Loading...
Piazza Serena TR 30092 BCPR2021-0027 - Title 24CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 1 - Pendleton S852 Calculation Date/Time:2022-02-04T15:46:38-08:00 (Page 1 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 1 - Pendleton S852.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   15:50:37 GENERAL INFORMATION 01 Project Name Plan 1 - Pendleton S852 02 Run Title Title 24 Analysis 03 Project Location Bella at Piazza Serena 04 City La Quinta 05 Standards Version 2019 06 Zip code 07 Software Version EnergyPro 8.1 08 Climate Zone 15 09 Front Orientation (deg/ Cardinal)AllOrientations 10 Building Type Single family 11 Number of Dwelling Units 1 12 Project Scope NewConstruction 13 Number of Bedrooms 3 14 Addition Cond. Floor Area (ft 2)0 15 Number of Stories 1 16 Existing Cond. Floor Area (ft 2)n/a 17 Fenestration Average U-factor 0.33 18 Total Cond. Floor Area (ft 2)2328 19 Glazing Percentage (%)14.19% 20 ADU Bedroom Count 0 21 ADU Conditioned Floor Area 0 22 Is Natural Gas Available?Yes COMPLIANCE RESULTS 01 Building Complies with Computer Performance 02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider. 03 This building incorporates one or more Special Features shown below 221-P010157782C-000-000-0000000-0000 2022-02-04 16:48:07 CalCERTS inc. BCPR2021-0027 BELLA AT PIAZZA SERENA / TRACT 30092 CONSTRUCTION MASTER PLANS FOR DWELLINGS (SFD x 3) - PLANS 1, 2, AND 3. 2019 CALIFORNIA BUILDING CODES. PLAN 1: 2,328SF PLAN 2: 2,392SF PLAN 3: 2,630SF 04/26/2022 CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 1 - Pendleton S852 Calculation Date/Time:2022-02-04T15:46:38-08:00 (Page 2 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 1 - Pendleton S852.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   15:50:37 ENERGY DESIGN RATING Energy Design Ratings Efficiency¹ (EDR)Total² (EDR)Efficiency¹ (EDR)Total² (EDR) Standard Design 50.4 23.1 Proposed Designs North Facing 45.8 21 4.6 2.1 East Facing 46.9 22.1 3.5 1 South Facing 47.9 23.1 2.5 0 West Facing 47.8 23 2.6 0.1 RESULT:3:COMPLIES ¹ Efficiency EDR includes improvements to the building envelope and more efficient equipment ² Total EDR includes efficiency and demand response measures such as photovoltaic (PV) systems and batteries ³ Building complies when efficiency and total compliance margins are greater than or equal to zero •Standard Design PV Capacity: 5.21 kWdc •Proposed PV Capacity Scaling: North (5.22 kWdc) East (5.22 kWdc) South (5.22 kWdc) West (5.22 kWdc) 221-P010157782C-000-000-0000000-0000 2022-02-04 16:48:07 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 1 - Pendleton S852 Calculation Date/Time:2022-02-04T15:46:38-08:00 (Page 3 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 1 - Pendleton S852.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   15:50:37 ENERGY USE SUMMARY Energy Use (kTDV/ft 2-yr)Standard Design Proposed Design Compliance Margin Percent Improvement Space Heating 1.66 1.27 0.39 23.5 Space Cooling 86.2 73.69 12.51 14.5 IAQ Ventilation 4.45 4.45 0 0 Water Heating 8.54 7.76 0.78 9.1 Self Utilization Credit n/a 0 0 n/a North Facing Compliance Total 100.85 87.17 13.68 13.6 Space Heating 1.66 0.91 0.75 45.2 Space Cooling 86.2 77.45 8.75 10.2 IAQ Ventilation 4.45 4.45 0 0 Water Heating 8.54 7.76 0.78 9.1 Self Utilization Credit n/a 0 0 n/a East Facing Compliance Total 100.85 90.57 10.28 10.2 Space Heating 1.66 1.01 0.65 39.2 Space Cooling 86.2 80.25 5.95 6.9 IAQ Ventilation 4.45 4.45 0 0 Water Heating 8.54 7.76 0.78 9.1 Self Utilization Credit n/a 0 0 n/a South Facing Compliance Total 100.85 93.47 7.38 7.3 Space Heating 1.66 1.7 -0.04 -2.4 Space Cooling 86.2 79.13 7.07 8.2 IAQ Ventilation 4.45 4.45 0 0 Water Heating 8.54 7.76 0.78 9.1 Self Utilization Credit n/a 0 0 n/a West Facing Compliance Total 100.85 93.04 7.81 7.7 221-P010157782C-000-000-0000000-0000 2022-02-04 16:48:07 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 1 - Pendleton S852 Calculation Date/Time:2022-02-04T15:46:38-08:00 (Page 4 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 1 - Pendleton S852.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   15:50:37 REQUIRED PV SYSTEMS - SIMPLIFIED 01 02 03 04 05 06 07 08 09 10 11 12 DC System Size (kWdc)Exception Module Type Array Type Power Electronics CFI Azimuth (deg) Tilt Input Array Angle (deg)Tilt: (x in 12) Inverter Eff. (%) Annual Solar Access (%) 5.22 NA Premium Fixed (roof mount)Microinverters true 105-300 n/a n/a <=7:12 96 97 REQUIRED SPECIAL FEATURES The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis. •Indoor air quality, balanced fan •Non-standard roof reflectance •Insulation below roof deck •Window overhangs and/or fins HERS FEATURE SUMMARY The following is a summary of the features that must be field-verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional detail is provided in the buildng tables below. Registered CF2Rs and CF3Rs are required to be completed in the HERS Registry Building-level Verifications: •Quality insulation installation (QII) •Building air leakage/reduced infiltration •Indoor air quality ventilation •Kitchen range hood Cooling System Verifications: •Minimum Airflow •Verified EER •Verified SEER •Verified Refrigerant Charge •Fan Efficacy Watts/CFM Heating System Verifications: •-- None -- HVAC Distribution System Verifications: •Duct leakage testing •Low-leakage Air Handling Unit Domestic Hot Water System Verifications: •-- None -- 221-P010157782C-000-000-0000000-0000 2022-02-04 16:48:07 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 1 - Pendleton S852 Calculation Date/Time:2022-02-04T15:46:38-08:00 (Page 5 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 1 - Pendleton S852.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   15:50:37 BUILDING - FEATURES INFORMATION 01 02 03 04 05 06 07 Project Name Conditioned Floor Area (ft 2)Number of Dwelling Units Number of Bedrooms Number of Zones Number of Ventilation Cooling Systems Number of Water Heating Systems Plan 1 - Pendleton S852 2328 1 3 1 0 1 ZONE INFORMATION 01 02 03 04 05 06 07 Zone Name Zone Type HVAC System Name Zone Floor Area (ft 2)Avg. Ceiling Height Water Heating System 1 Water Heating System 2 Zone 1 Conditioned HVAC1 2328 9.1 DHW Sys 1 N/A OPAQUE SURFACES 01 02 03 04 05 06 07 08 Name Zone Construction Azimuth Orientation Gross Area (ft 2)Window and Door Area (ft2) Tilt (deg) Front 2X6 Zone 1 Ext. R-19 Wall + R-4.2 0 Front 378.4 26.8 90 Front 2X4 Zone 1 Ext. R-13 Wall + R-4.2 0 Front 337.4 67 90 Left 2X4 Zone 1 Ext. R-13 Wall + R-4.2 90 Left 455 181 90 Rear 2X4 Zone 1 Ext. R-13 Wall + R-4.2 180 Back 571 43 90 Right 2X4 Siding Zone 1 Ext. R-13 Wall 270 Right 81.9 36.5 90 Garage 2X4 Zone 1>>__Garage__Garage R-13 Wall n/a n/a 518 17.8 n/a Roof Zone 1 R-30 Roof Attic + R-13 BD n/a n/a 2298 n/a n/a Furnace Zone 1 R-30 Roof Attic n/a n/a 30 n/a n/a Roof 2 __Garage__R-0 Roof Attic n/a n/a 704 n/a n/a Front 2X4 2 __Garage__Ext R-0 Wall 0 Front 154 0 90 Rear 2X4 2 __Garage__Ext R-0 Wall 180 Back 298.8 56 90 Right 2X4 __Garage__Ext R-0 Wall 270 Right 373.1 112 90 221-P010157782C-000-000-0000000-0000 2022-02-04 16:48:07 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 1 - Pendleton S852 Calculation Date/Time:2022-02-04T15:46:38-08:00 (Page 6 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 1 - Pendleton S852.