Loading...
Cantera at Coral Mountain TR 31249 BCPR2021-0030 (Plans 1-4) Solar PlansPLAN SNAPSHOT REPORT BCPR2021-0030 FOR CITY OF LA QUINTA Building Construction Plan Review 09/16/2021App Date:Plan No.:Plan Type:BCPR2021-0030 City of La QuintaBuilding Construction Plan Review 06/29/2024Exp Date:District:Work Class: 0.00Expired NOT COMPLETEDCompleted:Square Feet:Status: Description: Valuation: CANTERA / SOLAR MASTER PLANS - 2019 CODE CYCLE 10/25/2021 3:19:53 PM (JAKE FUSON) CANTERA / SOLAR PHOTOVOLTAIC MASTER PLANS FOR PLANS 1, 2, 3, & 4 FOR THE 2019 CODE CYCLE. INDIVIDUAL SOLAR PERMITS TO BE ISSUED FOR EACH LOT. 2019 CALIFORNIA BUILDING CODES. PLAN 1, 2 & 3: 5.25kW SOLAR ARRAY - (15) 350W SUNPOWER SPR-X21-350-BLK-E-AC PANELS W/ INTEGRATED MICROINVERTERS + 100A PV LOAD CENTER [300SF] PLAN 4: 6.3kW SOLAR ARRAY - (18) 350W SUNPOWER SPR-X21-350-BLK-E-AC PANELS W/ INTEGRATED MICROINVERTERS + 100A PV LOAD CENTER [360SF] 3/24/2022 10:44:11 AM (JAKE FUSON) REVISION 1 - ROOF MATERIALS CHANGED TO S-TILE FOR ALL ROOFS. 8/25/2022 2:03:54 PM (JAKE FUSON) REVISION 2 - UPDATED ROOF OPTIONS FOR PLAN 3. 8/25/2022 2:09:05 PM (JAKE FUSON) REVISION 3 - UPDATED ROOF LAYOUTS FOR LOTS 43 & 49 + UPDATED ROOF LAYOUT AND SINGLE LINE DIAGRAM FOR LOT 6 WHERE AN ADDITIONAL PANEL WAS ADDED TO BRING THE SYSTEM SIZE TO 5.6kW (16 PANELS). 2/16/2023 9:35:52 AM (JAKE FUSON) REVISION 4 - ADDED ROOF LAYOUT FOR PLAN 1 ELEV. C. 7/12/2023 12:54:43 PM (AJ ORTEGA) REVISION 5: SYSTEM ATTRIBUTES CHANGED FOR 405W PANELS AND MICROINVETERS. PLAN 1, 2 & 3: 5.67kW SOLAR ARRAY - (14) 405W Q.PEAK DUO PANELS + ENPHASE IQ7HS MICROINVERTERS. PLAN 4: 6.48kW SOLAR ARRAY - (16) 405W Q.PEAK DUO PANELS + ENPHASE IQ7HS MICROINVERTERS. REVISION 6: PROVIDED SITE SPECIFIC ROOF LAYOUT FOR LOT 63. $0.00 Assigned To:Approval Expire Date:06/29/2024 Parcel:Main766070010 Address:Cantera At Coral Mountain Solar Master Plan Main Zone: Contractor Amy Clemans 1414 HARBOUR WAY S SUITE 1901 RICHMOND, CA 94804 Plan Custom Fields Tract / Subdivision Name CANTERA - PV SYSTEM Tract Number 31249 Model/Series Name Number of Plan Types SOLARX4 Code Edition 2019 Is this a revision?No Zoning RL General Plan LDR, ROW City Limits Within La Quinta City Limits Acreage 4.3 Subdivision Name TR 31249 Lot Number J Legal Description Lot J MB 411/23 TR 31249 Centerlines 96874, 96871, 92155, 96872, 92156, 96875, 96869, 96870, 96876, 96873 Page 1 of 378-495 Calle TampicoJune 18, 2025 PLAN SNAPSHOT REPORT (BCPR2021-0030) Lot Size 25349.7 Attachment File Name Added On Added By Attachment Group Notes BCPR2021-0030 - TAKEOFF SHEETS (405W PANELS ONLY).pdf 09/19/2023 10:56 Ortega, AJ Internal Only TAKEOFF SHEETS (405W PANELS ONLY) BCPR2021-0030 - TAKEOFF SHEETS.docx 09/19/2023 10:56 Ortega, AJ TAKEOFF SHEETS (DOC FILE) BCPR2021-0030 - TAKEOFF SHEETS.pdf 09/19/2023 10:56 Ortega, AJ Internal Only TAKEOFF SHEETS Construction Plan Set-2023-09-19-A1_v1.pdf 09/19/2023 10:58 Ortega, AJ Available Online Construction Plan Set - Master Plan Construction Plan Set-2023-09-19-B1_v1.pdf 09/19/2023 10:58 Ortega, AJ Available Online Construction Plan Set - Revision 1 Construction Plan Set-2023-09-19-C1_v1.pdf 09/19/2023 10:58 Ortega, AJ Available Online Construction Plan Set - Revision 2 Construction Plan Set-2023-09-19-D1_v1.pdf 09/19/2023 10:58 Ortega, AJ Available Online Construction Plan Set - Revision 3 Construction Plan Set-2023-09-19-E1_v1.pdf 09/19/2023 10:58 Ortega, AJ Available Online Construction Plan Set - Revision 4 Construction Plan Set-2023-09-19-F1_v1.pdf 09/19/2023 10:58 Ortega, AJ Available Online Construction Plan Set - Revision 5 Revision Narrative-2023-09-19-G1_v1.pdf 09/19/2023 10:58 Ortega, AJ Available Online Revision Narrative Revision Narrative-2023-09-19-H1_v1.pdf 09/19/2023 10:58 Ortega, AJ Available Online Revision Narrative Revision Narrative-2023-09-19-I1_v1.pdf 09/19/2023 10:58 Ortega, AJ Available Online Revision Narrative Revision Narrative-2023-09-19-J1_v1.pdf 09/19/2023 10:58 Ortega, AJ Available Online Revision Narrative Revision Narrative-2023-09-19-K1_v1.pdf 09/19/2023 10:58 Ortega, AJ Available Online Revision Narrative C002295 - MPermit 405 - Response Letter.pdf 09/19/2023 11:33 Clemans, Amy Uploaded via City of La Quinta C002295 - MPermit 405.pdf 09/19/2023 11:33 Clemans, Amy Uploaded via City of La Quinta C002295 - MPermit 405 - Response Letter.pdf 09/19/2023 11:36 Clemans, Amy Uploaded via City of La Quinta C002295 - MPermit 405.pdf 09/19/2023 11:36 Clemans, Amy Uploaded via City of La Quinta Construction Plan Set-2023-09-22-K1_v1.pdf 11/20/2023 10:47 Ortega, AJ Available Online Construction Plan Set - Revision 6 Revision Narrative-2023-09-22-J1_v1.pdf 11/20/2023 10:47 Ortega, AJ Available Online Revision Narrative Created ByNote Date and Time Created 1.AJ OrtegaThis is an archived record, do not use for 2022 Code Update - Applicant to submit new BCPR. 04/26/2024 9:17 Invoice No.Amount PaidFeeFee Amount INV-00002526 $131.25 Hourly Charge - City Building Staff $131.25 $175.00 Hourly Charge - City Building Staff $175.00 $3.28 Credit Card Convenience Fee $3.28 $4.38 Credit Card Convenience Fee $4.38 $313.91 $313.91 Total for Invoice INV-00002526 Grand Total for Plan $313.91 $313.91 UserActivity Number Name Created OnActivity Type Workflow Action Name Email ACT-000027-2023 AJ Ortega 11/20/2023 Comments: Emailed Applicant (Jared.Nast@sunpower.com; Cc: Amy.Clemans@sunpower.com) Revision 6 is Approved. Page 2 of 378-495 Calle TampicoJune 18, 2025 PLAN SNAPSHOT REPORT (BCPR2021-0030) Submittal Name Status Received Date Due Date Complete Date Resubmit Completed ApprovedBuilding Revision Review v.1 09/25/2023 10/02/2023 11/20/2023 No Yes Completed Date Due Date Assigned DateStatusAssigned UserDepartmentItem Review Name Building (1WK)Building Ortega, AJ Approved 09/25/2023 10/02/2023 11/20/2023 Comments: REVISION 6 ONLY Workflow Step / Action Name Action Type Start Date End Date Plan Check v.1 11/20/2023 10:47 Building Revision Review v.1 Receive Submittal 09/25/2023 0:00 11/20/2023 10:47 Linked Records v.1 Linked Permits v.1 Create Sub Permit Page 3 of 378-495 Calle TampicoJune 18, 2025 BCPR2021-0030 – CANTERA MASTER SOLAR PLAN TAKE- OFFS PLAN 1, 2 & 3 Permit Notes: PLAN 1, 2 & 3: 5.25kW SOLAR ARRAY - (15) 350W SUNPOWER SPR-X21-350-BLK-E-AC PANELS W/ INTEGRATED MICROINVERTERS + 100A PV LOAD CENTER [300SF] REFERENCE BCPR2021-0030 FOR APPROVED MASTER PLANS. 2019 CALIFORNIA BUILDING CODES. Fee Breakdown: - Building Standards Administration (BSAS) - Electrical 2019 o PV System less than 10kW PC o PV System less than 10kW o (1) Miscellaneous Electrical - Permit issuance - Records Management Fee - Technology Enhancement Fee PLAN 4 Permit Notes: PLAN 4: 6.3kW SOLAR ARRAY - (18) 350W SUNPOWER SPR-X21-350-BLK-E-AC PANELS W/ INTEGRATED MICROINVERTERS + 100A PV LOAD CENTER [360SF] REFERENCE BCPR2021-0030 FOR APPROVED MASTER PLANS. 2019 CALIFORNIA BUILDING CODES. Fee Breakdown: - Building Standards Administration (BSAS) - Electrical 2019 o PV System less than 10kW PC o PV System less than 10kW o (1) Miscellaneous Electrical - Permit issuance - Records Management Fee - Technology Enhancement Fee 405W PANEL SYSTEMS ONLY BCPR2021-0030 CANTERA MASTER SOLAR PLAN TAKE-OFFS PLAN 1, 2 & 3 Permit Notes: 5.67kW SOLAR ARRAY - (14) 405W Q.PEAK DUO PANELS + ENPHASE IQ7HS MICROINVERTERS AND 100A PV LOAD CENTER [294SF] REFERENCE BCPR2021-0030 FOR APPROVED MASTER PLANS. 2019 CALIFORNIA BUILDING CODES. Fee Breakdown: - Building Standards Administration (BSAS) - Electrical 2019 o PV System less than 10kW PC o PV System less than 10kW o No Miscellaneous Electrical - Permit issuance - Records Management Fee - Technology Enhancement Fee PLAN 4 Permit Notes: 6.48kW SOLAR ARRAY - (16) 405W Q.PEAK DUO PANELS + ENPHASE IQ7HS MICROINVERTERS AND 100A PV LOAD CENTER [336SF] REFERENCE BCPR2021-0030 FOR APPROVED MASTER PLANS. 2019 CALIFORNIA BUILDING CODES. Fee Breakdown: - Building Standards Administration (BSAS) - Electrical 2019 o PV System less than 10kW PC o PV System less than 10kW o No Miscellaneous Electrical - Permit issuance - Records Management Fee - Technology Enhancement Fee CANTERA / SOLAR PHOTOVOLTAIC MASTER PLANS FOR PLANS 1, 2, 3, & 4 FOR THE 2019 CODE CYCLE. INDIVIDUAL SOLAR PERMITS TO BE ISSUED FOR EACH LOT. 2019 CALIFORNIA BUILDING CODES. PLAN 1, 2 & 3: 5.25kW SOLAR ARRAY - (15) 350W SUNPOWER SPR-X21-350-BLK-E-AC PANELS W/ INTEGRATED MICROINVERTERS + 100A PV LOAD CENTER [300SF] PLAN 4: 6.3kW SOLAR ARRAY - (18) 350W SUNPOWER SPR-X21-350-BLK-E-AC PANELS W/ INTEGRATED MICROINVERTERS + 100A PV LOAD CENTER [360SF] REVISION 1 - ROOF MATERIALS CHANGED TO S-TILE FOR ALL ROOFS. REVISION 2 - UPDATED ROOF OPTIONS FOR PLAN 3. REVISION 3 - UPDATED ROOF LAYOUTS FOR LOTS 43 & 49 + UPDATED ROOF LAYOUT AND SINGLE LINE DIAGRAM FOR LOT 6 WHERE AN ADDITIONAL PANEL WAS ADDED TO BRING THE SYSTEM SIZE TO 5.6kW (16 PANELS). REVISION 4 - ADDED ROOF LAYOUT FOR PLAN 1 ELEV. C. REVISION 5: SYSTEM ATTRIBUTES CHANGED FOR 405W PANELS AND MICROINVETERS. PLAN 1, 2 & 3: 5.67kW SOLAR ARRAY - (14) 405W Q.PEAK DUO PANELS + ENPHASE IQ7HS MICROINVERTERS. PLAN 4: 6.48kW SOLAR ARRAY - (16) 405W Q.PEAK DUO PANELS + ENPHASE IQ7HS MICROINVERTERS. 