 400 cfm (200 L/s). (Some exceptions may apply.)
03
7.3 Multibranch Exhaust Ducting.If more than one of the exhaust fans in a dwelling unit shares a common exhaust duct,
each fan shall be equipped with a back draft damper to prevent the recirculation of exhaust air from one room to another
through the exhaust ducting system.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 6 of 7)
Registration Number:
424-P010255225A-001-008-M27005A-0000
Registration Date/Time: 2024-10-23 13:17:52 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
G. Multifamily Buildings -Other Requirements
The items listed below correspond to the information given in ASHRAE 62.2 Section 8 "Multifamily Buildings". Refer
also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.5) for information describing these
requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that
the building complies with these requirements specified in ASHRAE 62.2 Section 8, if applicable.
01
8.2 Whole-Building Mechanical Ventilation.For multifamily buildings, the term "building" in Section 4 refers to a single
dwelling unit.
8.4.1 Transfer Air.Measures shall be taken to minimize air movement across envelope components separating dwelling
units, including sealing penetrations in the common walls, ceilings, and floors of each unit and by sealing vertical chases
adjacent to the units. All doors between dwelling units and common hallways shall be gasketed or made substantially
airtight.
8.4.1.1 Compliance.One method of demonstrating compliance with Section 8.4.1 shall be to verify a leakage rate below a
maximum of 0.2 cfm/ ft2 (100 L/s per 100 m2) of the dwelling unit envelope area (i.e., the sum of the area of the walls
between dwelling units, exterior walls, ceiling and floor) at a test pressure of 50 Pa by a blower door test. The test shall be
conducted with the dwelling unit as if it were exposed to outdoor air on all sides, top, and bottom by opening doors and
windows of adjacent dwelling units.
8.5.1 Exhaust Ducts.Exhaust fans in separate dwelling units shall not share a common exhaust duct. Exhaust inlets from
more than one dwelling unit may be served by a single exhaust fan downstream of all the exhaust inlets if the fan is
designated and intended to run continuously or if each inlet is equipped with a back-draft damper to prevent
cross-contamination when the fan is not running.
8.5.2 Supply Ducts.Supply outlets to more than one dwelling unit may be served by a single fan upstream of all the supply
outlets if the fan is designed and intended to run continuously or if each supply outlet is equipped with a back-draft damper
to prevent cross-contamination when the fan is not running.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 7 of 7)
Registration Number:
424-P010255225A-001-008-M27005A-0000
Registration Date/Time: 2024-10-23 13:17:52 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-008-M20006A-0000
Registration Date/Time: 2024-10-23 13:18:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 208)
City: La Quinta Zip Code: 92253
A. System Information
01 Space Conditioning System Identification or Name UNIT 208 HVACSys
02 Space Conditioning System Location or Area Served Main
03 Building Type from CF-1R Multi-family
04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS)
Credit from CF1R?
No, credit is not taken
05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit
from CF1R?
No, credit is not taken
06 Duct System Compliance Category New
MCH-20a - Completely New Duct System
B. Duct Leakage Diagnostic Test
01 Condenser Nominal Cooling Capacity (ton)3
02 Heating Capacity (kBtu/h)36
03 Conditioned Floor Area Served by this HVAC System (ft2)931
04 Duct Leakage Test Conditions Test final
05 Duct Leakage Test Method Total leakage
06 Leakage Factor 0.12
07 Air Handling Unit Airflow (AHUAirflow) Determination
Method
Cooling system method
08 Measured AHUAirflow (cfm)This field or section is not applicable
09 Calculated Target Allowable Duct Leakage (cfm)144
10 Actual Duct Leakage Rate from Leakage Test Measurement
(cfm)
53.1
11 Compliance Statement System passes leakage test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 2 of 3)
Registration Number:
424-P010255225A-001-008-M20006A-0000
Registration Date/Time: 2024-10-23 13:18:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
C. Additional Requirements for Compliance
01 System was tested in its normal operation condition. No temporary taping allowed.
02
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage
testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation
Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required,
may configure the OA damper to the closed position during duct leakage testing.
03 All supply and return register boots were sealed to the drywall.
04 Building cavities were not used as plenums or platform returns in lieu of ducts.
05 If cloth backed tape was used it was covered with Mastic and draw bands.
06 All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in).
After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must
be performed
07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are
properly sealed.
08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points
between the air handler and the supply and return plenums to verify that the connection points are properly sealed.
09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 3 of 3)
Registration Number:
424-P010255225A-001-008-M20006A-0000
Registration Date/Time: 2024-10-23 13:18:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-008-M23007A-0000
Registration Date/Time: 2024-10-23 13:20:07 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 208)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 208 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement
B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP)
in the Supply Plenum.
Procedures for installing HSPP or PSPP are specified in RA3.3.1.1.
01 Method Used to Demonstrate Compliance with the
HSPP/PSPP Requirement
HSPP installed and labeled consistent with Figure RA3.3-1
C. Airflow Rate Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given
in RA3.3.2.
01 Airflow Rate Measurement Type used for this airflow rate
verification.
Traditional Flow Capture Hood according to procedure in
RA3.3.3.1.4
02 Manufacturer of Airflow Measurement Apparatus ALNOR
03 Model number of Airflow Measurement Apparatus EB† 731
04
Certification Status of the Airflow Measurement Apparatus
Accuracy
Certified by Manufacturer and listed on CEC Website at
http://www.energy.ca.gov/title24/equipment_cert/ama_fas
/index.html
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 2 of 3)
Registration Number:
424-P010255225A-001-008-M23007A-0000
Registration Date/Time: 2024-10-23 13:20:07 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
D. Forced Air System Airflow Rate Measurement
The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3.
01 Required Minimum System Airflow Rate (cfm/ton)350
02 Required Minimum System Airflow Target (cfm)1050
03 Actual System Airflow Rate Measurement (cfm)1052
04 Compliance Statement:System airflow rate complies
E. Additional Requirements
01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in
the system during system air flow rate measurement identified on this Certificate of Installation.
02
The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of
Installation was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the
instrumentation specifications given in RA3.3.1.
03
A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning
system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate
of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance
Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance.
04 All registers were fully open during the diagnostic test.
05 System fan was set at maximum speed during the diagnostic test.
06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
08
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-23-H
Space Conditioning System Airflow Rate (Page 3 of 3)
Registration Number:
424-P010255225A-001-008-M23007A-0000
Registration Date/Time: 2024-10-23 13:20:07 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-008-M22008A-0000
Registration Date/Time: 2024-10-23 13:20:31 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 208)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 208 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement
B. Fan Watt Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in
RA3.3.2.2.
01 Fan Watt Verification Device Used.Portable watt meter
MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
01 Actual Tested Watts 610.16
02 Actual Tested Airflow from MCH-23 (cfm)1052
03 Required Fan Efficacy (watts/cfm)0.58
04 Actual Fan Efficacy (watts/cfm)0.58
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 2 of 3)
Registration Number:
424-P010255225A-001-008-M22008A-0000
Registration Date/Time: 2024-10-23 13:20:31 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
05 Compliance Statement:System fan efficacy complies
D. Additional Requirements
01 All registers were fully open during the diagnostic test.
02 System fan was set at maximum speed during the diagnostic test.
03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
05
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy
(Watt/cfm) criteria in every zonal control mode.
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 3 of 3)
Registration Number:
424-P010255225A-001-008-M22008A-0000
Registration Date/Time: 2024-10-23 13:20:31 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-008-M26009A-0000
Registration Date/Time: 2024-10-23 13:20:48 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 208)
City: La Quinta Zip Code: 92253
A. System Information
Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system
requiring verification must use a separate form.
01 System Name or Identification/Tag UNIT 208 HVACSys
02 System Location or Area Served Main
03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required
04 Directory used to certify product performance AHRI
05 AHRI certification number for the installed space
conditioning system from http://www.ahridirectory.org
208650564
06 Does the directory used to certify product performance
require a specific air handler/furnace make and model?
Yes
07 Does the directory used to certify product performance
require a time delay relay (+TDR)?
Yes
08 Does the directory used to certify product performance
require a TXV (+TXV)?
Yes
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the
Directory used to certify product performance in order to demonstrate compliance.
Data from Nameplate of Installed system
component
Data from the Directory used to certify
product performance for the rated system
component
Outdoor Condenser or Package Unit -
Installed Manufacturer Name
01 RHEEM 02 RHEEM
Outdoor Condenser or Package Unit -
Installed Model Number
03 RHPAZR036JT000NA 04 RHPAZR036JT000NA
Inside Coil - Installed Manufacturer
Name
05 06 This field or section is not applicable
Inside Coil - Installed Model Number 07 08 This field or section is not applicable
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 2 of 3)
Registration Number:
424-P010255225A-001-008-M26009A-0000
Registration Date/Time: 2024-10-23 13:20:48 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the
Directory used to certify product performance in order to demonstrate compliance.
Air Handler/Furnace - Installed
Manufacturer Name
09 10 RHEEM
Air Handler/Furnace - Installed Model
Number
11 12 RHPAZR036AJT
C. Verified Cooling System SEER
01 Required minimum SEER 15
02 Installed SEER 15
03 Compliance Statement:System passes SEER verification
Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed
on the CF1R.
D. Verified Cooling System EER
This section does not apply to this project.
E. Verified Cooling System Air Handler/Furnace
01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party
certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory.
F. Verified Cooling System Time Delay Relay
01
If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by
signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of
RA3.4.3.
G. Verified Cooling System TXV
01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below
that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF INSTALLATION CF2R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 3 of 3)
Registration Number:
424-P010255225A-001-008-M26009A-0000
Registration Date/Time: 2024-10-23 13:20:48 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:32
Documentation Author's Declaration Statement
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Paul Marcinkowski
Documentation Author Signature:
Company:
Muskoka Development LLC
Signature Date:
2024-10-23
Address:
3245 University Ave Ste 1-232
CEA/ HERS Certification Identification (if applicable):
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Installation is true and correct.
2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept
responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work
identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible
person and attest to the declarations in this statement on the responsible person’s behalf.
3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and
specifications approved by the enforcement agency.
4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am
required to offer any necessary corrective action at no charge to the building owner.
5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Paul Marcinkowski
Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or
Builder/Owner)
Muskoka Development LLC
Position With Company (Title):
Address:
3245 University Ave Ste 1-232
CSLB License:
1100564
City/State/Zip:
San Diego CA 92104
Phone:
7607994638
Date Signed:
2024-10-23
Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-001-E21001A-E21A
Registration Date/Time: 2024-10-23 13:21:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:33
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 6)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 105)
City: La Quinta Zip Code: 92253
A. Air Infiltration And Insulation Installation (Qii) - Framing Stage
01 The requirements below cover the required air sealing and installation of insulation that must occur in the framing stage.
02
An air barrier is required in all thermal envelope assemblies to limit air movement between unconditioned/outside spaces
and conditioned/inside spaces and must meet one of the following:
1.Using individual materials that have an air permeance not exceeding 0.004 cfm/ft 2 under pressure differential of 0.3
in w.g. (1.57 psf) (0.02 L/s.m2 at 75 pa) when tested in accordance with ASTM E2178; or
•A list of example materials meeting the air permenace testing performance levels of 1 above is available in
RA3.5.2
2.Using assemblies of materials and components that have an average air leakage not to exceed 0.04 cfm/ft 2 under a
pressure differential of 0.3 in w.g. (1.57 psf) (0.2 L/s.m2 at 75 pa) when tested in accordance with ASTM E2357,
ASTM E1677, ASTM E1680 or ASTM E283, or
3.Testing the complete building and demonstrating that the air leakage rate of the building envelope does not exceed
0.4 cfm/ft2 at a pressure differential of 0.3 in w.g. (1.57 psf) (2.0 L/m2 at 75 pa) in accordance with ASTM E779 or an
equivalent approved method.
03 Air Barrier Material Installed
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Raised Floor
01 All gaps in the raised floor are sealed.
02 All chases sealed at floor level using a hard cover and the hard covers are sealed.
03 All Plumbing and electrical wires that penetrate the floor are sealed.
04 Subfloor sheathing is glued or sealed at all exterior panel edges, to create a continuous air tight subfloor.
05 Verification Status Pass - all applicable requirements are met
06 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 2 of 6)
Registration Number:
424-P010255225A-001-001-E21001A-E21A
Registration Date/Time: 2024-10-23 13:21:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:33
C. Walls/Knee Walls
01 All penetrations through the exterior wall air barrier are sealed to provide an air-tight envelope to unconditioned spaces
such as the outdoors, attic, garage and crawl space.
02 Exterior wall air barrier is sealed to the top plate and bottom plate in each stud bay.
03 All electrical boxes including knockouts that penetrate the air barrier to unconditioned space are sealed.
04 All openings in top and bottom plate, including all interior and exterior walls, to unconditioned space are sealed. Such as
holes drilled for electrical and plumbing.
05 Exterior bottom plates (all stories) are sealed to the floor using the appropriate sealing method.
06 All gaps around windows and doors are sealed. Proper sealant used was specified by window manufacturer.
07 Rim Joists all gaps and openings fully sealed.
08 Fan exhaust ducts that run between conditioned floors to exterior walls have a damper at the exterior wall.
09 Metal tie downs are insulated between exterior framing and tie down.
10 Insulation is installed in hard to access wall stud cavities, such as corner channels, wall intersections are insulated to the
proper R-value prior to exterior sheathing, or the exterior stucco lath.
11 Insulation is installed behind tub, shower, fireplace enclosures, and exterior stairwells to the R-value listed on the CF1R
when located against exterior walls. Insulation is required to be installed before tub, shower, and fireplace are installed.
12 A solid air barrier is installed on the interior wall from floor to ceiling tub, shower, and fireplace enclosures are installed in
exterior walls. Insulation in contact on all six sides of air barrier on exterior walls.
13
All single-member window and door headers shall be insulated to a minimum of R-3 for a 2x4 framing, or equivalent width,
and a minimum of R-5 for all other assemblies. Insulation is to be placed between the interior face of the header and inside
surface of the interior wall finish. If continuous exterior rigid insulation is used an insulated header is not required. No
header insulation is required for single-member headers that are the same width as the wall, so long as the entire wall has
at least R-2 insulation.
14 Knee walls have solid and sealed blocking at the bottom, top, left side and right side of the knee wall.
15 Verification Status Pass - all applicable requirements are met
16 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Ceiling/Attic
01 For vented attics much of the ceiling air barrier is verified after the ceiling drywall is installed using the ENV-22.
02 For non-vented attics ensure all penetrations through the roof deck and gable ends are sealed and air tight.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 3 of 6)
Registration Number:
424-P010255225A-001-001-E21001A-E21A
Registration Date/Time: 2024-10-23 13:21:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:33
D. Ceiling/Attic
03 All eave vents are covered with a rigid ventilation baffle that maintains the Net free-ventilation area.
04 All dropped ceilings and soffits are covered with hard covers and sealed to framing.
05 All chases are covered with hard covers and sealed to framing.
06 HVAC ducts that travel down a chase the chase is sealed at the ceiling level.
07 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The
flashing shall be sealed to the surrounding framing.
08 All Eave/soffit baffles are installed to stop air movement around the baffle and into insulation. Net free-ventilation of the
eave/soffit shall be maintained.
09 Double walls that open to attic are covered with an air barrier and cover has an air tight seal to the framing.
10 Verification Status Pass - all applicable requirements are met
11 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Conditioned Space Above Or Adjacent To Garage Air Barrier
01 All penetrations in the subfloor above the garage into conditioned space must follow the raised floor air barrier
requirements above.
02
Infiltration between the space above the garage and subfloor is prevented by one of the following methods:
•Seal all edges of garage ceiling (typically drywall) at the perimeter of the garage to create a continuous air tight
surface between the garage and adjacent conditioned envelope. Seal all plumbing, electric and mechanical
penetrations between the garage and the adjacent conditioned space. For an open-web truss, airtight blocking is
added on four sides of the garage perimeter. Insulation can be placed on the garage ceiling.
•Seal band joist above the wall at the garage to conditioned space transition. Seal all subfloor seams and penetrations
between the conditioned space and the garage. Insulation must be placed in contact of subfloor below conditioned
space.
03 Verification Status Pass - all applicable requirements are met
04 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
F. Walls For Attached Porch, Attic, Double Wall
01 All walls that separate conditioned and unconditioned space includes a continuous air barrier on the interior and exterior
wall.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 4 of 6)
Registration Number:
424-P010255225A-001-001-E21001A-E21A
Registration Date/Time: 2024-10-23 13:21:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:33
F. Walls For Attached Porch, Attic, Double Wall
02 Exterior wall, air barrier required at the intersection of the porch and exterior wall when there is conditioned space on the
other side. The exterior wall where the attic attaches to the conditioned space does includes an air barrier.
03 Truss framing blocking is used at the top and bottom of each wall/roof section.
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
G. Cantilevered Floor Air Barrier
01 Airtight blocking is installed between joists where the wall rim joist would have been located in the absence of a cantilever.
02
Exterior sheathing is installed to the bottom of the cantilever so that there is a continuous air and weather barrier for the
cantilever. The cantilevered joist must be insulated to the same R value as would be required for the subfloor prior to
closing.
03 Any gaps, cracks or penetrations in the air barrier of the cantilever are sealed. Can lights in the cantilever are IC and AT
rated and properly sealed to sheathing.
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Multifamily Air Barrier
01 Multifamily buildings must meet all air sealing requirements for single family buildings listed above.
02 Each dwelling unit must be air sealed to stop air movement from one unit to another.
03 Floor AND Ceiling of each Dwelling Unit: All penetrations through the floor and ceiling of each unit are sealed including,
electric and gas utilities, water pipes, drain pipes, fire protection service pipes, communication wiring.
04 Elevator penthouse, mechanical penthouse, stairwell doors, roof access hatch, plumbing stacks sealed to reduce air transfer
from attached spaces.
05
Common Walls: Bottom plate between units is sealed to the subfloor. All penetrations in the common walls are sealed
including electrical boxes, wiring and plumbing penetrations. Perpendicular Interior walls that open into the common walls
are sealed.
06 Vertical Chases for garbage chutes, elevator shafts, and HVAC ducting plumbing must be sealed to the floor and ceiling of
each unit to stop air movement up and around the chase due to stack effect.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 5 of 6)
Registration Number:
424-P010255225A-001-001-E21001A-E21A
Registration Date/Time: 2024-10-23 13:21:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:33
H. Multifamily Air Barrier
07 Vertical Chases such as garbage chutes, elevator shafts, and HVAC ducting plumbing, wiring etc. must be sealed to stop air
movement through the chase to the surrounding spaces.
08 Common Hallways - Penetrations between dwelling unit and common hallways are sealed, doors to the dwelling unit are
gasketed or made substantially airtight .
09 Verification Status Pass - all applicable requirements are met
10 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
I. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 6 of 6)
Registration Number:
424-P010255225A-001-001-E21001A-E21A
Registration Date/Time: 2024-10-23 13:21:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:33
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-001-E22002A-E22A
Registration Date/Time: 2024-10-23 13:21:34 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:33
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 105)
City: La Quinta Zip Code: 92253
For typical vented attics where the insulation is at the roof deck ceiling air barrier must be verified after the ceiling drywall is
installed and before attic insulation is installed. If SPF will be used in the attic this can be considered the air barrier. Soffit and
chases must still be covered and chimneys and flues require metal flashing. Buildings with a Non vented attic all air sealing
requirements appropriate for the roof must be verified.
A. Ceiling Inspection - Vented Attics
01 If there is a continuous air barrier at the ceiling level; All opening into walls, drops, chasses, double walls are sealed.
Examples are below.
02 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The
flashing shall be sealed to the surrounding framing.
03 All penetration through the top plate of interior and exterior walls are sealed.
04 All penetrations shall be sealed to the surrounding drywall or have a secondary air barrier created around the fixture; with
the exception of fire sprinklers.
05
All installed recessed light fixtures that penetrate the ceiling to unconditioned space, or where insulation is present, are
rated to be Insulation Contact and Air Tight (IC and AT) which allows direct contact with insulation. Housing is sealed to the
drywall.
06 Exhaust fan housing is sealed to surrounding drywall and all holes and seams in the housing sealed.
07 All soffits and chases are covered with a hard cover that is sealed to the framing with caulk or foam.
08 Double walls that open to attic are covered and the cover sealed to the framing.
09 Attic Access forms airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical
compression using screws, or latches.
10 Knee walls require solid and sealed blocking at the bottom, top left side and right side of the knee wall. When the knee wall
is placed on top of a subfloor the open cavity below the subfloor and the ceiling below are sealed.
11 HVAC ducts that travel down a chase the chase are sealed at the ceiling level.
12 HVAC boots that penetrate the ceiling are sealed to the surrounding drywall.
13 All top plates of interior and exterior walls sealed to drywall.
14 Attic access must be surrounded with a dam at least the same depth as the insulation to prevent loss of ceiling insulation.
15 There must be a dam placed at the exterior edge of all kneewalls and all edges of insulation to stop air movement through
insulation.
16 Verification Status:Pass - all applicable requirements are met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 2 of 3)
Registration Number:
424-P010255225A-001-001-E22002A-E22A
Registration Date/Time: 2024-10-23 13:21:34 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:33
A. Ceiling Inspection - Vented Attics
17 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Roof Inspection - Non-Vented Attics
01 There is a continuous air barrier at the roof deck and gable ends.
02 Chimney and Flue require sheet metal flashing at the roof deck. The flashing is sealed to the chimney or flue with fire rated
caulk. The flashing is sealed to the surrounding framing.
03 All penetrations for plumbing, electrical etc in the roof deck and gable ends are sealed.
04 Verification Status:Pass - all applicable requirements are met
05 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
C. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 3 of 3)
Registration Number:
424-P010255225A-001-001-E22002A-E22A
Registration Date/Time: 2024-10-23 13:21:34 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:33
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-001-E23003A-E23A
Registration Date/Time: 2024-10-23 13:21:36 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:34
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 1 of 7)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 105)
City: La Quinta Zip Code: 92253
A. Quality Insulation Installation (QII) Preparation For Insulation
01 Air barrier installation and preparation for insulation was done and verified at framing stage prior to insulation being
installed. Where applicable, CF3R-ENV21 and 22 compliance documents have been signed off.
02
All structural framing areas shall be insulated in a manner that resists thermal bridging of the assembly separating
conditioned from unconditioned space. Structural bracing, tie-downs, and framing of steel, or specialized framing used to
meet structural requirements of the CBC are allowed and must be insulated. These areas shall be called out on the building
plans with diagrams and or specific design drawings indicating the R-value of insulation and fastening method to be used. It
is recommended that spray foam be used.
03 All insulation was installed to the manufactures insulation installation instructions.
04 Verification Status:Pass - all applicable requirements are met
05 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Quality Of All Installed Insulation
01 Installed insulation R-values is the same or greater than specified on the CF1R.
02 No gaps or voids between the insulation and framing.
03 Gaps between studs shall be filled with insulation.
04 Batt - ensure the ends are cut so there are no gaps.
05 Batt - Insulation is cut around obstructions like electrical boxes and no gaps exist.
06 Batt - insulation is not compressed (no stuffing of the insulation into the cavity.
07 Batt insulation is delaminated around all plumbing and electrical lines in ceilings, walls and floors.
08 An air barrier is installed at all exposed faces of batt, loose fill and SPF insulation.
09 Loose-fill insulation installed to the minimum installed weight per ft 2 per the manufacturer labeled R-value specification.
10 SPF insulation shall be spray-applied to fully adhere to structural assembly framing, floor and ceiling joists, and other
framing surfaces within the construction cavity.
11 SPF - with multiple layers applied, each foam lift (i.e. spray application) adheres to the substrate and foam interfaces.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 2 of 7)
Registration Number:
424-P010255225A-001-001-E23003A-E23A
Registration Date/Time: 2024-10-23 13:21:36 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:34
B. Quality Of All Installed Insulation
12 SPF - if values other than R-5.8 per inch for closed-cell SPF (ccSPF) and R-3.6 per inch for open-cell SPF (ocSPF) are used, the
ICC Evaluation Service Report (ESR) number (e.g. ESR-xxxx) will be documented in the CF2R-ENV-03.
13 ccSPF in areas where an air barrier is required the foam is at least 2 inches thick.
14 ocSPF depressions in the foam insulation surface is not greater than 1-inch of the required thickness provided these
depressions do not exceed 10 percent of the surface area being insulated.
15 ocSPF insulation completely fills cavities of 2x4 inch framing or less.
16 ocSPF cavities greater than 2x4 inch framing are filled to the thickness that meets the required R-value used for compliance.
17 SPF installed as an air barrier is sprayed at a minimum thickness of 5.5 inches for open cell and 2.0 inches for closed cell.
18
The insulation installer provided a CF2R-ENV-03. Labels or specification/data sheets are attached to the CF2R-ENV-03 for
each insulating material. The material datasheet for the installed material meets the performance specifications of the
required R-Values. Blown in material also includes insulation material bag labels or coverage charts.
19 Verification Status:Pass - all applicable requirements are met
20 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
C. Ceiling/Roof Insulation Quality
01 Insulation extends to the outside edge of the exterior top plates and is flush against any ventilation dams or baffles.
02 Insulation is in direct contact with ceiling so there are no gaps between the ceiling and the insulation.
03
Chimneys and flues (except for zero clearance) require a sheet metal collar around the stack. The collar must be at least as
tall as the depth of the insulation. The collar shall be 1 inch from the chimney or flue for double wall vents, and 6 inches
from the chimney/flue for single wall vents unless the manufacturer requires otherwise. The collar must be sealed to the
ceiling with high temperature sealant to prevent air leakage. The insulation is in contact with the sheet metal collar.
04 Required eave ventilation shall not be obstructed - the net free-ventilation area of the eave vent is maintained
05 Eave vent baffles are installed to prevent air movement under or into the ceiling insulation
06 Recessed downlights are covered with insulation. If they are not covered to the same depth as required by the CF1R for
ceiling insulation then a area weighted calculation is required. Recessed downlights are AT and IC rated.
07
SPF insulation shall not be applied directly to recessed lighting fixtures. Recessed downlights where SPF insulation is
installed shall:
(a) be covered with a minimum of 1.5 inches of mineral fiber insulation, or
(b) be enclosed in a box fabricated from 1/4 inch plywood, 18 gauge metal, 3/8 inch hard board or gypboard. Hard board
or gypboard does not cause a recessed downlights to meet the zero clearance insulation contact requirements.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 3 of 7)
Registration Number:
424-P010255225A-001-001-E23003A-E23A
Registration Date/Time: 2024-10-23 13:21:36 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:34
C. Ceiling/Roof Insulation Quality
08 Walkways and mechanical platforms are insulated to the same R-value as required by the CF1R for ceiling insulation. If not,
an area weighted calculation is completed and turned in with this compliance document.
09 Soffits, chasses and drop ceiling areas have a sealed hard cover and the insulation is in direct contact with the hard cover.
10 Knee walls - an air dam the full depth of the ceiling insulation is added to the exterior edge of the knee wall so the ceiling
insulation overlaps the knee wall to the full depth of the ceiling insulation.
11 Attic access doors are insulated to the same R-value required by the CF1R for roof insulation and the insulation is
permanently attached using adhesive or mechanical fasteners. The preferred method is rigid insulation.
12 Attic access forms an airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical
compression using screws, or latches.
13 Attic access must have a dam around the access to at least the same depth as the insulation.
14 Insulation batts must be cut to fit around cross bracings and truss webs.
15
Attic rulers appropriate to the material are installed and evenly distributed throughout the attic to verify depth (one ruler
for every 250 ft2) The rulers are clearly readable from the attic access and scaled to read inches of insulation and the
R-value installed.
16
Loose-fill and SPF insulation - a HERS rater shall measure the installed thickness (including low and high areas) and density
of insulation in at least 6 random locations on roof/ceilings and floors to ensure minimum thickness levels and installed
density necessary to meet the R-value specified on the Certificate of Compliance, and consistency with the manufacturer
coverage chart.
17 Steel-framed knee walls, skylight shafts, and gable ends, external surfaces of steel studs are covered with insulation
18 Verification Status:Pass - all applicable requirements are met
19 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Wall Insulation
01 Batts, loose fill mineral fiber, mineral and natural wool, and cellulose:fills cavity and is in contact with air barrier on six
sides.
02 ocSPF:completely fill cavities of 2x4 inch framing or less. Not required to fill cavities greater than 2x4 inch framing unless
required to meet R-value.
03 ccSPF:insulation is not required to fill the cavities of framed assemblies unless required to meet R-value.
04
Double walls and bump-outs - insulation fills the cavity, or additional air barrier is installed so the insulation fills the cavity
and is in contact with the insulation on all six sides unless SPF is used. Insulation shall be installed on the exterior of the
double walls or bump-outs.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 4 of 7)
Registration Number:
424-P010255225A-001-001-E23003A-E23A
Registration Date/Time: 2024-10-23 13:21:36 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:34
D. Wall Insulation
05 Low expanding foam used around windows and doors, if allowed by the manufacturer. If not allowed fill cavity with
insulation. Batts are not allowed to be stuffed into space.
06 Electrical panel in exterior insulated wall the panel is air tight and insulation is installed behind the panel.
07 Skylight shafts and attic knee wall insulation must meet all the requirements for walls and is in contact with the air barrier
on six sides unless SPF is used.
08 Skylight shafts and attic kneewalls insulation shall be in full contact with the drywall or other interior wall finish. Batt
insulation must be cut to fit around 2x4 framing that are laid flat.
09 Skylight shafts and attic kneewalls shall be completely enclosed by vertical and horizontal framing, including horizontal
plates at top and bottom of the insulation.
10 Band/Rim joists are insulated to the same R-value as the wall.
11 Verification Status:Pass - all applicable requirements are met
12 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Raised Floor Insulation Quality
01 Insulation is in full contact with subfloor.
02 Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation.
03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor.
04 When daylight basements are adjacent to crawlspaces, if the basement is conditioned the walls adjacent to the crawlspace
are insulated to the R-value listed on the CF1R. This includes framed stem walls, and vertical concrete retaining walls.
05 If access to the crawlspace is from the conditioned area the raised floor includes an airtight insulated access hatch. Where
possible locate crawl space access from the exterior.
06 Verification Status:Pass - all applicable requirements are met
07 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
F. Floor Above Garage Insulation Quality
01 Insulation must be in full contact with subfloor if the air barrier is at the band joist at the garage house wall.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 5 of 7)
Registration Number:
424-P010255225A-001-001-E23003A-E23A
Registration Date/Time: 2024-10-23 13:21:36 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:34
F. Floor Above Garage Insulation Quality
02 Insulation hangers spaced at 18 inches or less, insulation hangers must not compress insulation.
03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor.
04 If air barrier is at the perimeter of the garage below the conditioned subfloor then the insulation may be placed on the
garage ceiling. Perimeter of subfloor must also be insulated.
05 Verification Status:Pass - all applicable requirements are met
06 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
G. Cantilevered Floor Insulation Quality
01
Insulation is in full contact with cantilevered subfloor. Insulation hangers are spaced at 18 inches or less, insulation hangers
do not compress insulation. Netting or mesh can be used if the cavity under the floor is filled and in contact with the
subfloor.
02 Sealed Blocking shall be installed between joists where the wall rim joist would have been located in the absence of a
cantilever. Insulation shall be placed on both sides of this block.
03 Verification Status:Pass - all applicable requirements are met
04 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Attached Porch Roof Insulation Quality
01 Exterior wall at the intersection of the porch roof is fully insulated above, below and behind the roof line.
02 Where truss framing is used, airtight blocking is used at the top and bottom of each wall/roof section and insulated.
03 Verification Status:Pass - all applicable requirements are met
04 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 6 of 7)
Registration Number:
424-P010255225A-001-001-E23003A-E23A
Registration Date/Time: 2024-10-23 13:21:36 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:34
I. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 7 of 7)
Registration Number:
424-P010255225A-001-001-E23003A-E23A
Registration Date/Time: 2024-10-23 13:21:36 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:34
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-002-E21001A-E21A
Registration Date/Time: 2024-10-23 13:22:17 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:37
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 6)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 106)
City: La Quinta Zip Code: 92253
A. Air Infiltration And Insulation Installation (Qii) - Framing Stage
01 The requirements below cover the required air sealing and installation of insulation that must occur in the framing stage.