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   15:50:37 ATTIC 01 02 03 04 05 06 07 08 Name Construction Type Roof Rise (x in 12)Roof Reflectance Roof Emittance Radiant Barrier Cool Roof Attic __Garage__Attic Garage Roof Cons Ventilated 4 0.12 0.92 No No Attic Zone 1 Attic RoofZone 1 Ventilated 4 0.12 0.92 No No FENESTRATION / GLAZING 01 02 03 04 05 06 07 08 09 10 11 12 13 14 Name Type Surface Orientation Azimuth Width (ft) Height (ft)Mult.Area (ft2)U-factor U-factor Source SHGC SHGC Sourc e Exterior Shading Window Window Front 2X6 Front 0 1 26.8 0.33 NFRC 0.23 NFRC Bug Screen Window 2 Window Front 2X4 Front 0 1 67 0.33 NFRC 0.23 NFRC Bug Screen Window 3 Window Left 2X4 Left 90 1 85 0.33 NFRC 0.23 NFRC Bug Screen SGD - OH Window Left 2X4 Left 90 12 8 1 96 0.33 NFRC 0.23 NFRC Bug Screen Window 4 Window Rear 2X4 Back 180 1 43 0.33 NFRC 0.23 NFRC Bug Screen Window 5 Window Right 2X4 Siding Right 270 1 12.5 0.33 NFRC 0.23 NFRC Bug Screen OPAQUE DOORS 01 02 03 04 Name Side of Building Area (ft 2)U-factor Main Door Right 2X4 Siding 24 0.142857 Int Garage Door Garage 2X4 17.8 0.5 Overhead Garage Door Rear 2X4 2 56 0.7 Overhead Garage Door 2 Right 2X4 112 0.7 221-P010157782C-000-000-0000000-0000 2022-02-04 16:48:07 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 1 - Pendleton S852 Calculation Date/Time:2022-02-04T15:46:38-08:00 (Page 7 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 1 - Pendleton S852.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   15:50:37 OVERHANGS AND FINS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 Window Overhang Left Fin Right Fin Depth Dist Up Left Extent Right Extent Flap Ht.Depth Top Up Dist L Bot Up Depth Top Up Dist R Bot Up SGD - OH 12 1 10 10 0 0 0 0 0 0 0 0 0 SLAB FLOORS 01 02 03 04 05 06 07 Name Zone Area (ft2)Perimeter (ft)Edge Insul. R-value and Depth Carpeted Fraction Heated Slab-on-Grade Zone 1 2238 200 None 80%No Slab-on-Grade 2 __Garage__704 91 None 0%No OPAQUE SURFACE CONSTRUCTIONS 01 02 03 04 05 06 07 08 Construction Name Surface Type Construction Type Framing Total Cavity R-value Interior / Exterior Continuous R-value U-factor Assembly Layers Ext R-0 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-0 None / None 0.361 Inside Finish: Gypsum Board Cavity / Frame: no insul. / 2x4 Exterior Finish: 3 Coat Stucco Ext. R-19 Wall + R-4.2 Exterior Walls Wood Framed Wall 2x6 @ 16 in. O. C.R-19 None / R-4.2 0.054 Inside Finish: Gypsum Board Cavity / Frame: R-19 in 5-1/2 in. (R-18) / 2x6 Sheathing / Insulation: R-4.2 Sheathing Exterior Finish: Synthetic Stucco Ext. R-13 Wall + R-4.2 Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-13 None / R-4.2 0.067 Inside Finish: Gypsum Board Cavity / Frame: R-13 / 2x4 Sheathing / Insulation: R-4.2 Sheathing Exterior Finish: Synthetic Stucco 221-P010157782C-000-000-0000000-0000 2022-02-04 16:48:07 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 1 - Pendleton S852 Calculation Date/Time:2022-02-04T15:46:38-08:00 (Page 8 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 1 - Pendleton S852.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   15:50:37 OPAQUE SURFACE CONSTRUCTIONS 01 02 03 04 05 06 07 08 Construction Name Surface Type Construction Type Framing Total Cavity R-value Interior / Exterior Continuous R-value U-factor Assembly Layers Ext. R-13 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-13 None / None 0.101 Inside Finish: Gypsum Board Cavity / Frame: R-13 / 2x4 Exterior Finish: 3 Coat Stucco Garage R-13 Wall Interior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-13 None / None 0.092 Inside Finish: Gypsum Board Cavity / Frame: R-13 / 2x4 Other Side Finish: Gypsum Board Attic Garage Roof Cons Attic Roofs Wood Framed Ceiling 2x4 @ 24 in. O. C.R-0 None / None 0.4 Roofing: 10 PSF (RoofTile) Tile Gap: present Roof Deck: Wood Siding/sheathing/decking Cavity / Frame: no insul. / 2x4 Attic RoofZone 1 Attic Roofs Wood Framed Ceiling 2x4 @ 24 in. O. C.R-13 None / None 0.072 Roofing: 10 PSF (RoofTile) Tile Gap: present Roof Deck: Wood Siding/sheathing/decking Cavity / Frame: R-13.0 / 2x4 Around Roof Joists: R-0.0 insul. R-0 Roof Attic Ceilings (below attic) Wood Framed Ceiling 2x4 @ 24 in. O. C.R-0 None / None 0.481 Cavity / Frame: no insul. / 2x4 Inside Finish: Gypsum Board R-30 Roof Attic + R-13 BD Ceilings (below attic) Wood Framed Ceiling 2x4 @ 24 in. O. C.R-30 None / None 0.032 Over Ceiling Joists: R-20.9 insul. Cavity / Frame: R-9.1 / 2x4 Inside Finish: Gypsum Board R-30 Roof Attic Ceilings (below attic) Wood Framed Ceiling 2x4 @ 24 in. O. C.R-30 None / None 0.032 Over Ceiling Joists: R-20.9 insul. Cavity / Frame: R-9.1 / 2x4 Inside Finish: Gypsum Board 221-P010157782C-000-000-0000000-0000 2022-02-04 16:48:07 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 1 - Pendleton S852 Calculation Date/Time:2022-02-04T15:46:38-08:00 (Page 9 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 1 - Pendleton S852.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   15:50:37 BUILDING ENVELOPE - HERS VERIFICATION 01 02 03 04 Quality Insulation Installation (QII)Quality Installation of Spray Foam Insulation Building Envelope Air Leakage CFM50 Required Not Required Required 1412.3 WATER HEATING SYSTEMS 01 02 03 04 05 06 07 Name System Type Distribution Type Water Heater Name (#)Solar Heating System Compact Distribution HERS Verification DHW Sys 1 Domestic Hot Water (DHW) Standard Distribution System DHW Heater 1 (1)n/a None n/a WATER HEATERS 01 02 03 04 05 06 07 08 09 10 11 12 Name Heating Element Type Tank Type # Units Tank Vol. (gal) Energy Factor or Efficiency Input Rating or Pilot Tank Insulation R-value (Int/Ext) Standby Loss or Recovery Eff. 1st Hr. Rating or Flow Rate NEEA Heat Pump Brand or Model Tank Location or Ambient Condition DHW Heater 1 Gas Consumer Instantaneous 1 0 0.93-UEF <= 200 kBtu/hr 0 n/a n/a n/a n/a WATER HEATING - HERS VERIFICATION 01 02 03 04 05 06 07 08 Name Pipe Insulation Parallel Piping Compact Distribution Compact Distribution Type Recirculation Control Central DHW Distribution Shower Drain Water Heat Recovery DHW Sys 1 - 1/1 Not Required Not Required Not Required None Not Required Not Required Not Required 221-P010157782C-000-000-0000000-0000 2022-02-04 16:48:07 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 1 - Pendleton S852 Calculation Date/Time:2022-02-04T15:46:38-08:00 (Page 10 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 1 - Pendleton S852.