2/8/2022 BUILDING AND SAFETY DEPARTMENT City LaQuinta RE: RESUBMITAL LETTER Project Name:Cantera Project Address: Project Description:Roof top photovoltaic system Master Permit Package Sheet No. PVA-1 TO PVA-4 Should you have any additional questions, feel free to contact me. Sincerely, _____________________________ Elen C. Dimaalihan / Design Engineer elen.culla@sunpower.com LaQuinta CA 92210 Change No.Description of Change 1 Updated to S-tile for all roofs 5/31/2022 BUILDING AND SAFETY DEPARTMENT City of LaQuinta RE: RESUBMITAL LETTER Project Name:Cantera Project Address: Project Description:Roof top photovoltaic system IPermit Package for Cantera Sheet No. PVA-3.2 Should you have any additional questions, feel free to contact me. Sincerely, _____________________________ Elen C. Dimaalihan / Design Engineer elen.culla@sunpower.com LaQuinta, CA 92210 Change No.Description of Change 1 Updated to show options 12/28/2022 BUILDING AND SAFETY DEPARTMENT City of La Quinta RE: RESUBMITAL LETTER Project Name: Project Address: Project Description:Roof top photovoltaic system Individual Permit Package Cantera Sheet No. PVA-1 Should you have any additional questions, feel free to contact me. Sincerely, _____________________________ Elen C. Dimaalihan / Design Engineer elen.culla@sunpower.com Replaced layouts 5 & 6 for Plan 1/C with the attached redline. Cantera LaQuinta, CA 92253 Change No.Description of Change 6 3/5/2023 BUILDING AND SAFETY DEPARTMENT City of LaQuinta RE: RESUBMITAL LETTER Plan Check Number/Permit Number: Project Name: Project Address: Project Description:Rooftop Photovoltaic System Master Plan Permit Package for Cantera Sheet No. ALL Should you have any additional questions, feel free to contact me. Sincerely, Elen C. Dimaalihan / Design Engineer elen.culla@sunpower.com 7 CHANGED TO 405W HANWA QCELLS MODULES & UPDATED Kw Change No. Description of Change Cantera Laquinta, California 92253 9/11/2023 BUILDING AND SAFETY DEPARTMENT City of La Quinta RE: PLAN CHECK RESPONSE Plan Check Number/Permit Number: Project Name:Cantera Project Address:Laquinta, California 92253 This is in response to the plan check comments dated 09/11/2023 for the project noted above. Sheet No. PVA-4, PVE-1.4 & PVE-1.5 Please do note that this response letter is applicable to all plan types. Should you have any additional questions, feel free to contact me. Sincerely, _____________________________ John Mark Singh / Design Engineer JohnMark.Singh@sunpowercorp.com Comment No.Comments Response Project Description:Rooftop Photovoltaic System Master Plan Permit Package for Cantera Added Custom Layout Used for Lot 63 & Corrected Wire & Breaker Size on SLD for 16 Modules 6 Include Custom Layout for Lot 63 6/28/2022 BUILDING AND SAFETY DEPARTMENT City of LaQuinta RE: RESUBMITAL LETTER Project Name:Cantera Project Address: Project Description:Roof top photovoltaic system Master Plan Permit Package for Cantera Sheet No. PVA-1, PVA-3 Should you have any additional questions, feel free to contact me. Sincerely, _____________________________ Elen C. Dimaalihan / Design Engineer elen.culla@sunpower.com 4 Removed previous layout and added customized layout used in Lot 43 and 49 LaQuinta, CA 92210 Change No.Description of Change PVA-1.15 Added custom layout for model lot 6 CFI compliance 9/11/2023 BUILDING AND SAFETY DEPARTMENT City of La Quinta RE: PLAN CHECK RESPONSE Plan Check Number/Permit Number: Project Name:Cantera Project Address:Laquinta, California 92253 This is in response to the plan check comments dated 09/11/2023 for the project noted above. Sheet No. PVA-4, PVE-1.4 & PVE-1.5 Please do note that this response letter is applicable to all plan types. Should you have any additional questions, feel free to contact me. Sincerely, _____________________________ John Mark Singh / Design Engineer JohnMark.Singh@sunpowercorp.com Comment No.Comments Response Project Description:Rooftop Photovoltaic System Master Plan Permit Package for Cantera Added Custom Layout Used for Lot 63 & Corrected Wire & Breaker Size on SLD for 16 Modules 6 Include Custom Layout for Lot 63 SOLAR MASTER PLAN PERMIT PACKAGE BEAZER HOMES - SOUTHERN CALIFORNIA 310 COMMERCE STE 150IRVINE, CA 92602 LA QUINTA, CALIFORNIA 92210 CANTERA PLAN 1, 2, 3, 4 CODE INFORMATION APPLICABLE CODES, LAWS AND REGULATIONS 2019 CALIFORNIA RESIDENTIAL CODE (CRC) 2019 CALIFORNIA BUILDING CODE (CBC) 2019 CALIFORNIA FIRE CODE (CFC) 2019 CALIFORNIA ELECTRICAL CODE (CEC) 2019 CALIFORNIA MECHANICAL CODE (CMC) 2019 CALIFORNIA PLUMBING CODE (CPC) 2019 GREEN BUILDING CODE 2019 LA QUINTA MUNICIPAL CODE NOT TO SCALE SHEET GENERAL NOTES: SHEET INDEX VICINITY MAP SO L A R M A S T E R P L A N P E R M I T P A C K A G E PROJECT LOCATION RE V D E S C R I P T I O N D A T E D B C B R E V I S I O N S PVA-0 E LECT R I C A L E22659 Exp. 03-31-23R EGISTERE D P R O F ESSIONAL E N G I N E ER S TATE OF CA L I F O R NIA CHI F UNG L E UN G 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 (5 1 0 ) 5 4 0 - 0 5 5 0 TH I S D O C U M E N T C O N T A I N S P R O P R I E T A R Y I N F O R M A T I O N . R E P R O D U C T I O N , DI S C L O S U R E , O R U S E W I T H O U T S P E C I F I C W R I T T E N A U T H O R I Z A T I O N O F T H E SU N P O W E R C O R P O R A T I O N I S S T R I C T L Y F O R B I D D E N . C O R P O R A T I O N , S Y S T E M S C A L I C E N S E # : 8 9 0 8 9 5 DRAWN BY PROJECT NO. DATE DRAWN COMMUNITY ID CHECKED BY DATE CHECKED CA N T E R A BE A Z E R H O M E S - S O U T H E R N C A L I F O R N I A 31 0 C O M M E R C E S T E 1 5 0 LA Q U I N T A , C A L I F O R N I A 9 2 2 1 0 C002295 D-0114898 08-09-2021 ECULLA 08-09-2021 EOR IR V I N E , C A 9 2 6 0 2 08-09-2021 FI L E : D - 0 1 1 4 8 9 8 - M P P P - 0 8 0 9 2 0 2 1 - S O L A R - P V A - 0 . d w g , U S E R : e c u l l a , D A T E / T I M E : A u g 1 1 , 2 0 2 1 - 6 : 3 9 p m SOLAR ARCHITECTURAL DRAWINGS SOLAR STRUCTURAL DRAWINGS PL A N 1 , 2 , 3 , 4 MOUNTING DETAILS, STRUCTURAL INFORMATION & SPECIFICATIONS PVS-1 PVS-2 STRUCTURAL CALCULATIONS SOLAR ELECTRICAL DRAWINGS PVE-1.1 ELECTRICAL SINGLE LINE DIAGRAM PVE-2 ELECTRICAL DETAILS PVE-3 ELECTRICAL DATA & SPECIFICATIONS PVE-1.2 ELECTRICAL SINGLE LINE DIAGRAM PVE-1.3 ELECTRICAL SINGLE LINE DIAGRAM PVE-1.4 ELECTRICAL SINGLE LINE DIAGRAM PVE-1.5 ELECTRICAL SINGLE LINE DIAGRAM PVE-1.6 ELECTRICAL SINGLE LINE DIAGRAM COVER PAGEPV0-1 PVA-1 PVA-2 PVA-3 PVA-4 PLAN 1 ELEVATION A,B,C PLAN 2 ELEVATION A,B,C PLAN 3 ELEVATION A,B,C PLAN 4 ELEVATION A,B,C BCPR2021-0030 CANTERA / SOLAR PHOTOVOLTAIC MASTER PLANS FOR PLANS 1, 2, 3, & 4 FOR THE 2019 CODE CYCLE. INDIVIDUAL SOLAR PERMITS TO BE ISSUED FOR EACH LOT. 2019 CALIFORNIA BUILDING CODES. PLAN 1, 2 & 3: 5.25kW SOLAR ARRAY - (15) 350W SUNPOWER SPR-X21-350-BLK-E-AC PANELS W/ INTEGRATED MICROINVERTERS + 100A PV LOAD CENTER [300SF] PLAN 4: 6.3kW SOLAR ARRAY - (18) 350W SUNPOWER SPR-X21-350-BLK-E-AC PANELS W/ INTEGRATED MICROINVERTERS + 100A PV LOAD CENTER [360SF] 12/09/2021 LEGEND: ARE 3' WIDE FIRE ACCESS PATH PLAN TYPE OPTION DESCRIPTION 01 02 03 ----------------------------------- ----------------------------------- ----------------------------------- 04 05 ----------------------------------- ----------------------------------- FRONT OF HOUSE : 150° - 270°LAYOUT 1 FRONT OF HOUSE : 330° - 90°LAYOUT 2 PLAN 1 - ELEVATION A - S- TILE PLAN 1 - ELEVATION B - S- TILE PLAN 1 - ELEVATION C - FLAT TILE FRONT OF HOUSE : 330° - 90°LAYOUT 1 FRONT OF HOUSE : 60° - 180°LAYOUT 2 FRONT OF HOUSE : 330° - 0°LAYOUT 3 FRONT OF HOUSE : 330° - 90°LAYOUT 1 FRONT OF HOUSE : 60° - 180°LAYOUT 2 FRONT OF HOUSE : 150° - 180°LAYOUT 3 FRONT OF HOUSE : 330° - 0°LAYOUT 4 LAYOUT 5 NOTE : ROOFTOP PENETRATIONS AND/OR OBSTRUCTIONS NOT PERTAINING TO SOLAR INSTALLATION SHALL NOT BE LOCATED UNDER THE ARRAY. BASE SQUARE FOOTAGE: 2,179 SQ. FT. SUNPOWER 96 CELLS AC MODULES QUANTITY: 15 MODEL NO.NOMINAL POWER (Pnom) 335W SYSTEM SIZE 5.03 kW 350W 5.25 kWSPR-350 SPR-335 SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAMTO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING (N) LOAD CENTER (INSIDE GARAGE) UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAMTO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING (N) LOAD CENTER (INSIDE GARAGE) UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAMTO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING (N) LOAD CENTER (INSIDE GARAGE) UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINTROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAMTO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING (N) LOAD CENTER (INSIDE GARAGE) UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) ROOF ACCESS POINT ROOF ACCESS POINT SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAMTO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING (N) LOAD CENTER (INSIDE GARAGE) UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT TRANSITION BOX TRANSITION BOX TRANSITION BOX TRANSITION BOX TRANSITION BOX (TYP.) FRONT OF HOUSE (FOH)FRONT OF HOUSE (FOH) FRONT OF HOUSE (FOH)FRONT OF HOUSE (FOH)FRONT OF HOUSE (FOH) SEE PVE 1.1 FOR ELECTRICAL SINGLE DIAGRAMTO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING (N) LOAD CENTER (INSIDE GARAGE) UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) ROOF ACCESS POINT ROOF ACCESS POINT TRANSITION BOX (TYP.) FRONT OF HOUSE (FOH) FRONT OF HOUSE : 240° - 270° SEE PVE 1.1 FOR ELECTRICAL SINGLE DIAGRAMTO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING (N) LOAD CENTER (INSIDE GARAGE) UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) ROOF ACCESS POINT ROOF ACCESS POINT TRANSITION BOX (TYP.) FRONT OF HOUSE (FOH) SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAMTO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING (N) LOAD CENTER (INSIDE GARAGE) UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT TRANSITION BOX (TYP.) FRONT OF HOUSE (FOH) SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAMTO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING (N) LOAD CENTER (INSIDE GARAGE) UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) ROOF ACCESS POINT ROOF ACCESS POINT FRONT OF HOUSE (FOH) TRANSITION BOX SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAMTO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING (N) LOAD CENTER (INSIDE GARAGE) UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) TRANSITION BOX ROOF ACCESS POINT ROOF ACCESS POINT FRONT OF HOUSE (FOH) SHEET SO L A R M A S T E R P L A N P E R M I T P A C K A G E RE V D E S C R I P T I O N D A T E D B C B R E V I S I O N S PVA-1 E LECT R I C A L E22659 Exp. 03-31-23R EGISTERE D P R O F ESSIONAL E N G I N E ER S TATE OF CA L I F O R NIA CHI F UNG L E UN G FI L E : D - 0 1 1 4 8 9 8 - M P P P - 0 8 0 9 2 0 2 1 - S O L A