02
An air barrier is required in all thermal envelope assemblies to limit air movement between unconditioned/outside spaces
and conditioned/inside spaces and must meet one of the following:
1.Using individual materials that have an air permeance not exceeding 0.004 cfm/ft 2 under pressure differential of 0.3
in w.g. (1.57 psf) (0.02 L/s.m2 at 75 pa) when tested in accordance with ASTM E2178; or
•A list of example materials meeting the air permenace testing performance levels of 1 above is available in
RA3.5.2
2.Using assemblies of materials and components that have an average air leakage not to exceed 0.04 cfm/ft 2 under a
pressure differential of 0.3 in w.g. (1.57 psf) (0.2 L/s.m2 at 75 pa) when tested in accordance with ASTM E2357,
ASTM E1677, ASTM E1680 or ASTM E283, or
3.Testing the complete building and demonstrating that the air leakage rate of the building envelope does not exceed
0.4 cfm/ft2 at a pressure differential of 0.3 in w.g. (1.57 psf) (2.0 L/m2 at 75 pa) in accordance with ASTM E779 or an
equivalent approved method.
03 Air Barrier Material Installed
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Raised Floor
01 All gaps in the raised floor are sealed.
02 All chases sealed at floor level using a hard cover and the hard covers are sealed.
03 All Plumbing and electrical wires that penetrate the floor are sealed.
04 Subfloor sheathing is glued or sealed at all exterior panel edges, to create a continuous air tight subfloor.
05 Verification Status Pass - all applicable requirements are met
06 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 2 of 6)
Registration Number:
424-P010255225A-001-002-E21001A-E21A
Registration Date/Time: 2024-10-23 13:22:17 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:37
C. Walls/Knee Walls
01 All penetrations through the exterior wall air barrier are sealed to provide an air-tight envelope to unconditioned spaces
such as the outdoors, attic, garage and crawl space.
02 Exterior wall air barrier is sealed to the top plate and bottom plate in each stud bay.
03 All electrical boxes including knockouts that penetrate the air barrier to unconditioned space are sealed.
04 All openings in top and bottom plate, including all interior and exterior walls, to unconditioned space are sealed. Such as
holes drilled for electrical and plumbing.
05 Exterior bottom plates (all stories) are sealed to the floor using the appropriate sealing method.
06 All gaps around windows and doors are sealed. Proper sealant used was specified by window manufacturer.
07 Rim Joists all gaps and openings fully sealed.
08 Fan exhaust ducts that run between conditioned floors to exterior walls have a damper at the exterior wall.
09 Metal tie downs are insulated between exterior framing and tie down.
10 Insulation is installed in hard to access wall stud cavities, such as corner channels, wall intersections are insulated to the
proper R-value prior to exterior sheathing, or the exterior stucco lath.
11 Insulation is installed behind tub, shower, fireplace enclosures, and exterior stairwells to the R-value listed on the CF1R
when located against exterior walls. Insulation is required to be installed before tub, shower, and fireplace are installed.
12 A solid air barrier is installed on the interior wall from floor to ceiling tub, shower, and fireplace enclosures are installed in
exterior walls. Insulation in contact on all six sides of air barrier on exterior walls.
13
All single-member window and door headers shall be insulated to a minimum of R-3 for a 2x4 framing, or equivalent width,
and a minimum of R-5 for all other assemblies. Insulation is to be placed between the interior face of the header and inside
surface of the interior wall finish. If continuous exterior rigid insulation is used an insulated header is not required. No
header insulation is required for single-member headers that are the same width as the wall, so long as the entire wall has
at least R-2 insulation.
14 Knee walls have solid and sealed blocking at the bottom, top, left side and right side of the knee wall.
15 Verification Status Pass - all applicable requirements are met
16 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Ceiling/Attic
01 For vented attics much of the ceiling air barrier is verified after the ceiling drywall is installed using the ENV-22.
02 For non-vented attics ensure all penetrations through the roof deck and gable ends are sealed and air tight.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 3 of 6)
Registration Number:
424-P010255225A-001-002-E21001A-E21A
Registration Date/Time: 2024-10-23 13:22:17 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:37
D. Ceiling/Attic
03 All eave vents are covered with a rigid ventilation baffle that maintains the Net free-ventilation area.
04 All dropped ceilings and soffits are covered with hard covers and sealed to framing.
05 All chases are covered with hard covers and sealed to framing.
06 HVAC ducts that travel down a chase the chase is sealed at the ceiling level.
07 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The
flashing shall be sealed to the surrounding framing.
08 All Eave/soffit baffles are installed to stop air movement around the baffle and into insulation. Net free-ventilation of the
eave/soffit shall be maintained.
09 Double walls that open to attic are covered with an air barrier and cover has an air tight seal to the framing.
10 Verification Status Pass - all applicable requirements are met
11 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Conditioned Space Above Or Adjacent To Garage Air Barrier
01 All penetrations in the subfloor above the garage into conditioned space must follow the raised floor air barrier
requirements above.
02
Infiltration between the space above the garage and subfloor is prevented by one of the following methods:
•Seal all edges of garage ceiling (typically drywall) at the perimeter of the garage to create a continuous air tight
surface between the garage and adjacent conditioned envelope. Seal all plumbing, electric and mechanical
penetrations between the garage and the adjacent conditioned space. For an open-web truss, airtight blocking is
added on four sides of the garage perimeter. Insulation can be placed on the garage ceiling.
•Seal band joist above the wall at the garage to conditioned space transition. Seal all subfloor seams and penetrations
between the conditioned space and the garage. Insulation must be placed in contact of subfloor below conditioned
space.
03 Verification Status Pass - all applicable requirements are met
04 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
F. Walls For Attached Porch, Attic, Double Wall
01 All walls that separate conditioned and unconditioned space includes a continuous air barrier on the interior and exterior
wall.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 4 of 6)
Registration Number:
424-P010255225A-001-002-E21001A-E21A
Registration Date/Time: 2024-10-23 13:22:17 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:37
F. Walls For Attached Porch, Attic, Double Wall
02 Exterior wall, air barrier required at the intersection of the porch and exterior wall when there is conditioned space on the
other side. The exterior wall where the attic attaches to the conditioned space does includes an air barrier.
03 Truss framing blocking is used at the top and bottom of each wall/roof section.
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
G. Cantilevered Floor Air Barrier
01 Airtight blocking is installed between joists where the wall rim joist would have been located in the absence of a cantilever.
02
Exterior sheathing is installed to the bottom of the cantilever so that there is a continuous air and weather barrier for the
cantilever. The cantilevered joist must be insulated to the same R value as would be required for the subfloor prior to
closing.
03 Any gaps, cracks or penetrations in the air barrier of the cantilever are sealed. Can lights in the cantilever are IC and AT
rated and properly sealed to sheathing.
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Multifamily Air Barrier
01 Multifamily buildings must meet all air sealing requirements for single family buildings listed above.
02 Each dwelling unit must be air sealed to stop air movement from one unit to another.
03 Floor AND Ceiling of each Dwelling Unit: All penetrations through the floor and ceiling of each unit are sealed including,
electric and gas utilities, water pipes, drain pipes, fire protection service pipes, communication wiring.
04 Elevator penthouse, mechanical penthouse, stairwell doors, roof access hatch, plumbing stacks sealed to reduce air transfer
from attached spaces.
05
Common Walls: Bottom plate between units is sealed to the subfloor. All penetrations in the common walls are sealed
including electrical boxes, wiring and plumbing penetrations. Perpendicular Interior walls that open into the common walls
are sealed.
06 Vertical Chases for garbage chutes, elevator shafts, and HVAC ducting plumbing must be sealed to the floor and ceiling of
each unit to stop air movement up and around the chase due to stack effect.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 5 of 6)
Registration Number:
424-P010255225A-001-002-E21001A-E21A
Registration Date/Time: 2024-10-23 13:22:17 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:37
H. Multifamily Air Barrier
07 Vertical Chases such as garbage chutes, elevator shafts, and HVAC ducting plumbing, wiring etc. must be sealed to stop air
movement through the chase to the surrounding spaces.
08 Common Hallways - Penetrations between dwelling unit and common hallways are sealed, doors to the dwelling unit are
gasketed or made substantially airtight .
09 Verification Status Pass - all applicable requirements are met
10 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
I. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 6 of 6)
Registration Number:
424-P010255225A-001-002-E21001A-E21A
Registration Date/Time: 2024-10-23 13:22:17 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:37
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-002-E22002A-E22A
Registration Date/Time: 2024-10-23 13:22:20 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:37
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 106)
City: La Quinta Zip Code: 92253
For typical vented attics where the insulation is at the roof deck ceiling air barrier must be verified after the ceiling drywall is
installed and before attic insulation is installed. If SPF will be used in the attic this can be considered the air barrier. Soffit and
chases must still be covered and chimneys and flues require metal flashing. Buildings with a Non vented attic all air sealing
requirements appropriate for the roof must be verified.
A. Ceiling Inspection - Vented Attics
01 If there is a continuous air barrier at the ceiling level; All opening into walls, drops, chasses, double walls are sealed.
Examples are below.
02 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The
flashing shall be sealed to the surrounding framing.
03 All penetration through the top plate of interior and exterior walls are sealed.
04 All penetrations shall be sealed to the surrounding drywall or have a secondary air barrier created around the fixture; with
the exception of fire sprinklers.
05
All installed recessed light fixtures that penetrate the ceiling to unconditioned space, or where insulation is present, are
rated to be Insulation Contact and Air Tight (IC and AT) which allows direct contact with insulation. Housing is sealed to the
drywall.
06 Exhaust fan housing is sealed to surrounding drywall and all holes and seams in the housing sealed.
07 All soffits and chases are covered with a hard cover that is sealed to the framing with caulk or foam.
08 Double walls that open to attic are covered and the cover sealed to the framing.
09 Attic Access forms airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical
compression using screws, or latches.
10 Knee walls require solid and sealed blocking at the bottom, top left side and right side of the knee wall. When the knee wall
is placed on top of a subfloor the open cavity below the subfloor and the ceiling below are sealed.
11 HVAC ducts that travel down a chase the chase are sealed at the ceiling level.
12 HVAC boots that penetrate the ceiling are sealed to the surrounding drywall.
13 All top plates of interior and exterior walls sealed to drywall.
14 Attic access must be surrounded with a dam at least the same depth as the insulation to prevent loss of ceiling insulation.
15 There must be a dam placed at the exterior edge of all kneewalls and all edges of insulation to stop air movement through
insulation.
16 Verification Status:Pass - all applicable requirements are met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 2 of 3)
Registration Number:
424-P010255225A-001-002-E22002A-E22A
Registration Date/Time: 2024-10-23 13:22:20 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:37
A. Ceiling Inspection - Vented Attics
17 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Roof Inspection - Non-Vented Attics
01 There is a continuous air barrier at the roof deck and gable ends.
02 Chimney and Flue require sheet metal flashing at the roof deck. The flashing is sealed to the chimney or flue with fire rated
caulk. The flashing is sealed to the surrounding framing.
03 All penetrations for plumbing, electrical etc in the roof deck and gable ends are sealed.
04 Verification Status:Pass - all applicable requirements are met
05 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
C. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 3 of 3)
Registration Number:
424-P010255225A-001-002-E22002A-E22A
Registration Date/Time: 2024-10-23 13:22:20 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:37
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-002-E23003A-E23A
Registration Date/Time: 2024-10-23 13:22:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:37
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 1 of 7)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 106)
City: La Quinta Zip Code: 92253
A. Quality Insulation Installation (QII) Preparation For Insulation
01 Air barrier installation and preparation for insulation was done and verified at framing stage prior to insulation being
installed. Where applicable, CF3R-ENV21 and 22 compliance documents have been signed off.
02
All structural framing areas shall be insulated in a manner that resists thermal bridging of the assembly separating
conditioned from unconditioned space. Structural bracing, tie-downs, and framing of steel, or specialized framing used to
meet structural requirements of the CBC are allowed and must be insulated. These areas shall be called out on the building
plans with diagrams and or specific design drawings indicating the R-value of insulation and fastening method to be used. It
is recommended that spray foam be used.
03 All insulation was installed to the manufactures insulation installation instructions.
04 Verification Status:Pass - all applicable requirements are met
05 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Quality Of All Installed Insulation
01 Installed insulation R-values is the same or greater than specified on the CF1R.
02 No gaps or voids between the insulation and framing.
03 Gaps between studs shall be filled with insulation.
04 Batt - ensure the ends are cut so there are no gaps.
05 Batt - Insulation is cut around obstructions like electrical boxes and no gaps exist.
06 Batt - insulation is not compressed (no stuffing of the insulation into the cavity.
07 Batt insulation is delaminated around all plumbing and electrical lines in ceilings, walls and floors.
08 An air barrier is installed at all exposed faces of batt, loose fill and SPF insulation.
09 Loose-fill insulation installed to the minimum installed weight per ft 2 per the manufacturer labeled R-value specification.
10 SPF insulation shall be spray-applied to fully adhere to structural assembly framing, floor and ceiling joists, and other
framing surfaces within the construction cavity.
11 SPF - with multiple layers applied, each foam lift (i.e. spray application) adheres to the substrate and foam interfaces.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 2 of 7)
Registration Number:
424-P010255225A-001-002-E23003A-E23A
Registration Date/Time: 2024-10-23 13:22:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:37
B. Quality Of All Installed Insulation
12 SPF - if values other than R-5.8 per inch for closed-cell SPF (ccSPF) and R-3.6 per inch for open-cell SPF (ocSPF) are used, the
ICC Evaluation Service Report (ESR) number (e.g. ESR-xxxx) will be documented in the CF2R-ENV-03.
13 ccSPF in areas where an air barrier is required the foam is at least 2 inches thick.
14 ocSPF depressions in the foam insulation surface is not greater than 1-inch of the required thickness provided these
depressions do not exceed 10 percent of the surface area being insulated.
15 ocSPF insulation completely fills cavities of 2x4 inch framing or less.
16 ocSPF cavities greater than 2x4 inch framing are filled to the thickness that meets the required R-value used for compliance.
17 SPF installed as an air barrier is sprayed at a minimum thickness of 5.5 inches for open cell and 2.0 inches for closed cell.
18
The insulation installer provided a CF2R-ENV-03. Labels or specification/data sheets are attached to the CF2R-ENV-03 for
each insulating material. The material datasheet for the installed material meets the performance specifications of the
required R-Values. Blown in material also includes insulation material bag labels or coverage charts.
19 Verification Status:Pass - all applicable requirements are met
20 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
C. Ceiling/Roof Insulation Quality
01 Insulation extends to the outside edge of the exterior top plates and is flush against any ventilation dams or baffles.
02 Insulation is in direct contact with ceiling so there are no gaps between the ceiling and the insulation.
03
Chimneys and flues (except for zero clearance) require a sheet metal collar around the stack. The collar must be at least as
tall as the depth of the insulation. The collar shall be 1 inch from the chimney or flue for double wall vents, and 6 inches
from the chimney/flue for single wall vents unless the manufacturer requires otherwise. The collar must be sealed to the
ceiling with high temperature sealant to prevent air leakage. The insulation is in contact with the sheet metal collar.
04 Required eave ventilation shall not be obstructed - the net free-ventilation area of the eave vent is maintained
05 Eave vent baffles are installed to prevent air movement under or into the ceiling insulation
06 Recessed downlights are covered with insulation. If they are not covered to the same depth as required by the CF1R for
ceiling insulation then a area weighted calculation is required. Recessed downlights are AT and IC rated.
07
SPF insulation shall not be applied directly to recessed lighting fixtures. Recessed downlights where SPF insulation is
installed shall:
(a) be covered with a minimum of 1.5 inches of mineral fiber insulation, or
(b) be enclosed in a box fabricated from 1/4 inch plywood, 18 gauge metal, 3/8 inch hard board or gypboard. Hard board
or gypboard does not cause a recessed downlights to meet the zero clearance insulation contact requirements.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 3 of 7)
Registration Number:
424-P010255225A-001-002-E23003A-E23A
Registration Date/Time: 2024-10-23 13:22:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:37
C. Ceiling/Roof Insulation Quality
08 Walkways and mechanical platforms are insulated to the same R-value as required by the CF1R for ceiling insulation. If not,
an area weighted calculation is completed and turned in with this compliance document.
09 Soffits, chasses and drop ceiling areas have a sealed hard cover and the insulation is in direct contact with the hard cover.
10 Knee walls - an air dam the full depth of the ceiling insulation is added to the exterior edge of the knee wall so the ceiling
insulation overlaps the knee wall to the full depth of the ceiling insulation.
11 Attic access doors are insulated to the same R-value required by the CF1R for roof insulation and the insulation is
permanently attached using adhesive or mechanical fasteners. The preferred method is rigid insulation.
12 Attic access forms an airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical
compression using screws, or latches.
13 Attic access must have a dam around the access to at least the same depth as the insulation.
14 Insulation batts must be cut to fit around cross bracings and truss webs.
15
Attic rulers appropriate to the material are installed and evenly distributed throughout the attic to verify depth (one ruler
for every 250 ft2) The rulers are clearly readable from the attic access and scaled to read inches of insulation and the
R-value installed.
16
Loose-fill and SPF insulation - a HERS rater shall measure the installed thickness (including low and high areas) and density
of insulation in at least 6 random locations on roof/ceilings and floors to ensure minimum thickness levels and installed
density necessary to meet the R-value specified on the Certificate of Compliance, and consistency with the manufacturer
coverage chart.
17 Steel-framed knee walls, skylight shafts, and gable ends, external surfaces of steel studs are covered with insulation
18 Verification Status:Pass - all applicable requirements are met
19 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Wall Insulation
01 Batts, loose fill mineral fiber, mineral and natural wool, and cellulose:fills cavity and is in contact with air barrier on six
sides.
02 ocSPF:completely fill cavities of 2x4 inch framing or less. Not required to fill cavities greater than 2x4 inch framing unless
required to meet R-value.
03 ccSPF:insulation is not required to fill the cavities of framed assemblies unless required to meet R-value.
04
Double walls and bump-outs - insulation fills the cavity, or additional air barrier is installed so the insulation fills the cavity
and is in contact with the insulation on all six sides unless SPF is used. Insulation shall be installed on the exterior of the
double walls or bump-outs.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 4 of 7)
Registration Number:
424-P010255225A-001-002-E23003A-E23A
Registration Date/Time: 2024-10-23 13:22:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:37
D. Wall Insulation
05 Low expanding foam used around windows and doors, if allowed by the manufacturer. If not allowed fill cavity with
insulation. Batts are not allowed to be stuffed into space.
06 Electrical panel in exterior insulated wall the panel is air tight and insulation is installed behind the panel.
07 Skylight shafts and attic knee wall insulation must meet all the requirements for walls and is in contact with the air barrier
on six sides unless SPF is used.
08 Skylight shafts and attic kneewalls insulation shall be in full contact with the drywall or other interior wall finish. Batt
insulation must be cut to fit around 2x4 framing that are laid flat.
09 Skylight shafts and attic kneewalls shall be completely enclosed by vertical and horizontal framing, including horizontal
plates at top and bottom of the insulation.
10 Band/Rim joists are insulated to the same R-value as the wall.
11 Verification Status:Pass - all applicable requirements are met
12 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Raised Floor Insulation Quality
01 Insulation is in full contact with subfloor.
02 Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation.
03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor.
04 When daylight basements are adjacent to crawlspaces, if the basement is conditioned the walls adjacent to the crawlspace
are insulated to the R-value listed on the CF1R. This includes framed stem walls, and vertical concrete retaining walls.
05 If access to the crawlspace is from the conditioned area the raised floor includes an airtight insulated access hatch. Where
possible locate crawl space access from the exterior.
06 Verification Status:Pass - all applicable requirements are met
07 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
F. Floor Above Garage Insulation Quality
01 Insulation must be in full contact with subfloor if the air barrier is at the band joist at the garage house wall.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 5 of 7)
Registration Number:
424-P010255225A-001-002-E23003A-E23A
Registration Date/Time: 2024-10-23 13:22:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:37
F. Floor Above Garage Insulation Quality
02 Insulation hangers spaced at 18 inches or less, insulation hangers must not compress insulation.
03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor.
04 If air barrier is at the perimeter of the garage below the conditioned subfloor then the insulation may be placed on the
garage ceiling. Perimeter of subfloor must also be insulated.
05 Verification Status:Pass - all applicable requirements are met
06 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
G. Cantilevered Floor Insulation Quality
01
Insulation is in full contact with cantilevered subfloor. Insulation hangers are spaced at 18 inches or less, insulation hangers
do not compress insulation. Netting or mesh can be used if the cavity under the floor is filled and in contact with the
subfloor.
02 Sealed Blocking shall be installed between joists where the wall rim joist would have been located in the absence of a
cantilever. Insulation shall be placed on both sides of this block.
03 Verification Status:Pass - all applicable requirements are met
04 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Attached Porch Roof Insulation Quality
01 Exterior wall at the intersection of the porch roof is fully insulated above, below and behind the roof line.
02 Where truss framing is used, airtight blocking is used at the top and bottom of each wall/roof section and insulated.
03 Verification Status:Pass - all applicable requirements are met
04 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 6 of 7)
Registration Number:
424-P010255225A-001-002-E23003A-E23A
Registration Date/Time: 2024-10-23 13:22:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:37
I. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 7 of 7)
Registration Number:
424-P010255225A-001-002-E23003A-E23A
Registration Date/Time: 2024-10-23 13:22:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:37
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-003-E21001A-E21A
Registration Date/Time: 2024-10-23 13:22:25 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:37
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 6)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 107)
City: La Quinta Zip Code: 92253
A. Air Infiltration And Insulation Installation (Qii) - Framing Stage
01 The requirements below cover the required air sealing and installation of insulation that must occur in the framing stage.
02
An air barrier is required in all thermal envelope assemblies to limit air movement between unconditioned/outside spaces
and conditioned/inside spaces and must meet one of the following:
1.Using individual materials that have an air permeance not exceeding 0.004 cfm/ft 2 under pressure differential of 0.3
in w.g. (1.57 psf) (0.02 L/s.m2 at 75 pa) when tested in accordance with ASTM E2178; or
•A list of example materials meeting the air permenace testing performance levels of 1 above is available in
RA3.5.2
2.Using assemblies of materials and components that have an average air leakage not to exceed 0.04 cfm/ft 2 under a
pressure differential of 0.3 in w.g. (1.57 psf) (0.2 L/s.m2 at 75 pa) when tested in accordance with ASTM E2357,
ASTM E1677, ASTM E1680 or ASTM E283, or
3.Testing the complete building and demonstrating that the air leakage rate of the building envelope does not exceed
0.4 cfm/ft2 at a pressure differential of 0.3 in w.g. (1.57 psf) (2.0 L/m2 at 75 pa) in accordance with ASTM E779 or an
equivalent approved method.
03 Air Barrier Material Installed
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Raised Floor
01 All gaps in the raised floor are sealed.
02 All chases sealed at floor level using a hard cover and the hard covers are sealed.
03 All Plumbing and electrical wires that penetrate the floor are sealed.
04 Subfloor sheathing is glued or sealed at all exterior panel edges, to create a continuous air tight subfloor.
05 Verification Status Pass - all applicable requirements are met
06 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 2 of 6)
Registration Number:
424-P010255225A-001-003-E21001A-E21A
Registration Date/Time: 2024-10-23 13:22:25 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:37
C. Walls/Knee Walls
01 All penetrations through the exterior wall air barrier are sealed to provide an air-tight envelope to unconditioned spaces
such as the outdoors, attic, garage and crawl space.
02 Exterior wall air barrier is sealed to the top plate and bottom plate in each stud bay.
03 All electrical boxes including knockouts that penetrate the air barrier to unconditioned space are sealed.
04 All openings in top and bottom plate, including all interior and exterior walls, to unconditioned space are sealed. Such as
holes drilled for electrical and plumbing.
05 Exterior bottom plates (all stories) are sealed to the floor using the appropriate sealing method.
06 All gaps around windows and doors are sealed. Proper sealant used was specified by window manufacturer.
07 Rim Joists all gaps and openings fully sealed.
08 Fan exhaust ducts that run between conditioned floors to exterior walls have a damper at the exterior wall.
09 Metal tie downs are insulated between exterior framing and tie down.
10 Insulation is installed in hard to access wall stud cavities, such as corner channels, wall intersections are insulated to the
proper R-value prior to exterior sheathing, or the exterior stucco lath.
11 Insulation is installed behind tub, shower, fireplace enclosures, and exterior stairwells to the R-value listed on the CF1R
when located against exterior walls. Insulation is required to be installed before tub, shower, and fireplace are installed.
12 A solid air barrier is installed on the interior wall from floor to ceiling tub, shower, and fireplace enclosures are installed in
exterior walls. Insulation in contact on all six sides of air barrier on exterior walls.
13
All single-member window and door headers shall be insulated to a minimum of R-3 for a 2x4 framing, or equivalent width,
and a minimum of R-5 for all other assemblies. Insulation is to be placed between the interior face of the header and inside
surface of the interior wall finish. If continuous exterior rigid insulation is used an insulated header is not required. No
header insulation is required for single-member headers that are the same width as the wall, so long as the entire wall has
at least R-2 insulation.
14 Knee walls have solid and sealed blocking at the bottom, top, left side and right side of the knee wall.
15 Verification Status Pass - all applicable requirements are met
16 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Ceiling/Attic
01 For vented attics much of the ceiling air barrier is verified after the ceiling drywall is installed using the ENV-22.
02 For non-vented attics ensure all penetrations through the roof deck and gable ends are sealed and air tight.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 3 of 6)
Registration Number:
424-P010255225A-001-003-E21001A-E21A
Registration Date/Time: 2024-10-23 13:22:25 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:37
D. Ceiling/Attic
03 All eave vents are covered with a rigid ventilation baffle that maintains the Net free-ventilation area.
04 All dropped ceilings and soffits are covered with hard covers and sealed to framing.
05 All chases are covered with hard covers and sealed to framing.
06 HVAC ducts that travel down a chase the chase is sealed at the ceiling level.
07 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The
flashing shall be sealed to the surrounding framing.
08 All Eave/soffit baffles are installed to stop air movement around the baffle and into insulation. Net free-ventilation of the
eave/soffit shall be maintained.
09 Double walls that open to attic are covered with an air barrier and cover has an air tight seal to the framing.
10 Verification Status Pass - all applicable requirements are met
11 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Conditioned Space Above Or Adjacent To Garage Air Barrier
01 All penetrations in the subfloor above the garage into conditioned space must follow the raised floor air barrier
requirements above.
02
Infiltration between the space above the garage and subfloor is prevented by one of the following methods:
•Seal all edges of garage ceiling (typically drywall) at the perimeter of the garage to create a continuous air tight
surface between the garage and adjacent conditioned envelope. Seal all plumbing, electric and mechanical
penetrations between the garage and the adjacent conditioned space. For an open-web truss, airtight blocking is
added on four sides of the garage perimeter. Insulation can be placed on the garage ceiling.
•Seal band joist above the wall at the garage to conditioned space transition. Seal all subfloor seams and penetrations
between the conditioned space and the garage. Insulation must be placed in contact of subfloor below conditioned
space.
03 Verification Status Pass - all applicable requirements are met
04 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
F. Walls For Attached Porch, Attic, Double Wall
01 All walls that separate conditioned and unconditioned space includes a continuous air barrier on the interior and exterior
wall.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 4 of 6)
Registration Number:
424-P010255225A-001-003-E21001A-E21A
Registration Date/Time: 2024-10-23 13:22:25 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:37
F. Walls For Attached Porch, Attic, Double Wall
02 Exterior wall, air barrier required at the intersection of the porch and exterior wall when there is conditioned space on the
other side. The exterior wall where the attic attaches to the conditioned space does includes an air barrier.
03 Truss framing blocking is used at the top and bottom of each wall/roof section.
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
G. Cantilevered Floor Air Barrier
01 Airtight blocking is installed between joists where the wall rim joist would have been located in the absence of a cantilever.
02
Exterior sheathing is installed to the bottom of the cantilever so that there is a continuous air and weather barrier for the
cantilever. The cantilevered joist must be insulated to the same R value as would be required for the subfloor prior to
closing.
03 Any gaps, cracks or penetrations in the air barrier of the cantilever are sealed. Can lights in the cantilever are IC and AT
rated and properly sealed to sheathing.
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Multifamily Air Barrier
01 Multifamily buildings must meet all air sealing requirements for single family buildings listed above.
02 Each dwelling unit must be air sealed to stop air movement from one unit to another.
03 Floor AND Ceiling of each Dwelling Unit: All penetrations through the floor and ceiling of each unit are sealed including,
electric and gas utilities, water pipes, drain pipes, fire protection service pipes, communication wiring.
04 Elevator penthouse, mechanical penthouse, stairwell doors, roof access hatch, plumbing stacks sealed to reduce air transfer
from attached spaces.
05
Common Walls: Bottom plate between units is sealed to the subfloor. All penetrations in the common walls are sealed
including electrical boxes, wiring and plumbing penetrations. Perpendicular Interior walls that open into the common walls
are sealed.
06 Vertical Chases for garbage chutes, elevator shafts, and HVAC ducting plumbing must be sealed to the floor and ceiling of
each unit to stop air movement up and around the chase due to stack effect.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 5 of 6)
Registration Number:
424-P010255225A-001-003-E21001A-E21A
Registration Date/Time: 2024-10-23 13:22:25 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:37
H. Multifamily Air Barrier
07 Vertical Chases such as garbage chutes, elevator shafts, and HVAC ducting plumbing, wiring etc. must be sealed to stop air
movement through the chase to the surrounding spaces.
08 Common Hallways - Penetrations between dwelling unit and common hallways are sealed, doors to the dwelling unit are
gasketed or made substantially airtight .
09 Verification Status Pass - all applicable requirements are met
10 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
I. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 6 of 6)
Registration Number:
424-P010255225A-001-003-E21001A-E21A
Registration Date/Time: 2024-10-23 13:22:25 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:37
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-003-E22002A-E22A
Registration Date/Time: 2024-10-23 13:22:29 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:38
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 107)
City: La Quinta Zip Code: 92253
For typical vented attics where the insulation is at the roof deck ceiling air barrier must be verified after the ceiling drywall is
installed and before attic insulation is installed. If SPF will be used in the attic this can be considered the air barrier. Soffit and
chases must still be covered and chimneys and flues require metal flashing. Buildings with a Non vented attic all air sealing
requirements appropriate for the roof must be verified.
A. Ceiling Inspection - Vented Attics
01 If there is a continuous air barrier at the ceiling level; All opening into walls, drops, chasses, double walls are sealed.
Examples are below.
02 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The
flashing shall be sealed to the surrounding framing.
03 All penetration through the top plate of interior and exterior walls are sealed.
04 All penetrations shall be sealed to the surrounding drywall or have a secondary air barrier created around the fixture; with
the exception of fire sprinklers.
05
All installed recessed light fixtures that penetrate the ceiling to unconditioned space, or where insulation is present, are
rated to be Insulation Contact and Air Tight (IC and AT) which allows direct contact with insulation. Housing is sealed to the
drywall.
06 Exhaust fan housing is sealed to surrounding drywall and all holes and seams in the housing sealed.
07 All soffits and chases are covered with a hard cover that is sealed to the framing with caulk or foam.
08 Double walls that open to attic are covered and the cover sealed to the framing.
09 Attic Access forms airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical
compression using screws, or latches.
10 Knee walls require solid and sealed blocking at the bottom, top left side and right side of the knee wall. When the knee wall
is placed on top of a subfloor the open cavity below the subfloor and the ceiling below are sealed.
11 HVAC ducts that travel down a chase the chase are sealed at the ceiling level.
12 HVAC boots that penetrate the ceiling are sealed to the surrounding drywall.
13 All top plates of interior and exterior walls sealed to drywall.
14 Attic access must be surrounded with a dam at least the same depth as the insulation to prevent loss of ceiling insulation.
15 There must be a dam placed at the exterior edge of all kneewalls and all edges of insulation to stop air movement through
insulation.
16 Verification Status:Pass - all applicable requirements are met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 2 of 3)
Registration Number:
424-P010255225A-001-003-E22002A-E22A
Registration Date/Time: 2024-10-23 13:22:29 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:38
A. Ceiling Inspection - Vented Attics
17 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Roof Inspection - Non-Vented Attics
01 There is a continuous air barrier at the roof deck and gable ends.
02 Chimney and Flue require sheet metal flashing at the roof deck. The flashing is sealed to the chimney or flue with fire rated
caulk. The flashing is sealed to the surrounding framing.
03 All penetrations for plumbing, electrical etc in the roof deck and gable ends are sealed.
04 Verification Status:Pass - all applicable requirements are met
05 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
C. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 3 of 3)
Registration Number:
424-P010255225A-001-003-E22002A-E22A
Registration Date/Time: 2024-10-23 13:22:29 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:38
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-003-E23003A-E23A
Registration Date/Time: 2024-10-23 13:22:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:38
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 1 of 7)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 107)
City: La Quinta Zip Code: 92253
A. Quality Insulation Installation (QII) Preparation For Insulation
01 Air barrier installation and preparation for insulation was done and verified at framing stage prior to insulation being
installed. Where applicable, CF3R-ENV21 and 22 compliance documents have been signed off.