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   15:50:37 SPACE CONDITIONING SYSTEMS 01 02 03 04 05 06 07 08 09 10 11 Name System Type Heating Unit Name Cooling Unit Name Fan Name Distribution Name Required Thermostat Type Status Verified Existing Condition Heating Equipment Count Cooling Equipment Count HVAC1 Heating and cooling system other Heating Component 1 Cooling Component 1 HVAC Fan 1 Air Distribution System 1 Setback New NA 2 2 HVAC - HEATING UNIT TYPES 01 02 03 04 Name System Type Number of Units Heating Efficiency Heating Component 1 Central gas furnace 2 AFUE-96 HVAC - COOLING UNIT TYPES 01 02 03 04 05 06 07 08 Name System Type Number of Units Efficiency EER Efficiency SEER Zonally Controlled Mulit-speed Compressor HERS Verification Cooling Component 1 Central split AC 2 13 16.5 Not Zonal Single Speed Cooling Component 1-hers-cool HVAC COOLING - HERS VERIFICATION 01 02 03 04 05 06 Name Verified Airflow Airflow Target Verified EER Verified SEER Verified Refrigerant Charge Cooling Component 1-hers-cool Required 350 Required Required Required 221-P010157782C-000-000-0000000-0000 2022-02-04 16:48:07 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 1 - Pendleton S852 Calculation Date/Time:2022-02-04T15:46:38-08:00 (Page 11 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 1 - Pendleton S852.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   15:50:37 HVAC - DISTRIBUTION SYSTEMS 01 02 03 04 05 06 07 08 09 10 11 12 Duct Ins. R-value Duct Location Surface Area Name Type Design Type Supply Return Supply Return Supply Return Bypass Duct Duct Leakage HERS Verification Air Distribution System 1 Unconditioned attic Non-Verified R-6 R-6 Attic Attic n/a n/a No Bypass Duct Air Distribution System 1-hers-dist HVAC DISTRIBUTION - HERS VERIFICATION 01 02 03 04 05 06 07 08 09 Name Duct Leakage Verification Duct Leakage Target (%) Verified Duct Location Verified Duct Design Buried Ducts Deeply Buried Ducts Low-leakage Air Handler Low Leakage Ducts Entirely in Conditioned Space Air Distribution System 1-hers-dist Yes 5.0 Not Required Not Required Not Required Credit not taken Required No HVAC - FAN SYSTEMS 01 02 03 04 Name Type Fan Power (Watts/CFM)Name HVAC Fan 1 HVAC Fan 0.45 HVAC Fan 1-hers-fan HVAC FAN SYSTEMS - HERS VERIFICATION 01 02 03 Name Verified Fan Watt Draw Required Fan Efficacy (Watts/CFM) HVAC Fan 1-hers-fan Required 0.45 221-P010157782C-000-000-0000000-0000 2022-02-04 16:48:07 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 1 - Pendleton S852 Calculation Date/Time:2022-02-04T15:46:38-08:00 (Page 12 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 1 - Pendleton S852.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   15:50:37 IAQ (INDOOR AIR QUALITY) FANS 01 02 03 04 05 06 Dwelling Unit IAQ CFM IAQ Watts/CFM IAQ Fan Type IAQ Recovery Effectiveness (%) IAQ Recovery Effectiveness - SREIAQ Recovery Effectiveness - SRE SFam IAQVentRpt 1-1 85 0.517647 Balanced HRV 75 n/a 221-P010157782C-000-000-0000000-0000 2022-02-04 16:48:07 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 1 - Pendleton S852 Calculation Date/Time:2022-02-04T15:46:38-08:00 (Page 13 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 1 - Pendleton S852.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   15:50:37 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name:Documentation Author Signature: Company:Signature Date: Address:CEA/ HERS Certification Identification (If applicable): City/State/Zip:Phone: RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance. 2.I certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 3.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Responsible Designer Name:Responsible Designer Signature: Company:Date Signed: Address:License: City/State/Zip:Phone:   Easy to Verify at CalCERTS.com Cristela Lujan Energy Inspectors 2570 South Miller Lane Las Vegas, NV 89117 2022-02-04 16:44:05 R19-18-30081 702-365-8080 John Heimann Richmond American Homes 5171 California Ave. Suite #120 Irvine, CA 92617 2022-02-04 16:48:07 N/A 949-467-2661 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 221-P010157782C-000-000-0000000-0000 2022-02-04 16:48:07 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 2 - Pinecrest S853 Calculation Date/Time:2022-02-04T16:18:07-08:00 (Page 1 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 2 - Pinecrest S853.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:22:27 GENERAL INFORMATION 01 Project Name Plan 2 - Pinecrest S853 02 Run Title Title 24 Analysis 03 Project Location Bella at Piazza Serena 04 City La Quinta 05 Standards Version 2019 06 Zip code 07 Software Version EnergyPro 8.1 08 Climate Zone 15 09 Front Orientation (deg/ Cardinal)AllOrientations 10 Building Type Single family 11 Number of Dwelling Units 1 12 Project Scope NewConstruction 13 Number of Bedrooms 3 14 Addition Cond. Floor Area (ft 2)0 15 Number of Stories 1 16 Existing Cond. Floor Area (ft 2)n/a 17 Fenestration Average U-factor 0.33 18 Total Cond. Floor Area (ft 2)2392 19 Glazing Percentage (%)13.29% 20 ADU Bedroom Count 0 21 ADU Conditioned Floor Area 0 22 Is Natural Gas Available?Yes COMPLIANCE RESULTS 01 Building Complies with Computer Performance 02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider. 03 This building incorporates one or more Special Features shown below 221-P010157785C-000-000-0000000-0000 2022-02-04 16:48:53 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 2 - Pinecrest S853 Calculation Date/Time:2022-02-04T16:18:07-08:00 (Page 2 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 2 - Pinecrest S853.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:22:27 ENERGY DESIGN RATING Energy Design Ratings Efficiency¹ (EDR)Total² (EDR)Efficiency¹ (EDR)Total² (EDR) Standard Design 50.4 23.1 Proposed Designs North Facing 45.5 21.1 4.9 2 East Facing 47.1 22.6 3.3 0.5 South Facing 47.2 22.8 3.2 0.3 West Facing 47.4 23 3 0.1 RESULT:3:COMPLIES ¹ Efficiency EDR includes improvements to the building envelope and more efficient equipment ² Total EDR includes efficiency and demand response measures such as photovoltaic (PV) systems and batteries ³ Building complies when efficiency and total compliance margins are greater than or equal to zero •Standard Design PV Capacity: 5.19 kWdc •Proposed PV Capacity Scaling: North (5.12 kWdc) East (5.12 kWdc) South (5.12 kWdc) West (5.12 kWdc) 221-P010157785C-000-000-0000000-0000 2022-02-04 16:48:53 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 2 - Pinecrest S853 Calculation Date/Time:2022-02-04T16:18:07-08:00 (Page 3 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 2 - Pinecrest S853.