R - P V A - 1 . d w g , U S E R : e c u l l a , D A T E / T I M E : A u g 1 1 , 2 0 2 1 - 4 : 5 9 p m PL A N 1 E L E V A T I O N A , B , C 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 (5 1 0 ) 5 4 0 - 0 5 5 0 TH I S D O C U M E N T C O N T A I N S P R O P R I E T A R Y I N F O R M A T I O N . R E P R O D U C T I O N , DI S C L O S U R E , O R U S E W I T H O U T S P E C I F I C W R I T T E N A U T H O R I Z A T I O N O F T H E SU N P O W E R C O R P O R A T I O N I S S T R I C T L Y F O R B I D D E N . C O R P O R A T I O N , S Y S T E M S C A L I C E N S E # : 8 9 0 8 9 5 DRAWN BY PROJECT NO. DATE DRAWN COMMUNITY ID CHECKED BY DATE CHECKED CA N T E R A BE A Z E R H O M E S - S O U T H E R N C A L I F O R N I A 31 0 C O M M E R C E S T E 1 5 0 LA Q U I N T A , C A L I F O R N I A 9 2 2 1 0 C002295 D-0114898 08-09-2021 ECULLA 08-09-2021 EOR IR V I N E , C A 9 2 6 0 2 08-09-2021 SCALE 3/32" - 1'-0" 12/09/2021 LEGEND: ARE 3' WIDE FIRE ACCESS PATH PLAN TYPE OPTION DESCRIPTION 01 02 03 ----------------------------------- ----------------------------------- ----------------------------------- 04 05 ----------------------------------- ----------------------------------- FRONT OF HOUSE : 150° - 270°LAYOUT 1 FRONT OF HOUSE : 330° - 90°LAYOUT 2 PLAN 2 - ELEVATION A - S- TILE PLAN 2 - ELEVATION B - S- TILE PLAN 2 - ELEVATION C - FLAT TILE FRONT OF HOUSE : 330° - 90°LAYOUT 1 FRONT OF HOUSE : 60° - 180°LAYOUT 2 FRONT OF HOUSE : 240° - 360°LAYOUT 3 FRONT OF HOUSE : 150° - 180°LAYOUT 4 FRONT OF HOUSE : 240° - 270°LAYOUT 5 FRONT OF HOUSE : 330° - 90°LAYOUT 1 FRONT OF HOUSE : 60° - 180°LAYOUT 2 FRONT OF HOUSE : 240° - 360°LAYOUT 3 FRONT OF HOUSE : 150° - 180°LAYOUT 4 FRONT OF HOUSE : 240° - 270°LAYOUT 5 NOTE : ROOFTOP PENETRATIONS AND/OR OBSTRUCTIONS NOT PERTAINING TO SOLAR INSTALLATION SHALL NOT BE LOCATED UNDER THE ARRAY. BASE SQUARE FOOTAGE: 2,333 SQ. FT. SUNPOWER 96 CELLS AC MODULES QUANTITY: 15 MODEL NO.NOMINAL POWER (Pnom) 335W SYSTEM SIZE 5.03 kW 350W 5.25 kWSPR-350 SPR-335 SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAM TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAM TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) ROOF ACCESS POINT SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAM TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) ROOF ACCESS POINT SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAM TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAM ROOF ACCESS POINT SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAM TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) ROOF ACCESS POINT TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) TRANSITION BOX TRANSITION BOX FRONT OF HOUSE (FOH) FRONT OF HOUSE (FOH)FRONT OF HOUSE (FOH)FRONT OF HOUSE (FOH) FRONT OF HOUSE (FOH)FRONT OF HOUSE (FOH) TRANSITION BOX TRANSITION BOX TRANSITION BOX TRANSITION BOX ROOF ACCESS POINT ROOF ACCESS POINT SEE PVE 1.2 FOR ELECTRICAL SINGLE DIAGRAM TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) SEE PVE 1.2 FOR ELECTRICAL SINGLE DIAGRAM TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) ROOF ACCESS POINT FRONT OF HOUSE (FOH) ROOF ACCESS POINT FRONT OF HOUSE (FOH) TRANSITION BOX (TYP.) TRANSITION BOX (TYP.) ROOF ACCESS POINT SEE PVE 1.2 FOR ELECTRICAL SINGLE DIAGRAM TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) FRONT OF HOUSE (FOH) ROOF ACCESS POINT TRANSITION BOX (TYP.) SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAM TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) ROOF ACCESS POINT FRONT OF HOUSE (FOH) TRANSITION BOX ROOF ACCESS POINT SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAM TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) ROOF ACCESS POINT FRONT OF HOUSE (FOH) TRANSITION BOX ROOF ACCESS POINT SEE PVE 1.2 FOR ELECTRICAL SINGLE DIAGRAM TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) ROOF ACCESS POINT FRONT OF HOUSE (FOH) TRANSITION BOX (TYP.) SHEET SO L A R M A S T E R P L A N P E R M I T P A C K A G E RE V D E S C R I P T I O N D A T E D B C B R E V I S I O N S PVA-2 E LECT R I C A L E22659 Exp. 03-31-23R EGISTERE D P R O F ESSIONAL E N G I N E ER S TATE OF CA L I F O R NIA CHI F UNG L E UN G FI L E : D - 0 1 1 4 8 9 8 - M P P P - 0 8 0 9 2 0 2 1 - S O L A R - P V A - 2 . d w g , U S E R : e c u l l a , D A T E / T I M E : A u g 1 1 , 2 0 2 1 - 4 : 5 9 p m PL A N 2 E L E V A T I O N A , B , C 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 (5 1 0 ) 5 4 0 - 0 5 5 0 TH I S D O C U M E N T C O N T A I N S P R O P R I E T A R Y I N F O R M A T I O N . R E P R O D U C T I O N , DI S C L O S U R E , O R U S E W I T H O U T S P E C I F I C W R I T T E N A U T H O R I Z A T I O N O F T H E SU N P O W E R C O R P O R A T I O N I S S T R I C T L Y F O R B I D D E N . C O R P O R A T I O N , S Y S T E M S C A L I C E N S E # : 8 9 0 8 9 5 DRAWN BY PROJECT NO. DATE DRAWN COMMUNITY ID CHECKED BY DATE CHECKED CA N T E R A BE A Z E R H O M E S - S O U T H E R N C A L I F O R N I A 31 0 C O M M E R C E S T E 1 5 0 LA Q U I N T A , C A L I F O R N I A 9 2 2 1 0 C002295 D-0114898 08-09-2021 ECULLA 08-09-2021 EOR IR V I N E , C A 9 2 6 0 2 08-09-2021 SCALE 3/32" - 1'-0" 12/09/2021 LEGEND: ARE 3' WIDE FIRE ACCESS PATH PLAN TYPE OPTION DESCRIPTION 01 02 03 ----------------------------------- ----------------------------------- ----------------------------------- 04 05 ----------------------------------- ----------------------------------- FRONT OF HOUSE : 150° - 270°LAYOUT 1 FRONT OF HOUSE : 330° - 90°LAYOUT 2 PLAN 3 - ELEVATION A - S- TILE PLAN 3 - ELEVATION B - S- TILE PLAN 3 - ELEVATION C - FLAT TILE FRONT OF HOUSE : 330° - 90°LAYOUT 1 FRONT OF HOUSE : 60° - 180°LAYOUT 2 FRONT OF HOUSE : 240° - 360°LAYOUT 3 FRONT OF HOUSE : 330° - 90°LAYOUT 1 FRONT OF HOUSE : 60° - 180°LAYOUT 2 FRONT OF HOUSE : 240° - 360°LAYOUT 3 NOTE : ROOFTOP PENETRATIONS AND/OR OBSTRUCTIONS NOT PERTAINING TO SOLAR INSTALLATION SHALL NOT BE LOCATED UNDER THE ARRAY. BASE SQUARE FOOTAGE: 2,670 SQ. FT. SUNPOWER 96 CELLS AC MODULES QUANTITY: 15 MODEL NO.NOMINAL POWER (Pnom) 335W SYSTEM SIZE 5.03 kW 350W 5.25 kWSPR-350 SPR-335 FRONT OF HOUSE (FOH) FRONT OF HOUSE (FOH) SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAMTO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) FRONT OF HOUSE (FOH) SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAMTO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) ROOF ACCESS POINT ROOF ACCESS POINT TRANSITION BOX FRONT OF HOUSE (FOH) SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAMTO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) FRONT OF HOUSE (FOH) SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAMTO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAMTO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAMTO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAMTO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT TRANSITION BOX TRANSITION BOX TRANSITION BOX TRANSITION BOX TRANSITION BOX TRANSITION BOX FRONT OF HOUSE (FOH) SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAMTO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) ROOF ACCESS POINT ROOF ACCESS POINT TRANSITION BOX SHEET SO L A R M A S T E R P L A N P E R M I T P A C K A G E RE V D E S C R I P T I O N D A T E D B C B R E V I S I O N S PVA-3 E LECT R I C A L E22659 Exp. 03-31-23R EGISTERE D P R O F ESSIONAL E N G I N E ER S TATE OF CA L I F O R NIA CHI F UNG L E UN G FI L E : D - 0 1 1 4 8 9 8 - M P P P - 0 8 0 9 2 0 2 1 - S O L A R - P V A - 3 . d w g , U S E R : e c u l l a , D A T E / T I M E : A u g 1 1 , 2 0 2 1 - 4 : 5 8 p m PL A N 3 E L E V A T I O N A , B , C 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 (5 1 0 ) 5 4 0 - 0 5 5 0 TH I S D O C U M E N T C O N T A I N S P R O P R I E T A R Y I N F O R M A T I O N . R E P R O D U C T I O N , DI S C L O S U R E , O R U S E W I T H O U T S P E C I F I C W R I T T E N A U T H O R I Z A T I O N O F T H E SU N P O W E R C O R P O R A T I O N I S S T R I C T L Y F O R B I D D E N . C O R P O R A T I O N , S Y S T E M S C A L I C E N S E # : 8 9 0 8 9 5 DRAWN BY PROJECT NO. DATE DRAWN COMMUNITY ID CHECKED BY DATE CHECKED CA N T E R A BE A Z E R H O M E S - S O U T H E R N C A L I F O R N I A 31 0 C O M M E R C E S T E 1 5 0 LA Q U I N T A , C A L I F O R N I A 9 2 2 1 0 C002295 D-0114898 08-09-2021 ECULLA 08-09-2021 EOR IR V I N E , C A 9 2 6 0 2 08-09-2021 SCALE 3/32" - 1'-0" 12/09/2021 LEGEND: ARE 3' WIDE FIRE ACCESS PATH PLAN TYPE OPTION DESCRIPTION 01 02 03 ----------------------------------- ----------------------------------- ----------------------------------- 04 05 ----------------------------------- ----------------------------------- FRONT OF HOUSE : 150° - 270°LAYOUT 1 FRONT OF HOUSE : 330° - 90°LAYOUT 2 PLAN 4 - ELEVATION A - S- TILE PLAN 4 - ELEVATION B - S- TILE PLAN 4 - ELEVATION C - FLAT TILE FRONT OF HOUSE : 330° - 90°LAYOUT 1 FRONT OF HOUSE : 60° - 180°LAYOUT 2 FRONT OF HOUSE : 240° - 360°LAYOUT 3 FRONT OF HOUSE : 150° - 180°LAYOUT 4 FRONT OF HOUSE : 240° - 270°LAYOUT 5 FRONT OF HOUSE : 330° - 90°LAYOUT 1 FRONT OF HOUSE : 60° - 180°LAYOUT 2 FRONT OF HOUSE : 240° - 360°LAYOUT 3 FRONT OF HOUSE : 150° - 180°LAYOUT 4 FRONT OF HOUSE : 240° - 270°LAYOUT 5 NOTE : ROOFTOP PENETRATIONS AND/OR OBSTRUCTIONS NOT PERTAINING TO SOLAR INSTALLATION SHALL NOT BE LOCATED UNDER THE ARRAY. BASE SQUARE FOOTAGE: 3,006 SQ. FT. SUNPOWER 96 CELLS AC MODULES QUANTITY: 18 MODEL NO.NOMINAL POWER (Pnom) 335W SYSTEM SIZE 6.03 kW 350W 6.30 kWSPR-350 SPR-335 FRONT OF HOUSE (FOH) FRONT OF HOUSE (FOH) TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) SEE PVE 1.4 FOR ELECTRICAL SINGLE DIAGRAM FRONT OF HOUSE (FOH) TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) SEE PVE 1.4 FOR ELECTRICAL SINGLE DIAGRAM ROOF ACCESS POINT ROOF ACCESS POINT FRONT OF HOUSE (FOH) TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) SEE PVE 1.4 FOR ELECTRICAL SINGLE DIAGRAM FRONT OF HOUSE (FOH) TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) SEE