02
All structural framing areas shall be insulated in a manner that resists thermal bridging of the assembly separating
conditioned from unconditioned space. Structural bracing, tie-downs, and framing of steel, or specialized framing used to
meet structural requirements of the CBC are allowed and must be insulated. These areas shall be called out on the building
plans with diagrams and or specific design drawings indicating the R-value of insulation and fastening method to be used. It
is recommended that spray foam be used.
03 All insulation was installed to the manufactures insulation installation instructions.
04 Verification Status:Pass - all applicable requirements are met
05 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Quality Of All Installed Insulation
01 Installed insulation R-values is the same or greater than specified on the CF1R.
02 No gaps or voids between the insulation and framing.
03 Gaps between studs shall be filled with insulation.
04 Batt - ensure the ends are cut so there are no gaps.
05 Batt - Insulation is cut around obstructions like electrical boxes and no gaps exist.
06 Batt - insulation is not compressed (no stuffing of the insulation into the cavity.
07 Batt insulation is delaminated around all plumbing and electrical lines in ceilings, walls and floors.
08 An air barrier is installed at all exposed faces of batt, loose fill and SPF insulation.
09 Loose-fill insulation installed to the minimum installed weight per ft 2 per the manufacturer labeled R-value specification.
10 SPF insulation shall be spray-applied to fully adhere to structural assembly framing, floor and ceiling joists, and other
framing surfaces within the construction cavity.
11 SPF - with multiple layers applied, each foam lift (i.e. spray application) adheres to the substrate and foam interfaces.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 2 of 7)
Registration Number:
424-P010255225A-001-003-E23003A-E23A
Registration Date/Time: 2024-10-23 13:22:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:38
B. Quality Of All Installed Insulation
12 SPF - if values other than R-5.8 per inch for closed-cell SPF (ccSPF) and R-3.6 per inch for open-cell SPF (ocSPF) are used, the
ICC Evaluation Service Report (ESR) number (e.g. ESR-xxxx) will be documented in the CF2R-ENV-03.
13 ccSPF in areas where an air barrier is required the foam is at least 2 inches thick.
14 ocSPF depressions in the foam insulation surface is not greater than 1-inch of the required thickness provided these
depressions do not exceed 10 percent of the surface area being insulated.
15 ocSPF insulation completely fills cavities of 2x4 inch framing or less.
16 ocSPF cavities greater than 2x4 inch framing are filled to the thickness that meets the required R-value used for compliance.
17 SPF installed as an air barrier is sprayed at a minimum thickness of 5.5 inches for open cell and 2.0 inches for closed cell.
18
The insulation installer provided a CF2R-ENV-03. Labels or specification/data sheets are attached to the CF2R-ENV-03 for
each insulating material. The material datasheet for the installed material meets the performance specifications of the
required R-Values. Blown in material also includes insulation material bag labels or coverage charts.
19 Verification Status:Pass - all applicable requirements are met
20 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
C. Ceiling/Roof Insulation Quality
01 Insulation extends to the outside edge of the exterior top plates and is flush against any ventilation dams or baffles.
02 Insulation is in direct contact with ceiling so there are no gaps between the ceiling and the insulation.
03
Chimneys and flues (except for zero clearance) require a sheet metal collar around the stack. The collar must be at least as
tall as the depth of the insulation. The collar shall be 1 inch from the chimney or flue for double wall vents, and 6 inches
from the chimney/flue for single wall vents unless the manufacturer requires otherwise. The collar must be sealed to the
ceiling with high temperature sealant to prevent air leakage. The insulation is in contact with the sheet metal collar.
04 Required eave ventilation shall not be obstructed - the net free-ventilation area of the eave vent is maintained
05 Eave vent baffles are installed to prevent air movement under or into the ceiling insulation
06 Recessed downlights are covered with insulation. If they are not covered to the same depth as required by the CF1R for
ceiling insulation then a area weighted calculation is required. Recessed downlights are AT and IC rated.
07
SPF insulation shall not be applied directly to recessed lighting fixtures. Recessed downlights where SPF insulation is
installed shall:
(a) be covered with a minimum of 1.5 inches of mineral fiber insulation, or
(b) be enclosed in a box fabricated from 1/4 inch plywood, 18 gauge metal, 3/8 inch hard board or gypboard. Hard board
or gypboard does not cause a recessed downlights to meet the zero clearance insulation contact requirements.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 3 of 7)
Registration Number:
424-P010255225A-001-003-E23003A-E23A
Registration Date/Time: 2024-10-23 13:22:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:38
C. Ceiling/Roof Insulation Quality
08 Walkways and mechanical platforms are insulated to the same R-value as required by the CF1R for ceiling insulation. If not,
an area weighted calculation is completed and turned in with this compliance document.
09 Soffits, chasses and drop ceiling areas have a sealed hard cover and the insulation is in direct contact with the hard cover.
10 Knee walls - an air dam the full depth of the ceiling insulation is added to the exterior edge of the knee wall so the ceiling
insulation overlaps the knee wall to the full depth of the ceiling insulation.
11 Attic access doors are insulated to the same R-value required by the CF1R for roof insulation and the insulation is
permanently attached using adhesive or mechanical fasteners. The preferred method is rigid insulation.
12 Attic access forms an airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical
compression using screws, or latches.
13 Attic access must have a dam around the access to at least the same depth as the insulation.
14 Insulation batts must be cut to fit around cross bracings and truss webs.
15
Attic rulers appropriate to the material are installed and evenly distributed throughout the attic to verify depth (one ruler
for every 250 ft2) The rulers are clearly readable from the attic access and scaled to read inches of insulation and the
R-value installed.
16
Loose-fill and SPF insulation - a HERS rater shall measure the installed thickness (including low and high areas) and density
of insulation in at least 6 random locations on roof/ceilings and floors to ensure minimum thickness levels and installed
density necessary to meet the R-value specified on the Certificate of Compliance, and consistency with the manufacturer
coverage chart.
17 Steel-framed knee walls, skylight shafts, and gable ends, external surfaces of steel studs are covered with insulation
18 Verification Status:Pass - all applicable requirements are met
19 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Wall Insulation
01 Batts, loose fill mineral fiber, mineral and natural wool, and cellulose:fills cavity and is in contact with air barrier on six
sides.
02 ocSPF:completely fill cavities of 2x4 inch framing or less. Not required to fill cavities greater than 2x4 inch framing unless
required to meet R-value.
03 ccSPF:insulation is not required to fill the cavities of framed assemblies unless required to meet R-value.
04
Double walls and bump-outs - insulation fills the cavity, or additional air barrier is installed so the insulation fills the cavity
and is in contact with the insulation on all six sides unless SPF is used. Insulation shall be installed on the exterior of the
double walls or bump-outs.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 4 of 7)
Registration Number:
424-P010255225A-001-003-E23003A-E23A
Registration Date/Time: 2024-10-23 13:22:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:38
D. Wall Insulation
05 Low expanding foam used around windows and doors, if allowed by the manufacturer. If not allowed fill cavity with
insulation. Batts are not allowed to be stuffed into space.
06 Electrical panel in exterior insulated wall the panel is air tight and insulation is installed behind the panel.
07 Skylight shafts and attic knee wall insulation must meet all the requirements for walls and is in contact with the air barrier
on six sides unless SPF is used.
08 Skylight shafts and attic kneewalls insulation shall be in full contact with the drywall or other interior wall finish. Batt
insulation must be cut to fit around 2x4 framing that are laid flat.
09 Skylight shafts and attic kneewalls shall be completely enclosed by vertical and horizontal framing, including horizontal
plates at top and bottom of the insulation.
10 Band/Rim joists are insulated to the same R-value as the wall.
11 Verification Status:Pass - all applicable requirements are met
12 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Raised Floor Insulation Quality
01 Insulation is in full contact with subfloor.
02 Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation.
03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor.
04 When daylight basements are adjacent to crawlspaces, if the basement is conditioned the walls adjacent to the crawlspace
are insulated to the R-value listed on the CF1R. This includes framed stem walls, and vertical concrete retaining walls.
05 If access to the crawlspace is from the conditioned area the raised floor includes an airtight insulated access hatch. Where
possible locate crawl space access from the exterior.
06 Verification Status:Pass - all applicable requirements are met
07 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
F. Floor Above Garage Insulation Quality
01 Insulation must be in full contact with subfloor if the air barrier is at the band joist at the garage house wall.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 5 of 7)
Registration Number:
424-P010255225A-001-003-E23003A-E23A
Registration Date/Time: 2024-10-23 13:22:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:38
F. Floor Above Garage Insulation Quality
02 Insulation hangers spaced at 18 inches or less, insulation hangers must not compress insulation.
03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor.
04 If air barrier is at the perimeter of the garage below the conditioned subfloor then the insulation may be placed on the
garage ceiling. Perimeter of subfloor must also be insulated.
05 Verification Status:Pass - all applicable requirements are met
06 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
G. Cantilevered Floor Insulation Quality
01
Insulation is in full contact with cantilevered subfloor. Insulation hangers are spaced at 18 inches or less, insulation hangers
do not compress insulation. Netting or mesh can be used if the cavity under the floor is filled and in contact with the
subfloor.
02 Sealed Blocking shall be installed between joists where the wall rim joist would have been located in the absence of a
cantilever. Insulation shall be placed on both sides of this block.
03 Verification Status:Pass - all applicable requirements are met
04 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Attached Porch Roof Insulation Quality
01 Exterior wall at the intersection of the porch roof is fully insulated above, below and behind the roof line.
02 Where truss framing is used, airtight blocking is used at the top and bottom of each wall/roof section and insulated.
03 Verification Status:Pass - all applicable requirements are met
04 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 6 of 7)
Registration Number:
424-P010255225A-001-003-E23003A-E23A
Registration Date/Time: 2024-10-23 13:22:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:38
I. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 7 of 7)
Registration Number:
424-P010255225A-001-003-E23003A-E23A
Registration Date/Time: 2024-10-23 13:22:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:38
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-004-E21001A-E21A
Registration Date/Time: 2024-10-23 13:23:29 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:40
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 6)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 108)
City: La Quinta Zip Code: 92253
A. Air Infiltration And Insulation Installation (Qii) - Framing Stage
01 The requirements below cover the required air sealing and installation of insulation that must occur in the framing stage.
02
An air barrier is required in all thermal envelope assemblies to limit air movement between unconditioned/outside spaces
and conditioned/inside spaces and must meet one of the following:
1.Using individual materials that have an air permeance not exceeding 0.004 cfm/ft 2 under pressure differential of 0.3
in w.g. (1.57 psf) (0.02 L/s.m2 at 75 pa) when tested in accordance with ASTM E2178; or
•A list of example materials meeting the air permenace testing performance levels of 1 above is available in
RA3.5.2
2.Using assemblies of materials and components that have an average air leakage not to exceed 0.04 cfm/ft 2 under a
pressure differential of 0.3 in w.g. (1.57 psf) (0.2 L/s.m2 at 75 pa) when tested in accordance with ASTM E2357,
ASTM E1677, ASTM E1680 or ASTM E283, or
3.Testing the complete building and demonstrating that the air leakage rate of the building envelope does not exceed
0.4 cfm/ft2 at a pressure differential of 0.3 in w.g. (1.57 psf) (2.0 L/m2 at 75 pa) in accordance with ASTM E779 or an
equivalent approved method.
03 Air Barrier Material Installed
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Raised Floor
01 All gaps in the raised floor are sealed.
02 All chases sealed at floor level using a hard cover and the hard covers are sealed.
03 All Plumbing and electrical wires that penetrate the floor are sealed.
04 Subfloor sheathing is glued or sealed at all exterior panel edges, to create a continuous air tight subfloor.
05 Verification Status Pass - all applicable requirements are met
06 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 2 of 6)
Registration Number:
424-P010255225A-001-004-E21001A-E21A
Registration Date/Time: 2024-10-23 13:23:29 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:40
C. Walls/Knee Walls
01 All penetrations through the exterior wall air barrier are sealed to provide an air-tight envelope to unconditioned spaces
such as the outdoors, attic, garage and crawl space.
02 Exterior wall air barrier is sealed to the top plate and bottom plate in each stud bay.
03 All electrical boxes including knockouts that penetrate the air barrier to unconditioned space are sealed.
04 All openings in top and bottom plate, including all interior and exterior walls, to unconditioned space are sealed. Such as
holes drilled for electrical and plumbing.
05 Exterior bottom plates (all stories) are sealed to the floor using the appropriate sealing method.
06 All gaps around windows and doors are sealed. Proper sealant used was specified by window manufacturer.
07 Rim Joists all gaps and openings fully sealed.
08 Fan exhaust ducts that run between conditioned floors to exterior walls have a damper at the exterior wall.
09 Metal tie downs are insulated between exterior framing and tie down.
10 Insulation is installed in hard to access wall stud cavities, such as corner channels, wall intersections are insulated to the
proper R-value prior to exterior sheathing, or the exterior stucco lath.
11 Insulation is installed behind tub, shower, fireplace enclosures, and exterior stairwells to the R-value listed on the CF1R
when located against exterior walls. Insulation is required to be installed before tub, shower, and fireplace are installed.
12 A solid air barrier is installed on the interior wall from floor to ceiling tub, shower, and fireplace enclosures are installed in
exterior walls. Insulation in contact on all six sides of air barrier on exterior walls.
13
All single-member window and door headers shall be insulated to a minimum of R-3 for a 2x4 framing, or equivalent width,
and a minimum of R-5 for all other assemblies. Insulation is to be placed between the interior face of the header and inside
surface of the interior wall finish. If continuous exterior rigid insulation is used an insulated header is not required. No
header insulation is required for single-member headers that are the same width as the wall, so long as the entire wall has
at least R-2 insulation.
14 Knee walls have solid and sealed blocking at the bottom, top, left side and right side of the knee wall.
15 Verification Status Pass - all applicable requirements are met
16 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Ceiling/Attic
01 For vented attics much of the ceiling air barrier is verified after the ceiling drywall is installed using the ENV-22.
02 For non-vented attics ensure all penetrations through the roof deck and gable ends are sealed and air tight.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 3 of 6)
Registration Number:
424-P010255225A-001-004-E21001A-E21A
Registration Date/Time: 2024-10-23 13:23:29 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:40
D. Ceiling/Attic
03 All eave vents are covered with a rigid ventilation baffle that maintains the Net free-ventilation area.
04 All dropped ceilings and soffits are covered with hard covers and sealed to framing.
05 All chases are covered with hard covers and sealed to framing.
06 HVAC ducts that travel down a chase the chase is sealed at the ceiling level.
07 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The
flashing shall be sealed to the surrounding framing.
08 All Eave/soffit baffles are installed to stop air movement around the baffle and into insulation. Net free-ventilation of the
eave/soffit shall be maintained.
09 Double walls that open to attic are covered with an air barrier and cover has an air tight seal to the framing.
10 Verification Status Pass - all applicable requirements are met
11 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Conditioned Space Above Or Adjacent To Garage Air Barrier
01 All penetrations in the subfloor above the garage into conditioned space must follow the raised floor air barrier
requirements above.
02
Infiltration between the space above the garage and subfloor is prevented by one of the following methods:
•Seal all edges of garage ceiling (typically drywall) at the perimeter of the garage to create a continuous air tight
surface between the garage and adjacent conditioned envelope. Seal all plumbing, electric and mechanical
penetrations between the garage and the adjacent conditioned space. For an open-web truss, airtight blocking is
added on four sides of the garage perimeter. Insulation can be placed on the garage ceiling.
•Seal band joist above the wall at the garage to conditioned space transition. Seal all subfloor seams and penetrations
between the conditioned space and the garage. Insulation must be placed in contact of subfloor below conditioned
space.
03 Verification Status Pass - all applicable requirements are met
04 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
F. Walls For Attached Porch, Attic, Double Wall
01 All walls that separate conditioned and unconditioned space includes a continuous air barrier on the interior and exterior
wall.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 4 of 6)
Registration Number:
424-P010255225A-001-004-E21001A-E21A
Registration Date/Time: 2024-10-23 13:23:29 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:40
F. Walls For Attached Porch, Attic, Double Wall
02 Exterior wall, air barrier required at the intersection of the porch and exterior wall when there is conditioned space on the
other side. The exterior wall where the attic attaches to the conditioned space does includes an air barrier.
03 Truss framing blocking is used at the top and bottom of each wall/roof section.
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
G. Cantilevered Floor Air Barrier
01 Airtight blocking is installed between joists where the wall rim joist would have been located in the absence of a cantilever.
02
Exterior sheathing is installed to the bottom of the cantilever so that there is a continuous air and weather barrier for the
cantilever. The cantilevered joist must be insulated to the same R value as would be required for the subfloor prior to
closing.
03 Any gaps, cracks or penetrations in the air barrier of the cantilever are sealed. Can lights in the cantilever are IC and AT
rated and properly sealed to sheathing.
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Multifamily Air Barrier
01 Multifamily buildings must meet all air sealing requirements for single family buildings listed above.
02 Each dwelling unit must be air sealed to stop air movement from one unit to another.
03 Floor AND Ceiling of each Dwelling Unit: All penetrations through the floor and ceiling of each unit are sealed including,
electric and gas utilities, water pipes, drain pipes, fire protection service pipes, communication wiring.
04 Elevator penthouse, mechanical penthouse, stairwell doors, roof access hatch, plumbing stacks sealed to reduce air transfer
from attached spaces.
05
Common Walls: Bottom plate between units is sealed to the subfloor. All penetrations in the common walls are sealed
including electrical boxes, wiring and plumbing penetrations. Perpendicular Interior walls that open into the common walls
are sealed.
06 Vertical Chases for garbage chutes, elevator shafts, and HVAC ducting plumbing must be sealed to the floor and ceiling of
each unit to stop air movement up and around the chase due to stack effect.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 5 of 6)
Registration Number:
424-P010255225A-001-004-E21001A-E21A
Registration Date/Time: 2024-10-23 13:23:29 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:40
H. Multifamily Air Barrier
07 Vertical Chases such as garbage chutes, elevator shafts, and HVAC ducting plumbing, wiring etc. must be sealed to stop air
movement through the chase to the surrounding spaces.
08 Common Hallways - Penetrations between dwelling unit and common hallways are sealed, doors to the dwelling unit are
gasketed or made substantially airtight .
09 Verification Status Pass - all applicable requirements are met
10 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
I. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 6 of 6)
Registration Number:
424-P010255225A-001-004-E21001A-E21A
Registration Date/Time: 2024-10-23 13:23:29 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:40
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-004-E22002A-E22A
Registration Date/Time: 2024-10-23 13:23:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:41
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 108)
City: La Quinta Zip Code: 92253
For typical vented attics where the insulation is at the roof deck ceiling air barrier must be verified after the ceiling drywall is
installed and before attic insulation is installed. If SPF will be used in the attic this can be considered the air barrier. Soffit and
chases must still be covered and chimneys and flues require metal flashing. Buildings with a Non vented attic all air sealing
requirements appropriate for the roof must be verified.
A. Ceiling Inspection - Vented Attics
01 If there is a continuous air barrier at the ceiling level; All opening into walls, drops, chasses, double walls are sealed.
Examples are below.
02 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The
flashing shall be sealed to the surrounding framing.
03 All penetration through the top plate of interior and exterior walls are sealed.
04 All penetrations shall be sealed to the surrounding drywall or have a secondary air barrier created around the fixture; with
the exception of fire sprinklers.
05
All installed recessed light fixtures that penetrate the ceiling to unconditioned space, or where insulation is present, are
rated to be Insulation Contact and Air Tight (IC and AT) which allows direct contact with insulation. Housing is sealed to the
drywall.
06 Exhaust fan housing is sealed to surrounding drywall and all holes and seams in the housing sealed.
07 All soffits and chases are covered with a hard cover that is sealed to the framing with caulk or foam.
08 Double walls that open to attic are covered and the cover sealed to the framing.
09 Attic Access forms airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical
compression using screws, or latches.
10 Knee walls require solid and sealed blocking at the bottom, top left side and right side of the knee wall. When the knee wall
is placed on top of a subfloor the open cavity below the subfloor and the ceiling below are sealed.
11 HVAC ducts that travel down a chase the chase are sealed at the ceiling level.
12 HVAC boots that penetrate the ceiling are sealed to the surrounding drywall.
13 All top plates of interior and exterior walls sealed to drywall.
14 Attic access must be surrounded with a dam at least the same depth as the insulation to prevent loss of ceiling insulation.
15 There must be a dam placed at the exterior edge of all kneewalls and all edges of insulation to stop air movement through
insulation.
16 Verification Status:Pass - all applicable requirements are met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 2 of 3)
Registration Number:
424-P010255225A-001-004-E22002A-E22A
Registration Date/Time: 2024-10-23 13:23:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:41
A. Ceiling Inspection - Vented Attics
17 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Roof Inspection - Non-Vented Attics
01 There is a continuous air barrier at the roof deck and gable ends.
02 Chimney and Flue require sheet metal flashing at the roof deck. The flashing is sealed to the chimney or flue with fire rated
caulk. The flashing is sealed to the surrounding framing.
03 All penetrations for plumbing, electrical etc in the roof deck and gable ends are sealed.
04 Verification Status:Pass - all applicable requirements are met
05 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
C. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 3 of 3)
Registration Number:
424-P010255225A-001-004-E22002A-E22A
Registration Date/Time: 2024-10-23 13:23:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:41
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-004-E23003A-E23A
Registration Date/Time: 2024-10-23 13:23:34 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 1 of 7)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 108)
City: La Quinta Zip Code: 92253
A. Quality Insulation Installation (QII) Preparation For Insulation
01 Air barrier installation and preparation for insulation was done and verified at framing stage prior to insulation being
installed. Where applicable, CF3R-ENV21 and 22 compliance documents have been signed off.
02
All structural framing areas shall be insulated in a manner that resists thermal bridging of the assembly separating
conditioned from unconditioned space. Structural bracing, tie-downs, and framing of steel, or specialized framing used to
meet structural requirements of the CBC are allowed and must be insulated. These areas shall be called out on the building
plans with diagrams and or specific design drawings indicating the R-value of insulation and fastening method to be used. It
is recommended that spray foam be used.
03 All insulation was installed to the manufactures insulation installation instructions.
04 Verification Status:Pass - all applicable requirements are met
05 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Quality Of All Installed Insulation
01 Installed insulation R-values is the same or greater than specified on the CF1R.
02 No gaps or voids between the insulation and framing.
03 Gaps between studs shall be filled with insulation.
04 Batt - ensure the ends are cut so there are no gaps.
05 Batt - Insulation is cut around obstructions like electrical boxes and no gaps exist.
06 Batt - insulation is not compressed (no stuffing of the insulation into the cavity.
07 Batt insulation is delaminated around all plumbing and electrical lines in ceilings, walls and floors.
08 An air barrier is installed at all exposed faces of batt, loose fill and SPF insulation.
09 Loose-fill insulation installed to the minimum installed weight per ft 2 per the manufacturer labeled R-value specification.
10 SPF insulation shall be spray-applied to fully adhere to structural assembly framing, floor and ceiling joists, and other
framing surfaces within the construction cavity.
11 SPF - with multiple layers applied, each foam lift (i.e. spray application) adheres to the substrate and foam interfaces.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 2 of 7)
Registration Number:
424-P010255225A-001-004-E23003A-E23A
Registration Date/Time: 2024-10-23 13:23:34 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
B. Quality Of All Installed Insulation
12 SPF - if values other than R-5.8 per inch for closed-cell SPF (ccSPF) and R-3.6 per inch for open-cell SPF (ocSPF) are used, the
ICC Evaluation Service Report (ESR) number (e.g. ESR-xxxx) will be documented in the CF2R-ENV-03.
13 ccSPF in areas where an air barrier is required the foam is at least 2 inches thick.
14 ocSPF depressions in the foam insulation surface is not greater than 1-inch of the required thickness provided these
depressions do not exceed 10 percent of the surface area being insulated.
15 ocSPF insulation completely fills cavities of 2x4 inch framing or less.
16 ocSPF cavities greater than 2x4 inch framing are filled to the thickness that meets the required R-value used for compliance.
17 SPF installed as an air barrier is sprayed at a minimum thickness of 5.5 inches for open cell and 2.0 inches for closed cell.
18
The insulation installer provided a CF2R-ENV-03. Labels or specification/data sheets are attached to the CF2R-ENV-03 for
each insulating material. The material datasheet for the installed material meets the performance specifications of the
required R-Values. Blown in material also includes insulation material bag labels or coverage charts.
19 Verification Status:Pass - all applicable requirements are met
20 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
C. Ceiling/Roof Insulation Quality
01 Insulation extends to the outside edge of the exterior top plates and is flush against any ventilation dams or baffles.
02 Insulation is in direct contact with ceiling so there are no gaps between the ceiling and the insulation.
03
Chimneys and flues (except for zero clearance) require a sheet metal collar around the stack. The collar must be at least as
tall as the depth of the insulation. The collar shall be 1 inch from the chimney or flue for double wall vents, and 6 inches
from the chimney/flue for single wall vents unless the manufacturer requires otherwise. The collar must be sealed to the
ceiling with high temperature sealant to prevent air leakage. The insulation is in contact with the sheet metal collar.
04 Required eave ventilation shall not be obstructed - the net free-ventilation area of the eave vent is maintained
05 Eave vent baffles are installed to prevent air movement under or into the ceiling insulation
06 Recessed downlights are covered with insulation. If they are not covered to the same depth as required by the CF1R for
ceiling insulation then a area weighted calculation is required. Recessed downlights are AT and IC rated.
07
SPF insulation shall not be applied directly to recessed lighting fixtures. Recessed downlights where SPF insulation is
installed shall:
(a) be covered with a minimum of 1.5 inches of mineral fiber insulation, or
(b) be enclosed in a box fabricated from 1/4 inch plywood, 18 gauge metal, 3/8 inch hard board or gypboard. Hard board
or gypboard does not cause a recessed downlights to meet the zero clearance insulation contact requirements.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 3 of 7)
Registration Number:
424-P010255225A-001-004-E23003A-E23A
Registration Date/Time: 2024-10-23 13:23:34 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
C. Ceiling/Roof Insulation Quality
08 Walkways and mechanical platforms are insulated to the same R-value as required by the CF1R for ceiling insulation. If not,
an area weighted calculation is completed and turned in with this compliance document.
09 Soffits, chasses and drop ceiling areas have a sealed hard cover and the insulation is in direct contact with the hard cover.
10 Knee walls - an air dam the full depth of the ceiling insulation is added to the exterior edge of the knee wall so the ceiling
insulation overlaps the knee wall to the full depth of the ceiling insulation.
11 Attic access doors are insulated to the same R-value required by the CF1R for roof insulation and the insulation is
permanently attached using adhesive or mechanical fasteners. The preferred method is rigid insulation.
12 Attic access forms an airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical
compression using screws, or latches.
13 Attic access must have a dam around the access to at least the same depth as the insulation.
14 Insulation batts must be cut to fit around cross bracings and truss webs.
15
Attic rulers appropriate to the material are installed and evenly distributed throughout the attic to verify depth (one ruler
for every 250 ft2) The rulers are clearly readable from the attic access and scaled to read inches of insulation and the
R-value installed.
16
Loose-fill and SPF insulation - a HERS rater shall measure the installed thickness (including low and high areas) and density
of insulation in at least 6 random locations on roof/ceilings and floors to ensure minimum thickness levels and installed
density necessary to meet the R-value specified on the Certificate of Compliance, and consistency with the manufacturer
coverage chart.
17 Steel-framed knee walls, skylight shafts, and gable ends, external surfaces of steel studs are covered with insulation
18 Verification Status:Pass - all applicable requirements are met
19 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Wall Insulation
01 Batts, loose fill mineral fiber, mineral and natural wool, and cellulose:fills cavity and is in contact with air barrier on six
sides.
02 ocSPF:completely fill cavities of 2x4 inch framing or less. Not required to fill cavities greater than 2x4 inch framing unless
required to meet R-value.
03 ccSPF:insulation is not required to fill the cavities of framed assemblies unless required to meet R-value.
04
Double walls and bump-outs - insulation fills the cavity, or additional air barrier is installed so the insulation fills the cavity
and is in contact with the insulation on all six sides unless SPF is used. Insulation shall be installed on the exterior of the
double walls or bump-outs.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 4 of 7)
Registration Number:
424-P010255225A-001-004-E23003A-E23A
Registration Date/Time: 2024-10-23 13:23:34 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
D. Wall Insulation
05 Low expanding foam used around windows and doors, if allowed by the manufacturer. If not allowed fill cavity with
insulation. Batts are not allowed to be stuffed into space.
06 Electrical panel in exterior insulated wall the panel is air tight and insulation is installed behind the panel.
07 Skylight shafts and attic knee wall insulation must meet all the requirements for walls and is in contact with the air barrier
on six sides unless SPF is used.
08 Skylight shafts and attic kneewalls insulation shall be in full contact with the drywall or other interior wall finish. Batt
insulation must be cut to fit around 2x4 framing that are laid flat.
09 Skylight shafts and attic kneewalls shall be completely enclosed by vertical and horizontal framing, including horizontal
plates at top and bottom of the insulation.
10 Band/Rim joists are insulated to the same R-value as the wall.
11 Verification Status:Pass - all applicable requirements are met
12 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Raised Floor Insulation Quality
01 Insulation is in full contact with subfloor.
02 Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation.
03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor.
04 When daylight basements are adjacent to crawlspaces, if the basement is conditioned the walls adjacent to the crawlspace
are insulated to the R-value listed on the CF1R. This includes framed stem walls, and vertical concrete retaining walls.
05 If access to the crawlspace is from the conditioned area the raised floor includes an airtight insulated access hatch. Where
possible locate crawl space access from the exterior.
06 Verification Status:Pass - all applicable requirements are met
07 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
F. Floor Above Garage Insulation Quality
01 Insulation must be in full contact with subfloor if the air barrier is at the band joist at the garage house wall.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 5 of 7)
Registration Number:
424-P010255225A-001-004-E23003A-E23A
Registration Date/Time: 2024-10-23 13:23:34 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
F. Floor Above Garage Insulation Quality
02 Insulation hangers spaced at 18 inches or less, insulation hangers must not compress insulation.
03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor.
04 If air barrier is at the perimeter of the garage below the conditioned subfloor then the insulation may be placed on the
garage ceiling. Perimeter of subfloor must also be insulated.
05 Verification Status:Pass - all applicable requirements are met
06 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
G. Cantilevered Floor Insulation Quality
01
Insulation is in full contact with cantilevered subfloor. Insulation hangers are spaced at 18 inches or less, insulation hangers
do not compress insulation. Netting or mesh can be used if the cavity under the floor is filled and in contact with the
subfloor.
02 Sealed Blocking shall be installed between joists where the wall rim joist would have been located in the absence of a
cantilever. Insulation shall be placed on both sides of this block.
03 Verification Status:Pass - all applicable requirements are met
04 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Attached Porch Roof Insulation Quality
01 Exterior wall at the intersection of the porch roof is fully insulated above, below and behind the roof line.
02 Where truss framing is used, airtight blocking is used at the top and bottom of each wall/roof section and insulated.
03 Verification Status:Pass - all applicable requirements are met
04 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 6 of 7)
Registration Number:
424-P010255225A-001-004-E23003A-E23A
Registration Date/Time: 2024-10-23 13:23:34 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
I. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 7 of 7)
Registration Number:
424-P010255225A-001-004-E23003A-E23A
Registration Date/Time: 2024-10-23 13:23:34 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-005-E21001A-E21A
Registration Date/Time: 2024-10-23 13:24:04 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:47
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 6)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 205)
City: La Quinta Zip Code: 92253
A. Air Infiltration And Insulation Installation (Qii) - Framing Stage
01 The requirements below cover the required air sealing and installation of insulation that must occur in the framing stage.
02
An air barrier is required in all thermal envelope assemblies to limit air movement between unconditioned/outside spaces
and conditioned/inside spaces and must meet one of the following:
1.Using individual materials that have an air permeance not exceeding 0.004 cfm/ft 2 under pressure differential of 0.3
in w.g. (1.57 psf) (0.02 L/s.m2 at 75 pa) when tested in accordance with ASTM E2178; or
•A list of example materials meeting the air permenace testing performance levels of 1 above is available in
RA3.5.2
2.Using assemblies of materials and components that have an average air leakage not to exceed 0.04 cfm/ft 2 under a
pressure differential of 0.3 in w.g. (1.57 psf) (0.2 L/s.m2 at 75 pa) when tested in accordance with ASTM E2357,
ASTM E1677, ASTM E1680 or ASTM E283, or
3.Testing the complete building and demonstrating that the air leakage rate of the building envelope does not exceed
0.4 cfm/ft2 at a pressure differential of 0.3 in w.g. (1.57 psf) (2.0 L/m2 at 75 pa) in accordance with ASTM E779 or an
equivalent approved method.