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:22:27 ENERGY USE SUMMARY Energy Use (kTDV/ft 2-yr)Standard Design Proposed Design Compliance Margin Percent Improvement Space Heating 1.46 1.13 0.33 22.6 Space Cooling 83.21 70.27 12.94 15.6 IAQ Ventilation 4.33 4.33 0 0 Water Heating 8.33 7.57 0.76 9.1 Self Utilization Credit n/a 0 0 n/a North Facing Compliance Total 97.33 83.3 14.03 14.4 Space Heating 1.46 0.95 0.51 34.9 Space Cooling 83.21 74.89 8.32 10 IAQ Ventilation 4.33 4.33 0 0 Water Heating 8.33 7.57 0.76 9.1 Self Utilization Credit n/a 0 0 n/a East Facing Compliance Total 97.33 87.74 9.59 9.9 Space Heating 1.46 1.04 0.42 28.8 Space Cooling 83.21 75.25 7.96 9.6 IAQ Ventilation 4.33 4.33 0 0 Water Heating 8.33 7.57 0.76 9.1 Self Utilization Credit n/a 0 0 n/a South Facing Compliance Total 97.33 88.19 9.14 9.4 Space Heating 1.46 1.44 0.02 1.4 Space Cooling 83.21 75.43 7.78 9.3 IAQ Ventilation 4.33 4.33 0 0 Water Heating 8.33 7.57 0.76 9.1 Self Utilization Credit n/a 0 0 n/a West Facing Compliance Total 97.33 88.77 8.56 8.8 221-P010157785C-000-000-0000000-0000 2022-02-04 16:48:53 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 2 - Pinecrest S853 Calculation Date/Time:2022-02-04T16:18:07-08:00 (Page 4 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 2 - Pinecrest S853.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:22:27 REQUIRED PV SYSTEMS - SIMPLIFIED 01 02 03 04 05 06 07 08 09 10 11 12 DC System Size (kWdc)Exception Module Type Array Type Power Electronics CFI Azimuth (deg) Tilt Input Array Angle (deg)Tilt: (x in 12) Inverter Eff. (%) Annual Solar Access (%) 5.12 NA Premium Fixed (roof mount)Microinverters true 105-300 n/a n/a <=7:12 96 97 REQUIRED SPECIAL FEATURES The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis. •Indoor air quality, balanced fan •Non-standard roof reflectance •Insulation below roof deck •Window overhangs and/or fins HERS FEATURE SUMMARY The following is a summary of the features that must be field-verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional detail is provided in the buildng tables below. Registered CF2Rs and CF3Rs are required to be completed in the HERS Registry Building-level Verifications: •Quality insulation installation (QII) •Building air leakage/reduced infiltration •Indoor air quality ventilation •Kitchen range hood Cooling System Verifications: •Minimum Airflow •Verified EER •Verified SEER •Verified Refrigerant Charge •Fan Efficacy Watts/CFM Heating System Verifications: •-- None -- HVAC Distribution System Verifications: •Duct leakage testing •Low-leakage Air Handling Unit Domestic Hot Water System Verifications: •-- None -- 221-P010157785C-000-000-0000000-0000 2022-02-04 16:48:53 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 2 - Pinecrest S853 Calculation Date/Time:2022-02-04T16:18:07-08:00 (Page 5 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 2 - Pinecrest S853.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:22:27 BUILDING - FEATURES INFORMATION 01 02 03 04 05 06 07 Project Name Conditioned Floor Area (ft 2)Number of Dwelling Units Number of Bedrooms Number of Zones Number of Ventilation Cooling Systems Number of Water Heating Systems Plan 2 - Pinecrest S853 2392 1 3 1 0 1 ZONE INFORMATION 01 02 03 04 05 06 07 Zone Name Zone Type HVAC System Name Zone Floor Area (ft 2)Avg. Ceiling Height Water Heating System 1 Water Heating System 2 Zone 1 Conditioned HVAC1 2392 9.1 DHW Sys 1 N/A OPAQUE SURFACES 01 02 03 04 05 06 07 08 Name Zone Construction Azimuth Orientation Gross Area (ft 2)Window and Door Area (ft2) Tilt (deg) Front 2X4 Zone 1 Ext. R-13 Wall + R-4.2 0 Front 591.5 76.0032 90 Front 2X6 Zone 1 Ext. R-19 Wall + R-4.2 0 Front 97.8 8 90 Left 2X4 Zone 1 Ext. R-13 Wall + R-4.2 90 Left 455 132 90 Rear 2X4 Zone 1 Ext. R-13 Wall + R-4.2 180 Back 283.6 73 90 Rear 2X6 Zone 1 Ext. R-19 Wall + R-4.2 180 Back 200.9 18.8 90 Right 2X4 Siding Zone 1 Ext. R-13 Wall 270 Right 84.7 34 90 Garage 2X4 Zone 1>>__Garage__Garage R-13 Wall n/a n/a 574.9 17.8 n/a Roof Zone 1 R-30 Roof Attic + R-13 BD n/a n/a 2362 n/a n/a Furnace Zone 1 R-30 Roof Attic n/a n/a 30 n/a n/a Roof 2 __Garage__R-0 Roof Attic n/a n/a 753 n/a n/a Front 2X4 2 __Garage__Ext R-0 Wall 0 Front 171.4 0 90 Rear 2X4 2 __Garage__Ext R-0 Wall 180 Back 376.1 56 90 Right 2X4 __Garage__Ext R-0 Wall 270 Right 370.1 112 90 221-P010157785C-000-000-0000000-0000 2022-02-04 16:48:53 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 2 - Pinecrest S853 Calculation Date/Time:2022-02-04T16:18:07-08:00 (Page 6 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 2 - Pinecrest S853.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:22:27 ATTIC 01 02 03 04 05 06 07 08 Name Construction Type Roof Rise (x in 12)Roof Reflectance Roof Emittance Radiant Barrier Cool Roof Attic __Garage__Attic Garage Roof Cons Ventilated 4 0.12 0.92 No No Attic Zone 1 Attic RoofZone 1 Ventilated 4 0.12 0.92 No No FENESTRATION / GLAZING 01 02 03 04 05 06 07 08 09 10 11 12 13 14 Name Type Surface Orientation Azimuth Width (ft) Height (ft)Mult.Area (ft2)U-factor U-factor Source SHGC SHGC Sourc e Exterior Shading Window Window Front 2X4 Front 0 1 56 0.33 NFRC 0.23 NFRC Bug Screen FRDR - OH Window Front 2X4 Front 0 2.8 8 0 20 0.33 NFRC 0.23 NFRC Bug Screen Window 2 Window Front 2X6 Front 0 1 8 0.33 NFRC 0.23 NFRC Bug Screen Window 3 Window Left 2X4 Left 90 1 36 0.33 NFRC 0.23 NFRC Bug Screen SGD - OH Window Left 2X4 Left 90 12 8 1 96 0.33 NFRC 0.23 NFRC Bug Screen Window 4 Window Rear 2X4 Back 180 1 25 0.33 NFRC 0.23 NFRC Bug Screen SGD - OH 2 Window Rear 2X4 Back 180 6 8 1 48 0.33 NFRC 0.23 NFRC Bug Screen Window 5 Window Rear 2X6 Back 180 1 18.8 0.33 NFRC 0.23 NFRC Bug Screen Window 6 Window Right 2X4 Siding Right 270 1 10 0.33 NFRC 0.23 NFRC Bug Screen OPAQUE DOORS 01 02 03 04 Name Side of Building Area (ft 2)U-factor Main Door Right 2X4 Siding 24 0.142857 Int Garage Door Garage 2X4 17.8 0.5 Overhead Garage Door Rear 2X4 2 56 0.7 Overhead Garage Door 2 Right 2X4 112 0.7 221-P010157785C-000-000-0000000-0000 2022-02-04 16:48:53 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 2 - Pinecrest S853 Calculation Date/Time:2022-02-04T16:18:07-08:00 (Page 7 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 2 - Pinecrest S853.