PVE 1.4 FOR ELECTRICAL SINGLE DIAGRAM FRONT OF HOUSE (FOH) TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) SEE PVE 1.5 FOR ELECTRICAL SINGLE DIAGRAM ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT FRONT OF HOUSE (FOH) TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) SEE PVE 1.4 FOR ELECTRICAL SINGLE DIAGRAM FRONT OF HOUSE (FOH) TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) SEE PVE 1.4 FOR ELECTRICAL SINGLE DIAGRAM FRONT OF HOUSE (FOH) TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) SEE PVE 1.3 FOR ELECTRICAL SINGLE DIAGRAM FRONT OF HOUSE (FOH) TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) SEE PVE 1.6 FOR ELECTRICAL SINGLE DIAGRAM ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT ROOF ACCESS POINT TRANSITION BOX TRANSITION BOX TRANSITION BOX TRANSITION BOX TRANSITION BOX (TYP.) TRANSITION BOX TRANSITION BOX TRANSITION BOX FRONT OF HOUSE (FOH) TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) SEE PVE 1.4 FOR ELECTRICAL SINGLE DIAGRAM ROOF ACCESS POINT ROOF ACCESS POINT TRANSITION BOX FRONT OF HOUSE (FOH) TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) SEE PVE 1.5 FOR ELECTRICAL SINGLE DIAGRAM ROOF ACCESS POINT ROOF ACCESS POINT TRANSITION BOX (TYP.) FRONT OF HOUSE (FOH) TO ELECTRIC UTILITY GRID (E) SERVICE POINT AND UTILITY METERING UTILITY AC DISCONNECT SWITCH (OUTSIDE GARAGE WITHIN SIGHT FROM THE MAIN SERVICE PANEL) (N) LOAD CENTER (INSIDE GARAGE) SEE PVE 1.6 FOR ELECTRICAL SINGLE DIAGRAM ROOF ACCESS POINT ROOF ACCESS POINT TRANSITION BOX (TYP.) SHEET SO L A R M A S T E R P L A N P E R M I T P A C K A G E RE V D E S C R I P T I O N D A T E D B C B R E V I S I O N S PVA-4 E LECT R I C A L E22659 Exp. 03-31-23R EGISTERE D P R O F ESSIONAL E N G I N E ER S TATE OF CA L I F O R NIA CHI F UNG L E UN G FI L E : D - 0 1 1 4 8 9 8 - M P P P - 0 8 0 9 2 0 2 1 - S O L A R - P V A - 4 . d w g , U S E R : e c u l l a , D A T E / T I M E : A u g 1 1 , 2 0 2 1 - 4 : 5 8 p m PL A N 4 E L E V A T I O N A , B , C 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 (5 1 0 ) 5 4 0 - 0 5 5 0 TH I S D O C U M E N T C O N T A I N S P R O P R I E T A R Y I N F O R M A T I O N . R E P R O D U C T I O N , DI S C L O S U R E , O R U S E W I T H O U T S P E C I F I C W R I T T E N A U T H O R I Z A T I O N O F T H E SU N P O W E R C O R P O R A T I O N I S S T R I C T L Y F O R B I D D E N . C O R P O R A T I O N , S Y S T E M S C A L I C E N S E # : 8 9 0 8 9 5 DRAWN BY PROJECT NO. DATE DRAWN COMMUNITY ID CHECKED BY DATE CHECKED CA N T E R A BE A Z E R H O M E S - S O U T H E R N C A L I F O R N I A 31 0 C O M M E R C E S T E 1 5 0 LA Q U I N T A , C A L I F O R N I A 9 2 2 1 0 C002295 D-0114898 08-09-2021 ECULLA 08-09-2021 EOR IR V I N E , C A 9 2 6 0 2 08-09-2021 SCALE 3/32" - 1'-0" 12/09/2021 SHEET RE V D E S C R I P T I O N D A T E D B C B R E V I S I O N S NOT TO SCALE 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 (5 1 0 ) 5 4 0 - 0 5 5 0 TH I S D O C U M E N T C O N T A I N S P R O P R I E T A R Y I N F O R M A T I O N . R E P R O D U C T I O N , DI S C L O S U R E , O R U S E W I T H O U T S P E C I F I C W R I T T E N A U T H O R I Z A T I O N O F T H E SU N P O W E R C O R P O R A T I O N I S S T R I C T L Y F O R B I D D E N . C O R P O R A T I O N , S Y S T E M S C A L I C E N S E # : 8 9 0 8 9 5 DRAWN BY PROJECT DATE DRAWN OPPORTUNITY CHECKED BY DATE CHECKED CA N T E R A BE A Z E R H O M E S - S O U T H E R N C A L I F O R N I A 31 0 C O M M E R C E S T E 1 5 0 LA Q U I N T A , C A L I F O R N I A 9 2 2 1 0 C002295 D-0114898 08-09-2021 ECULLA 08-09-2021 EOR IR V I N E , C A 9 2 6 0 2 FI L E : D - 0 1 1 4 8 9 8 - M P P P - 0 8 0 9 2 0 2 1 - S O L A R - P V S - 2 . d w g , U S E R : e c u l l a , D A T E / T I M E : A u g 0 9 , 2 0 2 1 - 6 : 1 1 p m PVS-1 12/09/2021 SHEET RE V D E S C R I P T I O N D A T E D B C B R E V I S I O N S NOT TO SCALE 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 (5 1 0 ) 5 4 0 - 0 5 5 0 TH I S D O C U M E N T C O N T A I N S P R O P R I E T A R Y I N F O R M A T I O N . R E P R O D U C T I O N , DI S C L O S U R E , O R U S E W I T H O U T S P E C I F I C W R I T T E N A U T H O R I Z A T I O N O F T H E SU N P O W E R C O R P O R A T I O N I S S T R I C T L Y F O R B I D D E N . C O R P O R A T I O N , S Y S T E M S C A L I C E N S E # : 8 9 0 8 9 5 DRAWN BY PROJECT DATE DRAWN OPPORTUNITY CHECKED BY DATE CHECKED CA N T E R A BE A Z E R H O M E S - S O U T H E R N C A L I F O R N I A 31 0 C O M M E R C E S T E 1 5 0 LA Q U I N T A , C A L I F O R N I A 9 2 2 1 0 C002295 D-0114898 08-09-2021 ECULLA 08-09-2021 EOR IR V I N E , C A 9 2 6 0 2 FI L E : D - 0 1 1 4 8 9 8 - M P P P - 0 8 0 9 2 0 2 1 - S O L A R - P V S - 2 . d w g , U S E R : e c u l l a , D A T E / T I M E : A u g 0 9 , 2 0 2 1 - 6 : 1 1 p m PVS-2 12/09/2021 FIGURE A: SINGLE LINE DIAGRAM - 5.25 kWDC UTILITY BIDIRECTIONAL METER (NOT CENTER-FED)INCOMING SOURCE FEED H MCB (E)MAIN SERVICE PANEL 200A, 120/240V, 1PH, 3W GND EXISTING GND TO HOUSE LOADS BREAKERS SHALL BE INSTALLED OPPOSITE END OF THE MAIN BREAKER *MSP MAX PV BREAKER (A) = X 120% - =200A, 2P 25A, 2P 200A, 2P 200A, 2P 40A, 2P GND 3 NOTE: FOR SOLAR PHOTOVOLTAIC ONLY. NO ADDITIONAL LOADS TO BE APPLIED (N)LOAD CENTER 100A OR EQUIVALENT, 120/240V, 1PH 20A, 2P 20A, 2P TAG 1 2 3 4 5 SOURCE CIRCUIT TRANSITION BOX (N) LOAD CENTER PV PRODUCTION METER SEPARATE AC DISCONNECT DESCRIPTION SOLAR AC MODULE / BRANCH 3 4 (N) LOAD CENTER PV PRODUCTION METER AC, BRANCH 1 FIGURE C: ELECTRICAL CALCULATIONS AC, BRANCH 2 AC, SUB-PANEL #10 NUMBER OF MODULES PER BRANCH CIRCUIT 10 VOLTAGE 240 V BRANCH CURRENT: IOUT = 13.10 A MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25 16.38 A CONDUCTOR DE-RATING MAXIMUM AMBIENT TEMPERATURE 47°C TEMPERATURE ADDER 22°C TEMPERATURE USED FOR AMPACITY DE-RATING 69°C TEMPERATURE DE-RATING COEFFICIENT 0.58 FILL DE-RATING COEFFICIENT 1 IWIRE_MIN = IOUT / TEMP_COEFF / FILL_COEFF 22.59 A WIRE SIZE SELECTED BASED ON AMPACITY #10 AMPACITY AT 60C TERMINATION (>IOUT) 30 A CONDUCTOR SIZE PER NEC #10 CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP #10 0.69% OVERCURRENT PROTECTION 20A, 2P MINIMUM OCPD = IOUT x 1.25 16.38 A NEXT LARGER OCPD SIZE 20 A ROOF JCT BOX TO PV LOAD CENTER #10 NUMBER OF MODULES PER BRANCH CIRCUIT 5 VOLTAGE 240 V BRANCH CURRENT: IOUT = 6.55 A MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25 8.19 A CONDUCTOR DE-RATING MAXIMUM AMBIENT TEMPERATURE 47°C TEMPERATURE ADDER 22°C TEMPERATURE USED FOR AMPACITY DE-RATING 69°C TEMPERATURE DE-RATING COEFFICIENT 0.58 FILL DE-RATING COEFFICIENT 1 IWIRE_MIN = IOUT / TEMP_COEFF / FILL_COEFF 11.29 A WIRE SIZE SELECTED BASED ON AMPACITY #10 AMPACITY AT 60C TERMINATION (>IOUT) 30 A CONDUCTOR SIZE PER NEC #10 CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP #10 0.61% OVERCURRENT PROTECTION 20A, 2P MINIMUM OCPD = IOUT x 1.25 8.19 A NEXT LARGER OCPD SIZE 20 A #10 VOLTAGE 240 V SUM OF BRANCHES: IOUT_TOTAL = 19.65 A MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25 24.56 A CONDUCTOR DE-RATING MAXIMUM AMBIENT TEMPERATURE 47°C TEMPERATURE USED FOR AMPACITY DE-RATING 47°C TEMPERATURE DE-RATING COEFFICIENT 0.82 FILL DE-RATING COEFFICIENT 1 IWIRE_MIN = IOUT / TEMP_COEFF / FILL_COEFF 23.96 A WIRE SIZE SELECTED BASED ON AMPACITY #10 AMPACITY AT 60C TERMINATION (>IOUT) 30A CONDUCTOR SIZE PER NEC #10 CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP #10 0.20% OVERCURRENT PROTECTION 25A, 2P MINIMUM OCPD = IOUT x 1.25 24.56 A NEXT LARGER OCPD SIZE 25 A VOLTAGE DROP AT 51 FT DISTANCE VOLTAGE DROP AT 90 FT DISTANCE VOLTAGE DROP AT 10 FT DISTANCE ELECTRICAL NOTES 1. ALL SEAL TIGHT FLEXIBLE METAL CONDUIT (OR EQUIVALENT) TO BE BONDED TO GROUND AT COUPLINGS ON BOTH ENDS. 2. CONDUIT ENTRY/CONNECTION TO ELECTRICAL ENCLOSURES SHALL BE SUITABLE FOR GROUNDING AND SHALL BE SEALED AGAINST ENVIRONMENT, SUCH AS WATER, INSECTS AND RODENTS. CONDUIT SHALL NOT ENTER FROM TOP OF ELECTRICAL EQUIPMENT IN OUTDOOR LOCATIONS WITHOUT SITE-SPECIFIC APPROVAL FROM SUNPOWER. IF GRANTED APPROVAL FOR TOP ENTRY, ONLY RIGID CONDUIT WITH MEYERS HUBS TO BE USED. 3. PROPER LISTING EXPECTED FOR CONDITIONS OF USE ON ALL LUGS, FITTINGS, CRIMPS, ETC. 4. ALL CONDUIT BEND RADII TO CONFORM TO THE CEC MINIMUM BEND RADII REQUIREMENTS. 5. MINIMUM CLEARANCE SHALL BE MAINTAINED PER CEC FOR ALL NEW EQUIPMENTS TO BE INSTALLED. 6. EXISTING GROUNDING ELECTRODE SYSTEM MUST MEET CEC AND LOCAL UTILITY REQUIREMENTS. 7. COPPER CONDUCTORS SHALL BE USED UNLESS SPECIFIED. 8. TYPE NM (ROMEX) CONDUCTORS ARE ALLOWED FOR INTERNAL AND ATTIC RUNS AND SHALL BE INSTALLED MEETING CEC REQUIREMENTS. 9. AC WIRING SHALL UPSIZE IF VOLTAGE DROP EXCEEDS 2%. 10. RUN CONDUCTORS IN EXISTING CONDUIT WHEN AVAILABLE PROVIDED IT HAS NO OTHER CONDUCTORS RUNNING THROUGH IT. 11. IF MAIN SERVICE PANEL IS TO BE UPGRADED, IT WILL BE PERMITTED AND INSTALLED BY A THIRD PARTY. 12. CONDUIT SIZE BASED ON 2 BENDS MAXIMUM. ANY ADDITIONAL BENDS MAY REQUIRE UPSIZE. NOTE : x SUNPOWER 15A MONITORING BREAKER CAN BE RELOCATED TO OTHER LOAD CENTER OR SUB-PANEL WITHIN THE HOUSE FOR CONSTRUCTION FEASIBILITY. x BELOW ARE OPTIONAL OFFERINGS AND SHALL ONLY BE INSTALLED IF THE HOMEOWNER SIGNS A SPECIFIC CONTRACT WITH SUNPOWER. x SUNPOWER MONITORING SYSTEM x AS DC POWER IS INTERNAL TO THE MODULE, GROUNDING ELECTRODE CONDUCTOR (GEC) FOR THE MODULE OR ARRAY IS NOT REQUIRED. 