03 Air Barrier Material Installed
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Raised Floor
01 All gaps in the raised floor are sealed.
02 All chases sealed at floor level using a hard cover and the hard covers are sealed.
03 All Plumbing and electrical wires that penetrate the floor are sealed.
04 Subfloor sheathing is glued or sealed at all exterior panel edges, to create a continuous air tight subfloor.
05 Verification Status Pass - all applicable requirements are met
06 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 2 of 6)
Registration Number:
424-P010255225A-001-005-E21001A-E21A
Registration Date/Time: 2024-10-23 13:24:04 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:47
C. Walls/Knee Walls
01 All penetrations through the exterior wall air barrier are sealed to provide an air-tight envelope to unconditioned spaces
such as the outdoors, attic, garage and crawl space.
02 Exterior wall air barrier is sealed to the top plate and bottom plate in each stud bay.
03 All electrical boxes including knockouts that penetrate the air barrier to unconditioned space are sealed.
04 All openings in top and bottom plate, including all interior and exterior walls, to unconditioned space are sealed. Such as
holes drilled for electrical and plumbing.
05 Exterior bottom plates (all stories) are sealed to the floor using the appropriate sealing method.
06 All gaps around windows and doors are sealed. Proper sealant used was specified by window manufacturer.
07 Rim Joists all gaps and openings fully sealed.
08 Fan exhaust ducts that run between conditioned floors to exterior walls have a damper at the exterior wall.
09 Metal tie downs are insulated between exterior framing and tie down.
10 Insulation is installed in hard to access wall stud cavities, such as corner channels, wall intersections are insulated to the
proper R-value prior to exterior sheathing, or the exterior stucco lath.
11 Insulation is installed behind tub, shower, fireplace enclosures, and exterior stairwells to the R-value listed on the CF1R
when located against exterior walls. Insulation is required to be installed before tub, shower, and fireplace are installed.
12 A solid air barrier is installed on the interior wall from floor to ceiling tub, shower, and fireplace enclosures are installed in
exterior walls. Insulation in contact on all six sides of air barrier on exterior walls.
13
All single-member window and door headers shall be insulated to a minimum of R-3 for a 2x4 framing, or equivalent width,
and a minimum of R-5 for all other assemblies. Insulation is to be placed between the interior face of the header and inside
surface of the interior wall finish. If continuous exterior rigid insulation is used an insulated header is not required. No
header insulation is required for single-member headers that are the same width as the wall, so long as the entire wall has
at least R-2 insulation.
14 Knee walls have solid and sealed blocking at the bottom, top, left side and right side of the knee wall.
15 Verification Status Pass - all applicable requirements are met
16 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Ceiling/Attic
01 For vented attics much of the ceiling air barrier is verified after the ceiling drywall is installed using the ENV-22.
02 For non-vented attics ensure all penetrations through the roof deck and gable ends are sealed and air tight.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 3 of 6)
Registration Number:
424-P010255225A-001-005-E21001A-E21A
Registration Date/Time: 2024-10-23 13:24:04 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:47
D. Ceiling/Attic
03 All eave vents are covered with a rigid ventilation baffle that maintains the Net free-ventilation area.
04 All dropped ceilings and soffits are covered with hard covers and sealed to framing.
05 All chases are covered with hard covers and sealed to framing.
06 HVAC ducts that travel down a chase the chase is sealed at the ceiling level.
07 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The
flashing shall be sealed to the surrounding framing.
08 All Eave/soffit baffles are installed to stop air movement around the baffle and into insulation. Net free-ventilation of the
eave/soffit shall be maintained.
09 Double walls that open to attic are covered with an air barrier and cover has an air tight seal to the framing.
10 Verification Status Pass - all applicable requirements are met
11 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Conditioned Space Above Or Adjacent To Garage Air Barrier
01 All penetrations in the subfloor above the garage into conditioned space must follow the raised floor air barrier
requirements above.
02
Infiltration between the space above the garage and subfloor is prevented by one of the following methods:
•Seal all edges of garage ceiling (typically drywall) at the perimeter of the garage to create a continuous air tight
surface between the garage and adjacent conditioned envelope. Seal all plumbing, electric and mechanical
penetrations between the garage and the adjacent conditioned space. For an open-web truss, airtight blocking is
added on four sides of the garage perimeter. Insulation can be placed on the garage ceiling.
•Seal band joist above the wall at the garage to conditioned space transition. Seal all subfloor seams and penetrations
between the conditioned space and the garage. Insulation must be placed in contact of subfloor below conditioned
space.
03 Verification Status Pass - all applicable requirements are met
04 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
F. Walls For Attached Porch, Attic, Double Wall
01 All walls that separate conditioned and unconditioned space includes a continuous air barrier on the interior and exterior
wall.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 4 of 6)
Registration Number:
424-P010255225A-001-005-E21001A-E21A
Registration Date/Time: 2024-10-23 13:24:04 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:47
F. Walls For Attached Porch, Attic, Double Wall
02 Exterior wall, air barrier required at the intersection of the porch and exterior wall when there is conditioned space on the
other side. The exterior wall where the attic attaches to the conditioned space does includes an air barrier.
03 Truss framing blocking is used at the top and bottom of each wall/roof section.
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
G. Cantilevered Floor Air Barrier
01 Airtight blocking is installed between joists where the wall rim joist would have been located in the absence of a cantilever.
02
Exterior sheathing is installed to the bottom of the cantilever so that there is a continuous air and weather barrier for the
cantilever. The cantilevered joist must be insulated to the same R value as would be required for the subfloor prior to
closing.
03 Any gaps, cracks or penetrations in the air barrier of the cantilever are sealed. Can lights in the cantilever are IC and AT
rated and properly sealed to sheathing.
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Multifamily Air Barrier
01 Multifamily buildings must meet all air sealing requirements for single family buildings listed above.
02 Each dwelling unit must be air sealed to stop air movement from one unit to another.
03 Floor AND Ceiling of each Dwelling Unit: All penetrations through the floor and ceiling of each unit are sealed including,
electric and gas utilities, water pipes, drain pipes, fire protection service pipes, communication wiring.
04 Elevator penthouse, mechanical penthouse, stairwell doors, roof access hatch, plumbing stacks sealed to reduce air transfer
from attached spaces.
05
Common Walls: Bottom plate between units is sealed to the subfloor. All penetrations in the common walls are sealed
including electrical boxes, wiring and plumbing penetrations. Perpendicular Interior walls that open into the common walls
are sealed.
06 Vertical Chases for garbage chutes, elevator shafts, and HVAC ducting plumbing must be sealed to the floor and ceiling of
each unit to stop air movement up and around the chase due to stack effect.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 5 of 6)
Registration Number:
424-P010255225A-001-005-E21001A-E21A
Registration Date/Time: 2024-10-23 13:24:04 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:47
H. Multifamily Air Barrier
07 Vertical Chases such as garbage chutes, elevator shafts, and HVAC ducting plumbing, wiring etc. must be sealed to stop air
movement through the chase to the surrounding spaces.
08 Common Hallways - Penetrations between dwelling unit and common hallways are sealed, doors to the dwelling unit are
gasketed or made substantially airtight .
09 Verification Status Pass - all applicable requirements are met
10 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
I. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 6 of 6)
Registration Number:
424-P010255225A-001-005-E21001A-E21A
Registration Date/Time: 2024-10-23 13:24:04 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:47
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-005-E22002A-E22A
Registration Date/Time: 2024-10-23 13:24:11 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 205)
City: La Quinta Zip Code: 92253
For typical vented attics where the insulation is at the roof deck ceiling air barrier must be verified after the ceiling drywall is
installed and before attic insulation is installed. If SPF will be used in the attic this can be considered the air barrier. Soffit and
chases must still be covered and chimneys and flues require metal flashing. Buildings with a Non vented attic all air sealing
requirements appropriate for the roof must be verified.
A. Ceiling Inspection - Vented Attics
01 If there is a continuous air barrier at the ceiling level; All opening into walls, drops, chasses, double walls are sealed.
Examples are below.
02 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The
flashing shall be sealed to the surrounding framing.
03 All penetration through the top plate of interior and exterior walls are sealed.
04 All penetrations shall be sealed to the surrounding drywall or have a secondary air barrier created around the fixture; with
the exception of fire sprinklers.
05
All installed recessed light fixtures that penetrate the ceiling to unconditioned space, or where insulation is present, are
rated to be Insulation Contact and Air Tight (IC and AT) which allows direct contact with insulation. Housing is sealed to the
drywall.
06 Exhaust fan housing is sealed to surrounding drywall and all holes and seams in the housing sealed.
07 All soffits and chases are covered with a hard cover that is sealed to the framing with caulk or foam.
08 Double walls that open to attic are covered and the cover sealed to the framing.
09 Attic Access forms airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical
compression using screws, or latches.
10 Knee walls require solid and sealed blocking at the bottom, top left side and right side of the knee wall. When the knee wall
is placed on top of a subfloor the open cavity below the subfloor and the ceiling below are sealed.
11 HVAC ducts that travel down a chase the chase are sealed at the ceiling level.
12 HVAC boots that penetrate the ceiling are sealed to the surrounding drywall.
13 All top plates of interior and exterior walls sealed to drywall.
14 Attic access must be surrounded with a dam at least the same depth as the insulation to prevent loss of ceiling insulation.
15 There must be a dam placed at the exterior edge of all kneewalls and all edges of insulation to stop air movement through
insulation.
16 Verification Status:Pass - all applicable requirements are met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 2 of 3)
Registration Number:
424-P010255225A-001-005-E22002A-E22A
Registration Date/Time: 2024-10-23 13:24:11 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
A. Ceiling Inspection - Vented Attics
17 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Roof Inspection - Non-Vented Attics
01 There is a continuous air barrier at the roof deck and gable ends.
02 Chimney and Flue require sheet metal flashing at the roof deck. The flashing is sealed to the chimney or flue with fire rated
caulk. The flashing is sealed to the surrounding framing.
03 All penetrations for plumbing, electrical etc in the roof deck and gable ends are sealed.
04 Verification Status:Pass - all applicable requirements are met
05 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
C. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 3 of 3)
Registration Number:
424-P010255225A-001-005-E22002A-E22A
Registration Date/Time: 2024-10-23 13:24:11 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-005-E23003A-E23A
Registration Date/Time: 2024-10-23 13:24:14 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 1 of 7)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 205)
City: La Quinta Zip Code: 92253
A. Quality Insulation Installation (QII) Preparation For Insulation
01 Air barrier installation and preparation for insulation was done and verified at framing stage prior to insulation being
installed. Where applicable, CF3R-ENV21 and 22 compliance documents have been signed off.
02
All structural framing areas shall be insulated in a manner that resists thermal bridging of the assembly separating
conditioned from unconditioned space. Structural bracing, tie-downs, and framing of steel, or specialized framing used to
meet structural requirements of the CBC are allowed and must be insulated. These areas shall be called out on the building
plans with diagrams and or specific design drawings indicating the R-value of insulation and fastening method to be used. It
is recommended that spray foam be used.
03 All insulation was installed to the manufactures insulation installation instructions.
04 Verification Status:Pass - all applicable requirements are met
05 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Quality Of All Installed Insulation
01 Installed insulation R-values is the same or greater than specified on the CF1R.
02 No gaps or voids between the insulation and framing.
03 Gaps between studs shall be filled with insulation.
04 Batt - ensure the ends are cut so there are no gaps.
05 Batt - Insulation is cut around obstructions like electrical boxes and no gaps exist.
06 Batt - insulation is not compressed (no stuffing of the insulation into the cavity.
07 Batt insulation is delaminated around all plumbing and electrical lines in ceilings, walls and floors.
08 An air barrier is installed at all exposed faces of batt, loose fill and SPF insulation.
09 Loose-fill insulation installed to the minimum installed weight per ft 2 per the manufacturer labeled R-value specification.
10 SPF insulation shall be spray-applied to fully adhere to structural assembly framing, floor and ceiling joists, and other
framing surfaces within the construction cavity.
11 SPF - with multiple layers applied, each foam lift (i.e. spray application) adheres to the substrate and foam interfaces.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 2 of 7)
Registration Number:
424-P010255225A-001-005-E23003A-E23A
Registration Date/Time: 2024-10-23 13:24:14 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
B. Quality Of All Installed Insulation
12 SPF - if values other than R-5.8 per inch for closed-cell SPF (ccSPF) and R-3.6 per inch for open-cell SPF (ocSPF) are used, the
ICC Evaluation Service Report (ESR) number (e.g. ESR-xxxx) will be documented in the CF2R-ENV-03.
13 ccSPF in areas where an air barrier is required the foam is at least 2 inches thick.
14 ocSPF depressions in the foam insulation surface is not greater than 1-inch of the required thickness provided these
depressions do not exceed 10 percent of the surface area being insulated.
15 ocSPF insulation completely fills cavities of 2x4 inch framing or less.
16 ocSPF cavities greater than 2x4 inch framing are filled to the thickness that meets the required R-value used for compliance.
17 SPF installed as an air barrier is sprayed at a minimum thickness of 5.5 inches for open cell and 2.0 inches for closed cell.
18
The insulation installer provided a CF2R-ENV-03. Labels or specification/data sheets are attached to the CF2R-ENV-03 for
each insulating material. The material datasheet for the installed material meets the performance specifications of the
required R-Values. Blown in material also includes insulation material bag labels or coverage charts.
19 Verification Status:Pass - all applicable requirements are met
20 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
C. Ceiling/Roof Insulation Quality
01 Insulation extends to the outside edge of the exterior top plates and is flush against any ventilation dams or baffles.
02 Insulation is in direct contact with ceiling so there are no gaps between the ceiling and the insulation.
03
Chimneys and flues (except for zero clearance) require a sheet metal collar around the stack. The collar must be at least as
tall as the depth of the insulation. The collar shall be 1 inch from the chimney or flue for double wall vents, and 6 inches
from the chimney/flue for single wall vents unless the manufacturer requires otherwise. The collar must be sealed to the
ceiling with high temperature sealant to prevent air leakage. The insulation is in contact with the sheet metal collar.
04 Required eave ventilation shall not be obstructed - the net free-ventilation area of the eave vent is maintained
05 Eave vent baffles are installed to prevent air movement under or into the ceiling insulation
06 Recessed downlights are covered with insulation. If they are not covered to the same depth as required by the CF1R for
ceiling insulation then a area weighted calculation is required. Recessed downlights are AT and IC rated.
07
SPF insulation shall not be applied directly to recessed lighting fixtures. Recessed downlights where SPF insulation is
installed shall:
(a) be covered with a minimum of 1.5 inches of mineral fiber insulation, or
(b) be enclosed in a box fabricated from 1/4 inch plywood, 18 gauge metal, 3/8 inch hard board or gypboard. Hard board
or gypboard does not cause a recessed downlights to meet the zero clearance insulation contact requirements.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 3 of 7)
Registration Number:
424-P010255225A-001-005-E23003A-E23A
Registration Date/Time: 2024-10-23 13:24:14 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
C. Ceiling/Roof Insulation Quality
08 Walkways and mechanical platforms are insulated to the same R-value as required by the CF1R for ceiling insulation. If not,
an area weighted calculation is completed and turned in with this compliance document.
09 Soffits, chasses and drop ceiling areas have a sealed hard cover and the insulation is in direct contact with the hard cover.
10 Knee walls - an air dam the full depth of the ceiling insulation is added to the exterior edge of the knee wall so the ceiling
insulation overlaps the knee wall to the full depth of the ceiling insulation.
11 Attic access doors are insulated to the same R-value required by the CF1R for roof insulation and the insulation is
permanently attached using adhesive or mechanical fasteners. The preferred method is rigid insulation.
12 Attic access forms an airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical
compression using screws, or latches.
13 Attic access must have a dam around the access to at least the same depth as the insulation.
14 Insulation batts must be cut to fit around cross bracings and truss webs.
15
Attic rulers appropriate to the material are installed and evenly distributed throughout the attic to verify depth (one ruler
for every 250 ft2) The rulers are clearly readable from the attic access and scaled to read inches of insulation and the
R-value installed.
16
Loose-fill and SPF insulation - a HERS rater shall measure the installed thickness (including low and high areas) and density
of insulation in at least 6 random locations on roof/ceilings and floors to ensure minimum thickness levels and installed
density necessary to meet the R-value specified on the Certificate of Compliance, and consistency with the manufacturer
coverage chart.
17 Steel-framed knee walls, skylight shafts, and gable ends, external surfaces of steel studs are covered with insulation
18 Verification Status:Pass - all applicable requirements are met
19 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Wall Insulation
01 Batts, loose fill mineral fiber, mineral and natural wool, and cellulose:fills cavity and is in contact with air barrier on six
sides.
02 ocSPF:completely fill cavities of 2x4 inch framing or less. Not required to fill cavities greater than 2x4 inch framing unless
required to meet R-value.
03 ccSPF:insulation is not required to fill the cavities of framed assemblies unless required to meet R-value.
04
Double walls and bump-outs - insulation fills the cavity, or additional air barrier is installed so the insulation fills the cavity
and is in contact with the insulation on all six sides unless SPF is used. Insulation shall be installed on the exterior of the
double walls or bump-outs.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 4 of 7)
Registration Number:
424-P010255225A-001-005-E23003A-E23A
Registration Date/Time: 2024-10-23 13:24:14 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
D. Wall Insulation
05 Low expanding foam used around windows and doors, if allowed by the manufacturer. If not allowed fill cavity with
insulation. Batts are not allowed to be stuffed into space.
06 Electrical panel in exterior insulated wall the panel is air tight and insulation is installed behind the panel.
07 Skylight shafts and attic knee wall insulation must meet all the requirements for walls and is in contact with the air barrier
on six sides unless SPF is used.
08 Skylight shafts and attic kneewalls insulation shall be in full contact with the drywall or other interior wall finish. Batt
insulation must be cut to fit around 2x4 framing that are laid flat.
09 Skylight shafts and attic kneewalls shall be completely enclosed by vertical and horizontal framing, including horizontal
plates at top and bottom of the insulation.
10 Band/Rim joists are insulated to the same R-value as the wall.
11 Verification Status:Pass - all applicable requirements are met
12 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Raised Floor Insulation Quality
01 Insulation is in full contact with subfloor.
02 Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation.
03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor.
04 When daylight basements are adjacent to crawlspaces, if the basement is conditioned the walls adjacent to the crawlspace
are insulated to the R-value listed on the CF1R. This includes framed stem walls, and vertical concrete retaining walls.
05 If access to the crawlspace is from the conditioned area the raised floor includes an airtight insulated access hatch. Where
possible locate crawl space access from the exterior.
06 Verification Status:Pass - all applicable requirements are met
07 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
F. Floor Above Garage Insulation Quality
01 Insulation must be in full contact with subfloor if the air barrier is at the band joist at the garage house wall.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 5 of 7)
Registration Number:
424-P010255225A-001-005-E23003A-E23A
Registration Date/Time: 2024-10-23 13:24:14 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
F. Floor Above Garage Insulation Quality
02 Insulation hangers spaced at 18 inches or less, insulation hangers must not compress insulation.
03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor.
04 If air barrier is at the perimeter of the garage below the conditioned subfloor then the insulation may be placed on the
garage ceiling. Perimeter of subfloor must also be insulated.
05 Verification Status:Pass - all applicable requirements are met
06 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
G. Cantilevered Floor Insulation Quality
01
Insulation is in full contact with cantilevered subfloor. Insulation hangers are spaced at 18 inches or less, insulation hangers
do not compress insulation. Netting or mesh can be used if the cavity under the floor is filled and in contact with the
subfloor.
02 Sealed Blocking shall be installed between joists where the wall rim joist would have been located in the absence of a
cantilever. Insulation shall be placed on both sides of this block.
03 Verification Status:Pass - all applicable requirements are met
04 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Attached Porch Roof Insulation Quality
01 Exterior wall at the intersection of the porch roof is fully insulated above, below and behind the roof line.
02 Where truss framing is used, airtight blocking is used at the top and bottom of each wall/roof section and insulated.
03 Verification Status:Pass - all applicable requirements are met
04 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 6 of 7)
Registration Number:
424-P010255225A-001-005-E23003A-E23A
Registration Date/Time: 2024-10-23 13:24:14 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
I. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 7 of 7)
Registration Number:
424-P010255225A-001-005-E23003A-E23A
Registration Date/Time: 2024-10-23 13:24:14 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-006-E21001A-E21A
Registration Date/Time: 2024-10-23 13:24:25 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 6)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 206)
City: La Quinta Zip Code: 92253
A. Air Infiltration And Insulation Installation (Qii) - Framing Stage
01 The requirements below cover the required air sealing and installation of insulation that must occur in the framing stage.
02
An air barrier is required in all thermal envelope assemblies to limit air movement between unconditioned/outside spaces
and conditioned/inside spaces and must meet one of the following:
1.Using individual materials that have an air permeance not exceeding 0.004 cfm/ft 2 under pressure differential of 0.3
in w.g. (1.57 psf) (0.02 L/s.m2 at 75 pa) when tested in accordance with ASTM E2178; or
•A list of example materials meeting the air permenace testing performance levels of 1 above is available in
RA3.5.2
2.Using assemblies of materials and components that have an average air leakage not to exceed 0.04 cfm/ft 2 under a
pressure differential of 0.3 in w.g. (1.57 psf) (0.2 L/s.m2 at 75 pa) when tested in accordance with ASTM E2357,
ASTM E1677, ASTM E1680 or ASTM E283, or
3.Testing the complete building and demonstrating that the air leakage rate of the building envelope does not exceed
0.4 cfm/ft2 at a pressure differential of 0.3 in w.g. (1.57 psf) (2.0 L/m2 at 75 pa) in accordance with ASTM E779 or an
equivalent approved method.
03 Air Barrier Material Installed
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Raised Floor
01 All gaps in the raised floor are sealed.
02 All chases sealed at floor level using a hard cover and the hard covers are sealed.
03 All Plumbing and electrical wires that penetrate the floor are sealed.
04 Subfloor sheathing is glued or sealed at all exterior panel edges, to create a continuous air tight subfloor.
05 Verification Status Pass - all applicable requirements are met
06 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 2 of 6)
Registration Number:
424-P010255225A-001-006-E21001A-E21A
Registration Date/Time: 2024-10-23 13:24:25 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
C. Walls/Knee Walls
01 All penetrations through the exterior wall air barrier are sealed to provide an air-tight envelope to unconditioned spaces
such as the outdoors, attic, garage and crawl space.
02 Exterior wall air barrier is sealed to the top plate and bottom plate in each stud bay.
03 All electrical boxes including knockouts that penetrate the air barrier to unconditioned space are sealed.
04 All openings in top and bottom plate, including all interior and exterior walls, to unconditioned space are sealed. Such as
holes drilled for electrical and plumbing.
05 Exterior bottom plates (all stories) are sealed to the floor using the appropriate sealing method.
06 All gaps around windows and doors are sealed. Proper sealant used was specified by window manufacturer.
07 Rim Joists all gaps and openings fully sealed.
08 Fan exhaust ducts that run between conditioned floors to exterior walls have a damper at the exterior wall.
09 Metal tie downs are insulated between exterior framing and tie down.
10 Insulation is installed in hard to access wall stud cavities, such as corner channels, wall intersections are insulated to the
proper R-value prior to exterior sheathing, or the exterior stucco lath.
11 Insulation is installed behind tub, shower, fireplace enclosures, and exterior stairwells to the R-value listed on the CF1R
when located against exterior walls. Insulation is required to be installed before tub, shower, and fireplace are installed.
12 A solid air barrier is installed on the interior wall from floor to ceiling tub, shower, and fireplace enclosures are installed in
exterior walls. Insulation in contact on all six sides of air barrier on exterior walls.
13
All single-member window and door headers shall be insulated to a minimum of R-3 for a 2x4 framing, or equivalent width,
and a minimum of R-5 for all other assemblies. Insulation is to be placed between the interior face of the header and inside
surface of the interior wall finish. If continuous exterior rigid insulation is used an insulated header is not required. No
header insulation is required for single-member headers that are the same width as the wall, so long as the entire wall has
at least R-2 insulation.
14 Knee walls have solid and sealed blocking at the bottom, top, left side and right side of the knee wall.
15 Verification Status Pass - all applicable requirements are met
16 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Ceiling/Attic
01 For vented attics much of the ceiling air barrier is verified after the ceiling drywall is installed using the ENV-22.
02 For non-vented attics ensure all penetrations through the roof deck and gable ends are sealed and air tight.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 3 of 6)
Registration Number:
424-P010255225A-001-006-E21001A-E21A
Registration Date/Time: 2024-10-23 13:24:25 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
D. Ceiling/Attic
03 All eave vents are covered with a rigid ventilation baffle that maintains the Net free-ventilation area.
04 All dropped ceilings and soffits are covered with hard covers and sealed to framing.
05 All chases are covered with hard covers and sealed to framing.
06 HVAC ducts that travel down a chase the chase is sealed at the ceiling level.
07 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The
flashing shall be sealed to the surrounding framing.
08 All Eave/soffit baffles are installed to stop air movement around the baffle and into insulation. Net free-ventilation of the
eave/soffit shall be maintained.
09 Double walls that open to attic are covered with an air barrier and cover has an air tight seal to the framing.
10 Verification Status Pass - all applicable requirements are met
11 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Conditioned Space Above Or Adjacent To Garage Air Barrier
01 All penetrations in the subfloor above the garage into conditioned space must follow the raised floor air barrier
requirements above.
02
Infiltration between the space above the garage and subfloor is prevented by one of the following methods:
•Seal all edges of garage ceiling (typically drywall) at the perimeter of the garage to create a continuous air tight
surface between the garage and adjacent conditioned envelope. Seal all plumbing, electric and mechanical
penetrations between the garage and the adjacent conditioned space. For an open-web truss, airtight blocking is
added on four sides of the garage perimeter. Insulation can be placed on the garage ceiling.
•Seal band joist above the wall at the garage to conditioned space transition. Seal all subfloor seams and penetrations
between the conditioned space and the garage. Insulation must be placed in contact of subfloor below conditioned
space.
03 Verification Status Pass - all applicable requirements are met
04 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
F. Walls For Attached Porch, Attic, Double Wall
01 All walls that separate conditioned and unconditioned space includes a continuous air barrier on the interior and exterior
wall.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 4 of 6)
Registration Number:
424-P010255225A-001-006-E21001A-E21A
Registration Date/Time: 2024-10-23 13:24:25 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
F. Walls For Attached Porch, Attic, Double Wall
02 Exterior wall, air barrier required at the intersection of the porch and exterior wall when there is conditioned space on the
other side. The exterior wall where the attic attaches to the conditioned space does includes an air barrier.
03 Truss framing blocking is used at the top and bottom of each wall/roof section.
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
G. Cantilevered Floor Air Barrier
01 Airtight blocking is installed between joists where the wall rim joist would have been located in the absence of a cantilever.
02
Exterior sheathing is installed to the bottom of the cantilever so that there is a continuous air and weather barrier for the
cantilever. The cantilevered joist must be insulated to the same R value as would be required for the subfloor prior to
closing.
03 Any gaps, cracks or penetrations in the air barrier of the cantilever are sealed. Can lights in the cantilever are IC and AT
rated and properly sealed to sheathing.
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Multifamily Air Barrier
01 Multifamily buildings must meet all air sealing requirements for single family buildings listed above.
02 Each dwelling unit must be air sealed to stop air movement from one unit to another.
03 Floor AND Ceiling of each Dwelling Unit: All penetrations through the floor and ceiling of each unit are sealed including,
electric and gas utilities, water pipes, drain pipes, fire protection service pipes, communication wiring.
04 Elevator penthouse, mechanical penthouse, stairwell doors, roof access hatch, plumbing stacks sealed to reduce air transfer
from attached spaces.
05
Common Walls: Bottom plate between units is sealed to the subfloor. All penetrations in the common walls are sealed
including electrical boxes, wiring and plumbing penetrations. Perpendicular Interior walls that open into the common walls
are sealed.
06 Vertical Chases for garbage chutes, elevator shafts, and HVAC ducting plumbing must be sealed to the floor and ceiling of
each unit to stop air movement up and around the chase due to stack effect.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 5 of 6)
Registration Number:
424-P010255225A-001-006-E21001A-E21A
Registration Date/Time: 2024-10-23 13:24:25 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
H. Multifamily Air Barrier
07 Vertical Chases such as garbage chutes, elevator shafts, and HVAC ducting plumbing, wiring etc. must be sealed to stop air
movement through the chase to the surrounding spaces.
08 Common Hallways - Penetrations between dwelling unit and common hallways are sealed, doors to the dwelling unit are
gasketed or made substantially airtight .
09 Verification Status Pass - all applicable requirements are met
10 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
I. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 6 of 6)
Registration Number:
424-P010255225A-001-006-E21001A-E21A
Registration Date/Time: 2024-10-23 13:24:25 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-006-E22002A-E22A
Registration Date/Time: 2024-10-23 13:24:27 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 206)
City: La Quinta Zip Code: 92253
For typical vented attics where the insulation is at the roof deck ceiling air barrier must be verified after the ceiling drywall is
installed and before attic insulation is installed. If SPF will be used in the attic this can be considered the air barrier. Soffit and
chases must still be covered and chimneys and flues require metal flashing. Buildings with a Non vented attic all air sealing
requirements appropriate for the roof must be verified.
A. Ceiling Inspection - Vented Attics
01 If there is a continuous air barrier at the ceiling level; All opening into walls, drops, chasses, double walls are sealed.
Examples are below.
02 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The
flashing shall be sealed to the surrounding framing.
03 All penetration through the top plate of interior and exterior walls are sealed.
04 All penetrations shall be sealed to the surrounding drywall or have a secondary air barrier created around the fixture; with
the exception of fire sprinklers.
05
All installed recessed light fixtures that penetrate the ceiling to unconditioned space, or where insulation is present, are
rated to be Insulation Contact and Air Tight (IC and AT) which allows direct contact with insulation. Housing is sealed to the
drywall.
06 Exhaust fan housing is sealed to surrounding drywall and all holes and seams in the housing sealed.
07 All soffits and chases are covered with a hard cover that is sealed to the framing with caulk or foam.
08 Double walls that open to attic are covered and the cover sealed to the framing.
09 Attic Access forms airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical
compression using screws, or latches.
10 Knee walls require solid and sealed blocking at the bottom, top left side and right side of the knee wall. When the knee wall
is placed on top of a subfloor the open cavity below the subfloor and the ceiling below are sealed.
11 HVAC ducts that travel down a chase the chase are sealed at the ceiling level.
12 HVAC boots that penetrate the ceiling are sealed to the surrounding drywall.
13 All top plates of interior and exterior walls sealed to drywall.
14 Attic access must be surrounded with a dam at least the same depth as the insulation to prevent loss of ceiling insulation.
15 There must be a dam placed at the exterior edge of all kneewalls and all edges of insulation to stop air movement through
insulation.
16 Verification Status:Pass - all applicable requirements are met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 2 of 3)
Registration Number:
424-P010255225A-001-006-E22002A-E22A
Registration Date/Time: 2024-10-23 13:24:27 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
A. Ceiling Inspection - Vented Attics
17 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Roof Inspection - Non-Vented Attics
01 There is a continuous air barrier at the roof deck and gable ends.
02 Chimney and Flue require sheet metal flashing at the roof deck. The flashing is sealed to the chimney or flue with fire rated
caulk. The flashing is sealed to the surrounding framing.
03 All penetrations for plumbing, electrical etc in the roof deck and gable ends are sealed.
04 Verification Status:Pass - all applicable requirements are met
05 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
C. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 3 of 3)
Registration Number:
424-P010255225A-001-006-E22002A-E22A
Registration Date/Time: 2024-10-23 13:24:27 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-006-E23003A-E23A
Registration Date/Time: 2024-10-23 13:24:30 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 1 of 7)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 206)
City: La Quinta Zip Code: 92253
A. Quality Insulation Installation (QII) Preparation For Insulation
01 Air barrier installation and preparation for insulation was done and verified at framing stage prior to insulation being
installed. Where applicable, CF3R-ENV21 and 22 compliance documents have been signed off.
02
All structural framing areas shall be insulated in a manner that resists thermal bridging of the assembly separating
conditioned from unconditioned space. Structural bracing, tie-downs, and framing of steel, or specialized framing used to
meet structural requirements of the CBC are allowed and must be insulated. These areas shall be called out on the building
plans with diagrams and or specific design drawings indicating the R-value of insulation and fastening method to be used. It
is recommended that spray foam be used.