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:22:27 OVERHANGS AND FINS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 Window Overhang Left Fin Right Fin Depth Dist Up Left Extent Right Extent Flap Ht.Depth Top Up Dist L Bot Up Depth Top Up Dist R Bot Up FRDR - OH 16.5 1 2 2 0 0 0 0 0 0 0 0 0 SGD - OH 10 1 10 10 0 0 0 0 0 0 0 0 0 SGD - OH 2 16.5 1 2 2 0 0 0 0 0 0 0 0 0 SLAB FLOORS 01 02 03 04 05 06 07 Name Zone Area (ft2)Perimeter (ft)Edge Insul. R-value and Depth Carpeted Fraction Heated Slab-on-Grade Zone 1 2392 181 None 80%No Slab-on-Grade 2 __Garage__753 93 None 0%No OPAQUE SURFACE CONSTRUCTIONS 01 02 03 04 05 06 07 08 Construction Name Surface Type Construction Type Framing Total Cavity R-value Interior / Exterior Continuous R-value U-factor Assembly Layers Ext R-0 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-0 None / None 0.361 Inside Finish: Gypsum Board Cavity / Frame: no insul. / 2x4 Exterior Finish: 3 Coat Stucco Ext. R-13 Wall + R-4.2 Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-13 None / R-4.2 0.067 Inside Finish: Gypsum Board Cavity / Frame: R-13 / 2x4 Sheathing / Insulation: R-4.2 Sheathing Exterior Finish: Synthetic Stucco 221-P010157785C-000-000-0000000-0000 2022-02-04 16:48:53 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 2 - Pinecrest S853 Calculation Date/Time:2022-02-04T16:18:07-08:00 (Page 8 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 2 - Pinecrest S853.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:22:27 OPAQUE SURFACE CONSTRUCTIONS 01 02 03 04 05 06 07 08 Construction Name Surface Type Construction Type Framing Total Cavity R-value Interior / Exterior Continuous R-value U-factor Assembly Layers Ext. R-19 Wall + R-4.2 Exterior Walls Wood Framed Wall 2x6 @ 16 in. O. C.R-19 None / R-4.2 0.054 Inside Finish: Gypsum Board Cavity / Frame: R-19 in 5-1/2 in. (R-18) / 2x6 Sheathing / Insulation: R-4.2 Sheathing Exterior Finish: Synthetic Stucco Ext. R-13 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-13 None / None 0.101 Inside Finish: Gypsum Board Cavity / Frame: R-13 / 2x4 Exterior Finish: 3 Coat Stucco Garage R-13 Wall Interior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-13 None / None 0.092 Inside Finish: Gypsum Board Cavity / Frame: R-13 / 2x4 Other Side Finish: Gypsum Board Attic Garage Roof Cons Attic Roofs Wood Framed Ceiling 2x4 @ 24 in. O. C.R-0 None / None 0.4 Roofing: 10 PSF (RoofTile) Tile Gap: present Roof Deck: Wood Siding/sheathing/decking Cavity / Frame: no insul. / 2x4 Attic RoofZone 1 Attic Roofs Wood Framed Ceiling 2x4 @ 24 in. O. C.R-13 None / None 0.072 Roofing: 10 PSF (RoofTile) Tile Gap: present Roof Deck: Wood Siding/sheathing/decking Cavity / Frame: R-13.0 / 2x4 Around Roof Joists: R-0.0 insul. R-0 Roof Attic Ceilings (below attic) Wood Framed Ceiling 2x4 @ 24 in. O. C.R-0 None / None 0.481 Cavity / Frame: no insul. / 2x4 Inside Finish: Gypsum Board R-30 Roof Attic + R-13 BD Ceilings (below attic) Wood Framed Ceiling 2x4 @ 24 in. O. C.R-30 None / None 0.032 Over Ceiling Joists: R-20.9 insul. Cavity / Frame: R-9.1 / 2x4 Inside Finish: Gypsum Board 221-P010157785C-000-000-0000000-0000 2022-02-04 16:48:53 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 2 - Pinecrest S853 Calculation Date/Time:2022-02-04T16:18:07-08:00 (Page 9 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 2 - Pinecrest S853.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:22:27 OPAQUE SURFACE CONSTRUCTIONS 01 02 03 04 05 06 07 08 Construction Name Surface Type Construction Type Framing Total Cavity R-value Interior / Exterior Continuous R-value U-factor Assembly Layers R-30 Roof Attic Ceilings (below attic) Wood Framed Ceiling 2x4 @ 24 in. O. C.R-30 None / None 0.032 Over Ceiling Joists: R-20.9 insul. Cavity / Frame: R-9.1 / 2x4 Inside Finish: Gypsum Board BUILDING ENVELOPE - HERS VERIFICATION 01 02 03 04 Quality Insulation Installation (QII)Quality Installation of Spray Foam Insulation Building Envelope Air Leakage CFM50 Required Not Required Required 1451.1 WATER HEATING SYSTEMS 01 02 03 04 05 06 07 Name System Type Distribution Type Water Heater Name (#)Solar Heating System Compact Distribution HERS Verification DHW Sys 1 Domestic Hot Water (DHW) Standard Distribution System DHW Heater 1 (1)n/a None n/a WATER HEATERS 01 02 03 04 05 06 07 08 09 10 11 12 Name Heating Element Type Tank Type # Units Tank Vol. (gal) Energy Factor or Efficiency Input Rating or Pilot Tank Insulation R-value (Int/Ext) Standby Loss or Recovery Eff. 1st Hr. Rating or Flow Rate NEEA Heat Pump Brand or Model Tank Location or Ambient Condition DHW Heater 1 Gas Consumer Instantaneous 1 0 0.93-UEF <= 200 kBtu/hr 0 n/a n/a n/a n/a 221-P010157785C-000-000-0000000-0000 2022-02-04 16:48:53 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 2 - Pinecrest S853 Calculation Date/Time:2022-02-04T16:18:07-08:00 (Page 10 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 2 - Pinecrest S853.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:22:27 WATER HEATING - HERS VERIFICATION 01 02 03 04 05 06 07 08 Name Pipe Insulation Parallel Piping Compact Distribution Compact Distribution Type Recirculation Control Central DHW Distribution Shower Drain Water Heat Recovery DHW Sys 1 - 1/1 Not Required Not Required Not Required None Not Required Not Required Not Required SPACE CONDITIONING SYSTEMS 01 02 03 04 05 06 07 08 09 10 11 Name System Type Heating Unit Name Cooling Unit Name Fan Name Distribution Name Required Thermostat Type Status Verified Existing Condition Heating Equipment Count Cooling Equipment Count HVAC1 Heating and cooling system other Heating Component 1 Cooling Component 1 HVAC Fan 1 Air Distribution System 1 Setback New NA 2 2 HVAC - HEATING UNIT TYPES 01 02 03 04 Name System Type Number of Units Heating Efficiency Heating Component 1 Central gas furnace 2 AFUE-96 HVAC - COOLING UNIT TYPES 01 02 03 04 05 06 07 08 Name System Type Number of Units Efficiency EER Efficiency SEER Zonally Controlled Mulit-speed Compressor HERS Verification Cooling Component 1 Central split AC 2 13 16.5 Not Zonal Single Speed Cooling Component 1-hers-cool 221-P010157785C-000-000-0000000-0000 2022-02-04 16:48:53 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 2 - Pinecrest S853 Calculation Date/Time:2022-02-04T16:18:07-08:00 (Page 11 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 2 - Pinecrest S853.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:22:27 HVAC COOLING - HERS VERIFICATION 01 02 03 04 05 06 Name Verified Airflow Airflow Target Verified EER Verified SEER Verified Refrigerant Charge Cooling Component 1-hers-cool Required 350 Required Required Required HVAC - DISTRIBUTION SYSTEMS 01 02 03 04 05 06 07 08 09 10 11 12 Duct Ins. R-value Duct Location Surface Area Name Type Design Type Supply Return Supply Return Supply Return Bypass Duct Duct Leakage HERS Verification Air Distribution System 1 Unconditioned attic Non-Verified R-6 R-6 Attic Attic n/a n/a No Bypass Duct Air Distribution System 1-hers-dist HVAC DISTRIBUTION - HERS VERIFICATION 01 02 03 04 05 06 07 08 09 Name Duct Leakage Verification Duct Leakage Target (%) Verified Duct Location Verified Duct Design Buried Ducts Deeply Buried Ducts Low-leakage Air Handler Low Leakage Ducts Entirely in Conditioned Space Air Distribution System 1-hers-dist Yes 5.0 Not Required Not Required Not Required Credit not taken Required No HVAC - FAN SYSTEMS 01 02 03 04 Name Type Fan Power (Watts/CFM)Name HVAC Fan 1 HVAC Fan 0.45 HVAC Fan 1-hers-fan 221-P010157785C-000-000-0000000-0000 2022-02-04 16:48:53 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 2 - Pinecrest S853 Calculation Date/Time:2022-02-04T16:18:07-08:00 (Page 12 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 2 - Pinecrest S853.