1 2 CONDUCTOR / CONDUIT SCHEDULE DESCRIPTION & CONDUCTOR TYPE CONDUCTOR SIZE(AWG) 2 1 SUNPOWER PROVIDED AC MODULES EXTENSION CABLE, LISTED AS AN ASSEMBLY NUMBER OF CONDUCTORS CONDUIT/ CABLE TYPE CONDUIT SIZE (WHEN NEEDED) #12 TYPE-ER, PER BRANCH CIRCUIT --WITH EGCA B TAG SPR-X21-350-BLK-E-AC (240) EATON DG221URB OR EQUIVALENT LOCATED OUTSIDE WITH VISIBLE KNIFE BLADES 5 NM CABLE OR EQ INSTALLED IN WALL CAVITY --EGC BARE CU CU-NM-B 3 1 GND C C UTILITY-LOCKABLE SAFETY SWITCH 30A, 240VAC #10 #10 OPTIONAL ETHERNET CONNECTION TO DSL/CABLE MODEM CAT5e CURRENT TRANSFORMERS (100A) INSTALLED ON THE CUSTOMER SIDE OF THE PANEL 1#14 NM CABLE OR EQ INSTALLED IN WALL CAVITY #22 NMFC CU-NM-B AWG TWISTED PAIR EGC BARE CU 3 INSTALLED IN WALL CAVITY 1/2" -- PRODUCTION CURRENT TRANSFORMERS (100A) SUNPOWER MONITORING PVS6 E #14 3 D E E D #6 15A, 2P 2 A DC AC DC AC 1 SUNPOWER MODULES AC MODULE EXTENSION CABLE NM CABLE OR EQ INSTALLED IN WALL CAVITY --EGC BARE CU CU-NM-B INTEGRATED MICROINVERTER B 5 AC MODULESBRANCH CIRCUIT #2 10 AC MODULESBRANCH CIRCUIT #1 SPR-X21-350-BLK-E-AC #10 #10 SPR-X21-350-BLK-E-AC (240) EL E C T R I C A L S I N G L E L I N E D I A G R A M & S P E C I F I C A T I O N SHEET RE V D E S C R I P T I O N D A T E D B C B R E V I S I O N S NOT TO SCALE 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 (5 1 0 ) 5 4 0 - 0 5 5 0 TH I S D O C U M E N T C O N T A I N S P R O P R I E T A R Y I N F O R M A T I O N . R E P R O D U C T I O N , DI S C L O S U R E , O R U S E W I T H O U T S P E C I F I C W R I T T E N A U T H O R I Z A T I O N O F T H E SU N P O W E R C O R P O R A T I O N I S S T R I C T L Y F O R B I D D E N . C O R P O R A T I O N , S Y S T E M S C A L I C E N S E # : 8 9 0 8 9 5 SP R - X 2 1 - 3 5 0 - B L K - E - A C ( 2 4 0 ) PVE-1.1 E LECT R I C A L E22659 Exp. 03-31-23R EGISTERE D P R O F ESSIONAL E N G I N E ER S TATE OF CA L I F O R NIA CHIFUNG L E UN G DRAWN BY PROJECT NO. DATE DRAWN COMMUNITY ID CHECKED BY DATE CHECKED CA N T E R A BE A Z E R H O M E S - S O U T H E R N C A L I F O R N I A 31 0 C O M M E R C E S T E 1 5 0 LA Q U I N T A , C A L I F O R N I A 9 2 2 1 0 C002295 D-0114898 08-09-2021 ECULLA 08-09-2021 EOR IR V I N E , C A 9 2 6 0 2 08-09-2021 ROOF JCT BOX TO PV LOAD CENTER PV LOAD CENTER TO GRID-TIE WIRING 12/09/2021 FIGURE A: SINGLE LINE DIAGRAM - 5.25 kWDC UTILITY BIDIRECTIONAL METER (NOT CENTER-FED)INCOMING SOURCE FEED H MCB (E)MAIN SERVICE PANEL 200A, 120/240V, 1PH, 3W GND EXISTING GND TO HOUSE LOADS BREAKERS SHALL BE INSTALLED OPPOSITE END OF THE MAIN BREAKER *MSP MAX PV BREAKER (A) = X 120% - =200A, 2P 25A, 2P 200A, 2P 200A, 2P 40A, 2P GND 3 NOTE: FOR SOLAR PHOTOVOLTAIC ONLY. NO ADDITIONAL LOADS TO BE APPLIED (N)LOAD CENTER 100A OR EQUIVALENT, 120/240V, 1PH 20A, 2P 20A, 2P TAG 1 2 3 4 5 SOURCE CIRCUIT TRANSITION BOX (N) LOAD CENTER PV PRODUCTION METER SEPARATE AC DISCONNECT DESCRIPTION SOLAR AC MODULE / BRANCH 3 4 (N) LOAD CENTER PV PRODUCTION METER AC, BRANCH 1 FIGURE C: ELECTRICAL CALCULATIONS AC, BRANCH 2 AC, SUB-PANEL ROOF JCT BOX TO PV LOAD CENTER #10 NUMBER OF MODULES PER BRANCH CIRCUIT 9 VOLTAGE 240 V BRANCH CURRENT: IOUT = 11.79 A MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25 14.74 A CONDUCTOR DE-RATING MAXIMUM AMBIENT TEMPERATURE 47°C TEMPERATURE ADDER 22°C TEMPERATURE USED FOR AMPACITY DE-RATING 69°C TEMPERATURE DE-RATING COEFFICIENT 0.58 FILL DE-RATING COEFFICIENT 1 IWIRE_MIN = IOUT / TEMP_COEFF / FILL_COEFF 20.33 A WIRE SIZE SELECTED BASED ON AMPACITY #10 AMPACITY AT 60C TERMINATION (>IOUT) 30 A CONDUCTOR SIZE PER NEC #10 CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP #10 0.78% OVERCURRENT PROTECTION 20A, 2P MINIMUM OCPD = IOUT x 1.25 14.74 A NEXT LARGER OCPD SIZE 20 A ROOF JCT BOX TO PV LOAD CENTER #10 NUMBER OF MODULES PER BRANCH CIRCUIT 6 VOLTAGE 240 V BRANCH CURRENT: IOUT = 7.86 A MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25 9.83 A CONDUCTOR DE-RATING MAXIMUM AMBIENT TEMPERATURE 47°C TEMPERATURE ADDER 22°C TEMPERATURE USED FOR AMPACITY DE-RATING 69°C TEMPERATURE DE-RATING COEFFICIENT 0.58 FILL DE-RATING COEFFICIENT 1 IWIRE_MIN = IOUT / TEMP_COEFF / FILL_COEFF 13.55 A WIRE SIZE SELECTED BASED ON AMPACITY #10 AMPACITY AT 60C TERMINATION (>IOUT) 30 A CONDUCTOR SIZE PER NEC #10 CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP #10 0.38% OVERCURRENT PROTECTION 20A, 2P MINIMUM OCPD = IOUT x 1.25 9.83 A NEXT LARGER OCPD SIZE 20 A PV LOAD CENTER TO GRID-TIE WIRING #10 VOLTAGE 240 V SUM OF BRANCHES: IOUT_TOTAL = 19.65 A MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25 24.56 A CONDUCTOR DE-RATING MAXIMUM AMBIENT TEMPERATURE 47°C TEMPERATURE USED FOR AMPACITY DE-RATING 47°C TEMPERATURE DE-RATING COEFFICIENT 0.82 FILL DE-RATING COEFFICIENT 1 IWIRE_MIN = IOUT / TEMP_COEFF / FILL_COEFF 23.96 A WIRE SIZE SELECTED BASED ON AMPACITY #10 AMPACITY AT 60C TERMINATION (>IOUT) 30A CONDUCTOR SIZE PER NEC #10 CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP #10 0.20% OVERCURRENT PROTECTION 25A, 2P MINIMUM OCPD = IOUT x 1.25 24.56 A NEXT LARGER OCPD SIZE 25 A VOLTAGE DROP AT 64 FT DISTANCE VOLTAGE DROP AT 47 FT DISTANCE VOLTAGE DROP AT 10 FT DISTANCE ELECTRICAL NOTES 1. ALL SEAL TIGHT FLEXIBLE METAL CONDUIT (OR EQUIVALENT) TO BE BONDED TO GROUND AT COUPLINGS ON BOTH ENDS. 2. CONDUIT ENTRY/CONNECTION TO ELECTRICAL ENCLOSURES SHALL BE SUITABLE FOR GROUNDING AND SHALL BE SEALED AGAINST ENVIRONMENT, SUCH AS WATER, INSECTS AND RODENTS. CONDUIT SHALL NOT ENTER FROM TOP OF ELECTRICAL EQUIPMENT IN OUTDOOR LOCATIONS WITHOUT SITE-SPECIFIC APPROVAL FROM SUNPOWER. IF GRANTED APPROVAL FOR TOP ENTRY, ONLY RIGID CONDUIT WITH MEYERS HUBS TO BE USED. 3. PROPER LISTING EXPECTED FOR CONDITIONS OF USE ON ALL LUGS, FITTINGS, CRIMPS, ETC. 4. ALL CONDUIT BEND RADII TO CONFORM TO THE CEC MINIMUM BEND RADII REQUIREMENTS. 5. MINIMUM CLEARANCE SHALL BE MAINTAINED PER CEC FOR ALL NEW EQUIPMENTS TO BE INSTALLED. 6. EXISTING GROUNDING ELECTRODE SYSTEM MUST MEET CEC AND LOCAL UTILITY REQUIREMENTS. 7. COPPER CONDUCTORS SHALL BE USED UNLESS SPECIFIED. 8. TYPE NM (ROMEX) CONDUCTORS ARE ALLOWED FOR INTERNAL AND ATTIC RUNS AND SHALL BE INSTALLED MEETING CEC REQUIREMENTS. 9. AC WIRING SHALL UPSIZE IF VOLTAGE DROP EXCEEDS 2%. 10. RUN CONDUCTORS IN EXISTING CONDUIT WHEN AVAILABLE PROVIDED IT HAS NO OTHER CONDUCTORS RUNNING THROUGH IT. 11. IF MAIN SERVICE PANEL IS TO BE UPGRADED, IT WILL BE PERMITTED AND INSTALLED BY A THIRD PARTY. 12. CONDUIT SIZE BASED ON 2 BENDS MAXIMUM. ANY ADDITIONAL BENDS MAY REQUIRE UPSIZE. NOTE : x SUNPOWER 15A MONITORING BREAKER CAN BE RELOCATED TO OTHER LOAD CENTER OR SUB-PANEL WITHIN THE HOUSE FOR CONSTRUCTION FEASIBILITY. x BELOW ARE OPTIONAL OFFERINGS AND SHALL ONLY BE INSTALLED IF THE HOMEOWNER SIGNS A SPECIFIC CONTRACT WITH SUNPOWER. x SUNPOWER MONITORING SYSTEM x AS DC POWER IS INTERNAL TO THE MODULE, GROUNDING ELECTRODE CONDUCTOR (GEC) FOR THE MODULE OR ARRAY IS NOT REQUIRED. 1 2 CONDUCTOR / CONDUIT SCHEDULE DESCRIPTION & CONDUCTOR TYPE CONDUCTOR SIZE(AWG) 2 1 SUNPOWER PROVIDED AC MODULES EXTENSION CABLE, LISTED AS AN ASSEMBLY NUMBER OF CONDUCTORS CONDUIT/ CABLE TYPE CONDUIT SIZE (WHEN NEEDED) #12 TYPE-ER, PER BRANCH CIRCUIT --WITH EGCA B TAG SPR-X21-350-BLK-E-AC (240) EATON DG221URB OR EQUIVALENT LOCATED OUTSIDE WITH VISIBLE KNIFE BLADES 5 NM CABLE OR EQ INSTALLED IN WALL CAVITY --EGC BARE CU CU-NM-B 3 1 GND C C UTILITY-LOCKABLE SAFETY SWITCH 30A, 240VAC #10 #10 OPTIONAL ETHERNET CONNECTION TO DSL/CABLE MODEM CAT5e CURRENT TRANSFORMERS (100A) INSTALLED ON THE CUSTOMER SIDE OF THE PANEL 1#14 NM CABLE OR EQ INSTALLED IN WALL CAVITY #22 NMFC CU-NM-B AWG TWISTED PAIR EGC BARE CU 3 INSTALLED IN WALL CAVITY 1/2" -- PRODUCTION CURRENT TRANSFORMERS (100A) SUNPOWER MONITORING PVS6 E #14 3 D E E D #6 15A, 2P 2 A DC AC DC AC 1 SUNPOWER MODULES AC MODULE EXTENSION CABLE NM CABLE OR EQ INSTALLED IN WALL CAVITY --EGC BARE CU CU-NM-B INTEGRATED MICROINVERTER B 6 AC MODULESBRANCH CIRCUIT #2 9 AC MODULESBRANCH CIRCUIT #1 SPR-X21-350-BLK-E-AC #10 #10 SPR-X21-350-BLK-E-AC (240) EL E C T R I C A L S I N G L E L I N E D I A G R A M & S P E C I F I C A T I O N SHEET RE V D E S C R I P T I O N D A T E D B C B R E V I S I O N S NOT TO SCALE 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 (5 1 0 ) 5 4 0 - 0 5 5 0 TH I S D O C U M E N T C O N T A I N S P R O P R I E T A R Y I N F O R M A T I O N . R E P R O D U C T I O N , DI S C L O S U R E , O R U S E W I T H O U T S P E C I F I C W R I T T E N A U T H O R I Z A T I O N O F T H E SU N P O W E R C O R P O R A T I O N I S S T R I C T L Y F O R B I D D E N . C O R P O R A T I O N , S Y S T E M S C A L I C E N S E # : 8 9 0 8 9 5 SP R - X 2 1 - 3 5 0 - B L K - E - A C ( 2 4 0 ) PVE-1.2 E LECT R I C A L E22659 Exp. 03-31-23R EGISTERE D P R O F ESSIONAL E N G I N E ER S TATE OF CA L I F O R NIA CHI F UNG L E UN G DRAWN BY PROJECT NO. DATE DRAWN COMMUNITY ID CHECKED BY DATE CHECKED CA N T E R A BE A Z E R H O M E S - S O U T H E R N C A L I F O R N I A 31 0 C O M M E R C E S T E 1 5 0 LA Q U I N T A , C A L I F O R N I A 9 2 2 1 0 C002295 D-0114898 08-09-2021 ECULLA 08-09-2021 EOR IR V I N E , C A 9 2 6 0 2 08-09-2021 12/09/2021 FIGURE A: SINGLE LINE DIAGRAM - 5.25 kWDC UTILITY BIDIRECTIONAL METER (NOT CENTER-FED)INCOMING SOURCE FEED H MCB (E)MAIN SERVICE PANEL 200A, 120/240V, 1PH, 3W GND EXISTING GND TO HOUSE LOADS BREAKERS SHALL BE INSTALLED OPPOSITE END OF THE MAIN BREAKER *MSP MAX PV BREAKER (A) = X 120% - =200A, 2P 25A, 2P 200A, 2P 200A, 2P 40A, 2P GND 3 NOTE: FOR SOLAR PHOTOVOLTAIC ONLY. NO ADDITIONAL LOADS TO BE APPLIED (N)LOAD CENTER 100A OR EQUIVALENT, 120/240V, 1PH 20A, 2P 20A, 2P TAG 1 2 3 4 5 SOURCE CIRCUIT TRANSITION BOX (N) LOAD CENTER PV PRODUCTION METER SEPARATE AC DISCONNECT DESCRIPTION SOLAR AC MODULE / BRANCH 3 4 (N) LOAD CENTER PV PRODUCTION METER AC, BRANCH 1 FIGURE C: ELECTRICAL CALCULATIONS AC, BRANCH 2 AC, SUB-PANEL #10 NUMBER OF MODULES PER BRANCH CIRCUIT 8 VOLTAGE 240 V BRANCH CURRENT: IOUT = 10.48 A MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25 13.10 A CONDUCTOR DE-RATING MAXIMUM AMBIENT TEMPERATURE 47°C TEMPERATURE ADDER 22°C TEMPERATURE USED FOR AMPACITY DE-RATING 69°C TEMPERATURE DE-RATING COEFFICIENT 0.58 FILL DE-RATING COEFFICIENT 1 IWIRE_MIN = IOUT / TEMP_COEFF / FILL_COEFF 18.07 A WIRE SIZE SELECTED BASED ON AMPACITY #10 AMPACITY AT 60C TERMINATION (>IOUT) 30 A CONDUCTOR SIZE PER NEC #10 CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP #10 0.76% OVERCURRENT PROTECTION 20A, 2P MINIMUM OCPD = IOUT x 1.25 13.10 A NEXT LARGER OCPD SIZE 20 A #10 NUMBER OF MODULES PER BRANCH CIRCUIT 7 VOLTAGE 240 