03 All insulation was installed to the manufactures insulation installation instructions.
04 Verification Status:Pass - all applicable requirements are met
05 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Quality Of All Installed Insulation
01 Installed insulation R-values is the same or greater than specified on the CF1R.
02 No gaps or voids between the insulation and framing.
03 Gaps between studs shall be filled with insulation.
04 Batt - ensure the ends are cut so there are no gaps.
05 Batt - Insulation is cut around obstructions like electrical boxes and no gaps exist.
06 Batt - insulation is not compressed (no stuffing of the insulation into the cavity.
07 Batt insulation is delaminated around all plumbing and electrical lines in ceilings, walls and floors.
08 An air barrier is installed at all exposed faces of batt, loose fill and SPF insulation.
09 Loose-fill insulation installed to the minimum installed weight per ft 2 per the manufacturer labeled R-value specification.
10 SPF insulation shall be spray-applied to fully adhere to structural assembly framing, floor and ceiling joists, and other
framing surfaces within the construction cavity.
11 SPF - with multiple layers applied, each foam lift (i.e. spray application) adheres to the substrate and foam interfaces.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 2 of 7)
Registration Number:
424-P010255225A-001-006-E23003A-E23A
Registration Date/Time: 2024-10-23 13:24:30 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
B. Quality Of All Installed Insulation
12 SPF - if values other than R-5.8 per inch for closed-cell SPF (ccSPF) and R-3.6 per inch for open-cell SPF (ocSPF) are used, the
ICC Evaluation Service Report (ESR) number (e.g. ESR-xxxx) will be documented in the CF2R-ENV-03.
13 ccSPF in areas where an air barrier is required the foam is at least 2 inches thick.
14 ocSPF depressions in the foam insulation surface is not greater than 1-inch of the required thickness provided these
depressions do not exceed 10 percent of the surface area being insulated.
15 ocSPF insulation completely fills cavities of 2x4 inch framing or less.
16 ocSPF cavities greater than 2x4 inch framing are filled to the thickness that meets the required R-value used for compliance.
17 SPF installed as an air barrier is sprayed at a minimum thickness of 5.5 inches for open cell and 2.0 inches for closed cell.
18
The insulation installer provided a CF2R-ENV-03. Labels or specification/data sheets are attached to the CF2R-ENV-03 for
each insulating material. The material datasheet for the installed material meets the performance specifications of the
required R-Values. Blown in material also includes insulation material bag labels or coverage charts.
19 Verification Status:Pass - all applicable requirements are met
20 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
C. Ceiling/Roof Insulation Quality
01 Insulation extends to the outside edge of the exterior top plates and is flush against any ventilation dams or baffles.
02 Insulation is in direct contact with ceiling so there are no gaps between the ceiling and the insulation.
03
Chimneys and flues (except for zero clearance) require a sheet metal collar around the stack. The collar must be at least as
tall as the depth of the insulation. The collar shall be 1 inch from the chimney or flue for double wall vents, and 6 inches
from the chimney/flue for single wall vents unless the manufacturer requires otherwise. The collar must be sealed to the
ceiling with high temperature sealant to prevent air leakage. The insulation is in contact with the sheet metal collar.
04 Required eave ventilation shall not be obstructed - the net free-ventilation area of the eave vent is maintained
05 Eave vent baffles are installed to prevent air movement under or into the ceiling insulation
06 Recessed downlights are covered with insulation. If they are not covered to the same depth as required by the CF1R for
ceiling insulation then a area weighted calculation is required. Recessed downlights are AT and IC rated.
07
SPF insulation shall not be applied directly to recessed lighting fixtures. Recessed downlights where SPF insulation is
installed shall:
(a) be covered with a minimum of 1.5 inches of mineral fiber insulation, or
(b) be enclosed in a box fabricated from 1/4 inch plywood, 18 gauge metal, 3/8 inch hard board or gypboard. Hard board
or gypboard does not cause a recessed downlights to meet the zero clearance insulation contact requirements.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 3 of 7)
Registration Number:
424-P010255225A-001-006-E23003A-E23A
Registration Date/Time: 2024-10-23 13:24:30 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
C. Ceiling/Roof Insulation Quality
08 Walkways and mechanical platforms are insulated to the same R-value as required by the CF1R for ceiling insulation. If not,
an area weighted calculation is completed and turned in with this compliance document.
09 Soffits, chasses and drop ceiling areas have a sealed hard cover and the insulation is in direct contact with the hard cover.
10 Knee walls - an air dam the full depth of the ceiling insulation is added to the exterior edge of the knee wall so the ceiling
insulation overlaps the knee wall to the full depth of the ceiling insulation.
11 Attic access doors are insulated to the same R-value required by the CF1R for roof insulation and the insulation is
permanently attached using adhesive or mechanical fasteners. The preferred method is rigid insulation.
12 Attic access forms an airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical
compression using screws, or latches.
13 Attic access must have a dam around the access to at least the same depth as the insulation.
14 Insulation batts must be cut to fit around cross bracings and truss webs.
15
Attic rulers appropriate to the material are installed and evenly distributed throughout the attic to verify depth (one ruler
for every 250 ft2) The rulers are clearly readable from the attic access and scaled to read inches of insulation and the
R-value installed.
16
Loose-fill and SPF insulation - a HERS rater shall measure the installed thickness (including low and high areas) and density
of insulation in at least 6 random locations on roof/ceilings and floors to ensure minimum thickness levels and installed
density necessary to meet the R-value specified on the Certificate of Compliance, and consistency with the manufacturer
coverage chart.
17 Steel-framed knee walls, skylight shafts, and gable ends, external surfaces of steel studs are covered with insulation
18 Verification Status:Pass - all applicable requirements are met
19 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Wall Insulation
01 Batts, loose fill mineral fiber, mineral and natural wool, and cellulose:fills cavity and is in contact with air barrier on six
sides.
02 ocSPF:completely fill cavities of 2x4 inch framing or less. Not required to fill cavities greater than 2x4 inch framing unless
required to meet R-value.
03 ccSPF:insulation is not required to fill the cavities of framed assemblies unless required to meet R-value.
04
Double walls and bump-outs - insulation fills the cavity, or additional air barrier is installed so the insulation fills the cavity
and is in contact with the insulation on all six sides unless SPF is used. Insulation shall be installed on the exterior of the
double walls or bump-outs.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 4 of 7)
Registration Number:
424-P010255225A-001-006-E23003A-E23A
Registration Date/Time: 2024-10-23 13:24:30 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
D. Wall Insulation
05 Low expanding foam used around windows and doors, if allowed by the manufacturer. If not allowed fill cavity with
insulation. Batts are not allowed to be stuffed into space.
06 Electrical panel in exterior insulated wall the panel is air tight and insulation is installed behind the panel.
07 Skylight shafts and attic knee wall insulation must meet all the requirements for walls and is in contact with the air barrier
on six sides unless SPF is used.
08 Skylight shafts and attic kneewalls insulation shall be in full contact with the drywall or other interior wall finish. Batt
insulation must be cut to fit around 2x4 framing that are laid flat.
09 Skylight shafts and attic kneewalls shall be completely enclosed by vertical and horizontal framing, including horizontal
plates at top and bottom of the insulation.
10 Band/Rim joists are insulated to the same R-value as the wall.
11 Verification Status:Pass - all applicable requirements are met
12 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Raised Floor Insulation Quality
01 Insulation is in full contact with subfloor.
02 Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation.
03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor.
04 When daylight basements are adjacent to crawlspaces, if the basement is conditioned the walls adjacent to the crawlspace
are insulated to the R-value listed on the CF1R. This includes framed stem walls, and vertical concrete retaining walls.
05 If access to the crawlspace is from the conditioned area the raised floor includes an airtight insulated access hatch. Where
possible locate crawl space access from the exterior.
06 Verification Status:Pass - all applicable requirements are met
07 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
F. Floor Above Garage Insulation Quality
01 Insulation must be in full contact with subfloor if the air barrier is at the band joist at the garage house wall.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 5 of 7)
Registration Number:
424-P010255225A-001-006-E23003A-E23A
Registration Date/Time: 2024-10-23 13:24:30 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
F. Floor Above Garage Insulation Quality
02 Insulation hangers spaced at 18 inches or less, insulation hangers must not compress insulation.
03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor.
04 If air barrier is at the perimeter of the garage below the conditioned subfloor then the insulation may be placed on the
garage ceiling. Perimeter of subfloor must also be insulated.
05 Verification Status:Pass - all applicable requirements are met
06 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
G. Cantilevered Floor Insulation Quality
01
Insulation is in full contact with cantilevered subfloor. Insulation hangers are spaced at 18 inches or less, insulation hangers
do not compress insulation. Netting or mesh can be used if the cavity under the floor is filled and in contact with the
subfloor.
02 Sealed Blocking shall be installed between joists where the wall rim joist would have been located in the absence of a
cantilever. Insulation shall be placed on both sides of this block.
03 Verification Status:Pass - all applicable requirements are met
04 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Attached Porch Roof Insulation Quality
01 Exterior wall at the intersection of the porch roof is fully insulated above, below and behind the roof line.
02 Where truss framing is used, airtight blocking is used at the top and bottom of each wall/roof section and insulated.
03 Verification Status:Pass - all applicable requirements are met
04 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 6 of 7)
Registration Number:
424-P010255225A-001-006-E23003A-E23A
Registration Date/Time: 2024-10-23 13:24:30 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
I. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 7 of 7)
Registration Number:
424-P010255225A-001-006-E23003A-E23A
Registration Date/Time: 2024-10-23 13:24:30 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-007-E21001A-E21A
Registration Date/Time: 2024-10-23 13:25:19 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 6)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 207)
City: La Quinta Zip Code: 92253
A. Air Infiltration And Insulation Installation (Qii) - Framing Stage
01 The requirements below cover the required air sealing and installation of insulation that must occur in the framing stage.
02
An air barrier is required in all thermal envelope assemblies to limit air movement between unconditioned/outside spaces
and conditioned/inside spaces and must meet one of the following:
1.Using individual materials that have an air permeance not exceeding 0.004 cfm/ft 2 under pressure differential of 0.3
in w.g. (1.57 psf) (0.02 L/s.m2 at 75 pa) when tested in accordance with ASTM E2178; or
•A list of example materials meeting the air permenace testing performance levels of 1 above is available in
RA3.5.2
2.Using assemblies of materials and components that have an average air leakage not to exceed 0.04 cfm/ft 2 under a
pressure differential of 0.3 in w.g. (1.57 psf) (0.2 L/s.m2 at 75 pa) when tested in accordance with ASTM E2357,
ASTM E1677, ASTM E1680 or ASTM E283, or
3.Testing the complete building and demonstrating that the air leakage rate of the building envelope does not exceed
0.4 cfm/ft2 at a pressure differential of 0.3 in w.g. (1.57 psf) (2.0 L/m2 at 75 pa) in accordance with ASTM E779 or an
equivalent approved method.
03 Air Barrier Material Installed
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Raised Floor
01 All gaps in the raised floor are sealed.
02 All chases sealed at floor level using a hard cover and the hard covers are sealed.
03 All Plumbing and electrical wires that penetrate the floor are sealed.
04 Subfloor sheathing is glued or sealed at all exterior panel edges, to create a continuous air tight subfloor.
05 Verification Status Pass - all applicable requirements are met
06 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 2 of 6)
Registration Number:
424-P010255225A-001-007-E21001A-E21A
Registration Date/Time: 2024-10-23 13:25:19 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
C. Walls/Knee Walls
01 All penetrations through the exterior wall air barrier are sealed to provide an air-tight envelope to unconditioned spaces
such as the outdoors, attic, garage and crawl space.
02 Exterior wall air barrier is sealed to the top plate and bottom plate in each stud bay.
03 All electrical boxes including knockouts that penetrate the air barrier to unconditioned space are sealed.
04 All openings in top and bottom plate, including all interior and exterior walls, to unconditioned space are sealed. Such as
holes drilled for electrical and plumbing.
05 Exterior bottom plates (all stories) are sealed to the floor using the appropriate sealing method.
06 All gaps around windows and doors are sealed. Proper sealant used was specified by window manufacturer.
07 Rim Joists all gaps and openings fully sealed.
08 Fan exhaust ducts that run between conditioned floors to exterior walls have a damper at the exterior wall.
09 Metal tie downs are insulated between exterior framing and tie down.
10 Insulation is installed in hard to access wall stud cavities, such as corner channels, wall intersections are insulated to the
proper R-value prior to exterior sheathing, or the exterior stucco lath.
11 Insulation is installed behind tub, shower, fireplace enclosures, and exterior stairwells to the R-value listed on the CF1R
when located against exterior walls. Insulation is required to be installed before tub, shower, and fireplace are installed.
12 A solid air barrier is installed on the interior wall from floor to ceiling tub, shower, and fireplace enclosures are installed in
exterior walls. Insulation in contact on all six sides of air barrier on exterior walls.
13
All single-member window and door headers shall be insulated to a minimum of R-3 for a 2x4 framing, or equivalent width,
and a minimum of R-5 for all other assemblies. Insulation is to be placed between the interior face of the header and inside
surface of the interior wall finish. If continuous exterior rigid insulation is used an insulated header is not required. No
header insulation is required for single-member headers that are the same width as the wall, so long as the entire wall has
at least R-2 insulation.
14 Knee walls have solid and sealed blocking at the bottom, top, left side and right side of the knee wall.
15 Verification Status Pass - all applicable requirements are met
16 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Ceiling/Attic
01 For vented attics much of the ceiling air barrier is verified after the ceiling drywall is installed using the ENV-22.
02 For non-vented attics ensure all penetrations through the roof deck and gable ends are sealed and air tight.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 3 of 6)
Registration Number:
424-P010255225A-001-007-E21001A-E21A
Registration Date/Time: 2024-10-23 13:25:19 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
D. Ceiling/Attic
03 All eave vents are covered with a rigid ventilation baffle that maintains the Net free-ventilation area.
04 All dropped ceilings and soffits are covered with hard covers and sealed to framing.
05 All chases are covered with hard covers and sealed to framing.
06 HVAC ducts that travel down a chase the chase is sealed at the ceiling level.
07 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The
flashing shall be sealed to the surrounding framing.
08 All Eave/soffit baffles are installed to stop air movement around the baffle and into insulation. Net free-ventilation of the
eave/soffit shall be maintained.
09 Double walls that open to attic are covered with an air barrier and cover has an air tight seal to the framing.
10 Verification Status Pass - all applicable requirements are met
11 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Conditioned Space Above Or Adjacent To Garage Air Barrier
01 All penetrations in the subfloor above the garage into conditioned space must follow the raised floor air barrier
requirements above.
02
Infiltration between the space above the garage and subfloor is prevented by one of the following methods:
•Seal all edges of garage ceiling (typically drywall) at the perimeter of the garage to create a continuous air tight
surface between the garage and adjacent conditioned envelope. Seal all plumbing, electric and mechanical
penetrations between the garage and the adjacent conditioned space. For an open-web truss, airtight blocking is
added on four sides of the garage perimeter. Insulation can be placed on the garage ceiling.
•Seal band joist above the wall at the garage to conditioned space transition. Seal all subfloor seams and penetrations
between the conditioned space and the garage. Insulation must be placed in contact of subfloor below conditioned
space.
03 Verification Status Pass - all applicable requirements are met
04 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
F. Walls For Attached Porch, Attic, Double Wall
01 All walls that separate conditioned and unconditioned space includes a continuous air barrier on the interior and exterior
wall.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 4 of 6)
Registration Number:
424-P010255225A-001-007-E21001A-E21A
Registration Date/Time: 2024-10-23 13:25:19 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
F. Walls For Attached Porch, Attic, Double Wall
02 Exterior wall, air barrier required at the intersection of the porch and exterior wall when there is conditioned space on the
other side. The exterior wall where the attic attaches to the conditioned space does includes an air barrier.
03 Truss framing blocking is used at the top and bottom of each wall/roof section.
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
G. Cantilevered Floor Air Barrier
01 Airtight blocking is installed between joists where the wall rim joist would have been located in the absence of a cantilever.
02
Exterior sheathing is installed to the bottom of the cantilever so that there is a continuous air and weather barrier for the
cantilever. The cantilevered joist must be insulated to the same R value as would be required for the subfloor prior to
closing.
03 Any gaps, cracks or penetrations in the air barrier of the cantilever are sealed. Can lights in the cantilever are IC and AT
rated and properly sealed to sheathing.
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Multifamily Air Barrier
01 Multifamily buildings must meet all air sealing requirements for single family buildings listed above.
02 Each dwelling unit must be air sealed to stop air movement from one unit to another.
03 Floor AND Ceiling of each Dwelling Unit: All penetrations through the floor and ceiling of each unit are sealed including,
electric and gas utilities, water pipes, drain pipes, fire protection service pipes, communication wiring.
04 Elevator penthouse, mechanical penthouse, stairwell doors, roof access hatch, plumbing stacks sealed to reduce air transfer
from attached spaces.
05
Common Walls: Bottom plate between units is sealed to the subfloor. All penetrations in the common walls are sealed
including electrical boxes, wiring and plumbing penetrations. Perpendicular Interior walls that open into the common walls
are sealed.
06 Vertical Chases for garbage chutes, elevator shafts, and HVAC ducting plumbing must be sealed to the floor and ceiling of
each unit to stop air movement up and around the chase due to stack effect.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 5 of 6)
Registration Number:
424-P010255225A-001-007-E21001A-E21A
Registration Date/Time: 2024-10-23 13:25:19 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
H. Multifamily Air Barrier
07 Vertical Chases such as garbage chutes, elevator shafts, and HVAC ducting plumbing, wiring etc. must be sealed to stop air
movement through the chase to the surrounding spaces.
08 Common Hallways - Penetrations between dwelling unit and common hallways are sealed, doors to the dwelling unit are
gasketed or made substantially airtight .
09 Verification Status Pass - all applicable requirements are met
10 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
I. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 6 of 6)
Registration Number:
424-P010255225A-001-007-E21001A-E21A
Registration Date/Time: 2024-10-23 13:25:19 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-007-E22002A-E22A
Registration Date/Time: 2024-10-23 13:25:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:52
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 207)
City: La Quinta Zip Code: 92253
For typical vented attics where the insulation is at the roof deck ceiling air barrier must be verified after the ceiling drywall is
installed and before attic insulation is installed. If SPF will be used in the attic this can be considered the air barrier. Soffit and
chases must still be covered and chimneys and flues require metal flashing. Buildings with a Non vented attic all air sealing
requirements appropriate for the roof must be verified.
A. Ceiling Inspection - Vented Attics
01 If there is a continuous air barrier at the ceiling level; All opening into walls, drops, chasses, double walls are sealed.
Examples are below.
02 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The
flashing shall be sealed to the surrounding framing.
03 All penetration through the top plate of interior and exterior walls are sealed.
04 All penetrations shall be sealed to the surrounding drywall or have a secondary air barrier created around the fixture; with
the exception of fire sprinklers.
05
All installed recessed light fixtures that penetrate the ceiling to unconditioned space, or where insulation is present, are
rated to be Insulation Contact and Air Tight (IC and AT) which allows direct contact with insulation. Housing is sealed to the
drywall.
06 Exhaust fan housing is sealed to surrounding drywall and all holes and seams in the housing sealed.
07 All soffits and chases are covered with a hard cover that is sealed to the framing with caulk or foam.
08 Double walls that open to attic are covered and the cover sealed to the framing.
09 Attic Access forms airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical
compression using screws, or latches.
10 Knee walls require solid and sealed blocking at the bottom, top left side and right side of the knee wall. When the knee wall
is placed on top of a subfloor the open cavity below the subfloor and the ceiling below are sealed.
11 HVAC ducts that travel down a chase the chase are sealed at the ceiling level.
12 HVAC boots that penetrate the ceiling are sealed to the surrounding drywall.
13 All top plates of interior and exterior walls sealed to drywall.
14 Attic access must be surrounded with a dam at least the same depth as the insulation to prevent loss of ceiling insulation.
15 There must be a dam placed at the exterior edge of all kneewalls and all edges of insulation to stop air movement through
insulation.
16 Verification Status:Pass - all applicable requirements are met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 2 of 3)
Registration Number:
424-P010255225A-001-007-E22002A-E22A
Registration Date/Time: 2024-10-23 13:25:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:52
A. Ceiling Inspection - Vented Attics
17 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Roof Inspection - Non-Vented Attics
01 There is a continuous air barrier at the roof deck and gable ends.
02 Chimney and Flue require sheet metal flashing at the roof deck. The flashing is sealed to the chimney or flue with fire rated
caulk. The flashing is sealed to the surrounding framing.
03 All penetrations for plumbing, electrical etc in the roof deck and gable ends are sealed.
04 Verification Status:Pass - all applicable requirements are met
05 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
C. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 3 of 3)
Registration Number:
424-P010255225A-001-007-E22002A-E22A
Registration Date/Time: 2024-10-23 13:25:22 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:52
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-007-E23003A-E23A
Registration Date/Time: 2024-10-23 13:25:25 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:52
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 1 of 7)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 207)
City: La Quinta Zip Code: 92253
A. Quality Insulation Installation (QII) Preparation For Insulation
01 Air barrier installation and preparation for insulation was done and verified at framing stage prior to insulation being
installed. Where applicable, CF3R-ENV21 and 22 compliance documents have been signed off.
02
All structural framing areas shall be insulated in a manner that resists thermal bridging of the assembly separating
conditioned from unconditioned space. Structural bracing, tie-downs, and framing of steel, or specialized framing used to
meet structural requirements of the CBC are allowed and must be insulated. These areas shall be called out on the building
plans with diagrams and or specific design drawings indicating the R-value of insulation and fastening method to be used. It
is recommended that spray foam be used.
03 All insulation was installed to the manufactures insulation installation instructions.
04 Verification Status:Pass - all applicable requirements are met
05 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Quality Of All Installed Insulation
01 Installed insulation R-values is the same or greater than specified on the CF1R.
02 No gaps or voids between the insulation and framing.
03 Gaps between studs shall be filled with insulation.
04 Batt - ensure the ends are cut so there are no gaps.
05 Batt - Insulation is cut around obstructions like electrical boxes and no gaps exist.
06 Batt - insulation is not compressed (no stuffing of the insulation into the cavity.
07 Batt insulation is delaminated around all plumbing and electrical lines in ceilings, walls and floors.
08 An air barrier is installed at all exposed faces of batt, loose fill and SPF insulation.
09 Loose-fill insulation installed to the minimum installed weight per ft 2 per the manufacturer labeled R-value specification.
10 SPF insulation shall be spray-applied to fully adhere to structural assembly framing, floor and ceiling joists, and other
framing surfaces within the construction cavity.
11 SPF - with multiple layers applied, each foam lift (i.e. spray application) adheres to the substrate and foam interfaces.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 2 of 7)
Registration Number:
424-P010255225A-001-007-E23003A-E23A
Registration Date/Time: 2024-10-23 13:25:25 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:52
B. Quality Of All Installed Insulation
12 SPF - if values other than R-5.8 per inch for closed-cell SPF (ccSPF) and R-3.6 per inch for open-cell SPF (ocSPF) are used, the
ICC Evaluation Service Report (ESR) number (e.g. ESR-xxxx) will be documented in the CF2R-ENV-03.
13 ccSPF in areas where an air barrier is required the foam is at least 2 inches thick.
14 ocSPF depressions in the foam insulation surface is not greater than 1-inch of the required thickness provided these
depressions do not exceed 10 percent of the surface area being insulated.
15 ocSPF insulation completely fills cavities of 2x4 inch framing or less.
16 ocSPF cavities greater than 2x4 inch framing are filled to the thickness that meets the required R-value used for compliance.
17 SPF installed as an air barrier is sprayed at a minimum thickness of 5.5 inches for open cell and 2.0 inches for closed cell.
18
The insulation installer provided a CF2R-ENV-03. Labels or specification/data sheets are attached to the CF2R-ENV-03 for
each insulating material. The material datasheet for the installed material meets the performance specifications of the
required R-Values. Blown in material also includes insulation material bag labels or coverage charts.
19 Verification Status:Pass - all applicable requirements are met
20 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
C. Ceiling/Roof Insulation Quality
01 Insulation extends to the outside edge of the exterior top plates and is flush against any ventilation dams or baffles.
02 Insulation is in direct contact with ceiling so there are no gaps between the ceiling and the insulation.
03
Chimneys and flues (except for zero clearance) require a sheet metal collar around the stack. The collar must be at least as
tall as the depth of the insulation. The collar shall be 1 inch from the chimney or flue for double wall vents, and 6 inches
from the chimney/flue for single wall vents unless the manufacturer requires otherwise. The collar must be sealed to the
ceiling with high temperature sealant to prevent air leakage. The insulation is in contact with the sheet metal collar.
04 Required eave ventilation shall not be obstructed - the net free-ventilation area of the eave vent is maintained
05 Eave vent baffles are installed to prevent air movement under or into the ceiling insulation
06 Recessed downlights are covered with insulation. If they are not covered to the same depth as required by the CF1R for
ceiling insulation then a area weighted calculation is required. Recessed downlights are AT and IC rated.
07
SPF insulation shall not be applied directly to recessed lighting fixtures. Recessed downlights where SPF insulation is
installed shall:
(a) be covered with a minimum of 1.5 inches of mineral fiber insulation, or
(b) be enclosed in a box fabricated from 1/4 inch plywood, 18 gauge metal, 3/8 inch hard board or gypboard. Hard board
or gypboard does not cause a recessed downlights to meet the zero clearance insulation contact requirements.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 3 of 7)
Registration Number:
424-P010255225A-001-007-E23003A-E23A
Registration Date/Time: 2024-10-23 13:25:25 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:52
C. Ceiling/Roof Insulation Quality
08 Walkways and mechanical platforms are insulated to the same R-value as required by the CF1R for ceiling insulation. If not,
an area weighted calculation is completed and turned in with this compliance document.
09 Soffits, chasses and drop ceiling areas have a sealed hard cover and the insulation is in direct contact with the hard cover.
10 Knee walls - an air dam the full depth of the ceiling insulation is added to the exterior edge of the knee wall so the ceiling
insulation overlaps the knee wall to the full depth of the ceiling insulation.
11 Attic access doors are insulated to the same R-value required by the CF1R for roof insulation and the insulation is
permanently attached using adhesive or mechanical fasteners. The preferred method is rigid insulation.
12 Attic access forms an airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical
compression using screws, or latches.
13 Attic access must have a dam around the access to at least the same depth as the insulation.
14 Insulation batts must be cut to fit around cross bracings and truss webs.
15
Attic rulers appropriate to the material are installed and evenly distributed throughout the attic to verify depth (one ruler
for every 250 ft2) The rulers are clearly readable from the attic access and scaled to read inches of insulation and the
R-value installed.
16
Loose-fill and SPF insulation - a HERS rater shall measure the installed thickness (including low and high areas) and density
of insulation in at least 6 random locations on roof/ceilings and floors to ensure minimum thickness levels and installed
density necessary to meet the R-value specified on the Certificate of Compliance, and consistency with the manufacturer
coverage chart.
17 Steel-framed knee walls, skylight shafts, and gable ends, external surfaces of steel studs are covered with insulation
18 Verification Status:Pass - all applicable requirements are met
19 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Wall Insulation
01 Batts, loose fill mineral fiber, mineral and natural wool, and cellulose:fills cavity and is in contact with air barrier on six
sides.
02 ocSPF:completely fill cavities of 2x4 inch framing or less. Not required to fill cavities greater than 2x4 inch framing unless
required to meet R-value.
03 ccSPF:insulation is not required to fill the cavities of framed assemblies unless required to meet R-value.
04
Double walls and bump-outs - insulation fills the cavity, or additional air barrier is installed so the insulation fills the cavity
and is in contact with the insulation on all six sides unless SPF is used. Insulation shall be installed on the exterior of the
double walls or bump-outs.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 4 of 7)
Registration Number:
424-P010255225A-001-007-E23003A-E23A
Registration Date/Time: 2024-10-23 13:25:25 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:52
D. Wall Insulation
05 Low expanding foam used around windows and doors, if allowed by the manufacturer. If not allowed fill cavity with
insulation. Batts are not allowed to be stuffed into space.
06 Electrical panel in exterior insulated wall the panel is air tight and insulation is installed behind the panel.
07 Skylight shafts and attic knee wall insulation must meet all the requirements for walls and is in contact with the air barrier
on six sides unless SPF is used.
08 Skylight shafts and attic kneewalls insulation shall be in full contact with the drywall or other interior wall finish. Batt
insulation must be cut to fit around 2x4 framing that are laid flat.
09 Skylight shafts and attic kneewalls shall be completely enclosed by vertical and horizontal framing, including horizontal
plates at top and bottom of the insulation.
10 Band/Rim joists are insulated to the same R-value as the wall.
11 Verification Status:Pass - all applicable requirements are met
12 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Raised Floor Insulation Quality
01 Insulation is in full contact with subfloor.
02 Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation.
03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor.
04 When daylight basements are adjacent to crawlspaces, if the basement is conditioned the walls adjacent to the crawlspace
are insulated to the R-value listed on the CF1R. This includes framed stem walls, and vertical concrete retaining walls.
05 If access to the crawlspace is from the conditioned area the raised floor includes an airtight insulated access hatch. Where
possible locate crawl space access from the exterior.
06 Verification Status:Pass - all applicable requirements are met
07 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
F. Floor Above Garage Insulation Quality
01 Insulation must be in full contact with subfloor if the air barrier is at the band joist at the garage house wall.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 5 of 7)
Registration Number:
424-P010255225A-001-007-E23003A-E23A
Registration Date/Time: 2024-10-23 13:25:25 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:52
F. Floor Above Garage Insulation Quality
02 Insulation hangers spaced at 18 inches or less, insulation hangers must not compress insulation.
03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor.
04 If air barrier is at the perimeter of the garage below the conditioned subfloor then the insulation may be placed on the
garage ceiling. Perimeter of subfloor must also be insulated.
05 Verification Status:Pass - all applicable requirements are met
06 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
G. Cantilevered Floor Insulation Quality
01
Insulation is in full contact with cantilevered subfloor. Insulation hangers are spaced at 18 inches or less, insulation hangers
do not compress insulation. Netting or mesh can be used if the cavity under the floor is filled and in contact with the
subfloor.
02 Sealed Blocking shall be installed between joists where the wall rim joist would have been located in the absence of a
cantilever. Insulation shall be placed on both sides of this block.
03 Verification Status:Pass - all applicable requirements are met
04 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Attached Porch Roof Insulation Quality
01 Exterior wall at the intersection of the porch roof is fully insulated above, below and behind the roof line.
02 Where truss framing is used, airtight blocking is used at the top and bottom of each wall/roof section and insulated.
03 Verification Status:Pass - all applicable requirements are met
04 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 6 of 7)
Registration Number:
424-P010255225A-001-007-E23003A-E23A
Registration Date/Time: 2024-10-23 13:25:25 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:52
I. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 7 of 7)
Registration Number:
424-P010255225A-001-007-E23003A-E23A
Registration Date/Time: 2024-10-23 13:25:25 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:52
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-008-E21001A-E21A
Registration Date/Time: 2024-10-23 13:25:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:53
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 1 of 6)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 208)
City: La Quinta Zip Code: 92253
A. Air Infiltration And Insulation Installation (Qii) - Framing Stage
01 The requirements below cover the required air sealing and installation of insulation that must occur in the framing stage.
02
An air barrier is required in all thermal envelope assemblies to limit air movement between unconditioned/outside spaces
and conditioned/inside spaces and must meet one of the following:
1.Using individual materials that have an air permeance not exceeding 0.004 cfm/ft 2 under pressure differential of 0.3
in w.g. (1.57 psf) (0.02 L/s.m2 at 75 pa) when tested in accordance with ASTM E2178; or
•A list of example materials meeting the air permenace testing performance levels of 1 above is available in
RA3.5.2
2.Using assemblies of materials and components that have an average air leakage not to exceed 0.04 cfm/ft 2 under a
pressure differential of 0.3 in w.g. (1.57 psf) (0.2 L/s.m2 at 75 pa) when tested in accordance with ASTM E2357,
ASTM E1677, ASTM E1680 or ASTM E283, or
3.Testing the complete building and demonstrating that the air leakage rate of the building envelope does not exceed
0.4 cfm/ft2 at a pressure differential of 0.3 in w.g. (1.57 psf) (2.0 L/m2 at 75 pa) in accordance with ASTM E779 or an
equivalent approved method.
03 Air Barrier Material Installed
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Raised Floor
01 All gaps in the raised floor are sealed.
02 All chases sealed at floor level using a hard cover and the hard covers are sealed.
03 All Plumbing and electrical wires that penetrate the floor are sealed.
04 Subfloor sheathing is glued or sealed at all exterior panel edges, to create a continuous air tight subfloor.
05 Verification Status Pass - all applicable requirements are met
06 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 2 of 6)
Registration Number:
424-P010255225A-001-008-E21001A-E21A
Registration Date/Time: 2024-10-23 13:25:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:53
C. Walls/Knee Walls
01 All penetrations through the exterior wall air barrier are sealed to provide an air-tight envelope to unconditioned spaces
such as the outdoors, attic, garage and crawl space.