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:22:27 HVAC FAN SYSTEMS - HERS VERIFICATION 01 02 03 Name Verified Fan Watt Draw Required Fan Efficacy (Watts/CFM) HVAC Fan 1-hers-fan Required 0.45 IAQ (INDOOR AIR QUALITY) FANS 01 02 03 04 05 06 Dwelling Unit IAQ CFM IAQ Watts/CFM IAQ Fan Type IAQ Recovery Effectiveness (%) IAQ Recovery Effectiveness - SREIAQ Recovery Effectiveness - SRE SFam IAQVentRpt 1-1 85 0.517647 Balanced HRV 75 n/a 221-P010157785C-000-000-0000000-0000 2022-02-04 16:48:53 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 2 - Pinecrest S853 Calculation Date/Time:2022-02-04T16:18:07-08:00 (Page 13 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 2 - Pinecrest S853.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:22:27 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name:Documentation Author Signature: Company:Signature Date: Address:CEA/ HERS Certification Identification (If applicable): City/State/Zip:Phone: RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance. 2.I certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 3.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Responsible Designer Name:Responsible Designer Signature: Company:Date Signed: Address:License: City/State/Zip:Phone:   Easy to Verify at CalCERTS.com Cristela Lujan Energy Inspectors 2570 South Miller Lane Las Vegas, NV 89117 2022-02-04 16:44:46 R19-18-30081 702-365-8080 John Heimann Richmond American Homes 5171 California Ave. Suite #120 Irvine, CA 92617 2022-02-04 16:48:53 N/A 949-467-2661 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 221-P010157785C-000-000-0000000-0000 2022-02-04 16:48:53 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 3 - Pomona S850 Calculation Date/Time:2022-02-04T16:37:39-08:00 (Page 1 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 3 - Pomona S850.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:41:58 GENERAL INFORMATION 01 Project Name Plan 3 - Pomona S850 02 Run Title Title 24 Analysis 03 Project Location Bella at Piazza Serena 04 City La Quinta 05 Standards Version 2019 06 Zip code 07 Software Version EnergyPro 8.1 08 Climate Zone 15 09 Front Orientation (deg/ Cardinal)AllOrientations 10 Building Type Single family 11 Number of Dwelling Units 1 12 Project Scope NewConstruction 13 Number of Bedrooms 4 14 Addition Cond. Floor Area (ft 2)0 15 Number of Stories 1 16 Existing Cond. Floor Area (ft 2)n/a 17 Fenestration Average U-factor 0.32 18 Total Cond. Floor Area (ft 2)2630 19 Glazing Percentage (%)17.07% 20 ADU Bedroom Count 0 21 ADU Conditioned Floor Area 0 22 Is Natural Gas Available?Yes COMPLIANCE RESULTS 01 Building Complies with Computer Performance 02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider. 03 This building incorporates one or more Special Features shown below 221-P010157786C-000-000-0000000-0000 2022-02-04 16:49:31 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 3 - Pomona S850 Calculation Date/Time:2022-02-04T16:37:39-08:00 (Page 2 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 3 - Pomona S850.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:41:58 ENERGY DESIGN RATING Energy Design Ratings Efficiency¹ (EDR)Total² (EDR)Efficiency¹ (EDR)Total² (EDR) Standard Design 50.8 23.1 Proposed Designs North Facing 45.6 20.4 5.2 2.7 East Facing 48.2 23.1 2.6 0 South Facing 47 21.9 3.8 1.2 West Facing 47.2 22.1 3.6 1 RESULT:3:COMPLIES ¹ Efficiency EDR includes improvements to the building envelope and more efficient equipment ² Total EDR includes efficiency and demand response measures such as photovoltaic (PV) systems and batteries ³ Building complies when efficiency and total compliance margins are greater than or equal to zero •Standard Design PV Capacity: 6.06 kWdc •Proposed PV Capacity Scaling: North (6.05 kWdc) East (6.05 kWdc) South (6.05 kWdc) West (6.05 kWdc) 221-P010157786C-000-000-0000000-0000 2022-02-04 16:49:31 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 3 - Pomona S850 Calculation Date/Time:2022-02-04T16:37:39-08:00 (Page 3 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 3 - Pomona S850.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:41:58 ENERGY USE SUMMARY Energy Use (kTDV/ft 2-yr)Standard Design Proposed Design Compliance Margin Percent Improvement Space Heating 1.64 0.85 0.79 48.2 Space Cooling 88.4 74.06 14.34 16.2 IAQ Ventilation 5.46 5.46 0 0 Water Heating 8.11 7.35 0.76 9.4 Self Utilization Credit n/a 0 0 n/a North Facing Compliance Total 103.61 87.72 15.89 15.3 Space Heating 1.64 1.02 0.62 37.8 Space Cooling 88.4 81.97 6.43 7.3 IAQ Ventilation 5.46 5.46 0 0 Water Heating 8.11 7.35 0.76 9.4 Self Utilization Credit n/a 0 0 n/a East Facing Compliance Total 103.61 95.8 7.81 7.5 Space Heating 1.64 1.4 0.24 14.6 Space Cooling 88.4 77.9 10.5 11.9 IAQ Ventilation 5.46 5.46 0 0 Water Heating 8.11 7.35 0.76 9.4 Self Utilization Credit n/a 0 0 n/a South Facing Compliance Total 103.61 92.11 11.5 11.1 Space Heating 1.64 1.45 0.19 11.6 Space Cooling 88.4 78.53 9.87 11.2 IAQ Ventilation 5.46 5.46 0 0 Water Heating 8.11 7.35 0.76 9.4 Self Utilization Credit n/a 0 0 n/a West Facing Compliance Total 103.61 92.79 10.82 10.4 221-P010157786C-000-000-0000000-0000 2022-02-04 16:49:31 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 3 - Pomona S850 Calculation Date/Time:2022-02-04T16:37:39-08:00 (Page 4 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 3 - Pomona S850.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:41:58 REQUIRED PV SYSTEMS - SIMPLIFIED 01 02 03 04 05 06 07 08 09 10 11 12 DC System Size (kWdc)Exception Module Type Array Type Power Electronics CFI Azimuth (deg) Tilt Input Array Angle (deg)Tilt: (x in 12) Inverter Eff. (%) Annual Solar Access (%) 6.05 NA Premium Fixed (roof mount)Microinverters true 105-300 n/a n/a <=7:12 96 97 REQUIRED SPECIAL FEATURES The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis. •Indoor air quality, balanced fan •Non-standard roof reflectance •Insulation below roof deck •Window overhangs and/or fins HERS FEATURE SUMMARY The following is a summary of the features that must be field-verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional detail is provided in the buildng tables below. Registered CF2Rs and CF3Rs are required to be completed in the HERS Registry Building-level Verifications: •Quality insulation installation (QII) •Building air leakage/reduced infiltration •Indoor air quality ventilation •Kitchen range hood Cooling System Verifications: •Minimum Airflow •Verified EER •Verified SEER •Verified Refrigerant Charge •Fan Efficacy Watts/CFM Heating System Verifications: •-- None -- HVAC Distribution System Verifications: •Duct leakage testing •Low-leakage Air Handling Unit Domestic Hot Water System Verifications: •-- None -- 221-P010157786C-000-000-0000000-0000 2022-02-04 16:49:31 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 3 - Pomona S850 Calculation Date/Time:2022-02-04T16:37:39-08:00 (Page 5 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 3 - Pomona S850.