V BRANCH CURRENT: IOUT = 9.17 A MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25 11.46 A CONDUCTOR DE-RATING MAXIMUM AMBIENT TEMPERATURE 47°C TEMPERATURE ADDER 22°C TEMPERATURE USED FOR AMPACITY DE-RATING 69°C TEMPERATURE DE-RATING COEFFICIENT 0.58 FILL DE-RATING COEFFICIENT 1 IWIRE_MIN = IOUT / TEMP_COEFF / FILL_COEFF 15.81 A WIRE SIZE SELECTED BASED ON AMPACITY #10 AMPACITY AT 60C TERMINATION (>IOUT) 30 A CONDUCTOR SIZE PER NEC #10 CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP #10 0.89% OVERCURRENT PROTECTION 20A, 2P MINIMUM OCPD = IOUT x 1.25 11.46 A NEXT LARGER OCPD SIZE 20 A #10 VOLTAGE 240 V SUM OF BRANCHES: IOUT_TOTAL = 19.65 A MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25 24.56 A CONDUCTOR DE-RATING MAXIMUM AMBIENT TEMPERATURE 47°C TEMPERATURE USED FOR AMPACITY DE-RATING 47°C TEMPERATURE DE-RATING COEFFICIENT 0.82 FILL DE-RATING COEFFICIENT 1 IWIRE_MIN = IOUT / TEMP_COEFF / FILL_COEFF 23.96 A WIRE SIZE SELECTED BASED ON AMPACITY #10 AMPACITY AT 60C TERMINATION (>IOUT) 30A CONDUCTOR SIZE PER NEC #10 CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP #10 0.20% OVERCURRENT PROTECTION 25A, 2P MINIMUM OCPD = IOUT x 1.25 24.56 A NEXT LARGER OCPD SIZE 25 A VOLTAGE DROP AT 70 FT DISTANCE VOLTAGE DROP AT 94 FT DISTANCE VOLTAGE DROP AT 10 FT DISTANCE ELECTRICAL NOTES 1. ALL SEAL TIGHT FLEXIBLE METAL CONDUIT (OR EQUIVALENT) TO BE BONDED TO GROUND AT COUPLINGS ON BOTH ENDS. 2. CONDUIT ENTRY/CONNECTION TO ELECTRICAL ENCLOSURES SHALL BE SUITABLE FOR GROUNDING AND SHALL BE SEALED AGAINST ENVIRONMENT, SUCH AS WATER, INSECTS AND RODENTS. CONDUIT SHALL NOT ENTER FROM TOP OF ELECTRICAL EQUIPMENT IN OUTDOOR LOCATIONS WITHOUT SITE-SPECIFIC APPROVAL FROM SUNPOWER. IF GRANTED APPROVAL FOR TOP ENTRY, ONLY RIGID CONDUIT WITH MEYERS HUBS TO BE USED. 3. PROPER LISTING EXPECTED FOR CONDITIONS OF USE ON ALL LUGS, FITTINGS, CRIMPS, ETC. 4. ALL CONDUIT BEND RADII TO CONFORM TO THE CEC MINIMUM BEND RADII REQUIREMENTS. 5. MINIMUM CLEARANCE SHALL BE MAINTAINED PER CEC FOR ALL NEW EQUIPMENTS TO BE INSTALLED. 6. EXISTING GROUNDING ELECTRODE SYSTEM MUST MEET CEC AND LOCAL UTILITY REQUIREMENTS. 7. COPPER CONDUCTORS SHALL BE USED UNLESS SPECIFIED. 8. TYPE NM (ROMEX) CONDUCTORS ARE ALLOWED FOR INTERNAL AND ATTIC RUNS AND SHALL BE INSTALLED MEETING CEC REQUIREMENTS. 9. AC WIRING SHALL UPSIZE IF VOLTAGE DROP EXCEEDS 2%. 10. RUN CONDUCTORS IN EXISTING CONDUIT WHEN AVAILABLE PROVIDED IT HAS NO OTHER CONDUCTORS RUNNING THROUGH IT. 11. IF MAIN SERVICE PANEL IS TO BE UPGRADED, IT WILL BE PERMITTED AND INSTALLED BY A THIRD PARTY. 12. CONDUIT SIZE BASED ON 2 BENDS MAXIMUM. ANY ADDITIONAL BENDS MAY REQUIRE UPSIZE. NOTE : x SUNPOWER 15A MONITORING BREAKER CAN BE RELOCATED TO OTHER LOAD CENTER OR SUB-PANEL WITHIN THE HOUSE FOR CONSTRUCTION FEASIBILITY. x BELOW ARE OPTIONAL OFFERINGS AND SHALL ONLY BE INSTALLED IF THE HOMEOWNER SIGNS A SPECIFIC CONTRACT WITH SUNPOWER. x SUNPOWER MONITORING SYSTEM x AS DC POWER IS INTERNAL TO THE MODULE, GROUNDING ELECTRODE CONDUCTOR (GEC) FOR THE MODULE OR ARRAY IS NOT REQUIRED. 1 2 CONDUCTOR / CONDUIT SCHEDULE DESCRIPTION & CONDUCTOR TYPE CONDUCTOR SIZE(AWG) 2 1 SUNPOWER PROVIDED AC MODULES EXTENSION CABLE, LISTED AS AN ASSEMBLY NUMBER OF CONDUCTORS CONDUIT/ CABLE TYPE CONDUIT SIZE (WHEN NEEDED) #12 TYPE-ER, PER BRANCH CIRCUIT --WITH EGCA B TAG SPR-X21-350-BLK-E-AC (240) EATON DG221URB OR EQUIVALENT LOCATED OUTSIDE WITH VISIBLE KNIFE BLADES 5 NM CABLE OR EQ INSTALLED IN WALL CAVITY --EGC BARE CU CU-NM-B 3 1 GND C C UTILITY-LOCKABLE SAFETY SWITCH 30A, 240VAC #10 #10 OPTIONAL ETHERNET CONNECTION TO DSL/CABLE MODEM CAT5e CURRENT TRANSFORMERS (100A) INSTALLED ON THE CUSTOMER SIDE OF THE PANEL 1#14 NM CABLE OR EQ INSTALLED IN WALL CAVITY #22 NMFC CU-NM-B AWG TWISTED PAIR EGC BARE CU 3 INSTALLED IN WALL CAVITY 1/2" -- PRODUCTION CURRENT TRANSFORMERS (100A) SUNPOWER MONITORING PVS6 E #14 3 D E E D #6 15A, 2P 2 A DC AC DC AC 1 SUNPOWER MODULES AC MODULE EXTENSION CABLE NM CABLE OR EQ INSTALLED IN WALL CAVITY --EGC BARE CU CU-NM-B INTEGRATED MICROINVERTER B 7 AC MODULESBRANCH CIRCUIT #2 8 AC MODULESBRANCH CIRCUIT #1 SPR-X21-350-BLK-E-AC #10 #10 SPR-X21-350-BLK-E-AC (240) EL E C T R I C A L S I N G L E L I N E D I A G R A M & S P E C I F I C A T I O N SHEET RE V D E S C R I P T I O N D A T E D B C B R E V I S I O N S NOT TO SCALE 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 (5 1 0 ) 5 4 0 - 0 5 5 0 TH I S D O C U M E N T C O N T A I N S P R O P R I E T A R Y I N F O R M A T I O N . R E P R O D U C T I O N , DI S C L O S U R E , O R U S E W I T H O U T S P E C I F I C W R I T T E N A U T H O R I Z A T I O N O F T H E SU N P O W E R C O R P O R A T I O N I S S T R I C T L Y F O R B I D D E N . C O R P O R A T I O N , S Y S T E M S C A L I C E N S E # : 8 9 0 8 9 5 SP R - X 2 1 - 3 5 0 - B L K - E - A C ( 2 4 0 ) PVE-1.3 E LECT R I C A L E22659 Exp. 03-31-23R EGISTERE D P R O F ESSIONAL E N G I N E ER S TATE OF CA L I F O R NIA CHIFUNG L E UN G DRAWN BY PROJECT NO. DATE DRAWN COMMUNITY ID CHECKED BY DATE CHECKED CA N T E R A BE A Z E R H O M E S - S O U T H E R N C A L I F O R N I A 31 0 C O M M E R C E S T E 1 5 0 LA Q U I N T A , C A L I F O R N I A 9 2 2 1 0 C002295 D-0114898 08-09-2021 ECULLA 08-09-2021 EOR IR V I N E , C A 9 2 6 0 2 08-09-2021 ROOF JCT BOX TO PV LOAD CENTER ROOF JCT BOX TO PV LOAD CENTER PV LOAD CENTER TO GRID-TIE WIRING 12/09/2021 FIGURE A: SINGLE LINE DIAGRAM - 6.30 kWDC UTILITY BIDIRECTIONAL METER (NOT CENTER-FED)INCOMING SOURCE FEED H MCB (E)MAIN SERVICE PANEL 200A, 120/240V, 1PH, 3W GND EXISTING GND TO HOUSE LOADS BREAKERS SHALL BE INSTALLED OPPOSITE END OF THE MAIN BREAKER *MSP MAX PV BREAKER (A) = X 120% - =200A, 2P 30A, 2P 200A, 2P 200A, 2P 40A, 2P GND 3 NOTE: FOR SOLAR PHOTOVOLTAIC ONLY. NO ADDITIONAL LOADS TO BE APPLIED (N)LOAD CENTER 100A OR EQUIVALENT, 120/240V, 1PH 20A, 2P 20A, 2P TAG 1 2 3 4 5 SOURCE CIRCUIT TRANSITION BOX (N) LOAD CENTER PV PRODUCTION METER SEPARATE AC DISCONNECT DESCRIPTION SOLAR AC MODULE / BRANCH 3 4 (N) LOAD CENTER PV PRODUCTION METER AC, BRANCH 1 FIGURE C: ELECTRICAL CALCULATIONS AC, BRANCH 2 AC, SUB-PANEL #10 NUMBER OF MODULES PER BRANCH CIRCUIT 9 VOLTAGE 240 V BRANCH CURRENT: IOUT = 11.79 A MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25 14.74 A CONDUCTOR DE-RATING MAXIMUM AMBIENT TEMPERATURE 47°C TEMPERATURE ADDER 22°C TEMPERATURE USED FOR AMPACITY DE-RATING 69°C TEMPERATURE DE-RATING COEFFICIENT 0.58 FILL DE-RATING COEFFICIENT 1 IWIRE_MIN = IOUT / TEMP_COEFF / FILL_COEFF 20.33 A WIRE SIZE SELECTED BASED ON AMPACITY #10 AMPACITY AT 60C TERMINATION (>IOUT) 30 A CONDUCTOR SIZE PER NEC #10 CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP #10 0.84% OVERCURRENT PROTECTION 20A, 2P MINIMUM OCPD = IOUT x 1.25 14.74 A NEXT LARGER OCPD SIZE 20 A #10 NUMBER OF MODULES PER BRANCH CIRCUIT 9 VOLTAGE 240 V BRANCH CURRENT: IOUT = 11.79 A MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25 14.74 A CONDUCTOR DE-RATING MAXIMUM AMBIENT TEMPERATURE 47°C TEMPERATURE ADDER 22°C TEMPERATURE USED FOR AMPACITY DE-RATING 69°C TEMPERATURE DE-RATING COEFFICIENT 0.58 FILL DE-RATING COEFFICIENT 1 IWIRE_MIN = IOUT / TEMP_COEFF / FILL_COEFF 20.33 A WIRE SIZE SELECTED BASED ON AMPACITY #10 AMPACITY AT 60C TERMINATION (>IOUT) 30 A CONDUCTOR SIZE PER NEC #10 CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP #10 0.84% OVERCURRENT PROTECTION 20A, 2P MINIMUM OCPD = IOUT x 1.25 14.74 A NEXT LARGER OCPD SIZE 20 A #10 VOLTAGE 240 V SUM OF BRANCHES: IOUT_TOTAL = 23.58 A MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25 29.48 A CONDUCTOR DE-RATING MAXIMUM AMBIENT TEMPERATURE 47°C TEMPERATURE USED FOR AMPACITY DE-RATING 47°C TEMPERATURE DE-RATING COEFFICIENT 0.82 FILL DE-RATING COEFFICIENT 1 IWIRE_MIN = IOUT / TEMP_COEFF / FILL_COEFF 28.76 A WIRE SIZE SELECTED BASED ON AMPACITY #10 AMPACITY AT 60C TERMINATION (>IOUT) 30A CONDUCTOR SIZE PER NEC #10 CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP #10 0.24% OVERCURRENT PROTECTION 30A, 2P MINIMUM OCPD = IOUT x 1.25 29.48 A NEXT LARGER OCPD SIZE 30 A VOLTAGE DROP AT 69 FT DISTANCE VOLTAGE DROP AT 69 FT DISTANCE VOLTAGE DROP AT 10 FT DISTANCE ELECTRICAL NOTES 1. ALL SEAL TIGHT FLEXIBLE METAL CONDUIT (OR EQUIVALENT) TO BE BONDED TO GROUND AT COUPLINGS ON BOTH ENDS. 2. CONDUIT ENTRY/CONNECTION TO ELECTRICAL ENCLOSURES SHALL BE SUITABLE FOR GROUNDING AND SHALL BE SEALED AGAINST ENVIRONMENT, SUCH AS WATER, INSECTS AND RODENTS. CONDUIT SHALL NOT ENTER FROM TOP OF ELECTRICAL EQUIPMENT IN OUTDOOR LOCATIONS WITHOUT SITE-SPECIFIC APPROVAL FROM SUNPOWER. IF GRANTED APPROVAL FOR TOP ENTRY, ONLY RIGID CONDUIT WITH MEYERS HUBS TO BE USED. 3. PROPER LISTING EXPECTED FOR CONDITIONS OF USE ON ALL LUGS, FITTINGS, CRIMPS, ETC. 4. ALL CONDUIT BEND RADII TO CONFORM TO THE CEC MINIMUM BEND RADII REQUIREMENTS. 5. MINIMUM CLEARANCE SHALL BE MAINTAINED PER CEC FOR ALL NEW EQUIPMENTS TO BE INSTALLED. 6. EXISTING GROUNDING ELECTRODE SYSTEM MUST MEET CEC AND LOCAL UTILITY REQUIREMENTS. 7. COPPER CONDUCTORS SHALL BE USED UNLESS SPECIFIED. 8. TYPE NM (ROMEX) CONDUCTORS ARE ALLOWED FOR INTERNAL AND ATTIC RUNS AND SHALL BE INSTALLED MEETING CEC REQUIREMENTS. 9. AC WIRING SHALL UPSIZE IF VOLTAGE DROP EXCEEDS 2%. 10. RUN CONDUCTORS IN EXISTING CONDUIT WHEN AVAILABLE PROVIDED IT HAS NO OTHER CONDUCTORS RUNNING THROUGH IT. 11. IF MAIN SERVICE PANEL IS TO BE UPGRADED, IT WILL BE PERMITTED AND INSTALLED BY A THIRD PARTY. 12. CONDUIT SIZE BASED ON 2 BENDS MAXIMUM. ANY ADDITIONAL BENDS MAY REQUIRE UPSIZE. NOTE : x SUNPOWER 15A MONITORING BREAKER CAN BE RELOCATED TO OTHER LOAD CENTER OR SUB-PANEL WITHIN THE HOUSE FOR CONSTRUCTION FEASIBILITY. x BELOW ARE OPTIONAL OFFERINGS AND SHALL ONLY BE INSTALLED IF THE HOMEOWNER SIGNS A SPECIFIC CONTRACT WITH SUNPOWER. x SUNPOWER MONITORING SYSTEM x AS DC POWER IS INTERNAL TO THE MODULE, GROUNDING ELECTRODE CONDUCTOR (GEC) FOR THE MODULE OR ARRAY IS NOT REQUIRED. 