02 Exterior wall air barrier is sealed to the top plate and bottom plate in each stud bay.
03 All electrical boxes including knockouts that penetrate the air barrier to unconditioned space are sealed.
04 All openings in top and bottom plate, including all interior and exterior walls, to unconditioned space are sealed. Such as
holes drilled for electrical and plumbing.
05 Exterior bottom plates (all stories) are sealed to the floor using the appropriate sealing method.
06 All gaps around windows and doors are sealed. Proper sealant used was specified by window manufacturer.
07 Rim Joists all gaps and openings fully sealed.
08 Fan exhaust ducts that run between conditioned floors to exterior walls have a damper at the exterior wall.
09 Metal tie downs are insulated between exterior framing and tie down.
10 Insulation is installed in hard to access wall stud cavities, such as corner channels, wall intersections are insulated to the
proper R-value prior to exterior sheathing, or the exterior stucco lath.
11 Insulation is installed behind tub, shower, fireplace enclosures, and exterior stairwells to the R-value listed on the CF1R
when located against exterior walls. Insulation is required to be installed before tub, shower, and fireplace are installed.
12 A solid air barrier is installed on the interior wall from floor to ceiling tub, shower, and fireplace enclosures are installed in
exterior walls. Insulation in contact on all six sides of air barrier on exterior walls.
13
All single-member window and door headers shall be insulated to a minimum of R-3 for a 2x4 framing, or equivalent width,
and a minimum of R-5 for all other assemblies. Insulation is to be placed between the interior face of the header and inside
surface of the interior wall finish. If continuous exterior rigid insulation is used an insulated header is not required. No
header insulation is required for single-member headers that are the same width as the wall, so long as the entire wall has
at least R-2 insulation.
14 Knee walls have solid and sealed blocking at the bottom, top, left side and right side of the knee wall.
15 Verification Status Pass - all applicable requirements are met
16 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Ceiling/Attic
01 For vented attics much of the ceiling air barrier is verified after the ceiling drywall is installed using the ENV-22.
02 For non-vented attics ensure all penetrations through the roof deck and gable ends are sealed and air tight.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 3 of 6)
Registration Number:
424-P010255225A-001-008-E21001A-E21A
Registration Date/Time: 2024-10-23 13:25:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:53
D. Ceiling/Attic
03 All eave vents are covered with a rigid ventilation baffle that maintains the Net free-ventilation area.
04 All dropped ceilings and soffits are covered with hard covers and sealed to framing.
05 All chases are covered with hard covers and sealed to framing.
06 HVAC ducts that travel down a chase the chase is sealed at the ceiling level.
07 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The
flashing shall be sealed to the surrounding framing.
08 All Eave/soffit baffles are installed to stop air movement around the baffle and into insulation. Net free-ventilation of the
eave/soffit shall be maintained.
09 Double walls that open to attic are covered with an air barrier and cover has an air tight seal to the framing.
10 Verification Status Pass - all applicable requirements are met
11 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Conditioned Space Above Or Adjacent To Garage Air Barrier
01 All penetrations in the subfloor above the garage into conditioned space must follow the raised floor air barrier
requirements above.
02
Infiltration between the space above the garage and subfloor is prevented by one of the following methods:
•Seal all edges of garage ceiling (typically drywall) at the perimeter of the garage to create a continuous air tight
surface between the garage and adjacent conditioned envelope. Seal all plumbing, electric and mechanical
penetrations between the garage and the adjacent conditioned space. For an open-web truss, airtight blocking is
added on four sides of the garage perimeter. Insulation can be placed on the garage ceiling.
•Seal band joist above the wall at the garage to conditioned space transition. Seal all subfloor seams and penetrations
between the conditioned space and the garage. Insulation must be placed in contact of subfloor below conditioned
space.
03 Verification Status Pass - all applicable requirements are met
04 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
F. Walls For Attached Porch, Attic, Double Wall
01 All walls that separate conditioned and unconditioned space includes a continuous air barrier on the interior and exterior
wall.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 4 of 6)
Registration Number:
424-P010255225A-001-008-E21001A-E21A
Registration Date/Time: 2024-10-23 13:25:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:53
F. Walls For Attached Porch, Attic, Double Wall
02 Exterior wall, air barrier required at the intersection of the porch and exterior wall when there is conditioned space on the
other side. The exterior wall where the attic attaches to the conditioned space does includes an air barrier.
03 Truss framing blocking is used at the top and bottom of each wall/roof section.
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
G. Cantilevered Floor Air Barrier
01 Airtight blocking is installed between joists where the wall rim joist would have been located in the absence of a cantilever.
02
Exterior sheathing is installed to the bottom of the cantilever so that there is a continuous air and weather barrier for the
cantilever. The cantilevered joist must be insulated to the same R value as would be required for the subfloor prior to
closing.
03 Any gaps, cracks or penetrations in the air barrier of the cantilever are sealed. Can lights in the cantilever are IC and AT
rated and properly sealed to sheathing.
04 Verification Status Pass - all applicable requirements are met
05 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Multifamily Air Barrier
01 Multifamily buildings must meet all air sealing requirements for single family buildings listed above.
02 Each dwelling unit must be air sealed to stop air movement from one unit to another.
03 Floor AND Ceiling of each Dwelling Unit: All penetrations through the floor and ceiling of each unit are sealed including,
electric and gas utilities, water pipes, drain pipes, fire protection service pipes, communication wiring.
04 Elevator penthouse, mechanical penthouse, stairwell doors, roof access hatch, plumbing stacks sealed to reduce air transfer
from attached spaces.
05
Common Walls: Bottom plate between units is sealed to the subfloor. All penetrations in the common walls are sealed
including electrical boxes, wiring and plumbing penetrations. Perpendicular Interior walls that open into the common walls
are sealed.
06 Vertical Chases for garbage chutes, elevator shafts, and HVAC ducting plumbing must be sealed to the floor and ceiling of
each unit to stop air movement up and around the chase due to stack effect.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 5 of 6)
Registration Number:
424-P010255225A-001-008-E21001A-E21A
Registration Date/Time: 2024-10-23 13:25:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:53
H. Multifamily Air Barrier
07 Vertical Chases such as garbage chutes, elevator shafts, and HVAC ducting plumbing, wiring etc. must be sealed to stop air
movement through the chase to the surrounding spaces.
08 Common Hallways - Penetrations between dwelling unit and common hallways are sealed, doors to the dwelling unit are
gasketed or made substantially airtight .
09 Verification Status Pass - all applicable requirements are met
10 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
I. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-21-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF (Page 6 of 6)
Registration Number:
424-P010255225A-001-008-E21001A-E21A
Registration Date/Time: 2024-10-23 13:25:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:53
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-008-E22002A-E22A
Registration Date/Time: 2024-10-23 13:25:44 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:55
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 208)
City: La Quinta Zip Code: 92253
For typical vented attics where the insulation is at the roof deck ceiling air barrier must be verified after the ceiling drywall is
installed and before attic insulation is installed. If SPF will be used in the attic this can be considered the air barrier. Soffit and
chases must still be covered and chimneys and flues require metal flashing. Buildings with a Non vented attic all air sealing
requirements appropriate for the roof must be verified.
A. Ceiling Inspection - Vented Attics
01 If there is a continuous air barrier at the ceiling level; All opening into walls, drops, chasses, double walls are sealed.
Examples are below.
02 Chimney and Flue require sheet metal flashing. The flashing shall be sealed to the chimney or flue with fire rated caulk. The
flashing shall be sealed to the surrounding framing.
03 All penetration through the top plate of interior and exterior walls are sealed.
04 All penetrations shall be sealed to the surrounding drywall or have a secondary air barrier created around the fixture; with
the exception of fire sprinklers.
05
All installed recessed light fixtures that penetrate the ceiling to unconditioned space, or where insulation is present, are
rated to be Insulation Contact and Air Tight (IC and AT) which allows direct contact with insulation. Housing is sealed to the
drywall.
06 Exhaust fan housing is sealed to surrounding drywall and all holes and seams in the housing sealed.
07 All soffits and chases are covered with a hard cover that is sealed to the framing with caulk or foam.
08 Double walls that open to attic are covered and the cover sealed to the framing.
09 Attic Access forms airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical
compression using screws, or latches.
10 Knee walls require solid and sealed blocking at the bottom, top left side and right side of the knee wall. When the knee wall
is placed on top of a subfloor the open cavity below the subfloor and the ceiling below are sealed.
11 HVAC ducts that travel down a chase the chase are sealed at the ceiling level.
12 HVAC boots that penetrate the ceiling are sealed to the surrounding drywall.
13 All top plates of interior and exterior walls sealed to drywall.
14 Attic access must be surrounded with a dam at least the same depth as the insulation to prevent loss of ceiling insulation.
15 There must be a dam placed at the exterior edge of all kneewalls and all edges of insulation to stop air movement through
insulation.
16 Verification Status:Pass - all applicable requirements are met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 2 of 3)
Registration Number:
424-P010255225A-001-008-E22002A-E22A
Registration Date/Time: 2024-10-23 13:25:44 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:55
A. Ceiling Inspection - Vented Attics
17 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Roof Inspection - Non-Vented Attics
01 There is a continuous air barrier at the roof deck and gable ends.
02 Chimney and Flue require sheet metal flashing at the roof deck. The flashing is sealed to the chimney or flue with fire rated
caulk. The flashing is sealed to the surrounding framing.
03 All penetrations for plumbing, electrical etc in the roof deck and gable ends are sealed.
04 Verification Status:Pass - all applicable requirements are met
05 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
C. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-22-H
Quality Insulation Installation (QII) Air Infiltration Sealing - Ceiling Roof Deck (Page 3 of 3)
Registration Number:
424-P010255225A-001-008-E22002A-E22A
Registration Date/Time: 2024-10-23 13:25:44 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:55
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-008-E23003A-E23A
Registration Date/Time: 2024-10-23 13:25:48 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:55
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 1 of 7)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 208)
City: La Quinta Zip Code: 92253
A. Quality Insulation Installation (QII) Preparation For Insulation
01 Air barrier installation and preparation for insulation was done and verified at framing stage prior to insulation being
installed. Where applicable, CF3R-ENV21 and 22 compliance documents have been signed off.
02
All structural framing areas shall be insulated in a manner that resists thermal bridging of the assembly separating
conditioned from unconditioned space. Structural bracing, tie-downs, and framing of steel, or specialized framing used to
meet structural requirements of the CBC are allowed and must be insulated. These areas shall be called out on the building
plans with diagrams and or specific design drawings indicating the R-value of insulation and fastening method to be used. It
is recommended that spray foam be used.
03 All insulation was installed to the manufactures insulation installation instructions.
04 Verification Status:Pass - all applicable requirements are met
05 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
B. Quality Of All Installed Insulation
01 Installed insulation R-values is the same or greater than specified on the CF1R.
02 No gaps or voids between the insulation and framing.
03 Gaps between studs shall be filled with insulation.
04 Batt - ensure the ends are cut so there are no gaps.
05 Batt - Insulation is cut around obstructions like electrical boxes and no gaps exist.
06 Batt - insulation is not compressed (no stuffing of the insulation into the cavity.
07 Batt insulation is delaminated around all plumbing and electrical lines in ceilings, walls and floors.
08 An air barrier is installed at all exposed faces of batt, loose fill and SPF insulation.
09 Loose-fill insulation installed to the minimum installed weight per ft 2 per the manufacturer labeled R-value specification.
10 SPF insulation shall be spray-applied to fully adhere to structural assembly framing, floor and ceiling joists, and other
framing surfaces within the construction cavity.
11 SPF - with multiple layers applied, each foam lift (i.e. spray application) adheres to the substrate and foam interfaces.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 2 of 7)
Registration Number:
424-P010255225A-001-008-E23003A-E23A
Registration Date/Time: 2024-10-23 13:25:48 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:55
B. Quality Of All Installed Insulation
12 SPF - if values other than R-5.8 per inch for closed-cell SPF (ccSPF) and R-3.6 per inch for open-cell SPF (ocSPF) are used, the
ICC Evaluation Service Report (ESR) number (e.g. ESR-xxxx) will be documented in the CF2R-ENV-03.
13 ccSPF in areas where an air barrier is required the foam is at least 2 inches thick.
14 ocSPF depressions in the foam insulation surface is not greater than 1-inch of the required thickness provided these
depressions do not exceed 10 percent of the surface area being insulated.
15 ocSPF insulation completely fills cavities of 2x4 inch framing or less.
16 ocSPF cavities greater than 2x4 inch framing are filled to the thickness that meets the required R-value used for compliance.
17 SPF installed as an air barrier is sprayed at a minimum thickness of 5.5 inches for open cell and 2.0 inches for closed cell.
18
The insulation installer provided a CF2R-ENV-03. Labels or specification/data sheets are attached to the CF2R-ENV-03 for
each insulating material. The material datasheet for the installed material meets the performance specifications of the
required R-Values. Blown in material also includes insulation material bag labels or coverage charts.
19 Verification Status:Pass - all applicable requirements are met
20 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
C. Ceiling/Roof Insulation Quality
01 Insulation extends to the outside edge of the exterior top plates and is flush against any ventilation dams or baffles.
02 Insulation is in direct contact with ceiling so there are no gaps between the ceiling and the insulation.
03
Chimneys and flues (except for zero clearance) require a sheet metal collar around the stack. The collar must be at least as
tall as the depth of the insulation. The collar shall be 1 inch from the chimney or flue for double wall vents, and 6 inches
from the chimney/flue for single wall vents unless the manufacturer requires otherwise. The collar must be sealed to the
ceiling with high temperature sealant to prevent air leakage. The insulation is in contact with the sheet metal collar.
04 Required eave ventilation shall not be obstructed - the net free-ventilation area of the eave vent is maintained
05 Eave vent baffles are installed to prevent air movement under or into the ceiling insulation
06 Recessed downlights are covered with insulation. If they are not covered to the same depth as required by the CF1R for
ceiling insulation then a area weighted calculation is required. Recessed downlights are AT and IC rated.
07
SPF insulation shall not be applied directly to recessed lighting fixtures. Recessed downlights where SPF insulation is
installed shall:
(a) be covered with a minimum of 1.5 inches of mineral fiber insulation, or
(b) be enclosed in a box fabricated from 1/4 inch plywood, 18 gauge metal, 3/8 inch hard board or gypboard. Hard board
or gypboard does not cause a recessed downlights to meet the zero clearance insulation contact requirements.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 3 of 7)
Registration Number:
424-P010255225A-001-008-E23003A-E23A
Registration Date/Time: 2024-10-23 13:25:48 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:55
C. Ceiling/Roof Insulation Quality
08 Walkways and mechanical platforms are insulated to the same R-value as required by the CF1R for ceiling insulation. If not,
an area weighted calculation is completed and turned in with this compliance document.
09 Soffits, chasses and drop ceiling areas have a sealed hard cover and the insulation is in direct contact with the hard cover.
10 Knee walls - an air dam the full depth of the ceiling insulation is added to the exterior edge of the knee wall so the ceiling
insulation overlaps the knee wall to the full depth of the ceiling insulation.
11 Attic access doors are insulated to the same R-value required by the CF1R for roof insulation and the insulation is
permanently attached using adhesive or mechanical fasteners. The preferred method is rigid insulation.
12 Attic access forms an airtight seal from conditioned space to unconditioned space. Vertical attic access requires mechanical
compression using screws, or latches.
13 Attic access must have a dam around the access to at least the same depth as the insulation.
14 Insulation batts must be cut to fit around cross bracings and truss webs.
15
Attic rulers appropriate to the material are installed and evenly distributed throughout the attic to verify depth (one ruler
for every 250 ft2) The rulers are clearly readable from the attic access and scaled to read inches of insulation and the
R-value installed.
16
Loose-fill and SPF insulation - a HERS rater shall measure the installed thickness (including low and high areas) and density
of insulation in at least 6 random locations on roof/ceilings and floors to ensure minimum thickness levels and installed
density necessary to meet the R-value specified on the Certificate of Compliance, and consistency with the manufacturer
coverage chart.
17 Steel-framed knee walls, skylight shafts, and gable ends, external surfaces of steel studs are covered with insulation
18 Verification Status:Pass - all applicable requirements are met
19 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Wall Insulation
01 Batts, loose fill mineral fiber, mineral and natural wool, and cellulose:fills cavity and is in contact with air barrier on six
sides.
02 ocSPF:completely fill cavities of 2x4 inch framing or less. Not required to fill cavities greater than 2x4 inch framing unless
required to meet R-value.
03 ccSPF:insulation is not required to fill the cavities of framed assemblies unless required to meet R-value.
04
Double walls and bump-outs - insulation fills the cavity, or additional air barrier is installed so the insulation fills the cavity
and is in contact with the insulation on all six sides unless SPF is used. Insulation shall be installed on the exterior of the
double walls or bump-outs.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 4 of 7)
Registration Number:
424-P010255225A-001-008-E23003A-E23A
Registration Date/Time: 2024-10-23 13:25:48 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:55
D. Wall Insulation
05 Low expanding foam used around windows and doors, if allowed by the manufacturer. If not allowed fill cavity with
insulation. Batts are not allowed to be stuffed into space.
06 Electrical panel in exterior insulated wall the panel is air tight and insulation is installed behind the panel.
07 Skylight shafts and attic knee wall insulation must meet all the requirements for walls and is in contact with the air barrier
on six sides unless SPF is used.
08 Skylight shafts and attic kneewalls insulation shall be in full contact with the drywall or other interior wall finish. Batt
insulation must be cut to fit around 2x4 framing that are laid flat.
09 Skylight shafts and attic kneewalls shall be completely enclosed by vertical and horizontal framing, including horizontal
plates at top and bottom of the insulation.
10 Band/Rim joists are insulated to the same R-value as the wall.
11 Verification Status:Pass - all applicable requirements are met
12 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Raised Floor Insulation Quality
01 Insulation is in full contact with subfloor.
02 Insulation hangers are spaced at 18 inches or less, insulation hangers do not compress insulation.
03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor.
04 When daylight basements are adjacent to crawlspaces, if the basement is conditioned the walls adjacent to the crawlspace
are insulated to the R-value listed on the CF1R. This includes framed stem walls, and vertical concrete retaining walls.
05 If access to the crawlspace is from the conditioned area the raised floor includes an airtight insulated access hatch. Where
possible locate crawl space access from the exterior.
06 Verification Status:Pass - all applicable requirements are met
07 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
F. Floor Above Garage Insulation Quality
01 Insulation must be in full contact with subfloor if the air barrier is at the band joist at the garage house wall.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 5 of 7)
Registration Number:
424-P010255225A-001-008-E23003A-E23A
Registration Date/Time: 2024-10-23 13:25:48 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:55
F. Floor Above Garage Insulation Quality
02 Insulation hangers spaced at 18 inches or less, insulation hangers must not compress insulation.
03 Netting or mesh can be used if the cavity under the floor is filled and in contact with the subfloor.
04 If air barrier is at the perimeter of the garage below the conditioned subfloor then the insulation may be placed on the
garage ceiling. Perimeter of subfloor must also be insulated.
05 Verification Status:Pass - all applicable requirements are met
06 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
G. Cantilevered Floor Insulation Quality
01
Insulation is in full contact with cantilevered subfloor. Insulation hangers are spaced at 18 inches or less, insulation hangers
do not compress insulation. Netting or mesh can be used if the cavity under the floor is filled and in contact with the
subfloor.
02 Sealed Blocking shall be installed between joists where the wall rim joist would have been located in the absence of a
cantilever. Insulation shall be placed on both sides of this block.
03 Verification Status:Pass - all applicable requirements are met
04 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Attached Porch Roof Insulation Quality
01 Exterior wall at the intersection of the porch roof is fully insulated above, below and behind the roof line.
02 Where truss framing is used, airtight blocking is used at the top and bottom of each wall/roof section and insulated.
03 Verification Status:Pass - all applicable requirements are met
04 Correction Notes:
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been
met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 6 of 7)
Registration Number:
424-P010255225A-001-008-E23003A-E23A
Registration Date/Time: 2024-10-23 13:25:48 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:55
I. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-ENV-23-H
Quality Insulation Installation (QII) Insulation Installation (Page 7 of 7)
Registration Number:
424-P010255225A-001-008-E23003A-E23A
Registration Date/Time: 2024-10-23 13:25:48 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:55
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-001-M27005A-M27A
Registration Date/Time: 2024-10-23 13:21:39 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:34
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 105)
City: La Quinta Zip Code: 92253
Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE
Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on
this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010.
A. Dwelling Mechanical Ventilation - General Information
01 Dwelling unit name DwellingUnit 105
02 Building Type Single family
03 Project scope Newly constructed building
04
Total Conditioned Floor Area of Dwelling Unit
(For addition projects the conditioned floor area equals
existing area plus addition area. )
931
05
Number of bedrooms in dwelling unit
(For addition projects the number of bedrooms equals the
existing bedrooms plus addition bedrooms)
2
06 Ventilation Operation Schedule Continuous
07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1)
08 Whole Building Ventilation System Type Standalone - Balanced
09 IAQ Fan Location
MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method
B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method
A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with
outdoor air each hour at no less than the rate in equation 4.1a.
01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81
02 Installed Continuous Whole-Building Ventilation Rate 136
C. Compliance Statement
01 Building passes continuous whole-building ventilation rate test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 2 of 3)
Registration Number:
424-P010255225A-001-001-M27005A-M27A
Registration Date/Time: 2024-10-23 13:21:39 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:34
D. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 3 of 3)
Registration Number:
424-P010255225A-001-001-M27005A-M27A
Registration Date/Time: 2024-10-23 13:21:39 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:34
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-001-M20006A-M20A
Registration Date/Time: 2024-10-23 13:21:42 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:34
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 105)
City: La Quinta Zip Code: 92253
A. System Information
01 Space Conditioning System Identification or Name UNIT 105 HVACSys
02 Space Conditioning System Location or Area Served Main
03 Building Type from CF-1R Multi-family
04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS)
Credit from CF1R?
No, credit is not taken
05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit
from CF1R?
No, credit is not taken
06 Duct System Compliance Category New
MCH-20a - Completely New Duct System
B. Duct Leakage Diagnostic Test
01 Condenser Nominal Cooling Capacity (ton)3
02 Heating Capacity (kBtu/h)36
03 Conditioned Floor Area served by this HVAC system (ft2)931
04 Duct Leakage Test Conditions Test final
05 Duct Leakage Test Method Total leakage
06 Leakage Factor 0.12
07 Air Handling Unit Airflow (AHUAirflow) Determination
Method
Cooling system method
08 Measured AHUAirflow This field or section is not applicable
09 Calculated Target Allowable Duct Leakage (cfm)144
10 Actual Duct Leakage Rate from Leakage Test
Measurement (cfm)
59.5
11 Compliance Statement System passes leakage test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 2 of 3)
Registration Number:
424-P010255225A-001-001-M20006A-M20A
Registration Date/Time: 2024-10-23 13:21:42 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:34
B. Duct Leakage Diagnostic Test
12 Notes
C. Additional Requirements for Compliance
01 System was tested in its normal operation condition. No temporary taping allowed.
02
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage
testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation
Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required,
may configure the OA damper to the closed position during duct leakage testing.
03 All supply and return register boots were sealed to the drywall.
04 Building cavities were not used as plenums or platform returns in lieu of ducts.
05 If cloth backed tape was used it was covered with Mastic and draw bands.
06 All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in).
After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must
be performed
07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are
properly sealed.
08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points
between the air handler and the supply and return plenums to verify that the connection points are properly sealed.
09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
10 Verification Status:Pass
11 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 3 of 3)
Registration Number:
424-P010255225A-001-001-M20006A-M20A
Registration Date/Time: 2024-10-23 13:21:42 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:34
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-001-M23007A-M23A
Registration Date/Time: 2024-10-23 13:21:44 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:35
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 1 of 4)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 105)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 105 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement
B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP)
in the Supply Plenum.
Procedures for installing HSPP or PSPP are specified in RA3.3.1.1.
01 Method Used to Demonstrate Compliance with the
HSPP/PSPP Requirement
HSPP installed and labeled consistent with Figure RA3.3-1
C. Airflow Rate Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given
in RA3.3.2.
01 Airflow Rate Measurement Type used for this airflow rate
verification.
Traditional Flow Capture Hood according to procedure in
RA3.3.3.1.4
02 Manufacturer of Airflow Measurement Apparatus ALNOR
03 Model number of Airflow Measurement Apparatus EBT731
04
Certification Status of the Airflow Measurement Apparatus
Accuracy
Certified by Manufacturer and listed on CEC Website at
http://www.energy.ca.gov/title24/equipment_cert/ama_fas
/index.html
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 2 of 4)
Registration Number:
424-P010255225A-001-001-M23007A-M23A
Registration Date/Time: 2024-10-23 13:21:44 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:35
MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
D. Forced Air System Airflow Rate Measurement
The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3.
01 Required Minimum System Airflow Rate (cfm/ton)350
02 Required Minimum System Airflow Target (cfm)1050
03 Actual System Airflow Rate Measurement (cfm)1108
04 Compliance Statement:System airflow rate complies
E. Additional Requirements
01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in
the system during system air flow rate measurement identified on this Certificate of Verification.
02
The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of
Verification was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the
instrumentation specifications given in RA3.3.1.
03
A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning
system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate
of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance
Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance.
04 All registers were fully open during the diagnostic test.
05 System fan was set at maximum speed during the diagnostic test.
06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
08
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
09 Verification Status:Pass - all applicable requirements are met
10 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 3 of 4)
Registration Number:
424-P010255225A-001-001-M23007A-M23A
Registration Date/Time: 2024-10-23 13:21:44 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:35
F. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 4 of 4)
Registration Number:
424-P010255225A-001-001-M23007A-M23A
Registration Date/Time: 2024-10-23 13:21:44 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:35
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-001-M22008A-M22A
Registration Date/Time: 2024-10-23 13:21:47 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:35
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 105)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 105 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement
B. Fan Watt Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in
RA3.3.2.2.
01 Fan Watt Verification Device Used.Portable watt meter
MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
01 Actual Tested Watts 642.64
02 Actual Tested Airflow from MCH-23 (cfm)1108
03 Required Fan Efficacy (watts/cfm)0.58
04 Actual Fan Efficacy (watts/cfm)0.58
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 2 of 3)
Registration Number:
424-P010255225A-001-001-M22008A-M22A
Registration Date/Time: 2024-10-23 13:21:47 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:35
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
05 Compliance Statement:System fan efficacy complies
D. Additional Requirements
01 All registers were fully open during the diagnostic test.
02 System fan was set at maximum speed during the diagnostic test.
03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
05
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy
(Watt/cfm) criteria in every zonal control mode.
07 Verification Status Pass - all applicable requirements are met
08 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 3 of 3)
Registration Number:
424-P010255225A-001-001-M22008A-M22A
Registration Date/Time: 2024-10-23 13:21:47 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:35
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-001-M26009A-M26A
Registration Date/Time: 2024-10-23 13:21:51 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:35
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 1 of 4)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 105)
City: La Quinta Zip Code: 92253
A. System Information
Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC
system requiring verification must use a separate form.
01 System Name or Identification/Tag UNIT 105 HVACSys
02 System Location or Area Served Main
03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required
04 Directory used to certify product performance AHRI
05 AHRI certification number for the installed space
conditioning system from http://www.ahridirectory.org
208650564
06 Does the directory used to certify product performance
require a specific air handler/furnace make and model?
Yes
07 Does the directory used to certify product performance
require a time delay relay (+TDR)?
Yes
08 Does the directory used to certify product performance
require a TXV (+TXV)?
Yes
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to
certify product performance in order to demonstrate compliance.
Data from Nameplate of Installed System
Component
Data from the Directory Used to Certify the
Rated System Component
Outdoor Condenser or Package Unit -
Installed Manufacturer Name
01 RHEEM 02 RHEEM
Outdoor Condenser or Package Unit -
Installed Model Number
03 RHPAZR036JT000NA 04 RHPAZR036JT000NA
Inside Coil - Installed Manufacturer
Name
05 06 This field or section is not applicable
Inside Coil - Installed Model Number 07 08 This field or section is not applicable
Air Handler/Furnace - Installed
Manufacturer Name
09 10 RHEEM
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 2 of 4)
Registration Number:
424-P010255225A-001-001-M26009A-M26A
Registration Date/Time: 2024-10-23 13:21:51 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:35
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to
certify product performance in order to demonstrate compliance.
Air Handler/Furnace - Installed Model
Number
11 12 RHPAZR036AJT
C. Verified Cooling System SEER
01 Required minimum SEER 15
02 Installed SEER 15
03 Compliance Statement:System passes SEER verification
Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed
on the CF2R.
D. Verified Cooling System EER
This section does not apply to this project.
E. Verified Cooling System Air Handler/Furnace
01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party
certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory.
02 Verification Status:Pass - all applicable requirements are met
03 Correction Notes:
F. Verified Cooling System Time Delay Relay
01
If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by
signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of
RA3.4.3.
02 Verification Status:Pass - all applicable requirements are met
03 Correction Notes:
G. Verified Cooling System TXV
01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below
that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb
02 Verification Status:Pass - all applicable requirements are met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 3 of 4)
Registration Number:
424-P010255225A-001-001-M26009A-M26A
Registration Date/Time: 2024-10-23 13:21:51 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:35
G. Verified Cooling System TXV
03 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 4 of 4)
Registration Number:
424-P010255225A-001-001-M26009A-M26A
Registration Date/Time: 2024-10-23 13:21:51 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:35
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-002-M27005A-M27A
Registration Date/Time: 2024-10-23 13:21:56 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:36
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 106)
City: La Quinta Zip Code: 92253
Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE
Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on
this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010.
A. Dwelling Mechanical Ventilation - General Information
01 Dwelling unit name DwellingUnit 106
02 Building Type Single family
03 Project scope Newly constructed building
04
Total Conditioned Floor Area of Dwelling Unit
(For addition projects the conditioned floor area equals
existing area plus addition area. )
931
05
Number of bedrooms in dwelling unit
(For addition projects the number of bedrooms equals the
existing bedrooms plus addition bedrooms)
2
06 Ventilation Operation Schedule Continuous
07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1)
08 Whole Building Ventilation System Type Standalone - Balanced
09 IAQ Fan Location
MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method
B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method
A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with
outdoor air each hour at no less than the rate in equation 4.1a.
01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81
02 Installed Continuous Whole-Building Ventilation Rate 138
C. Compliance Statement
01 Building passes continuous whole-building ventilation rate test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 2 of 3)
Registration Number:
424-P010255225A-001-002-M27005A-M27A
Registration Date/Time: 2024-10-23 13:21:56 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:36
D. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 3 of 3)
Registration Number:
424-P010255225A-001-002-M27005A-M27A
Registration Date/Time: 2024-10-23 13:21:56 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:36
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-002-M20006A-M20A
Registration Date/Time: 2024-10-23 13:22:02 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:36
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 106)
City: La Quinta Zip Code: 92253
A. System Information
01 Space Conditioning System Identification or Name UNIT 106 HVACSys
02 Space Conditioning System Location or Area Served Main
03 Building Type from CF-1R Multi-family
04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS)
Credit from CF1R?
No, credit is not taken
05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit
from CF1R?
No, credit is not taken
06 Duct System Compliance Category New
MCH-20a - Completely New Duct System
B. Duct Leakage Diagnostic Test
01 Condenser Nominal Cooling Capacity (ton)3
02 Heating Capacity (kBtu/h)36
03 Conditioned Floor Area served by this HVAC system (ft2)931
04 Duct Leakage Test Conditions Test final
05 Duct Leakage Test Method Total leakage
06 Leakage Factor 0.12
07 Air Handling Unit Airflow (AHUAirflow) Determination
Method
Cooling system method
08 Measured AHUAirflow This field or section is not applicable
09 Calculated Target Allowable Duct Leakage (cfm)144
10 Actual Duct Leakage Rate from Leakage Test
Measurement (cfm)
68.6
11 Compliance Statement System passes leakage test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 2 of 3)
Registration Number:
424-P010255225A-001-002-M20006A-M20A
Registration Date/Time: 2024-10-23 13:22:02 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:36
B. Duct Leakage Diagnostic Test
12 Notes
C. Additional Requirements for Compliance
01 System was tested in its normal operation condition. No temporary taping allowed.
02
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage
testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation
Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required,
may configure the OA damper to the closed position during duct leakage testing.
03 All supply and return register boots were sealed to the drywall.
04 Building cavities were not used as plenums or platform returns in lieu of ducts.
05 If cloth backed tape was used it was covered with Mastic and draw bands.
06 All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in).
After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must
be performed
07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are
properly sealed.