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:41:58 BUILDING - FEATURES INFORMATION 01 02 03 04 05 06 07 Project Name Conditioned Floor Area (ft 2)Number of Dwelling Units Number of Bedrooms Number of Zones Number of Ventilation Cooling Systems Number of Water Heating Systems Plan 3 - Pomona S850 2630 1 4 1 0 1 ZONE INFORMATION 01 02 03 04 05 06 07 Zone Name Zone Type HVAC System Name Zone Floor Area (ft 2)Avg. Ceiling Height Water Heating System 1 Water Heating System 2 Zone 1 Conditioned HVAC1 2630 9.1 DHW Sys 1 N/A OPAQUE SURFACES 01 02 03 04 05 06 07 08 Name Zone Construction Azimuth Orientation Gross Area (ft 2)Window and Door Area (ft2) Tilt (deg) Front 2X4 Zone 1 Ext. R-13 Wall + R-4.2 0 Front 596.1 55.0024 90 Front 2X6 Zone 1 Ext. R-19 Wall + R-4.2 0 Front 161.5 28 90 Left 2X4 Zone 1 Ext. R-13 Wall + R-4.2 90 Left 455 156 90 Rear 2X4 Zone 1 Ext. R-13 Wall + R-4.2 180 Back 615 121 90 Rear 2X6 Zone 1 Ext. R-19 Wall + R-4.2 180 Back 159.3 63 90 Right 2X4 Siding Zone 1 Ext. R-13 Wall 270 Right 116.8 50 90 Garage 2X4 Zone 1>>__Garage__Garage R-13 Wall n/a n/a 354.9 17.8 n/a Roof Zone 1 R-30 Roof Attic + R-13 BD n/a n/a 2600 n/a n/a Furnace Zone 1 R-30 Roof Attic n/a n/a 30 n/a n/a Roof 2 __Garage__R-0 Roof Attic n/a n/a 659 n/a n/a Front 2X4 2 __Garage__Ext R-0 Wall 0 Front 302.6 0 90 Left 2X4 2 __Garage__Ext R-0 Wall 90 Left 37.9 0 90 Rear 2X4 2 __Garage__Ext R-0 Wall 180 Back 285.9 56 90 Right 2X4 __Garage__Ext R-0 Wall 270 Right 376.2 112 90 221-P010157786C-000-000-0000000-0000 2022-02-04 16:49:31 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 3 - Pomona S850 Calculation Date/Time:2022-02-04T16:37:39-08:00 (Page 6 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 3 - Pomona S850.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:41:58 ATTIC 01 02 03 04 05 06 07 08 Name Construction Type Roof Rise (x in 12)Roof Reflectance Roof Emittance Radiant Barrier Cool Roof Attic __Garage__Attic Garage Roof Cons Ventilated 5 0.12 0.92 No No Attic Zone 1 Attic RoofZone 1 Ventilated 5 0.12 0.92 No No FENESTRATION / GLAZING 01 02 03 04 05 06 07 08 09 10 11 12 13 14 Name Type Surface Orientation Azimuth Width (ft) Height (ft)Mult.Area (ft2)U-factor U-factor Source SHGC SHGC Sourc e Exterior Shading Window Window Front 2X4 Front 0 1 33.7 0.33 NFRC 0.23 NFRC Bug Screen FRDR - OH Window Front 2X4 Front 0 2.8 8 0 21.3 0.33 NFRC 0.23 NFRC Bug Screen Window 2 Window Front 2X6 Front 0 1 28 0.33 NFRC 0.23 NFRC Bug Screen Window 3 Window Left 2X4 Left 90 1 60 0.33 NFRC 0.23 NFRC Bug Screen SGD - OH Window Left 2X4 Left 90 12 8 1 96 0.33 NFRC 0.23 NFRC Bug Screen Window 4 Window Rear 2X4 Back 180 1 121 0.3 NFRC 0.23 NFRC Bug Screen Window 5 Window Rear 2X6 Back 180 1 15 0.33 NFRC 0.23 NFRC Bug Screen SGD - OH 2 Window Rear 2X6 Back 180 6 8 1 48 0.33 NFRC 0.23 NFRC Bug Screen Window 6 Window Right 2X4 Siding Right 270 1 26 0.33 NFRC 0.23 NFRC Bug Screen OPAQUE DOORS 01 02 03 04 Name Side of Building Area (ft 2)U-factor Main Door Right 2X4 Siding 24 0.142857 Int Garage Door Garage 2X4 17.8 0.5 Overhead Garage Door Rear 2X4 2 56 0.7 Overhead Garage Door 2 Right 2X4 112 0.7 221-P010157786C-000-000-0000000-0000 2022-02-04 16:49:31 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 3 - Pomona S850 Calculation Date/Time:2022-02-04T16:37:39-08:00 (Page 7 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 3 - Pomona S850.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:41:58 OVERHANGS AND FINS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 Window Overhang Left Fin Right Fin Depth Dist Up Left Extent Right Extent Flap Ht.Depth Top Up Dist L Bot Up Depth Top Up Dist R Bot Up FRDR - OH 19 1 2 2 0 0 0 0 0 0 0 0 0 SGD - OH 10 1 10 10 0 0 0 0 0 0 0 0 0 SGD - OH 2 19 1 2 2 0 0 0 0 0 0 0 0 0 SLAB FLOORS 01 02 03 04 05 06 07 Name Zone Area (ft2)Perimeter (ft)Edge Insul. R-value and Depth Carpeted Fraction Heated Slab-on-Grade Zone 1 2630 231 None 80%No Slab-on-Grade 2 __Garage__659 110 None 0%No OPAQUE SURFACE CONSTRUCTIONS 01 02 03 04 05 06 07 08 Construction Name Surface Type Construction Type Framing Total Cavity R-value Interior / Exterior Continuous R-value U-factor Assembly Layers Ext R-0 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-0 None / None 0.361 Inside Finish: Gypsum Board Cavity / Frame: no insul. / 2x4 Exterior Finish: 3 Coat Stucco Ext. R-13 Wall + R-4.2 Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-13 None / R-4.2 0.067 Inside Finish: Gypsum Board Cavity / Frame: R-13 / 2x4 Sheathing / Insulation: R-4.2 Sheathing Exterior Finish: Synthetic Stucco 221-P010157786C-000-000-0000000-0000 2022-02-04 16:49:31 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 3 - Pomona S850 Calculation Date/Time:2022-02-04T16:37:39-08:00 (Page 8 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 3 - Pomona S850.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:41:58 OPAQUE SURFACE CONSTRUCTIONS 01 02 03 04 05 06 07 08 Construction Name Surface Type Construction Type Framing Total Cavity R-value Interior / Exterior Continuous R-value U-factor Assembly Layers Ext. R-19 Wall + R-4.2 Exterior Walls Wood Framed Wall 2x6 @ 16 in. O. C.R-19 None / R-4.2 0.054 Inside Finish: Gypsum Board Cavity / Frame: R-19 in 5-1/2 in. (R-18) / 2x6 Sheathing / Insulation: R-4.2 Sheathing Exterior Finish: Synthetic Stucco Ext. R-13 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-13 None / None 0.101 Inside Finish: Gypsum Board Cavity / Frame: R-13 / 2x4 Exterior Finish: 3 Coat Stucco Garage R-13 Wall Interior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-13 None / None 0.092 Inside Finish: Gypsum Board Cavity / Frame: R-13 / 2x4 Other Side Finish: Gypsum Board Attic Garage Roof Cons Attic Roofs Wood Framed Ceiling 2x4 @ 24 in. O. C.R-0 None / None 0.4 Roofing: 10 PSF (RoofTile) Tile Gap: present Roof Deck: Wood Siding/sheathing/decking Cavity / Frame: no insul. / 2x4 Attic RoofZone 1 Attic Roofs Wood Framed Ceiling 2x4 @ 24 in. O. C.R-13 None / None 0.072 Roofing: 10 PSF (RoofTile) Tile Gap: present Roof Deck: Wood Siding/sheathing/decking Cavity / Frame: R-13.0 / 2x4 Around Roof Joists: R-0.0 insul. R-0 Roof Attic Ceilings (below attic) Wood Framed Ceiling 2x4 @ 24 in. O. C.R-0 None / None 0.481 Cavity / Frame: no insul. / 2x4 Inside Finish: Gypsum Board R-30 Roof Attic + R-13 BD Ceilings (below attic) Wood Framed Ceiling 2x4 @ 24 in. O. C.R-30 None / None 0.032 Over Ceiling Joists: R-20.9 insul. Cavity / Frame: R-9.1 / 2x4 Inside Finish: Gypsum Board 221-P010157786C-000-000-0000000-0000 2022-02-04 16:49:31 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 3 - Pomona S850 Calculation Date/Time:2022-02-04T16:37:39-08:00 (Page 9 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 3 - Pomona S850.