1 2 CONDUCTOR / CONDUIT SCHEDULE DESCRIPTION & CONDUCTOR TYPE CONDUCTOR SIZE(AWG) 2 1 SUNPOWER PROVIDED AC MODULES EXTENSION CABLE, LISTED AS AN ASSEMBLY NUMBER OF CONDUCTORS CONDUIT/ CABLE TYPE CONDUIT SIZE (WHEN NEEDED) #12 TYPE-ER, PER BRANCH CIRCUIT --WITH EGCA B TAG SPR-X21-350-BLK-E-AC (240) EATON DG221URB OR EQUIVALENT LOCATED OUTSIDE WITH VISIBLE KNIFE BLADES 5 NM CABLE OR EQ INSTALLED IN WALL CAVITY --EGC BARE CU CU-NM-B 3 1 GND C C UTILITY-LOCKABLE SAFETY SWITCH 30A, 240VAC #10 #10 OPTIONAL ETHERNET CONNECTION TO DSL/CABLE MODEM CAT5e CURRENT TRANSFORMERS (100A) INSTALLED ON THE CUSTOMER SIDE OF THE PANEL 1#14 NM CABLE OR EQ INSTALLED IN WALL CAVITY #22 NMFC CU-NM-B AWG TWISTED PAIR EGC BARE CU 3 INSTALLED IN WALL CAVITY 1/2" -- PRODUCTION CURRENT TRANSFORMERS (100A) SUNPOWER MONITORING PVS6 E #14 3 D E E D #6 15A, 2P 2 A DC AC DC AC 1 SUNPOWER MODULES AC MODULE EXTENSION CABLE NM CABLE OR EQ INSTALLED IN WALL CAVITY --EGC BARE CU CU-NM-B INTEGRATED MICROINVERTER B 9 AC MODULESBRANCH CIRCUIT #2 9 AC MODULESBRANCH CIRCUIT #1 SPR-X21-350-BLK-E-AC #10 #10 SPR-X21-350-BLK-E-AC (240) EL E C T R I C A L S I N G L E L I N E D I A G R A M & S P E C I F I C A T I O N SHEET RE V D E S C R I P T I O N D A T E D B C B R E V I S I O N S NOT TO SCALE 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 (5 1 0 ) 5 4 0 - 0 5 5 0 TH I S D O C U M E N T C O N T A I N S P R O P R I E T A R Y I N F O R M A T I O N . R E P R O D U C T I O N , DI S C L O S U R E , O R U S E W I T H O U T S P E C I F I C W R I T T E N A U T H O R I Z A T I O N O F T H E SU N P O W E R C O R P O R A T I O N I S S T R I C T L Y F O R B I D D E N . C O R P O R A T I O N , S Y S T E M S C A L I C E N S E # : 8 9 0 8 9 5 SP R - X 2 1 - 3 5 0 - B L K - E - A C ( 2 4 0 ) PVE-1.4 E LECT R I C A L E22659 Exp. 03-31-23R EGISTERE D P R O F ESSIONAL E N G I N E ER S TATE OF CA L I F O R NIA CHIFUNG L E UN G DRAWN BY PROJECT NO. DATE DRAWN COMMUNITY ID CHECKED BY DATE CHECKED CA N T E R A BE A Z E R H O M E S - S O U T H E R N C A L I F O R N I A 31 0 C O M M E R C E S T E 1 5 0 LA Q U I N T A , C A L I F O R N I A 9 2 2 1 0 C002295 D-0114898 08-09-2021 ECULLA 08-09-2021 EOR IR V I N E , C A 9 2 6 0 2 08-09-2021 ROOF JCT BOX TO PV LOAD CENTER ROOF JCT BOX TO PV LOAD CENTER PV LOAD CENTER TO GRID-TIE WIRING 12/09/2021 FIGURE A: SINGLE LINE DIAGRAM - 6.30 kWDC UTILITY BIDIRECTIONAL METER (NOT CENTER-FED)INCOMING SOURCE FEED H MCB (E)MAIN SERVICE PANEL 200A, 120/240V, 1PH, 3W GND EXISTING GND TO HOUSE LOADS BREAKERS SHALL BE INSTALLED OPPOSITE END OF THE MAIN BREAKER *MSP MAX PV BREAKER (A) = X 120% - =200A, 2P 30A, 2P 200A, 2P 200A, 2P 40A, 2P GND 3 NOTE: FOR SOLAR PHOTOVOLTAIC ONLY. NO ADDITIONAL LOADS TO BE APPLIED (N)LOAD CENTER 100A OR EQUIVALENT, 120/240V, 1PH 20A, 2P 20A, 2P TAG 1 2 3 4 5 SOURCE CIRCUIT TRANSITION BOX (N) LOAD CENTER PV PRODUCTION METER SEPARATE AC DISCONNECT DESCRIPTION SOLAR AC MODULE / BRANCH 3 4 (N) LOAD CENTER PV PRODUCTION METER AC, BRANCH 1 FIGURE C: ELECTRICAL CALCULATIONS AC, BRANCH 2 AC, SUB-PANEL #10 NUMBER OF MODULES PER BRANCH CIRCUIT 12 VOLTAGE 240 V BRANCH CURRENT: IOUT = 15.75 A MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25 19.65 A CONDUCTOR DE-RATING MAXIMUM AMBIENT TEMPERATURE 47°C TEMPERATURE ADDER 22°C TEMPERATURE USED FOR AMPACITY DE-RATING 69°C TEMPERATURE DE-RATING COEFFICIENT 0.58 FILL DE-RATING COEFFICIENT 1 IWIRE_MIN = IOUT / TEMP_COEFF / FILL_COEFF 27.10 A WIRE SIZE SELECTED BASED ON AMPACITY #10 AMPACITY AT 60C TERMINATION (>IOUT) 30 A CONDUCTOR SIZE PER NEC #10 CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP #10 0.97% OVERCURRENT PROTECTION 20A, 2P MINIMUM OCPD = IOUT x 1.25 19.65 A NEXT LARGER OCPD SIZE 20 A #10 NUMBER OF MODULES PER BRANCH CIRCUIT 6 VOLTAGE 240 V BRANCH CURRENT: IOUT = 7.86 A MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25 9.83 A CONDUCTOR DE-RATING MAXIMUM AMBIENT TEMPERATURE 47°C TEMPERATURE ADDER 22°C TEMPERATURE USED FOR AMPACITY DE-RATING 69°C TEMPERATURE DE-RATING COEFFICIENT 0.58 FILL DE-RATING COEFFICIENT 1 IWIRE_MIN = IOUT / TEMP_COEFF / FILL_COEFF 20.33 A WIRE SIZE SELECTED BASED ON AMPACITY #10 AMPACITY AT 60C TERMINATION (>IOUT) 30 A CONDUCTOR SIZE PER NEC #10 CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP #10 0.35% OVERCURRENT PROTECTION 20A, 2P MINIMUM OCPD = IOUT x 1.25 9.83 A NEXT LARGER OCPD SIZE 20 A #10 VOLTAGE 240 V SUM OF BRANCHES: IOUT_TOTAL = 23.58 A MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25 29.48 A CONDUCTOR DE-RATING MAXIMUM AMBIENT TEMPERATURE 47°C TEMPERATURE USED FOR AMPACITY DE-RATING 47°C TEMPERATURE DE-RATING COEFFICIENT 0.82 FILL DE-RATING COEFFICIENT 1 IWIRE_MIN = IOUT / TEMP_COEFF / FILL_COEFF 28.76 A WIRE SIZE SELECTED BASED ON AMPACITY #10 AMPACITY AT 60C TERMINATION (>IOUT) 30A CONDUCTOR SIZE PER NEC #10 CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP #10 0.24% OVERCURRENT PROTECTION 30A, 2P MINIMUM OCPD = IOUT x 1.25 29.48 A NEXT LARGER OCPD SIZE 30 A VOLTAGE DROP AT 60 FT DISTANCE VOLTAGE DROP AT 43 FT DISTANCE VOLTAGE DROP AT 10 FT DISTANCE ELECTRICAL NOTES 1. ALL SEAL TIGHT FLEXIBLE METAL CONDUIT (OR EQUIVALENT) TO BE BONDED TO GROUND AT COUPLINGS ON BOTH ENDS. 2. CONDUIT ENTRY/CONNECTION TO ELECTRICAL ENCLOSURES SHALL BE SUITABLE FOR GROUNDING AND SHALL BE SEALED AGAINST ENVIRONMENT, SUCH AS WATER, INSECTS AND RODENTS. CONDUIT SHALL NOT ENTER FROM TOP OF ELECTRICAL EQUIPMENT IN OUTDOOR LOCATIONS WITHOUT SITE-SPECIFIC APPROVAL FROM SUNPOWER. IF GRANTED APPROVAL FOR TOP ENTRY, ONLY RIGID CONDUIT WITH MEYERS HUBS TO BE USED. 3. PROPER LISTING EXPECTED FOR CONDITIONS OF USE ON ALL LUGS, FITTINGS, CRIMPS, ETC. 4. ALL CONDUIT BEND RADII TO CONFORM TO THE CEC MINIMUM BEND RADII REQUIREMENTS. 5. MINIMUM CLEARANCE SHALL BE MAINTAINED PER CEC FOR ALL NEW EQUIPMENTS TO BE INSTALLED. 6. EXISTING GROUNDING ELECTRODE SYSTEM MUST MEET CEC AND LOCAL UTILITY REQUIREMENTS. 7. COPPER CONDUCTORS SHALL BE USED UNLESS SPECIFIED. 8. TYPE NM (ROMEX) CONDUCTORS ARE ALLOWED FOR INTERNAL AND ATTIC RUNS AND SHALL BE INSTALLED MEETING CEC REQUIREMENTS. 9. AC WIRING SHALL UPSIZE IF VOLTAGE DROP EXCEEDS 2%. 10. RUN CONDUCTORS IN EXISTING CONDUIT WHEN AVAILABLE PROVIDED IT HAS NO OTHER CONDUCTORS RUNNING THROUGH IT. 11. IF MAIN SERVICE PANEL IS TO BE UPGRADED, IT WILL BE PERMITTED AND INSTALLED BY A THIRD PARTY. 12. CONDUIT SIZE BASED ON 2 BENDS MAXIMUM. ANY ADDITIONAL BENDS MAY REQUIRE UPSIZE. NOTE : x SUNPOWER 15A MONITORING BREAKER CAN BE RELOCATED TO OTHER LOAD CENTER OR SUB-PANEL WITHIN THE HOUSE FOR CONSTRUCTION FEASIBILITY. x BELOW ARE OPTIONAL OFFERINGS AND SHALL ONLY BE INSTALLED IF THE HOMEOWNER SIGNS A SPECIFIC CONTRACT WITH SUNPOWER. x SUNPOWER MONITORING SYSTEM x AS DC POWER IS INTERNAL TO THE MODULE, GROUNDING ELECTRODE CONDUCTOR (GEC) FOR THE MODULE OR ARRAY IS NOT REQUIRED. 1 2 CONDUCTOR / CONDUIT SCHEDULE DESCRIPTION & CONDUCTOR TYPE CONDUCTOR SIZE(AWG) 2 1 SUNPOWER PROVIDED AC MODULES EXTENSION CABLE, LISTED AS AN ASSEMBLY NUMBER OF CONDUCTORS CONDUIT/ CABLE TYPE CONDUIT SIZE (WHEN NEEDED) #12 TYPE-ER, PER BRANCH CIRCUIT --WITH EGCA B TAG SPR-X21-350-BLK-E-AC (240) EATON DG221URB OR EQUIVALENT LOCATED OUTSIDE WITH VISIBLE KNIFE BLADES 5 NM CABLE OR EQ INSTALLED IN WALL CAVITY --EGC BARE CU CU-NM-B 3 1 GND C C UTILITY-LOCKABLE SAFETY SWITCH 30A, 240VAC #10 #10 OPTIONAL ETHERNET CONNECTION TO DSL/CABLE MODEM CAT5e CURRENT TRANSFORMERS (100A) INSTALLED ON THE CUSTOMER SIDE OF THE PANEL 1#14 NM CABLE OR EQ INSTALLED IN WALL CAVITY #22 NMFC CU-NM-B AWG TWISTED PAIR EGC BARE CU 3 INSTALLED IN WALL CAVITY 1/2" -- PRODUCTION CURRENT TRANSFORMERS (100A) SUNPOWER MONITORING PVS6 E #14 3 D E E D #6 15A, 2P 2 A DC AC DC AC 1 SUNPOWER MODULES AC MODULE EXTENSION CABLE NM CABLE OR EQ INSTALLED IN WALL CAVITY --EGC BARE CU CU-NM-B INTEGRATED MICROINVERTER B 6 AC MODULESBRANCH CIRCUIT #2 12 AC MODULESBRANCH CIRCUIT #1 SPR-X21-350-BLK-E-AC #10 #10 SPR-X21-350-BLK-E-AC (240) EL E C T R I C A L S I N G L E L I N E D I A G R A M & S P E C I F I C A T I O N SHEET RE V D E S C R I P T I O N D A T E D B C B R E V I S I O N S NOT TO SCALE 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 (5 1 0 ) 5 4 0 - 0 5 5 0 TH I S D O C U M E N T C O N T A I N S P R O P R I E T A R Y I N F O R M A T I O N . R E P R O D U C T I O N , DI S C L O S U R E , O R U S E W I T H O U T S P E C I F I C W R I T T E N A U T H O R I Z A T I O N O F T H E SU N P O W E R C O R P O R A T I O N I S S T R I C T L Y F O R B I D D E N . C O R P O R A T I O N , S Y S T E M S C A L I C E N S E # : 8 9 0 8 9 5 SP R - X 2 1 - 3 5 0 - B L K - E - A C ( 2 4 0 ) PVE-1.5 E LECT R I C A L E22659 Exp. 03-31-23R EGISTERE D P R O F ESSIONAL E N G I N E ER S TATE OF CA L I F O R NIA CHIFUNG L E UN G DRAWN BY PROJECT NO. DATE DRAWN COMMUNITY ID CHECKED BY DATE CHECKED CA N T E R A BE A Z E R H O M E S - S O U T H E R N C A L I F O R N I A 31 0 C O M M E R C E S T E 1 5 0 LA Q U I N T A , C A L I F O R N I A 9 2 2 1 0 C002295 D-0114898 08-09-2021 ECULLA 08-09-2021 EOR IR V I N E , C A 9 2 6 0 2 08-09-2021 ROOF JCT BOX TO PV LOAD CENTER ROOF JCT BOX TO PV LOAD CENTER PV LOAD CENTER TO GRID-TIE WIRING 12/09/2021 FIGURE A: SINGLE LINE DIAGRAM - 6.30 kWDC UTILITY BIDIRECTIONAL METER (NOT CENTER-FED)INCOMING SOURCE FEED H MCB (E)MAIN SERVICE PANEL 200A, 120/240V, 1PH, 3W GND EXISTING GND TO HOUSE LOADS BREAKERS SHALL BE INSTALLED OPPOSITE END OF THE MAIN BREAKER *MSP MAX PV BREAKER (A) = X 120% - =200A, 2P 30A, 2P 200A, 2P 200A, 2P 40A, 2P GND 3 NOTE: FOR SOLAR PHOTOVOLTAIC ONLY. NO ADDITIONAL LOADS TO BE APPLIED (N)LOAD CENTER 100A OR EQUIVALENT, 120/240V, 1PH 20A, 2P 20A, 2P TAG 1 2 3 4 5 SOURCE CIRCUIT TRANSITION BOX (N) LOAD CENTER PV PRODUCTION METER SEPARATE AC DISCONNECT DESCRIPTION SOLAR AC MODULE / BRANCH 3 4 (N) LOAD CENTER PV PRODUCTION METER AC, BRANCH 1 FIGURE C: ELECTRICAL CALCULATIONS AC, BRANCH 2 AC, SUB-PANEL #10 NUMBER OF MODULES PER BRANCH CIRCUIT 10 VOLTAGE 240 V BRANCH CURRENT: IOUT = 13.10 A MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25 16.38 A CONDUCTOR DE-RATING