08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points
between the air handler and the supply and return plenums to verify that the connection points are properly sealed.
09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
10 Verification Status:Pass
11 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 3 of 3)
Registration Number:
424-P010255225A-001-002-M20006A-M20A
Registration Date/Time: 2024-10-23 13:22:02 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:36
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-002-M23007A-M23A
Registration Date/Time: 2024-10-23 13:22:07 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:36
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 1 of 4)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 106)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 106 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement
B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP)
in the Supply Plenum.
Procedures for installing HSPP or PSPP are specified in RA3.3.1.1.
01 Method Used to Demonstrate Compliance with the
HSPP/PSPP Requirement
HSPP installed and labeled consistent with Figure RA3.3-1
C. Airflow Rate Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given
in RA3.3.2.
01 Airflow Rate Measurement Type used for this airflow rate
verification.
Traditional Flow Capture Hood according to procedure in
RA3.3.3.1.4
02 Manufacturer of Airflow Measurement Apparatus ALNOR
03 Model number of Airflow Measurement Apparatus EBT731
04
Certification Status of the Airflow Measurement Apparatus
Accuracy
Certified by Manufacturer and listed on CEC Website at
http://www.energy.ca.gov/title24/equipment_cert/ama_fas
/index.html
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 2 of 4)
Registration Number:
424-P010255225A-001-002-M23007A-M23A
Registration Date/Time: 2024-10-23 13:22:07 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:36
MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
D. Forced Air System Airflow Rate Measurement
The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3.
01 Required Minimum System Airflow Rate (cfm/ton)350
02 Required Minimum System Airflow Target (cfm)1050
03 Actual System Airflow Rate Measurement (cfm)1077
04 Compliance Statement:System airflow rate complies
E. Additional Requirements
01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in
the system during system air flow rate measurement identified on this Certificate of Verification.
02
The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of
Verification was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the
instrumentation specifications given in RA3.3.1.
03
A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning
system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate
of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance
Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance.
04 All registers were fully open during the diagnostic test.
05 System fan was set at maximum speed during the diagnostic test.
06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
08
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
09 Verification Status:Pass - all applicable requirements are met
10 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 3 of 4)
Registration Number:
424-P010255225A-001-002-M23007A-M23A
Registration Date/Time: 2024-10-23 13:22:07 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:36
F. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 4 of 4)
Registration Number:
424-P010255225A-001-002-M23007A-M23A
Registration Date/Time: 2024-10-23 13:22:07 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:36
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-002-M22008A-M22A
Registration Date/Time: 2024-10-23 13:22:12 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:36
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 106)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 106 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement
B. Fan Watt Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in
RA3.3.2.2.
01 Fan Watt Verification Device Used.Portable watt meter
MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
01 Actual Tested Watts 624.66
02 Actual Tested Airflow from MCH-23 (cfm)1077
03 Required Fan Efficacy (watts/cfm)0.58
04 Actual Fan Efficacy (watts/cfm)0.58
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 2 of 3)
Registration Number:
424-P010255225A-001-002-M22008A-M22A
Registration Date/Time: 2024-10-23 13:22:12 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:36
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
05 Compliance Statement:System fan efficacy complies
D. Additional Requirements
01 All registers were fully open during the diagnostic test.
02 System fan was set at maximum speed during the diagnostic test.
03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
05
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy
(Watt/cfm) criteria in every zonal control mode.
07 Verification Status Pass - all applicable requirements are met
08 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 3 of 3)
Registration Number:
424-P010255225A-001-002-M22008A-M22A
Registration Date/Time: 2024-10-23 13:22:12 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:36
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-002-M26009A-M26A
Registration Date/Time: 2024-10-23 13:22:15 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:36
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 1 of 4)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 106)
City: La Quinta Zip Code: 92253
A. System Information
Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC
system requiring verification must use a separate form.
01 System Name or Identification/Tag UNIT 106 HVACSys
02 System Location or Area Served Main
03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required
04 Directory used to certify product performance AHRI
05 AHRI certification number for the installed space
conditioning system from http://www.ahridirectory.org
208650564
06 Does the directory used to certify product performance
require a specific air handler/furnace make and model?
Yes
07 Does the directory used to certify product performance
require a time delay relay (+TDR)?
Yes
08 Does the directory used to certify product performance
require a TXV (+TXV)?
Yes
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to
certify product performance in order to demonstrate compliance.
Data from Nameplate of Installed System
Component
Data from the Directory Used to Certify the
Rated System Component
Outdoor Condenser or Package Unit -
Installed Manufacturer Name
01 RHEEM 02 RHEEM
Outdoor Condenser or Package Unit -
Installed Model Number
03 RHPAZR036JT000NA 04 RHPAZR036JT000NA
Inside Coil - Installed Manufacturer
Name
05 06 This field or section is not applicable
Inside Coil - Installed Model Number 07 08 This field or section is not applicable
Air Handler/Furnace - Installed
Manufacturer Name
09 10 RHEEM
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 2 of 4)
Registration Number:
424-P010255225A-001-002-M26009A-M26A
Registration Date/Time: 2024-10-23 13:22:15 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:36
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to
certify product performance in order to demonstrate compliance.
Air Handler/Furnace - Installed Model
Number
11 12 RHPAZR036AJT
C. Verified Cooling System SEER
01 Required minimum SEER 15
02 Installed SEER 15
03 Compliance Statement:System passes SEER verification
Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed
on the CF2R.
D. Verified Cooling System EER
This section does not apply to this project.
E. Verified Cooling System Air Handler/Furnace
01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party
certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory.
02 Verification Status:Pass - all applicable requirements are met
03 Correction Notes:
F. Verified Cooling System Time Delay Relay
01
If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by
signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of
RA3.4.3.
02 Verification Status:Pass - all applicable requirements are met
03 Correction Notes:
G. Verified Cooling System TXV
01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below
that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb
02 Verification Status:Pass - all applicable requirements are met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 3 of 4)
Registration Number:
424-P010255225A-001-002-M26009A-M26A
Registration Date/Time: 2024-10-23 13:22:15 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:36
G. Verified Cooling System TXV
03 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 4 of 4)
Registration Number:
424-P010255225A-001-002-M26009A-M26A
Registration Date/Time: 2024-10-23 13:22:15 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:36
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-003-M27005A-M27A
Registration Date/Time: 2024-10-23 13:22:34 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:38
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 107)
City: La Quinta Zip Code: 92253
Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE
Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on
this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010.
A. Dwelling Mechanical Ventilation - General Information
01 Dwelling unit name DwellingUnit 107
02 Building Type Single family
03 Project scope Newly constructed building
04
Total Conditioned Floor Area of Dwelling Unit
(For addition projects the conditioned floor area equals
existing area plus addition area. )
931
05
Number of bedrooms in dwelling unit
(For addition projects the number of bedrooms equals the
existing bedrooms plus addition bedrooms)
2
06 Ventilation Operation Schedule Continuous
07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1)
08 Whole Building Ventilation System Type Standalone - Balanced
09 IAQ Fan Location
MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method
B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method
A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with
outdoor air each hour at no less than the rate in equation 4.1a.
01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81
02 Installed Continuous Whole-Building Ventilation Rate 178
C. Compliance Statement
01 Building passes continuous whole-building ventilation rate test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 2 of 3)
Registration Number:
424-P010255225A-001-003-M27005A-M27A
Registration Date/Time: 2024-10-23 13:22:34 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:38
D. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 3 of 3)
Registration Number:
424-P010255225A-001-003-M27005A-M27A
Registration Date/Time: 2024-10-23 13:22:34 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:38
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-003-M20006A-M20A
Registration Date/Time: 2024-10-23 13:22:37 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:39
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 107)
City: La Quinta Zip Code: 92253
A. System Information
01 Space Conditioning System Identification or Name UNIT 107 HVACSys
02 Space Conditioning System Location or Area Served Main
03 Building Type from CF-1R Multi-family
04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS)
Credit from CF1R?
No, credit is not taken
05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit
from CF1R?
No, credit is not taken
06 Duct System Compliance Category New
MCH-20a - Completely New Duct System
B. Duct Leakage Diagnostic Test
01 Condenser Nominal Cooling Capacity (ton)3
02 Heating Capacity (kBtu/h)36
03 Conditioned Floor Area served by this HVAC system (ft2)931
04 Duct Leakage Test Conditions Test final
05 Duct Leakage Test Method Total leakage
06 Leakage Factor 0.12
07 Air Handling Unit Airflow (AHUAirflow) Determination
Method
Cooling system method
08 Measured AHUAirflow This field or section is not applicable
09 Calculated Target Allowable Duct Leakage (cfm)144
10 Actual Duct Leakage Rate from Leakage Test
Measurement (cfm)
56.6
11 Compliance Statement System passes leakage test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 2 of 3)
Registration Number:
424-P010255225A-001-003-M20006A-M20A
Registration Date/Time: 2024-10-23 13:22:37 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:39
B. Duct Leakage Diagnostic Test
12 Notes
C. Additional Requirements for Compliance
01 System was tested in its normal operation condition. No temporary taping allowed.
02
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage
testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation
Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required,
may configure the OA damper to the closed position during duct leakage testing.
03 All supply and return register boots were sealed to the drywall.
04 Building cavities were not used as plenums or platform returns in lieu of ducts.
05 If cloth backed tape was used it was covered with Mastic and draw bands.
06 All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in).
After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must
be performed
07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are
properly sealed.
08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points
between the air handler and the supply and return plenums to verify that the connection points are properly sealed.
09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
10 Verification Status:Pass
11 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 3 of 3)
Registration Number:
424-P010255225A-001-003-M20006A-M20A
Registration Date/Time: 2024-10-23 13:22:37 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:39
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-003-M23007A-M23A
Registration Date/Time: 2024-10-23 13:22:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:39
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 1 of 4)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 107)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 107 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement
B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP)
in the Supply Plenum.
Procedures for installing HSPP or PSPP are specified in RA3.3.1.1.
01 Method Used to Demonstrate Compliance with the
HSPP/PSPP Requirement
HSPP installed and labeled consistent with Figure RA3.3-1
C. Airflow Rate Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given
in RA3.3.2.
01 Airflow Rate Measurement Type used for this airflow rate
verification.
Traditional Flow Capture Hood according to procedure in
RA3.3.3.1.4
02 Manufacturer of Airflow Measurement Apparatus ALNOR
03 Model number of Airflow Measurement Apparatus EBT731
04
Certification Status of the Airflow Measurement Apparatus
Accuracy
Certified by Manufacturer and listed on CEC Website at
http://www.energy.ca.gov/title24/equipment_cert/ama_fas
/index.html
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 2 of 4)
Registration Number:
424-P010255225A-001-003-M23007A-M23A
Registration Date/Time: 2024-10-23 13:22:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:39
MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
D. Forced Air System Airflow Rate Measurement
The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3.
01 Required Minimum System Airflow Rate (cfm/ton)350
02 Required Minimum System Airflow Target (cfm)1050
03 Actual System Airflow Rate Measurement (cfm)1136
04 Compliance Statement:System airflow rate complies
E. Additional Requirements
01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in
the system during system air flow rate measurement identified on this Certificate of Verification.
02
The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of
Verification was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the
instrumentation specifications given in RA3.3.1.
03
A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning
system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate
of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance
Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance.
04 All registers were fully open during the diagnostic test.
05 System fan was set at maximum speed during the diagnostic test.
06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
08
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
09 Verification Status:Pass - all applicable requirements are met
10 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 3 of 4)
Registration Number:
424-P010255225A-001-003-M23007A-M23A
Registration Date/Time: 2024-10-23 13:22:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:39
F. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 4 of 4)
Registration Number:
424-P010255225A-001-003-M23007A-M23A
Registration Date/Time: 2024-10-23 13:22:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:39
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-003-M22008A-M22A
Registration Date/Time: 2024-10-23 13:22:47 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:39
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 107)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 107 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement
B. Fan Watt Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in
RA3.3.2.2.
01 Fan Watt Verification Device Used.Portable watt meter
MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
01 Actual Tested Watts 658.88
02 Actual Tested Airflow from MCH-23 (cfm)1136
03 Required Fan Efficacy (watts/cfm)0.58
04 Actual Fan Efficacy (watts/cfm)0.58
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 2 of 3)
Registration Number:
424-P010255225A-001-003-M22008A-M22A
Registration Date/Time: 2024-10-23 13:22:47 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:39
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
05 Compliance Statement:System fan efficacy complies
D. Additional Requirements
01 All registers were fully open during the diagnostic test.
02 System fan was set at maximum speed during the diagnostic test.
03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
05
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy
(Watt/cfm) criteria in every zonal control mode.
07 Verification Status Pass - all applicable requirements are met
08 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 3 of 3)
Registration Number:
424-P010255225A-001-003-M22008A-M22A
Registration Date/Time: 2024-10-23 13:22:47 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:39
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-003-M26009A-M26A
Registration Date/Time: 2024-10-23 13:22:55 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:39
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 1 of 4)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 107)
City: La Quinta Zip Code: 92253
A. System Information
Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC
system requiring verification must use a separate form.
01 System Name or Identification/Tag UNIT 107 HVACSys
02 System Location or Area Served Main
03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required
04 Directory used to certify product performance AHRI
05 AHRI certification number for the installed space
conditioning system from http://www.ahridirectory.org
208650564
06 Does the directory used to certify product performance
require a specific air handler/furnace make and model?
Yes
07 Does the directory used to certify product performance
require a time delay relay (+TDR)?
Yes
08 Does the directory used to certify product performance
require a TXV (+TXV)?
Yes
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to
certify product performance in order to demonstrate compliance.
Data from Nameplate of Installed System
Component
Data from the Directory Used to Certify the
Rated System Component
Outdoor Condenser or Package Unit -
Installed Manufacturer Name
01 RHEEM 02 RHEEM
Outdoor Condenser or Package Unit -
Installed Model Number
03 RHPAZR036JT000NA 04 RHPAZR036JT000NA
Inside Coil - Installed Manufacturer
Name
05 06 This field or section is not applicable
Inside Coil - Installed Model Number 07 08 This field or section is not applicable
Air Handler/Furnace - Installed
Manufacturer Name
09 10 RHEEM
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 2 of 4)
Registration Number:
424-P010255225A-001-003-M26009A-M26A
Registration Date/Time: 2024-10-23 13:22:55 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:39
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to
certify product performance in order to demonstrate compliance.
Air Handler/Furnace - Installed Model
Number
11 12 RHPAZR036AJT
C. Verified Cooling System SEER
01 Required minimum SEER 15
02 Installed SEER 15
03 Compliance Statement:System passes SEER verification
Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed
on the CF2R.
D. Verified Cooling System EER
This section does not apply to this project.
E. Verified Cooling System Air Handler/Furnace
01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party
certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory.
02 Verification Status:Pass - all applicable requirements are met
03 Correction Notes:
F. Verified Cooling System Time Delay Relay
01
If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by
signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of
RA3.4.3.
02 Verification Status:Pass - all applicable requirements are met
03 Correction Notes:
G. Verified Cooling System TXV
01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below
that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb
02 Verification Status:Pass - all applicable requirements are met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 3 of 4)
Registration Number:
424-P010255225A-001-003-M26009A-M26A
Registration Date/Time: 2024-10-23 13:22:55 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:39
G. Verified Cooling System TXV
03 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 4 of 4)
Registration Number:
424-P010255225A-001-003-M26009A-M26A
Registration Date/Time: 2024-10-23 13:22:55 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:39
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-004-M27005A-M27A
Registration Date/Time: 2024-10-23 13:23:02 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:39
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 108)
City: La Quinta Zip Code: 92253
Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE
Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on
this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010.
A. Dwelling Mechanical Ventilation - General Information
01 Dwelling unit name DwellingUnit 108
02 Building Type Single family
03 Project scope Newly constructed building
04
Total Conditioned Floor Area of Dwelling Unit
(For addition projects the conditioned floor area equals
existing area plus addition area. )
931
05
Number of bedrooms in dwelling unit
(For addition projects the number of bedrooms equals the
existing bedrooms plus addition bedrooms)
2
06 Ventilation Operation Schedule Continuous
07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1)
08 Whole Building Ventilation System Type Standalone - Balanced
09 IAQ Fan Location
MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method
B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method
A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with
outdoor air each hour at no less than the rate in equation 4.1a.
01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81
02 Installed Continuous Whole-Building Ventilation Rate 122
C. Compliance Statement
01 Building passes continuous whole-building ventilation rate test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 2 of 3)
Registration Number:
424-P010255225A-001-004-M27005A-M27A
Registration Date/Time: 2024-10-23 13:23:02 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:39
D. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 3 of 3)
Registration Number:
424-P010255225A-001-004-M27005A-M27A
Registration Date/Time: 2024-10-23 13:23:02 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:39
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-004-M20006A-M20A
Registration Date/Time: 2024-10-23 13:23:05 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:39
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 108)
City: La Quinta Zip Code: 92253
A. System Information
01 Space Conditioning System Identification or Name UNIT 108 HVACSys
02 Space Conditioning System Location or Area Served Main
03 Building Type from CF-1R Multi-family
04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS)
Credit from CF1R?
No, credit is not taken
05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit
from CF1R?
No, credit is not taken
06 Duct System Compliance Category New
MCH-20a - Completely New Duct System
B. Duct Leakage Diagnostic Test
01 Condenser Nominal Cooling Capacity (ton)3
02 Heating Capacity (kBtu/h)36
03 Conditioned Floor Area served by this HVAC system (ft2)931
04 Duct Leakage Test Conditions Test final
05 Duct Leakage Test Method Total leakage
06 Leakage Factor 0.12
07 Air Handling Unit Airflow (AHUAirflow) Determination
Method
Cooling system method
08 Measured AHUAirflow This field or section is not applicable
09 Calculated Target Allowable Duct Leakage (cfm)144
10 Actual Duct Leakage Rate from Leakage Test
Measurement (cfm)
72.9
11 Compliance Statement System passes leakage test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 2 of 3)
Registration Number:
424-P010255225A-001-004-M20006A-M20A
Registration Date/Time: 2024-10-23 13:23:05 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:39
B. Duct Leakage Diagnostic Test
12 Notes
C. Additional Requirements for Compliance
01 System was tested in its normal operation condition. No temporary taping allowed.
02
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage
testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation
Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required,
may configure the OA damper to the closed position during duct leakage testing.
03 All supply and return register boots were sealed to the drywall.
04 Building cavities were not used as plenums or platform returns in lieu of ducts.
05 If cloth backed tape was used it was covered with Mastic and draw bands.
06 All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in).
After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must
be performed
07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are
properly sealed.
08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points
between the air handler and the supply and return plenums to verify that the connection points are properly sealed.
09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
10 Verification Status:Pass
11 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 3 of 3)
Registration Number:
424-P010255225A-001-004-M20006A-M20A
Registration Date/Time: 2024-10-23 13:23:05 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:39
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-004-M23007A-M23A
Registration Date/Time: 2024-10-23 13:23:07 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:40
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 1 of 4)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 108)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 108 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement
B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP)
in the Supply Plenum.
Procedures for installing HSPP or PSPP are specified in RA3.3.1.1.
01 Method Used to Demonstrate Compliance with the
HSPP/PSPP Requirement
HSPP installed and labeled consistent with Figure RA3.3-1
C. Airflow Rate Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given
in RA3.3.2.
01 Airflow Rate Measurement Type used for this airflow rate
verification.
Traditional Flow Capture Hood according to procedure in
RA3.3.3.1.4
02 Manufacturer of Airflow Measurement Apparatus ALNOR
03 Model number of Airflow Measurement Apparatus EBT731
04
Certification Status of the Airflow Measurement Apparatus
Accuracy
Certified by Manufacturer and listed on CEC Website at
http://www.energy.ca.gov/title24/equipment_cert/ama_fas
/index.html
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 2 of 4)
Registration Number:
424-P010255225A-001-004-M23007A-M23A
Registration Date/Time: 2024-10-23 13:23:07 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:40
MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
D. Forced Air System Airflow Rate Measurement
The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3.
01 Required Minimum System Airflow Rate (cfm/ton)350
02 Required Minimum System Airflow Target (cfm)1050
03 Actual System Airflow Rate Measurement (cfm)1092
04 Compliance Statement:System airflow rate complies
E. Additional Requirements
01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in
the system during system air flow rate measurement identified on this Certificate of Verification.
02
The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of
Verification was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the
instrumentation specifications given in RA3.3.1.
03
A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning
system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate
of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance
Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance.
04 All registers were fully open during the diagnostic test.
05 System fan was set at maximum speed during the diagnostic test.
06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
08
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
09 Verification Status:Pass - all applicable requirements are met
10 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 3 of 4)
Registration Number:
424-P010255225A-001-004-M23007A-M23A
Registration Date/Time: 2024-10-23 13:23:07 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:40
F. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 4 of 4)
Registration Number:
424-P010255225A-001-004-M23007A-M23A
Registration Date/Time: 2024-10-23 13:23:07 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:44:40
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-004-M22008A-M22A
Registration Date/Time: 2024-10-23 13:23:38 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 108)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 108 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement
B. Fan Watt Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in
RA3.3.2.2.
01 Fan Watt Verification Device Used.Portable watt meter
MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
01 Actual Tested Watts 633.36
02 Actual Tested Airflow from MCH-23 (cfm)1092
03 Required Fan Efficacy (watts/cfm)0.58
04 Actual Fan Efficacy (watts/cfm)0.58
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 2 of 3)
Registration Number:
424-P010255225A-001-004-M22008A-M22A
Registration Date/Time: 2024-10-23 13:23:38 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
05 Compliance Statement:System fan efficacy complies
D. Additional Requirements
01 All registers were fully open during the diagnostic test.
02 System fan was set at maximum speed during the diagnostic test.
03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
05
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy
(Watt/cfm) criteria in every zonal control mode.
07 Verification Status Pass - all applicable requirements are met
08 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 3 of 3)
Registration Number:
424-P010255225A-001-004-M22008A-M22A
Registration Date/Time: 2024-10-23 13:23:38 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-004-M26009A-M26A
Registration Date/Time: 2024-10-23 13:23:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 1 of 4)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 108)
City: La Quinta Zip Code: 92253
A. System Information
Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC
system requiring verification must use a separate form.
01 System Name or Identification/Tag UNIT 108 HVACSys
02 System Location or Area Served Main
03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required
04 Directory used to certify product performance AHRI
05 AHRI certification number for the installed space
conditioning system from http://www.ahridirectory.org
208650564
06 Does the directory used to certify product performance
require a specific air handler/furnace make and model?
Yes
07 Does the directory used to certify product performance
require a time delay relay (+TDR)?
Yes
08 Does the directory used to certify product performance
require a TXV (+TXV)?
Yes
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to
certify product performance in order to demonstrate compliance.
Data from Nameplate of Installed System
Component
Data from the Directory Used to Certify the
Rated System Component
Outdoor Condenser or Package Unit -
Installed Manufacturer Name
01 RHEEM 02 RHEEM
Outdoor Condenser or Package Unit -
Installed Model Number
03 RHPAZR036JT000NA 04 RHPAZR036JT000NA
Inside Coil - Installed Manufacturer
Name
05 06 This field or section is not applicable
Inside Coil - Installed Model Number 07 08 This field or section is not applicable
Air Handler/Furnace - Installed
Manufacturer Name
09 10 RHEEM
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 2 of 4)
Registration Number:
424-P010255225A-001-004-M26009A-M26A
Registration Date/Time: 2024-10-23 13:23:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to
certify product performance in order to demonstrate compliance.
Air Handler/Furnace - Installed Model
Number
11 12 RHPAZR036AJT
C. Verified Cooling System SEER
01 Required minimum SEER 15
02 Installed SEER 15
03 Compliance Statement:System passes SEER verification
Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed
on the CF2R.
D. Verified Cooling System EER
This section does not apply to this project.
E. Verified Cooling System Air Handler/Furnace
01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party
certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory.
02 Verification Status:Pass - all applicable requirements are met
03 Correction Notes:
F. Verified Cooling System Time Delay Relay
01
If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by
signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of
RA3.4.3.
02 Verification Status:Pass - all applicable requirements are met
03 Correction Notes:
G. Verified Cooling System TXV
01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below
that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb
02 Verification Status:Pass - all applicable requirements are met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 3 of 4)
Registration Number:
424-P010255225A-001-004-M26009A-M26A
Registration Date/Time: 2024-10-23 13:23:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
G. Verified Cooling System TXV
03 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 4 of 4)
Registration Number:
424-P010255225A-001-004-M26009A-M26A
Registration Date/Time: 2024-10-23 13:23:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-005-M27005A-M27A
Registration Date/Time: 2024-10-23 13:23:45 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 205)
City: La Quinta Zip Code: 92253
Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE
Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on
this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010.
A. Dwelling Mechanical Ventilation - General Information
01 Dwelling unit name DwellingUnit 205
02 Building Type Single family
03 Project scope Newly constructed building
04
Total Conditioned Floor Area of Dwelling Unit
(For addition projects the conditioned floor area equals
existing area plus addition area. )
931
05
Number of bedrooms in dwelling unit
(For addition projects the number of bedrooms equals the
existing bedrooms plus addition bedrooms)
2
06 Ventilation Operation Schedule Continuous
07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1)
08 Whole Building Ventilation System Type Standalone - Balanced
09 IAQ Fan Location
MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method
B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method
A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with
outdoor air each hour at no less than the rate in equation 4.1a.
01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81
02 Installed Continuous Whole-Building Ventilation Rate 154
C. Compliance Statement
01 Building passes continuous whole-building ventilation rate test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 2 of 3)
Registration Number:
424-P010255225A-001-005-M27005A-M27A
Registration Date/Time: 2024-10-23 13:23:45 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
D. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 3 of 3)
Registration Number:
424-P010255225A-001-005-M27005A-M27A
Registration Date/Time: 2024-10-23 13:23:45 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-005-M20006A-M20A
Registration Date/Time: 2024-10-23 13:23:50 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 205)
City: La Quinta Zip Code: 92253
A. System Information
01 Space Conditioning System Identification or Name UNIT 205 HVACSys
02 Space Conditioning System Location or Area Served Main
03 Building Type from CF-1R Multi-family
04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS)
Credit from CF1R?
No, credit is not taken
05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit
from CF1R?
No, credit is not taken
06 Duct System Compliance Category New
MCH-20a - Completely New Duct System
B. Duct Leakage Diagnostic Test
01 Condenser Nominal Cooling Capacity (ton)3
02 Heating Capacity (kBtu/h)36
03 Conditioned Floor Area served by this HVAC system (ft2)931
04 Duct Leakage Test Conditions Test final
05 Duct Leakage Test Method Total leakage
06 Leakage Factor 0.12
07 Air Handling Unit Airflow (AHUAirflow) Determination
Method
Cooling system method
08 Measured AHUAirflow This field or section is not applicable
09 Calculated Target Allowable Duct Leakage (cfm)144
10 Actual Duct Leakage Rate from Leakage Test
Measurement (cfm)
45
11 Compliance Statement System passes leakage test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 2 of 3)
Registration Number:
424-P010255225A-001-005-M20006A-M20A
Registration Date/Time: 2024-10-23 13:23:50 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
B. Duct Leakage Diagnostic Test
12 Notes
C. Additional Requirements for Compliance
01 System was tested in its normal operation condition. No temporary taping allowed.
02
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage
testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation
Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required,
may configure the OA damper to the closed position during duct leakage testing.
03 All supply and return register boots were sealed to the drywall.
04 Building cavities were not used as plenums or platform returns in lieu of ducts.
05 If cloth backed tape was used it was covered with Mastic and draw bands.
06 All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in).
After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must
be performed
07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are
properly sealed.
08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points
between the air handler and the supply and return plenums to verify that the connection points are properly sealed.
09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
10 Verification Status:Pass
11 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 3 of 3)
Registration Number:
424-P010255225A-001-005-M20006A-M20A
Registration Date/Time: 2024-10-23 13:23:50 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-005-M23007A-M23A
Registration Date/Time: 2024-10-23 13:23:53 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 1 of 4)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 205)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 205 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement
B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP)
in the Supply Plenum.
Procedures for installing HSPP or PSPP are specified in RA3.3.1.1.
01 Method Used to Demonstrate Compliance with the
HSPP/PSPP Requirement
HSPP installed and labeled consistent with Figure RA3.3-1
C. Airflow Rate Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given
in RA3.3.2.
01 Airflow Rate Measurement Type used for this airflow rate
verification.
Traditional Flow Capture Hood according to procedure in
RA3.3.3.1.4
02 Manufacturer of Airflow Measurement Apparatus ALNOR
03 Model number of Airflow Measurement Apparatus EBT731
04
Certification Status of the Airflow Measurement Apparatus
Accuracy
Certified by Manufacturer and listed on CEC Website at
http://www.energy.ca.gov/title24/equipment_cert/ama_fas
/index.html
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 2 of 4)
Registration Number:
424-P010255225A-001-005-M23007A-M23A
Registration Date/Time: 2024-10-23 13:23:53 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
D. Forced Air System Airflow Rate Measurement
The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3.
01 Required Minimum System Airflow Rate (cfm/ton)350
02 Required Minimum System Airflow Target (cfm)1050
03 Actual System Airflow Rate Measurement (cfm)1544
04 Compliance Statement:System airflow rate complies
E. Additional Requirements
01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in
the system during system air flow rate measurement identified on this Certificate of Verification.
02
The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of
Verification was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the
instrumentation specifications given in RA3.3.1.
03
A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning
system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate
of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance
Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance.
04 All registers were fully open during the diagnostic test.
05 System fan was set at maximum speed during the diagnostic test.
06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
08
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
09 Verification Status:Pass - all applicable requirements are met
10 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 3 of 4)
Registration Number:
424-P010255225A-001-005-M23007A-M23A
Registration Date/Time: 2024-10-23 13:23:53 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
F. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 4 of 4)
Registration Number:
424-P010255225A-001-005-M23007A-M23A
Registration Date/Time: 2024-10-23 13:23:53 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-005-M22008A-M22A
Registration Date/Time: 2024-10-23 13:23:58 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 205)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 205 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement
B. Fan Watt Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in
RA3.3.2.2.
01 Fan Watt Verification Device Used.Portable watt meter
MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
01 Actual Tested Watts 895.52
02 Actual Tested Airflow from MCH-23 (cfm)1544
03 Required Fan Efficacy (watts/cfm)0.58
04 Actual Fan Efficacy (watts/cfm)0.58
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 2 of 3)
Registration Number:
424-P010255225A-001-005-M22008A-M22A
Registration Date/Time: 2024-10-23 13:23:58 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
05 Compliance Statement:System fan efficacy complies
D. Additional Requirements
01 All registers were fully open during the diagnostic test.
02 System fan was set at maximum speed during the diagnostic test.
03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
05
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy
(Watt/cfm) criteria in every zonal control mode.
07 Verification Status Pass - all applicable requirements are met
08 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 3 of 3)
Registration Number:
424-P010255225A-001-005-M22008A-M22A
Registration Date/Time: 2024-10-23 13:23:58 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-005-M26009A-M26A
Registration Date/Time: 2024-10-23 13:24:02 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 1 of 4)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 205)
City: La Quinta Zip Code: 92253
A. System Information
Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC
system requiring verification must use a separate form.
01 System Name or Identification/Tag UNIT 205 HVACSys
02 System Location or Area Served Main
03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required
04 Directory used to certify product performance AHRI
05 AHRI certification number for the installed space
conditioning system from http://www.ahridirectory.org
208650564
06 Does the directory used to certify product performance
require a specific air handler/furnace make and model?
Yes
07 Does the directory used to certify product performance
require a time delay relay (+TDR)?
Yes
08 Does the directory used to certify product performance
require a TXV (+TXV)?
Yes
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to
certify product performance in order to demonstrate compliance.
Data from Nameplate of Installed System
Component
Data from the Directory Used to Certify the
Rated System Component
Outdoor Condenser or Package Unit -
Installed Manufacturer Name
01 RHEEM 02 RHEEM
Outdoor Condenser or Package Unit -
Installed Model Number
03 RHPAZR036JT000NA 04 RHPAZR036JT000NA
Inside Coil - Installed Manufacturer
Name
05 06 This field or section is not applicable
Inside Coil - Installed Model Number 07 08 This field or section is not applicable
Air Handler/Furnace - Installed
Manufacturer Name
09 10 RHEEM
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 2 of 4)
Registration Number:
424-P010255225A-001-005-M26009A-M26A
Registration Date/Time: 2024-10-23 13:24:02 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to
certify product performance in order to demonstrate compliance.
Air Handler/Furnace - Installed Model
Number
11 12 RHPAZR036AJT
C. Verified Cooling System SEER
01 Required minimum SEER 15
02 Installed SEER 15
03 Compliance Statement:System passes SEER verification
Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed
on the CF2R.