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:41:58 OPAQUE SURFACE CONSTRUCTIONS 01 02 03 04 05 06 07 08 Construction Name Surface Type Construction Type Framing Total Cavity R-value Interior / Exterior Continuous R-value U-factor Assembly Layers R-30 Roof Attic Ceilings (below attic) Wood Framed Ceiling 2x4 @ 24 in. O. C.R-30 None / None 0.032 Over Ceiling Joists: R-20.9 insul. Cavity / Frame: R-9.1 / 2x4 Inside Finish: Gypsum Board BUILDING ENVELOPE - HERS VERIFICATION 01 02 03 04 Quality Insulation Installation (QII)Quality Installation of Spray Foam Insulation Building Envelope Air Leakage CFM50 Required Not Required Required 1595.5 WATER HEATING SYSTEMS 01 02 03 04 05 06 07 Name System Type Distribution Type Water Heater Name (#)Solar Heating System Compact Distribution HERS Verification DHW Sys 1 Domestic Hot Water (DHW) Standard Distribution System DHW Heater 1 (1)n/a None n/a WATER HEATERS 01 02 03 04 05 06 07 08 09 10 11 12 Name Heating Element Type Tank Type # Units Tank Vol. (gal) Energy Factor or Efficiency Input Rating or Pilot Tank Insulation R-value (Int/Ext) Standby Loss or Recovery Eff. 1st Hr. Rating or Flow Rate NEEA Heat Pump Brand or Model Tank Location or Ambient Condition DHW Heater 1 Gas Consumer Instantaneous 1 0 0.93-UEF <= 200 kBtu/hr 0 n/a n/a n/a n/a 221-P010157786C-000-000-0000000-0000 2022-02-04 16:49:31 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 3 - Pomona S850 Calculation Date/Time:2022-02-04T16:37:39-08:00 (Page 10 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 3 - Pomona S850.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:41:58 WATER HEATING - HERS VERIFICATION 01 02 03 04 05 06 07 08 Name Pipe Insulation Parallel Piping Compact Distribution Compact Distribution Type Recirculation Control Central DHW Distribution Shower Drain Water Heat Recovery DHW Sys 1 - 1/1 Not Required Not Required Not Required None Not Required Not Required Not Required SPACE CONDITIONING SYSTEMS 01 02 03 04 05 06 07 08 09 10 11 Name System Type Heating Unit Name Cooling Unit Name Fan Name Distribution Name Required Thermostat Type Status Verified Existing Condition Heating Equipment Count Cooling Equipment Count HVAC1 Heating and cooling system other Heating Component 1 Cooling Component 1 HVAC Fan 1 Air Distribution System 1 Setback New NA 2 2 HVAC - HEATING UNIT TYPES 01 02 03 04 Name System Type Number of Units Heating Efficiency Heating Component 1 Central gas furnace 2 AFUE-96 HVAC - COOLING UNIT TYPES 01 02 03 04 05 06 07 08 Name System Type Number of Units Efficiency EER Efficiency SEER Zonally Controlled Mulit-speed Compressor HERS Verification Cooling Component 1 Central split AC 2 13 16.5 Not Zonal Single Speed Cooling Component 1-hers-cool 221-P010157786C-000-000-0000000-0000 2022-02-04 16:49:31 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 3 - Pomona S850 Calculation Date/Time:2022-02-04T16:37:39-08:00 (Page 11 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 3 - Pomona S850.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:41:58 HVAC COOLING - HERS VERIFICATION 01 02 03 04 05 06 Name Verified Airflow Airflow Target Verified EER Verified SEER Verified Refrigerant Charge Cooling Component 1-hers-cool Required 350 Required Required Required HVAC - DISTRIBUTION SYSTEMS 01 02 03 04 05 06 07 08 09 10 11 12 Duct Ins. R-value Duct Location Surface Area Name Type Design Type Supply Return Supply Return Supply Return Bypass Duct Duct Leakage HERS Verification Air Distribution System 1 Unconditioned attic Non-Verified R-6 R-6 Attic Attic n/a n/a No Bypass Duct Air Distribution System 1-hers-dist HVAC DISTRIBUTION - HERS VERIFICATION 01 02 03 04 05 06 07 08 09 Name Duct Leakage Verification Duct Leakage Target (%) Verified Duct Location Verified Duct Design Buried Ducts Deeply Buried Ducts Low-leakage Air Handler Low Leakage Ducts Entirely in Conditioned Space Air Distribution System 1-hers-dist Yes 5.0 Not Required Not Required Not Required Credit not taken Required No HVAC - FAN SYSTEMS 01 02 03 04 Name Type Fan Power (Watts/CFM)Name HVAC Fan 1 HVAC Fan 0.45 HVAC Fan 1-hers-fan 221-P010157786C-000-000-0000000-0000 2022-02-04 16:49:31 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 3 - Pomona S850 Calculation Date/Time:2022-02-04T16:37:39-08:00 (Page 12 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 3 - Pomona S850.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:41:58 HVAC FAN SYSTEMS - HERS VERIFICATION 01 02 03 Name Verified Fan Watt Draw Required Fan Efficacy (Watts/CFM) HVAC Fan 1-hers-fan Required 0.45 IAQ (INDOOR AIR QUALITY) FANS 01 02 03 04 05 06 Dwelling Unit IAQ CFM IAQ Watts/CFM IAQ Fan Type IAQ Recovery Effectiveness (%) IAQ Recovery Effectiveness - SREIAQ Recovery Effectiveness - SRE SFam IAQVentRpt 1-1 100 0.61 Balanced HRV 75 n/a 221-P010157786C-000-000-0000000-0000 2022-02-04 16:49:31 CalCERTS inc. CERTIFICATE OF COMPLIANCE CF1R-PRF-01E Project Name:Plan 3 - Pomona S850 Calculation Date/Time:2022-02-04T16:37:39-08:00 (Page 13 of 13) Calculation Description:Title 24 Analysis Input File Name:Plan 3 - Pomona S850.ribd19x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.108 Schema Version: rev 20200101 Report Generated: 2022-02-04   16:41:58 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name:Documentation Author Signature: Company:Signature Date: Address:CEA/ HERS Certification Identification (If applicable): City/State/Zip:Phone: RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance. 2.I certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 3.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Responsible Designer Name:Responsible Designer Signature: Company:Date Signed: Address:License: City/State/Zip:Phone:   Easy to Verify at CalCERTS.com Cristela Lujan Energy Inspectors 2570 South Miller Lane Las Vegas, NV 89117 2022-02-04 16:45:27 R19-18-30081 702-365-8080 John Heimann Richmond American Homes 5171 California Ave. Suite #120 Irvine, CA 92617 2022-02-04 16:49:31 N/A 949-467-2661 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 221-P010157786C-000-000-0000000-0000 2022-02-04 16:49:31 CalCERTS inc.