MAXIMUM AMBIENT TEMPERATURE 47°C TEMPERATURE ADDER 22°C TEMPERATURE USED FOR AMPACITY DE-RATING 69°C TEMPERATURE DE-RATING COEFFICIENT 0.58 FILL DE-RATING COEFFICIENT 1 IWIRE_MIN = IOUT / TEMP_COEFF / FILL_COEFF 22.59 A WIRE SIZE SELECTED BASED ON AMPACITY #10 AMPACITY AT 60C TERMINATION (>IOUT) 30 A CONDUCTOR SIZE PER NEC #10 CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP #10 0.46% OVERCURRENT PROTECTION 20A, 2P MINIMUM OCPD = IOUT x 1.25 16.38 A NEXT LARGER OCPD SIZE 20 A #10 NUMBER OF MODULES PER BRANCH CIRCUIT 8 VOLTAGE 240 V BRANCH CURRENT: IOUT = 10.48 A MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25 13.10 A CONDUCTOR DE-RATING MAXIMUM AMBIENT TEMPERATURE 47°C TEMPERATURE ADDER 22°C TEMPERATURE USED FOR AMPACITY DE-RATING 69°C TEMPERATURE DE-RATING COEFFICIENT 0.58 FILL DE-RATING COEFFICIENT 1 IWIRE_MIN = IOUT / TEMP_COEFF / FILL_COEFF 18.07 A WIRE SIZE SELECTED BASED ON AMPACITY #10 AMPACITY AT 60C TERMINATION (>IOUT) 30 A CONDUCTOR SIZE PER NEC #10 CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP #10 0.65% OVERCURRENT PROTECTION 20A, 2P MINIMUM OCPD = IOUT x 1.25 13.10 A NEXT LARGER OCPD SIZE 20 A #10 VOLTAGE 240 V SUM OF BRANCHES: IOUT_TOTAL = 23.58 A MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25 29.48 A CONDUCTOR DE-RATING MAXIMUM AMBIENT TEMPERATURE 47°C TEMPERATURE USED FOR AMPACITY DE-RATING 47°C TEMPERATURE DE-RATING COEFFICIENT 0.82 FILL DE-RATING COEFFICIENT 1 IWIRE_MIN = IOUT / TEMP_COEFF / FILL_COEFF 28.76 A WIRE SIZE SELECTED BASED ON AMPACITY #10 AMPACITY AT 60C TERMINATION (>IOUT) 30A CONDUCTOR SIZE PER NEC #10 CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP #10 0.24% OVERCURRENT PROTECTION 30A, 2P MINIMUM OCPD = IOUT x 1.25 29.48 A NEXT LARGER OCPD SIZE 30 A VOLTAGE DROP AT 34 FT DISTANCE VOLTAGE DROP AT 60 FT DISTANCE VOLTAGE DROP AT 10 FT DISTANCE ELECTRICAL NOTES 1. ALL SEAL TIGHT FLEXIBLE METAL CONDUIT (OR EQUIVALENT) TO BE BONDED TO GROUND AT COUPLINGS ON BOTH ENDS. 2. CONDUIT ENTRY/CONNECTION TO ELECTRICAL ENCLOSURES SHALL BE SUITABLE FOR GROUNDING AND SHALL BE SEALED AGAINST ENVIRONMENT, SUCH AS WATER, INSECTS AND RODENTS. CONDUIT SHALL NOT ENTER FROM TOP OF ELECTRICAL EQUIPMENT IN OUTDOOR LOCATIONS WITHOUT SITE-SPECIFIC APPROVAL FROM SUNPOWER. IF GRANTED APPROVAL FOR TOP ENTRY, ONLY RIGID CONDUIT WITH MEYERS HUBS TO BE USED. 3. PROPER LISTING EXPECTED FOR CONDITIONS OF USE ON ALL LUGS, FITTINGS, CRIMPS, ETC. 4. ALL CONDUIT BEND RADII TO CONFORM TO THE CEC MINIMUM BEND RADII REQUIREMENTS. 5. MINIMUM CLEARANCE SHALL BE MAINTAINED PER CEC FOR ALL NEW EQUIPMENTS TO BE INSTALLED. 6. EXISTING GROUNDING ELECTRODE SYSTEM MUST MEET CEC AND LOCAL UTILITY REQUIREMENTS. 7. COPPER CONDUCTORS SHALL BE USED UNLESS SPECIFIED. 8. TYPE NM (ROMEX) CONDUCTORS ARE ALLOWED FOR INTERNAL AND ATTIC RUNS AND SHALL BE INSTALLED MEETING CEC REQUIREMENTS. 9. AC WIRING SHALL UPSIZE IF VOLTAGE DROP EXCEEDS 2%. 10. RUN CONDUCTORS IN EXISTING CONDUIT WHEN AVAILABLE PROVIDED IT HAS NO OTHER CONDUCTORS RUNNING THROUGH IT. 11. IF MAIN SERVICE PANEL IS TO BE UPGRADED, IT WILL BE PERMITTED AND INSTALLED BY A THIRD PARTY. 12. CONDUIT SIZE BASED ON 2 BENDS MAXIMUM. ANY ADDITIONAL BENDS MAY REQUIRE UPSIZE. NOTE : x SUNPOWER 15A MONITORING BREAKER CAN BE RELOCATED TO OTHER LOAD CENTER OR SUB-PANEL WITHIN THE HOUSE FOR CONSTRUCTION FEASIBILITY. x BELOW ARE OPTIONAL OFFERINGS AND SHALL ONLY BE INSTALLED IF THE HOMEOWNER SIGNS A SPECIFIC CONTRACT WITH SUNPOWER. x SUNPOWER MONITORING SYSTEM x AS DC POWER IS INTERNAL TO THE MODULE, GROUNDING ELECTRODE CONDUCTOR (GEC) FOR THE MODULE OR ARRAY IS NOT REQUIRED. 1 2 CONDUCTOR / CONDUIT SCHEDULE DESCRIPTION & CONDUCTOR TYPE CONDUCTOR SIZE(AWG) 2 1 SUNPOWER PROVIDED AC MODULES EXTENSION CABLE, LISTED AS AN ASSEMBLY NUMBER OF CONDUCTORS CONDUIT/ CABLE TYPE CONDUIT SIZE (WHEN NEEDED) #12 TYPE-ER, PER BRANCH CIRCUIT --WITH EGCA B TAG SPR-X21-350-BLK-E-AC (240) EATON DG221URB OR EQUIVALENT LOCATED OUTSIDE WITH VISIBLE KNIFE BLADES 5 NM CABLE OR EQ INSTALLED IN WALL CAVITY --EGC BARE CU CU-NM-B 3 1 GND C C UTILITY-LOCKABLE SAFETY SWITCH 30A, 240VAC #10 #10 OPTIONAL ETHERNET CONNECTION TO DSL/CABLE MODEM CAT5e CURRENT TRANSFORMERS (100A) INSTALLED ON THE CUSTOMER SIDE OF THE PANEL 1#14 NM CABLE OR EQ INSTALLED IN WALL CAVITY #22 NMFC CU-NM-B AWG TWISTED PAIR EGC BARE CU 3 INSTALLED IN WALL CAVITY 1/2" -- PRODUCTION CURRENT TRANSFORMERS (100A) SUNPOWER MONITORING PVS6 E #14 3 D E E D #6 15A, 2P 2 A DC AC DC AC 1 SUNPOWER MODULES AC MODULE EXTENSION CABLE NM CABLE OR EQ INSTALLED IN WALL CAVITY --EGC BARE CU CU-NM-B INTEGRATED MICROINVERTER B 8 AC MODULESBRANCH CIRCUIT #2 10 AC MODULESBRANCH CIRCUIT #1 SPR-X21-350-BLK-E-AC #10 #10 SPR-X21-350-BLK-E-AC (240) EL E C T R I C A L S I N G L E L I N E D I A G R A M & S P E C I F I C A T I O N SHEET RE V D E S C R I P T I O N D A T E D B C B R E V I S I O N S NOT TO SCALE 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 (5 1 0 ) 5 4 0 - 0 5 5 0 TH I S D O C U M E N T C O N T A I N S P R O P R I E T A R Y I N F O R M A T I O N . R E P R O D U C T I O N , DI S C L O S U R E , O R U S E W I T H O U T S P E C I F I C W R I T T E N A U T H O R I Z A T I O N O F T H E SU N P O W E R C O R P O R A T I O N I S S T R I C T L Y F O R B I D D E N . C O R P O R A T I O N , S Y S T E M S C A L I C E N S E # : 8 9 0 8 9 5 SP R - X 2 1 - 3 5 0 - B L K - E - A C ( 2 4 0 ) PVE-1.6 E LECT R I C A L E22659 Exp. 03-31-23R EGISTERE D P R O F ESSIONAL E N G I N E ER S TATE OF CA L I F O R NIA CHIFUNG L E UN G DRAWN BY PROJECT NO. DATE DRAWN COMMUNITY ID CHECKED BY DATE CHECKED CA N T E R A BE A Z E R H O M E S - S O U T H E R N C A L I F O R N I A 31 0 C O M M E R C E S T E 1 5 0 LA Q U I N T A , C A L I F O R N I A 9 2 2 1 0 C002295 D-0114898 08-09-2021 ECULLA 08-09-2021 EOR IR V I N E , C A 9 2 6 0 2 08-09-2021 ROOF JCT BOX TO PV LOAD CENTER ROOF JCT BOX TO PV LOAD CENTER PV LOAD CENTER TO GRID-TIE WIRING 12/09/2021 FIGURE 2: WIRING ROOF PENETRATION CROSS SECTION FIGURE 1: ELECTRICAL SIGNAGES/STICKERS SIGNAGE NOTES WARNING POWER SOURCE OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE x x x TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUTDOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM x x x PHOTOVOLTAIC SYSTEM COMBINER PANEL: DO NOT ADD LOADS x x x x x x x PHOTOVOLTAIC SYSTEM AC DISCONNECT RATED AC OUTPUT CURRENT: NOMINAL OPERATING AC VOLTAGE: AMPS VOLTS AMPS VOLTS PHOTOVOLTAIC POINT OF INTERCONNECTION WARNING: ELECTIC SHOCK HAZARD. DO NOT TOUCH TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDE MAY BE ENERGIZED IN THE OPEN POSITION. FOR SERVICE DE-ENERGIZE BOTH SOURCE AND MAIN BREAKER PV POWER SOURCE MAXIMUM RATED AC OUTPUT CURRENT: MAXIMUM OPERATING AC VOLTAGE: PHOTOVOLTAIC SYSTEM AC DISCONNECT RATED AC OUTPUT CURRENT: NOMINAL OPERATING AC VOLTAGE: AMPS VOLTS AMPS VOLTS PHOTOVOLTAIC POINT OF INTERCONNECTION WARNING: ELECTIC SHOCK HAZARD. DO NOT TOUCH TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDE MAY BE ENERGIZED IN THE OPEN POSITION. FOR SERVICE DE-ENERGIZE BOTH SOURCE AND MAIN BREAKER PV POWER SOURCE MAXIMUM RATED AC OUTPUT CURRENT: MAXIMUM OPERATING AC VOLTAGE: ( kWDC) ( kWDC) ( kWDC) ( kWDC) 19.65 240 19.65 240 23.58 240 23.58 240 5.25 5.25 5.25 AC SOLAR DISCONNECT x TYPICAL DIRECTORY PLACARD EL E C T R I C A L D E T A I L S SHEET RE V D E S C R I P T I O N DA T E D B C B R E V I S I O N S NOT TO SCALE SP R - X 2 1 - 3 5 0 - B L K - E - A C ( 2 4 0 ) 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 (5 1 0 ) 5 4 0 - 0 5 5 0 TH I S D O C U M E N T C O N T A I N S P R O P R I E T A R Y I N F O R M A T I O N . R E P R O D U C T I O N , DI S C L O S U R E , O R U S E W I T H O U T S P E C I F I C W R I T T E N A U T H O R I Z A T I O N O F T H E SU N P O W E R C O R P O R A T I O N I S S T R I C T L Y F O R B I D D E N . C O R P O R A T I O N , S Y S T E M S C A L I C E N S E # : 8 9 0 8 9 5 DRAWN BY PROJECT NO. DATE DRAWN COMMUNITY ID CHECKED BY DATE CHECKED CA N T E R A BE A Z E R H O M E S - S O U T H E R N C A L I F O R N I A 31 0 C O M M E R C E S T E 1 5 0 LA Q U I N T A , C A L I F O R N I A 9 2 2 1 0 C002295 D-0116477 09-28-2021 ECULLA 09-28-2021 EOR IR V I N E , C A 9 2 6 0 2 08-09-2021 R E V I S I O N S PVE-2 PHOTOVOLTAICARRAY ON ROOF POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: CAUTION: DRIVEWAY PHOTOVOLTAICAC DISCONNECT MAIN SERVICEPANEL SOLAR LOADCENTER E LECT R I C A L E22659 Exp. 03-31-23R EGISTERE D P R O F ESSIONAL E N G I N E ER S TATE OF CA L I F O R NIA CHIFUNG L E UN G 12/09/2021 SOLADECK DATA SHEETCURRENT TRANSFORMER SPECIFICATION SHEET AC DISCONNECT DATA SHEET ROMEX SPECIFICATION SHEET P2/2 PV MODULE SPECIFICATION SHEET PG PVS6 DATASHEET 1 PVS6 DATASHEET 2 PVS6 INSTALLATION INSTRUCTIONS 1 PVS6 INSTALLATION INSTRUCTIONS 2 PV MODULE COMPLIANCE LETTER CERTIFICATE OF COMPLIANCE FOR WIRING SYSTEM AND HARNESS EL E C T R I C A L D A T A & S P E C I F I C A T I O N S SHEET RE V D E S C R I P T I O N D A T E D B C B R E V I S I O N S NOT TO SCALE SP R - X 2 1 - 3 5 0 - B L K - E - A C ( 2 4 0 ) FI L E : D - 0 1 1 4 8 9 8 - M P P P - 0 8 0 9 2 0 2 1 - S O L A R - P V E - 4 . d w g , U S E R : e c u l l a , D A T E / T I M E : A u g 0 8 , 2 0 2 1 - 1 1 : 4 3 p m 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 (5 1 0 ) 5 4 0 - 0 5 5 0 TH I S D O C U M E N T C O N T A I N S P R O P R I E T A R Y I N F O R M A T I O N . R E P R O D U C T I O N , DI S C L O S U R E , O R U S E W I T H O U T S P E C I F I C W R I T T E N A U T H O R I Z A T I O N O F T H E SU N P O W E R C O R P O R A T I O N I S S T R I C T L Y F O R B I D D E N . C O R P O R A T I O N , S Y S T E M S C A L I C E N S E # : 8 9 0 8 9 5 DRAWN BY PROJECT NO. DATE DRAWN COMMUNITY ID CHECKED BY DATE CHECKED CA N T E R A BE A Z E R H O M E S - S O U T H E R N C A L I F O R N I A 31 0 C O M M E R C E S T E 1 5 0 LA Q U I N T A , C A L I F O R N I A 9 2 2 1 0 C002295 D-0114898 08-09-2021 ECULLA 08-09-2021 EOR IR V I N E , C A 9 2 6 0 2 PVE-3