D. Verified Cooling System EER
This section does not apply to this project.
E. Verified Cooling System Air Handler/Furnace
01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party
certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory.
02 Verification Status:Pass - all applicable requirements are met
03 Correction Notes:
F. Verified Cooling System Time Delay Relay
01
If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by
signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of
RA3.4.3.
02 Verification Status:Pass - all applicable requirements are met
03 Correction Notes:
G. Verified Cooling System TXV
01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below
that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb
02 Verification Status:Pass - all applicable requirements are met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 3 of 4)
Registration Number:
424-P010255225A-001-005-M26009A-M26A
Registration Date/Time: 2024-10-23 13:24:02 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
G. Verified Cooling System TXV
03 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 4 of 4)
Registration Number:
424-P010255225A-001-005-M26009A-M26A
Registration Date/Time: 2024-10-23 13:24:02 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:45
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-006-M27005A-M27A
Registration Date/Time: 2024-10-23 13:24:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 206)
City: La Quinta Zip Code: 92253
Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE
Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on
this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010.
A. Dwelling Mechanical Ventilation - General Information
01 Dwelling unit name DwellingUnit 206
02 Building Type Single family
03 Project scope Newly constructed building
04
Total Conditioned Floor Area of Dwelling Unit
(For addition projects the conditioned floor area equals
existing area plus addition area. )
931
05
Number of bedrooms in dwelling unit
(For addition projects the number of bedrooms equals the
existing bedrooms plus addition bedrooms)
2
06 Ventilation Operation Schedule Continuous
07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1)
08 Whole Building Ventilation System Type Standalone - Balanced
09 IAQ Fan Location
MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method
B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method
A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with
outdoor air each hour at no less than the rate in equation 4.1a.
01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81
02 Installed Continuous Whole-Building Ventilation Rate 125
C. Compliance Statement
01 Building passes continuous whole-building ventilation rate test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 2 of 3)
Registration Number:
424-P010255225A-001-006-M27005A-M27A
Registration Date/Time: 2024-10-23 13:24:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
D. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 3 of 3)
Registration Number:
424-P010255225A-001-006-M27005A-M27A
Registration Date/Time: 2024-10-23 13:24:32 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-006-M20006A-M20A
Registration Date/Time: 2024-10-23 13:24:35 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 206)
City: La Quinta Zip Code: 92253
A. System Information
01 Space Conditioning System Identification or Name UNIT 206 HVACSys
02 Space Conditioning System Location or Area Served Main
03 Building Type from CF-1R Multi-family
04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS)
Credit from CF1R?
No, credit is not taken
05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit
from CF1R?
No, credit is not taken
06 Duct System Compliance Category New
MCH-20a - Completely New Duct System
B. Duct Leakage Diagnostic Test
01 Condenser Nominal Cooling Capacity (ton)3
02 Heating Capacity (kBtu/h)36
03 Conditioned Floor Area served by this HVAC system (ft2)931
04 Duct Leakage Test Conditions Test final
05 Duct Leakage Test Method Total leakage
06 Leakage Factor 0.12
07 Air Handling Unit Airflow (AHUAirflow) Determination
Method
Cooling system method
08 Measured AHUAirflow This field or section is not applicable
09 Calculated Target Allowable Duct Leakage (cfm)144
10 Actual Duct Leakage Rate from Leakage Test
Measurement (cfm)
56.6
11 Compliance Statement System passes leakage test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 2 of 3)
Registration Number:
424-P010255225A-001-006-M20006A-M20A
Registration Date/Time: 2024-10-23 13:24:35 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
B. Duct Leakage Diagnostic Test
12 Notes
C. Additional Requirements for Compliance
01 System was tested in its normal operation condition. No temporary taping allowed.
02
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage
testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation
Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required,
may configure the OA damper to the closed position during duct leakage testing.
03 All supply and return register boots were sealed to the drywall.
04 Building cavities were not used as plenums or platform returns in lieu of ducts.
05 If cloth backed tape was used it was covered with Mastic and draw bands.
06 All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in).
After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must
be performed
07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are
properly sealed.
08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points
between the air handler and the supply and return plenums to verify that the connection points are properly sealed.
09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
10 Verification Status:Pass
11 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 3 of 3)
Registration Number:
424-P010255225A-001-006-M20006A-M20A
Registration Date/Time: 2024-10-23 13:24:35 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:48
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-006-M23007A-M23A
Registration Date/Time: 2024-10-23 13:24:38 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:50
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 1 of 4)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 206)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 206 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement
B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP)
in the Supply Plenum.
Procedures for installing HSPP or PSPP are specified in RA3.3.1.1.
01 Method Used to Demonstrate Compliance with the
HSPP/PSPP Requirement
HSPP installed and labeled consistent with Figure RA3.3-1
C. Airflow Rate Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given
in RA3.3.2.
01 Airflow Rate Measurement Type used for this airflow rate
verification.
Traditional Flow Capture Hood according to procedure in
RA3.3.3.1.4
02 Manufacturer of Airflow Measurement Apparatus ALNOR
03 Model number of Airflow Measurement Apparatus EBT731
04
Certification Status of the Airflow Measurement Apparatus
Accuracy
Certified by Manufacturer and listed on CEC Website at
http://www.energy.ca.gov/title24/equipment_cert/ama_fas
/index.html
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 2 of 4)
Registration Number:
424-P010255225A-001-006-M23007A-M23A
Registration Date/Time: 2024-10-23 13:24:38 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:50
MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
D. Forced Air System Airflow Rate Measurement
The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3.
01 Required Minimum System Airflow Rate (cfm/ton)350
02 Required Minimum System Airflow Target (cfm)1050
03 Actual System Airflow Rate Measurement (cfm)1627
04 Compliance Statement:System airflow rate complies
E. Additional Requirements
01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in
the system during system air flow rate measurement identified on this Certificate of Verification.
02
The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of
Verification was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the
instrumentation specifications given in RA3.3.1.
03
A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning
system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate
of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance
Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance.
04 All registers were fully open during the diagnostic test.
05 System fan was set at maximum speed during the diagnostic test.
06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
08
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
09 Verification Status:Pass - all applicable requirements are met
10 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 3 of 4)
Registration Number:
424-P010255225A-001-006-M23007A-M23A
Registration Date/Time: 2024-10-23 13:24:38 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:50
F. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 4 of 4)
Registration Number:
424-P010255225A-001-006-M23007A-M23A
Registration Date/Time: 2024-10-23 13:24:38 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:50
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-006-M22008A-M22A
Registration Date/Time: 2024-10-23 13:24:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:50
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 206)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 206 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement
B. Fan Watt Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in
RA3.3.2.2.
01 Fan Watt Verification Device Used.Portable watt meter
MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
01 Actual Tested Watts 943.66
02 Actual Tested Airflow from MCH-23 (cfm)1627
03 Required Fan Efficacy (watts/cfm)0.58
04 Actual Fan Efficacy (watts/cfm)0.58
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 2 of 3)
Registration Number:
424-P010255225A-001-006-M22008A-M22A
Registration Date/Time: 2024-10-23 13:24:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:50
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
05 Compliance Statement:System fan efficacy complies
D. Additional Requirements
01 All registers were fully open during the diagnostic test.
02 System fan was set at maximum speed during the diagnostic test.
03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
05
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy
(Watt/cfm) criteria in every zonal control mode.
07 Verification Status Pass - all applicable requirements are met
08 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 3 of 3)
Registration Number:
424-P010255225A-001-006-M22008A-M22A
Registration Date/Time: 2024-10-23 13:24:41 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:50
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-006-M26009A-M26A
Registration Date/Time: 2024-10-23 13:24:49 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:50
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 1 of 4)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 206)
City: La Quinta Zip Code: 92253
A. System Information
Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC
system requiring verification must use a separate form.
01 System Name or Identification/Tag UNIT 206 HVACSys
02 System Location or Area Served Main
03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required
04 Directory used to certify product performance AHRI
05 AHRI certification number for the installed space
conditioning system from http://www.ahridirectory.org
208650564
06 Does the directory used to certify product performance
require a specific air handler/furnace make and model?
Yes
07 Does the directory used to certify product performance
require a time delay relay (+TDR)?
Yes
08 Does the directory used to certify product performance
require a TXV (+TXV)?
Yes
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to
certify product performance in order to demonstrate compliance.
Data from Nameplate of Installed System
Component
Data from the Directory Used to Certify the
Rated System Component
Outdoor Condenser or Package Unit -
Installed Manufacturer Name
01 RHEEM 02 RHEEM
Outdoor Condenser or Package Unit -
Installed Model Number
03 RHPAZR036JT000NA 04 RHPAZR036JT000NA
Inside Coil - Installed Manufacturer
Name
05 06 This field or section is not applicable
Inside Coil - Installed Model Number 07 08 This field or section is not applicable
Air Handler/Furnace - Installed
Manufacturer Name
09 10 RHEEM
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 2 of 4)
Registration Number:
424-P010255225A-001-006-M26009A-M26A
Registration Date/Time: 2024-10-23 13:24:49 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:50
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to
certify product performance in order to demonstrate compliance.
Air Handler/Furnace - Installed Model
Number
11 12 RHPAZR036AJT
C. Verified Cooling System SEER
01 Required minimum SEER 15
02 Installed SEER 15
03 Compliance Statement:System passes SEER verification
Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed
on the CF2R.
D. Verified Cooling System EER
This section does not apply to this project.
E. Verified Cooling System Air Handler/Furnace
01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party
certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory.
02 Verification Status:Pass - all applicable requirements are met
03 Correction Notes:
F. Verified Cooling System Time Delay Relay
01
If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by
signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of
RA3.4.3.
02 Verification Status:Pass - all applicable requirements are met
03 Correction Notes:
G. Verified Cooling System TXV
01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below
that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb
02 Verification Status:Pass - all applicable requirements are met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 3 of 4)
Registration Number:
424-P010255225A-001-006-M26009A-M26A
Registration Date/Time: 2024-10-23 13:24:49 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:50
G. Verified Cooling System TXV
03 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 4 of 4)
Registration Number:
424-P010255225A-001-006-M26009A-M26A
Registration Date/Time: 2024-10-23 13:24:49 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:50
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-007-M27005A-M27A
Registration Date/Time: 2024-10-23 13:24:55 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 207)
City: La Quinta Zip Code: 92253
Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE
Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on
this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010.
A. Dwelling Mechanical Ventilation - General Information
01 Dwelling unit name DwellingUnit 207
02 Building Type Single family
03 Project scope Newly constructed building
04
Total Conditioned Floor Area of Dwelling Unit
(For addition projects the conditioned floor area equals
existing area plus addition area. )
931
05
Number of bedrooms in dwelling unit
(For addition projects the number of bedrooms equals the
existing bedrooms plus addition bedrooms)
2
06 Ventilation Operation Schedule Continuous
07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1)
08 Whole Building Ventilation System Type Standalone - Balanced
09 IAQ Fan Location
MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method
B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method
A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with
outdoor air each hour at no less than the rate in equation 4.1a.
01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81
02 Installed Continuous Whole-Building Ventilation Rate 109
C. Compliance Statement
01 Building passes continuous whole-building ventilation rate test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 2 of 3)
Registration Number:
424-P010255225A-001-007-M27005A-M27A
Registration Date/Time: 2024-10-23 13:24:55 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
D. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 3 of 3)
Registration Number:
424-P010255225A-001-007-M27005A-M27A
Registration Date/Time: 2024-10-23 13:24:55 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-007-M20006A-M20A
Registration Date/Time: 2024-10-23 13:24:59 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 207)
City: La Quinta Zip Code: 92253
A. System Information
01 Space Conditioning System Identification or Name UNIT 207 HVACSys
02 Space Conditioning System Location or Area Served Main
03 Building Type from CF-1R Multi-family
04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS)
Credit from CF1R?
No, credit is not taken
05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit
from CF1R?
No, credit is not taken
06 Duct System Compliance Category New
MCH-20a - Completely New Duct System
B. Duct Leakage Diagnostic Test
01 Condenser Nominal Cooling Capacity (ton)3
02 Heating Capacity (kBtu/h)36
03 Conditioned Floor Area served by this HVAC system (ft2)931
04 Duct Leakage Test Conditions Test final
05 Duct Leakage Test Method Total leakage
06 Leakage Factor 0.12
07 Air Handling Unit Airflow (AHUAirflow) Determination
Method
Cooling system method
08 Measured AHUAirflow This field or section is not applicable
09 Calculated Target Allowable Duct Leakage (cfm)144
10 Actual Duct Leakage Rate from Leakage Test
Measurement (cfm)
42.9
11 Compliance Statement System passes leakage test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 2 of 3)
Registration Number:
424-P010255225A-001-007-M20006A-M20A
Registration Date/Time: 2024-10-23 13:24:59 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
B. Duct Leakage Diagnostic Test
12 Notes
C. Additional Requirements for Compliance
01 System was tested in its normal operation condition. No temporary taping allowed.
02
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage
testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation
Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required,
may configure the OA damper to the closed position during duct leakage testing.
03 All supply and return register boots were sealed to the drywall.
04 Building cavities were not used as plenums or platform returns in lieu of ducts.
05 If cloth backed tape was used it was covered with Mastic and draw bands.
06 All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in).
After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must
be performed
07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are
properly sealed.
08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points
between the air handler and the supply and return plenums to verify that the connection points are properly sealed.
09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
10 Verification Status:Pass
11 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 3 of 3)
Registration Number:
424-P010255225A-001-007-M20006A-M20A
Registration Date/Time: 2024-10-23 13:24:59 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-007-M23007A-M23A
Registration Date/Time: 2024-10-23 13:25:03 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 1 of 4)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 207)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 207 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement
B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP)
in the Supply Plenum.
Procedures for installing HSPP or PSPP are specified in RA3.3.1.1.
01 Method Used to Demonstrate Compliance with the
HSPP/PSPP Requirement
HSPP installed and labeled consistent with Figure RA3.3-1
C. Airflow Rate Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given
in RA3.3.2.
01 Airflow Rate Measurement Type used for this airflow rate
verification.
Traditional Flow Capture Hood according to procedure in
RA3.3.3.1.4
02 Manufacturer of Airflow Measurement Apparatus ALNOR
03 Model number of Airflow Measurement Apparatus EBT731
04
Certification Status of the Airflow Measurement Apparatus
Accuracy
Certified by Manufacturer and listed on CEC Website at
http://www.energy.ca.gov/title24/equipment_cert/ama_fas
/index.html
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 2 of 4)
Registration Number:
424-P010255225A-001-007-M23007A-M23A
Registration Date/Time: 2024-10-23 13:25:03 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
D. Forced Air System Airflow Rate Measurement
The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3.
01 Required Minimum System Airflow Rate (cfm/ton)350
02 Required Minimum System Airflow Target (cfm)1050
03 Actual System Airflow Rate Measurement (cfm)1547
04 Compliance Statement:System airflow rate complies
E. Additional Requirements
01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in
the system during system air flow rate measurement identified on this Certificate of Verification.
02
The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of
Verification was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the
instrumentation specifications given in RA3.3.1.
03
A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning
system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate
of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance
Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance.
04 All registers were fully open during the diagnostic test.
05 System fan was set at maximum speed during the diagnostic test.
06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
08
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
09 Verification Status:Pass - all applicable requirements are met
10 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 3 of 4)
Registration Number:
424-P010255225A-001-007-M23007A-M23A
Registration Date/Time: 2024-10-23 13:25:03 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
F. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 4 of 4)
Registration Number:
424-P010255225A-001-007-M23007A-M23A
Registration Date/Time: 2024-10-23 13:25:03 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-007-M22008A-M22A
Registration Date/Time: 2024-10-23 13:25:06 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 207)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 207 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement
B. Fan Watt Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in
RA3.3.2.2.
01 Fan Watt Verification Device Used.Portable watt meter
MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
01 Actual Tested Watts 897.26
02 Actual Tested Airflow from MCH-23 (cfm)1547
03 Required Fan Efficacy (watts/cfm)0.58
04 Actual Fan Efficacy (watts/cfm)0.58
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 2 of 3)
Registration Number:
424-P010255225A-001-007-M22008A-M22A
Registration Date/Time: 2024-10-23 13:25:06 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
05 Compliance Statement:System fan efficacy complies
D. Additional Requirements
01 All registers were fully open during the diagnostic test.
02 System fan was set at maximum speed during the diagnostic test.
03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
05
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy
(Watt/cfm) criteria in every zonal control mode.
07 Verification Status Pass - all applicable requirements are met
08 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 3 of 3)
Registration Number:
424-P010255225A-001-007-M22008A-M22A
Registration Date/Time: 2024-10-23 13:25:06 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-007-M26009A-M26A
Registration Date/Time: 2024-10-23 13:25:10 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 1 of 4)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 207)
City: La Quinta Zip Code: 92253
A. System Information
Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC
system requiring verification must use a separate form.
01 System Name or Identification/Tag UNIT 207 HVACSys
02 System Location or Area Served Main
03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required
04 Directory used to certify product performance AHRI
05 AHRI certification number for the installed space
conditioning system from http://www.ahridirectory.org
208650564
06 Does the directory used to certify product performance
require a specific air handler/furnace make and model?
Yes
07 Does the directory used to certify product performance
require a time delay relay (+TDR)?
Yes
08 Does the directory used to certify product performance
require a TXV (+TXV)?
Yes
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to
certify product performance in order to demonstrate compliance.
Data from Nameplate of Installed System
Component
Data from the Directory Used to Certify the
Rated System Component
Outdoor Condenser or Package Unit -
Installed Manufacturer Name
01 RHEEM 02 RHEEM
Outdoor Condenser or Package Unit -
Installed Model Number
03 RHPAZR036JT000NA 04 RHPAZR036JT000NA
Inside Coil - Installed Manufacturer
Name
05 06 This field or section is not applicable
Inside Coil - Installed Model Number 07 08 This field or section is not applicable
Air Handler/Furnace - Installed
Manufacturer Name
09 10 RHEEM
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 2 of 4)
Registration Number:
424-P010255225A-001-007-M26009A-M26A
Registration Date/Time: 2024-10-23 13:25:10 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to
certify product performance in order to demonstrate compliance.
Air Handler/Furnace - Installed Model
Number
11 12 RHPAZR036AJT
C. Verified Cooling System SEER
01 Required minimum SEER 15
02 Installed SEER 15
03 Compliance Statement:System passes SEER verification
Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed
on the CF2R.
D. Verified Cooling System EER
This section does not apply to this project.
E. Verified Cooling System Air Handler/Furnace
01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party
certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory.
02 Verification Status:Pass - all applicable requirements are met
03 Correction Notes:
F. Verified Cooling System Time Delay Relay
01
If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by
signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of
RA3.4.3.
02 Verification Status:Pass - all applicable requirements are met
03 Correction Notes:
G. Verified Cooling System TXV
01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below
that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb
02 Verification Status:Pass - all applicable requirements are met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 3 of 4)
Registration Number:
424-P010255225A-001-007-M26009A-M26A
Registration Date/Time: 2024-10-23 13:25:10 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
G. Verified Cooling System TXV
03 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 4 of 4)
Registration Number:
424-P010255225A-001-007-M26009A-M26A
Registration Date/Time: 2024-10-23 13:25:10 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:51
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-008-M27005A-M27A
Registration Date/Time: 2024-10-23 13:25:51 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:55
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 208)
City: La Quinta Zip Code: 92253
Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE
Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on
this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010.
A. Dwelling Mechanical Ventilation - General Information
01 Dwelling unit name DwellingUnit 208
02 Building Type Single family
03 Project scope Newly constructed building
04
Total Conditioned Floor Area of Dwelling Unit
(For addition projects the conditioned floor area equals
existing area plus addition area. )
931
05
Number of bedrooms in dwelling unit
(For addition projects the number of bedrooms equals the
existing bedrooms plus addition bedrooms)
2
06 Ventilation Operation Schedule Continuous
07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1)
08 Whole Building Ventilation System Type Standalone - Balanced
09 IAQ Fan Location
MCH-27a - Continuous Ventilation Airflow - Fan Ventilation Rate Method
B. Whole-Building Continuous Ventilation - Fan Ventilation Rate Method
A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with
outdoor air each hour at no less than the rate in equation 4.1a.
01 Required Continuous Whole-Building Ventilation Rate (Qfan)31.81
02 Installed Continuous Whole-Building Ventilation Rate 140
C. Compliance Statement
01 Building passes continuous whole-building ventilation rate test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 2 of 3)
Registration Number:
424-P010255225A-001-008-M27005A-M27A
Registration Date/Time: 2024-10-23 13:25:51 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:55
D. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-27-H
Indoor Air Quality and Mechanical Ventilation (Page 3 of 3)
Registration Number:
424-P010255225A-001-008-M27005A-M27A
Registration Date/Time: 2024-10-23 13:25:51 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:55
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-008-M20006A-M20A
Registration Date/Time: 2024-10-23 13:25:54 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:55
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 208)
City: La Quinta Zip Code: 92253
A. System Information
01 Space Conditioning System Identification or Name UNIT 208 HVACSys
02 Space Conditioning System Location or Area Served Main
03 Building Type from CF-1R Multi-family
04 Verified Low Leakage Ducts in Conditioned Space (VLLDCS)
Credit from CF1R?
No, credit is not taken
05 Verified Low Leakage Air Handling Unit (VLLAHU) Credit
from CF1R?
No, credit is not taken
06 Duct System Compliance Category New
MCH-20a - Completely New Duct System
B. Duct Leakage Diagnostic Test
01 Condenser Nominal Cooling Capacity (ton)3
02 Heating Capacity (kBtu/h)36
03 Conditioned Floor Area served by this HVAC system (ft2)931
04 Duct Leakage Test Conditions Test final
05 Duct Leakage Test Method Total leakage
06 Leakage Factor 0.12
07 Air Handling Unit Airflow (AHUAirflow) Determination
Method
Cooling system method
08 Measured AHUAirflow This field or section is not applicable
09 Calculated Target Allowable Duct Leakage (cfm)144
10 Actual Duct Leakage Rate from Leakage Test
Measurement (cfm)
53.1
11 Compliance Statement System passes leakage test
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 2 of 3)
Registration Number:
424-P010255225A-001-008-M20006A-M20A
Registration Date/Time: 2024-10-23 13:25:54 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:55
B. Duct Leakage Diagnostic Test
12 Notes
C. Additional Requirements for Compliance
01 System was tested in its normal operation condition. No temporary taping allowed.
02
Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage
testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation
Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required,
may configure the OA damper to the closed position during duct leakage testing.
03 All supply and return register boots were sealed to the drywall.
04 Building cavities were not used as plenums or platform returns in lieu of ducts.
05 If cloth backed tape was used it was covered with Mastic and draw bands.
06 All connection points between the air handler and the supply and return plenums are completely sealed.
Visual Inspection at Final Construction Stage (applicable if system was tested at rough-in).
After installing the interior finishing wall and verifying that the above rough-in tests was completed, the following procedure must
be performed
07 For all supply and return registers, verify that the spaces between the register boot and the interior finishing wall are
properly sealed.
08 If the house rough-in duct leakage test was conducted without an air handler installed, inspect the connection points
between the air handler and the supply and return plenums to verify that the connection points are properly sealed.
09 Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used.
10 Verification Status:Pass
11 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
D. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-20-H
Duct Leakage Diagnostic Test (Page 3 of 3)
Registration Number:
424-P010255225A-001-008-M20006A-M20A
Registration Date/Time: 2024-10-23 13:25:54 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:55
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-008-M23007A-M23A
Registration Date/Time: 2024-10-23 13:26:04 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:55
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 1 of 4)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 208)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 208 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement
B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP)
in the Supply Plenum.
Procedures for installing HSPP or PSPP are specified in RA3.3.1.1.
01 Method Used to Demonstrate Compliance with the
HSPP/PSPP Requirement
HSPP installed and labeled consistent with Figure RA3.3-1
C. Airflow Rate Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given
in RA3.3.2.
01 Airflow Rate Measurement Type used for this airflow rate
verification.
Traditional Flow Capture Hood according to procedure in
RA3.3.3.1.4
02 Manufacturer of Airflow Measurement Apparatus ALNOR
03 Model number of Airflow Measurement Apparatus EBT731
04
Certification Status of the Airflow Measurement Apparatus
Accuracy
Certified by Manufacturer and listed on CEC Website at
http://www.energy.ca.gov/title24/equipment_cert/ama_fas
/index.html
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 2 of 4)
Registration Number:
424-P010255225A-001-008-M23007A-M23A
Registration Date/Time: 2024-10-23 13:26:04 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:55
MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
D. Forced Air System Airflow Rate Measurement
The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3.
01 Required Minimum System Airflow Rate (cfm/ton)350
02 Required Minimum System Airflow Target (cfm)1050
03 Actual System Airflow Rate Measurement (cfm)1052
04 Compliance Statement:System airflow rate complies
E. Additional Requirements
01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in
the system during system air flow rate measurement identified on this Certificate of Verification.
02
The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of
Verification was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the
instrumentation specifications given in RA3.3.1.
03
A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning
system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate
of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance
Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance.
04 All registers were fully open during the diagnostic test.
05 System fan was set at maximum speed during the diagnostic test.
06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
08
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
09 Verification Status:Pass - all applicable requirements are met
10 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 3 of 4)
Registration Number:
424-P010255225A-001-008-M23007A-M23A
Registration Date/Time: 2024-10-23 13:26:04 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:55
F. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-23-H
Space Conditioning System Airflow Rate (Page 4 of 4)
Registration Number:
424-P010255225A-001-008-M23007A-M23A
Registration Date/Time: 2024-10-23 13:26:04 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2016.2.000
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:55
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-008-M22008A-M22A
Registration Date/Time: 2024-10-23 13:26:09 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:56
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 1 of 3)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 208)
City: La Quinta Zip Code: 92253
A. Ducted Cooling System Information
01 System Identification or Name UNIT 208 HVACSys
02 System Location or Area Served Main
03 System Installation Type New
04 Nominal Cooling Capacity (tons) of Condenser 3
05 Condenser Speed Type Single Speed
06 Cooling System Zonal Control Type Not Zonal
07 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system
08 System Bypass Duct Status No Bypass Duct
09 Date of System Airflow Rate Measurement 2024-10-17
10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement
B. Fan Watt Measurement Apparatus and Procedure Information
Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in
RA3.3.2.2.
01 Fan Watt Verification Device Used.Portable watt meter
MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed
Compressor
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
01 Actual Tested Watts 610.16
02 Actual Tested Airflow from MCH-23 (cfm)1052
03 Required Fan Efficacy (watts/cfm)0.58
04 Actual Fan Efficacy (watts/cfm)0.58
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 2 of 3)
Registration Number:
424-P010255225A-001-008-M22008A-M22A
Registration Date/Time: 2024-10-23 13:26:09 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:56
C. Forced Air System Fan Efficacy Measurement
The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3
05 Compliance Statement:System fan efficacy complies
D. Additional Requirements
01 All registers were fully open during the diagnostic test.
02 System fan was set at maximum speed during the diagnostic test.
03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test.
04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value.
05
Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan
efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air
handler fan speed.
06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy
(Watt/cfm) criteria in every zonal control mode.
07 Verification Status Pass - all applicable requirements are met
08 Correction Notes
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
E. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-22-H
Space Conditioning System Fan Efficacy (Page 3 of 3)
Registration Number:
424-P010255225A-001-008-M22008A-M22A
Registration Date/Time: 2024-10-23 13:26:09 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:56
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
Registration Number:
424-P010255225A-001-008-M26009A-M26A
Registration Date/Time: 2024-10-23 13:26:20 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:56
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 1 of 4)
Project Name: Desert Club Enforcement Agency: La Quinta,
City of
Permit Number: BRES2019-0330
Dwelling Address: 51480 Desert Club Dr, La
Quinta (DwellingUnit 208)
City: La Quinta Zip Code: 92253
A. System Information
Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC
system requiring verification must use a separate form.
01 System Name or Identification/Tag UNIT 208 HVACSys
02 System Location or Area Served Main
03 Status: SEER and EER performance compliance credit check SEER HERS Verification is required
04 Directory used to certify product performance AHRI
05 AHRI certification number for the installed space
conditioning system from http://www.ahridirectory.org
208650564
06 Does the directory used to certify product performance
require a specific air handler/furnace make and model?
Yes
07 Does the directory used to certify product performance
require a time delay relay (+TDR)?
Yes
08 Does the directory used to certify product performance
require a TXV (+TXV)?
Yes
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to
certify product performance in order to demonstrate compliance.
Data from Nameplate of Installed System
Component
Data from the Directory Used to Certify the
Rated System Component
Outdoor Condenser or Package Unit -
Installed Manufacturer Name
01 RHEEM 02 RHEEM
Outdoor Condenser or Package Unit -
Installed Model Number
03 RHPAZR036JT000NA 04 RHPAZR036JT000NA
Inside Coil - Installed Manufacturer
Name
05 06 This field or section is not applicable
Inside Coil - Installed Model Number 07 08 This field or section is not applicable
Air Handler/Furnace - Installed
Manufacturer Name
09 10 RHEEM
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 2 of 4)
Registration Number:
424-P010255225A-001-008-M26009A-M26A
Registration Date/Time: 2024-10-23 13:26:20 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:56
B. Rated Space Conditioning System Equipment Verification
The data on nameplate of the installed component shall conform to the data for the component as shown in the Directory used to
certify product performance in order to demonstrate compliance.
Air Handler/Furnace - Installed Model
Number
11 12 RHPAZR036AJT
C. Verified Cooling System SEER
01 Required minimum SEER 15
02 Installed SEER 15
03 Compliance Statement:System passes SEER verification
Signature by responsible party below certifies that the installed cooling equipment meets or exceeds the required value listed
on the CF2R.
D. Verified Cooling System EER
This section does not apply to this project.
E. Verified Cooling System Air Handler/Furnace
01 If a specific air handler or furnace is required by the directory used to certify product performance, the responsible party
certifies by signing below that the installed air handler/furnace matches the equipment specified in the directory.
02 Verification Status:Pass - all applicable requirements are met
03 Correction Notes:
F. Verified Cooling System Time Delay Relay
01
If a Time Delay Relay is required by the directory used to certify product performance, the responsible party certifies by
signing below that the Time Delay Relay is installed and has been tested to operate correctly according to the protocols of
RA3.4.3.
02 Verification Status:Pass - all applicable requirements are met
03 Correction Notes:
G. Verified Cooling System TXV
01 If a TXV is required by the directory used to certify product performance, the responsible party certifies by signing below
that the TXV is properly installed and has been visually verified, including proper placement of sensing bulb
02 Verification Status:Pass - all applicable requirements are met
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 3 of 4)
Registration Number:
424-P010255225A-001-008-M26009A-M26A
Registration Date/Time: 2024-10-23 13:26:20 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:56
G. Verified Cooling System TXV
03 Correction Notes:
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have
been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.
H. Determination of HERS Verification Compliance
All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order
for this Certificate of Verification as a whole to be determined to be in compliance.
01 Complies: All specified verification protocol requirements on this document are met.
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
CERTIFICATE OF VERIFICATION CF3R-MCH-26-H
Rated Space Conditioning System Equipment Verification (Page 4 of 4)
Registration Number:
424-P010255225A-001-008-M26009A-M26A
Registration Date/Time: 2024-10-23 13:26:20 HERS Provider: CHEERS
CA Building Energy Efficiency Standards
2016 Residential Compliance
Report Version: 2018.0.001
Schema Version: rev 20180426
Report Generated: 2024-10-29 13:45:56
Documentation Author's Declaration Statement
1. I certify that this Certificate of Verification documentation is accurate and complete.
Documentation Author Name:
Shari Sims
Documentation Author Signature:
Company:
Advancing Home Performance, Inc.
Date Signed:
2024-10-23
Address:
74998 Country Club Drive
CEA/ HERS Certification Identification (if applicable):
RCN14014
City/State/Zip:
Palm Desert CA 92260
Phone:
760-851-8648
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1.The information provided on this Certificate of Verification is true and correct.
2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater).
3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification
identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements
specified on the Certificate of Compliance for the building approved by the enforcement agency.
4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the
construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R) approved by the enforcement agency.
5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Verification is required to be included with the documentation the builder provides to the building owner at occupancy.
Builder Or Installer Information As Shown On The Certificate Of Installation
Company Name (Installing Subcontractor, General Contractor, or Builder/Owner):
Muskoka Development LLC
Responsible Builder or Installer Name:
Paul Marcinkowski
CSLB License:
1100564
HERS Provider Data Registry Information
Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable)
N/A
HERS Rater Information
HERS Rater Company Name:
Advancing Home Performance, Inc.
Responsible Rater Name:
Shari Sims
Responsible Rater Signature:
Responsible Rater Certification Number w/ this HERS Provider:
RCN14014
Date Signed:
2024-10-23
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or
related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.